Go to spec numbering scheme page
3GPP Specification Change Request records for: 23.007
CR no. | rev | cat | Release | CR written to vers | new vers | CR title | TSG meeting | TSG doc | TSG status | source | WG meeting | WG doc | WG status | cover date | work item | remarks | database record created |
0001 | - | F | R99 | 3.0.0 | 3.1.0 | GPRS restoration procedures | NP-04 | N2-99620 | approved | N2B | - | - | agreed | 1999-06-28 | - | approved via corresp (28/6/99) | - |
0002 | 2 | B | R99 | 3.1.3 | 3.2.0 | Authentication procedure | NP-06 | NP-99498 | approved | N2 | N2-12 | N2-99H72 | - | 1999-12-15 | Security | - | - |
0003 | - | B | R99 | 3.1.3 | 3.2.0 | Support of VLR and HLR Data Restoration procedures with LCS | NP-06 | NP-99494 | approved | N2 | N2-12 | N2-99H89 | - | 1999-12-15 | LCS | - | - |
0004 | - | F | R99 | 3.2.0 | 3.3.0 | Support of VLR and HLR Data Restoration procedures with LCS | NP-07 | NP-000071 | approved | N2 | - | N2B000019 | - | 2000-03-31 | LCS | - | - |
0005 | - | F | R99 | 3.3.0 | 3.4.0 | Clarifications on GSM vs. UMTS specific parts | NP-08 | NP-000296 | approved | N4 | - | N4-000052 | - | 2000-06-27 | LCS | - | - |
0006 | - | F | R99 | 3.4.0 | 3.5.0 | Removal of an optional IMSI paging after SGSN restart | NP-16 | NP-020258 | approved | N4 | N4-14 | N4-020670 | agreed | 2002-05-24 | TEI | - | - |
0007 | - | A | Rel-4 | 4.0.0 | 4.1.0 | Removal of an optional IMSI paging after SGSN restart | NP-16 | NP-020258 | approved | N4 | N4-14 | N4-020672 | agreed | 2002-05-24 | TEI | - | - |
0008 | 3 | C | Rel-6 | 5.1.0 | 6.0.0 | Change of Restart Counter definition for enhanced GTP | NP-23 | NP-040060 | approved | N4 | N4-22 | N4-040317 | agreed | 2004-02-19 | GTP_enhancement | - | 2004-03-05 |
0009 | - | F | R99 | 3.5.0 | 3.6.0 | Restoration of data in RA update | NP-22 | NP-030497 | approved | N4 | N4-21 | N4-031323 | Agreed | 2003-12-10 | GPRS | - | 2004-01-05 |
0010 | - | A | Rel-4 | 4.1.1 | 4.2.0 | Restoration of data in RA update | NP-22 | NP-030497 | approved | N4 | N4-21 | N4-031324 | Agreed | 2003-12-10 | GPRS | - | 2004-01-05 |
0011 | - | A | Rel-5 | 5.0.0 | 5.1.0 | Restoration of data in RA update | NP-22 | NP-030497 | approved | N4 | N4-21 | N4-031325 | Agreed | 2003-12-10 | GPRS | - | 2004-01-05 |
0012 | - | F | Rel-6 | 6.0.0 | 6.1.0 | Error Indication during an ongoing MBMS data transfer | NP-25 | NP-040402 | approved | N4 | N4-24 | N4-040994 | agreed | 2004-08-04 | MBMS | - | 2004-09-03 |
0013 | - | F | Rel-6 | 6.0.0 | 6.1.0 | Restoration of GSNs in MBMS | NP-25 | NP-040402 | approved | N4 | N4-24 | N4-040996 | agreed | 2004-08-04 | MBMS | - | 2004-09-03 |
0014 | - | F | Rel-6 | 6.1.0 | - | Incorrect References | CP-30 | CP-050621 | withdrawn | C4 | C4-29 | C4-051457 | AGREED | 2005-10-18 | TEI6 | - | 2005-11-29 |
0014 | - | F | Rel-6 | 6.1.0 | 6.2.0 | Incorrect References | CP-30 | CP-050665 | approved | Lucent Tec | - | C4-051457 | - | 2005-10-19 | TEI6 | - | 2005-11-30 |
0015 | - | F | R99 | 3.6.0 | - | Correction for Usage of Cancel Location for Supercharger | - | - | - | C4 | C4-31 | C4-060634 | Withdrawn | 2006-05-24 | TEI | - | 2006-05-31 |
0016 | - | A | Rel-4 | 4.2.0 | - | Correction for Usage of Cancel Location for Supercharger | - | - | - | C4 | C4-31 | C4-060635 | Withdrawn | 2006-05-24 | TEI | - | 2006-05-31 |
0017 | - | A | Rel-5 | 5.1.0 | - | Correction for Usage of Cancel Location for Supercharger | - | - | - | C4 | C4-31 | C4-060636 | Withdrawn | 2006-05-24 | TEI | - | 2006-05-31 |
0018 | - | A | Rel-6 | 6.2.0 | - | Correction for Usage of Cancel Location for Supercharger | - | - | - | C4 | C4-31 | C4-060637 | Revised | 2006-05-24 | TEI | - | 2006-05-31 |
0019 | - | - | Rel-7 | - | - | Correction for Usage of Cancel Location for Supercharger | - | - | - | C4 | C4-31 | C4-060751 | Revised | 2006-05-24 | TEI7 | - | 2006-05-31 |
0019 | 1 | F | Rel-7 | 6.2.0 | 7.0.0 | Correction for Usage of Cancel Location for Supercharger | CP-32 | CP-060312 | approved | C4 | C4-31 | C4-060836 | Agreed | 2006-05-24 | TEI7 | - | 2006-05-31 |
0020 | - | B | Rel-8 | - | - | EPS Restoration | - | - | - | C4 | C4-39 | C4-081111 | Revised | 2008-05-23 | SAES | - | 2008-05-23 |
0020 | 1 | B | Rel-8 | - | - | EPS Restoration | - | - | - | C4 | C4-39 | C4-081282 | Revised | 2008-05-23 | SAES | - | 2008-05-23 |
0020 | 2 | B | Rel-8 | 7.0.0 | 8.0.0 | EPS Restoration | CP-40 | CP-080260 | approved | C4 | C4-39 | C4-081291 | Agreed | 2008-05-23 | SAES | - | 2008-05-23 |
0021 | - | B | Rel-8 | .. | - | Restoration procedures for SGW and PGW | - | - | - | C4 | C4-39b | C4-081721 | Revised | 2008-05-09 | TEI8 | - | 2008-09-08 |
0021 | 1 | B | Rel-8 | .. | - | Restoration procedures for SGW and PGW | - | - | - | C4 | C4-39b | C4-081896 | Postponed | 2008-05-09 | TEI8 | - | 2008-09-08 |
0021 | 1 | B | Rel-8 | 8.0.0 | - | Restoration procedures for SGW and PGW | - | - | - | C4 | C4-40 | C4-082071 | Revised | 2008-05-09 | TEI8 | - | 2008-09-08 |
0021 | 2 | B | Rel-8 | 8.0.0 | 8.1.0 | Restoration procedures for SGW and PGW | CP-41 | CP-080458 | approved | C4 | C4-40 | C4-082331 | Agreed | 2008-05-09 | TEI8 | - | 2008-09-08 |
0022 | - | B | Rel-8 | 8.0.0 | - | Node Restart Restoration Procedures for PGW, SGW and MME | - | - | - | C4 | C4-40 | C4-082029 | Revised | 2008-05-09 | SAES | - | 2008-09-08 |
0022 | 1 | B | Rel-8 | 8.0.0 | - | Node Restart Restoration Procedures for PGW, SGW and MME | - | - | - | C4 | C4-40 | C4-082330 | Revised | 2008-05-09 | SAES | - | 2008-09-08 |
0022 | 2 | B | Rel-8 | 8.0.0 | 8.1.0 | Node Restart Restoration Procedures for PGW, SGW and MME | CP-41 | CP-080458 | approved | C4 | C4-40 | C4-082559 | Agreed | 2008-05-09 | SAES | - | 2008-09-08 |
0023 | - | B | Rel-8 | 8.0.0 | - | Partial Node Fault Restoration Procedures for PGW, SGW and MME | - | - | - | C4 | C4-40 | C4-082030 | Withdrawn | 2008-05-09 | SAES | - | 2008-09-08 |
0024 | - | F | Rel-8 | 8.0.0 | - | Setting ""Location Info not Confirmed in HLR"" on receipt of MAP Send Identification | - | - | - | C4 | C4-40 | C4-082035 | Revised | 2008-05-09 | TEI8 | - | 2008-09-08 |
0025 | - | B | Rel-8 | 8.0.0 | - | MME, SGW, PGW Restoration including partial restart | - | - | - | C4 | C4-40 | C4-082328 | - | 2008-05-09 | SAES | - | 2008-09-08 |
0026 | - | B | Rel-8 | 8.0.0 | - | Partial Node Fault Restoration Procedures for PGW, SGW and MME | - | - | - | C4 | C4-40b | C4-082602 | Postponed | 2008-12-02 | SAES | - | 2008-12-03 |
0027 | - | F | Rel-8 | 8.1.0 | - | RNC failure aligns with TS23.060 | - | - | - | C4 | C4-40b | C4-082794 | Revised | 2008-12-02 | SAES | - | 2008-12-03 |
0027 | 1 | F | Rel-8 | 8.1.0 | - | RNC failure aligns with TS23.060 | - | - | - | C4 | C4-40b | C4-083016 | Revised | 2008-12-02 | SAES | - | 2008-12-03 |
0027 | 2 | F | Rel-8 | 8.1.0 | 8.2.0 | RNC failure aligns with TS23.060 | CP-42 | CP-080687 | approved | C4 | C4-40b | C4-083165 | Agreed | 2008-12-02 | SAES | - | 2008-12-03 |
0028 | - | B | Rel-8 | 8.1.0 | 8.2.0 | Restoration procedures for SGs interface | CP-42 | CP-080700 | approved | C4 | C4-40b | C4-082808 | Agreed | 2008-12-02 | CSFB | - | 2008-12-03 |
0029 | - | B | Rel-8 | 8.1.0 | - | Partial Node Failure in EPS | - | - | - | C4 | C4-40b | C4-082830 | Postponed | 2008-12-02 | SAES | - | 2008-12-03 |
0030 | - | - | Rel-8 | 8.1.0 | - | Moving the description of the restoration procedures (from 29.274) to 23.007 | - | - | - | C4 | C4-40b | C4-082867 | Revised | 2008-12-02 | TEI8 | - | 2008-12-03 |
0030 | 1 | - | Rel-8 | 8.1.0 | - | Moving the description of the restoration procedures (from 29.274) to 23.007 | - | - | - | C4 | C4-40b | C4-083190 | Postponed | 2008-12-02 | TEI8 | - | 2008-12-03 |
0030 | 1 | F | Rel-8 | 8.1.0 | - | Moving the description of the restoration procedures (from 29.281) to 23.007 | - | - | - | C4 | C4-41 | C4-083491 | Revised | 2008-12-02 | TEI8 | - | 2008-12-03 |
0030 | 2 | F | Rel-8 | 8.1.0 | - | Moving the description of the restoration procedures (from 29.281) to 23.007 | - | - | - | C4 | C4-41 | C4-083608 | Postponed | 2008-12-02 | TEI8 | - | 2008-12-03 |
0030 | 2 | - | Rel-8 | 8.2.0 | - | Moving the description of the restoration procedures (from 29.274) to 23.007 | - | - | - | C4 | C4-42 | C4-090457 | Revised | 2009-02-24 | SAES | - | 2009-02-25 |
0030 | 3 | - | Rel-8 | 8.2.0 | - | Moving the description of the restoration procedures (from 29.274) to 23.007 | - | - | - | C4 | C4-42 | C4-090791 | Revised | 2009-02-24 | SAES | - | 2009-02-25 |
0030 | 4 | - | Rel-8 | 8.2.0 | - | Moving the description of the restoration procedures (from 29.274) to 23.007 | - | - | - | C4 | C4-42 | C4-090944 | Revised | 2009-02-24 | SAES | - | 2009-02-25 |
0030 | 5 | - | Rel-8 | 8.2.0 | - | Moving the description of the restoration procedures (from 29.274) to 23.007 | CP-43 | CP-090045 | reissued | C4 | C4-42 | C4-090954 | Agreed | 2009-02-24 | SAES | - | 2009-02-25 |
0030 | 5 | C | Rel-8 | 8.2.0 | 8.3.0 | Moving the description of the restoration procedures (from 29.274) to 23.007 | CP-43 | CP-090236 | approved | C4 | - | C4-090954 | - | 2009-09-02 | SAES | - | 2009-03-05 |
0031 | - | B | Rel-8 | 8.1.0 | - | Partial Node Fault Restoration Procedures for PGW, SGW and MME | - | - | - | C4 | C4-41 | C4-083210 | Withdrawn | 2008-12-02 | SAES | - | 2008-12-03 |
0032 | - | - | Rel-8 | 8.1.0 | - | Path Failure | - | - | - | C4 | C4-41 | C4-083254 | Revised | 2008-12-02 | SAES-DEPS | - | 2008-12-03 |
0032 | 1 | - | Rel-8 | 8.1.0 | - | Path Failure | - | - | - | C4 | C4-41 | C4-083610 | Withdrawn | 2008-12-02 | SAES-DEPS | - | 2008-12-03 |
0033 | - | B | Rel-8 | 8.1.0 | - | Partial Failure handling | - | - | - | C4 | C4-41 | C4-083297 | Revised | 2008-12-02 | SAE | - | 2008-12-03 |
0033 | 1 | B | Rel-8 | 8.1.0 | - | Partial Failure handling | - | - | - | C4 | C4-41 | C4-083583 | Revised | 2008-12-02 | SAE | - | 2008-12-03 |
0033 | 2 | B | Rel-8 | 8.1.0 | - | Partial Failure handling | - | - | - | C4 | C4-41 | C4-083595 | Revised | 2008-12-02 | SAE | - | 2008-12-03 |
0033 | 3 | B | Rel-8 | 8.1.0 | - | Partial Failure handling | - | - | - | C4 | C4-41 | C4-083606 | Revised | 2008-12-02 | SAE | - | 2008-12-03 |
0033 | 4 | B | Rel-8 | 8.1.0 | - | Partial Failure handling | CP-42 | CP-080687 | revised | C4 | C4-41 | C4-083852 | Agreed | 2008-12-02 | SAES | - | 2008-12-03 |
0033 | 5 | B | Rel-8 | 8.1.0 | 8.2.0 | Partial Failure Handling | CP-42 | CP-080953 | approved | C4 | - | - | - | 2008-10-30 | SAES | CT approval conditional on SP-42 apr of equiv stage 1 CR | 2008-12-06 |
0034 | - | B | Rel-8 | 8.1.0 | - | Parital Reset in EPS | - | - | - | C4 | C4-41 | C4-083405 | Noted | 2008-12-02 | SAES | - | 2008-12-03 |
0036 | - | B | Rel-8 | 8.1.0 | - | Partial Reset for TS 23.007 | - | - | - | C4 | C4-41 | C4-083493 | Withdrawn | 2008-12-02 | TEI8 | - | 2008-12-03 |
0037 | - | F | Rel-8 | 8.1.0 | - | PMIP Path management / Restoration Clean-up | CP-42 | CP-080692 | revised | C4 | C4-41 | C4-083543 | Agreed | 2008-12-02 | SAES-St3-EPC | - | 2008-12-03 |
0037 | 1 | F | Rel-8 | 8.1.0 | 8.2.0 | PMIP Path management / Restoration Clean-up | CP-42 | CP-080954 | approved | Nokia Siemens Networks | - | CP-080954 | - | 2008-10-30 | SAES-St3-impacts | - | 2008-12-06 |
0038 | - | B | Rel-8 | 8.2.0 | - | Partial Fault Handling finalization | - | - | - | C4 | C4-42 | C4-090011 | Revised | 2009-02-24 | SAES | - | 2009-02-25 |
0038 | 1 | B | Rel-8 | 8.2.0 | - | Partial Fault Handling finalization | - | - | - | C4 | C4-42 | C4-090485 | Revised | 2009-02-24 | SAES | - | 2009-02-25 |
0038 | 2 | B | Rel-8 | 8.2.0 | - | Partial Fault Handling finalization | - | - | - | C4 | C4-42 | C4-090513 | Revised | 2009-02-24 | SAES | - | 2009-02-25 |
0038 | 3 | B | Rel-8 | 8.2.0 | - | Partial Fault Handling finalization | - | - | - | C4 | C4-42 | C4-090837 | Revised | 2009-02-24 | SAES | - | 2009-02-25 |
0038 | 4 | B | Rel-8 | 8.2.0 | - | Partial Fault Handling finalization | CP-43 | CP-090045 | reissued | C4 | C4-42 | C4-090937 | Agreed | 2009-02-24 | SAES | - | 2009-02-25 |
0038 | 4 | B | Rel-8 | 8.2.0 | 8.3.0 | Partial fault handling finalization | CP-43 | CP-090236 | approved | C4 | - | C4-090937 | - | 2009-02-18 | SAES | - | 2009-03-05 |
0039 | - | C | Rel-8 | 8.2.0 | - | Partial Failure Handling | - | - | - | C4 | C4-42 | C4-090240 | Revised | 2009-02-24 | SAES | - | 2009-02-25 |
0040 | - | C | Rel-8 | 8.2.0 | - | Security improvement on Full Node failure restoration procedure | - | - | - | C4 | C4-42 | C4-090257 | Withdrawn | 2009-02-24 | SAES | - | 2009-02-25 |
0041 | - | C | Rel-8 | 8.2.0 | - | Security improvement on Partial Node failure restoration procedure | - | - | - | C4 | C4-42 | C4-090258 | Withdrawn | 2009-02-24 | SAES | - | 2009-02-25 |
0042 | - | F | Rel-8 | - | - | Relay Full Node Failure Notification | - | - | - | C4 | C4-42 | C4-090815 | Withdrawn | 2009-02-24 | SAES | - | 2009-02-25 |
0043 | - | F | Rel-8 | 8.3.0 | - | FQ-CSID corrections | - | - | - | C4 | C4-43 | C4-091179 | Revised | 2009-05-26 | SAES | - | 2009-05-26 |
0043 | 1 | F | Rel-8 | 8.3.0 | 8.4.0 | FQ-CSID corrections | CP-44 | CP-090286 | approved | C4 | C4-43 | C4-091376 | Agreed | 2009-05-26 | SAES | - | 2009-05-26 |
0044 | - | B | Rel-9 | 8.3.0 | - | PCRF Restoration procedure | - | - | - | C4 | C4-43 | C4-091210 | Withdrawn | 2009-05-26 | TEI9 | - | 2009-05-26 |
0045 | - | C | Rel-9 | 8.3.0 | - | General on PMIP based restart procedure | - | - | - | C4 | C4-43 | C4-091211 | Revised | 2009-05-26 | TEI9 | - | 2009-05-26 |
0045 | 1 | B | Rel-9 | 8.3.0 | 9.0.0 | General on PMIP based restart procedure | CP-44 | CP-090285 | approved | C4 | C4-43 | C4-091368 | Agreed | 2009-05-26 | TEI9 | - | 2009-05-26 |
0046 | - | C | Rel-9 | 8.3.0 | - | DIAMETER based restart procedures for PCRF interfaces | - | - | - | C4 | C4-43 | C4-091212 | Withdrawn | 2009-05-26 | TEI9 | - | 2009-05-26 |
0047 | - | F | Rel-8 | 8.3.0 | - | SGSN and SGW handling in case RNC failure using S4 | - | - | - | C4 | C4-43 | C4-091230 | Revised | 2009-05-26 | SAES | - | 2009-05-26 |
0047 | 1 | F | Rel-8 | 8.3.0 | 8.4.0 | SGSN and SGW handling in case RNC failure using S4 | CP-44 | CP-090286 | approved | C4 | C4-43 | C4-091379 | Agreed | 2009-05-26 | SAES | - | 2009-05-26 |
0048 | - | F | Rel-8 | 8.4.0 | - | CSID handling during SGW/MME handover | - | - | - | C4 | C4-44 | C4-091673 | Postponed | 2009-09-08 | SAES | - | 2009-09-08 |
0049 | - | A | Rel-9 | 9.0.0 | - | CSID handling during SGW/MME handover | - | - | - | C4 | C4-44 | C4-091675 | Postponed | 2009-09-08 | SAES | - | 2009-09-08 |
0050 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Removal of Editor's Note | CP-45 | CP-090530 | approved | C4 | C4-44 | C4-091705 | Agreed | 2009-09-08 | SAES | - | 2009-09-08 |
0051 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Removal of Editor's Note | CP-45 | CP-090530 | approved | C4 | C4-44 | C4-091706 | Agreed | 2009-09-08 | SAES | - | 2009-09-08 |
0052 | - | F | Rel-8 | 8.4.0 | - | Restoration of data in E-UTRAN | - | - | - | C4 | C4-45 | C4-092278 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0052 | 1 | F | Rel-8 | 8.4.0 | - | Restoration of data in E-UTRAN | - | - | - | C4 | C4-45 | C4-092483 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0052 | 2 | F | Rel-8 | 8.4.0 | - | Restoration of data in E-UTRAN | - | - | - | C4 | C4-45 | C4-092507 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0052 | 3 | F | Rel-8 | 8.4.0 | 8.5.0 | Restoration of data in E-UTRAN | CP-45 | CP-090530 | approved | C4 | C4-45 | C4-092511 | Agreed | 2009-09-08 | SAES | - | 2009-09-08 |
0053 | - | B | Rel-9 | 9.0.0 | - | Restoration of data in MBMS GW | - | - | - | C4 | C4-45 | C4-092329 | Revised | 2009-09-08 | MBMS_EPS | - | 2009-09-08 |
0053 | 1 | B | Rel-9 | 9.0.0 | 9.1.0 | Restoration of data in MBMS GW | CP-45 | CP-090559 | approved | C4 | C4-45 | C4-092600 | Agreed | 2009-09-08 | MBMS_EPS | - | 2009-09-08 |
0054 | - | B | Rel-9 | 9.0.0 | - | Restoration of data in MME/SGSN | - | - | - | C4 | C4-45 | C4-092330 | Noted | 2009-09-08 | MBMS_EPS | - | 2009-09-08 |
0055 | - | F | Rel-8 | 8.4.0 | - | Removal of the partial failure support from stage 2 | - | - | - | C4 | C4-45 | C4-092377 | Withdrawn | 2009-09-08 | SAES | - | 2009-09-08 |
0056 | - | A | Rel-9 | 9.0.0 | - | Removal of the partial failure support from stage 2 | - | - | - | C4 | C4-45 | C4-092378 | Withdrawn | 2009-09-08 | SAES | - | 2009-09-08 |
0057 | - | F | Rel-8 | 8.4.0 | - | Echo usage for GTPv2 | - | - | - | C4 | C4-45 | C4-092379 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0057 | 1 | F | Rel-8 | 8.4.0 | - | Echo usage for GTPv2 | - | - | - | C4 | C4-45 | C4-092508 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0057 | 2 | F | Rel-8 | 8.4.0 | 8.5.0 | Echo usage for GTPv2 | CP-45 | CP-090530 | approved | C4 | C4-45 | C4-092728 | agreed | 2009-09-08 | SAES | - | 2009-09-08 |
0058 | - | A | Rel-9 | 9.0.0 | - | Echo usage for GTPv2 | - | - | - | C4 | C4-45 | C4-092380 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0058 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Echo usage for GTPv2 | CP-45 | CP-090530 | approved | C4 | C4-45 | C4-092509 | Agreed | 2009-09-08 | SAES | - | 2009-09-08 |
0059 | - | F | Rel-8 | 8.4.0 | - | Restoration of data in E-UTRAN | - | - | - | C4 | C4-45 | C4-092391 | Withdrawn | 2009-09-08 | SAES | - | 2009-09-08 |
0060 | - | F | Rel-8 | 8.4.0 | - | Essential corrections to the partial failure support | - | - | - | C4 | C4-45 | C4-092406 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0060 | 1 | F | Rel-8 | 8.4.0 | - | Essential corrections to the partial failure support | - | - | - | C4 | C4-45 | C4-092515 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0060 | 2 | F | Rel-8 | 8.4.0 | - | Essential corrections to the partial failure support | - | - | - | C4 | C4-45 | C4-092627 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0060 | 3 | F | Rel-8 | 8.4.0 | - | Essential corrections to the partial failure support | CP-45 | CP-090540 | reissued | C4 | C4-45 | C4-092752 | Agreed | 2009-09-08 | SAES | - | 2009-09-08 |
0060 | 3 | F | Rel-8 | 8.4.0 | 8.5.0 | Essential corrections to the partial failure support | CP-45 | CP-090729 | approved | C4 | - | C4-092752 | - | 2009-08-28 | SAES | - | 2009-09-17 |
0061 | - | F | Rel-8 | 8.4.0 | - | Partial failure handling for S1 based handovers | - | - | - | C4 | C4-45 | C4-092407 | Withdrawn | 2009-09-08 | SAES | - | 2009-09-08 |
0062 | - | F | Rel-8 | 8.4.0 | - | Error Indication cleanup | - | - | - | C4 | C4-45 | C4-092412 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0062 | 1 | F | Rel-8 | 8.4.0 | - | Error Indication cleanup | - | - | - | C4 | C4-45 | C4-092481 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0062 | 2 | F | Rel-8 | 8.4.0 | 8.5.0 | Error Indication cleanup | CP-45 | CP-090530 | approved | C4 | C4-45 | C4-092513 | Agreed | 2009-09-08 | SAES | - | 2009-09-08 |
0063 | - | A | Rel-9 | 9.0.0 | - | Error Indication cleanup | - | - | - | C4 | C4-45 | C4-092413 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0063 | 1 | A | Rel-9 | 9.0.0 | - | Error Indication cleanup | - | - | - | C4 | C4-45 | C4-092482 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0063 | 2 | A | Rel-9 | 9.0.0 | - | Error Indication cleanup | - | - | - | C4 | C4-45 | C4-092514 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0063 | 3 | F | Rel-9 | 9.0.0 | 9.1.0 | Error Indication cleanup | CP-45 | CP-090530 | approved | C4 | C4-45 | C4-092601 | Agreed | 2009-09-08 | SAES | - | 2009-09-08 |
0064 | - | A | Rel-9 | 9.0.0 | - | Restoration of data in E-UTRAN | - | - | - | C4 | C4-45 | C4-092490 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0064 | 1 | A | Rel-9 | 9.0.0 | - | Restoration of data in E-UTRAN | - | - | - | C4 | C4-45 | C4-092512 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0064 | 2 | A | Rel-9 | 9.0.0 | 9.1.0 | Restoration of data in E-UTRAN | CP-45 | CP-090530 | approved | C4 | C4-45 | C4-092729 | Agreed | 2009-09-08 | SAES | - | 2009-09-08 |
0065 | - | A | Rel-9 | 9.0.0 | - | Essential corrections to the partial failure support | - | - | - | C4 | C4-45 | C4-092628 | Revised | 2009-09-08 | SAES | - | 2009-09-08 |
0065 | 1 | A | Rel-9 | 9.0.0 | - | Essential corrections to the partial failure support | CP-45 | CP-090540 | reissued | C4 | C4-45 | C4-092753 | Agreed | 2009-09-08 | SAES | - | 2009-09-08 |
0065 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Essential corrections to the partial failure support | CP-45 | CP-090729 | approved | C4 | - | C4-092753 | - | 2009-09-08 | SAES | - | 2009-09-17 |
0066 | - | B | Rel-9 | 9.1.0 | 9.2.0 | Paging signalling optimization after SGSN failure | CP-46 | CP-090792 | approved | C4 | C4-46 | C4-092788 | Agreed | 2009-11-26 | TEI9 | - | 2009-11-26 |
0067 | - | B | Rel-9 | 9.1.0 | 9.2.0 | Paging signalling optimization after MME failure | CP-46 | CP-090792 | approved | C4 | C4-46 | C4-092789 | Agreed | 2009-11-26 | TEI9 | - | 2009-11-26 |
0068 | - | B | Rel-9 | 9.1.0 | 9.2.0 | Error Indication for MBMS | CP-46 | CP-090798 | approved | C4 | C4-46 | C4-092819 | Agreed | 2009-11-26 | MBMS_EPS | - | 2009-11-26 |
0069 | - | F | Rel-8 | 8.5.0 | - | Correction on eNodeB failure | - | - | - | C4 | C4-46 | C4-092822 | Revised | 2009-11-26 | SAES | - | 2009-11-26 |
0069 | 1 | F | Rel-8 | 8.5.0 | - | Correction on eNodeB failure | - | - | - | C4 | C4-47 | C4-093700 | Withdrawn | 2009-11-26 | SAES | - | 2009-11-26 |
0070 | - | A | Rel-9 | 9.1.0 | - | Correction on eNodeB failure | - | - | - | C4 | C4-46 | C4-092823 | Revised | 2009-11-26 | SAES | - | 2009-11-26 |
0070 | 1 | A | Rel-9 | 9.1.0 | - | Correction on eNodeB failure | - | - | - | C4 | C4-47 | C4-093701 | Withdrawn | 2009-11-26 | SAES | - | 2009-11-26 |
0071 | - | F | Rel-8 | 8.5.0 | - | Removal of Editor's Notes for Partial Failure | - | - | - | C4 | C4-46 | C4-092894 | Revised | 2009-11-26 | SAES | - | 2009-11-26 |
0071 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | Removal of Editor's Notes for Partial Failure | CP-46 | CP-090765 | approved | C4 | C4-46 | C4-093191 | Agreed | 2009-11-26 | SAES | - | 2009-11-26 |
0072 | - | A | Rel-9 | 9.1.0 | - | Removal of Editor's Notes for Partial Failure | - | - | - | C4 | C4-46 | C4-092895 | Revised | 2009-11-26 | TEI9 | - | 2009-11-26 |
0072 | 1 | A | Rel-9 | 9.1.0 | 9.2.0 | Removal of Editor's Notes for Partial Failure | CP-46 | CP-090765 | approved | C4 | C4-46 | C4-093192 | Agreed | 2009-11-26 | SAES | - | 2009-11-26 |
0073 | - | F | Rel-8 | 8.5.0 | - | Alignment of RNC/BSC failure sub-clause | - | - | - | C4 | C4-46 | C4-092995 | Postponed | 2009-11-26 | SAES | - | 2009-11-26 |
0074 | - | F | Rel-9 | 9.1.0 | - | Alignment of RNC/BSC failure sub-clause | - | - | - | C4 | C4-46 | C4-092996 | Postponed | 2009-11-26 | SAES | - | 2009-11-26 |
0075 | - | F | Rel-8 | 8.5.0 | - | Cleanup of hanging PDN connections/bearers | - | - | - | C4 | C4-47 | C4-093572 | Postponed | 2009-11-26 | SAES | - | 2009-11-26 |
0075 | 1 | F | Rel-8 | 8.6.0 | - | Cleanup of hanging PDN connections | - | - | - | C4 | C4-48 | C4-100408 | Postponed | 2010-03-10 | SAES | - | 2010-03-10 |
0076 | - | A | Rel-9 | 9.1.0 | - | Cleanup of hanging PDN connections/bearers | - | - | - | C4 | C4-47 | C4-093573 | Postponed | 2009-11-26 | SAES | - | 2009-11-26 |
0076 | 1 | A | Rel-9 | 9.2.0 | - | Cleanup on hanging PDN connections procedures | - | - | - | C4 | C4-48 | C4-100406 | Postponed | 2010-03-10 | SAES | - | 2010-03-10 |
0076 | 2 | F | Rel-9 | 9.3.0 | - | Cleanup on hanging PDN connections procedures | - | - | - | C4 | C4-49 | C4-101179 | Revised | 2010-05-26 | SAES | - | 2010-05-26 |
0076 | 3 | A | Rel-9 | 9.3.0 | - | Cleanup on hanging PDN connections procedures | - | - | - | C4 | C4-49 | C4-101393 | Revised | 2010-05-26 | SAES | - | 2010-05-26 |
0076 | 4 | A | Rel-9 | 9.3.0 | 9.4.0 | Cleanup on hanging PDN connections procedures | CP-48 | CP-100263 | approved | C4 | C4-49 | C4-101575 | Agreed | 2010-05-26 | SAES | - | 2010-05-26 |
0077 | - | F | Rel-8 | 8.5.0 | - | Error Indication Handling for MBMS | - | - | - | C4 | C4-47 | C4-093598 | Revised | 2009-11-26 | SAES | - | 2009-11-26 |
0077 | 1 | F | Rel-8 | 8.5.0 | - | Error Indication Handling for MBMS | CP-46 | CP-090766 | withdrawn | C4 | C4-47 | C4-093912 | Agreed | 2009-11-26 | SAES | - | 2009-11-26 |
0078 | - | A | Rel-9 | 9.1.0 | - | Error Indication Handling for MBMS | - | - | - | C4 | C4-47 | C4-093599 | Revised | 2009-11-26 | SAES | - | 2009-11-26 |
0078 | 1 | A | Rel-9 | 9.1.0 | - | Error Indication Handling for MBMS | CP-46 | CP-090766 | withdrawn | C4 | C4-47 | C4-093913 | Agreed | 2009-11-26 | SAES | - | 2009-11-26 |
0079 | - | F | Rel-8 | 8.5.0 | - | Stage2 alignment of eNodeB Failure | - | - | - | C4 | C4-47 | C4-093610 | Revised | 2009-11-26 | SAES | - | 2009-11-26 |
0079 | 1 | F | Rel-8 | 8.5.0 | - | Stage2 alignment of eNodeB Failure | - | - | - | C4 | C4-47 | C4-093964 | Revised | 2009-11-26 | SAES | - | 2009-11-26 |
0079 | 2 | F | Rel-8 | 8.5.0 | - | Stage2 alignment of eNodeB Failure | CP-46 | CP-090766 | withdrawn | C4 | C4-47 | C4-094166 | Agreed | 2009-11-26 | SAES | - | 2009-11-26 |
0079 | 2 | F | Rel-8 | 8.5.0 | 8.6.0 | Alignment of eNodeB failure sub-clause | CP-46 | CP-091034 | approved | C4 | - | C4-094166 | - | 2009-11-13 | SAES | - | 2009-12-04 |
0080 | - | A | Rel-9 | 9.1.0 | - | Stage2 alignment of eNodeB Failure | - | - | - | C4 | C4-47 | C4-093611 | Revised | 2009-11-26 | SAES | - | 2009-11-26 |
0080 | 1 | A | Rel-9 | 9.1.0 | - | Stage2 alignment of eNodeB Failure | - | - | - | C4 | C4-47 | C4-093965 | Revised | 2009-11-26 | SAES | - | 2009-11-26 |
0080 | 2 | A | Rel-9 | 9.1.0 | - | Stage2 alignment of eNodeB Failure | CP-46 | CP-090766 | withdrawn | C4 | C4-47 | C4-094167 | Agreed | 2009-11-26 | SAES | - | 2009-11-26 |
0080 | 3 | F | Rel-9 | 9.1.0 | 9.2.0 | Alignment of eNodeB failure sub-clause | CP-46 | CP-091034 | approved | C4 | - | C4-094167 | - | 2009-12-02 | SAES | - | 2009-12-04 |
0081 | - | F | Rel-8 | 8.5.0 | - | Stage2 alignment of RNC Failure | - | - | - | C4 | C4-47 | C4-093612 | Revised | 2009-11-26 | SAES | - | 2009-11-26 |
0081 | 1 | F | Rel-8 | 8.5.0 | - | Stage2 alignment of RNC Failure | - | - | - | C4 | C4-47 | C4-093966 | Revised | 2009-11-26 | SAES | - | 2009-11-26 |
0081 | 2 | F | Rel-8 | 8.5.0 | - | Stage2 alignment of RNC Failure | CP-46 | CP-090766 | withdrawn | C4 | C4-47 | C4-094168 | Agreed | 2009-11-26 | SAES | - | 2009-11-26 |
0081 | 2 | F | Rel-8 | 8.5.0 | 8.6.0 | Alignment of RNC/BSC failure sub-clause | CP-46 | CP-091034 | approved | C4 | - | C4-094168 | - | 2009-11-13 | SAES | - | 2009-12-04 |
0082 | - | A | Rel-9 | 9.1.0 | - | Stage2 alignment of RNC Failure | - | - | - | C4 | C4-47 | C4-093613 | Revised | 2009-11-26 | SAES | - | 2009-11-26 |
0082 | 1 | A | Rel-9 | 9.1.0 | - | Stage2 alignment of RNC Failure | - | - | - | C4 | C4-47 | C4-093967 | Revised | 2009-11-26 | SAES | - | 2009-11-26 |
0082 | 2 | A | Rel-9 | 9.1.0 | - | Stage2 alignment of RNC Failure | CP-46 | CP-090766 | withdrawn | C4 | C4-47 | C4-094169 | Agreed | 2009-11-26 | SAES | - | 2009-11-26 |
0082 | 3 | F | Rel-9 | 9.1.0 | 9.2.0 | Alignment of RNC/BSC failure sub-clause | CP-46 | CP-091034 | approved | C4 | - | C4-094169 | - | 2009-12-02 | SAES | - | 2009-12-04 |
0083 | - | F | Rel-9 | 9.2.0 | - | Clarifications to eNode failure | - | - | - | C4 | C4-48 | C4-100149 | Revised | 2010-03-10 | TEI9 | - | 2010-03-10 |
0083 | 1 | F | Rel-9 | 9.2.0 | - | Clarifications to eNode failure | - | - | - | C4 | C4-48 | C4-100699 | Revised | 2010-03-10 | TEI9 | - | 2010-03-10 |
0083 | 2 | F | Rel-9 | 9.2.0 | 9.3.0 | Clarifications to eNode failure | CP-47 | CP-100035 | approved | C4 | C4-48 | C4-100916 | Agreed | 2010-03-10 | TEI9 | - | 2010-03-10 |
0084 | - | F | Rel-8 | 6.2.0 | - | Remote peer restart | - | - | - | C4 | C4-48 | C4-100279 | Withdrawn | 2010-03-10 | SAES | - | 2010-03-10 |
0085 | - | A | Rel-9 | 9.2.0 | - | Remote peer restart | - | - | - | C4 | C4-48 | C4-100280 | Withdrawn | 2010-03-10 | SAES | - | 2010-03-10 |
0088 | - | D | Rel-8 | 8.6.0 | - | Reference correction | - | - | - | C4 | C4-48 | C4-100429 | Withdrawn | 2010-03-10 | SAES | - | 2010-03-10 |
0089 | - | D | Rel-9 | 9.2.0 | - | Reference correction | - | - | - | C4 | C4-48 | C4-100430 | Withdrawn | 2010-03-10 | SAES | - | 2010-03-10 |
0090 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Bulk Binding Revocation Indication | CP-47 | CP-100026 | approved | C4 | C4-48 | C4-100437 | Agreed | 2010-03-10 | SAES | - | 2010-03-10 |
0091 | - | A | Rel-9 | 9.2.0 | 9.3.0 | Bulk Binding Revocation Indication | CP-47 | CP-100026 | approved | C4 | C4-48 | C4-100438 | Agreed | 2010-03-10 | SAES | - | 2010-03-10 |
0092 | - | F | Rel-9 | 9.2.0 | - | Fix miscellaneous errors | - | - | - | C4 | C4-48 | C4-100458 | Revised | 2010-03-10 | TEI9 | - | 2010-03-10 |
0092 | 1 | F | Rel-9 | 9.2.0 | 9.3.0 | Fix miscellaneous errors | CP-47 | CP-100035 | approved | C4 | C4-48 | C4-100706 | Agreed | 2010-03-10 | TEI9 | - | 2010-03-10 |
0093 | - | F | Rel-8 | 8.6.0 | - | Clarification of a Restart Counter | - | - | - | C4 | C4-48 | C4-100465 | Withdrawn | 2010-03-10 | SAES | - | 2010-03-10 |
0094 | - | A | Rel-9 | 9.2.0 | - | Clarification of a Restart Counter | - | - | - | C4 | C4-48 | C4-100466 | Withdrawn | 2010-03-10 | SAES | - | 2010-03-10 |
0095 | - | F | - | - | - | Restart counter correction | - | - | - | C4 | C4-48 | C4-100733 | Revised | 2010-03-10 | TEI9 | - | 2010-03-10 |
0095 | 1 | F | Rel-9 | 9.2.0 | 9.3.0 | Restart counter correction | CP-47 | CP-100035 | approved | C4 | C4-48 | C4-100925 | Agreed | 2010-03-10 | TEI9 | - | 2010-03-10 |
0096 | - | F | Rel-8 | 8.7.0 | - | Failure of remote nodes | - | - | - | C4 | C4-49 | C4-101100 | Rejected | 2010-05-26 | SAES | - | 2010-05-26 |
0097 | - | F | Rel-9 | 9.3.0 | - | Failure of remote nodes | - | - | - | C4 | C4-49 | C4-101101 | Revised | 2010-05-26 | SAES | - | 2010-05-26 |
0097 | 1 | F | Rel-9 | 9.3.0 | 9.4.0 | Failure of remote nodes | CP-48 | CP-100272 | approved | C4 | C4-49 | C4-101392 | Agreed | 2010-05-26 | TEI9 | - | 2010-05-26 |
0098 | - | B | Rel-10 | 9.3.0 | - | Passing Restart Counter to External Network | - | - | - | C4 | C4-49 | C4-101196 | Postponed | 2010-05-26 | TEI10 | - | 2010-05-26 |
0099 | - | F | Rel-8 | 8.7.0 | - | Essential correction to Error Indication message handling for the default bearer | - | - | - | C4 | C4-49 | C4-101212 | Revised | 2010-05-26 | SAES | - | 2010-05-26 |
0099 | 1 | F | Rel-8 | 8.7.0 | 8.8.0 | Essential correction to Error Indication message handling for the default bearer | CP-48 | CP-100263 | approved | C4 | C4-49 | C4-101381 | Agreed | 2010-05-26 | SAES | - | 2010-05-26 |
0100 | - | A | Rel-9 | 9.3.0 | - | Essential correction to Error Indication message handling for the default bearer | - | - | - | C4 | C4-49 | C4-101213 | Revised | 2010-05-26 | SAES | - | 2010-05-26 |
0100 | 1 | A | Rel-9 | 9.3.0 | 9.4.0 | Essential correction to Error Indication message handling for the default bearer | CP-48 | CP-100263 | approved | C4 | C4-49 | C4-101382 | Agreed | 2010-05-26 | SAES | - | 2010-05-26 |
0101 | - | F | Rel-8 | 8.7.0 | - | Handling of new PDN connection request for the existing active PDN connection context at PGW | - | - | - | C4 | C4-49 | C4-101214 | Withdrawn | 2010-05-26 | SAES | - | 2010-05-26 |
0102 | - | A | Rel-9 | 9.3.0 | - | Handling of new PDN connection request for the existing active PDN connection context at PGW | - | - | - | C4 | C4-49 | C4-101215 | Withdrawn | 2010-05-26 | SAES | - | 2010-05-26 |
0103 | - | F | Rel-8 | 8.7.0 | - | Handling of new PDN connection request for the existing active PDN connection context at SGW | - | - | - | C4 | C4-49 | C4-101216 | Withdrawn | 2010-05-26 | SAES | - | 2010-05-26 |
0104 | - | A | Rel-9 | 9.3.0 | - | Handling of new PDN connection request for the existing active PDN connection context at SGW | - | - | - | C4 | C4-49 | C4-101217 | Withdrawn | 2010-05-26 | SAES | - | 2010-05-26 |
0105 | - | F | Rel-9 | 9.3.0 | - | PGW failure and recovery | - | - | - | C4 | C4-49 | C4-101334 | Withdrawn | 2010-05-26 | TEI9 | - | 2010-05-26 |
0106 | - | F | Rel-7 | 7.0.0 | - | Cleanup on hanging PDN connections procedures | - | - | - | C4 | C4-49 | C4-101456 | Revised | 2010-05-26 | - | - | 2010-05-26 |
0106 | 1 | F | Rel-8 | 8.7.0 | 8.8.0 | Cleanup on hanging PDN connections procedures | CP-48 | CP-100263 | approved | C4 | C4-49 | C4-101574 | Agreed | 2010-05-26 | SAES | - | 2010-05-26 |
0107 | - | B | Rel-10 | - | - | optimisation on hanging PDN connections clean-up procedures | - | - | - | C4 | C4-49 | C4-101457 | Revised | 2010-05-26 | TEI10 | - | 2010-05-26 |
0107 | 1 | B | Rel-10 | 9.3.0 | 10.0.0 | optimisation on hanging PDN connections clean-up procedures | CP-48 | CP-100291 | approved | C4 | C4-49 | C4-101576 | Agreed | 2010-05-26 | TEI10 | - | 2010-05-26 |
0108 | - | B | Rel-10 | 10.0.0 | - | MME/SGSN Restart | - | - | - | C4 | C4-49b | C4-101671 | Postponed | 2010-09-15 | TEI10 | - | 2010-09-15 |
0108 | 1 | B | Rel-10 | 10.0.0 | - | MME/SGSN Restart | - | - | - | C4 | C4-50 | C4-102101 | Withdrawn | 2010-09-15 | TEI10 | - | 2010-09-15 |
0109 | - | F | Rel-9 | 9.4.0 | - | Data Restoration for SMS | - | - | - | C4 | C4-49b | C4-101723 | Revised | 2010-09-15 | TEI9 | - | 2010-09-15 |
0109 | 1 | F | Rel-9 | 9.4.0 | 9.5.0 | Data Restoration for SMS | CP-49 | CP-100458 | approved | C4 | C4-49b | C4-101804 | Agreed | 2010-09-15 | TEI9 | - | 2010-09-15 |
0110 | - | F | Rel-9 | 9.4.0 | - | IMS voice call termination when EPC node restarted | - | - | - | C4 | C4-49b | C4-101733 | Postponed | 2010-09-15 | TEI9 | - | 2010-09-15 |
0111 | - | A | Rel-10 | 10.0.0 | - | IMS voice call termination when EPC node restarted | - | - | - | C4 | C4-49b | C4-101734 | Postponed | 2010-09-15 | TEI9 | - | 2010-09-15 |
0112 | - | F | Rel-10 | 10.0.0 | - | Partial Failure Handling for full node failure | - | - | - | C4 | C4-49b | C4-101744 | Postponed | 2010-09-15 | TEI10 | - | 2010-09-15 |
0113 | - | F | Rel-9 | 9.4.0 | - | Fix the issue on the terminating IMS call over the LTE after the MME/SGSN failure | - | - | - | C4 | C4-50 | C4-101984 | Withdrawn | 2010-09-15 | TEI9 | - | 2010-09-15 |
0114 | - | A | Rel-10 | 10.0.0 | - | Fix the issue on the terminating IMS call over the LTE after the MME/SGSN failure | - | - | - | C4 | C4-50 | C4-101985 | Withdrawn | 2010-09-15 | TEI9 | - | 2010-09-15 |
0115 | - | A | Rel-10 | 10.0.0 | 10.1.0 | Data Restoration for SMS | CP-49 | CP-100458 | approved | C4 | C4-50 | C4-102037 | Agreed | 2010-09-15 | TEI9 | - | 2010-09-15 |
0116 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GTP-C based restart procedures | CP-49 | CP-100456 | approved | C4 | C4-50 | C4-102040 | Agreed | 2010-09-15 | TEI9 | - | 2010-09-15 |
0117 | - | A | Rel-10 | 10.0.0 | 10.1.0 | GTP-C based restart procedures | CP-49 | CP-100456 | approved | C4 | C4-50 | C4-102041 | Agreed | 2010-09-15 | TEI9 | - | 2010-09-15 |
0118 | - | B | Rel-9 | 9.4.0 | - | Reestablishment of the UEs context after MME/S4-SGSN node failure | - | - | - | C4 | C4-50 | C4-102054 | Withdrawn | 2010-09-15 | TEI9 | - | 2010-09-15 |
0119 | - | F | Rel-9 | 9.4.0 | - | MME Self Recovery after Restart | - | - | - | C4 | C4-50 | C4-102124 | Withdrawn | 2010-09-15 | TEI9 | - | 2010-09-15 |
0120 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Partial Failure handling | CP-49 | CP-100456 | approved | C4 | C4-50 | C4-102189 | Agreed | 2010-09-15 | TEI9 | - | 2010-09-15 |
0121 | - | A | Rel-10 | 10.0.0 | 10.1.0 | Partial Failure handling | CP-49 | CP-100456 | approved | C4 | C4-50 | C4-102190 | Agreed | 2010-09-15 | TEI9 | - | 2010-09-15 |
0122 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Essential correction to MME and PGW restoration procedure | CP-50 | CP-100674 | approved | C4 | C4-50b | C4-102474 | Agreed | 2010-11-30 | TEI8 | - | 2010-12-07 |
0123 | - | A | Rel-9 | 9.5.0 | 9.6.0 | Essential correction to MME and PGW restoration procedure | CP-50 | CP-100674 | approved | C4 | C4-50b | C4-102475 | Agreed | 2010-11-30 | TEI8 | - | 2010-12-07 |
0124 | - | A | Rel-10 | 10.1.0 | 10.2.0 | Essential correction to MME and PGW restoration procedure | CP-50 | CP-100674 | approved | C4 | C4-50b | C4-102476 | Agreed | 2010-11-30 | TEI8 | - | 2010-12-07 |
0126 | - | B | Rel-10 | 10.1.0 | - | Requirements for PCRF failure and restoration | - | - | - | C4 | C4-50b | C4-102502 | Postponed | 2010-11-30 | FS_PCRF-FR | - | 2010-12-07 |
0127 | - | B | Rel-10 | 10.1.0 | - | PCRF Restoration | - | - | - | C4 | C4-50b | C4-102536 | Revised | 2010-11-30 | FS_PCRF-FR | - | 2010-12-07 |
0127 | 1 | B | Rel-10 | 10.1.0 | - | PCRF Restoration | - | - | - | C4 | C4-51 | C4-103040 | Revised | 2010-11-30 | FS_PCRF-FR | - | 2010-12-07 |
0127 | 2 | B | Rel-10 | 10.1.0 | - | PCRF Restoration | - | - | - | C4 | C4-51 | C4-103152 | Postponed | 2010-11-30 | FS_PCRF-FR | - | 2010-12-07 |
0127 | 3 | B | Rel-10 | 10.2.0 | - | PCRF Restoration | - | - | - | C4 | C4-51b | C4-110013 | Withdrawn | 2011-03-09 | PCRF-FR | - | 2011-03-09 |
0128 | - | B | Rel-10 | 10.1.0 | - | Design Objective for PCRF | - | - | - | C4 | C4-50b | C4-102537 | Postponed | 2010-11-30 | FS_PCRF-FR | - | 2010-12-07 |
0129 | - | B | Rel-10 | 10.1.0 | - | ePDG Partial failure | - | - | - | C4 | C4-50b | C4-102538 | Revised | 2010-11-30 | SMOG-St3 | - | 2010-12-07 |
0129 | 1 | B | Rel-10 | 10.1.0 | 10.2.0 | ePDG Partial failure | CP-50 | CP-100686 | approved | C4 | C4-50b | C4-102798 | Agreed | 2010-11-30 | SMOG-St3 | - | 2010-12-07 |
0130 | - | B | Rel-10 | 10.1.0 | - | Bulk PDN Connections Delete Request/Response | - | - | - | C4 | C4-50b | C4-102541 | Revised | 2010-11-30 | TEI10 | - | 2010-12-07 |
0130 | 1 | B | Rel-10 | 10.1.0 | 10.2.0 | Bulk PDN Connections Delete Request/Response | CP-50 | CP-100695 | approved | C4 | C4-50b | C4-102769 | Agreed | 2010-11-30 | TEI10 | - | 2010-12-07 |
0131 | - | B | Rel-10 | 10.1.0 | - | Error Indication handling in PGW and ePDG | - | - | - | C4 | C4-50b | C4-102600 | Revised | 2010-11-30 | SMOG-St3 | - | 2010-12-07 |
0131 | 1 | B | Rel-10 | 10.1.0 | 10.2.0 | Error Indication handling in PGW and ePDG | CP-50 | CP-100686 | approved | C4 | C4-50b | C4-102799 | Agreed | 2010-11-30 | SMOG-St3 | - | 2010-12-07 |
0132 | - | B | Rel-10 | 10.1.0 | 10.2.0 | ePDG/PGW restart and restoration | CP-50 | CP-100686 | approved | C4 | C4-50b | C4-102601 | Agreed | 2010-11-30 | SMOG-St3 | - | 2010-12-07 |
0133 | - | B | Rel-10 | 10.1.0 | - | Restoration of data in the ePDG | - | - | - | C4 | C4-50b | C4-102651 | Revised | 2010-11-30 | SMOG-St3 | - | 2010-12-07 |
0133 | 1 | B | Rel-10 | 10.1.0 | 10.2.0 | Restoration of data in the ePDG | CP-50 | CP-100686 | approved | C4 | C4-50b | C4-102800 | Agreed | 2010-11-30 | SMOG-St3 | - | 2010-12-07 |
0134 | - | F | Rel-9 | 9.5.0 | - | Heartbeat Request | - | - | - | C4 | C4-51 | C4-102939 | Revised | 2010-11-30 | TEI9 | - | 2010-12-07 |
0134 | 1 | F | Rel-9 | 9.5.0 | 9.6.0 | Heartbeat Request | CP-50 | CP-100675 | approved | C4 | C4-51 | C4-103239 | Agreed | 2010-11-30 | TEI9 | - | 2010-12-07 |
0135 | - | A | Rel-10 | 10.1.0 | - | Heartbeat Request | - | - | - | C4 | C4-51 | C4-102940 | Revised | 2010-11-30 | TEI9 | - | 2010-12-07 |
0135 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | Heartbeat Request | CP-50 | CP-100675 | approved | C4 | C4-51 | C4-103240 | Agreed | 2010-11-30 | TEI9 | - | 2010-12-07 |
0136 | - | B | Rel-10 | 10.1.0 | - | Requirement for PCRF Restoration-General | - | - | - | C4 | C4-51 | C4-103014 | Withdrawn | 2010-11-30 | TEI10 | - | 2010-12-07 |
0137 | - | B | Rel-10 | 10.1.0 | - | Requirement for PCRF Restoration-failure detection | - | - | - | C4 | C4-51 | C4-103015 | Withdrawn | 2010-11-30 | TEI10 | - | 2010-12-07 |
0138 | - | B | Rel-10 | 10.1.0 | - | Requirements for PCRF failure and restoration | - | - | - | C4 | C4-51 | C4-103026 | Withdrawn | 2010-11-30 | FS_PCRF-FR | - | 2010-12-07 |
0139 | - | B | Rel-10 | 10.1.0 | - | Session rebuilding for restarted PCRF | - | - | - | C4 | C4-51 | C4-103027 | Withdrawn | 2010-11-30 | FS_PCRF-FR | - | 2010-12-07 |
0140 | - | B | Rel-10 | 10.2.0 | - | PCRF Failure and Restoration | - | - | - | C4 | C4-51b | C4-110061 | Revised | 2011-03-09 | PCRF-FR | - | 2011-03-09 |
0140 | 1 | B | Rel-10 | 10.2.0 | - | PCRF Failure and Restoration | - | - | - | C4 | C4-51b | C4-110259 | Withdrawn | 2011-03-09 | PCRF-FR | - | 2011-03-09 |
0141 | - | F | Rel-9 | 9.6.0 | - | Timing for sending Downlink Data Notification as a result of the SGW having received an Error Indication message from the eNodeB/RNC | - | - | - | C4 | C4-51b | C4-110093 | Revised | 2011-03-09 | TEI9 | - | 2011-03-09 |
0141 | 1 | F | Rel-9 | 9.6.0 | - | Timing for sending Downlink Data Notification as a result of the SGW having received an Error Indication message from the eNodeB/RNC | - | - | - | C4 | C4-51b | C4-110342 | Revised | 2011-03-09 | TEI9 | - | 2011-03-09 |
0141 | 2 | F | Rel-9 | 9.6.0 | 9.7.0 | Timing for sending Downlink Data Notification as a result of the SGW having received an Error Indication message from the eNodeB/RNC | CP-51 | CP-110047 | approved | C4 | C4-51b | C4-110407 | Agreed | 2011-03-09 | TEI9 | - | 2011-03-09 |
0142 | - | A | Rel-10 | 10.2.0 | - | Timing for sending Downlink Data Notification as a result of the SGW having received an Error Indication message from the eNodeB/RNC | - | - | - | C4 | C4-51b | C4-110094 | Revised | 2011-03-09 | TEI9 | - | 2011-03-09 |
0142 | 1 | A | Rel-10 | 10.2.0 | - | Timing for sending Downlink Data Notification as a result of the SGW having received an Error Indication message from the eNodeB/RNC | - | - | - | C4 | C4-51b | C4-110343 | Revised | 2011-03-09 | TEI9 | - | 2011-03-09 |
0142 | 2 | A | Rel-10 | 10.2.0 | 10.3.0 | Timing for sending Downlink Data Notification as a result of the SGW having received an Error Indication message from the eNodeB/RNC | CP-51 | CP-110047 | approved | C4 | C4-51b | C4-110416 | Agreed | 2011-03-09 | TEI9 | - | 2011-03-09 |
0143 | - | F | Rel-9 | 9.6.0 | - | Unclearness of Downlink Data Notification Handling as a result of the SGW having received an Error Indication message from the eNodeB/RNC | - | - | - | C4 | C4-51b | C4-110095 | Revised | 2011-03-09 | TEI9 | - | 2011-03-09 |
0143 | 1 | F | Rel-9 | 9.6.0 | - | Unclearness of Downlink Data Notification Handling as a result of the SGW having received an Error Indication message from the eNodeB/RNC | - | - | - | C4 | C4-51b | C4-110344 | Postponed | 2011-03-09 | TEI9 | - | 2011-03-09 |
0144 | - | A | Rel-10 | 10.2.0 | - | Unclearness of Downlink Data Notification Handling as a result of the SGW having received an Error Indication message from the eNodeB/RNC | - | - | - | C4 | C4-51b | C4-110096 | Revised | 2011-03-09 | TEI9 | - | 2011-03-09 |
0144 | 1 | A | Rel-10 | 10.2.0 | - | Unclearness of Downlink Data Notification Handling as a result of the SGW having received an Error Indication message from the eNodeB/RNC | - | - | - | C4 | C4-51b | C4-110345 | Postponed | 2011-03-09 | TEI9 | - | 2011-03-09 |
0145 | - | F | Rel-10 | 10.2.0 | - | Error Indication for SGW | - | - | - | C4 | C4-51b | C4-110115 | Revised | 2011-03-09 | TEI10 | - | 2011-03-09 |
0145 | 1 | F | Rel-10 | 10.2.0 | 10.3.0 | Error Indication for SGW | CP-51 | CP-110065 | approved | C4 | C4-51b | C4-110368 | Agreed | 2011-03-09 | TEI10 | - | 2011-03-09 |
0146 | - | B | Rel-10 | 10.2.0 | - | PCRF Failure and Restoration | - | - | - | C4 | C4-51b | C4-110126 | Revised | 2011-03-09 | PCRF-FR | - | 2011-03-09 |
0146 | 1 | B | Rel-10 | 10.2.0 | - | PCRF Failure and Restoration | - | - | - | C4 | C4-51b | C4-110346 | Revised | 2011-03-09 | PCRF-FR | - | 2011-03-09 |
0146 | 2 | B | Rel-10 | 10.2.0 | - | PCRF Failure and Restoration | - | - | - | C4 | C4-51b | C4-110387 | Revised | 2011-03-09 | PCRF-FR | - | 2011-03-09 |
0146 | 3 | B | Rel-10 | 10.2.0 | - | PCRF Failure and Restoration | - | - | - | C4 | C4-52 | C4-110547 | Revised | 2011-03-09 | PCRF-FR | - | 2011-03-09 |
0146 | 3 | B | Rel-10 | 10.2.0 | - | PCRF Failure and Restoration | - | - | - | C4 | C4-52 | C4-110713 | Revised | 2011-03-09 | PCRF-FR | - | 2011-03-09 |
0146 | 4 | B | Rel-10 | 10.2.0 | - | PCRF Failure and Restoration | - | - | - | C4 | C4-52 | C4-110742 | Withdrawn | 2011-03-09 | PCRF-FR | - | 2011-03-09 |
0146 | 4 | B | Rel-10 | 10.2.0 | - | PCRF Failure and Restoration | - | - | - | C4 | C4-52 | C4-110860 | Revised | 2011-03-09 | PCRF-FR | - | 2011-03-09 |
0146 | 5 | B | Rel-10 | 10.2.0 | 10.3.0 | PCRF Failure and Restoration | CP-51 | CP-110085 | approved | C4 | C4-52 | C4-110953 | Agreed | 2011-03-09 | PCRF-FR | - | 2011-03-09 |
0147 | - | B | Rel-10 | 10.2.0 | - | PCRF reselection for the PCRF failure and restoration | - | - | - | C4 | C4-51b | C4-110161 | Withdrawn | 2011-03-09 | PCRF-FR | - | 2011-03-09 |
0148 | - | F | Rel-10 | 10.2.0 | - | Error Indication in SGW | - | - | - | C4 | C4-52 | C4-110481 | Revised | 2011-03-09 | TEI10 | - | 2011-03-09 |
0148 | 1 | F | Rel-10 | 10.2.0 | - | Error Indication in SGW | - | - | - | C4 | C4-52 | C4-110829 | Revised | 2011-03-09 | TEI10 | - | 2011-03-09 |
0148 | 2 | F | Rel-10 | 10.2.0 | 10.3.0 | Error Indication in SGW | CP-51 | CP-110065 | approved | C4 | C4-52 | C4-110956 | Agreed | 2011-03-09 | TEI10 | - | 2011-03-09 |
0149 | - | B | Rel-10 | 10.2.0 | - | MME restart and restoration procedure | - | - | - | C4 | C4-52 | C4-110528 | Withdrawn | 2011-03-09 | EPCNR | - | 2011-03-09 |
0150 | - | F | Rel-9 | 9.6.0 | - | Unclearness of Downlink Data Notification Handling at MME/S4 SGSN as a result of the SGW having received an Error Indication message from the eNodeB/RNC | - | - | - | C4 | C4-52 | C4-110534 | Revised | 2011-03-09 | TEI9 | - | 2011-03-09 |
0150 | 1 | F | Rel-9 | 9.6.0 | 9.7.0 | Unclearness of Downlink Data Notification Handling at MME/S4 SGSN as a result of the SGW having received an Error Indication message from the eNodeB/RNC | CP-51 | CP-110047 | approved | C4 | C4-52 | C4-110930 | Agreed | 2011-03-09 | TEI9 | - | 2011-03-09 |
0151 | - | A | Rel-10 | 10.2.0 | - | Unclearness of Downlink Data Notification Handling at MME/S4 SGSN as a result of the SGW having received an Error Indication message from the eNodeB/RNC | - | - | - | C4 | C4-52 | C4-110535 | Revised | 2011-03-09 | TEI9 | - | 2011-03-09 |
0151 | 1 | A | Rel-10 | 10.2.0 | 10.3.0 | Unclearness of Downlink Data Notification Handling at MME/S4 SGSN as a result of the SGW having received an Error Indication message from the eNodeB/RNC | CP-51 | CP-110047 | approved | C4 | C4-52 | C4-110931 | Agreed | 2011-03-09 | TEI9 | - | 2011-03-09 |
0152 | - | F | Rel-10 | 10.2.0 | - | Handling of UE specific Error Indication over the PMIP | - | - | - | C4 | C4-52 | C4-110543 | Revised | 2011-03-09 | TEI10 | - | 2011-03-09 |
0152 | 1 | F | Rel-10 | 10.2.0 | - | Handling of UE specific Error Indication over the PMIP | - | - | - | C4 | C4-52 | C4-110869 | Revised | 2011-03-09 | TEI10 | - | 2011-03-09 |
0152 | 2 | F | Rel-10 | 10.2.0 | 10.3.0 | Handling of UE specific Error Indication over the PMIP | CP-51 | CP-110072 | approved | C4 | C4-52 | C4-110984 | Agreed | 2011-03-09 | TEI10 | - | 2011-03-09 |
0153 | - | B | Rel-10 | 10.2.0 | - | Add restoration instruction for MME failure | - | - | - | C4 | C4-52 | C4-110545 | Withdrawn | 2011-03-09 | EPC_NR | - | 2011-03-09 |
0154 | - | F | Rel-10 | 10.2.0 | - | RNC failure | - | - | - | C4 | C4-52 | C4-110634 | Revised | 2011-03-09 | TEI10 | - | 2011-03-09 |
0154 | 1 | F | Rel-10 | 10.2.0 | 10.3.0 | RNC failure | CP-51 | CP-110065 | approved | C4 | C4-52 | C4-110878 | Agreed | 2011-03-09 | TEI10 | - | 2011-03-09 |
0155 | - | F | Rel-10 | 10.2.0 | 10.3.0 | eNodeB failure | CP-51 | CP-110065 | approved | C4 | C4-52 | C4-110635 | Agreed | 2011-03-09 | TEI10 | - | 2011-03-09 |
0156 | - | B | Rel-10 | 10.2.0 | - | MME restart and restoration procedure | - | - | - | C4 | C4-52 | C4-110636 | Revised | 2011-03-09 | EPCNR | - | 2011-03-09 |
0156 | 1 | B | Rel-10 | 10.2.0 | - | MME restart and restoration procedure | - | - | - | C4 | C4-52 | C4-110743 | Revised | 2011-03-09 | EPCNR | - | 2011-03-09 |
0156 | 2 | B | Rel-10 | 10.2.0 | - | MME restart and restoration procedure | - | - | - | C4 | C4-52 | C4-110802 | Revised | 2011-03-09 | EPCNR | - | 2011-03-09 |
0156 | 3 | B | Rel-10 | 10.2.0 | - | MME restart and restoration procedure | - | - | - | C4 | C4-52 | C4-110784 | Revised | 2011-03-09 | EPCNR | - | 2011-03-09 |
0156 | 4 | B | Rel-10 | 10.2.0 | - | MME restart and restoration procedure | - | - | - | C4 | C4-52 | C4-110934 | Revised | 2011-03-09 | EPCNR | - | 2011-03-09 |
0156 | 5 | B | Rel-10 | 10.2.0 | 10.3.0 | MME restart and restoration procedure | CP-51 | CP-110083 | approved | C4 | C4-52 | C4-110969 | Agreed | 2011-03-09 | EPCNR | - | 2011-03-09 |
0157 | - | B | Rel-10 | 10.2.0 | - | Handling MME failure when ISR is enabled | - | - | - | C4 | C4-52 | C4-110642 | Withdrawn | 2011-03-09 | TEI10 | - | 2011-03-09 |
0158 | - | F | Rel-9 | 9.6.0 | - | Downlink Data Notification Handling at MME/S4 SGSN from SGW following Error Indication message from eNodeB/RNC | - | - | - | C4 | C4-52 | C4-110714 | Withdrawn | 2011-03-09 | TEI9 | - | 2011-03-09 |
0159 | - | A | Rel-10 | 10.2.0 | - | Downlink Data Notification Handling at MME/S4 SGSN from SGW following Error Indication message from eNodeB/RNC | - | - | - | C4 | C4-52 | C4-110715 | Withdrawn | 2011-03-09 | TEI9 | - | 2011-03-09 |
0160 | - | F | Rel-10 | 10.3.0 | - | Fix wrong expression ""Double paging"" | - | - | - | C4 | C4-53 | C4-111080 | Revised | 2011-06-01 | EPC_NR | - | 2011-06-01 |
0160 | 1 | F | Rel-10 | 10.3.0 | 10.4.0 | Fix wrong expression ""Double paging"" | CP-52 | CP-110377 | approved | C4 | C4-53 | C4-111429 | Agreed | 2011-06-01 | EPC_NR | - | 2011-06-01 |
0161 | - | F | Rel-10 | 10.3.0 | - | Moving PCRF Restoration text under appropriate heading | - | - | - | C4 | C4-53 | C4-111082 | Revised | 2011-06-01 | PCRF_FR | - | 2011-06-01 |
0161 | 1 | F | Rel-10 | 10.3.0 | 10.4.0 | Moving PCRF Restoration text under appropriate heading | CP-52 | CP-110379 | approved | C4 | C4-53 | C4-111419 | Agreed | 2011-06-01 | PCRF_FR | - | 2011-06-01 |
0162 | - | F | Rel-10 | 10.3.0 | 10.4.0 | eNB Error Indication Handling | CP-52 | CP-110374 | approved | C4 | C4-53 | C4-111086 | Agreed | 2011-06-01 | TEI10 | - | 2011-06-01 |
0163 | - | B | Rel-10 | 10.3.0 | - | MME restart with ISR | - | - | - | C4 | C4-53 | C4-111113 | Revised | 2011-06-01 | EPC_NR_wISR | - | 2011-06-01 |
0163 | 1 | B | Rel-10 | 10.3.0 | - | MME restart with ISR | - | - | - | C4 | C4-53 | C4-111432 | Revised | 2011-06-01 | EPC_NR_wISR | - | 2011-06-01 |
0163 | 2 | B | Rel-10 | 10.3.0 | - | MME restart with ISR | - | - | - | C4 | C4-53 | C4-111608 | Revised | 2011-06-01 | EPC_NR_wISR | - | 2011-06-01 |
0163 | 3 | B | Rel-10 | 10.3.0 | 10.4.0 | MME restart with ISR | CP-52 | CP-110378 | approved | C4 | C4-53 | C4-111655 | Agreed | 2011-06-01 | EPC_NR_wISR | - | 2011-06-01 |
0164 | - | F | Rel-10 | 10.3.0 | - | Clarification on Network triggered service restoration procedure | - | - | - | C4 | C4-53 | C4-111114 | Revised | 2011-06-01 | EPC_NR | - | 2011-06-01 |
0164 | 1 | F | Rel-10 | 10.3.0 | - | Clarification on Network triggered service restoration procedure | - | - | - | C4 | C4-53 | C4-111430 | Revised | 2011-06-01 | EPC_NR | - | 2011-06-01 |
0164 | 2 | F | Rel-10 | 10.3.0 | 10.4.0 | Clarification on Network triggered service restoration procedure | CP-52 | CP-110377 | approved | C4 | C4-53 | C4-111606 | Agreed | 2011-06-01 | EPC_NR | - | 2011-06-01 |
0165 | - | F | Rel-9 | 9.7.0 | - | SGW behaviour when it receives GTP error indication from S4-SGSN | - | - | - | C4 | C4-53 | C4-111140 | Revised | 2011-06-01 | TEI9 | - | 2011-06-01 |
0165 | 1 | F | Rel-9 | 9.7.0 | - | SGW behaviour when it receives GTP error indication from S4-SGSN | - | - | - | C4 | C4-53 | C4-111540 | Revised | 2011-06-01 | TEI9 | - | 2011-06-01 |
0165 | 2 | F | Rel-9 | 9.7.0 | 9.8.0 | SGW behaviour when it receives GTP error indication from S4-SGSN | CP-52 | CP-110366 | approved | C4 | C4-53 | C4-111597 | Agreed | 2011-06-01 | TEI9 | - | 2011-06-01 |
0166 | - | A | Rel-10 | 10.3.0 | - | SGW behaviour when it receives GTP error indication from S4-SGSN | - | - | - | C4 | C4-53 | C4-111141 | Revised | 2011-06-01 | TEI9 | - | 2011-06-01 |
0166 | 1 | A | Rel-10 | 10.3.0 | - | SGW behaviour when it receives GTP error indication from S4-SGSN | - | - | - | C4 | C4-53 | C4-111541 | Revised | 2011-06-01 | TEI9 | - | 2011-06-01 |
0166 | 2 | A | Rel-10 | 10.3.0 | 10.4.0 | SGW behaviour when it receives GTP error indication from S4-SGSN | CP-52 | CP-110366 | approved | C4 | C4-53 | C4-111598 | Agreed | 2011-06-01 | TEI9 | - | 2011-06-01 |
0167 | - | F | Rel-10 | 10.3.0 | - | Gateway Control and QoS Policy Rules Provision Procedure handling at SGW | - | - | - | C4 | C4-53 | C4-111203 | Revised | 2011-06-01 | EPC_NR | - | 2011-06-01 |
0167 | 1 | F | Rel-10 | 10.3.0 | - | Gateway Control and QoS Policy Rules Provision Procedure handling at SGW | - | - | - | C4 | C4-53 | C4-111431 | Revised | 2011-06-01 | EPC_NR | - | 2011-06-01 |
0167 | 2 | F | Rel-10 | 10.3.0 | 10.4.0 | Gateway Control and QoS Policy Rules Provision Procedure handling at SGW | CP-52 | CP-110377 | approved | C4 | C4-53 | C4-111607 | Agreed | 2011-06-01 | EPC_NR | - | 2011-06-01 |
0168 | - | F | Rel-10 | 10.3.0 | - | Restoration of CS services after MME failure | - | - | - | C4 | C4-54 | C4-111677 | Revised | 2011-09-02 | TEI10 | - | 2011-09-15 |
0168 | 1 | F | Rel-10 | 10.3.0 | - | Restoration of CS services after MME failure | - | - | - | C4 | C4-54 | C4-112047 | Postponed | 2011-09-02 | TEI10 | - | 2011-09-15 |
0168 | 2 | F | Rel-11 | 10.5.0 | - | Restoration of CS services after MME failure | - | - | - | C4 | C4-54b | C4-112293 | Revised | 2011-11-28 | eEPC_NR | - | 2011-11-28 |
0168 | 3 | F | Rel-11 | 10.5.0 | - | Restoration of CS services after MME failure | - | - | - | C4 | C4-54b | C4-112459 | Revised | 2011-11-28 | eEPC_NR | - | 2011-11-28 |
0168 | 4 | F | Rel-11 | 10.5.0 | - | Restoration of CS services after MME failure | - | - | - | C4 | C4-55 | C4-112566 | Revised | 2011-11-28 | eEPC_NR | - | 2011-11-28 |
0168 | 5 | B | Rel-11 | 10.5.0 | 11.0.0 | Restoration of CS services after MME failure | CP-54 | CP-110815 | approved | C4 | C4-55 | C4-112974 | Agreed | 2011-11-28 | eEPC_NR | - | 2011-11-28 |
0169 | - | F | Rel-10 | 10.3.0 | - | Signalling path failure handling | - | - | - | C4 | C4-54 | C4-111691 | Revised | 2011-09-02 | TEI10 | - | 2011-09-15 |
0169 | 1 | F | Rel-10 | 10.3.0 | - | Signalling path failure handling | - | - | - | C4 | C4-54 | C4-112135 | Revised | 2011-09-02 | TEI10 | - | 2011-09-15 |
0169 | 2 | F | Rel-10 | 10.4.0 | 10.5.0 | Signalling path failure handling | CP-53 | CP-110567 | approved | C4 | C4-54 | C4-112224 | Agreed | 2011-09-02 | TEI10 | - | 2011-09-15 |
0170 | - | F | Rel-10 | 10.3.0 | - | User plane path failure handling | - | - | - | C4 | C4-54 | C4-111694 | Revised | 2011-09-02 | TEI10 | - | 2011-09-15 |
0170 | 1 | F | Rel-10 | 10.4.0 | 10.5.0 | User plane path failure handling | CP-53 | CP-110567 | approved | C4 | C4-54 | C4-112141 | Agreed | 2011-09-02 | TEI10 | - | 2011-09-15 |
0171 | - | F | Rel-10 | 10.4.0 | - | PMIP alignment for the network triggered service restoration procedure | - | - | - | C4 | C4-54 | C4-111705 | Revised | 2011-09-02 | EPC_NR | - | 2011-09-15 |
0171 | 1 | F | Rel-10 | 10.4.0 | 10.5.0 | PMIP alignment for the network triggered service restoration procedure | CP-53 | CP-110572 | approved | C4 | C4-54 | C4-112045 | Agreed | 2011-09-02 | EPC_NR | - | 2011-09-15 |
0172 | - | F | Rel-10 | 10.4.0 | - | Advanced handling of a signalling path failure | - | - | - | C4 | C4-54 | C4-111717 | Withdrawn | 2011-09-02 | TEI10 | - | 2011-09-15 |
0173 | - | F | Rel-11 | .. | - | CR: Handling MME partial failure for ISR enabled UEs | - | - | - | C4 | C4-54 | C4-111820 | Postponed | 2011-09-02 | TEI11 | - | 2011-09-15 |
0174 | - | F | Rel-9 | 9.8.0 | - | Downlink Data Notification Handling at MME/S4 SGSN | - | - | - | C4 | C4-54 | C4-111996 | Revised | 2011-09-02 | TEI9 | - | 2011-09-15 |
0174 | 1 | F | Rel-9 | 9.8.0 | 9.9.0 | Downlink Data Notification Handling at MME/S4 SGSN | CP-53 | CP-110557 | approved | C4 | C4-54 | C4-112196 | Agreed | 2011-09-02 | TEI9 | - | 2011-09-15 |
0175 | - | A | Rel-10 | 10.4.0 | - | Downlink Data Notification Handling at MME/S4 SGSN | - | - | - | C4 | C4-54 | C4-111997 | Revised | 2011-09-02 | TEI9 | - | 2011-09-15 |
0175 | 1 | A | Rel-10 | 10.4.0 | 10.5.0 | Downlink Data Notification Handling at MME/S4 SGSN | CP-53 | CP-110557 | approved | C4 | C4-54 | C4-112197 | Agreed | 2011-09-02 | TEI9 | - | 2011-09-15 |
0176 | - | F | Rel-10 | 10.5.0 | 10.6.0 | NTSR with ISR active | CP-54 | CP-110800 | approved | C4 | C4-54b | C4-112269 | Agreed | 2011-11-28 | EPC_NR | - | 2011-11-28 |
0177 | - | B | Rel-11 | .. | - | PGW restoration | - | - | - | C4 | C4-54b | C4-112271 | Revised | 2011-11-28 | eEPC_NR | - | 2011-11-28 |
0177 | 1 | B | Rel-11 | 10.5.0 | 11.0.0 | PGW restoration | CP-54 | CP-110815 | approved | C4 | C4-54b | C4-112458 | Agreed | 2011-11-28 | eEPC_NR | - | 2011-11-28 |
0178 | - | F | Rel-11 | 10.5.0 | 11.0.0 | FQ-CSID Reporting | CP-54 | CP-110810 | approved | C4 | C4-54b | C4-112295 | Agreed | 2011-11-28 | TEI11 | - | 2011-11-28 |
0179 | - | B | Rel-11 | .. | - | PGW failure | - | - | - | C4 | C4-54b | C4-112356 | Withdrawn | 2011-11-28 | eNR_EPC | - | 2011-11-28 |
0180 | - | F | Rel-10 | 10.5.0 | - | Paging Area for the MME/SGSN restoration procedure | - | - | - | C4 | C4-55 | C4-112574 | Rejected | 2011-11-28 | EPC_NR | - | 2011-11-28 |
0181 | - | F | Rel-10 | 10.5.0 | - | Restart entity | - | - | - | C4 | C4-55 | C4-112654 | Revised | 2011-11-28 | TEI10 | - | 2011-11-28 |
0181 | 1 | F | Rel-10 | 10.5.0 | - | Restart entity | - | - | - | C4 | C4-55 | C4-112977 | Withdrawn | 2011-11-28 | TEI10 | - | 2011-11-28 |
0182 | - | F | Rel-9 | 9.9.0 | 9.10.0 | Inter MME and intra SGW HOTAU procedures | CP-54 | CP-110788 | approved | C4 | C4-55 | C4-112659 | Agreed | 2011-11-28 | TEI9 | - | 2011-11-28 |
0183 | - | A | Rel-10 | 10.5.0 | 10.6.0 | Inter MME and intra SGW HOTAU procedures | CP-54 | CP-110788 | approved | C4 | C4-55 | C4-112660 | Agreed | 2011-11-28 | TEI9 | - | 2011-11-28 |
0184 | - | F | Rel-10 | 10.5.0 | - | Notification of Failure | - | - | - | C4 | C4-55 | C4-112681 | Withdrawn | 2011-11-28 | TEI10 | - | 2011-11-28 |
0185 | - | F | Rel-10 | 10.5.0 | - | MME FQ-CSID with ISR | - | - | - | C4 | C4-55 | C4-112682 | Revised | 2011-11-28 | TEI10 | - | 2011-11-28 |
0185 | 1 | F | Rel-10 | 10.5.0 | - | MME FQ-CSID with ISR | - | - | - | C4 | C4-55 | C4-112978 | Revised | 2011-11-28 | TEI10 | - | 2011-11-28 |
0185 | 2 | F | Rel-10 | 10.5.0 | 10.6.0 | MME FQ-CSID with ISR | CP-54 | CP-110794 | approved | C4 | C4-55 | C4-113140 | Agreed | 2011-11-28 | TEI10 | - | 2011-11-28 |
0186 | - | F | Rel-9 | 9.9.0 | - | Essential correction to partial failure feature when the ISR is activated for the UE | - | - | - | C4 | C4-55 | C4-112710 | Withdrawn | 2011-11-28 | TEI9 | - | 2011-11-28 |
0187 | - | A | Rel-10 | 10.5.0 | - | Essential correction to partial failure feature when the ISR is activated for the UE | - | - | - | C4 | C4-55 | C4-112711 | Withdrawn | 2011-11-28 | TEI9 | - | 2011-11-28 |
0188 | - | B | Rel-11 | .. | - | Service restoration procedure for PGW partial failure | - | - | - | C4 | C4-55 | C4-112739 | Postponed | 2011-11-28 | eNR_EPC | - | 2011-11-28 |
0189 | - | B | Rel-11 | .. | - | Restoration of Data for VCSG | - | - | - | C4 | C4-55 | C4-112742 | Revised | 2011-11-28 | VCSG-St3 | - | 2011-11-28 |
0189 | 1 | B | Rel-11 | .. | - | Restoration of Data for VCSG | - | - | - | C4 | C4-55 | C4-112991 | Noted | 2011-11-28 | VCSG-St3 | - | 2011-11-28 |
0189 | 1 | B | Rel-11 | 11.0.0 | - | Restoration of Data for VCSG | - | - | - | C4 | C4-56 | C4-120131 | Revised | 2012-02-20 | VCSG-St3 | - | 2012-02-20 |
0189 | 2 | B | Rel-11 | 11.0.0 | - | Restoration of Data for VCSG | - | - | - | C4 | C4-56 | C4-120474 | Noted | 2012-02-20 | VCSG-St3 | - | 2012-02-20 |
0189 | 3 | B | Rel-11 | 11.1.0 | - | Restoration of Data for VCSG | - | - | - | C4 | C4-56b | C4-120676 | Revised | 2012-06-04 | VCSG-St3 | - | 2012-06-04 |
0189 | 4 | B | Rel-11 | 11.1.0 | - | Restoration of Data for VCSG | - | - | - | C4 | C4-57 | C4-120995 | Revised | 2012-06-04 | VCSG-St3 | - | 2012-06-04 |
0189 | 5 | B | Rel-11 | 11.1.0 | - | Restoration of Data for VCSG | - | - | - | C4 | C4-57 | C4-121224 | Postponed | 2012-06-04 | VCSG-St3 | - | 2012-06-04 |
0190 | - | F | Rel-10 | 10.5.0 | 10.6.0 | DDN message in the service restoration procedure | CP-54 | CP-110800 | approved | C4 | C4-55 | C4-112761 | Agreed | 2011-11-28 | EPC_NR | - | 2011-11-28 |
0191 | - | B | Rel-11 | 11.0.0 | - | SGW Restoration procedure | - | - | - | C4 | C4-56 | C4-120125 | Postponed | 2012-02-20 | eNR_EPC | - | 2012-02-20 |
0191 | 1 | B | Rel-11 | 11.1.0 | 11.2.0 | SGW Restoration procedure | CP-56 | CP-120230 | approved | C4 | C4-56b | C4-120670 | Agreed | 2012-06-04 | eNR_EPC | - | 2012-06-04 |
0193 | - | B | Rel-11 | 11.0.0 | - | Error Indication Handling on S2a | - | - | - | C4 | C4-56 | C4-120137 | Revised | 2012-02-20 | SaMOG_WLAN-CN | - | 2012-02-20 |
0193 | 1 | B | Rel-11 | 11.0.0 | 11.1.0 | Error Indication Handling on S2a | CP-55 | CP-120045 | approved | C4 | C4-56 | C4-120451 | Agreed | 2012-02-20 | SaMOG_WLAN-CN | - | 2012-02-20 |
0194 | - | B | Rel-11 | 11.0.0 | - | Restoration of data in the TWAN for S2a | - | - | - | C4 | C4-56 | C4-120138 | Revised | 2012-02-20 | SaMOG_WLAN-CN | - | 2012-02-20 |
0194 | 1 | B | Rel-11 | 11.0.0 | - | Restoration of data in the TWAN for S2a | - | - | - | C4 | C4-56 | C4-120452 | Revised | 2012-02-20 | SaMOG_WLAN-CN | - | 2012-02-20 |
0194 | 2 | B | Rel-11 | 11.0.0 | 11.1.0 | Restoration of data in the TWAN for S2a | CP-55 | CP-120045 | approved | C4 | C4-56 | C4-120529 | Agreed | 2012-02-20 | SaMOG_WLAN-CN | - | 2012-02-20 |
0195 | - | B | Rel-11 | 11.0.0 | - | TWAN partial failure | - | - | - | C4 | C4-56 | C4-120139 | Revised | 2012-02-20 | SaMOG_WLAN-CN | - | 2012-02-20 |
0195 | 1 | B | Rel-11 | 11.0.0 | - | TWAN partial failure | - | - | - | C4 | C4-56 | C4-120454 | Revised | 2012-02-20 | SaMOG_WLAN-CN | - | 2012-02-20 |
0195 | 2 | B | Rel-11 | 11.0.0 | 11.1.0 | TWAN partial failure | CP-55 | CP-120045 | approved | C4 | C4-56 | C4-120565 | Agreed | 2012-02-20 | SaMOG_WLAN-CN | - | 2012-02-20 |
0196 | - | B | Rel-11 | 11.0.0 | - | Restoration of data in the PGW for S2a | - | - | - | C4 | C4-56 | C4-120140 | Revised | 2012-02-20 | SaMOG_WLAN-CN | - | 2012-02-20 |
0196 | 1 | B | Rel-11 | 11.0.0 | 11.1.0 | Restoration of data in the PGW for S2a | CP-55 | CP-120045 | approved | C4 | C4-56 | C4-120455 | Agreed | 2012-02-20 | SaMOG_WLAN-CN | - | 2012-02-20 |
0197 | - | F | Rel-10 | 10.6.0 | - | Correction on the S4-SGSN failure | - | - | - | C4 | C4-56 | C4-120143 | Revised | 2012-02-20 | EPC_NR | - | 2012-02-20 |
0197 | 1 | F | Rel-10 | 10.6.0 | 10.7.0 | Correction on the S4-SGSN failure | CP-55 | CP-120031 | approved | C4 | C4-56 | C4-120400 | Agreed | 2012-02-20 | EPC_NR | - | 2012-02-20 |
0198 | - | A | Rel-11 | 11.0.0 | - | Correction on the S4-SGSN failure | - | - | - | C4 | C4-56 | C4-120144 | Revised | 2012-02-20 | EPC_NR | - | 2012-02-20 |
0198 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | Correction on the S4-SGSN failure | CP-55 | CP-120031 | approved | C4 | C4-56 | C4-120401 | Agreed | 2012-02-20 | EPC_NR | - | 2012-02-20 |
0199 | - | F | Rel-11 | 11.0.0 | - | S1 path failure handling | - | - | - | C4 | C4-56 | C4-120244 | Revised | 2012-02-20 | TEI11 | - | 2012-02-20 |
0199 | 1 | F | Rel-11 | 11.0.0 | 11.1.0 | S1 path failure handling | CP-55 | CP-120039 | approved | C4 | C4-56 | C4-120399 | Agreed | 2012-02-20 | TEI11 | - | 2012-02-20 |
0200 | - | F | Rel-10 | 10.3.0 | - | Restart entity | - | - | - | C4 | C4-56 | C4-120369 | Revised | 2012-02-20 | TEI10 | - | 2012-02-20 |
0200 | 1 | F | Rel-10 | 10.3.0 | - | Restart entity | - | - | - | C4 | C4-56 | C4-120508 | Revised | 2012-02-20 | TEI10 | - | 2012-02-20 |
0200 | 2 | F | Rel-10 | 10.6.0 | 10.7.0 | Restart entity | CP-55 | CP-120026 | approved | C4 | C4-56 | C4-120564 | Agreed | 2012-02-20 | TEI10 | - | 2012-02-20 |
0201 | - | A | Rel-11 | 11.0.0 | - | Restart entity | - | - | - | C4 | C4-56 | C4-120370 | Revised | 2012-02-20 | TEI10 | - | 2012-02-20 |
0201 | 1 | A | Rel-11 | 11.0.0 | - | Restart entity | - | - | - | C4 | C4-56 | C4-120509 | Revised | 2012-02-20 | TEI10 | - | 2012-02-20 |
0201 | 2 | A | Rel-11 | 11.0.0 | 11.1.0 | Restart entity | CP-55 | CP-120026 | approved | C4 | C4-56 | C4-120566 | Agreed | 2012-02-20 | TEI10 | - | 2012-02-20 |
0202 | - | A | Rel-11 | 11.1.0 | - | Restarted peer with two IP addresses | - | - | - | C4 | C4-56b | C4-120602 | Withdrawn | 2012-06-04 | TEI10 | - | 2012-06-04 |
0203 | - | F | Rel-10 | 10.7.0 | - | Restarted peer with two IP addresses | - | - | - | C4 | C4-56b | C4-120615 | Withdrawn | 2012-06-04 | TEI10 | - | 2012-06-04 |
0204 | - | F | Rel-11 | 11.1.0 | - | Missing SGSN behavior in the PGW failure | - | - | - | C4 | C4-56b | C4-120632 | Revised | 2012-06-04 | TEI11 | - | 2012-06-04 |
0204 | 1 | F | Rel-11 | 11.1.0 | 11.2.0 | Missing SGSN behavior in the PGW failure | CP-56 | CP-120230 | approved | C4 | C4-56b | C4-120886 | Agreed | 2012-06-04 | TEI11 | - | 2012-06-04 |
0205 | - | B | Rel-11 | 11.1.0 | - | APN based restoration | - | - | - | C4 | C4-56b | C4-120633 | Withdrawn | 2012-06-04 | TEI11 | - | 2012-06-04 |
0206 | - | B | Rel-11 | 11.1.0 | - | PGW Triggered SGW Restoration Procedure | - | - | - | C4 | C4-56b | C4-120695 | Revised | 2012-06-04 | eNR_EPC | - | 2012-06-04 |
0206 | 1 | B | Rel-11 | 11.1.0 | 11.2.0 | PGW Triggered SGW Restoration Procedure | CP-56 | CP-120230 | approved | C4 | C4-56b | C4-120885 | Agreed | 2012-06-04 | eNR_EPC | - | 2012-06-04 |
0207 | - | F | Rel-11 | 11.1.0 | - | Back-off timer for PGW/GGSN failure | - | - | - | C4 | C4-56b | C4-120767 | Revised | 2012-06-04 | eNR_EPC | - | 2012-06-04 |
0207 | 1 | F | Rel-11 | 11.1.0 | - | Back-off timer for PGW/GGSN failure | - | - | - | C4 | C4-56b | C4-120889 | Postponed | 2012-06-04 | eNR_EPC | - | 2012-06-04 |
0208 | - | F | Rel-11 | 11.1.0 | 11.2.0 | Corrections to external resources cleanup upon SGW failure | CP-56 | CP-120230 | approved | C4 | C4-57 | C4-121065 | Agreed | 2012-06-04 | eNR_EPC | - | 2012-06-04 |
0209 | - | C | Rel-11 | 11.2.0 | - | PCC and PMIP impacts for the SGW restoration procedure | - | - | - | C4 | C4-58 | C4-121376 | Revised | 2012-09-05 | eNR_EPC | - | 2012-09-05 |
0209 | 1 | C | Rel-11 | 11.2.0 | - | PCC and PMIP impacts for the SGW restoration procedure | - | - | - | C4 | C4-58 | C4-121700 | Postponed | 2012-09-05 | eNR_EPC | - | 2012-09-05 |
0209 | 2 | C | Rel-11 | 11.3.0 | - | PCC and PMIP impacts for the SGW restoration procedure | - | - | - | C4 | C4-58b | C4-121879 | Revised | 2012-11-28 | eNR_EPC | - | 2012-11-28 |
0209 | 3 | C | Rel-11 | 11.3.0 | 11.4.0 | PCC and PMIP impacts for the SGW restoration procedure | CP-58 | CP-120739 | approved | C4 | C4-58b | C4-122146 | Agreed | 2012-11-28 | eNR_EPC | - | 2012-11-28 |
0210 | - | B | Rel-11 | 11.2.0 | - | Restoration of Data for VCSG | - | - | - | C4 | C4-58 | C4-121378 | Revised | 2012-09-05 | VCSG-St3 | - | 2012-09-05 |
0210 | 1 | B | Rel-11 | 11.2.0 | - | Restoration of Data for VCSG | - | - | - | C4 | C4-58 | C4-121611 | Revised | 2012-09-05 | VCSG-St3 | - | 2012-09-05 |
0210 | 2 | B | Rel-11 | 11.2.0 | 11.3.0 | Restoration of Data for VCSG | CP-57 | CP-120476 | approved | C4 | C4-58 | C4-121647 | Agreed | 2012-09-05 | VCSG-St3 | - | 2012-09-05 |
0211 | - | F | Rel-11 | 11.2.0 | - | Downlink Data Notification message handling in S4 SGSN | - | - | - | C4 | C4-58 | C4-121425 | Revised | 2012-09-05 | eNR_EPC | - | 2012-09-05 |
0211 | 1 | F | Rel-11 | 11.2.0 | 11.3.0 | Downlink Data Notification message handling in S4 SGSN | CP-57 | CP-120471 | approved | C4 | C4-58 | C4-121701 | Agreed | 2012-09-05 | eNR_EPC | - | 2012-09-05 |
0212 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Corrections to reference titles | CP-58 | CP-120739 | approved | C4 | C4-58b | C4-121895 | Agreed | 2012-11-28 | TEI11 | - | 2012-11-28 |
0213 | 2 | B | Rel-11 | 11.3.0 | - | PCC and PMIP impacts for the SGW restoration procedure | - | - | - | C4 | C4-58b | C4-121905 | Withdrawn | 2012-11-28 | eNR_EPC | - | 2012-11-28 |
0214 | - | F | Rel-11 | 11.3.0 | - | Handling of VLR Failure without Restart | - | - | - | C4 | C4-58b | C4-121913 | Revised | 2012-11-28 | TEI11 | - | 2012-11-28 |
0214 | 1 | F | Rel-11 | 11.3.0 | - | Handling of VLR Failure without Restart | - | - | - | C4 | C4-58b | C4-122160 | Revised | 2012-11-28 | TEI11 | - | 2012-11-28 |
0214 | 2 | F | Rel-11 | 11.3.0 | - | Handling of VLR Failure without Restart | - | - | - | C4 | C4-59 | C4-122312 | Revised | 2012-11-28 | TEI11 | - | 2012-11-28 |
0214 | 3 | F | Rel-11 | 11.3.0 | - | Handling of VLR Failure without Restart | - | - | - | C4 | C4-59 | C4-122471 | Revised | 2012-11-28 | TEI11 | - | 2012-11-28 |
0214 | 4 | F | Rel-11 | 11.3.0 | 11.4.0 | Handling of VLR Failure without Restart | CP-58 | CP-120753 | approved | C4 | C4-59 | C4-122626 | Agreed | 2012-11-28 | TEI11 | - | 2012-11-28 |
0215 | - | F | Rel-11 | 11.3.0 | - | Handling of emergency PDN connections during restoration procedure | - | - | - | C4 | C4-58b | C4-122008 | Revised | 2012-11-28 | eNR_EPC | - | 2012-11-28 |
0215 | 1 | F | Rel-11 | 11.3.0 | 11.4.0 | Handling of emergency PDN connections during restoration procedure | CP-58 | CP-120739 | approved | C4 | C4-58b | C4-122151 | Agreed | 2012-11-28 | eNR_EPC | - | 2012-11-28 |
0216 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Corrections to reference errors | CP-58 | CP-120739 | approved | C4 | C4-59 | C4-122288 | Agreed | 2012-11-28 | TEI11 | - | 2012-11-28 |
0217 | - | B | Rel-11 | 11.3.0 | - | SGW failure when ISR is active | - | - | - | C4 | C4-59 | C4-122321 | Revised | 2012-11-28 | eNR_EPC | - | 2012-11-28 |
0217 | 1 | B | Rel-11 | 11.3.0 | - | SGW failure when ISR is active | - | - | - | C4 | C4-59 | C4-122571 | Revised | 2012-11-28 | eNR_EPC | - | 2012-11-28 |
0217 | 2 | B | Rel-11 | 11.3.0 | - | SGW failure when ISR is active | - | - | - | C4 | C4-59 | C4-122614 | Revised | 2012-11-28 | eNR_EPC | - | 2012-11-28 |
0217 | 3 | B | Rel-11 | 11.3.0 | 11.4.0 | SGW failure when ISR is active | CP-58 | CP-120739 | approved | C4 | C4-59 | C4-122625 | Agreed | 2012-11-28 | eNR_EPC | - | 2012-11-28 |
0217 | 4 | B | Rel-11 | 11.3.0 | - | SGW failure when ISR is active | CP-58 | CP-120857 | withdrawn | Ericsson | - | C4-122625-revis | - | 2012-11-29 | eNR_EPC | - | 2012-12-05 |
0217 | 4 | B | Rel-11 | 11.3.0 | - | SGW failure when ISR is active | CP-58 | CP-120857 | withdrawn | Ericsson | - | CP-120857 | - | 2012-11-29 | eNR_EPC | - | 2012-12-05 |
0218 | - | F | Rel-11 | 11.4.0 | - | Corrections to reference error for periodic location update timer | - | - | - | C4 | C4-60 | C4-130050 | Revised | 2013-02-21 | TEI11 | - | 2013-02-21 |
0218 | 1 | F | Rel-12 | 11.4.0 | 12.0.0 | Corrections to reference error for periodic location update timer | CP-59 | CP-130031 | approved | C4 | C4-60 | C4-130250 | Agreed | 2013-02-21 | TEI12 | - | 2013-02-21 |
0219 | - | F | Rel-11 | 11.4.0 | - | Cause value over the Gx interface | - | - | - | C4 | C4-60 | C4-130095 | Withdrawn | 2013-02-21 | eNR_EPC | - | 2013-02-21 |
0220 | - | F | Rel-12 | .. | - | MME/SGSN behaviour upon MBMS GW restart | - | - | - | C4 | C4-60 | C4-130100 | Revised | 2013-02-21 | eMBMS_Rest | - | 2013-02-21 |
0220 | 1 | F | Rel-12 | 11.4.0 | 12.0.0 | MME/SGSN behaviour upon MBMS GW restart | CP-59 | CP-130033 | approved | C4 | C4-60 | C4-130352 | Agreed | 2013-02-21 | eMBMS_Rest | - | 2013-02-21 |
0221 | - | B | Rel-12 | .. | - | eMBMS service restoration upon MCE failure or M3AP path failure | - | - | - | C4 | C4-60 | C4-130101 | Revised | 2013-02-21 | eMBMS_Rest | - | 2013-02-21 |
0221 | 1 | B | Rel-12 | 11.4.0 | 12.0.0 | eMBMS service restoration upon MCE failure or M3AP path failure | CP-59 | CP-130033 | approved | C4 | C4-60 | C4-130353 | Agreed | 2013-02-21 | eMBMS_Rest | - | 2013-02-21 |
0222 | - | B | Rel-12 | .. | - | eMBMS service restoration upon MME/SGSN restart | - | - | - | C4 | C4-60 | C4-130102 | Revised | 2013-02-21 | eMBMS_Rest | - | 2013-02-21 |
0222 | 1 | B | Rel-12 | 11.4.0 | 12.0.0 | eMBMS service restoration upon MME/SGSN restart | CP-59 | CP-130033 | approved | C4 | C4-60 | C4-130354 | Agreed | 2013-02-21 | eMBMS_Rest | - | 2013-02-21 |
0223 | - | B | Rel-12 | .. | - | Sm path failure handling | - | - | - | C4 | C4-60 | C4-130103 | Revised | 2013-02-21 | eMBMS_Rest | - | 2013-02-21 |
0223 | 1 | B | Rel-12 | .. | - | Sm path failure handling | - | - | - | C4 | C4-60 | C4-130355 | Revised | 2013-02-21 | eMBMS_Rest | - | 2013-02-21 |
0223 | 2 | B | Rel-12 | 11.4.0 | 12.0.0 | Sm path failure handling | CP-59 | CP-130033 | approved | C4 | C4-60 | C4-130401 | Agreed | 2013-02-21 | eMBMS_Rest | - | 2013-02-21 |
0224 | - | F | Rel-11 | 11.4.0 | - | SGSN handling of VLR restart | - | - | - | C4 | C4-60 | C4-130104 | Revised | 2013-02-21 | TEI11 | - | 2013-02-21 |
0224 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | SGSN handling of VLR restart | CP-59 | CP-130024 | approved | C4 | C4-60 | C4-130251 | Agreed | 2013-02-21 | TEI11 | - | 2013-02-21 |
0225 | - | F | Rel-11 | 11.4.0 | - | Fixing editor's notes in SGW restoration procedure | - | - | - | C4 | C4-60 | C4-130107 | Revised | 2013-02-21 | eNR_EPC | - | 2013-02-21 |
0225 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | Fixing editor's notes in SGW restoration procedure | CP-59 | CP-130019 | approved | C4 | C4-60 | C4-130386 | Agreed | 2013-02-21 | eNR_EPC | - | 2013-02-21 |
0226 | - | F | Rel-11 | 11.4.0 | - | The inclusion of the MME S4-SGSN identifier IE | - | - | - | C4 | C4-60 | C4-130123 | Revised | 2013-02-21 | eNR_EPC | - | 2013-02-21 |
0226 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | The inclusion of the MME S4-SGSN identifier IE | CP-59 | CP-130019 | approved | C4 | C4-60 | C4-130389 | Agreed | 2013-02-21 | eNR_EPC | - | 2013-02-21 |
0227 | - | F | Rel-11 | 11.4.0 | - | Cleanup on open issued (Editor's notes) | - | - | - | C4 | C4-60 | C4-130124 | Withdrawn | 2013-02-21 | eNR_EPC | - | 2013-02-21 |
0228 | - | B | Rel-12 | 12.0.0 | 12.1.0 | Trigger for re-establishing MBMS sessions upon an M3AP path recovery | CP-60 | CP-130301 | approved | C4 | C4-61 | C4-130557 | Agreed | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0229 | - | B | Rel-12 | 12.0.0 | - | Moving the control of an MBMS session to another MME | - | - | - | C4 | C4-61 | C4-130558 | Revised | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0229 | 1 | B | Rel-12 | 12.0.0 | 12.1.0 | Moving the control of an MBMS session to another MME | CP-60 | CP-130301 | approved | C4 | C4-61 | C4-130903 | Agreed | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0230 | - | B | Rel-12 | 12.0.0 | - | BM-SC behaviour upon MBMS GW restart | - | - | - | C4 | C4-61 | C4-130559 | Revised | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0230 | 1 | B | Rel-12 | 12.0.0 | 12.1.0 | BM-SC behaviour upon MBMS GW restart | CP-60 | CP-130301 | approved | C4 | C4-61 | C4-130907 | Agreed | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0231 | - | B | Rel-12 | 12.0.0 | - | SGmb path failure | - | - | - | C4 | C4-61 | C4-130560 | Revised | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0231 | 1 | B | Rel-12 | 12.0.0 | - | SGmb path failure | - | - | - | C4 | C4-61 | C4-130908 | Revised | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0231 | 2 | B | Rel-12 | 12.0.0 | 12.1.0 | SGmb path failure | CP-60 | CP-130301 | approved | C4 | C4-61 | C4-131012 | Agreed | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0232 | - | B | Rel-12 | 12.0.0 | - | Contents of MBMS Session Start Request when re-establishing MBMS sessions | - | - | - | C4 | C4-61 | C4-130561 | Revised | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0232 | 1 | B | Rel-12 | 12.0.0 | 12.1.0 | Contents of MBMS Session Start Request when re-establishing MBMS sessions | CP-60 | CP-130301 | approved | C4 | C4-61 | C4-130909 | Agreed | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0233 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Restoration Priority during SGW and PGW restoration procedures | CP-60 | CP-130295 | approved | C4 | C4-61 | C4-130577 | Agreed | 2013-06-12 | eNR_EPC | - | 2013-06-12 |
0234 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Restoration Priority during SGW and PGW restoration procedures | CP-60 | CP-130295 | approved | C4 | C4-61 | C4-130578 | Agreed | 2013-06-12 | eNR_EPC | - | 2013-06-12 |
0235 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Clean-up of statements related to emergency PSAP callback | CP-60 | CP-130295 | approved | C4 | C4-61 | C4-130586 | Agreed | 2013-06-12 | eNR_EPC | - | 2013-06-12 |
0236 | - | B | Rel-12 | 12.0.0 | - | MCE behavior on MME restart and MME behavior on MCE restart | - | - | - | C4 | C4-61 | C4-130643 | Revised | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0236 | 1 | B | Rel-12 | 12.0.0 | - | MCE behavior on MME restart and MME behavior on MCE restart | - | - | - | C4 | C4-61 | C4-130902 | Revised | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0236 | 2 | B | Rel-12 | 12.0.0 | 12.1.0 | MCE behavior on MME restart and MME behavior on MCE restart | CP-60 | CP-130301 | approved | C4 | C4-61 | C4-131013 | Agreed | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0237 | - | B | Rel-12 | 12.0.0 | - | BM-SC failure | - | - | - | C4 | C4-61 | C4-130669 | Revised | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0237 | 1 | B | Rel-12 | 12.0.0 | 12.1.0 | BM-SC failure | CP-60 | CP-130301 | approved | C4 | C4-61 | C4-130910 | Agreed | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0238 | - | B | Rel-12 | 12.0.0 | - | MBMS GW behaviour upon MME/SGSN restart | - | - | - | C4 | C4-61 | C4-130670 | Revised | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0238 | 1 | B | Rel-12 | 12.0.0 | 12.1.0 | MBMS GW behaviour upon MME/SGSN restart | CP-60 | CP-130301 | approved | C4 | C4-61 | C4-130911 | Agreed | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0239 | - | B | Rel-12 | 12.0.0 | - | MME behaviour upon MBMS GW restart | - | - | - | C4 | C4-61 | C4-130671 | Revised | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0239 | 1 | B | Rel-12 | 12.0.0 | 12.1.0 | MME behaviour upon MBMS GW restart | CP-60 | CP-130301 | approved | C4 | C4-61 | C4-130912 | Agreed | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0240 | - | B | Rel-12 | 12.0.0 | - | SGSN behaviour upon MBMS GW restart | - | - | - | C4 | C4-61 | C4-130672 | Revised | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0240 | 1 | B | Rel-12 | 12.0.0 | 12.1.0 | SGSN behaviour upon MBMS GW restart | CP-60 | CP-130301 | approved | C4 | C4-61 | C4-130913 | Agreed | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0241 | - | B | Rel-12 | 12.0.0 | - | Sn-path failure | - | - | - | C4 | C4-61 | C4-130673 | Revised | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0241 | 1 | B | Rel-12 | 12.0.0 | - | Sn-path failure | - | - | - | C4 | C4-61 | C4-130914 | Revised | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0241 | 2 | B | Rel-12 | 12.0.0 | 12.1.0 | Sn-path failure | CP-60 | CP-130301 | approved | C4 | C4-61 | C4-131014 | Agreed | 2013-06-12 | eMBMS_Rest | - | 2013-06-12 |
0242 | - | F | Rel-12 | 12.0.0 | - | Stop Paging Indication in service restoration procedure with ISR | - | - | - | C4 | C4-61 | C4-130681 | Revised | 2013-06-12 | TEI12 | - | 2013-06-12 |
0242 | 1 | F | Rel-12 | 12.0.0 | 12.1.0 | Stop Paging Indication in service restoration procedure with ISR | CP-60 | CP-130304 | approved | C4 | C4-61 | C4-130932 | Agreed | 2013-06-12 | TEI12 | - | 2013-06-12 |
0243 | - | F | Rel-12 | 12.0.0 | - | Delete Bearer Request triggered by PMIP error indication message | - | - | - | C4 | C4-61 | C4-130683 | Revised | 2013-06-12 | TEI12 | - | 2013-06-12 |
0243 | 1 | F | Rel-12 | 12.0.0 | - | Delete Bearer Request triggered by PMIP error indication message | - | - | - | C4 | C4-61 | C4-130941 | Revised | 2013-06-12 | TEI12 | - | 2013-06-12 |
0243 | 2 | F | Rel-12 | 12.0.0 | 12.1.0 | Delete Bearer Request triggered by PMIP error indication message | CP-60 | CP-130304 | approved | C4 | C4-61 | C4-131056 | Agreed | 2013-06-12 | TEI12 | - | 2013-06-12 |
0244 | - | F | Rel-11 | 11.5.0 | - | SGSN behaviour upon SGW restart | - | - | - | C4 | C4-61 | C4-130688 | Revised | 2013-06-12 | eNR_EPC | - | 2013-06-12 |
0244 | 1 | F | Rel-11 | 11.5.0 | 11.6.0 | SGSN behaviour upon SGW restart | CP-60 | CP-130295 | approved | C4 | C4-61 | C4-130930 | Agreed | 2013-06-12 | eNR_EPC | - | 2013-06-12 |
0245 | - | A | Rel-12 | 12.0.0 | - | SGSN behaviour upon SGW restart | - | - | - | C4 | C4-61 | C4-130689 | Revised | 2013-06-12 | eNR_EPC | - | 2013-06-12 |
0245 | 1 | A | Rel-12 | 12.0.0 | 12.1.0 | SGSN behaviour upon SGW restart | CP-60 | CP-130295 | approved | C4 | C4-61 | C4-130931 | Agreed | 2013-06-12 | eNR_EPC | - | 2013-06-12 |
0246 | - | B | Rel-12 | 12.1.0 | - | MBMS Session Start Request received for an on-going MBMS bearer service | - | - | - | C4 | C4-62 | C4-131089 | Revised | 2013-08-29 | eMBMS_Rest | - | 2013-08-29 |
0246 | 1 | B | Rel-12 | 12.1.0 | 12.2.0 | MBMS Session Start Request received for an on-going MBMS bearer service | CP-61 | CP-130454 | approved | C4 | C4-62 | C4-131406 | Agreed | 2013-08-29 | eMBMS_Rest | - | 2013-08-29 |
0247 | - | B | Rel-12 | 12.1.0 | - | MBMS Session duration | - | - | - | C4 | C4-62 | C4-131148 | Revised | 2013-08-29 | eMBMS_Rest | - | 2013-08-29 |
0247 | 1 | B | Rel-12 | 12.1.0 | 12.2.0 | MBMS Session duration | CP-61 | CP-130454 | approved | C4 | C4-62 | C4-131407 | Agreed | 2013-08-29 | eMBMS_Rest | - | 2013-08-29 |
0248 | - | F | Rel-12 | 12.1.0 | - | BM-SC behaviour during SGmb path failure | - | - | - | C4 | C4-62 | C4-131149 | Revised | 2013-08-29 | eMBMS_Rest | - | 2013-08-29 |
0248 | 1 | B | Rel-12 | 12.1.0 | 12.2.0 | BM-SC behaviour during SGmb path failure | CP-61 | CP-130454 | approved | C4 | C4-62 | C4-131408 | Agreed | 2013-08-29 | eMBMS_Rest | - | 2013-08-29 |
0249 | - | F | Rel-12 | 12.1.0 | - | MCE behaviour on MME restart | - | - | - | C4 | C4-62 | C4-131150 | Revised | 2013-08-29 | eMBMS_Rest | - | 2013-08-29 |
0249 | 1 | B | Rel-12 | 12.1.0 | 12.2.0 | MCE behaviour on MME restart | CP-61 | CP-130454 | approved | C4 | C4-62 | C4-131409 | Agreed | 2013-08-29 | eMBMS_Rest | - | 2013-08-29 |
0250 | - | B | Rel-12 | 12.1.0 | - | Release of resources at old MME/SGSN during transient Sm path failure | - | - | - | C4 | C4-62 | C4-131163 | Revised | 2013-08-29 | eMBMS_Rest | - | 2013-08-29 |
0250 | 1 | B | Rel-12 | 12.1.0 | 12.2.0 | Release of resources at old MME/SGSN during transient Sm path failure | CP-61 | CP-130454 | approved | C4 | C4-62 | C4-131410 | Agreed | 2013-08-29 | eMBMS_Rest | - | 2013-08-29 |
0251 | - | B | Rel-12 | 12.1.0 | - | Separate Subclause for MCE and RNC restoration functionality | - | - | - | C4 | C4-62 | C4-131218 | Revised | 2013-08-29 | eMBMS_Rest | - | 2013-08-29 |
0251 | 1 | B | Rel-12 | 12.1.0 | 12.2.0 | Separate Subclause for MCE and RNC restoration functionality | CP-61 | CP-130454 | approved | C4 | C4-62 | C4-131411 | Agreed | 2013-08-29 | eMBMS_Rest | - | 2013-08-29 |
0252 | - | F | Rel-12 | 12.1.0 | - | Correct S-GW behaviours when a peer P-GW failed | - | - | - | C4 | C4-62 | C4-131236 | Revised | 2013-08-29 | TEI12 | - | 2013-08-29 |
0252 | 1 | F | Rel-12 | 12.1.0 | - | Correct S-GW behaviours when a peer P-GW failed | - | - | - | C4 | C4-62 | C4-131464 | Revised | 2013-08-29 | TEI12 | - | 2013-08-29 |
0252 | 2 | F | Rel-12 | 12.1.0 | 12.2.0 | Correct S-GW behaviours when a peer P-GW failed | CP-61 | CP-130467 | approved | C4 | C4-62 | C4-131530 | Agreed | 2013-08-29 | TEI12 | - | 2013-08-29 |
0253 | - | F | Rel-12 | 12.1.0 | - | Correct wrong NOTE reference | - | - | - | C4 | C4-62 | C4-131237 | Revised | 2013-08-29 | TEI12 | - | 2013-08-29 |
0253 | 1 | F | Rel-12 | 12.1.0 | 12.2.0 | Correct wrong NOTE reference | CP-61 | CP-130467 | approved | C4 | C4-62 | C4-131465 | Agreed | 2013-08-29 | TEI12 | - | 2013-08-29 |
0254 | - | F | Rel-11 | 11.6.0 | - | Handling of VLR Failure for MO SMS | - | - | - | C4 | C4-62 | C4-131248 | Withdrawn | 2013-08-29 | TEI11 | - | 2013-08-29 |
0255 | - | A | Rel-12 | 12.1.0 | - | Handling of VLR Failure for MO SMS | - | - | - | C4 | C4-62 | C4-131249 | Revised | 2013-08-29 | TEI11 | - | 2013-08-29 |
0255 | 1 | B | Rel-12 | 12.1.0 | - | Handling of VLR Failure for MO SMS | - | - | - | C4 | C4-62 | C4-131420 | Revised | 2013-08-29 | TEI12 | - | 2013-08-29 |
0255 | 2 | B | Rel-12 | 12.1.0 | 12.2.0 | Handling of VLR Failure for MO SMS | CP-61 | CP-130467 | approved | C4 | C4-62 | C4-131539 | Agreed | 2013-08-29 | TEI12 | - | 2013-08-29 |
page generated from database: 2013-10-16 10:33:15