FreeCalypso > hg > freecalypso-docs
view DUART28-with-FCDEV3B @ 93:7609ff4be49f
SIM-data-formats: grammar/typo fix
author | Mychaela Falconia <falcon@freecalypso.org> |
---|---|
date | Tue, 10 May 2022 06:17:08 +0000 |
parents | ac33ec9a07d9 |
children |
line wrap: on
line source
This article describes how to connect FreeCalypso DUART28 adapter to an FCDEV3B target board, both the main connection of dual UART and optional boot control connections. Main connection: dual UART ========================== The main connection of two UARTs is made with a 10-wire ribbon cable. You should have received the correct cable from Falconia Partners LLC together with your FCDEV3B+DUART28 board kit - it is a rainbow-colored 10-wire ribbon cable with two different end terminations: one end is terminated with a blue or grey IDC connector, the other end is terminated with a black connector into which individual wires are inserted from the top. The blue or grey connector goes to the DUART28, the black connector goes to the FCDEV3B. The blue or grey connector going to the DUART28 board is keyed such that it can be inserted in only one orientation, hence that one is expected to be always correct. The black connector goes to the middle of the three headers on FCDEV3B (J301), and in this case you are responsible for ensuring the correct orientation. If you are using the official DUART28 to FCDEV3B cable from Falconia Partners LLC, then the side with brown and red wires needs to be facing toward JTAG and power input connectors. Optional boot control provision =============================== If you wish to connect the optional boot control signals, connect two individual jumper wires as follows: * For PWON control, connect DUART28 CTL1 to the top pin of 2-pin header JP1 on FCDEV3B, namely the pin that is closer to the adjacent PWON button. (The other pin on JP1 is ground.) * For RESET control, connect DUART28 CTL2 to JTAG connector J310 pin 2 on FCDEV3B, which is the XDS_RESET signal. Naturally one cannot connect both DUART28 CTL2 and JTAG at the same time. * Ground connection between the two boards will normally be provided by the main dual UART cable. If you are going to connect these boot control signals, you MUST reprogram the EEPROM on your DUART28 board to the DUART28C configuration and apply the necessary DUART28C support patch to your Linux kernel ftdi_sio driver - otherwise your hardware setup will be inoperable, with FCDEV3B getting held down in reset whenever the second serial port is opened for regular serial communication.