Go to spec numbering scheme page
3GPP Specification Change Request records for: 23.018
CR no. | rev | cat | Release | CR written to vers | new vers | CR title | TSG meeting | TSG doc | TSG status | source | WG meeting | WG doc | WG status | cover date | work item | remarks | database record created |
0001 | - | F | Rel-11 | .. | - | CSG access control in CS domain | - | - | - | C4 | C4-54b | C4-112348 | Revised | 2011-11-28 | TEI11 | - | 2011-11-28 |
0001 | - | A | R99 | 3.0.0 | 3.1.0 | Notification of call forwarding to the gsmSCF | NP-04 | N2-99589 | approved | N2B | - | - | agreed | 1999-06-28 | - | approved via corresp (28/6/99) | - |
0002 | 4 | B | R99 | 3.1.0 | 3.2.0 | Addition of the description for Pre-paging | NP-05 | NP-99304 | approved | N2 | - | N2-99C94 | Agreed | 1999-10-05 | Prepaging | - | - |
0004 | 2 | C | R99 | 3.2.0 | 3.3.0 | Introduction of the Super-Charger Concept in TS 23.018 | NP-06 | NP-99500 | approved | N2 | N2-12 | N2-99G08 | - | 1999-12-15 | Super_Charger | - | - |
0006 | - | A | R99 | 3.1.0 | 3.2.0 | Removal of TDP-Criteria from RCH | NP-05 | NP-99298 | approved | N2 | - | N2-99B24 | Agreed | 1999-10-05 | CAMEL2 | - | - |
0007 | 1 | A | R99 | 3.1.0 | 3.2.0 | GMSC CAMEL Phases in PRN | NP-05 | NP-99298 | approved | N2 | - | N2-99D09 | Agreed | 1999-10-05 | CAMEL2 | - | - |
0023 | - | A | R99 | 3.1.0 | 3.2.0 | Separation of success & failure cases for OR of late call forwarding | NP-05 | NP-99308 | approved | N2 | - | N2-99B62 | Agreed | 1999-10-05 | Call_Deflection | - | - |
0024 | - | A | R99 | 3.1.0 | 3.2.0 | Notification of CF to gsmSCF before activation of CF process Frowardin process | NP-05 | NP-99298 | approved | N2 | - | N2-99D05 | Agreed | 1999-10-05 | CAMEL2 | - | - |
0025 | 2 | B | R99 | 3.2.0 | - | Addition of the description for Multicall | NP-06 | NP-99496 | rejected | N2 | N2-12 | N2-99H19 | - | 1999-12-15 | Multicall | - | - |
0025 | 7 | B | R99 | 3.3.0 | 3.4.0 | Addition of the description for Multicall | NP-07 | NP-000073 | approved | N2 | - | N2B000435 | - | 2000-03-31 | Multicall | - | - |
0026 | 2 | B | R99 | 3.3.0 | 3.4.0 | Alternative solution for ALR | NP-07 | NP-000065 | approved | N2 | - | N2B000326 | - | 2000-03-31 | CAMEL3 | - | - |
0027 | 3 | C | R99 | 3.2.0 | 3.3.0 | Introduction of CAMEL Phase 3 | NP-06 | NP-99490 | approved | N2 | N2-12 | N2-99L16 | - | 1999-12-15 | CAMEL3 | - | - |
0028 | 1 | C | R99 | 3.3.0 | - | User interaction and monitoring | NP-07 | NP-000065 | rejected | N2 | - | N2B000294 | - | 2000-03-31 | CAMEL3 | - | - |
0030 | - | F | R99 | 3.3.0 | 3.4.0 | Correction of the SDL diagram for Pre-paging | NP-07 | NP-000075 | approved | N2 | - | N2B000008 | - | 2000-03-31 | Prepaging | - | - |
0032 | 1 | F | R99 | 3.3.0 | 3.4.0 | Inclusion of D-CSI/N-CSI check in HLR/VLR | NP-07 | NP-000065 | approved | N2 | - | N2A000149 | - | 2000-03-31 | CAMEL3 | - | - |
0033 | - | F | R99 | 3.3.0 | 3.4.0 | Initialisation of Backward Call indicator | NP-07 | NP-000065 | approved | N2 | - | N2A000071 | - | 2000-03-31 | CAMEL3 | - | - |
0034 | - | F | R99 | 3.3.0 | 3.4.0 | Correction of the result of the procedure CAMEL_ICH_MSC_INIT | NP-07 | NP-000065 | approved | N2 | - | N2A000072 | - | 2000-03-31 | CAMEL3 | - | - |
0036 | 3 | B | R99 | 3.3.0 | - | Introduction of Enhanced User Identity Confidentiality | NP-07 | NP-000076 | rejected | N2 | - | N2B000421 | - | 2000-03-31 | Security | - | - |
0037 | - | F | R99 | 3.3.0 | 3.4.0 | Clarification of N-CSI in Core Network | NP-07 | NP-000065 | approved | N2 | - | N2A000146 | - | 2000-03-31 | CAMEL3 | - | - |
0038 | 1 | F | R99 | 3.3.0 | 3.4.0 | Definition of Continue CAMEL Handling | NP-07 | NP-000065 | approved | N2 | - | N2B000327 | - | 2000-03-31 | CAMEL3 | - | - |
0039 | 2 | D | R99 | 3.3.0 | 3.4.0 | Updating references to point to 3G specifications | NP-07 | NP-000079 | approved | N2 | - | N2B000359 | - | 2000-03-31 | TEI | - | - |
0043 | 1 | F | R99 | 3.3.0 | 3.4.0 | Clarification of NPDB error detection and MNP specific call handling | NP-07 | NP-000072 | approved | N2 | - | N2B000362 | - | 2000-03-31 | MNP | - | - |
0044 | - | F | R99 | 3.3.0 | 3.4.0 | Setting the Destination Address for MO calls | NP-07 | NP-000065 | approved | N2 | - | N2B000443 | - | 2000-03-31 | CAMEL3 | - | - |
0045 | 1 | D | R99 | 3.4.0 | 3.5.0 | Correction of CAMEL Incoming Call Handling | NP-08 | NP-000289 | approved | N4 | - | N4-000087 | - | 2000-06-27 | CAMEL3 | - | - |
0047 | - | F | R99 | 3.3.0 | 3.4.0 | O-CSI and D-CSI checks for ORLCF calls | NP-07 | NP-000065 | approved | N2 | - | N2B000409 | - | 2000-03-31 | CAMEL3 | - | - |
0048 | - | F | R99 | 3.3.0 | 3.4.0 | Correction of CF notification | NP-07 | NP-000065 | approved | N2 | - | N2B000166 | - | 2000-03-31 | CAMEL3 | - | - |
0049 | - | B | R99 | 3.3.0 | 3.4.0 | Introduction of Authentication Failure Report | NP-07 | NP-000076 | approved | N2 | - | N2B000315 | - | 2000-03-31 | Security | - | - |
0050 | 3 | C | R99 | 3.3.0 | 3.4.0 | ISUP release cause value | NP-07 | NP-000072 | approved | N2 | - | N2B000462 | - | 2000-03-31 | MNP | - | - |
0051 | 4 | F | R99 | 3.4.0 | 3.5.0 | Correction of Active Retrieval of Location Information procedure | NP-08 | NP-000289 | approved | N4 | - | N4-000394 | - | 2000-06-27 | CAMEL3 | - | - |
0052 | 2 | B | R99 | 3.4.0 | 3.5.0 | North American Service Provider Number Portability impacts for Mobile Number Portability | NP-08 | NP-000297 | approved | N4 | - | N4-000334 | - | 2000-06-27 | MNP | - | - |
0053 | - | F | R99 | 3.5.0 | 3.6.0 | Correction of connector numbering in process ICH_MSC | NP-09 | NP-000499 | approved | N4 | N4-03 | N4-000441 | Agreed in Helsinki | 2000-09-13 | TEI | - | - |
0054 | - | F | R99 | 3.5.0 | 3.6.0 | Correction of the SDL diagram for Pre-paging | NP-09 | NP-000496 | approved | N4 | N4-03 | N4-000446 | Agreed in Helsinki | 2000-09-13 | Prepaging | - | - |
0055 | 4 | C | Rel-4 | 3.5.0 | 4.0.0 | Inclusion of Call Hold in Basic Call Handling | NP-09 | NP-000545 | approved | N4 | N4-04 | N4-000754 | Agreed in Seattle | 2000-09-13 | TEI | - | - |
0056 | - | F | R99 | 3.5.0 | 3.6.0 | Correction to Process ICH_VLR | NP-09 | NP-000483 | approved | N4 | N4-03 | N2-000533 | Agreed in Helsinki | 2000-09-13 | CAMEL3 | - | - |
0057 | 3 | F | R99 | 3.5.0 | 3.6.0 | Handling of the Call Diversion Treatment Indicator | NP-09 | NP-000483 | approved | N4 | N4-04 | N4-000577 | Agreed in Seattle | 2000-09-13 | CAMEL3 | - | - |
0059 | - | F | R99 | 3.5.0 | 3.6.0 | Corrections to procedure obtain routeing address | NP-09 | NP-000499 | approved | N4 | N4-04 | N4-000564 | Agreed in Seattle | 2000-09-13 | TEI | - | - |
0060 | - | F | R99 | 3.5.0 | 3.6.0 | Corrections to process ICH_VLR | NP-09 | NP-000499 | approved | N4 | N4-04 | N4-000569 | Agreed in Seattle | 2000-09-13 | TEI | - | - |
0061 | 2 | F | R99 | 3.5.0 | 3.6.0 | Update of CAMEL References | NP-09 | NP-000483 | approved | N4 | N4-04 | N4-000722 | Agreed in Seattle | 2000-09-13 | CAMEL3 | - | - |
0063 | 1 | A | R99 | 3.5.0 | 3.6.0 | Correction of Obtain_Routeing_Address for the reconnect case | NP-09 | NP-000483 | approved | N4 | N4-04 | N4-000770 | Agreed in Seattle | 2000-09-13 | CAMEL3 | - | - |
0064 | - | C | Rel-4 | 4.0.0 | 4.1.0 | Tidying up of Process Subs_FSM and inter-process signals. | NP-10 | NP-000650 | approved | N4 | N4-05 | N4-000944 | Agreed | 2000-11-30 | TEI | Agreed in Paris | - |
0065 | 1 | C | Rel-4 | 4.1.0 | - | Incorporation of MPTY and ECT into the Subs_FSM process | NP-11 | NP-010088 | revised | N4 | N4-07 | N4-010355 | Agreed | - | TEI | 0 | - |
0065 | 2 | C | Rel-4 | 4.1.0 | 4.2.0 | Incorporation of MPTY and ECT into the Subs_FSM process | NP-11 | NP-010219 | approved | N4 | N4-07 | - | - | 2001-03-17 | TEI4 | - | - |
0067 | - | C | Rel-4 | 4.1.0 | - | Removal of CW descriptions | NP-11 | NP-010088 | revised | N4 | N4-07 | N4-010357 | Agreed | - | TEI | 0 | - |
0067 | 1 | C | Rel-4 | 4.1.0 | 4.2.0 | Removal of CW descriptions | NP-11 | NP-010219 | approved | N4 | N4-07 | - | - | 2001-03-17 | TEI4 | - | - |
0068 | - | F | R99 | 3.6.0 | 3.7.0 | Paging not via the SGSN correction | NP-11 | NP-010076 | approved | N4 | N4-07 | N4-010413 | Agreed | - | LCS | 0 | - |
0069 | - | A | Rel-4 | 4.1.0 | 4.2.0 | Paging not via the SGSN correction | NP-11 | NP-010076 | approved | N4 | N4-07 | N4-010414 | Agreed | - | LCS | 0 | - |
0072 | - | C | Rel-5 | 4.2.0 | 5.0.0 | Handling of MultiCall in MPTY procedure | NP-12 | NP-010300 | approved | N4 | N4-08 | N4-010534 | agreed | 2001-05-18 | TEI5 | - | - |
0073 | - | F | R99 | 3.7.0 | 3.8.0 | Initialisation of variable to monitor activation of CSI's | NP-12 | NP-010283 | approved | N4 | N4-08 | N4-010722 | agreed | 2001-05-18 | CAMEL3 | - | - |
0074 | - | A | Rel-4 | 4.2.0 | 4.3.0 | Initialisation of variable to monitor activation of CSI's | NP-12 | NP-010283 | approved | N4 | N4-08 | N4-010723 | agreed | 2001-05-18 | CAMEL3 | - | - |
0075 | - | F | R99 | 3.8.0 | 3.9.0 | Addition of missing process Update_Location_VLR | NP-13 | NP-010458 | approved | N4 | N4-09 | N4-010853 | agreed | 2001-07-04 | TEI | - | - |
0076 | - | A | Rel-4 | 4.3.0 | 4.4.0 | Addition of missing process Update_Location_VLR | NP-13 | NP-010458 | approved | N4 | N4-09 | N4-010854 | agreed | 2001-07-04 | TEI | - | - |
0077 | - | A | Rel-5 | 5.0.0 | 5.1.0 | Addition of missing process Update_Location_VLR | NP-13 | NP-010458 | approved | N4 | N4-09 | N4-010855 | agreed | 2001-07-04 | TEI | - | - |
0078 | - | F | R99 | 3.9.0 | 3.10.0 | Missing connector in procedure Process_Call_Waiting_MSC | NP-14 | NP-010616 | approved | N4 | N4-09 | N4-011041 | agreed | 2001-10-02 | TEI | - | - |
0079 | - | F | R99 | 3.9.0 | 3.10.0 | Handling of Reconnect on leg2 disconnect | NP-14 | NP-010609 | approved | N4 | N4-10 | N4-011201 | agreed | 2001-10-16 | CAMEL3 | - | - |
0080 | - | A | Rel-4 | 4.4.0 | 4.5.0 | Handling of Reconnect on leg2 disconnect | NP-14 | NP-010609 | approved | N4 | N4-10 | N4-011202 | agreed | 2001-10-16 | CAMEL3 | - | - |
0081 | - | A | Rel-5 | 5.1.0 | 5.2.0 | Handling of Reconnect on leg2 disconnect | NP-14 | NP-010609 | approved | N4 | N4-10 | N4-011203 | agreed | 2001-10-16 | CAMEL3 | - | - |
0082 | 2 | B | Rel-5 | 5.2.0 | 5.3.0 | Introduction of CAMEL Phase 4 | NP-15 | NP-020063 | approved | N4 | N4-12 | N4-020260 | agreed | 2001-10-16 | CAMEL4 | - | - |
0089 | 2 | F | R99 | 3.9.0 | 3.10.0 | Corrections in the ATI mechanism description | NP-14 | NP-010609 | approved | N4 | N4-11 | N4-011412 | agreed | 2001-11-26 | CAMEL3 | - | - |
0090 | 2 | A | Rel-4 | 4.4.0 | 4.5.0 | Corrections in the ATI mechanism description | NP-14 | NP-010609 | approved | N4 | N4-11 | N4-011413 | agreed | 2001-11-26 | CAMEL3 | - | - |
0091 | 2 | A | Rel-5 | 5.1.0 | 5.2.0 | Corrections in the ATI mechanism description | NP-14 | NP-010609 | approved | N4 | N4-11 | N4-011414 | agreed | 2001-11-26 | CAMEL3 | - | - |
0092 | 2 | A | Rel-4 | 4.5.0 | 4.6.0 | MSISDN in Provide Roaming Number in case of MSP | NP-15 | NP-020028 | approved | N4 | N4-12 | N4-020262 | agreed | 2002-01-30 | TEI | - | - |
0093 | 1 | A | Rel-5 | 5.2.0 | 5.3.0 | MSISDN in Provide Roaming Number in case of MSP | NP-15 | NP-020028 | approved | N4 | N4-12 | N4-020232 | agreed | 2002-01-30 | TEI | - | - |
0096 | - | F | R99 | 3.10.0 | 3.11.0 | Correction on the Active Location Retrieval description | NP-15 | NP-020023 | approved | N4 | N4-12 | N4-020133 | agreed | 2002-01-21 | CAMEL3 | - | - |
0097 | - | A | Rel-4 | 4.5.0 | 4.6.0 | Correction on the Active Location Retrieval description | NP-15 | NP-020023 | approved | N4 | N4-12 | N4-020134 | agreed | 2002-01-21 | CAMEL3 | - | - |
0098 | - | A | Rel-5 | 5.2.0 | 5.3.0 | Correction on the Active Location Retrieval description | NP-15 | NP-020023 | approved | N4 | N4-12 | N4-020135 | agreed | 2002-01-21 | CAMEL3 | - | - |
0100 | 1 | C | Rel-5 | 5.2.0 | 5.3.0 | Transferring the MS classmark & IMEI to the gsmSCF | NP-15 | NP-020063 | approved | N4 | N4-12 | N4-020288 | agreed | 2002-01-29 | CAMEL4 | - | - |
0101 | 1 | F | R99 | 3.10.0 | 3.11.0 | MSISDN in Provide Roaming Number in case of MSP | NP-15 | NP-020028 | approved | N4 | N4-12 | N4-020261 | agreed | 2002-01-30 | TEI | - | - |
0109 | 1 | F | Rel-5 | 5.3.0 | 5.4.0 | Determining the basic service for MT calls | NP-17 | NP-020454 | approved | N4 | N4-15 | N4-021039 | agreed | 2002-06-25 | TEI5 | - | - |
0110 | - | F | Rel-5 | 5.3.0 | 5.4.0 | Minor corrections to Process ICH_MSC | NP-17 | NP-020454 | approved | N4 | N4-15 | N4-020917 | agreed | 2002-07-17 | TEI5 | - | - |
0111 | - | F | Rel-5 | 5.3.0 | 5.4.0 | Setting of Leg1_Status Variable | NP-17 | NP-020452 | approved | N4 | N4-15 | N4-020965 | agreed | 2002-07-18 | CAMEL4 | - | - |
0112 | 1 | F | Rel-5 | 5.4.0 | 5.5.0 | Clarification of requirements for the presence of IEs in messages | NP-18 | NP-020596 | approved | N4 | N4-15 | N4-021500 | agreed | 2002-10-23 | TEI5 | - | 2002-11-26 |
0115 | 2 | F | Rel-5 | 5.6.0 | 5.7.0 | Stopping No_Answer timer in the case of forwarding notification | NP-20 | NP-030217 | approved | N4 | N4-19 | N4-030679 | agreed | 2003-01-30 | CAMEL4 | - | 2003-06-04 |
0116 | 1 | F | R99 | 3.11.0 | 3.12.0 | Correction to wrong implementation of approved 089r2 and 096 | NP-19 | NP-030095 | approved | N4 | N4-18 | N4-030327 | revised | 2003-01-31 | CAMEL3 | - | 2003-03-04 |
0117 | - | A | Rel-4 | 4.6.0 | 4.7.0 | Correction to wrong implementation of approved 089r2 and 096 | NP-19 | NP-030095 | approved | N4 | N4-18 | N4-030328 | agreed | 2003-01-31 | CAMEL3 | - | 2003-03-04 |
0118 | - | A | Rel-5 | 5.5.0 | 5.6.0 | Correction to wrong implementation of approved 089r2 and 096 | NP-19 | NP-030095 | approved | N4 | N4-18 | N4-030329 | agreed | 2003-01-31 | CAMEL3 | - | 2003-03-04 |
0123 | 1 | F | Rel-5 | 5.6.0 | 5.7.0 | Enhancements of dialled services procedures in MO and MF calls | NP-20 | NP-030217 | approved | N4 | N4-19 | N4-030679 | agreed | 2003-06-04 | CAMEL4 | - | 2003-06-04 |
0124 | 1 | F | Rel-5 | 5.6.0 | 5.7.0 | Addition of procedure to retrieve UE-specific behaviour data | NP-20 | NP-030224 | approved | N4 | N4-19 | N4-030660 | agreed | 2003-05-08 | LATE_UE | dependent on CRs to be approved at GP-15 | 2003-06-04 |
0124 | 1 | F | Rel-5 | 5.6.0 | 5.7.0 | Addition of procedure to retrieve UE-specific behaviour data | NP-20 | NP-030226 | approved | N4 | N4-19 | N4-030660 | agreed | 2003-05-08 | LATE_UE | dependent on CRs to be approved at GP-15 | 2003-06-04 |
0125 | - | F | Rel-5 | 5.6.0 | - | Addition of procedure to retrieve UE-specific behaviour data | NP-20 | NP-030225 | rejected | N4 | N4-19 | N4-030661 | agreed | 2003-05-20 | LATE_UE | - | 2003-06-04 |
0125 | - | F | Rel-5 | 5.6.0 | - | Addition of procedure to retrieve UE-specific behaviour data | NP-20 | NP-030227 | rejected | N4 | N4-19 | N4-030661 | agreed | 2003-05-20 | LATE_UE | - | 2003-06-04 |
0126 | 1 | B | Rel-6 | 6.0.0 | 6.1.0 | Collective for Rel-6 Enhanced Dialled Services | NP-22 | NP-030515 | approved | N4 | N4-21 | N4-031133 | Agreed | 2003-12-10 | EDCamel | - | 2004-01-05 |
0128 | - | F | Rel-5 | 5.7.0 | 5.8.0 | Corrections to ""Early UE"" handling | NP-21 | NP-030390 | approved | N4 | N4-20 | N4-030845 | agreed | 2003-08-14 | LATE_UE | - | - |
0132 | - | F | Rel-6 | 5.7.0 | - | Removal of SIWF material | NP-21 | NP-030397 | withdrawn | N4 | N4-20 | N4-030959 | agreed | 2003-08-21 | TEI6 | - | - |
0132 | - | F | Rel-6 | 5.7.0 | 6.0.0 | Removal of SIWF material | NP-21 | NP-030426 | approved | N4 | N4-20 | N4-030959 | agreed | 2003-08-21 | TEI6 | - | - |
0133 | - | F | Rel-5 | 5.7.0 | 5.8.0 | SCUDIF HLR Interrogation | NP-21 | NP-030387 | approved | N4 | N4-20 | N4-031025 | agreed | 2003-08-27 | SCUDIF | - | - |
0134 | - | F | Rel-5 | 5.8.0 | - | Incorrect implementation of 133 | NP-23 | NP-040051 | revised | N4 | N4-22 | N4-040024 | agreed | 2004-01-22 | SCUDIF | - | 2004-03-05 |
0134 | 1 | F | Rel-5 | 5.8.0 | 5.9.0 | Incorrect implementation of 133 | NP-23 | NP-040139 | approved | N4 | N4-22 | N4-040024 | agreed | 2004-01-22 | SCUDIF | - | 2004-03-12 |
0135 | - | A | Rel-6 | 6.1.0 | - | Incorrect implementation of 133 | NP-23 | NP-040051 | revised | N4 | N4-22 | N4-040025 | agreed | 2004-01-22 | SCUDIF | - | 2004-03-05 |
0135 | 1 | A | Rel-6 | 6.1.0 | 6.2.0 | Incorrect implementation of 133 | NP-23 | NP-040139 | approved | N4 | N4-22 | N4-040025 | agreed | 2004-01-22 | SCUDIF | - | 2004-03-12 |
0136 | 1 | F | Rel-5 | 5.8.0 | 5.9.0 | Default Basic Service for gsmSCF-initiated calls | NP-23 | NP-040049 | approved | N4 | N4-22 | N4-040269 | agreed | 2004-02-04 | CAMEL4 | - | 2004-03-05 |
0137 | - | A | Rel-6 | 6.1.0 | 6.2.0 | Default Basic Service for gsmSCF-initiated calls | NP-23 | NP-040049 | approved | N4 | N4-22 | N4-040187 | agreed | 2004-02-04 | CAMEL4 | - | 2004-03-05 |
0141 | 1 | B | Rel-6 | 6.2.0 | 6.3.0 | Pre-Paging Resource Optimization | NP-25 | NP-040407 | approved | N4 | N4-23 | N4-040926 | agreed | 2004-04-22 | TEI6 | - | 2004-09-03 |
0143 | - | F | Rel-6 | 6.2.0 | - | Add “CAMEL_Stop_TNRy”in Procedure OG_Call_Setup _MSC (sheet 4) | - | - | - | N4 | N4-24 | N4-040938 | revised | 2004-07-27 | TEI6 | - | 2004-09-03 |
0143 | 1 | F | Rel-6 | 6.2.0 | 6.3.0 | Add “CAMEL_Stop_TNRy”in Procedure OG_Call_Setup _MSC (sheet 4) | NP-25 | NP-040406 | approved | N4 | N4-24 | N4-041181 | agreed | 2004-07-27 | TEI6 | - | 2004-09-03 |
0144 | - | B | Rel-6 | 6.3.0 | 6.4.0 | Management Based Activation Impacts | NP-27 | NP-050057 | approved | N4 | N4-26 | N4-050211 | AGREED | 2005-03-04 | OEM-TRACE | - | 2005-03-08 |
0145 | 1 | B | Rel-7 | 6.4.0 | 7.0.0 | Trunk Originated CAMEL triggering - SDLs | CP-28 | CP-050103 | APPROVED | C4 | C4-27 | C4-050785 | AGREED | 2005-04-25 | CAMELR7 | - | 2005-06-07 |
0146 | - | F | Rel-7 | 7.0.0 | 7.1.0 | Trunk Originated CAMEL: Inter-digit timer stop/reset SDL correction | CP-29 | CP-050312 | approved | C4 | C4-28 | C4-051023 | AGREED | 2005-08-15 | CAMEL7 | - | 2005-09-14 |
0147 | - | F | Rel-6 | 6.4.0 | - | Incorrect References | CP-30 | CP-050621 | withdrawn | C4 | C4-29 | C4-051459 | AGREED | 2005-10-18 | TEI6 | - | 2005-11-29 |
0147 | - | F | Rel-6 | 6.4.0 | 6.5.0 | Incorrect References | CP-30 | CP-050665 | approved | Lucent Tec | - | C4-051459 | - | 2005-10-19 | TEI6 | - | 2005-11-30 |
0148 | - | A | Rel-7 | 7.1.0 | - | Incorrect References | CP-30 | CP-050632 | withdrawn | C4 | C4-29 | C4-051460 | AGREED | 2005-10-18 | TEI6 | - | 2005-11-29 |
0148 | - | A | Rel-7 | 7.1.0 | 7.2.0 | Incorrect References | CP-30 | CP-050665 | approved | Lucent Tec | - | C4-051460 | - | 2005-10-19 | TEI6 | - | 2005-11-30 |
0150 | - | A | Rel-7 | 7.2.0 | 7.3.0 | Correction to the IC_CUG_Check Procedure | CP-33 | CP-060398 | approved | C4 | C4-32 | C4-061188 | Agreed | 2006-09-21 | TEI5 | - | 2006-09-21 |
0151 | - | F | Rel-7 | 7.2.0 | - | Suppression of CUG and CCBS terminating services for a GSM | - | - | - | C4 | C4-32 | C4-061189 | Revised | 2006-09-21 | TEI7 | - | 2006-09-21 |
0151 | 1 | F | Rel-7 | 7.2.0 | - | Suppression of CUG and CCBS terminating services for a GSM | - | - | - | C4 | C4-32 | C4-061390 | Withdrawn | 2006-09-21 | TEI7 | - | 2006-09-21 |
0152 | - | F | Rel-5 | 5.9.0 | 5.10.0 | Correction to the IC_CUG_Check Procedure | CP-33 | CP-060398 | approved | C4 | C4-32 | C4-061388 | Agreed | 2006-09-21 | TEI5 | - | 2006-09-21 |
0153 | - | A | Rel-6 | 6.5.0 | 6.6.0 | Correction to the IC_CUG_Check Procedure | CP-33 | CP-060398 | approved | C4 | C4-32 | C4-061389 | Agreed | 2006-09-21 | TEI5 | - | 2006-09-21 |
0154 | - | C | Rel-7 | 7.3.0 | - | Optional Suppress All parameter in SRI | - | - | - | C4 | C4-33 | C4-061660 | Withdrawn | 2006-11-24 | TEI7 | - | 2006-11-27 |
0155 | - | B | Rel-7 | 7.3.0 | 7.4.0 | Optional Suppress Terminating Services Bit String in SRI | CP-34 | CP-060695 | approved | C4 | C4-33 | C4-061663 | Agreed | 2006-11-24 | TEI7 | - | 2006-11-27 |
0156 | - | F | Rel-7 | 7.4.0 | - | MT to MS moving to another MSC | - | - | - | C4 | C4-34 | C4-070100 | Revised | 2007-03-05 | TEI7 | - | 2007-03-07 |
0156 | 1 | F | Rel-7 | 7.4.0 | - | MT to MS moving to another MSC | - | - | - | C4 | C4-34 | C4-070211 | Revised | 2007-03-05 | TEI7 | - | 2007-03-07 |
0156 | 2 | F | Rel-7 | 7.4.0 | - | MT to MS moving to another MSC | - | - | - | C4 | C4-34 | C4-070256 | Revised | 2007-03-05 | TEI7 | - | 2007-03-07 |
0156 | 3 | F | Rel-7 | 7.4.0 | - | MT to MS moving to another MSC | - | - | - | C4 | C4-34 | C4-070328 | Postponed | 2007-03-05 | TEI7 | - | 2007-03-07 |
0157 | - | F | Rel-7 | 7.4.0 | - | Mobile Termination whilst the MS is moving to another MSC | - | - | - | Alcatel-Lucent | C4-34b | C4-070385 | Revised | 2007-05-22 | MTmovMS | - | 2007-05-24 |
0157 | 1 | F | Rel-7 | 7.4.0 | - | Mobile Termination whilst the MS is moving to another MSC | - | - | - | Alcatel-Lucent | C4-34b | C4-070465 | Revised | 2007-05-22 | MTmovMS | - | 2007-05-24 |
0157 | 2 | B | Rel-7 | 7.4.0 | - | Mobile Termination whilst the MS is moving to another MSC | - | - | - | Alcatel-Lucent | C4-34b | C4-070499 | Revised | 2007-05-22 | MTmovMS | - | 2007-05-24 |
0157 | 3 | B | Rel-7 | 7.4.0 | - | Mobile Termination whilst the MS is moving to another MSC | - | - | - | Alcatel-Lucent | C4-35 | C4-070632 | Revised | 2007-05-22 | MTmovMS | - | 2007-05-24 |
0157 | 4 | B | Rel-7 | 7.4.0 | 7.5.0 | Mobile Termination whilst the MS is moving to another MSC | CP-36 | CP-070328 | approved | Alcatel-Lucent | C4-35 | C4-070777 | Agreed | 2007-05-22 | MTmovMS | - | 2007-05-24 |
0159 | - | F | Rel-7 | 7.4.0 | 7.5.0 | PLMN BC in PRN for alternate speech/fax - alignment with TS 29.007 | CP-36 | CP-070329 | approved | Alcatel-Lucent | C4-35 | C4-070635 | Agreed | 2007-05-22 | TEI7 | - | 2007-05-24 |
0160 | - | F | Rel-7 | 7.5.0 | 7.6.0 | Procedure Check_OG_Barring | CP-37 | CP-070543 | approved | C4 | C4-36 | C4-070921 | Agreed | 2007-09-07 | TEI7 | - | 2007-09-07 |
0161 | - | F | Rel-7 | 7.5.0 | - | Call forwarding on busy handling in HLR | - | - | - | - | C4-36 | C4-071098 | Withdrawn | 2007-09-07 | TEI7 | - | 2007-09-07 |
0162 | - | F | Rel-7 | 7.5.0 | 7.6.0 | Missing SRIack negative response to ISUP release cause mapping in GMSC | CP-37 | CP-070540 | approved | C4 | C4-36 | C4-071157 | Agreed | 2007-09-07 | TEI7 | - | 2007-09-07 |
0163 | - | B | Rel-8 | - | - | Paging optimization with A/Iu flex | - | - | - | C4 | C4-38 | C4-080042 | Revised | 2008-02-18 | TEI8 | - | 2008-02-20 |
0163 | 1 | B | Rel-8 | - | - | Paging optimization with A/Iu flex | - | - | - | C4 | C4-38 | C4-080335 | Noted | 2008-02-18 | TEI8 | - | 2008-02-20 |
0163 | 2 | B | Rel-8 | 7.6.0 | 8.0.0 | Paging optimization with A/Iu flex | CP-40 | CP-080277 | approved | C4 | C4-38b | C4-080646 | Agreed | 2008-05-23 | TEI8 | - | 2008-05-23 |
0164 | - | F | Rel-8 | 8.0.0 | - | eMLPP Priority in MAP SRI, PRN and PSI request | - | - | - | C4 | C4-40 | C4-082004 | Revised | 2008-05-09 | TEI8 | - | 2008-09-08 |
0164 | 1 | F | Rel-8 | 8.0.0 | 8.1.0 | eMLPP Priority in MAP SRI, PRN and PSI request | CP-41 | CP-080467 | approved | C4 | C4-40 | C4-082445 | Agreed | 2008-05-09 | TEI8 | - | 2008-09-08 |
0165 | - | F | Rel-7 | 7.6.0 | 7.7.0 | Corrections to figures and SDLs | CP-41 | CP-080457 | approved | C4 | C4-40 | C4-082005 | Agreed | 2008-05-09 | TEI7 | - | 2008-09-08 |
0166 | - | F | Rel-8 | 8.1.1 | 8.2.0 | PSI negative response | CP-45 | CP-090547 | approved | C4 | C4-45 | C4-092243 | Agreed | 2009-09-08 | TEI8 | - | 2009-09-08 |
0167 | - | C | Rel-8 | 8.2.0 | - | Mobile Termination on Pre-paging whilst the MS is moving to another MSC | - | - | - | C4 | C4-47 | C4-093689 | Revised | 2009-11-26 | TEI8 | - | 2009-11-26 |
0167 | 1 | C | Rel-9 | 8.2.0 | - | Mobile Termination on Pre-paging whilst the MS is moving to another MSC | - | - | - | C4 | C4-47 | C4-094137 | Revised | 2009-11-26 | TEI9 | - | 2009-11-26 |
0167 | 2 | C | Rel-9 | 8.2.0 | - | Mobile Termination on Pre-paging whilst the MS is moving to another MSC | - | - | - | C4 | C4-47 | C4-094247 | Email Approval | 2009-11-26 | TEI8 | - | 2009-11-26 |
0167 | 2 | C | Rel-9 | 8.2.0 | - | Mobile Termination on Pre-paging whilst the MS is moving to another MSC | CP-46 | CP-091010 | revised | C4 | - | C4-094247 | - | 2009-11-25 | TEI9 | Revised in 1039 | 2009-12-02 |
0167 | 3 | C | Rel-9 | 9.0.0 | - | Mobile Termination on Pre-paging whilst the MS is moving to another MSC | - | - | - | C4 | C4-48 | C4-100352 | Revised | 2010-03-10 | TEI9 | - | 2010-03-10 |
0167 | 3 | C | Rel-9 | 8.2.0 | - | Mobile Termination on Pre-paging whilst the MS is moving to another MSC | CP-46 | CP-091039 | postponed | ZTE | - | - | - | 2009-12-02 | TEI9 | - | 2009-12-04 |
0167 | 4 | C | Rel-9 | 9.0.0 | 9.1.0 | Mobile Termination on Pre-paging whilst the MS is moving to another MSC | CP-47 | CP-100038 | approved | C4 | C4-48 | C4-100889 | Agreed | 2010-03-10 | TEI9 | - | 2010-03-10 |
0168 | - | F | Rel-9 | 9.1.0 | - | SRI Negative Response Error | - | - | - | C4 | C4-49 | C4-101221 | Revised | 2010-05-26 | TEI9 | - | 2010-05-26 |
0168 | 1 | F | Rel-9 | 9.1.0 | - | SRI Negative Response Error | - | - | - | C4 | C4-49 | C4-101360 | Withdrawn | 2010-05-26 | TEI9 | - | 2010-05-26 |
0168 | 2 | F | Rel-9 | 9.1.0 | 9.2.0 | SRI Negative Response Error | CP-49 | CP-100458 | approved | C4 | C4-50 | C4-102039 | Agreed | 2010-09-15 | TEI9 | - | 2010-09-15 |
0169 | - | F | Rel-8 | 8.2.0 | 8.3.0 | Correction for SMS via SGs charging | CP-49 | CP-100449 | approved | C4 | C4-50 | C4-102005 | Agreed | 2010-09-15 | TEI8 | - | 2010-09-15 |
0170 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Correction for SMS via SGs charging | CP-49 | CP-100449 | approved | C4 | C4-50 | C4-102006 | Agreed | 2010-09-15 | TEI8 | - | 2010-09-15 |
0171 | - | F | Rel-10 | 9.2.1 | 10.0.0 | MT Roaming Retry | CP-50 | CP-100690 | approved | C4 | C4-50b | C4-102566 | Agreed | 2010-11-30 | TEI10 | - | 2010-12-07 |
0172 | - | - | Rel-10 | 10.0.0 | - | Mobile Terminating Roaming Forwarding | - | - | - | C4 | C4-52 | C4-110474 | Withdrawn | 2011-03-09 | MTRF | - | 2011-03-09 |
0173 | - | F | Rel-10 | 10.0.0 | 10.1.0 | MT Roaming Retry and Super Charger | CP-51 | CP-110068 | approved | C4 | C4-52 | C4-110483 | Agreed | 2011-03-09 | TEI10 | - | 2011-03-09 |
0174 | - | B | Rel-10 | 10.0.0 | - | MT Roaming Forwarding | - | - | - | C4 | C4-52 | C4-110487 | Revised | 2011-03-09 | MTRF | - | 2011-03-09 |
0174 | 1 | B | Rel-10 | 10.0.0 | - | MT Roaming Forwarding | - | - | - | C4 | C4-52 | C4-110738 | Revised | 2011-03-09 | MTRF | - | 2011-03-09 |
0174 | 2 | B | Rel-10 | 10.0.0 | 10.1.0 | MT Roaming Forwarding | CP-51 | CP-110086 | approved | C4 | C4-52 | C4-110758 | Agreed | 2011-03-09 | MTRF | - | 2011-03-09 |
0175 | - | B | Rel-10 | 10.0.0 | - | Mobile Terminating Roaming Forwarding for Pre-paging | - | - | - | C4 | C4-52 | C4-110638 | Revised | 2011-03-09 | MTRF | - | 2011-03-09 |
0175 | 1 | B | Rel-10 | 10.0.0 | - | Mobile Terminating Roaming Forwarding for Pre-paging | - | - | - | C4 | C4-52 | C4-110762 | Postponed | 2011-03-09 | MTRF | - | 2011-03-09 |
0175 | 2 | B | Rel-10 | 10.0.0 | - | Mobile Terminating Roaming Forwarding for Pre-paging | - | - | - | C4 | C4-53 | C4-111229 | Revised | 2011-06-01 | MTRF | - | 2011-06-01 |
0175 | 3 | B | Rel-10 | 10.1.0 | 10.2.0 | Mobile Terminating Roaming Forwarding for Pre-paging | CP-52 | CP-110381 | approved | C4 | C4-53 | C4-111418 | Agreed | 2011-06-01 | MTRF | Written to wrong version of spec. | 2011-06-01 |
0176 | - | B | Rel-10 | 10.1.0 | 10.2.0 | New LMSI handling for MTRF | CP-52 | CP-110381 | approved | C4 | C4-53 | C4-111167 | Agreed | 2011-06-01 | MTRF | - | 2011-06-01 |
0177 | - | B | Rel-10 | 10.1.0 | - | SDL changes for MTRF after retrieval of routeing information | - | - | - | C4 | C4-53 | C4-111169 | Revised | 2011-06-01 | MTRF | - | 2011-06-01 |
0177 | 1 | F | Rel-10 | 10.1.0 | 10.2.0 | SDL changes for MTRF after retrieval of routeing information | CP-52 | CP-110381 | approved | C4 | C4-53 | C4-111415 | Agreed | 2011-06-01 | MTRF | - | 2011-06-01 |
0178 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Paging optimization with A/Iu flex | CP-52 | CP-110350 | approved | C4 | C4-53 | C4-111181 | Agreed | 2011-06-01 | TEI8 | - | 2011-06-01 |
0179 | - | A | Rel-9 | 9.2.1 | 9.3.0 | Paging optimization with A/Iu flex | CP-52 | CP-110350 | approved | C4 | C4-53 | C4-111182 | Agreed | 2011-06-01 | TEI8 | - | 2011-06-01 |
0180 | - | A | Rel-10 | 10.1.0 | 10.2.0 | Paging optimization with A/Iu flex | CP-52 | CP-110350 | approved | C4 | C4-53 | C4-111183 | Agreed | 2011-06-01 | TEI8 | - | 2011-06-01 |
0181 | - | B | Rel-11 | .. | - | Addition of Anonymous Call Rejection in the CS domain | - | - | - | C4 | C4-54 | C4-111685 | Revised | 2011-09-02 | ACR_CS-CN | - | 2011-09-15 |
0181 | 1 | B | Rel-11 | 10.2.1 | 11.0.0 | Addition of Anonymous Call Rejection in the CS domain | CP-53 | CP-110585 | approved | C4 | C4-54 | C4-112034 | Agreed | 2011-09-02 | ACR_CS-CN | - | 2011-09-15 |
0182 | - | B | Rel-11 | .. | - | HLR/HSS domain selection function alignment with Stage 2 requirement | - | - | - | C4 | C4-54 | C4-111939 | Revised | 2011-09-02 | TEI11 | - | 2011-09-15 |
0182 | 1 | B | Rel-11 | .. | - | HLR/HSS domain selection function alignment with Stage 2 requirement | - | - | - | C4 | C4-54 | C4-112098 | Revised | 2011-09-02 | TEI11 | - | 2011-09-15 |
0182 | 2 | B | Rel-11 | 10.2.1 | 11.0.0 | HLR/HSS domain selection function alignment with Stage 2 requirement | CP-53 | CP-110578 | approved | C4 | C4-54 | C4-112217 | Agreed | 2011-09-02 | TEI11 | - | 2011-09-15 |
0183 | - | B | Rel-11 | .. | - | Cause code mapping | - | - | - | C4 | C4-54b | C4-112276 | Revised | 2011-11-28 | ACR_CS-CN | - | 2011-11-28 |
0183 | 1 | B | Rel-11 | 11.0.0 | 11.1.0 | Cause code mapping | CP-54 | CP-110814 | approved | C4 | C4-54b | C4-112433 | Agreed | 2011-11-28 | ACR_CS-CN | - | 2011-11-28 |
0184 | - | F | Rel-11 | .. | - | Provide Subscriber Information handling for UE under LTE | - | - | - | C4 | C4-54b | C4-112280 | Postponed | 2011-11-28 | TEI11 | - | 2011-11-28 |
0185 | - | F | Rel-8 | 8.4.0 | - | Provide Subscriber Information handling for UE under LTE | - | - | - | C4 | C4-55 | C4-112577 | Revised | 2011-11-28 | SAES | - | 2011-11-28 |
0185 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Provide Subscriber Information handling for UE under LTE | CP-54 | CP-110780 | approved | C4 | C4-55 | C4-112919 | Agreed | 2011-11-28 | SAES | - | 2011-11-28 |
0185 | 1 | F | Rel-11 | 11.0.0 | 11.1.0 | CSG access control in CS domain | CP-54 | CP-110813 | approved | C4 | C4-54b | C4-112409 | Agreed | 2011-11-28 | TEI11 | - | 2011-11-28 |
0186 | - | A | Rel-9 | 9.3.0 | - | Provide Subscriber Information handling for UE under LTE | - | - | - | C4 | C4-55 | C4-112578 | Revised | 2011-11-28 | SAES | - | 2011-11-28 |
0186 | 1 | A | Rel-9 | 9.3.0 | 9.4.0 | Provide Subscriber Information handling for UE under LTE | CP-54 | CP-110780 | approved | C4 | C4-55 | C4-112920 | Agreed | 2011-11-28 | SAES | - | 2011-11-28 |
0187 | - | A | Rel-10 | 10.2.1 | - | Provide Subscriber Information handling for UE under LTE | - | - | - | C4 | C4-55 | C4-112579 | Revised | 2011-11-28 | SAES | - | 2011-11-28 |
0187 | 1 | A | Rel-10 | 10.2.1 | 10.3.0 | Provide Subscriber Information handling for UE under LTE | CP-54 | CP-110780 | approved | C4 | C4-55 | C4-112921 | Agreed | 2011-11-28 | SAES | - | 2011-11-28 |
0188 | - | A | Rel-11 | 11.0.0 | - | Provide Subscriber Information handling for UE under LTE | - | - | - | C4 | C4-55 | C4-112580 | Revised | 2011-11-28 | SAES | - | 2011-11-28 |
0188 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | Provide Subscriber Information handling for UE under LTE | CP-54 | CP-110780 | approved | C4 | C4-55 | C4-112922 | Agreed | 2011-11-28 | SAES | - | 2011-11-28 |
0189 | - | F | Rel-11 | 11.1.0 | - | Termination of VT-CSI Dialogue during MTRR and MTRF Procedures | - | - | - | C4 | C4-56 | C4-120181 | Revised | 2012-02-20 | TEI11 | - | 2012-02-20 |
0189 | 1 | F | Rel-11 | 11.1.0 | - | Termination of VT-CSI Dialogue during MTRR and MTRF Procedures | - | - | - | C4 | C4-56 | C4-120389 | Revised | 2012-02-20 | TEI11 | - | 2012-02-20 |
0189 | 2 | F | Rel-11 | 11.1.0 | - | Termination of VT-CSI Dialogue during MTRR and MTRF Procedures | CP-55 | CP-120038 | revised | C4 | C4-56 | C4-120578 | Agreed | 2012-02-20 | TEI11 | discussion post WG, see CP-120184 | 2012-02-20 |
0189 | 4 | F | Rel-11 | 11.1.0 | 11.2.0 | Termination of VT-CSI Dialogue during MTRR and MTRF Procedures | CP-55 | CP-120184 | approved | CT4 | - | CP-120184 | - | 2012-02-29 | TEI11 | - | 2012-03-01 |
0190 | - | B | Rel-11 | 11.2.0 | - | MTRF upon establishment of SGs association | - | - | - | C4 | C4-56b | C4-120724 | Revised | 2012-06-04 | eNR_EPC | - | 2012-06-04 |
0190 | 1 | B | Rel-11 | 11.2.0 | 11.3.0 | MTRF upon establishment of SGs association | CP-56 | CP-120230 | approved | C4 | C4-56b | C4-120822 | Agreed | 2012-06-04 | eNR_EPC | - | 2012-06-04 |
0191 | - | F | Rel-11 | 11.2.0 | - | Subclause number correction on MTRF | - | - | - | C4 | C4-57 | C4-121166 | Revised | 2012-06-04 | TEI11 | - | 2012-06-04 |
0191 | 1 | F | Rel-11 | 11.2.0 | 11.3.0 | Subclause number correction on MTRF | CP-56 | CP-120250 | approved | C4 | C4-57 | C4-121247 | Agreed | 2012-06-04 | TEI11 | - | 2012-06-04 |
0192 | - | F | Rel-11 | 11.3.0 | - | Process Access Request MSC procedure | - | - | - | C4 | C4-59 | C4-122261 | Withdrawn | 2012-11-28 | TEI11 | - | 2012-11-28 |
0193 | - | F | Rel-11 | 11.3.0 | - | MTRR for normal 2G/3G MT call | - | - | - | C4 | C4-60 | C4-130106 | Revised | 2013-02-21 | TEI11 | - | 2013-02-21 |
0193 | 1 | C | Rel-12 | 11.3.0 | 12.0.0 | MTRR for normal 2G/3G MT call | CP-59 | CP-130031 | approved | C4 | C4-60 | C4-130255 | Agreed | 2013-02-21 | TEI12 | - | 2013-02-21 |
0194 | - | F | Rel-11 | 11.3.0 | - | MTRF to for normal 2G and 3G MT call | - | - | - | C4 | C4-60 | C4-130175 | Revised | 2013-02-21 | TEI11 | - | 2013-02-21 |
0194 | 1 | F | Rel-10 | 11.3.0 | - | MTRF to for normal 2G and 3G MT call | - | - | - | C4 | C4-60 | C4-130252 | Revised | 2013-02-21 | TEI10 | - | 2013-02-21 |
0194 | 2 | F | Rel-10 | 11.3.0 | - | MTRF to for normal 2G and 3G MT call | - | - | - | C4 | C4-60 | C4-130411 | Revised | 2013-02-21 | TEI10 | - | 2013-02-21 |
0194 | 3 | F | Rel-10 | 11.3.0 | - | MTRF to for normal 2G and 3G MT call | CP-59 | CP-130015 | revised | C4 | C4-60 | C4-130426 | Agreed | 2013-02-21 | MTRF | written to wrong version | 2013-02-21 |
0194 | 4 | F | Rel-10 | 10.3.0 | 10.4.0 | MTRF for normal 2G and 3G MT call | CP-59 | CP-130016 | approved | China Mobile, Alcatel-Lucent | - | - | - | 2013-02-07 | MTRF | - | 2013-02-27 |
0195 | - | A | Rel-11 | 11.3.0 | - | MTRF to for normal 2G and 3G MT call | - | - | - | C4 | C4-60 | C4-130253 | Revised | 2013-02-21 | TEI10 | - | 2013-02-21 |
0195 | 1 | A | Rel-11 | 11.3.0 | - | MTRF to for normal 2G and 3G MT call | - | - | - | C4 | C4-60 | C4-130412 | Revised | 2013-02-21 | TEI10 | - | 2013-02-21 |
0195 | 2 | A | Rel-11 | 11.3.0 | - | MTRF to for normal 2G and 3G MT call | CP-59 | CP-130015 | revised | C4 | C4-60 | C4-130427 | Agreed | 2013-02-21 | MTRF | - | 2013-02-21 |
0195 | 3 | A | Rel-11 | 11.3.0 | 11.4.0 | MTRF for normal 2G and 3G MT call | CP-59 | CP-130017 | approved | China Mobile, Alcatel-Lucent | - | - | - | 2013-02-07 | TEI11 | - | 2013-02-27 |
0196 | - | C | Rel-12 | .. | - | MTRF to for normal 2G and 3G MT call | - | - | - | C4 | C4-60 | C4-130254 | Revised | 2013-02-21 | TEI12 | - | 2013-02-21 |
0196 | 1 | C | Rel-12 | 11.3.0 | 12.0.0 | MTRF to for normal 2G and 3G MT call | CP-59 | CP-130031 | approved | C4 | C4-60 | C4-130428 | Agreed | 2013-02-21 | TEI12 | - | 2013-02-21 |
0197 | - | F | Rel-12 | 12.0.0 | 12.1.0 | MM Abort intead of CM Service Reject after CM service acceptance | CP-60 | CP-130308 | approved | C4 | C4-61 | C4-130572 | Agreed | 2013-06-12 | TEI12 | - | 2013-06-12 |
0198 | - | B | Rel-12 | 12.1.0 | - | MTRF Optimal Routing when the GMSC and new MSC/VLR are the same node | - | - | - | C4 | C4-62 | C4-131091 | Revised | 2013-08-29 | TEI12 | - | 2013-08-29 |
0198 | 1 | B | Rel-12 | 12.1.0 | - | MTRF Optimal Routing when the GMSC and new MSC/VLR are the same node | - | - | - | C4 | C4-62 | C4-131340 | Revised | 2013-08-29 | TEI12 | - | 2013-08-29 |
0198 | 2 | B | Rel-12 | 12.1.0 | 12.2.0 | MTRF Optimal Routing when the GMSC and new MSC/VLR are the same node | CP-61 | CP-130466 | approved | C4 | C4-62 | C4-131532 | Agreed | 2013-08-29 | TEI12 | - | 2013-08-29 |
page generated from database: 2013-10-16 10:33:15