3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 21.900

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - F R99 3.0.0 3.1.0 Alignment with TSG SA decisions made at TSG#3. Deletion of Strategic/non strategic references. Change of PT to Support Team, editorial corrections. SP-04 SP-99288 approved SP - - - 2000-11-21 - - -
0002 - F R99 3.0.0 3.1.0 Harmonisation of the use of software for 3GPP documents SP-04 SP-99289 approved SP - - - 2000-11-21 - - -
0003 - C R99 3.1.0 3.2.0 Addition of new text related ti electronic working practices SP-05 SP-99428 approved SP - - - 1999-10-22 - - -
0005 - C R99 3.2.0 3.3.0 Clarification and editorial corrections to provisions covering the management of specifications and work items SP-08 SP-000279 approved SP - - - 2000-11-21 - - -
0007 1 F R99 3.3.0 3.4.0 Role of rapporteur for both Specifications and Work Items SP-09 SP-000402 approved SP - - - 2000-11-21 - - -
0008 2 F R99 3.3.0 3.4.0 Clarification of categories SP-09 SP-000492 approved SP - - - 2000-11-21 - - -
0008 3 C R99 3.2.0 3.3.0 Clarification of categories SP-09 SP-000493 approved SP - - - 1999-10-22 - - -
0010 - F R99 3.3.0 3.4.0 Clarification of categories for a frozen 3GPP release SP-09 SP-000461 approved SP - - - 2000-11-21 - - -
0011 - F R99 3.4.0 - Release numbers appearing in cover sheets SP-10 SP-000506 revised MCC - - - 2000-11-21 TEI - -
0011 1 F R99 3.4.0 3.5.0 Release numbers appearing in cover sheets SP-10 SP-000693 approved MCC - - - 2000-12-08 TEI - -
0012 1 F R99 3.4.0 3.5.0 Clarification of the ""freezing"" of specifications SP-10 SP-000693 approved MCC - - - 2000-12-08 TEI - -
0013 2 F R99 3.4.0 3.5.0 Release mechanisms SP-10 SP-000693 approved MCC - - - 2000-12-08 TEI - -
0014 - F R99 3.5.0 - Inclusion of GSM spec numbering scheme SP-11 SP-010066 revised MCC - - - 2001-03-09 TEI - -
0014 1 F R99 3.5.0 3.6.0 Inclusion of GSM spec numbering scheme SP-11 SP-010178 approved MCC - - - 2001-03-09 TEI - -
0015 - F Rel-6 5.0.1 6.0.0 Addition of stage 1-2-3 specification structure description SP-21 SP-030499 approved MCC - - - 2003-09-16 TEI - 2003-09-23
0016 - D R99 3.6.0 3.7.0 Make working procedures release-independent SP-22 SP-030575 approved MCC - - - 2003-12-09 TEI - 2004-01-05
0017 - D Rel-4 4.0.0 4.1.0 Make working procedures release-independent SP-22 SP-030575 approved MCC - - - 2003-12-09 TEI - 2004-01-05
0018 - D Rel-5 5.0.1 5.1.0 Make working procedures release-independent SP-22 SP-030575 approved MCC - - - 2003-12-09 TEI - 2004-01-05
0019 - D Rel-6 6.0.0 6.1.0 Corrects references SP-22 SP-030575 approved MCC - - - 2003-12-09 TEI - 2004-01-05
0020 - F Rel-6 6.1.1 6.2.0 Release planning SP-24 SP-040310 approved Siemens AG - - - 2004-05-10 TEI - 2004-05-12
0021 - B Rel-6 6.1.1 - Introduction of “Early Implementation” process SP-24 SP-040472 rejected Nortel Networks - - - 2004-06-09 TEI6 - 2004-06-09
0021 1 B Rel-6 6.2.0 - Introduction of “Early Implementation” process - - revised Nortel Networks - - - 2004-08-01 TEI6 Circulated by e-mail only 2004-09-08
0021 2 B Rel-6 6.2.0 - Introduction of “Early Implementation” process SP-25 SP-040499 revised Nortel Networks - - - 2004-09-06 TEI6 - 2004-09-08
0021 3 B Rel-6 6.2.0 6.3.0 Introduction of “Early Implementation” process SP-25 SP-040705 approved Nortel Networks - - - 2004-09-16 TEI6 - 2004-09-16
0022 - F Rel-6 6.2.0 - From draft to change control in one easy move - - revised MCC - - - 2004-09-07 TEI6 - 2004-09-08
0022 1 F Rel-6 6.2.0 - From draft to change control in one easy move SP-25 SP-040605 rejected MCC - - - 2004-09-09 TEI6 - 2004-09-08
0023 - F Rel-6 6.2.0 - WI code to be shown on sets changing similar functionality in several Releases - - revised MCC - - - 2004-09-07 TEI6 - 2004-09-08
0023 1 F Rel-6 6.2.0 - WI code to be shown on sets changing similar functionality in several Releases SP-25 SP-040605 rejected MCC - - - 2004-09-09 TEI6 - 2004-09-08
0024 - B Rel-6 6.2.0 6.3.0 Improved tracking of work item status SP-25 SP-040706 approved Nortel Networks - - - 2004-09-16 TEI6 - 2004-09-16
0025 - D Rel-7 6.3.0 7.0.0 Editorial clarification of version numbering system, upgrade to Rel-7 SP-26 SP-040824 approved MCC - - - 2004-12-07 TEI - 2004-12-08
0026 - D Rel-6 6.3.0 6.4.0 Make working procedures release-independent SP-26 SP-040824 approved MCC - - - 2004-12-07 TEI - 2004-12-08
0027 - F Rel-7 7.0.0 - Clarify the usage of specific references SP-27 SP-040019 rejected Lucent Technologies - - - 2005-03-02 TEI - 2005-03-02
0028 - B Rel-7 7.0.1 - Introduction of the concept of ""study item"" SP-29 SP-050469 revised MCC - - - 2005-09-20 TEI7 - 2005-09-20
0028 1 B Rel-7 7.0.1 7.1.0 Introduction of the concept of ""study item"" SP-29 SP-050537 approved MCC - - - 2005-09-20 TEI7 - 2005-09-25
0029 - F Rel-7 7.1.0 - Inclusion of ""study item"" in definition of ""work item"" SP-32 SP-060340 withdrawn Nokia, MCC - - - 2006-05-30 TEI7 -> SP-060403 2006-05-30
0029 - F Rel-7 7.1.0 7.2.0 Inclusion of ""study item"" in definition of ""work item"" SP-32 SP-060403 approved Nokia, MCC - - - 2006-05-30 TEI7 - 2006-06-04
0030 - D Rel-7 7.1.0 - Change ""short"" to ""long"" WG abbreviations SP-32 SP-060340 withdrawn Nokia, MCC - - - 2006-05-30 TEI7 -> SP-060403 2006-05-30
0030 - D Rel-7 7.1.0 7.2.0 Change ""short"" to ""long"" WG abbreviations SP-32 SP-060403 approved Nokia, MCC - - - 2006-05-30 TEI7 - 2006-06-04
0031 - F Rel-7 7.1.0 - Correct references to obsolete TSG. SP-32 SP-060340 revised Nokia, MCC - - - 2006-05-30 TEI7 -> SP-060403 2006-05-30
0031 1 F Rel-7 7.1.0 7.2.0 Correct references to obsolete TSG. SP-32 SP-060403 approved Nokia, MCC - - - 2006-06-01 TEI7 - 2006-06-04
0032 - B Rel-7 7.1.0 - Registration of code points with external bodies SP-32 SP-060340 withdrawn MCC - - - 2006-05-30 TEI7 -> SP-060403 2006-05-30
0032 - B Rel-7 7.1.0 7.2.0 Registration of code points with external bodies SP-32 SP-060403 approved MCC - - - 2006-05-30 TEI7 - 2006-06-04
0033 - F Rel-7 7.2.0 7.3.0 Propagation to Rel-8 SP-37 SP-070528 approved MCC (mailto:john.meredith@etsi.org) - - - 2007-08-27 TEI7 - 2007-08-27
0034 - F Rel-8 7.2.0 - Alignment of working methods with alignment practice agreed in TSG SA#36 SP-37 SP-070638 revised Nokia - - - 2007-09-14 TEI8 - 2007-09-14
0034 1 C Rel-8 7.2.0 - Alignment of working methods with alignment practice agreed in TSG SA#36 SP-37 SP-070687 revised Nokia - - - 2007-09-19 TEI8 - 2007-09-19
0034 2 C Rel-8 7.2.0 8.0.0 Alignment of working methods with alignment practice agreed in TSG SA#36 SP-37 SP-070703 approved Nokia - - - 2007-09-19 TEI8 - 2007-09-19
0035 - F Rel-8 8.0.0 - Addition of 36.-series to Specs series table SP-38 SP-070777 reissued MCC - - - 2007-11-23 TEI8 - 2007-11-23
0035 - F Rel-8 8.0.0 8.1.0 Addition of 36.-series to Specs series table SP-38 SP-070900 approved MCC - - - 2007-11-23 TEI8 - 2007-12-02
0036 - F Rel-8 8.0.0 - Clarification of version nomenclature SP-38 SP-070777 revised MCC - - - 2007-11-23 TEI8 - 2007-11-23
0036 1 F Rel-8 8.0.0 - Clarification of version nomenclature SP-38 SP-070900 postponed MCC, Motorola - - - 2007-12-02 TEI8 - 2007-12-02
0036 2 F Rel-8 8.1.1 8.2.0 Clarification of version nomenclature SP-39 SP-080079 approved MCC, Motorola - - - 2008-03-03 TEI8 - 2008-03-03
0037 - C Rel-8 8.2.0 - Determination of freeze dates for stages of a Release. (Correction recommended by OP ad hoc group on improvements.) - - - MCC - - - 2008-11-19 TEI8 - 2008-11-28
0037 1 C Rel-8 8.2.0 - Determination of freeze dates for stages of a Release. (Correction recommended by OP ad hoc group on improvements.) - - - MCC - - - 2008-11-28 TEI8 - 2008-11-28
0037 2 C Rel-8 8.2.0 - Determination of freeze dates for stages of a Release. (Correction recommended by OP ad hoc group on improvements.) SP-42 SP-080721 revised MCC - - - 2008-07-12 TEI8 - 2008-12-07
0037 3 C Rel-8 8.2.0 8.3.0 Determination of freeze dates for stages of a Release. (Correction recommended by OP ad hoc group on improvements.) SP-42 SP-080897 approved MCC - - - 2008-12-10 TEI8 - 2008-12-10
0038 - C Rel-8 8.2.0 - Cross-TSG work coordination. (Correction recommended by OP ad hoc group on improvements.) - - - MCC - - - 2008-11-19 TEI8 - 2008-11-28
0038 1 C Rel-8 8.2.0 8.3.0 Cross-TSG work coordination. (Correction recommended by OP ad hoc group on improvements.) SP-42 SP-080721 approved MCC - - - 2008-11-28 TEI8 - 2008-11-28
0039 - C Rel-8 8.2.0 - Introduction of concept of ""exception sheets"" for late-running work items - - - MCC - - - 2008-11-19 TEI8 - 2008-11-28
0039 1 C Rel-8 8.2.0 - Introduction of concept of ""exception sheets"" for late-running work items - - - MCC - - - 2008-11-19 TEI8 - 2008-11-28
0039 2 C Rel-8 8.2.0 8.3.0 Introduction of concept of ""exception sheets"" for late-running work items SP-42 SP-080721 approved MCC - - - 2008-07-12 TEI8 - 2008-12-07
0040 - C Rel-8 8.2.0 - Restriction on use of TEI work item codes - - - MCC - - - 2008-11-25 TEI8 - 2008-11-28
0040 1 B Rel-8 8.2.0 - Restriction on use of TEI work item codes SP-42 SP-080721 rejected MCC - - - 2008-11-28 TEI8 - 2008-11-28
0041 - F Rel-8 8.3.0 8.4.0 Eliminate contents of Rel-8 and substitute with pointer to Rel-9 SP-47 SP-100013 approved MCC - - - 2010-03-15 TEI8 - 2010-03-16
0042 - F Rel-9 9.0.0 - Clarification of treatment of CRs in WGs and in TSGs - - - MCC - - - 2010-03-15 TEI9 - 2010-03-16
0042 1 F Rel-9 9.0.0 - Clarification of treatment of CRs in WGs and in TSGs SP-47 SP-100013 postponed MCC - - - 2010-03-21 TEI9 Discuss by email 2010-03-21
0043 - F Rel-9 9.0.0 - Encourage allocation of CR number at first sight - - - MCC - - - 2010-03-15 TEI9 - 2010-03-16
0043 1 F Rel-9 9.0.0 - Encourage allocation of CR number at first sight SP-47 SP-100013 postponed MCC - - - 2010-03-21 TEI9 Discuss by email 2010-03-21
0044 - F Rel-9 9.0.0 9.1.0 Eliminate contents of Rel-9 and substitute with pointer to Rel-10 SP-52 SP-110297 approved MCC - - - 2011-05-27 TEI9 - 2011-05-27
0045 - F Rel-11 10.0.0 11.0.0 The use of Category A CRs SP-54 SP-110802 approved MCC (Specifications Manager) - - - 2011-12-02 TEI11 Typo in new text to be fixed at implementation time. 2011-12-02
0046 - F Rel-10 10.0.0 10.1.0 Eliminate contents of Rel-10 and substitute with pointer to Rel-11 SP-54 SP-110802 approved MCC (Specifications Manager) - - - 2011-11-29 TEI10 - 2011-12-02

page generated from database: 2013-10-16 10:33:11