Go to spec numbering scheme page
3GPP Specification Change Request records for: 11.20
CR no. | rev | cat | Release | CR written to vers | new vers | CR title | TSG meeting | TSG doc | TSG status | source | WG meeting | WG doc | WG status | cover date | work item | remarks | database record created |
0001 | 1 | A | Ph1 | 3.01.00 | - | BSS receiver tests: Modification of BER-tables and RXQUAL-tables, modified blocking/spurious response requirements. | smg-27 | 158/90 | Approved | PT12/ES | - | - | - | 1990-05-01 | - | - | 1999-08-15 |
0002 | 1 | A | Ph1 | 3.01.00 | - | BSS transmitter tests: changes in power/time mask, video/resolution bandwidth setting, spur. emission level in RX-band | smg-27 | 158/90 | Approved | pt12/es | - | - | - | 1990-05-01 | - | - | 1999-08-15 |
0003 | 1 | A | Ph1 | 3.01.00 | - | Channel release procedure: test divided into 2 parts, 1 resulting from a radio interface failure, the other one not. | smg-27 | 158/90 | Approved | pt12/es | - | - | - | 1990-05-01 | - | - | 1999-08-15 |
0004 | 1 | A | Ph1 | 3.01.00 | - | Paging messages: PAG REQ messages or other valid layer 3 messages are required to be transmitted continuously on the PCH | smg-27 | 158/90 | Approved | pt12/es | - | - | - | 1990-05-01 | - | - | 1999-08-15 |
0005 | 1 | A | Ph1 | 3.01.00 | - | Short Message Cell Broadcast: Mapping of SMS BC REQ messages on the A-bis-interface. | smg-27 | 158/90 | Approved | pt12/es | - | - | - | 1990-05-01 | - | - | 1999-08-15 |
0006 | 1 | A | Ph1 | 3.01.00 | - | VAD testing: alignment with names of files and file structure on test sequence floppy disks. | smg-27 | 158/90 | Approved | pt12/es | - | - | - | 1990-05-01 | - | - | 1999-08-15 |
0008 | 1 | A | Ph1 | 3.00.00 | - | LAPDm testing: test reception of SABMs with different info fields, new test on reception REJ frames, test sending REJ fr | smg-27 | 158/90 | Approved | pt12/es | - | - | - | 1990-05-01 | - | - | 1999-08-15 |
0009 | 1 | A | Ph1 | 3.00.00 | - | Testing of transmission delay, alignment with the results of of the GSM special ad-group on transmission delay. | smg-27 | 158/90 | Approved | pt12/es | - | - | - | 1990-05-01 | - | - | 1999-08-15 |
0010 | 1 | A | Ph1 | 3.01.00 | - | Updates of Annex 2: alignment with the latest structure of GSM recommendations. | smg-27 | 158/90 | Approved | pt12/es | - | - | - | 1990-05-01 | - | - | 1999-08-15 |
0011 | - | A | Ph1 | 3.01.00 | - | Fill frames on FACCH: Alignment to 45/05.08, fill frames to be transmitted on TCH/FACCH when used for signalling only | smg-27 | 158/90 | Approved | pt12/es | - | - | - | 1990-05-01 | - | - | 1999-08-15 |
0012 | - | A | Ph1 | 3.02.00 | - | Interface point Y' section 11.2; SCH is no longer applicable as this is uplink monitor point | smg-28 | 294/90 | Approved | pt12/es | - | - | - | 1990-09-01 | - | - | 1999-08-15 |
0012 | - | 3 | Ph1 | 3.18.0 | 3.19.0 | Testing of conducted spurious emissions frm the power leads | smg-16 | 565/95 | Approved | SMG8 | - | - | - | 1995-09-08 | - | - | 1999-08-15 |
0013 | - | A | Ph1 | 3.02.00 | - | Addition of tests for synchronised handover, this was previously omitted | smg-28 | 295/90 | Approved | pt12/ES | - | - | - | 1990-09-01 | - | - | 1999-08-15 |
0014 | 1 | A | Ph1 | 3.02.00 | - | Testing of O&M messages from the BSC, The repitition indicator is set. | smg-28 | 296/90 | Approved | PT12/ES | - | - | - | 1990-09-01 | - | - | 1999-08-15 |
0015 | - | A | Ph1 | 3.02.00 | - | TEST of immediate assignment, reference to configuration of IMM_ASS has been removed | smg-28 | 297/90 | Approved | PT12/ES | - | - | - | 1990-09-01 | - | - | 1999-08-15 |
0016 | - | A | Ph1 | 3.02.00 | - | In the testing of layer 3, UA messages may occur on the air interface when the specification was that nothing should occ | smg-28 | 298/90 | Approved | PT12/ES | - | - | - | 1990-09-01 | - | - | 1999-08-15 |
0017 | - | A | Ph1 | 3.02.00 | - | Channel activaytion message type change | smg-28 | 299/90 | Approved | PT12/ES | - | - | - | 1990-09-01 | - | - | 1999-08-15 |
0018 | 2 | A | Ph1 | 3.02.00 | - | Testing of time alignment on the A-bis interface | smg-28 | 300/90 | Approved | PT12/ES | - | - | - | 1990-09-01 | - | - | 1999-08-15 |
0019 | - | A | Ph1 | 3.02.00 | - | Radio link timeout during time alignment test (2.1.8.6) | smg-28 | 301/90 | Approved | PT12/ES | - | - | - | 1990-09-01 | - | - | 1999-08-15 |
0020 | 1 | A | Ph1 | 3.02.00 | - | Sytem delay distribution | smg-28 | 243/90 | Approved | PT12 | - | - | - | 1990-09-01 | - | - | 1999-08-15 |
0021 | - | A | Ph1 | 3.02.00 | - | Initial time alignment on the A-bis interface | smg-28 | 335/90 | Approved | PT12 | - | - | - | 1990-10-01 | - | - | 1999-08-15 |
0022 | - | A | Ph1 | 3.3.0 | - | Problems with measuring amplitude ripple. | - | - | - | - | - | - | - | 1990-11-08 | - | - | 1999-08-15 |
0022 | 1 | A | Ph1 | 3.3.0 | - | Problem with measuring amplitude ripple. | smg-30 | 171/91 | Approved | PT12-ES | - | - | - | 1991-02-07 | - | - | 1999-08-15 |
0023 | - | E | Ph1 | 3.3.0 | - | Multipath reference sensitivity. | smg-30 | 171/91 | Approved | PT12-ES | - | - | - | 1990-11-08 | - | - | 1999-08-15 |
0024 | - | E | Ph1 | 3.3.0 | - | Switching transient measurement clarification. | - | - | - | - | - | - | - | 1990-11-08 | - | - | 1999-08-15 |
0024 | 1 | E | Ph1 | 3.3.0 | - | Switching transient measurement clarification. | smg-30 | 171/91 | Approved | PT12-ES | - | - | - | 1990-12-13 | - | - | 1999-08-15 |
0025 | - | A | Ph1 | 3.3.0 | - | Alignment with error correction in GSM 05.05. | smg-30 | 171/91 | Approved | PT12-ES | - | - | - | 1990-11-22 | - | - | 1999-08-15 |
0026 | - | A | Ph1 | 3.3.0 | - | Change to nominal error rates specification. | - | - | - | - | - | - | - | 1990-11-22 | - | - | 1999-08-15 |
0027 | - | E | Ph1 | 3.3.0 | - | Deletion of references to Annex 3 (system delay distribution). | smg-30 | 171/91 | Approved | PT12-ES | - | - | - | 1990-12-12 | - | - | 1999-08-15 |
0028 | - | A | Ph1 | 3.3.0 | - | Allowance of a trade off between frame erasure rates and RBER. | - | - | - | - | - | - | - | 1990-11-22 | - | - | 1999-08-15 |
0028 | 1 | A | Ph1 | 3.3.0 | - | Allowance of a trade off between frame erasure rates and RBER. | smg-30 | 171/91 | Approved | PT12-ES | - | - | - | 1991-02-07 | - | - | 1999-08-15 |
0029 | - | E | Ph1 | 3.3.0 | - | Clarification of reference. | smg-30 | 171/91 | Approved | PT12-ES | - | - | - | 1991-02-01 | - | - | 1999-08-15 |
0030 | - | A | Ph1 | 3.3.0 | - | Clarification of allowed spurious signals during modulation test. | smg-30 | 171/91 | Approved | PT12-ES | - | - | - | 1991-02-01 | - | - | 1999-08-15 |
0031 | - | A | Ph1 | 3.3.0 | - | Clarification of fill frames and fill bits. | - | - | - | - | - | - | - | 1991-02-01 | - | - | 1999-08-15 |
0031 | 1 | A | Ph1 | 3.3.0 | - | Clarification of fill frames and fill bits. | smg-30 | 171/91 | Approved | PT12-ES | - | - | - | 1991-02-07 | - | - | 1999-08-15 |
0032 | - | A | Ph1 | 3.3.0 | - | Correction of Layer 2 Test. | - | - | - | - | - | - | - | 1991-02-05 | - | - | 1999-08-15 |
0032 | 1 | A | Ph1 | 3.3.0 | - | Simplification of test of Layer 2 error cases. | smg-30 | 171/91 | Approved | PT12-ES | - | - | - | 1991-02-05 | - | - | 1999-08-15 |
0033 | - | E | Ph1 | 3.3.0 | - | Corretion of Text on N(R) Sequence Error Test. | - | - | - | - | - | - | - | 1991-02-05 | - | - | 1999-08-15 |
0033 | 1 | E | Ph1 | 3.3.0 | - | Correction of Text on N(R) Sequence Error Test. | smg-30 | 171/91 | Approved | PT12-ES | - | - | - | 1991-02-07 | - | - | 1999-08-15 |
0034 | - | A | Ph1 | 3.3.0 | - | Alignment with error correction in Tables 1 and 2 of GSM 05.05. | smg-30 | 124/91 | Approved | GSM2/PT12 | - | - | - | 1991-02-18 | - | - | 1999-08-15 |
0035 | - | A | Ph1 | 3.3.0 | - | Spurious response exceptions. | smg-30 | 125/91 | Approved | GSM2/PT12 | - | - | - | 1991-02-18 | - | - | 1999-08-15 |
0036 | - | A | Ph1 | 3.3.0 | - | Correction of RXQUAL testing requirements. | smg-30 | 188/91 | Approved | Norwegian Telecom | - | - | - | 1991-03-11 | - | - | 1999-08-15 |
0037 | - | A | Ph1 | 3.4.0 | - | Uplink receiver DTX - misinterpretation of signal energy measurements. | smg-32 | 348/91 | Approved | PT12-ES | - | - | - | 1991-07-15 | - | - | 1999-08-15 |
0038 | - | A | Ph1 | 3.4.0 | - | Uplink receiver DTX - alignment with GSM 06.10 re. block amplitude (xmaxc). | smg-32 | 348/91 | Approved | PT12-ES | - | - | - | 1991-07-15 | - | - | 1999-08-15 |
0039 | - | A | Ph1 | 3.4.0 | - | Transmitter carrier power versus time. | - | /91 | - | - | - | - | - | 1991-07-11 | - | - | 1999-08-15 |
0039 | 1 | A | Ph1 | 3.4.0 | - | Power/time mask measurement. | - | /91 | - | PT12-ES | - | - | - | 1991-09-20 | - | - | 1999-08-15 |
0040 | - | A | Ph1 | 3.4.0 | - | Possible answers to N(S) sequence error testing. | - | /91 | - | PT12-ES | - | - | - | 1991-08-23 | - | - | 1999-08-15 |
0041 | 2 | A | Ph1 | 3.4.0 | - | Input test frames for transcoder tests. | smg-32 | 348/91 | Approved | PT12-ES | - | - | - | 1991-09-20 | - | - | 1999-08-15 |
0042 | 1 | A | Ph1 | 3.4.0 | - | 0 dB reference point for power/time mask. | smg-32 | 348/91 | Approved | PT12-ES | - | - | - | 1991-09-20 | - | - | 1999-08-15 |
0043 | - | A | Ph1 | 3.4.0 | - | Power/time mask measurement. | smg-32 | 348/91 | Approved | PT12-ES | - | - | - | 1991-09-20 | - | - | 1999-08-15 |
0044 | - | A | Ph1 | 3.4.0 | - | New data delay budget. | smg-32 | 349/91 | Approved | PT12-ES | - | - | - | 1991-09-20 | - | - | 1999-08-15 |
0045 | 1 | A | Ph1 | 3.4.0 | - | Various minor ambiguities. | smg-32 | 348/91 | Approved | PT12-ES | - | - | - | 1991-09-20 | - | - | 1999-08-15 |
0046 | - | A | Ph1 | 3.5.0 | - | Static Time Alignment. | smg-33 | /92 | - | PT12-ES | - | - | - | 1991-11-18 | - | - | 1999-08-15 |
0046 | - | A | Ph1 | 3.5.0 | - | Static time alignment | smg-01 | 33/92 | Approved | - | - | - | - | - | - | - | 1999-08-15 |
0048 | - | A | Ph1-DCS | 3.0.0 | 3.1.0 | Minor changes to align with core specifications | smg-01 | 36/92 | Approved | PT12_ES | - | - | - | 1991-10-17 | - | - | 1999-08-15 |
0049 | - | A | Ph1 | 3.6.0 | - | Uplink Receiver DTX functions | smg-02 | 139/92 | Approved | PT12-ES | - | - | - | 1992-02-10 | - | - | 1999-08-15 |
0050 | - | A | Ph1 | 3.6.0 | - | Downlink Transmitter DTX / VAD functions | smg-02 | 139/92 | Approved | PT12-ES | - | - | - | 1992-02-10 | - | - | 1999-08-15 |
0051 | - | A | Ph1 | 3.6.0 | - | Transcoder testing | smg-02 | 139/92 | Approved | PT12-ES | - | - | - | 1992-02-10 | - | - | 1999-08-15 |
0052 | - | A | Ph1 | 3.6.0 | - | Synchronization of the test sequences with BSS and provision of test mode | smg-02 | 139/92 | Approved | PT12-ES | - | - | - | 1992-02-11 | - | - | 1999-08-15 |
0053 | - | A | Ph1 | 3.6.0 | - | Uplink Receiver DTX functions (Data output format and evaluation of results) | smg-02 | 139/92 | Approved | PT12-ES | - | - | - | 1992-03-12 | - | - | 1999-08-15 |
0054 | - | A | Ph1 | 3.6.0 | - | TX and RX power lead, spurious emissions | smg-02 | 139/92 | Approved | PT12-ES | - | - | - | 1992-02-11 | - | - | 1999-08-15 |
0055 | - | A | Ph1 | 3.6.0 | - | Inconsistencies between 05.05 and 11.20 in TX power measurements | smg-02 | 139/92 | Approved | PT12-ES | - | - | - | 1992-02-11 | - | - | 1999-08-15 |
0056 | - | A | Ph1-DCS | 3.6.0 | 3.2.0 | Incorrect change made to Static Time Alignment | smg-02 | 139/92 | Approved | PT12-ES | - | - | - | 1992-02-11 | - | - | 1999-08-15 |
0057 | - | A | Ph1 | 3.7.0 | - | Initial Time Alignment | smg-03 | 319/92 | Approved | PT12-ES | - | - | - | 1992-06-02 | - | - | 1999-08-15 |
0058 | - | A | Ph1 | 3.7.0 | - | Downlink and Uplink rate adaption in the BSC | smg-03 | 319/92 | Approved | PT12-ES | - | - | - | 1992-06-02 | - | - | 1999-08-15 |
0059 | - | A | Ph1-DCS | 3.7.0 | 3.3.0 | Errors in the Time Alignment bits | smg-03 | 319/92 | Approved | PT12-ES | - | - | - | 1992-06-02 | - | - | 1999-08-15 |
0060 | - | E | Ph1-DCS | 3.2.0 | 3.3.0 | Correction to RF channel number in 11.20-DCS Section 2.1.6.8 | smg-03 | 320/92 | Approved | PT12-ES | - | - | - | 1992-06-02 | - | - | 1999-08-15 |
0061 | - | A | Ph1 | 3.8.0 | - | Intermodulation testing | smg-04 | 406/92 | Postponed | PT12-ES | - | - | - | 1992-07-08 | - | - | 1999-08-15 |
0062 | - | A | Ph1 | 3.8.0 | 3.9.0 | Inter BSS Intermodulation attenuation testing | smg-04 | 406/92 | Approved | PT12-ES | - | - | - | 1992-07-08 | - | - | 1999-08-15 |
0063 | - | E | Ph1 | 3.4.0 | - | Rationalisation of Electrical terms in Section 2.1.7 | smg-05 | 118/93 | Approved | PT12-ES | - | - | - | 1993-01-05 | - | - | 1999-08-15 |
0064 | - | A | Ph1 | 3.9.0 | - | Frequency Bands of GSM | smg-05 | 117/93 | Approved | PT12-ES | - | - | - | 1993-01-05 | - | - | 1999-08-15 |
0065 | - | E | Ph1 | 3.9.0 | - | Clarification of required measurement bandwidth in the Tx RF carrier power versus time measurement | smg-05 | 117/93 | Postponed | PT12-ES | - | - | - | 1993-01-05 | - | - | 1999-08-15 |
0066 | - | E | Ph1 | 3.9.0 | - | Imprecise static time alignment test | smg-05 | 117/93 | Approved | PT12-ES | - | - | - | 1993-01-05 | - | - | 1999-08-15 |
0067 | - | A | Ph1 | 3.9.0 | - | Downlink Tx DTX/VAD functions | smg-05 | 117/93 | Approved | PT12-ES | - | - | - | 1993-01-05 | - | - | 1999-08-15 |
0068 | - | A | Ph1 | 3.4.0 | - | Dynamic Range of active/inactive timeslot power switching | smg-05 | 118/93 | Approved | PT12-ES | - | - | - | 1993-01-05 | - | - | 1999-08-15 |
0069 | - | E | Ph1 | 3.4.0 | - | Clarification of Transmitter Idle Timeslot power level | smg-05 | 118/93 | Approved | PT12-ES | - | - | - | 1993-01-05 | - | - | 1999-08-15 |
0070 | - | E | Ph1 | 3.4.0 | - | Definition of ""dB"" (Tables 2.3 and 2.4) | smg-05 | 118/93 | Approved | PT12-ES | - | - | - | 1993-01-05 | - | - | 1999-08-15 |
0071 | - | E | Ph1 | 3.9.0 | - | Clarification of the logical reference point for BER tests | smg-05 | 117/93 | Approved | PT12-ES | - | - | - | 1993-01-05 | - | - | 1999-08-15 |
0072 | - | A | Ph1 | 3.9.0 | - | Use of non-hopping interferer for SFH measurements | smg-05 | 117/93 | Approved | PT12-ES | - | - | - | 1993-01-05 | - | - | 1999-08-15 |
0073 | - | A | Ph1 | 3.9.0 | - | Verification of BER performance time domain | smg-05 | 117/93 | Approved | PT12-ES | - | - | - | 1993-01-05 | - | - | 1999-08-15 |
0074 | - | A | Ph1 | 3.9.0 | - | Intra-BSS intermodulation test | smg-05 | 117/93 | Approved | PT12-ES | - | - | - | 1993-01-05 | - | - | 1999-08-15 |
0075 | - | A | Ph1 | 3.9.0 | - | BSS Transmitter Spurious Emission Measurement in the RX Band | smg-05 | 117/93 | Approved | PT12-ES | - | - | - | 1993-01-05 | - | - | 1999-08-15 |
0076 | - | A | Ph1 | 3.4.0 | - | BSS Transmitter Spurious Emission Measurement in the RX Band | smg-05 | 118/93 | Approved | PT12-ES | - | - | - | 1993-01-05 | - | - | 1999-08-15 |
0077 | - | E | Ph1 | 3.9.0 | - | Rationalisation of Electrical terms in Section 2.1.7 | smg-05 | 117/93 | Approved | PT12-ES | - | - | - | 1993-01-05 | - | - | 1999-08-15 |
0078 | - | E | Ph1-DCS | 3.9.0 | 3.10.0 | Definition of ""dB"" (Tables 2.3 and 2.4) | smg-05 | 117/93 | Approved | PT12-ES | - | - | - | 1993-01-05 | - | - | 1999-08-15 |
0079 | - | A | Ph1 | 3.10.0 | - | Incorrect diagrammatic representation of BSS types | smg-06 | 230/93 | Approved | PT12-ES | - | - | - | 1993-03-02 | - | - | 1999-08-15 |
0080 | - | E | Ph1 | 3.10.0 | - | Correction of transcoder terminology | smg-06 | 230/93 | Approved | PT12-ES | - | - | - | 1993-03-02 | - | - | 1999-08-15 |
0081 | - | A | Ph1 | 3.10.0 | - | Choice of logical channels for SMS tests | smg-06 | 230/93 | Approved | PT12-ES | - | - | - | 1993-03-02 | - | - | 1999-08-15 |
0082 | - | A | Ph1 | 3.10.0 | - | Testing of Diversity Reveivers | smg-06 | 230/93 | Approved | PT12-ES | - | - | - | 1993-03-19 | - | - | 1999-08-15 |
0083 | - | A | Ph1 | 3.10.0 | - | Blocking and Spurious Response Rejection Measurement | smg-06 | 230/93 | Approved | PT12-ES | - | - | - | 1993-03-19 | - | - | 1999-08-15 |
0084 | - | E | Ph1 | 3.10.0 | - | Power Level uncertainty in a fading channel, test 2.1.7.5 | smg-06 | 230/93 | Approved | PT12-ES | - | - | - | 1993-03-19 | - | - | 1999-08-15 |
0085 | - | A | Ph1 | 3.5.0 | - | Power/Time mask in Figure 2-1, Section 2.1.6.4 is inaccurate | smg-06 | 231/93 | Approved | PT12-ES | - | - | - | 1993-03-18 | - | - | 1999-08-15 |
0086 | - | E | Ph1 | 3.10.0 | - | Section 2.1.7.5 on Reference Interference level makes reference to ""static propogation conditions"" | smg-06 | 230/93 | Approved | PT12-ES | - | - | - | 1993-03-19 | - | - | 1999-08-15 |
0087 | - | A | Ph1 | 3.5.0 | - | Section 2.1.7.7 for Intermodulation Rejection, Figure 2-5 | smg-06 | 231/93 | Approved | PT12-ES | - | - | - | 1993-03-18 | - | - | 1999-08-15 |
0088 | - | A | Ph1 | 3.10.0 | - | BSS Intermodulation Test | smg-06 | 230/93 | Approved | PT12-ES | - | - | - | 1993-03-19 | - | - | 1999-08-15 |
0089 | - | A | Ph1 | 3.5.0 | - | BSS Intermodulation Test | smg-06 | 231/93 | Approved | PT12-ES | - | - | - | 1993-03-19 | - | - | 1999-08-15 |
0090 | - | A | Ph1 | 3.5.0 | - | Switching Transient Spectrum Maximum Limits in Table in 2.1.6.5.2 | smg-06 | 231/93 | Approved | PT12-ES | - | - | - | 1993-03-18 | - | - | 1999-08-15 |
0091 | - | A | Ph1 | 3.10.0 | - | Re-write of Environmental Requirements | smg-06 | 230/93 | Approved | PT12-ES | - | - | - | 1993-03-19 | - | - | 1999-08-15 |
0092 | - | A | Ph1 | 3.5.0 | - | Intra-BSS intermodulation test | smg-06 | 231/93 | Approved | PT12-ES | - | - | - | 1993-03-18 | - | - | 1999-08-15 |
0093 | - | A | Ph1 | 3.10.0 | - | Intra BSS intermodulation measurement in the BTS receive band | smg-06 | 230/93 | Approved | PT12-ES | - | - | - | 1993-03-18 | - | - | 1999-08-15 |
0094 | - | A | Ph1 | 3.10.0 | - | Number of frames within which the signal energy is required to be constant in 5.1.4.1.3 | smg-06 | 230/93 | Approved | PT12-ES | - | - | - | 1993-03-19 | - | - | 1999-08-15 |
0095 | - | E | Ph1 | 3.5.0 | - | Add missing information elements to list under Handover Command test in 5.1.3.7 | smg-06 | 231/93 | Approved | PT12-ES | - | - | - | 1993-03-18 | - | - | 1999-08-15 |
0096 | - | E | Ph1 | 3.10.0 | - | Incorrect reference in section 2.2.2.2.9.5 | smg-06 | 230/93 | Approved | PT12-ES | - | - | - | 1993-03-18 | - | - | 1999-08-15 |
0097 | - | A | Ph1 | 3.5.0 | - | Blocking and Spurious Response Rejection Measurement | smg-06 | 231/93 | Approved | PT12-ES | - | - | - | 1993-03-19 | - | - | 1999-08-15 |
0098 | - | A | Ph1 | 3.10.0 | - | Measurement of transmitter spurious emissions in the BTS receive band | smg-06 | 230/93 | Approved | PT12-ES | - | - | - | 1993-03-18 | - | - | 1999-08-15 |
0099 | - | A | Ph1-DCS | 3.10.0 | Amendment to proposed new Annex 3 of TDoc 230/93 | smg-06 | 285/93 | Postponed | DBP Telekom | - | - | - | 1993-03-26 | - | 11.20 Sub Group to consider | 1999-08-15 | |
0100 | - | E | Ph1 | 3.11.0 | - | Issues relating to test 2.2.2.2.7 | smg-07 | 417/93 | Approved | - | - | - | - | 1993-05-25 | - | - | 1999-08-15 |
0101 | - | E | Ph1 | 3.11.0 | - | Use of zero length I-frames | smg-07 | 417/93 | Approved | - | - | - | - | 1993-05-25 | - | - | 1999-08-15 |
0102 | - | E | Ph1 | 3.11.0 | - | T200 expires waiting for acknowledgement | smg-07 | 417/93 | Approved | - | - | - | - | 1993-05-25 | - | - | 1999-08-15 |
0103 | - | E | Ph1 | 3.11.0 | - | 11.20 testing directly on the A-bis interface | smg-07 | 417/93 | Approved | - | - | - | - | 1993-05-25 | - | - | 1999-08-15 |
0104 | - | A | Ph1 | 3.11.0 | - | Modification of limits within which the output is required to be silenced | smg-07 | 417/93 | Approved | - | - | - | - | 1993-05-25 | - | - | 1999-08-15 |
0105 | 1 | A | Ph1 | 3.11.0 | - | Intermodulation Attenuation | smg-07 | 489/93 | Approved | - | - | - | - | 1993-05-25 | - | - | 1999-08-15 |
0106 | - | A | Ph1 | 3.11.0 | - | Intra-BSS Intermodulation Attenuation | smg-07 | 417/93 | Approved | - | - | - | - | 1993-05-25 | - | - | 1999-08-15 |
0107 | - | A | Ph1 | 3.11.0 | - | Informative Annex to TX-Intermodulation | smg-07 | 417/93 | Approved | - | - | - | - | 1993-05-25 | - | - | 1999-08-15 |
0108 | - | A | Ph1 | 3.11.0 | - | Amendment to Annex 3 | smg-07 | 417/93 | Approved | - | - | - | - | 1993-05-25 | - | - | 1999-08-15 |
0109 | - | E | Ph1 | 3.11.0 | - | Clarification of Required Measurement Bandwidth in the Transmitted RF Carrier Power versus Time Measurement | smg-07 | 417/93 | Approved | - | - | - | - | 1993-05-25 | - | - | 1999-08-15 |
0110 | - | A | Ph1 | 3.11.0 | Spurious emissions from the BSS receivers | smg-07 | 417/93 | Postponed | - | - | - | - | 1993-05-25 | - | - | 1999-08-15 | |
0111 | - | E | Ph1-DCS | 3.12.0 | 3. | Placing the BSS in ""Multiple Frame established state"" | smg-08 | 665/93 | Approved | - | - | - | - | 1993-09-17 | - | - | 1999-08-15 |
0112 | - | A | Ph1 | 3.13.0 | - | Mods to A-bis layer2 tests | smg-09 | 66/94 | Approved | - | - | - | - | 1994-01-17 | - | - | 1999-08-15 |
0113 | - | E | Ph1 | 3.13.0 | - | Adjacent Channel Power Measurement | smg-09 | 66/94 | Approved | - | - | - | - | 1994-01-17 | - | - | 1999-08-15 |
0114 | - | A | Ph1 | 3.13.0 | 3.14.0 | Dynamic range of timeslot power switching | smg-09 | 66/94 | Approved | - | - | - | - | 1994-01-17 | - | - | 1999-08-15 |
0115 | - | E | Ph1 | 3.14.0 | - | Bad references in section 2.2.2.2.4, General Setup | smg-10 | 273/94 | Approved | SMG8 | - | - | - | 1994-04-11 | - | - | 1999-08-15 |
0116 | - | A | Ph1 | 3.14.0 | - | Sequence number errors in LAPD(m) sections | smg-10 | 273/94 | Approved | SMG8 | - | - | - | 1994-04-11 | - | - | 1999-08-15 |
0117 | - | A | Ph1-DCS | 3.14.0 | 3. | Problems with test 2.2.2.2.8.6.3 | smg-10 | 273/94 | Approved | SMG8 | - | - | - | 1994-04-11 | - | - | 1999-08-15 |
0118 | - | A | Ph1 | 3.15.0 | - | Test 5.1.3.16, Channel release | smg-11 | 419/94 | Approved | SMG8 | - | - | - | 1994-06-27 | - | - | 1999-08-15 |
0119 | - | A | Ph1 | 3.15.0 | - | Test 5.1.3.18, Blocking | smg-11 | 419/94 | Approved | SMG8 | - | - | - | 1994-06-27 | - | - | 1999-08-15 |
0120 | - | A | Ph1 | 3.15.0 | - | Test 5.1.3.20, Reset | smg-11 | 419/94 | Approved | SMG8 | - | - | - | 1994-06-27 | - | - | 1999-08-15 |
0121 | - | A | Ph1 | 3.15.0 | - | Test 5.1.3.25, Queuing | smg-11 | 419/94 | Approved | SMG8 | - | - | - | 1994-06-27 | - | - | 1999-08-15 |
0122 | - | F | Ph1 | 3.16.0 | - | Provision of inputs and outputs for testing of speech encoder / decoder | smg-12 | 585/94 | Approved | SMG8 | - | - | - | 1994-09-27 | - | - | 1999-08-15 |
0123 | - | F | Ph1 | 3.16.0 | - | Initial time alignment entry test | smg-12 | 585/94 | Approved | SMG8 | - | - | - | 1994-09-27 | - | - | 1999-08-15 |
0124 | - | F | Ph1 | 3.16.0 | - | Entering static time alignment state | smg-12 | 585/94 | Approved | SMG8 | - | - | - | 1994-09-27 | - | - | 1999-08-15 |
0125 | - | F | Ph1 | 3.17.0 | 3.18.0 | Testing of Spurious Emissions | smg-14 | 259/95 | Approved | SMG8 | - | - | - | 1995-03-23 | - | No separate CR to 11.20-DCS | 1999-08-15 |
0126 | - | F | Ph1 | 3.18.0 | 3.19.0 | Testing of conducted spurious emissions from the power leads | smg-17 | 076/96 | Approved | SMG8 | - | - | - | 1995-09-08 | - | - | 1999-08-15 |
0127 | - | 3 | Ph1 | 3.18.0 | 3.19.0 | Updating of scope of GSM 11.20 | smg-17 | 076/96 | Approved | SMG8 | - | - | - | 1995-09-08 | - | - | 1999-08-15 |
page generated from database: 2013-10-16 10:33:10