3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 02.78

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0000 - - R99 8d1.0 CAMEL Phase 3 Service description: Stage 1 smg-28 P-99-044 noted SMG1 - - - 1999-02-25 - - 1999-08-15
A001 - C R96 5.0.0 5.1.0 Information elements between IPLMN/VPLMN and CSE smg-20 579/96 approved SMG1 3/96 306/96 - 1996-08-16 CAMEL_R96 - -
A002 1 D R96 5.0.0 5.1.0 Editorial changes smg-20 579/96 Approved SMG1 3/96 306/96 - 1996-08-19 CAMEL_R96 - 1999-08-15
A003 - C R96 5.0.0 5.1.0 Changing CLIR indication by the CSE smg-20 579/96 Approved SMG1 3/96 306/96 - 1996-08-19 CAMEL_R96 - 1999-08-15
A004 1 C R96 5.0.0 5.1.0 CSE initiated call termination smg-20 579/96 approved SMG1 3/96 - - 1996-08-20 CAMEL_R96 - -
A005 - C R96 5.0.0 5.1.0 Interaction of CAMEL and Call Forwarding smg-20 579/96 Approved SMG1 3/96 306/96 - 1996-08-21 CAMEL_R96 - 1999-08-15
A006 - C R96 5.0.0 5.1.0 Subscriber Status smg-20 579/96 Approved SMG1 3/96 306/96 - 1996-08-21 CAMEL_R96 - 1999-08-15
A007 - D R96 5.0.0 5.1.0 Editorial change for inclusion of CAMEL charging information smg-20 579/96 Approved SMG1 3/96 307/96 - 1996-08-21 CAMEL_R96 - 1999-08-15
A008 - D R96 5.0.0 5.1.0 Ambiguity of the current stage 1 smg-20 579/96 approved SMG1 3/96 373/96 - 1996-08-28 CAMEL_R96 - -
A009 - D R96 5.0.0 5.1.0 Information provided about the served subscriber smg-20 579/96 approved SMG1 3/96 361/96 - 1996-08-28 CAMEL_R96 - -
A010 - D R96 5.1.0 5.1.1 Clarification of CAMEL interaction with CLIP smg-21 286/97 approved SMG1 4/96 480/96 Agreed 1997-02-10 CAMEL_R96 - 1999-08-15
A011 - D R96 5.1.1 5.2.0 Camel Phase 1 on Time and Location smg-22 313/97 approved SMG1 - 152 - 1997-06-05 CAMEL_R96 - 1999-08-15
A012 - C R96 5.1.1 5.2.0 Camel Phase 1 Called digits * and # to be transported to CSE smg-22 303/97 approved SMG1 - 11 - 1997-06-05 CAMEL_R96 - 1999-08-15
A013 4 B R97 5.2.1 5.3.0 Camel Phase 2 and Camel Phase 1 smg-23 97-652 approved SMG1 - 97-n/a - 1997-10-02 CAMEL_R97 CR contains one change that pertains to CAMEL R96 1999-08-15
A014 - B R97 5.3.0 5.4.0 changes are purely editorial and apply to both, CAMEL R96 and R97, and result from re-organisation of the previous text or editorial improvements.No technical changes to the CAMEL phase 1 smg-24 97-977 approved SMG1 - 536 - 1997-12-15 CAMEL_R96 - 1999-08-15
A015 - F R97 5.4.0 6.0.0 Suppress announcements even when the called party number has been changed by the CSE smg-25 98-0070 approved SMG1 1/98 98-105 Agreed 1998-03-12 CAMEL_R97 - 1999-08-15
A016 - B R97 5.4.0 6.0.0 Allow CSE to send an NI alerting pattern to the IPLMN during the incoming call request procedure. smg-25 98-0070 approved SMG1 1/98 98-124 Agreed 1998-03-12 CAMEL_R97 - -
A017 - D R97 5.4.0 6.0.0 Treating GSM Forwarding and CSE Forwarding in the same way. smg-25 98-0070 approved SMG1 1/98 98-137 Agreed 1998-03-12 CAMEL_R97 - -
A018 - C R97 5.4.0 6.0.0 Removal of restriction on number of Follow-on calls and/or call re-attempts. smg-25 98-0070 approved SMG1 1/98 98-138 Agreed 1998-03-12 CAMEL_R97 - -
A019 - D R97 5.4.0 6.0.0 Editorial change of ""call segment"" to ""call period"" due to different meaning in ITU-T standards. smg-25 98-0070 approved SMG1 1/98 98-139 Agreed 1998-03-12 CAMEL_R97 - 1999-08-15
A020 - F R97 6.0.1 6.1.0 Correction of misinterpretation in Camel Phase 2 of A16 of SMG#25. smg-26 98-0323 approved SMG1 - 98-339 agreed 1998-06-09 CAMEL2 - -
A021 - F R97 6.0.1 6.1.0 Health warning of CAMEL interworking with Call Barring. smg-26 98-0323 approved SMG1 - 98-339 agreed 1998-06-11 CAMEL2 - -
A022 1 F R97 6.0.1 6.1.0 Correction and enhancement of CAMEL interworking with Call Forwarding - (PT SMG added ""PHASE 2"" following a reference to ""CAMEL"" as requested) smg-26 98-0323 approved SMG1 - 98-339 agreed 1998-06-11 CAMEL2 - 1999-08-15
A023 - F R96 5.4.0 5.5.0 Correction of CAMEL phase 1 - (PT SMG Changed # from A020 to A023 to avoid duplication!) smg-26 98-0322 approved SMG1 - 98-361 agreed 1998-06-09 CAMEL Corrected CR# from A020 to A023 -
A024 - F R96 5.5.0 5.6.0 Clarification of handling of request & notification service events smg-28 P-99-029 approved SMG1 - 98-745 agreed 1999-01-17 CAMEL - -
A025 - A R97 6.1.0 6.2.0 Clarification of handling of request & notification service events smg-28 P-99-029 approved SMG1 - 98-739 agreed 1999-01-17 CAMEL2 - 1999-08-15
A026 - D R97 6.1.0 6.2.0 Correction of scope section smg-28 P-99-029 approved SMG1 - 98-737 agreed 1999-01-17 CAMEL2 - 1999-08-15
A027 1 D R97 6.1.0 6.2.0 Interactions between CAMEL and SOR smg-28 P-99-029 approved SMG1 - 98-882 agreed 1999-01-17 CAMEL2 - 1999-08-15
A028 2 F R97 6.1.0 6.2.0 Clarification of Camel interaction with CF smg-28 P-99-029 approved SMG1 - 98-881 agreed 1999-01-17 CAMEL2 - 1999-08-15
A029 - F R97 6.1.0 6.2.0 Functional alignment with stage 2 and 3 smg-28 P-99-029 approved SMG1 - 98-738 agreed 1999-01-17 CAMEL2 - -
A030 - F R97 6.1.0 6.2.0 Tariff Switch Control smg-28 P-99-029 approved SMG1 - 98-740 agreed 1999-01-17 CAMEL2 - 1999-08-15
A031 - F R97 6.1.0 6.2.0 Alignment to CAP smg-28 P-99-029 approved SMG1 - 98-741 agreed 1999-01-17 CAMEL2 - 1999-08-15
A032 - F R97 6.1.0 6.2.0 The current text defining the treatment of criteria is open to misinterpretation smg-28 P-99-029 approved SMG1 - 98-743 agreed 1999-01-17 CAMEL2 - 1999-08-15
A033 - C R97 6.1.0 6.2.0 More flexible interpretation of a criterion smg-28 P-99-029 approved SMG1 - 98-887 agreed 1999-01-17 CAMEL2 - -
A034 - F R97 6.1.0 6.2.0 Handling of subscribed (U-CSI) and dialled (UG-CSI) USSD Strings smg-28 P-99-029 approved SMG1 - 98-888 agreed 1999-01-17 CAMEL2 - -
A035 - F R96 5.5.0 5.6.0 CSE is not able to change the presentation indicator given to the called subscriber smg-28 P-99-029 approved SMG1 - 98-889 agreed 1999-01-17 CAMEL1 - 1999-08-15
A036 - A R97 6.1.0 6.2.0 Correction of the CLIR interaction section smg-28 P-99-029 approved SMG1 - 98-890 agreed 1999-01-17 CAMEL2 - 1999-08-15
A037 - F R97 6.1.0 6.2.0 TDP and EDP’s in IPLMN. smg-28 P-99-029 approved SMG1 - 98- agreed 1999-01-20 CAMEL2 - 1999-08-15
A038 1 B R97 6.1.0 6.2.0 Addition of North American Carrier related Information to CAMEL Phase 2 smg-28 P-99-315 approved SMG1 - 98- postponed 1999-01-20 Harmonisation_CAMEL2 - -
A039 - F R96 5.5.0 5.6.0 Alignment to CAP smg-28 P-99-029 approved SMG1 - 98-744 agreed 1999-01-17 CAMEL1 - 1999-08-15
A040 - F R97 6.2.0 6.3.0 TDP and EDP’s in IPLMN. smg-29 P-99-366 approved SMG1 - 1-99-041 Agreed 1999-06-02 CAMEL - -
A041 - D R97 6.3.0 6.3.1 Introduction of a “Health Warning” on type of numbers sent by the mobile other than “unknown” or “international” SP-05 SP-99443 approved S1 - S1-99335 agreed 1999-10-18 - - -
A042 - F R97 6.4.0 6.5.0 Support of CAMEL Phase 1 and 2 SP-10 SP-000536 approved S1 S1-10 S1-000808 Agreed 2000-11-17 CAMEL2 - -
A043 - A R98 7.0.0 7.1.0 Support of CAMEL Phase 1 and 2 SP-10 SP-000536 approved S1 S1-10 S1-000809 Agreed 2000-11-17 CAMEL2 - -
A044 - F R97 6.5.0 6.6.0 Calling Party Number can not be modified by CSE SP-14 SP-010663 approved S1 S1-14 966 Agreed 2001-11-09 CAMEL2 - -
A045 - A R98 7.1.0 7.2.0 Calling Party Number can not be modified by CSE SP-14 SP-010663 approved S1 S1-14 967 Agreed 2001-11-09 CAMEL2 - -

page generated from database: 2013-10-16 10:33:00