3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 23.002

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - B R99 3.0.0 3.1.0 Incorporation of UMTS aspects SP-05 SP-99397 approved S2 - - - 1999-10-11 - - -
0002 1 B R99 3.1.0 3.2.0 Addition of GLR related descriptions SP-06 SP-99546 approved S2 S2-10 S2-99E07 agreed 1999-12-16 - - -
0004 - F R99 3.2.0 3.3.0 General improvements of the split between section 3 (Definitions and abbreviations) and section 4 (The entities of the mobile system). SP-07 SP-000084 approved S2 S2_11/12 S2-000004 agreed 2000-03-17 - - -
0005 1 D R99 3.2.0 3.3.0 Re-ordering of section 4 (The entities of the mobile system). SP-07 SP-000084 approved S2 S2_11/12 S2-000205 agreed 2000-03-17 - - -
0006 - D R99 3.2.0 3.3.0 Re-ordering of section 5 (Configuration of a Public Land Mobile Network). SP-07 SP-000084 approved S2 S2_11/12 S2-000006 agreed 2000-03-17 - - -
0007 - D R99 3.2.0 3.3.0 Re-ordering of section 6 (""PLMN interfaces""). SP-07 SP-000084 approved S2 S2_11/12 S2-000007 agreed 2000-03-17 - - -
0008 - D R99 3.2.0 3.3.0 Simplification of the figure 1 (configuration of a PLMN and interfaces) SP-07 SP-000084 approved S2 S2_11/12 S2-000008 agreed 2000-03-17 - - -
0009 1 B R99 3.2.0 3.3.0 Introduction of CAMEL aspects. SP-07 SP-000084 approved S2 S2_11/12 S2-000206 agreed 2000-03-17 - - -
0011 1 B R99 3.2.0 3.3.0 Introduction of CBS aspects SP-07 SP-000084 approved S2 S2_11/12 S2-000207 agreed 2000-03-17 - - -
0012 2 C R99 3.2.0 3.3.0 Add LCS enhancements SP-07 SP-000084 approved S2 S2_11/12 S2-000596 agreed 2000-03-17 - - -
0013 4 C R99 3.2.0 3.3.0 Define GSM LCS parts and add UMTS LCS ""hooks"" in the network architecture. SP-07 SP-000084 approved S2 S2_11/12 S2-000597 agreed 2000-03-17 - - -
0014 1 F R99 3.2.0 3.3.0 Incorporation of network architecture material coming from section 4 of 29.002 SP-07 SP-000084 approved S2 S2_11/12 S2-000494 agreed 2000-03-17 - - -
0016 - B Rel-5 3.3.0 5.0.0 Introduction of R00 Definitions from 23.821 into 23.002 SP-09 SP-000449 Approved S2 S2-14 S2-001276 Agreed 2000-09-29 IMS - -
0017 - B Rel-5 3.3.0 5.0.0 on functional elements SP-09 SP-000449 Approved S2 S2-14 S2-001277 Agreed 2000-09-29 IMS - -
0018 - B Rel-5 3.3.0 5.0.0 on reference model SP-09 SP-000449 Approved S2 S2-14 S2-001278 Agreed 2000-09-29 IMS - -
0019 - B Rel-5 3.3.0 5.0.0 on reference points SP-09 SP-000449 Approved S2 S2-14 S2-001279 Agreed 2000-09-29 IMS - -
0022 - F R99 3.3.0 3.4.0 CAMEL for the PS domain SP-10 SP-000587 approved S2 S2-15 S2-001804 agreed 2000-12-10 - - -
0023 - - Rel-5 5.5.0 Removal of Sr from 23.002 - - - S2 S2-23 S2-020920 Postponed 2002-03-10 - - -
0023 - F Rel-4 4.0.0 4.1.0 CAMEL for the PS domain SP-10 SP-000587 approved S2 S2-15 S2-001805 agreed 2000-12-10 TEI - -
0024 - F Rel-5 5.0.0 5.1.0 CAMEL for the PS domain SP-10 SP-000587 approved S2 S2-15 S2-001806 agreed 2000-12-11 TEI - -
0026 1 B Rel-4 4.0.0 4.1.0 Introduction of Iu-CS and Iu-PS interfaces to BSS of type GERAN in the network architecture for REL-4 SP-10 SP-000587 approved S2 S2-15 S2-002084 agreed 2000-12-11 GERAN - -
0032 1 D Rel-4 4.1.0 4.2.0 Clarification of the difference between MGW in BICCN and IMS SP-11 SP-010115 approved S2 S2-16 S2-010315 agreed 2001-03-19 IMS - -
0033 1 D Rel-5 5.1.0 5.2.0 Clarification of the difference between MGW in BICCN and IMS SP-11 SP-010115 approved S2 S2-16 S2-010316 agreed 2001-03-19 IMS - -
0034 - A Rel-5 5.1.0 5.2.0 Introduction of Iu-CS and Iu-PS interfaces to BSS of type GERANin the network architecture SP-11 SP-010115 approved S2 S2-16 S2-010172 agreed 2001-03-19 GERAN - -
0035 1 B Rel-5 5.1.0 5.2.0 CSCF-GGSN interface SP-11 SP-010115 approved S2 S2-16 S2-010367 agreed 2001-03-19 IMS - -
0037 1 C Rel-5 5.2.0 5.3.0 HSS / HLR structuring SP-12 SP-010329 Approved S2 S2-18 S2-011565 Agreed 2001-06-19 IMS-CCR - -
0040 - F Rel-4 4.1.0 4.2.0 Missing Nc interface in basic configuration figure SP-11 SP-010115 approved S2 S2-17 S2-010631 agreed 2001-03-19 CSSPLIT - -
0041 - A Rel-5 5.1.0 5.2.0 Missing Nc interface in basic configuration figure SP-11 SP-010115 approved S2 S2-17 S2-010632 agreed 2001-03-19 CSSPLIT - -
0042 - F Rel-4 4.1.0 4.2.0 Removal of Iu for GERAN in Rel 4 SP-11 SP-010115 approved S2 S2-17 S2-010633 agreed 2001-03-19 GERAN - -
0043 - D Rel-4 4.1.0 4.2.0 Signalling and User Traffic Interfaces SP-11 SP-010115 approved S2 S2-17 S2-010634 agreed 2001-03-19 CSSPLIT - -
0044 2 F Rel-5 5.1.0 5.2.0 Clarification to the GGSN/PCF interface to the R5 reference architecture SP-11 SP-010115 approved S2 S2-17 S2-010830 agreed 2001-03-19 IMS - -
0045 - D Rel-4 4.1.0 4.2.0 Resolution of editor's note in the MGW description SP-11 SP-010115 approved S2 S2-17 S2-010636 agreed 2001-03-19 CSSPLIT - -
0046 - A Rel-5 5.1.0 5.2.0 Resolution of editor's note in the MGW description SP-11 SP-010115 approved S2 S2-17 S2-010637 agreed 2001-03-19 CSSPLIT - -
0047 - D Rel-4 4.1.0 4.2.0 Removal of an editor's note in GMSC description SP-11 SP-010115 approved S2 S2-17 S2-010638 agreed 2001-03-19 CSSPLIT - -
0050 - A Rel-5 5.1.0 5.2.0 Signalling and User Traffic Interfaces SP-11 SP-010115 approved S2 S2-17 S2-010635 agreed 2001-03-19 CSSPLIT - -
0051 3 B Rel-5 5.2.0 5.3.0 Addition of GTT Specific sntities SP-12 SP-010329 Approved S2 S2-18 S2-011468 Agreed 2001-06-19 GTT - -
0052 1 F Rel-4 4.2.0 4.3.0 Addition of Radio Access Technologies SP-12 SP-010329 Approved S2 S2-18 S2-011475 Agreed 2001-06-19 LCRTDD - -
0053 1 A Rel-5 5.2.0 5.3.0 Addition of Radio Access Technologies SP-12 SP-010329 Approved S2 S2-18 S2-011476 Agreed 2001-06-19 LCRTDD - -
0056 1 F R99 3.5.0 3.6.0 The usage of Iu-interface signalling is missing in the E-interface description SP-17 SP-020530 approved S2 S2-26 S2-022189 Agreed 2002-09-08 TEI - -
0057 1 A Rel-4 4.4.0 4.5.0 The usage of Iu-interface signalling is missing in the E-interface description SP-17 SP-020530 approved S2 S2-26 S2-022190 Agreed 2002-09-08 TEI - -
0058 1 A Rel-5 5.7.0 5.8.0 The usage of Iu-interface signalling is missing in the E-interface description SP-17 SP-020530 approved S2 S2-26 S2-022191 Agreed 2002-09-08 TEI - -
0061 1 F Rel-4 4.2.0 4.3.0 Clarification of the role of the SGWs SP-12 SP-010329 Approved S2 S2-18 S2-011478 Agreed 2001-06-19 IMS-CCR - -
0061 2 F Rel-5 5.3.0 5.4.0 on Introduction of Dx Reference Point in the IMS Reference Architecture"" SP-13 SP-010511 approved S2 S2-19 S2-011691 Agreed. 2001-08-31 IMS-CCR - -
0062 1 A Rel-5 5.2.0 5.3.0 Clarification of the role of the SGWs SP-12 SP-010329 Approved S2 S2-18 S2-011479 Agreed 2001-06-19 IMS-CCR - -
0063 1 F Rel-5 5.3.0 5.4.0 on ""Update the IP MM Subsystem configuration to include the BGCF node"" SP-13 SP-010511 approved S2 S2-19 S2-011679 Agreed. 2001-08-31 IMS-CCR - -
0068 - C Rel-5 5.3.0 5.4.0 on ""MRF functionality"" SP-13 SP-010511 approved S2 S2-19 S2-011698 Agreed. 2001-08-31 IMS-CCR - -
0070 - D Rel-5 5.4.0 5.5.0 Editorial alignment of 23.002 on CSCF SP-14 SP-010708 approved S2 S2-20 S2-012176 Agreed. 2001-12-16 IMS - -
0071 1 B Rel-5 - - Clarification to IM-MGW functionality - - - S2 S2-20 S2-012767 Rejected 2001-12-16 IMS-CCR - -
0072 - D Rel-5 5.4.0 5.5.0 Aligning MGW descriptions SP-14 SP-010708 approved S2 S2-20 S2-012207 Agreed. 2001-12-16 IMS-CCR - -
0074 - D Rel-5 5.4.0 5.5.0 Correction of abbreviation of CSCF SP-14 SP-010708 approved S2 S2-20 S2-012775 Agreed. 2001-12-16 IMS-CCR - -
0075 - C Rel-5 - - HSS definition clean-up - - - S2 S2-20 S2-012780 Revised. 2001-12-16 IMS-CCR - -
0075 - C Rel-5 - - HSS section clean up - - - S2 S2-20 S2-013034 Rejected. 2001-12-16 CCR - -
0075 1 C Rel-5 - - HSS section clean up - - - S2 S2-21 S2-013332 Revised. 2001-12-16 IMS-CCR - -
0075 2 C Rel-5 5.4.0 5.5.0 HSS section clean up SP-14 SP-010708 approved S2 S2-21 S2-013547 Agreed. 2001-12-16 IMS-CCR - -
0076 - - Rel-5 - - Gi Interface - - - S2 S2-20 S2-013028 Withdrawn. 2001-12-16 IMS-CCR - -
0077 - D Rel-5 - - Editorial correction to References - - - S2 S2-21 S2-013347 Revised. 2001-12-16 TEI5 - -
0077 1 D Rel-5 5.5.0 Editorial correction to References - - - S2 S2-21 S2-013507 Revised 2002-03-10 TEI5 - -
0077 2 D Rel-5 5.5.0 - Editorial correction to References SP-15 SP-020130 revised S2 S2-22 S2-020274 Agreed 2002-03-10 TEI5 - -
0077 3 D Rel-5 5.5.0 5.6.0 Editorial correction to References SP-15 SP-020165 approved S2 S2-22 - - 2002-03-10 TEI5 - -
0078 - F Rel-5 - - Introduction of an IMS bearer reference point - - - S2 S2-21 S2-013413 Revised 2001-12-16 IMS-CCR - -
0078 1 F Rel-5 - - Introduction of an IMS bearer reference point - - - S2 S2-21 S2-013535 Rejected. 2001-12-16 IMS-CCR - -
0078 1 F Rel-5 5.5.0 - Introduction of an IMS bearer reference point SP-15 SP-020130 revised S2 S2-22 S2-020270 Agreed 2002-03-10 IMS - -
0078 2 F Rel-5 5.5.0 5.6.0 Introduction of an IMS bearer reference point SP-15 SP-020165 approved S2 S2-22 - - 2002-03-10 IMS - -
0079 - F Rel-5 - - Correction of Gi reference point definition - - - S2 S2-21 S2-013412 Withdrawn. 2001-12-16 TEI - -
0079 - F Rel-5 5.4.0 5.5.0 Correction of Gi reference point definition SP-14 SP-010708 approved S2 S2-21 S2-013455 Agreed. 2001-12-16 TEI - -
0080 - F R99 3.4.0 3.5.0 Deleting SIWF functionality SP-14 SP-010708 approved S2 S2-21 S2-013452 Agreed. 2001-12-16 TEI - -
0081 - A Rel-4 4.3.0 4.4.0 Deleting SIWF functionality SP-14 SP-010708 approved S2 S2-21 S2-013453 Agreed. 2001-12-16 TEI4 - -
0082 - A Rel-5 5.4.0 5.5.0 Deleting SIWF functionality SP-14 SP-010708 approved S2 S2-21 S2-013454 Agreed. 2001-12-16 TEI5 - -
0083 - F Rel-5 5.5.0 Correction to the IM Subsystem entities figure - - - S2 S2-22 S2-020020 Rejected 2002-03-10 IMS-CCR - -
0084 - F Rel-5 5.5.0 Corrections to Mj reference point and configuration of IMS entities figure - - - S2 S2-22 S2-020021 Rejected 2002-03-10 IMS-CCR - -
0085 - F Rel-5 5.5.0 - Corrections to the Radio Network System (node B) definitions SP-15 SP-020130 revised S2 S2-22 S2-020022 Agreed 2002-03-10 IMS-CCR - -
0085 - F Rel-5 5.5.0 5.6.0 Corrections to the Radio Network System (node B) definitions SP-15 SP-020165 approved S2 S2-22 S2-020022 Agreed 2002-03-10 IMS-CCR - -
0087 - D Rel-5 5.5.0 - Nb and Nc reference points - editorial corrections SP-15 SP-020130 revised S2 S2-22 S2-020147 Agreed 2002-03-10 TEI - -
0087 - D Rel-5 5.5.0 5.6.0 Nb and Nc reference points - editorial corrections SP-15 SP-020165 approved S2 S2-22 S2-020147 Agreed 2002-03-10 TEI - -
0088 - F Rel-5 5.5.0 Title to be provided later - - - S2 S2-22 S2-020155 Withdrawn 2002-03-10 IMS-CCR - -
0089 - F Rel-5 5.5.0 - Correction to Reference Architecture Figure SP-15 SP-020130 revised S2 S2-23 S2-020426 Agreed 2002-03-10 IMS-CCR - -
0090 - F Rel-5 5.5.0 - Deletion of Reference Point towards SCP SP-15 SP-020130 revised S2 S2-23 S2-020427 Agreed 2002-03-10 IMS-CCR - -
0090 - F Rel-5 5.5.0 5.6.0 Deletion of Reference Point towards SCP SP-15 SP-020165 approved S2 S2-23 S2-020427 Agreed 2002-03-10 IMS-CCR - -
0091 - F Rel-5 5.5.0 BGCF: Alignment to 23.228 - - - S2 S2-23 S2-020484 Revised 2002-03-10 IMS-CCR - -
0091 1 F Rel-5 5.5.0 - BGCF: Alignment to 23.228 SP-15 SP-020130 revised S2 S2-23 S2-020818 Agreed 2002-03-10 IMS-CCR - -
0091 1 F Rel-5 5.5.0 5.6.0 BGCF: Alignment to 23.228 SP-15 SP-020165 approved S2 S2-23 S2-020818 Agreed 2002-03-10 IMS-CCR - -
0092 - B Rel-5 5.5.0 General updates due to Intra Domain Connection of RAN nodes to multiple CN nodes - - - S2 S2-23 S2-020581 Revised 2002-03-10 FLOGER - -
0092 1 B Rel-5 5.6.0 General updates due to Intra Domain Connection of RAN nodes to multiple CN nodes SP-16 - - S2 S2-24 S2-021012 Revised. 2002-06-06 FLOGER - -
0092 2 F Rel-5 5.6.0 5.7.0 General updates due to Intra Domain Connection of RAN nodes to multiple CN nodes SP-16 SP-020310 approved S2 S2-24 S2-021454 Agreed. 2002-06-06 FLOGER - -
0093 - F Rel-5 5.5.0 - Removal of the Sr Reference point SP-15 SP-020130 revised S2 S2-23 S2-020920 Agreed 2002-03-10 IMS-CCR - -
0093 - F Rel-5 5.5.0 5.6.0 Removal of the Sr Reference point SP-15 SP-020165 approved S2 S2-23 S2-020920 Agreed 2002-03-10 IMS-CCR - -
0094 - B Rel-5 5.6.0 Security Gateway SP-16 - - S2 S2-24 S2-021120 Revised 2002-06-06 IMS-CCR - -
0094 1 F Rel-5 5.6.0 5.7.0 Security Gateway SP-16 SP-020310 approved S2 S2-24 S2-021431 Agreed. 2002-06-06 IMS-CCR - -
0095 - F Rel-5 5.6.0 Alignment with TS23.271 SP-16 - - S2 S2-24 S2-021215 Revised 2002-06-06 LCS1 - -
0095 1 F Rel-5 5.6.0 Alignment with TS23.271 SP-16 - - S2 S2-24 S2-021383 Revised 2002-06-06 LCS1 - -
0095 2 F Rel-5 5.6.0 5.7.0 Alignment with TS23.271 SP-16 SP-020310 approved S2 S2-24 S2-021394 Agreed. 2002-06-06 LCS1 - -
0096 - F Rel-5 5.6.0 IMS-MGW to MGCF reference point SP-16 - - S2 S2-24 S2-021273 Withdrawn 2002-06-06 IMS - -
0097 - F Rel-5 5.7.0 Mc interface - - - S2 S2-25 S2-021715 Revised 2002-09-08 IMS-CCR - -
0097 1 F Rel-5 5.7.0 Mc interface - - - S2 S2-25 S2-021897 Revised 2002-09-08 IMS-CCR - -
0097 2 F Rel-5 5.7.0 5.8.0 Mc interface SP-17 SP-020530 approved S2 S2-25 S2-021990 Agreed 2002-09-08 IMS-CCR - -
0098 - F Rel-5 5.7.0 Clean-up of 23.002 - - - S2 S2-25 S2-021720 Revised 2002-09-08 IMS - -
0098 1 F Rel-5 5.7.0 5.8.0 Clean-up SP-17 SP-020530 approved S2 S2-25 S2-021953 Agreed 2002-09-08 IMS - -
0099 - F Rel-4 4.4.0 Align LCS architecture based on impacts from Radio Access Networks (RAN & GERAN) - - - S2 S2-25 S2-021788 Revised 2002-09-08 LCS1 - -
0099 1 F Rel-4 4.4.0 Align LCS architecture based on impacts from Radio Access Networks (RAN & GERAN) - - - S2 S2-25 S2-022039 Postponed 2002-09-08 LCS1 - -
0099 2 F Rel-4 4.4.0 4.5.0 Align LCS architecture based on impacts from Radio Access Networks (RAN & GERAN) SP-17 SP-020530 approved S2 S2-26 S2-022616 Agreed 2002-09-08 LCS1 - -
0100 - F Rel-5 5.7.0 Align LCS architecture based on impacts from Radio Access Networks (RAN & GERAN) - - - S2 S2-25 S2-021789 Rejected 2002-09-08 LCS1 - -
0100 1 F Rel-5 5.7.0 Align LCS architecture based on impacts from Radio Access Networks (RAN & GERAN) - - - S2 S2-26 S2-022362 Revised 2002-09-08 LCS1 - -
0100 3 F Rel-5 5.7.0 - Align LCS architecture based on impacts from Radio Access Networks (RAN & GERAN) SP-17 SP-020530 rejected S2 S2-26 S2-022617 Agreed 2002-09-08 LCS1 - -
0101 - D Rel-6 5.7.0 Cleanup of IM Subsystem definition - - - S2 S2-26 S2-022129 Rejected 2002-09-08 IMS - -
0102 - B Rel-6 5.7.0 Updates for the Presence Service - - - S2 S2-26 S2-022130 Postponed 2002-09-08 IMS - -
0103 - F Rel-5 5.7.0 IMS Reference Points - - - S2 S2-26 S2-022187 Revised 2002-09-08 IMS - -
0103 1 F Rel-5 5.7.0 5.8.0 IMS Reference Points SP-17 SP-020530 approved S2 S2-26 S2-022516 Agreed 2002-09-08 IMS - -
0104 - D Rel-5 5.7.0 23002 changes for Access Independence - - - S2 S2-26 S2-022281 Rejected 2002-09-08 IMS-CCR - -
0105 - F Rel-5 5.8.0 Updates of entities of the mobile system for Rel-5 - - - S2 S2-27 S2-022726 Revised 2002-12-09 TEI5 - 2002-12-09
0105 1 F Rel-5 5.8.0 Updates of entities of the mobile system for Rel-5 - - - S2 S2-27 S2-023014 Withdrawn 2002-12-09 TEI5 - 2002-12-09
0106 - F Rel-5 5.8.0 Service architecture - - - S2 S2-27 S2-022814 Revised 2002-12-09 IMS-CCR - 2002-12-09
0106 1 F Rel-5 5.8.0 - Service architecture SP-18 SP-020770 withdrawn S2 S2-27 S2-023057 Agreed. 2002-12-09 IMS-CCR - 2002-12-09
0106 1 F Rel-5 5.8.0 5.9.0 Service architecture SP-18 SP-020827 approved S2 S2-27 S2-023057 Agreed. 2002-12-09 IMS-CCR - 2002-12-10
0107 - F Rel-4 4.5.0 Update LCS architecture specification 23.002 to avoid duplication with RAN specifications - - - S2 S2-27 S2-022906 Revised 2002-12-09 LCS - 2002-12-09
0107 - F Rel-4 4.5.0 Update LCS architecture specification 23.002 to provide an overview of RAN for LCS but avoid duplication with RAN specifications - - - S2 S2-28 S2-023283 Revised 2002-12-09 LCS - 2002-12-09
0107 1 F Rel-4 4.5.0 Update LCS architecture specification 23.002 to avoid duplication with RAN specifications - - - S2 S2-27 S2-023037 Rejected 2002-12-09 LCS - 2002-12-09
0107 1 F Rel-4 4.5.0 Corrections in the LCS descriptions of 23.002 - - - S2 S2-28 S2-023581 Revised 2002-12-09 LCS - 2002-12-09
0107 2 F Rel-4 4.5.0 - Corrections in the LCS descriptions of 23.002 SP-18 SP-020770 withdrawn S2 S2-28 S2-023669 Agreed. 2002-12-09 LCS - 2002-12-09
0107 5 F Rel-4 4.5.0 4.6.0 Corrections in the LCS descriptions of 23.002 SP-18 SP-020827 approved S2 S2-28 S2-023669 Agreed. 2002-12-09 LCS - 2002-12-10
0108 - A Rel-5 5.8.0 Update LCS architecture specification 23.002 to avoid duplication with RAN specifications - - - S2 S2-27 S2-022907 Postponed 2002-12-09 LCS - 2002-12-09
0108 - A Rel-5 5.8.0 Update LCS architecture specification 23.002 to provide an overview of RAN for LCS but avoid duplication with RAN specifications - - - S2 S2-28 S2-023284 Revised 2002-12-09 LCS - 2002-12-09
0108 1 F Rel-5 5.8.0 Corrections in the LCS descriptions of 23.002 - - - S2 S2-28 S2-023582 Revised 2002-12-09 LCS1 - 2002-12-09
0108 4 F Rel-5 5.8.0 Corrections in the LCS descriptions of 23.002 SP-18 SP-020770 withdrawn Nokia/Nort - - - 2002-12-05 - - 2002-12-12
0108 5 A Rel-5 5.8.0 5.9.0 Corrections in the LCS descriptions of 23.002 SP-18 SP-020827 approved Nokia/Nort - - - 2002-12-05 - - 2002-12-12
0110 - F Rel-5 5.8.0 - PCF to PDF Changes SP-18 SP-020770 withdrawn S2 S2-28 S2-023268 Agreed. 2002-12-09 IMS-CCR - 2002-12-09
0110 - F Rel-5 5.8.0 5.9.0 PCF to PDF Changes SP-18 SP-020827 approved S2 S2-28 S2-023268 Agreed. 2002-12-09 IMS-CCR - 2002-12-10
0111 - F Rel-4 4.5.0 Scope of TS 23.002 - - - S2 S2-28 S2-023351 Revised 2002-12-09 TEI4 - 2002-12-09
0111 1 F Rel-4 4.5.0 - Scope of TS 23.002 SP-18 SP-020770 withdrawn S2 S2-28 S2-023493 Agreed 2002-12-09 TEI4 - 2002-12-09
0111 1 F Rel-4 4.5.0 4.6.0 Scope of TS 23.002 SP-18 SP-020827 approved S2 - - - 2002-12-10 TEI4 - 2002-12-10
0112 - F Rel-5 5.8.0 Scope of TS 23.002 - - - S2 S2-28 S2-023352 Revised 2002-12-09 TEI5 - 2002-12-09
0112 1 F Rel-5 5.8.0 - Scope of TS 23.002 SP-18 SP-020770 withdrawn S2 S2-28 S2-023494 Agreed 2002-12-09 TEI5 - 2002-12-09
0112 1 F Rel-5 5.8.0 5.9.0 Scope of TS 23.002 SP-18 SP-020827 approved S2 - - - 2002-12-10 TEI5 - 2002-12-10
0113 - B Rel-5 5.8.0 Management interface - - - S2 S2-28 S2-023365 Postponed. 2002-12-09 IMS2 - 2002-12-09
0114 - F Rel-4 4.5.0 Corrections in the LCS descriptions of 23.002 - - - S2 S2-28 S2-023406 Revised 2002-12-09 LCS - 2002-12-09
0114 - F Rel-4 4.5.0 - Corrections in the LCS figures SP-18 SP-020770 withdrawn S2 S2-28 S2-023583 Agreed 2002-12-09 LCS - 2002-12-09
0114 1 F Rel-4 4.5.0 4.6.0 Corrections in the LCS figures SP-18 SP-020827 approved S2 S2-28 S2-023583 Agreed 2002-12-09 LCS - 2002-12-10
0115 - F Rel-5 5.8.0 Corrections in the LCS descriptions of 23.002 - - - S2 S2-28 S2-023407 Revised 2002-12-09 LCS - 2002-12-09
0115 1 F Rel-5 5.8.0 - Corrections in the LCS figures SP-18 SP-020770 revised S2 S2-28 S2-023584 Agreed 2002-12-09 LCS - 2002-12-09
0115 2 A Rel-5 5.8.0 5.9.0 Corrections in the LCS figures SP-18 SP-020827 approved S2 S2-28 S2-023584 Agreed 2002-12-09 LCS - 2002-12-10
0116 - F Rel-5 5.9.0 Interworking between IMS and CS networks - - - S2 S2-29 S2-030166 Rejected 2003-03-17 IMS-CCR - 2003-03-18
0117 - F Rel-6 5.9.0 LCS architecture in 6 - - - S2 S2-29 S2-030184 Postponed 2003-03-17 LCS2 - 2003-03-18
0118 - F Rel-5 5.9.0 5.10.0 Change of reference to LIF document SP-19 SP-030115 approved S2 S2-30 S2-030832 Agreed 2003-03-17 LCS1 - 2003-03-18
0119 - B Rel-6 5.9.0 Management interface - - - S2 S2-30 S2-030881 Revised 2003-03-17 IMS2 - 2003-03-18
0119 1 B Rel-6 5.9.0 6.0.0 Management interface SP-19 SP-030115 approved S2 S2-30 S2-030915 Agreed 2003-03-17 IMS2 - 2003-03-18
0120 - F Rel-4 4.6.0 4.7.0 LCS architecture in Rel4 SP-19 SP-030115 approved S2 S2-30 S2-030582 Agreed 2003-03-17 LCS2 - 2003-03-18
0121 - F Rel-5 5.9.0 LCS architecture in 5 - - - S2 S2-30 S2-030583 Revised 2003-03-17 LCS2 - 2003-03-18
0121 1 F Rel-5 5.9.0 LCS architecture in 5 - - - S2 S2-30 S2-030599 Revised 2003-03-17 LCS2, TEI - 2003-03-18
0121 2 F Rel-5 5.9.0 5.10.0 LCS architecture in 5 SP-19 SP-030115 approved S2 S2-30 S2-030986 Agreed 2003-03-17 LCS2, TEI - 2003-03-18
0122 - B Rel-6 6.0.1 Introduction of GUP Server in the network architecture - - - S2 S2-31 S2-031375 Rejected 2003-06-09 GUP - 2003-06-08
0123 - F Rel-5 5.5.0 Application Server Definition - - - S2 S2-22 S2-020044 Revised 2002-03-10 IMS-CCR - -
0123 - F Rel-6 6.0.1 Ge reference point - - - S2 S2-31 S2-031391 Revised 2003-06-09 TEI6 - 2003-06-08
0123 1 F Rel-5 5.5.0 Application Server Definition - - - S2 S2-22 S2-020268 Revised 2002-03-10 IMS-CCR - -
0123 2 F Rel-5 5.5.0 - Application Server Definition SP-15 SP-020130 revised S2 S2-22 S2-020292 Agreed 2002-03-10 IMS-CCR - -
0123 2 F Rel-5 5.5.0 5.6.0 Application Server Definition SP-15 SP-020165 approved S2 S2-22 S2-020292 Agreed 2002-03-10 IMS-CCR - -
0124 - F Rel-6 6.0.1 6.1.0 Gd reference point SP-20 SP-030299 approved S2 S2-31 S2-031392 Agreed 2003-06-09 TEI6 - 2003-06-08
0125 - C Rel-6 6.0.0 Enhancements of the Mt reference point - - - S2 S2-31 S2-031437 Revised 2003-06-09 IMS2 - 2003-06-08
0126 - F Rel-6 6.0.1 Clarification of Mt reference point for Si - - - S2 S2-31 S2-031446 Revised 2003-06-09 IMS-CCR - 2003-06-08
0126 1 F Rel-6 6.0.1 Clarification of Mt reference point for Si - - - S2 S2-31 S2-031489 Revised 2003-06-09 IMS-CCR - 2003-06-08
0127 - B Rel-6 6.1.0 SLF on Sh interface - - - S2 S2-31 S2-031453 Revised 2003-06-09 IMS2 - 2003-06-08
0127 1 B Rel-6 6.0.1 SLF on Sh interface - - - S2 S2-31 S2-031486 Revised 2003-06-09 IMS2 - 2003-06-08
0127 2 B Rel-6 6.0.1 6.1.0 SLF on Sh interface SP-20 SP-030299 approved S2 S2-31 S2-031554 Agreed 2003-06-09 IMS2 - 2003-06-08
0128 - F Rel-6 6.0.1 Ge reference point - - - S2 S2-31 S2-031499 Revised 2003-06-09 TEI6 - 2003-06-08
0128 1 F Rel-6 6.0.1 6.1.0 Ge reference point SP-20 SP-030299 approved S2 S2-31 S2-031546 Agreed 2003-06-09 TEI6 - 2003-06-08
0129 - F Rel-6 6.0.0 Management interface - - - S2 S2-32 S2-031961 Revised 2003-06-09 IMS2 - 2003-06-08
0129 1 F Rel-6 6.0.0 Management interface - - - S2 S2-32 S2-032106 Revised 2003-06-09 IMS2 - 2003-06-08
0129 2 F Rel-6 6.0.1 6.1.0 Management interface SP-20 SP-030299 approved S2 S2-32 S2-032144 Agreed 2003-06-09 IMS2 - 2003-06-08
0130 - F Rel-4 4.7.0 4.8.0 Removal of Mh interface from the reference model SP-20 SP-030299 approved S2 S2-32 S2-031974 Agreed 2003-06-09 TEI4 - 2003-06-08
0131 - F Rel-5 5.10.0 Architecture corrections - - - S2 S2-32 S2-031981 Revised 2003-06-09 TEI5 - 2003-06-08
0131 1 F Rel-5 5.10.0 5.11.0 Architecture corrections SP-20 SP-030299 approved S2 S2-32 S2-032100 Agreed 2003-06-09 TEI5 - 2003-06-08
0132 - A Rel-6 6.0.1 Architecture corrections - - - S2 S2-32 S2-031982 Revised 2003-06-09 TEI6 - 2003-06-08
0132 1 A Rel-6 6.0.1 6.1.0 Architecture corrections SP-20 SP-030299 approved S2 S2-32 S2-032101 Agreed 2003-06-09 TEI5 - 2003-06-08
0133 - F Rel-5 5.11.0 - Use of Security Gateways - - - S2 S2-33 S2-032546 Revised 2003-09-22 SECNDSIP - 2003-09-11
0133 1 F Rel-5 5.11.0 - Use of Security Gateways SP-21 SP-030374 revised S2 S2-33 S2-032707 Agreed 2003-09-22 SECNDSIP - 2003-09-11
0133 1 F Rel-5 5.11.0 5.12.0 Use of Security Gateways SP-21 SP-030521 approved Siemens - S2-032707 - 2003-07-10 SECNDSIP - 2003-09-23
0134 - A Rel-6 6.1.0 - Use of Security Gateways - - - S2 S2-33 S2-032547 Revised 2003-09-22 SECNDSIP - 2003-09-11
0134 1 A Rel-6 6.1.0 - Use of Security Gateways - - - S2 S2-33 S2-032708 revised 2003-09-22 SECNDSIP - 2003-09-11
0134 2 A Rel-6 6.1.0 - Use of Security Gateways SP-21 SP-030374 revised S2 S2-33 S2-033267 Agreed 2003-09-22 SECNDSIP - 2003-09-11
0134 2 A Rel-6 6.1.0 6.2.0 Use of Security Gateways SP-21 SP-030521 approved Siemens - S2-033267 - 2003-07-10 SECNDSIP - 2003-09-23
0135 - B Rel-6 6.2.0 - Gq reference point - - - S2 S2-35 S2-033516 Revised 2003-12-15 QoS1 - 2004-01-05
0135 1 B Rel-6 6.2.0 - Gq reference point - - - S2 S2-35 S2-033526 Revised 2003-12-15 QoS1 - 2004-01-05
0135 2 B Rel-6 6.2.0 - Gq reference point - - - S2 S2-36 S2-034087 Revised 2003-12-15 QoS1 - 2004-01-05
0135 3 B Rel-6 6.2.0 - Gq reference point - - - S2 S2-36 S2-034260 Revised 2003-12-15 QoS1 - 2004-01-05
0135 4 B Rel-6 6.2.0 6.3.0 Gq reference point SP-22 SP-030652 approved S2 S2-36 S2-034340 Agreed 2003-12-15 QoS1 - 2004-01-05
0136 - F Rel-6 6.3.0 6.4.0 Gq clean-up SP-23 SP-040031 approved S2 S2-37 S2-040338 Agreed 2004-03-15 QoS1 - 2004-03-05
0137 - F Rel-6 6.4.0 - Missing Lr reference point in 23.002 and usage of MLP at Le - - - - S2-39 S2-041407 Rejected 2004-08-06 LCS2 - 2004-06-01
0138 - F Rel-6 6.4.0 - Introduction of WLAN Interworking functional elements in 23.002 - - - - S2-39 S2-041227 Revised 2004-08-06 WLAN - 2004-06-01
0138 1 F Rel-6 6.4.0 6.5.0 Introduction of WLAN Interworking functional elements in 23.002 SP-24 SP-040312 approved S2 S2-39 S2-041240 Agreed 2004-08-06 WLAN - 2004-06-01
0139 - F Rel-6 6.4.0 6.5.0 Introduction of WLAN Interworking reference points and configuration in 23.002 SP-24 SP-040312 approved S2 S2-39 S2-041228 Agreed 2004-08-06 WLAN - 2004-06-01
0140 - B Rel-6 6.4.0 - New interface for support of ADD - - - - S2-39 S2-041420 Rejected 2004-08-06 TEI6 - 2004-06-01
0141 - F Rel-6 6.4.0 - Configuration of Presence Service - - - - S2-39 S2-041418 Revised 2004-08-06 PRESNC - 2004-06-01
0141 1 F Rel-6 6.4.0 - Configuration of Presence Service - - - - S2-39 S2-041485 Revised 2004-08-06 PRESNC - 2004-06-01
0141 2 F Rel-6 6.4.0 6.5.0 Configuration of Presence Service SP-24 SP-040312 approved S2 S2-39 S2-041608 Agreed 2004-08-06 PRESNC - 2004-06-01
0142 - F Rel-6 6.4.0 - Correction on the scope of the Ut reference point - - - - S2-39 S2-041480 Revised 2004-08-06 TEI - 2004-06-01
0142 1 F Rel-6 6.4.0 6.5.0 Correction on the scope of the Ut reference point SP-24 SP-040312 approved S2 S2-39 S2-041669 Agreed 2004-08-06 TEI - 2004-06-01
0143 - F Rel-6 6.4.0 6.5.0 Missing Lr reference point in 23.002 SP-24 SP-040312 approved S2 S2-40 S2-041864 Agreed 2004-08-06 LCS2 - 2004-06-01
0144 - F Rel-6 6.5.0 - Introducing A-GNSS concept to extend A-GPS to include GALILEO - - - Orange S2-42 S2-043186 REVISED TO S2-043320 2004-10-15 LCS2 - 2004-12-09
0144 1 F Rel-6 6.5.0 - Introducing A-GNSS concept to extend A-GPS to include GALILEO - - - Orange S2-42 S2-043320 rejected 2004-10-15 LCS2 - 2004-12-09
0145 - F Rel-6 6.5.0 6.6.0 Floor control SP-26 SP-040750 approved Siemens S2-42 S2-043333 AGREED 2004-10-15 IMS2 - 2004-12-09
0146 - F Rel-6 6.5.0 6.6.0 Removing GPS specifity for SAS to unify with RAN Technical Specifications SP-26 SP-040750 approved Orange S2-42 S2-043369 AGREED 2004-10-15 LCS2 - 2004-12-09
0147 - F Rel-6 6.6.0 - Removal of WLAN UE from Core Network entities - - - Lucent Technologies S2-44 S2-050045 rejected 2005-02-02 WLAN - 2005-03-13
0148 - F Rel-6 6.6.0 - Inclusion of WLAN functionality in HSS description - - - Lucent Technologies S2-44 S2-050046 revised 2005-02-02 WLAN Revised to S2-050054 2005-03-13
0148 1 F Rel-6 6.6.0 - Inclusion of WLAN functionality in HSS description - - - Lucent Technologies S2-44 S2-050054 revised 2005-02-02 WLAN Revised to S2-050063 2005-03-13
0148 2 F Rel-6 6.6.0 6.7.0 Inclusion of WLAN functionality in HSS description SP-27 SP-050104 approved Lucent Technologies S2-44 S2-050063 agreed 2005-02-02 WLAN - 2005-03-13
0149 - F Rel-6 6.6.0 - Inclusion of WLAN entities in PS domain - - - Lucent Technologies S2-44 S2-050047 rejected 2005-02-02 WLAN - 2005-03-13
0150 - F Rel-6 6.6.0 - Generalising Subscriber Location Function (SLF) to support WLAN - - - Lucent Technologies S2-44 S2-050048 rejected 2005-02-02 WLAN - 2005-03-13
0150 1 F Rel-6 6.6.0 - Generalising Subscriber Location Function (SLF) to support WLAN and Removal of WLAN charging reference points and functional entities - - - Lucent Technologies S2-44 S2-050055 revised 2005-02-02 WLAN Revised to S2-050064 2005-03-13
0150 2 F Rel-6 6.6.0 - Generalising Subscriber Location Function (SLF) to support WLAN and Removal of WLAN charging reference points and functional entities - - - Lucent Technologies S2-44 S2-050064 revised 2005-02-02 WLAN Revised to S2-050433 2005-03-13
0150 3 F Rel-6 6.6.0 - Generalising Subscriber Location Function (SLF) to support WLAN and Removal of WLAN charging reference points and functional entities - - - Lucent Technologies S2-44 S2-050433 rejected 2005-02-02 WLAN - 2005-03-13
0151 - F Rel-6 6.6.0 - Removal of WLAN charging reference points and functional entities - - - Lucent Technologies S2-44 S2-050049 rejected 2005-02-02 WLAN - 2005-03-13
0152 - F Rel-6 6.6.0 - Update of I-WLAN configuration and reference points in TS 23.002 - - - Siemens S2-44 S2-050289 rejected 2005-02-02 WLAN - 2005-03-13
0153 - F Rel-6 6.6.0 6.7.0 Generalising Subscriber Location Function (SLF) to support WLAN and Removal of WLAN charging reference points and functional entities SP-27 SP-050104 approved Lucent Technologies S2-44 S2-050522 agreed 2005-02-02 WLAN - 2005-03-13
0154 - F Rel-6 6.7.0 6.8.0 Missing MBMS Architecture entities SP-28 SP-050332 approved Vodafone S2-45 S2-050588 agreed 2005-03-29 MBMS - 2005-06-03
0155 - F Rel-7 6.7.0 - Naming of the IP multimedia functionality of the HSS - - - Orange S2-45 S2-050688 Postponed 2005-03-29 FBI - 2005-06-03
0156 - F Rel-6 6.7.0 - Addition of Flow Based Charging architecture - - - Siemens S2-46 S2-051276 revised 2005-05-04 CH-FBC Revised in S2-051332 2005-06-03
0156 1 F Rel-6 6.7.0 6.8.0 Addition of Flow Based Charging architecture SP-28 SP-050332 approved Siemens S2-46 S2-051332 agreed 2005-05-09 CH-FBC - 2005-06-03
0157 - F Rel-6 6.8.0 - Introduction of GUP Server in the network architecture - - - Nokia S2-47 S2-051597 Revised 2005-06-30 GUP Revised in S2-051811 2005-09-14
0157 1 F Rel-6 6.8.0 - Introduction of GUP Server in the network architecture SP-29 SP-050475 revised Nokia S2-47 S2-051811 agreed 2005-06-30 GUP - 2005-09-14
0157 2 F Rel-6 6.8.0 - Introduction of GUP Server in the network architecture SP-29 SP-050445 revised Nokia - - - 2005-09-16 GUP - 2005-09-27
0157 3 F Rel-6 6.8.0 6.9.0 Introduction of GUP Server in the network architecture SP-29 SP-050499 approved Nokia - - - 2005-09-26 GUP cover sheet shows rev2 2005-09-26
0158 - F Rel-6 6.8.0 - Consistent Specification of the Mr and Mp Interfaces - - - Lucent Technologies S2-47 S2-051633 postponed 2005-06-30 IMS2 - 2005-09-14
0159 - F Rel-6 6.8.0 - Introduction of IMS ALG and TrGW - - - Siemens S2-48 S2-052128 revised 2005-08-29 IMS2 Revised in S2-052335 2005-06-03
0159 1 F Rel-6 6.8.0 6.9.0 Introduction of IMS ALG and TrGW SP-29 SP-050476 approved Siemens S2-48 S2-052335 agreed 2005-09-07 IMS2 - 2005-06-03
0160 - F Rel-6 6.8.0 6.9.0 Correction of Wg reference point SP-29 SP-050478 approved Siemens S2-48 S2-052132 agreed 2005-08-31 WLAN - 2005-06-03
0161 - F Rel-7 6.8.0 - Routing by the MGCF - - - Lucent S2-48 S2-051959 rejected 2005-08-29 FBI WRONG CR NUMBER ON DOC DUE TO MCC ALLOCATION ERROR. More info needed from TISPAN before making changes 2005-06-03
0161 2 B Rel-7 6.9.0 - Routing by the MGCF - - - Lucent S2-49 S2-052708 revised 2005-11-01 FBI Revised in S2-052982 2005-06-03
0161 3 B Rel-7 6.9.0 7.0.0 Routing by the MGCF SP-30 SP-050670 approved Lucent S2-49 S2-052982 agreed 2005-11-10 FBI Editorial errors 2005-06-03
0162 - F Rel-6 6.8.0 - Reference to OMA specifications used at Le and Lr interfaces - - - LG Electronics S2-48 S2-051982 revised 2005-08-29 LCS2 WRONG CR NUMBER ON DOC DUE TO MCC ALLOCATION ERROR. Revised in S2-052430 2005-06-03
0162 1 F Rel-6 6.8.0 6.9.0 Reference to OMA specifications used at Le and Lr interfaces SP-29 SP-050479 approved LG Electronics S2-48 S2-052430 agreed 2005-09-14 LCS2 - 2005-06-03
0163 - F Rel-6 6.9.0 - Interface between I-CSCF and AS - - - Siemens S2-49 S2-052534 revised 2005-10-29 IMS2 Revised in S2-052895 2005-06-03
0163 1 F Rel-6 6.9.0 6.10.0 Interface between I-CSCF and AS SP-30 SP-050664 approved Siemens S2-49 S2-052895 agreed 2005-11-08 IMS2 Email Approved 2005-06-03
0164 - C Rel-7 6.9.0 - Introduction of IBCF in 23.002 - - - Siemens S2-49 S2-052536 postponed 2005-10-29 FBI No time in meeting 2005-06-03
0165 - F Rel-6 6.9.0 - The position of IWF - - - China Mobile, Huawei S2-49 S2-052735 rejected 2005-11-01 TEI6 - 2005-06-03
0166 - F Rel-6 6.9.0 - MSC limit VT service in particular area - - - China Mobile S2-49 S2-052963 rejected 2005-11-10 TEI6 Proprietary functionality not for standardisation 2005-06-03
0167 - F Rel-6 6.9.0 - MSC Play announcement for VT - - - China Mobile S2-49 S2-052690 rejected 2005-11-01 TEI6 China Mobile may ask SA1 to discuss requirements 2005-06-03
0168 - B Rel-7 6.10.0 - Introduction of TRCF - - - Siemens S2-50 S2-060188 postponed 2006-01-10 FBI - 2005-06-03
0169 - C Rel-7 6.10.0 - Introduction of IBCF - - - Siemens S2-50 S2-060189 revised 2006-01-10 FBI revised in S2-060435 2005-06-03
0169 1 C Rel-7 7.0.0 7.1.0 Introduction of IBCF in 23.002 SP-31 SP-060129 approved Siemens S2-50 S2-060435 agreed 2006-01-18 FBI - 2005-06-03
0170 - F Rel-7 7.1.0 - Extension of the Mr Reference Point to the I-CSCF - - - Orange S2-52 S2-061590 postponed 2006-05-02 FBI Not handled at SA2#52 2005-06-03
0171 - B Rel-7 7.1.0 - Reference point between IBCF and AS - - - Nokia S2-53 S2-062209 revised 2006-06-20 FBI Not handled S2#53. Revised in S2-063012 2005-06-03
0171 1 B Rel-7 7.1.0 - Reference point between IBCF and AS - - - Nokia S2-54 S2-063012 postponed 2006-08-21 FBI Not handled S2#54 2005-06-03
0171 2 F Rel-7 7.1.0 - Reference point between IBCF and AS - - - Nokia S2-55 S2-063708 withdrawn 2006-10-16 FBI Postponed at S2#54. Withdrawn before S2#55 2005-06-03
0172 - B Rel-7 7.1.0 - Introducing PCC to UMTS Architecture - - - Ericsson S2-56 S2-070163 postponed 2007-01-08 PCC Not handled S2#56 2005-06-03
0172 1 F Rel-7 7.1.0 - Introducing PCC to UMTS Architecture - - - - S2-56c S2-071314 revised 2007-03-20 PCC Revised in S2-071491 2007-06-05
0172 2 F Rel-7 7.1.0 7.2.0 Introducing PCC to UMTS Architecture SP-36 SP-070390 approved S2 S2-56c S2-071491 agreed 2007-04-03 PCC Approved 2007-06-05
0173 - B Rel-8 7.1.0 - Ic and Iz reference points between IM CN subsystem networks - - - - S2-57 S2-071916 revised 2007-04-18 FBI2 Revised in IMS SWG to S2072002 2007-06-05
0173 1 B Rel-8 7.1.0 8.0.0 Ic and Iz reference points between IM CN subsystem networks SP-36 SP-070387 approved S2 S2-57 S2-072002 agreed 2007-04-24 IMS_NNI WI code changed from FBI2-TISP2 as a result of discussions under agenda item 12 at SP-36. 2007-06-05
0174 - D Rel-8 8.0.0 8.1.0 Renaming reference points between IM CN subsystem networks SP-37 SP-070543 approved S2 S2-58 S2-072547 agreed 2007-06-18 IMS-NNI - 2007-06-05
0175 - F Rel-7 7.2.0 - IMS emergency services alignment - - - - S2-59 S2-073461 revised 2007-08-21 IMS-EMER Revised in S2-073704 2007-06-05
0175 1 F Rel-7 7.2.0 - IMS emergency services alignment - - - - S2-59 S2-073704 noted 2007-08-27 IMS-EMER Merged into S2-073724 2007-06-05
0176 - A Rel-8 8.0.0 - IMS emergency services alignment - - - - S2-59 S2-073462 revised 2007-08-21 IMS-EMER Revised in S2-073705 2007-06-05
0176 1 A Rel-8 8.0.0 - IMS emergency services alignment - - - - S2-59 S2-073705 noted 2007-08-27 IMS-EMER Merged into S2-073724 2007-06-05
0177 - F Rel-7 7.2.0 - Correction of IMS interworking with CS - - - - S2-59 S2-073465 noted 2007-08-21 TEI7 Merged into S2-073724 2007-06-05
0178 - A Rel-8 8.0.0 - Correction of IMS interworking with CS - - - - S2-59 S2-073466 noted 2007-08-21 TEI7 Merged into S2-073725 2007-06-05
0179 - F Rel-7 7.2.0 7.3.0 Correction of IMS interworking with CS and IMS emergency services alignment SP-37 SP-070538 approved S2 S2-59 S2-073724 agreed 2007-08-29 TEI7 - 2007-06-05
0180 - A Rel-8 8.0.0 8.1.0 Correction of IMS interworking with CS and IMS emergency services alignment SP-37 SP-070538 approved S2 S2-59 S2-073725 agreed 2007-08-21 TEI7 - 2007-06-05
0181 - B Rel-8 8.1.0 - Network Architecture - - - - S2-60 S2-074387 postponed 2007-10-02 RED Not Handled at S2#60 2007-06-05
0182 - F Rel-7 7.3.1 7.4.0 Incorrect text on Iub specs in section 6.3.2 SP-38 SP-070806 approved S2 S2-61 S2-075283 agreed 2007-11-02 TEI7 - 2007-06-05
0183 - F Rel-8 8.1.1 - Alignement proposal of TS 23.002 with TS 23.228 - - - - S2-61 - withdrawn 2007-11-07 IMS CR number allocated in error 2007-06-05
0184 - A Rel-8 8.1.1 8.2.0 Incorrect text on Iub specs in section 6.3.2 SP-38 SP-070806 approved S2 S2-61 S2-075582 agreed 2007-11-12 TEI7 - 2007-06-05
0185 - F Rel-8 8.1.1 - Changes needed to 3GPP TS 23.002 Rel-8 - - - - S2-61 S2-075697 revised 2007-11-13 TEI8 Revised in IMS SWG to S2-075548 2007-11-13
0185 1 F Rel-8 8.1.1 - Changes needed to 3GPP TS 23.002 Rel-8 - - - - S2-61 S2-075548 revised 2007-11-15 TEI8 Revised in S2-075821 2007-11-13
0185 2 F Rel-8 8.1.1 - Changes needed to 3GPP TS 23.002 Rel-8 - - - - S2-61 S2-075821 revised 2007-11-15 TEI8 For e-mail approval. Rev 3 agreed, revised in S2-075868 2007-11-13
0185 3 F Rel-8 8.1.1 8.2.0 Changes needed to 3GPP TS 23.002 Rel-8 SP-38 SP-070814 approved S2 S2-61 S2-075868 agreed 2007-11-22 TEI8 e-mail agreed; Relates to WID in SP-070823. 2007-11-13
0186 - B Rel-8 8.2.0 - 23.002 CR0186: Deletion of IMS Architecture and configuration information - - - - S2-62 S2-080227 noted 2008-01-17 TEI8 Noted 2008-01-17
0187 - B Rel-8 8.2.0 - Creation of IMS Architecture document TS 23.002-2 - - - - S2-63 S2-081165 noted 2008-02-05 IMS_Comm_Doc CR to create 23.002-2 (IMS Part). Noted (2-part spec not created) 2008-01-17
0188 - B Rel-8 8.2.0 - Removal of IMS Architecture parts to create TS 23.002-1 - - - - S2-63 S2-081166 noted 2008-02-05 IMS_Comm_Doc CR to create 23.002-1 (non-IMS Part). Noted (2-part spec not created) 2008-01-17
0189 - B Rel-8 8.2.0 - Network Architecture enhancement on UMTS registration area definition - - - - S2-63 S2-081206 noted 2008-02-06 RED-St2 Not Handled 2008-02-06
0190 - B Rel-8 8.2.0 - Architectural Changes to support an alternative SLF mechanism - - - - S2-63 S2-081398 revised 2008-02-07 CIMS_3GPP2 Revised in IMS SWG to S2-081639 2008-02-07
0190 1 B Rel-8 8.2.0 - Architectural Changes to support an alternative SLF mechanism - - - - S2-63 S2-081639 noted 2008-02-20 CIMS_3GPP2 Noted 2008-02-20
0191 - F Rel-8 8.2.0 - SMSIP alignment in 23.002 - - - - S2-67 S2-085555 revised 2008-08-19 TEI8 Revised in S2-086220 2008-08-19
0191 1 F Rel-8 8.2.0 - SMSIP alignment in 23.002 - - - - S2-67 S2-086220 revised 2008-08-29 MESSIW Revised in S2-086350 2008-08-29
0191 2 B Rel-8 8.2.0 8.3.0 SMSIP alignment in 23.002 SP-41 SP-080578 approved S2 S2-67 S2-086350 agreed 2008-08-29 MESSIW Cover shows Cat A. 2008-08-29
0192 - B Rel-8 8.2.0 - Update of overall architecture due to SAE and other Rel-8 work - - - - S2-67 S2-085589 revised 2008-08-19 SAES Revised in S2-086222 2008-08-19
0192 1 B Rel-8 8.2.0 - Update of overall architecture due to SAE and other Rel-8 work - - - - S2-67 S2-086222 revised 2008-08-29 SAES Revised in S2-086367 2008-08-29
0192 2 B Rel-8 8.2.0 8.3.0 Update of overall architecture due to SAE and other Rel-8 work SP-41 SP-080580 approved S2 S2-67 S2-086367 agreed 2008-08-29 SAES Approved 2008-08-29
0193 - F Rel-8 8.2.0 - AS clarification for IMS CN - - - - S2-67 S2-085600 revised 2008-08-18 TEI8 Revised in IMS SWG to S2-085881 2008-08-18
0193 1 F Rel-8 8.2.0 - AS clarification for IMS CN - - - - S2-67 S2-085881 revised 2008-08-29 TEI8 Revised in IMS SWG to S2-085951 2008-08-29
0193 2 F Rel-8 8.2.0 8.3.0 AS clarification for IM CN subsystem SP-41 SP-080605 approved S2 S2-67 S2-085951 agreed 2008-08-29 TEI8 Approved 2008-08-29
0194 - F Rel-8 8.2.0 - Updating architecture to address ICS and SC - - - - S2-67 S2-085703 revised 2008-08-19 TEI8 Revised in IMS SWG to S2-085880 2008-08-19
0194 1 F Rel-8 8.2.0 - Updating architecture to address ICS and SC - - - - S2-67 S2-085880 revised 2008-08-25 TEI8 Revised in IMS SWG to S2-085888 2008-08-25
0194 2 F Rel-8 8.2.0 - Updating architecture to address ICS and SC - - - - S2-67 S2-085888 revised 2008-08-26 TEI8 Revised in IMS SWG to S2-085950 2008-08-26
0194 3 F Rel-8 8.2.0 8.3.0 IMS Centralized services and Service Continuity alignment SP-41 SP-080570 approved S2 S2-67 S2-085950 agreed 2008-08-29 ICSRA-St2 Approved 2008-08-29
0195 - F Rel-7 7.4.0 - SMSIP alignment in 23.002 - - - - S2-67 S2-086219 revised 2008-08-29 SMSIP Revised in S2-086349 2008-08-29
0195 1 F Rel-7 7.4.0 - SMSIP alignment in 23.002 - - - - S2-67 S2-086349 revised 2008-08-29 SMSIP Revised in S2-086369 2008-08-29
0195 2 F Rel-7 7.4.0 7.5.0 SMSIP alignment in 23.002 SP-41 SP-080602 approved S2 S2-67 S2-086369 agreed 2008-08-29 SMSIP Approved 2008-08-29
0196 - F Rel-7 7.5.0 - Correction for Ma reference point description - - - S2 S2-68 S2-086704 revised 2008-10-07 TEI7 Revised in IMS SWG to S2-086931 2008-10-07
0196 1 F Rel-7 7.5.0 7.6.0 Correction for Ma reference point description SP-42 SP-080833 approved S2 S2-68 S2-086931 agreed 2008-10-13 TEI7 Approved 2008-10-13
0197 - A Rel-8 8.3.0 - Correction for Ma reference point description - - - S2 S2-68 S2-086705 revised 2008-10-07 TEI7 Revised in IMS SWG to S2-086932 2008-10-07
0197 1 A Rel-8 8.3.0 8.4.0 Correction for Ma reference point description SP-42 SP-080833 approved S2 S2-68 S2-086932 agreed 2008-10-13 TEI7 Approved 2008-10-13
0198 - F Rel-8 8.3.0 8.4.0 Removal of I1 specific details SP-42 SP-080803 approved S2 S2-68 S2-086748 agreed 2008-10-07 ICSRA-St2 Approved 2008-10-07
0199 - B Rel-8 8.3.0 - Update of TS23.002 with IWLAN Mobility architectural aspects - - - S2 S2-68 S2-086896 revised 2008-10-07 IWLAN Revised in S2-087120 2008-10-07
0199 1 B Rel-8 8.3.0 8.4.0 Update of TS23.002 with IWLAN Mobility architectural aspects SP-42 SP-080810 approved S2 S2-68 S2-087120 agreed 2008-10-17 IWLAN Approved 2008-10-17
0200 - B Rel-8 8.3.0 - Media control (Cr) reference point and MRB - - - S2 S2-69 S2-087582 revised 2008-11-12 IMS_NNI Revised in parallel session to S2-087933 2008-11-12
0200 1 B Rel-8 8.3.0 8.4.0 Media control (Cr) reference point and MRB SP-42 SP-080808 approved S2 S2-69 S2-087933 agreed 2008-11-21 IMS_NNI Approved 2008-11-21
0201 - F Rel-8 8.4.0 8.5.0 Correcting usage of I3 for ICS SP-44 SP-090322 approved S2 S2-72 S2-092238 agreed 2009-05-26 ICSRA-St2 Block Approved 2009-05-26
0202 - F Rel-9 8.4.0 - Stage 2 alignment of E-CSCF - AS interface - - - S2 S2-73 S2-093234 revised 2009-05-26 IMS_EMER_GPRS_EPS-SRVCC Alignment CR Revised to S2-093746 2009-05-26
0202 1 F Rel-9 8.4.0 9.0.0 Stage 2 alignment of E-CSCF - AS interface SP-44 SP-090353 approved S2 S2-73 S2-093746 agreed 2009-05-26 IMS_EMER_GPRS_EPS-SRVCC Agreed in IMS SWG 2009-05-26
0203 - F Rel-8 8.4.0 - Update the misalignment in 23.002 related with SRVCC and CSFB - - - S2 S2-73 S2-093305 revised 2009-05-26 TEI8 TEI-8 -> TEI8. Revised to S2-093938 2009-05-26
0203 1 F Rel-8 8.4.0 8.5.0 Update the misalignment in 23.002 related with SRVCC and CSFB SP-44 SP-090345 approved S2 S2-73 S2-093938 agreed 2009-05-26 TEI8 This CR was approved 2009-05-26
0204 - B Rel-9 8.4.0 - Introduction of the H(e)NB architecture into 3GPP TS 23.002 - - - S2 S2-73 S2-093321 revised 2009-05-26 EHNB The CR was revised off-line in S2-093957 2009-05-26
0204 1 B Rel-9 8.4.0 - Introduction of the H(e)NB architecture into 3GPP TS 23.002 - - - S2 S2-73 S2-093957 revised 2009-05-26 EHNB Revised in S2-094153 2009-05-26
0204 2 B Rel-9 8.4.0 - Introduction of the H(e)NB architecture into 3GPP TS 23.002 - - - S2 S2-73 S2-094153 revised 2009-05-26 EHNB The CR was revised accordingly in S2-094205 2009-05-26
0204 3 B Rel-9 8.4.0 9.0.0 Introduction of the H(e)NB architecture into 3GPP TS 23.002 SP-44 SP-090346 approved S2 S2-73 S2-094205 agreed 2009-05-26 EHNB This CR was approved 2009-05-26
0205 - B Rel-9 8.4.0 - Add I1 interface for ICS - - - S2 S2-73 S2-093550 revised 2009-05-26 IMS_SCC-ICS No WI Code! Revised to S2-093712 2009-05-26
0205 1 B Rel-9 8.4.0 - Add I1 interface for ICS - - - S2 S2-73 S2-093712 revised 2009-05-26 IMS_SCC-ICS IMS SWG revision of S2-093550. No WI Code ! Revised to S2-093781 2009-05-26
0205 2 B Rel-9 8.4.0 9.0.0 Add I1 interface for ICS SP-44 SP-090349 approved S2 S2-73 S2-093781 agreed 2009-05-26 IMS_SCC-ICS Agreed in IMS SWG 2009-05-26
0206 - F Rel-9 9.0.0 9.1.0 Clarification about 3GDT for Home NB subsystem SP-45 SP-090597 approved S2 74 S2-094308 agreed 2009-07-10 EHNB This CR was approved 2009-09-17
0207 - F Rel-9 9.0.0 - Remove obsolete note on Mm reference point - - - S2 75 S2-095197 revised 2009-09-04 TEI9 Revised to S2-095606 2009-09-17
0207 1 A Rel-9 9.0.0 9.1.0 Remove obsolete note on Mm reference point SP-45 SP-090596 approved S2 75 S2-095606 agreed 2009-09-04 TEI8 Agreed in IMS SWG 2009-09-17
0208 - F Rel-6 6.10.0 - Addition of reference point for session control - - - S2 75 S2-095207 noted 2009-09-04 IMS2 Noted in IMS SWG 2009-09-17
0209 - A Rel-7 7.6.0 - Addition of reference point for session control - - - S2 75 S2-095208 noted 2009-09-04 IMS2 Noted in IMS SWG 2009-09-17
0210 - F Rel-8 8.5.0 - Addition of session control to reference point - - - S2 75 S2-095209 noted 2009-09-04 TEI8 Noted in IMS SWG 2009-09-17
0211 - A Rel-9 9.0.0 - Addition of session control to reference point - - - S2 75 S2-095210 noted 2009-09-04 TEI8 Noted in IMS SWG 2009-09-17
0212 - F Rel-9 9.0.0 9.1.0 Renaming of E-SCC AS to EATF SP-45 SP-090600 approved S2 75 S2-095411 agreed 2009-09-04 IMS_EMER_GPRS_EPS-SRVCC Agreed in IMS SWG 2009-09-17
0213 - F Rel-8 8.5.0 - Correction for Sv and S102 interface - - - S2 75 S2-095552 noted 2009-09-04 SAES-SRVCC Not Handled 2009-09-17
0214 - A Rel-9 9.0.0 - Correction for Sv and S102 interface - - - S2 75 S2-095553 noted 2009-09-04 SAES-SRVCC Not Handled 2009-09-17
0214 1 F Rel-9 9.1.0 9.2.0 correction for Sv and S102 interface_r9 SP-46 SP-090794 approved S2 S2-75E S2-096196 agreed 2009-11-17 TEI9 APPROVED 2009-11-26
0215 - F Rel-8 8.5.0 8.6.0 Remove obsolete note on Mm reference point SP-45 SP-090596 approved S2 75 S2-095701 agreed 2009-09-04 TEI8 Agreed in IMS SWG 2009-09-17
0216 - B Rel-9 9.1.0 - Reference Point between MRFC and AS - - - S2 S2-76 S2-096538 Revised 2009-11-17 TEI9 LATE DOC: Rx 12/11, 12:10 Revised to S2-097098 2009-11-26
0216 1 B Rel-9 9.1.0 9.2.0 Reference Point between MRFC and AS SP-46 SP-090794 approved S2 S2-76 S2-097098 agreed 2009-11-17 TEI9 This CR was approved 2009-11-26
0217 - F Rel-9 9.1.0 9.2.0 Include the Operator CSG list in the Uh reference point SP-46 SP-090787 approved S2 S2-76 S2-096715 agreed 2009-11-17 EHNB This CR was approved 2009-11-26
0218 - F Rel-9 9.1.0 9.2.0 IMS emergency session continuity related architecture update SP-46 SP-090790 approved S2 S2-76 S2-097047 agreed 2009-11-17 IMS_EMER_GPRS_EPS-SRVCC Agreed in IMS SWG 2009-11-26
0219 - F Rel-9 9.2.0 - BSC - CBC Cell Broadcast interface: alignment with stage 3 specifications - - - - S2-79 S2-102456 revised 2010-05-03 TEI9 Revised in parallel session in S2-102830 2010-03-05
0219 1 F Rel-9 9.2.0 9.3.0 BSC - CBC Cell Broadcast interface: alignment with stage 3 specifications SP-48 SP-100326 approved S2 S2-79 S2-102830 agreed 2010-05-14 TEI9 Agreed 2010-05-14
0220 - B Rel-9 9.2.0 - Reference to UDC architecture - - - - S2-79 S2-102471 revised 2010-05-03 UDC-CN Revised in parallel session in S2-102831 2010-03-05
0220 1 B Rel-9 9.2.0 9.3.0 Reference to UDC architecture SP-48 SP-100319 approved S2 S2-79 S2-102831 agreed 2010-05-12 UDC-CN Agreed 2010-12-05
0221 - F Rel-9 9.2.0 - Add E-UTRAN CP LCS support - - - - S2-79 S2-102521 revised 2010-05-04 LCS_EPS-CPS Revised in parallel session in S2-102832 2010-04-05
0221 1 F Rel-9 9.2.0 9.3.0 Add E-UTRAN CP LCS support SP-48 SP-100323 approved S2 S2-79 S2-102832 agreed 2010-05-14 LCS_EPS-CPS Agreed 2010-05-14
0222 - B Rel-10 9.3.0 - Addition of GTP based S2b in 3GPP Network Architecture - - - - S2-80 S2-103322 Revised 2010-08-18 SMOG Revised 2010-08-18
0222 1 B Rel-10 9.3.0 10.0.0 Addition of GTP based S2b in 3GPP Network Architecture SP-49 SP-100555 approved S2 S2-80 S2-104120 Agreed 2010-08-30 SMOG - 2010-08-30
0223 - F Rel-10 9.3.0 10.0.0 Updates to IM Subsystem figure for E-CSCF and IBCF SP-49 SP-100557 approved S2 S2-80 S2-103531 Agreed 2010-08-21 PEST SP-50: WI code changed from TEI10 to PEST 2010-08-21
0224 - F Rel-9 9.3.0 9.4.0 Clarification of I2 definition SP-49 SP-100540 approved S2 S2-80 S2-103693 Agreed 2010-08-23 IMS_SCC-SPI - 2010-08-23
0225 - B Rel-10 9.3.0 10.0.0 Architecture update of SRVCC architecture enhanced with ATCF SP-49 SP-100557 approved S2 S2-80 S2-103710 Agreed 2010-08-23 PEST SP-50: WI code changed from TEI10 to PEST 2010-08-23
0226 - B Rel-9 9.3.0 - Addition of Mr' Reference Point - - - - S2-80 S2-103821 Revised 2010-08-24 TEI9 Revised 2010-08-24
0226 1 B Rel-9 9.3.0 - Addition of Mr' Reference Point - - - - S2-80 S2-103994 Revised 2010-08-27 TEI9 Revised 2010-08-27
0226 2 B Rel-9 9.3.0 9.4.0 Addition of Mr' Reference Point SP-49 SP-100540 approved S2 S2-80 S2-103873 Agreed 2010-08-31 TEI9 - 2010-08-31
0227 - B Rel-10 9.3.0 - Introducing Ud interface between UDR and PCRF - - - - S2-80 S2-103841 Revised 2010-08-24 TEI10 Revised 2010-08-24
0227 1 B Rel-10 9.3.0 10.0.0 Introducing Ud interface between UDR and PCRF SP-49 SP-100557 approved S2 S2-80 S2-104024 Agreed 2010-08-31 PEST SP-50: WI code changed from TEI10 to PEST 2010-08-31
0228 - F Rel-10 10.0.0 - Correction on the protocol of S2b interface - - - S2 S2-81 S2-104865 revised 2010-10-06 TEI10 Not Handled. Revised at S2-82 in S2-105663 2010-11-25
0228 1 F Rel-10 10.0.0 - Correction on the protocol of S2b interface - - - S2 S2-82 S2-105663 - 2010-11-09 TEI10 Not Handled 2010-11-25
0228 2 F Rel-10 10.1.1 10.2.0 Correction on the reference of S2b interface SP-51 SP-110075 approved S2 S2-82E S2-110042 Agreed 2011-01-12 TEI10 Agreed 2011-01-12
0229 - F Rel-8 8.6.0 8.7.0 Correction of MGCF definition to make it consistent with TS 29.235 SP-50 SP-100674 approved S2 S2-81 S2-104920 agreed 2010-10-06 TEI8 Agreed in IMS SWG. Block Approved. 2010-11-25
0230 - A Rel-9 9.4.0 9.5.0 Correction of MGCF definition to make it consistent with TS 29.235 SP-50 SP-100674 approved S2 S2-81 S2-104921 agreed 2010-10-06 TEI8 Agreed in IMS SWG. Block Approved 2010-11-25
0231 - A Rel-10 10.0.0 10.1.0 Correction of MGCF definition to make it consistent with TS 29.235 SP-50 SP-100674 approved S2 S2-81 S2-104922 agreed 2010-10-06 TEI8 Agreed in IMS SWG. Block Approved 2010-11-25
0232 - B Rel-10 10.1.1 10.2.0 Add LIPA_SIPTO in 23002 SP-51 SP-110070 approved S2 S2-83 S2-110428 Agreed 2011-02-12 LIPA_SIPTO Agreed 2011-02-12
0233 - F Rel-9 9.5.0 - I2 23.002 clarifications - - - - S2-83 S2-110609 Noted 2011-02-14 IMS_SCC-ICS Noted 2011-02-14
0234 - A Rel-9 9.5.0 - I2 23.002 clarifications - mirror - - - - S2-83 S2-110610 Noted 2011-02-14 IMS_SCC-ICS Noted 2011-02-14
0235 - F Rel-9 9.5.0 - Use of Mg and Mj clarified - - - - S2-84 S2-111715 Revised 2011-04-05 IMS_SCC-ICS Revised 2011-05-04
0235 1 F Rel-9 9.5.0 - Use of Mg and Mj clarified - - - - S2-84 S2-111851 Withdrawn 2011-04-13 IMS_SCC-ICS Withdrawn 2011-04-13
0236 - A Rel-10 10.2.0 - Use of Mg and Mj clarified - - - - S2-84 S2-111716 Revised 2011-04-05 IMS_SCC-ICS Revised 2011-05-04
0236 1 A Rel-10 10.2.0 - Use of Mg and Mj clarified - - - - S2-84 S2-111852 Withdrawn 2011-04-13 IMS_SCC-ICS Withdrawn 2011-04-13
0237 - F Rel-9 9.5.0 - Correcting the definition of I2 - - - - S2-86 S2-113011 Revised 2011-07-01 TEI9 Revised 2011-01-07
0237 1 F Rel-9 9.5.0 - Correcting the definition of I2 - - - - S2-86 S2-113465 Revised 2011-07-13 TEI9 Revised 2011-07-13
0237 2 F Rel-9 9.5.0 9.6.0 Correcting the definition of I2 SP-53 SP-110456 approved S2 S2-86 S2-113486 Agreed 2011-07-14 TEI9 Agreed 2011-07-14
0238 - A Rel-10 10.2.0 - Correcting the definition of I2 - - - - S2-86 S2-113012 Revised 2011-07-01 TEI9 Revised 2011-01-07
0238 1 A Rel-10 10.2.0 - Correcting the definition of I2 - - - - S2-86 S2-113466 Revised 2011-07-13 TEI9 Revised 2011-07-13
0238 2 A Rel-10 10.2.0 10.3.0 Correcting the definition of I2 SP-53 SP-110456 approved S2 S2-86 S2-113487 Agreed 2011-07-14 TEI9 Agreed 2011-07-14
0239 - F Rel-10 10.2.0 - MBMS support in EPS - - - - S2-86 S2-113184 Revised 2011-07-04 TEI10 Revised 2011-04-07
0239 1 F Rel-10 10.2.0 10.3.0 MBMS support in EPS SP-53 SP-110460 approved S2 S2-86 S2-113722 Agreed 2011-07-15 TEI10 Agreed 2011-07-15
0240 - B Rel-11 10.2.0 - Introduction of the CSG Subscriber Server entity and interfaces - - - - S2-86 S2-113189 Revised 2011-07-04 VCSG Revised 2011-04-07
0240 1 B Rel-11 10.2.0 - Introduction of the CSG Subscriber Server entity and interfaces - - - - S2-86 S2-113549 Revised 2011-07-11 VCSG Revised 2011-11-07
0240 2 B Rel-11 10.2.0 11.0.0 Introduction of the CSG Subscriber Server entity and interfaces SP-53 SP-110468 approved S2 S2-86 S2-113820 Agreed 2011-07-15 VCSG Agreed 2011-07-15
0241 - B Rel-11 11.0.0 - Normative documentation for SIMTC and MT-SMS Triggering - - - - S2-87 S2-114033 - 2011-09-29 SIMTC-Reach Not Handled 2011-09-29
0242 - F Rel-11 11.0.0 - Clarification on GUP data repository's role as logical function in the HSS - - - - S2-87 S2-114062 Revised 2011-09-30 TEI11 Not Handled. Revised at S2-88 in S2-115134 2011-09-30
0242 1 F Rel-11 11.0.0 - Clarification on GUP data repository's role as logical function in the HSS - - - - S2-88 S2-115134 - 2011-11-07 TEI11 Postpone to e-meeting S2-88E. Not Handled 2011-11-07
0242 2 F Rel-11 11.1.0 11.2.0 Clarification on GUP data repository's role as logical function in the HSS SP-55 SP-120087 approved S2 S2-88E S2-120133 Agreed 2012-01-09 TEI11 Approved 2012-01-09
0243 - F Rel-10 10.3.0 10.4.0 Adding missing ACTF to IMS entities clause SP-54 SP-110737 approved S2 S2-88 S2-115009 Agreed 2011-11-06 TEI10 Agreed in IMS Sessions. This CR was agreed 2011-11-06
0244 - A Rel-11 11.0.0 11.1.0 Adding missing ACTF to IMS entities clause SP-54 SP-110737 approved S2 S2-88 S2-115021 Agreed 2011-11-06 TEI10 Agreed in IMS Sessions. This CR was agreed 2011-11-06
0245 - F Rel-11 11.1.0 11.2.0 Editorial and reference corrections to 23.002 SP-55 SP-120087 approved S2 S2-88E S2-120054 Agreed 2012-01-04 TEI11 Approved 2012-01-04
0246 - B Rel-11 11.1.0 11.2.0 Clarifications for SaMOG in 23.002 SP-55 SP-120085 approved S2 S2-89 S2-120565 Agreed 2012-01-30 SaMOG_WLAN This CR was agreed 2012-01-30
0247 - F Rel-11 11.2.0 - Corrections related to SAPP introduction in the Network Architecture specification - - - - S2-90 S2-121232 Revised 2012-04-05 SAPP Revised to S2-121700. 2012-04-05
0247 1 F Rel-11 11.2.0 11.3.0 Corrections related to SAPP introduction in the Network Architecture specification SP-56 SP-120244 approved S2 S2-90 S2-121700 Agreed 2012-04-18 SAPP Agreed in parallel sessions. This CR was agreed 2012-04-18
0248 - F Rel-11 11.2.0 - Corrections related to QoS_SSL introduction in the Network Architecture specification - - - - S2-90 S2-121234 Revised 2012-04-05 QoS_SSL Revised to S2-121701. 2012-04-05
0248 1 F Rel-11 11.2.0 11.3.0 Corrections related to QoS_SSL introduction in the Network Architecture specification SP-56 SP-120238 approved S2 S2-90 S2-121701 Agreed 2012-04-18 QoS_SSL Agreed in parallel sessions. This CR was agreed 2012-04-18
0249 - F Rel-12 11.2.0 - 23002-b20 CR for BBAI - - - - S2-90 S2-121356 - 2012-04-10 BBAI Improve CR title!. Not Handled 2012-04-10
0250 - F Rel-11 11.2.0 - Introduction of CS to PS SRVCC architecture - - - - S2-90 S2-121407 Revised 2012-04-10 rSRVCC Revised to S2-121748. 2012-04-10
0250 1 B Rel-11 11.2.0 11.3.0 Introduction of CS to PS SRVCC architecture SP-56 SP-120248 approved S2 S2-90 S2-121748 Agreed 2012-04-18 rSRVCC This CR was agreed 2012-04-18
0251 - F Rel-11 11.2.0 - BBAI update for architecture, entity and interface function - - - - S2-91 S2-122117 Revised 2012-05-14 BBAI Revised to S2-122424. 2012-05-14
0251 1 F Rel-11 11.2.0 - BBAI update for architecture, entity and interface function - - - - S2-91 S2-122424 Revised 2012-05-24 BBAI Revised to S2-122439. 2012-05-24
0251 2 F Rel-11 11.2.0 - BBAI update for architecture, entity and interface function - - - - S2-91 S2-122439 Revised 2012-05-24 BBAI Revised to S2-122596. 2012-05-24
0251 3 F Rel-11 11.2.0 11.3.0 BBAI update for architecture, entity and interface function SP-56 SP-120241 approved S2 S2-91 S2-122596 Agreed 2012-05-25 BBAI This CR was agreed 2012-05-25
0252 - F Rel-12 11.3.0 12.0.0 Correction to the IMS architecture diagram: Addition of missing Mm interface between I-CSCF and IP Multimedia Networks SP-57 SP-120487 approved S2 S2-92 S2-122814 Agreed 2012-07-02 TEI12 IMS TEI12 is not on the agenda - open this only if time permits. Agreed in IMS Sessions. This CR was agreed 2012-07-02
0253 - B Rel-11 11.3.0 - SIMTC update for architecture, entities and interfaces - - - - S2-92 S2-122939 Revised 2012-07-02 SIMTC-Reach Revised to S2-123108. 2012-07-02
0253 1 B Rel-11 11.3.0 11.4.0 SIMTC update for architecture, entities and interfaces SP-57 SP-120482 approved S2 S2-92 S2-123108 Agreed 2012-07-09 SIMTC-Reach This CR was agreed. 2012-07-09
0254 - F Rel-11 11.3.0 - Reference list correction to align with the corrected TS 29.212 title SP-57 SP-120474 revised Allot Communications, Vodafone, Juniper Networks - - - 2012-08-14 TEI11 - 2012-08-14
0254 1 F Rel-11 11.3.0 11.4.0 Reference list correction to align with the corrected TS 29.212 title SP-57 SP-120627 approved Allot Communications, Vodafone, Juniper Networks - - - 2012-09-06 TEI11 - 2012-09-09
0255 - F Rel-11 11.4.0 - Clarifying that MSC Server assisted mid-call feature does not imply I2 interface - - - - S2-93 S2-123676 Revised 2012-09-29 TEI11 Revised to S2-123931. 2012-09-29
0255 1 A Rel-11 11.4.0 11.5.0 Clarifying that MSC Server assisted mid-call feature does not imply I2 interface SP-58 SP-120714 approved S2 S2-93 S2-123931 Agreed 2012-10-10 TEI10 Agreed in IMS Sessions. This CR was agreed 2012-10-10
0256 - A Rel-12 12.0.0 - Clarifying that MSC Server assisted mid-call feature does not imply I2 interface - - - - S2-93 S2-123677 Revised 2012-09-29 TEI11 Revised to S2-123932. 2012-09-29
0256 1 A Rel-12 12.0.0 12.1.0 Clarifying that MSC Server assisted mid-call feature does not imply I2 interface SP-58 SP-120714 approved S2 S2-93 S2-123932 Agreed 2012-10-11 TEI10 Agreed in IMS Sessions. This CR was agreed 2012-10-11
0257 - F Rel-10 10.4.0 10.5.0 Clarifying that MSC Server assisted mid-call feature does not imply I2 interface SP-58 SP-120714 approved S2 S2-93 S2-123930 Agreed 2012-10-10 TEI10 Agreed in IMS Sessions. This CR was agreed 2012-10-10
0258 - F Rel-10 10.4.0 - Adding the missing ATGW to IMS entities description subclause - - - - S2-94 S2-124570 Noted 2012-11-06 TEI10 Noted in IMS Sessions 2012-11-06
0259 - A Rel-11 11.4.0 - Adding the missing ATGW to IMS entities description subclause - - - - S2-94 S2-124571 Revised 2012-11-06 TEI10 Revised to S2-124599. 2012-11-06
0259 1 F Rel-11 11.4.0 11.5.0 Adding the missing ATGW to IMS entities description subclause SP-58 SP-120726 approved S2 S2-94 S2-124599 Agreed 2012-11-12 TEI11 Agreed in IMS Sessions. This CR was agreed 2012-11-12
0260 - A Rel-12 12.0.0 12.1.0 Adding the missing ATGW to IMS entities description subclause SP-58 SP-120881 approved ZTE - - - 2012-11-29 TEI11 23.002 CR0260 (missing mirror CR to 23.002 CR0259R1 in SP-120726) 2012-11-29
0261 - F Rel-11 11.5.0 - Clarification on the reference of SGd and S6c - - - - S2-95 S2-130090 - 2013-01-18 SIMTC-Reach Not Handled 2013-01-18
0261 1 F Rel-11 11.5.0 - Clarification on the reference of SGd and S6c - - - - S2-96 S2-131016 Revised 2013-04-01 SIMTC-Reach Revised to S2-131278. 2013-04-01
0261 2 F Rel-11 11.5.0 - Clarification on the reference of SGd and S6c SP-60 SP-130216 reissued S2 S2-96 S2-131278 Agreed 2013-04-10 SIMTC-Reach Agreed in parallel sessions. This CR was agreed 2013-04-10
0261 2 F Rel-11 11.5.0 11.6.0 Clarification on the reference of SGd and S6c SP-60 SP-130305 approved S2 - S2-131278 - 2013-06-04 SIMTC-Reach - 2013-06-17
0262 - A Rel-12 12.1.0 - Clarification on the reference of SGd and S6c - - - - S2-95 S2-130091 - 2013-01-18 SIMTC-Reach Not Handled 2013-01-18
0262 1 A Rel-12 12.1.0 - Clarification on the reference of SGd and S6c - - - - S2-96 S2-131017 Revised 2013-04-01 SIMTC-Reach Revised to S2-131279. 2013-04-01
0262 2 A Rel-12 12.1.0 - Clarification on the reference of SGd and S6c SP-60 SP-130216 reissued S2 S2-96 S2-131279 Agreed 2013-04-10 SIMTC-Reach Agreed in parallel sessions. This CR was agreed 2013-04-10
0262 2 A Rel-12 12.1.0 12.2.0 Clarification on the reference of SGd and S6c SP-60 SP-130305 approved S2 - S2-131279 - 2013-06-04 SIMTC-Reach - 2013-06-17
0263 - B Rel-12 12.1.0 - Adding SIPTO at the Local Network - - - - S2-96 S2-131018 Revised 2013-04-01 LIMONET Revised to S2-131271. 2013-04-01
0263 1 B Rel-12 12.1.0 - Adding SIPTO at the Local Network - - - - S2-96 S2-131271 Revised 2013-04-10 LIMONET Revised to S2-131516. 2013-04-10
0263 2 B Rel-12 12.1.0 - Adding SIPTO at the Local Network SP-60 SP-130226 reissued S2 S2-96 S2-131516 Agreed 2013-04-12 LIMONET This CR was agreed 2013-04-12
0263 2 B Rel-12 12.1.0 12.2.0 Adding SIPTO at the Local Network SP-60 SP-130310 approved S2 - S2-131516 - 2013-06-04 LIMONET - 2013-06-17
0264 - B Rel-12 12.1.0 - Introduction of Gyn/Gzn interfaces to the specification - - - - S2-97 S2-131603 Revised 2013-05-13 ABC Revised to S2-131808. 2013-05-13
0264 1 B Rel-12 12.1.0 - Introduction of Gyn/Gzn interfaces to the specification - - - - S2-97 S2-131808 Revised 2013-05-20 ABC Revised to S2-132037. 2013-05-20
0264 2 B Rel-12 12.1.0 12.2.0 Introduction of Gyn/Gzn interfaces to the specification SP-60 SP-130230 approved S2 S2-97 S2-132037 Agreed 2013-05-29 ABC This CR was agreed 2013-05-29
0265 - F Rel-11 11.5.0 - Correction of home routed access PCC architecture SP-60 SP-130219 reissued S2 S2-97 S2-132036 Agreed 2013-05-29 SAPP This CR was agreed 2013-05-29
0265 - F Rel-11 11.5.0 11.6.0 Correction of home routed access PCC architecture SP-60 SP-130307 approved S2 - S2-132036 - 2013-05-29 SAPP - 2013-06-17
0266 - B Rel-12 12.2.0 - Add New Interface Description between MME and HRPD AN - - - - S2-98 S2-132503 Withdrawn 2013-07-08 LTE_HRPD_SON WITHDRAWN 2013-07-08

page generated from database: 2013-10-16 10:33:14