Go to spec numbering scheme page
3GPP TR 09.90 (click spec number to see fileserver directory for this spec)
Interworking between Phase 1 Infrastructure and Phase 2 Mobile Stations (MS)
.
TSG / WG responsible: C1 (click TSG/WG to see its home page)
Work item which gave rise to this spec:  -  (click WI code to see Work Item details in the Work Plan)
Work items which may have impacted this spec:  click here
CP-27: change of WG as a result of closure of CN and T.
Rapporteur: BURBIDGE, Richard Specification required for: GERAN-based systems In the table below ... ... click meeting number for meeting details; ... click spec version number to download that version; ... click SDO publication reference to download SDO transposed document. event version available remarks 1995-07-07 - smg-16 ? 1995-10-20 - 1996-04-12 - 1996-06-28 - 1997-06-13 - event version available remarks smg-17? 1996-02-02 2001-01-02 event version available remarks 1998-10-16 -
Release
Freeze meeting
Freeze date
::
remarks
SDO publications
Ph2
smg-11b
1994-09-13
::
.
ETSI
click ref to download
R96
smg-22
1997-06-13
::
.
ETSI
click ref to download
R97
smg-26
1998-06-26
::
#27: 6.0.0 #32:withdrawn RELEASE WITHDRAWN
ETSI
click ref to download
Change Requests for this spec: click here.
Genealogy of this spec:
antecedent(s) | this spec | descendant(s) |
(no antecedents) | 09.90 | (no descendants) |
page generated from database: 2013-10-16 10:25:22