3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 11.10

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - E Ph1 3.4.0 - Section II.5.3.3.1, Test of Idle Mode, initial conditions. - - - - - - - 1991-03-27 - - 1999-08-15
0001 1 E Ph1 3.4.0 - Section II.5.3.3.1, Test of Idle Mode, initial conditions. - - - - - - - 1991-04-30 - - 1999-08-15
0001 2 E Ph1 3.4.0 - Section II.5.3.3.1, Test of Idle Mode, initial conditions. - - - - - - - 1991-05-22 - - 1999-08-15
0003 - D Ph2 3.4.0 - Section II.5.3.6.7.3, Coding of 4.8/H Data Channel. - - - - - - - 1991-03-27 - - 1999-08-15
0004 - E Ph1 3.4.0 - Section II.5.3.7.4.1/Proc. 1, Activation of Ciphering Mode. - - - - - - - 1991-03-27 - - 1999-08-15
0004 2 A Ph1 3.1.0 - Alignment of section II.6 to 05.08/05.10 smg-28 232/90b Approved PT12/11-ser. - - - 1990-09-15 - - 1999-08-15
0005 - E Ph1 3.4.0 - Section II.5.3.7.4.2.2, Test of Mobility Management. - - - - - - - 1991-03-27 - - 1999-08-15
0007 - E Ph1 3.4.0 - Section II.5.3.7.4.3.3/Proc.2-5, Test of Mobility Management. - - - - - - - 1991-03-27 - - 1999-08-15
0007 - A Ph1 3.1.0 - Default conditions during L3 tests. smg-28 232/90 Approved PT12 ES - - - 1990-09-28 - - 1999-08-15
0007 1 E Ph1 3.4.0 - Section II.5.3.7.4.3.3/Proc.2-5, Test of Mobility Management. - - - - - - - 1991-05-22 - - 1999-08-15
0008 - E Ph1 3.4.0 - Section II.5.3.7.4.3.4/Req. 1), Test of Mobility Management. - - - - - - - 1991-03-27 - - 1999-08-15
0008 - A Ph1 3.1.0 - Test of paging (Normal) smg-28 232/90 Approved PT12 ES - - - 1990-09-11 - - 1999-08-15
0009 - A Ph1 3.4.0 - Section II.5.3.7.4.3.4/Req. 4), Test of Mobility Management. - - - - - - - 1991-03-27 - - 1999-08-15
0009 - A Ph1 3.1.0 - Extended paging and paging Reorganization smg-28 232/90 Approved PT12/11-ser. - - - 1990-09-05 - - 1999-08-15
0010 - E Ph1 3.4.0 - Section II.5.3.8.1.2.2.2, Test of Call Control. - - - - - - - 1991-03-27 - - 1999-08-15
0010 - A Ph1 3.1.0 - Correction of messages from SS smg-28 232/90 Approved PT12 ES - - - 1990-09-24 - - 1999-08-15
0011 - E Ph1 3.1.0 - Wrong references and typographical errors. smg-28 232/90 Approved PT12 ES - - - 1999-09-24 - - 1999-08-15
0012 - E Ph1 3.1.0 - Channel configuration smg-28 232/90 Approved PT12 / ES - - - 1990-09-11 - - 1999-08-15
0013 - A Ph1 3.1.0 - Mobile ID in IMSI attach test smg-28 232/90 Approved PT12 ES - - - 1990-09-11 - - 1999-08-15
0014 - A Ph1 3.4.0 - Section II.5.3.8, Tests with State Transitions to `U0`. - - - - - - - 1991-04-04 - - 1999-08-15
0014 - E Ph1 3.1.0 - Power on for MS and SIM insertion smg-28 232/90 Approved PT12 ES - - - 1990-09-11 - - 1999-08-15
0014 1 A Ph1 3.4.0 - Section II.5.3.8, Tests with State Transitions to `U0` and Clarification on Tests of In-call Functions. - - - - - - - 1991-05-03 - - 1999-08-15
0015 - E Ph1 3.4.0 - L3 Error Handling bad section reference. - - - - - - - 1991-04-11 - - 1999-08-15
0015 - A Ph1 3.1.0 - Test of MS reaction to non-mandatory information element errors in MM messages smg-28 232/90 Approved PT12/11-ser. - - - 1990-07-13 - - 1999-08-15
0015 1 E Ph1 3.4.0 - L3 Error Handling bad section reference. - - - - - - - 1991-05-22 - - 1999-08-15
0016 - A Ph1 3.4.0 - Frequency Redefinition: ma(j) range is too large. - - - - - - - 1991-04-11 - - 1999-08-15
0016 - A Ph1 3.1.0 - Test of dedicated channel assignment smg-28 232/90 Approved PT12 ES - - - 1990-09-11 - - 1999-08-15
0017 - E Ph1 3.4.0 - `Illegal MS` is NOT tested in a case of Location Updating Failure. - - - - - - - 1991-04-12 - - 1999-08-15
0018 - A Ph1 3.4.0 - After CHANNEL REL and before Paging time must be allowed for MS to do cell reselection. - - - - - - - 1991-04-12 - - 1999-08-15
0018 - E Ph1 3.1.0 - Clarification on how the MS is brought back to idle mode smg-28 232/90 Approved PT12 ES - - - 1990-09-24 - - 1999-08-15
0018 1 A Ph1 3.4.0 - Response time of the MS after lower layer failure. - - - - - - - 1991-05-22 - - 1999-08-15
0019 - A Ph1 3.4.0 - Paging MS without waiting for MS to do Cell Reselection. - - - - - - - 1991-04-12 - - 1999-08-15
0019 - A Ph1 3.1.0 - Test of structured procedures smg-28 232/90 Approved PT12/11-ser. - - - 1990-09-24 - - 1999-08-15
0019 1 A Ph1 3.4.0 - Paging MS without waiting for MS to do Cell Reselection. - - - - - - - 1991-05-22 - - 1999-08-15
0020 - A Ph1 3.4.0 - Waiting for Page Response after Location Updating Failure. - - - - - - - 1991-04-12 - - 1999-08-15
0020 - A Ph1 3.1.0 - Allowance of FACCH fill frames in layer 2 testing smg-28 232/90 Approved PT12/11-ser. - - - 1990-09-25 - - 1999-08-15
0020 1 A Ph1 3.4.0 - Waiting for Page Response after Location Updating Failure. - - - - - - - 1991-05-22 - - 1999-08-15
0021 - A Ph1 3.1.0 - Test of immediate assignment procedure smg-28 232/90 Approved PT12/11-ser - - - 1990-09-24 - - 1999-08-15
0022 - A Ph1 3.4.0 - Multiple Authentication procedure during Location Updating Failure. - - - - - - - 1991-04-11 - - 1999-08-15
0023 - E Ph1 3.4.0 - Bad comment in purpose of procedures. - - - - - - - 1991-04-12 - - 1999-08-15
0024 - E Ph1 3.4.0 - Section II.5.3.7.4.3.3: Removal of procedure without purpose. - - - - - - - 1991-04-11 - - 1999-08-15
0025 - C Ph2 3.4.0 - IMSI Detach in case of Location Updating Failure not tested. - - - - - - - 1991-04-12 - - 1999-08-15
0025 1 C Ph2 3.4.0 - IMSI Detach in case of Location Updating Failure not tested. - - - - - - - 1991-05-22 - - 1999-08-15
0026 - E Ph1 3.4.0 - Section II.5.3.7.4.3.3, Unclear reference to a Location Update Request message. - - - - - - - 1991-04-11 - - 1999-08-15
0026 - A Ph1 3.1.0 - Call control tests smg-28 232/90 Approved PT12/11-ser. - - - 1990-09-28 - - 1999-08-15
0026 1 E Ph1 3.4.0 - Section II.5.3.7.4.3.3, Unclear reference to a Location Update Request message. - - - - - - - 1991-05-22 - - 1999-08-15
0027 - E Ph1 3.4.0 - Section II.5.3.7.4.3.4, Unclear reference to a Location Update Request message. - - - - - - - 1991-04-11 - - 1999-08-15
0027 - A Ph1 3.1.0 - RR response frame loss smg-28 232/90 Approved PT12 ES - - - 1990-09-25 - - 1999-08-15
0027 1 E Ph1 3.4.0 - Section II.5.3.7.4.3.4, Unclear reference to a Location Update Request message. - - - - - - - 1991-05-22 - - 1999-08-15
0028 - E Ph1 3.4.0 - Wrong purpose of test for MM Connection Establishment rejected. - - - - - - - 1991-04-11 - - 1999-08-15
0028 - A Ph1 3.1.0 - Removal of RR commands from some layer 2 tests. smg-28 232/90 Approved PT12 ES - - - 1990-09-25 - - 1999-08-15
0029 - C Ph2 3.4.0 - `Illegal MS` is NOT tested in a case of Location Updating Failure. - - - - - - - 1991-04-12 - - 1999-08-15
0029 - A Ph1 3.1.0 - Messages for activation and deactivation of EMMI smg-28 232/90 Approved PT12 ES - - - 1990-09-10 - - 1999-08-15
0030 - A Ph1 3.4.0 - `Roaming not allowed` is no longer a valid MM Reject Cause. - - - - - - - 1991-04-12 - - 1999-08-15
0030 - A Ph1 3.1.0 - Removal of Test Request/Test Response messages smg-28 232/90 Approved PT12 - - - 1990-09-29 - - 1999-08-15
0031 - A Ph1 3.1.0 - Missing Assignment Complete smg-28 232/90 Approved PT12 ES - - - 1990-09-11 - - 1999-08-15
0032 - A Ph1 3.1.0 - Initial test on random access smg-28 232/90 Approved PT12 ES - - - 1990-09-06 - - 1999-08-15
0033 - A Ph1 3.1.0 - Mobile identity in IMSI attach test smg-28 232/90 Withdrawn PT12/11-ser. - - - 1990-09-28 - - 1999-08-15
0034 - A Ph1 3.1.0 - Test of MS functions in idle mode smg-28 232/90 Approved PT12 ES - - - 1990-09-11 - - 1999-08-15
0035 - A Ph1 3.1.0 - Cell selection/reselection under abnormal cases. smg-28 232/90 Approved PT12 ES - - - 1990-09-11 - - 1999-08-15
0036 - A Ph1 3.1.0 - Displaying mobile originating short messages. smg-28 232/90 Approved PT12 ES - - - 1990-09-11 - - 1999-08-15
0037 - C Ph2 3.4.0 - Activation and Deactivation of EMMI. - - - - - - - 1991-04-11 - - 1999-08-15
0037 - A Ph1 3.1.0 - Service codes in tests of call barring smg-28 232/90 Approved PT12 ES - - - 1990-09-11 - - 1999-08-15
0037 1 C Ph1 3.4.0 - Activation and Deactivation of EMMI. - - - - - - - 1991-04-19 - - 1999-08-15
0037 2 A Ph1 3.4.0 - Activation and Deactivation of EMMI. - - - - - - - 1991-05-22 - - 1999-08-15
0038 - C Ph2 3.4.0 - Modification of EMMI specification to assist with testing. - - - PT12-ES - - - 1991-04-14 - - 1999-08-15
0038 - A Ph1 3.1.0 - Test of deactivation of call barring smg-28 232/90 Approved PT12 ES - - - 1990-09-11 - - 1999-08-15
0038 0 A Ph1 3.3.0 - Modification of EMMI specification to assist with testing. - - - PT12-ES - - - 1990-07-20 - - 1999-08-15
0038 c C Ph2 3.4.0 - Modification of EMMI specification to assist with testing. - - - PT12-ES - - - 1991-04-14 - - 1999-08-15
0039 - C Ph2 3.4.0 - Removal of N(SD) field in Special Test Message Descriptions. - - - - - - - 1991-04-12 - - 1999-08-15
0039 - A Ph1 3.1.0 - Wording of note concerning use of NAK. smg-28 232/90 Approved PT12 ES - - - 1990-09-11 - - 1999-08-15
0039 0 A Ph1 3.3.0 - Removal of N(SD) field in Special Test Message Descriptions. - - - - - - - 1991-04-11 - - 1999-08-15
0040 - C Ph2 3.4.0 - Clarification on use of EMMI messages 241 and 242. - - - - - - - 1991-04-12 - - 1999-08-15
0040 - A Ph1 3.1.0 - Specification of key codes for ""058 KEYS"" message smg-28 232/90 Approved PT12 ES - - - 1990-09-11 - - 1999-08-15
0041 - C Ph2 3.4.0 - EMMI messages for investigation of MS status. - - - - - - - 1991-04-10 - - 1999-08-15
0041 - A Ph1 3.1.0 - Test of L3 error handling smg-28 232/90 Approved PT12/11-ser. - - - 1990-09-03 - - 1999-08-15
0042 - C Ph1 3.4.0 - Clarification of EMMI definition. - - - - - - - 1991-04-19 - - 1999-08-15
0042 - A Ph1 3.1.0 - EMMI message on receipt of short message. smg-28 232/90 Approved PT12 ES - - - 1990-09-10 - - 1999-08-15
0043 - A Ph1 3.1.0 - Test of handover smg-28 232/90 Approved PT12-ES - - - 1990-09-05 - - 1999-08-15
0044 - C Ph1 3.4.0 - Clarification on use and implications of a Test-SIM. - - - - - - - 1991-04-19 - - 1999-08-15
0044 - A Ph1 3.1.0 - Messages on the EMMI smg-28 232/90 Approved PT12 ES - - - 1990-09-10 - - 1999-08-15
0044 1 A Ph1 3.4.0 - Clarification on use and implications of a Test-SIM. - - - - - - - 1991-05-22 - - 1999-08-15
0045 1 A Ph1 3.1.0 - Correction of test II.5.3.5.6.3 (error handling) smg-28 232/90t Approved PT12 ES - - - 1990-09-24 - - 1999-08-15
0046 - A Ph1 3.1.0 - Intermodulation rejection smg-28 232/90 Approved PT12/11-ser. - - - 1990-09-28 - - 1999-08-15
0047 - A Ph1 3.4.0 - Definitions on EMMI Layer 1 and 2. - - - - - - - 1991-05-17 - - 1999-08-15
0047 - A Ph1 3.1.0 - Channel request smg-28 232/90 Approved PT12/11-ser. - - - 1990-09-28 - - 1999-08-15
0047 1 A Ph1 3.4.0 - Definitions on EMMI Layer 1 and 2. - - - ES EMMI SG - - - 1991-05-22 - - 1999-08-15
0048 - A Ph1 3.1.0 - Changes to sect. II.6.1.5 smg-28 234/90 Approved MoU-RIC - - - 1990-09-27 - - 1999-08-15
0049 - E Ph1 3.1.0 - Testing of call progress tones, II.16.2 smg-28 235/90 Approved MoU-RIC - - - 1990-09-27 - - 1999-08-15
0050 - A Ph1 3.1.0 - Modification of sect. II.11.1.10.2 smg-28 236/90 Approved MoU-RIC - - - 1990-09-27 - - 1999-08-15
0051 - A Ph1 3.1.0 - Deletion of sect. II.11.1.5.2 smg-28 237/90 Approved MoU-RIC - - - 1990-09-27 - - 1999-08-15
0052 - D Ph2 3.4.0 - Cause value in a CM SERVICE REJECT message during CC tests. - - - - - - - 1991-05-22 - - 1999-08-15
0052 - A Ph1 3.1.0 - Changes to sect. II.4.6 Intermodulation Rejection smg-28 238/90 Withdrawn PT12/11-ser. - - - 1990-09-27 - - 1999-08-15
0053 - A Ph1 3.2.0 - Blocking and Spurious Response. - - - PT12-ES - - - 1990-11-05 - - 1999-08-15
0053 1 A Ph1 3.2.0 - Blocking and Spurious Response. smg-29 85/91 Approved PT12-ES - - - 1991-01-05 - - 1999-08-15
0054 - E Ph1 3.4.0 - Wrong state in two tables. - - - - - - - 1991-05-22 - - 1999-08-15
0054 - A Ph1 3.2.0 - Output RF Spectrum Gating Function. smg-29 85/91 Approved PT12-ES - - - 1990-11-05 - - 1999-08-15
0055 - D Ph2 3.4.0 - Sequence of messages. - - - - - - - 1991-05-22 - - 1999-08-15
0055 - A Ph1 3.2.0 - Output RF Spectrum Signal Level. smg-29 85/91 Approved PT12-ES - - - 1990-11-05 - - 1999-08-15
0056 - A Ph1 3.2.0 - Spurious emissions resolution bandwith. - - - - - - - 1990-11-05 - - 1999-08-15
0056 1 A Ph1 3.2.0 - Spurious emissions resolution bandwith. - - - - - - - 1990-12-12 - - 1999-08-15
0056 2 A Ph1 3.2.0 - Test on Spurious Emissions. smg-29 85/91 Approved PT12-ES - - - 1991-01-05 - - 1999-08-15
0057 - A Ph1 3.2.0 - Radiation Test Sites (11.10 Appendix). - - - PT12-ES - - - 1990-11-06 - - 1999-08-15
0057 1 E Ph1 3.2.0 - Review of Annex 1 and Appendices. smg-29 85/91 Approved PT12-ES - - - 1991-01-05 - - 1999-08-15
0058 - A Ph1 3.4.0 - Tests of modification procedure. - - - - - - - 1991-05-22 - - 1999-08-15
0058 - E Ph1 3.1.0 - Additional editorial changes to v.3.01.00 for release as v.3.02.00. smg-29 85/91 Approved PT12-ES - - - 1991-01-15 - - 1999-08-15
0059 - - Ph2 3.4.0 - ? (Two tests?). - - - - - - - 1991-05-22 - - 1999-08-15
0059 - A Ph1 3.2.0 - Test input level for interfering signals. smg-29 85/91 Approved PT12-ES - - - 1990-11-29 - - 1999-08-15
0060 - A Ph1 3.2.0 - Automatic Repeat Call Attempt Restrictions. - - - - - - - 1991-01-03 - - 1999-08-15
0060 0 A Ph1 3.2.0 - Section II.9 - Blacklisting. - - - PT12-ES - - - 1990-08-31 - - 1999-08-15
0060 1 A Ph1 3.2.0 - Test of Autocalling Restrictions. smg-29 11/91 postponed PT12-ES - - - 1991-01-04 - - 1999-08-15
0060 2 A Ph1 3.2.0 - Test of Autocalling Restrictions. smg-29 11/91R Approved PT12-ES - - - 1991-01-15 - - 1999-08-15
0061 - A Ph1 3.2.0 - Introduction of a trade off between FER and class Ib RBER. - - - - - - - 1991-01-05 - - 1999-08-15
0061 0 A Ph1 3.2.0 - Introduction of a tradeoff between FER and RBER. - - - - - - - 1990-10-24 - - 1999-08-15
0061 1 A Ph1 3.2.0 - Introduction of a trade off between FER and class Ib RBER. smg-29 53/91 Approved PT12-ES - - - 1991-01-05 - - 1999-08-15
0062 - A Ph1 3.2.0 - Change to nominal error rates specification. smg-29 54/91 Rejected PT12-ES - - - 1990-11-23 - - 1999-08-15
0063 - A Ph1 3.2.0 - Spurious emissions allowed in spectrum due to modulation test. smg-29 56/91 Approved PT12-ES - - - 1991-01-05 - - 1999-08-15
0064 - A Ph1 3.2.0 - Adjacent Time Slot Rejection. smg-29 103/91 Approved Alcatel, F - - - 1990-12-12 - - 1999-08-15
0065 - A Ph1 3.2.0 - Network selection / Indication (II.16.3 and II.16.4). - - - - - - - 1991-01-05 - - 1999-08-15
0065 1 A Ph1 3.2.0 - Network selection / Indication (II.16.3 and II.16.4). smg-29 17/91 postponed PT12-ES - - - 1991-01-10 - - 1999-08-15
0065 2 A Ph1 3.2.0 - Network selection / Indication (II.16.3 and II.16.4). smg-29 118/91 Approved PT12-ES - - - 1991-01-18 - - 1999-08-15
0066 - A Ph1 3.2.0 - Handling of undefined supplementary services. smg-29 87/91 postponed Norwegian Telecom - - - 1991-01-11 - - 1999-08-15
0066 1 A Ph1 3.2.0 - Handling of undefined supplementary services. smg-29 87/91R postponed Norwegian Telecom - - - 1991-01-16 - - 1999-08-15
0067 - A Ph1 3.2.0 - Bit/Character duration on contact C7 of the SIM/ME Interface. - - - PT12-ES - - - 1990-07-24 - - 1999-08-15
0068 - A Ph1 3.2.0 - Removal of Progress I frame from some Layer 2 tests. smg-29 31/91 Approved PT12-ES - - - 1991-01-07 - - 1999-08-15
0070 - A Ph1 3.2.0 - Test of spurious emissions. smg-29 85/91 Approved PT12-ES - - - 1991-01-05 - - 1999-08-15
0071 - E Ph1 3.2.0 - Phase and Frequency Error under vibration. smg-29 85/91 Approved PT12-ES - - - 1991-01-04 - - 1999-08-15
0071 0 E Ph1 3.2.0 - Phase and Frequency Error under vibration. - - - - - - - 1991-01-04 - - 1999-08-15
0072 - A Ph1 3.2.0 - Mounting for Vibration Test. smg-29 85/91 Approved PT12-ES - - - 1991-01-04 - - 1999-08-15
0072 0 A Ph1 3.2.0 - Mounting for Vibration Test. - - - - - - - 1991-01-04 - - 1999-08-15
0073 - E Ph1 3.2.0 - Switching transient measurement clarification. - - - PT12-ES - - - - - - 1999-08-15
0073 1 A Ph1 3.2.0 - Switching transient measurement. smg-29 85/91 Approved PT12-ES - - - 1991-01-05 - - 1999-08-15
0074 - E Ph1 3.2.0 - Section II.5.2.1.1.3: Pre-conditions. smg-29 85/91 Approved PT12-ES - - - 1991-01-04 - - 1999-08-15
0075 - E Ph1 3.2.0 - Wrong reference in II.5.2.1.1.6. smg-29 85/91 Approved PT12-ES - - - 1991-01-04 - - 1999-08-15
0076 - A Ph1 3.2.0 - Segmentation and Concatenation. - - - - - - - 1990-12-12 - - 1999-08-15
0076 0 A Ph1 3.2.0 - Segmentation and Concatenation. - - - - - - - 1990-12-12 - - 1999-08-15
0076 1 A Ph1 3.2.0 - Errors in section II.5.2.2.2.3. smg-29 85/91 Approved PT12-ES - - - 1991-01-04 - - 1999-08-15
0077 - E Ph1 3.2.0 - Section II.5.2.2.3: Normal Layer 2 Disconnection. smg-29 85/91 Approved PT12-ES - - - 1991-01-04 - - 1999-08-15
0078 - A Ph1 3.2.0 - Undefined test messages in L2 tests. smg-29 85/91 Approved PT12-ES - - - 1991-01-04 - - 1999-08-15
0079 - A Ph1 3.2.0 - Correction of N(S) sequence error test. smg-29 85/91 Approved PT12-ES - - - 1991-01-04 - - 1999-08-15
0080 - A Ph1 3.2.0 - N(R) sequence error test. smg-29 85/91 postponed PT12-ES - - - 1990-12-12 - - 1999-08-15
0080 0 A Ph1 3.2.0 - N(R) sequence error test. - - - - - - - 1990-12-12 - - 1999-08-15
0080 1 A Ph1 3.2.0 - N(R) sequence error test. smg-29 115/91 Approved PT12_ES - - - 1991-01-17 - - 1999-08-15
0081 - A Ph1 3.2.0 - Default conditions during L3 tests. smg-29 85/91 Approved PT12-ES - - - 1990-12-05 - - 1999-08-15
0081 0 A Ph1 3.2.0 - Default conditions during L3 tests. - - - - - - - 1990-12-05 - - 1999-08-15
0082 - E Ph1 3.2.0 - General Rules for Message Parameters. smg-29 85/91 Approved PT12-ES - - - 1991-01-04 - - 1999-08-15
0083 - A Ph1 3.2.0 - Test of TI error in CC message. smg-29 85/91 Approved PT12-ES - - - 1990-12-05 - - 1999-08-15
0084 - A Ph1 3.2.0 - Alignment with GSM 04.08 (04.08-200 R1). smg-29 85/91 - PT12-ES - - - 1990-12-04 - - 1999-08-15
0084 0 A Ph1 3.2.0 - Alignment with GSM 04.08 (04.08-200 R1). - - - - - - - 1990-12-04 - - 1999-08-15
0085 - A Ph1 3.2.0 - Changing the order of RR-STATUS and handover. smg-29 85/91 Approved PT12-ES - - - 1991-01-04 - - 1999-08-15
0086 - A Ph1 3.2.0 - Section II.5.3.6.3: Measurement Report. smg-29 85/91 Approved PT12-ES - - - 1991-01-04 - - 1999-08-15
0087 - A Ph1 3.2.0 - Deletion for Phase 1 of Tests II.5.3.6.9 and II.5.3.6.10. smg-29 85/91 Approved PT12-ES - - - 1990-12-05 - - 1999-08-15
0087 0 A Ph1 3.2.0 - Deletion for Phase 1 of Tests II.5.3.6.9 and II.5.3.6.10. - - - - - - - 1990-12-05 - - 1999-08-15
0088 - E Ph1 3.2.0 - Correction of references in II.5.3.7.4.3.1, Procedure 6, d). - - - - - - - 1990-12-07 - - 1999-08-15
0089 - A Ph1 3.2.0 - Location updating failure. smg-29 85/91 Approved PT12-ES - - - 1991-01-04 - - 1999-08-15
0090 - A Ph1 3.2.0 - Test of Call Control. smg-29 85/91 Approved PT12-ES - - - 1990-12-05 - - 1999-08-15
0090 0 A Ph1 3.2.0 - Test of Call Control. - - - - - - - 1990-12-05 - - 1999-08-15
0091 - A Ph1 3.2.0 - Call Reestablishment. smg-29 85/91 Approved PT12-ES - - - 1991-01-04 - - 1999-08-15
0092 - A Ph1 3.2.0 - Reception Time Tracking Speed, Signal Levels. smg-29 85/91 Approved PT12-ES - - - 1991-01-05 - - 1999-08-15
0093 - A Ph1 3.2.0 - Section II.6.2: RX Measurement. smg-29 85/91 Approved PT12-ES - - - 1991-01-05 - - 1999-08-15
0094 - E Ph1 3.3.0 - Clarification to align with 07.01-16. (Will not be presented by GSM4.) - - - - - - - 1991-03-07 - - 1999-08-15
0094 - A Ph1 3.2.0 - Test of handover. smg-29 85/91 Approved PT12-ES - - - 1991-01-04 - - 1999-08-15
0095 - A Ph1 3.2.0 - Section II.8 - Testing of SIM/ME Interface. smg-29 85/91 Approved PT12-ES - - - 1991-01-05 - - 1999-08-15
0095 0 A Ph1 3.2.0 - Section II.8 - Testing of SIM/ME Interface. - - - - - - - 1990-11-06 - - 1999-08-15
0096 - E Ph1 3.2.0 - Revision of II.5.3.1 and II.5.3.2 for removal of codings. - - - - - - - 1990-12-05 - - 1999-08-15
0096 - A Ph1 3.2.0 - Change of Echo Loss from 56 dB to 46 dB. smg-29 85/91 Approved PT12-ES - - - 1990-10-05 - - 1999-08-15
0096 0 E Ph1 3.2.0 - Revision of II.5.3.1 and II.5.3.2 for removal of codings. - - - - - - - 1990-12-05 - - 1999-08-15
0097 - E Ph1 3.2.0 - Removal of coding in section II.5.3.5. - - - - - - - 1990-12-04 - - 1999-08-15
0097 - A Ph1 3.2.0 - Deletion of Tests on Fax services. smg-29 85/91 Approved PT12-ES - - - 1991-01-05 - - 1999-08-15
0097 0 E Ph1 3.2.0 - Removal of coding in section II.5.3.5. - - - - - - - 1990-12-04 - - 1999-08-15
0098 - E Ph1 3.2.0 - Test of authentication elementary procedure. - - - - - - - 1990-12-05 - - 1999-08-15
0098 - A Ph1 3.2.0 - Test of SS in GSM 11.10 - Use of basic public MMI. smg-29 85/91 Approved PT12-ES - - - 1991-01-05 - - 1999-08-15
0098 0 E Ph1 3.2.0 - Test of authentication elementary procedure. - - - - - - - 1990-12-05 - - 1999-08-15
0099 - E Ph1 3.2.0 - Test of identification elementary procedure. - - - - - - - 1990-12-05 - - 1999-08-15
0099 - A Ph1 3.2.0 - Alignment of section II.12 to GSM 04.82. smg-29 85/91 Approved PT12-ES - - - 1991-01-05 - - 1999-08-15
0099 0 E Ph1 3.2.0 - Test of identification elementary procedure. - - - - - - - 1990-12-05 - - 1999-08-15
0100 - A Ph1 3.2.0 - Handling of undefined (future) GSM Supplementary Services. smg-29 85/91 postponed PT12-ES - - - 1991-01-05 - - 1999-08-15
0100 1 A Ph1 3.2.0 - Handling of undefined (future) GSM Supplementary Services. smg-29 120/91 Approved PT12 and VODAFONE - - - 1991-01-18 - - 1999-08-15
0101 - A Ph1 3.2.0 - Handling of Undefined Supplementary Services. smg-29 85/91 postponed UK - VODAFONE - - - 1991-01-15 - - 1999-08-15
0102 - A Ph1 3.2.0 - Annex 2: Measurement Uncertainty. smg-29 85/91 Approved PT12-ES - - - 1991-01-16 - - 1999-08-15
0103 - A Ph1 3.2.0 - Protocol implementation information. smg-29 85/91 Approved PT12-ES - - - 1991-01-15 - - 1999-08-15
0104 - A Ph1 3.2.0 - Test Report smg-29 85/91 Approved PT12-ES - - - 1990-01-15 - - 1999-08-15
0105 - E Ph1 3.2.0 - Editorial changes for clarification. smg-29 85/91 postponed PT12-ES - - - 1991-01-15 - - 1999-08-15
0105 1 E Ph1 3.2.0 - Editorial changes for clarification. smg-29 123/91 Approved PT12-ES - - - 1991-01-18 - - 1999-08-15
0106 - A Ph1 3.2.0 - Echo return loss. smg-29 122/91 Approved PT12-ES - - - 1991-01-13 - - 1999-08-15
0107 0 A Ph1 3.3.0 - Correction of 11.10-95, Testing of SIM/ME Interface. - - - - - - - 1991-02-01 - - 1999-08-15
0107 1 A Ph1 3.3.0 - Correction of 11.10-95, Testing of SIM/ME Interface. smg-30 170/91 Approved PT12-ES - - - 1991-03-04 - - 1999-08-15
0107 2 A Ph1 3.3.0 - Correction of 11.10-95, Testing of SIM/ME Interface. smg-31 207/91 - PT12-ES - - - 1991-04-22 - - 1999-08-15
0107 a A Ph1 3.3.0 - Other comments to 11.10-107 R2. - - - PT12 - - - 1991-04-22 - - 1999-08-15
0108 - A Ph1 3.3.0 - Test of Password Procedures. smg-30 170/91 Approved PT12-ES - - - 1991-02-09 - - 1999-08-15
0108 0 A Ph1 3.3.0 - Test of Password Procedures. - - - - - - - 1991-02-04 - - 1999-08-15
0109 - E Ph1 3.3.0 - EMMI: OPEN_LOOP_ACK Message. smg-30 170/91 Approved PT12-ES - - - 1991-01-30 - - 1999-08-15
0110 - E Ph1 3.3.0 - Correction of coding indication in section II.5.3.1.1. smg-30 170/91 Approved PT12-ES - - - 1991-02-07 - - 1999-08-15
0111 - E Ph1 3.3.0 - Correction of text for clarification in Annex 3, 1.2.5. smg-30 170/91 Approved PT12-ES - - - 1991-02-08 - - 1999-08-15
0112 - A Ph1 3.3.0 - Test of Adjacent Timeslot Rejection - - - - - - - 1991-02-07 - - 1999-08-15
0112 1 A Ph1 3.3.0 - Test of Adjacent Timeslot Selectivity. smg-30 170/91 Approved PT12-ES - - - 1991-02-20 - - 1999-08-15
0113 - A Ph1 3.3.0 - Change of limit performance values for reference sensitivity test on control channels. - - - GSM2/PT12 - - - 1991-03-07 - - 1999-08-15
0113 1 A Ph1 3.3.0 - Change of limit performance values for reference sensitivity test on control channels. smg-30 124/91 Approved GSM2/PT12 - - - 1991-03-07 - - 1999-08-15
0114 - A Ph1 3.3.0 - Change of test of spurious response to allow realistic exceptions. - - - GSM2/PT12 - - - 1991-03-07 - - 1999-08-15
0114 1 A Ph1 3.3.0 - Change of test of spurious response to allow realistic exceptions. smg-30 125/91 Approved GSM2/PT12 - - - 1991-03-07 - - 1999-08-15
0115 - A Ph1 3.3.0 - Contents of the message RXSM on the EMMI. smg-30 170/91 Approved Alcatel, France - - - 1991-03-06 - - 1999-08-15
0116 - A Ph1 3.3.0 - Section II.3.3, Excessive test time. smg-30 170/91 Approved VODAFONE (UK) - - - 1991-03-07 - - 1999-08-15
0117 - A Ph1 3.3.0 - Alignment to GSM 07.02 on V.25bis. smg-30 173/91 Approved PT12 - - - 1991-03-07 - - 1999-08-15
0118 - A Ph1 3.3.0 - Removal of Tests for User Data Rate of 600 bit/s. smg-30 170/91 Approved PT12 - - - 1991-03-07 - - 1999-08-15
0119 - A Ph1 3.3.0 - Alignment with GSM core recs. on data services. smg-30 170/91 Approved PT12 - - - 1991-03-07 - - 1999-08-15
0120 - A Ph1 3.3.0 - Call Clearing by DTE. smg-30 170/91 Approved PT12 - - - 1991-03-07 - - 1999-08-15
0121 - E Ph1 3.3.0 - Removal of editorial notes in sections II.15.2.3.3-4. smg-30 170/91 Approved PT12 - - - 1991-03-07 - - 1999-08-15
0122 - A Ph1 3.3.0 - Removal of test of quiescent states for Phase 1. smg-30 170/91 Approved PT12 - - - 1991-03-07 - - 1999-08-15
0123 - A Ph1 3.3.0 - Definition of Test-SIM and Test Algorithm for Authentication. smg-30 174/91 Withdrawn Cellnet (UK) - - - 1991-03-08 - - 1999-08-15
0123 1 A Ph1 3.3.0 - Definition of Test-SIM and Test Algoritm for Authentication. smg-30 174/91R Approved MoU (Cellnet, UK) - - - 1991-03-13 - - 1999-08-15
0124 - A Ph1 3.3.0 - Removal of half rate channels for Phase 1. smg-30 195/91 Approved PT12 - - - 1991-03-14 - - 1999-08-15
0125 - A Ph1 3.3.0 - Withdrawal of GSM 11.01. smg-31 206/91 - PT12 - - - 1991-04-18 - - 1999-08-15
0125 a A Ph1 3.3.0 - Other comments to 11.10-125, Withdrawal of GSM 11.01. - - - PT12 - - - 1991-04-18 - - 1999-08-15
0126 - A Ph1 3.4.0 - Correction to 112 R1 on Test of Adjacent Timeslot Selectivity. smg-31 250/91 - PT12 - - - 1991-05-28 - - 1999-08-15
0127 - E Ph1 3.4.0 - Section II.5.3.6.2.4, Test of Radio Resource. smg-31 250/91 - PT12-ES - - - 1991-03-27 - - 1999-08-15
0129 - A Ph1 3.4.0 - Coding of unknown Information Elements in Layer 3 messages. smg-31 250/91 - PT12-ES - - - 1991-04-04 - - 1999-08-15
0130 - A Ph1 3.4.0 - Test II.5.2.2.2.3, Segmentation and Concatenation. smg-31 250/91 - PT12-ES - - - 1991-04-04 - - 1999-08-15
0131 - A Ph1 3.4.0 - Frequency Redefinition: ma(j) range is too large. smg-31 250/91 - PT12-ES - - - 1991-05-22 - - 1999-08-15
0132 - A Ph1 3.4.0 - Paging MS without waiting for MS to do Cell Reselection. smg-31 250/91 - PT12-ES - - - 1991-05-23 - - 1999-08-15
0133 - A Ph1 3.4.0 - Location Updating: Wrong procedure reference. smg-31 250/91 - PT12-ES - - - 1991-04-11 - - 1999-08-15
0134 - A Ph1 3.4.0 - Activation and Deactivation of EMMI. - - - PT12-ES - - - 1991-05-23 - - 1999-08-15
0134 1 A Ph1 3.4.0 - Activation and Deactivation of EMMI. smg-31 251/91 - PT12-ES - - - 1991-05-29 - - 1999-08-15
0135 - A Ph1 3.4.0 - Modification of EMMI specification to assist with testing. - - - PT12-ES - - - 1991-04-19 - - 1999-08-15
0135 1 A Ph1 3.4.0 - Modification of EMMI specification to assist with testing. smg-31 251/91 - PT12 - - - 1991-06-06 - - 1999-08-15
0136 - E Ph1 3.4.0 - Removal of N(SD) field in Special Test Message Descriptions. smg-31 251/91 - PT12-ES - - - 1991-04-19 - - 1999-08-15
0137 - E Ph1 3.4.0 - Clarification on use of EMMI messages 240, 241 and 242. smg-31 251/91 - PT12-ES - - - 1991-04-19 - - 1999-08-15
0138 - A Ph1 3.4.0 - EMMI messages for investigation on reception of Short Message. smg-31 251/91 - PT12-ES - - - 1991-04-19 - - 1999-08-15
0139 - E Ph1 3.4.0 - Clarification of EMMI definition. smg-31 251/91 - PT12-ES - - - 1991-05-22 - - 1999-08-15
0140 - E Ph1 3.4.0 - Use of EMMI `ACK`, `NAK`, `XON` and `XOF` messages. smg-31 251/91 - PT12-ES - - - 1991-04-19 - - 1999-08-15
0141 - A Ph1 3.4.0 - Clarification on use and implications of a Test-SIM. smg-31 251/91 - PT12-ES - - - 1991-05-23 - - 1999-08-15
0142 - A Ph1 3.4.0 - EMMI messages on internal Bell/User Alert status. smg-31 251/91 - PT12-ES - - - 1991-05-06 - - 1999-08-15
0143 - E Ph1 3.4.0 - Clarification on EMMI `HW and SW Reset` Message. smg-31 251/91 - PT12-ES - - - 1991-05-06 - - 1999-08-15
0144 - A Ph1 3.4.0 - Definitions on EMMI Layer 1 and 2. smg-31 251/91 - PT12-ES - - - 1991-05-23 - - 1999-08-15
0145 - A Ph1 3.4.0 - Section II.11.1.2: SLR Requirement. smg-31 250/91 - PT12-ES - - - 1991-05-14 - - 1999-08-15
0146 - A Ph1 3.4.0 - Authentication failure tone (II.16.2.5). smg-31 250/91 - PT12-ES - - - 1991-05-14 - - 1999-08-15
0147 - A Ph1 3.4.0 - Verification of U0 in call control tests. smg-31 250/91 - PT12-ES - - - 1991-05-22 - - 1999-08-15
0147 a A Ph1 3.4.0 - Sol. PH2 to: Verification of U0 in call control tests. - - - - - - - 1991-05-22 - - 1999-08-15
0148 - A Ph1 3.4.0 - Verification of U0.1 in call control tests. smg-31 250/91 - PT12-ES - - - 1991-05-22 - - 1999-08-15
0149 - A Ph1 3.4.0 - Timer T301 in L3 tests. smg-31 250/91 - PT12-ES - - - 1991-05-22 - - 1999-08-15
0150 - A Ph1 3.4.0 - Wrong state in two tables. smg-31 250/91 - PT12-ES - - - 1991-05-23 - - 1999-08-15
0151 - A Ph1 3.4.0 - Call release with Progress Indicator #8. smg-31 250/91 - PT12-ES - - - 1991-05-22 - - 1999-08-15
0152 - A Ph1 3.4.0 - MMCC_SYNC_IND. smg-31 250/91 - PT12-ES - - - 1991-05-22 - - 1999-08-15
0153 - A Ph1 3.4.0 - Tests of modification procedure. smg-31 250/91 - PT12-ES - - - 1991-05-23 - - 1999-08-15
0154 - A Ph1 3.4.0 - EMMI Keystroke definition. smg-31 251/91 - PT12-ES - - - 1991-05-22 - - 1999-08-15
0155 - A Ph1 3.4.0 - PIXIT Statement on Support of EMMI. smg-31 251/91 - PT12 - - - 1991-05-24 - - 1999-08-15
0156 - A Ph1 3.4.0 - Incorporation of Bearer Service 11 into other Bearer Services. smg-31 218/91 - GSM4 - - - 1991-05-17 - - 1999-08-15
0157 - A Ph1 3.4.0 - Time Reference of the Power/Time Mask. smg-31 244/91 - PT12-ES - - - 1991-05-30 - - 1999-08-15
0158 - A Ph1 3.4.0 - II.3.4: Reduction of Test Time. smg-31 245/91 - PT12-ES - - - 1991-05-30 - - 1999-08-15
0159 - E Ph1 3.4.0 - Reference Power Level for Power/Time Template. smg-31 250/91 - PT12 - - - 1991-05-30 - - 1999-08-15
0160 - E Ph1 3.4.0 - Test of state transition on user call reject. smg-31 250/91 - PT12 - - - 1991-05-30 - - 1999-08-15
0161 - A Ph1 3.4.0 - Removal of error in testing of random delay generation (part of initial Layer 3 tests). smg-31 250/91 - Ericsson, Sweden - - - 1991-05-21 - - 1999-08-15
0162 - A Ph1 3.4.0 - Testing of Notification Procedure. smg-31 250/91 - PT12-ES - - - 1991-05-31 - - 1999-08-15
0163 - A Ph1 3.5.0 - Testing of SIM/ME Interface: Access Control. - /91 - PT12-ES - - - 1991-07-12 - - 1999-08-15
0164 1 A Ph1 3.5.0 - Section II.16.3 Test of Manual PLMN Selection. smg-32 347/91 - PT12-ES - - - 1991-07-18 - - 1999-08-15
0165 - A Ph1 3.5.0 - Error in L2 test ""Loss of RR-frame"". smg-32 347/91 Approved PT12-ES - - - 1991-09-12 - - 1999-08-15
0166 - E Ph1 3.5.0 - Wrong value of T1 in test of initial access. smg-32 347/91 - PT12-ES - - - 1991-08-16 - - 1999-08-15
0167 1 A Ph1 3.5.0 - Response to paging with IMSI when the MS is in the `idle, roaming not allowed` state. smg-32 347/91 - PT12-ES - - - 1991-09-03 - - 1999-08-15
0168 1 A Ph1 3.5.0 - Test on Expiry of Timer T3230. - /91 - - - - - 1991-09-04 - - 1999-08-15
0168 2 A Ph1 3.5.0 - Test on Expiry of Timer T3230. smg-32 347/91 - PT12-ES - - - 1991-09-20 - - 1999-08-15
0169 - A Ph1 3.5.0 - Test of L3 error handling in II.5.3.5.6.3. smg-32 347/91 - PT12-ES - - - 1991-07-09 - - 1999-08-15
0170 - E Ph1 3.5.0 - II.5.3.6.3 Measurement Report, levels and colour codes. - /91 - - - - - 1991-07-09 - - 1999-08-15
0170 1 E Ph1 3.5.0 - II.5.3.6.3 Measurement Report, levels and colour codes. smg-32 347/91 - PT12-ES - - - 1991-09-17 - - 1999-08-15
0171 - A Ph1 3.5.0 - Default conditions during L3 tests: Uplink output power. - /91 - - - - - 1991-07-09 - - 1999-08-15
0172 - E Ph1 3.5.0 - Testing of transient CC-states. smg-32 347/91 - PT12-ES - - - 1991-09-20 - - 1999-08-15
0173 - A Ph1 3.5.0 - Error in initial conditions in tests of CC. smg-32 347/91 - PT12-ES - - - 1991-09-19 - - 1999-08-15
0174 - E Ph1 3.5.0 - Missing indication that state U6 is transient. smg-32 347/91 - PT12-ES - - - 1991-09-19 - - 1999-08-15
0175 1 A Ph1 3.5.0 - Selftesting of the MS. smg-32 347/91 - PT12-ES - - - 1991-09-19 - - 1999-08-15
0176 - A Ph1 3.5.0 - II.3.1.1 Phase Error and Frequency Error. smg-32 347/91 - PT12-ES - - - 1991-09-16 - - 1999-08-15
0177 - A Ph1 3.5.0 - Power/time template test for equipment with an integral antenna. smg-32 347/91 - PT12-ES - - - 1991-09-19 - - 1999-08-15
0178 1 A Ph1 3.5.0 - Channel release tests. smg-32 347/91 - PT12-ES - - - 1991-09-20 - - 1999-08-15
0179 - A Ph1 3.5.0 - II.6.2.1.2: Correction of step numbers. smg-32 347/91 - Nokia Mob.Phones UK - - - 1991-09-24 - - 1999-08-15
0180 - A Ph1 3.5.0 - II.6.2.1: Test on RXLEV. smg-32 347/91 - Nokia Mob.Phones UK - - - 1991-09-24 - - 1999-08-15
0181 - A Ph1 3.5.0 - Testing of SMS. smg-32 347/91 - PT12-ES - - - 1991-09-20 - - 1999-08-15
0182 - A Ph1 3.5.0 - II.8.8: Access Class coding. smg-32 347/91 - PT12-ES - - - 1991-09-20 - - 1999-08-15
0187 2 A Ph1 3.6.0 - Testing of 'Channel release after unrecoverable errors'. smg-01 32/92 Approved PT12-ES - - - 1991-11-13 - - 1999-08-15
0188 2 A Ph1 3.6.0 - Errors in the 'CHANNEL RELEASE' tests. smg-01 32/92 Approved PT12-ES - - - 1991-10-18 - - 1999-08-15
0189 1 A Ph1 3.6.0 - Test of MS reaction to non-mandatory IE errors. smg-01 32/92 Approved PT12-ES - - - 1991-10-18 - - 1999-08-15
0190 3 A Ph1 3.6.0 - Indication of NO-NCELL-M in measurement reports. smg-01 32/92 Approved PT12-ES - - - 1991-10-18 - - 1999-08-15
0191 - A Ph1 3.6.0 - Section II.16.3: Check of camping on cell. - /91 - PT12 - - - 1991-11-15 - - 1999-08-15
0191 2 E Ph1 3.6.0 - Section II.16.3: Check of camping on cell. smg-01 32/92 Approved PT12-ES - - - 1991-12-04 - - 1999-08-15
0192 - A Ph1 3.6.0 - DAI - Correction of inconsistent description. smg-01 32/92 Approved PT12-ES - - - 1991-11-28 - - 1999-08-15
0193 - A Ph1 3.6.0 - Testing of Data Services - Section I.3 smg-01 32/92 Approved PT12-ES - - - 1991-12-11 - - 1999-08-15
0194 - A Ph1 3.6.0 - Testing of Bearer Services smg-01 32/92 Approved PT12-ES - - - 1991-12-11 - - 1999-08-15
0195 - A Ph1 3.6.0 - Testing of Support for Non-Transparent Services smg-01 32/92 Approved PT12-ES - - - 1991-12-11 - - 1999-08-15
0196 - A Ph1 3.6.0 - Tests for Mobile Stations Equipped with a Connector, to connect Data Terminal Equipment smg-01 32/92 Approved PT12-ES - - - 1991-12-11 - - 1999-08-15
0197 - E Ph1 3.6.0 - Editorial changes and clarifications to II.4.2.3 smg-01 32/92 Approved PT12-ES - - - 1991-12-11 - - 1999-08-15
0198 - A Ph1 3.6.0 - Annex 3, related to Testing of Data Services smg-01 32/92 Approved PT12-ES - - - 1991-12-04 - - 1999-08-15
0199 - A Ph1 3.6.0 - Test of Temporary Reception Gaps smg-01 32/92 Approved PT12-ES - - - 1991-12-10 - - 1999-08-15
0200 - A Ph1 3.6.0 - Testing of TMSI reallocation procedure smg-01 32/92 Approved PT12-ES - - - 1991-12-05 - - 1999-08-15
0201 - A Ph1 3.6.0 - Annex 3 PIXIT Information - IMEI. smg-01 32/92 Approved PT12-ES - - - 1991-11-29 - - 1999-08-15
0202 1 A Ph1 3.6.0 - Spurious Emissions, Section II.2.2.2.1 smg-01 32/92 Approved PT12-ES - - - 1991-12-09 - - 1999-08-15
0203 - A Ph1 3.6.0 - FER measurement on FACCH using TEST INTERFACE message smg-01 32/92 Approved PT12-ES - - - 1991-12-10 - - 1999-08-15
0204 - A Ph1 3.6.0 - Essential corrections to section II.11.various smg-01 32/92 Approved PT12-ES - - - 1991-12-10 - - 1999-08-15
0205 - A Ph1 3.6.0 - SIM/ME Interface Tests smg-01 32/92 Approved PT12-ES - - - 1991-12-06 - - 1999-08-15
0206 - A Ph1 3.6.0 - Testing of Call Control smg-01 32/92 Approved PT12-ES - - - 1991-12-05 - - 1999-08-15
0207 - E Ph1 3.6.0 - II.5.3.9.3.3. Corrections of reference smg-01 32/92 Approved PT12-ES - - - 1991-12-05 - - 1999-08-15
0208 - E Ph1 3.6.0 - Independency of L2 tests (section II.5.2) smg-01 32/92 Approved PT12-ES - - - 1991-12-10 - - 1999-08-15
0209 - A Ph1 3.6.0 - Fill frames in L2 testing. smg-01 32/92 Approved PT12-ES - - - 1991-12-10 - - 1999-08-15
0210 1 A Ph1 3.6.0 - SIM/ME Test Interface smg-01 32/92 Approved PT12-ES - - - 1991-12-09 - - 1999-08-15
0211 2 A Ph1 3.6.0 - Value of ""RR-cause"" information element in II.5.3 smg-01 32/92 Approved PT12-ES - - - 1991-12-09 - - 1999-08-15
0212 - A Ph1 3.6.0 - Verification of Support for Services smg-01 32/92 Approved PT12-ES - - - 1992-01-08 - - 1999-08-15
0213 - A Ph1 3.6.0 - Blocking and Spurious Responses smg-01 32/92 Approved PT12-ES - - - 1991-10-17 - - 1999-08-15
0214 - A Ph1 3.6.0 - Testing of invalid PIN and blocked PIN indicators smg-01 32/92 Approved PT12-ES - - - 1991-10-15 - - 1999-08-15
0215 - A Ph1 3.6.0 - Testing of IMMEDIATE ASSIGNMENT EXTENDED smg-01 32/92 Approved PT12 - - - 1992-01-09 - - 1999-08-15
0216 - A Ph1 3.6.0 - L2 segmentation and concatenation smg-01 32/92 Approved PT12 - - - 1992-01-09 - - 1999-08-15
0217 - A Ph1 3.6.0 - Test of Autocalling Restrictions smg-01 32/92 Approved PT12-ES - - - 1992-01-08 - - 1999-08-15
0218 - E Ph1 3.6.0 - Verification of transient states smg-01 32/92 Approved PT12 - - - 1992-01-11 - - 1999-08-15
0219 - A Ph1 3.0.0 - Video Bandwidth in spurious emmission measurement smg-01 35/92 Approved PT12-ES - - - 1991-12-10 - - 1999-08-15
0220 - A Ph1 3.0.0 - Modulation and Switching Transiients smg-01 35/92 Approved PT12-ES - - - 1991-12-10 - - 1999-08-15
0221 - A Ph1 3.0.0 - Test on input level range smg-01 35/92 Approved PT12-ES - - - 1991-12-10 - - 1999-08-15
0222 - A Ph1 3.0.0 - Test on blocking and spurious response smg-01 35/92 Approved PT12-ES - - - 1991-12-10 - - 1999-08-15
0223 - A Ph1 3.0.0 - Channel Release Test smg-01 35/92 Withdrawn PT12-ES - - - 1991-10-09 - - 1999-08-15
0224 - A Ph1 3.0.0 - Receiver sensitivity test on FACCH smg-01 35/92 Approved PT12-ES - - - 1991-10-18 - - 1999-08-15
0225 - A Ph1 3.6.0 - Layer 2 response to the retransmission of an I frame smg-01 93/92 approved Panasonic/Orbitel - - - 1992-01-16 - - 1999-08-15
0226 - - Ph1 3.6.0 3.7.0 SIM/ME interface; Testing of spikes on Vcc smg-01 107/92 Approved - - - - - - - 1999-08-15
0227 1 A Ph1 3.7.0 - Power Control levels incorrect smg-02 138/92 Approved PT12-ES - - - 1992-02-10 - - 1999-08-15
0228 - E Ph1 3.7.0 - Reference test methods / Frequency hopping smg-02 138/92 Approved PT12-ES - - - 1992-02-10 - - 1999-08-15
0229 1 A Ph1 3.7.0 - SIM / ME tests under extreme conditions smg-02 138/92 Approved PT12-ES - - - 1992-02-10 - - 1999-08-15
0230 1 A Ph1 3.7.0 - TX power control (test II.6.3) smg-02 138/92 Approved PT12-ES - - - 1992-02-10 - - 1999-08-15
0231 1 A Ph1 3.7.0 - Test of SS Notification at Network Erasure smg-02 138/92 Approved PT12-ES - - - 1992-02-10 - - 1999-08-15
0232 1 A Ph1 3.7.0 - Supplementary Service MMI Service Code Group smg-02 138/92 Approved PT12-ES - - - 1992-02-10 - - 1999-08-15
0233 1 A Ph1 3.7.0 - Fixed Length of Mobile Network Code (MNC) smg-02 138/92 Approved PR12-ES - - - 1992-02-10 - - 1999-08-15
0234 1 A Ph1 3.7.0 - BCCH synchronisation time in test II.5.3.6.3 smg-02 138/92 Approved PT12-ES - - - 1992-02-10 - - 1999-08-15
0235 1 A Ph1 3.7.0 - Incorrect value in Layer 2 test II.5.2.2.6.1 smg-02 138/92 Approved PT12-ES - - - 1992-02-10 - - 1999-08-15
0236 1 A Ph1 3.7.0 - Radio Link timeout in test II.5.3.6.8.3.4 smg-02 138/92 Approved PT12-ES - - - 1992-02-10 - - 1999-08-15
0237 1 A Ph1 3.7.0 - Test Case II.5.3.6.6, Frequency Redefinition smg-02 138/92 Approved PT12-ES - - - 1992-02-10 - - 1999-08-15
0238 - A Ph1 3.7.0 - Incorrect references in II.5.2.2 tests smg-02 138/92 Approved PT12-ES - - - 1992-03-11 - - 1999-08-15
0239 - A Ph1 3.7.0 - Incorrect descriptions in tests II.4.2.3.2 and II.4.4.2 smg-02 138/92 Approved PT12-ES - - - 1992-03-11 - - 1999-08-15
0240 - A Ph1 3.7.0 - Test II.5.2.2.1.1.2.2 'UA frame with different information field' smg-02 138/92 Approved PT12-ES - - - 1992-03-11 - - 1999-08-15
0241 1 E Ph1 3.7.0 - Expected scheduling of Alert message in Call Control tests smg-02 138/92 Approved PT12-ES - - - 1992-03-12 - Approved as rev 1 1999-08-15
0242 - A Ph1 3.7.0 - Introduction of a tolerance on Timer T3212 (periodic location updating timer) smg-02 138/92 Approved PT12-ES - - - 1992-03-12 - - 1999-08-15
0243 - A Ph1 3.7.0 - Use of a different table in Call Control test, II.5.3.8.1.3.2.3 smg-02 138/92 Approved PT12-ES - - - 1992-03-12 - - 1999-08-15
0244 1 A Ph1 3.7.0 - SDCCH Handover smg-02 138/92 Approved PT12-ES - - - 1992-03-12 - Approved as rev 1 1999-08-15
0245 - A Ph1 3.7.0 - L2 test of segmentation and concatenation smg-02 138/92 Approved PT12-ES - - - 1992-03-12 - - 1999-08-15
0246 - A Ph1 3.7.0 - Ambiguous test II.5.3.5.5.3 smg-02 138/92 Approved PT12-ES - - - 1992-03-12 - - 1999-08-15
0247 1 A Ph1 3.7.0 - Undefined Layer 3 Timers in Handover tests and Structured Procedure tests smg-02 138/92 Approved PT12-ES - - - 1992-03-12 - Approved as rev 1 1999-08-15
0248 - E Ph1 3.7.0 - II.5.3.1.1 Default test conditions during L3 tests smg-02 138/92 Approved PT12-ES - - - 1992-03-12 - - 1999-08-15
0249 - A Ph1 3.7.0 - Coding of values in II.8 smg-02 138/92 Approved PT12-ES - - - 1992-03-12 - - 1999-08-15
0250 - A Ph1 3.7.0 - Measurement Bandwidths in II.2.2 spurious emission tests smg-02 138/92 Approved PT12-ES - - - 1992-03-12 - - 1999-08-15
0251 1 A Ph1 3.7.0 - Verification of service and Generic Call Set-up Procedures in GSM 11.10 smg-02 241/92 Approved PT12-ES - - - 1992-03-12 - - 1999-08-15
0252 1 A Ph1 3.7.0 - Clarification of test II.5.3.7.4.2.2 smg-02 138/92 Approved PT12-ES - - - 1992-03-12 - Approved as rev 1 (tdoc 221/92) 1999-08-15
0253 2 A Ph1 3.7.0 - Addition of test for Single Numbering Scheme smg-02 247/92r1 Approved PT12-ES - - - 1992-03-12 - - 1999-08-15
0254 - A Ph1 3.7.0 - Reception Time Tracking Speed smg-02 138/92 Approved PT12-ES - - - 1992-03-12 - - 1999-08-15
0255 - A Ph1 3.7.0 - Blocking and Spurious response test smg-02 138/92 Approved PT12-ES - - - 1992-03-12 - - 1999-08-15
0256 - A Ph1 3.1.0 - Incorrect peak power class 2 in II.3.3.3 smg-02 141/92 Approved PT12-ES - - - 1992-03-12 - - 1999-08-15
0257 - A Ph1 3.1.0 - Power control levels incorrect smg-02 141/92 Approved PT12-ES - - - 1992-03-12 - - 1999-08-15
0258 - A Ph2 3.7.0 - Merging of 11.10 and 11.10-DCS to form Phase 2 specification smg-02 142/92 Approved PT12-ES - - - 1992-03-12 - - 1999-08-15
0259 - A Ph1 3.7.0 - II.6.2.1.1 Signal strength measurements smg-02 229/92 Withdrawn Panasonic - - - 1992-03-26 - Replaced by CR no 263 1999-08-15
0260 - A Ph1 3.7.0 - II.6.2.1.1 Signal strenght measurements smg-02 229/92 Withdrawn Panasonic - - - 1992-03-26 - Replaced by CR no 263 1999-08-15
0261 - A Ph1 3.7.0 - II.6.2.1.1 Signal strenght measurement smg-02 229/92 Withdrawn Panasonic - - - 1992-03-26 - Replaced by CR no 263 1999-08-15
0262 - A Ph1 3.7.0 - Incorrect operation of SEQ02.* smg-02 239/92 Approved PT 12 - - - 1992-03-31 - - 1999-08-15
0263 - A Ph1 3.7.0 II.6.2.1.1 Signal strenght measurements smg-02 229/92 Postponed PT 12 - - - 1992-03-31 - Acceptance by correspondence 1999-08-15
0263 2 A Ph1 3.8.0 - Test II.6.2.1 - RX Measurement - Signal Strength smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0264 - A Ph1 3.8.0 - Measurement of Spectrum due to Modulation smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0265 - E Ph1 3.8.0 - Incorrect state referenced in test II.5.3.8.1.3.2.5.9 smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0266 - A Ph1 3.8.0 - Optional DISC required in tests II.5.3.8.1.3.2.3.4 and II.5.3.8.1.3.2.4.2 smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0267 - E Ph1 3.8.0 - Unreferenced note in test II.5.3.8.1.3.2.4.2 smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0268 1 A Ph1 3.8.0 - Ambiguity of wording in test II.5.3.7.4.3.1 The Random Access Fails smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0269 - A Ph1 3.8.0 - RR release not mandatory in II.5.3.7.5.4.6 smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0270 - A Ph1 3.8.0 - Order of events unclear in test II.5.3.8.1.4.1 smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0271 1 E Ph1 3.8.0 - Completion of the table of primitives in II.5.3.8 smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0272 - A Ph1 3.8.0 - Test limits in II.4 do not align with core requirements smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0273 - A Ph1 3.8.0 - II.5.3.8.1.2.2.7 Timer T305 accuracy being checked smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0274 1 A Ph1 3.8.0 - Changes to GSM 11.10 RF Tests for non-speech MS smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0275 - A Ph1 3.8.0 - Changes to GSM 11.10 Signalling Tests for non-speech mobiles smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0276 - A Ph1 3.8.0 - Cell Selection/Reselection smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0277 - A Ph1 3.8.0 - II.5.2.2.2.3 and II.5.3.6.5.4.4 smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0278 - A Ph1 3.8.0 - II.6.1.6.8 Cell selection after release of TCH and SDCCH smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0279 - A Ph1 3.8.0 - II.5.3.8.1.4.1.1 smg-03 318/92 Approved PT12-ES - - - 1992-06-02 - - 1999-08-15
0280 1 A Ph1 3.8.0 - II.6.2.2.1 Test on signal quality under statis conditions smg-03 318/92 Postponed PT12-ES - - - 1992-06-02 - Postponed as rev 1 in TDoc 377/92 1999-08-15
0280 2 A Ph1 3.8.0 - II.6.2.2.1 Test on signal quality under static conditions smg-03 - Rejected PT12-ES - - - 1992-07-08 - Sent out for approval by correspondence 1999-08-15
0280 3 A Ph1 3.9.0 - II.6.2.2.1 Test on signal quality under static conditions smg-04 483/92 Approved PT12-ES - - - 1992-09-08 - - 1999-08-15
0281 - A Ph1 3.8.0 - Downlink and Uplink coding delay smg-03 318/92 Approved PT12-ES - - - 1992-06-04 - - 1999-08-15
0282 1 A Ph1 3.8.0 - II.17 Selftesting of the MS smg-03 318/92 Approved PT12 - - - 1992-06-04 - Approved as rec 1 in TDoc 378/92 1999-08-15
0283 - A Ph1 3.8.0 - II.3.2 Frequency errr under multipath and interference conditions smg-03 318/92 Approved PT12 - - - 1992-06-04 - - 1999-08-15
0284 - A Ph1-DCS 3.8.0 3.3.0 Cell Reselection smg-03 349/92 Approved PT12 - - - 1992-06-16 - - 1999-08-15
0285 1 A Ph1 3.9.0 - II.4.5 Adjacent Channel Rejection smg-04 550/92 Approved PT12-ES - - - 1992-10-02 - - 1999-08-15
0286 - A Ph1 3.8.0 - Unnecessary time constraint in test II.5.3.2.1.2.3 smg-03 - Approved PT12-ES - - - 1992-07-07 - Sent out for approval by correspondence 1999-08-15
0287 - A Ph1 3.9.0 - Paging Reorganisation smg-04 407/92 Approved PT12-ES - - - 1992-07-07 - - 1999-08-15
0288 - A Ph1 3.8.0 - Location Updating smg-03 - Rejected PT12-ES - - - 1992-07-07 - Sent out for approval by correspondence 1999-08-15
0288 1 A Ph1 3.9.0 - Location Updating smg-04 407/92 Approved PT12-ES - - - 1992-09-08 - - 1999-08-15
0289 - A Ph1 3.8.0 - RF Level changes in receiver test procedures smg-03 - Approved PT12-ES - - - 1992-07-07 - Sent out for approval by correspondence 1999-08-15
0290 - A Ph1 3.9.0 - SIM data field values for the SIM/ME interface test sequences smg-04 407/92 Approved PT12-ES - - - 1992-07-10 - - 1999-08-15
0291 1 A Ph1 3.9.0 - II.1.4.1 Description of DATA call set-up/release procedure smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0292 - A Ph1 3.3.0 - Test II.3.3.2 - TX Measurement, power control levels smg-04 409/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0293 - A Ph1 3.3.0 - Default parameters used in section II.5.3.9 smg-04 409/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0294 - A Ph1 3.3.0 - Test II.4.7 - RX Measurement, blocking and spurious response smg-04 409/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0295 - A Ph1 3.3.0 - Changes to 11.10-DCS to reduce cost of System Simulator smg-04 410/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0296 - A Ph1 3.9.0 - II.3.2 Frequency error under multipath and interference conditions smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0297 1 A Ph1 3.9.0 - Vibration testing smg-04 528/92 Approved PT12-ES - - - 1992-07-08 - Approved with minor modifications 1999-08-15
0298 - A Ph1 3.9.0 - DAI description smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0299 - A Ph1 3.9.0 - Specification of 2nd connection type of the SIM-Simulator interface in III.1.5.4 smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0300 - A Ph1 3.9.0 - Modifications to test of Uplink Transmitter DTX Functions, II.13.4 smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0301 - A Ph1 3.9.0 - II.13.2 Downlink Receiver DTX Functions smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0302 - A Ph1 3.9.0 - Test of the Authentication Procedure smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0303 - A Ph1 3.9.0 - Tolerance of timer T3212 smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0304 - A Ph1 3.9.0 - Test of Location Updating procedure smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0305 - A Ph1 3.9.0 - Test of T3240 Timer (II.5.3.7.4.4) smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0306 - E Ph1 3.9.0 - MM Connection Establishment Rejected smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0307 - A Ph1 3.9.0 - Errors in Layer 2 Tests smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0308 - A Ph1 3.9.0 - Test II.5.3.5.3.2 smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0309 - A Ph1 3.9.0 - Supplementary Services Test Cases smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0310 - A Ph1 3.9.0 - Corrections to SM tests, II.11 smg-04 407/92 Withdrawn PT12-ES - - - 1992-07-08 - - 1999-08-15
0311 - A Ph1 3.9.0 - SIM removal in tests smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0312 1 A Ph1 3.9.0 - Modification of tests in II.5.3.9 for data only MS smg-04 529/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0313 - A Ph1 3.9.0 - Review of GSM 11.10 section II.10 smg-04 407/92 Withdrawn PT12-ES - - - 1992-07-08 - - 1999-08-15
0314 - A Ph1 3.9.0 - Test II.6.1.6.6 step aa) smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0315 1 A Ph1 3.9.0 - Test II.6.1.4 and II.6.1.5 smg-04 544/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0316 - A Ph1 3.3.0 - RF Tests using temporary antenna connector smg-04 409/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0317 - A Ph1 3.3.0 - Incorrect parameter value in II.5.3.6.3.3 smg-04 409/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0318 - A Ph1 3.9.0 - Test II.16.7 smg-04 407/92 Postponed PT12-ES - - - 1992-07-08 - - 1999-08-15
0319 - A Ph1 3.9.0 - Signal Level changes prior to receiver measurements, II.4 smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0320 - E Ph1 3.9.0 - Calibration factor missing from some of the limits in II.3.4.2 smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0321 - A Ph1 3.9.0 - Incorrect step in test II.6.3 smg-04 407/92 Approved PT12-ES - - - 1992-07-08 - - 1999-08-15
0322 - A Ph1 3.9.0 - II.13.2 Downlink Receiver DTX smg-04 500/92 Approved R&S - - - 1992-09-28 - - 1999-08-15
0323 - A Ph1 3.9.0 - Removal of a restriction of a speech traffic channel smg-04 545/92 Approved PT12-ES - - - 1992-10-01 - - 1999-08-15
0324 - A Ph1 3.9.0 - Applicability of tests to different types of MS smg-04b 561/92 Approved PT12-ES - - - 1992-10-21 - Approved at SMG#4bis (Paris) 1999-08-15
0325 - A Ph1 3.9.0 - Short Message Service smg-04b 561/92 Approved PT12-ES - - - 1992-10-21 - Approved at SMG#4bis (Paris) 1999-08-15
0326 - A Ph1 3.9.0 - Dupliation of tests smg-04b 561/92 Approved PT12-ES - - - 1992-10-21 - Approved at SMG#4bis (Paris) 1999-08-15
0327 - A Ph1 3.9.0 - No test method applicable to II.5.3.7.4.5.1 smg-04b 562/92 Approved PT12-ES - - - 1992-10-21 - Approved at SMG#4bis (Paris) 1999-08-15
0328 - A Ph1 3.9.0 - Removal of Acoustic Shock test smg-04b 562/92 Approved PT12-ES - - - 1992-10-21 - Approved at SMG#4bis (Paris) 1999-08-15
0329 - A Ph1 3.9.0 - Review of Supplementary Services smg-04b 563/92 Approved PT12-ES - - - 1992-10-21 - Approved at SMG#4bis (Paris) 1999-08-15
0330 - A Ph1 3.9.0 - Test II.5.3.2.2.13 smg-04b 563/92 Approved PT12-ES - - - 1992-10-21 - Approved at SMG#4bis (Paris) 1999-08-15
0331 - A Ph1 3.9.0 - Test II.6.1.6.11 smg-04b 563/92 Approved PT12-ES - - - 1992-10-21 - Approved at SMG#4bis (Paris) 1999-08-15
0332 - A Ph1 3.9.0 - Test II.6.1.6.11, Cell reselection abnormal cases, Emergency calls smg-04b 563/92 Approved PT12-ES - - - 1992-10-21 - Approved at SMG#4bis (Paris) 1999-08-15
0333 - A Ph1 3.9.0 - Test II.6.1.6.6 step z) and related requirements smg-04b 564/92 Approved PT12-ES - - - 1992-10-21 - Approved at SMG#4bis (Paris) 1999-08-15
0334 - A Ph1 3.9.0 - Generic Call Set-Up with fading simulator smg-04b 564/92 Approved PT12-ES - - - 1992-10-21 - Approved at SMG#4bis (Paris) 1999-08-15
0335 - A Ph1 3.9.0 - Test II.6.1.4 using step of 63 dBuV smg-04b 564/92 Approved PT12-ES - - - 1992-10-21 - Approved at SMG#4bis (Paris) 1999-08-15
0336 1 A Ph1 3.9.0 V3.10.0 RF tests using temporary antenna connector smg-04b 581/92 Approved PT12-ES - - - 1992-10-21 - Approved at SMG#4bis (Paris) 1999-08-15
0337 - A Ph1 3.10.0 - Test II.5.3.3.2 - MS Indication of Available PLMNs smg-05 115/93 Approved PT12-ES - - - 1993-01-07 - - 1999-08-15
0338 - A Ph1 3.10.0 - Echo Return Loss and Stability Margin - II.11.1.7 smg-05 115/93 Approved PT12-ES - - - 1992-12-09 - - 1999-08-15
0339 - E Ph1 3.10.0 - II.13.4 Uplink Transmitter DTX Functions smg-05 114/93 Approved PT12-ES - - - 1993-01-07 - - 1999-08-15
0340 - A Ph1 3.10.0 - Data only MS testing smg-05 119/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0341 - A Ph1 3.4.0 - Data only MS testing smg-05 119/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0342 - A Ph1 3.10.0 - Errors in SIM tests smg-05 115/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0343 - A Ph1 3.10.0 - Testing of SIM/ME Interface; Test Sequence 4 smg-05 115/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0344 - A Ph1 3.10.0 - Clarification of test conditions and nominal electrical values to be applied during the tests smg-05 115/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0345 1 A Ph1 3.10.0 - Power Transition Phases smg-05 176/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0346 - E Ph1 3.10.0 - Characters of the Answer to Reset smg-05 114/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0347 - A Ph1 3.10.0 - Test Sequence 13; Secret Code Usage smg-05 115/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0348 - A Ph1 3.10.0 - New test procedure for test sequence II.8.10.1 smg-05 115/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0349 - A Ph1 3.10.0 - II.5.3.6.4.2 Assignment Completion smg-05 115/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0350 - E Ph1 3.10.0 - III.1.4.5, Functionality of the DAI smg-05 114/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0351 - A Ph1 3.4.0 - Change to the average signal levels used for signal strength measurements smg-05 116/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0352 - A Ph1 3.4.0 - Modification of default test conditions during L3 tests smg-05 116/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0353 1 A Ph1 3.4.0 - Change to the test parameters for Frequency redefinition smg-05 160/93 Postponed PT12-ES - - - 1993-01-08 - TDoc 116/93 holds original version 1999-08-15
0353 2 A Ph1 3.5.0 - Change to the test parameters for Frequency redefinition smg-06 228/93 Rejected PT12-ES - - - 1993-03-16 - - 1999-08-15
0353 3 A Ph1 3.5.0 - Change to the test parameters for Frequency Redefinition smg-06 286/93 Rejected Motorola - - - 1993-03-31 - - 1999-08-15
0353 4 A Ph1 3.5.0 - Change to the test parameters for Frequency Redefinition smg-06 295/93 Approved Motorola - - - 1993-03-31 - - 1999-08-15
0354 - A Ph1 3.4.0 - Wrong ARFCN referenced in Table II.6-1 smg-05 116/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0355 - A Ph1 3.10.0 - Use of temporary antenna connector smg-05 115/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0356 - E Ph1 3.10.0 - General Sequence of frames in II.5.2.2.2.1 smg-05 114/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0357 - A Ph1 3.10.0 - II.5.3.5.6.1.2 Test of MS reaction to unrecognised information element in RR message on BCCH smg-05 115/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0358 - A Ph1 3.10.0 - II.6, Cell Selection/Re-selection test smg-05 115/93 Approved PT12-ES - - - 1993-01-08 - - 1999-08-15
0359 - A Ph1 3.10.0 3.11.0 Cell selection parameters in test II.6.1.6.8 smg-05 161/93 Approved Vodafone - - - 1993-01-15 - TDoc 137/93 holds original version 1999-08-15
0360 - A Ph1 3.5.0 - To align with previous decisions made by SMG smg-06 228/93 Approved PT12-ES - - - 1993-03-11 - - 1999-08-15
0361 - A Ph1 3.11.0 - Testing of location update area indication smg-06 226/93 Approved PT12-ES - - - 1993-03-16 - - 1999-08-15
0362 - A Ph1 3.11.0 - Test Case II.4.5 smg-06 226/93 Approved PT12-ES - - - 1993-03-16 - - 1999-08-15
0363 - A Ph1 3.11.0 - Missing cause in RELEASE, II.5.3.5.5.3 smg-06 226/93 Approved PT12-ES - - - 1993-03-16 - - 1999-08-15
0364 - E Ph1 3.11.0 - Tests II.2.2.2.2 and II.2.2.3.2, MS in idle mode smg-06 227/93 Approved PT12-ES - - - 1993-03-16 - - 1999-08-15
0365 - A Ph1 3.11.0 - Test II.17 refers to the antenna coupling device smg-06 226/93 Approved PT12-ES - - - 1993-03-16 - - 1999-08-15
0366 - E Ph1 3.11.0 - Test II.5.3.8.2.6.1 and II.5.3.8.2.7.1 are inconsistent smg-06 227/93 Approved PT12-ES - - - 1993-03-16 - - 1999-08-15
0367 - A Ph1 3.11.0 - Test II.4.2.1.2, Adjacent cell BCCHs could cause problems to the test smg-06 270/93 Approved Vodafone/PT12-ES - - - 1993-03-25 - - 1999-08-15
0368 - E Ph1 3.11.0 - Incorrect TI flag in test case II.5.3.5.2.3 smg-06 227/93 Approved PT12-ES - - - 1993-03-16 - - 1999-08-15
0369 - A Ph1 3.11.0 - Classmark Change smg-06 226/93 Approved PT12-ES - - - 1993-03-16 - - 1999-08-15
0370 - A Ph1 3.11.0 - Erased fields in test II.8.6 smg-06 287/93 Approved Motorola - - - 1993-03-29 - - 1999-08-15
0371 - A Ph1 3.11.0 - Manual Network Reselection smg-06 267/93 Withdrawn Vodafone - - - 1993-03-30 - - 1999-08-15
0372 - A Ph1 3.11.0 - Incorrect and incomplete references in section II.9 smg-06 296/93 Approved PT12-ES - - - 1993-03-31 - - 1999-08-15
0373 1 A Ph1 3.11.0 3.12.0 Manual Network Reselection smg-06 267/93r1 Approved Vodafone/DeTeMobil - - - 1993-03-30 - - 1999-08-15
0374 - E Ph1 3.12.0 - Testing of ME/SIM interface section II.8 - TMSI value smg-07 413/93 Approved Rohde&Schwarz - - - 1993-06-01 - - 1999-08-15
0375 - A Ph1 3.12.0 - Cell Reselection smg-07 412/93 Approved ES Sig SG - - - 1993-06-01 - - 1999-08-15
0376 - A Ph1 3.6.0 - II.6.1.6.9 Cell Selection after release of TCH and SDCCH smg-07 414/93 Approved Mercury One-2-One - - - 1993-06-01 - - 1999-08-15
0377 - A Ph1 3.12.0 - Testing of SIM/ME: Mute Card smg-07 412/93 Approved - - - - 1993-06-01 - - 1999-08-15
0378 - A Ph1 3.12.0 - Testing of SIM/ME: Electrical Tests smg-07 412/93 Approved - - - - 1993-06-01 - - 1999-08-15
0379 - A Ph1 3.12.0 - Nominal Error rate and inout level dynamic range smg-07 412/93 Approved - - - - 1993-06-01 - - 1999-08-15
0380 - A Ph1 3.6.0 - Changes to ii.10-DCS section II.8 smg-07 414/93 Approved - - - - 1993-06-01 - - 1999-08-15
0381 - A Ph1 3.6.0 - Annex 1, GC1 Choice of frequencies in hopping mode smg-07 414/93 Approved - - - - 1993-06-01 - - 1999-08-15
0382 - A Ph1 3.6.0 - Spurious Emissions smg-07 414/93 Approved - - - - 1993-06-01 - - 1999-08-15
0383 - E Ph1 3.12.0 - Editorial Changes to the signalling tests smg-07 413/93 Approved - - - - 1993-06-01 - - 1999-08-15
0384 - A Ph1 3.12.0 - Erroneous Error Handling Tests smg-07 412/93 Approved - - - - 1993-06-01 - - 1999-08-15
0385 - A Ph1 3.12.0 - Insufficient time allowed in II.5.3.6.2.3 smg-07 412/93 Approved - - - - 1993-06-01 - - 1999-08-15
0386 - A Ph1 3.12.0 - II.5.3.6.2.4 No change of page mode smg-07 412/93 Approved - - - - 1993-06-01 - - 1999-08-15
0387 - A Ph1 3.6.0 - Inclusion of serving cel in BA list for RXLEV test smg-07 414/93 Approved - - - - 1993-06-01 - - 1999-08-15
0388 - A Ph1 3.12.0 - Temporary Antenna Connector smg-07 412/93 Approved - - - - 1993-06-01 - - 1999-08-15
0389 - A Ph1 3.6.0 - Correction to test method II.4.2.1.2 smg-07 414/93 Approved - - - - 1993-06-01 - - 1999-08-15
0390 - E Ph1 3.12.0 - Clarification of MS terminology smg-07 413/93 Approved - - - - 1993-06-01 - - 1999-08-15
0391 - A Ph1 3.12.0 - Disabling of automatic network selection smg-07 412/93 Approved - - - - 1993-06-01 - - 1999-08-15
0392 - E Ph1 3.12.0 - Brand and standardised MMI functions smg-07 413/93 Approved - - - - 1993-06-01 - - 1999-08-15
0393 - D Ph2 4.3.0 - Re-drafting of Signalling sections of GSM 11.10 (Phase 2) smg-07 415/93 Approved - - - - 1993-06-02 - - 1999-08-15
0394 - E Ph1 3.6.0 - II.5.3.6.1.5.5 Immediate Assignment smg-07 414/93 Approved - - - - 1993-06-02 - - 1999-08-15
0395 - A Ph1 3.6.0 - Inconsistencies between Table of Test Conditions and Table of Limits in II.4 smg-07 418/93 Approved - - - - 1993-06-01 - - 1999-08-15
0396 - A Ph1 3.12.0 - Consequential change due to 11.10-379 on 'Nominal error rate ...' smg-07 419/93 Approved - - - - 1993-06-02 - - 1999-08-15
0397 - A Ph1 3.12.0 - Consequential change due to 11.10-388 on 'Temporary Antenna ...' smg-07 501/93 Approved - - - - 1993-06-24 - - 1999-08-15
0398 - A Ph1 3.12.0 3.13.0 Consequential change due to 11.10-379 on 'Nominal error rate ...' smg-07 - Approved SMG-ES - - - 1993-06-30 - Sent out for approval by correspondence 1999-08-15
0399 - C Ph2 4.4.0 - Revision of sections I and II.1, of GSM 11.10 Phase 2 smg-08 563/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0400 - C Ph2 4.4.0 - Revision of transceiver section, of GSM 11.10 Phase 2 smg-08 564/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0401 - C Ph2 4.4.0 - Revision of transmitter section, of GSM 11.10 Phase 2 smg-08 565/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0402 - C Ph2 4.4.0 - Revision of receiver section, of GSM 11.10 Phase 2 smg-08 566/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0403 - C Ph2 4.4.0 - Revision of link management section, of GSM 11.10 Phase 2 smg-08 567/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0404 - C Ph2 4.4.0 - Revision of II.6.2 to II.6.4, of GSM 11.10 Phase 2 smg-08 568/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0405 - D Ph2 4.4.0 - Revision of II.13 test cases, in GSM 11.10 Phase 2 smg-08 569/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0406 - C Ph2 4.4.0 - Revision of II.17, of GSM 11.10 Phase 2 smg-08 570/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0407 - C Ph2 4.4.0 - Revision of Annex 1, of GSM 11.10 Phase 2 smg-08 571/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0408 - D Ph2 4.4.0 - Review of Annex 4, of GSM 11.10 Phase 2 smg-08 572/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0409 - D Ph2 4.4.0 - Review of Test Report, in GSM 11.10 Phase 2 smg-08 573/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0410 - C Ph2 4.4.0 - New Short Message Service tests for Phase 2 smg-08 636/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0411 - C Ph2 4.4.0 - Tests for transparent Bearer services (II.10) for Phase 2 smg-08 636/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0412 - C Ph2 4.4.0 - Signalling for Phase 2 - II.5.3.8 smg-08 637/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0413 - C Ph2 4.4.0 - Default test conditions smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0414 - D Ph2 4.4.0 - Format definition smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0415 - C Ph2 4.4.0 - II.5.3.5.1 for non-CC MS smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0416 - D Ph2 4.4.0 - Editorial alignment of II.5.3.5.2.1 smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0417 - D Ph2 4.4.0 - Applicability of II.5.3.5.2.2 smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0418 - D Ph2 4.4.0 - Clarification and editorial alignment of II.5.3.5.2.3 smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0419 - D Ph2 4.4.0 - Editorials on II.5.3.5.3.1 smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0420 - D Ph2 4.4.0 - Editorials on II.5.3.5.3.2 smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0421 - C Ph2 4.4.0 - New test II.5.3.5.3.2a on undefined RR message smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0422 - D Ph2 4.4.0 - Editorials on II.5.3.5.3.3 smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0423 - D Ph2 4.4.0 - Editorials and clarifications in II.5.3.5.4.1 smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0424 - D Ph2 4.4.0 - Editorials in II.5.3.5.5.1.1 smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0425 - C Ph2 4.4.0 - II.5.3.5.5.1.2 smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0426 - C Ph2 4.4.0 - II.5.3.5.5.2.1 for non-CC MS smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0427 - C Ph2 4.4.0 - II.5.3.5.5.2.2 smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0428 - D Ph2 4.4.0 - II.5.3.5.5.3 smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0429 - C Ph2 4.4.0 - II.5.3.5.6 smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0430 - D Ph2 4.4.0 - II.5.3.5.7 smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0431 - D Ph2 4.4.0 - II.5.3.5.8 (default message contents) smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0432 - C Ph2 4.4.0 - Immediate Assignment/SDCCH or TCH, II.5.3.6 smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0433 - C Ph2 4.4.0 - Extended assignment smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0434 - C Ph2 4.4.0 - Assignment rejection smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0435 - C Ph2 4.4.0 - Normal paging smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0436 - B Ph2 4.4.0 - Paging in a roaming not allowed state smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0437 - C Ph2 4.4.0 - Extended paging and paging reorganisation smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0438 - C Ph2 4.4.0 - Measurement report smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0439 - C Ph2 4.4.0 - Test of dedicated assignment smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0440 - B Ph2 4.4.0 - Handover tests smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0441 - B Ph2 4.4.0 - Frequency redefinition smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0442 - B Ph2 4.4.0 - Ciphering smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0443 - B Ph2 4.4.0 - Classmark change smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0444 - C Ph2 4.4.0 - Release smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0445 - C Ph2 4.4.0 - Default RR messages smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0446 - C Ph2 4.4.0 - Identity request smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0447 - D Ph2 4.4.0 - II.5.3.7.2 Authentication smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0448 - C Ph2 4.4.0 - PLMN selection after reject cause ""PLMN not allowed"" smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0449 - D Ph2 4.4.0 - II.5.3.7.4.2.3 answer to paging with IMSI smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0450 - C Ph2 4.4.0 - Default contents of messages for section II.5.3.7 smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0451 - C Ph2 4.4.0 - Structured procedures smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0452 - C Ph2 4.4.0 - Annex 3: A section on classmark smg-08 542/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0453 - E Ph1 3.13.0 - Temporary antenna connector smg-08 560/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0454 - A Ph1 3.13.0 - Synchronized handover test smg-08 560/93 Rejected SMG ES - - - 1993-08-27 - - 1999-08-15
0455 - A Ph1 3.13.0 - Non-Synchronized handover test smg-08 560/93 Rejected SMG ES - - - 1993-08-27 - - 1999-08-15
0456 - A Ph1 3.13.0 - Signal Quality, TU50 propagation conditions smg-08 560/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0457 - A Ph1 3.13.0 - Signal Quality, static conditions smg-08 562/93 Rejected SMG ES - - - 1993-08-27 - - 1999-08-15
0458 - E Ph1 3.13.0 - Testing of SIM/ME interface - II.8.9.1.3 smg-08 560/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0459 - E Ph1 3.13.0 - Echo loss measurement smg-08 560/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0460 - A Ph1 3.13.0 - II.12.8.4 B1) Rejection after invoke of DeactivateSS operation smg-08 560/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0461 - A Ph1 3.7.0 - Correction of test method to reflect 4 channel working smg-08 561/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0462 - A Ph1 3.7.0 - Removal of square brackets and consequence alignment of text smg-08 561/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0463 - A Ph1 3.7.0 - II.5.3.6.3 Measurement report smg-08 561/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0464 - E Ph1 3.7.0 - II.6.1.2.2 Reception time tracking speed smg-08 561/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0465 - A Ph1 3.13.0 - FACCH FER of static interferer smg-08 575/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0466 - A Ph1 3.7.0 - FACCH FER of static interferer smg-08 575/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0467 - A Ph1 3.13.0 - II.4.6, Intermodulation rejection smg-08 560/93 Approved SMG ES - - - 1993-08-27 - - 1999-08-15
0468 - A Ph1 3.13.0 - Signal Quality, static conditions smg-08 562/93 Approved Motorola, CSELT - - - 1993-09-13 - - 1999-08-15
0469 - C Ph2 4.4.0 - Signalling CR, II.5.3.8, Phase 2 smg-08 637/93 Approved SMG ES PT48V - - - 1993-09-20 - - 1999-08-15
0470 - C Ph2 4.4.0 - Signalling CR, II.5.3.8, Phase 2 smg-08 637/93 Approved SMG ES PT48V - - - 1993-09-20 - - 1999-08-15
0471 - C Ph2 4.4.0 - Signalling CR, II.5.3.8, Phase 2 smg-08 637/93 Approved SMG ES PT48V - - - 1993-09-20 - - 1999-08-15
0472 - C Ph2 4.4.0 - Signalling CR, II.5.3.8, Phase 2 smg-08 637/93 Approved SMG ES PT48V - - - 1993-09-20 - - 1999-08-15
0473 - C Ph2 4.4.0 - Signalling CR, II.5.3.8, Phase 2 smg-08 637/93 Approved SMG ES PT48V - - - 1993-09-20 - - 1999-08-15
0474 - A Ph1 3.13.0 - Testing of the SIM-ME contacts smg-08 682/93 Approved Vodafone - - - 1993-09-28 - - 1999-08-15
0475 - A Ph1 3.13.0 - Testing of the SIM-ME contacts smg-08 664/93 Postponed Vodafone - - - 1993-09-28 - Replaced by 11.10-492 at SMG#9 1999-08-15
0476 - A Ph1 3.13.0 - II.6.3 TX Power control smg-08 679/93 Postponed Telecom Denmark/R&S - - - 1993-09-29 - To be approved by correspondence 1999-08-15
0477 - A Ph1 3.13.0 - Addition of measurement uncertainty to frequency accuracy test (II.3.2) smg-08 675/93 Approved AEG - - - 1993-09-29 - - 1999-08-15
0478 - A Ph1 3.7.0 - Addition of measurement uncertainty to frequency accuracy test (II.3.2) smg-08 674/93 Postponed AEG - - - 1993-09-29 - ES to review (DCS CR) 1999-08-15
0479 - A Ph1 3.13.0 - II.6.2.1 Signal strength smg-08 680/93 Postponed Orbitel/R&S - - - 1993-09-29 - To be approved by correspondence 1999-08-15
0480 - A Ph2 4.4.0 - Testing of the SIM-ME contacts smg-08 682/93 Approved Vodafone - - - 1993-09-29 - - 1999-08-15
0481 - A Ph1 3.13.0 - Clarification of requirements in test II.6.1.3 smg-08 686/93 Postponed Telecom Denmark - - - 1993-09-30 - To be approved by correspondence 1999-08-15
0482 - A Ph1 3.13.0 - Testing of SIM/ME interface - test sequence 5 (Tables II.8-1 and II.8-2) smg-08 658/93 Approved RWTUV - - - 1993-09-23 - SIMEG to review 1999-08-15
0483 - A Ph1 3.13.0 - Testing of SIM/ME interface - section II.8.9.2 - answer to reset - mute card smg-08 658/93 Approved RWTUV - - - 1993-09-23 - SIMEG to review 1999-08-15
0484 - A Ph1 3.13.0 - Testing of SIM/ME interface - section II.8.9.1.3 a.2) - inter character delay smg-08 658/93 Approved RWTUV - - - 1993-09-23 - SIMEG to review 1999-08-15
0485 - A Ph2 4.4.0 4.5.0 Rework of Call Control tests for Phase 2 (II.5.3.8) smg-08 637/93 Approved PT48V - - - 1993-09-27 - - 1999-08-15
0486 - A Ph1 3.14.0 3.15.0 Frequency error under interference smg-09 - Approved PT48V - - - 1993-10-29 - Sent for approval by correspondence 1999-08-15
0487 - F Ph1 3.8.0 - National roaming tests smg-09 24/94 Approved SMG ES - - - 1993-12-08 - - 1999-08-15
0488 - F Ph1 3.8.0 - Correction of C1 value in II.6.1.6.6 smg-09 24/94 Approved SMG ES - - - 1993-12-08 - - 1999-08-15
0489 - F Ph1 3.15.0 - Echo return loss smg-09 23/94 Approved SMG ES - - - 1993-12-10 - - 1999-08-15
0490 - F Ph1 3.15.0 - Errors in tests in II.4 smg-09 23/94 Approved SMG ES - - - 1993-12-10 - - 1999-08-15
0491 - F Ph1 3.15.0 - Voltage level in I/O in II.8.7.2.5 smg-09 23/94 Approved SMG ES - - - 1993-12-10 - - 1999-08-15
0492 - F Ph1 3.15.0 - Testing of SIM/ME contacts, II.8.7.1.1 smg-09 16/94 Approved SMG ES / SIMEG - - - 1993-12-10 - Replaces CR 11.10-475 1999-08-15
0493 - F Ph1 3.15.0 - Testing of SIM/ME contacts, II.8.7.1.2 and II.8.7.1.3 smg-09 16/94 Approved SMG ES / SIMEG - - - 1993-12-10 - - 1999-08-15
0494 - F Ph1 3.15.0 - II.5.3.7.4.3.4 Requirement 5 should expect IMSI attach smg-09 23/94 Approved SMG ES - - - 1993-12-10 - - 1999-08-15
0495 - F Ph1 3.8.0 - Changes to II.6.1.6.2 smg-09 24/94 Approved SMG ES - - - 1993-12-08 - - 1999-08-15
0496 - F Ph1 3.15.0 - II.5.3.6.2.3 Paging Reorganisation smg-09 23/94 Approved SMG ES - - - 1993-12-10 - - 1999-08-15
0497 - F Ph1 3.15.0 - Change to test requirement II.5.3.7.4.2.2 smg-09 23/94 Approved SMG ES - - - 1993-12-10 - - 1999-08-15
0498 - F Ph1 3.15.0 - Ordering of Assignment and alerting message in II.5.3.8 smg-09 23/94 Approved SMG ES - - - 1993-12-10 - - 1999-08-15
0499 - F Ph1 3.15.0 - II.5.3.7.4.3.2 Proc 6 is inconsistent with GSM 05.08 smg-09 23/94 Approved SMG ES - - - 1993-12-10 - - 1999-08-15
0500 - F Ph1 3.15.0 - Incorrect reference in II.5.3.8.2.4.4 and II.5.3.8.2.6.4 smg-09 23/94 Approved SMG ES - - - 1993-12-10 - - 1999-08-15
0501 - F Ph1 3.8.0 - RF measurement over the DCS band in II.17 smg-09 24/94 Approved SMG ES - - - 1993-12-08 - - 1999-08-15
0502 - D Ph2 4.5.0 - Update to Section 30 and Annex 3 smg-09 29/94 Approved SMG ES - - - 1993-12-13 - - 1999-08-15
0503 - F Ph2 4.5.0 - Update of Annex 2 smg-09 29/94 Approved SMG ES - - - 1993-12-13 - - 1999-08-15
0504 - D Ph2 4.5.0 - Editorial changes to GSM 11.10 (Phase2) smg-09 29/94 Approved SMG ES - - - 1993-12-13 - - 1999-08-15
0505 - F Ph2 4.5.0 - Invalid PCM sequence SEQ05.INP used in test 32.3 smg-09 29/94 Approved SMG ES - - - 1993-12-13 - - 1999-08-15
0506 - D Ph2 4.5.0 - Wrong name given to test sequences in Uplink Transmitter DTX Functions test smg-09 29/94 Approved SMG ES - - - 1993-12-13 - - 1999-08-15
0507 - D Ph2 4.5.0 - Review of sections 1 to 9 of GSM 11.10 (Phase 2) smg-09 29/94 Approved SMG ES - - - 1993-12-13 - - 1999-08-15
0508 - F Ph2 4.5.0 - Review of section 30 of GSM 11.10 (Phase 2), Speech Teleservices smg-09 29/94 Approved SMG ES - - - 1993-12-13 - - 1999-08-15
0509 - D Ph2 4.5.0 - Deletion of Appendix A and B from GSM 11.10 (Phase 2) smg-09 29/94 Approved SMG ES - - - 1993-12-13 - - 1999-08-15
0510 - F Ph2 4.5.0 - Clarification of test requirements in 'Access time during handover' tests smg-09 29/94 Approved SMG ES - - - 1993-12-13 - - 1999-08-15
0511 - F Ph2 4.5.0 - RXLEV test smg-09 29/94 Approved SMG ES - - - 1993-12-13 - - 1999-08-15
0512 - F Ph2 4.5.0 - Addition of Mobile Originating call set up procedure and editorial corrections to MT call set up procedure smg-09 29/94 Approved SMG ES - - - 1993-12-13 - - 1999-08-15
0513 - F Ph2 4.5.0 - Review of section 14 of GSM 11.10 (Phase 2) smg-09 29/94 Approved SMG ES - - - 1993-12-13 - - 1999-08-15
0514 - F Ph2 4.5.0 - Review of Section 34 of GSM 11.10 (Phase 2), Mobile Station features smg-09 29/94 Approved SMG ES - - - 1993-12-13 - - 1999-08-15
0515 - F Ph2 4.5.0 - Review of Annex 1 of GSM 11.10 (Phase 2) smg-09 29/94 Approved SMG ES - - - 1993-12-13 - - 1999-08-15
0516 - F Ph2 4.5.0 - Review of Cell Selection / Reselection tests in GSM 11.10 (Phase 2) smg-09 62/94 Approved SMG ES - - - 1993-12-13 - - 1999-08-15
0517 - F Ph2 4.5.0 - Definition of default SIM parameters in GSM 11.10 (Phase 2), new Annex 4 smg-09 29/94 Approved SMG ES - - - 1993-12-13 - - 1999-08-15
0518 - F Ph1 3.15.0 - Additional information for Annex 3 (PICS) smg-09 23/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0519 - F Ph2 4.5.0 - New test for handling cipher key and algorithm changes smg-09 112/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0520 - F Ph2 4.5.0 - New test for pre-synchronized and pseudo-synchronized handover smg-09 112/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0521 - F Ph2 4.5.0 - Tests for phase 2 Classmark Enquiry procedure smg-09 112/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0522 - F Ph2 4.5.0 - Default RR message contents smg-09 112/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0523 - F Ph2 4.5.0 - IMEI request within ciphering mode command smg-09 112/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0524 - F Ph2 4.5.0 - PICS/PIXIT smg-09 111/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0525 - F Ph2 4.5.0 - Definition of ""idle (not) updated"" smg-09 111/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0526 - F Ph2 4.5.0 - Tests of the channel assignment procedure smg-09 112/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0527 - F Ph2 4.5.0 - Updating of the intial tests smg-09 111/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0528 - F Ph2 4.5.0 - Updating of the elementary procedures for mobility management (26-7) smg-09 114/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0529 - F Ph2 4.5.0 - Testing of the establishment cause smg-09 111/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0530 - F Ph2 4.5.0 - Default contents of messages for CC smg-09 113/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0531 - F Ph2 4.5.0 - SETUP for a non supported BC smg-09 113/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0532 - F Ph2 4.5.0 - Progress values for user attachment smg-09 113/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0533 - D Ph2 4.5.0 - Alerting Indication smg-09 113/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0534 - D Ph2 4.5.0 - Editorials for 26-8 smg-09 113/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0535 - F Ph2 4.5.0 - Message contents for in-call modify smg-09 113/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0536 - F Ph2 4.5.0 - RELEASE COMPLETE in CC states smg-09 113/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0537 - F Ph2 4.5.0 - Internal alerting indication smg-09 113/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0538 - F Ph2 4.5.0 - Format of call re-establishment tests smg-09 113/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0539 - F Ph2 4.5.0 - Cause values for RELEASE smg-09 113/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0540 - D Ph2 4.5.0 - Removal of *.5 from CC smg-09 113/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0541 - F Ph2 4.5.0 - MT In-call modification smg-09 113/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0542 - F Ph2 4.5.0 - Regional provision of service smg-09 143/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0543 - F Ph2 4.5.0 - Tests for Advice of Charge Charging smg-09 116/94 Approved SMG ES - - - 1994-01-07 - - 1999-08-15
0544 - F Ph1 3.15.0 - Clarification of CC-state U6 smg-09 124/94 Approved PT12/48V - - - 1994-01-07 - - 1999-08-15
0545 - F Ph2 4.5.0 4.6.0 Incoporation of new SIM/ME Interface test section in GSM 11.10 (Phase 2) smg-09 130/94 approved PT12/48V SIM SG - - - 1994-01-17 - To be sent to ES for comment by 7/2/94 1999-08-15
0546 - F Ph1 3.16.0 - Testing of SIM/ME interface - section II.8.7.2 smg-10 256/94 Approved SMG7 - - - 1994-03-09 - - 1999-08-15
0547 - F Ph1 3.16.0 - Testing of SIM/ME interface - section II.8.7.2.5 smg-10 256/94 Approved SMG7 - - - 1994-03-09 - - 1999-08-15
0548 - F Ph1 3.16.0 - Change to signalling test II.5.3.7.4.3.3 smg-10 256/94 Approved SMG7 - - - 1994-03-09 - - 1999-08-15
0549 - F Ph1 3.9.0 - Change to test II.4.7.4 smg-10 257/94 Approved SMG7 - - - 1994-03-09 - - 1999-08-15
0550 - F Ph1 3.9.0 - Change to tests II.5.3.6.2.1.7 and II.5.3.6.2.1.8 smg-10 257/94 Approved SMG7 - - - 1994-03-09 - - 1999-08-15
0551 - F Ph1 3.9.0 - Change to test II.6.1.6.5 smg-10 257/94 Approved SMG7 - - - 1994-03-09 - - 1999-08-15
0552 - F Ph1 3.9.0 - Change to test II.6.3 smg-10 257/94 Approved SMG7 - - - 1994-03-09 - - 1999-08-15
0553 - F Ph1 3.9.0 - Change to test II.6.3.3 smg-10 257/94 Approved SMG7 - - - 1994-03-09 - - 1999-08-15
0554 - F Ph2 4.6.0 - Revision of SIM/ME Interface tests (Section 27) smg-10 258/94 Approved SMG7/PT48V SIM SG - - - 1994-03-09 - - 1999-08-15
0555 - F Ph2 4.6.0 - Channel Mode Modification smg-10 259/94 Approved SMG7 - - - 1994-03-09 - - 1999-08-15
0556 - F Ph2 4.6.0 - Testing of MM follow-on procedure smg-10 259/94 Approved SMG7 - - - 1994-03-09 - - 1999-08-15
0557 - F Ph2 4.6.0 - Updating of section 26.7 smg-10 259/94 Approved SMG7 - - - 1994-03-09 - - 1999-08-15
0558 - D Ph2 4.6.0 - Clarifications in section 26.2 smg-10 259/94 Approved SMG7 - - - 1994-03-09 - - 1999-08-15
0559 - F Ph2 4.6.0 - Updating of Authentication tests smg-10 259/94 Approved SMG7 - - - 1994-03-09 - - 1999-08-15
0560 - F Ph2 4.6.0 - Testing of MM Connection Abortion smg-10 259/94 Approved SMG7 - - - 1994-03-09 - - 1999-08-15
0561 - F Ph2 4.6.0 - IMEI Paging smg-10 259/94 Approved SMG7 - - - 1994-03-09 - - 1999-08-15
0562 - F Ph1 3.16.0 - II.4.7.2 Blocking and spurious response smg-10 256/94 Approved SMG7 - - - 1994-03-29 - - 1999-08-15
0563 - F Ph1 3.16.0 - Problem with phase 1 test II.3.2 smg-10 255/94 Approved SMG7 - - - 1994-03-29 - - 1999-08-15
0564 - D Ph2 4.6.0 - Definition of term 'arbitrary' smg-10 259/94 Approved SMG7 - - - 1994-03-29 - - 1999-08-15
0565 - F Ph2 4.6.0 - Addition of generic call set-up procedure for data calls smg-10 259/94 Approved SMG7 - - - 1994-03-29 - - 1999-08-15
0566 - F Ph2 4.6.0 - Review of general tests smg-10 259/94 Approved SMG7 - - - 1994-03-29 - - 1999-08-15
0567 - F Ph2 4.6.0 - Clarifications in clause 26.8.1.3.5.4 to remove verification of audio path smg-10 259/94 Approved SMG7 - - - 1994-03-29 - - 1999-08-15
0568 - F Ph2 4.6.0 - Testing of handling of multislot CCCH smg-10 259/94 Approved SMG7 - - - 1994-03-29 - - 1999-08-15
0569 - D Ph2 4.6.0 - Editorial clarifications to 26.5 smg-10 259/94 Approved SMG7 - - - 1994-03-29 - - 1999-08-15
0570 - F Ph2 4.6.0 - Removal of requirement to place BCCH measurements in order of increasing RXLEV smg-10 259/94 Approved SMG7 - - - 1994-03-29 - - 1999-08-15
0571 - F Ph2 4.6.0 - Testing of handling IMSI shorter than the maximum length smg-10 259/94 Approved SMG7 - - - 1994-03-29 - - 1999-08-15
0572 - F Ph2 4.6.0 - Updating of 'Periodic updating' tests smg-10 259/94 Approved SMG7 - - - 1994-03-29 - - 1999-08-15
0573 - F Ph2 4.6.0 4.7.0 Conformance requirement and T313 in 26.8.1.3.5 smg-10 259/94 Approved SMG7 - - - 1994-03-29 - - 1999-08-15
0574 - D Ph1 3.17.0 - Removal of regulatory text in section 1 smg-11 373/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0575 - F Ph1 3.17.0 - Application of LLC and HLC in GSM 11.10, II.1.2.2 smg-11 373/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0576 - F Ph1 3.17.0 - Non-synchronised handovers and frequency hopping smg-11 373/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0577 - F Ph1 3.17.0 - SIM test sequence 2 - deletion of second test purpose (handling of short TMSI) smg-11 373/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0578 - F Ph1 3.17.0 - SIM/ME interface testing - II.8.7.2.1.2, specification for minimum current smg-11 376/94 Approved SMG7 - - - 1994-06-16 - Joint CR with CR 11.40-031 1999-08-15
0579 - F Ph1 3.17.0 - SIM/ME interface testing - II.8.7.2.3.3, minimum high level voltage corrected smg-11 373/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0580 - F Ph1 3.17.0 - To allow for simpler test equipment to be used for Talker Sigetone testing smg-11 373/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0581 - F Ph1 3.10.0 - II.5.3.6.3 - correction of message contents and insufficient time to measure neighbouring cells smg-11 374/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0582 - F Ph1 3.10.0 - DCS1800 receiver performance with frequency hopping smg-11 374/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0583 - F Ph2 4.7.0 - Receiver performance with frequency hopping smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0584 - F Ph2 4.7.0 - Changes to sections 10.3 and 10.4 (generic call setups) smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0585 - F Ph2 4.7.0 - Testing of non-support of Fixed Dialling Number smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0586 - D Ph2 4.7.0 - Editorial clarifications and corrections to GSM 11.10 in relation to signalling tests smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0587 - F Ph2 4.7.0 - Updating of Cell Selection/Reselection tests smg-11 380/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0588 - F Ph2 4.7.0 - Correction of lowest levels in Signal level measurement test smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0589 - D Ph2 4.7.0 - Testing of layer 2 on FACCH/H smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0590 - F Ph2 4.7.0 - Proposal for a test of layer 2 link failure - I frame loss smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0591 - F Ph2 4.7.0 - Proposal for a test of layer 2 link failure - DISC frame loss smg-11 375/94 Postponed SMG7 - - - 1994-06-16 - Covered by Layer 3 test 26.6.12.2 1999-08-15
0592 - D Ph2 4.7.0 - Editorial corrections to 26.5.5.2 smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0593 - F Ph2 4.7.0 - Receipt of Immediate Assignment Command after Immediate Assignment Reject smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0594 - F Ph2 4.7.0 - Ignoring Immediate Assignment messages for other mobiles smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0595 - D Ph2 4.7.0 - Missing Heading and incorrect clause numbering smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0596 - F Ph2 4.7.0 - Introduction of new tests for Periodic HPLMN Search procedure smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0597 - F Ph2 4.7.0 - Removal of untestable statement in 26.8.1.2.4.3 smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0598 - F Ph2 4.7.0 - Removal of unnecessary text that could be misleading - 26.8.1.2.4.8 smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0599 - F Ph2 4.7.0 - Incorrect direction of message in 26.9.4 smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0600 - F Ph2 4.7.0 - Phase 2 SIM/ME tests - corrections and updates to align with core specifications smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0601 - F Ph2 4.7.0 - Correction to Access Control Class table and diagram - 27.10 smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0602 - F Ph2 4.7.0 - Access tests - Negotiation of parameters in the BC smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0603 - F Ph2 4.7.0 - Access tests - Negotiation TS 61 / TS 62 smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0604 - F Ph2 4.7.0 - Changes to section 29.8.1.4.5 smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0605 - F Ph2 4.7.0 - Changes to phase 2 SMS tests smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0606 - F Ph2 4.7.0 - Update of uncertainty figures in Annex 2 smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0607 - F Ph2 4.7.0 - Changes to Annex 3 (PICS/PIXIT) smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0608 - F Ph2 4.7.0 - Incorporating essential parts of GSM 11.40 into GSM 11.10 smg-11 377/94 Withdrawn SMG7 - - - 1994-06-16 - - 1999-08-15
0608 1 F Ph2 4.7.0 - Incorporating essential parts of GSM 11.40 into GSM 11.10 smg-11 450/94 Approved PT12 - - - 1994-06-16 - - 1999-08-15
0609 - F Ph2 4.7.0 - Removal of test of downlink DTMF in section 26.8 smg-11 375/94 Approved SMG7 - - - 1994-06-16 - - 1999-08-15
0610 1 F Ph2 4.7.0 - Definition of new test loop smg-11 424/94 Approved SMG7 Chairman - - - 1994-06-17 - - 1999-08-15
0611 - A Ph2 4.7.0 - Manufacturer's Declaration of IMEI Security smg-11 432/94 Revised MoU Security Group - - - 1994-06-17 - Not seen by SMG7 1999-08-15
0611 1 F Ph2 4.7.0 - Manufacturer's Declaration of IMEI Security smg-11 484/94 Approved MoU Security Group - - - 1994-06-30 - Not seen by SMG7 1999-08-15
0612 - A Ph1 3.17.0 - Testing of the SIM/ME contact C7 (phase 1) smg-11 466/94 Approved SMG9 - - - 1994-06-28 - Not seen by SMG7 1999-08-15
0613 - A Ph2 4.7.0 - Testing of the SIM/ME contact C7 (phase 2) smg-11 466/94 Approved SMG9 - - - 1994-06-28 - Not seen by SMG7 1999-08-15
0614 - F Ph1 3.17.0 - Phase 1 MS RLR requirement relaxed to Phase 2 limit smg-11 381/94 Approved GSM-MoU - - - 1994-06-20 - Not seen by SMG7 1999-08-15
0615 - F Ph1 3.17.0 - Support of A5/2 algorithm smg-11 485/94 Approved SMG7/PT12 - - - 1994-06-30 - Based on Delta spec in TDoc SMG 378/94 1999-08-15
0616 - F Ph1 3.18.0 - Cause value #100 should not be tested in II.5.3.5.6.1.3 smg-12 550/94 Approved SMG7 - - - 1994-09-01 - - 1999-08-15
0617 1 F Ph2 4.8.0 - LLC in Call Setup smg-12 647/94 Approved SMG7 - - - 1994-09-02 - - 1999-08-15
0618 - F Ph2 4.8.0 - Radiated spurious emissions testing smg-12 553/94 Approved SMG7 - - - 1994-09-02 - - 1999-08-15
0619 - D Ph2 4.8.0 - Application of LLC and HLC in 'Verification of support of the single numbering plan' smg-12 555/94 Approved SMG7 - - - 1994-09-01 - - 1999-08-15
0620 - F Ph2 4.8.0 - Detail of requirements in 'Verification of non support of services, Call Hold and Multiparty' smg-12 555/94 Approved SMG7 - - - 1994-09-01 - - 1999-08-15
0621 - F Ph2 4.8.0 - Reference sensitivity testing in the E-GSM band smg-12 555/94 Approved SMG7 - - - 1994-09-01 - - 1999-08-15
0622 - F Ph2 4.8.0 - MS out of band blocking performance smg-12 555/94 Approved SMG7 - - - 1994-09-01 - - 1999-08-15
0623 - F Ph2 4.8.0 - Changes to Cell Selection / Reselection tests due to PT48V work smg-12 554/94 Approved SMG7 - - - 1994-09-02 - - 1999-08-15
0624 1 F Ph2 4.8.0 - 25.2.1.1.2.2.1 UA frame with different information field smg-12 652/94 Approved SMG7 - - - 1994-09-01 - - 1999-08-15
0625 - D Ph2 4.8.0 - Misleading reference in section 26.1.5 smg-12 555/94 Approved SMG7 - - - 1994-09-01 - - 1999-08-15
0626 - F Ph2 4.8.0 - Deletion of section 33 smg-12 555/94 Approved SMG7 - - - 1994-09-02 - - 1999-08-15
0627 - F Ph2 4.8.0 - Adding protocol error test case for RR checking the skip indicator smg-12 555/94 Approved SMG7 - - - 1994-08-31 - - 1999-08-15
0628 - F Ph2 4.8.0 - Adding protocol error test case for RR case; unknown IE, comprehension not required smg-12 555/94 Approved SMG7 - - - 1994-08-31 - - 1999-08-15
0629 - F Ph2 4.8.0 - Adding protocol error test case for testing that spare bits will be ignored in RR/MM/CC messages smg-12 555/94 Approved SMG7 - - - 1994-08-31 - - 1999-08-15
0630 - F Ph2 4.8.0 - More realistic test for extended paging smg-12 555/94 Approved SMG7 - - - 1994-08-31 - - 1999-08-15
0631 - F Ph2 4.8.0 - More realistic handover tests smg-12 555/94 Approved SMG7 - - - 1994-08-31 - - 1999-08-15
0632 - F Ph2 4.8.0 - Non-synchronised handovers and frequency hopping smg-12 555/94 Approved SMG7 - - - 1994-08-31 - - 1999-08-15
0633 - F Ph2 4.8.0 - Proposed new signalling test; reception of a SETUP message in the active state of a call smg-12 555/94 Postponed SMG7 - - - 1994-08-31 - Review at SMG7 1999-08-15
0634 - D Ph2 4.8.0 - Editorial corrections to 26.8.2.2.4 smg-12 555/94 Approved SMG7 - - - 1994-08-31 - - 1999-08-15
0635 - F Ph2 4.8.0 - Making section 29 applicable to all mobile configurations smg-12 555/94 Approved SMG7 - - - 1994-08-31 - - 1999-08-15
0636 - F Ph2 4.8.0 - New section 29.3 - Tests of RLP protocol smg-12 551/94 Approved SMG7 - - - 1994-08-31 - - 1999-08-15
0637 - F Ph2 4.8.0 - Talker sidetone testing, allowance for simpler equipment smg-12 555/94 Approved SMG7 - - - 1994-08-25 - - 1999-08-15
0638 - D Ph2 4.8.0 - Removal of square brackets in section 32 smg-12 555/94 Approved SMG7 - - - 1994-09-02 - - 1999-08-15
0639 - F Ph2 4.8.0 - DTX flag in cell options is for Uplink DTX only smg-12 555/94 Approved SMG7 - - - 1994-09-02 - - 1999-08-15
0640 - F Ph1 3.11.0 - Further corrections to National Roaming Tests smg-12 556/94 Approved SMG7 - - - 1994-09-01 - - 1999-08-15
0641 - F Ph2 4.8.0 - BFI setting during SID frame smg-12 555/94 Approved SMG7 - - - 1994-09-01 - - 1999-08-15
0642 - F Ph2 4.8.0 - Maximum voltage at low level on contact C3 smg-12 637/94 Approved SMG9 - - - 1994-09-09 - - 1999-08-15
0643 - D Ph2 4.8.0 - Editorial changes to align GSM 11.10 with ETSI PNE rules smg-12 571/94 Approved PT12 - - - 1994-09-21 - - 1999-08-15
0644 1 F Ph2 4.8.0 - Essential clarifications for new test loop smg-12 615/94 Approved SMG7 - - - 1994-09-22 - - 1999-08-15
0645 - F Ph2 4.8.0 - Receive Loudness rating smg-12 574/94 Approved PT12 - - - 1994-09-23 - - 1999-08-15
0646 - F Ph2 4.8.0 - SIM/ME Testing - minimum high voltage incorrect in 27.17.2.2 smg-12 637/94 Approved SMG9 - - - 1994-09-23 - - 1999-08-15
0647 - F Ph2 4.8.0 - SIM/ME Testing - alignment of 27.17.2 with GSM 11.11 smg-12 637/94 Approved SMG9 - - - 1994-09-23 - - 1999-08-15
0648 - F Ph1 3.12.1 - Section II.4 - Use of STATUS messages in FACCH tests smg-13 17/95 Approved SMG7 - - - 1995-12-08 - - 1999-08-15
0649 - D Ph1 3.19.0 - GSM 11.10 testing undefined GSM 04.08 requirement, II.5.3.7.4.3.3 and II.5.3.7.4.3.4 smg-13 18/95 Postponed SMG7 - - - 1994-12-07 - - 1999-08-15
0649 1 D Ph1 3.19.0 - GSM 11.10 testing undefined GSM 04.08 requirement, II.5.3.7.4.3.3 and II.5.3.7.4.3.4 smg-13 187/95 Approved SMG7 - - - 1994-12-07 - - 1999-08-15
0650 - F Ph1 3.19.0 - Clarification of conformance requirement for II.6.1.2.2 smg-13 18/95 Approved SMG7 - - - 1994-12-07 - - 1999-08-15
0651 - F Ph1 3.19.0 - II.6.2.1.3 Signal Strength - Relative accuracy smg-13 18/95 Approved SMG7 - - - 1994-12-07 - - 1999-08-15
0652 - D Ph1 3.19.0 - SIM/ME testing - clarification of II.8.7.1.2 smg-13 18/95 Approved SMG7 - - - 1994-12-06 - - 1999-08-15
0653 - F Ph2 4.9.0 4.10.0 Maximum duration of signalling tests smg-13 20/95 approved SMG7 - - - 1994-11-23 - - -
0653 - F Ph2 4.9.0 - Maximum duration of signalling tests smg-13 20/95 Approved SMG7 - - - 1994-11-23 - - 1999-08-15
0654 - F Ph2 4.9.0 4.10.0 34.2.7 test of the replace mechanism for SM type 1-7 - alignment with 03.40 smg-13 20/95 approved SMG7 - - - 1994-11-30 - - -
0654 - F Ph2 4.9.0 - 34.2.7 test of the replace mechanism for SM type 1-7 - alignment with 03.40 smg-13 20/95 Approved SMG7 - - - 1994-11-30 - - 1999-08-15
0655 - F R96 4.9.0 - Two digit dialing smg-13 21/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0656 - F Ph2 4.9.0 - Clarification of test 26.7.4.2.3 smg-13 20/95 postponed SMG7 - - - 1994-12-06 - - -
0656 - F Ph2 4.9.0 - Clarification of test 26.7.4.2.3 smg-13 20/95 Postponed SMG7 - - - 1994-12-06 - - 1999-08-15
0656 1 F Ph2 4.9.0 - Clarification of test 26.7.4.2.3 smg-13 187/95 Approved SMG7 - - - 1994-12-06 - - 1999-08-15
0657 - F Ph2 4.9.0 4.10.0 Proposed new test 'In-call functions / MS originating in-call modification / a release complete received' smg-13 20/95 approved SMG7 - - - 1994-12-06 - - -
0657 - F Ph2 4.9.0 - Proposed new test 'In-call functions / MS originating in-call modification / a release complete received' smg-13 20/95 Approved SMG7 - - - 1994-12-06 - - 1999-08-15
0658 - F Ph2 4.9.0 4.10.0 Interoperation of IMSI attach and PLU smg-13 20/95 approved SMG7 - - - 1994-12-06 - - -
0658 - F Ph2 4.9.0 - Interoperation of IMSI attach and PLU smg-13 20/95 Approved SMG7 - - - 1994-12-06 - - 1999-08-15
0659 - F Ph2 4.9.0 4.10.0 Proposed new section 31.8 'Call barring supplementary services' smg-13 22/95 approved SMG7 - - - 1994-12-08 - - -
0659 - F Ph2 4.9.0 - Proposed new section 31.8 'Call barring supplementary services' smg-13 22/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0660 - F Ph2 4.9.0 4.10.0 Proposed new section 31.2 'Call forwarding supplementary services' smg-13 23/95 approved SMG7 - - - 1994-12-08 - - -
0660 - F Ph2 4.9.0 - Proposed new section 31.2 'Call forwarding supplementary services' smg-13 23/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0661 - F Ph2 4.9.0 - Manual mode of PLMN selection smg-13 20/95 postponed SMG7 - - - 1994-12-08 - - -
0661 - F Ph2 4.9.0 - Manual mode of PLMN selection smg-13 20/95 Postponed SMG7 - - - 1994-12-08 - - 1999-08-15
0661 1 F Ph2 4.9.0 - Manual mode of PLMN selection smg-13 187/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0662 - F Ph2 4.9.0 4.10.0 Clarification and error correction in section 26.5.2.1.2 smg-13 20/95 approved SMG7 - - - 1994-12-08 - - -
0662 - F Ph2 4.9.0 - Clarification and error correction in section 26.5.2.1.2 smg-13 20/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0663 - F Ph2 4.9.0 4.10.0 Clarification in section 26.5.6.3 smg-13 20/95 approved SMG7 - - - 1994-12-08 - - -
0663 - F Ph2 4.9.0 - Clarification in section 26.5.6.3 smg-13 20/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0664 - F Ph2 4.9.0 4.10.0 Starting Time tests smg-13 24/95 approved SMG7 - - - 1994-12-07 - - -
0664 - F Ph2 4.9.0 - Starting Time tests smg-13 24/95 Approved SMG7 - - - 1994-12-07 - - 1999-08-15
0665 - F Ph2 4.9.0 4.10.0 Introduction of SYSTEM INFORMATION 5bis messages for measurement reporting tests smg-13 20/95 approved SMG7 - - - 1994-12-08 - - -
0665 - F Ph2 4.9.0 - Introduction of SYSTEM INFORMATION 5bis messages for measurement reporting tests smg-13 20/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0666 - F Ph2 4.9.0 4.10.0 Introduction of new measurement reporting test smg-13 20/95 approved SMG7 - - - 1994-12-08 - - -
0666 - F Ph2 4.9.0 - Introduction of new measurement reporting test smg-13 20/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0667 - F Ph2 4.9.0 - Editorial errors detected by PT65V smg-13 20/95 Approved SMG7 - - - 1994-12-07 - - 1999-08-15
0668 - F Ph2 4.9.0 - Test of frequency list IE in the assignment command smg-13 20/95 Approved SMG7 - - - 1994-12-07 - - 1999-08-15
0669 - F Ph2 4.9.0 - Proposed new test 'Reception of a SETUP message in the active state of a call' smg-13 20/95 Approved SMG7 - - - 1994-12-07 - - 1999-08-15
0670 - F Ph2 4.9.0 - Section 14 - Use of STATUS messages in FACCH tests smg-13 25/95 Approved SMG7 - - - 1994-11-17 - - 1999-08-15
0671 - F Ph2 4.9.0 - MS Transmitter output power and burst timing smg-13 25/95 Approved SMG7 - - - 1994-12-05 - - 1999-08-15
0672 - F Ph2 4.9.0 - Correction of cell selection / reselection tests smg-13 25/95 Approved SMG7 - - - 1994-12-05 - - 1999-08-15
0673 - F Ph2 4.9.0 - Receiver AM suppression performance smg-13 62/95SM Approved SMG7 - - - 1994-12-05 - - 1999-08-15
0674 - F Ph2 4.9.0 4.10.0 Alignment of Speech Teleservices tests with 03.50 smg-13 25/95 approved SMG7 - - - 1994-12-08 - - -
0674 - F Ph2 4.9.0 - Alignment of Speech Teleservices tests with 03.50 smg-13 25/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0675 - F Ph2 4.9.0 - Speech Channel Transmission Delay smg-13 56/95SM Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0676 - F Ph2 4.9.0 - Listener Sidetone Rating (LSTR) tests smg-13 25/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0677 - F Ph2 4.9.0 - Temporary reception gaps smg-13 25/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0678 - F Ph2 4.9.0 - Output power testing on integral antenna smg-13 25/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0679 - F Ph2 4.9.0 4.10.0 Cell reselection using parameters transmitted in the system information type 2bis, 7 and 8 messages smg-13 25/95 approved SMG7 - - - 1994-12-08 - - -
0679 - F Ph2 4.9.0 - Cell reselection using parameters transmitted in the system information type 2bis, 7 and 8 messages smg-13 25/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0680 - F Ph2 4.9.0 4.10.0 Proposed new test 'Cell reselection on release of SDDCH and TCH' smg-13 25/95 approved SMG7 - - - 1994-12-08 - - -
0680 - F Ph2 4.9.0 - Proposed new test 'Cell reselection on release of SDDCH and TCH' smg-13 25/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0681 - F Ph2 4.9.0 - Half rate speech transcoding tests smg-13 14/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0682 - D Ph2 4.9.0 - SIM/ME testing - 27.17.1.2 clarification smg-13 26/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0683 - D Ph2 4.9.0 - SIM/ME testing - 27.22 may be omitted smg-13 26/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0684 - F Ph2 4.9.0 - SIM/ME testing - Testing storage of Short messages smg-13 26/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0685 - D Ph2 4.9.0 - Incorrect reference to Appendix B smg-13 13/95 Approved PT12 - - - 1995-01-05 - - 1999-08-15
0686 - F Ph2 4.9.0 4.10.0 Test of Teleservices Facsimile: TS61 and TS62 smg-13 16/95 approved SMG7 - - - 1994-12-08 - - -
0686 - F Ph2 4.9.0 - Test of Teleservices Facsimile: TS61 and TS62 smg-13 16/95 Approved SMG7 - - - 1994-12-08 - - 1999-08-15
0687 - F Ph2 4.9.0 - Default L3 parameters in section 26 smg-13 82/95 Approved PT65V - - - 1995-01-17 - - 1999-08-15
0688 - F Ph2 4.9.0 - Combining test purposes, 26.5.5.2 smg-13 82/95 Approved PT65V - - - 1995-01-17 - - 1999-08-15
0689 - F Ph2 4.9.0 - Inconsistencies in section 26.5.3.1 smg-13 82/95 Approved PT65V - - - 1995-01-17 - - 1999-08-15
0690 - F Ph2 4.9.0 - Missing conformance requirement, 26.6.1.2 smg-13 82/95 Approved PT65V - - - 1995-01-17 - - 1999-08-15
0691 - F Ph2 4.9.0 - Paging reorganisation smg-13 82/95 Approved PT65V - - - 1995-01-17 - - 1999-08-15
0692 - F Ph2 4.9.0 - Error in expected sequence for test of channel mode modify smg-13 82/95 Approved PT65V - - - 1995-01-17 - - 1999-08-15
0693 - F Ph2 4.9.0 - Editorial errors in MM tests smg-13 82/95 Approved PT65V - - - 1995-01-17 - - 1999-08-15
0694 - F Ph2 4.9.0 4.10.0 Errors in section 26.7.4.3.2 smg-13 82/95 approved PT65V - - - 1995-01-17 - - -
0694 - F Ph2 4.9.0 - Errors in section 26.7.4.3.2 smg-13 82/95 Approved PT65V - - - 1995-01-17 - - 1999-08-15
0695 - F Ph2 4.9.0 4.10.0 Errors in section 26.7.4.3.3 smg-13 82/95 approved PT65V - - - 1995-01-17 - - -
0695 - F Ph2 4.9.0 - Errors in section 26.7.4.3.3 smg-13 82/95 Approved PT65V - - - 1995-01-17 - - 1999-08-15
0696 - F Ph2 4.9.0 - IMEI plus software version smg-13 100/95 revised Vodafone - - - 1995-01-17 - - -
0696 1 F Ph2 4.9.0 - IMEI plus software version smg-13 - Approved Vodafone - - - 1995-01-17 - - 1999-08-15
0697 - F Ph2 4.9.0 - E-GSM frequencies for Access times during handover smg-13 140/95 Approved Vodafone - - - 1995-01-23 - - 1999-08-15
0698 - F Ph2 4.9.0 4.10.0 Frequency hopping sequence for E-GSM test cases smg-13 141/95 approved Vodafone - - - 1995-01-23 - - -
0699 - F Ph2 4.9.0 - Corrections to section 13 references smg-13 142/95 Approved Vodafone - - - 1995-01-23 - - 1999-08-15
0700 - F Ph2 4.9.0 - Tests of RLP negotiation procedure smg-13 167/95 Approved France Telecom - - - 1995-01-16 - - 1999-08-15
0701 - F Ph2 4.9.0 - Tests of REJ and SREJ frames in RLP smg-13 168/95 Approved France Telecom - - - 1995-01-16 - - 1999-08-15
0702 - F Ph2 4.9.0 4.10.0 BCCH surrounding cell ARFCNs in blocking test smg-13 163/95 approved Vodafone - - - 1995-01-23 - - -
0703 - F Ph2 4.9.0 - BCCH surrounding cell ARFCNs when frequency hopping smg-13 164/95 Approved Vodafone - - - 1995-01-23 - - 1999-08-15
0704 - F Ph1 3.19.0 - Measurement report test smg-13 185/95 Postponed DeTeMobil - - - 1995-01-04 - - 1999-08-15
0704 1 F Ph1-DCS 3.19.0 3.13.0 Measurement report test smg-13 187/95 Approved DeTeMobil - - - 1995-01-04 - - 1999-08-15
0705 - F Ph2 4.10.0 4.11.0 Corrections to Verification of non-support of feature (Fixed Dialling Number) smg-14 270/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0706 - F Ph2 4.10.0 4.11.0 Essential changes to Dedicated assignment / Failure / failure during active state. smg-14 270/95 approved SMG7 - - - 1995-03-29 - - -
0707 - F Ph2 4.10.0 4.11.0 Addition of new section 26.6.15 ""Default contents for DCS 1800 layer 3 messages for RR tests. smg-14 270/95 approved SMG7 - - - 1995-03-29 - - -
0708 - F Ph2 4.10.0 - Essential changes to section 26.6 Tests of the elementary procedures for Radio Resource Management smg-14 270/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0709 - F Ph2 4.10.0 - Essential changes to add specific message contents to IMSI attach/detach tests. smg-14 270/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0710 - F Ph2 4.10.0 4.11.0 Update of non-synchronised U10 Handover Tests smg-14 270/95 approved SMG7 - - - 1995-03-29 - - -
0711 - F Ph2 4.10.0 - Update of Finely Synchronised Handover Tests smg-14 270/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0712 - F Ph2 4.10.0 - Update of Call Under Establishment on-synchronised Handover tests. smg-14 270/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0713 - F Ph2 4.10.0 4.11.0 Update to Frequency Redefinition Test. smg-14 270/95 approved SMG7 - - - 1995-03-29 - - -
0714 - F Ph2 4.10.0 - Update to section 26.8.1.4.3, In-call functions/ channel changes. smg-14 270/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0715 - F Ph2 4.10.0 - Update to section 26.8.3, User to User signalling smg-14 270/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0716 - F Ph2 4.10.0 - Periodic HPLMN Search Tests smg-14 270/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0717 - F Ph2 4.10.0 - Update to Cipher Mode/ change of mode, algorithm and key. smg-14 270/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0718 - F Ph2 4.10.0 - Spare bits/RR/BCCH test. Errors in specific message. smg-14 270/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0719 - F Ph2 4.10.0 - Spare bits/CC tests. smg-14 270/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0720 - F Ph2 4.10.0 - Handover failure tests. smg-14 270/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0721 - F Ph2 4.10.0 - Unknown IEs in RR message test smg-14 271/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0722 - D Ph2 4.10.0 - Incorrect references in call control tests smg-14 271/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0723 - F Ph2 4.10.0 - T303 expiry in U1 state smg-14 271/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0724 - F Ph2 4.10.0 4.11.0 U3: Progress message stops T310 smg-14 271/95 approved SMG7 - - - 1995-03-29 - - -
0725 - F Ph2 4.10.0 - U3: Progress with inband tones smg-14 271/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0726 - F Ph2 4.10.0 - TI flag for Status Enquiry message smg-14 271/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0727 - F Ph2 4.10.0 - U10: Disconnect without inband tones smg-14 271/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0728 - F Ph2 4.10.0 - Minor corrections to U10/Setup received smg-14 271/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0729 - F Ph2 4.10.0 - U11: T305 timeout smg-14 271/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0730 - F Ph2 4.10.0 - Non-transient U12 state smg-14 271/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0731 - F Ph2 4.10.0 4.11.0 Permitted range for T308 smg-14 271/95 approved SMG7 - - - 1995-03-29 - - -
0732 - F Ph2 4.10.0 - CC tests: incoming call table 2 smg-14 271/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0733 - F Ph2 4.10.0 4.11.0 MT call for non-supported bearer capability smg-14 271/95 approved SMG7 - - - 1995-03-29 - - -
0734 - F Ph2 4.10.0 4.11.0 Mobiles supporting Immediate Connect: U9 tests smg-14 271/95 approved SMG7 - - - 1995-03-29 - - -
0735 - F Ph2 4.10.0 - Mobiles supporting Immediate Connect: U7 tests smg-14 271/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0736 - F Ph2 4.10.0 - Incorrect PICS and applicability: U8 tests. smg-14 271/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0737 - F Ph2 4.10.0 - User notification smg-14 272/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0738 - D Ph2 4.10.0 - Unclear message direction smg-14 272/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0739 - F Ph2 4.10.0 4.11.0 T323 accuracy (in call modification test) smg-14 272/95 approved SMG7 - - - 1995-03-29 - - -
0740 - F Ph2 4.10.0 - In call modification/ successful channel change smg-14 272/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0741 - F Ph2 4.10.0 - In call modification: release complete received smg-14 272/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0742 - F Ph2 4.10.0 - Section 10: generic call setup procedures smg-14 272/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0743 - F Ph2 4.10.0 - Specific message contents for in call modification smg-14 272/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0744 - F Ph2 4.10.0 4.11.0 Call reestablishment successful: CSKN value smg-14 272/95 approved SMG7 - - - 1995-03-29 - - -
0745 - F Ph2 4.10.0 4.11.0 Ciphering mode: IMEISV request smg-14 272/95 approved SMG7 - - - 1995-03-29 - - -
0746 - F Ph2 4.10.0 - Errors in channel request repetition time tests smg-14 272/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0747 - D Ph2 4.10.0 4.11.0 Immediate assignment/rejection test smg-14 272/95 approved SMG7 - - - 1995-03-29 - - -
0748 - F Ph2 4.10.0 - Incorrect reference in unknown PD test smg-14 272/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0749 - F Ph2 4.10.0 4.11.0 Pre and pseudo synchronised handowver tests smg-14 272/95 approved SMG7 - - - 1995-03-29 - - -
0750 - F Ph2 4.10.0 4.11.0 Call control TI test smg-14 272/95 approved SMG7 - - - 1995-03-29 - - -
0751 - F Ph2 4.10.0 - Default messages for `error handling' tests. smg-14 272/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0752 - F Ph2 4.10.0 - Incorrect reference in 26.5.5.3.2 smg-14 272/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0753 - F Ph2 4.10.0 4.11.0 Errors in section 26.5.5.2.2 smg-14 272/95 approved SMG7 - - - 1995-03-29 - - -
0754 - F Ph2 4.10.0 - Establishment cause test smg-14 272/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0755 - F Ph2 4.10.0 - Manual mode PLMN selection smg-14 272/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0756 - F Ph2 4.10.0 - Correction on 26.9.6.2.1.2 smg-14 273/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0757 - F Ph2 4.10.0 - Missing conformance reqirements in MM tests. smg-14 273/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0758 - F Ph2 4.10.0 4.11.0 Handling of TI value 111 smg-14 273/95 approved SMG7 - - - 1995-03-29 - - -
0759 - F Ph2 4.10.0 4.11.0 Progress indicator in disconnect messages smg-14 273/95 approved SMG7 - - - 1995-03-29 - - -
0760 - F Ph2 4.10.0 - Spare bits/RR/AGCH test, problem with T3126 smg-14 273/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0761 - F Ph2 4.10.0 4.11.0 Spare bits/RR/Connected mode tests: poor spare bit definition smg-14 273/95 approved SMG7 - - - 1995-03-29 - - -
0762 - F Ph2 4.10.0 4.11.0 Skip indicator/RR connection test errors smg-14 273/95 approved SMG7 - - - 1995-03-29 - - -
0763 - F Ph2 4.10.0 - Duplicated IE test smg-14 273/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0764 - F Ph2 4.10.0 - MM IE unknown in the MM protocol test smg-14 273/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0765 - F Ph2 4.10.0 4.11.0 MM IE unknown in message test smg-14 273/95 approved SMG7 - - - 1995-03-29 - - -
0766 - F Ph2 4.10.0 - IMSI attach/detach test smg-14 273/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0767 - F Ph2 4.10.0 4.11.0 Contents of unknown CC messages smg-14 273/95 approved SMG7 - - - 1995-03-29 - - -
0768 - F Ph2 4.10.0 4.11.0 Supported teleservices and Bearer Services smg-14 273/95 approved SMG7 - - - 1995-03-29 - - -
0769 - F Ph2 4.10.0 - Proposed to 26.7.4.5.2/3 smg-14 273/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0770 - F Ph2 4.10.0 - References in 26.9 smg-14 273/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0771 - F Ph2 4.10.0 4.11.0 Modification to 20 to test E-GSM mobile station smg-14 273/95 approved SMG7 - - - 1995-03-29 - - -
0772 - D Ph2 4.10.0 4.11.0 Some minor clarifications of Section 36 smg-14 273/95 approved SMG7 - - - 1995-03-29 - - -
0773 - F Ph2 4.10.0 4.11.0 Section 20.2 - Timer and modified carrier smg-14 273/95 approved SMG7 - - - 1995-03-29 - - -
0774 - F Ph2 4.10.0 - Section 20 - RF levels smg-14 274/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0775 - F Ph2 4.10.0 4.11.0 31.6.2.4 ACMM operation / Mobile originating smg-14 274/95 approved SMG7 - - - 1995-03-29 - - -
0776 - F Ph2 4.10.0 - Correction of test requirement in 13.4.5 smg-14 274/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0777 - F Ph2 4.10.0 - Measurement report test smg-14 274/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0778 - F Ph2 4.10.0 - Update of Call Under Establishment - Finely synchronised handover tests smg-14 274/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0779 - D Ph2 4.10.0 - Mobility Management - Default contents of messages smg-14 274/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0780 - F Ph2 4.10.0 4.11.0 Update to 26.6.7 Test of Channel Mode Modify procedure. smg-14 274/95 approved SMG7 - - - 1995-03-29 - - -
0781 - F Ph2 4.10.0 - Non sematical mandatory IE errors/MM/ comprehension required smg-14 274/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0782 - F Ph2 4.10.0 4.11.0 Interruption of power supply during an active call smg-14 274/95 approved SMG7 - - - 1995-03-29 - - -
0783 - D Ph2 4.10.0 - Editorial changes to the half-rate speech codec test cases. smg-14 274/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0784 - F Ph2 4.10.0 4.11.0 Assignment tests smg-14 274/95 approved SMG7 - - - 1995-03-29 - - -
0785 - F Ph2 4.10.0 - U3: T310 timeout smg-14 274/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0786 - F Ph2 4.10.0 4.11.0 Correction of errors and inconsistencies in section 26.8. smg-14 274/95 approved SMG7 - - - 1995-03-29 - - -
0787 - F Ph2 4.10.0 4.11.0 Update to Section 21 Received signal measurements smg-14 275/95 approved SMG7 - - - 1995-03-29 - - -
0788 - F Ph2 4.10.0 - Propose to Section 26.7.4.5.4. smg-14 275/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0789 - F Ph2 4.10.0 - Proposed to Section 31.6 smg-14 275/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0790 - F Ph2 4.10.0 - Proposed to Section 27.21 smg-14 275/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0791 - F Ph2 4.10.0 - Section 28 re-written and clarified smg-14 275/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0792 - D Ph2 4.10.0 - Clarification of Test SIM parameters, Annex 4 smg-14 275/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0793 - F Ph2 4.10.0 - Proposed new section 34 Short Message Service smg-14 275/95 Approved SMG7 - - - 1995-03-29 - - 1999-08-15
0794 - F Ph2 4.10.0 4.11.0 GSM 11.10 Section 14 TCH/HS Receiver test cases. smg-14 275/95 approved SMG7 - - - 1995-03-29 - - -
0795 - F Ph2 - - E-GSM, New section 26.10 for E-GSM smg-14 359/95 Approved - - - - - - - 1999-08-15
0796 - F Ph2 4.10.0 4.11.0 E-GSM, Measurements smg-14 359/95 approved - - - - - - - -
0797 - F Ph2 - - E-GSM, Immediate assignment procedure smg-14 359/95 Approved - - - - - - - 1999-08-15
0798 - F Ph2 4.10.0 4.11.0 E-GSM, Assignment procedure smg-14 359/95 approved - - - - - - - -
0799 - F Ph2 - - E-GSM, Handover procedure smg-14 359/95 Approved - - - - - - - 1999-08-15
0800 - F Ph2 - - E-GSM, Frequency re-definition smg-14 359/95 Approved - - - - - - - 1999-08-15
0801 - F Ph2 - - E-GSM, Structured procedures smg-14 359/95 Approved - - - - - - - 1999-08-15
0802 - F Ph2 - - E-GSM, Default message contents smg-14 359/95 Approved - - - - - - - 1999-08-15
0803 - F Ph2 4.11.0 4.12.0 Test procedure 13.3.4.1.2 smg-15 391/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0804 - F Ph2 4.11.0 4.12.0 Test of ARFCN 5 for GSM900 added in section 14.2 smg-15 391/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0805 - F Ph2 4.11.0 4.12.0 Basic Cell Reselection - number of monitored carriers smg-15 391/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0806 - F Ph2 4.11.0 4.12.0 RXLEV test smg-15 391/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0808 - F Ph2 4.11.0 4.12.0 Segmentation and smg-15 391/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0809 - F Ph2 4.11.0 4.12.0 Default test conditions for layer 3 tests smg-15 391/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0810 - F Ph2 4.11.0 4.12.0 New maximum value between reception of paging message and start of the IMM ASS procedure smg-15 391/95 approved SMG7 - - - 1995-06-27 - - -
0811 - F Ph2 4.11.0 4.12.0 Column header & ARFCN for DCS smg-15 391/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0812 - F Ph2 4.11.0 4.12.0 Errors in the specific messages in the non-synchronised, call under establishment, handover tests smg-15 391/95 approved SMG7 - - - 1995-06-27 - - -
0813 - F Ph2 4.11.0 4.12.0 Correction to 26.7.3.2.3 smg-15 391/95 approved SMG7 - - - 1995-06-27 - - -
0814 - F Ph2 4.11.0 4.12.0 Corrections on 26.7.4.3.3 smg-15 391/95 approved SMG7 - - - 1995-06-27 - - -
0815 - F Ph2 4.11.0 4.12.0 Optional steps in 26.7.4.3.2.3 and 26.7.4.3.4.3 smg-15 391/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0816 - F Ph2 4.11.0 4.12.0 Correction on 26.7.4.3.3 smg-15 391/95 approved SMG7 - - - 1995-06-27 - - -
0817 - F Ph2 4.11.0 4.12.0 Default cell settings for MM tests smg-15 391/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0818 - F Ph2 4.11.0 4.12.0 Structured procedures/emergency call smg-15 391/95 approved SMG7 - - - 1995-06-27 - - -
0819 - F Ph2 4.11.0 4.12.0 Editorial errors in the CC tests smg-15 391/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0820 - F Ph2 4.11.0 4.12.0 MT CC tests: incorrect call directions smg-15 391/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0821 - F Ph2 4.11.0 4.12.0 Structured procedures, early assignment smg-15 391/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0822 - F Ph2 4.11.0 4.12.0 Error correction in Annex 3 smg-15 391/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0823 - F Ph2 4.11.0 4.12.0 AoCC: non-integer values of ACM smg-15 392/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0824 - D Ph2 4.11.0 4.12.0 Test of Call Forwarding No reply smg-15 392/95 approved SMG7 - - - 1995-06-27 - - -
0825 - D Ph2 4.11.0 4.12.0 Test of Erasure Accepted smg-15 392/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0826 - D Ph2 4.11.0 4.12.0 Test of Erasure Rejected smg-15 392/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0827 - D Ph2 4.11.0 4.12.0 Test of interrogation rejected smg-15 392/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0828 - D Ph2 4.11.0 4.12.0 Notification during an incoming call smg-15 392/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0829 - D Ph2 4.11.0 4.12.0 Test of registration rejected smg-15 392/95 approved SMG7 - - - 1995-06-27 - - -
0830 - D Ph2 4.11.0 4.12.0 31.8 from ""call restriction"" to ""call barring"" smg-15 392/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0831 - D Ph2 4.11.0 4.12.0 Activation accepted smg-15 392/95 approved SMG7 - - - 1995-06-27 - - -
0832 - D Ph2 4.11.0 4.12.0 Test of activation rejected smg-15 392/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0833 - F Ph2 4.11.0 4.12.0 Short message service smg-15 392/95 approved SMG7 - - - 1995-06-27 - - -
0834 - F Ph2 4.11.0 4.12.0 mobile initiated USSD operations: processUnstructuredSS-request/accepted smg-15 393/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0835 - F Ph2 4.11.0 4.12.0 mobile initiated USSD operations: ProcessUnstructuredSS-request operation/cross-phase compatibility and errors handling smg-15 393/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0836 - F Ph2 4.11.0 4.12.0 network initiated USSD operation: UnstructuredSS-Notify operation/accepted smg-15 393/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0837 - F Ph2 4.11.0 4.12.0 network initiated USSD operation: UnstructuresSS-Notify operation/rejected on user busy. smg-15 393/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0838 - F Ph2 4.11.0 4.12.0 Network initiated USSD operation: UnstructuredSS-Request operation accepted smg-15 393/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0839 - F Ph2 4.11.0 4.12.0 network initiated USSD operation: UnstructuredSS-Request operation/rejected on user busy smg-15 393/95 approved SMG7 - - - 1995-06-27 - - -
0840 - F Ph2 4.11.0 4.12.0 Modification to 26.3 to test E-GSM Mobile station smg-15 394/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0841 - F Ph2 4.11.0 4.12.0 Inclusion of new section 26.10 in introduction to section 26 smg-15 394/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0842 - F Ph2 4.11.0 4.12.0 Taking 26.10 into account in section 26 smg-15 394/95 approved SMG7 - - - 1995-06-27 - - -
0843 - F Ph2 4.11.0 4.12.0 Corrections to 26.10 smg-15 394/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0844 - F Ph2 4.11.0 4.12.0 Reorganisation of 26.10 smg-15 394/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0845 - F Ph2 4.11.0 - CC capabilities IE smg-15 395/95 Withdrawn SMG7 - - - 1995-06-27 - To be re-discussed at SMG SG meeting. 1999-08-15
0846 - F Ph2 4.11.0 - Introduction of a new section 26.11 for multiband specific signalling tests smg-15 395/95 Withdrawn SMG7 - - - 1995-06-27 - SMG#15bis will decide on handling. 1999-08-15
0847 - F Ph2 4.11.0 - Inclusion of new section 26.11 in introduction to section 26 smg-15 395/95 Withdrawn SMG7 - - - 1995-06-27 - SMG#15bis will decide on handling. 1999-08-15
0848 - F Ph2 4.12.1 4.13.0 Immediate assignment procedure: multiband smg-16 655/95 Approved SMG7 - - - 1995-06-27 - SMG#15bis will decide on handling. 1999-08-15
0849 - F Ph2 4.11.0 - Handover procedure: Multiband MSs smg-15 395/95 Withdrawn SMG7 - - - 1995-06-27 - SMG#15bis will decide on handling. 1999-08-15
0850 - F Ph2 4.11.0 - Structured procedures, multiband smg-15 395/95 Withdrawn SMG7 - - - 1995-06-27 - SMG#15bis will decide on handling. 1999-08-15
0851 - F Ph2 4.11.0 - Default message contents for section 26.11 smg-15 395/95 Withdrawn SMG7 - - - 1995-06-27 - SMG#15bis will decide on handling. 1999-08-15
0852 - F Ph2 4.11.0 - Modification of section 26.3 for Multiband MSs smg-15 395/95 withdrawn SMG7 - - - 1995-06-27 - SMG#15bis will decide on handling. -
0853 - F Ph2 4.11.0 - received signal measurements for multiband MSs smg-15 395/95 Withdrawn SMG7 - - - 1995-06-27 - SMG#15bis will decide on handling. 1999-08-15
0854 - F Ph2 4.11.0 - Measurement reporting for Multiband MSs smg-15 395/95 Withdrawn SMG7 - - - 1995-06-27 - SMG#15bis will decide on handling. 1999-08-15
0855 - F Ph2 4.11.0 - Modification of section 26.6.15 default message contents of DCS1800 layer 3 messages for RR smg-15 396/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0856 - F Ph2 4.11.0 4.12.0 Intermodulation rejection smg-15 396/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0857 - F Ph2 4.11.0 4.12.0 Output RF spectrum smg-15 396/95 approved SMG7 - - - 1995-06-27 - - -
0858 - F Ph2 4.11.0 4.12.0 Transmitter output power and burst timing smg-15 396/95 approved SMG7 - - - 1995-06-27 - - -
0859 - F Ph2 4.11.0 4.12.0 Changes to section 21 to refelect new DCs1800 power class smg-15 396/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0860 - F Ph2 4.11.0 4.12.0 introduction of Cell Reselection tests for DCS1800 Class 3 Mobile station. smg-15 396/95 approved SMG7 - - - 1995-06-27 - - -
0861 - F Ph2 4.11.0 4.12.0 Additional tests for 3V and 3V/5V SIM/ME interfaces in section 27.17, amendment to the PIXIT section in Annex 3 smg-15 397/95 Approved SMG7 - - - 1995-06-27 - Maybe to TBR at SMG#16. 1999-08-15
0862 - F Ph2 4.11.0 - Missing tests added in section 27.17.1.5 for SIM type recognition and voltage switching (for 3V onlyand 5V/3V SIM/ME) smg-15 397/95 Revised SMG7 - - - 1995-06-27 - Maybe to TBR at SMG#16. 1999-08-15
0862 1 - Ph2 - 4.12.0 Missing tests added in section 27.17.1.5 for SIM type recognition and voltage switching (for 3V onlyand 5V/3V SIM/ME) smg-15 509/95 Approved - - - - - - Maybe to TBR at SMG#16. 1999-08-15
0863 - F Ph2 4.11.0 4.12.0 new/modified test parameters in section 27.17.2.1.2 for SIM simulator in Annex 5 smg-15 397/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0864 - F Ph2 4.11.0 4.12.0 Direction of response wrong smg-15 397/95 approved SMG7 - - - 1995-06-27 - - -
0865 - F Ph2 4.11.0 4.12.0 Test cases 20.4, 20.5 smg-15 397/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0866 - F Ph2 4.11.0 4.12.0 test case 20.15 smg-15 397/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0867 - F Ph1 3.20.0 3.21.0 Handling of TI value 111 smg-15 390/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0868 - F Ph1 3.20.0 3.21.0 Test II.5.3.6.3.3 Measurement report smg-15 390/95 Approved SMG7 - - - 1995-06-27 - - 1999-08-15
0869 - F Ph1 3.21.0 3.22.0 Incorrect use of 3 x TC1M in test II.11.2.2. smg-16 638/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0870 - D Ph1 3.22.0 3.23.0 Changes to test case II.5.3.6.2.1.9 procedure 4 smg-20 594/96 Approved SMG7 - 578 - 1996-10-03 - - 1999-08-15
0870 - F Ph2 4.12.1 - Precedance of TTCN and textual descriptions smg-16 639/95 withdrawn SMG7 - - - 1995-10-10 - - 1999-08-15
0870 1 F Ph2 4.12.1 4.13.1 Precedance of TTCN and textual descriptions smg-16 726/95 approved SMG7 - - - 1995-10-10 - - -
0871 - B Ph1 3.22.0 3.23.0 Changes to II.5.3.8.4 DTMF INFORMATION TRANSFER / Procedure 6 smg-20 594/96 Approved SMG7 - 578 - 1996-10-03 - - 1999-08-15
0871 - F Ph2 4.12.1 - Precedance of TTCN and textual descriptions smg-16 639/95 withdrawn SMG7 - - - 1995-10-10 - - 1999-08-15
0872 - F Ph1 3.22.0 3.23.0 Clarification to test II.5.3.2.2.3 'Normal Layer 2 Disconnect' smg-20 594/96 Approved SMG7 - 578 - 1996-10-03 - - 1999-08-15
0872 - F Ph2 4.12.1 4.13.0 Reduction of Table of contents smg-16 639/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0873 - F Ph2 4.12.1 4.13.0 Applicability of tests smg-16 639/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0874 - F Ph2 4.12.1 4.13.0 Section 13.2 Frequency error under multipath & interference conditions smg-16 640/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0875 - F Ph2 4.12.1 4.13.0 Section 13.4 Output RF spectrum smg-16 640/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0876 - F Ph2 4.12.1 4.13.0 Impact of GSM 05.05 half rate terminology changes on section 14 smg-16 640/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0877 - F Ph2 4.12.1 4.13.0 Replacement of 'handheld' with 'small MS' in tables 14-17 and 14-29. smg-16 640/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0878 - F Ph2 4.12.1 4.13.0 Revision of BFI tests (section 14.1) following the ARs to GSM 05.02 and GSM 05.05 agreed at SMG#15 smg-16 640/95 approved SMG7 - - - 1995-10-10 - - -
0879 - F Ph2 4.12.1 4.13.0 Test of ARFCN 70 for GSM 900 added in section 14.2 smg-16 640/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0880 - F Ph2 4.12.1 4.13.0 Inclusion of GSM 05.08 timer tolerances smg-16 640/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0881 - F Ph2 4.12.1 4.13.0 Impact SMG2 GSM 05.08 ARs on GSM 11.10 smg-16 640/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0882 - F Ph2 4.12.1 4.13.0 Section 20.19 cell selection on release of SDDCH & TCH smg-16 640/95 approved SMG7 - - - 1995-10-10 - - -
0883 - F Ph2 4.12.1 4.13.0 Section 21.1: Received signal measurements smg-16 640/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0884 - F Ph2 4.12.1 4.13.0 25.2.1.1.2.2 UA frame with different information field smg-16 641/95 approved SMG7 - - - 1995-10-10 - - -
0885 - F Ph2 4.12.1 4.13.0 Section 26, editorial changes smg-16 641/95 approved SMG7 - - - 1995-10-10 - - -
0886 - F Ph2 4.12.1 4.13.0 Test 26.2.3, Title is incorrect smg-16 641/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0887 - F Ph2 4.12.1 4.13.0 26.2.4 Establishment Cause smg-16 641/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0888 - F Ph2 4.12.1 4.13.0 Corrections to test case 26.7.3.2 smg-16 641/95 approved SMG7 - - - 1995-10-10 - - -
0889 - F Ph2 4.12.1 4.13.0 Corrections to test case 26.7.4.2 smg-16 641/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0890 - F Ph2 4.12.1 4.13.0 26.7.4.3.1 Location updating / abnormal cases / random access fails smg-16 641/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0891 - F Ph2 4.12.1 4.13.0 Changes to tests 26.7.4.3.2, 26.7.4.3.3 and 26.7.4.3.4 smg-16 641/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0892 - F Ph2 4.12.1 4.13.0 Section 28.1.3.5 smg-16 641/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0893 - F Ph2 4.12.1 4.13.0 Inconsistency between call-re-establishment tests and core specs smg-16 641/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0894 - F Ph2 4.12.1 4.13.0 MMI code and basic service code in 31.2.1.1.1 & 31.2.1.2.2 smg-16 642/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0895 - F Ph2 4.12.1 4.13.0 Error in test case 31.2.1.6.1 Interrogation accepted smg-16 642/95 approved SMG7 - - - 1995-10-10 - - -
0896 - F Ph2 4.12.1 4.13.0 Error in test case 31.2.1.7.1.1, illegal message flow smg-16 642/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0897 - F Ph2 4.12.1 4.13.0 Error within test cases 31.6.1.7 and 31.6.1.8 smg-16 642/95 approved SMG7 - - - 1995-10-10 - - -
0898 - F Ph2 4.12.1 4.13.0 Errors in test case 31.2.6.4, illegal message flow smg-16 642/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0899 - F Ph2 4.12.1 4.13.0 Errors in testcase 31.6.2.5, illegal message flow smg-16 642/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0900 - F Ph2 4.12.1 4.13.0 Registration of password: rejection after password check with negative result smg-16 642/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0901 - F Ph2 4.12.1 4.13.0 Inconsistency in test case 31.8.7, illegal message flow smg-16 642/95 approved SMG7 - - - 1995-10-10 - - -
0902 - F Ph2 4.12.1 4.13.0 Default message contents for ASN.1 messages smg-16 642/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0903 - F Ph2 4.12.1 4.13.0 processunstructuredSS-request/ accepted smg-16 642/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0904 - F Ph2 4.12.1 4.13.0 processunstructuredSS-request operation/ cross phase compatibility and errors handling smg-16 642/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0905 - F Ph2 4.12.1 4.13.0 processunstructuredSS-Notify operation/ accepted smg-16 642/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0906 - F Ph2 4.12.1 4.13.0 processunstructuredSS-Notify operation/ rejected on user busy smg-16 642/95 approved SMG7 - - - 1995-10-10 - - -
0907 - F Ph2 4.12.1 4.13.0 processunstructuredSS-Request operation/ accepted smg-16 642/95 approved SMG7 - - - 1995-10-10 - - -
0908 - F Ph2 4.12.1 4.13.0 processunstructuredSS-request operation/ rejected on user busy smg-16 642/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0909 - F Ph2 4.12.1 4.13.0 Corrections to section 34 due to TTCN work smg-16 643/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0910 - F Ph2 4.12.1 4.13.0 Correction of section 34.2.1 due to missing page in earlier CR smg-16 643/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0911 - F Ph2 4.12.1 4.13.0 Maximum number of CP-DATA retransmissions smg-16 643/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0912 - F Ph2 4.12.1 4.13.0 Default message contents of section 34 smg-16 643/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0913 - F Ph2 4.12.1 4.13.0 Introduction of a new section 26.11 for multiband specific signalling tests smg-16 644/95 approved SMG7 - - - 1995-10-10 - - -
0914 - F Ph2 4.12.1 4.13.0 Inclusion of new section 26.11 in introduction to section 26 smg-16 644/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0915 - F Ph2 4.12.1 4.13.0 Immediate assignment procedure: Multiband smg-16 644/95 approved SMG7 - - - 1995-10-10 - - -
0916 - F Ph2 4.12.1 4.13.0 Measurement reporting in Multiband environment smg-16 644/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0917 - F Ph2 4.12.1 4.13.0 Handover procedure: Multiband MSs smg-16 644/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0918 - F Ph2 4.12.1 4.13.0 Structured procedures: Multiband smg-16 644/95 approved SMG7 - - - 1995-10-10 - - -
0919 - F Ph2 4.12.1 4.13.0 Default message contents for section 26.11 smg-16 644/95 approved SMG7 - - - 1995-10-10 - - -
0920 - F Ph2 4.12.1 4.13.0 Modification of Section 26.3 for Multiband MSs smg-16 644/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0921 - F Ph2 4.12.1 4.13.0 Section 21: Received siganl measurements for Multiband MSs smg-16 644/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0922 1 F Ph2 4.12.1 4.13.0 Test SIM parameters smg-16 645/95 Approved SMG7 - - - 1995-10-10 - - 1999-08-15
0923 - F Ph2 4.12.1 - 27.15 Abbreviated dialling numbers - definition of SIM location number not supported by core requirement smg-16 645/95 Withdrawn SMG7 - - - 1995-10-10 - - 1999-08-15

page generated from database: 2013-10-16 10:33:09