3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 09.78

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0000 - - R96 2.0.0 5.0.0 CAMEL Application Part phase1 (stage 3), Annex B only electronic format smg-21 049/97 approved SMG3 WPC 9701p2 97P125 agreed 1997-01-22 CAMEL_R96 - 1999-08-15
A001 - C R96 5.0.0 - Introduction of SSN prior used in MAP - - - SMG3 WPC 9701p2 - withdrawn 1997-01-22 CAMEL - 1999-08-15
A001 1 C R96 5.0.0 5.1.0 CallingPartyNumber in Connect smg-22 374/97 approved SMG3 WPC 9704p4 97C161 agreed 1997-06-02 CAMEL_R96 - 1999-08-15
A002 1 F R96 5.0.0 5.1.0 Description of Connect message smg-22 374/97 approved SMG3 WPC 9703p3 97C140 agreed 1997-06-02 CAMEL_R96 - -
A003 - C R96 5.0.0 5.1.0 MSC Id for Call Reference Number smg-22 374/97 approved SMG3 WPC 9704p4 97C220 agreed 1997-06-02 CAMEL_R96 - 1999-08-15
A004 1 F R96 5.0.0 5.1.0 Coding of ISUP_ACM message smg-22 374/97 approved SMG3 WPC 9704p4 97C236 agreed 1997-06-02 CAMEL_R96 - 1999-08-15
A005 - F R96 5.0.0 5.1.0 Use of SSN for inter-plmn signalling smg-22 374/97 approved SMG3 WPC 9704p4 97C225 agreed 1997-06-02 CAMEL_R96 - 1999-08-15
A006 - F R96 5.0.0 5.1.0 Correction of references smg-22 374/97 approved SMG3 WPC 9704p4 97C226 agreed 1997-06-02 CAMEL_R96 - 1999-08-15
A007 - F R96 5.0.0 5.1.0 Range constants for address strings smg-22 374/97 approved SMG3 WPC 9704p4 97C228 agreed 1997-06-02 CAMEL_R96 - 1999-08-15
A008 - C R96 5.0.0 5.1.0 Mapping of CAP Generic Number to ISUP. smg-22 374/97 approved SMG3 WPC 9704p4 97C190 agreed 1997-06-02 CAMEL_R96 - -
A009 1 F R96 5.0.0 5.1.0 Alignment of text in two sections smg-22 374/97 approved SMG3 WPC 9704p4 97C263 agreed 1997-06-02 CAMEL_R96 - -
A010 - D R96 5.0.0 5.1.0 SCCP addressing for CAP smg-22 374/97 approved SMG3 WPC 9704p4 97C158 agreed 1997-06-02 CAMEL_R96 - 1999-08-15
A011 - C R96 5.0.0 5.1.0 Change to CAMEL phase 1 regarding * and # in Called Party Number smg-22 303/97 approved SMG3 WPC 9704p4 97C271 agreed 1997-06-02 CAMEL_R96 - -
A013 1 D R96 5.1.0 5.2.0 Modifications resulting from comments by SPS3 smg-23 97-688 approved SMG3 WPC 9709p6 97C490 agreed 1997-09-30 CAMEL_R96 - 1999-08-15
A014 5 B R97 5.3.0 6.0.0 CAMEL phase 2 smg-25 98-0083 approved SMG3 WPC 9802p 98c169 agreed 1998-02-23 CAMEL_R97 - 1999-08-15
A015 - F R96 5.1.0 5.2.0 Called Party BCD number with initial DP operation smg-23 97-688 approved SMG3 WPC 9709p6 97C478 agreed 1997-09-30 CAMEL_R96 - -
A016 - D R96 5.1.0 5.2.0 Removal of the informative Annex B smg-23 97-688 approved SMG3 WPC 9709p6 97C512 agreed 1997-09-30 CAMEL_R96 - 1999-08-15
A018 - F R96 5.1.0 5.2.0 Alignment with stage 2 smg-23 97-688 approved SMG3 WPC 9706p5 97C304 agreed 1997-09-30 CAMEL_R96 - -
A019 - F R96 5.2.0 5.3.0 Removal of CallingPartyNumber from Connect smg-24 97-915 approved SMG3 WPC 9711p7 97C638 agreed 1997-12-06 CAMEL_R96 - 1999-08-15
A020 - F R96 5.2.0 5.3.0 Removal of the transparent mode monitoring smg-24 97-915 approved SMG3 WPC 9711p7 97C634 agreed 1997-12-06 CAMEL_R96 - -
A021 - F R96 5.2.0 5.3.0 Update the SCCP class requirements in 09.78 smg-24 97-915 approved SMG3 WPC 9712p8 97C667 agreed 1997-12-06 CAMEL_R96 - 1999-08-15
A022 - F R96 5.2.0 5.3.0 Remove mapping of CalledPartyBCD number and order sequence in ASN.1 smg-24 97-915 approved SMG3 WPC 9712p8 97C733 agreed 1997-12-06 CAMEL_R96 - 1999-08-15
A023 1 F R96 5.3.0 5.4.0 Definition of CAP SSN replaced by a reference to GSM 03.03 smg-25 98-0087 approved SMG3 WPC 9802p 98c137 agreed 1998-02-23 CAMEL_R96 - -
A024 1 C R97 6.0.0 6.1.0 TCAP Basic End smg-26 98-0411 approved SMG3 #2/98 98P135 agreed 1998-05-26 - - 1999-08-15
A025 1 F R96 5.4.0 5.5.0 Encoding of TC User Information parameter smg-26 98-0404 approved SMG3 #2/98 98P134 agreed 1998-05-27 - - -
A026 - A R97 6.0.0 6.1.0 Encoding of TC User Information parameter smg-26 98-0404 approved SMG3 #2/98 98P134 agreed 1998-05-27 - - 1999-08-15
A027 1 D R97 6.0.0 6.1.0 CAMEL Phase 2 Stage 3 smg-26 98-0411 approved SMG3 #2/98 98P135 agreed 1998-05-12 - - 1999-08-15
A028 1 D R97 6.0.0 6.1.0 AC negotiation on the gsmSSF - gsmSCF interface smg-26 98-0411 approved SMG3 #2/98 98P135 agreed 1998-05-27 - - -
A029 1 C R97 6.0.0 6.1.0 GSM Forwarding Pending Indication in IDP Operation smg-26 98-0411 approved SMG3 #2/98 98P127 agreed 1998-05-28 - - 1999-08-15
A031 2 F R97 6.1.0 6.2.0 Corrections on GSM 09.78 smg-27 98-0724 approved SMG3 - 98p206 - - CAMEL2 - 1999-08-15
A033 1 F R97 6.1.0 6.2.0 Support of CAMEL Phase 2 smg-27 98-0724 approved SMG3 - 98p186 - - CAMEL2 - 1999-08-15
A038 1 F R97 6.2.1 6.3.0 Missing error on UnknownLegID in 09.78 smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A039 1 F R97 6.2.1 6.3.0 Clarification of CallInformationRequest/Report operation smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A042 3 F R97 6.3.0 6.4.0 SCCP smg-29 P-99-454 approved SMG3 - N2-99239 - 1999-06-24 CAMEL2 - 1999-08-15
A046 1 F R97 6.2.1 6.3.0 Use of ‘DP-Busy’ for ‘Not Reachable’ in EventReportBCSM smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A047 2 F R97 6.2.1 6.3.0 CAP message segmentation for CAMEL phase2 smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - -
A049 1 B R97 6.2.0 6.3.0 Addition of North American Carrier related Information to CAMEL Phase 2 smg-28 P-99-245 approved T1P1 - - - 1999-03-05 - - 1999-08-15
A051 2 D R97 6.2.1 6.3.0 CAMEL2 clarifications to a charging issue (FCI) smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A052 - F R97 6.2.1 6.3.0 Syntactical and editorial corrections to 09.78 smg-28 P-99-192 approved SMG3 - 3P99-023 - 1999-02-04 CAMEL - 1999-08-15
A055 - F R97 6.3.0 6.4.0 Corrections smg-29 P-99-454 approved SMG3 - 3C99-407 - 1999-06-24 CAMEL2 - 1999-08-15
A057 - F R97 6.3.0 6.4.0 Inclusion of Activity Test IF between gsmSCF & gsmSRF and gsmSCF and assistSSF smg-29 P-99-454 approved SMG3 - 3C99-481 - 1999-06-24 CAMEL2 - 1999-08-15
A058 3 F R97 6.3.0 6.4.0 Various corrections smg-29 P-99-454 approved SMG3 - N2-99344 - 1999-06-24 CAMEL2 - 1999-08-15
A064 1 C R97 6.3.0 6.4.0 Support of ANSI MTP and ANSI SCCP for CAMEL phase 2 smg-29 P-99-460 approved SMG3 - N2-99336 - 1999-06-24 PCS_Harmonis. - 1999-08-15
A065 - D R97 6.3.0 6.4.0 Removal of redundant reference smg-29 P-99-454 approved SMG3 - N2-99334 - 1999-06-24 CAMEL2 - 1999-08-15
A066 - F R97 6.3.0 6.4.0 Imports from MAP smg-29 P-99-463 approved SMG3 - N2-99521 - 1999-06-24 TE&I - 1999-08-15
A068 1 F R97 6.3.0 6.4.0 Notification of call forwarding to the gsmSCF smg-29 P-99-454 approved SMG3 - N2-99593 - 1999-06-24 CAMEL2 - 1999-08-15
A070 1 F R97 6.3.0 6.4.0 MSC address in the InitialDP operation smg-29 P-99-454 approved SMG3 - N2-99647 - 1999-06-24 CAMEL2 - 1999-08-15
A072 1 F R97 6.3.0 6.4.0 Interworking with Q.1218 and ETSI Core INAP smg-29 P-99-454 approved SMG3 - N2-99639 - 1999-06-24 CAMEL2 - 1999-08-15
A073 - F R96 5.6.0 5.7.0 Interworking with Q.1218 and ETSI Core INAP smg-29 P-99-453 approved SMG3 - N2-99640 - 1999-06-24 CAMEL1 - -
A075 2 F R97 6.4.0 6.5.0 Clarification of encoding of CollectedDigits NP-08 NP-000242 approved N2 N2-11 N2-000226 Agreed 2000-06-27 CAMEL2 - -
A076 2 A R98 7.0.0 7.1.0 Clarification of encoding of CollectedDigits NP-08 NP-000242 approved N2 N2-11 N2-000227 Agreed 2000-06-27 CAMEL2 - -

page generated from database: 2013-10-16 10:33:08