3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 05.10

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - 4 Ph1 3.0.1 - Radio Subsystem Synchronisation smg-21 - approved WP2 - - - 1989-01-01 - - 1999-08-15
0002 - A Ph1 3.0.1 - Results of some outstanding actions on rec 05.10 smg-22 - approved WP2 - - - 1989-02-01 - - 1999-08-15
0003 - A Ph1 3.1.0 - Corrections of Omissions smg-24 304/89 approved GSM2 - - - 1989-06-16 - - 1999-08-15
0004 - B Ph1 3.1.0 - Introduction of Dummy TA smg-24 304/89 approved GSM2 - - - 1989-06-26 - - 1999-08-15
0005 - A Ph1 3.1.0 - Handling of Timing Advance at Handover smg-24 304/89 approved GSM2 - - - 1989-06-26 - - 1999-08-15
0006 - C Ph1 3.1.0 - Introduction of the Pseudo-Synchronization Scheme smg-24 - approved GSM2 - - - 1989-07-24 - - 1999-08-15
0006 1 - Ph2 3.5.0 - Pseudo synchronisation smg-01 54/92 Approved GSM2 - - - 1992-01-09 - - 1999-08-15
0007 - A Ph1 3.2.0 - Accuracy of Timing Information of Neighbouring BS's Stored in an MS smg-25 442/89 approved UK - - - 1989-10-26 - - 1999-08-15
0008 - A Ph1 3.3.0 - Received signal timing jumps, reception gaps and handover timings smg-26 75/90 approved GSM 2 - - - 1990-02-28 - agreed for phase 1 1999-08-15
0009 - E Ph1 3.4.0 3.05.00 Clarification of which BS and MS Synchronization requirements shall be met under which conditions smg-29 58/91 Approved GSM2 - - - 1991-01-11 - - 1999-08-15
0010 - D Ph2 3.5.0 - Editorial changes to 05.10. smg-01 51/92 Approved GSM2 - - - 1991-04-19 - - 1999-08-15
0011 - C Ph2 3.5.0 4.0.0 Addition of the definition of ""MS timing offset"" smg-01 51/92 Approved GSM2 - - - 1991-04-19 - - 1999-08-15
0012 - D Ph2 4.0.0 - Editorial changes to pseudo-synchronization scheme - - - PT 12 - - - 1992-02-04 - - 1999-08-15
0012 1 D Ph2 4.0.0 4.0.1 (p2) Editorial changes to pseudo synchronization scheme smg-02 199/92 Approved PT 12 - - - 1992-02-04 - - 1999-08-15
0013 - D Ph1 3.5.0 - Clarification of ""Ready to transmit"" smg-04 546/92 Revised PT 12 - - - 1992-10-01 - Revised in 546/92r1 1999-08-15
0013 1 D Ph1 3.5.0 3.5.1(p1) Clarification of ""Ready to transmit"" smg-04 546/92r1 Approved PT 12 - - - - - - 1999-08-15
0014 - C Ph2 4.0.1 4.1.0 Pre-synchronised handover smg-05 42/93 Approved SMG2 - - - 1992-12-18 - - 1999-08-15
0015 - D Ph2 4.1.0 - Removal of { } in the text - - - PT12 - - - 1993-03-03 - - 1999-08-15
0015 1 D Ph2 4.1.0 4.1.1 Removal of { } in the text smg-06 208/93 Approved SMG2 - - - 1993-03-10 - - 1999-08-15
0016 - D Ph2 4.1.1 - Editorial changes to 05.10 v.4.1.1 - - - PT12 - - - 1993-04-16 - - 1999-08-15
0017 - B Ph2 4.1.1 - MS synchronisation requirements - - - SMG2 - - - 1993-04-19 - - 1999-08-15
0018 - F Ph2 4.1.1 - Timing advance handling at the BS smg-07 398/93 Approved SMG2 - - - 1993-05-26 - - 1999-08-15
0019 - F Ph2 4.1.1 - Clarification of the MS synchronisation requirements smg-07 398/93 Approved SMG2 - - - 1993-05-26 - - 1999-08-15
0020 - F Ph2 4.1.1 4.2.0 Pseudo-synchronisation smg-07 398/93 Approved SMG2 - - - 1993-05-26 - - 1999-08-15
0020 B F Ph2 4.2.0 - Mandatoriness of OTD reporting smg-08 582/93 Approved SMG2 - - - 1993-09-02 - - 1999-08-15
0021 - F Ph2 4.2.0 - Timing advance corrections smg-08 582/93 Approved PT12 - - - 1993-09-15 - - 1999-08-15
0022 - F Ph2 - - Observed Time difference - - - WPA #3/93 829/93 Supported 1993-09-10 - - 1999-08-15
0022 - F Ph2 4.2.0 - Observed time difference report smg-08 605/93 Approved SMG3 - - - 1993-09-15 - - 1999-08-15
0023 - D Ph2 - - Starting time - - - NMC #3/93 766/93 Supported 1993-09-10 - - 1999-08-15
0023 - D Ph2 4.2.0 4.3.0 Rewording of the reference to starting time smg-08 604/93 Approved SMG3 - - - 1993-09-15 - - 1999-08-15
0024 - F Ph2 4.3.0 4.4.0 Definition of ""ready to transmit"" smg-09 38/94 Approved SMG2 - - - 1993-12-16 - - 1999-08-15
0025 - F Ph2 - - Requirements on synchronisation - - - AEG SMG2-#10 109/94 Postponed 1994-05-20 - - 1999-08-15
A001 - 2 - - - Timing advance and synchronised handovers - - - PT12 #11 - Revised 1994-09-16 TEI - 1999-08-15
A001 1 2 - - - Timing advance and synchronised handovers smg-12 598/94 Approved PT12 #11 - Agreed 1994-09-16 TEI - 1999-08-15
A002 - 2 - - - Synchronised handovers - - - PT12 #12 - Revised 1994-12-21 TEI - 1999-08-15
A002 1 2 - - - Synchronised handovers smg-13 61/95 Approved PT12 #12 - Agreed 1994-12-21 TEI - 1999-08-15
A003 1 2 - - - Acceleration on the Synchronised Handovers Execution smg-14 291/95 Approved SMG3 - - - 1994-12-16 - - 1999-08-15
A004 - B R96 4.8.0 5.0.0 Addition of ASCI features smg-18 336/96 approved SMG2 - 35/96 Agreed 1996-03-08 ASCI - -
A005 - F - - 4.7.0 Pseudo Synchronisation smg-16 659/95 Approved SMG2 no.15 - Agreed 1996-06-19 - - 1999-08-15
A006 - F Ph2 - 4.8.0 Correction and clarification of pseudo-synchronisation timing smg-17 026/96 Approved SMG2 - - - - - - 1999-08-15
A007 - F Ph2 4.8.0 4.9.0 Correction to synchronized handover smg-18 202/96 Approved SMG2 - 20/96 Agreed 1996-03-08 - - 1999-08-15
A008 - B R96 5.0.0 5.1.0 Introduction of high speed circuit switched data smg-20 602/96 Approved SMG2 #19 188 Agreed 1996-09-06 HSCSD - 1999-08-15
A009 5 B R98 6.1.0 - Pico BTS (for information) smg-26 98-0389 noted SMG2 SMG2#26 222/98 agreed 1998-06-23 PicoBTS - 1999-08-15
A011 1 B R97 5.1.0 5.2.0 Introduction of the new Timing Advance Procedure for GPRS smg-23 97-640 approved SMG2 SMG2#23 276/97 agreed 1997-10-10 GPRS - -
A013 - C R97 6.0.0 6.1.0 Clarification of the use of TAI smg-25 98-0182 approved SMG2 SMG2#25 3/98 agreed 1998-03-13 GPRS - 1999-08-15
A014 - C R97 6.0.0 6.1.0 Renaming of GPRS RR states smg-25 98-0182 approved SMG2 SMG2#25 40/98 agreed 1998-03-13 GPRS - 1999-08-15
A015 - C R97 6.0.0 6.1.0 GPRS, Missing Timing Advance Updates on PTCCH smg-25 98-0182 approved SMG2 SMG2#25 56/98 agreed 1998-03-13 GPRS - -
A016 - F R97 6.1.0 6.2.0 Correction to timing advance for GPRS smg-26 98-0388 approved SMG2 SMG2#26 133/98 agreed 1998-06-23 GPRS - -
A017 2 F R97 6.2.0 6.3.0 Clarification of packet polling procedure for calculating new TA smg-27 98-0712 approved SMG2 SMG2#27 393/98 agreed 1998-10-12 GPRS - -
A018 - B R98 6.3.0 7.0.0 Harmonization between GSM and PCS 1900 standard smg-28 P-99-162 approved T1P1.5 - S298-464 agreed 1999-02-08 Harmonisation - 1999-08-15
A019 3 B R98 6.3.0 7.0.0 Synchronisation requirements for CTS smg-28 P-99-167 approved SMG2 - 2P99-050 agreed 1999-02-08 CTS - 1999-08-15
A020 - F R97 6.3.0 6.4.0 GPRS MS timing requirements smg-28 P-99-170 approved SMG2 - S298-459 agreed 1999-02-08 GPRS - 1999-08-15
A021 1 F R97 6.3.0 6.4.0 Correction of Timing Advance Procedure smg-28 P-99-170 approved SMG2 - 2P99-054 agreed 1999-02-08 GPRS - -
A023 2 F R97 6.3.0 6.4.0 Definition of additional GPRS related reaction times smg-28 P-99-170 approved SMG2 - 2P99-078 agreed 1999-02-08 GPRS - 1999-08-15
A025 - B R98 6.3.0 7.0.0 Synchronisation requirements for the control of the CTS-FP service range smg-28 P-99-167 approved SMG2 - 2P99-104 agreed 1999-02-08 CTS - -
A026 - C R97 6.3.0 6.4.0 Continuous timing advance procedure failure smg-28 P-99-170 approved SMG2 - 2P99-123 agreed 1999-02-08 GPRS - 1999-08-15
A027 - F R98 7.0.0 7.1.0 Correction of CTS-FP frequency source correction slope smg-29 P-99-489 approved SMG2 - 2-99-205 agreed - CTS - -
A029 1 F R97 6.4.0 6.5.0 Timing advance for access bursts on PTCCH/U smg-29 P-99-493 approved SMG2 - 2-99-459 agreed - GPRS - -
A033 - F R98 7.0.0 7.1.0 Timing advance for access bursts on PTCCH/U smg-29 P-99-493 approved SMG2 - 2-99-459 agreed - GPRS - 1999-08-15
A035 1 F R97 6.4.0 6.5.0 Reaction time after contention resolution during one phase access smg-29 P-99-493 approved SMG2 - 2-99-751 agreed - GPRS - 1999-08-15
A036 1 F R98 7.0.0 7.1.0 Reaction time after contention resolution during one phase access smg-29 P-99-493 approved SMG2 - 2-99-752 agreed - GPRS - -
A038 1 B R99 7.1.0 8.0.0 EDGE Compact logical channels smg-30 P-99-589 approved SMG2 - 2-99-D93 agreed - EDGE-Compact see also: 03.64, 04.03, 05.01, 05.02, 05.03 -
A039 1 C R99 8.0.0 8.1.0 Extended range TA information added in 05.10 smg-30b P-99-805 approved SMG2 - 2-99-G43 agreed 1999-12-07 GSM_400 - -
A040 - F R97 6.5.0 6.6.0 Definition of other reaction times smg-30 P-99-573 approved SMG2 - 2-99-E12 agreed - GPRS - -
A041 - A R98 7.1.0 7.2.0 Definition of other reaction times smg-30 P-99-573 approved SMG2 - 2-99-E12 agreed - GPRS - -
A042 - A R99 7.1.0 8.0.0 Definition of other reaction times smg-30 P-99-573 approved SMG2 - 2-99-E12 agreed - GPRS - -
A043 - B R99 8.0.0 8.1.0 Synchronization of 52-multiframes in EGPRS COMPACT smg-30b P-99-802 approved SMG2 - 2-99-J55 agreed 1999-12-07 EDGE-Compact - -
A047 1 C R98 7.2.0 - LCS Location Measurement Unit Synchronization requirements smg-30b P-99-789 postponed SMG2 - 2-99-J46 agreed 1999-12-07 LCS - -
A047 2 C R98 7.2.0 - BTS Synchronisation, Location Accuracy and LMU update rates smg-31 P-00-061 postponed T1P1 - - - 2000-02-16 LCS - -
A048 1 A R99 8.0.0 - LCS Location Measurement Unit Synchronization requirements, mirror to R'98 smg-30b P-99-789 postponed SMG2 - 2-99-J47 agreed 1999-12-07 LCS - -
A048 2 C R99 8.1.0 - BTS Synchronisation, Location Accuracy and LMU update rates smg-31 P-00-062 postponed T1P1 - - - 2000-02-16 LCS - -
A049 - B R99 8.0.0 8.1.0 Defining the MS carrier frequency accuracy value for GSM 400 MS smg-30b P-99-805 approved SMG2 - 2-99-G45 agreed 1999-12-07 GSM_400 - -
A050 - B R99 8.1.0 8.2.0 Modifications for 8-PSK smg-31 P-00-090 approved SMG2 01/00 2-00-062 agreed 2000-02-13 EDGE-Layer1 - -
A051 - B R99 8.1.0 8.2.0 Timegroup definition removal from 05.10 smg-31 P-00-095 approved SMG2 01/00 2-00-144 agreed 2000-02-13 EDGE-Compact - -
A054 - F R99 8.2.0 8.3.0 EGPRS Classic to COMPACT BTS synchronisation smg-31b P-00-216 approved SMG2 S2-35 539/00 agreed 2000-04-13 EDGE - -
A055 - C R98 7.2.0 7.3.0 BTS Synchronisation, Location Accuracy and LMU update rates smg-31b P-00-218 approved SMG2 S2-35 558/00 agreed 2000-04-13 LCS - -
A056 - A R99 8.2.0 8.3.0 BTS Synchronisation, Location Accuracy and LMU update rates smg-31b P-00-218 approved SMG2 S2-35 559/00 agreed 2000-04-13 LCS - -
A058 1 B R99 8.3.0 8.4.0 Class A Dual Transfer Mode (DTM) smg-32 P-00-281 approved SMG2 05/00 2-001166 agreed 2000-06-28 GPRS - -
A059 - F R99 8.4.0 8.5.0 05.10-A059 Correction of assignment reaction time (R99) GP-01 GP-000105 approved G1 G1-01 GP-000105 agreed 2000-09-18 GPRS - -
A060 - F R96 5.2.2 5.3.0 05.10-A060 Removal of GPRS related text (R96) GP-01 GP-000111 approved G1 G1-01 GP-000111 agreed 2000-09-18 TEI - -
A061 - B R99 8.4.0 8.5.0 05.10-A061 Addition of the switching requirement for the GSM to UTRAN (R99) GP-01 GP-000220 approved G1 G1-01 GP-000220 agreed 2000-09-18 2G3Ghandover - -
A062 - F R96 5.3.0 5.4.0 Corrections to synchronized handover GP-02 GP-000565 approved G1 G1-02 GP-000565 agreed 2000-11-14 TEI - -
A062 - F R96 5.3.0 5.4.0 Corrections to synchronized handover GP-02 GP-000565 approved G1 G1-02 GP-000565 agreed 2000-11-14 TEI - -
A063 - A R97 6.6.0 6.7.0 Corrections to synchronized handover GP-02 GP-000566 approved G1 G1-02 GP-000566 agreed 2000-11-14 TEI - -
A063 - A R97 6.6.0 6.7.0 Corrections to synchronized handover GP-02 GP-000566 approved G1 G1-02 GP-000566 agreed 2000-11-14 TEI - -
A064 - A R98 7.3.0 7.4.0 Corrections to synchronized handover GP-02 GP-000567 approved G1 G1-02 GP-000567 agreed 2000-11-14 TEI - -
A064 - A R98 7.3.0 7.4.0 Corrections to synchronized handover GP-02 GP-000567 approved G1 G1-02 GP-000567 agreed 2000-11-14 TEI - -
A065 - A R99 8.5.0 8.6.0 Corrections to synchronized handover GP-02 GP-000568 approved G1 G1-02 GP-000568 agreed 2000-11-14 TEI - -
A065 - A R99 8.5.0 8.6.0 Corrections to synchronized handover GP-02 GP-000568 approved G1 G1-02 GP-000568 agreed 2000-11-14 TEI - -
A066 - F R99 8.5.0 Reaction time at packet assignment with polling request GP-02 GP-000613 - G1 G1-02 GP-000613 revised 2000-11-14 GPRS - -
A066 - F R99 8.5.0 Reaction time at packet assignment with polling request GP-02 GP-000613 - G1 G1-02 GP-000613 revised 2000-11-14 GPRS - -
A066 1 F R99 8.5.0 Reaction time at packet assignment with polling request GP-02 GP-000807 - G1 G1-02 GP-000807 revised 2000-11-14 GPRS - -
A066 1 F R99 8.5.0 Reaction time at packet assignment with polling request GP-02 GP-000807 - G1 G1-02 GP-000807 revised 2000-11-14 GPRS - -
A066 2 F R99 8.5.0 8.6.0 Reaction time at packet assignment with polling request GP-02 GP-000903 approved G1 G1-02 GP-000903 agreed 2000-11-14 GPRS - -
A066 2 F R99 8.5.0 8.6.0 Reaction time at packet assignment with polling request GP-02 GP-000903 approved G1 G1-02 GP-000903 agreed 2000-11-14 GPRS - -
A067 - - R99 - - Delay requirements for blind handover to UTRAN GP-03 GP-010099 Revised Ericsson - - - 2001-01-31 - - -
A067 1 F R99 8.6.1 8.7.0 Delay requirements for blind handover to UTRAN GP-03 GP-010297 Approved Ericsson - - - 2001-01-31 2G3Ghandover - -
A068 - - Rel-4 - - Uplink and downlink assignment reaction time GP-03 GP-010141 Rejected Motorola - - - 2001-01-31 - - -
A069 - - R99 - - Timing requirements for blind handover 2G->2G GP-03 GP-010382 Revised Nortel Networks - - - 2001-01-31 - - -
A069 1 F R99 8.6.1 8.7.0 Timing requirements for blind handover 2G->2G GP-03 GP-010440 Approved Nortel Networks - - - 2001-01-31 2G3Ginterworking - -
A071 - - R99 8.7.0 - Initial Assignment reaction time GP-04 GP-010501 Revised Siemens G1-4 GP-010501 - 2001-04-06 - - -
A071 1 - R99 8.7.0 - Initial Assignment reaction time GP-04 GP-010972 Postponed Siemens G1-4 GP-010972 - 2001-04-06 - - -
A072 - - R99 8.7.0 - Handover to UTRAN delay GP-04 GP-010582 Withdrawn Ericsson G1-4 GP-010582 - 2001-04-06 - - -
A073 - - R99 8.7.0 - Updates to GSM UTRAN Handover Interruption Times GP-04 GP-010742 Revised Siemens G1-4 GP-010742 - 2001-04-06 - - -
A073 1 F R99 8.7.0 8.8.0 Updates to GSM UTRAN Handover Interruption Times GP-04 GP-010835 Approved Siemens G1-4 GP-010835 agreed 2001-04-06 2G3Ghandover - -
A074 - F R99 8.8.0 - Clarification to Requirements for Synchronization at DTM operation - - - Ericsson G1-08 GP-020087 revised 2002-01-09 Class_A_Dual_Transfer_Mode_(DTM) - -
A074 1 F R99 8.8.0 8.9.0 Clarification to Requirements for Synchronization at DTM operation GP-08 GP-020452 approved G1 G1-08 GP-020452 agreed 2002-02-05 Class_A_Dual_Transfer_Mode_(DTM) - -
A075 - - R99 - - Correction to inter system handover interruption times GP-10 - - - G1-10 GP-021759 revised 2002-06-28 - - -
A075 1 F R99 8.9.0 8.10.0 Correction to inter system handover interruption times GP-10 GP-021929 approved G1 G1-10 GP-021929 agreed 2002-06-28 2G3Ginterworking - -
A076 - F R99 8.10.0 8.11.0 Timing of DTM assignment GP-13 GP-030213 approved G1 G1-13 GP-030213 agreed 2003-02-07 TEI - 2003-02-12
A077 - - R99 - - Correction of interruption times for GSM to UTRAN FDD handover GP-13 - - - G1-13 GP-030254 revised 2003-02-06 - - 2003-02-12
A077 1 - R99 - - Correction of interruption times for GSM to UTRAN FDD handover GP-13 - - - G1-13 GP-030374 revised 2003-02-06 - - 2003-02-12
A077 2 F R99 8.10.0 8.11.0 Correction of interruption times for GSM to UTRAN FDD handover GP-13 GP-030437 approved G1 G1-13 GP-030437 agreed 2003-02-07 2G3Ginterworking - 2003-02-12
A078 - F R99 5.5.0 - Correction of interruption times for GSM to UTRAN TDD handover GP-13 - - Siemens G1-13 GP-030257 withdrawn 2003-02-06 - - 2003-02-12
A079 - - R99 - - Clarification on continuous TA procedure - - - Siemens G1-14 GP-030881 rejected 2003-04-11 - - 2003-04-15
A080 - - R99 - - Correction of definition of ""ready to transmit"" for inter-RAT handover - - - Siemens G1-15 GP-031384 rejected 2003-06-27 - - 2003-07-02
A081 - - R99 - - Correction of definition of ""ready to transmit"" for inter-RAT handover - - - - G1-16 GP-031979 revised 2003-08-29 - - 2003-09-02
A081 1 - R99 - - Correction of definition of ""ready to transmit"" for inter-RAT handover - - - - G1-16 GP-032188 revised 2003-08-29 - - 2003-09-02
A081 2 F R99 8.11.0 8.12.0 Correction of definition of ""ready to transmit"" for inter-RAT handover GP-16 GP-032281 approved G1 G1-16 GP-032281 agreed 2003-08-29 2G3Ginterworking - 2003-09-02
A082 - - R97 - - MS reaction time upon reception of assignment message on CCCH - - - Melco, Nortel G1-16 GP-032042 rejected 2003-08-29 - - 2003-09-02
A083 - - R98 - - MS reaction time upon reception of assignment message on CCCH - - - MELCO, Nortel G1-16 GP-032043 rejected 2003-08-29 - - 2003-09-02
A084 - - R99 - - MS reaction time upon reception of assignment message on CCCH - - - MELCO, Nortel G1-16 GP-032044 rejected 2003-08-29 - - 2003-09-02

page generated from database: 2013-10-16 10:33:05