3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 23.078

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0002 - D R99 3.0.0 3.1.0 Health warning on MSC address in Initial DP NP-04 NP-99244 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0003 - A R99 3.0.0 3.1.0 Inclusion of Subscriber Activity Information Flow NP-04 N2-99217 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0004 - F R99 3.0.0 3.1.0 Inclusion of Alerting Pattern in Provide Roaming Number (PRN) Information Flow.. NP-04 3C99-275 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0005 - F R99 3.0.0 3.1.0 Dialled Number String Format NP-04 N2-99225 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0006 - F R99 3.0.0 3.1.0 Handling of AC/Ain DP Busy, DP No Answer and DP Route Select NP-04 N2-99244 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0007 - F R99 3.0.0 3.1.0 Inclusion of Activity Test IF between gsmSCF & gsmSRF and gsmSCF and assistSSF NP-04 3C99-480 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0008 - F R99 3.0.0 3.1.0 Correction of USSD Information flows NP-04 N2-99238 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0009 - F R99 3.0.0 3.1.0 Various corrections NP-04 N2-99343 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0010 - F R99 3.0.0 3.1.0 Correction of CAMEL Phase interworking with Call Forwarding NP-04 N2-99223 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0011 - F R99 3.0.0 3.1.0 Renaming of Call Active Variable NP-04 N2-99255 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0012 - F R99 3.0.0 3.1.0 Reporting of O/T_Abandon DP when caller clears during O/T_Busy, O/T_No_Answer or Route_Select_Failure EDP-R. NP-04 N2-99310 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0013 - F R99 3.0.0 3.1.0 Clarification on the scope of CAMEL Capability Handling parameter NP-04 N2-99338 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0014 - F R99 3.0.0 3.1.0 Refining trigger criteria at DP2, due to the introduction of North American Equal Access NP-04 N2-99458 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0015 - F R99 3.0.0 3.1.0 Introduction of MSISDN Parameters in Process Unstructured NP-04 N2-99576 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0016 - F R99 3.0.0 3.1.0 MSC address in Initial DP NP-04 N2-99646 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0017 - F R99 3.0.0 3.1.0 Correction of gsmSDL; return to idle after ACR NP-04 N2-99630 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0018 - F R99 3.0.0 3.1.0 Notification of call forwarding to the gsmSCF NP-04 N2-99638 approved N2A - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0019 - A R99 3.1.0 3.2.0 Inclusion of the SS Invocation Notification Procedure NP-05 NP-99298 approved N2 - N2-99A71 Agreed 1999-10-05 CAMEL2 - -
0021 - A R99 3.1.0 3.2.0 Removal of TDP-Criteria from RCH NP-05 NP-99298 approved N2 - N2-99B27 Agreed 1999-10-05 CAMEL2 - -
0022 1 A R99 3.1.0 3.2.0 GMSC CAMEL Phases in PRN NP-05 NP-99298 approved N2 - N2-99D13 Agreed 1999-10-05 CAMEL2 - -
0023 1 A R99 3.1.0 3.2.0 Cal Reference Number NP-05 NP-99298 approved N2 - N2-99C49 Agreed 1999-10-05 CAMEL2 - -
0025 - A R99 3.1.0 3.2.0 Clarification on handling of Call Reference Number and GMSC address NP-05 NP-99298 approved N2 - N2-99985 Agreed 1999-10-05 CAMEL2 - -
0027 - A R99 3.1.0 3.2.0 Value of Call Active parameter in Aoperation - clarifications in the SDL NP-05 NP-99298 approved N2 - N2-99D17 Agreed 1999-10-05 CAMEL2 - -
0028 - A R99 3.1.0 3.2.0 Corrections of process gsmSSF SDL NP-05 NP-99298 approved N2 - N2-99C63 Agreed 1999-10-05 CAMEL2 - -
0029 - A R99 3.1.0 3.2.0 Alignment of CAMEL2 FCI & Handling of CIR NP-05 NP-99298 approved N2 - N2-99D01 Agreed 1999-10-05 CAMEL2 - -
0032 2 B R99 3.2.0 3.3.0 23.078 revised for CAMEL Phase 3 Relase 1999 NP-06 NP-99471 approved N2 N2-12 N2-99L23 Agreed 1999-12-15 CAMEL3 - -
0033 - F R99 3.2.0 3.3.0 Correction of the direction of Int_Continue after sending Int_O/T-Abandon NP-06 NP-99507 approved Siemens - - Agreed 1999-12-15 CAMEL3 Siemens -
0034 1 D R99 3.3.0 3.4.0 Correction to some SDLs in chapter 4 NP-07 NP-000160 approved N2 N2A-02 N2A000114 agreed 2000-05-18 CAMEL3 - -
0035 3 F R99 3.3.0 3.4.0 Correction of Translation Information Flag in the VLR for DTN NP-07 NP-000160 approved N2 N2A-02 N2A000306 agreed 2000-05-18 CAMEL3 Agreed via E-mail -
0037 3 C R99 3.3.0 3.4.0 Clarification on CUG handling NP-07 NP-000160 approved N2 N2A-02 N2A000255 agreed 2000-05-18 CAMEL3 Agreed via E-mail -
0038 1 F R99 3.3.0 3.4.0 Clarification of SS Invocation Notification NP-07 NP-000160 approved N2 N2A-02 N2A000117 agreed 2000-05-18 CAMEL3 - -
0040 5 C R99 3.3.0 3.4.0 Correction of SS Invocation Notification for CCBS NP-07 NP-000160 approved N2 N2A-02 N2A000300 agreed 2000-05-18 CAMEL3 - -
0041 5 C R99 3.3.0 3.4.0 Introduction of call gapping NP-07 NP-000160 approved N2 N2A-02 N2A000296 agreed 2000-05-18 CAMEL3 Agreed via E-mail -
0042 2 F R99 3.3.0 3.4.0 Technical and editorial corrections to ATSI, ATM, NCSD (rev of both 008 &014) NP-07 NP-000160 approved N2 N2A-02 N2A000264 agreed 2000-05-18 CAMEL3 - -
0043 2 F R99 3.3.0 3.4.0 Technical and editorial corrections to Location Services and Any Time Interrogation NP-07 NP-000160 approved N2 N2A-02 N2A000265 agreed 2000-05-18 CAMEL3 - -
0044 1 F R99 3.3.0 3.4.0 Technical and editorial corrections to circuit cwithed call handling NP-07 NP-000034 approved N2 N2A-02 N2A000118 agreed 2000-05-18 CAMEL3 - -
0045 - F R99 3.3.0 3.4.0 Technical and editorial corrections to USSD NP-07 NP-000160 approved N2 N2-09 N2A000017 agreed 2000-05-18 CAMEL3 - -
0046 1 F R99 3.3.0 3.4.0 Technical and editorial corrections to GPRS NP-07 NP-000160 approved N2 N2A-02 N2A000119 agreed 2000-05-18 CAMEL3 - -
0047 - F R99 3.3.0 3.4.0 Technical and editorial corrections to SMS NP-07 NP-000160 approved N2 N2-09 N2A000019 agreed 2000-05-18 CAMEL3 - -
0048 1 F R99 3.3.0 3.4.0 Inclusion of O-CSI trigger criteria in Resume Call Handling NP-07 NP-000160 approved N2 N2A-02 N2A000122 agreed 2000-05-18 CAMEL3 - -
0051 4 F R99 3.3.0 3.4.0 Correction of SDL related to CAMEL Phase3 for D-CSI NP-07 NP-000160 approved N2 N2A-02 N2A000268 agreed 2000-05-18 CAMEL3 - -
0052 4 F R99 3.3.0 3.4.0 Addition of description of D-CSI in MO Calls NP-07 NP-000160 approved N2 N2A-02 N2A000269 agreed 2000-05-18 CAMEL3 - -
0055 - F R99 3.3.0 3.4.0 Reporting of T_Busy when absent subscriber NP-07 NP-000160 approved N2 N2-09 N2A000033 agreed 2000-05-18 CAMEL3 - -
0056 3 F R99 3.3.0 3.4.0 GPRS TCAP dialogues NP-07 NP-000160 approved N2 N2A-02 N2A000277 agreed 2000-05-18 CAMEL3 - -
0059 - F R99 3.3.0 3.4.0 Addition of gsmSRF disconnect handling in CCF SDL NP-07 NP-000160 approved N2 N2A-02 N2A000059 agreed 2000-05-18 CAMEL3 - -
0061 3 B R99 3.3.0 3.4.0 Addition of SCI handling in Waiting for Instructions For DS state NP-07 NP-000160 approved N2 N2A-02 N2A000282 agreed 2000-05-18 CAMEL3 - -
0062 5 F R99 3.4.0 3.5.0 Correction of SDL and IF for Dialled Services in Call Forwarding case NP-08 NP-000245 approved N2 N2-10 N2A000390 Agreed 2000-06-27 CAMEL3 - -
0063 2 F R99 3.3.0 3.4.0 Clarification of N-CSI in Core NW NP-07 NP-000160 approved N2 N2A-02 N2A000151 agreed 2000-05-18 CAMEL3 - -
0066 - F R99 3.3.0 3.4.0 Addition of Int_Error in DP_O/T_Answer states NP-07 NP-000035 approved N2 N2A-02 N2A000075 agreed 2000-05-18 CAMEL3 - -
0068 - F R99 3.3.0 3.4.0 Correction of the decision box after receiving Int_DP_O_Answer and Int_DP_T_Answer in the procedure gsmSSF NP-07 NP-000035 approved N2 N2A-02 N2A000077 agreed 2000-05-18 CAMEL3 - -
0069 1 F R99 3.3.0 3.4.0 Correction of the description in the creation of a new leg in CF NP-07 NP-000035 approved N2 N2A-02 N2A000288 agreed 2000-05-18 CAMEL3 - -
0070 1 F R99 3.3.0 3.4.0 Correction of the description of BCSM relationships NP-07 NP-000035 approved N2 N2A-02 N2A000289 agreed 2000-05-18 CAMEL3 - -
0071 - F R99 3.3.0 3.4.0 Correction of the direction of Int_Continue after sending Int_T-Abandon (additional to 23.078-033) NP-07 NP-000035 approved N2 N2A-02 N2A000080 agreed 2000-05-18 CAMEL3 - -
0073 - D R99 3.3.0 3.4.0 Editorial changes for legs NP-07 NP-000035 approved N2 N2A-02 N2A000082 agreed 2000-05-18 CAMEL3 - -
0076 2 F R99 3.3.0 3.4.0 Extension of the description of the O_No_Answer NP-07 NP-000035 approved N2 N2A-02 N2A000292 agreed 2000-05-18 CAMEL3 - -
0077 2 A R99 3.4.0 3.5.0 gsmSSF DP handling in CF NP-08 NP-000241 approved N2 N2-11 N2-000131 Agreed 2000-06-27 CAMEL2 - -
0079 1 F R99 3.3.0 3.4.0 Inclusion of Release transaction in CAMEL_OCH_MSC_INIT NP-07 NP-000035 approved N2 N2A-02 N2A000291 agreed 2000-05-18 CAMEL3 - -
0081 1 D R99 3.3.0 3.4.0 Improved SDLs in GPRS interworking NP-07 NP-000035 approved N2 N2A-02 N2A000208 agreed 2000-05-18 CAMEL3 - -
0082 - F R99 3.3.0 3.4.0 Correction of the description of the SGSN NP-07 NP-000035 approved N2 N2A-02 N2A000097 agreed 2000-05-18 CAMEL3 - -
0084 1 F R99 3.3.0 3.4.0 Correction of references occurring in the SDL figures NP-07 NP-000035 approved N2 N2A-02 N2A000195 agreed 2000-05-18 CAMEL3 - -
0085 - D R99 3.3.0 3.4.0 Inclusion of CAMEL Phase 1 procedures as targets for references in 3G TS 23.018 NP-07 NP-000035 approved N2 N2A-02 N2A000100 agreed 2000-05-18 CAMEL3 - -
0086 - F R99 3.3.0 3.4.0 modelling of unsuccessful DPs NP-07 NP-000035 approved N2 N2A-02 N2A000101 agreed 2000-05-18 CAMEL3 - -
0090 - D R99 3.3.0 3.4.0 Definitions of service key NP-07 NP-000035 approved N2 N2A-02 N2A000144 agreed 2000-05-18 CAMEL3 - -
0091 1 A R99 3.3.0 3.4.0 Correction of CF notification NP-07 NP-000033 approved N2 N2A-02 N2B000285 agreed 2000-05-18 CAMEL2 - -
0093 2 B R99 3.3.0 3.4.0 Addition of Long Forwarded-to Numbers NP-07 NP-000055 approved N2 N2A-02 N2A000275 agreed 2000-05-18 CF_enhancements - -
0094 - F R99 3.3.0 3.4.0 Removal of Redirection Information from the ContinueWithArgument operation NP-07 NP-000035 approved N2 N2A-02 N2A000167 agreed 2000-05-18 CAMEL3 - -
0096 2 B R99 3.3.0 3.4.0 Addition to SDL of user interaction in Waiting_for_Instructions_for_DS NP-07 NP-000035 approved N2 N2A-02 N2A000251 agreed 2000-05-18 CAMEL3 - -
0098 1 C R99 3.3.0 3.4.0 addition of gsmSCF address list to CSI NP-07 NP-000035 approved N2 N2A-02 N2A000259 agreed 2000-05-18 CAMEL3 - -
0100 1 C R99 3.3.0 3.4.0 Introduction of 'Service Area Identity (SAI)' NP-07 NP-000113 approved N2 N2A-02 N2A000200 agreed 2000-05-18 TEI - -
0101 1 F R99 3.3.0 3.4.0 Correction of SII2 description NP-07 NP-000035 approved N2 N2A-02 N2A000262 agreed 2000-05-18 CAMEL3 - -
0102 1 F R99 3.3.0 3.4.0 Clarification on CUG handling NP-07 NP-000035 approved N2 N2A-02 N2A000257 agreed 2000-05-18 CAMEL3 - -
0103 - F R99 3.3.0 3.4.0 Replacement of Figure 4.57g: Process gsmSSF (sheet 7) by correct SDL figure. NP-07 NP-000036 approved N2 N2A-02 N2A000188 agreed 2000-05-18 CAMEL3 - -
0104 - F R99 3.3.0 3.4.0 Correction of ""Figure 6.2: GPRS Attach/Detach FSM"" NP-07 NP-000036 approved N2 N2A-02 N2A000189 agreed 2000-05-18 CAMEL3 - -
0105 - F R99 3.3.0 3.4.0 Correction of first state in ""Figure 6.14 l: Process GPRS_SSF"" NP-07 NP-000036 approved N2 N2A-02 N2A000190 agreed 2000-05-18 CAMEL3 - -
0106 1 F R99 3.3.0 3.4.0 Correction of GPRS session description NP-07 NP-000036 approved N2 N2A-02 N2A000272 agreed 2000-05-18 CAMEL3 - -
0108 2 F R99 3.3.0 3.4.0 Correction of GPRS PDP context FSM NP-07 NP-000036 approved N2 N2A-02 N2A000298 agreed 2000-05-18 CAMEL3 Agreed via E-mail -
0109 2 F R99 3.3.0 3.4.0 Enhancement of the SDL for ATM NP-07 NP-000036 approved N2 N2A-02 N2A000297 agreed 2000-05-18 CAMEL3 - -
0110 1 F R99 3.3.0 3.4.0 Enhancement of the SDL for NCSD NP-07 NP-000036 approved N2 N2A-02 N2A000284 agreed 2000-05-18 CAMEL3 - -
0111 - D R99 3.3.0 3.4.0 Removal of PSI description NP-07 NP-000036 approved N2 N2A-02 N2A000204 agreed 2000-05-18 CAMEL3 - -
0112 1 D R99 3.3.0 3.4.0 Procedure Handle_SCI_GPRS and Complete_FCI_Record_GPRS NP-07 NP-000036 approved N2 N2A-02 N2A000286 agreed 2000-05-18 CAMEL3 - -
0114 1 A R99 3.3.0 3.4.0 Correction on gsmSSF SDL; return to idle after ACR NP-07 NP-000033 approved N2 N2A-02 N2A000231 agreed 2000-05-18 CAMEL2 - -
0116 - F R99 3.3.0 3.4.0 O-CSI and D-CSI checks for ORLCF NP-07 NP-000036 approved N2 N2A-02 N2A000218 agreed 2000-05-18 CAMEL3 - -
0117 - F R99 3.3.0 3.4.0 Removal of user interaction in the monitoring state NP-07 NP-000144 approved Siemens N2A-02 N2A000221 rejected 2000-05-18 CAMEL3 - -
0119 1 C R99 3.3.0 3.4.0 Enhancement of the ATSI SDL NP-07 NP-000036 approved N2 N2A-02 N2A000285 agreed 2000-05-18 CAMEL3 - -
0120 - D R99 3.3.0 3.4.0 Transfer of destination address to gsmSCF NP-07 NP-000036 approved N2 N2A-02 N2A000248 agreed 2000-05-18 CAMEL3 Agreed via E-mail -
0121 1 F R99 3.3.0 3.4.0 Implementation of retriggering in gsmSSF SDL NP-07 NP-000036 approved N2 N2A-02 N2A000266 agreed 2000-05-18 CAMEL3 Agreed via E-mail -
0123 1 F R99 3.4.0 3.5.0 Correction of incoming call handling NP-08 NP-000245 approved N2 N2-10 N2A000363 Agreed 2000-06-27 CAMEL3 - -
0125 2 F R99 3.4.0 3.5.0 Correction of Call Gapping NP-08 NP-000245 approved N2 N2-10 N2A000400 Agreed 2000-06-27 CAMEL3 - -
0130 1 F R99 3.4.0 3.5.0 Remove of SII2 frw CCBS treatment ind NP-08 NP-000245 approved N2 N2-10 N2A000399 Agreed 2000-06-27 CAMEL3 - -
0132 - F R99 3.4.0 3.5.0 Correction of the CWA SII2 description NP-08 NP-000245 approved N2 N2-10 N2A000329 Agreed 2000-06-27 CAMEL3 - -
0133 2 F R99 3.4.0 3.5.0 Improvements on ATM/ATSI/NSDC NP-08 NP-000245 approved N2 N2-11 N2-000230 Agreed 2000-06-27 CAMEL3 - -
0134 4 F R99 3.5.0 3.6.0 Interworking of Call Forwardings and new CAMEL3 trigger detection points NP-09 NP-000456 approved N2 N2-12 N2-000327 Agreed 2000-09-01 CAMEL3 - -
0137 4 F R99 3.5.0 3.6.0 E-parameter handling of distinct CAP dialogues/TDPs NP-09 NP-000456 approved N2 N2-13 N2-000418 Agreed 2000-09-01 CAMEL3 - -
0138 1 F R99 3.4.0 3.5.0 Reception of Int_QoS_Change in the gprsSSF in gsmSSF SDL NP-08 NP-000245 approved N2 N2-10 N2A000397 Agreed 2000-06-27 CAMEL3 - -
0140 - C R99 3.4.0 3.5.0 Disallowing Compound Basic Service group codes for conditional triggering NP-08 NP-000243 approved N2 N2-10 N2A000348 Agreed 2000-06-27 CAMEL3 - -
0141 - F R99 3.4.0 3.5.0 Correction on chapter 10. NP-08 NP-000245 approved N2 N2-10 N2A000350 Agreed 2000-06-27 CAMEL3 - -
0142 1 C R99 3.4.0 3.5.0 Proposed information flow on Notify subscriber Data Change NP-08 NP-000243 approved N2 N2-10 N2A000385 Agreed 2000-06-27 CAMEL3 - -
0145 1 F R99 3.4.0 3.5.0 Invocation of O-BCSM in case of GSM call forwarding NP-08 NP-000246 approved N2 N2-10 N2A000404 Agreed 2000-06-27 CAMEL3 - -
0146 2 F R99 3.4.0 3.5.0 Clarification on TDP Analyzedinfoo Criteria checks NP-08 NP-000244 approved N2 N2-10 N2A000409 Agreed 2000-06-27 CAMEL3 - -
0147 2 F R99 3.4.0 3.5.0 CAMEL Subscription Info NP-08 NP-000246 approved N2 N2-11 N2-000236 Agreed 2000-06-27 CAMEL3 - -
0148 1 C R99 3.4.0 3.5.0 Usage of GPRS Reference Number NP-08 NP-000243 approved N2 N2-11 N2-000201 Agreed 2000-06-27 CAMEL3 - -
0150 2 F R99 3.4.0 3.5.0 Correction on Quality of Service (GPRS) NP-08 NP-000246 approved N2 N2-11 N2-000252 Agreed 2000-06-27 CAMEL3 - -
0153 - F R99 3.4.0 3.5.0 Alignment of the EventSpecificInformationBCSM Stage 2&3 definitions NP-08 NP-000246 approved N2 N2-11 N2-000121 Agreed 2000-06-27 CAMEL3 - -
0154 - F R99 3.4.0 3.5.0 Clean-up the Monitoring state User Interaction NP-08 NP-000246 approved N2 N2-11 N2-000122 Agreed 2000-06-27 CAMEL3 - -
0156 1 F R99 3.4.0 3.5.0 Correction of MM paragraph NP-08 NP-000246 approved N2 N2-11 N2-000237 Agreed 2000-06-27 CAMEL3 - -
0157 - F R99 3.4.0 3.5.0 Editorial correction of the GPRS_activate_PDP_context SDL NP-08 NP-000246 approved N2 N2-11 N2-000141 Agreed 2000-06-27 CAMEL3 - -
0158 1 F R99 3.4.0 3.5.0 Removal of ActivityTestSMS operation NP-08 NP-000246 approved N2 N2-11 N2-000238 Agreed 2000-06-27 CAMEL3 - -
0159 1 F R99 3.4.0 3.5.0 PDPid in the EntityReleasedGPRS operation NP-08 NP-000246 approved N2 N2-11 N2-000205 Agreed 2000-06-27 CAMEL3 - -
0161 1 D R99 3.4.0 3.5.0 Renaming ""FSM"" to ""State Model"" in GPRS NP-08 NP-000248 approved N2 N2-11 N2-000197 Agreed 2000-06-27 CAMEL3 - -
0162 2 F R99 3.4.0 3.5.0 Various corrections and updates for 23.078 NP-08 NP-000247 approved N2 N2-11 N2-000234 Agreed 2000-06-27 CAMEL3 - -
0163 1 F R99 3.4.0 3.5.0 Specification of segmented GPRS Dialogues NP-08 NP-000247 approved N2 N2-11 N2-000207 Agreed 2000-06-27 CAMEL3 - -
0164 - F R99 3.4.0 3.5.0 Release of PDP context during Waiting for Instructions NP-08 NP-000247 approved N2 N2-11 N2-000153 Agreed 2000-06-27 CAMEL3 - -
0165 1 F R99 3.4.0 3.5.0 Reset Timer GPRS NP-08 NP-000247 approved N2 N2-11 N2-000209 Agreed 2000-06-27 CAMEL3 - -
0166 - F R99 3.4.0 3.5.0 Correction: Enhancement of the SDL for ATM NP-08 NP-000247 approved N2 N2-11 N2-000158 Agreed 2000-06-27 CAMEL3 - -
0167 - F R99 3.4.0 3.5.0 gprsSSF definition NP-08 NP-000247 approved N2 N2-11 N2-000159 Agreed 2000-06-27 CAMEL3 - -
0168 - F R99 3.4.0 3.5.0 Reference to 3G TS 23.088 NP-08 NP-000247 approved N2 N2-11 N2-000160 Agreed 2000-06-27 CAMEL3 - -
0169 - D R99 3.4.0 3.5.0 Editorial corrections in the clause 5 NP-08 NP-000248 approved N2 N2-11 N2-000161 Agreed 2000-06-27 CAMEL3 - -
0170 1 D R99 3.4.0 3.5.0 Editorial corrections in the clause 6 NP-08 NP-000248 approved N2 N2-11 N2-000239 Agreed 2000-06-27 CAMEL3 - -
0171 1 D R99 3.4.0 3.5.0 Editorial corrections in the clause 7 NP-08 NP-000248 approved N2 N2-11 N2-000240 Agreed 2000-06-27 CAMEL3 - -
0172 - D R99 3.4.0 3.5.0 Editorial corrections in the clause 8 NP-08 NP-000248 approved N2 N2-11 N2-000164 Agreed 2000-06-27 CAMEL3 - -
0173 1 D R99 3.4.0 3.5.0 Editorial corrections in the clause 9 NP-08 NP-000248 approved N2 N2-11 N2-000241 Agreed 2000-06-27 CAMEL3 - -
0174 1 D R99 3.4.0 3.5.0 Editorial corrections in the clause 10 NP-08 NP-000248 approved N2 N2-11 N2-000242 Agreed 2000-06-27 CAMEL3 - -
0175 1 D R99 3.4.0 3.5.0 Editorial corrections in the clause 11 NP-08 NP-000248 approved N2 N2-11 N2-000243 Agreed 2000-06-27 CAMEL3 - -
0176 2 F R99 3.4.0 3.5.0 Clarifications on GPRS Concepts NP-08 NP-000247 approved N2 N2-11 N2-000254 Agreed 2000-06-27 CAMEL3 - -
0177 2 A R99 3.4.0 3.5.0 Usage of Announcement Suppression Indicator NP-08 NP-000240 approved N2 N2-11 N2-000249 Agreed 2000-06-27 CAMEL2 - -
0180 1 F R99 3.4.0 3.5.0 Addition of Location Information to Initial DP GPRS NP-08 NP-000247 approved N2 N2-11 N2-000257 Agreed 2000-06-27 CAMEL3 - -
0181 2 F R99 3.5.0 3.6.0 Indication of Network requested PDP Context in Initial DPGPRS message NP-09 NP-000459 approved N2 N2-12 N2-000280 Agreed 2000-09-01 CAMEL3 - -
0182 - D R99 3.4.0 - Improved SDLs in clauses 6-11 NP-08 NP-000319 withdrawn Siemens - - - 2000-06-27 CAMEL3 - -
0183 - D R99 3.4.0 - Editorial modifications NP-08 NP-000320 withdrawn Siemens - - - 2000-06-27 CAMEL3 - -
0185 1 F R99 3.5.0 3.6.0 Addition of the Handle_FCI_GPRS procedure NP-09 NP-000456 approved N2 N2-12 N2-000336 Agreed 2000-09-01 CAMEL3 - -
0186 - F R99 3.5.0 3.6.0 Correction to Procedure CAMEL_ICH_MSC_INIT NP-09 NP-000456 approved N2 N2-12 N2-000275 Agreed 2000-09-01 CAMEL3 - -
0187 1 F R99 3.5.0 3.6.0 Transfer of Procedure Check_CD_SII2 from TS 23.072 NP-09 NP-000456 approved N2 N2-13 N2-000358 Agreed 2000-09-01 CAMEL3 - -
0188 2 F R99 3.5.0 3.6.0 Update of References for the Location Information IE NP-09 NP-000456 approved N2 N2-13 N2-000411 Agreed 2000-09-01 CAMEL3 - -
0190 - F R99 3.5.0 3.6.0 Removal of duplicate SGSN address/number from IDP-GPRS NP-09 NP-000456 approved N2 N2-12 N2-000283 Agreed 2000-09-01 CAMEL3 - -
0191 - F R99 3.5.0 3.6.0 Clean-up the Monitoring state User Interaction NP-09 NP-000456 approved N2 N2-12 N2-000286 Agreed 2000-09-01 CAMEL3 - -
0192 - D R99 3.5.0 3.6.0 Editorial corrections and enhancements NP-09 NP-000456 approved N2 N2-12 N2-000287 Agreed 2000-09-01 CAMEL3 - -
0193 1 F R99 3.5.0 3.6.0 GPRS Change of Position Procedure for Session and Context NP-09 NP-000456 approved N2 N2-12 N2-000335 Agreed 2000-09-01 CAMEL3 - -
0194 3 F R99 3.5.0 3.6.0 Corrections on GPRS NP-09 NP-000456 approved N2 N2-13 N2-000438 Agreed 2000-09-01 CAMEL3 - -
0198 3 F R99 3.5.0 3.6.0 Location Number GPRS NP-09 NP-000456 approved N2 N2-13 N2-000378 Agreed 2000-09-01 CAMEL3 - -
0200 7 F R99 3.5.0 3.6.0 ACR/AC supervision for GPRS NP-09 NP-000456 approved N2 N2-13 N2-000439 Agreed 2000-09-01 CAMEL3 - -
0201 1 F R99 3.5.0 3.6.0 Correction to Proceure CAMEL_Modify_CUG_Info NP-09 NP-000456 approved N2 N2-12 N2-000326 Agreed 2000-09-01 CAMEL3 - -
0203 1 D R99 3.5.0 3.6.0 Move of processing rules for GPRS context. NP-09 NP-000456 approved N2 N2-12 N2-000342 Agreed 2000-09-01 CAMEL3 - -
0204 - F R99 3.5.0 3.6.0 Interaction with CUG NP-09 NP-000457 approved N2 N2-12 N2-000331 Agreed 2000-09-01 CAMEL3 - -
0205 1 F R99 3.5.0 3.6.0 Handling of the Call Diversion Treatment Indicator NP-09 NP-000457 approved N2 N2-13 N2-000419 Agreed 2000-09-01 CAMEL3 - -
0206 1 F R99 3.5.0 3.6.0 GPRS location information in GPRSEventSpecificInformation NP-09 NP-000457 approved N2 N2-13 N2-000408 Agreed 2000-09-01 CAMEL3 - -
0207 1 F R99 3.5.0 3.6.0 Removal of NPI check in DP Analyzed_Information NP-09 NP-000457 approved N2 N2-13 N2-000420 Agreed 2000-09-01 CAMEL3 - -
0208 2 F R99 3.5.0 3.6.0 SDL modelling and overlapping dialogue case NP-09 NP-000457 approved N2 N2-13 N2-000436 Agreed 2000-09-01 CAMEL3 - -
0209 - F R99 3.5.0 3.6.0 Correction CAMEL_MT_GMSC_INIT NP-09 NP-000457 approved N2 N2-13 N2-000380 Agreed 2000-09-01 CAMEL3 - -
0213 1 F R99 3.5.0 3.6.0 Correction of MO-SMS SDL's NP-09 NP-000457 approved N2 N2-13 N2-000416 Agreed 2000-09-01 CAMEL3 - -
0215 - F R99 3.5.0 3.6.0 Correction to description of DP Collected_Info NP-09 NP-000457 approved N2 N2-13 N2-000367 Agreed 2000-09-01 CAMEL3 - -
0216 1 F R99 3.5.0 3.6.0 Introduction of Guard Timer for GPRS TCAP dialogue handling NP-09 NP-000457 approved N2 N2-13 N2-000440 Agreed 2000-09-01 CAMEL3 - -
0217 - F R99 3.5.0 3.6.0 PDP establishment NP-09 NP-000459 approved N2 N2-13 N2-000409 Agreed 2000-09-01 CAMEL3 - -
0218 1 D R99 3.5.0 3.6.0 Clarification of description of number comparison for dialled services NP-09 NP-000457 approved N2 N2-13 N2-000434 Agreed 2000-09-01 CAMEL3 - -
0219 - F R99 3.5.0 3.6.0 Correction to Initial DP SMS Information Flow NP-09 NP-000457 approved N2 N2-13 N2-000427 Agreed 2000-09-01 CAMEL3 - -
0220 - F R99 3.5.0 3.6.0 Correction to the missing connection in SDL gsmSSF NP-09 NP-000581 approved Rapporteur N2 - - 2000-09-21 CAMEL3 - -
0221 3 F R99 3.6.0 3.7.0 Correction on CAMEL CF and OR NP-10 NP-000615 Approved N2 N2-14 N2-000558 Agreed 2000-11-29 CAMEL3 - -
0222 1 F R99 3.6.0 3.7.0 Corrections in clauses 3 and 4 NP-10 NP-000615 Approved N2 N2-14 N2-000527 Agreed 2000-11-29 CAMEL3 - -
0223 1 F R99 3.6.0 3.7.0 Clarification for the relationship for DPs NP-10 NP-000615 Approved N2 N2-14 N2-000528 Agreed 2000-11-29 CAMEL3 - -
0224 2 F R99 3.6.0 3.7.0 Clarification for the CUG data in Initial DP NP-10 NP-000615 Approved N2 N2-14 N2-000556 Agreed 2000-11-29 CAMEL3 - -
0225 1 F R99 3.6.0 3.7.0 Correction on the SDL CAMEL_Store_Destination_Address NP-10 NP-000615 Approved N2 N2-14 N2-000530 Agreed 2000-11-29 CAMEL3 - -
0226 - F R99 3.6.0 3.7.0 Correction on the SDL gsmSSF NP-10 NP-000615 Approved N2 N2-14 N2-000455 Agreed 2000-11-29 CAMEL3 - -
0228 3 F R99 3.6.0 3.7.0 Correction for ambiguous description in clause 10 and 11 NP-10 NP-000615 Approved N2 N2-14 N2-000550 Agreed 2000-11-29 CAMEL3 - -
0229 1 F R99 3.6.0 3.7.0 Clarification on GPRS 'guard timer' NP-10 NP-000615 Approved N2 N2-14 N2-000520 Agreed 2000-11-29 CAMEL3 - -
0230 1 F R99 3.6.0 3.7.0 Specifying timer range values NP-10 NP-000615 Approved N2 N2-14 N2-000523 Agreed 2000-11-29 CAMEL3 - -
0231 - F R99 3.6.0 3.7.0 Correction to ‘Initial DP SMS’ Information Flow NP-10 NP-000615 Approved N2 N2-14 N2-000467 Agreed 2000-11-29 CAMEL3 - -
0232 4 F R99 3.6.0 - First set of corrections of paragraph 6 GPRS NP-10 NP-000616 Revised N2 N2-15 N2-000642 Agreed 2000-11-29 CAMEL3 NP-000616 revised to NP-000714 -
0232 4 F R99 3.6.0 3.7.0 First set of corrections of paragraph 6 GPRS NP-10 NP-000714 Approved N2 - N2-000642 Agreed 2000-11-29 CAMEL3 NP-000714 revised from NP-000616 -
0233 3 F R99 3.6.0 3.7.0 Second set of corrections of paragraph 6 GPRS NP-10 NP-000615 Approved N2 N2-14 N2-000553 Agreed 2000-11-29 CAMEL3 - -
0235 - F R99 3.6.0 3.7.0 Correction on error implementing a 23.078-159r1 NP-10 NP-000615 Approved N2 N2-14 N2-000501 Agreed 2000-11-29 CAMEL3 - -
0236 - F R99 3.6.0 3.7.0 Correction on error implementing a 23.078-194r3 NP-10 NP-000615 Approved N2 N2-14 N2-000509 Agreed 2000-11-29 CAMEL3 - -
0237 - F R99 3.6.0 3.7.0 CallGap IF correction NP-10 NP-000615 Approved N2 N2-14 N2-000517 Agreed 2000-11-29 CAMEL3 - -
0238 - F R99 3.6.0 3.7.0 CAMEL3 removal of duplicate RAI NP-10 NP-000615 Approved N2 N2-14 N2-000525 Agreed 2000-11-29 CAMEL3 - -
0239 - F R99 3.6.0 3.7.0 Check_Gap_Criteria correction NP-10 NP-000618 Approved N2 N2-15 N2-000566 Agreed 2000-11-29 CAMEL3 - -
0244 - F R99 3.6.0 3.7.0 GsmSSF state transition in the case of Abandon/Disconnect is armed as an EDP-N, or when they are not armed NP-10 NP-000615 Approved N2 N2-14 N2-000482 Agreed 2000-11-29 CAMEL3 - -
0247 - F R99 3.6.0 - Request more than one SS data and/or CSI in one ATSI request NP-10 NP-000616 Rejected N2 N2-15 N2-000597 Agreed 2000-11-29 CAMEL3 - -
0248 2 F R99 3.6.0 - Improved description of the location information in SGSN NP-10 NP-000616 Revised N2 N2-15 N2-000673 Agreed 2000-11-29 CAMEL3 NP-000616 revised to NP-000714 -
0248 2 F R99 3.6.0 3.7.0 Improved description of the location information in SGSN NP-10 NP-000714 Approved N2 - N2-000673 Agreed 2000-11-29 CAMEL3 NP-000714 revised from NP-000616 -
0249 2 F R99 3.6.0 - Error handling in ATSI NP-10 NP-000616 Revised N2 N2-15 N2-000672 Agreed 2000-11-29 CAMEL3 NP-000616 revised to NP-000714 -
0249 2 F R99 3.6.0 3.7.0 Error handling in ATSI NP-10 NP-000714 Approved N2 - N2-000672 Agreed 2000-11-29 CAMEL3 NP-000714 revised from NP-000616 -
0250 2 F R99 3.6.0 - Additional clarification for ATM NP-10 NP-000616 Revised N2 N2-15 N2-000685 Agreed 2000-11-29 CAMEL3 E-mail appr 27/11.NP-000616 revised to NP-000714 -
0250 2 F R99 3.6.0 3.7.0 Additional clarification for ATM NP-10 NP-000714 Approved N2 - N2-000685 Agreed 2000-11-29 CAMEL3 e-mail agreedNP-000714 revised from NP-000616 -
0255 - F R99 3.6.0 - Introduction of GGSN Address NP-10 NP-000616 Revised N2 N2-15 N2-000645 Agreed 2000-11-29 CAMEL3 NP-000616 revised to NP-000714 -
0255 - F R99 3.6.0 3.7.0 Introduction of GGSN Address NP-10 NP-000714 Approved N2 - N2-000645 Agreed 2000-11-29 CAMEL3 NP-000714 revised from NP-000616 -
0256 2 F R99 3.7.0 3.8.0 Clarification on APN usage in the ConnectGPRS operation NP-11 NP-010055 approved N2 N2-17 N2-010209 Agreed 2001-03-02 CAMEL3 0 -
0257 - F R99 3.7.0 3.8.0 Update of References NP-11 NP-010055 approved N2 N2-16 N2-010009 Agreed 2001-01-19 CAMEL3 0 -
0258 1 F R99 3.7.0 3.8.0 Hand-over indication for GPRS NP-11 NP-010055 approved N2 N2-16 N2-010084 Agreed 2001-01-19 CAMEL3 0 -
0259 1 F R99 3.7.0 3.8.0 Description of Entity Released GPRS NP-11 NP-010055 approved N2 N2-16 N2-010086 Agreed 2001-01-19 CAMEL3 0 -
0260 1 F R99 3.7.0 3.8.0 Correction to description of 'O-CSI Applicable' parameter NP-11 NP-010055 approved N2 N2-16 N2-010095 Agreed 2001-01-19 CAMEL3 0 -
0261 1 F R99 3.7.0 3.8.0 Restriction on SS-CSI to VLR - no marking for CCBS NP-11 NP-010055 approved N2 N2-16 N2-010079 Agreed 2001-01-19 CAMEL3 0 -
0263 1 F R99 3.7.0 3.8.0 No Volume charging on GPRS Session (clarifying text) NP-11 NP-010055 approved N2 N2-16 N2-010089 Agreed 2001-01-19 CAMEL3 0 -
0264 2 F R99 3.7.0 3.8.0 Correction of ""Call Forwarding Notification"" feature in CAMEL Phase 3. NP-11 NP-010055 approved N2 N2-16 N2-010114 Agreed 2001-01-19 CAMEL3 0 -
0267 1 F R99 3.7.0 3.8.0 Usage of MSISDN for CAMEL - USSD Information Flows NP-11 NP-010055 approved N2 N2-16 N2-010081 Agreed 2001-01-19 CAMEL3 0 -
0268 1 F R99 3.7.0 3.8.0 Correction of error implementing 23.078-118r2 NP-11 NP-010055 approved N2 N2-16 N2-010082 Agreed 2001-01-19 CAMEL3 0 -
0269 4 F R99 3.7.0 3.8.0 Correction of reference NP-11 NP-010056 approved N2 N2-17 N2-010205 Agreed 2001-03-02 CAMEL3 0 -
0270 1 F R99 3.7.0 Clarification of APN change in PDP Context Established NP-11 - - N2 N2-16 N2-010092 rejected 2001-01-19 CAMEL3 Rejected in CN2#17, replaced by N2-010209 -
0271 1 F R99 3.7.0 3.8.0 Correction on GPRS related information flows NP-11 NP-010055 approved N2 N2-16 N2-010093 Agreed 2001-01-19 CAMEL3 0 -
0272 - F R99 3.7.0 3.8.0 Corrections to Information Flow Definitions NP-11 NP-010056 approved N2 N2-17 N2-010125 Agreed 2001-03-02 CAMEL3 0 -
0273 1 F R99 3.7.0 3.8.0 Correction of the Location Information IE NP-11 NP-010056 approved N2 N2-17 N2-010207 Agreed 2001-03-02 CAMEL3 0 -
0274 - F R99 3.7.0 3.8.0 Correction of Interactions with Call Barring in CAMEL Phase 3. NP-11 NP-010056 approved N2 N2-17 N2-010158 Agreed 2001-03-02 CAMEL3 0 -
0279 - F R99 3.7.0 3.8.0 Correction of Triggering after Call Gapping in CAMEL Phase 3. NP-11 NP-010056 approved N2 N2-17 N2-010163 Agreed 2001-03-02 CAMEL3 0 -
0280 1 F R99 3.7.0 3.8.0 Correction of SDL Set_Notification_Type NP-11 NP-010056 approved N2 N2-17 N2-010208 Agreed 2001-03-02 CAMEL3 0 -
0282 1 F R99 3.7.0 3.8.0 Correction to vendor/operator specific GPRS charging response timer handling NP-11 NP-010056 approved N2 N2-17 N2-010220 Agreed 2001-03-02 CAMEL3 0 -
0283 - F R99 3.7.0 3.8.0 Marking of Location Number in InitialDP SMS as 'Conditional' NP-11 NP-010056 approved N2 N2-17 N2-010215 Agreed 2001-03-02 CAMEL3 0 -
0284 1 F R99 3.7.0 3.8.0 Correction on checking DP criteria and sending VT/T-CSI NP-11 NP-010056 approved N2 N2-17 N2-010221 Agreed 2001-03-02 CAMEL3 0 -
0285 - F R99 3.7.0 3.8.0 Correction of Output Signals in Process Reconnected_MT_Call_VLR NP-11 NP-010056 approved N2 N2-17 N2-010219 Agreed 2001-03-02 CAMEL3 0 -
0286 - F R99 3.8.0 3.9.0 GGSN address in SGSN to SCP interface NP-12 NP-010310 approved N2 N2-18 N2-010282 agreed 2001-05-28 CAMEL3 0 -
0287 - A Rel-4 4.0.0 4.1.0 GGSN address in SGSN to SCP interface NP-12 NP-010310 approved N2 N2-18 N2-010283 agreed 2001-05-28 CAMEL3 0 -
0288 1 F R99 3.8.0 3.9.0 Mapping of Call Forwarding parameters from CAP-Connect to ISUP-IAM and CAP-InitialDP NP-12 NP-010309 approved N2 N2-18 N2-010381 agreed 2001-05-28 CAMEL3 0 -
0289 1 A Rel-4 4.0.0 4.1.0 Mapping of Call Forwarding parameters from CAP-Connect to ISUP-IAM and CAP-InitialDP NP-12 NP-010309 approved N2 N2-18 N2-010382 agreed 2001-05-28 CAMEL3 0 -
0290 - F R99 3.8.0 3.9.0 Correction of error implementing 23.078-181r2 NP-12 NP-010310 approved N2 N2-18 N2-010290 agreed 2001-05-28 CAMEL3 0 -
0291 - A Rel-4 4.0.0 4.1.0 Correction of error implementing 23.078-181r2 NP-12 NP-010310 approved N2 N2-18 N2-010291 agreed 2001-05-28 CAMEL3 0 -
0292 1 F R99 3.8.0 3.9.0 Handling of second SIFOC NP-12 NP-010310 approved N2 N2-18 N2-010404 agreed 2001-05-28 CAMEL3 0 -
0293 1 A Rel-4 4.0.0 4.1.0 Handling of second SIFOC NP-12 NP-010310 approved N2 N2-18 N2-010406 agreed 2001-05-28 CAMEL3 0 -
0294 1 F R99 3.8.0 3.9.0 Correction to GPRS SDL: no state transition for QoS-induced ACR-GPRS NP-12 NP-010310 approved N2 N2-18 N2-010389 agreed 2001-05-28 CAMEL3 0 -
0295 1 F R99 3.8.0 3.9.0 Correction on the call-Diversion-Treatment-Indicator at the GMSC NP-12 NP-010310 approved N2 N2-18 N2-010412 agreed 2001-05-28 CAMEL3 0 -
0296 3 F R99 3.8.0 - Introduction of Reference Number for MO-SMS NP-12 NP-010315 rejected N2 N2-18 N2-010444 agreed 2001-05-28 CAMEL3 0 -
0297 - A Rel-4 4.0.0 4.1.0 Correction to GPRS SDL: no state transition for QoS-induced ACR-GPRS NP-12 NP-010310 approved N2 N2-18 N2-010390 agreed 2001-05-28 CAMEL3 0 -
0298 1 F R99 3.8.0 - Inclusion of warning note for the reporting of total duration or volume for GPRS NP-12 NP-010316 rejected N2 N2-18 N2-010459 agreed 2001-05-28 CAMEL3 0 -
0299 - A Rel-4 4.0.0 4.1.0 Correction on the call-Diversion-Treatment-Indicator at the GMSC NP-12 NP-010310 approved N2 N2-18 N2-010413 agreed 2001-05-28 CAMEL3 0 -
0300 - A Rel-4 4.0.0 - Introduction of Reference Number for MO-SMS NP-12 NP-010315 rejected N2 N2-18 N2-010445 agreed 2001-05-28 CAMEL3 0 -
0301 - F R99 3.8.0 3.9.0 CAMEL Capability Handling in GPRS-CSI NP-12 NP-010310 approved N2 N2-18 N2-010449 agreed 2001-05-28 CAMEL3 0 -
0302 - A Rel-4 4.0.0 4.1.0 CAMEL Capability Handling in GPRS-CSI NP-12 NP-010310 approved N2 N2-18 N2-010450 agreed 2001-05-28 CAMEL3 0 -
0303 - A Rel-4 4.0.0 - Inclusion of warning note for the reporting of total duration or volume for GPRS NP-12 NP-010316 rejected N2 N2-18 N2-010460 agreed 2001-05-28 CAMEL3 0 -
0304 1 F R99 3.8.0 - Indication of gsmSCF Address in Continue GPRS and Connect GPRS IFs NP-12 NP-010314 rejected N2 N2-18 N2-010472 agreed 2001-05-28 CAMEL3 0 -
0305 - A Rel-4 4.0.0 - Indication of gsmSCF Address in Continue GPRS and Connect GPRS Ifs NP-12 NP-010314 rejected N2 N2-18 N2-010473 agreed 2001-05-28 CAMEL3 0 -
0306 - F R99 3.8.0 - Correction for the CAMEL3 ACR-GPRS parameter range problem (roll-over) NP-12 NP-010320 revised Nokia - - - 2001-06-05 CAMEL3 replaced by NP-010354 -
0306 1 F R99 3.8.0 3.9.0 Correction for the CAMEL3 ACR-GPRS parameter range problem (roll-over) NP-12 NP-010354 approved Nokia - - - 2001-06-14 CAMEL3 0 -
0307 - A Rel-4 4.0.0 - Correction for the CAMEL3 ACR-GPRS parameter range problem (roll-over) NP-12 NP-010320 revised Nokia - - - 2001-06-05 CAMEL3 replaced by NP-010354 -
0307 1 A Rel-4 4.0.0 4.1.0 Correction for the CAMEL3 ACR-GPRS parameter range problem (roll-over) NP-12 NP-010354 approved Nokia - - - 2001-06-14 CAMEL3 0 -
0308 - F R99 3.8.0 3.9.0 Correction to PDP Context DP description table (table 6.2) NP-12 NP-010246 approved Ericsson - - - 2001-06-07 CAMEL3 0 -
0309 - A Rel-4 4.0.0 4.1.0 Correction to PDP Context DP description table (table 6.2) NP-12 NP-010246 approved Ericsson - - - 2001-06-07 CAMEL3 0 -
0310 1 F R99 3.9.0 3.10.0 Correction of error implementing 23.078-194r3 NP-13 NP-010447 approved N2 N2-19 - agreed 2001-09-13 CAMEL3 - -
0311 - A Rel-4 4.1.0 4.2.0 Correction of error implementing 23.078-194r3 NP-13 NP-010447 approved N2 N2-19 - agreed 2001-09-13 CAMEL3 - -
0312 2 F R99 3.9.0 3.10.0 Possible information in Initial DP NP-13 NP-010447 approved N2 N2-19 - agreed 2001-09-13 CAMEL3 - -
0313 1 A Rel-4 4.1.0 4.2.0 Possible information in Initial DP NP-13 NP-010447 approved N2 N2-19 - agreed 2001-09-13 CAMEL3 - -
0317 1 F R99 3.9.0 3.10.0 Correction of CUG information handling NP-13 NP-010447 approved N2 N2-19 - agreed 2001-09-13 CAMEL3 - -
0318 1 A Rel-4 4.1.0 4.2.0 Correction of CUG information handling NP-13 NP-010447 approved N2 N2-19 - agreed 2001-09-13 CAMEL3 - -
0322 1 F R99 3.10.0 3.11.0 Handling of Reconnect on the MSC-VLR Interface NP-14 NP-010583 approved N2 N2-20 N2-010810 agreed - CAMEL3 - -
0323 1 A Rel-4 4.2.0 4.3.0 Handling of Reconnect on the MSC-VLR Interface NP-14 NP-010583 approved N2 N2-20 N2-010843 agreed - CAMEL3 - -
0324 1 F R99 3.10.0 3.11.0 Indication of deletion of CSI in Notify Subscriber Data Change NP-14 NP-010583 approved N2 N2-20 N2-010804 agreed - CAMEL3 - -
0325 1 A Rel-4 4.2.0 4.3.0 Indication of deletion of CSI in Notify Subscriber Data Change NP-14 NP-010583 approved N2 N2-20 N2-010815 agreed - CAMEL3 - -
0328 1 F R99 3.10.0 3.11.0 Clarification of the CUG data used in IDP NP-14 NP-010583 approved N2 N2-20 N2-010824 agreed - CAMEL3 - -
0329 1 A Rel-4 4.2.0 4.3.0 Clarification of the CUG data used in IDP NP-14 NP-010583 approved N2 N2-20 N2-010853 agreed - CAMEL3 - -
0331 1 F R99 3.10.0 3.11.0 TDP3 triggering criterion in MO case NP-14 NP-010583 approved N2 N2-20 N2-010827 agreed - CAMEL3 - -
0332 1 A Rel-4 4.2.0 4.3.0 TDP3 triggering criterion in MO case NP-14 NP-010583 approved N2 N2-20 N2-010828 agreed - CAMEL3 - -
0333 2 F R99 3.10.0 3.11.0 Guidance to the SCI operation if the subscriber or the VPLMN do not support AoC service NP-14 NP-010583 approved N2 N2-20 N2-010811 agreed - CAMEL3 - -
0334 - F R99 3.10.0 3.11.0 Inclusion of D-CSI in arming/disarming mechanism NP-14 NP-010582 approved N2 N2-20 N2-010773 agreed - CAMEL3 - -
0335 2 F R99 3.10.0 3.11.0 Clarification on ATM NP-14 NP-010582 approved N2 N2-20 N2-010808 agreed - CAMEL3 - -
0336 1 F R99 3.10.0 3.11.0 Clarification on NSCD when data is withdrawn NP-14 NP-010582 approved N2 N2-20 N2-010805 agreed - CAMEL3 - -
0337 - A Rel-4 4.2.0 4.3.0 Inclusion of D-CSI in arming/disarming mechanism NP-14 NP-010582 approved N2 N2-20 N2-010774 agreed - CAMEL3 - -
0338 - F R99 3.10.0 3.11.0 Correction of SDL to text extention NP-14 NP-010582 approved N2 N2-20 N2-010775 agreed - CAMEL3 - -
0339 - A Rel-4 4.2.0 4.3.0 Correction of SDL to text extention NP-14 NP-010582 approved N2 N2-20 N2-010776 agreed - CAMEL3 - -
0340 2 F R99 3.10.0 3.11.0 Introduction of SMS Reference Number NP-14 NP-010582 approved N2 N2-20 N2-010845 agreed - CAMEL3 - -
0341 - A Rel-4 4.2.0 4.3.0 Guidance to the SCI operation if the subscriber or the VPLMN do not support AoC service NP-14 NP-010583 approved N2 N2-20 N2-010812 agreed - CAMEL3 - -
0342 - A Rel-4 4.2.0 4.3.0 Clarification on NSCD when data is withdrawn NP-14 NP-010582 approved N2 N2-20 N2-010820 agreed - CAMEL3 - -
0343 - A Rel-4 4.2.0 4.3.0 Clarification on ATM NP-14 NP-010582 approved N2 N2-20 N2-010842 agreed - CAMEL3 - -
0344 - A Rel-4 4.2.0 4.3.0 Introduction of SMS Reference Number NP-14 NP-010582 approved N2 N2-20 N2-010846 agreed - CAMEL3 - -
0345 - F R99 3.10.0 3.11.0 Correction to Procedure ""Handle_AC"" (missing check box exit) NP-14 NP-010587 approved N2 N2-21 N2-010871 agreed 2001-12-05 CAMEL3 - -
0346 1 F R99 3.10.0 3.11.0 Corrections in the Call Information Report/Request operation NP-14 NP-010587 approved N2 N2-21 N2-010999 agreed 2001-12-05 CAMEL3 - -
0347 - F R99 3.10.0 3.11.0 Tccd shall be stopped in procedure Handle_ACR NP-14 NP-010587 approved N2 N2-21 N2-010895 agreed 2001-12-05 CAMEL3 - -
0348 - F R99 3.10.0 3.11.0 Correction to ECT Treatment Indicator description NP-14 NP-010587 approved N2 N2-21 N2-010896 agreed 2001-12-05 CAMEL3 - -
0351 - F R99 3.10.0 3.11.0 Reporting QoS changes shall not be restricted to ""User initiated"" QoS changes NP-14 NP-010587 approved N2 N2-21 N2-010899 agreed 2001-12-05 CAMEL3 - -
0352 1 F R99 3.10.0 3.11.0 Guidance to the usage of SCI-GPRS in the case of no support of AoC NP-14 NP-010588 approved N2 N2-21 N2-010997 agreed 2001-12-06 CAMEL3 - -
0355 1 F R99 3.10.0 3.11.0 Clarification on Connect and ContinueWithArgument about the SII2 NP-14 NP-010588 approved N2 N2-21 N2-011012 agreed 2001-12-06 CAMEL3 - -
0359 1 F R99 3.10.0 3.11.0 Clarification on ATM about simultaneous SS modifications NP-14 NP-010588 approved N2 N2-21 N2-010976 agreed 2001-12-06 CAMEL3 - -
0362 - A Rel-4 4.2.0 4.3.0 Clarification on ATM about simultaneous SS modifications NP-14 NP-010588 approved N2 N2-21 N2-010977 agreed 2001-12-06 CAMEL3 - -
0363 4 F R99 3.10.0 3.11.0 Clarification: use of SS-Code in ATM, ATSI and NSDC NP-14 NP-010588 approved N2 N2-21 N2-011040 agreed 2001-12-06 CAMEL3 - -
0364 - A Rel-4 4.2.0 4.3.0 Reporting QoS changes shall not be restricted to ""User initiated"" QoS changes NP-14 NP-010587 approved N2 N2-21 N2-010990 agreed 2001-12-05 CAMEL3 - -
0365 - A Rel-4 4.2.0 4.3.0 Correction to Procedure ""Handle_AC"" (missing check box exit) NP-14 NP-010587 approved N2 N2-21 N2-010998 agreed 2001-12-05 CAMEL3 - -
0366 - A Rel-4 4.2.0 4.3.0 Corrections in the Call Information Report/Request operation NP-14 NP-010587 approved N2 N2-21 N2-011000 agreed 2001-12-05 CAMEL3 - -
0367 - A Rel-4 4.2.0 4.3.0 Tccd shall be stopped in procedure Handle_ACR NP-14 NP-010587 approved N2 N2-21 N2-011009 agreed 2001-12-05 CAMEL3 - -
0368 - A Rel-4 4.2.0 4.3.0 Correction to ECT Treatment Indicator description NP-14 NP-010587 approved N2 N2-21 N2-011010 agreed 2001-12-05 CAMEL3 - -
0369 - A Rel-4 4.2.0 4.3.0 Guidance to the usage of SCI-GPRS in the case of no support of AoC NP-14 NP-010588 approved N2 N2-21 N2-011026 agreed 2001-12-06 CAMEL3 - -
0370 - A Rel-4 4.2.0 4.3.0 Clarification on Connect and ContinueWithArgument about the SII2 NP-14 NP-010588 approved N2 N2-21 N2-011027 agreed 2001-12-06 CAMEL3 - -
0371 - A Rel-4 4.2.0 4.3.0 Clarification: use of SS-Code in ATM, ATSI and NSDC NP-14 NP-010588 approved N2 N2-21 N2-011041 agreed 2001-12-06 CAMEL3 - -
0372 1 F R99 3.11.0 3.12.0 Clarification on NP check at DP2 NP-15 NP-020055 approved N2 N2-22 N2-020178 agreed 2002-02-06 CAMEL3 - -
0373 2 F R99 3.11.0 3.12.0 Clarification on national values of the Called Party Number’s Nature of Address field NP-15 NP-020056 approved N2 N2-22 N2-020216 agreed 2002-02-06 CAMEL3 - -
0374 - F R99 3.11.0 3.12.0 Correction to GPRS Dialogue Handler NP-15 NP-020054 approved N2 N2-22 N2-020031 agreed 2002-02-06 CAMEL3 - -
0376 1 F R99 3.11.0 3.12.0 Correction to Advice of Charge for MT calls NP-15 NP-020054 approved N2 N2-22 N2-020182 agreed 2002-02-06 CAMEL3 - -
0378 - F R99 3.11.0 3.12.0 Exact wordings for Apply Charging and Apply Charging Report in GPRS NP-15 NP-020054 approved N2 N2-22 N2-020077 agreed 2002-02-06 CAMEL3 - -
0379 - A Rel-4 4.3.0 4.4.0 Exact wordings for Apply Charging and Apply Charging Report in GPRS NP-15 NP-020054 approved N2 N2-22 N2-020078 agreed 2002-02-06 CAMEL3 - -
0380 - F R99 3.11.0 3.12.0 FCI handling harmonisation NP-15 NP-020054 approved N2 N2-22 N2-020107 agreed 2002-02-06 CAMEL3 - -
0381 - A Rel-4 4.3.0 4.4.0 FCI handling harmonisation NP-15 NP-020054 approved N2 N2-22 N2-020108 agreed 2002-02-06 CAMEL3 - -
0382 1 F R99 3.11.0 3.12.0 The waiting for new AC timers NP-15 NP-020055 approved N2 N2-22 N2-020194 agreed 2002-02-06 CAMEL3 - -
0383 1 A Rel-4 4.3.0 4.4.0 The waiting for new AC timers NP-15 NP-020055 approved N2 N2-22 N2-020195 agreed 2002-02-06 CAMEL3 - -
0384 1 F R99 3.11.0 3.12.0 Handling Disconnect From IP Forbidden IE in Play Announcement and Prompt And Collect User Information IFs NP-15 NP-020055 approved N2 N2-22 N2-020192 agreed 2002-02-06 CAMEL3 - -
0385 1 A Rel-4 4.3.0 4.4.0 Handling Disconnect From IP Forbidden IE in Play Announcement and Prompt And Collect User Information IFs NP-15 NP-020055 approved N2 N2-22 N2-020193 agreed 2002-02-06 CAMEL3 - -
0386 - F R99 3.11.0 3.12.0 Correction: CSI handling at several FEs NP-15 NP-020054 approved N2 N2-22 N2-020131 agreed 2002-02-06 CAMEL3 - -
0387 - A Rel-4 4.3.0 4.4.0 Correction: CSI handling at several FEs NP-15 NP-020054 approved N2 N2-22 N2-020132 agreed 2002-02-06 CAMEL3 - -
0388 - A Rel-4 4.3.0 4.4.0 Correction to GPRS Dialogue Handler NP-15 NP-020054 approved N2 N2-22 N2-020169 agreed 2002-02-06 CAMEL3 - -
0389 - A Rel-4 4.3.0 4.4.0 Correction to Advice of Charge for MT calls NP-15 NP-020054 approved N2 N2-22 N2-020183 agreed 2002-02-06 CAMEL3 - -
0390 1 F R99 3.11.0 3.12.0 MSISDN to be made available to MSC NP-15 NP-020055 approved N2 N2-22 N2-020206 agreed 2002-02-06 CAMEL3 - -
0391 1 A Rel-4 4.3.0 4.4.0 MSISDN to be made available to MSC NP-15 NP-020055 approved N2 N2-22 N2-020207 agreed 2002-02-06 CAMEL3 - -
0392 - A Rel-4 4.3.0 4.4.0 Clarification on NP check at DP2 NP-15 NP-020055 approved N2 N2-22 N2-020213 agreed 2002-02-06 CAMEL3 - -
0393 - A Rel-4 4.3.0 4.4.0 Clarification on national values of the Called Party Number’s Nature of Address field NP-15 NP-020056 approved N2 N2-22 N2-020217 agreed 2002-02-06 CAMEL3 - -
0394 - B Rel-5 4.3.0 - Composite changes for CAMEL phase 4 NP-15 NP-020057 noted N2 N2-22 - agreed 2002-03-01 CAMEL3 Intention is to approve huge CR at NP-16. -
0394 1 B Rel-5 4.4.0 5.0.0 Composite changes for CAMEL phase 4 NP-16 NP-020205 approved N2 N2-24 N2-020626 agreed 2002-03-01 CAMEL4 CR 394 provided for CN#15 for information -
0395 - F R99 3.12.0 - Correction of EventReportGPRS parameter QOS - - - N2 N2-23 N2-020355 revised 2002-03-28 CAMEL3 - -
0395 1 F R99 3.12.0 3.13.0 Correction of EventReportGPRS parameter QOS NP-16 NP-020203 approved N2 N2-23 N2-020434 agreed 2002-03-28 CAMEL3 - -
0396 - A Rel-4 4.4.0 - Correction of EventReportGPRS parameter QOS - - - N2 N2-23 N2-020356 revised 2002-03-28 CAMEL3 - -
0396 1 A Rel-4 4.4.0 4.5.0 Correction of EventReportGPRS parameter QOS NP-16 NP-020203 approved N2 N2-23 N2-020435 agreed 2002-03-28 CAMEL3 - -
0397 - F R99 3.12.0 - Clarifications on ATM/ATM-ack - - - N2 N2-23 N2-020375 revised 2002-04-03 CAMEL3 - -
0397 1 F R99 3.12.0 - Clarifications on ATM/ATM-ack - - - N2 N2-23 N2-020442 postponed 2002-04-03 CAMEL3 - -
0397 2 F R99 3.12.0 3.13.0 Clarifications on ATM/ATM-ack NP-16 NP-020204 approved N2 N2-24 N2-020564 agreed 2002-04-03 CAMEL3 - -
0398 - A R99 3.12.0 - Clarification in the case multiple RRBs are sent for a DP - - - N2 N2-23 N2-020379 revised 2002-04-03 CAMEL2 - -
0398 1 A R99 3.12.0 3.13.0 Clarification in the case multiple RRBs are sent for a DP NP-16 NP-020202 approved N2 N2-23 N2-020452 agreed 2002-04-03 CAMEL2 - -
0399 - A Rel-4 4.4.0 - Clarification in the case multiple RRBs are sent for a DP - - - N2 N2-23 N2-020380 revised 2002-04-03 CAMEL2 - -
0399 1 A Rel-4 4.4.0 4.5.0 Clarification in the case multiple RRBs are sent for a DP NP-16 NP-020202 approved N2 N2-23 N2-020453 agreed 2002-04-03 CAMEL2 - -
0400 - F R99 3.12.0 - Correction to handling when Delta is greater than received maximum threshold in an AC?GPRS - - - N2 N2-23 N2-020394 revised 2002-04-03 CAMEL3 - -
0400 1 F R99 3.12.0 - Correction to handling when Delta is greater than received maximum threshold in an AC?GPRS - - - N2 N2-23 N2-020436 postponed 2002-04-03 CAMEL3 - -
0401 - A Rel-4 4.4.0 - Correction to handling when Delta is greater than received maximum threshold in an AC?GPRS - - - N2 N2-23 N2-020395 postponed 2002-04-03 CAMEL3 - -
0402 - A R99 3.12.0 - 23.078 SDL correction of CancelGPRS - - - N2 N2-24 N2-020522 noted 2002-05-03 CAMEL3 merged with CR 408 -
0403 - F R99 3.12.0 - Correction to handling when Delta is greater than received maximum threshold - - - N2 N2-24 N2-020533 revised 2002-05-07 CAMEL3 - -
0403 1 F R99 3.12.0 - Correction to handling when Delta is greater than received maximum threshold - - - N2 N2-24 N2-020582 revised 2002-05-07 CAMEL3 - -
0403 2 F R99 3.12.0 - Correction to handling when Delta is greater than received maximum threshold - - - N2 N2-24 N2-020603 postponed 2002-05-07 CAMEL3 - -
0404 - A Rel-4 4.4.0 - Correction to handling when Delta is greater than received maximum threshold - - - N2 N2-24 N2-020534 postponed 2002-05-07 CAMEL3 - -
0405 - F R99 3.12.0 - Corrections to CTR and ETC Procedures - - - N2 N2-24 N2-020557 revised 2002-05-08 CAMEL3 - -
0405 1 F R99 3.12.0 3.13.0 Corrections to CTR and ETC Procedures NP-16 NP-020204 approved N2 N2-24 N2-020567 agreed 2002-05-08 CAMEL3 - -
0406 - A Rel-4 4.4.0 - Corrections to CTR and ETC Procedures - - - N2 N2-24 N2-020558 revised 2002-05-08 CAMEL3 - -
0406 1 A Rel-4 4.4.0 4.5.0 Corrections to CTR and ETC Procedures NP-16 NP-020204 approved N2 N2-24 N2-020568 agreed 2002-05-08 CAMEL3 - -
0407 - A Rel-4 4.4.0 4.5.0 Clarifications on ATM-req/ATM-ack NP-16 NP-020204 approved N2 N2-24 N2-020565 agreed 2002-05-15 CAMEL3 - -
0408 - F R99 3.12.0 - Clarification of PDP id for GPRS control - - - N2 N2-24 N2-020569 revised 2002-05-15 CAMEL3 - -
0408 1 F R99 3.12.0 - Clarification of PDP id for GPRS control - - - N2 N2-24 N2-020604 revised 2002-05-15 CAMEL3 - -
0408 2 F R99 3.12.0 3.13.0 Clarification of PDP id for GPRS control NP-16 NP-020204 approved N2 N2-24 N2-020619 agreed 2002-05-15 CAMEL3 - -
0409 - A R99 3.12.0 - Corrections to GPRS DP arming rules for scenario #1 - - - N2 N2-24 N2-020570 postponed 2002-05-15 CAMEL3 - -
0410 - A Rel-4 4.4.0 4.5.0 Clarification of PDP id for GPRS control NP-16 NP-020204 approved N2 N2-24 N2-020620 agreed 2002-05-17 CAMEL3 - -
0411 - F Rel-4 4.5.1 CAMEL3 inter-working with Rel-4 GPRS barring - - - N2 N2-25 N2-020631 revised 2002-06-26 CAMEL3 - -
0411 1 F Rel-4 4.5.1 4.6.0 CAMEL3 inter-working with Rel-4 GPRS barring NP-17 NP-020341 approved N2 N2-25 N2-020754 agreed 2002-06-26 CAMEL3 - -
0412 - B Rel-5 5.0.0 CPH clarification on overall SDL architecture - - - N2 N2-25 N2-020633 revised 2002-06-26 CAMEL4 - -
0412 1 B Rel-5 5.0.0 5.1.0 CPH clarification on overall SDL architecture NP-17 NP-020343 approved N2 N2-25 N2-020768 agreed 2002-06-26 CAMEL4 - -
0413 - F Rel-5 5.0.0 Only one AC/Aper BCSM - - - N2 N2-25 N2-020634 rejected 2002-06-26 CAMEL4 - -
0414 - F Rel-5 5.0.0 5.1.0 Move Leg not allowed before Active phase of ""normal"" A-B call NP-17 NP-020343 approved N2 N2-25 N2-020655 agreed 2002-07-15 CAMEL4 - -
0415 - F Rel-5 5.0.0 Disconnect of penultimate leg in CSID1 - - - N2 N2-25 N2-020657 revised 2002-07-15 CAMEL4 - -
0415 1 F Rel-5 5.0.0 5.1.0 Disconnect of penultimate leg in CSID1 NP-17 NP-020343 approved N2 N2-25 N2-020770 agreed 2002-07-15 CAMEL4 - -
0416 - C Rel-5 5.0.0 Handling of partial implementations of CAMEL phase 4 - - - N2 N2-25 N2-020659 revised 2002-07-15 CAMEL4 - -
0416 1 C Rel-5 5.0.0 Handling of partial implementations of CAMEL phase 4 - - - N2 N2-25 N2-020734 revised 2002-07-15 CAMEL4 - -
0416 2 C Rel-5 5.0.0 Handling of partial implementations of CAMEL phase 4 - - - N2 N2-25 N2-020775 revised 2002-07-15 CAMEL4 - -
0416 3 C Rel-5 5.0.0 5.1.0 Handling of partial implementations of CAMEL phase 4 NP-17 NP-020347 approved N2 N2-25 N2-020659 revised 2002-07-15 CAMEL4 See linked CRs to 22.078 in SP-17. -
0417 - C Rel-5 5.0.0 5.1.0 Removal of ChargingNotification feature NP-17 NP-020345 approved N2 N2-25 N2-020663 agreed 2002-07-15 CAMEL4 - -
0418 - B Rel-5 5.0.0 Playing of Warning Tones - - - N2 N2-25 N2-020666 revised 2002-07-15 CAMEL4 - -
0418 1 B Rel-5 5.0.0 Playing of Warning Tones - - - N2 N2-25 N2-020783 revised 2002-07-15 CAMEL4 - -
0418 2 B Rel-5 5.0.0 - Playing of Warning Tones NP-17 NP-020346 rejected N2 N2-25 N2-020794 agreed 2002-07-15 CAMEL4 - -
0418 3 F Rel-5 5.1.0 Playing of Warning Tones - - - N2 N2-27 N2-020978 revised 2002-09-17 CAMEL4 - 2002-11-29
0418 4 F Rel-5 5.1.0 5.2.0 Playing of Warning Tones NP-18 NP-020527 approved N2 N2-27 N2-021043 agreed 2002-09-17 CAMEL4 - 2002-11-29
0419 - F Rel-5 5.0.0 No use of Call Segment ID for the direct gsmSCF - gsmSRF case - - - N2 N2-25 N2-020669 revised 2002-07-15 CAMEL4 - -
0419 1 F Rel-5 5.0.0 5.1.0 No use of Call Segment ID for the direct gsmSCF - gsmSRF case NP-17 NP-020343 approved N2 N2-25 N2-020771 agreed 2002-07-15 CAMEL4 - -
0420 - F Rel-5 5.0.0 T_Change_Of_Position is not applicable for an MO call. - - - N2 N2-25 N2-020670 revised 2002-07-15 CAMEL4 - -
0420 1 D Rel-5 5.0.0 5.1.0 Clean-up of LocationInformation table for Call_Accepted DP NP-17 NP-020345 approved N2 N2-25 N2-020785 agreed 2002-07-15 CAMEL4 - -
0421 - F Rel-5 5.0.0 5.1.0 Correction of clause 4.3.3 N-CSI NP-17 NP-020342 approved N2 N2-25 N2-020671 agreed 2002-07-15 CAMEL4 - -
0422 - F Rel-5 5.0.0 5.1.0 Inconsistency for the negotiated Camel Capability handling of the D-CSI NP-17 NP-020342 approved N2 N2-25 N2-020675 agreed 2002-07-15 CAMEL4 - -
0423 - F Rel-5 5.0.0 5.1.0 Change ""Initial Call Segment"" to ""CSID1"" NP-17 NP-020343 approved N2 N2-25 N2-020681 agreed 2002-07-17 CAMEL4 - -
0424 - F Rel-5 5.0.0 5.1.0 Removal of DP_MidCall state from CAMEL_EXPORT_LEG_MSC NP-17 NP-020343 approved N2 N2-25 N2-020683 agreed 2002-07-17 CAMEL4 - -
0425 - F Rel-5 5.0.0 5.1.0 FtN in Perform Call Handling ack NP-17 NP-020343 approved N2 N2-25 N2-020684 agreed 2002-07-17 CAMEL4 - -
0426 - F Rel-5 5.0.0 CSA_gsmSSF: Handling signals in states such as DL_ack - - - N2 N2-25 N2-020685 revised 2002-07-17 CAMEL4 - -
0426 1 F Rel-5 5.0.0 - CSA_gsmSSF: Handling signals in states such as DL_ack NP-17 NP-020344 revised N2 N2-25 N2-020792 agreed 2002-07-17 CAMEL4 - -
0426 1 F Rel-5 5.0.0 5.1.0 CSA_gsmSSF: Handling signals in states such as DL_ack NP-17 NP-020476 approved N2 N2-25 N2-020792 agreed 2002-07-17 CAMEL4 NP-020476 replaces NP-020344 -
0427 - C Rel-5 5.0.0 Use of Release Call and Release Call Segment in gsmSSF processes - - - N2 N2-25 N2-020686 postponed 2002-07-17 CAMEL4 - -
0427 1 F Rel-5 5.1.0 Use of Release Call and Release Call Segment in gsmSSF processes - - - N2 N2-26 N2-020816 revised 2002-07-17 CAMEL4 - 2002-11-29
0427 2 F Rel-5 5.1.0 5.2.0 Use of Release Call and Release Call Segment in gsmSSF processes NP-18 NP-020526 approved N2 N2-26 N2-020943 agreed 2002-07-17 CAMEL4 - 2002-11-29
0428 - F Rel-5 5.0.0 - Removal of ""Note that"" in descriptions of CPH operations NP-17 NP-020344 revised N2 N2-25 N2-020687 agreed 2002-07-17 CAMEL4 CR incorrectly allocated (wrong spec!) -
0429 - F Rel-5 5.0.0 - Wrong State Name in CSA_gsmSSF NP-17 NP-020344 revised N2 N2-25 N2-020688 agreed 2002-07-17 CAMEL4 - -
0429 - F Rel-5 5.0.0 5.1.0 Wrong State Name in CSA_gsmSSF NP-17 NP-020476 approved N2 N2-25 N2-020688 agreed 2002-07-17 CAMEL4 NP-020476 replaces NP-020344 -
0430 - F Rel-5 5.0.0 - Change Int_Continue_Without_Leg2 to Int_Disconnect_Leg (Leg2) NP-17 NP-020344 revised N2 N2-25 N2-020689 agreed 2002-07-17 CAMEL3 - -
0430 - F Rel-5 5.0.0 5.1.0 Change Int_Continue_Without_Leg2 to Int_Disconnect_Leg (Leg2) NP-17 NP-020476 approved N2 N2-25 N2-020689 agreed 2002-07-17 CAMEL3 NP-020476 replaces NP-020344 -
0431 - C Rel-5 5.0.0 - Contents of CWA at MidCall DP NP-17 NP-020344 revised N2 N2-25 N2-020690 agreed 2002-07-17 CAMEL4 - -
0431 - C Rel-5 5.0.0 5.1.0 Contents of CWA at MidCall DP NP-17 NP-020476 approved N2 N2-25 N2-020690 agreed 2002-07-17 CAMEL4 NP-020476 replaces NP-020344 -
0432 - D Rel-5 5.0.0 Introduction of CPH Definitions - - - N2 N2-25 N2-020691 revised 2002-07-17 CAMEL4 - -
0432 1 D Rel-5 5.0.0 5.1.0 Introduction of CPH Definitions NP-17 NP-020343 approved N2 N2-25 N2-020779 agreed 2002-07-17 CAMEL4 - -
0433 - F R99 3.13.0 Correction in CAMEL_MO_Dialled_Services procedure - - - N2 N2-25 N2-020697 revised 2002-07-18 CAMEL4 - -
0433 1 F R99 3.13.0 3.14.0 Correction in CAMEL_MO_Dialled_Services procedure NP-17 NP-020340 approved N2 N2-25 N2-020751 agreed 2002-07-18 CAMEL3 - -
0434 - A Rel-4 4.5.1 Correction in CAMEL_MO_Dialled_Services procedure - - - N2 N2-25 N2-020698 revised 2002-07-18 CAMEL3 - -
0434 1 A Rel-4 4.5.1 4.6.0 Correction in CAMEL_MO_Dialled_Services procedure NP-17 NP-020340 approved N2 N2-25 N2-020752 agreed 2002-07-18 CAMEL3 - -
0435 - A Rel-5 5.0.0 Correction in CAMEL_MO_Dialled_Services procedure - - - N2 N2-25 N2-020699 revised 2002-07-18 CAMEL3 - -
0435 1 A Rel-5 5.0.0 5.1.0 Correction in CAMEL_MO_Dialled_Services procedure NP-17 NP-020340 approved N2 N2-25 N2-020753 agreed 2002-07-18 CAMEL3 - -
0436 - F Rel-5 5.0.0 Handling Password and WrongPasswordAttemptsCounter in ATSI result and ATMod - - - N2 N2-25 N2-020700 withdrawn 2002-07-18 CAMEL4 - -
0437 - C Rel-5 5.0.0 Ordering D-CSI destination number triggering criterion - - - N2 N2-25 N2-020701 revised 2002-07-18 CAMEL4 - -
0437 1 C Rel-5 5.0.0 Ordering D-CSI destination number triggering criterion - - - N2 N2-25 N2-020761 postponed 2002-07-18 CAMEL4 - -
0438 - F R99 3.13.0 ERB when VT call is reported in DP T_Busy due to Call Deflection - - - N2 N2-25 N2-020710 rejected 2002-07-23 CAMEL3 - -
0439 - A Rel-4 4.5.0 ERB when VT call is reported in DP T_Busy due to Call Deflection - - - N2 N2-25 N2-020711 rejected 2002-07-23 CAMEL3 - -
0440 - A Rel-5 5.0.0 ERB when VT call is reported in DP T_Busy due to Call Deflection - - - N2 N2-25 N2-020712 rejected 2002-07-23 CAMEL3 - -
0441 - F R99 3.13.0 Inconsistent description on ACR: time information - - - N2 N2-25 N2-020716 revised 2002-07-23 CAMEL3 - -
0441 1 F R99 3.13.0 3.14.0 Inconsistent description on ACR: time information NP-17 NP-020340 approved N2 N2-25 N2-020742 agreed 2002-07-23 CAMEL3 - -
0442 - A Rel-4 4.5.0 Inconsistent description on ACR: time information - - - N2 N2-25 N2-020717 revised 2002-07-23 CAMEL3 - -
0442 1 A Rel-4 4.5.1 4.6.0 Inconsistent description on ACR: time information NP-17 NP-020340 approved N2 N2-25 N2-020743 agreed 2002-07-23 CAMEL3 - -
0443 - A Rel-5 5.0.0 Inconsistent description on ACR: time information - - - N2 N2-25 N2-020718 revised 2002-07-23 CAMEL3 - -
0443 1 A Rel-5 5.0.0 5.1.0 Inconsistent description on ACR: time information NP-17 NP-020340 approved N2 N2-25 N2-020744 agreed 2002-07-23 CAMEL3 - -
0444 - F R99 3.13.0 Secondary PDP context for DP change of position context - - - N2 N2-25 N2-020719 rejected 2002-07-23 CAMEL3 - -
0445 - A Rel-4 4.5.1 Secondary PDP context for DP change of position context - - - N2 N2-25 N2-020720 rejected 2002-07-23 CAMEL3 - -
0446 - A Rel-5 5.0.0 Secondary PDP context for DP change of position context - - - N2 N2-25 N2-020721 revised 2002-07-23 CAMEL3 - -
0446 1 F Rel-5 5.0.0 5.1.0 Secondary PDP context for DP change of position context NP-17 NP-020342 approved N2 N2-25 N2-020747 agreed 2002-07-23 CAMEL3 - -
0447 - F Rel-5 5.0.0 Detail description for applicability of call cases - - - N2 N2-25 N2-020757 revised 2002-07-23 CAMEL4 - -
0447 1 F Rel-5 5.0.0 Detail description for applicability of call cases - - - N2 N2-25 N2-020722 revised 2002-07-23 CAMEL4 - -
0447 2 F Rel-5 5.0.0 5.1.0 Detail description for applicability of call cases NP-17 NP-020342 approved N2 N2-25 N2-020793 agreed 2002-07-23 CAMEL4 - -
0448 - F Rel-5 5.0.0 Location information for VT-call - - - N2 N2-25 N2-020723 postponed 2002-07-23 CAMEL4 - -
0449 - F Rel-5 5.0.0 Correction of handling of MT-SMS in the SGSN - - - N2 N2-25 N2-020724 revised 2002-07-23 CAMEL4 - -
0449 1 F Rel-5 5.0.0 Correction of handling of MT-SMS in the SGSN - - - N2 N2-25 N2-020795 postponed 2002-07-23 CAMEL4 - -
0449 1 F Rel-5 5.1.0 5.2.0 Correction of handling of MT-SMS in the SGSN NP-18 NP-020526 approved N2 N2-26 N2-020809 agreed 2002-07-23 CAMEL4 - 2002-11-29
0450 - A Rel-5 5.0.0 5.1.0 CAMEL3 inter-working with Rel-4 GPRS barring NP-17 NP-020341 approved N2 N2-25 N2-020755 agreed 2002-07-30 CAMEL3 - -
0451 - C Rel-5 5.0.0 Handling of partial implementations of CAMEL phase 4 - - - N2 N2-25 N2-020763 withdrawn 2002-07-31 CAMEL4 - -
0452 - F Rel-5 5.1.0 Clarification of architecture for CAMEL control of MT-SMS - - - N2 N2-26 N2-020810 revised 2002-08-12 CAMEL4 - 2002-11-29
0452 1 F Rel-5 5.1.0 Clarification of architecture for CAMEL control of MT-SMS - - - N2 N2-26 N2-020811 revised 2002-08-12 CAMEL4 - 2002-11-29
0452 2 F Rel-5 5.1.0 5.2.0 Clarification of architecture for CAMEL control of MT-SMS NP-18 NP-020526 approved N2 N2-26 N2-020930 agreed 2002-08-12 CAMEL4 - 2002-11-29
0453 - F Rel-5 5.1.0 5.2.0 Correction of handling of MT-SMS in the VLR NP-18 NP-020526 approved N2 N2-26 N2-020812 agreed 2002-08-19 CAMEL4 - 2002-11-29
0454 - F Rel-5 5.1.0 5.2.0 Correction of IDPs in new section 4.5.1 NP-18 NP-020526 approved N2 N2-26 N2-020814 agreed 2002-09-12 CAMEL4 - 2002-11-29
0455 - F Rel-5 5.1.0 Playing of the warning tone - - - N2 N2-26 N2-020820 postponed 2002-09-16 CAMEL4 - 2002-11-29
0456 - F Rel-5 5.1.0 5.2.0 Add result from GPRS mobility management procedure NP-18 NP-020526 approved N2 N2-26 N2-020832 agreed 2002-09-16 CAMEL4 - 2002-11-29
0457 - C Rel-5 5.1.0 Detach report in inter-SGSN routeing area update - - - N2 N2-26 N2-020833 revised 2002-09-16 CAMEL4 - 2002-11-29
0457 1 F Rel-5 5.1.0 5.2.0 Detach report in inter-SGSN routeing area update NP-18 NP-020526 approved N2 N2-26 N2-020902 agreed 2002-09-16 CAMEL4 - 2002-11-29
0458 - F R99 3.14.0 Correction to handling when Delta is greater than received maximum threshold - - - N2 N2-26 N2-020834 revised 2002-09-16 CAMEL3 - 2002-11-29
0458 1 F R99 3.14.0 Correction to handling when Delta is greater than received maximum threshold - - - N2 N2-26 N2-020912 withdrawn 2002-09-16 CAMEL3 - 2002-11-29
0459 - F R99 3.14.0 Deferral of QoS induced ACR-GPRS when waiting for ACH-GPRS - - - N2 N2-26 N2-020835 withdrawn 2002-09-16 CAMEL3 - 2002-11-29
0460 - F R99 3.14.0 Correction to reporting of subscribed QoS at PDPc Establishment - - - N2 N2-26 N2-020837 rejected 2002-09-16 CAMEL3 - 2002-11-29
0461 - A Rel-5 5.1.0 Correction to interaction between MO-SMS and CB / ODB - - - N2 N2-26 N2-020841 postponed 2002-09-16 CAMEL3 - 2002-11-29
0461 - A Rel-5 5.1.0 5.2.0 Correction to interaction between MO-SMS and CB / ODB NP-18 NP-020525 approved N2 N2-27 N2-021002 agreed 2002-09-16 CAMEL3 - 2002-11-29
0462 - F R99 3.14.0 Correction to ""forwardedCall"" parameter in T_Answer and O_Answer - - - N2 N2-26 N2-020844 revised 2002-09-16 CAMEL3 - 2002-11-29
0462 1 F R99 3.14.0 Correction to ""forwardedCall"" parameter in T_Answer and O_Answer - - - N2 N2-26 N2-020911 withdrawn 2002-09-16 CAMEL3 - 2002-11-29
0463 - F R99 3.14.0 Correction to ""destinationAddress"" parameter in T_Answer and O_Answer - - - N2 N2-26 N2-020845 withdrawn 2002-09-16 CAMEL3 - 2002-11-29
0464 - F R99 3.14.0 Correction to Dialled Services criteria - - - N2 N2-26 N2-020846 revised 2002-09-16 CAMEL3 - 2002-11-29
0464 1 F R99 3.14.0 Correction to Dialled Services criteria - - - N2 N2-26 N2-020929 postponed 2002-09-16 CAMEL3 - 2002-11-29
0465 - C Rel-5 5.1.0 Allowing backwards SII2 in ETC and CTR - - - N2 N2-26 N2-020849 revised 2002-09-16 CAMEL4 - 2002-11-29
0465 1 C Rel-5 5.1.0 Allowing backwards SII2 in ETC and CTR - - - N2 N2-27 N2-020954 rejected 2002-09-16 CAMEL4 - 2002-11-29
0466 - F Rel-5 5.1.0 Correction to VLR Address in Location Information - - - N2 N2-26 N2-020851 postponed 2002-09-16 CAMEL4 - 2002-11-29
0466 1 F Rel-5 5.1.0 5.2.0 Correction to VLR Address in Location Information NP-18 NP-020527 approved N2 N2-27 N2-021045 agreed 2002-09-16 CAMEL4 - 2002-11-29
0467 - B Rel-5 5.1.0 Introduction of ""CAP version indicator"" in ETC - - - N2 N2-27 N2-021004 rejected 2002-09-16 CAMEL4 - 2002-11-29
0468 - F R99 3.14.0 Alignement between 23.078 and 29.002 about RCH - - - N2 N2-26 N2-020871 revised 2002-09-17 CAMEL3 - 2002-11-29
0468 1 F R99 3.14.0 Alignement between 23.078 and 29.002 about RCH - - - N2 N2-26 N2-020896 revised 2002-09-17 CAMEL3 - 2002-11-29
0468 2 F R99 3.14.0 Alignement between 23.078 and 29.002 about RCH - - - N2 N2-26 N2-020901 revised 2002-09-17 CAMEL3 - 2002-11-29
0468 3 F R99 3.14.0 3.15.0 Alignement between 23.078 and 29.002 about RCH NP-18 NP-020523 approved N2 N2-26 N2-020937 agreed 2002-09-17 CAMEL3 - 2002-11-29
0469 - A Rel-4 4.6.0 Alignement between 23.078 and 29.002 about RCH - - - N2 N2-26 N2-020872 revised 2002-09-17 CAMEL3 - 2002-11-29
0469 1 A Rel-4 4.6.0 Alignement between 23.078 and 29.002 about RCH - - - N2 N2-26 N2-020897 revised 2002-09-17 CAMEL3 - 2002-11-29
0469 2 A Rel-4 4.6.1 4.7.0 Alignement between 23.078 and 29.002 about RCH NP-18 NP-020523 approved N2 N2-26 N2-020938 agreed 2002-09-17 CAMEL3 - 2002-11-29
0470 - C Rel-5 5.1.0 Resolving of open issues on ""Support of partial implementation of CAMEL - - - N2 N2-26 N2-020874 revised 2002-09-17 CAMEL4 - 2002-11-29
0470 1 C Rel-5 5.1.0 Resolving of open issues on ""Support of partial implementation of CAMEL - - - N2 N2-26 N2-020904 revised 2002-09-17 CAMEL4 - 2002-11-29
0470 2 C Rel-5 5.1.0 5.2.0 Resolving of open issues on ""Support of partial implementation of CAMEL NP-18 NP-020526 approved N2 N2-26 N2-020942 agreed 2002-09-17 CAMEL4 - 2002-11-29
0471 - F Rel-5 5.1.0 Removal of PSI enhancements in VLR to HLR information flows - - - N2 N2-26 N2-020883 withdrawn 2002-09-18 CAMEL4 - 2002-11-29
0472 - F Rel-5 5.1.0 No offered functionalities in IDP for PS - - - N2 N2-26 N2-020884 withdrawn 2002-09-18 CAMEL4 - 2002-11-29
0473 - F Rel-5 5.1.0 No indication of support of PSI enhancements in Initial DP - - - N2 N2-26 N2-020885 withdrawn 2002-09-18 CAMEL4 - 2002-11-29
0474 - F Rel-5 5.1.0 Removal of 'supported CSIs' I.E. in MM event notification - - - N2 N2-26 N2-020886 withdrawn 2002-09-18 CAMEL4 - 2002-11-29
0475 - F Rel-5 5.1.0 Removal of note to Identify IEs in CWA purely for NP case - - - N2 N2-26 N2-020887 withdrawn 2002-09-18 CAMEL4 - 2002-11-29
0476 - A Rel-4 4.6.0 Correction to handling when Delta is greater than received maximum threshold - - - N2 N2-26 N2-020913 withdrawn 2002-09-25 CAMEL3 - 2002-11-29
0477 - A Rel-5 5.1.0 Correction to handling when Delta is greater than received maximum threshold - - - N2 N2-26 N2-020914 withdrawn 2002-09-25 CAMEL3 - 2002-11-29
0478 - F R99 3.14.0 3.15.0 Correction to QoS reporting and delta timer overflow NP-18 NP-020523 approved N2 N2-26 N2-020931 agreed 2002-09-26 CAMEL3 - 2002-11-29
0479 - A Rel-4 4.6.1 4.7.0 Correction to QoS reporting and delta timer overflow NP-18 NP-020523 approved N2 N2-26 N2-020939 agreed 2002-09-27 CAMEL3 - 2002-11-29
0480 - A Rel-5 5.1.0 5.2.0 Correction to QoS reporting and delta timer overflow NP-18 NP-020523 approved N2 N2-26 N2-020940 agreed 2002-09-27 CAMEL3 - 2002-11-29
0481 - F Rel-5 5.1.0 Correction on referencing figure number - - - N2 N2-27 N2-020973 withdrawn 2002-10-26 CAMEL4 - 2002-11-29
0482 - F Rel-5 5.1.0 5.2.0 Correction on DP name NP-18 NP-020527 approved N2 N2-27 N2-020974 agreed 2002-10-26 CAMEL4 - 2002-11-29
0483 - D Rel-5 5.1.0 5.2.0 Figure and table numbers NP-18 NP-020529 approved N2 N2-27 N2-020975 agreed 2002-10-26 CAMEL4 - 2002-11-29
0484 - D Rel-5 5.1.0 Better SDL CSA_gsmSSF - - - N2 N2-27 N2-020976 revised 2002-10-26 CAMEL4 - 2002-11-29
0484 1 D Rel-5 5.1.0 5.2.0 Better SDL CSA_gsmSSF NP-18 NP-020528 approved N2 N2-27 N2-021075 agreed 2002-10-26 CAMEL4 - 2002-11-29
0485 - F Rel-5 5.1.0 Correction of ""Support of partial implementation of CAMEL"" - - - N2 N2-27 N2-020979 revised 2002-10-28 CAMEL4 - 2002-11-29
0485 1 F Rel-5 5.1.0 5.2.0 Correction of ""Support of partial implementation of CAMEL"" NP-18 NP-020527 approved N2 N2-27 N2-021027 agreed 2002-10-28 CAMEL4 - 2002-11-29
0486 - F Rel-5 5.1.0 Implementing and handling of the Outstanding Request Counter - - - N2 N2-27 N2-020980 revised 2002-10-28 CAMEL4 - 2002-11-29
0486 1 F Rel-5 5.1.0 Implementing and handling of the Outstanding Request Counter - - - N2 N2-27 N2-021044 revised 2002-10-28 CAMEL4 - 2002-11-29
0486 2 F Rel-5 5.2.0 Implementing and handling of the Outstanding Request Counter - - - N2 N2-28 N2-030028 revised 2003-01-28 CAMEL4 - 2003-03-07
0486 3 F Rel-5 5.2.0 Implementing and handling of the Outstanding Request Counter - - - N2 N2-28 N2-030119 revised 2003-01-28 CAMEL4 - 2003-03-07
0486 4 F Rel-5 5.2.0 Implementing and handling of the Outstanding Request Counter - - - N2 N2-28 N2-030153 postponed 2003-01-28 CAMEL4 - 2003-03-07
0486 6 F Rel-5 5.3.0 5.4.0 Implementing and handling of the Outstanding Request Counter NP-20 NP-030188 approved N2 N2-28 N2-030293 agreed 2003-01-28 CAMEL4 - 2003-06-04
0487 - F R99 3.14.0 Number comparison for D-CSI - - - N2 N2-27 N2-020983 revised 2002-10-28 CAMEL3 - 2002-11-29
0487 1 F R99 3.14.0 3.15.0 Number comparison for D-CSI NP-18 NP-020524 approved N2 N2-27 N2-021036 agreed 2002-10-28 CAMEL3 - 2002-11-29
0488 - A Rel-4 4.6.0 Number comparison for D-CSI - - - N2 N2-27 N2-020984 revised 2002-10-28 CAMEL3 - 2002-11-29
0488 1 A Rel-4 4.6.1 4.7.0 Number comparison for D-CSI NP-18 NP-020524 approved N2 N2-27 N2-021037 agreed 2002-10-28 CAMEL3 - 2002-11-29
0489 - A Rel-5 5.1.0 Number comparison for D-CSI - - - N2 N2-27 N2-020985 revised 2002-10-28 CAMEL4 - 2002-11-29
0489 1 A Rel-5 5.1.0 5.2.0 Number comparison for D-CSI NP-18 NP-020524 approved N2 N2-27 N2-021038 agreed 2002-10-28 CAMEL3 - 2002-11-29
0490 - F Rel-5 5.1.0 Handling of Apply Charging after gsmSCF terminates dialogue or sends 'Release Call' - - - N2 N2-27 N2-020990 revised 2002-10-28 CAMEL4 - 2002-11-29
0490 1 F Rel-5 5.1.0 5.2.0 Handling of Apply Charging after gsmSCF terminates dialogue or sends 'Release Call' NP-18 NP-020528 approved N2 N2-27 N2-021078 agreed 2002-10-28 CAMEL4 - 2002-11-29
0491 - F Rel-5 5.1.0 Handling of a Stand alone Call Segment in CS_gsmSSF - - - N2 N2-27 N2-020991 revised 2002-10-28 CAMEL4 - 2002-11-29
0491 2 F Rel-5 5.2.0 5.3.0 Handling of a Stand alone Call Segment in CS_gsmSSF NP-19 NP-030088 approved N2 N2-28 N2-030125 agreed 2002-10-28 CAMEL4 - 2003-03-07
0492 - F R99 3.14.0 Inconsistent description ""Store destination address"" - - - N2 N2-27 N2-020992 rejected 2002-10-29 CAMEL3 - 2002-11-29
0493 - A Rel-4 4.6.0 Inconsistent description ""Store destination address"" - - - N2 N2-27 N2-020993 rejected 2002-10-29 CAMEL3 - 2002-11-29
0494 - F Rel-5 5.1.0 5.2.0 Inconsistent description ""Store destination address"" NP-18 NP-020527 approved N2 N2-27 N2-020994 agreed 2002-10-29 CAMEL4 - 2002-11-29
0495 - F Rel-5 5.1.0 Correction to ATI handling in HLR - - - N2 N2-27 N2-021007 revised 2002-10-31 CAMEL4 - 2002-11-29
0495 1 F Rel-5 5.1.0 5.2.0 Correction to ATI handling in HLR NP-18 NP-020528 approved N2 N2-27 N2-021074 agreed 2002-10-31 CAMEL4 - 2002-11-29
0496 - F Rel-5 5.1.0 Correction to DP Abandon handling in MSC - - - N2 N2-27 N2-021008 withdrawn 2002-10-31 CAMEL4 - 2002-11-29
0497 - F Rel-5 5.1.0 Using ATI for Mobile Number Portability - - - N2 N2-27 N2-021011 postponed 2002-10-31 CAMEL4 - 2002-11-29
0498 - F R99 3.14.0 Clarification on ATM -> NSDC when status of one SS impacts another SS status. - - - N2 N2-27 N2-021012 revised 2002-10-31 CAMEL3 - 2002-11-29
0498 1 F R99 3.14.0 Clarification on ATM -> NSDC when status of one SS impacts another SS status. - - - N2 N2-27 N2-021029 revised 2002-10-31 CAMEL3 - 2002-11-29
0498 2 F R99 3.14.0 Clarification on ATM -> NSDC when status of one SS impacts another SS status. - - - N2 N2-27 N2-021083 revised 2002-10-31 CAMEL3 - 2002-11-29
0498 3 F R99 3.14.0 3.15.0 Clarification on ATM -> NSDC when status of one SS impacts another SS status. NP-18 NP-020524 approved N2 N2-27 N2-021087 agreed 2002-10-31 CAMEL3 - 2002-11-29
0499 - F Rel-5 5.1.0 MSC-number in MAP Location Information - - - N2 N2-27 N2-021013 revised 2002-10-31 CAMEL4 - 2002-11-29
0499 1 F Rel-5 5.1.0 5.2.0 MSC-number in MAP Location Information NP-18 NP-020528 approved N2 N2-27 N2-021079 agreed 2002-10-31 CAMEL4 - 2002-11-29
0500 - F Rel-5 5.1.0 ASN default for Flexible Tone BurstInterval due to MEGACO - - - N2 N2-27 N2-021014 revised 2002-10-31 CAMEL4 - 2002-11-29
0500 1 F Rel-5 5.1.0 5.2.0 ASN default for Flexible Tone BurstInterval due to MEGACO NP-18 NP-020527 approved N2 N2-27 N2-021081 agreed 2002-10-31 CAMEL4 - 2002-11-29
0501 - F R99 3.14.0 Behavior if the free format data exceeds 160 octets - - - N2 N2-27 N2-021018 rejected 2002-11-01 CAMEL3 - 2002-11-29
0502 - A Rel-4 4.6.0 Behavior if the free format data exceeds 160 octets - - - N2 N2-27 N2-021019 rejected 2002-11-01 CAMEL3 - 2002-11-29
0503 - A Rel-5 5.1.0 Behavior if the free format data exceeds 160 octets - - - N2 N2-27 N2-021020 rejected 2002-11-01 CAMEL3 - 2002-11-29
0504 - F Rel-5 5.1.0 5.2.0 Removal of redundant information elements from Location Information NP-18 NP-020527 approved N2 N2-27 N2-021021 agreed 2002-11-01 CAMEL4 - 2002-11-29
0505 - D Rel-5 5.1.0 CS to Call Segment - - - N2 N2-27 N2-021023 withdrawn 2002-11-05 CAMEL4 - 2002-11-29
0506 - A Rel-4 4.6.0 Clarification on ATM -> NSDC when status of one SS impacts another SS status. - - - N2 N2-27 N2-021030 revised 2002-11-11 CAMEL3 - 2002-11-29
0506 1 A Rel-4 4.6.0 Clarification on ATM -> NSDC when status of one SS impacts another SS status. - - - N2 N2-27 N2-021084 revised 2002-11-11 CAMEL3 - 2002-11-29
0506 2 A Rel-4 4.6.1 4.7.0 Clarification on ATM -> NSDC when status of one SS impacts another SS status. NP-18 NP-020524 approved N2 N2-27 N2-021088 agreed 2002-11-11 CAMEL3 - 2002-11-29
0507 - A Rel-5 5.1.0 Clarification on ATM -> NSDC when status of one SS impacts another SS status. - - - N2 N2-27 N2-021031 revised 2002-11-11 CAMEL3 - 2002-11-29
0507 1 A Rel-5 5.1.0 Clarification on ATM -> NSDC when status of one SS impacts another SS status. - - - N2 N2-27 N2-021085 revised 2002-11-11 CAMEL3 - 2002-11-29
0507 2 A Rel-5 5.1.0 5.2.0 Clarification on ATM -> NSDC when status of one SS impacts another SS status. NP-18 NP-020524 approved N2 N2-27 N2-021089 agreed 2002-11-11 CAMEL3 - 2002-11-29
0508 - F R99 3.14.0 Correction to dialled services criteria - - - N2 N2-27 N2-021040 revised 2002-11-11 CAMEL3 - 2002-11-29
0508 1 F R99 3.14.0 3.15.0 Correction to dialled services criteria NP-18 NP-020524 approved N2 N2-27 N2-021056 agreed 2002-11-11 CAMEL3 - 2002-11-29
0509 - F R99 3.14.0 3.15.0 Correction to interaction between MO-SMS and CB / ODB NP-18 NP-020525 approved N2 N2-27 N2-021041 agreed 2002-11-11 CAMEL3 - 2002-11-29
0510 - A Rel-4 4.6.1 4.7.0 Correction to interaction between MO-SMS and CB / ODB NP-18 NP-020525 approved N2 N2-27 N2-021042 agreed 2002-11-11 CAMEL3 - 2002-11-29
0511 - A Rel-4 4.6.1 4.7.0 Correction to dialled services criteria NP-18 NP-020524 approved N2 N2-27 N2-021057 agreed 2002-11-13 CAMEL3 - 2002-11-29
0512 - A Rel-5 5.1.0 5.2.0 Correction to dialled services criteria NP-18 NP-020524 approved N2 N2-27 N2-021058 agreed 2002-11-13 CAMEL3 - 2002-11-29
0513 - F Rel-5 5.2.0 5.3.0 Handling of Int_Import_Leg in CS_gsmSSF NP-19 NP-030088 approved N2 N2-28 N2-030013 agreed 2003-01-16 CAMEL4 - 2003-03-07
0514 - F Rel-5 5.2.0 Handling of events by CS_gsmSSF in state WFI - - - N2 N2-28 N2-030016 withdrawn 2003-01-27 CAMEL4 - 2003-03-07
0515 - F Rel-5 5.2.0 HLR handling when SRI from gsmSCF is not allowed - - - N2 N2-28 N2-030017 withdrawn 2003-01-27 CAMEL4 - 2003-03-07
0516 - F Rel-5 5.2.0 Correction to CAMEL interaction with Line Identification - - - N2 N2-28 N2-030018 revised 2003-01-27 CAMEL4 - 2003-03-07
0516 1 F Rel-5 5.2.0 Correction to CAMEL interaction with Line Identification - - - N2 N2-28 N2-030112 revised 2003-01-27 CAMEL4 - 2003-03-07
0516 2 F Rel-5 5.2.0 5.3.0 Correction to CAMEL interaction with Line Identification NP-19 NP-030088 approved N2 N2-28 N2-030157 agreed 2003-01-27 CAMEL4 - 2003-03-07
0517 - F Rel-5 5.2.0 Correction to implicit disarming of DPs in CS_gsmSSF - - - N2 N2-28 N2-030019 revised 2003-01-27 CAMEL4 - 2003-03-07
0517 1 F Rel-5 5.2.0 5.3.0 Correction to implicit disarming of DPs in CS_gsmSSF NP-19 NP-030088 approved N2 N2-28 N2-030113 agreed 2003-01-27 CAMEL4 - 2003-03-07
0518 - F Rel-5 5.2.0 HLR handling when Requested Domain is absent from ATI - - - N2 N2-28 N2-030020 revised 2003-01-27 CAMEL4 - 2003-03-07
0518 1 F Rel-5 5.2.0 HLR handling when Requested Domain is absent from ATI - - - N2 N2-28 N2-030142 revised 2003-01-27 CAMEL4 - 2003-03-07
0518 2 F Rel-5 5.2.0 HLR handling when Requested Domain is absent from ATI - - - N2 N2-28 N2-030159 revised 2003-01-27 CAMEL4 - 2003-03-07
0518 3 F Rel-5 5.2.0 5.3.0 HLR handling when Requested Domain is absent from ATI NP-19 NP-030088 approved N2 N2-28 N2-030160 agreed 2003-01-27 CAMEL4 - 2003-03-07
0519 - F Rel-5 5.2.0 Stopping No_Answer timer in the case of forwarding notification - - - N2 N2-28 N2-030021 withdrawn 2003-01-27 CAMEL4 - 2003-03-07
0520 - F Rel-5 5.2.0 Correction to CTR Information Flow - - - N2 N2-28 N2-030022 revised 2003-01-27 CAMEL4 - 2003-03-07
0520 1 F Rel-5 5.2.0 5.3.0 Correction to CTR Information Flow NP-19 NP-030088 approved N2 N2-28 N2-030114 agreed 2003-01-27 CAMEL4 - 2003-03-07
0521 - F R99 5.2.0 Correction to SRI Information Flow (add T-CSI criteria) - - - N2 N2-28 N2-030025 revised 2003-01-27 CAMEL3 - 2003-03-07
0521 1 F R99 3.15.0 3.16.0 Correction to SRI Information Flow (add T-CSI criteria) NP-19 NP-030085 approved N2 N2-28 N2-030115 agreed 2003-01-27 CAMEL3 - 2003-03-07
0522 - F Rel-5 5.2.0 Correction to SRF and TC disconnection handling - - - N2 N2-28 N2-030026 withdrawn 2003-01-27 CAMEL4 - 2003-03-07
0523 - F Rel-5 5.2.0 Handling of Connect operation with and without LegID - - - N2 N2-28 N2-030029 revised 2003-01-28 CAMEL4 - 2003-03-07
0523 1 F Rel-5 5.3.0 Handling of Connect operation with and without LegID - - - N2 N2-29 N2-030240 postponed 2003-01-28 CAMEL4 - 2003-06-04
0523 3 F Rel-5 5.4.0 - Handling of Connect operation with and without LegID - - - N2 N2-30 N2-030341 revised 2003-01-28 CAMEL4 0 2003-09-13
0523 4 F Rel-5 5.4.0 - Handling of Connect operation with and without LegID - - - N2 N2-30 N2-030429 revised 2003-01-28 CAMEL4 0 2003-09-13
0523 5 F Rel-5 5.4.0 5.5.0 Handling of Connect operation with and without LegID NP-21 NP-030365 approved N2 N2-30 N2-030466 agreed 2003-01-28 CAMEL4 0 2003-09-13
0524 - F Rel-5 5.2.0 Handling of Information Flows with absent LegID and CS ID - - - N2 N2-28 N2-030030 postponed 2003-01-28 CAMEL4 - 2003-03-07
0524 1 F Rel-5 5.3.0 Handling of Information Flows with absent LegID and CS ID - - - N2 N2-29 N2-030241 postponed 2003-01-28 CAMEL4 - 2003-06-04
0524 2 F Rel-5 5.4.0 - Handling of Information Flows with absent LegID and CS ID - - - N2 N2-30 N2-030342 revised 2003-01-28 CAMEL4 0 2003-09-13
0524 3 F Rel-5 5.4.0 - Handling of Information Flows with absent LegID and CS ID - - - N2 N2-30 N2-030430 revised 2003-01-28 CAMEL4 0 2003-09-13
0524 4 F Rel-5 5.4.0 5.5.0 Handling of Information Flows with absent LegID and CS ID NP-21 NP-030365 approved N2 N2-30 N2-030467 agreed 2003-01-28 CAMEL4 0 2003-09-13
0525 - F Rel-5 5.2.0 No concurrent playing of tones to the same leg or call segment - - - N2 N2-28 N2-030031 postponed 2003-01-28 CAMEL4 - 2003-03-07
0525 1 F Rel-5 5.3.0 No concurrent playing of tones to the same leg or call segment - - - N2 N2-29 N2-030242 noted 2003-01-28 CAMEL4 - 2003-06-04
0525 2 F Rel-5 5.4.0 - No concurrent playing of tones to the same leg or call segment - - - N2 N2-30 N2-030340 rejected 2003-01-28 CAMEL4 0 2003-09-13
0526 - F Rel-5 5.2.0 5.3.0 Consistent prefix naming of 23.078 signals. NP-19 NP-030089 approved N2 N2-28 N2-030032 agreed 2003-01-28 CAMEL4 - 2003-03-07
0527 - F R99 3.15.0 Correction to interactions between CAMEL control of MO SMS and barring - - - N2 N2-28 N2-030053 revised 2003-01-28 CAMEL3 - 2003-03-07
0527 1 F R99 3.15.0 Correction to interactions between CAMEL control of MO SMS and barring - - - N2 N2-28 N2-030104 rejected 2003-01-28 CAMEL3 It was conditionally approved by CN2. Condition not fullfilled, but document sent to CN#19 as Source Vodafone. The result of approval at CN#19 to be used to update status. 2003-03-07
0527 1 F R99 3.15.0 3.16.0 Correction to interactions between CAMEL control of MO SMS and barring NP-19 NP-030068 approved Vodafone - N2-030104 - 2003-02-11 CAMEL3 - 2003-03-13
0528 - A Rel-4 4.7.0 Correction to interactions between CAMEL control of MO SMS and barring - - - N2 N2-28 N2-030054 revised 2003-01-28 CAMEL3 - 2003-03-07
0528 1 A Rel-4 4.7.0 Correction to interactions between CAMEL control of MO SMS and barring - - - N2 N2-28 N2-030105 rejected 2003-01-28 CAMEL3 It was conditionally approved by CN2. Condition not fullfilled, but document sent to CN#19 as Source Vodafone. The result of approval at CN#19 to be used to update status. 2003-03-07
0528 1 A Rel-4 4.7.0 4.8.0 Correction to interactions between CAMEL control of MO SMS and barring NP-19 NP-030068 approved Vodafone - N2-030105 - 2003-02-11 CAMEL3 - 2003-03-13
0529 - A Rel-5 5.2.0 Correction to interactions between CAMEL control of MO SMS and barring - - - N2 N2-28 N2-030055 rejected 2003-01-28 CAMEL3 It was conditionally approved by CN2. Condition not fullfilled, but document sent to CN#19 as Source Vodafone. The result of approval at CN#19 to be used to update status. 2003-03-07
0529 - A Rel-5 5.2.0 5.3.0 Correction to interactions between CAMEL control of MO SMS and barring NP-19 NP-030068 approved Vodafone - N2-030055 - 2003-01-29 CAMEL3 - 2003-03-13
0530 - F Rel-5 5.2.0 Using ATI for Mobile Number Portability - - - N2 N2-28 N2-030056 noted 2003-01-29 CAMEL4 - 2003-03-07
0530 1 F Rel-5 5.4.0 - Using ATI for Mobile Number Portability - - - N2 N2-30 N2-030390 revised 2003-01-29 CAMEL4 0 2003-09-13
0530 2 F Rel-5 5.4.0 5.5.0 Using ATI for Mobile Number Portability NP-21 NP-030364 approved N2 N2-30 N2-030456 agreed 2003-01-29 CAMEL4 0 2003-09-13
0531 - F Rel-5 5.2.0 5.3.0 Alignment of signal names with TS 29.002 NP-19 NP-030089 approved N2 N2-28 N2-030057 agreed 2003-01-30 CAMEL4 - 2003-03-07
0532 - F R99 3.15.0 Introduction of ResetTimer input in state WFI-DS - - - N2 N2-28 N2-030059 revised 2003-01-30 CAMEL3 - 2003-03-07
0532 1 F R99 3.15.0 3.16.0 Introduction of ResetTimer input in state WFI-DS NP-19 NP-030085 approved N2 N2-28 N2-030121 agreed 2003-01-30 CAMEL3 - 2003-03-07
0533 - F Rel-5 5.2.0 Buffering of TC messages in the SGSN while waiting for the first SCP response - - - N2 N2-28 N2-030063 revised 2003-01-30 CAMEL4 - 2003-03-07
0533 1 F Rel-5 5.2.0 Buffering of TC messages in the SGSN while waiting for the first SCP response - - - N2 N2-28 N2-030102 revised 2003-01-30 CAMEL4 - 2003-03-07
0533 2 F Rel-5 5.2.0 5.3.0 Buffering of TC messages in the SGSN while waiting for the first SCP response NP-19 NP-030089 approved N2 N2-28 N2-030154 agreed 2003-01-30 CAMEL4 - 2003-03-07
0534 - F Rel-5 5.2.0 5.3.0 Disallowing ACH-GPRS when PDPc already disconnected NP-19 NP-030089 approved N2 N2-28 N2-030066 agreed 2003-01-30 CAMEL4 - 2003-03-07
0535 - F Rel-5 5.2.0 Correction of handling O_Abandon when 2 CAMEL dialogues exist - - - N2 N2-28 N2-030067 revised 2003-01-30 CAMEL4 - 2003-03-07
0535 1 F Rel-5 5.2.0 Correction of handling O_Abandon when 2 CAMEL dialogues exist - - - N2 N2-28 N2-030095 withdrawn 2003-01-30 CAMEL4 - 2003-03-07
0536 - F Rel-5 5.2.0 Correction to timer expiry handling during call forwarding notification - - - N2 N2-28 N2-030068 revised 2003-01-30 CAMEL4 - 2003-03-07
0536 1 F Rel-5 5.2.0 5.3.0 Correction to timer expiry handling during call forwarding notification NP-19 NP-030089 approved N2 N2-28 N2-030148 agreed 2003-01-30 CAMEL4 - 2003-03-07
0537 - F Rel-5 5.2.0 Removing CAMEL Support in SRI from gsmSCF to HLR - - - N2 N2-28 N2-030069 rejected 2003-01-30 CAMEL4 - 2003-03-07
0538 - F Rel-5 5.2.0 5.3.0 Correction to Call Information Request NP-19 NP-030089 approved N2 N2-28 N2-030070 agreed 2003-01-30 CAMEL4 - 2003-03-07
0539 - F R99 3.15.0 Inconsistency in Call Information Report in Re-Connect Case - - - N2 N2-28 N2-030091 revised 2003-01-31 CAMEL3 - 2003-03-07
0539 1 F R99 3.15.0 3.16.0 Inconsistency in Call Information Report in Re-Connect Case NP-19 NP-030085 approved N2 N2-28 N2-030106 agreed 2003-01-31 CAMEL3 - 2003-03-07
0540 - A Rel-4 4.7.0 Inconsistency in Call Information Report in Re-Connect Case - - - N2 N2-28 N2-030092 revised 2003-01-31 CAMEL3 - 2003-03-07
0540 1 A Rel-4 4.7.0 4.8.0 Inconsistency in Call Information Report in Re-Connect Case NP-19 NP-030085 approved N2 N2-28 N2-030107 agreed 2003-01-31 CAMEL3 - 2003-03-07
0541 - A Rel-5 5.2.0 Inconsistency in Call Information Report in Re-Connect Case - - - N2 N2-28 N2-030093 revised 2003-01-31 CAMEL3 - 2003-03-07
0541 1 A Rel-5 5.2.0 5.3.0 Inconsistency in Call Information Report in Re-Connect Case NP-19 NP-030085 approved N2 N2-28 N2-030108 agreed 2003-01-31 CAMEL3 - 2003-03-07
0542 - F Rel-5 5.2.0 Handling of AC and Afor GPRS - - - N2 N2-28 N2-030101 revised 2003-02-10 CAMEL4 - 2003-03-07
0542 1 F Rel-5 5.2.0 5.3.0 Handling of AC and Afor GPRS NP-19 NP-030089 approved N2 N2-28 N2-030152 agreed 2003-02-10 CAMEL4 - 2003-03-07
0543 - A Rel-4 4.7.0 5.3.0 Correction to SRI Information Flow NP-19 NP-030085 approved N2 N2-28 N2-030116 agreed 2003-02-11 CAMEL3 - 2003-03-07
0544 - A Rel-5 5.2.0 5.3.0 Correction to SRI Information Flow NP-19 NP-030085 approved N2 N2-28 N2-030117 agreed 2003-02-11 CAMEL3 - 2003-03-07
0545 - A Rel-4 4.7.0 4.8.0 Introduction of ResetTimer input in state WFI-DS NP-19 NP-030085 approved N2 N2-28 N2-030122 agreed 2003-02-11 CAMEL3 - 2003-03-07
0546 - A Rel-5 5.2.0 5.3.0 Introduction of ResetTimer input in state WFI-DS NP-19 NP-030085 approved N2 N2-28 N2-030123 agreed 2003-02-11 CAMEL3 - 2003-03-07
0547 - C Rel-6 5.3.0 Implementation of enhanced dialled service - - - N2 AdHoc N2-030164 noted 2003-03-21 EDCAMEL The content will be taken into account in CR#552 2003-06-04
0548 - C Rel-6 5.3.0 Handling of partial implementation for enhanced dialled service - - - N2 AdHoc N2-030165 noted 2003-03-21 EDCAMEL The content will be taken into account in CR#552 2003-06-04
0549 - C Rel-6 5.3.0 Implementation of enhanced dialled service in NP/NC Call - - - N2 AdHoc N2-030166 rejected 2003-03-21 EDCAMEL - 2003-06-04
0550 - B Rel-6 5.3.0 Enhancements for the Partial Implementation for Enhanced Dialled Services - - - N2 AdHoc N2-030168 noted 2003-03-25 EDCAMEL The content will be taken into account in CR#552 2003-06-04
0551 - B Rel-6 5.3.0 Enhanced CS_gsmSSF for Enhanced Dialled Services - - - N2 AdHoc N2-030169 noted 2003-03-25 EDCAMEL The content will be taken into account in CR#552 2003-06-04
0552 - B Rel-6 5.3.0 Enhancements for the Dialled Services and the Partial Implementation - - - N2 AdHoc N2-030172 revised 2003-04-02 EDCAMEL - 2003-06-04
0552 1 B Rel-6 5.3.0 Enhancements for the Dialled Services and the Partial Implementation - - - N2 AdHoc N2-030173 revised 2003-04-02 EDCAMEL - 2003-06-04
0552 2 B Rel-6 5.3.0 Enhancements for the Dialled Services and the Partial Implementation - - - N2 AdHoc N2-030174 agreed 2003-04-02 EDCAMEL Will become a part of collective CR for EDS in CN#22 2003-06-04
0553 - B Rel-6 5.3.0 Collective for Release 6 Enhanced Dialled Services - - - N2 AdHoc N2-030175 revised 2003-04-02 EDCAMEL - 2003-06-04
0553 1 B Rel-6 5.3.0 Collective for Release 6 Enhanced Dialled Services - - - N2 N2-29 N2-030206 revised 2003-04-02 EDCAMEL - 2003-06-04
0553 1 B Rel-6 5.4.0 - Collective for Release 6 Enhanced Dialled Services - - - N2 N2-30 N2-030318 revised 2003-04-02 EDCAMEL 0 2003-09-13
0553 2 B Rel-6 5.5.1 - Collective for Release 6 Enhanced Dialled Services - - - N2 N2-31 N2-030509 revised 2003-04-02 EDCAMEL - 2004-01-05
0553 3 B Rel-6 5.5.1 6.0.0 Collective for Release 6 Enhanced Dialled Services NP-22 NP-030526 approved N2 N2-31 N2-030569 agreed 2003-04-02 EDCAMEL - 2004-01-05
0554 - F Rel-5 5.3.0 Correction to MAP PRN and to MAP SRI - - - N2 N2-29 N2-030184 revised 2003-04-11 CAMEL4 - 2003-06-04
0554 1 F Rel-5 5.3.0 Correction to MAP PRN and to MAP SRI - - - N2 N2-29 N2-030296 revised 2003-04-11 CAMEL4 - 2003-06-04
0554 2 F Rel-5 5.3.0 5.4.0 Correction to MAP PRN and to MAP SRI NP-20 NP-030188 approved N2 N2-29 N2-030300 agreed 2003-04-11 CAMEL4 - 2003-06-04
0555 - F Rel-5 5.3.0 Removal of ENC disarming from SDL - - - N2 N2-29 N2-030185 revised 2003-04-28 CAMEL4 - 2003-06-04
0555 1 F Rel-5 5.3.0 5.4.0 Removal of ENC disarming from SDL NP-20 NP-030188 approved N2 N2-29 N2-030306 agreed 2003-04-28 CAMEL4 - 2003-06-04
0556 - F Rel-5 5.3.0 5.4.0 Correction to assisting gsmSSF NP-20 NP-030188 approved N2 N2-29 N2-030186 agreed 2003-04-28 CAMEL4 - 2003-06-04
0557 - F Rel-5 5.3.0 Correction to Charge Indicator - - - N2 N2-29 N2-030187 revised 2003-04-28 CAMEL4 - 2003-06-04
0557 1 F Rel-5 5.3.0 Correction to Charge Indicator - - - N2 N2-29 N2-030280 postponed 2003-04-28 CAMEL4 - 2003-06-04
0558 - F Rel-5 5.3.0 Correction to partial implementation of CAMEL4 - - - N2 N2-29 N2-030188 revised 2003-04-28 CAMEL4 - 2003-06-04
0558 - F Rel-5 5.4.0 5.5.0 Correction to partial implementation of CAMEL4 NP-21 NP-030368 approved N2 N2-30 N2-030334 agreed 2003-04-28 CAMEL4 0 2003-09-13
0559 - F Rel-5 5.3.0 Correction to Destination Routeing Address in ICA - - - N2 N2-29 N2-030189 revised 2003-04-28 CAMEL4 - 2003-06-04
0559 1 F Rel-5 5.3.0 5.4.0 Correction to Destination Routeing Address in ICA NP-20 NP-030188 approved N2 N2-29 N2-030309 agreed 2003-04-28 CAMEL4 - 2003-06-04
0560 - F Rel-5 5.3.0 Default value for Domain Indicator in ATI IF - - - N2 N2-29 N2-030190 revised 2003-04-28 CAMEL4 - 2003-06-04
0560 1 F Rel-5 5.3.0 5.4.0 Default value for Domain Indicator in ATI IF NP-20 NP-030188 approved N2 N2-29 N2-030282 agreed 2003-04-28 CAMEL4 - 2003-06-04
0561 - F Rel-5 5.3.0 Correction to Cancel IF - - - N2 N2-29 N2-030191 revised 2003-04-28 CAMEL4 - 2003-06-04
0561 1 F Rel-5 5.3.0 Correction to Cancel IF - - - N2 N2-29 N2-030191 revised 2003-04-28 CAMEL4 - 2003-06-04
0561 2 F Rel-5 5.3.0 5.4.0 Correction to Cancel IF NP-20 NP-030188 approved N2 N2-29 N2-030312 agreed 2003-04-28 CAMEL4 - 2003-06-04
0562 - F Rel-5 5.3.0 5.4.0 Correction to Specialized Resource Report IF NP-20 NP-030188 approved N2 N2-29 N2-030192 agreed 2003-04-28 CAMEL4 - 2003-06-04
0563 - F Rel-5 5.3.0 Reference to ITU-T timer for default No_Answer timer - - - N2 N2-29 N2-030199 revised 2003-04-28 CAMEL4 - 2003-06-04
0563 1 F Rel-5 5.3.0 5.4.0 Reference to ITU-T timer for default No_Answer timer NP-20 NP-030188 approved N2 N2-29 N2-030286 agreed 2003-04-28 CAMEL4 - 2003-06-04
0564 - F Rel-5 5.3.0 Correction to Reset Timer handling in CS_gsmSSF - - - N2 N2-29 N2-030201 revised 2003-04-28 CAMEL4 - 2003-06-04
0564 1 F Rel-5 5.3.0 5.4.0 Correction to Reset Timer handling in CS_gsmSSF NP-20 NP-030188 approved N2 N2-29 N2-030305 agreed 2003-04-28 CAMEL4 - 2003-06-04
0565 - F Rel-5 5.3.0 5.4.0 TC-ABORT shall not cause ""same signal"" output in GPRS dialogue handler NP-20 NP-030189 approved N2 N2-29 N2-030207 agreed 2003-04-30 CAMEL4 - 2003-06-04
0566 - F Rel-4 4.9.0 - Inclusion of check ""pty continues"" in procedure Handle_ACR. - - - N2 N2-30 N2-030320 withdrawn 2003-04-30 CAMEL3 0 2003-09-13
0567 - F Rel-5 5.3.0 5.4.0 Adding of TIF-CSI into CAMEL stage 2 MAP-ISD for Call Deflection NP-20 NP-030189 approved N2 N2-29 N2-030209 agreed 2003-04-30 CAMEL4 - 2003-06-04
0568 - F Rel-5 5.3.0 CLIR/CLIP interaction with CSE initiated calls - - - N2 N2-29 N2-030212 withdrawn 2003-04-30 CAMEL4 - 2003-06-04
0568 1 F Rel-5 5.5.1 - CLIR/CLIP interaction with CSE initiated calls - - - N2 N2-31 N2-030503 revised 2003-04-30 CAMEL4 - 2004-01-05
0568 2 F Rel-5 5.5.1 5.6.0 CLIR/CLIP interaction with CSE initiated calls NP-22 NP-030523 approved N2 N2-31 N2-030577 agreed 2003-04-30 CAMEL4 - 2004-01-05
0569 - F Rel-5 5.3.0 Warning note about legal interception in SCP initiated calls - - - N2 N2-29 N2-030214 postponed 2003-04-30 CAMEL4 - 2003-06-04
0570 - F Rel-5 5.3.0 Update of charging spec. references - - - N2 N2-29 N2-030215 postponed 2003-04-30 CAMEL4 2003:09-13: title changed from ""Update of charging spec. references"". 2003-06-04
0570 1 A Rel-5 5.3.0 - Update of charging spec. references - - - N2 N2-30 N2-030374 revised 2003-04-30 CAMEL4 0 2003-09-13
0570 2 F Rel-5 5.4.0 5.5.0 Update of charging spec. references NP-21 NP-030365 approved N2 N2-30 N2-030433 agreed 2003-04-30 CAMEL4 0 2003-09-13
0571 - F Rel-5 5.3.0 MSC behaviour in the case of SSF invocation failure - - - N2 N2-29 N2-030227 revised 2003-05-06 CAMEL4 - 2003-06-04
0571 1 F Rel-5 5.3.0 MSC behaviour in the case of SSF invocation failure - - - N2 N2-29 N2-030288 postponed 2003-05-06 CAMEL4 - 2003-06-04
0572 - F Rel-5 5.3.0 Receiving Int_CWA after reporting Abandon - - - N2 N2-29 N2-030228 revised 2003-05-06 CAMEL4 - 2003-06-04
0572 1 F Rel-5 5.3.0 5.4.0 Receiving Int_CWA after reporting Abandon NP-20 NP-030189 approved N2 N2-29 N2-030289 agreed 2003-05-06 CAMEL4 - 2003-06-04
0573 - F Rel-5 5.3.0 Reporting Disconnect (leg n) after Disconnect (leg 1) - - - N2 N2-29 N2-030229 postponed 2003-05-06 CAMEL4 - 2003-06-04
0573 1 F Rel-5 5.4.0 - Reporting Disconnect (leg n) - - - N2 N2-30 N2-030330 revised 2003-05-06 CAMEL4 0 2003-09-13
0573 2 F Rel-5 5.4.0 5.5.0 Reporting Disconnect (leg n) NP-21 NP-030365 approved N2 N2-30 N2-030427 agreed 2003-05-06 CAMEL4 0 2003-09-13
0574 - F Rel-5 5.3.0 Correction to User Interaction handling in MSC - - - N2 N2-29 N2-030230 revised 2003-05-06 CAMEL4 - 2003-06-04
0574 1 F Rel-5 5.3.0 Correction to User Interaction handling in MSC - - - N2 N2-29 N2-030291 postponed 2003-05-06 CAMEL4 - 2003-06-04
0575 - F Rel-5 5.3.0 Correction to procedure CAMEL_ICA_MSC - - - N2 N2-29 N2-030231 postponed 2003-05-06 CAMEL4 - 2003-06-04
0575 - F Rel-5 5.4.0 5.5.0 Correction to procedure CAMEL_ICA_MSC NP-21 NP-030365 approved N2 N2-30 N2-030331 agreed 2003-05-06 CAMEL4 0 2003-09-13
0576 - F Rel-5 5.3.0 5.4.0 Correction to TC Establishment procedure NP-20 NP-030189 approved N2 N2-29 N2-030232 agreed 2003-05-06 CAMEL4 - 2003-06-04
0577 - F Rel-5 5.3.0 Correction to Disconnect Forward Connection handling - - - N2 N2-29 N2-030233 revised 2003-05-06 CAMEL4 - 2003-06-04
0577 1 F Rel-5 5.3.0 Correction to Disconnect Forward Connection handling - - - N2 N2-29 N2-030292 revised 2003-05-06 CAMEL4 - 2003-06-04
0578 - F Rel-5 5.3.0 Reflecting default Leg Id for CWA in CS_gsmSSF - - - N2 N2-29 N2-030234 postponed 2003-05-06 CAMEL4 - 2003-06-04
0578 1 F Rel-5 5.4.0 - Reflecting default Leg Id for CWA in CS_gsmSSF - - - N2 N2-30 N2-030348 withdrawn 2003-05-06 CAMEL4 0 2003-09-13
0579 - B Rel-6 5.3.0 Enhancements of dialled services procedures in MO and MF calls - - - N2 N2-29 N2-030235 revised 2003-05-06 EDCAMEL - 2003-06-04
0580 - F Rel-6 5.3.0 Re-connect for Enhanced Dialled Services - - - N2 N2-29 N2-030244 postponed 2003-05-06 EDCAMEL - 2003-06-04
0580 1 F Rel-6 5.4.0 - Re-connect for Enhanced Dialled Services - - - N2 N2-30 N2-030343 postponed 2003-05-06 EDCAMEL 0 2003-09-13
0581 - F R99 3.16.0 Behavior of HLR upon location updating in CAMEL Phase 3 - - - N2 N2-29 N2-030250 revised 2003-05-06 CAMEL3 - 2003-06-04
0581 1 F R99 3.16.0 3.17.0 Behavior of HLR upon location updating in CAMEL Phase 3 NP-20 NP-030185 approved N2 N2-29 N2-030275 agreed 2003-05-06 CAMEL3 - 2003-06-04
0582 - A Rel-4 4.8.0 Behavior of HLR upon location updating in CAMEL Phase 3 - - - N2 N2-29 N2-030251 revised 2003-05-06 CAMEL3 - 2003-06-04
0582 1 A Rel-4 4.8.0 4.9.0 Behavior of HLR upon location updating in CAMEL Phase 3 NP-20 NP-030185 approved N2 N2-29 N2-030276 agreed 2003-05-06 CAMEL3 - 2003-06-04
0583 - F Rel-5 5.3.0 Behavior of HLR upon location updating in CAMEL Phase 4 - - - N2 N2-29 N2-030252 rejected 2003-05-06 CAMEL4 - 2003-06-04
0584 - F Rel-5 5.3.0 Direction change of incomming message Answer - - - N2 N2-29 N2-030253 postponed 2003-05-06 CAMEL4 - 2003-06-04
0584 - F Rel-5 5.4.0 5.5.0 Direction change of incomming message Answer NP-21 NP-030363 approved N2 N2-30 N2-030398 agreed 2003-05-06 CAMEL4 0 2003-09-13
0585 - F Rel-5 5.3.0 5.4.0 VLR number in ERB is not needed NP-20 NP-030189 approved N2 N2-29 N2-030254 agreed 2003-05-06 CAMEL4 - 2003-06-04
0586 - F Rel-5 5.3.0 5.4.0 Removal of Int_CWA in Process CAMEL_T_CHANGE_OF_POSITION_MSC NP-20 NP-030189 approved N2 N2-29 N2-030255 agreed 2003-05-06 CAMEL4 - 2003-06-04
0587 - F Rel-5 5.3.0 5.4.0 SRI Handling and CAMEL phase 4 NP-20 NP-030189 approved N2 N2-29 N2-030256 agreed 2003-05-07 CAMEL4 - 2003-06-04
0588 - F Rel-5 5.3.0 Misalignment between 23.078 and 29.078 about AC and ACR - - - N2 N2-29 N2-030257 postponed 2003-05-07 CAMEL4 - 2003-06-04
0589 - F Rel-6 5.3.0 Interworking between EDS and DP-O-Abandon handling - - - N2 N2-29 N2-030258 agreed 2003-05-07 CAMEL4 Will become a part of collective CR, not presented to CN#20 2003-06-04
0590 - F Rel-5 5.3.0 EDS and TDP-RouteSelectFailure - - - N2 N2-29 N2-030259 postponed 2003-05-07 CAMEL4 - 2003-06-04
0591 - F Rel-5 5.3.0 Using ATI for Mobile Number Portability - - - N2 N2-29 N2-030268 postponed 2003-05-08 CAMEL4 - 2003-06-04
0592 - F Rel-5 5.3.0 aChChargingAddress in ApplyCharging/ApplyChargingReport - - - N2 N2-29 N2-030270 postponed 2003-05-09 CAMEL4 - 2003-06-04
0592 1 F Rel-5 5.4.0 - aChChargingAddress in ApplyCharging/ApplyChargingReport - - - N2 N2-30 N2-030346 withdrawn 2003-05-09 CAMEL4 0 2003-09-13
0593 - F Rel-5 5.3.0 5.4.0 Behavior of HLR upon location updating in CAMEL Phase 4 NP-20 NP-030189 approved N2 N2-29 N2-030277 agreed 2003-05-19 CAMEL4 - 2003-06-04
0594 - F Rel-5 5.3.0 5.4.0 Inclusion of DFC IF for assisting gsmSSF NP-20 NP-030189 approved N2 N2-29 N2-030285 agreed 2003-05-19 CAMEL4 - 2003-06-04
0596 - F Rel-5 5.3.0 5.4.0 Replacing DP numbers by DP names NP-20 NP-030189 approved N2 N2-29 N2-030287 agreed 2003-05-20 CAMEL4 - 2003-06-04
0597 - F Rel-4 5.3.0 - Removal of blocks ""Stop Delta"" from the SDL ""handling of DPs O/T-Busy, O/T-No Answer and Route Select Failure in Monitoring state"". - - - N2 N2-30 N2-030322 withdrawn 2003-06-24 CAMEL3 0 2003-09-13
0598 - F Rel-5 5.3.0 - Adding the definition ""pty continues"" - - - N2 N2-30 N2-030323 withdrawn 2003-06-24 CAMEL4 0 2003-09-13
0599 - F Rel-5 5.3.0 - Removal of blocks ""Stop Delta"" from the SDL ""handling of DPs O/T-Busy, O/T-No Answer and Route Select Failure in Monitoring state"". - - - N2 N2-30 N2-030324 revised 2003-06-24 CAMEL4 0 2003-09-13
0599 1 F Rel-5 5.3.0 - Removal of blocks ""Stop Delta"" from the SDL ""handling of DPs O/T-Busy, O/T-No Answer and Route Select Failure in Monitoring state"". - - - N2 N2-30 N2-030357 agreed 2003-06-24 CAMEL4 0 2003-09-13
0600 - F Rel-4 4.9.0 - Correction in handling of Start-Delta and Stop-Delta operations. - - - N2 N2-30 N2-030329 revised 2003-07-01 CAMEL3 0 2003-09-13
0600 1 F Rel-4 4.9.0 - Correction in handling of Start-Delta and Stop-Delta operations. - - - N2 N2-30 N2-030358 revised 2003-07-01 CAMEL3 0 2003-09-13
0600 2 A Rel-4 4.9.0 4.10.0 Correction in handling of Start-Delta and Stop-Delta operations. NP-21 NP-030362 approved N2 N2-30 N2-030417 agreed 2003-07-01 CAMEL3 0 2003-09-13
0601 - F Rel-5 5.4.0 5.5.0 Corection of ""Int_leg_Status_Report"" to avoid double state changes in the CSA NP-21 NP-030365 approved N2 N2-30 N2-030345 agreed 2003-07-17 CAMEL4 0 2003-09-13
0602 - F Rel-5 5.4.0 - Alignment of Offered CAMEL4 functionalities - - - N2 N2-30 N2-030337 revised 2003-07-17 CAMEL4 0 2003-09-13
0602 1 F Rel-5 5.4.0 5.5.0 Alignment of Offered CAMEL4 functionalities NP-21 NP-030368 approved N2 N2-30 N2-030441 agreed 2003-07-17 CAMEL4 0 2003-09-13
0603 - F Rel-5 5.4.0 5.5.0 Correction to SMS Event Disarming NP-21 NP-030366 approved N2 N2-30 N2-030338 agreed 2003-07-17 CAMEL4 0 2003-09-13
0604 - F Rel-5 5.4.0 - Correction to SMS Error handling - - - N2 N2-30 N2-030339 revised 2003-07-17 CAMEL4 0 2003-09-13
0604 1 F Rel-5 5.4.0 5.5.0 Correction to SMS Error handling NP-21 NP-030366 approved N2 N2-30 N2-030463 agreed 2003-07-17 CAMEL4 0 2003-09-13
0605 - F Rel-5 5.4.0 5.5.0 Correction to PlayTone pre-conditions NP-21 NP-030367 approved N2 N2-30 N2-030347 agreed 2003-07-21 CAMEL4 0 2003-09-13
0606 - F Rel-5 5.4.0 - Correction to Release Leg handling in CPH call - - - N2 N2-30 N2-030349 withdrawn 2003-07-21 CAMEL4 0 2003-09-13
0607 - F Rel-5 5.4.0 - Correction to DP description for O-BCSM and T-BCSM - - - N2 N2-30 N2-030350 withdrawn 2003-07-21 CAMEL4 0 2003-09-13
0608 - F Rel-5 5.4.0 5.5.0 Correction to procedure Handle_O_Answer NP-21 NP-030363 approved N2 N2-30 N2-030351 agreed 2003-07-21 CAMEL4 0 2003-09-13
0608 1 F Rel-5 5.4.0 - Correction to procedure Handle_O_Answer - - - N2 N2-30 N2-030351 revised 2003-07-21 CAMEL4 0 2003-09-13
0609 - F Rel-5 5.4.0 5.5.0 Correction to usage of LegId in ICA Operation NP-21 NP-030365 approved N2 N2-30 N2-030352 agreed 2003-07-21 CAMEL4 0 2003-09-13
0610 - F Rel-5 5.4.0 - Replacing the check box “pty continues” by “LegActive” in procedure Handle_Aand mentioning the LegActive value at Handle_ACR task box in the SDL “handling of Tcp expiry in Monitioring state”. - - - N2 N2-30 N2-030356 revised 2003-07-23 CAMEL4 0 2003-09-13
0610 1 F Rel-5 5.4.0 5.5.0 Correction of “pty continues” and “LegActive” check boxes in SDL’s NP-21 NP-030363 approved N2 N2-30 N2-030426 agreed 2003-07-23 CAMEL4 0 2003-09-13
0611 - F Rel-5 5.4.0 - Correction to Apply Charging and Apply Charging Report due to introduction of CPH - - - N2 N2-30 N2-030359 revised 2003-07-29 CAMEL4 0 2003-09-13
0611 1 F Rel-5 5.4.0 5.5.0 Correction to Apply Charging and Apply Charging Report due to introduction of CPH NP-21 NP-030365 approved N2 N2-30 N2-030431 agreed 2003-07-29 CAMEL4 0 2003-09-13
0612 - F Rel-5 5.4.0 - Receiving Int_CWA after reporting Abandon - - - N2 N2-30 N2-030361 revised 2003-07-31 CAMEL4 0 2003-09-13
0612 1 F Rel-5 5.4.0 5.5.0 Receiving Int_CWA after reporting Abandon NP-21 NP-030363 approved N2 N2-30 N2-030403 agreed 2003-07-31 CAMEL4 0 2003-09-13
0613 - F Rel-5 5.4.0 - Handling AC Pending if ETC/ CTR fails - - - N2 N2-30 N2-030362 revised 2003-07-31 CAMEL4 0 2003-09-13
0613 1 F Rel-5 5.5.1 5.6.0 Handling AC Pending if ETC/ CTR fails NP-22 NP-030523 approved N2 N2-31 N2-030497 agreed 2003-10-13 CAMEL4 - 2004-01-05
0614 - F Rel-5 5.4.0 5.5.0 Correction to Change of position processes NP-21 NP-030368 approved N2 N2-30 N2-030366 agreed 2003-08-11 CAMEL4 0 2003-09-13
0615 - F Rel-5 5.4.0 5.5.0 Correction on MG-CSI sending to the SGSN NP-21 NP-030368 approved N2 N2-30 N2-030367 agreed 2003-08-11 CAMEL4 0 2003-09-13
0616 - F Rel-5 5.4.0 5.5.0 Allow user interaction at answer DP NP-21 NP-030365 approved N2 N2-30 N2-030376 agreed 2003-08-12 CAMEL4 0 2003-09-13
0617 - F Rel-5 5.4.0 - Handling of concurrent tones - - - N2 N2-30 N2-030378 revised 2003-08-12 CAMEL4 0 2003-09-13
0617 1 F Rel-5 5.4.0 - Handling of concurrent tones - - - N2 N2-30 N2-030464 revised 2003-08-12 CAMEL4 0 2003-09-13
0617 2 F Rel-5 5.4.0 - Handling of concurrent tones - - - N2 N2-30 N2-030469 revised 2003-08-12 CAMEL4 0 2003-09-13
0617 3 F Rel-5 5.4.0 5.5.0 Handling of concurrent tones NP-21 NP-030367 approved N2 N2-30 N2-030472 agreed 2003-08-12 CAMEL4 0 2003-09-13
0618 - B Rel-5 5.4.0 - One step HLR enquiry for SCUDIF-CSI criteria - - - N2 N2-30 N2-030381 withdrawn 2003-08-13 CAMEL4 0 2003-09-13
0619 - F Rel-5 5.4.0 - CAMEL Leg Handling - - - N2 N2-30 N2-030382 postponed 2003-08-13 CAMEL4 0 2003-09-13
0619 1 F Rel-5 5.5.1 - CAMEL Leg Handling - - - N2 N2-30 N2-030478 revised 2003-08-13 CAMEL4 - 2004-01-05
0619 2 F Rel-5 5.5.1 - CAMEL Leg Handling - - - N2 N2-30 N2-030553 revised 2003-08-13 CAMEL4 - 2004-01-05
0619 3 F Rel-5 5.5.1 5.6.0 CAMEL Leg Handling NP-22 NP-030522 approved N2 N2-30 N2-030578 agreed 2003-08-13 CAMEL4 - 2004-01-05
0620 - F Rel-5 5.4.0 - Correction to InitialDP for SCUDIF - - - N2 N2-30 N2-030384 revised 2003-08-13 CAMEL4 0 2003-09-13
0620 1 F Rel-5 5.4.0 5.5.0 Correction to InitialDP for SCUDIF NP-21 NP-030369 approved N2 N2-30 N2-030458 agreed 2003-08-13 CAMEL4 0 2003-09-13
0621 - F R99 3.17.0 3.18.0 Correction in handling of Start-Delta and Stop-Delta operations. NP-21 NP-030362 approved N2 N2-30 N2-030416 agreed 2003-08-25 CAMEL3 0 2003-09-13
0622 - A Rel-5 5.4.0 5.5.0 Correction in handling of Start-Delta and Stop-Delta operations NP-21 NP-030362 approved N2 N2-30 N2-030425 agreed 2003-08-25 CAMEL3 0 2003-09-13
0623 - F Rel-4 5.4.0 - Update of charging specifications references - - - N2 N2-30 N2-030434 agreed 2003-08-26 CAMEL4 0 2003-09-13
0624 - F Rel-5 5.5.1 - CAMEL DP Leg Handling - - - N2 N2-31 N2-030479 revised 2003-10-10 CAMEL4 - 2004-01-05
0624 1 F Rel-5 5.5.1 5.6.0 CAMEL DP Leg Handling NP-22 NP-030522 approved N2 N2-31 N2-030554 agreed 2003-10-10 CAMEL4 - 2004-01-05
0625 - F Rel-5 5.5.1 - CLIR and CAMEL interworking relative to ICA call and ICA leg - - - N2 N2-31 N2-030484 withdrawn 2003-10-13 CAMEL4 - 2004-01-05
0626 - F Rel-5 5.5.1 - Correction for data volumn report in GPRS data volumn threshold procedure - - - N2 N2-31 N2-030531 noted 2003-10-13 CAMEL4 - 2004-01-05
0627 - F Rel-5 5.5.1 5.6.0 Correction to MAP SRI between gsmSCF and HLR - Supported CAMEL Phases shall be Mandatory NP-22 NP-030522 approved N2 N2-31 N2-030487 agreed 2003-10-13 CAMEL4 - 2004-01-05
0628 - F Rel-5 5.5.1 - Removal of Int_Continue from process ICA_MSC - - - N2 N2-31 N2-030488 revised 2003-10-13 CAMEL4 - 2004-01-05
0628 1 F Rel-5 5.5.1 5.6.0 Removal of Int_Continue from process ICA_MSC NP-22 NP-030522 approved N2 N2-31 N2-030556 agreed 2003-10-13 CAMEL4 - 2004-01-05
0629 - F Rel-5 5.5.1 5.6.0 Remove contents table for MNP Requested Info parameter NP-22 NP-030523 approved N2 N2-31 N2-030498 agreed 2003-10-13 CAMEL4 - 2004-01-05
0630 - F Rel-5 5.5.1 - Correction to CAP ICA - addition of Additional Calling Party Number - - - N2 N2-31 N2-030490 withdrawn 2003-10-13 CAMEL4 - 2004-01-05
0631 - F Rel-5 5.5.1 - Correction to MAP SRI between gsmSCF and HLR - HLR shall use TS11 - - - N2 N2-31 N2-030492 revised 2003-10-13 CAMEL4 - 2004-01-05
0631 1 F Rel-5 5.5.1 - Correction to MAP SRI between gsmSCF and HLR - HLR shall use TS11 - - - N2 N2-31 N2-030558 revised 2003-10-13 CAMEL4 - 2004-01-05
0631 2 F Rel-5 5.5.1 5.6.0 Correction to MAP SRI between gsmSCF and HLR - HLR shall use TS11 NP-22 NP-030522 approved N2 N2-31 N2-030579 agreed 2003-10-13 CAMEL4 - 2004-01-05
0632 - F Rel-5 5.5.1 - Impact by LNP and GEA on Destination_Address in Answer - - - N2 N2-31 N2-030493 revised 2003-10-13 CAMEL4 - 2004-01-05
0632 1 F Rel-5 5.5.1 - Impact by LNP and GEA on Destination_Address in Answer - - - N2 N2-31 N2-030546 postponed 2003-10-13 CAMEL4 - 2004-01-05
0633 - F Rel-5 5.5.1 - Reporting Basic Service at DP Answer for SCUDIF calls - - - N2 N2-31 N2-030495 revised 2003-10-13 CAMEL4 - 2004-01-05
0633 1 F Rel-5 5.5.1 5.6.0 Reporting Basic Service at DP Answer for SCUDIF calls NP-22 NP-030523 approved N2 N2-31 N2-030563 agreed 2003-10-13 CAMEL4 - 2004-01-05
0634 - F Rel-5 5.5.1 - SDL handling of DisconnectFromIPForbidden handling in Assisting SSF case - - - N2 N2-31 N2-030513 revised 2003-10-14 CAMEL4 - 2004-01-05
0634 1 F Rel-5 5.5.1 5.6.0 SDL handling of DisconnectFromIPForbidden handling in Assisting SSF case NP-22 NP-030523 approved N2 N2-31 N2-030547 agreed 2003-10-14 CAMEL4 - 2004-01-05
0635 - F Rel-5 5.5.1 - Reporting of active basic service at answer due to SCUDIF - - - N2 N2-31 N2-030515 withdrawn 2003-10-14 CAMEL4 - 2004-01-05
0636 - F Rel-5 5.5.1 - CAMEL User interaction at alerting and MidCall - - - N2 N2-31 N2-030517 revised 2003-10-14 CAMEL4 - 2004-01-05
0636 1 F Rel-5 5.5.1 5.6.0 CAMEL User interaction at alerting and MidCall NP-22 NP-030522 approved N2 N2-31 N2-030557 agreed 2003-10-14 CAMEL4 - 2004-01-05
0637 - F Rel-5 5.5.1 - Extension of QoS for HSDPA in GPRS CAMEL - - - N2 N2-31 N2-030518 revised 2003-10-14 CAMEL4 - 2004-01-05
0637 1 F Rel-5 5.5.1 - Extension of QoS for HSDPA in GPRS CAMEL - - - N2 N2-31 N2-030532 revised 2003-10-14 CAMEL4 - 2004-01-05
0637 2 F Rel-5 5.5.1 - Extension of QoS for HSDPA in GPRS CAMEL - - - N2 N2-31 N2-030550 revised 2003-10-14 CAMEL4 - 2004-01-05
0637 3 F Rel-5 5.5.1 - Extension of QoS for HSDPA in GPRS CAMEL NP-22 NP-030530 rejected N2 N2-31 N2-030567 agreed 2003-10-14 CAMEL4 - 2004-01-05
0638 - F Rel-5 5.5.1 - Removal of location information at DP O_Term_Seized - - - N2 N2-31 N2-030520 rejected 2003-10-15 CAMEL4 - 2004-01-05
0639 - F Rel-5 5.5.1 - Inclusion of PSI Enhancement IE in VLR - HLR Ifs - - - N2 N2-31 N2-030522 rejected 2003-10-15 CAMEL4 - 2004-01-05
0640 - F Rel-5 5.5.1 - Correction to trigger criteria for forwarded calls - - - N2 N2-31 N2-030538 revised 2003-10-21 CAMEL4 - 2004-01-05
0641 - F Rel-5 5.5.1 5.6.0 Using Suppress T-CSI in ICA for NP call legs NP-22 NP-030524 approved N2 N2-31 N2-030539 agreed 2003-10-21 CAMEL4 - 2004-01-05
0642 - F Rel-5 5.5.1 - Use of Continue With Argument for gsmSCF initiated calls - - - N2 N2-31 N2-030542 revised 2003-10-21 CAMEL4 - 2004-01-05
0642 1 F Rel-5 5.5.1 5.6.0 Use of Continue With Argument for gsmSCF initiated calls NP-22 NP-030522 approved N2 N2-31 N2-030584 agreed 2003-10-21 CAMEL4 - 2004-01-05
0643 - F Rel-5 5.5.1 5.6.0 Inclusion of DP O_Term_Seized in CAMEL Phase 4 Partial Implementation NP-22 NP-030523 approved N2 N2-31 N2-030559 agreed 2003-10-28 CAMEL4 - 2004-01-05
0644 - F Rel-5 5.5.1 5.6.0 Correction to Disconnect Leg handling – gsmSSF shall send charging reports NP-22 NP-030522 approved N2 N2-31 N2-030576 agreed 2003-10-29 CAMEL4 - 2004-01-05
0645 - B Rel-6 5.5.1 - Change of position armed with criteria (check criteria in MSC) - - - N2 N2-31 N2-030581 revised 2003-10-30 CAMEL4 - 2004-01-05
0645 1 B Rel-6 5.5.1 6.0.0 Change of position armed with criteria (check criteria in MSC) NP-22 NP-030528 approved N2 N2-31 N2-030587 agreed 2003-10-30 TEI_6 - 2004-01-05
0646 - F Rel-5 5.5.1 - Extension of QoS for HSDPA in GPRS CAMEL - - - NEC, Vodafone N2-31 - - 2003-11-03 CAMEL4 - 2004-01-05
0646 - F Rel-5 5.5.1 5.6.0 Extension of QoS for HSDPA in GPRS CAMEL NP-22 NP-030531 approved NEC, Vodafone - - - 2003-11-03 CAMEL4 companies input to CN#22 (alternative to NP-030530) 2004-01-05
0647 - B Rel-6 5.5.1 - Enhancements for the Partial Implementation for ""Change of position procedure armed with criteria"" - - - N2 N2-31 N2-030480 revised 2003-11-07 CAMEL4 - 2004-01-05
0647 1 B Rel-6 5.5.1 6.0.0 Enhancements for the Partial Implementation for ""Change of position procedure armed with criteria"" NP-22 NP-030528 approved N2 N2-31 N2-030561 agreed 2003-11-07 TEI_6 - 2004-01-05
0648 1 F Rel-5 5.6.0 - Missing DisconnectLeg Result to the gsmSCF NP-23 NP-040092 revised N2 N2-32 N2-040122 agreed 2004-02-17 CAMEL4 - 2004-03-05
0648 1 F Rel-5 5.6.0 - Missing DisconnectLeg Result to the gsmSCF NP-23 NP-040110 revised N2 N2-32 N2-040122 agreed 2004-02-17 CAMEL4 - 2004-03-05
0648 1 F Rel-5 5.6.0 5.7.0 Missing DisconnectLeg Result to the gsmSCF NP-23 NP-040137 approved N2 N2-32 N2-040122 agreed 2004-02-17 CAMEL4 - 2004-03-12
0649 1 A Rel-6 6.0.0 - Missing DisconnectLeg Result to the gsmSCF NP-23 NP-040092 revised N2 N2-32 N2-040123 agreed 2004-02-17 CAMEL4 - 2004-03-05
0649 1 A Rel-6 6.0.0 - Missing DisconnectLeg Result to the gsmSCF NP-23 NP-040110 revised N2 N2-32 N2-040123 agreed 2004-02-17 CAMEL4 - 2004-03-05
0649 1 A Rel-6 6.0.0 6.1.0 Missing DisconnectLeg Result to the gsmSCF NP-23 NP-040137 approved N2 N2-32 N2-040123 agreed 2004-02-17 CAMEL4 - 2004-03-12
0651 1 A Rel-6 6.0.0 - Correction to DP description tables NP-23 NP-040092 revised N2 N2-32 N2-040135 agreed 2004-01-30 CAMEL4 - 2004-03-05
0651 1 A Rel-6 6.0.0 - Correction to DP description tables NP-23 NP-040110 revised N2 N2-32 N2-040135 agreed 2004-01-30 CAMEL4 - 2004-03-05
0651 1 A Rel-6 6.0.0 6.1.0 Correction to DP description tables NP-23 NP-040137 approved N2 N2-32 N2-040135 agreed 2004-01-30 CAMEL4 - 2004-03-12
0652 - F Rel-6 6.0.0 6.1.0 EDS and DisconnectLeg interworking NP-23 NP-040094 approved N2 N2-32 N2-040015 agreed 2004-01-28 EDCAMEL - 2004-03-05
0653 - F R99 3.18.0 3.19.0 DP Triggering without having armed the TDP NP-23 NP-040090 approved N2 N2-32 N2-040016 agreed 2004-01-30 CAMEL3 - 2004-03-05
0654 - A Rel-4 4.10.0 4.11.0 DP Triggering without having armed the TDP NP-23 NP-040090 approved N2 N2-32 N2-040017 agreed 2004-01-30 CAMEL3 - 2004-03-05
0655 - A Rel-5 5.6.0 5.7.0 DP Triggering without having armed the TDP NP-23 NP-040090 approved N2 N2-32 N2-040018 agreed 2004-01-30 CAMEL4 - 2004-03-05
0656 - A Rel-6 6.0.0 6.1.0 DP Triggering without having armed the TDP NP-23 NP-040090 approved N2 N2-32 N2-040019 agreed 2004-01-30 CAMEL4 - 2004-03-05
0657 - D Rel-6 6.0.0 - No receipt of Int_DP_Analysed_Information in state Monitoring NP-23 NP-040094 revised N2 N2-32 N2-040020 agreed 2004-01-30 EDCAMEL - 2004-03-05
0657 1 F Rel-6 6.0.0 6.1.0 No receipt of Int_DP_Analysed_Information in state Monitoring NP-23 NP-040145 approved N2 N2-32 N2-040020 agreed 2004-01-30 EDCAMEL - 2004-03-12
0659 1 B Rel-6 6.1.0 - Active Location Retrieval for MT call handling - - - N2 N2-33 N2-040189 revised 2004-04-27 CAMEL4 - 2004-05-28
0659 2 B Rel-6 6.1.0 - Active Location Retrieval for MT call handling - - - N2 N2-33 N2-040243 revised 2004-04-27 CAMEL4 - 2004-05-28
0659 3 B Rel-6 6.1.0 - Active Location Retrieval for MT call handling NP-24 NP-040208 rejected N2 N2-33 N2-040247 agreed 2004-04-27 CAMEL4 - 2004-05-28
0661 1 F Rel-5 5.6.0 - Correction to dialed services triggering for NP and NC calls NP-23 NP-040091 revised N2 N2-32 N2-040106 agreed 2004-01-30 CAMEL4 - 2004-03-05
0661 1 F Rel-5 5.6.0 - Correction to dialed services triggering for NP and NC calls NP-23 NP-040109 withdrawn N2 N2-32 N2-040106 agreed 2004-01-30 CAMEL4 - 2004-03-05
0661 1 F Rel-5 5.6.0 5.7.0 Correction to dialed services triggering for NP and NC calls NP-23 NP-040136 approved N2 N2-32 N2-040106 agreed 2004-01-30 CAMEL4 - 2004-03-12
0662 1 F Rel-5 5.6.0 - Correction to DP description tables NP-23 NP-040092 revised N2 N2-32 N2-040134 agreed 2004-01-30 CAMEL4 - 2004-03-05
0662 1 F Rel-5 5.6.0 - Correction to DP description tables NP-23 NP-040110 revised N2 N2-32 N2-040134 agreed 2004-01-30 CAMEL4 - 2004-03-05
0662 1 F Rel-5 5.6.0 5.7.0 Correction to DP description tables NP-23 NP-040137 approved N2 N2-32 N2-040134 agreed 2004-01-30 CAMEL4 - 2004-03-12
0663 - F Rel-5 5.6.0 - Correction to No Answer handling (CAMEL_OCH_MSC2) NP-23 NP-040091 revised N2 N2-32 N2-040027 agreed 2004-01-30 CAMEL4 - 2004-03-05
0663 - F Rel-5 5.6.0 - Correction to No Answer handling (CAMEL_OCH_MSC2) NP-23 NP-040109 withdrawn N2 N2-32 N2-040027 agreed 2004-01-30 CAMEL4 - 2004-03-05
0663 - F Rel-5 5.6.0 5.7.0 Correction to No Answer handling (CAMEL_OCH_MSC2) NP-23 NP-040136 approved N2 N2-32 N2-040027 agreed 2004-01-30 CAMEL4 - 2004-03-12
0666 1 F Rel-5 5.6.0 - Handling of DFCWA in ETC and CTR procedures NP-23 NP-040091 revised N2 N2-32 N2-040092 agreed 2004-01-30 CAMEL4 - 2004-03-05
0666 1 F Rel-5 5.6.0 - Handling of DFCWA in ETC and CTR procedures NP-23 NP-040109 withdrawn N2 N2-32 N2-040092 agreed 2004-01-30 CAMEL4 - 2004-03-05
0666 1 F Rel-5 5.6.0 5.7.0 Handling of DFCWA in ETC and CTR procedures NP-23 NP-040136 approved N2 N2-32 N2-040092 agreed 2004-01-30 CAMEL4 - 2004-03-12
0667 1 F Rel-5 5.6.0 - Correction to CUG handling for NP calls NP-23 NP-040092 revised N2 N2-32 N2-040125 agreed 2004-01-30 CAMEL4 - 2004-03-05
0667 1 F Rel-5 5.6.0 - Correction to CUG handling for NP calls NP-23 NP-040110 revised N2 N2-32 N2-040125 agreed 2004-01-30 CAMEL4 - 2004-03-05
0667 1 F Rel-5 5.6.0 5.7.0 Correction to CUG handling for NP calls NP-23 NP-040137 approved N2 N2-32 N2-040125 agreed 2004-01-30 CAMEL4 - 2004-03-12
0668 1 F Rel-5 5.6.0 - Correction to CAMEL_ICA_MSC (hanging connector) NP-23 NP-040092 revised N2 N2-32 N2-040127 agreed 2004-01-30 CAMEL4 - 2004-03-05
0668 1 F Rel-5 5.6.0 - Correction to CAMEL_ICA_MSC (hanging connector) NP-23 NP-040110 revised N2 N2-32 N2-040127 agreed 2004-01-30 CAMEL4 - 2004-03-05
0668 1 F Rel-5 5.6.0 5.7.0 Correction to CAMEL_ICA_MSC (hanging connector) NP-23 NP-040137 approved N2 N2-32 N2-040127 agreed 2004-01-30 CAMEL4 - 2004-03-12
0669 1 F Rel-5 5.6.0 - Allowing Export_leg at DP Alerting and DP Answer NP-23 NP-040092 revised N2 N2-32 N2-040136 agreed 2004-01-30 CAMEL4 - 2004-03-05
0669 1 F Rel-5 5.6.0 - Allowing Export_leg at DP Alerting and DP Answer NP-23 NP-040110 revised N2 N2-32 N2-040136 agreed 2004-01-30 CAMEL4 - 2004-03-05
0669 1 F Rel-5 5.6.0 5.7.0 Allowing Export_leg at DP Alerting and DP Answer NP-23 NP-040137 approved N2 N2-32 N2-040136 agreed 2004-01-30 CAMEL4 - 2004-03-12
0670 - F Rel-5 5.6.0 - Correction to handling of DFC in CS_gsmSSF NP-23 NP-040091 revised N2 N2-32 N2-040034 agreed 2004-01-30 CAMEL4 - 2004-03-05
0670 - F Rel-5 5.6.0 - Correction to handling of DFC in CS_gsmSSF NP-23 NP-040109 withdrawn N2 N2-32 N2-040034 agreed 2004-01-30 CAMEL4 - 2004-03-05
0670 - F Rel-5 5.6.0 5.7.0 Correction to handling of DFC in CS_gsmSSF NP-23 NP-040136 approved N2 N2-32 N2-040034 agreed 2004-01-30 CAMEL4 - 2004-03-12
0671 2 F Rel-5 5.6.0 - Correction to Request Report BCSM Event handling in CSA_gsmSSF NP-23 NP-040092 revised N2 N2-32 N2-040137 agreed 2004-01-30 CAMEL4 - 2004-03-05
0671 2 F Rel-5 5.6.0 - Correction to Request Report BCSM Event handling in CSA_gsmSSF NP-23 NP-040110 revised N2 N2-32 N2-040137 agreed 2004-01-30 CAMEL4 - 2004-03-05
0671 2 F Rel-5 5.6.0 5.7.0 Correction to Request Report BCSM Event handling in CSA_gsmSSF NP-23 NP-040137 approved N2 N2-32 N2-040137 agreed 2004-01-30 CAMEL4 - 2004-03-12
0673 2 F Rel-5 5.6.0 - Correction to Split Leg handling in CSA_gsmSSF NP-23 NP-040092 revised N2 N2-32 N2-040139 agreed 2004-01-30 CAMEL4 - 2004-03-05
0673 2 F Rel-5 5.6.0 - Correction to Split Leg handling in CSA_gsmSSF NP-23 NP-040110 revised N2 N2-32 N2-040139 agreed 2004-01-30 CAMEL4 - 2004-03-05
0673 2 F Rel-5 5.6.0 5.7.0 Correction to Split Leg handling in CSA_gsmSSF NP-23 NP-040137 approved N2 N2-32 N2-040139 agreed 2004-01-30 CAMEL4 - 2004-03-12
0674 1 F Rel-5 5.6.0 - Correction to both way through parameter for ETC and CTR NP-23 NP-040091 revised N2 N2-32 N2-040111 agreed 2004-01-30 CAMEL4 - 2004-03-05
0674 1 F Rel-5 5.6.0 - Correction to both way through parameter for ETC and CTR NP-23 NP-040109 withdrawn N2 N2-32 N2-040111 agreed 2004-01-30 CAMEL4 - 2004-03-05
0674 1 F Rel-5 5.6.0 5.7.0 Correction to both way through parameter for ETC and CTR NP-23 NP-040136 approved N2 N2-32 N2-040111 agreed 2004-01-30 CAMEL4 - 2004-03-12
0675 1 F Rel-5 5.6.0 - Correction to CS ID in Prompt & Collect User Information NP-23 NP-040092 revised N2 N2-32 N2-040141 agreed 2004-01-30 CAMEL4 - 2004-03-05
0675 1 F Rel-5 5.6.0 - Correction to CS ID in Prompt & Collect User Information NP-23 NP-040110 revised N2 N2-32 N2-040141 agreed 2004-01-30 CAMEL4 - 2004-03-05
0675 1 F Rel-5 5.6.0 5.7.0 Correction to CS ID in Prompt & Collect User Information NP-23 NP-040137 approved N2 N2-32 N2-040141 agreed 2004-01-30 CAMEL4 - 2004-03-12
0676 1 F Rel-5 5.6.0 - Correction to forwarded leg handling with Suppress O-CSI NP-23 NP-040091 revised N2 N2-32 N2-040115 agreed 2004-01-30 CAMEL4 - 2004-03-05
0676 1 F Rel-5 5.6.0 - Correction to forwarded leg handling with Suppress O-CSI NP-23 NP-040109 withdrawn N2 N2-32 N2-040115 agreed 2004-01-30 CAMEL4 - 2004-03-05
0676 1 F Rel-5 5.6.0 5.7.0 Correction to forwarded leg handling with Suppress O-CSI NP-23 NP-040136 approved N2 N2-32 N2-040115 agreed 2004-01-30 CAMEL4 - 2004-03-12
0677 1 F Rel-5 5.6.0 - Correction to ORLCF handling for CAMEL calls in VMSC NP-23 NP-040091 revised N2 N2-32 N2-040117 agreed 2004-01-30 CAMEL4 - 2004-03-05
0677 1 F Rel-5 5.6.0 - Correction to ORLCF handling for CAMEL calls in VMSC NP-23 NP-040109 withdrawn N2 N2-32 N2-040117 agreed 2004-01-30 CAMEL4 - 2004-03-05
0677 1 F Rel-5 5.6.0 5.7.0 Correction to ORLCF handling for CAMEL calls in VMSC NP-23 NP-040136 approved N2 N2-32 N2-040117 agreed 2004-01-30 CAMEL4 - 2004-03-12
0678 - F Rel-5 5.6.0 - Correction to Information Location at DP O_Term_Seized NP-23 NP-040091 revised N2 N2-32 N2-040042 agreed 2004-01-30 CAMEL4 - 2004-03-05
0678 - F Rel-5 5.6.0 - Correction to Information Location at DP O_Term_Seized NP-23 NP-040109 withdrawn N2 N2-32 N2-040042 agreed 2004-01-30 CAMEL4 - 2004-03-05
0678 - F Rel-5 5.6.0 5.7.0 Correction to Information Location at DP O_Term_Seized NP-23 NP-040136 approved N2 N2-32 N2-040042 agreed 2004-01-30 CAMEL4 - 2004-03-12
0679 2 F Rel-5 5.6.0 - Correction to Tssf timer at Apply Charging NP-23 NP-040092 revised N2 N2-32 N2-040119 agreed 2004-01-30 CAMEL4 - 2004-03-05
0679 2 F Rel-5 5.6.0 - Correction to Tssf timer at Apply Charging NP-23 NP-040110 revised N2 N2-32 N2-040119 agreed 2004-01-30 CAMEL4 - 2004-03-05
0679 2 F Rel-5 5.6.0 5.7.0 Correction to Tssf timer at Apply Charging NP-23 NP-040137 approved N2 N2-32 N2-040119 agreed 2004-01-30 CAMEL4 - 2004-03-12
0680 1 F Rel-5 5.6.0 - Correction to SplitLeg preconditions NP-23 NP-040092 revised N2 N2-32 N2-040143 agreed 2004-01-30 CAMEL4 - 2004-03-05
0680 1 F Rel-5 5.6.0 - Correction to SplitLeg preconditions NP-23 NP-040110 revised N2 N2-32 N2-040143 agreed 2004-01-30 CAMEL4 - 2004-03-05
0680 1 F Rel-5 5.6.0 5.7.0 Correction to SplitLeg preconditions NP-23 NP-040137 approved N2 N2-32 N2-040143 agreed 2004-01-30 CAMEL4 - 2004-03-12
0681 2 F Rel-5 5.6.0 - Correction to Disconnect Leg preconditions NP-23 NP-040093 revised N2 N2-32 N2-040147 agreed 2004-01-30 CAMEL4 - 2004-03-05
0681 2 F Rel-5 5.6.0 - Correction to Disconnect Leg preconditions NP-23 NP-040111 revised N2 N2-32 N2-040147 agreed 2004-01-30 CAMEL4 - 2004-03-05
0681 2 F Rel-5 5.6.0 5.7.0 Correction to Disconnect Leg preconditions NP-23 NP-040138 approved N2 N2-32 N2-040147 agreed 2004-01-30 CAMEL4 - 2004-03-12
0682 2 B Rel-6 6.0.0 - Enhancement of Event Specific Information for DP ‘Change of Position’ NP-23 NP-040093 revised N2 N2-32 N2-040156 agreed 2004-02-19 CAMEL4 - 2004-03-05
0682 2 B Rel-6 6.0.0 - Enhancement of Event Specific Information for DP ‘Change of Position’ NP-23 NP-040111 revised N2 N2-32 N2-040156 agreed 2004-02-19 CAMEL4 - 2004-03-05
0682 2 B Rel-6 6.0.0 6.1.0 Enhancement of Event Specific Information for DP ‘Change of Position’ NP-23 NP-040138 approved N2 N2-32 N2-040156 agreed 2004-02-19 TEI6 - 2004-03-12
0685 2 F Rel-6 6.1.0 - IP version of GGSN address for CAMEL NP-24 NP-040209 revised N2 N2-33 N2-030239 agreed 2004-05-28 TEI6 - 2004-05-28
0685 3 F Rel-6 6.1.0 6.2.0 IP version of GGSN address for CAMEL NP-24 NP-040249 approved N2 N2-33 N2-040239 agreed 2004-05-28 TEI6 - 2004-05-28
0686 1 F Rel-6 6.0.0 - GPRS ODB reporting to CAMEL SCP NP-23 NP-040090 revised N2 N2-32 N2-040159 agreed 2004-02-20 CAMEL3 - 2004-03-05
0686 1 F Rel-6 6.0.0 6.1.0 GPRS ODB reporting to CAMEL SCP NP-23 NP-040131 approved N2 N2-32 N2-040159 agreed 2004-02-20 TEI6 - 2004-03-05
0688 2 B Rel-6 6.0.0 6.1.0 CAMEL4 SCUDIF notification during active call for prepay NP-23 NP-040095 approved N2 N2-32 N2-040154 agreed 2004-02-20 SCCAMEL - 2004-03-05
0689 1 F Rel-6 6.0.0 - NoReply timer clarification for follow-on calls NP-23 NP-040093 revised N2 N2-32 N2-040160 agreed 2004-02-20 CAMEL4 - 2004-03-05
0689 1 F Rel-6 6.0.0 - NoReply timer clarification for follow-on calls NP-23 NP-040111 revised N2 N2-32 N2-040160 agreed 2004-02-20 CAMEL4 - 2004-03-05
0689 1 F Rel-6 6.0.0 6.1.0 NoReply timer clarification for follow-on calls NP-23 NP-040138 approved N2 N2-32 N2-040160 agreed 2004-02-20 TEI6 - 2004-03-12
0692 4 F Rel-5 5.6.0 5.7.0 Adding the Layer Compatibility information elements over the gsmSSF – gsmSCF interface NP-23 NP-040096 approved N2 N2-32 N2-040172 agreed 2004-02-16 CAMEL4 - 2004-03-05
0693 1 A Rel-6 6.0.0 6.1.0 Adding the Layer Compatibility information elements over the gsmSSF – gsmSCF interface NP-23 NP-040096 approved N2 N2-32 N2-040173 agreed 2004-02-16 CAMEL4 - 2004-03-05
0694 - A Rel-6 6.0.0 - Correction to dialed services triggering for NP and NC calls NP-23 NP-040091 revised N2 N2-32 N2-040107 agreed 2004-01-30 CAMEL4 - 2004-03-05
0694 - A Rel-6 6.0.0 - Correction to dialed services triggering for NP and NC calls NP-23 NP-040109 withdrawn N2 N2-32 N2-040107 agreed 2004-01-30 CAMEL4 - 2004-03-05
0694 - A Rel-6 6.0.0 6.1.0 Correction to dialed services triggering for NP and NC calls NP-23 NP-040136 approved N2 N2-32 N2-040107 agreed 2004-01-30 CAMEL4 - 2004-03-12
0695 - A Rel-6 6.0.0 - Correction to No Answer handling (CAMEL_OCH_MSC2) NP-23 NP-040091 revised N2 N2-32 N2-040108 agreed 2004-01-30 CAMEL4 - 2004-03-05
0695 - A Rel-6 6.0.0 - Correction to No Answer handling (CAMEL_OCH_MSC2) NP-23 NP-040109 withdrawn N2 N2-32 N2-040108 agreed 2004-01-30 CAMEL4 - 2004-03-05
0695 - A Rel-6 6.0.0 6.1.0 Correction to No Answer handling (CAMEL_OCH_MSC2) NP-23 NP-040136 approved N2 N2-32 N2-040108 agreed 2004-01-30 CAMEL4 - 2004-03-12
0696 - A Rel-6 6.0.0 - Correction to handling of DFC in CS_gsmSSF NP-23 NP-040091 revised N2 N2-32 N2-040109 agreed 2004-01-30 CAMEL4 - 2004-03-05
0696 - A Rel-6 6.0.0 - Correction to handling of DFC in CS_gsmSSF NP-23 NP-040109 withdrawn N2 N2-32 N2-040109 agreed 2004-01-30 CAMEL4 - 2004-03-05
0696 - A Rel-6 6.0.0 6.1.0 Correction to handling of DFC in CS_gsmSSF NP-23 NP-040136 approved N2 N2-32 N2-040109 agreed 2004-01-30 CAMEL4 - 2004-03-12
0697 - A Rel-6 6.0.0 - Correction to both way through parameter for ETC and CTR NP-23 NP-040091 revised N2 N2-32 N2-040112 agreed 2004-01-30 CAMEL4 - 2004-03-05
0697 - A Rel-6 6.0.0 - Correction to both way through parameter for ETC and CTR NP-23 NP-040109 withdrawn N2 N2-32 N2-040112 agreed 2004-01-30 CAMEL4 - 2004-03-05
0697 - A Rel-6 6.0.0 6.1.0 Correction to both way through parameter for ETC and CTR NP-23 NP-040136 approved N2 N2-32 N2-040112 agreed 2004-01-30 CAMEL4 - 2004-03-12
0698 - A Rel-6 6.0.0 - Correction to forwarded leg handling with Suppress O-CSI NP-23 NP-040091 revised N2 N2-32 N2-040116 agreed 2004-01-30 CAMEL4 - 2004-03-05
0698 - A Rel-6 6.0.0 - Correction to forwarded leg handling with Suppress O-CSI NP-23 NP-040109 withdrawn N2 N2-32 N2-040116 agreed 2004-01-30 CAMEL4 - 2004-03-05
0698 - A Rel-6 6.0.0 6.1.0 Correction to forwarded leg handling with Suppress O-CSI NP-23 NP-040136 approved N2 N2-32 N2-040116 agreed 2004-01-30 CAMEL4 - 2004-03-12
0699 - A Rel-6 6.0.0 - Correction to ORLCF handling for CAMEL calls in VMSC NP-23 NP-040091 revised N2 N2-32 N2-040118 agreed 2004-01-30 CAMEL4 - 2004-03-05
0699 - A Rel-6 6.0.0 - Correction to ORLCF handling for CAMEL calls in VMSC NP-23 NP-040109 withdrawn N2 N2-32 N2-040118 agreed 2004-01-30 CAMEL4 - 2004-03-05
0699 - A Rel-6 6.0.0 6.1.0 Correction to ORLCF handling for CAMEL calls in VMSC NP-23 NP-040136 approved N2 N2-32 N2-040118 agreed 2004-01-30 CAMEL4 - 2004-03-12
0700 - A Rel-6 6.0.0 - Handling of DFCWA in ETC and CTR procedures NP-23 NP-040091 revised N2 N2-32 N2-040124 agreed 2004-01-30 CAMEL4 - 2004-03-05
0700 - A Rel-6 6.0.0 - Handling of DFCWA in ETC and CTR procedures NP-23 NP-040109 withdrawn N2 N2-32 N2-040124 agreed 2004-01-30 CAMEL4 - 2004-03-05
0700 - A Rel-6 6.0.0 6.1.0 Handling of DFCWA in ETC and CTR procedures NP-23 NP-040136 approved N2 N2-32 N2-040124 agreed 2004-01-30 CAMEL4 - 2004-03-12
0701 - A Rel-6 6.0.0 - Correction to CUG handling for NP calls NP-23 NP-040092 revised N2 N2-32 N2-040126 agreed 2004-01-30 CAMEL4 - 2004-03-05
0701 - A Rel-6 6.0.0 - Correction to CUG handling for NP calls NP-23 NP-040110 revised N2 N2-32 N2-040126 agreed 2004-01-30 CAMEL4 - 2004-03-05
0701 - A Rel-6 6.0.0 6.1.0 Correction to CUG handling for NP calls NP-23 NP-040137 approved N2 N2-32 N2-040126 agreed 2004-01-30 CAMEL4 - 2004-03-12
0702 - A Rel-6 6.0.0 - Correction to CAMEL_ICA_MSC (hanging connector) NP-23 NP-040092 revised N2 N2-32 N2-040128 agreed 2004-01-30 CAMEL4 - 2004-03-05
0702 - A Rel-6 6.0.0 - Correction to CAMEL_ICA_MSC (hanging connector) NP-23 NP-040110 revised N2 N2-32 N2-040128 agreed 2004-01-30 CAMEL4 - 2004-03-05
0702 - A Rel-6 6.0.0 6.1.0 Correction to CAMEL_ICA_MSC (hanging connector) NP-23 NP-040137 approved N2 N2-32 N2-040128 agreed 2004-01-30 CAMEL4 - 2004-03-12
0703 - A Rel-6 6.0.0 - Correction to Request Report BCSM Event handling in CSA_gsmSSF NP-23 NP-040092 revised N2 N2-32 N2-040138 agreed 2004-01-30 CAMEL4 - 2004-03-05
0703 - A Rel-6 6.0.0 - Correction to Request Report BCSM Event handling in CSA_gsmSSF NP-23 NP-040110 revised N2 N2-32 N2-040138 agreed 2004-01-30 CAMEL4 - 2004-03-05
0703 - A Rel-6 6.0.0 6.1.0 Correction to Request Report BCSM Event handling in CSA_gsmSSF NP-23 NP-040137 approved N2 N2-32 N2-040138 agreed 2004-01-30 CAMEL4 - 2004-03-12
0704 - A Rel-6 6.0.0 - Correction to Split Leg handling in CSA_gsmSSF NP-23 NP-040092 revised N2 N2-32 N2-040140 agreed 2004-01-30 CAMEL4 - 2004-03-05
0704 - A Rel-6 6.0.0 - Correction to Split Leg handling in CSA_gsmSSF NP-23 NP-040110 revised N2 N2-32 N2-040140 agreed 2004-01-30 CAMEL4 - 2004-03-05
0704 - A Rel-6 6.0.0 6.1.0 Correction to Split Leg handling in CSA_gsmSSF NP-23 NP-040137 approved N2 N2-32 N2-040140 agreed 2004-01-30 CAMEL4 - 2004-03-12
0705 - A Rel-6 6.0.0 - Correction to CS ID in Prompt & Collect User Information NP-23 NP-040092 revised N2 N2-32 N2-040142 agreed 2004-01-30 CAMEL4 - 2004-03-05
0705 - A Rel-6 6.0.0 - Correction to CS ID in Prompt & Collect User Information NP-23 NP-040110 revised N2 N2-32 N2-040142 agreed 2004-01-30 CAMEL4 - 2004-03-05
0705 - A Rel-6 6.0.0 6.1.0 Correction to CS ID in Prompt & Collect User Information NP-23 NP-040137 approved N2 N2-32 N2-040142 agreed 2004-01-30 CAMEL4 - 2004-03-12
0706 - A Rel-6 6.0.0 - Correction to SplitLeg preconditions NP-23 NP-040092 revised N2 N2-32 N2-040144 agreed 2004-01-30 CAMEL4 - 2004-03-05
0706 - A Rel-6 6.0.0 - Correction to SplitLeg preconditions NP-23 NP-040110 revised N2 N2-32 N2-040144 agreed 2004-01-30 CAMEL4 - 2004-03-05
0706 - A Rel-6 6.0.0 6.1.0 Correction to SplitLeg preconditions NP-23 NP-040137 approved N2 N2-32 N2-040144 agreed 2004-01-30 CAMEL4 - 2004-03-12
0707 - A Rel-6 6.0.0 - Correction to Disconnect Leg preconditions NP-23 NP-040093 revised N2 N2-32 N2-040148 agreed 2004-01-30 CAMEL4 - 2004-03-05
0707 - A Rel-6 6.0.0 - Correction to Disconnect Leg preconditions NP-23 NP-040111 revised N2 N2-32 N2-040148 agreed 2004-01-30 CAMEL4 - 2004-03-05
0707 - A Rel-6 6.0.0 6.1.0 Correction to Disconnect Leg preconditions NP-23 NP-040138 approved N2 N2-32 N2-040148 agreed 2004-01-30 CAMEL4 - 2004-03-12
0708 - A Rel-6 6.0.0 - Correction to Information Location at DP O_Term_Seized NP-23 NP-040091 revised N2 N2-32 N2-040151 agreed 2004-01-30 CAMEL4 - 2004-03-05
0708 - A Rel-6 6.0.0 - Correction to Information Location at DP O_Term_Seized NP-23 NP-040109 withdrawn N2 N2-32 N2-040151 agreed 2004-01-30 CAMEL4 - 2004-03-05
0708 - A Rel-6 6.0.0 6.1.0 Correction to Information Location at DP O_Term_Seized NP-23 NP-040136 approved N2 N2-32 N2-040151 agreed 2004-01-30 CAMEL4 - 2004-03-12
0709 - F Rel-5 5.6.0 - Starting of Timer Tccd after Aon DP 'Change of Position' NP-23 NP-040093 revised N2 N2-32 N2-040155 agreed 2004-02-19 CAMEL4 - 2004-03-05
0709 - F Rel-5 5.6.0 - Starting of Timer Tccd after Aon DP 'Change of Position' NP-23 NP-040111 revised N2 N2-32 N2-040155 agreed 2004-02-19 CAMEL4 - 2004-03-05
0709 - F Rel-5 5.6.0 5.7.0 Starting of Timer Tccd after Aon DP 'Change of Position' NP-23 NP-040138 approved N2 N2-32 N2-040155 agreed 2004-02-19 CAMEL4 - 2004-03-12
0710 - A Rel-6 6.0.0 - Starting of Timer Tccd after Aon DP 'Change of Position' NP-23 NP-040093 revised N2 N2-32 N2-040170 agreed 2004-02-20 CAMEL4 - 2004-03-05
0710 - A Rel-6 6.0.0 - Starting of Timer Tccd after Aon DP 'Change of Position' NP-23 NP-040111 revised N2 N2-32 N2-040170 agreed 2004-02-20 CAMEL4 - 2004-03-05
0710 - A Rel-6 6.0.0 6.1.0 Starting of Timer Tccd after Aon DP 'Change of Position' NP-23 NP-040138 approved N2 N2-32 N2-040170 agreed 2004-02-20 CAMEL4 - 2004-03-12
0711 - A Rel-6 6.0.0 - Correction to Tssf timer at Apply Charging NP-23 NP-040092 revised N2 N2-32 N2-040175 agreed 2004-01-30 CAMEL4 - 2004-03-05
0711 - A Rel-6 6.0.0 - Correction to Tssf timer at Apply Charging NP-23 NP-040110 revised N2 N2-32 N2-040175 agreed 2004-01-30 CAMEL4 - 2004-03-05
0711 - A Rel-6 6.0.0 6.1.0 Correction to Tssf timer at Apply Charging NP-23 NP-040137 approved N2 N2-32 N2-040175 agreed 2004-01-30 CAMEL4 - 2004-03-12
0712 - F Rel-6 6.1.0 - Allowing Export_leg at DP Alerting and DP Answer - - - N2 N2-32 N2-040176 agreed 2004-04-22 CAMEL4 - 2004-05-28
0712 - A Rel-6 6.0.0 - Allowing Export_leg at DP Alerting and DP Answer NP-23 NP-040092 revised N2 N2-32 N2-040176 agreed 2004-01-30 CAMEL4 - 2004-03-05
0712 - A Rel-6 6.0.0 - Allowing Export_leg at DP Alerting and DP Answer NP-23 NP-040110 revised N2 N2-32 N2-040176 agreed 2004-01-30 CAMEL4 - 2004-03-05
0712 - A Rel-6 6.0.0 6.1.0 Allowing Export_leg at DP Alerting and DP Answer NP-23 NP-040137 approved N2 N2-32 N2-040176 agreed 2004-01-30 CAMEL4 - 2004-03-12
0713 - F Rel-5 5.7.0 - Correction to Tssf timer - - - N2 N2-32 N2-040183 revised 2004-04-22 CAMEL4 - 2004-05-28
0713 1 F Rel-5 5.7.0 - Correction to Tssf timer - - - N2 N2-32 N2-040210 revised 2004-04-22 CAMEL4 - 2004-05-28
0713 2 F Rel-5 5.7.0 5.8.0 Correction to Tssf timer NP-24 NP-040207 approved N2 N2-32 N2-040233 agreed 2004-04-22 CAMEL4 - 2004-05-28
0714 - F Rel-5 5.7.0 - Correction to Move Leg pre-condition - - - N2 N2-33 N2-040195 revised 2004-04-27 CAMEL4 - 2004-05-28
0714 1 F Rel-5 5.7.0 5.8.0 Correction to Move Leg pre-condition NP-24 NP-040207 approved N2 N2-33 N2-040214 agreed 2004-04-27 CAMEL4 - 2004-05-28
0715 - F Rel-5 5.7.0 - Correctiosn to USSD interworking - - - N2 N2-33 N2-040186 withdrawn 2004-04-27 CAMEL4 - 2004-05-28
0716 - B Rel-6 6.1.0 - Enhancement to Connect To Resource - - - N2 N2-33 N2-040191 revised 2004-04-27 CAMEL4 - 2004-05-28
0716 1 B Rel-6 6.1.0 - Enhancement to Connect To Resource - - - N2 N2-33 N2-040231 revised 2004-04-27 CAMEL4 - 2004-05-28
0716 2 B Rel-6 6.1.0 - Enhancement to Connect To Resource - - - N2 N2-33 N2-040245 revised 2004-04-27 CAMEL4 - 2004-05-28
0716 3 B Rel-6 6.1.0 - Enhancement to Connect To Resource NP-24 NP-040209 withdrawn N2 N2-33 N2-040248 agreed 2004-04-27 TEI6 - 2004-05-28
0716 3 B Rel-6 6.1.0 6.2.0 Enhancement to Connect To Resource NP-24 NP-040249 approved N2 N2-33 N2-040248 agreed 2004-04-27 TEI6 - 2004-05-28
0717 - F Rel-5 5.7.0 5.8.0 Correction to D-CSI suppression in Continue With Argument NP-24 NP-040207 approved N2 N2-33 N2-040196 agreed 2004-04-28 CAMEL4 - 2004-05-28
0718 - F Rel-5 5.7.0 - Correction to InitialDP IF for NP leg - - - N2 N2-33 N2-040197 revised 2004-04-28 CAMEL4 - 2004-05-28
0718 1 F Rel-5 5.7.0 - Correction to InitialDP IF for NP leg - - - N2 N2-33 N2-040217 agreed 2004-04-28 CAMEL4 - 2004-05-28
0718 2 F Rel-5 5.7.0 - Correction to InitialDP IF for NP leg - - - N2 N2-33 N2-040226 agreed 2004-04-28 CAMEL4 - 2004-05-28
0718 3 F Rel-5 5.7.0 5.8.0 Correction to InitialDP IF for NP leg NP-24 NP-040207 approved N2 N2-33 N2-040230 agreed 2004-04-28 CAMEL4 - 2004-05-28
0719 - F Rel-5 5.7.0 - Correction to Entity Released for individual call party - - - N2 N2-33 N2-040201 revised 2004-05-03 CAMEL4 - 2004-05-28
0719 1 F Rel-5 5.7.0 5.8.0 Correction to Entity Released for individual call party NP-24 NP-040207 approved N2 N2-33 N2-040218 agreed 2004-05-03 CAMEL4 - 2004-05-28
0720 - F Rel-5 5.7.0 - Correction to User Interaction before Answer - - - N2 N2-33 N2-040202 revised 2004-05-28 CAMEL4 - 2004-05-28
0720 1 F Rel-5 5.7.0 5.8.0 Correction to User Interaction before Answer NP-24 NP-040207 approved N2 N2-33 N2-040223 agreed 2004-05-28 CAMEL4 - 2004-05-28
0721 - A Rel-6 6.1.0 - Correction to Tssf timer - - - N2 N2-33 N2-040211 revised 2004-05-28 CAMEL4 - 2004-05-28
0721 1 A Rel-6 6.1.0 6.2.0 Correction to Tssf timer NP-24 NP-040207 approved N2 N2-33 N2-040234 agreed 2004-05-28 CAMEL4 - 2004-05-28
0722 - A Rel-6 6.1.0 6.2.0 Correction to D-CSI suppression in Continue With Argument NP-24 NP-040207 approved N2 N2-33 N2-040216 agreed 2004-05-28 CAMEL4 - 2004-05-28
0723 - F Rel-6 6.1.0 - Correction to CS_gsmSSF for call release NP-24 NP-040209 withdrawn N2 N2-33 N2-040207 agreed 2004-05-28 TEI6 - 2004-05-28
0723 - F Rel-6 6.1.0 6.2.0 Correction to CS_gsmSSF for call release NP-24 NP-040249 approved N2 N2-33 N2-040207 agreed 2004-05-28 TEI6 - 2004-05-28
0724 - F Rel-6 6.1.0 - Stopping charging timers after Cancel[All] NP-24 NP-040209 withdrawn N2 N2-33 N2-040209 agreed 2004-05-28 TEI6 - 2004-05-28
0724 - F Rel-6 6.1.0 6.2.0 Stopping charging timers after Cancel[All] NP-24 NP-040249 approved N2 N2-33 N2-040209 agreed 2004-05-28 TEI6 - 2004-05-28
0725 - A Rel-6 6.1.0 6.2.0 Correction to Move Leg pre-condition NP-24 NP-040207 approved N2 N2-33 N2-040235 agreed 2004-05-28 CAMEL4 - 2004-05-28
0726 - F Rel-6 6.1.0 6.2.0 Correction to InitialDP IF for NP leg NP-24 NP-040207 approved N2 N2-33 N2-040236 agreed 2004-05-28 CAMEL4 - 2004-05-28
0727 - F Rel-6 6.1.0 6.2.0 Correction to User Interaction before Answer NP-24 NP-040207 approved N2 N2-33 N2-040237 agreed 2004-05-28 CAMEL4 - 2004-05-28
0728 - A Rel-6 6.1.0 6.2.0 Correction to Entity Released for individual call party NP-24 NP-040207 approved N2 N2-33 N2-040242 agreed 2004-05-28 CAMEL4 - 2004-05-28
0729 - B Rel-6 6.2.0 - Support of User-to-User Information (UUI) in CAMEL InitialDP operation - - - N4 N4-24 N4-040927 revised 2004-07-26 TEI6 - 2004-09-03
0729 1 B Rel-6 6.2.0 - Support of User-to-User Information (UUI) in CAMEL InitialDP operation - - - N4 N4-24 N4-041173 revised 2004-07-26 TEI6 - 2004-09-03
0729 2 B Rel-6 6.2.0 6.3.0 Support of User-to-User Information (UUI) in CAMEL InitialDP operation NP-25 NP-040405 approved N4 N4-24 N4-041183 agreed 2004-07-26 TEI6 - 2004-09-03
0730 - D Rel-6 6.2.0 - Editorial correction - - - N4 N4-24 N4-040931 agreed 2004-07-27 TEI6 - 2004-09-03
0730 1 D Rel-6 6.2.0 6.3.0 Editorial correction NP-25 NP-040406 approved N4 N4-24 N4-041178 agreed 2004-07-27 TEI6 - 2004-09-03
0731 - F Rel-6 6.2.0 6.3.0 Correcting status in the procedure CAME_MT_CTR(sheet 4) NP-25 NP-040406 approved N4 N4-24 N4-040932 agreed 2004-07-27 TEI6 - 2004-09-03
0732 - F Rel-6 6.2.0 6.3.0 Redundantly modifying call parameter in CAMEL_MT_GMSC_Notify_CF NP-25 NP-040406 approved N4 N4-24 N4-040933 agreed 2004-07-27 TEI6 - 2004-09-03
0733 - F Rel-6 6.2.0 6.3.0 Correcting SDL of Process CS_gsmSSF(sheet 7) NP-25 NP-040406 approved N4 N4-24 N4-040934 agreed 2004-07-27 TEI6 - 2004-09-03
0735 - F Rel-6 6.2.0 - Appended a note in Process CAMEL_ICA_MSC - - - N4 N4-24 N4-040936 revised 2004-07-27 TEI6 - 2004-09-03
0735 1 F Rel-6 6.2.0 - Appended a note in Process CAMEL_ICA_MSC - - - N4 N4-24 N4-041179 revised 2004-07-27 TEI6 - 2004-09-03
0735 2 F Rel-6 6.2.0 6.3.0 Appended a note in Process CAMEL_ICA_MSC NP-25 NP-040406 approved N4 N4-24 N4-041186 agreed 2004-07-27 TEI6 - 2004-09-03
0737 - F Rel-6 6.2.0 6.3.0 Correction to CAP SCI for calls with multiple CAP dialogues NP-25 NP-040406 approved N4 N4-24 N4-041024 agreed 2004-08-04 TEI6 - 2004-09-03
0738 - F Rel-6 6.2.0 6.3.0 Correction to ICA_MSC1 and CAMEL_ICA_MSC2 NP-25 NP-040406 approved N4 N4-24 N4-041026 agreed 2004-08-04 TEI6 - 2004-09-03
0739 - F Rel-6 6.2.0 6.3.0 Removal of Int_O_Exception from CAMEL_OCH_MSC2 and CAMEL_MT_GMSC_DISC5 NP-25 NP-040406 approved N4 N4-24 N4-041027 agreed 2004-08-04 TEI6 - 2004-09-03
0740 - F Rel-6 6.2.0 6.3.0 Correction to CAMEL_Modify_CUG_Info NP-25 NP-040406 approved N4 N4-24 N4-041028 agreed 2004-08-04 TEI6 - 2004-09-03
0741 - F Rel-6 6.2.0 6.3.0 Correction to CAMEL_EXPORT_LEG_MSC procedure NP-25 NP-040406 approved N4 N4-24 N4-041030 agreed 2004-08-04 TEI6 - 2004-09-03
0743 - F Rel-6 6.2.0 6.3.0 Correction to CS_gsmSSF for EDS NP-25 NP-040406 approved N4 N4-24 N4-041032 agreed 2004-08-04 TEI6 - 2004-09-03
0744 - F Rel-6 6.2.0 6.3.0 Correction to CS_gsmSSF for Tcp expiry NP-25 NP-040406 approved N4 N4-24 N4-041033 agreed 2004-08-04 TEI6 - 2004-09-03
0745 - F Rel-6 6.2.0 6.3.0 Correction to Handle_Aprocedure for Tccd timer NP-25 NP-040406 approved N4 N4-24 N4-041034 agreed 2004-08-04 TEI6 - 2004-09-03
0747 - F Rel-6 6.2.0 6.3.0 Correction to any Time Interrogation NP-25 NP-040406 approved N4 N4-24 N4-041036 agreed 2004-08-04 TEI6 - 2004-09-03
0748 - F Rel-6 6.2.0 - Clarification on Outstanding Request Counter (ORC) handling at EDP-R or TDP-R resumption - - - N4 N4-24 N4-041067 revised 2004-08-05 TEI6 - 2004-09-03
0748 1 F Rel-6 6.2.0 - Clarification on Outstanding Request Counter (ORC) handling at EDP-R or TDP-R resumption - - - N4 N4-24 N4-041134 revised 2004-08-05 TEI6 - 2004-09-03
0748 2 F Rel-6 6.2.0 - Clarification on Outstanding Request Counter (ORC) handling at EDP-R or TDP-R resumption NP-25 NP-040406 postponed N4 N4-24 N4-041182 agreed 2004-08-05 TEI6 - 2004-09-03
0748 5 A Rel-6 6.3.0 6.4.0 Clarification on Outstanding Request Counter (ORC) handling at EDP-R or TDP-R resumption NP-26 NP-040525 approved N4 N4-24 N4-041635 agreed 2004-08-05 CAMEL4 - 2004-12-08
0749 2 F Rel-6 6.3.0 6.4.0 Correcting SDL of Process CS_gsmSSF (sheet 62) NP-26 NP-040544 approved N4 N4-25 N4-041631 agreed 2004-11-03 TEI6 - 2004-12-08
0752 - F Rel-6 6.3.0 6.4.0 Correction to Change of Position handling in gsmSSF NP-26 NP-040544 approved N4 N4-25 N4-041420 agreed 2004-11-03 TEI6 - 2004-12-08
0753 1 F Rel-6 6.3.0 6.4.0 Correction in Sheet 18 of Process CSA_gsmSSF NP-26 NP-040544 approved N4 N4-25 N4-041633 agreed 2004-11-03 TEI6 - 2004-12-08
0754 - F Rel-5 5.8.0 5.9.0 Clarification on Outstanding Request Counter (ORC) handling NP-26 NP-040525 approved N4 N4-25 N4-041423 agreed 2004-11-03 CAMEL4 - 2004-12-08
0757 1 F Rel-6 6.3.0 6.4.0 Warning Tone NP-26 NP-040544 approved N4 N4-25 N4-041632 agreed 2004-11-29 TEI6 - 2004-12-08
0762 1 F Rel-6 6.4.1 6.5.0 693 not implemented NP-27 NP-050051 approved N4 N4-26 N4-050361 AGREED 2005-03-04 TEI6 - 2005-03-08
0763 1 F Rel-6 6.5.0 6.6.0 DP T_No_Answer CP-28 CP-050097 APPROVED C4 C4-27 C4-050787 AGREED 2005-04-26 TEI6 - 2005-06-07
0764 1 B Rel-7 6.5.0 7.0.0 CAMEL procedures for trunk originated services CP-28 CP-050103 APPROVED C4 C4-27 C4-050782 AGREED 2005-04-25 CAMELR7 - 2005-06-07
0765 - F Rel-6 6.5.0 6.6.0 Correction toConditional triggering for SCUDIF calls CP-28 CP-050097 APPROVED C4 C4-27 C4-050614 AGREED 2005-04-13 TEI6 - 2005-06-07
0766 1 F Rel-5 5.9.0 5.10.0 Correction to CAMEL_MO_Dialled_Services CP-28 CP-050083 APPROVED C4 C4-27 C4-050790 AGREED 2005-04-26 TEI6 - 2005-06-07
0767 1 A Rel-6 6.5.0 6.6.0 Correction to CAMEL_MO_Dialled_Services CP-28 CP-050083 APPROVED C4 C4-27 C4-050791 AGREED 2005-04-26 TEI6 - 2005-06-07
0769 - F Rel-6 6.5.0 6.6.0 Correction to Outstanding Request Counter setting at IDP CP-28 CP-050097 APPROVED C4 C4-27 C4-050620 AGREED 2005-04-13 TEI6 - 2005-06-07
0770 1 B Rel-7 6.5.0 7.0.0 Trunk Originated CAMEL triggering - SDLs CP-28 CP-050103 APPROVED C4 C4-27 C4-050786 AGREED 2005-04-25 CAMELR7 - 2005-06-07
0771 1 F Rel-5 5.9.0 5.10.0 correction to No_Answer handling in CAMEL_ICA_MSC2 CP-28 CP-050083 APPROVED C4 C4-27 C4-050792 AGREED 2005-04-26 TEI5 - 2005-06-07
0772 - A Rel-6 6.5.0 6.6.0 correction to No_Answer handling in CAMEL_ICA_MSC2 CP-28 CP-050083 APPROVED C4 C4-27 C4-050700 AGREED 2005-04-14 TEI5 - 2005-06-07
0773 1 F Rel-5 5.9.0 5.10.0 correction to CAMEL_ICA_MSC1 and CAMEL_ICA_MSC2 for gsmSSF process checking CP-28 CP-050083 APPROVED C4 C4-27 C4-050793 AGREED 2005-04-26 TEI5 - 2005-06-07
0774 - A Rel-6 6.5.0 6.6.0 correction to CAMEL_ICA_MSC1 and CAMEL_ICA_MSC2 for gsmSSF process checking CP-28 CP-050083 APPROVED C4 C4-27 C4-050702 AGREED 2005-04-14 TEI5 - 2005-06-07
0775 1 F Rel-5 5.9.0 5.10.0 correction to EDP-N handling for ICA legs in Process CS_gsmSSF CP-28 CP-050083 APPROVED C4 C4-27 C4-050794 AGREED 2005-04-26 TEI5 - 2005-06-07
0776 - A Rel-6 6.5.0 6.6.0 correction to EDP-N handling for ICA legs in Process CS_gsmSSF CP-28 CP-050083 APPROVED C4 C4-27 C4-050704 AGREED 2005-04-14 TEI5 - 2005-06-07
0780 4 F Rel-6 6.5.0 6.6.0 No Reply timer clarification CP-28 CP-050097 APPROVED C4 C4-27 C4-050901 AGREED 2005-04-29 TEI6 - 2005-06-07
0781 1 F Rel-7 7.0.0 7.1.0 Trunk Originated CAMEL triggering - SDLs (re-introduce CR770) CP-29 CP-050312 approved C4 C4-28 C4-050951 AGREED 2005-08-09 CAMEL7 - 2005-09-14
0784 2 B Rel-7 7.0.0 7.1.0 Additions and clarifications for CAMEL trunk originated services CP-29 CP-050312 approved C4 C4-28 C4-051359 AGREED 2005-09-02 CAMEL7 - 2005-09-14
0786 - F Rel-6 6.6.0 6.7.0 Adding a missing reference CP-29 CP-050309 approved C4 C4-28 C4-051116 AGREED 2005-08-17 TEI6 - 2005-09-14
0787 - A Rel-7 7.0.0 7.1.0 Adding a missing reference CP-29 CP-050309 approved C4 C4-28 C4-051117 AGREED 2005-08-17 TEI6 - 2005-09-14
0788 - F Rel-6 6.6.0 6.7.0 Correction on Outstanding Request Counter handling CP-29 CP-050309 approved C4 C4-28 C4-051122 AGREED 2005-08-17 TEI6 - 2005-09-14
0789 - A Rel-7 7.0.0 7.1.0 Correction on Outstanding Request Counter handling CP-29 CP-050309 approved C4 C4-28 C4-051123 AGREED 2005-08-17 TEI6 - 2005-09-14
0790 - F Rel-6 6.6.0 6.7.0 Correction on T_Disconnect handling CP-29 CP-050309 approved C4 C4-28 C4-051124 AGREED 2005-08-17 TEI6 - 2005-09-14
0791 - A Rel-7 7.0.0 7.1.0 Correction on T_Disconnect handling CP-29 CP-050309 approved C4 C4-28 C4-051125 AGREED 2005-08-17 TEI6 - 2005-09-14
0792 2 F Rel-7 7.1.0 7.2.0 Trunk Originated CAMEL triggering - DTMF and CollectInfo parameters in SDL CP-30 CP-050626 approved C4 C4-29 C4-051723 AGREED 2005-11-03 CAMELR7 - 2005-11-29
0793 1 F Rel-7 7.1.0 7.2.0 Modification Procedure CAMEL_OCH_LEG1_MSC 11(13) CP-30 CP-050626 approved C4 C4-29 C4-051725 AGREED 2005-11-03 CAMELR7 - 2005-11-29
0794 - F Rel-7 7.2.0 7.3.0 Specification of gsmSCF Address format in AnyTime request messages CP-31 CP-060082 approved C4 C4-060129 C4-30 AGREED 2006-01-30 TEI7 - 2006-03-02
0796 - C Rel-7 7.3.0 - Addition of information related to service change - - - C4 C4-31 C4-060509 Revised 2006-05-24 SCUDIF - 2006-05-31
0796 1 A Rel-7 7.3.0 7.4.0 Addition of information related to service change CP-32 CP-060311 approved C4 C4-31 C4-060694 Agreed 2006-05-24 SCUDIF - 2006-05-31
0797 - F Rel-7 7.3.0 - MSISDN List - - - C4 C4-31 C4-060577 Revised 2006-05-24 TEI7 - 2006-05-31
0797 1 F Rel-7 7.3.0 - MSISDN List - - - C4 C4-31 C4-060697 Revised 2006-05-24 TEI7 - 2006-05-31
0797 2 C Rel-7 7.3.0 7.4.0 MSISDN List CP-32 CP-060336 approved C4 C4-31 C4-060814 Agreed 2006-05-24 TEI7 - 2006-05-31
0798 - A Rel-7 7.3.0 - Correction of Process CS_gsmSSF(sheet 36) - - - C4 C4-31 C4-060626 Revised 2006-05-24 TEI7 - 2006-05-31
0798 1 A Rel-7 7.3.0 7.4.0 Correction of Process CS_gsmSSF CP-32 CP-060300 approved C4 C4-31 C4-060701 Agreed 2006-05-24 TEI5 - 2006-05-31
0799 - F Rel-7 7.3.0 - Correction of Process CS_gsmSSF(sheet 43) - - - C4 C4-31 C4-060627 Withdrawn 2006-05-24 TEI7 - 2006-05-31
0800 - F Rel-7 7.3.0 - Correction of Process CS_gsmSSF(sheet 47 and sheet 48) - - - C4 C4-31 C4-060628 Withdrawn 2006-05-24 TEI7 - 2006-05-31
0801 - F Rel-7 7.3.0 - Correction of Process CS_gsmSSF(sheet 53) - - - C4 C4-31 C4-060629 Withdrawn 2006-05-24 TEI7 - 2006-05-31
0802 - F Rel-6 6.7.0 6.8.0 Addition of information related to service change CP-32 CP-060311 approved C4 C4-31 C4-060693 Agreed 2006-05-24 SCUDIF - 2006-05-31
0803 - F Rel-5 5.10.0 5.11.0 Correction of Process CS_gsmSSF CP-32 CP-060300 approved C4 C4-31 C4-060699 Agreed 2006-05-24 TEI5 - 2006-05-31
0804 - A Rel-6 6.7.0 6.8.0 Correction of Process CS_gsmSSF CP-32 CP-060300 approved C4 C4-31 C4-060700 Agreed 2006-05-24 TEI5 - 2006-05-31
0805 - F Rel-7 7.4.0 - Optional CUG and CCBS suppression parameters in SRI - - - C4 C4-32 C4-061191 Withdrawn 2006-09-21 TEI7 - 2006-09-21
0806 - F Rel-7 7.4.0 - Response to ATI for GPRS information when PSI not supported in the SGSN - - - C4 C4-32 C4-061225 Revised 2006-09-21 TEI7 - 2006-09-21
0806 1 F Rel-7 7.4.0 7.5.0 Response to ATI for GPRS information when PSI not supported in the SGSN CP-33 CP-060414 approved C4 C4-32 C4-061319 Agreed 2006-09-21 TEI7 - 2006-09-21
0807 - F Rel-7 7.4.0 7.5.0 SGSN number to be included in the ATI response CP-33 CP-060414 approved C4 C4-32 C4-061226 Agreed 2006-09-21 TEI7 - 2006-09-21
0808 - F Rel-6 6.8.0 6.9.0 Correction to figure 4.99 sheet 43 CP-34 CP-060558 approved C4 C4-33 C4-061628 Agreed 2006-11-24 TEI6 Repairs a mysteriously introduced error, no audit trail. 2006-11-27
0809 - C Rel-7 7.5.0 - Optional Suppress All parameter in SRI - - - C4 C4-33 C4-061662 Withdrawn 2006-11-24 TEI7 - 2006-11-27
0810 - C Rel-7 7.5.0 - Optional Suppress Terminating Services Bit String in SRI - - - C4 C4-33 C4-061665 Revised 2006-11-24 TEI7 - 2006-11-27
0810 1 B Rel-7 7.5.0 7.6.0 Optional Suppress Terminating Services Bit String in SRI CP-34 CP-060695 approved C4 C4-33 C4-061904 Agreed 2006-11-24 TEI7 - 2006-11-27
0811 - F Rel-6 6.8.0 - Re-instate correct SDL for figure 4.99-43 - - - C4 C4-33 C4-061675 Withdrawn 2006-11-24 TEI6 - 2006-11-27
0812 - F Rel-7 7.6.0 - MT to MS moving to another MSC - - - C4 C4-34 C4-070105 Revised 2007-03-05 TEI7 - 2007-03-07
0812 1 F Rel-7 7.6.0 - MT to MS moving to another MSC - - - C4 C4-34 C4-070214 Revised 2007-03-05 TEI7 - 2007-03-07
0812 2 F Rel-7 7.6.0 - MT to MS moving to another MSC - - - C4 C4-34 C4-070332 Postponed 2007-03-05 TEI7 - 2007-03-07
0813 - F Rel-7 7.6.0 - Addition of SMS over IP functionality - - - C4 C4-34 C4-070134 Revised 2007-03-05 SMSIP - 2007-03-07
0813 1 F Rel-7 7.6.0 7.7.0 Addition of SMS over IP functionality CP-35 CP-070030 approved C4 C4-34 C4-070231 Agreed 2007-03-05 SMSIP - 2007-03-07
0814 - F Rel-7 7.6.0 - AC/AHandling - - - C4 C4-34 C4-070138 Withdrawn 2007-03-05 TEI - 2007-03-07
0814 1 F Rel-7 7.7.0 - AC/AHandling - - - Nokia Siemens Networks C4-35 C4-070622 Revised 2007-05-22 TEI7 - 2007-05-24
0814 2 F Rel-7 7.7.0 - AC/AHandling - - - Nokia Siemens Networks C4-35 C4-070810 Revised 2007-05-22 TEI7 - 2007-05-24
0814 3 F Rel-7 7.7.0 - AC/AHandling - - - Nokia Siemens Networks C4-35 C4-070863 Withdrawn 2007-05-22 TEI7 - 2007-05-24
0814 3 F Rel-7 7.8.0 - AC/AHandling - - - - C4-36 C4-071049 Revised 2007-09-07 TEI7 - 2007-09-07
0814 4 F Rel-7 7.8.0 7.9.0 AC/AHandling CP-37 CP-070540 approved C4 C4-36 C4-071270 Agreed 2007-09-07 TEI7 - 2007-09-07
0815 - B Rel-7 7.7.0 7.8.0 Mobile Termination whilst the MS is moving to another MSC CP-36 CP-070328 approved Alcatel-Lucent C4-34b C4-070390 Agreed 2007-05-22 MTmovMS - 2007-05-24
0816 - F Rel-7 7.7.0 - Correction of IP-SM-GW update in the HSS - - - Ericsson C4-34b C4-070429 Revised 2007-05-22 SMSIP - 2007-05-24
0816 1 F Rel-7 7.7.0 7.8.0 Correction of IP-SM-GW update in the HSS CP-36 CP-070326 approved Ericsson C4-34b C4-070476 Agreed 2007-05-22 SMSIP - 2007-05-24
0818 - F R99 3.19.0 - Adding a Information Element to Continue Camel Handling Information Flow - - - ZTE C4-35 C4-070650 Rejected 2007-05-22 Camel - 2007-05-24
0819 - A Rel-4 4.11.1 - Adding a Information Element to Continue Camel Handling Information Flow - - - ZTE C4-35 C4-070651 Rejected 2007-05-22 Camel - 2007-05-24
0820 - A Rel-5 5.11.0 - Adding a Information Element to Continue Camel Handling Information Flow - - - ZTE C4-35 C4-070652 Rejected 2007-05-22 Camel - 2007-05-24
0821 - A Rel-6 6.9.0 - Adding a Information Element to Continue Camel Handling Information Flow - - - ZTE C4-35 C4-070653 Rejected 2007-05-22 Camel - 2007-05-24
0822 - A Rel-7 7.7.0 - Adding a Information Element to Continue Camel Handling Information Flow - - - ZTE C4-35 C4-070654 Revised 2007-05-22 Camel - 2007-05-24
0822 1 A Rel-7 7.7.0 - Adding a Information Element to Continue Camel Handling Information Flow - - - ZTE C4-35 C4-070814 Revised 2007-05-22 Camel - 2007-05-24
0822 2 F Rel-7 7.7.0 7.8.0 Adding a Information Element to Continue Camel Handling Information Flow CP-36 CP-070325 approved ZTE C4-35 C4-070900 Agreed 2007-05-22 TEI7 - 2007-05-24
0823 - F Rel-7 7.7.0 7.8.0 Mutually exclusive elements in Location Information in MSC for Initial DP SMS CP-36 CP-070325 approved Ericsson C4-35 C4-070693 Agreed 2007-05-22 TEI7 - 2007-05-24
0824 - F Rel-7 7.7.0 - Correction to DTMF detection in alerting phase - - - Ericsson C4-35 C4-070695 Revised 2007-05-22 TEI7 - 2007-05-24
0824 1 F Rel-7 7.7.0 7.8.0 Correction to DTMF detection in alerting phase CP-36 CP-070325 approved Ericsson C4-35 C4-070813 Agreed 2007-05-22 TEI7 - 2007-05-24
0825 - F Rel-7 7.7.0 - Corrections to Location Information definitions - - - Nortel Networks C4-35 C4-070714 Withdrawn 2007-05-22 TEI7 - 2007-05-24
0826 - F Rel-7 7.8.0 7.9.0 Correction to the Send Info for Incoming Call ack Information Flow CP-37 CP-070540 approved C4 C4-36 C4-071075 Agreed 2007-09-07 TEI7 - 2007-09-07
0827 - F Rel-9 - - Correction to ATSI and ATM for missing SS codes - - - C4 C4-45 C4-092147 Withdrawn 2009-09-08 TEI9 - 2009-09-08
0828 - F Rel-5 5.11.0 - Correction on Aand Warning Tone Play Handling of Leg 1 when successful move of a leg - - - C4 C4-45 C4-092344 Revised 2009-09-08 TEI5 - 2009-09-08
0828 1 F Rel-5 5.11.0 - Correction on Aand Warning Tone Play Handling of Leg 1 when successful move of a leg - - - C4 C4-45 C4-092570 Revised 2009-09-08 TEI5 - 2009-09-08
0828 2 F Rel-5 5.11.0 5.12.0 Correction on Aand Warning Tone Play Handling of Leg 1 when successful move of a leg CP-45 CP-090524 approved C4 C4-45 C4-092585 Agreed 2009-09-08 TEI5 - 2009-09-08
0829 - A Rel-6 6.9.0 - Correction on Aand Warning Tone Play Handling of Leg 1 when successful move of a leg - - - C4 C4-45 C4-092345 Revised 2009-09-08 TEI6 - 2009-09-08
0829 1 A Rel-6 6.9.0 - Correction on Aand Warning Tone Play Handling of Leg 1 when successful move of a leg - - - C4 C4-45 C4-092571 Revised 2009-09-08 TEI6 - 2009-09-08
0829 2 A Rel-6 6.9.0 6.10.0 Correction on Aand Warning Tone Play Handling of Leg 1 when successful move of a leg CP-45 CP-090524 approved C4 C4-45 C4-092586 Agreed 2009-09-08 TEI5 - 2009-09-08
0830 - A Rel-7 7.9.0 - Correction on Aand Warning Tone Play Handling of Leg 1 when successful move of a leg - - - C4 C4-45 C4-092346 Revised 2009-09-08 TEI7 - 2009-09-08
0830 1 A Rel-7 7.9.0 - Correction on Aand Warning Tone Play Handling of Leg 1 when successful move of a leg - - - C4 C4-45 C4-092572 Revised 2009-09-08 TEI7 - 2009-09-08
0830 2 A Rel-7 7.9.0 7.10.0 Correction on Aand Warning Tone Play Handling of Leg 1 when successful move of a leg CP-45 CP-090524 approved C4 C4-45 C4-092587 Agreed 2009-09-08 TEI5 - 2009-09-08
0831 - A Rel-8 8.0.0 - Correction on Aand Warning Tone Play Handling of Leg 1 when successful move of a leg - - - C4 C4-45 C4-092347 Revised 2009-09-08 TEI8 - 2009-09-08
0831 1 A Rel-8 8.0.0 - Correction on Aand Warning Tone Play Handling of Leg 1 when successful move of a leg - - - C4 C4-45 C4-092573 Revised 2009-09-08 TEI8 - 2009-09-08
0831 2 A Rel-8 8.0.0 8.1.0 Correction on Aand Warning Tone Play Handling of Leg 1 when successful move of a leg CP-45 CP-090524 approved C4 C4-45 C4-092588 Agreed 2009-09-08 TEI5 - 2009-09-08
0832 - F Rel-9 9.0.0 - User CSG Information for CAMEL - - - C4 C4-48 C4-100541 Revised 2010-03-10 TEI9 - 2010-03-10
0832 1 F Rel-9 9.0.0 9.1.0 User CSG Information for CAMEL CP-47 CP-100029 approved C4 C4-48 C4-101001 Agreed 2010-03-10 TEI9 - 2010-03-10
0833 - F Rel-8 8.1.0 - User CSG Information for CAMEL - - - C4 C4-48 C4-100569 Revised 2010-03-10 TEI8 - 2010-03-10
0833 1 F Rel-8 8.1.0 8.2.0 User CSG Information for CAMEL CP-47 CP-100029 approved C4 C4-48 C4-100718 Agreed 2010-03-10 TEI8 - 2010-03-10
0834 - F Rel-8 8.2.0 8.3.0 Correction for SMS via SGs charging CP-49 CP-100449 approved C4 C4-50 C4-101956 Agreed 2010-09-15 TEI8 - 2010-09-15
0835 - A Rel-9 9.1.0 - Correction for SMS via SGs charging - - - C4 C4-50 C4-101957 Revised 2010-09-15 TEI8 - 2010-09-15
0835 1 A Rel-9 9.1.0 9.2.0 Correction for SMS via SGs charging CP-49 CP-100449 approved C4 C4-50 C4-102268 Agreed 2010-09-15 TEI8 - 2010-09-15
0836 - F Rel-10 - - Correction to ATSI and ATM for missing SS codes - - - C4 C4-50 C4-101958 Revised 2010-09-15 TEI10 - 2010-09-15
0836 1 F Rel-10 - - Correction to ATSI and ATM for missing SS codes - - - C4 C4-50 C4-102241 Revised 2010-09-15 TEI10 - 2010-09-15
0836 2 C Rel-10 9.1.0 10.0.0 Addition of SS codes to the ATSI and ATM procedures CP-49 CP-100467 approved C4 C4-50 C4-102266 Agreed 2010-09-15 TEI10 - 2010-09-15
0837 - B Rel-11 .. - Extension parameter for Release Call - - - C4 C4-54 C4-111863 Revised 2011-09-02 TEI11 - 2011-09-15
0837 1 B Rel-11 10.0.0 - Extension parameter for Release Call CP-53 CP-110582 revised C4 C4-54 C4-112170 Agreed 2011-09-02 TEI11 - 2011-09-15
0837 2 B Rel-11 10.0.0 11.0.0 Extension parameter for Release Call CP-53 CP-110732 approved Nokia Siemens Networks - - - 2011-09-15 TEI11 - 2011-09-15
0838 - F Rel-8 8.3.0 - Provide Subscriber Information handling for UE under LTE - - - C4 C4-55 C4-112581 Revised 2011-11-28 SAES - 2011-11-28
0838 1 F Rel-8 8.3.0 8.4.0 Provide Subscriber Information handling for UE under LTE CP-54 CP-110780 approved C4 C4-55 C4-112923 Agreed 2011-11-28 SAES - 2011-11-28
0839 - A Rel-9 9.2.0 - Provide Subscriber Information handling for UE under LTE - - - C4 C4-55 C4-112582 Revised 2011-11-28 SAES - 2011-11-28
0839 1 A Rel-9 9.2.0 9.3.0 Provide Subscriber Information handling for UE under LTE CP-54 CP-110780 approved C4 C4-55 C4-112924 Agreed 2011-11-28 SAES - 2011-11-28
0840 - A Rel-10 10.0.0 - Provide Subscriber Information handling for UE under LTE - - - C4 C4-55 C4-112583 Revised 2011-11-28 SAES - 2011-11-28
0840 1 A Rel-10 10.0.0 10.1.0 Provide Subscriber Information handling for UE under LTE CP-54 CP-110780 approved C4 C4-55 C4-112925 Agreed 2011-11-28 SAES - 2011-11-28
0841 - A Rel-11 11.0.0 - Provide Subscriber Information handling for UE under LTE - - - C4 C4-55 C4-112584 Revised 2011-11-28 SAES - 2011-11-28
0841 1 A Rel-11 11.0.0 11.1.0 Provide Subscriber Information handling for UE under LTE CP-54 CP-110780 approved C4 C4-55 C4-112926 Agreed 2011-11-28 SAES - 2011-11-28
0842 - F Rel-11 11.1.0 - EPS Location in IDP - - - C4 C4-56 C4-120308 Revised 2012-02-20 TEI11 - 2012-02-20
0842 1 F Rel-11 11.1.0 - EPS Location in IDP - - - C4 C4-56 C4-120353 Revised 2012-02-20 TEI11 - 2012-02-20
0842 2 F Rel-11 11.1.0 11.2.0 EPS Location in IDP CP-55 CP-120038 approved C4 C4-56 C4-120397 Agreed 2012-02-20 TEI11 - 2012-02-20
0843 - F Rel-11 11.2.0 11.3.0 EPS location in Initial DP CP-56 CP-120244 approved C4 C4-56b C4-120730 Agreed 2012-06-04 TEI11 - 2012-06-04
0844 - F Rel-11 11.2.0 11.3.0 EPS location in MAP Note MM Event CP-56 CP-120244 approved C4 C4-56b C4-120731 Agreed 2012-06-04 TEI11 - 2012-06-04
0845 - F Rel-12 11.3.0 12.0.0 Clarification of allowed values for SS-status in Any Time Modification procedure CP-61 CP-130468 approved C4 C4-62 C4-131281 Agreed 2013-08-29 TEI12 - 2013-08-29

page generated from database: 2013-10-16 10:33:18