Go to spec numbering scheme page
3GPP TR 09.01 (click spec number to see fileserver directory for this spec)
General Network Interworking Scenarios
.
TSG / WG responsible: C4 (click TSG/WG to see its home page)
Work item which gave rise to this spec:  -  (click WI code to see Work Item details in the Work Plan)
Work items which may have impacted this spec:  click here
CP-27: change of WG as a result of closure of CN and T.
Rapporteur: SCHMITT, Peter Specification required for: GERAN-based systems In the table below ... ... click meeting number for meeting details; ... click spec version number to download that version; ... click SDO publication reference to download SDO transposed document. event version available remarks ETSI publication 1995-01-01 event version available remarks 1993-10-01 - 1994-01-21 - event version available remarks 1996-10-11 - event version available remarks 1998-10-16 event version available remarks 1999-06-25 event version available remarks 2000-03-15
Release
Freeze meeting
Freeze date
::
remarks
SDO publications
Ph1
gsm-25b
1990-01-25
::
.
ETSI
click ref to download
Ph2
smg-11b
1994-09-13
::
.
ETSI
click ref to download
R96
smg-22
1997-06-13
::
.
ETSI
click ref to download
R97
smg-26
1998-06-26
::
.
ETSI
click ref to download
R98
smg-29
1999-06-25
::
.
ETSI
click ref to download
R99
SP-06
1999-12-17
::
.
ETSI
click ref to download
Change Requests for this spec: click here.
Genealogy of this spec:
antecedent(s) | this spec | descendant(s) |
(no antecedents) | 09.01 |
49.001 |
page generated from database: 2013-10-16 10:25:20