Go to spec numbering scheme page
3GPP Specification Change Request records for: 04.80
CR no. | rev | cat | Release | CR written to vers | new vers | CR title | TSG meeting | TSG doc | TSG status | source | WG meeting | WG doc | WG status | cover date | work item | remarks | database record created |
0001 | 1 | D | Ph1 | 3.0.1 | - | Correction of editorial mistakes in SS coding | - | - | - | ALCATEL | - | 212/90 | Pending | 1990-05-21 | - | - | 1999-08-15 |
0002 | - | E | Ph1 | 3.0.1 | - | Minor mistakes in ASN.1 notation | smg-28 | 286/90r1 | Approved | GSM3 | - | 322/90 | Agreed | 1990-09-09 | - | #3 | 1999-08-15 |
0003 | - | A | Ph1 | 3.0.1 | - | Restrictions of Basic Encoding Rules No.1 | smg-28 | 267/90 | Approved | GSM3 | - | 329/90 | Agreed | 1990-09-14 | - | #3 | 1999-08-15 |
0004 | 1 | B | Ph2 | 3.0.1 | - | Call_Is_Waiting Indicator and Call_Hold_Indicator | smg-28 | 286/90r1 | Approved | GSM3 | - | 343/90 | Agreed | 1990-09-14 | - | #3 | 1999-08-15 |
0005 | 2 | B | Ph2 | 4.0.0 | - | ForwardChargeAdvice Operation | - | - | - | GSM3-SS | #5 | 390/90 | Agreed | 1990-09-14 | - | - | 1999-08-15 |
0005 | 3 | B | Ph2 | 4.1.0 | - | ForwardChargeAdvice Operations | smg-30 | 141/91 | Approved | GSM3 | #1/91 | - | Agreed | 1991-02-18 | - | - | 1999-08-15 |
0006 | 1 | B | Ph2 | 3.0.1 | - | Hold 3PTY and Retrieve 3PTY Operations | - | - | - | GSM3 | - | 347/90 | Agreed | 1990-09-14 | - | #3 | 1999-08-15 |
0007 | 2 | B | Ph2 | 3.0.1 | - | Three Party Indication | - | - | - | GSM3 | - | 346/90 | Agreed | 1990-09-14 | - | #3 | 1999-08-15 |
0008 | - | B | Ph2 | 3.0.1 | - | Support of Supplementary Services in connection with Short Message Service | - | - | - | GSM3 | #3 | 351/90 | Postponed | 1990-09-14 | - | - | 1999-08-15 |
0009 | - | A | Ph1 | 3.1.0 | - | Protocol discriminator | - | - | - | Telecom DK | #5 | 392/90 | Withdrawn | 1990-10-30 | - | - | 1999-08-15 |
0010 | 1 | D | Ph2 | 4.0.0 | - | Protocol discriminator | smg-29 | 75/91 | - | Telecom DK | #5 | 395/90 | Agreed | 1990-10-30 | - | - | 1999-08-15 |
0010 | 2 | D | - | - | - | Protocol discriminator | - | - | - | - | #1/91 | - | Agreed | - | - | - | 1999-08-15 |
0010 | 3 | D | Ph2 | 3.1.0 | - | Protocol discriminator | smg-31 | 228/91 | Approved | - | #2/91 | 150/91 | Agreed | - | - | - | 1999-08-15 |
0011 | - | A | Ph1 | 3.1.0 | - | Maximum length of the Facility information element | - | - | - | Telecom DK | #5 | 393/90 | Withdrawn | 1990-10-30 | - | - | 1999-08-15 |
0012 | 1 | D | Ph2 | 4.0.0 | - | Maximum length of the Facility information element | smg-29 | 75/91 | - | Telecom DK | #5 | 394/90 | Postponed | 1990-10-30 | - | - | 1999-08-15 |
0012 | 2 | D | - | - | - | Maximum length of the Facility information element | - | - | - | - | #1/91 | - | Agreed | - | - | - | 1999-08-15 |
0012 | 3 | D | Ph2 | 3.1.0 | - | Maximum length of the Facility information element | smg-31 | 228/91 | Approved | - | #2/91 | 150/91 | Agreed | - | - | - | 1999-08-15 |
0013 | - | A | Ph1 | 3.1.0 | - | Lower length limit of the Facility information element | smg-29 | 68/91 | Approved | Telecom DK | #5 | 401/90 | Agreed | 1990-10-30 | - | - | 1999-08-15 |
0014 | - | A | Ph2 | 4.0.0 | - | Lower length limit of the Facility IE in the FACILITY message | smg-29 | 75/91 | - | Telecom DK | #5 | 399/90 | Agreed | 1990-11-08 | - | - | 1999-08-15 |
0015 | - | A | Ph1 | 3.0.1 | - | Wrong maximum length on Facility IE | - | - | - | DC-Developm | #5 | 391/90 | Rejected | 1990-10-05 | - | - | 1999-08-15 |
0016 | - | D | Ph2 | 3.1.0 | - | Cause definitions for supplementary services | smg-29 | 75/91 | - | Telecom DK | #5 | 494/90 | Agreed | 1990-11-12 | - | - | 1999-08-15 |
0017 | - | E | Ph1 | 3.1.0 | - | Cause definitions for supplementary services | smg-29 | 68/91 | Approved | Telecom DK | #5 | 493/90 | Agreed | 1990-11-12 | - | - | 1999-08-15 |
0018 | 1 | B | Ph2 | 3.1.0 | - | Range of elements in Charge Advice Information | smg-31 | 228/91 | Approved | - | #2/91 | 150/91 | Agreed | - | - | - | 1999-08-15 |
0019 | - | B | Ph1 | 3.1.0 | - | Suppress SS Operation Code | - | - | - | GSM3 | #1/91 | 88/91 | - | 1990-02-16 | - | - | 1999-08-15 |
0019 | 2 | B | Ph2 | 3.1.0 | - | Suppress SS Operation Code | smg-31 | 228/91 | Approved | GSM3-SS | #2/91 | 142/91 | Agreed | - | - | - | 1999-08-15 |
0020 | - | B | Ph2 | 3.1.0 | - | Repeated Facility Information Element | smg-31 | 228/91 | Approved | SIEMENS AUSTRIA | #2/91 | 173/91 | Agreed | - | - | - | 1999-08-15 |
0021 | - | D | Ph2 | 4.3.0 | - | Deletion of un-used information elements | - | - | - | Motorola | (#4/91) | 454/91 | Revised | 1991-10-14 | - | - | 1999-08-15 |
0021 | 1 | D | Ph2 | 4.3.0 | - | Deletion of un-used information elements | - | - | - | Motorola | (#4/91) | 624/91 | Agreed | - | - | - | 1999-08-15 |
0021 | 2 | - | Ph2 | - | - | Deletion of unused data type and identifier | - | - | - | Chairman ;WPB | #1/92 | 90/92 | Revised | - | - | - | 1999-08-15 |
0021 | 3 | C | Ph2 | - | - | Deletion of unused data type and identifier | smg-02 | 129/92 | Approved | SMG3/WPB | #1/92 | - | Agreed | - | - | - | 1999-08-15 |
0022 | - | - | Ph2 | 4.3.0 | - | Hold and retrieve messages from network to MS | - | - | - | NEC | (#4/91) | 507/91 | Postponed | 1991-11-12 | - | - | 1999-08-15 |
0022 | 1 | - | Ph2 | - | - | HOLD and RETRIEVE messages from network to MS | - | - | - | NEC | ss1/92 | 8/92 | Agreed | - | - | - | 1999-08-15 |
0022 | 1 | C | Ph2 | - | - | HOLD and RETRIEVE messages from network to MS | smg-02 | 133/92 | - | Ad hoc SS | #1/92 | 22/92 | Agreed | - | - | - | 1999-08-15 |
0023 | - | B | Ph2 | 4.3.0 | - | Coding for the MPTY suppl. service | - | - | - | TELECOM DENMARK | (#4/91) | 584/91 | Postponed | 1991-11-18 | - | - | 1999-08-15 |
0023 | 1 | - | Ph2 | - | - | Coding of MPTY SS | - | - | - | Chairman ;WPB | #1/92 | 91/92 | Revised | - | - | - | 1999-08-15 |
0023 | 2 | C | Ph2 | - | - | Coding for the Multi Party Supplementary Service | smg-02 | 129/92 | Approved | SMG3/WPB | #1/92 | - | Agreed | - | - | - | 1999-08-15 |
0024 | - | - | Ph2 | - | - | Closed User Group | - | - | - | NEC | (#4/91) | 541/91 | Postponed | - | - | - | 1999-08-15 |
0025 | - | - | Ph2 | - | - | Table classifying Call Related and Call Independant Supplementary Service operations | - | - | - | Ad hoc SS | #1/92 | 23/92 | Withdrawn | - | - | - | 1999-08-15 |
0025 | - | - | Ph2 | - | - | Table classifying call related and call independent SS operations | - | - | - | Norwegian Telecom | ss1/92 | 31/92 | Postponed | - | - | - | 1999-08-15 |
0025 | 1 | - | Ph2 | - | - | Table classifying call related and call independent supplementary service operations | - | - | - | Norwegian ;Telecom ; | #1/92 | 134/92 | Revised | - | - | - | 1999-08-15 |
0025 | 2 | D | Ph2 | - | - | Table classifying Call Related and Call independent supplementary service operations | smg-02 | 129/92 | Approved | SMG3 | #1/92 | --- | Agreed | - | - | - | 1999-08-15 |
0026 | - | - | Ph2 | - | - | Inconsistencies between service and protocol | - | - | - | AD HOC | ss1/92 | 45/92 | Revised | 1992-01-10 | - | - | 1999-08-15 |
0026 | 1 | - | Ph2 | - | - | Inconsistemcies between service and protocol | - | - | - | AD HOC | ss1/92 | -- | Agreed | 1992-01-10 | - | - | 1999-08-15 |
0026 | 1 | - | Ph2 | - | - | Inconsistencies between service and protocol description | - | - | - | Ad hoc SS | #1/92 | 24/92 | Revised | - | - | - | 1999-08-15 |
0026 | 2 | D | Ph2 | - | - | Inconsistency between service and protocol | smg-02 | 129/92 | Approved | Siemens AG | #1/92 | 168/92 | Agreed | 1993-03-05 | - | - | 1999-08-15 |
0027 | - | D | Ph2 | - | - | Deletion of Supress SS operation | smg-02 | 129/92 | Approved | Chairman ;WPB | #1/92 | 92/92 | Agreed | - | - | - | 1999-08-15 |
0028 | - | - | Ph2 | - | - | Deletion of Invoke SS operation | - | - | - | Chairman ;WPB | #1/92 | 93/92 | Revised | - | - | - | 1999-08-15 |
0028 | 1 | C | Ph2 | - | - | Deletion of InvokeSS operation | smg-02 | 129/92 | Approved | SMG3/WPB | #1/92 | - | Agreed | - | - | - | 1999-08-15 |
0029 | - | D | Ph2 | - | - | Deletion of SS specific error | smg-02 | 129/92 | Approved | Chairman ;WPB | #1/92 | 94/92 | Agreed | - | - | - | 1999-08-15 |
0030 | - | - | Ph2 | - | - | Coding for CUG SS | - | - | - | Chairman ;WPB | #1/92 | 95/92 | Revised | - | - | - | 1999-08-15 |
0030 | 1 | C | Ph2 | - | - | Coding of the CUG supplementary service | smg-02 | 129/92 | Approved | SMG3/WPB | #1/92 | - | Agreed | - | - | - | 1999-08-15 |
0031 | - | C | Ph2 | - | - | Errors for Multiparty | - | - | - | NEC | #2/92 | 351/92 | Postponed | 1992-05-11 | - | - | 1999-08-15 |
0032 | - | D | Ph2 | - | - | Introduction of Protocol Evolution Rules into GSM 04.80 | - | - | - | - | #3/92 | 532/92 | Postponed | 1992-09-18 | - | - | 1999-08-15 |
0033 | - | D | Ph2 | - | - | Removal of Redudant Information | smg-04 | 448/92 | Approved | - | #3/92 | 598/92 | Agreed | 1992-09-18 | - | - | 1999-08-15 |
0034 | - | C | Ph2 | - | - | Alignment with MAP version 2 | - | - | - | - | #3/92 | 599/92 | Postponed | 1992-09-18 | - | - | 1999-08-15 |
0035 | - | C | Ph2 | - | - | Formal Improvement of ASN.1 and alignment with other TS's | smg-05 | 85/93 | Approved | SMG3-WPB | #5/92 | - | Agreed | 1992-12-21 | - | - | 1999-08-15 |
0036 | - | D | Ph2 | - | - | Clarification on indication of information elements in RELEASE COMPLETE for Call Independent SS | - | - | - | - | #1/93 | 93B009 | Revised | 1993-03-05 | - | - | 1999-08-15 |
0036 | 1 | D | Ph2 | 4.4.0 | - | Clarification on indication of information elements in RELEASE COMPLETE for Call Independent SS | - | - | - | SMG3 WPB | #1/93 | - | Revised | 1993-03-05 | - | - | 1999-08-15 |
0036 | 2 | D | Ph2 | 4.4.0 | - | Clarification on indication of information elements in RELEASE COMPLETE for Call Independent SS | smg-06 | 275/93 | Approved | PT12 | #1/93 | - | Agreed | 1993-03-05 | - | - | 1999-08-15 |
0037 | - | C | Ph2 | - | - | Formal corrections and alignment with TCAP/MAP | - | - | - | - | #1/93 | 93B040 | Revised | 1993-03-05 | - | - | 1999-08-15 |
0037 | 1 | D | Ph2 | 4.5.0 | - | Formal corrections and alignment with TCAP/MAP | smg-06 | 275/93 | Approved | Siemens | #1/93 | 68/93 | Agreed | 1993-03-05 | - | - | 1999-08-15 |
0038 | - | C | Ph2 | 4.5.0 | - | Introduction of Ellipsis Notation in section 4 | smg-07 | 444/93 | Approved | Siemens | #2/93 | 63/93 | Agreed | 1993-06-11 | - | - | 1999-08-15 |
0039 | - | D | Ph2 | 4.5.0 | - | 04.80 deletion of message formats & ref to 04.08 | - | - | - | AT&T NSI | #1/93 | 115/93 | Revised | 1993-03-05 | - | - | 1999-08-15 |
0039 | 1 | D | Ph2 | 4.5.0 | - | Deletion of message formats & ref to 04.08 | smg-06 | 275/93 | Approved | AT&T NSI | #1/93 | 153/93 | Agreed | 1993-03-05 | - | - | 1999-08-15 |
0040 | - | C | Ph2 | 4.5.0 | - | Introduction of SS version handling with SS Version indicator and SS Screening indicator | - | - | - | Vodafone/Detecon | #1/93 | 160/93 | Revised | 1993-03-05 | - | - | 1999-08-15 |
0040 | 1 | C | Ph2 | 4.5.0 | - | Introduction of SS version handling with SS Version indicator and SS Screening indicator | smg-06 | 275/93 | Approved | Vodafone/Detecon | #1/93 | 193/93 | Agreed | 1993-03-05 | - | - | 1999-08-15 |
0041 | - | D | Ph2 | 4.5.0 | - | Alignment of 04.80 messages with 04.08 | - | - | - | SMG3 WPB | #1/93 | - | Postponed | 1993-03-05 | - | - | 1999-08-15 |
0042 | - | D | Ph2 | 4.6.0 | - | Correction of 04.80 error description | - | - | - | Siemens | #2/93 | 93B063 | Revised | 1993-06-11 | - | - | 1999-08-15 |
0042 | 1 | D | Ph2 | 4.6.0 | - | Correction of 04.80 error description | smg-07 | 451/93 | Approved | SMG3-WPB | #2/93 | - | Agreed | 1993-06-11 | - | - | 1999-08-15 |
0043 | - | D | Ph2 | 4.6.0 | - | Change of possibly misleading | - | - | - | Siemens | #2/93 | 93B064 | Revised | 1993-06-11 | - | - | 1999-08-15 |
0043 | 1 | D | Ph2 | 4.6.0 | - | Change of possibly misleading | smg-07 | 451/93 | Approved | SMG3-WPB | #2/93 | - | Agreed | 1993-06-11 | - | - | 1999-08-15 |
0044 | - | D | Ph2 | 4.6.0 | - | Transfer of information from TS GSM 04.80 to GSM 04.08 | smg-07 | 443/93 | Approved | Hutchison Microtel | #2/93 | 236/93 | Agreed | 1993-06-11 | - | - | 1999-08-15 |
0045 | - | D | Ph2 | 4.6.0 | - | General Tidy-up | - | - | - | Hutchison Microtel | #2/93 | 237/93 | Revised | 1993-06-11 | - | - | 1999-08-15 |
0045 | 1 | D | Ph2 | 4.6.0 | - | General Tidy-up | - | - | - | Hutchison Microtel | #2/93 | 458/93 | Revised | 1993-06-11 | - | - | 1999-08-15 |
0045 | 2 | D | Ph2 | 4.6.0 | - | General tidy-up | smg-07 | 451/93 | Approved | SMG3 | #2/93 | 515/93 | Agreed | 1993-06-11 | - | - | 1999-08-15 |
0046 | - | C | Ph2 | 4.6.0 | - | Introduction of unstructured SS operations | - | - | - | Ericsson | #2/93 | 267/93 | Postponed | 1993-06-11 | - | - | 1999-08-15 |
0046 | 1 | C | Ph2 | - | - | Introduction of unstructured SS operations | - | - | - | Ericsson | #3/93 | 752/93 | Revised | 1993-09-10 | - | - | 1999-08-15 |
0046 | 2 | C | Ph2 | - | - | Introduction of unstructured SS operations | - | - | - | Ericsson Germany | #3/93 | 795/93 | Revised | 1993-09-10 | - | - | 1999-08-15 |
0046 | 3 | C | Ph2 | - | - | Introduction of unstructured SS operations | - | - | - | Ericsson | #3/93 | 810/93 | Postponed | 1993-09-10 | - | - | 1999-08-15 |
0046 | 4 | F | Ph2 | - | - | Introduction of phase 2 USSD | - | - | - | Ericsson | #4/93 | 979/93 | Revised | 1993-12-03 | - | - | 1999-08-15 |
0046 | 5 | F | Ph2 | - | - | Introduction of phase 2 USSD | - | - | - | Ericsson | #4/93 | A25/93 | Revised | 1993-12-03 | - | - | 1999-08-15 |
0046 | 6 | F | Ph2 | - | 4.8.0 | Introduction of phase 2 USSD | smg-09 | 98/94 | Approved | Ericsson | #4/93 | A74/93 | Agreed | 1993-12-03 | - | - | 1999-08-15 |
0047 | - | C | Ph2 | 4.6.0 | - | Deletion of the error ""SS Subscription Violation"" for the BuildMPTY operation | - | - | - | Ericsson | #2/93 | 302/93 | Revised | 1993-06-11 | - | - | 1999-08-15 |
0047 | 1 | C | Ph2 | 4.6.0 | - | Deletion of the error ""SS Subscription Violation"" for the BuildMPTY operation | smg-07 | 451/93 | Approved | SMG3-WPB | #2/93 | - | Agreed | 1993-06-11 | - | - | 1999-08-15 |
0048 | - | C | Ph2 | 4.6.0 | - | Misisng SS version Indicator in REGISTER message | - | - | - | Alcatel Sel | #2/93 | 398/93 | Withdrawn | 1993-06-11 | - | - | 1999-08-15 |
0049 | - | C | Ph2 | 4.6.0 | - | Alignment of error types descriptions to TS GSM 09.02 | smg-07 | 451/93 | Approved | Detecon | #2/93 | 468/93 | Agreed | 1993-06-11 | - | - | 1999-08-15 |
0050 | - | D | Ph2 | - | - | Correction of errors in ASN.1 and new Annex A | smg-08 | 624/93 | Approved | Siemens | #3/93 | 605/93 | Agreed | 1993-09-10 | - | - | 1999-08-15 |
0051 | - | D | Ph2 | - | - | Correction of format of FACILITY and RELEASE COMPLETE messages | - | - | - | Siemens | #3/93 | 606/93 | Withdrawn | 1993-09-10 | - | - | 1999-08-15 |
0052 | - | F | Ph2 | - | 4.8.0 | ForwardCheckSSIndication | smg-09 | 103/94 | Approved | Northern Telecom | #4/93 | 844/93 | Agreed | 1993-12-03 | - | - | 1999-08-15 |
0053 | - | F | Ph2 | - | 4.8.0 | Deletion of unnecessary imports from MAP and correction of an error in ASN.1 | smg-09 | 101/94 | Approved | Siemens AG | #4/93 | 847/93 | Agreed | 1993-12-03 | - | - | 1999-08-15 |
0054 | - | F | Ph2 | - | 4.8.0 | SS indicator corections | smg-09 | 101/94 | Approved | Vodafone | #4/93 | 974/93 | Agreed | 1993-12-03 | - | - | 1999-08-15 |
0055 | - | F | Ph2 | - | - | Timers for Call Related SS Operations | - | - | - | Northern Tlecom | #4/93 | 981/93 | Revised | 1993-12-03 | - | - | 1999-08-15 |
0055 | 1 | F | Ph2 | - | 4.8.0 | Timers for Call Releated SS Operations | smg-09 | 96/94 | Approved | Northern Telecom | #4/93 | A28/93 | Agreed | 1993-12-03 | - | - | 1999-08-15 |
0056 | - | F | Ph2 | - | - | CLIR, second default value in temporary mode | smg-09 | 19/94 | Postponed | Mannesmann Mobilfunk | #4/93 | A51/93 | Agreed | 1993-12-03 | - | - | 1999-08-15 |
0056 | 1 | F | Ph2 | - | - | CLIR, second default value in temporary mode | smg-09 | 138/94 | Postponed | Mannesmann Mobilfunk | #1/94 | 53/94 | Revised | 1994-03-25 | - | - | 1999-08-15 |
0056 | 2 | F | Ph2 | 4.8.0 | 4.9.0 | CLIR second default value in temporary mode | smg-10 | 221/94 | Approved | - | #1/94 | 209/94 | Agreed | 1994-03-25 | - | - | 1999-08-15 |
0057 | - | F | Ph2 | 4.8.0 | - | Error handling for SS operations with respect to Basic Service groups | - | - | - | Ericsson | #1/94 | 265/94 | Postponed | 1994-03-25 | - | - | 1999-08-15 |
0058 | - | D | Ph2 | - | 4.9.1 | Correction of misalignment in Facility IEI | smg-12 | 545/94 | Approved | Siemens AG | #3/94 | 590/94 | Agreed | 1994-09-02 | - | - | 1999-08-15 |
0059 | - | D | Ph2 | - | - | Editorial correction of error descriptions | - | - | - | Ericsson SA | #3/94 | 675/94 | Revised | 1994-09-02 | - | - | 1999-08-15 |
0059 | 1 | D | Ph2 | - | 4.9.1 | Editorial correction of error descriptions | smg-12 | 545/94 | Approved | Ericsson | #3/94 | 765/94 | Agreed | 1994-09-02 | - | - | 1999-08-15 |
A003 | - | D | - | - | 4.10.0 | SS screening indicator | smg-16 | 597/95 | Approved | SMG3 | #3/95 | 306/95 | agreed | 1996-06-19 | TEIions | - | 1999-08-15 |
A004 | - | F | Ph2 | - | 4.11.0 | Use of Phase 1 USSD operation by the MSC | smg-17 | 097/96 | Approved | SMG3 | - | 95P445 | Agreed | - | - | - | 1999-08-15 |
A005 | - | B | R96 | 4.11.0 | 5.0.0 | ECT signalling support | smg-18 | 304/96 | Approved | - | - | 96P049 | Agreed | - | ECT | - | 1999-08-15 |
A006 | 1 | F | R96 | 5.1.0 | 5.2.0 | Definition of ProcessUnstructuredSS-Data and its data types | smg-25 | 98-0146 | approved | SMG3 | 9802 | 98P026 | agreed | 1998-02-13 | TEI | - | 1999-08-15 |
A007 | 1 | B | R97 | - | - | Introduction of CNAP | smg-23 | 97-799 | postponed | T1P1 | - | - | - | 1997-10-15 | - | - | 1999-08-15 |
A007 | 2 | B | R97 | 5.0.1 | 5.1.0 | Changes due to Calling Name Presentation | smg-24 | 97-1048 | approved | SMG3 WPB | - | - | - | 1997-12-15 | CNAP_R97 | - | 1999-08-15 |
A007 | 2 | B | R97 | 5.0.1 | 5.1.0 | Calling Name Presentation | smg-24 | 97-1081 | approved | T1P1.5 | - | - | - | 1997-12-19 | CNAP_R97 | - | 1999-08-15 |
A010 | 2 | B | R97 | 6.0.0 | 6.1.0 | Introduction of changes in GM 04.80 due to CCBS | smg-26 | 98-0356 | approved | SMG3 | #2/98 | 98P105 | agreed | 1998-05-15 | - | - | 1999-08-15 |
A011 | 4 | B | R98 | 6.1.0 | 7.0.0 | Introduction of CD supplementary service | smg-28 | P-99-195 | approved | SMG3 | - | 3P99-032 | - | 1999-02-04 | Call_Deflection | - | 1999-08-15 |
A012 | 3 | B | R98 | 6.1.0 | 7.0.0 | Introduction of UUS | smg-28 | P-99-197 | approved | SMG3 | - | 3P99-027 | - | 1999-02-04 | UUS | - | - |
A013 | - | D | R97 | 6.1.0 | 6.1.1 | Removal of § notation from version 6 | smg-28 | P-99-219 | approved | SMG3 | - | - | agreed | 1999-02-08 | CNAP | - | 1999-08-15 |
A014 | - | D | R96 | 5.2.1 | 5.3.0 | Removal of CNAP from Release 96 specifications | smg-28 | P-99-219 | approved | SMG3 | - | - | agreed | 1999-02-08 | CNAP | - | 1999-08-15 |
A015 | - | F | R98 | 7.0.0 | 7.1.0 | Addition of LCS operations (was A060) | NP-06 | NP-99563 | approved | NS | NS-04 | NSS-99139 | agreed | 1999-12-15 | LCS | incorrectly marked on doc as A060 and version fixed | - |
A016 | 1 | F | R98 | 7.1.0 | 7.2.0 | Correction to Location Notification Type and LCS-MOLR errors | NP-07 | NP-000027 | approved | NS | NS-05 | NS-000051 | agreed | 2000-05-18 | LCS | - | - |
A017 | - | F | R98 | 7.2.0 | 7.3.0 | Correction of definition of Deflected-to number | NP-08 | NP-000288 | approved | N4 | - | N4-000305 | - | 2000-06-27 | Call_Deflection | - | - |
A018 | - | F | R98 | 7.3.0 | 7.4.0 | Addition of error type description for PositionMethodFailure | NP-09 | NP-000492 | approved | N4 | N4-04 | N4-000566 | Agreed in Seattle | 2000-09-13 | LCS | - | - |
page generated from database: 2013-10-16 10:33:04