3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 03.78

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0000 - - R96 2.0.0 5.0.0 CAMEL phase 1 (stage 2) smg-21 048/97 approved SMG3 WPC 9701p2 97P120 agreed 1997-01-22 CAMEL_R96 - 1999-08-15
A001 1 C R96 5.0.0 5.1.0 CallingPartyNumber in Connect smg-22 377/97 approved SMG3 WPC 9704p4 97C160 agreed 1997-06-02 CAMEL_R96 - 1999-08-15
A002 1 C R96 5.0.0 5.1.0 MSC Id for Call Reference Number smg-22 377/97 approved SMG3 WPC 9704p4 97C219 agreed 1997-06-02 CAMEL_R96 - 1999-08-15
A003 3 F R96 5.1.0 5.2.0 Alignment with stage 3 specifications (09.78 and 09.02) and clarifications smg-23 97-688 approved SMG3 WPC 9709p6 97C397 agreed 1997-09-30 CAMEL_R96 - 1999-08-15
A004 1 C R96 5.0.0 5.1.0 Introduction of value 'not Provided from VLR"" in subscriber state smg-22 377/97 approved SMG3 WPC 9704p4 97C237 agreed 1997-06-02 CAMEL_R96 - 1999-08-15
A005 1 D R96 5.0.0 5.1.0 Setting of Location Number smg-22 377/97 approved SMG3 WPC 9704p4 97C274 agreed 1997-06-02 CAMEL_R96 - -
A006 1 D R96 5.0.0 5.1.0 Clarification on handling of Connect and Continue operations smg-22 377/97 approved SMG3 WPC 9704p4 97C238 agreed 1997-06-02 CAMEL_R96 - -
A007 - C R96 5.0.0 5.1.0 Change to CAMEL phase 1 regarding * and # in Called Party Number smg-22 303/97 approved SMG3 WPC 9704p4 97C271 agreed 1997-06-02 CAMEL_R96 - -
A008 8 B R97 5.2.0 Support of CAMEL phase 2 (stage2) smg-24 97-909 noted SMG3 WPC - 97C711 - 1997-12-19 CAMEL_R97 presented for better transparency of work on CAMEL 1999-08-15
A008 E B R97 5.3.1 6.0.0 CAMEL phase 2 smg-25 98-0084 approved SMG3 WPC 9802p 98c174 agreed 1998-02-23 CAMEL_R97 - 1999-08-15
A009 4 D R96 5.2.0 5.3.0 Concentration of description of core call handling functions in 03.18, Changes to ease the documentation of new services smg-24 97-913 approved SMG3 WPC 9712p8 97C734 agreed 1997-12-06 CAMEL_R96 - 1999-08-15
A010 - F R96 5.1.0 5.2.0 Alignment subscriber status in CAMEL with MAP smg-23 97-688 approved SMG3 WPC 9709p6 97C514 agreed 1997-09-30 CAMEL_R96 - 1999-08-15
A011 - F R96 5.2.0 5.3.0 Removal of CallingPartyNumber from Connect smg-24 97-915 approved SMG3 WPC 9711p7 97C637 agreed 1997-12-06 CAMEL_R96 - -
A013 - F R96 5.2.0 5.3.0 Removal of the CalledPartyNumber for MO calls from IDP smg-24 97-915 approved SMG3 WPC 9712p8 97C652 agreed 1997-12-06 CAMEL_R96 - 1999-08-15
A014 1 F R96 5.2.0 5.3.0 Use of the CallReference Number & GMSC address in SRI smg-24 97-915 approved SMG3 WPC 9712p8 97C735 agreed 1997-12-06 CAMEL_R96 - -
A015 - F R96 5.3.1 5.4.0 Redundant definition of Location Information elements smg-25 98-0086 approved SMG3 WPC 9802p 98c090 agreed 1998-02-23 CAMEL_R96 - 1999-08-15
A016 - F R96 5.3.1 5.4.0 Corrections to CAMEL relationship description smg-25 98-0086 approved SMG3 WPC 9802p 98c165 agreed 1998-02-23 CAMEL_R96 - 1999-08-15
A017 - F R96 5.3.1 5.4.0 Correction to CAMEL phase 1 for forwarded calls smg-25 98-0086 approved SMG3 WPC 9802p 98c005 agreed 1998-02-23 CAMEL_R96, SOR - 1999-08-15
A019 2 F R97 6.0.0 6.1.0 Combination clean up on CAMEL Phase 2 smg-26 98-0410 approved SMG3 #2/98 98P126 agreed 1998-05-28 - - -
A020 1 F R96 5.4.0 5.5.0 Error handling in GSM 03.78 paragraph 8.6 smg-26 98-0404 approved SMG3 #2/98 98P115 agreed 1998-05-27 - - 1999-08-15
A021 1 A R97 6.0.0 6.1.0 Error handling in GSM 03.78 paragraph 8.6 smg-26 98-0404 approved SMG3 #2/98 98P125 agreed 1998-05-28 - - 1999-08-15
A022 - F R96 5.4.0 5.5.0 Release by A party for forwarded calls and CAMEL smg-26 98-0404 approved SMG3 #2/98 98P125 agreed 1998-03-30 - - -
A023 1 F R96 5.4.0 5.5.0 Progress is to be sent on CONNECT reception smg-26 98-0404 approved SMG3 #2/98 98P125 agreed 1998-05-26 - - 1999-08-15
A024 1 A R97 6.0.0 6.1.0 Progress is to be sent on CONNECT reception smg-26 98-0404 approved SMG3 #2/98 98P125 agreed 1998-05-26 - - 1999-08-15
A025 2 F R97 6.1.1 6.2.0 CAMEL Phase 2 stage 2 smg-27 98-0724 approved SMG3 - 98p186 - - CAMEL2 - -
A026 1 C R97 6.0.0 6.1.0 Supported CAMEL Phase indication smg-26 98-0411 approved SMG3 #2/98 98P127 agreed 1998-05-06 - - 1999-08-15
A027 - A R97 6.0.0 6.1.0 Release by A party for forwarded calls and CAMEL smg-26 98-0404 approved SMG3 #2/98 98P125 agreed 1998-05-21 - - -
A028 - C R97 6.0.0 6.1.0 GSM Forwarding Pending Indication in IDP Operation smg-26 98-0411 approved SMG3 #2/98 98P126 agreed 1998-05-28 - - -
A029 1 F R97 6.1.1 6.2.0 Corrections smg-27 98-0724 approved SMG3 - 98p206 - - CAMEL2 - -
A032 6 F R97 6.2.0 6.3.0 Correction to handling of Call Information Report smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A033 - F R96 5.5.0 5.6.0 Corrections to any Time Interrogation smg-27 98-0723 approved SMG3 - 98p206 - - CAMEL - 1999-08-15
A034 2 F R97 6.1.1 6.2.0 Interworking CAMEL with general Bearer Service smg-27 98-0724 approved SMG3 - 98p206 - - CAMEL2 - -
A037 1 C R97 6.1.1 - Removal of O_Not_Reachable and T_Not_Reachable detection points smg-27 98-0724 postponed SMG3 - 98p186 - - CAMEL2 - -
A039 1 F R97 6.2.0 6.3.0 Progress Indicator smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A040 1 F R97 6.2.0 6.3.0 SCI handling in 03.78 smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A041 3 F R97 6.2.0 6.3.0 Implicit Disarming of Detection Points smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A042 - F R97 6.2.0 6.3.0 Tariff Switch Handling Correction smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - -
A043 - C R97 6.1.1 6.2.0 GSM Forwarding Pending Indication in IDP Operation smg-27 98-0724 approved SMG3 - 98p191 - - CAMEL2 - 1999-08-15
A046 - F R97 6.2.0 6.3.0 Correction of 03.78 SDLs smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A047 1 F R96 5.6.0 5.7.0 Clarification of handling of call forwarding smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A048 2 F R97 6.2.0 6.3.0 Clarification of handling of call forwarding smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - -
A049 - F R97 6.2.0 6.3.0 Correction of the 03.78 SDLs for Reconnect in case for MTC smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A050 2 F R97 6.2.0 6.3.0 Corrections on CAMEL phase 2 stage 2 smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - -
A052 - F R97 6.2.0 6.3.0 USSD smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - -
A055 - F R97 6.2.0 6.3.0 P&C (Prompt & Collect) correction smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A056 - F R97 6.2.0 6.3.0 Use of Facility message to transport the E parameters smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A057 - C R97 6.2.0 6.3.0 Criteria for inhibiting triggering smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A058 - D R97 6.2.0 6.3.0 Clarifying description of Implicit Disarming rules smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A059 - F R97 6.2.0 6.3.0 Removal of ‘Send Calculation To SCP Indication’ smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - -
A060 1 F R97 6.2.0 6.3.0 Insertion of the handling of the call duration and of E parameters at the reception of answer in case of temporary connection smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A061 3 F R97 6.2.0 6.3.0 Timer TNRy smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - -
A063 1 B R97 6.2.0 6.3.0 Addition of North American Carrier related Information to CAMEL Phase 2 smg-28 P-99-245 approved T1P1 - - - 1999-03-05 - - 1999-08-15
A067 1 D R97 6.2.0 6.3.0 CAMEL 2 clarifications to charging issues smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - -
A069 - F R97 6.2.0 6.3.0 Interactions of CAMEL with call forwarding & call barring smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A070 1 A R97 6.3.0 6.4.0 Inclusion of Subscriber Activity Information Flow smg-29 P-99-454 approved SMG3 - N2-99217 - 1999-06-24 CAMEL2 - 1999-08-15
A072 - B R98 6.2.0 7.0.0 Introduction of WI CLI Enhancement smg-28 P-99-196 approved SMG3 - 3P99-049 - 1999-02-04 CLI_enhancements - -
A074 - F R97 6.3.0 6.4.0 Inclusion of Alerting Pattern in Provide Roaming Number (PRN) Information Flow.. smg-29 P-99-454 approved SMG3 - 3C99-275 - 1999-06-24 CAMEL2 - 1999-08-15
A075 1 F R97 6.3.0 6.4.0 Dialled Number String Format smg-29 P-99-454 approved SMG3 - N2-99225 - 1999-06-24 CAMEL2 - -
A076 2 F R97 6.3.0 6.4.0 Handling of AC/Ain DP Busy, DP No Answer and DP Route Select smg-29 P-99-454 approved SMG3 - N2-99244 - 1999-06-24 CAMEL2 - 1999-08-15
A083 - F R97 6.3.0 6.4.0 Inclusion of Activity Test IF between gsmSCF & gsmSRF and gsmSCF and assistSSF smg-29 P-99-454 approved SMG3 - 3C99-480 - 1999-06-24 CAMEL2 - 1999-08-15
A084 1 F R97 6.3.0 6.4.0 Correction of USSD Information flows smg-29 P-99-454 approved SMG3 - N2-99238 - 1999-06-24 CAMEL2 - -
A085 2 F R97 6.3.0 6.4.0 Various corrections smg-29 P-99-454 approved SMG3 - N2-99343 - 1999-06-24 CAMEL2 - 1999-08-15
A092 - F R97 6.3.0 6.4.0 Correction of CAMEL Phase interworking with Call Forwarding smg-29 P-99-454 approved SMG3 - N2-99223 - 1999-06-24 CAMEL2 - -
A093 - F R97 6.3.0 6.4.0 Renaming of Call Active Variable smg-29 P-99-454 approved SMG3 - N2-99255 - 1999-06-24 CAMEL2 - 1999-08-15
A099 - F R97 6.3.0 6.4.0 Reporting of O/T_Abandon DP when caller clears during O/T_Busy, O/T_No_Answer or Route_Select_Failure EDP-R. smg-29 P-99-454 approved SMG3 - N2-99310 - 1999-06-24 CAMEL2 - 1999-08-15
A100 1 F R97 6.3.0 6.4.0 Clarification on the scope of CAMEL Capability Handling parameter smg-29 P-99-454 approved SMG3 - N2-99338 - 1999-06-24 CAMEL2 - -
A102 - F R97 6.3.0 6.4.0 Refining trigger criteria at DP2, due to the introduction of North American Equal Access smg-29 P-99-454 approved SMG3 - N2-99458 - 1999-06-24 CAMEL2 - -
A103 - F R97 6.3.0 6.4.0 Introduction of MSISDN Parameters in Process Unstructured smg-29 P-99-454 approved SMG3 - N2-99576 - 1999-06-24 CAMEL2 - -
A104 3 F R97 6.3.0 6.4.0 MSC address in Initial DP smg-29 P-99-454 approved SMG3 - N2-99646 - 1999-06-24 CAMEL2 - 1999-08-15
A105 - F R97 6.3.0 6.4.0 Correction of gsmSDL; return to idle after ACR smg-29 P-99-454 approved SMG3 - N2-99630 - 1999-06-24 CAMEL2 - -
A106 2 F R97 6.3.0 6.4.0 Notification of call forwarding to the gsmSCF smg-29 P-99-454 approved SMG3 - N2-99638 - 1999-06-24 CAMEL2 - 1999-08-15
A107 - D R96 5.7.0 5.8.0 Health warning on MSC address in Initial DP smg-29 P-99-453 approved SMG3 - NP-99244 - 1999-06-24 CAMEL1 - 1999-08-15
A108 2 F R97 6.4.0 6.5.0 Inclusion of the SS Invocation Notification Procedure NP-05 NP-99298 approved N2 - N2-99939 agreed 1999-09-30 CAMEL2 - -
A109 2 A R98 7.1.0 7.2.0 Inclusion of the SS Invocation Notification Procedure NP-05 NP-99298 approved N2 - N2-99937 agreed 1999-09-30 CAMEL2 - -
A110 1 A R98 7.0.0 7.1.0 Inclusion of Subscriber Activity Information Flow smg-29 P-99-551 approved SMG3 - N2-99217 - 1999-06-24 CAMEL2 Virtual CR: R97 CR is same as R96 CR in A070 -
A111 - F R98 7.0.0 7.1.0 Inclusion of Alerting Pattern in Provide Roaming Number (PRN) Information Flow.. smg-29 P-99-551 approved SMG3 - 3C99-275 - 1999-06-24 CAMEL2 Virtual CR: R98 CR is same as R97 CR in A074 -
A112 1 F R98 7.0.0 7.1.0 Dialled Number String Format smg-29 P-99-551 approved SMG3 - N2-99225 - 1999-06-24 CAMEL2 Virtual CR: R98 CR is same as R97 CR in A075 1999-08-15
A113 2 F R98 7.0.0 7.1.0 Handling of AC/Ain DP Busy, DP No Answer and DP Route Select smg-29 P-99-551 approved SMG3 - N2-99244 - 1999-06-24 CAMEL2 Virtual CR: R98 CR is same as R97 CR in A076 1999-08-15
A114 - F R98 7.0.0 7.1.0 Inclusion of Activity Test IF between gsmSCF & gsmSRF and gsmSCF and assistSSF smg-29 P-99-551 approved SMG3 - 3C99-480 - 1999-06-24 CAMEL2 Virtual CR: R98 CR is same as R97 CR in A083 -
A115 1 F R98 7.0.0 7.1.0 Correction of USSD Information flows smg-29 P-99-551 approved SMG3 - N2-99238 - 1999-06-24 CAMEL2 Virtual CR: R98 CR is same as R97 CR in A084 -
A116 2 F R98 7.0.0 7.1.0 Various corrections smg-29 P-99-551 approved SMG3 - N2-99343 - 1999-06-24 CAMEL2 Virtual CR: R98 CR is same as R97 CR in A085 -
A117 - F R98 7.0.0 7.1.0 Correction of CAMEL Phase interworking with Call Forwarding smg-29 P-99-551 approved SMG3 - N2-99223 - 1999-06-24 CAMEL2 Virtual CR: R98 CR is same as R97 CR in A092 -
A118 - F R98 7.0.0 7.1.0 Renaming of Call Active Variable smg-29 P-99-551 approved SMG3 - N2-99255 - 1999-06-24 CAMEL2 Virtual CR: R98 CR is same as R97 CR in A093 -
A119 - F R98 7.0.0 7.1.0 Reporting of O/T_Abandon DP when caller clears during O/T_Busy, O/T_No_Answer or Route_Select_Failure EDP-R. smg-29 P-99-551 approved SMG3 - N2-99310 - 1999-06-24 CAMEL2 Virtual CR: R98 CR is same as R97 CR in A099 1999-08-15
A120 1 F R98 7.0.0 7.1.0 Clarification on the scope of CAMEL Capability Handling parameter smg-29 P-99-551 approved SMG3 - N2-99338 - 1999-06-24 CAMEL2 Virtual CR: R98 CR is same as R97 CR in A100 1999-08-15
A121 - F R98 7.0.0 7.1.0 Refining trigger criteria at DP2, due to the introduction of North American Equal Access smg-29 P-99-551 approved SMG3 - N2-99458 - 1999-06-24 CAMEL2 Virtual CR: R98 CR is same as R97 CR in A102 -
A122 - F R98 7.0.0 7.1.0 Introduction of MSISDN Parameters in Process Unstructured smg-29 P-99-551 approved SMG3 - N2-99576 - 1999-06-24 CAMEL2 Virtual CR: R98 CR is same as R97 CR in A103 1999-08-15
A123 3 F R98 7.0.0 7.1.0 MSC address in Initial DP smg-29 P-99-551 approved SMG3 - N2-99646 - 1999-06-24 CAMEL2 Virtual CR: R98 CR is same as R97 CR in A104 1999-08-15
A124 - F R98 7.0.0 7.1.0 Correction of gsmSDL; return to idle after ACR smg-29 P-99-551 approved SMG3 - N2-99630 - 1999-06-24 CAMEL2 Virtual CR: R98 CR is same as R97 CR in A105 1999-08-15
A125 2 F R98 7.0.0 7.1.0 Notification of call forwarding to the gsmSCF smg-29 P-99-551 approved SMG3 - N2-99638 - 1999-06-24 CAMEL2 Virtual CR: R98 CR is same as R97 CR in A106 -
A127 1 F R97 6.4.0 6.5.0 Clarification on handling of Call Reference Number and GMSC address NP-05 NP-99298 approved N2 - N2-99925 agreed 1999-09-30 CAMEL2 - -
A130 2 F R97 6.4.0 6.5.0 Alignment of CAMEL2 FCI & Handling of CIR NP-05 NP-99298 approved N2 - N2-99C85 agreed 1999-09-30 CAMEL2 - -
A132 1 F R97 6.4.0 6.5.0 Call Reference Number NP-05 NP-99298 approved N2 - N2-99C45 agreed 1999-09-30 CAMEL2 - -
A133 1 A R98 7.1.0 7.2.0 Call Reference Number NP-05 NP-99298 approved N2 - N2-99C47 agreed 1999-09-30 CAMEL2 - -
A134 - F R97 6.4.0 6.5.0 Removal of TDP-Criteria from RCH NP-05 NP-99298 approved N2 - N2-99B25 agreed 1999-09-30 CAMEL2 - -
A135 - A R98 7.1.0 7.2.0 Removal of TDP-Criteria from RCH NP-05 NP-99298 approved N2 - N2-99B26 agreed 1999-09-30 CAMEL2 - -
A136 1 F R97 6.4.0 6.5.0 GMSC CAMEL Phases in PRN NP-05 NP-99298 approved N2 - N2-99C53 agreed 1999-09-30 CAMEL2 - -
A137 1 A R98 7.1.0 7.2.0 GMSC CAMEL Phases in PRN NP-05 NP-99298 approved N2 - N2-99D11 agreed 1999-09-30 CAMEL2 - -
A138 1 D R97 6.4.0 6.5.0 Value of Call Active parameter in Aoperation - clarifications in the SDL NP-05 NP-99298 approved N2 - N2-99C55 agreed 1999-09-30 CAMEL2 - -
A141 1 F R97 6.4.0 6.5.0 Corrections of process gsmSSF SDL NP-05 NP-99298 approved N2 - N2-99C59 agreed 1999-09-30 CAMEL2 - -
A142 - A R98 7.1.0 7.2.0 Clarification on handling of Call Reference Number and GMSC address NP-05 NP-99298 approved N2 - N2-99986 agreed 1999-09-30 CAMEL2 - -
A143 - A R98 7.1.0 7.2.0 Value of Call Active parameter in Aoperation - clarifications in the SDL NP-05 NP-99298 approved N2 - N2-99D15 agreed 1999-09-30 CAMEL2 - -
A144 - A R98 7.1.0 7.2.0 Corrections of process gsmSSF SDL NP-05 NP-99298 approved N2 - N2-99C61 agreed 1999-09-30 CAMEL2 - -
A145 - A R98 7.1.0 7.2.0 Alignment of CAMEL2 FCI & Handling of CIR NP-05 NP-99298 approved N2 - N2-99C99 agreed 1999-09-30 CAMEL2 - -
A151 1 F R97 6.5.0 6.6.0 Correction of CF notification NP-07 NP-000033 approved N2 N2A-02 N2B000283 agreed 2000-05-18 CAMEL2 - -
A152 1 A R98 7.2.0 7.3.0 Correction of CF notification NP-07 NP-000033 approved N2 N2A-02 N2B000284 agreed 2000-05-18 CAMEL2 - -
A153 1 F R97 6.5.0 6.6.0 Correction on gsmSSF SDL; return to idle after ACR NP-07 NP-000033 approved N2 N2A-02 N2A000229 agreed 2000-05-18 CAMEL2 - -
A154 1 A R98 7.2.0 7.3.0 Correction on gsmSSF SDL; return to idle after ACR NP-07 NP-000033 approved N2 N2A-02 N2A000230 agreed 2000-05-18 CAMEL2 - -
A155 2 F R97 6.6.0 6.7.0 gsmSSF DP handling in CF NP-08 NP-000241 approved N2 N2-11 N2-000195 Agreed 2000-06-27 CAMEL2 - -
A156 2 A R98 7.3.0 7.4.0 gsmSSF DP handling in CF NP-08 NP-000241 approved N2 N2-11 N2-000196 Agreed 2000-06-27 CAMEL2 - -
A157 2 F R97 6.6.0 6.7.0 Usage of Announcement Suppression Indicator NP-08 NP-000240 approved N2 N2-11 N2-000247 Agreed 2000-06-27 CAMEL2 - -
A158 2 A R98 7.3.0 7.4.0 Usage of Announcement Suppression Indicator NP-08 NP-000240 approved N2 N2-11 N2-000248 Agreed 2000-06-27 CAMEL2 - -
A159 5 F R97 6.7.0 6.8.0 Correction on CF notification NP-10 NP-000614 Approved N2 N2-15 N2-000683 Agreed 2000-11-29 CAMEL2 - -
A160 5 A R98 7.4.0 7.5.0 Correction on CF notification NP-10 NP-000614 Approved N2 N2-15 N2-000684 Agreed 2000-11-29 CAMEL2 - -
A161 1 F R97 6.8.0 6.9.0 Mapping of Call Forwarding parameters from CAP-Connect to ISUP-IAM and CAP-InitialDP NP-12 NP-010309 approved N2 N2-18 N2-010379 agreed 2001-05-28 CAMEL2 0 -
A162 1 A R98 7.5.0 7.6.0 Mapping of Call Forwarding parameters from CAP-Connect to ISUP-IAM and CAP-InitialDP NP-12 NP-010309 approved N2 N2-18 N2-010380 agreed 2001-05-28 CAMEL2 0 -
A165 - F R98 7.6.1 7.7.0 Re-insertion of missing CLI box into CAMEL Release 1998 NP-14 NP-010580 approved N2 N2-20 N2-010726 agreed - CAMEL2 - -
A166 - F R97 6.9.1 6.10.0 Correction to implementation of 03.78-A141r1 NP-14 NP-010581 approved N2 N2-20 N2-010748 agreed - CAMEL2 - -
A167 1 F R97 6.9.1 6.10.0 Guidance to the SCI operation if the subscriber or the VPLMN do not support AoC service NP-14 NP-010581 approved N2 N2-20 N2-010799 agreed - CAMEL2 - -
A168 - A R98 7.6.1 7.7.0 Correction to implementation of 03.78-A141r1 NP-14 NP-010581 approved N2 N2-20 N2-010797 agreed - CAMEL2 - -
A169 - A R98 7.6.1 7.7.0 Guidance to the SCI operation if the subscriber or the VPLMN do not support AoC service NP-14 NP-010581 approved N2 N2-20 N2-010800 agreed - CAMEL2 - -
A170 - F R97 6.10.0 - Clarification in the case multiple RRBs are sent for a DP - - - N2 N2-23 N2-020377 revised 2002-04-03 CAMEL2 - -
A170 1 F R97 6.10.0 - Clarification in the case multiple RRBs are sent for a DP - - - N2 N2-23 N2-020431 revised 2002-04-03 CAMEL2 - -
A170 2 F R97 6.10.0 6.11.0 Clarification in the case multiple RRBs are sent for a DP NP-16 NP-020202 approved N2 N2-23 N2-020441 agreed 2002-04-03 CAMEL2 - -
A171 - A R98 7.7.0 - Clarification in the case multiple RRBs are sent for a DP - - - N2 N2-23 N2-020378 revised 2002-04-03 CAMEL2 - -
A171 1 A R98 7.7.0 7.8.0 Clarification in the case multiple RRBs are sent for a DP NP-16 NP-020202 approved N2 N2-23 N2-020451 agreed 2002-04-03 CAMEL2 - -
A172 - F R97 6.10.0 - Corrections to Connect To Resource Procedures - - - N2 N2-24 N2-020555 rejected 2002-05-08 CAMEL2 - -
A173 - A R98 7.7.0 - Corrections to Connect To Resource Procedures - - - N2 N2-24 N2-020556 rejected 2002-05-08 CAMEL2 - -

page generated from database: 2013-10-16 10:33:02