3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 03.20

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - D Ph1 3.2.0 - Key Kc at Handover smg-23 - Approved Editor - - - 1989-06-06 - - 1999-08-15
0002 - D Ph1 3.2.0 - removing reference to Rec. GSM 03.21 smg-23 - Approved Editor - - - 1989-06-06 - - 1999-08-15
0003 - D Ph1 3.2.0 - storage of Kc in the SIM smg-23 - Approved Editor - - - 1989-06-06 - - 1999-08-15
0004 - D Ph1 3.2.0 - Ciphering key sequence number smg-23 - Approved Editor - - - 1989-06-06 - - 1999-08-15
0005 - D Ph1 3.2.0 - Authentication procedure smg-23 - Approved Editor - - - 1989-06-06 - - 1999-08-15
0006 - D Ph1 3.2.0 - Identifying method smg-23 - Approved Editor - - - 1989-06-06 - - 1999-08-15
0007 - A Ph1 3.2.2 - Maximum length of the security keys Ki and Kc smg-25b 7/90 Approved GSM3 - 16/90 Agreed 1990-01-08 - - 1999-08-15
0008 - A Ph1 3.2.2 - Length of the Authentication parameter RAND smg-25b 7/90 Approved GSM3 - 16/90 Agreed 1990-01-08 - - 1999-08-15
0009 1 E Ph1 3.3.0 - Clarification of COUNT parameter smg-28 329/90r1 Withdrawn PT12 - - - 1990-09-14 - Deferred for review in GSM3 1999-08-15
0010 2 E Ph1 3.3.1 - Format of COUNT parameter smg-29 45/91 Approved GSM3 #5 520/90 Agreed 1990-11-22 - - 1999-08-15
0011 - B Ph1 3.3.2 - Transport of Ki to HLR and VLR - - - VODAFONE nby - - 1992-03-24 - - 1999-08-15
0011 2 B Ph2 3.3.2 - Transport of Ki to HLR and VLR smg-03 342/92 Approved VODAFONE #2/92 262/92 Agreed 1992-05-11 - - 1999-08-15
0013 - B Ph2 3.3.2 - Reuse of Authentication Triplets - - - VODAFONE #2/92 263/92 Revised 1992-05-11 - - 1999-08-15
0013 1 B Ph2 - - Reuse of Authentication Triplets smg-03 342/92 Revised Vodafone #2/92 366/92 Agreed 1992-05-11 - Approved as version 2 in Tdoc SMG 385/92 1999-08-15
0013 2 B Ph2 - - Reuse of Authentification Triplets smg-03 385/92 Approved - - - - - - - 1999-08-15
0014 - B Ph2 - - Handling of TMSI reallocation failure smg-03 342/92 Approved SMG3 - 436/92 Agreed - - - 1999-08-15
0015 - C Ph2 - - Negotiation of A5 algorithm smg-03 342/92 Approved SMG3 - 437/92 Agreed - - - 1999-08-15
0015 1 C Ph2 - - Support of Multiple Ciphering and Authentification Algorithms - - - - #3/92 616/92 Revised 1992-09-18 - - 1999-08-15
0015 2 C Ph2 - - Support of Multiple Ciphering and Authentification Algorithms smg-04 451/92 Approved - #3/92 662/92 Agreed 1992-09-18 - - 1999-08-15
0016 - D Ph2 - - Editorial updating (Working version 4) smg-03 - Approved PT12 - -- - - - - 1999-08-15
0017 - D Ph2 4.1.0 - Support of multiple ciphering algorithms - - - Vodafone #4/92 - Revised 1992-11-27 - - 1999-08-15
0017 1 C Ph2 4.1.0 - Support of multiple ciphering algorithms smg-05 112/93 Revised Vodafone #4/92 702/92 Agreed 1992-11-27 - - 1999-08-15
0017 2 C Ph2 4.1.0 - Support of multiple ciphering algorithms smg-05 157/93 Approved PT12 - - - 1993-01-18 - - 1999-08-15
0018 - D Ph2 4.0.0 - Editorial Changes agreed on SMG3/WPC ad hoc Meeting in 1992 - - - Alcatel SEL #4/92 766/92 Postponed 1992-11-27 - - 1999-08-15
0019 - - Ph2 - - - - - - - - - - 1993-03-05 - - 1999-08-15
0020 2 C Ph2 4.1.0 - Purging of the MS in the HLR - - - Vodafone/Alcatel SEL #4/92 - Revised 1992-11-27 - - 1999-08-15
0020 3 C Ph2 4.1.0 - Purging of the MS in the HLR - - - Vodafone/Alcatel SEL #4/92 751/92 Revised 1992-11-27 - - 1999-08-15
0020 4 C Ph2 4.1.0 - Purging of the MS in the HLR - - - Vodafone/Alcatel SEL #4/92 929/92 Postponed 1992-11-27 - - 1999-08-15
0021 - C Ph2 4.2.0 - Different A5 Algorithms - - - France Telecom #1/93 198/93 Postponed 1993-03-05 - - 1999-08-15
0022 - D Ph2 4.2.0 - Support of multiple ciphering algorithms smg-07 453/93 Approved Vodafone #2/93 231/93 Agreed 1993-06-11 - - 1999-08-15
0023 - F Ph2 - - Editorial improvement - - - Alcatel SEL #3/93 663/93 Withdrawn 1993-09-10 - - 1999-08-15
0024 - F Ph2 4.2.2 - Error Correction and Clarifications - - - Alcatel SEL #1/94 256/94 Revised 1994-03-25 - - 1999-08-15
0024 1 F Ph2 4.2.2 4.3.0 Error Correction and Clarifications smg-10 215/94 Approved Alcatel SEL #1/94 274/94 Agreed 1994-03-25 - - 1999-08-15
0025 - F Ph2 4.2.2 4.3.0 Support of encryption algorithms smg-10 328/94 Approved PT12/SMG #1/94 --- To SMG 1994-04-11 - - 1999-08-15
0026 - F R99 8.3.0 - A5/2 removal from new MS SP-34 SP-060793 rejected Vodafone S3-45 S3-060790 agreed 2006-10-31 SEC1 see SP-060907 2006-11-27
0027 - F R99 8.3.0 8.4.0 Correction of implmentation error of A025 SP-34 SP-060907 approved MCC - - - 2006-12-04 SEC1 Correction of implementation error 2006-12-04
0028 - F R99 8.4.1 - Prohibiting A5/2 in mobile stations and other clarifications regarding A5 algorithm support - - - - S3-48 S3-070569 revised 2007-08-01 SEC1 - 2007-08-01
0028 1 F R99 8.4.1 - Prohibiting A5/2 in mobile stations and other clarifications regarding A5 algorithm support SP-37 SP-070593 revised S3 S3-48 S3-070646 agreed 2007-07-13 SEC1 - 2007-09-17
0028 2 F R99 8.4.1 8.5.0 Prohibiting A5/2 in mobile stations and other clarifications regarding A5 algorithm support SP-37 SP-070671 approved SP - - - 2007-09-18 SEC1 - 2007-09-17
0029 - F R99 8.5.0 8.6.0 Recommendation to support A5/3 and explicit prohibition of non-standard A5 algorithms in MS SP-38 SP-070784 approved S3 S3-49 S3-070887 agreed 2007-10-11 SEC1 - 2007-10-11
A001 - D Ph2 - 4.3.2 Length of ciphering key Kc for signalling and testing purposes smg-17 157/96 approved SG chairman/PT12 - - - - - - -
A002 2 B R96 4.3.2 5.3.0 Definition of ciphering for HSCSD - - Approved SMG3 WPA - 96P134 Agreed, on hold - HSCSD - 1999-08-15
A002 4 B R96 4.3.2 5.1.0 03.20-A002r4 on Definition of ciphering for HSCSD smg-21 132/97 approved SMG3 WPA Sept 96 97P043 agreed 1997-02-05 HSCSD - 1999-08-15
A003 3 F Ph2 4.3.2 4.4.0 Ciphering Algorithm(s) support (phase 2) smg-21 181/97 approved SMG3 SA 9701p 97P131 agreed 1997-02-06 - - 1999-08-15
A004 1 A R96 5.0.0 5.1.0 Ciphering Algorithm(s) support (phase 2+) smg-21 181/97 approved SMG3 SA 9701p 97P131 agreed 1997-02-06 - - 1999-08-15
A006 1 B R97 5.1.1 5.2.0 GPRS interaction with existing security mechanisms smg-23 97-778 approved SMG10 97-3 182/97 agreed 1997-10-13 GPRS - 1999-08-15
A007 1 B R97 5.1.1 5.2.0 GPRS security smg-23 97-778 approved SMG10 97-3 183/97 agreed 1997-10-13 GPRS - 1999-08-15
A010 - B R98 6.0.1 7.0.0 Proposed annex E on CTS security smg-28 P-99-117 approved SMG10 - - - 1999-02-08 CTS - 1999-08-15
A011 4 F R97 6.0.1 6.1.0 Correction of the handling of the Ciphering Key Sequence Number (CKSN) smg-29 P-99-456 approved SMG3 - N1-99354 - 1999-06-24 GPRS - 1999-08-15
A012 - A R97 6.0.1 - Clarification on security triplet re-use conditions smg-29 p-99-530 postponed SMG10 - AP99-051 agreed 1999-06-29 TEI - 1999-08-15
A013 - B R98 7.0.0 7.1.0 Introduction of CTS-FP authentication and signature generation by CTS-SN. smg-29 p-99-530 approved SMG10 - AP99-055 agreed 1999-06-29 CTS - 1999-08-15
A014 - F R98 7.0.0 7.1.0 CTS Security functions in case of license exempt frequencies smg-29 p-99-530 approved SMG10 - AP99-030 agreed 1999-06-29 CTS - -
A015 - F R96 5.2.1 - Clarification on security triplet re-use conditions smg-29 p-99-530 postponed SMG10 - AP99-050 agreed 1999-06-29 TEI - -
A016 4 F R98 7.0.0 7.1.0 Correction of the handling of the Ciphering Key Sequence Number (CKSN) smg-29 P-99-456 approved SMG3 - N1-99354 - 1999-08-19 GPRS Virtual CR: R98 CR is same as R97 CR in A011. See P-99-553 to meeting smg-30. -
A017 - B R99 7.1.0 8.0.0 Introduction of EDGE variant of A5 algorithm smg-30 P-99-743 approved SMG10 99-2 AP99-100 - 1999-08-05 EDGE - -
A018 - F R98 7.1.0 7.2.0 Clarification on security triplet re-use conditions smg-30 P-99-743 approved SMG10 99-2 AP99-112 - 1999-08-05 - - -
A019 - F R97 6.1.0 - GPRS encryption smg-31 P-00-126 postponed SMG10 - - - 2000-02-16 - - -
A020 - A R98 7.2.0 - GPRS encryption smg-31 P-00-126 postponed SMG10 - - - 2000-02-16 - - -
A021 - A R99 8.0.0 - GPRS encryption smg-31 P-00-126 postponed SMG10 - - - 2000-02-16 - - -
A022 - A R98 7.2.0 GPRS Ciphering algorithm negotiation smg-32 P-00-309 approved SMG10 - S3-000252 AGREED 2000-06-29 - Minor modification were agreed at s32 - see report -
A023 - A R99 8.0.0 GPRS Ciphering algorithm negotiation smg-32 P-00-309 approved SMG10 - S3-000252 AGREED 2000-06-29 - Minor modification were agreed at s32 - see report -
A024 - F R99 8.1.0 8.2.0 Recommendation not to support A5/2 in new terminals SP-31 SP-060046 approved S3 S3-42 S3-060146 agreed 2006-01-25 TEI Was originally marked CR A002. 2006-03-01
A025 - F R99 8.2.0 8.3.0 Clarification on A5 algorithm support SP-32 SP-060374 approved S3 S3-43 S3-060378 agreed 2006-04-06 SEC1 - 2006-06-01

page generated from database: 2013-10-16 10:33:01