Go to spec numbering scheme page
3GPP TS 03.93 (click spec number to see fileserver directory for this spec)
Technical realization of Completion of Calls to Busy Subscriber (CCBS); Stage 2
.
TSG / WG responsible: C4 (click TSG/WG to see its home page)
Work item which gave rise to this spec:  -  (click WI code to see Work Item details in the Work Plan)
Work items which may have impacted this spec:  click here
CP-27: change of WG as a result of closure of CN and T.
Rapporteur: WIEHE, Ulrich Specification required for: GERAN-based systems In the table below ... ... click meeting number for meeting details; ... click spec version number to download that version; ... click SDO publication reference to download SDO transposed document. event version available remarks 1998-03-20 - 1998-06-26 1998-10-16 event version available remarks 1999-06-25
Release
Freeze meeting
Freeze date
::
remarks
SDO publications
R97
smg-26
1998-06-26
::
#25: 6.0.0 #26: 6.1.0 #27: 6.2.0 .
ETSI
click ref to download
R98
smg-29
1999-06-25
::
#29: 7.0.0 .
ETSI
click ref to download
Change Requests for this spec: click here.
Genealogy of this spec:
antecedent(s) | this spec | descendant(s) |
(no antecedents) | 03.93 |
23.093 |
page generated from database: 2013-10-16 10:25:09