0001 - F Ph2 4.0.0 4.1.0 Inclusion of repeater scenarios and removal of the list from the document smg-13 65/95 Approved SMG2 - - Agreed 1994-12-21 - - 1999-08-15
A002 - D Ph2 - 4.2.0 Simulations and Error Patterns smg-17 117/96 Approved SMG2 12/96 - Agreed - - - 1999-08-15
A003 - B R96 5.0.0 5.1.0 Background for UIC RF requirements smg-21 157/97 Approved SMG2 - - - 1997-02-06 - - 1999-08-15
A004 - D R96 5.1.0 5.1.1 Correction of terminology smg-23 97-769 approved SMG2 SMG2#23 290/97 agreed 1997-10-08 ASCI_R96, RGSM - -
A005 1 B R97 5.1.1 6.0.0 Introduction of simulation results for GPRS receiver performance smg-24 97-1006 approved SMG2 24 341/97 agreed 1997-12-12 GPRS - 1999-08-15
A006 - B R98 6.0.2 - Pico BTS Scenarios (background to the previous two CRs) smg-26 98-0389 postponed SMG2 SMG2#26 177/98 agreed 1998-06-23 PicoBTS CR was postponed at s26 and approved at s28 -
A006 - B R98 6.0.2 7.0.0 Pico BTS Scenarios (background to the previous two CRs) smg-28 98-0389 approved SMG2 SMG2#26 177/98 agreed 1998-06-23 PicoBTS CR was postponed at s26 and approved at s28 1999-08-15
A007 - B R98 7.0.0 7.1.0 Introduction of CTS system scenarios smg-29 P-99-489 approved SMG2 - 2-99-580 agreed - CTS - 1999-08-15
A008 - B R99 7.1.0 8.0.0 EDGE 850 MHz and 1900 MHz mixed mode scenarios smg-30 P-99-590 approved SMG2 - 2-99-A09 agreed - EDGE See also: 05.05 -
A009 - B R99 7.1.0 8.0.0 Addition of GSM 400 system scenarios into GSM 05.50 smg-30 P-99-583 approved SMG2 - 2-99-A71 agreed - GSM_400 - -
A010 - F R98 7.1.0 7.2.0 AMR performance simulation smg-30 P-99-579 approved SMG2 - 2-99-919 agreed - AMR - -
A011 1 B R99 8.0.0 8.1.0 8-PSK scenarios in GSM 05.50 smg-31 P-00-091 approved SMG2 01/00 2-00-458 agreed 2000-02-13 EDGE-Layer1 - -
A012 1 C R98 7.2.0 7.3.0 Background information for equirements for TOA LMU smg-31 P-00-084 approved SMG2 01/00 2-00-382 agreed 2000-02-13 LCS - -
A013 1 A R99 8.0.0 8.1.0 Background information for equirements for TOA LMU smg-31 P-00-084 approved SMG2 01/00 2-00-383 agreed 2000-02-13 LCS - -
A016 - C R97 6.0.2 6.1.0 Update of GPRS background information smg-31 P-00-081 approved SMG2 01/00 2-00-411 agreed 2000-02-13 GPRS - -
A017 - A R98 7.2.0 7.3.0 Update of GPRS background information smg-31 P-00-081 approved SMG2 01/00 2-00-412 agreed 2000-02-13 GPRS - -
A018 - A R99 8.0.0 8.1.0 Update of GPRS background information smg-31 P-00-081 approved SMG2 01/00 2-00-413 agreed 2000-02-13 GPRS - -
A019 - C R98 7.2.0 - BTS Synchronisation, Location Accuracy and LMU update rates smg-31 P-00-063 postponed T1P1 - - - 2000-02-16 LCS - -
A020 - C R99 8.0.0 - BTS Synchronisation, Location Accuracy and LMU update rates smg-31 P-00-064 postponed T1P1 - - - 2000-02-16 LCS - -
A021 - C R98 7.3.0 7.4.0 BTS Synchronisation, Location Accuracy and LMU update rates smg-31b P-00-219 approved SMG2 S2-35 560/00 agreed 2000-04-13 LCS - -
A022 - A R99 8.1.0 8.2.0 BTS Synchronisation, Location Accuracy and LMU update rates smg-31b P-00-219 approved SMG2 S2-35 561/00 agreed 2000-04-13 LCS - -
A023 - F R99 8.2.0 - Align the Mixed-Mode IMD Test Bandwidth (annex U.2.3) with GSM 05.05 and GSM 11.21 GP-02 GP-000717 postponed G1 G1-02 GP-000717 agreed 2000-11-14 EDGE - -
A023 - F R99 8.2.0 - Align the Mixed-Mode IMD Test Bandwidth (annex U.2.3) with GSM 05.05 and GSM 11.21 GP-02 GP-000717 postponed G1 G1-02 GP-000717 agreed 2000-11-14 EDGE - -