Go to spec numbering scheme page
3GPP TR 21.978 (click spec number to see fileserver directory for this spec)
Feasibility Technical Report; CAMEL Control of VoIP Services
.
TSG / WG responsible: C4 (click TSG/WG to see its home page)
Work item which gave rise to this spec:  -  (click WI code to see Work Item details in the Work Plan)
Work items which may have impacted this spec:  click here
NP-24: txferred to N4 on closure of N2.CP-27: change of WG as a result of closure of CN and T.
Rapporteur: SMITH, David Specification required for: GERAN-based systems and UTRAN-based systems In the table below ... ... click meeting number for meeting details; ... click spec version number to download that version; ... click SDO publication reference to download SDO transposed document. event version available remarks 1999-12-17 - Revised clause 11 2000-01-14 - 2.1.1 - - 2000-06-23 Change Requests for this spec:
Release
Freeze meeting
Freeze date
::
remarks
SDO publications
R99
SP-07
2000-03-17
::
.
ETSI
click ref to download
Genealogy of this spec:
antecedent(s) | this spec | descendant(s) |
(no antecedents) | 21.978 | (no descendants) |
page generated from database: 2013-10-16 10:25:29