CR no. | rev | cat | Release | CR written to vers | new vers | CR title | TSG meeting | TSG doc | TSG status | source | WG meeting | WG doc | WG status | cover date | work item | remarks | database record created |
0001 | - | F | Ph2 | 4.0.0 | 4.1.0 | Inclusion of repeater scenarios and removal of the list from the document | smg-13 | 65/95 | Approved | SMG2 | - | - | Agreed | 1994-12-21 | - | - | 1999-08-15 |
A002 | - | D | Ph2 | - | 4.2.0 | Simulations and Error Patterns | smg-17 | 117/96 | Approved | SMG2 | 12/96 | - | Agreed | - | - | - | 1999-08-15 |
A003 | - | B | R96 | 5.0.0 | 5.1.0 | Background for UIC RF requirements | smg-21 | 157/97 | Approved | SMG2 | - | - | - | 1997-02-06 | - | - | 1999-08-15 |
A004 | - | D | R96 | 5.1.0 | 5.1.1 | Correction of terminology | smg-23 | 97-769 | approved | SMG2 | SMG2#23 | 290/97 | agreed | 1997-10-08 | ASCI_R96, RGSM | - | - |
A005 | 1 | B | R97 | 5.1.1 | 6.0.0 | Introduction of simulation results for GPRS receiver performance | smg-24 | 97-1006 | approved | SMG2 | 24 | 341/97 | agreed | 1997-12-12 | GPRS | - | 1999-08-15 |
A006 | - | B | R98 | 6.0.2 | - | Pico BTS Scenarios (background to the previous two CRs) | smg-26 | 98-0389 | postponed | SMG2 | SMG2#26 | 177/98 | agreed | 1998-06-23 | PicoBTS | CR was postponed at s26 and approved at s28 | - |
A006 | - | B | R98 | 6.0.2 | 7.0.0 | Pico BTS Scenarios (background to the previous two CRs) | smg-28 | 98-0389 | approved | SMG2 | SMG2#26 | 177/98 | agreed | 1998-06-23 | PicoBTS | CR was postponed at s26 and approved at s28 | 1999-08-15 |
A007 | - | B | R98 | 7.0.0 | 7.1.0 | Introduction of CTS system scenarios | smg-29 | P-99-489 | approved | SMG2 | - | 2-99-580 | agreed | - | CTS | - | 1999-08-15 |
A008 | - | B | R99 | 7.1.0 | 8.0.0 | EDGE 850 MHz and 1900 MHz mixed mode scenarios | smg-30 | P-99-590 | approved | SMG2 | - | 2-99-A09 | agreed | - | EDGE | See also: 05.05 | - |
A009 | - | B | R99 | 7.1.0 | 8.0.0 | Addition of GSM 400 system scenarios into GSM 05.50 | smg-30 | P-99-583 | approved | SMG2 | - | 2-99-A71 | agreed | - | GSM_400 | - | - |
A010 | - | F | R98 | 7.1.0 | 7.2.0 | AMR performance simulation | smg-30 | P-99-579 | approved | SMG2 | - | 2-99-919 | agreed | - | AMR | - | - |
A011 | 1 | B | R99 | 8.0.0 | 8.1.0 | 8-PSK scenarios in GSM 05.50 | smg-31 | P-00-091 | approved | SMG2 | 01/00 | 2-00-458 | agreed | 2000-02-13 | EDGE-Layer1 | - | - |
A012 | 1 | C | R98 | 7.2.0 | 7.3.0 | Background information for equirements for TOA LMU | smg-31 | P-00-084 | approved | SMG2 | 01/00 | 2-00-382 | agreed | 2000-02-13 | LCS | - | - |
A013 | 1 | A | R99 | 8.0.0 | 8.1.0 | Background information for equirements for TOA LMU | smg-31 | P-00-084 | approved | SMG2 | 01/00 | 2-00-383 | agreed | 2000-02-13 | LCS | - | - |
A016 | - | C | R97 | 6.0.2 | 6.1.0 | Update of GPRS background information | smg-31 | P-00-081 | approved | SMG2 | 01/00 | 2-00-411 | agreed | 2000-02-13 | GPRS | - | - |
A017 | - | A | R98 | 7.2.0 | 7.3.0 | Update of GPRS background information | smg-31 | P-00-081 | approved | SMG2 | 01/00 | 2-00-412 | agreed | 2000-02-13 | GPRS | - | - |
A018 | - | A | R99 | 8.0.0 | 8.1.0 | Update of GPRS background information | smg-31 | P-00-081 | approved | SMG2 | 01/00 | 2-00-413 | agreed | 2000-02-13 | GPRS | - | - |
A019 | - | C | R98 | 7.2.0 | - | BTS Synchronisation, Location Accuracy and LMU update rates | smg-31 | P-00-063 | postponed | T1P1 | - | - | - | 2000-02-16 | LCS | - | - |
A020 | - | C | R99 | 8.0.0 | - | BTS Synchronisation, Location Accuracy and LMU update rates | smg-31 | P-00-064 | postponed | T1P1 | - | - | - | 2000-02-16 | LCS | - | - |
A021 | - | C | R98 | 7.3.0 | 7.4.0 | BTS Synchronisation, Location Accuracy and LMU update rates | smg-31b | P-00-219 | approved | SMG2 | S2-35 | 560/00 | agreed | 2000-04-13 | LCS | - | - |
A022 | - | A | R99 | 8.1.0 | 8.2.0 | BTS Synchronisation, Location Accuracy and LMU update rates | smg-31b | P-00-219 | approved | SMG2 | S2-35 | 561/00 | agreed | 2000-04-13 | LCS | - | - |
A023 | - | F | R99 | 8.2.0 | - | Align the Mixed-Mode IMD Test Bandwidth (annex U.2.3) with GSM 05.05 and GSM 11.21 | GP-02 | GP-000717 | postponed | G1 | G1-02 | GP-000717 | agreed | 2000-11-14 | EDGE | - | - |
A023 | - | F | R99 | 8.2.0 | - | Align the Mixed-Mode IMD Test Bandwidth (annex U.2.3) with GSM 05.05 and GSM 11.21 | GP-02 | GP-000717 | postponed | G1 | G1-02 | GP-000717 | agreed | 2000-11-14 | EDGE | - | - |