0001 - F Rel-6 6.0.0 - Clarifications on charging action - - - - S2-39 S2-041268 Revised 2004-08-06 CH - 2004-06-01
0002 - B Rel-6 6.0.0 - Introduction of charging rule identifier - - - - S2-39 S2-041269 Revised 2004-08-06 CH - 2004-06-01
0002 1 B Rel-6 6.0.0 6.1.0 Introduction of charging rule identifier SP-24 SP-040314 approved S2 S2-39 S2-041454 Agreed 2004-08-06 CH - 2004-06-01
0003 - B Rel-6 6.0.0 - Introdution of modify and add charging actions - - - - S2-39 S2-041270 Revised 2004-08-06 CH - 2004-06-01
0003 1 B Rel-6 6.0.0 - Introdution of modify and add charging actions - - - - S2-39 S2-041461 Revised 2004-08-06 CH - 2004-06-01
0003 2 B Rel-6 6.0.0 - Introdution of modify and add charging actions SP-24 SP-040314 withdrawn S2 S2-39 S2-041664 Agreed 2004-08-06 CH - 2004-06-01
0004 - B Rel-6 6.0.0 - some use cases to the Flow Based Charging - - - - S2-39 S2-041271 Revised 2004-08-06 CH - 2004-06-01
0004 1 B Rel-6 6.0.0 6.1.0 Add some use cases to the Flow Based Charging SP-24 SP-040314 approved S2 S2-39 S2-041456 Agreed 2004-08-06 CH - 2004-06-01
0005 - C Rel-6 6.0.0 - AF Identification - - - - S2-39 S2-041272 Rejected 2004-08-06 CH - 2004-06-01
0006 - B Rel-6 6.0.0 - Time based charging tariffs - - - - S2-39 S2-041276 Revised 2004-08-06 CH - 2004-06-01
0006 1 B Rel-6 6.0.0 - Time based charging tariffs - - - - S2-39 S2-041594 Revised 2004-08-06 CH - 2004-06-01
0006 2 B Rel-6 6.0.0 6.1.0 Time based charging tariffs SP-24 SP-040314 approved S2 S2-39 S2-041684 Agreed 2004-08-06 CH - 2004-06-01
0007 - C Rel-6 6.0.0 - Specify trigers for re-rating and charging rule modification - - - - S2-39 S2-041277 Withdrawn 2004-08-06 CH - 2004-06-01
0008 - B Rel-6 6.0.0 - FBC and IMS - - - - S2-39 S2-041278 Revised 2004-08-06 CH - 2004-06-01
0008 1 B Rel-6 6.0.0 - FBC and IMS - - - - S2-39 S2-041595 Revised 2004-08-06 CH - 2004-06-01
0008 2 B Rel-6 6.0.0 6.1.0 FBC and IMS SP-24 SP-040314 approved S2 S2-39 S2-041685 Agreed 2004-08-06 CH - 2004-06-01
0009 - F Rel-6 6.0.0 6.1.0 RAT Type as possible re-authorisation trigger SP-24 SP-040314 approved S2 S2-39 S2-041279 Agreed 2004-08-06 CH - 2004-06-01
0010 - F Rel-6 6.0.0 - Gx reference point clarification - - - - S2-39 S2-041280 Rejected 2004-08-06 CH - 2004-06-01
0011 - F Rel-6 6.0.0 - Ro reference removal - - - - S2-39 S2-041281 Revised 2004-08-06 CH - 2004-06-01
0011 1 F Rel-6 6.0.0 6.1.0 Ro reference removal SP-24 SP-040314 approved S2 S2-39 S2-041592 Agreed 2004-08-06 CH - 2004-06-01
0012 - F Rel-6 6.0.0 - Bearer establishment, charging rules availability and credit control - - - - S2-39 S2-041282 Revised 2004-08-06 CH - 2004-06-01
0012 1 F Rel-6 6.0.0 - Bearer establishment, charging rules availability and credit control - - - - S2-39 S2-041593 Revised 2004-08-06 CH - 2004-06-01
0012 2 F Rel-6 6.0.0 - Bearer establishment, charging rules availability and credit control SP-24 SP-040314 withdrawn S2 S2-39 S2-041686 Agreed 2004-08-06 CH - 2004-06-01
0013 - F Rel-6 6.0.0 - Traffic flow at TPF - - - - S2-39 S2-041283 Revised 2004-08-06 CH - 2004-06-01
0013 1 F Rel-6 6.0.0 - Traffic flow at TPF - - - - S2-39 S2-041459 Revised 2004-08-06 CH - 2004-06-01
0013 2 C Rel-6 6.0.0 6.1.0 Traffic flow at TPF SP-24 SP-040314 approved S2 S2-39 S2-041663 Agreed 2004-08-06 CH - 2004-06-01
0014 - C Rel-6 6.0.0 - Bearer modification triggers - - - - S2-39 S2-041284 Revised 2004-08-06 CH - 2004-06-01
0014 1 C Rel-6 6.0.0 - Bearer modification triggers - - - - S2-39 S2-041458 Revised 2004-08-06 CH - 2004-06-01
0014 2 C Rel-6 6.0.0 - Bearer modification triggers SP-24 SP-040314 withdrawn S2 S2-39 S2-041662 Agreed 2004-08-06 CH - 2004-06-01
0015 - F Rel-6 6.0.0 - Bearer modification information to the AF - - - - S2-39 S2-041285 Rejected 2004-08-06 CH - 2004-06-01
0016 - F Rel-6 6.0.0 - Time and volume allocation in online charging - - - - S2-39 S2-041286 Revised 2004-08-06 CH - 2004-06-01
0016 1 F Rel-6 6.0.0 6.1.0 Time and volume allocation in online charging SP-24 SP-040314 approved S2 S2-39 S2-041457 Agreed 2004-08-06 CH - 2004-06-01
0017 - - Rel-6 6.0.0 - Correlation of information at the Charging Rules Function - - - - S2-39 S2-041288 Rejected 2004-08-06 CH - 2004-06-01
0018 - F Rel-6 6.0.0 6.1.0 General Corrections SP-24 SP-040314 approved S2 S2-39 S2-041289 Agreed 2004-08-06 CH - 2004-06-01
0019 - F Rel-6 6.0.0 6.1.0 Gx connection maintenance SP-24 SP-040314 approved S2 S2-39 S2-041290 Agreed 2004-08-06 CH - 2004-06-01
0020 - F Rel-6 6.0.0 6.1.0 Rx connection maintenance SP-24 SP-040314 approved S2 S2-39 S2-041291 Agreed 2004-08-06 CH - 2004-06-01
0021 - C Rel-6 6.0.0 - FBC online charging - - - - S2-39 S2-041292 Revised 2004-08-06 CH - 2004-06-01
0021 1 C Rel-6 6.0.0 - FBC online charging - - - - S2-39 S2-041455 Revised 2004-08-06 CH - 2004-06-01
0021 2 C Rel-6 6.0.0 6.1.0 FBC online charging SP-24 SP-040314 approved S2 S2-39 S2-041661 Agreed 2004-08-06 CH - 2004-06-01
0022 - C Rel-6 6.0.0 - Charging Key - - - - S2-39 S2-041294 Rejected 2004-08-06 CH - 2004-06-01
0023 - C Rel-6 6.0.0 - Include the option to re-use TPF in the GGSN for WLAN access - - - - S2-39 S2-041295 Rejected 2004-08-06 CH - 2004-06-01
0024 - B Rel-6 6.0.0 - Message flow for input to provision of charging rules in Ry interface. - - - - S2-39 S2-041606 Revised 2004-08-06 CH - 2004-06-01
0024 1 B Rel-6 6.0.0 6.1.0 Message flow for input to provision of charging rules in Ry interface SP-24 SP-040314 approved S2 S2-39 S2-041610 Agreed 2004-08-06 CH - 2004-06-01
0025 - F Rel-6 6.0.0 - Correction to the termination action - - - - S2-40 S2-041924 Revised 2004-08-06 CH - 2004-06-01
0025 1 F Rel-6 6.0.0 - Correction to the Termination Action - - - - S2-40 S2-041952 Revised 2004-08-06 CH - 2004-06-01
0025 2 F Rel-6 6.0.0 6.1.0 Correction to the Termination Action SP-24 SP-040314 approved S2 S2-40 S2-042245 Agreed 2004-08-06 CH - 2004-06-01
0026 - B Rel-6 6.0.0 - Add alerting action in FBC - - - - S2-40 S2-041925 Revised 2004-08-06 CH - 2004-06-01
0026 1 B Rel-6 6.0.0 - Add alerting action in FBC - - - - S2-40 S2-042242 Rejected 2004-08-06 CH - 2004-06-01
0027 - F Rel-6 6.0.0 - Chlarification to the the charging rule - - - - S2-40 S2-041926 Revised 2004-08-06 CH - 2004-06-01
0027 1 F Rel-6 6.0.0 6.1.0 Clarification to the charging rule SP-24 SP-040314 approved S2 S2-40 S2-041953 Agreed 2004-08-06 CH - 2004-06-01
0028 - B Rel-6 6.0.0 - Information to support charging rule selection. - - - - S2-40 S2-041927 Revised 2004-08-06 CH - 2004-06-01
0028 1 B Rel-6 6.0.0 6.1.0 Information to support charging rule selection SP-24 SP-040314 approved S2 S2-40 S2-041954 Agreed 2004-08-06 CH - 2004-06-01
0029 - F Rel-6 6.0.0 - An Optimization for Rx and Gx functions and SBLP usage in IMS Charging - - - - S2-40 S2-041928 Rejected 2004-08-06 CH - 2004-06-01
0030 - F Rel-6 6.0.0 - Add a definition of TPF/CRF instance - - - - S2-40 S2-041929 Rejected 2004-08-06 CH - 2004-06-01
0031 - B Rel-6 6.0.0 - Add OCS address to charging rule - - - - S2-40 S2-041930 Rejected 2004-08-06 CH - 2004-06-01
0032 - B Rel-6 6.0.0 - Add Service Info to charging rule - - - - S2-40 S2-041931 Revised 2004-08-06 CH - 2004-06-01
0032 1 B Rel-6 6.0.0 - Add information of service to charging rule - - - - S2-40 S2-042256 Rejected 2004-08-06 CH - 2004-06-01
0033 - C Rel-6 6.0.0 - Re-authorization in case of charging rule change - - - - S2-40 S2-041932 Revised 2004-08-06 CH - 2004-06-01
0033 1 C Rel-6 6.0.0 6.1.0 Re-authorization in case of charging rule change SP-24 SP-040314 approved S2 S2-40 S2-042255 Agreed 2004-08-06 CH - 2004-06-01
0034 - C Rel-6 6.0.0 - Some clarifications on credit management - - - - S2-40 S2-041933 Rejected 2004-08-06 CH - 2004-06-01
0035 - F Rel-6 6.0.0 - Applying charging rules input from AF - - - - S2-40 S2-041934 Revised 2004-08-06 CH - 2004-06-01
0035 1 F Rel-6 6.0.0 6.1.0 Applying charging rules input from AF SP-24 SP-040314 approved S2 S2-40 S2-041947 Agreed 2004-08-06 CH - 2004-06-01
0036 - C Rel-6 6.0.0 - Set of charging rules - - - - S2-40 S2-041935 Revised 2004-08-06 CH - 2004-06-01
0036 1 C Rel-6 6.0.0 6.1.0 Set of charging rules SP-24 SP-040314 approved S2 S2-40 S2-041948 Agreed 2004-08-06 CH - 2004-06-01
0037 - B Rel-6 6.0.0 - Policy functions provided by FBC - - - - S2-40 S2-041936 Revised 2004-08-06 CH - 2004-06-01
0037 1 B Rel-6 6.0.0 - Policy functions provided by FBC - - - - S2-40 S2-041949 Revised 2004-08-06 CH - 2004-06-01
0037 2 B Rel-6 6.0.0 - Policy functions provided by FBC - - - - S2-40 S2-042258 Revised 2004-08-06 CH - 2004-06-01
0037 3 B Rel-6 6.0.0 6.1.0 Policy functions provided by FBC SP-24 SP-040314 approved S2 S2-40 S2-042338 Agreed 2004-08-06 CH - 2004-06-01
0038 - F Rel-6 6.0.0 - Charging key counts at the TPF - - - - S2-40 S2-041937 Rejected 2004-08-06 CH - 2004-06-01
0039 - B Rel-6 6.0.0 - Bearer information to the AF - - - - S2-40 S2-041938 Rejected 2004-08-06 CH - 2004-06-01
0040 - B Rel-6 6.0.0 - QoS information to the TPF - - - - S2-40 S2-041939 Rejected 2004-08-06 CH - 2004-06-01
0041 - C Rel-6 6.0.0 - Selection of CRF - - - - S2-40 S2-041940 Rejected 2004-08-06 CH - 2004-06-01
0042 - B Rel-6 6.0.0 - Introduction of the rating rule - - - - S2-40 S2-041941 Rejected 2004-08-06 CH - 2004-06-01
0043 - C Rel-6 6.0.0 - TPF in the GGSN for WLAN access - - - - S2-40 S2-041942 Revised 2004-08-06 CH - 2004-06-01
0043 1 C Rel-6 6.0.0 6.1.0 TPF in the GGSN for WLAN access SP-24 SP-040314 approved S2 S2-40 S2-042257 Agreed 2004-08-06 CH - 2004-06-01
0044 - B Rel-6 6.0.0 - FBC and Flow Based Policy Control - - - - S2-40 S2-041943 Rejected 2004-08-06 CH - 2004-06-01
0045 - B Rel-6 6.0.0 - FBC and GAA - - - - S2-40 S2-041944 Revised 2004-08-06 CH - 2004-06-01
0045 1 B Rel-6 6.0.0 - FBC and GAA - - - - S2-40 S2-041951 Revised 2004-08-06 CH - 2004-06-01
0045 2 B Rel-6 6.0.0 6.1.0 FBC and GAA SP-24 SP-040314 approved S2 S2-40 S2-042244 Agreed 2004-08-06 CH - 2004-06-01
0046 - B Rel-6 6.0.0 - Limitations of FBC for IMS - - - - S2-40 S2-041946 Revised 2004-08-06 CH - 2004-06-01
0046 1 B Rel-6 6.0.0 - Limitations of FBC for IMS - - - - S2-40 S2-041950 Revised 2004-08-06 CH - 2004-06-01
0046 2 B Rel-6 6.0.0 6.1.0 Limitations of FBC for IMS SP-24 SP-040314 approved S2 S2-40 S2-042243 Agreed 2004-08-06 CH - 2004-06-01
0047 - C Rel-6 6.0.0 6.1.0 Combined for CR#3, CR#12, CR#14 SP-24 SP-040458 approved Nokia, Nor - SP-040458 - 2004-06-08 CH - 2004-06-10
0048 - B Rel-6 6.1.0 - Add CCF and/or OCS address to charging rule - - - S2 S2-41 S2-042525 Revised 2004-09-13 CH - 2004-09-08
0048 1 B Rel-6 6.1.0 - Add CCF and/or OCS address to charging rule - - - S2 S2-41 S2-042555 Revised 2004-09-13 CH - 2004-09-08
0048 2 B Rel-6 6.1.0 6.2.0 Add CCF and/or OCS address to charging rule SP-25 SP-040518 approved S2 S2-41 S2-042781 Agreed 2004-09-13 CH - 2004-09-08
0049 - B Rel-6 6.1.0 - Re-authorisation triggers provided by OCS - - - S2 S2-41 S2-042527 Rejected 2004-09-13 CH - 2004-09-08
0050 - B Rel-6 6.1.0 - Merge the re-authorisation triggers into event trigger - - - S2 S2-41 S2-042528 Rejected 2004-09-13 CH - 2004-09-08
0051 - B Rel-6 6.1.0 - Add a definition of TPF/CRF instance - - - S2 S2-41 S2-042529 Revised 2004-09-13 CH - 2004-09-08
0051 1 B Rel-6 6.1.0 6.2.0 Add a definition of TPF/CRF instance SP-25 SP-040518 approved S2 S2-41 S2-042776 Agreed 2004-09-13 CH - 2004-09-08
0052 - B Rel-6 6.1.0 - TPF/CRF instance scenarios - - - S2 S2-41 S2-042530 Rejected 2004-09-13 - - 2004-09-08
0053 - F Rel-6 6.1.0 - Clarification to the offline charging in Flow Based Charging - - - S2 S2-41 S2-042531 Rejected 2004-09-13 CH - 2004-09-08
0054 - F Rel-6 6.1.0 - Introducing the CDR activation indication to the Flow Based Charging - - - S2 S2-41 S2-042532 Rejected 2004-09-13 CH - 2004-09-08
0055 - F Rel-6 6.1.0 6.2.0 Allowing specific charging rule selection for dedicated IMS signalling PDP contexts SP-25 SP-040518 approved S2 S2-41 S2-042533 Agreed 2004-09-13 CH - 2004-09-08
0056 - B Rel-6 6.1.0 - Application Function Tag - - - S2 S2-41 S2-042534 Revised 2004-09-13 CH - 2004-09-08
0056 1 B Rel-6 6.1.0 - Application Function Tag - - - S2 S2-41 S2-042557 Revised 2004-09-13 CH - 2004-09-08
0056 2 B Rel-6 6.1.0 6.2.0 Application Function Tag SP-25 SP-040518 approved S2 S2-41 S2-042780 Agreed 2004-09-13 CH - 2004-09-08
0057 - B Rel-6 6.1.0 - Time information for charging rules - - - S2 S2-41 S2-042535 Rejected 2004-09-13 CH - 2004-09-08
0058 - B Rel-6 6.1.0 - Bearer information for charging rules - - - S2 S2-41 S2-042536 Rejected 2004-09-13 CH - 2004-09-08
0059 - B Rel-6 6.1.0 - Clarification on precedence of charging rules - - - S2 S2-41 S2-042537 Revised 2004-09-13 CH - 2004-09-08
0059 1 B Rel-6 6.1.0 - Clarification on precedence of charging rules - - - S2 S2-41 S2-042779 Revised 2004-09-13 CH - 2004-09-08
0059 2 B Rel-6 6.1.0 6.2.0 Clarification on precedence of charging rules SP-25 SP-040518 approved S2 S2-41 S2-042914 Agreed 2004-09-13 CH - 2004-09-08
0060 - B Rel-6 6.1.0 - Rx/Gx functions and SBLP usage in IMS Charging - - - S2 S2-41 S2-042538 Revised 2004-09-13 CH - 2004-09-08
0060 1 B Rel-6 6.1.0 - Rx/Gx functions and SBLP usage in IMS Charging - - - S2 S2-41 S2-042819 Revised 2004-09-13 CH - 2004-09-08
0060 2 B Rel-6 6.1.0 6.2.0 Rx/Gx functions and SBLP usage in IMS Charging SP-25 SP-040518 approved S2 S2-41 S2-042901 Agreed 2004-09-13 CH - 2004-09-08
0061 - B Rel-6 6.1.0 - Policy control functions provided by FBC - - - S2 S2-41 S2-042539 Revised 2004-09-13 CH - 2004-09-08
0061 1 B Rel-6 6.1.0 - Policy control functions provided by FBC - - - S2 S2-41 S2-042820 Revised 2004-09-13 CH - 2004-09-08
0061 2 B Rel-6 6.1.0 6.2.0 Policy control functions provided by FBC SP-25 SP-040518 approved S2 S2-41 S2-042902 Agreed 2004-09-13 CH - 2004-09-08
0062 - F Rel-6 6.1.0 - Charging model free of charge - - - S2 S2-41 S2-042540 Rejected 2004-09-13 CH - 2004-09-08
0063 - F Rel-6 6.1.0 - Clarification of pre-defined charging rules - - - S2 S2-41 S2-042541 Revised 2004-09-13 CH - 2004-09-08
0063 1 F Rel-6 6.1.0 - Clarification of pre-defined charging rules - - - S2 S2-41 S2-042559 Revised 2004-09-13 CH - 2004-09-08
0063 2 F Rel-6 6.1.0 6.2.0 Clarification of pre-defined charging rules SP-25 SP-040518 approved S2 S2-41 S2-042783 Agreed 2004-09-13 CH - 2004-09-08
0064 - F Rel-6 6.1.0 6.2.0 Clarification on charging rules SP-25 SP-040518 approved S2 S2-41 S2-042542 Agreed 2004-09-13 CH - 2004-09-08
0065 - F Rel-6 6.1.0 - Traffic plane function behavior - - - S2 S2-41 S2-042543 Revised 2004-09-13 CH - 2004-09-08
0065 1 F Rel-6 6.1.0 - Traffic plane function behavior - - - S2 S2-41 S2-042561 Revised 2004-09-13 CH - 2004-09-08
0065 2 F Rel-6 6.1.0 6.2.0 Traffic plane function behavior SP-25 SP-040518 approved S2 S2-41 S2-042784 Agreed 2004-09-13 CH - 2004-09-08
0066 - F Rel-6 6.1.0 - Termination action - - - S2 S2-41 S2-042544 Revised 2004-09-13 CH - 2004-09-08
0066 1 F Rel-6 6.1.0 - Termination action - - - S2 S2-41 S2-042777 Revised 2004-09-13 CH - 2004-09-08
0066 2 F Rel-6 6.1.0 6.2.0 Termination action SP-25 SP-040518 approved S2 S2-41 S2-042941 Agreed 2004-09-13 CH - 2004-09-08
0067 - F Rel-6 6.1.0 6.2.0 Re-authorization triggers SP-25 SP-040518 approved S2 S2-41 S2-042545 Agreed 2004-09-13 CH - 2004-09-08
0068 - F Rel-6 6.1.0 - Gx reference point functions - - - S2 S2-41 S2-042546 Revised 2004-09-13 CH - 2004-09-08
0068 1 F Rel-6 6.1.0 6.2.0 Gx reference point functions SP-25 SP-040518 approved S2 S2-41 S2-042778 Agreed 2004-09-13 CH - 2004-09-08
0069 - F Rel-6 6.1.0 - Clarifications in message flows - - - S2 S2-41 S2-042547 Revised 2004-09-13 CH - 2004-09-08
0069 1 F Rel-6 6.1.0 - Clarifications in message flows - - - S2 S2-41 S2-042563 Revised 2004-09-13 CH - 2004-09-08
0069 2 F Rel-6 6.1.0 6.2.0 Clarifications in message flows SP-25 SP-040518 approved S2 S2-41 S2-042786 Agreed 2004-09-13 CH - 2004-09-08
0070 - F Rel-6 6.1.0 - Bearer service modification in case of online charging - - - S2 S2-41 S2-042548 Revised 2004-09-13 CH - 2004-09-08
0070 1 F Rel-6 6.1.0 - Bearer service modification in case of online charging - - - S2 S2-41 S2-042562 Revised 2004-09-13 CH - 2004-09-08
0070 2 F Rel-6 6.1.0 6.2.0 Bearer service modification in case of online charging SP-25 SP-040518 approved S2 S2-41 S2-042785 Agreed 2004-09-13 CH - 2004-09-08
0071 - F Rel-6 6.1.0 - Policy functions of FBC – update of Annex D - - - S2 S2-41 S2-042550 Revised 2004-09-13 CH - 2004-09-08
0071 1 F Rel-6 6.1.0 - Policy functions of FBC – update of Annex D - - - S2 S2-41 S2-042821 Revised 2004-09-13 CH - 2004-09-08
0071 2 F Rel-6 6.1.0 6.2.0 Policy functions of FBC – update of Annex D SP-25 SP-040518 approved S2 S2-41 S2-042903 Agreed 2004-09-13 CH - 2004-09-08
0072 - D Rel-6 6.1.0 - Removal of superfluous FFS notes - - - S2 S2-41 S2-042551 Revised 2004-09-13 CH - 2004-09-08
0072 1 D Rel-6 6.1.0 6.2.0 Removal of superfluous FFS notes SP-25 SP-040518 approved S2 S2-41 S2-042775 Agreed 2004-09-13 CH - 2004-09-08
0073 - F Rel-6 6.1.0 - Selection of CRF - - - S2 S2-41 S2-042552 Rejected 2004-09-13 CH - 2004-09-08
0074 - C Rel-6 6.1.0 - FBC Control - - - S2 S2-41 S2-042553 Revised 2004-09-13 CH - 2004-09-08
0074 1 C Rel-6 6.1.0 - FBC Control - - - S2 S2-41 S2-042560 Revised 2004-09-13 CH - 2004-09-08
0074 2 C Rel-6 6.1.0 6.2.0 FBC Control SP-25 SP-040518 approved S2 S2-41 S2-042913 Agreed 2004-09-13 CH - 2004-09-08
0075 - F Rel-6 6.1.0 - TPF performing no charging - - - S2 S2-41 S2-042558 Revised 2004-09-13 CH - 2004-09-08
0075 1 F Rel-6 6.1.0 6.2.0 TPF performing no charging SP-25 SP-040518 approved S2 S2-41 S2-042782 Agreed 2004-09-13 CH - 2004-09-08
0076 - F Rel-6 6.2.0 - Adding service information to charging rule - - - Nokia S2-42 S2-043087 REVISED TO S2-043105 2004-10-15 CH-FBC - 2004-12-09
0076 1 F Rel-6 6.2.0 - Adding service information to charging rule SP-26 SP-040875 rejected Nokia - S2-043105 - 2004-10-14 CH-FBC - 2004-12-14
0077 - F Rel-6 6.2.0 - Clarification of modify action - - - Huawei S2-42 S2-043088 rejected 2004-10-15 FBC - 2004-12-09
0078 - F Rel-6 6.2.0 - CCF/OCS address clarifications - - - Siemens S2-42 S2-043089 REVISED TO S2-043107 2004-10-15 CH - 2004-12-09
0078 1 F Rel-6 6.2.0 - CCF/OCS address clarifications - - - Siemens S2-42 S2-043107 REVISED TO S2-043762 2004-10-15 CH-FBC - 2004-12-09
0078 2 F Rel-6 6.2.0 - CCF/OCS address clarifications - - - Siemens S2-43 S2-043619 REVISED TO S2-043762 2004-11-19 CH-FBC - 2004-12-09
0078 3 F Rel-6 6.2.0 6.3.0 CCF/OCS address clarifications SP-26 SP-040753 approved Siemens S2-43 S2-043762 AGREED 2004-11-19 CH-FBC - 2004-12-09
0079 - F Rel-6 6.2.0 - Connection maintenance - - - Siemens S2-42 S2-043090 REVISED TO S2-043108 2004-10-15 CH - 2004-12-09
0079 1 F Rel-6 6.2.0 6.3.0 Connection maintenance SP-26 SP-040753 approved Siemens S2-42 S2-043108 AGREED 2004-10-15 CH-FBC - 2004-12-09
0080 - F Rel-6 6.2.0 - Modification of charging rules - - - Siemens S2-42 S2-043091 REVISED TO S2-043106 2004-10-15 CH - 2004-12-09
0080 1 F Rel-6 6.2.0 6.3.0 Modification of charging rules SP-26 SP-040753 approved Siemens S2-42 S2-043106 AGREED 2004-10-15 CH-FBC - 2004-12-09
0081 - F Rel-6 6.2.0 - Duration of service data flows - - - Siemens S2-42 S2-043092 WITHDRAWN 2004-10-15 CH - 2004-12-09
0082 - F Rel-6 6.2.0 - Granularity of charging data collection - - - Nortel Networks S2-42 S2-043095 REVISED TO S2-043110 2004-10-15 FBC - 2004-12-09
0082 1 F Rel-6 6.2.0 - Granularity of charging data collection - - - Nortel Networks S2-42 S2-043110 REVISED TO S2-043377 2004-10-15 CH-FBC - 2004-12-09
0082 2 F Rel-6 6.2.0 - Granularity of charging data collection SP-26 SP-040875 rejected Nortel Networks S2-42 S2-043377 AGREED 2004-10-15 CH-FBC - 2004-12-09
0083 - F Rel-6 6.2.0 - Clarify that SGSN event is MCC/MNC related - - - Ericsson S2-42 S2-043096 REVISED TO S2-043282 2004-10-15 CH-FBC - 2004-12-09
0083 1 F Rel-6 6.2.0 - Clarify that SGSN event is MCC/MNC related - - - Ericsson S2-42 S2-043282 REVISED TO S2-043378 2004-10-15 CH-FBC - 2004-12-09
0083 2 F Rel-6 6.2.0 6.3.0 Clarify that SGSN event is MCC/MNC related SP-26 SP-040753 approved Ericsson S2-42 S2-043378 AGREED 2004-10-15 CH-FBC - 2004-12-09
0084 - F Rel-6 6.2.0 - Clarify that CRF is responsible for policy control functions in FBC - - - Ericsson S2-42 S2-043097 rejected 2004-10-15 CH-FBC - 2004-12-09
0085 - F Rel-6 6.2.0 - Clarify the handling of PDP contexts - - - Ericsson S2-42 S2-043098 REVISED TO S2-043283 2004-10-15 CH-FBC - 2004-12-09
0085 1 F Rel-6 6.2.0 - Clarify the handling of PDP contexts - - - Ericsson S2-42 S2-043283 REVISED TO S2-043379 2004-10-15 CH-FBC - 2004-12-09
0085 2 F Rel-6 6.2.0 6.3.0 Clarify the handling of PDP contexts SP-26 SP-040753 approved Ericsson S2-42 S2-043379 AGREED 2004-10-15 CH-FBC - 2004-12-09
0086 - F Rel-6 6.2.0 - Clarify that Charging Rules apply on a per PDP context basis - - - Ericsson S2-42 S2-043099 REVISED TO S2-043324 2004-10-15 CH-FBC - 2004-12-09
0086 1 F Rel-6 6.2.0 - Clarify that Charging Rules apply on a per PDP context basis - - - Ericsson S2-42 S2-043324 REVISED TO S2-043375 2004-10-15 CH-FBC - 2004-12-09
0086 2 F Rel-6 6.2.0 6.3.0 Clarify that Charging Rules apply on a per PDP context basis SP-26 SP-040753 approved Ericsson S2-42 S2-043375 AGREED 2004-10-15 CH-FBC - 2004-12-09
0087 - F Rel-6 6.2.0 - Clarifiy CRF report to AF on bearer events - - - Ericsson S2-42 S2-043100 rejected 2004-10-15 CH-FBC - 2004-12-09
0088 - F Rel-6 6.2.0 - CRF addressing - - - Ericsson S2-42 S2-043101 REVISED TO S2-043109 2004-10-15 CH-FBC - 2004-12-09
0088 1 F Rel-6 6.2.0 6.3.0 CRF addressing SP-26 SP-040753 approved Ericsson S2-42 S2-043109 AGREED 2004-10-15 CH-FBC - 2004-12-09
0089 - D Rel-6 6.2.0 - Removal of FFS notes - - - Ericsson S2-42 S2-043102 REVISED TO S2-043325 2004-10-15 CH-FBC - 2004-12-09
0089 1 D Rel-6 6.2.0 6.3.0 Removal of FFS notes SP-26 SP-040753 approved Ericsson S2-42 S2-043325 AGREED 2004-10-15 CH-FBC - 2004-12-09
0090 - F Rel-6 6.2.0 - Add QoS input over Rx interface - - - Ericsson S2-42 S2-043103 rejected 2004-10-15 CH-FBC - 2004-12-09
0091 - F Rel-6 6.2.0 - Clarify the terminology related to instances - - - Ericsson S2-42 S2-043104 REVISED TO S2-043326 2004-10-15 CH-FBC - 2004-12-09
0091 1 F Rel-6 6.2.0 - Clarify the terminology related to instances - - - Ericsson S2-42 S2-043326 REVISED TO S2-043376 2004-10-15 CH-FBC - 2004-12-09
0091 2 F Rel-6 6.2.0 6.3.0 Clarify the terminology related to instances SP-26 SP-040753 approved Ericsson S2-42 S2-043376 AGREED 2004-10-15 CH-FBC - 2004-12-09
0092 - F Rel-6 6.2.0 - Clarification of Credit Pooling - - - Nortel Networks S2-42 S2-043094 REVISED TO S2-043280 2004-10-15 FBC - 2004-12-09
0092 1 F Rel-6 6.2.0 6.3.0 Clarification of Credit Pooling SP-26 SP-040753 approved Nortel Networks S2-42 S2-043280 AGREED 2004-10-15 CH-FBC - 2004-12-09
0093 - F Rel-6 6.2.0 6.3.0 Clarify that CRF is responsible for policy control functions in FBC SP-26 SP-040753 approved Ericsson S2-42 S2-043323 AGREED 2004-10-15 CH-FBC - 2004-12-09
0094 - F Rel-6 6.2.0 - selecting the charging rule - - - ZTE Corporation S2-43 S2-043518 REVISED TO S2-043703 2004-11-19 CH-FBC - 2004-12-09
0094 1 F Rel-6 6.2.0 - selecting the charging rule - - - ZTE Corporation S2-43 S2-043703 REVISED TO S2-043764 2004-11-19 CH-FBC - 2004-12-09
0094 2 F Rel-6 6.2.0 - selecting the charging rule - - - ZTE Corporation S2-43 S2-043764 REVISED TO S2-043906 2004-11-19 CH-FBC - 2004-12-09
0094 3 F Rel-6 6.2.0 6.3.0 selecting the charging rule SP-26 SP-040753 approved ZTE Corporation S2-43 S2-043906 AGREED 2004-11-19 CH-FBC - 2004-12-09
0095 - B Rel-6 6.2.0 - Security considerations between CRF and AF - - - ZTE Corporation S2-43 S2-043519 REVISED TO S2-043758 2004-11-19 CH-FBC - 2004-12-09
0095 1 B Rel-6 6.2.0 6.3.0 Security considerations between CRF and AF SP-26 SP-040753 approved ZTE Corporation S2-43 S2-043758 AGREED 2004-11-19 CH-FBC - 2004-12-09
0096 - B Rel-6 6.2.0 - Selection of the appropriate CRF by a TPF for a user in GPRS. - - - ZTE Corporation S2-43 S2-043520 REVISED TO S2-043759 2004-11-19 CH-FBC - 2004-12-09
0096 1 B Rel-6 6.2.0 6.3.0 Selection of the appropriate CRF by a TPF for a user in GPRS. SP-26 SP-040753 approved ZTE Corporation S2-43 S2-043759 AGREED 2004-11-19 CH-FBC - 2004-12-09
0097 - F Rel-6 6.2.0 - Clarification of the TPF/CRF dialogue - - - Huawei S2-43 S2-043529 rejected 2004-11-19 CH-FBC - 2004-12-09
0098 - F Rel-6 6.2.0 - Clarification of volume and time based charging - - - Huawei S2-43 S2-043530 REVISED TO S2-043760 2004-11-19 CH-FBC - 2004-12-09
0098 1 F Rel-6 6.2.0 6.3.0 Clarification of volume and time based charging SP-26 SP-040753 approved Huawei S2-43 S2-043760 AGREED 2004-11-19 CH-FBC - 2004-12-09
0099 - F Rel-6 6.2.0 - clarification of online charging procedure - - - Huawei S2-43 S2-043531 REVISED TO S2-043761 2004-11-19 CH-FBC - 2004-12-09
0099 1 F Rel-6 6.2.0 - clarification of online charging procedure - - - Huawei S2-43 S2-043761 REVISED TO S2-043904 2004-11-19 CH-FBC - 2004-12-09
0099 2 F Rel-6 6.2.0 6.3.0 clarification of online charging procedure SP-26 SP-040753 approved Huawei S2-43 S2-043904 AGREED 2004-11-19 CH-FBC - 2004-12-09
0100 - B Rel-6 6.2.0 - Introduction of charging correlation ID - - - Huawei S2-43 S2-043532 rejected 2004-11-19 CH-FBC - 2004-12-09
0101 - F Rel-6 6.2.0 6.3.0 Update of bearer termination message flow SP-26 SP-040753 approved Siemens S2-43 S2-043618 AGREED 2004-11-19 CH-FBC - 2004-12-09
0101 1 F Rel-6 6.2.0 - Update of bearer termination message flow - - - Siemens S2-43 S2-043704 WITHDRAWN 2004-11-19 CH-FBC - 2004-12-09
0102 - F Rel-6 6.2.0 - Reporting and credit management granularity - - - Ericsson S2-43 S2-043640 REVISED TO S2-043705 2004-11-19 CH-FBC - 2004-12-09
0102 1 F Rel-6 6.2.0 - Reporting and credit management granularity - - - Ericsson S2-43 S2-043705 REVISED TO S2-043903 2004-11-19 CH-FBC - 2004-12-09
0102 2 F Rel-6 6.2.0 - Reporting and credit management granularity SP-26 SP-040875 rejected Ericsson - S2-043903 - 2004-11-18 CH-FBC - 2004-12-14
0102 4 F Rel-6 6.2.0 6.3.0 Reporting and credit management granularity SP-26 SP-040882 approved Ericsson, - - - 2004-12-07 CH-FBC - 2004-12-13
0103 - C Rel-6 6.2.0 - Updates to Rx handling - - - Ericsson S2-43 S2-043642 REVISED TO S2-043763 2004-11-19 CH-FBC - 2004-12-09
0103 1 C Rel-6 6.2.0 - Updates to Rx handling - - - Ericsson S2-43 S2-043763 REVISED TO S2-043905 2004-11-19 CH-FBC - 2004-12-09
0103 2 C Rel-6 6.2.0 6.3.0 Updates to Rx handling SP-26 SP-040753 approved Ericsson S2-43 S2-043905 AGREED 2004-11-19 CH-FBC - 2004-12-09
0104 - F Rel-6 6.3.0 - Input information from AF to CRF - - - Huawei S2-44 S2-050092 rejected 2005-02-02 CH-FBC - 2005-03-13
0105 - F Rel-6 6.3.0 - Check of AF’s subscription - - - Huawei S2-44 S2-050093 revised 2005-02-02 CH-FBC Revised to S2-050116 2005-03-13
0105 1 F Rel-6 6.3.0 - Check of AF’s subscription - - - Huawei S2-44 S2-050116 revised 2005-02-02 CH-FBC Revised to S2-050417 2005-03-13
0106 - F Rel-6 6.3.0 - Clarification of record indicator and charging key - - - Huawei S2-44 S2-050094 rejected 2005-02-02 CH-FBC - 2005-03-13
0107 - B Rel-6 6.3.0 - Introduction of predefined handling in TPF - - - Huawei S2-44 S2-050095 rejected 2005-02-02 CH-FBC - 2005-03-13
0108 - B Rel-6 6.3.0 - Introduction of charging instruction info - - - Huawei S2-44 S2-050096 rejected 2005-02-02 CH-FBC - 2005-03-13
0109 - F Rel-6 6.3.0 - Optional sending of GCID for complete charging correlation - - - Nortel Networks S2-44 S2-050254 rejected 2005-02-02 CH - 2005-03-13
0110 - F Rel-6 6.3.0 - Application Function Record information - - - Nortel Networks S2-44 S2-050255 revised 2005-02-02 CH Revised to S2-050119 2005-03-13
0110 1 F Rel-6 6.3.0 - Application Function Record information - - - Nortel Networks S2-44 S2-050119 revised 2005-02-02 CH Revised to S2-050476 2005-03-13
0110 2 F Rel-6 6.3.0 6.4.0 Application Function Record information SP-27 SP-050106 approved Nortel Networks S2-44 S2-050476 agreed 2005-02-02 CH-FBC - 2005-03-13
0111 - F Rel-6 6.3.0 - Changes to requirements on contacting CRF - - - Lucent S2-44 S2-050097 revised 2005-02-02 CH-FBC Revised to S2-050117 2005-03-13
0111 1 F Rel-6 6.3.0 - Changes to requirements on contacting CRF - - - Lucent S2-44 S2-050117 revised 2005-02-02 CH-FBC Revised to S2-050418 2005-03-13
0111 2 F Rel-6 6.3.0 - Changes to requirements on contacting CRF - - - Lucent S2-44 S2-050418 rejected 2005-02-02 CH-FBC - 2005-03-13
0112 - F Rel-6 6.3.0 - FBC flows for bearer event reporting - - - Lucent S2-44 S2-050098 revised 2005-02-02 CH-FBC Revised to S2-050111 2005-03-13
0112 1 F Rel-6 6.3.0 - FBC flows for bearer event reporting - - - Lucent S2-44 S2-050111 revised 2005-02-02 CH-FBC Revised to S2-050415 2005-03-13
0112 2 F Rel-6 6.3.0 - FBC flows for bearer event reporting - - - Lucent S2-44 S2-050415 revised 2005-02-02 CH-FBC Revised to S2-050479 2005-03-13
0112 3 F Rel-6 6.3.0 6.4.0 FBC flows for bearer event reporting SP-27 SP-050106 approved Lucent S2-44 S2-050479 agreed 2005-02-02 CH-FBC - 2005-03-13
0113 - F Rel-6 6.3.0 - Update of Annex B.4 - - - Siemens S2-44 S2-050100 revised 2005-02-02 CH-FBC Revised to S2-050113 2005-03-13
0113 1 F Rel-6 6.3.0 - Update of Annex B.4 - - - Siemens S2-44 S2-050113 revised 2005-02-02 CH-FBC Revised to S2-050470 2005-03-13
0113 2 F Rel-6 6.3.0 6.4.0 Update of Annex B.4 SP-27 SP-050106 approved Siemens S2-44 S2-050470 agreed 2005-02-02 CH-FBC - 2005-03-13
0114 - F Rel-6 6.3.0 - Protection of Rx and Gx interfaces - - - Ericsson S2-44 S2-050102 rejected 2005-02-02 CH-FBC - 2005-03-13
0115 - F Rel-6 6.3.0 - Updates to service data flow identification - - - Ericsson S2-44 S2-050103 revised 2005-02-02 CH-FBC Revised to S2-050411 2005-03-13
0115 1 F Rel-6 6.3.0 6.4.0 Updates to service data flow identification SP-27 SP-050106 approved Ericsson S2-44 S2-050411 agreed 2005-02-02 CH-FBC - 2005-03-13
0116 - F Rel-6 6.3.0 - FBC and MBMS - - - Ericsson S2-44 S2-050104 revised 2005-02-02 CH-FBC Revised to S2-050114 2005-03-13
0116 1 F Rel-6 6.3.0 - FBC and MBMS - - - Ericsson S2-44 S2-050114 revised 2005-02-02 CH-FBC Revised to S2-050472 2005-03-13
0116 2 F Rel-6 6.3.0 - FBC and MBMS - - - Ericsson S2-44 S2-050472 rejected 2005-02-02 CH-FBC - 2005-03-13
0117 - F Rel-6 6.3.0 - FBC and MBMS and collection of statistics - - - Ericsson S2-44 S2-050105 revised 2005-02-02 CH-FBC Revised to S2-050115 2005-03-13
0117 1 F Rel-6 6.3.0 - FBC and MBMS and collection of statistics - - - Ericsson S2-44 S2-050115 revised 2005-02-02 CH-FBC Revised to S2-050474 2005-03-13
0117 2 F Rel-6 6.3.0 6.4.0 FBC and MBMS and collection of statistics SP-27 SP-050106 approved Ericsson S2-44 S2-050474 agreed 2005-02-02 CH-FBC - 2005-03-13
0118 - F Rel-6 6.3.0 - Removal of the Ry reference point - - - Ericsson S2-44 S2-050106 revised 2005-02-02 CH-FBC Revised to S2-050413 2005-03-13
0118 1 F Rel-6 6.3.0 - Removal of the Ry reference point - - - Ericsson S2-44 S2-050413 revised 2005-02-02 CH-FBC Revised to S2-050477 2005-03-13
0118 2 F Rel-6 6.3.0 6.4.0 Removal of the Ry reference point SP-27 SP-050106 approved Ericsson S2-44 S2-050477 agreed 2005-02-02 CH-FBC - 2005-03-13
0119 - D Rel-6 6.3.0 - Editorial and readability amendments - - - Ericsson S2-44 S2-050107 revised 2005-02-02 CH-FBC Revised to S2-050416 2005-03-13
0119 1 D Rel-6 6.3.0 - Editorial and readability amendments - - - Ericsson S2-44 S2-050416 revised 2005-02-02 CH-FBC Revised to S2-050480 2005-03-13
0119 2 F Rel-6 6.3.0 6.4.0 Editorial and readability amendments SP-27 SP-050106 approved Ericsson S2-44 S2-050480 agreed 2005-02-02 CH-FBC CR cover shows cat D 2005-03-13
0120 - F Rel-6 6.3.0 - FBC and SBLP for Release 6 - - - Ericsson S2-44 S2-050108 rejected 2005-02-02 CH-FBC - 2005-03-13
0121 - F Rel-6 6.3.0 - Bearer Modification Event - - - Ericsson S2-44 S2-050110 withdrawn 2005-02-02 CH-FBC - 2005-03-13
0122 - B Rel-6 6.3.0 - Introduction of predefined handling in TPF - - - Huawei S2-44 S2-050118 revised 2005-02-02 CH-FBC Revised to S2-050475 2005-03-13
0122 1 F Rel-6 6.3.0 6.4.0 Introduction of predefined handling in TPF SP-27 SP-050106 approved Huawei S2-44 S2-050475 agreed 2005-02-02 CH-FBC - 2005-03-13
0123 F Rel-6 6.3.0 - Clarification on the handling of the CRF to the input from the AF - - - Huawei S2-44 S2-050417 revised 2005-02-02 CH-FBC Revised to S2-050473 2005-03-13
0123 1 F Rel-6 6.3.0 - Clarification on the handling of the CRF to the input from the AF - - - Huawei S2-44 S2-050473 revised 2005-02-02 CH-FBC Revised to S2-050518 2005-03-13
0123 2 F Rel-6 6.3.0 6.4.0 Clarification on the handling of the CRF to the input from the AF SP-27 SP-050106 approved Huawei S2-44 S2-050518 agreed 2005-02-02 CH-FBC - 2005-03-13
0124 - F Rel-6 6.3.0 6.4.0 Indication of Charging Unit y SP-27 SP-050106 approved Huawei S2-44 S2-050410 agreed 2005-02-02 CH-FBC - 2005-03-13
0125 - F Rel-6 6.3.0 6.4.0 FBC and MBMS and changes to requirements on contacting CRF SP-27 SP-050106 approved Ericsson, Lucent S2-44 S2-050524 agreed 2005-02-02 CH-FBC wrong version of spec on CR form 2005-03-13
0126 - F Rel-6 6.4.0 - TPF behaviour in case of no charging rules for a bearer - - - Siemens S2-45 S2-050728 Revised 2005-03-30 CH-FBC Revised in S2-050839 2005-06-03
0126 1 F Rel-6 6.4.0 - TPF behaviour in case of no charging rules for a bearer - - - Siemens S2-45 S2-050839 Revised 2005-03-30 CH-FBC Revised in S2-050930 2005-06-03
0126 2 F Rel-6 6.4.0 6.5.0 TPF behaviour in case of no charging rules for a bearer SP-28 SP-050335 approved Siemens S2-45 S2-050930 agreed 2005-03-30 CH-FBC - 2005-06-03
0127 - F Rel-6 6.4.0 - FBC Terminology amendments - - - Ericsson S2-45 S2-050753 Revised 2005-03-30 CH-FBC Revised in S2-050840 2005-06-03
0127 1 F Rel-6 6.4.0 6.5.0 FBC Terminology amendments SP-28 SP-050335 approved Ericsson S2-45 S2-050840 agreed 2005-03-30 CH-FBC Agreed by e-mail 2005-06-03
0128 - F Rel-6 6.4.0 - Alignment of Re-authorisation triggers - - - Vodafone S2-45 S2-050594 Revised 2005-03-30 CH-FBC Revised in S2-050838 2005-06-03
0128 1 F Rel-6 6.4.0 6.5.0 Alignment of Re-authorisation triggers SP-28 SP-050335 approved Vodafone S2-45 S2-050838 agreed 2005-03-30 CH-FBC - 2005-06-03
0129 - F Rel-6 6.4.0 - OCS initiated bearer removal - - - Siemens S2-46 S2-051277 revised 2005-05-04 CH-FBC Revised in S2-051379 2005-06-03
0129 1 F Rel-6 6.4.0 6.5.0 OCS initiated bearer removal SP-28 SP-050335 approved Siemens S2-46 S2-051369 agreed 2005-05-09 CH-FBC - 2005-06-03
0130 - F Rel-6 6.4.0 - Credit management clarified - - - Ericsson S2-46 S2-051306 rejected 2005-05-04 CH-FBC - 2005-06-03
0131 - F Rel-6 6.5.0 - Constraints for charging rule precedence - - - Ericsson S2-47 S2-051701 revised 2005-06-30 CH-FBC Revised in S2-051701 2005-09-14
0131 1 F Rel-6 6.5.0 - Constraints for charging rule precedence - - - Ericsson S2-47 S2-051788 revised 2005-06-30 CH-FBC Revised in S2-051868 2005-09-14
0131 2 F Rel-6 6.5.0 6.6.0 Constraints for charging rule precedence SP-29 SP-050481 approved Ericsson S2-47 S2-051868 agreed 2005-06-30 CH-FBC - 2005-09-14
0132 - F Rel-6 6.5.0 - Credit authorization and service rendering - - - Ericsson S2-47 S2-051702 withdrawn 2005-06-30 CH-FBC - 2005-09-14
0133 - F Rel-6 6.5.0 - Determining the charging method - - - Ericsson S2-48 S2-052207 postponed 2005-08-29 CH-FBC Postponed to next SA2 meeting 2005-06-03
0134 - F Rel-6 6.5.0 - Various corrections - - - Ericsson S2-48 S2-052190 revised 2005-08-29 CH-FBC WRONG CR NUMBER ON DOC DUE TO MCC ALLOCATION ERROR. Revised in S2-052242 2005-06-03
0134 1 F Rel-6 6.5.0 - Various corrections - - - Ericsson S2-48 S2-052242 revised 2005-08-29 CH-FBC WRONG CR NUMBER ON DOC DUE TO MCC ALLOCATION ERROR. Revised in S2-052432 2005-06-03
0134 2 F Rel-6 6.5.0 6.6.0 Various corrections SP-29 SP-050481 approved Ericsson S2-48 S2-052432 agreed 2005-09-14 CH-FBC - 2005-06-03
0135 - F Rel-6 6.5.0 - Credit management clarified - - - Ericsson S2-48 S2-052206 withdrawn 2005-08-29 CH-FBC WRONG CR NUMBER ON DOC DUE TO MCC ALLOCATION ERROR. 2005-06-03
0136 - F Rel-6 6.6.0 - Diameter Credit Control References Update - - - Lucent S2-49 S2-052686 revised 2005-11-01 CH-FBC Revised in S2-052824 2005-06-03
0136 1 F Rel-6 6.6.0 6.7.0 Diameter Credit Control References Update SP-30 SP-050663 approved Lucent S2-49 S2-052824 agreed 2005-11-07 CH-FBC - 2005-06-03
0137 - F Rel-6 6.6.0 - Clarification of TPF/CRF dialogue - - - Siemens S2-49 S2-052743 revised 2005-11-01 CH-FBC Revised in S2-052825 2005-06-03
0137 1 F Rel-6 6.6.0 - Clarification of TPF/CRF dialogue - - - Siemens S2-49 S2-052825 rejected 2005-11-01 CH-FBC Email Approval 2005-06-03
0137 2 F Rel-6 6.7.0 - Clarification of TPF/CRF dialogue - - - Siemens S2-50 S2-060253 revised 2006-01-10 CH-FBC revised in S2-060340 2005-06-03
0137 3 F Rel-6 6.7.0 - Clarification of TPF/CRF dialogue - - - Siemens S2-50 S2-060340 revised 2006-01-18 CH-FBC Revised in S2-060355 2005-06-03
0137 4 F Rel-6 6.7.0 6.8.0 Clarification of TPF/CRF dialogue SP-31 SP-060124 approved Siemens S2-50 S2-060355 agreed 2006-01-18 CH-FBC - 2005-06-03
0138 - F Rel-6 6.6.0 6.7.0 Precedence of CRF provided wildcarded charging rule SP-30 SP-050663 approved Siemens S2-49 S2-052744 agreed 2005-11-01 CH-FBC - 2005-06-03
0139 - F Rel-6 6.7.0 - Reporting per AF record information - - - Siemens S2-50 S2-060254 revised 2006-01-10 CH-FBC Revised in S2-060329 2005-06-03
0139 1 F Rel-6 6.7.0 - Reporting per AF record information - - - Siemens S2-50 S2-060329 revised 2006-01-18 CH-FBC Revised in S2-060350 2005-06-03
0139 2 F Rel-6 6.7.0 6.8.0 Reporting per AF record information SP-31 SP-060124 approved Siemens S2-50 S2-060350 agreed 2006-01-18 CH-FBC - 2005-06-03
0140 - F Rel-6 6.7.0 - Time zone at the UE location as a basis for CRF decisions - - - Ericsson S2-51 S2-060590 rejected 2006-02-03 CH-FBC - 2005-06-03