3GPP Specification detail

Go to spec numbering scheme page

Back to series index


3GPP TR  09.90  (click spec number to see fileserver directory for this spec)

Interworking between Phase 1 Infrastructure and Phase 2 Mobile Stations (MS)

.

TSG / WG responsible: C1  (click TSG/WG to see its home page)

Work item which gave rise to this spec:  -  (click WI code to see Work Item details in the Work Plan)

Work items which may have impacted this spec:  click here

CP-27: change of WG as a result of closure of CN and T.

Rapporteur: BURBIDGE, Richard

Specification required for: GERAN-based systems

In the table below ...

... click meeting number for meeting details;

... click spec version number to download that version;

... click SDO publication reference to download SDO transposed document.

Release Freeze meeting Freeze date :: remarks SDO publications
Ph2 smg-11b 1994-09-13 ::  . ETSI
 

event

version

available

remarks

click ref to download
 

smg-15

4.5.0

1995-07-07

-

 

smg-16 ?

4.6.0

1995-10-20

-

 

smg-18

4.7.0

1996-04-12

-

 

smg-19

4.8.0

1996-06-28

-

 

smg-22

4.9.0

1997-06-13

-

R96 smg-22 1997-06-13 ::  . ETSI
 

event

version

available

remarks

click ref to download
 

smg-17?

5.0.0

1996-02-02

DGTS/SMG-000990Q

 

smg-22

5.1.0

2001-01-02

RTS/TSGN-010990QR1

R97 smg-26 1998-06-26 :: #27: 6.0.0 #32:withdrawn RELEASE WITHDRAWN ETSI
 

event

version

available

remarks

click ref to download
 

smg-27

6.0.0

1998-10-16

-

Change Requests for this spec: click here.

Genealogy of this spec:

antecedent(s) this spec descendant(s)
(no antecedents) 09.90 (no descendants)

page generated from database: 2013-10-16 10:25:22