comparison doc/Test-system-interface @ 131:8e26cb57c7f8

doc/Test-system-interface: additions for Tx ramp testing
author Mychaela Falconia <falcon@freecalypso.org>
date Mon, 20 Dec 2021 03:29:23 +0000
parents 01bae2629ffd
children
comparison
equal deleted inserted replaced
130:634995d55601 131:8e26cb57c7f8
34 txpwr-cal-channel arfcn 34 txpwr-cal-channel arfcn
35 35
36 This command is used during Tx power level calibration procedures to tell the 36 This command is used during Tx power level calibration procedures to tell the
37 RF test system to switch to a different channel. 37 RF test system to switch to a different channel.
38 38
39 txpwr-cal-pcl pcl
40
41 This command is used during Tx power level calibration procedures to tell the
42 RF test system which PCL is being tested - it allows the RF test system to
43 prepare for the expected power level and select the right template for ramp
44 tolerance checking.
45
39 power-meas 46 power-meas
40 47
41 This command directs the RF test system to take a power level measurement 48 This command directs the RF test system to take a power level measurement
42 (txpwr-cal-setup must have been performed previously) and report it back to the 49 (txpwr-cal-setup must have been performed previously) and report it back to the
43 client in the response line. 50 client in the response line.
51
52 power-meas ramp
53
54 This command is the same as more basic power-meas, but it tells the TSID that
55 the client is interested not only in the power level measurement, but also needs
56 the RF test system to evaluate the ramp put out by the DUT, according to the PCL
57 template selected earlier with txpwr-cal-pcl. The response consists of the dBm
58 power measurement and a ramp status keyword, separated by white space.
59
60 A given TSID implementation may ignore the ramp keyword after power-meas and
61 always return both values, if the actual RF test instrument always returns both
62 on the same query.
44 63
45 signal-gen-setup band 64 signal-gen-setup band
46 65
47 This command is sent to the TSID to prepare the RF test system for tests in 66 This command is sent to the TSID to prepare the RF test system for tests in
48 which the latter acts as a signal generator. The argument after the command 67 which the latter acts as a signal generator. The argument after the command