CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - F Rel-7 7.0.0 - Mapping on Gx - QCI to R99 Profile - - - Ericsson S2-55 S2-063557 revised 2006-10-12 PCC Revised in S2-064032 2006-09-21
0001 1 F Rel-7 7.0.0 - Mapping on Gx - QCI to R99 Profile - - - Ericsson S2-55 S2-064032 revised 2006-10-24 PCC For e-mail approval. Rev1 agreed in S2-064139 2006-09-21
0001 2 F Rel-7 7.0.0 7.1.0 Mapping on Gx - QCI to R99 Profile SP-34 SP-060868 approved Ericsson S2-55 S2-064139 agreed 2006-10-31 PCC E-mail approved S2-064032r1 2006-09-21
0002 - F Rel-7 7.0.0 - ARP in the PCC rule - - - Ericsson S2-55 S2-063558 rejected 2006-10-12 PCC More discussion needed 2006-09-21
0003 - F Rel-7 7.0.0 - GGSN handling of PDP contexts - - - Ericsson, Samsung S2-55 S2-063560 withdrawn 2006-10-12 PCC For e-mail approval. Withdrawn 2006-09-21
0004 - F Rel-7 7.0.0 - PCC IP-CAN Session Termination - - - Ericsson S2-55 S2-063561 rejected 2006-10-12 PCC - 2006-09-21
0005 - F Rel-7 7.0.0 - PCC reporting, alignment with SA WG5 specifications - - - Ericsson S2-55 S2-063562 rejected 2006-10-12 PCC Should be included in SA WG5 specs 2006-09-21
0006 - F Rel-7 7.0.0 - PCC charging requirements - - - Ericsson S2-55 S2-063563 revised 2006-10-12 PCC Revised in S2-064033 2006-09-21
0006 1 F Rel-7 7.0.0 - PCC charging requirements SP-34 SP-060825 revised Ericsson S2-55 S2-064033 agreed 2006-10-24 PCC For e-mail approval. Approved. MCC editorial update before presentation to TSG SA in SP-060868 2006-09-21
0006 2 F Rel-7 7.0.0 7.1.0 PCC charging requirements SP-34 SP-060868 approved Ericsson - - - 2006-11-30 PCC - 2006-09-21
0007 - F Rel-7 7.0.0 - Clarifications on visited network PCC - - - Nokia S2-55 S2-063691 postponed 2006-10-16 PCC Not handled S2#55 2006-09-21
0008 - F Rel-7 7.0.0 - Requesting credit for PCC rules - - - Nokia, Telefonica S2-55 S2-063693 postponed 2006-10-16 PCC Not handled S2#55 2006-09-21
0008 1 F Rel-7 7.1.0 - Requesting credit for PCC rules - - - Nokia, Telefonica S2-56 S2-070360 revised 2007-01-09 PCC Revised in drafting sessions to S2-070511 2006-09-21
0008 2 F Rel-7 7.1.0 - Requesting credit for PCC rules - - - Nokia, Telefonica S2-56 S2-070511 revised 2007-01-18 PCC For e-mail approval. S2-070615 rev1 approved. CR0008R3 provided in S2-070635 2006-09-21
0008 3 F Rel-7 7.1.0 7.2.0 Requesting credit for PCC rules SP-35 SP-070093 approved Nokia, Telefonica S2-56 S2-070635 agreed 2007-01-26 PCC e-mail approved 2006-09-21
0009 - F Rel-7 7.0.0 - PCC and bearer control mode - - - Siemens S2-55 S2-063723 rejected 2006-10-16 PCC More study needed for Rel-7 2006-09-21
0009 1 F Rel-7 7.1.0 - PCC and bearer control mode - - - Siemens Networks S2-56 S2-070227 revised 2007-01-08 PCC Revised in drafting sessions to S2-070502 2006-09-21
0009 2 F Rel-7 7.1.0 - PCC and bearer control mode - - - Siemens Networks S2-56 S2-070502 revised 2007-01-18 PCC Revised to S2-070615 for e-mail approval. S2-070615 rev1 approved with wrong CR Rev number. CR0009R3 provided in S2-070633 2006-09-21
0009 3 F Rel-7 7.1.0 7.2.0 PCC and bearer control mode SP-35 SP-070093 approved Siemens Networks, China Mobile, Alcatel-Lucent, Qualcomm, Huawei S2-56 S2-070633 agreed 2007-01-26 PCC e-mail approved 2006-09-21
0010 - F Rel-7 7.0.0 - UE provided traffic mapping information - - - Siemens S2-55 S2-063724 revised 2006-10-16 PCC Revised in S2-064046 2006-09-21
0010 1 F Rel-7 7.0.0 - UE provided traffic mapping information - - - Siemens S2-55 S2-064046 withdrawn 2006-10-25 PCC For e-mail approval. Withdrawn 2006-09-21
0011 - F Rel-7 7.0.0 - Proxy Server between AF and PCRF - - - Siemens S2-55 S2-063725 revised 2006-10-16 PCC Revised in S2-064047 2006-09-21
0011 1 F Rel-7 7.0.0 - Proxy Server between AF and PCRF - - - Siemens S2-55 S2-064047 rejected 2006-10-25 PCC For e-mail approval. Noted 2006-09-21
0011 2 F Rel-7 7.1.0 - Proxy Server between AF and PCRF - - - Siemens Networks S2-56 S2-070228 rejected 2007-01-08 PCC For e-mail approval. Noted 2006-09-21
0012 - F Rel-7 7.0.0 - PCC with multiple AFs - - - Siemens S2-55 S2-063726 revised 2006-10-16 PCC Revised in S2-064048 2006-09-21
0012 1 F Rel-7 7.0.0 - PCC with multiple AFs - - - Siemens S2-55 S2-064048 rejected 2006-10-16 PCC For e-mail approval. Noted 2006-09-21
0012 2 F Rel-7 7.1.0 - PCC with multiple AFs - - - Siemens Networks S2-56 S2-070229 revised 2007-01-08 PCC Revised in drafting sessions to S2-070513 2006-09-21
0012 3 F Rel-7 7.1.0 - PCC with multiple AFs - - - Siemens Networks S2-56 S2-070513 revised 2007-01-19 PCC For e-mail approval. S2-070513 rev1 approved. CR0012R4 provided in S2-070632 2006-09-21
0012 4 F Rel-7 7.1.0 7.2.0 PCC with multiple AFs SP-35 SP-070093 approved Siemens Networks S2-56 S2-070632 agreed 2007-01-26 PCC e-mail approved 2006-09-21
0013 - F Rel-7 7.0.0 - Predefined PCC rule usage restrictions - - - Siemens S2-55 S2-063727 revised 2006-10-16 PCC For e-mail approval. Rev3 agreed in S2-064138 2006-09-21
0013 1 F Rel-7 7.0.0 7.1.0 Predefined PCC rule usage restrictions SP-34 SP-060868 approved Siemens S2-55 S2-064138 agreed 2006-11-01 PCC E-mail approved S2-063727r3 2006-09-21
0014 - F Rel-7 7.0.0 - WiMAX IP-CAN Introduction - - - Intel, Samsung, InterDigital, Nortel, British Telecom S2-55 S2-063595 revised 2006-10-17 PCC Revised in S2-063995 2006-09-21
0014 1 F Rel-7 7.0.0 - WiMAX IP-CAN Introduction - - - Intel, Samsung, InterDigital, Nortel, British Telecom, Motorola S2-55 S2-063995 revised 2006-10-24 PCC Revised in S2-064034 2006-09-21
0014 2 F Rel-7 7.0.0 - WiMAX IP-CAN Introduction - - - Intel, Samsung, InterDigital, Nortel, British Telecom, Motorola S2-55 S2-064034 revised 2006-10-25 PCC Revised in S2-064089 2006-09-21
0014 3 B Rel-7 7.0.0 - WiMAX IP-CAN Introduction - - - Intel, Samsung, InterDigital, Nortel, British Telecom, Motorola S2-55 S2-064089 revised 2006-10-26 PCC Revised in S2-064127 2006-09-21
0014 4 B Rel-7 7.0.0 - WiMAX IP-CAN Introduction SP-34 SP-060825 revised Intel, Samsung, InterDigital, Nortel, British Telecom, Motorola S2-55 S2-064127 agreed 2006-10-27 PCC MCC editorial update before presentation to TSG SA in SP-060868 2006-09-21
0014 5 B Rel-7 7.0.0 7.1.0 WiMAX IP-CAN Introduction SP-34 SP-060868 approved Intel, Samsung, InterDigital, Nortel, British Telecom, Motorola - - - 2006-11-30 PCC - 2006-09-21
0015 - F Rel-7 7.0.0 - PCRF to SPR interactions for Session Modification - - - Motorola S2-55 S2-063896 postponed 2006-10-17 PCC Not handled S2#55 2006-09-21
0016 - F Rel-7 7.0.0 - Provision of requested and authorised QoS information - - - Nortel S2-55 S2-063916 rejected 2006-10-20 PCC For e-mail approval. Noted 2006-09-21
0017 - D Rel-7 7.0.0 - Restructure of Informative Annexes for PCC - - - Intel, Nortel, Ericsson, Samsung, Motorola S2-55 S2-064090 revised 2006-10-27 PCC Revised in S2-064128 2006-09-21
0017 1 F Rel-7 7.0.0 - Restructure of Informative Annexes for PCC SP-34 SP-060825 revised Intel, Nortel, Ericsson, Samsung, Motorola S2-55 S2-064128 agreed 2006-10-27 PCC MCC editorial update before presentation to TSG SA in SP-060868 2006-09-21
0017 2 F Rel-7 7.0.0 7.1.0 Restructure of Informative Annexes for PCC SP-34 SP-060868 approved Intel, Nortel, Ericsson, Samsung, Motorola - - - 2006-11-30 PCC - 2006-09-21
0018 - F Rel-7 7.1.0 7.2.0 MCC Correction to implementation of CRs after TSG SA#34 SP-35 SP-070093 approved MCC S2-56 S2-070104 agreed 2007-01-05 PCC - 2006-09-21
0019 - F Rel-7 7.1.0 - QoS class identifier definition and usage - - - Ericsson, Samsung S2-56 S2-070178 revised 2007-01-08 PCC Revised in drafting sessions to S2-070505 2006-09-21
0019 1 F Rel-7 7.1.0 - QoS class identifier definition and usage - - - Ericsson, Samsung, Cingular, Qualcomm Europe S2-56 S2-070505 revised 2007-01-18 PCC Revised in drafting sessions to S2-070517 2006-09-21
0019 2 F Rel-7 7.1.0 7.2.0 QoS class identifier definition and usage SP-35 SP-070093 approved Ericsson, Samsung, Cingular, Qualcomm Europe S2-56 S2-070517 agreed 2007-01-18 PCC - 2006-09-21
0020 - F Rel-7 7.1.0 - GGSN handling of NW init PDP contexts - - - Ericsson, Samsung S2-56 S2-070179 revised 2007-01-08 PCC Revised in drafting sessions to S2-070506 2006-09-21
0020 1 F Rel-7 7.1.0 - GGSN handling of NW init PDP contexts - - - Ericsson, Samsung S2-56 S2-070506 revised 2007-01-18 PCC Revised in drafting sessions to S2-070518 2006-09-21
0020 2 F Rel-7 7.1.0 7.2.0 GGSN handling of NW init PDP contexts SP-35 SP-070093 approved Ericsson, Samsung S2-56 S2-070518 agreed 2007-01-18 PCC - 2006-09-21
0021 - F Rel-7 7.1.0 - Way forward on the issue of SPR location - - - Huawei S2-56 S2-070184 rejected 2007-01-08 PCC Noted in PCC sessions 2006-09-21
0022 - F Rel-7 7.1.0 - Way forward on the issue of SPR location-Moving it to latter releases - - - Huawei S2-56 S2-070185 rejected 2007-01-08 PCC Noted in PCC sessions 2006-09-21
0023 - C Rel-7 7.1.0 - Successful MT Delivery Procedure in SMS-IP Architecture - - - Qualcomm S2-56 S2-070242 withdrawn 2007-01-08 SMS-IP Noted in IMS sessions. Revised in S2-56b ad-hoc in S2-070739. Withdrawn: CR should be to 23.204 2006-09-21
0023 1 C Rel-7 7.1.0 - Successful MT Delivery Procedure in SMS-IP Architecture - - - Qualcomm S2-56b S2-070739 withdrawn 2007-02-06 SMS-IP Revised in S2#56b AH to S2-070884. Withdrawn: CR should be to 23.204 2006-09-21
0023 2 C Rel-7 7.1.0 - Successful MT Delivery Procedure in SMS-IP Architecture - - - Qualcomm S2-56b S2-070884 withdrawn 2007-02-15 SMS-IP Revised in S2#56b AH to S2-070902. Withdrawn: CR should be to 23.204 2006-09-21
0023 3 C Rel-7 7.1.0 - Successful MT Delivery Procedure in SMS-IP Architecture - - - Qualcomm S2-56b S2-070902 withdrawn 2007-02-15 SMS-IP Revised in S2#56b AH to S2-070997. Withdrawn: CR should be to 23.204 2006-09-21
0023 4 C Rel-7 7.1.0 - Successful MT Delivery Procedure in SMS-IP Architecture - - - Qualcomm S2-56b S2-070997 withdrawn 2007-02-15 SMS-IP Withdrawn: CR should be to 23.204 2006-09-21
0024 - F Rel-7 7.1.0 - Alignment to measurement and charging functionality - - - Vodafone S2-56 S2-070292 revised 2007-01-09 PCC Revised before the meeting in S2-070386 2006-09-21
0024 1 F Rel-7 7.1.0 - Alignment to measurement and charging functionality - - - Vodafone S2-56 S2-070386 revised 2007-01-09 PCC Revised in S2-070509 2006-09-21
0024 2 F Rel-7 7.1.0 7.2.0 Alignment to measurement and charging functionality SP-35 SP-070093 approved Vodafone S2-56 S2-070509 agreed 2007-01-17 PCC - 2006-09-21
0025 - F Rel-7 7.1.0 - Normative handling of GGSN controlled QoS upgrading - - - Vodafone S2-56 S2-070293 revised 2007-01-09 PCC Revised in drafting sessions to S2-070507 2006-09-21
0025 1 F Rel-7 7.1.0 7.2.0 Normative handling of GGSN controlled QoS upgrading SP-35 SP-070093 approved Vodafone S2-56 S2-070507 agreed 2007-01-17 PCC - 2006-09-21
0026 - F Rel-7 7.1.0 - Clarification on ""type of IP-CAN"" information - - - Orange S2-56 S2-070309 revised 2007-01-09 PCC Revised in S2-070514 2006-09-21
0026 1 F Rel-7 7.1.0 - Clarification on ""type of IP-CAN"" information - - - Orange S2-56 S2-070514 revised 2007-01-18 PCC Revised in S2-070520 2006-09-21
0026 2 F Rel-7 7.1.0 - Clarification on ""type of IP-CAN"" information - - - Orange S2-56 S2-070520 revised 2007-01-19 PCC For e-mail approval. S2-070520 rev2 approved. CR0026R3 provided in S2-070636 2006-09-21
0026 3 F Rel-7 7.1.0 7.2.0 Clarification on ""type of IP-CAN"" information SP-35 SP-070093 approved Orange S2-56 S2-070636 agreed 2007-01-26 PCC e-mail approved 2006-09-21
0027 - F Rel-7 7.1.0 - Default charging method for IP-CAN session - - - Nokia S2-56 S2-070359 revised 2007-01-09 PCC Revised in drafting sessions to S2-070510 2006-09-21
0027 1 F Rel-7 7.1.0 - Default charging method for IP-CAN session - - - Nokia S2-56 S2-070510 revised 2007-01-18 PCC For e-mail approval.S2-070510 rev2 approved. CR0027R2 provided in S2-070634 2006-09-21
0027 2 F Rel-7 7.1.0 7.2.0 Default charging method for IP-CAN session SP-35 SP-070093 approved Nokia S2-56 S2-070634 agreed 2007-01-26 PCC e-mail approved 2006-09-21
0028 - F Rel-7 7.1.0 - GBR and MBR information in PCC rule - - - Samsung, Ericsson, Qualcomm Europe S2-56 S2-070371 revised 2007-01-09 PCC Revised in drafting sessions to S2-070519 2006-09-21
0028 1 F Rel-7 7.1.0 7.2.0 GBR and MBR information in PCC rule SP-35 SP-070093 approved Samsung, Ericsson, Qualcomm Europe S2-56 S2-070519 agreed 2007-01-18 PCC - 2006-09-21
0029 - F Rel-7 7.1.0 - Sp/SPR issue in Rel-7 - - - Huawei S2-56 S2-070504 revised 2007-01-17 PCC Revised in drafting sessions to S2-070516 2006-09-21
0029 1 F Rel-7 7.1.0 7.2.0 Sp/SPR issue in Rel-7 SP-35 SP-070093 approved Huawei S2-56 S2-070516 agreed 2007-01-18 PCC - 2006-09-21
0030 - C Rel-7 7.1.0 - Registration Procedures for SMS-IP - - - Qualcomm S2-56b S2-070740 rejected 2007-02-06 SMS-IP Noted in S2#56b AH 2006-09-21
0031 - B Rel-7 7.1.0 - PCC Support for emergency Sessions - - - Nokia, Siemens Networks S2-56b S2-070812 revised 2007-02-07 EMC1 Revised in S2#56b AH to S2-070984 2006-09-21
0031 1 B Rel-7 7.1.0 - PCC Support for emergency Sessions - - - Nokia, Siemens Networks S2-56b S2-070984 revised 2007-02-15 EMC1 Revised in S2#56b AH to S2-070987 2006-09-21
0031 2 B Rel-7 7.1.0 7.2.0 PCC Support for emergency Sessions SP-35 SP-070087 approved Nokia, Siemens Networks S2-56b S2-070987 agreed 2007-02-15 EMC1 - 2006-09-21
0032 - F Rel-7 7.1.0 - Use of PCC rules to enforce emergency bearer's usage - - - Huawei S2-56b S2-070826 revised 2007-02-07 EMC1 Revised in S2#56b AH to S2-070986 2006-09-21
0032 1 B Rel-7 7.1.0 7.2.0 Use of PCC rules to enforce emergency bearer's usage SP-35 SP-070087 approved Huawei S2-56b S2-070986 agreed 2007-02-15 EMC1 - 2006-09-21
0033 - F Rel-7 7.2.0 - Alignment of Rx interaction for GW and PCRF initiated IP-CAN modifications - - - - S2-56c S2-071343 revised 2007-03-21 PCC Revised in S2-071492 2007-06-05
0033 1 F Rel-7 7.2.0 7.3.0 Alignment of Rx interaction for GW and PCRF initiated IP-CAN modifications SP-36 SP-070391 approved S2 S2-56c S2-071492 agreed 2007-04-03 PCC Approved 2007-06-05
0034 - F Rel-7 7.2.0 - PCC support for emergency sessions - - - - S2-56c S2-071389 revised 2007-03-21 EMC1 Revised in S2-071493 2007-06-05
0034 1 F Rel-7 7.2.0 - PCC support for emergency sessions - - - - S2-56c S2-071493 revised 2007-04-03 EMC1 Postponed for further discussion. Revised at S2-57 in S2-071946 2007-06-05
0034 2 F Rel-7 7.2.0 - PCC support for emergency sessions - - - - S2-57 S2-071946 withdrawn 2007-04-18 EMC1 Merged with CR0036 in S2-072084 2007-06-05
0035 - D Rel-7 7.2.0 - Corrections to definitions - - - - S2-56c S2-071432 revised 2007-03-21 PCC Revised in S2-071490 2007-06-05
0035 1 D Rel-7 7.2.0 - Corrections to definitions - - - - S2-56c S2-071490 revised 2007-04-03 PCC Revised in S2-071607 2007-06-05
0035 2 F Rel-7 7.2.0 7.3.0 Corrections to definitions SP-36 SP-070391 approved S2 S2-56c S2-071607 agreed 2007-04-03 PCC Approved 2007-06-05
0036 - F Rel-7 7.2.0 - PCC support for service priority - - - - S2-57 S2-071898 revised 2007-04-18 EMC1 Merged with CR0034R2 in S2-072084 2007-06-05
0036 1 F Rel-7 7.2.0 - PCC support for service priority - - - - S2-57 S2-072084 withdrawn 2007-04-26 EMC1 Withdrawn (not provided) 2007-06-05
0037 - F Rel-7 7.2.0 - Information on co-existence between Rel-6 and Rel-7 policy control - - - - S2-57 S2-071901 revised 2007-04-18 PCC Revised in S2-072078 2007-06-05
0037 1 F Rel-7 7.2.0 - Information on co-existence between Rel-6 and Rel-7 policy control - - - - S2-57 S2-072078 revised 2007-04-24 PCC Revised in S2-072086 2007-06-05
0037 2 F Rel-7 7.2.0 7.3.0 Information on co-existence between Rel-6 and Rel-7 policy control SP-36 SP-070391 approved S2 S2-57 S2-072086 agreed 2007-04-26 PCC - 2007-06-05
0038 - F Rel-7 7.2.0 - Support for Authorization Token within Release 7 PCC - - - - S2-57 S2-071902 revised 2007-04-18 PCC Revised in S2-072079 2007-06-05
0038 1 F Rel-7 7.2.0 7.3.0 Support for Authorization Token within Release 7 PCC SP-36 SP-070391 approved S2 S2-57 S2-072079 agreed 2007-04-24 PCC - 2007-06-05
0039 - F Rel-7 7.2.0 - Taking Time of day into account in policy rules for QoS decision - - - - S2-57 S2-071926 revised 2007-04-18 PCC Revised in S2-072085 2007-06-05
0039 1 F Rel-7 7.2.0 - Taking Time of day into account in policy rules for QoS decision - - - - S2-57 S2-072085 rejected 2007-04-26 PCC For e-mail approval. Noted 2007-06-05
0040 - F Rel-7 7.2.0 - Loss and recovery of bearer - - - - S2-57 S2-071947 revised 2007-04-18 PCC Revised in S2-072081 2007-06-05
0040 1 F Rel-7 7.2.0 - Loss and recovery of bearer - - - - S2-57 S2-072081 revised 2007-04-24 PCC Revised in S2-072087 2007-06-05
0040 2 F Rel-7 7.2.0 - Loss and recovery of bearer - - - - S2-57 S2-072087 revised 2007-04-26 PCC Revised in S2-072090 2007-06-05
0040 3 F Rel-7 7.2.0 - Loss and recovery of bearer - - - - S2-57 S2-072090 revised 2007-04-26 PCC Revised in S2-072091 2007-06-05
0040 4 F Rel-7 7.2.0 7.3.0 Loss and recovery of bearer SP-36 SP-070391 approved S2 S2-57 S2-072091 agreed 2007-04-26 PCC - 2007-06-05
0041 - F Rel-7 7.2.0 - Precedence of PCC rules - - - - S2-57 S2-071948 revised 2007-04-18 PCC Revised in S2-072082 2007-06-05
0041 1 F Rel-7 7.2.0 - Precedence of PCC rules - - - - S2-57 S2-072082 revised 2007-04-24 PCC Revised in S2-072088 2007-06-05
0041 2 F Rel-7 7.2.0 7.3.0 Precedence of PCC rules SP-36 SP-070391 approved S2 S2-57 S2-072088 agreed 2007-04-26 PCC - 2007-06-05
0042 - F Rel-7 7.2.0 - Removal of editor's notes - - - - S2-57 S2-071949 revised 2007-04-18 PCC Revised in S2-072083 2007-06-05
0042 1 F Rel-7 7.2.0 7.3.0 Removal of editor's notes SP-36 SP-070391 approved S2 S2-57 S2-072083 agreed 2007-04-24 PCC - 2007-06-05
0043 - F Rel-7 7.3.0 - Authorized QoS for IP-CAN bearer - - - - S2-58 S2-072477 noted 2007-06-15 PCC Revised in S2-072918 2007-06-05
0043 1 F Rel-7 7.3.0 - Authorized QoS for IP-CAN bearer - - - - S2-58 S2-072918 revised 2007-06-26 PCC Revised in S2-073076 2007-06-05
0043 2 F Rel-7 7.3.0 7.4.0 Authorized QoS for IP-CAN bearer SP-37 SP-070549 approved S2 S2-58 S2-073076 agreed 2007-06-28 PCC - 2007-06-05
0044 - F Rel-7 7.3.0 - Resource reservation results - - - - S2-58 S2-072478 revised 2007-06-15 PCC Revised in S2-072919 2007-06-05
0044 1 F Rel-7 7.3.0 - Resource reservation results - - - - S2-58 S2-072919 revised 2007-06-25 PCC For e-mail approval. Revised in S2-073085 2007-06-05
0044 2 F Rel-7 7.3.0 7.4.0 Resource reservation results SP-37 SP-070549 approved S2 S2-58 S2-073085 agreed 2007-07-27 PCC e-mail approved version 2007-06-05
0045 - F Rel-7 7.3.0 - Removal of editor's note on MBMS - - - - S2-58 S2-072531 revised 2007-06-18 PCC Revised in S2-072920 2007-06-05
0045 1 F Rel-7 7.3.0 7.4.0 Removal of editor's note on MBMS SP-37 SP-070549 approved S2 S2-58 S2-072920 agreed 2007-06-25 PCC - 2007-06-05
0046 - F Rel-7 7.3.0 7.4.0 Removal of editor's notes SP-37 SP-070549 approved S2 S2-58 S2-072532 agreed 2007-06-18 PCC - 2007-06-05
0047 - F Rel-7 7.3.0 - Clarification on Service Rejection - - - - S2-58 S2-072533 revised 2007-06-18 PCC Revised in S2-072925 2007-06-05
0047 1 F Rel-7 7.3.0 7.4.0 Clarification on Service Rejection SP-37 SP-070549 approved S2 S2-58 S2-072925 agreed 2007-06-25 PCC - 2007-06-05
0048 - F Rel-7 7.3.0 - Handling of MBR and GBR per QCI - - - - S2-58 S2-072775 revised 2007-06-19 PCC Merged into CR0048R1 (S2-072918) 2007-06-05
0049 - F Rel-7 7.3.0 - PCC rule handling at PCEF in a special case - - - - S2-59 S2-073242 revised 2007-08-17 TEI7 Revised in S2-073657 2007-06-05
0049 1 F Rel-7 7.3.0 - PCC rule handling at PCEF in a special case - - - - S2-59 S2-073657 revised 2007-08-27 TEI7 Revised in S2-073927 2007-06-05
0049 2 F Rel-7 7.3.0 7.4.0 PCC rule handling at PCEF in a special case SP-37 SP-070549 approved S2 S2-59 S2-073927 agreed 2007-08-28 PCC - 2007-06-05
0050 - F Rel-7 7.3.0 - Session binding clarification - - - - S2-59 S2-073243 revised 2007-08-17 PCC Revised in S2-073658 2007-06-05
0050 1 F Rel-7 7.3.0 7.4.0 Session binding clarification SP-37 SP-070549 approved S2 S2-59 S2-073658 agreed 2007-08-27 PCC - 2007-06-05
0051 - C Rel-7 7.3.0 7.4.0 Removal of Emergency APN SP-37 SP-070549 approved S2 S2-59 S2-073530 agreed 2007-08-21 PCC - 2007-06-05
0052 - F Rel-7 7.3.0 - Correction of input parameters list for PCC decisions - - - - S2-59 S2-073562 revised 2007-08-21 PCC Revised in S2-073660 2007-06-05
0052 1 F Rel-7 7.3.0 7.4.0 Correction of input parameters list for PCC decisions SP-37 SP-070549 approved S2 S2-59 S2-073660 agreed 2007-08-27 PCC - 2007-06-05
0053 - F Rel-7 7.3.0 - Removal of Emergency APN specification - - - - S2-59 S2-073563 noted 2007-08-21 PCC Covered by CR0052 2007-06-05
0054 - F Rel-7 7.3.0 7.4.0 Removal of editor’s notes SP-37 SP-070549 approved S2 S2-59 S2-073564 agreed 2007-08-21 PCC - 2007-06-05
0055 - F Rel-7 7.4.0 7.5.0 Alignment of Charging requirements with IMS SP-38 SP-070801 approved S2 S2-60 S2-074091 agreed 2007-09-30 PCC - 2007-06-05
0056 - A Rel-8 7.4.0 - Alignment of Charging requirements with IMS - - - - S2-60 S2-074092 withdrawn 2007-09-30 PCC Withdrawn before the meeting 2007-06-05
0057 - F Rel-8 7.4.0 - Selection of PCRF at the GW and at the AF alternative 1 - - - - S2-60 S2-074374 postponed 2007-10-02 PCC Not Handled at S2#60 2007-06-05
0058 - F Rel-8 7.4.0 - Selection of PCRF at the GW and at the AF alternative 2 - - - - S2-60 S2-074375 postponed 2007-10-02 PCC Not Handled at S2#60 2007-06-05
0059 - B Rel-8 7.4.0 - Scope of the new 23.203 - - - - S2-61 S2-075190 revised 2007-11-01 SAES Revised in S2-075739 2007-06-05
0059 1 B Rel-8 7.4.0 - Scope of the new 23.203 - - - - S2-61 S2-075739 revised 2007-11-15 SAES Revised in S2-075844 2007-06-05
0059 2 B Rel-8 7.4.0 8.0.0 Scope of the new 23.203 SP-38 SP-070812 approved S2 S2-61 S2-075844 agreed 2007-11-15 SAES - 2007-06-05
0060 - B Rel-8 7.4.0 - Proposal of content for TS 23.203 - - - - S2-61 S2-075191 revised 2007-11-01 SAES Revised in S2-075738 2007-06-05
0060 1 B Rel-8 7.4.0 - Proposal of content for TS 23.203 - - - - S2-61 S2-075738 revised 2007-11-15 SAES Revised in S2-075845 2007-06-05
0060 2 B Rel-8 7.4.0 8.0.0 Proposal of content for TS 23.203 SP-38 SP-070812 approved S2 S2-61 S2-075845 agreed 2007-11-15 SAES - 2007-06-05
0061 - B Rel-8 7.4.0 - PCRF discovery selection principles - - - - S2-61 S2-075716 revised 2007-11-14 SAES For e-mail approval. Rev7 agreed. Revised in S2-075862 2007-11-14
0061 1 B Rel-8 7.4.0 8.0.0 PCRF discovery selection principles SP-38 SP-070812 approved S2 S2-61 S2-075862 agreed 2007-11-22 SAES e-mail approved 2007-11-14
0062 - B Rel-8 8.0.0 - Role of the vPCRF - - - - S2-62 S2-080102 revised 2008-01-17 SAES-SA-HLF Revised in S2-080763 2008-01-17
0062 1 B Rel-8 8.0.0 - Role of the vPCRF - - - - S2-62 S2-080763 revised 2008-01-17 SAES Revised in S2-080921 2008-01-17
0062 2 B Rel-8 8.0.0 8.1.0 Role of the vPCRF SP-39 SP-080175 approved S2 S2-62 S2-080921 agreed 2008-01-17 SAES Approved at S2-62, revised at S2-63 to correct error in S2-081097, but was not handled 2008-01-17
0062 3 B Rel-8 8.0.0 - Role of the vPCRF - - - - S2-63 S2-081097 noted 2008-02-06 SAES Not Handled 2008-02-06
0063 - B Rel-8 8.0.0. - Architecture and functional entities for Rel-8 - - - - S2-62 S2-080104 revised 2008-01-17 SAES-SA-HLF Revised in S2-080762 2008-01-17
0063 1 B Rel-8 8.0.0 8.1.0 Architecture and functional entities for Rel-8 SP-39 SP-080107 approved S2 S2-62 S2-080762 agreed 2008-01-17 SAES Approved 2008-01-17
0064 - B Rel-8 8.0.0 - Documentation strategy for incorporating items from 23.401/23.402 into 23.203 - - - - S2-62 S2-080105 revised 2008-01-17 SAES-SA-HLF Revised in S2-080760 2008-01-17
0064 1 B Rel-8 8.0.0 8.1.0 Documentation strategy for incorporating items from 23.401/23.402 into 23.203 SP-39 SP-080107 approved S2 S2-62 S2-080760 agreed 2008-01-17 SAES Approved 2008-01-17
0065 - F Rel-8 8.0.0 - Rx reference point domain definition - - - - S2-62 S2-080113 revised 2008-01-17 SAES-SA-HLF Revised in S2-080765 2008-01-17
0065 1 F Rel-8 8.0.0 - Rx reference point domain definition - - - - S2-62 S2-080765 revised 2008-01-17 SAES Revised in S2-080923 2008-01-17
0065 2 F Rel-8 8.0.0 8.1.0 Rx reference point domain definition SP-39 SP-080107 approved S2 S2-62 S2-080923 agreed 2008-01-17 SAES Approved 2008-01-17
0066 - B Rel-8 8.0.0 - Clarification for PCRF selection. - - - - S2-62 S2-080135 revised 2008-01-17 SAES Revised in S2-080764 2008-01-17
0066 1 B Rel-8 8.0.0 - Clarification for PCRF selection. - - - - S2-62 S2-080764 revised 2008-01-17 SAES Revised in S2-080922 2008-01-17
0066 2 B Rel-8 8.0.0 8.1.0 Clarification for PCRF selection. SP-39 SP-080107 approved S2 S2-62 S2-080922 agreed 2008-01-17 SAES Approved 2008-01-17
0093 - B Rel-8 8.0.0 - Non-3GPP Gateway Control Session Relocation - - - - S2-62 S2-080346 withdrawn 2008-01-17 SAES Withdrawn 2008-01-17
0094 - C Rel-8 8.0.0 - Definitions for 23.203 - - - - S2-62 S2-080348 revised 2008-01-17 SAES Revised in S2-080761 2008-01-17
0094 1 C Rel-8 8.0.0 - Definitions for 23.203 - - - - S2-62 S2-080761 revised 2008-01-17 SAES Revised in S2-080920 2008-01-17
0094 2 C Rel-8 8.0.0 8.1.0 Definitions for 23.203 SP-39 SP-080107 approved S2 S2-62 S2-080920 agreed 2008-01-17 SAES Approved 2008-01-17
0095 - B Rel-8 8.0.0 - for PCRF selection in roaming scenario - - - - S2-62 S2-080364 revised 2008-01-17 SAES Revised in S2-080767 2008-01-17
0095 1 B Rel-8 8.0.0 - for PCRF selection in roaming scenario - - - - S2-62 S2-080767 revised 2008-01-17 SAES Revised in S2-080924 2008-01-17
0095 2 B Rel-8 8.0.0 8.1.0 for PCRF selection in roaming scenario SP-39 SP-080107 approved S2 S2-62 S2-080924 agreed 2008-01-17 SAES Approved 2008-01-17
0096 - B Rel-8 8.0.0 - for information storage in DRA - - - - S2-62 S2-080366 revised 2008-01-17 SAES Revised in S2-080768 2008-01-17
0096 1 B Rel-8 8.0.0 - for information storage in DRA - - - - S2-62 S2-080768 revised 2008-01-17 SAES Revised in S2-080925 2008-01-17
0096 2 B Rel-8 8.0.0 8.1.0 for information storage in DRA SP-39 SP-080107 approved S2 S2-62 S2-080925 agreed 2008-01-17 SAES Approved 2008-01-17
0097 - B Rel-8 8.0.0 - to update DRA role - - - - S2-62 S2-080368 withdrawn 2008-01-17 SAES Withdrawn 2008-01-17
0098 - B Rel-8 8.0.0 - to update of procedures in Section 7 - - - - S2-62 S2-080369 noted 2008-01-17 SAES Not Handled 2008-01-17
0099 - C Rel-8 8.0.0 - Updating Section 6.1 to incorporate BBERF - - - - S2-62 S2-080424 noted 2008-01-17 SAES Not Handled 2008-01-17
0100 - F Rel-8 8.0.0 - Verification of access type value requested by the AF at the PCRF - - - - S2-62 S2-080464 noted 2008-01-17 SAE Not Handled 2008-01-17
0101 - F Rel-7 7.5.0 - QoS Authorization for incomplete service information - - - - S2-62 S2-080538 noted 2008-01-17 PCC Not Handled 2008-01-17
0102 - B Rel-8 8.0.0 - Generic procedures introduction and IP-CAN session establishment procedure for EPS - - - - S2-63 S2-081095 noted 2008-02-01 SAES Noted 2008-02-01
0103 - B Rel-8 8.0.0 - Generic IP-CAN session termination procedure for EPS - - - - S2-63 S2-081096 revised 2008-02-01 SAES Revised in S2-081874 2008-02-01
0103 1 B Rel-8 8.0.0 - Generic IP-CAN session termination procedure for EPS - - - - S2-63 S2-081874 noted 2008-02-20 SAES Not Handled 2008-02-20
0103 2 B Rel-8 8.1.1 - Generic IP-CAN session termination procedure for EPS - - - - S2-64 S2-082171 revised 2008-04-01 SAES Revised in parallel session in S2-082865 2008-04-01
0103 3 B Rel-8 8.1.1 - Generic IP-CAN session termination procedure for EPS - - - - S2-64 S2-082865 revised 2008-04-09 SAES Revised in parallel session in S2-082907 2008-04-09
0103 4 B Rel-8 8.1.1 - Generic IP-CAN session termination procedure for EPS - - - - S2-64 S2-082907 revised 2008-04-10 SAES Approved, but revised at S2-65 2008-04-10
0103 5 B Rel-8 8.1.1 - Generic IP-CAN session termination procedure for EPS - - - - S2-65 S2-083251 revised 2008-05-02 SAES Revised in parallel session in S2-084055 2008-05-02
0103 6 B Rel-8 8.1.1 - Generic IP-CAN session termination procedure for EPS - - - - S2-65 S2-084055 revised 2008-05-13 SAES Revised in parallel session in S2-084135 2008-05-13
0103 7 B Rel-8 8.1.1 - Generic IP-CAN session termination procedure for EPS - - - - S2-65 S2-084135 revised 2008-05-16 SAES Revised in parallel session in S2-084349 2008-05-16
0103 8 B Rel-8 8.1.1 8.2.0 Generic IP-CAN session termination procedure for EPS SP-40 SP-080372 approved S2 S2-65 S2-084349 agreed 2008-05-16 SAES Approved 2008-05-16
0104 - B Rel-8 8.0.0 - Definition of IPCAN - - - - S2-63 S2-081099 withdrawn 2008-02-01 SAES Withdrawn 2008-02-01
0105 - B Rel-8 8.0.0 - Additional Procedures for PCC - - - - S2-63 S2-081110 revised 2008-02-02 ServID Revised in parallel session in S2-081768 2008-02-02
0105 1 B Rel-8 8.0.0 - Additional Procedures for PCC - - - - S2-63 S2-081768 revised 2008-02-02 ServID Revised in S2-081954 2008-02-02
0105 2 B Rel-8 8.0.0 8.1.0 Additional Procedures for PCC SP-39 SP-080107 approved S2 S2-63 S2-081954 agreed 2008-02-02 ServID Approved 2008-02-02
0107 - C Rel-8 8.0.0 - Tunneled and untunneled PCC rules in Release 8 - - - - S2-63 S2-081311 revised 2008-02-07 SAES Revised in S2-081652 2008-02-07
0107 1 C Rel-8 8.0.0 - Tunneled and untunneled PCC rules in Release 8 - - - - S2-63 S2-081652 revised 2008-02-20 SAES Revised in parallel session in S2-081767 2008-02-20
0107 2 C Rel-8 8.0.0 - Tunneled and untunneled PCC rules in Release 8 - - - - S2-63 S2-081767 revised 2008-02-20 SAES Revised in S2-081955 2008-02-20
0107 3 C Rel-8 8.0.0 8.1.0 Tunneled and untunneled PCC rules in Release 8 SP-39 SP-080107 approved S2 S2-63 S2-081955 agreed 2008-02-20 SAES Approved 2008-02-20
0108 - C Rel-8 8.0.0 - Usage of IPCAN type, RAT type and other identifiers in Release 8 - - - - S2-63 S2-081312 revised 2008-02-07 SAES Revised in S2-081653 2008-02-07
0108 1 C Rel-8 8.0.0 - Usage of IPCAN type, RAT type and other identifiers in Release 8 - - - - S2-63 S2-081653 noted 2008-02-20 SAES Not Handled 2008-02-20
0109 - B Rel-8 8.0.0 - Home operator control of PCC rules when AF is in the visited network - - - - S2-63 S2-081314 noted 2008-02-07 SAES Not Handled 2008-02-07
0109 1 B Rel-8 8.1.0 - Home operator control of PCC rules when AF is in the visited network - - - - S2-64 S2-082094 noted 2008-04-01 SAES Not Handled 2008-04-01
0110 - B Rel-8 8.0.0 - Requirements for PCRF in roaming case - - - - S2-63 S2-081417 noted 2008-02-08 PCC Not Handled 2008-02-08
0111 - F Rel-7 7.5.0 - QoS Authorization for incomplete service information - - - - S2-63 S2-081511 noted 2008-02-08 PCC Not Handled 2008-02-08
0111 1 F Rel-7 7.7.0 - QoS Authorization for incomplete service information - - - - S2-66 S2-084753 noted 2008-06-18 PCC Noted 2008-06-18
0111 2 F Rel-7 7.8.0 - QoS Authorization for incomplete service information - - - S2 S2-69 S2-087804 revised 2008-11-12 PCC Revised in S2-088277 2008-11-12
0111 3 F Rel-7 7.8.0 7.9.0 QoS Authorization for incomplete service information SP-42 SP-080811 approved S2 S2-69 S2-088277 agreed 2008-11-21 PCC Approved 2008-11-21
0112 - F Rel-7 7.5.0 - Clarification for PCRF initiated IP-CAN session termination - - - - S2-63 S2-081512 revised 2008-02-08 PCC Revised in parallel session in S2-081764 2008-02-08
0112 1 F Rel-7 7.5.0 7.6.0 Clarification for PCRF initiated IP-CAN session termination SP-39 SP-080106 approved S2 S2-63 S2-081764 agreed 2008-02-20 PCC Approved 2008-02-20
0113 - A Rel-8 8.0.0 - Clarification for PCRF initiated IP-CAN session termination - - - - S2-63 S2-081513 revised 2008-02-08 PCC Revised in parallel session in S2-081765 2008-02-08
0113 1 A Rel-8 8.0.0 8.1.0 Clarification for PCRF initiated IP-CAN session termination SP-39 SP-080106 approved S2 S2-63 S2-081765 agreed 2008-02-20 PCC Approved 2008-02-20
0114 - C Rel-8 8.0.0 - Support of tunnelled SDFs at BBERF - - - - S2-63 S2-081872 noted 2008-02-20 SAES Not Handled 2008-02-20
0115 - C Rel-8 8.0.0 8.1.0 Update of Reference Point names SP-39 SP-080107 approved S2 S2-63 S2-081909 agreed 2008-02-21 SAES Approved 2008-02-21
0116 - C Rel-8 8.1.1 - Handling of multiple BBERFs - - - - S2-64 S2-082077 withdrawn 2008-04-04 SAES - 2008-04-04
0116 1 C Rel-8 8.1.1 - Handling of multiple BBERFs - - - - S2-65 S2-083550 noted 2008-05-02 SAES Not Handled 2008-05-02
0116 2 C Rel-8 8.2.0 - Handling of multiple BBERFs - - - - S2-66 S2-084747 revised 2008-06-18 SAES Revised in S2-085209 2008-06-18
0116 3 C Rel-8 8.2.0 - Handling of multiple BBERFs - - - - S2-66 S2-085209 revised 2008-06-26 SAES Revised in S2-085216 2008-06-26
0116 4 B Rel-8 8.2.0 - Handling of multiple BBERFs - - - - S2-66 S2-085216 revised 2008-06-27 SAES Revised in S2-085275 2008-06-27
0116 5 B Rel-8 8.2.0 - Handling of multiple BBERFs - - - - S2-66 S2-085275 revised 2008-06-27 SAES Revised at S2-67. Approved at S2-66 2008-06-27
0116 6 B Rel-8 8.3.1 - Handling of multiple BBERFs - - - S2 S2-68 S2-086558 revised 2008-10-07 SAES Revised in S2-087116 2008-10-07
0116 7 B Rel-8 8.3.1 - Handling of multiple BBERFs - - - S2 S2-68 S2-087116 revised 2008-10-16 SAES Revised in S2-087291 2008-10-16
0116 8 B Rel-8 8.3.1 8.4.0 Handling of multiple BBERFs SP-42 SP-080815 approved S2 S2-68 S2-087291 agreed 2008-10-16 SAES Approved 2008-10-16
0116 9 B Rel-8 8.3.1 - Handling of Multiple BBERFs - - - S2 S2-69 S2-087826 withdrawn 2008-11-12 SAES WITHDRAWN 2008-11-12
0117 - C Rel-8 8.1.1 - Multiple leg linking at the PCRF - - - - S2-64 S2-082086 revised 2008-04-01 SAES Revised in parallel session in S2-082866 2008-04-01
0117 1 C Rel-8 8.1.1 - Multiple leg linking at the PCRF - - - - S2-64 S2-082866 revised 2008-04-09 SAES Revised in parallel session in S2-082904 2008-04-09
0117 2 C Rel-8 8.1.1 - Multiple leg linking at the PCRF - - - - S2-64 S2-082904 revised 2008-04-09 SAES Approved, but revised at S2-65 2008-04-09
0117 3 C Rel-8 8.1.1 - Multiple leg linking at the PCRF - - - - S2-65 S2-083394 revised 2008-05-02 SAES Revised in parallel session in S2-084053 2008-05-02
0117 4 C Rel-8 8.1.1 - Multiple leg linking at the PCRF - - - - S2-65 S2-084053 revised 2008-05-13 SAES Revised in parallel session in S2-084132 2008-05-13
0117 5 C Rel-8 8.1.1 8.2.0 Multiple leg linking at the PCRF SP-40 SP-080373 approved S2 S2-65 S2-084132 agreed 2008-05-15 SAES Approved 2008-05-15
0118 - C Rel-8 8.1.1 - Alignment of PCC functionalities to EPS principles in terms of bearer binding, policy enforcement, u - - - - S2-64 S2-082087 revised 2008-04-01 SAES Revised in parallel session in S2-082867 2008-04-01
0118 1 C Rel-8 8.1.1 - Alignment of PCC functionalities to EPS principles in terms of bearer binding, policy enforcement, u - - - - S2-64 S2-082867 revised 2008-04-09 SAES Revised in parallel session in S2-082906 2008-04-09
0118 2 C Rel-8 8.1.1 - Alignment of PCC functionalities to EPS principles in terms of bearer binding, policy enforcement, u - - - - S2-64 S2-082906 revised 2008-04-09 SAES Revised in S2-083130 2008-04-09
0118 3 C Rel-8 8.1.1 - Alignment of PCC functionalities to EPS principles in terms of bearer binding, policy enforcement, u - - - - S2-64 S2-083130 revised 2008-04-11 SAES Revised in S2-083138 2008-04-11
0118 4 C Rel-8 8.1.1 8.2.0 Alignment of PCC functionalities to EPS principles in terms of bearer binding, policy enforcement, u SP-40 SP-080372 approved S2 S2-64 S2-083138 agreed 2008-04-11 SAES Approved 2008-04-11
0118 5 C Rel-8 8.1.1 - Alignment of PCC functionalities to EPS principles in terms of bearer binding, policy enforcement, u - - - - S2-65 S2-083320 noted 2008-05-02 SAES Noted 2008-05-02
0119 - F Rel-8 8.1.1 - Updated IP-CAN Definition for Multiple IPv6 Prefixes - - - - S2-64 S2-082097 noted 2008-04-01 SAES Noted 2008-04-01
0120 - B Rel-8 8.1.1 - Session binding updates for common IMS - - - - S2-64 S2-082119 revised 2008-04-01 SAES Revised in S2-082967 2008-04-01
0120 1 B Rel-8 8.1.1 - Session binding updates for common IMS - - - - S2-64 S2-082967 noted 2008-04-07 SAES Noted 2008-04-07
0121 - B Rel-8 8.1.1 - Modify PCC Procedures - - - - S2-64 S2-082138 revised 2008-04-01 SAES Revised in parallel session in S2-082863 2008-04-01
0121 1 B Rel-8 8.1.1 - Modify PCC Procedures - - - - S2-64 S2-082863 revised 2008-04-09 SAES Revised in parallel session in S2-082903 2008-04-09
0121 2 B Rel-8 8.1.1 - Modify PCC Procedures - - - - S2-64 S2-082903 revised 2008-04-10 SAES Revised in parallel session in S2-082941 2008-04-10
0121 3 B Rel-8 8.1.1 - Modify PCC Procedures - - - - S2-64 S2-082941 revised 2008-04-11 SAES Revised in S2-083142 2008-04-11
0121 4 B Rel-8 8.1.1 8.2.0 Modify PCC Procedures SP-40 SP-080373 approved S2 S2-64 S2-083142 agreed 2008-04-11 SAES Approved 2008-04-11
0122 - F Rel-7 7.6.0 - Centralized unit determination for charging with PCC - - - - S2-64 S2-082172 noted 2008-04-01 PCC Noted 2008-04-01
0123 - A Rel-8 8.1.1 - Centralized unit determination for charging with PCC - - - - S2-64 S2-082173 noted 2008-04-01 PCC Noted 2008-04-01
0124 - B Rel-8 8.1.1 - Inclusion of Annex C and K from 23.401 - - - - S2-64 S2-082174 noted 2008-04-01 SAES Not Handled 2008-04-01
0125 - B Rel-8 8.1.1 - Inclusion of Annex B from 23.401 - - - - S2-64 S2-082176 noted 2008-04-01 SAES Not Handled 2008-04-01
0125 1 B Rel-8 8.1.1 - Inclusion of Annex C from 23.401 to main body - - - - S2-65 S2-083262 revised 2008-05-02 SAES Revised in parallel session in S2-084137 2008-05-02
0125 2 B Rel-8 8.1.1 8.2.0 Inclusion of Annex C from 23.401 to main body SP-40 SP-080373 approved S2 S2-65 S2-084137 agreed 2008-05-16 SAES Approved 2008-05-16
0126 - B Rel-8 8.1.1 - Generic IP-CAN session modification procedure for EPS - - - - S2-64 S2-082178 revised 2008-04-01 SAES Revised in parallel session in S2-082864 2008-04-01
0126 1 B Rel-8 8.1.1 - Generic IP-CAN session modification procedure for EPS - - - - S2-64 S2-082864 revised 2008-04-09 SAES Revised in parallel session in S2-082905 2008-04-09
0126 2 B Rel-8 8.1.1 - Generic IP-CAN session modification procedure for EPS - - - - S2-64 S2-082905 revised 2008-04-10 SAES Approved, but revised at S2-65 2008-04-10
0126 3 B Rel-8 8.1.1 - Generic IP-CAN session modification procedure for EPS - - - - S2-65 S2-083265 revised 2008-05-02 SAES Revised in parallel session in S2-084054 2008-05-02
0126 4 B Rel-8 8.1.1 - Generic IP-CAN session modification procedure for EPS - - - - S2-65 S2-084054 revised 2008-05-13 SAES Revised in parallel session in S2-084134 2008-05-13
0126 5 B Rel-8 8.1.1 - Generic IP-CAN session modification procedure for EPS - - - - S2-65 S2-084134 revised 2008-05-16 SAES Revised in parallel session in S2-084343 2008-05-16
0126 6 B Rel-8 8.1.1 8.2.0 Generic IP-CAN session modification procedure for EPS SP-40 SP-080372 approved S2 S2-65 S2-084343 agreed 2008-05-16 SAES Approved 2008-05-16
0127 - B Rel-8 8.1.1 - QoS rule definition and procedures - - - - S2-64 S2-082180 revised 2008-04-01 SAES Revised in parallel session in S2-082868 2008-04-01
0127 1 B Rel-8 8.1.1 - QoS rule definition and procedures - - - - S2-64 S2-082868 revised 2008-04-09 SAES Revised in parallel session in S2-082938 2008-04-09
0127 2 B Rel-8 8.1.1 8.2.0 QoS rule definition and procedures SP-40 SP-080373 approved S2 S2-64 S2-082938 agreed 2008-04-11 SAES Approved 2008-04-11
0128 - B Rel-8 8.1.1 - Online charging session per IP-CAN session - - - - S2-64 S2-082182 revised 2008-04-01 SAES Revised in parallel session in S2-082869 2008-04-01
0128 1 B Rel-8 8.1.1 - Online charging session per IP-CAN session - - - - S2-64 S2-082869 revised 2008-04-09 SAES Revised in parallel session in S2-082939 2008-04-09
0128 2 B Rel-8 8.1.1 - Online charging session per IP-CAN session - - - - S2-64 S2-082939 revised 2008-04-10 SAES Revised in parallel session in S2-083129 2008-04-10
0128 3 B Rel-8 8.1.1 8.2.0 Online charging session per IP-CAN session SP-40 SP-080373 approved S2 S2-64 S2-083129 agreed 2008-04-11 SAES Approved 2008-04-11
0129 - B Rel-8 8.1.1 - Notification of IP-CAN Type Change - - - - S2-64 S2-082183 noted 2008-04-01 SAES Not Handled 2008-04-01
0129 1 B Rel-8 8.1.1 - Notification of IP-CAN Type Change - - - - S2-65 S2-083259 revised 2008-05-02 SAES Revised in parallel session in S2-084085 2008-05-02
0129 2 B Rel-8 8.1.1 8.2.0 Notification of IP-CAN Type Change SP-40 SP-080373 approved S2 S2-65 S2-084085 agreed 2008-05-14 SAES Approved 2008-05-14
0130 - B Rel-8 8.1.1 - 3GPP Accesses specific aspects - - - - S2-64 S2-082196 noted 2008-04-02 SAES Not Handled 2008-04-02
0130 1 B Rel-8 8.1.1 - Handling of event triggers and credit re-authorization triggers - - - - S2-65 S2-083359 revised 2008-05-02 SAES Revised in parallel session in S2-084082 2008-05-02
0130 2 B Rel-8 8.1.1 - Handling of event triggers and credit re-authorization triggers - - - - S2-65 S2-084082 revised 2008-05-15 SAES Revised in parallel session in S2-084140 2008-05-15
0130 3 B Rel-8 8.1.1 - Handling of event triggers and credit re-authorization triggers - - - - S2-65 S2-084140 revised 2008-05-16 SAES Revised in parallel session in S2-084346 2008-05-16
0130 4 B Rel-8 8.1.1 - Handling of event triggers and credit re-authorization triggers - - - - S2-65 S2-084346 revised 2008-05-16 SAES Revised in parallel session in S2-084351 2008-05-16
0130 5 B Rel-8 8.1.1 8.2.0 Handling of event triggers and credit re-authorization triggers SP-40 SP-080372 approved S2 S2-65 S2-084351 agreed 2008-05-16 SAES Approved 2008-05-16
0131 - B Rel-8 8.1.1 - Update of Credit re-authorization triggers - - - - S2-64 S2-082197 noted 2008-04-02 SAES Not Handled 2008-04-02
0132 - F Rel-8 8.1.1 - Clean up for the PCC reference architecture - - - - S2-64 S2-082198 noted 2008-04-02 SAES Not Handled 2008-04-02
0133 - F Rel-8 8.1.1 - Input from AF for PCC decision - - - - S2-64 S2-082199 noted 2008-04-02 SAES Not Handled 2008-04-02
0134 - F Rel-7 7.6.0 - Binding of PCC rules having no AF session - - - - S2-64 S2-082261 revised 2008-04-01 PCC Revised in S2-082856 2008-04-01
0134 1 F Rel-7 7.6.0 7.7.0 Binding of PCC rules having no AF session SP-40 SP-080369 approved S2 S2-64 S2-082856 agreed 2008-04-10 PCC Approved 2008-04-10
0135 - A Rel-8 8.1.1 - Binding of PCC rules having no AF session - - - - S2-64 S2-082262 revised 2008-04-01 PCC Revised in S2-082857 2008-04-01
0135 1 A Rel-8 8.1.1 8.2.0 Binding of PCC rules having no AF session SP-40 SP-080369 approved S2 S2-64 S2-082857 agreed 2008-04-10 PCC Approved 2008-04-10
0136 - B Rel-8 8.1.1 - Role of V-PCRF - - - - S2-64 S2-082170 noted 2008-04-03 SAES Not Handled 2008-04-03
0137 - F Rel-8 8.1.0 - The addition of event triggers section in 23.203 - - - - S2-64 S2-082407 noted 2008-04-01 SAES Not Handled 2008-04-01
0137 1 F Rel-8 8.1.0 - The addition of event triggers section in annex A.4 - - - - S2-65 S2-083623 revised 2008-05-02 SAES Merged into S2-084082 2008-05-02
0138 - F Rel-8 8.1.1 - Clarification for vPCRF to notify the hPCRF of the establishment of Gateway Control Session - - - - S2-64 S2-082659 noted 2008-04-01 SAES Noted 2008-04-01
0139 - B Rel-8 8.1.1 - Role of V-PCRF and H-PCRF in case of visited access - - - - S2-64 S2-082893 revised 2008-04-09 SAES Revised in S2-083111 2008-04-09
0139 1 B Rel-8 8.1.1 - Role of V-PCRF and H-PCRF in case of visited access - - - - S2-64 S2-083111 revised 2008-04-10 SAES Revised in parallel session in S2-082940 2008-04-10
0139 2 B Rel-8 8.1.1 - Role of V-PCRF and H-PCRF in case of visited access - - - - S2-64 S2-082940 revised 2008-04-11 SAES Approved, but revised at S2-65 2008-04-11
0139 3 B Rel-8 8.1.1 - Role of V-PCRF and H-PCRF in case of visited access - - - - S2-65 S2-083421 revised 2008-05-02 SAES Merged in parallel sessions with S2-083250 in S2-084052 2008-05-02
0139 4 B Rel-8 8.1.1 - Role of V-PCRF and H-PCRF in case of visited access - - - - S2-65 S2-083250 revised 2008-05-02 SAES Revised in parallel session in S2-084052 2008-05-02
0139 5 B Rel-8 8.1.1 - Role of V-PCRF and H-PCRF in case of visited access - - - - S2-65 S2-084052 revised 2008-05-15 SAES Revised in parallel session in S2-084133 2008-05-15
0139 6 B Rel-8 8.1.1 8.2.0 Role of V-PCRF and H-PCRF in case of visited access SP-40 SP-080373 approved S2 S2-65 S2-084133 agreed 2008-05-16 SAES Approved 2008-05-16
0140 - B Rel-8 8.1.1 - Alignment of PCC functionalities to EPS principles in terms of bearer binding, policy enforcement, u - - - - S2-65 S2-083460 revised 2008-05-02 SAES Revised in IMS SWG to S2-084057 2008-05-02
0140 1 B Rel-8 8.1.1 - Alignment of PCC functionalities to EPS principles in terms of bearer binding, policy enforcement, u - - - - S2-65 S2-084057 revised 2008-05-13 SAES Revised in parallel session in S2-084083 2008-05-13
0140 2 B Rel-8 8.1.1 - Alignment of PCC functionalities to EPS principles in terms of bearer binding, poli - - - - S2-65 S2-084083 withdrawn 2008-04-04 SAES - 2008-04-04
0141 - C Rel-8 8.1.1 8.2.0 PCRF Bearer binding SP-40 SP-080373 approved S2 S2-65 S2-083461 agreed 2008-05-02 SAES Approved 2008-05-02
0142 - C Rel-8 8.1.1 - Clean up of architecture related FFS in 23.203 - - - - S2-65 S2-083253 revised 2008-05-02 SAES Revised in parallel session in S2-084044 2008-05-02
0142 1 C Rel-8 8.1.1 - Clean up of architecture related FFS in 23.203 - - - - S2-65 S2-084044 revised 2008-05-15 SAES Revised in parallel session in S2-084136 2008-05-15
0142 2 C Rel-8 8.1.1 8.2.0 Clean up of architecture related FFS in 23.203 SP-40 SP-080372 approved S2 S2-65 S2-084136 agreed 2008-05-16 SAES Approved 2008-05-16
0143 - C Rel-8 8.1.1 - Clean up of functionality related FFS 23.203 - - - - S2-65 S2-083254 revised 2008-05-02 SAES Revised in parallel session in S2-084045 2008-05-02
0143 1 F Rel-8 8.1.1 8.2.0 Clean up of functionality related FFS 23.203 SP-40 SP-080372 approved S2 S2-65 S2-084045 agreed 2008-05-14 SAES Approved 2008-05-14
0144 - B Rel-8 8.1.1 - Additions to Annex A4 - - - - S2-65 S2-083255 revised 2008-05-02 SAES Revised in parallel session in S2-084046 2008-05-02
0144 1 B Rel-8 8.1.1 - Additions to Annex A4 - - - - S2-65 S2-084046 revised 2008-05-15 SAES Revised in parallel session in S2-084344 2008-05-15
0144 2 B Rel-8 8.1.1 - Additions to Annex A4 - - - - S2-65 S2-084344 revised 2008-05-16 SAES Revised in parallel session in S2-084347 2008-05-16
0144 3 B Rel-8 8.1.1 8.2.0 Additions to Annex A4 SP-40 SP-080372 approved S2 S2-65 S2-084347 agreed 2008-05-16 SAES Approved 2008-05-16
0145 - B Rel-8 8.1.1 - Additions to Annex A5 - - - - S2-65 S2-083256 revised 2008-05-02 SAES Revised in parallel session in S2-084047 2008-05-02
0145 1 B Rel-8 8.1.1 - Additions to Annex A5 - - - - S2-65 S2-084047 revised 2008-05-15 SAES Revised in parallel session in S2-084345 2008-05-15
0145 2 B Rel-8 8.1.1 - Additions to Annex A5 - - - - S2-65 S2-084345 revised 2008-05-16 SAES Revised in parallel session in S2-084348 2008-05-16
0145 3 B Rel-8 8.1.1 8.2.0 Additions to Annex A5 SP-40 SP-080372 approved S2 S2-65 S2-084348 agreed 2008-05-16 SAES Approved 2008-05-16
0146 - B Rel-8 8.1.1 - ARP in PCC Rule - - - - S2-65 S2-083257 revised 2008-05-02 SAES Revised in parallel session in S2-084084 2008-05-02
0146 1 B Rel-8 8.1.1 8.2.0 ARP in PCC Rule SP-40 SP-080372 approved S2 S2-65 S2-084084 agreed 2008-05-14 SAES Approved 2008-05-14
0147 - B Rel-8 8.1.1 - Clarification of PCRF initiated IPCAN Session termination - - - - S2-65 S2-083258 withdrawn 2008-04-04 SAES - 2008-04-04
0148 - B Rel-8 8.1.1 - Inclusion of Annex C from 23.401 - - - - S2-65 S2-083260 revised 2008-05-02 SAES Revised in parallel session in S2-084048 2008-05-02
0148 1 B Rel-8 8.1.1 8.2.0 Inclusion of Annex C from 23.401 SP-40 SP-080373 approved S2 S2-65 S2-084048 agreed 2008-05-13 SAES Approved 2008-05-13
0150 - F Rel-7 7.6.0 - Termination actions - - - - S2-65 S2-083313 revised 2008-05-02 PCC Revised in S2-084027 2008-05-02
0150 1 F Rel-7 7.6.0 7.7.0 Termination actions SP-40 SP-080369 approved S2 S2-65 S2-084027 agreed 2008-05-15 PCC Approved 2008-05-15
0151 - A Rel-8 8.1.1 - Termination actions - - - - S2-65 S2-083314 revised 2008-05-02 PCC Revised in S2-084028 2008-05-02
0151 1 A Rel-8 8.1.1 8.2.0 Termination actions SP-40 SP-080369 approved S2 S2-65 S2-084028 agreed 2008-05-15 PCC Approved 2008-05-15
0152 - F Rel-7 7.6.0 - Uplink TFT packet filters - - - - S2-65 S2-083315 revised 2008-05-02 PCC Revised in S2-084029 2008-05-02
0152 1 F Rel-7 7.6.0 7.7.0 Uplink TFT packet filters SP-40 SP-080369 approved S2 S2-65 S2-084029 agreed 2008-05-15 PCC Approved 2008-05-15
0153 - A Rel-8 8.1.1 - Uplink TFT packet filters - - - - S2-65 S2-083316 revised 2008-05-02 PCC Revised in S2-084030 2008-05-02
0153 1 A Rel-8 8.1.1 8.2.0 Uplink TFT packet filters SP-40 SP-080369 approved S2 S2-65 S2-084030 agreed 2008-05-15 PCC Approved 2008-05-15
0154 - F Rel-7 7.6.0 - Forwarding of information to the AF - - - - S2-65 S2-083317 revised 2008-05-02 PCC Revised in S2-084031 2008-05-02
0154 1 F Rel-7 7.6.0 - Forwarding of information to the AF - - - - S2-65 S2-084031 revised 2008-05-15 PCC Revised in S2-084378 2008-05-15
0154 2 F Rel-7 7.6.0 7.7.0 Forwarding of information to the AF SP-40 SP-080369 approved S2 S2-65 S2-084378 agreed 2008-05-16 PCC Approved 2008-05-16
0155 - A Rel-8 8.1.1 - Forwarding of information to the AF - - - - S2-65 S2-083318 revised 2008-05-02 PCC Revised in S2-084032 2008-05-02
0155 1 A Rel-8 8.1.1 - Forwarding of information to the AF - - - - S2-65 S2-084032 revised 2008-05-15 PCC Revised in S2-084379 2008-05-15
0155 2 A Rel-8 8.1.1 8.2.0 Forwarding of information to the AF SP-40 SP-080369 approved S2 S2-65 S2-084379 agreed 2008-05-16 PCC Approved 2008-05-16
0156 - F Rel-8 8.1.1 - Input from AF for PCC decision - - - - S2-65 S2-083358 revised 2008-05-02 SAES Revised in parallel session in S2-084056 2008-05-02
0156 1 F Rel-8 8.1.1 - Input from AF for PCC decision - - - - S2-65 S2-084056 revised 2008-05-15 SAES Revised in parallel session in S2-084138 2008-05-15
0156 2 F Rel-8 8.1.1 8.2.0 Input from AF for PCC decision SP-40 SP-080373 approved S2 S2-65 S2-084138 agreed 2008-05-15 SAES Approved 2008-05-15
0157 - C Rel-8 8.1.0 - PCC impacts of multiple PDN Connections to one PDN - - - - S2-65 S2-083681 noted 2008-05-02 SAES Noted 2008-05-02
0158 - C Rel-7 7.6.0 - A QoS Rule on Default Bearer Handling - - - - S2-65 S2-083735 noted 2008-05-02 SAES Not Handled 2008-05-02
0159 - B Rel-8 8.1.1 - BBERF initiated IP CAN Session termination procedure - - - - S2-65 S2-083756 noted 2008-05-02 PCC Not Handled 2008-05-02
0160 - C Rel-8 8.1.1 - Adding ARP to PCC Rules - - - - S2-65 S2-083771 noted 2008-05-02 SAES Not Handled 2008-05-02
0161 - F Rel-8 8.1.1 - Missing PCC architecture in roaming situation - - - - S2-65 S2-083783 noted 2008-05-02 SAES Noted 2008-05-02
0162 - F Rel-7 7.6.0 - Changes due to Bearer Mapping - - - - S2-65 S2-084183 revised 2008-05-15 SAES Revised in S2-084368 2008-05-15
0162 1 C Rel-7 7.6.0 7.7.0 Changes due to Bearer Mapping SP-40 SP-080390 approved S2 S2-65 S2-084368 agreed 2008-05-16 TEI7 Approved 2008-05-16
0163 - A Rel-8 8.1.1 - Changes due to Bearer Mapping - - - - S2-65 S2-084184 revised 2008-05-15 SAES Revised in S2-084369 2008-05-15
0163 1 A Rel-8 8.1.1 8.2.0 Changes due to Bearer Mapping SP-40 SP-080390 approved S2 S2-65 S2-084369 agreed 2008-05-16 TEI7 Approved 2008-05-16
0164 - B Rel-8 8.1.1 - Limited PCC Deployment - - - - S2-65 S2-084126 revised 2008-05-15 PCC Revised in parallel session in S2-084337 2008-05-15
0164 1 B Rel-8 8.1.1 8.2.0 Limited PCC Deployment SP-40 SP-080369 approved S2 S2-65 S2-084337 agreed 2008-05-16 PCC Approved 2008-05-16
0165 - C Rel-8 8.1.1 8.2.0 Addition of Credit denied information SP-40 SP-080369 approved S2 S2-65 S2-084380 agreed 2008-05-16 PCC Approved 2008-05-16
0166 - F Rel-8 8.2.0 8.3.0 Clean up of roaming related aspects SP-41 SP-080583 approved S2 S2-66 S2-084467 agreed 2008-06-18 SAES Approved 2008-06-18
0167 - F Rel-8 8.2.0 - Correction to credit re-authorization functionality when Gxx is used - - - - S2-66 S2-084470 revised 2008-06-18 SAES Revised in S2-085211 2008-06-18
0167 1 F Rel-8 8.2.0 - Correction to credit re-authorization functionality when Gxx is used - - - - S2-66 S2-085211 revised 2008-06-27 SAES Revised in S2-085283 2008-06-27
0167 2 F Rel-8 8.2.0 8.3.0 Correction to credit re-authorization functionality when Gxx is used SP-41 SP-080583 approved S2 S2-66 S2-085283 agreed 2008-07-01 SAES Approved 2008-07-01
0168 - F Rel-8 8.2.0 - Refinement of Annex A.4 and A.5 - - - - S2-66 S2-084473 revised 2008-06-18 SAES Revised in S2-085217 2008-06-18
0168 1 F Rel-8 8.2.0 8.3.0 Refinement of Annex A.4 and Annex A.5 SP-41 SP-080583 approved S2 S2-66 S2-085217 agreed 2008-06-27 SAES Approved 2008-06-27
0169 - F Rel-8 8.2.0 - Correction to IP-CAN Session Establishment Procedure - - - - S2-66 S2-084476 revised 2008-06-18 SAES Revised in S2-085212 2008-06-18
0169 1 F Rel-8 8.2.0 8.3.0 Correction to IP-CAN Session Establishment Procedure SP-41 SP-080583 approved S2 S2-66 S2-085212 agreed 2008-06-27 SAES Approved 2008-06-27
0170 - F Rel-7 7.7.0 7.8.0 Service Information Request from PCRF SP-41 SP-080579 approved S2 S2-66 S2-084481 agreed 2008-06-18 PCC Approved 2008-06-18
0171 - A Rel-8 8.2.0 8.3.0 Service Information Request from PCRF SP-41 SP-080579 approved S2 S2-66 S2-084482 agreed 2008-06-18 PCC Approved 2008-06-18
0172 - F Rel-8 8.2.0 - Handling of DRA discovery and selection in DSMIP - - - - S2-66 S2-084486 revised 2008-06-18 SAES Revised in S2-085139 2008-06-18
0172 1 F Rel-8 8.2.0 - Handling of DRA discovery and selection in DSMIP - - - - S2-66 S2-085139 noted 2008-07-01 SAES Noted 2008-07-01
0173 - F Rel-8 8.2.0 - The IP-CAN session modification procedure for IP address configuration - - - - S2-66 S2-084487 revised 2008-06-18 SAES Revised in S2-085102 2008-06-18
0173 1 F Rel-8 8.2.0 - The IP-CAN session modification procedure for IP address configuration - - - - S2-66 S2-085102 noted 2008-06-23 SAES Noted 2008-06-23
0174 - F Rel-8 8.2.0 - Refine Gateway Control Session Establishment Procedure - - - - S2-66 S2-084489 withdrawn 2008-06-18 SAES WITHDRAWN 2008-06-18
0175 - F Rel-8 8.2.0 - Correction of network scenarios for IP-CAN Session - - - - S2-66 S2-084490 noted 2008-06-18 SAES Noted 2008-06-18
0176 - F Rel-8 8.2.0 - The method of V-PCRF determining a request is for home routed access or visited access - - - - S2-66 S2-084583 revised 2008-06-18 SAES Revised in S2-085138 2008-06-18
0176 1 F Rel-8 8.2.0 - The method of V-PCRF determining a request is for home routed access or visited access - - - - S2-66 S2-085138 revised 2008-06-26 SAES Revised at S2-67. Noted at S2-66 2008-06-26
0176 2 F Rel-8 8.2.0 - The method of V-PCRF determining a request is for home routed access or visited access - - - - S2-67 S2-085550 noted 2008-08-19 SAES Noted 2008-08-19
0177 - F Rel-8 8.2.0 - Static QoS policy in BBERF - - - - S2-66 S2-084590 noted 2008-06-18 SAES Noted 2008-06-18
0178 - F Rel-8 8.2.0 - Aligning Off-path Text with 23.402 - - - - S2-66 S2-084670 revised 2008-06-18 SAES Revised in S2-085214 2008-06-18
0178 1 F Rel-8 8.2.0 - Aligning Off-path Text with 23.402 - - - - S2-66 S2-085214 revised 2008-06-27 SAES Revised in S2-085277 2008-06-27
0178 2 F Rel-8 8.2.0 8.3.0 Aligning Off-path Text with 23.402 SP-41 SP-080583 approved S2 S2-66 S2-085277 agreed 2008-06-27 SAES Approved 2008-06-27
0179 - D Rel-8 8.2.0 - Removal of Annex B and Annex I - - - - S2-66 S2-084750 noted 2008-06-18 SAES Noted. New CR created in S2-085234 2008-06-18
0180 - A Rel-8 8.2.0 - QoS Authorization for incomplete service information - - - - S2-66 S2-084754 noted 2008-06-18 PCC Noted 2008-06-18
0180 1 A Rel-8 8.3.1 - QoS Authorization for incomplete service information - - - S2 S2-69 S2-087805 revised 2008-11-12 PCC Revised in S2-088278 2008-11-12
0180 2 A Rel-8 8.3.1 - QoS Authorization for incomplete service information - - - S2 S2-69 S2-088278 revised 2008-11-21 PCC Revised in S2-088287 2008-11-21
0180 3 A Rel-8 8.3.1 8.4.0 QoS Authorization for incomplete service information SP-42 SP-080811 approved S2 S2-69 S2-088287 agreed 2008-11-21 PCC Approved 2008-11-21
0181 - F Rel-8 8.2.0 - Allocation/Retention Priority details - - - - S2-66 S2-084756 revised 2008-06-18 PCC Revised at S2-67. Noted at S2-66 2008-06-18
0181 1 F Rel-8 8.2.0 - Allocation/Retention Priority details - - - - S2-67 S2-085439 noted 2008-08-19 PCC Noted 2008-08-19
0181 2 F Rel-8 8.3.1 - Allocation/Retention Priority details - - - S2 S2-68 S2-086759 revised 2008-10-07 SAES Revised in S2-087237 2008-10-07
0181 3 F Rel-8 8.3.1 - Allocation/Retention Priority details - - - S2 S2-68 S2-087237 revised 2008-10-16 SAES Revised in S2-087289 2008-10-16
0181 4 F Rel-8 8.3.1 8.4.0 Allocation/Retention Priority details SP-42 SP-080815 approved S2 S2-68 S2-087289 agreed 2008-10-17 SAES Approved 2008-10-17
0182 - F Rel-8 8.2.0 - The revise of the signalling flow about mobility protocol tunnelling encapsulation header informatio - - - - S2-66 S2-084890 revised 2008-06-18 SAES Revised at S2-67. Approved at S2-66 2008-06-18
0182 2 F Rel-8 8.2.0 - The revise of the signalling flow about mobility protocol tunnelling encapsulation header informatio - - - - S2-67 S2-085429 revised 2008-08-19 SAES Revised in S2-086050 2008-08-19
0182 3 F Rel-8 8.2.0 - The revise of the signalling flow about mobility protocol tunnelling encapsulation header informatio - - - - S2-67 S2-086050 revised 2008-08-25 SAES Revised in parallel session in S2-086079 2008-08-25
0182 4 F Rel-8 8.2.0 - The revise of the signalling flow about mobility protocol tunnelling encapsulation header informatio - - - - S2-67 S2-086079 revised 2008-08-26 SAES Revised in parallel session in S2-086200 2008-08-26
0182 5 F Rel-8 8.2.0 - The revise of the signalling flow about mobility protocol tunnelling encapsulation header informatio - - - - S2-67 S2-086200 revised 2008-08-28 SAES Revised in parallel session in S2-086207 2008-08-28
0182 6 F Rel-8 8.2.0 - The revise of the signalling flow about mobility protocol tunnelling encapsulation header informatio - - - - S2-67 S2-086207 revised 2008-08-29 SAES Revised in S2-086333 2008-08-29
0182 7 F Rel-8 8.2.0 8.3.0 The revise of the signalling flow about mobility protocol tunnelling encapsulation header information SP-41 SP-080583 approved S2 S2-67 S2-086333 agreed 2008-08-29 SAES Approved 2008-08-29
0183 - C Rel-8 8.2.0 - Inclusion of PCRF-initiated IP-CAN Session Termination - - - - S2-66 S2-084950 noted 2008-06-18 SAES Noted 2008-06-18
0184 - F Rel-8 8.2.0 - HRPD specific content for Annex H - - - - S2-66 S2-084962 revised 2008-06-18 PCC Revised in S2-085235 2008-06-18
0184 1 F Rel-8 8.2.0 8.3.0 HRPD specific content for Annex H SP-41 SP-080605 approved S2 S2-66 S2-085235 agreed 2008-06-27 TEI8 Approved 2008-06-27
0185 - F Rel-8 8.2.0 - Clarifications on UE/NW-initiated resource allocation - - - - S2-66 S2-084974 revised 2008-06-18 SAES Revised in S2-085236 2008-06-18
0185 1 F Rel-8 8.2.0 - Clarifications on UE/NW-initiated resource allocation - - - - S2-66 S2-085236 revised 2008-06-27 SAES Revised in S2-085276 2008-06-27
0185 2 F Rel-8 8.2.0 8.3.0 Clarifications on UE/NW-initiated resource allocation SP-41 SP-080583 approved S2 S2-66 S2-085276 agreed 2008-06-27 SAES Approved 2008-06-27
0186 - F Rel-8 8.2.0 - Support of Multimedia Priority Service in PCC - - - - S2-66 S2-084994 noted 2008-06-18 PCC Not Handled 2008-06-18
0187 - D Rel-8 8.2.0 8.3.0 Removal of Annex I SP-41 SP-080583 approved S2 S2-66 S2-085234 agreed 2008-06-26 SAES Approved 2008-06-26
0188 - F Rel-8 8.2.0 - Cleanup for binding mechanisms - - - - S2-67 S2-085365 revised 2008-08-19 SAES Revised in parallel session in S2-086078 2008-08-19
0188 1 F Rel-8 8.2.0 8.3.0 Cleanup for binding mechanisms SP-41 SP-080583 approved S2 S2-67 S2-086078 agreed 2008-08-26 SAES Approved 2008-08-26
0189 - F Rel-8 8.2.0 - Clarification on input for PCC decisions - - - - S2-67 S2-085366 revised 2008-08-19 SAES Revised in parallel session in S2-086023 2008-08-19
0189 1 F Rel-8 8.2.0 8.3.0 Clarification on input for PCC decisions SP-41 SP-080583 approved S2 S2-67 S2-086023 agreed 2008-08-26 SAES Approved 2008-08-26
0190 - F Rel-8 8.2.0 - Clarification on visited access procedures - - - - S2-67 S2-085367 revised 2008-08-19 SAES Revised in parallel session in S2-086024 2008-08-19
0190 1 F Rel-8 8.2.0 8.3.0 Clarification on visited access procedures SP-41 SP-080584 approved S2 S2-67 S2-086024 agreed 2008-08-26 SAES Approved 2008-08-26
0191 - F Rel-8 8.2.0 - Clarification on QoS control at BBERF - - - - S2-67 S2-085368 noted 2008-08-19 SAES Noted 2008-08-19
0191 1 F Rel-8 8.3.0 - Clarification to BBERF QoS handling - - - S2 S2-68 S2-086628 noted 2008-10-07 SAES Not Handled 2008-10-07
0191 2 F Rel-8 8.3.1 - Clarification on QoS control at the BBERF - - - S2 S2-69 S2-087484 revised 2008-11-12 SAES Revised in S2-088086 2008-11-12
0191 3 F Rel-8 8.3.1 8.4.0 Clarification on QoS control at the BBERF SP-42 SP-080814 approved S2 S2-69 S2-088086 agreed 2008-11-21 SAES Approved 2008-11-21
0192 - F Rel-8 8.2.0 8.3.0 Clarification on bearer control mode handling SP-41 SP-080584 approved S2 S2-67 S2-085369 agreed 2008-08-19 SAES Approved 2008-08-19
0193 - F Rel-8 8.2.0 - Clarification on pre-defined rules - - - - S2-67 S2-085370 noted 2008-08-19 SAES Not Handled 2008-08-19
0193 1 F Rel-8 8.3.0 - Pre-defined QoS rules - - - S2 S2-68 S2-086627 noted 2008-10-07 SAES Not Handled 2008-10-07
0193 2 F Rel-8 8.3.1 - Clarifications on pre-defined rules - - - S2 S2-69 S2-087483 revised 2008-11-12 SAES Revised in S2-088085 2008-11-12
0193 3 F Rel-8 8.3.1 - Clarifications on pre-defined rules - - - S2 S2-69 S2-088085 withdrawn 2008-10-07 SAES - 2008-10-07
0194 - F Rel-8 8.2.0 - Minor cleanups for 23.203 - - - - S2-67 S2-085371 noted 2008-08-19 SAES Noted 2008-08-19
0194 1 F Rel-8 8.3.0 - Minor cleanups for 23.203 - - - S2 S2-68 S2-086629 noted 2008-10-07 SAES Not Handled 2008-10-07
0195 - F Rel-7 7.7.0 - Missing Ack in GW(PCEF) initiated IP-CAN Session Modification - - - - S2-67 S2-085436 revised 2008-08-19 PCC Revised in S2-086033 2008-08-19
0195 1 F Rel-7 7.7.0 - Missing Ack in GW(PCEF) initiated IP-CAN Session Modification - - - - S2-67 S2-086033 revised 2008-08-29 PCC Revised in S2-086327 2008-08-29
0195 2 F Rel-7 7.7.0 - Missing Ack in GW(PCEF) initiated IP-CAN Session Modification - - - - S2-67 S2-086327 revised 2008-08-29 PCC Revised in S2-086343 2008-08-29
0195 3 F Rel-7 7.7.0 7.8.0 Missing Ack in GW(PCEF) initiated IP-CAN Session Modification SP-41 SP-080579 approved S2 S2-67 S2-086343 agreed 2008-08-29 PCC Approved 2008-08-29
0196 - F Rel-8 8.2.0 - Missing Ack in GW(PCEF) initiated IP-CAN Session Modification - - - - S2-67 S2-085440 revised 2008-08-19 PCC Revised in S2-086037 2008-08-19
0196 1 A Rel-8 8.2.0 - Missing Ack in GW(PCEF) initiated IP-CAN Session Modification - - - - S2-67 S2-086037 revised 2008-08-29 PCC Revised in S2-086328 2008-08-29
0196 2 A Rel-8 8.2.0 - Missing Ack in GW(PCEF) initiated IP-CAN Session Modification - - - - S2-67 S2-086328 revised 2008-08-29 PCC Revised in S2-086344 2008-08-29
0196 3 A Rel-8 8.2.0 8.3.0 Missing Ack in GW(PCEF) initiated IP-CAN Session Modification SP-41 SP-080579 approved S2 S2-67 S2-086344 agreed 2008-08-29 PCC Approved 2008-08-29
0197 - F Rel-8 8.2.0 - Addition of access system interactions to some GW control session procedures - - - - S2-67 S2-085441 revised 2008-08-19 PCC Revised in parallel session in S2-086025 2008-08-19
0197 1 F Rel-8 8.2.0 - Addition of access system interactions to some GW control session procedures - - - - S2-67 S2-086025 revised 2008-08-29 PCC Revised in S2-086334 2008-08-29
0197 2 F Rel-8 8.2.0 8.3.0 Addition of access system interactions to some GW control session procedures SP-41 SP-080584 approved S2 S2-67 S2-086334 agreed 2008-08-29 SAES Approved 2008-08-29
0198 - F Rel-8 8.2.0 - Gateway Control and QoS Rules Request - - - - S2-67 S2-085442 revised 2008-08-19 PCC Revised in parallel session in S2-086026 2008-08-19
0198 1 F Rel-8 8.2.0 - Gateway Control and QoS Rules Request - - - - S2-67 S2-086026 revised 2008-08-29 PCC Revised in parallel session in S2-086208 2008-08-29
0198 2 F Rel-8 8.2.0 - Gateway Control and QoS Rules Request - - - - S2-67 S2-086208 revised 2008-08-29 PCC Revised in S2-086335 2008-08-29
0198 3 F Rel-8 8.2.0 8.3.0 Gateway Control and QoS Rules Request SP-41 SP-080584 approved S2 S2-67 S2-086335 agreed 2008-08-29 SAES Approved 2008-08-29
0199 - F Rel-8 8.2.0 - Gateway Control Session Establishment - - - - S2-67 S2-085443 revised 2008-08-19 PCC Revised in parallel session in S2-086027 2008-08-19
0199 1 F Rel-8 8.2.0 - Gateway Control Session Establishment - - - - S2-67 S2-086027 revised 2008-08-29 PCC Revised in parallel session in S2-086209 2008-08-29
0199 2 F Rel-8 8.2.0 8.3.0 Gateway Control Session Establishment SP-41 SP-080584 approved S2 S2-67 S2-086209 agreed 2008-08-29 SAES Approved 2008-08-29
0200 - F Rel-8 8.2.0 - Correction to PCRF informs the requested trigger from PCEF in the roaming scenarios where the V-PLMN - - - - S2-67 S2-085547 revised 2008-08-19 SAES Revised in parallel session in S2-086028 2008-08-19
0200 1 F Rel-8 8.2.0 - Correction to PCRF informs the requested trigger from PCEF in the roaming scenarios where the V-PLMN - - - - S2-67 S2-086028 revised 2008-08-29 SAES Revised in parallel session in S2-086210 2008-08-29
0200 2 F Rel-8 8.2.0 8.3.0 Correction to PCRF informs the requested trigger from PCEF in the roaming scenarios where the V-PLMN does not configure PCC SP-41 SP-080584 approved S2 S2-67 S2-086210 agreed 2008-08-29 SAES Approved 2008-08-29
0201 - F Rel-8 8.2.0 - PCC session linking on PCRF - - - - S2-67 S2-085548 noted 2008-08-19 SAES Noted. Merged in parallel sessions with S2-085574 in S2-086029 2008-08-19
0202 - F Rel-8 8.2.0 - Handling of PCRF discovery and selection in DSMIP - - - - S2-67 S2-085549 noted 2008-08-19 SAES Noted 2008-08-19
0203 - F Rel-8 8.2.0 - QCI alignment with Rel-7 - - - - S2-67 S2-085569 revised 2008-08-19 SAES Revised in S2-086045 2008-08-19
0203 1 F Rel-8 8.2.0 8.3.0 Rel-7/Rel-8 QCI Alignment SP-41 SP-080584 approved S2 S2-67 S2-086045 agreed 2008-08-27 SAES Approved 2008-08-27
0204 - F Rel-8 8.2.0 - Clarifications in the usage of APN-AMBR - - - - S2-67 S2-085571 revised 2008-08-19 SAES Revised in parallel session in S2-086075 2008-08-19
0204 1 F Rel-8 8.2.0 - Clarifications in the usage of APN-AMBR - - - - S2-67 S2-086075 revised 2008-08-28 SAES Revised in parallel session in S2-086211 2008-08-28
0204 2 F Rel-8 8.2.0 8.3.0 Clarifications in the usage of the APN-AMBR SP-41 SP-080584 approved S2 S2-67 S2-086211 agreed 2008-08-29 SAES Approved 2008-08-29
0205 - F Rel-8 8.2.0 - Clarifications to Gxx/Gx leg binding - - - - S2-67 S2-085574 revised 2008-08-19 SAES Revised in parallel session in S2-086029 2008-08-19
0205 1 F Rel-8 8.2.0 8.3.0 Clarifications to Gxx/Gx leg binding SP-41 SP-080584 approved S2 S2-67 S2-086029 agreed 2008-08-26 SAES Approved 2008-08-26
0206 - F Rel-8 8.2.0 - Removal of FFSs in Gateway Control Session Establishment Procedure - - - - S2-67 S2-085590 noted 2008-08-19 SAES Not Handled 2008-08-19
0207 - F Rel-8 8.2.0 - Cleanup of text on linking PCRFs and identifying PCC sessions - - - - S2-67 S2-085591 noted 2008-08-19 SAES Not Handled 2008-08-19
0207 1 F Rel-8 8.3.1 - Cleanup of text on linking PCRFs and identifying PCC sessions - - - S2 S2-68 S2-086554 noted 2008-10-07 SAES Not Handled 2008-10-07
0207 2 F Rel-8 8.3.1 - Cleanup of text on linking PCRFs and identifying PCC sessions - - - S2 S2-69 S2-087584 revised 2008-11-12 SAES Revised in S2-088090 2008-11-12
0207 3 F Rel-8 8.3.1 8.4.0 Cleanup of text on linking PCRFs and identifying PCC sessions SP-42 SP-080814 approved S2 S2-69 S2-088090 agreed 2008-11-26 SAES Approved 2008-11-26
0208 - F Rel-8 8.2.0 - Rules created based on UE/NW-init resource requests - - - - S2-67 S2-085620 revised 2008-08-19 SAES Revised in parallel session in S2-086077 2008-08-19
0208 1 F Rel-8 8.2.0 - Rules created based on UE/NW-init resource requests - - - - S2-67 S2-086077 withdrawn 2008-08-22 SAES - 2008-08-22
0209 - F Rel-8 8.2.0 - ARP Value Range - - - - S2-67 S2-085783 noted 2008-08-19 SAES Not Handled 2008-08-19
0209 1 F Rel-8 8.3.1 - 23.203 CR0209: ARP Value Range - - - S2 S2-68 S2-086620 revised 2008-10-07 SAES Revised in S2-087134 2008-10-07
0209 2 F Rel-8 8.3.1 - 23.203 CR0209: ARP Value Range - - - S2 S2-68 S2-087134 withdrawn 2008-10-07 SAES - 2008-10-07
0210 - F Rel-7 7.7.0 - Event Trigger supporting Time of Day based charging - - - - S2-67 S2-085802 revised 2008-08-19 PCC Revised in S2-086035 2008-08-19
0210 1 F Rel-7 7.7.0 - Event Trigger supporting Time of Day based charging - - - - S2-67 S2-086035 revised 2008-08-29 PCC Revised in S2-086330 2008-08-29
0210 2 F Rel-7 7.7.0 - Event Trigger supporting Time of Day based charging - - - - S2-67 S2-086330 revised 2008-08-29 PCC Revised in S2-086370 2008-08-29
0210 3 F Rel-7 7.7.0 7.8.0 Event Trigger supporting Time of Day based PCC rule state change SP-41 SP-080579 approved S2 S2-67 S2-086370 agreed 2008-08-29 PCC Approved 2008-08-29
0211 - F Rel-8 8.2.0 - Event Trigger supporting Time of Day based charging - - - - S2-67 S2-085803 revised 2008-08-19 PCC Revised in S2-086036 2008-08-19
0211 1 A Rel-8 8.2.0 - Event Trigger supporting Time of Day based charging - - - - S2-67 S2-086036 revised 2008-08-29 PCC Revised in S2-086331 2008-08-29
0211 2 A Rel-8 8.2.0 - Event Trigger supporting Time of Day based charging - - - - S2-67 S2-086331 revised 2008-08-29 PCC Revised in S2-086371 2008-08-29
0211 3 A Rel-8 8.2.0 8.3.0 Event Trigger supporting Time of Day based PCC rule state change SP-41 SP-080579 approved S2 S2-67 S2-086371 agreed 2008-08-29 PCC Approved 2008-08-29
0212 - F Rel-8 8.2.0 - Clarification on Gateway Control Session - - - - S2-67 S2-085804 revised 2008-08-19 PCC Revised in S2-086098 2008-08-19
0212 1 F Rel-8 8.2.0 - Clarification on Gateway Control Session - - - - S2-67 S2-086098 revised 2008-08-26 PCC Revised in S2-086336 2008-08-26
0212 2 F Rel-8 8.2.0 - Clarification on Gateway Control Session - - - - S2-67 S2-086336 revised 2008-08-29 PCC Revised after e-mail approval in S2-086409 2008-08-29
0212 3 F Rel-8 8.2.0 8.3.0 Clarification on Gateway Control Session SP-41 SP-080584 approved S2 S2-67 S2-086409 agreed 2008-08-22 SAES Approved by e-mail 2008-08-22
0213 - B Rel-8 8.2.0 - Information from PCEF for PCC decision - - - - S2-67 S2-085824 noted 2008-08-19 SAES Not Handled 2008-08-19
0214 - F Rel-8 8.3.0 - The interaction between GW (PCEF) and PCRF when the limited PCC deployed. - - - S2 S2-68 S2-086456 noted 2008-10-07 SAES Noted 2008-10-07
0215 - F Rel-8 8.3.0 - Event triggers for QoS change and UE IP address change - - - S2 S2-68 S2-086535 revised 2008-10-07 SAES Revised in S2-087114 2008-10-07
0215 1 F Rel-8 8.3.0 8.4.0 Event triggers for QoS change and UE IP address change SP-42 SP-080815 approved S2 S2-68 S2-087114 agreed 2008-10-16 SAES Approved 2008-10-16
0216 - F Rel-8 8.3.0 - Change of default EPS Bearer QoS - - - S2 S2-68 S2-086536 revised 2008-10-07 SAES Revised in S2-087115 2008-10-07
0216 1 F Rel-8 8.3.0 8.4.0 Change of default EPS Bearer QoS SP-42 SP-080815 approved S2 S2-68 S2-087115 agreed 2008-10-16 SAES Approved 2008-10-16
0217 - F Rel-8 8.3.0 - Removing the requirements on messages - - - S2 S2-68 S2-086537 noted 2008-10-07 SAES Not Handled 2008-10-07
0217 1 F Rel-8 8.3.1 8.4.0 Removing the requirements on messages SP-42 SP-080815 approved S2 S2-69 S2-087560 agreed 2008-11-11 SAES Approved 2008-11-11
0218 - F Rel-8 8.3.0 - Clarification on session linking for roaming scenarios - - - S2 S2-68 S2-086538 noted 2008-10-07 SAES Not Handled 2008-10-07
0218 1 F Rel-8 8.3.1 - Clarification on session linking for roaming scenarios - - - S2 S2-69 S2-087561 revised 2008-11-11 SAES Revised in S2-088089 2008-11-11
0218 2 F Rel-8 8.3.1 8.4.0 Clarification on session linking for roaming scenarios SP-42 SP-080814 approved S2 S2-69 S2-088089 agreed 2008-11-21 SAES Approved 2008-11-21
0219 - F Rel-8 8.3.1 - Per-QCI/ARP Usage Reporting at the PCEF - - - S2 S2-68 S2-086555 noted 2008-10-07 SAES Not Handled 2008-10-07
0220 - F Rel-8 8.3.1 - Event Trigger: QoS change exceeding authorization - - - S2 S2-68 S2-086559 noted 2008-10-07 SAES Not Handled 2008-10-07
0221 - F Rel-8 8.3.0 - Correction on PDNs supported by a PCRF - - - S2 S2-68 S2-086604 revised 2008-10-07 SAES Revised in S2-087117 2008-10-07
0221 1 F Rel-8 8.3.0 8.4.0 Correction on PDNs supported by a PCRF SP-42 SP-080814 approved S2 S2-68 S2-087117 agreed 2008-10-16 SAES Approved 2008-10-16
0222 - F Rel-8 8.3.0 - Clarification of UE-initiated vs. NW-initiated QoS handling - - - S2 S2-68 S2-086626 noted 2008-10-07 SAES Noted 2008-10-07
0223 - F Rel-8 8.3.1 - Clarification of resource setup in target access during HO - - - S2 S2-68 S2-086636 revised 2008-10-07 SAES Revised in S2-087121 2008-10-07
0223 1 F Rel-8 8.3.1 8.4.0 Clarification of resource setup in target access during HO SP-42 SP-080814 approved S2 S2-68 S2-087121 agreed 2008-10-15 SAES Approved 2008-10-15
0224 - F Rel-8 8.3.1 - Clarfication of credit authorisation in the IP-CAN Session Modification procedure - - - S2 S2-68 S2-086668 withdrawn 2008-10-07 SAES WITHDRAWN 2008-10-07
0225 - F Rel-8 8.3.1 - Clarification of procedure for Gateway Control Session Establishment during Attach - - - S2 S2-68 S2-086669 noted 2008-10-07 SAES Noted 2008-10-07
0226 - F Rel-8 8.3.0 - Correction to time of day PCC rule handling - - - S2 S2-68 S2-086733 noted 2008-10-07 TEI8 Not Handled 2008-10-07
0227 - F Rel-8 8.3.1 - Reporting for PMIP based EPC - - - S2 S2-68 S2-086760 revised 2008-10-07 SAES Revised in S2-087133 2008-10-07
0227 1 F Rel-8 8.3.1 8.4.0 Reporting for PMIP based EPC SP-42 SP-080815 approved S2 S2-68 S2-087133 agreed 2008-10-15 SAES Approved 2008-10-15
0228 - F Rel-8 8.3.0 - Editorial clarification on PCEF initiated IP-CAN Session Modification - - - S2 S2-68 S2-086803 noted 2008-10-07 SAES Not Handled 2008-10-07
0228 1 F Rel-8 8.3.1 - Editorial clarification on PCEF initiated IP-CAN Session Modification - - - S2 S2-69 S2-087832 revised 2008-11-12 SAES Revised in S2-088097 2008-11-12
0228 2 F Rel-8 8.3.1 8.4.0 Editorial clarification on PCEF initiated IP-CAN Session Modification SP-42 SP-080814 approved S2 S2-69 S2-088097 agreed 2008-11-21 SAES Approved 2008-11-21
0229 - F Rel-8 8.3.0 8.4.0 Correction to the IP-CAN Session Establishment procedure SP-42 SP-080814 approved S2 S2-68 S2-086837 agreed 2008-10-07 SAES Approved 2008-10-07
0230 - F Rel-8 8.3.0 - Correction to the Gateway Control Session Establishment procedure - - - S2 S2-68 S2-086838 withdrawn 2008-10-07 SAES WITHDRAWN 2008-10-07
0231 - F Rel-8 8.3.0 8.4.0 Event trigger provision over Gxx SP-42 SP-080815 approved S2 S2-68 S2-086839 agreed 2008-10-07 SAES Approved 2008-10-07
0232 - F Rel-8 8.3.0 - Cleanup for the NOTE in the clause of session binding - - - S2 S2-68 S2-086840 noted 2008-10-07 SAES Not Handled 2008-10-07
0233 - F Rel-8 8.3.0 - The Method of the limited PCC deployment detection - - - S2 S2-68 S2-086842 noted 2008-10-07 SAES Not Handled 2008-10-07
0233 1 F Rel-8 8.3.1 - The Method of the limited PCC deployment detection - - - S2 S2-69 S2-087554 noted 2008-11-10 SAES Noted 2008-11-10
0234 - F Rel-8 8.3.0 - Correction to the condition description of installing event triggers in BBERF in chapter 6.2.1.0 - - - S2 S2-68 S2-086843 noted 2008-10-07 SAES Not Handled 2008-10-07
0235 - F Rel-8 8.3.0 - Addition of subscription information in GW Control Session establishment - - - S2 S2-68 S2-086913 noted 2008-10-07 SAES Not Handled 2008-10-07
0235 1 F Rel-8 8.3.1 - Addition of subscription information in GW Control Session establishment - - - S2 S2-69 S2-087837 revised 2008-11-12 SAES Revised in S2-088098 2008-11-12
0235 2 F Rel-8 8.3.1 - Addition of subscription information in GW Control Session establishment - - - S2 S2-69 S2-088098 revised 2008-11-21 SAES Revised in S2-088218 2008-11-21
0235 3 F Rel-8 8.3.1 8.4.0 Addition of subscription information in GW Control Session establishment SP-42 SP-080815 approved S2 S2-69 S2-088218 agreed 2008-11-21 SAES Approved 2008-11-21
0236 - F Rel-8 8.3.1 - Correction to the clause of session binding - - - S2 S2-69 S2-087555 revised 2008-11-10 SAES Revised in S2-088087 2008-11-10
0236 1 F Rel-8 8.3.1 8.4.0 Correction to the clause of session binding SP-42 SP-080834 approved S2 S2-69 S2-088087 agreed 2008-11-19 TEI8 Approved 2008-11-19
0237 - F Rel-8 8.3.1 8.4.0 Clarifications to mandatory event triggers for GPRS SP-42 SP-080814 approved S2 S2-69 S2-087558 agreed 2008-11-11 SAES Approved 2008-11-11
0238 - F Rel-8 8.3.1 - MBR per QCI - - - S2 S2-69 S2-087559 revised 2008-11-12 SAES Revised in S2-088088 2008-11-12
0238 1 F Rel-8 8.3.1 8.4.0 MBR per QCI SP-42 SP-080815 approved S2 S2-69 S2-088088 agreed 2008-11-21 SAES Approved 2008-11-21
0239 - F Rel-7 7.8.0 - Update to IP-CAN Session Modification ACK step - - - S2 S2-69 S2-087762 noted 2008-11-12 PCC Noted 2008-11-12
0240 - A Rel-8 8.3.1 - Update to IP-CAN Session Modification ACK step - - - S2 S2-69 S2-087763 noted 2008-11-12 PCC Noted 2008-11-12
0241 - C Rel-8 8.3.1 - ARP pre-emption level definition - - - S2 S2-69 S2-087766 withdrawn 2008-11-13 SAES WITHDRAWN 2008-11-13
0242 - F Rel-8 8.3.1 - Avoid occurrence of race condition for bearer establishment modes - - - S2 S2-69 S2-087769 revised 2008-11-12 SAES Revised in S2-088091 2008-11-12
0242 1 F Rel-8 8.3.1 - Avoid occurrence of race condition for bearer establishment modes - - - S2 S2-69 S2-088091 revised 2008-11-21 SAES Revised in S2-088215 2008-11-21
0242 2 F Rel-8 8.3.1 8.4.0 Avoid occurrence of race condition for bearer establishment modes SP-42 SP-080815 approved S2 S2-69 S2-088215 agreed 2008-11-21 SAES Approved 2008-11-21
0243 - F Rel-8 8.3.1 - Minor change on IP-CAN session modificationR1: GW(PCEF) initiated - - - S2 S2-69 S2-087850 noted 2008-11-13 SAES Noted (merged into CR0228) 2008-11-13
0244 - F Rel-7 7.8.0 - Alignment of TFT and PCC packet filters - - - S2 S2-69 S2-087806 revised 2008-11-12 PCC Revised in S2-088022 2008-11-12
0244 1 F Rel-7 7.8.0 7.9.0 Alignment of TFT and PCC packet filters SP-42 SP-080811 approved S2 S2-69 S2-088022 agreed 2008-11-21 PCC Approved 2008-11-21
0245 - A Rel-8 8.3.1 - Alignment of TFT and PCC packet filters - - - S2 S2-69 S2-087807 revised 2008-11-12 PCC Revised in S2-088023 2008-11-12
0245 1 A Rel-8 8.3.1 - Alignment of TFT and PCC packet filters - - - S2 S2-69 S2-088023 revised 2008-11-21 PCC Revised in S2-088220 2008-11-21
0245 2 A Rel-8 8.3.1 8.4.0 Alignment of TFT and PCC packet filters SP-42 SP-080815 approved S2 S2-69 S2-088220 agreed 2008-11-21 PCC Approved 2008-11-21
0246 - F Rel-8 8.3.1 - Event reporting for PMIP based EPC with PCEF in visited network and locally terminated Gxx interacti - - - S2 S2-69 S2-087808 revised 2008-11-12 PCC Revised in S2-088094 2008-11-12
0246 1 F Rel-8 8.3.1 - Event reporting for PMIP based EPC with PCEF in visited network and locally terminated Gxx interacti - - - S2 S2-69 S2-088094 revised 2008-11-21 PCC Revised in S2-088221 2008-11-21
0246 2 F Rel-8 8.3.1 8.4.0 Event reporting for PMIP based EPC with PCEF in visited network and locally terminated Gxx interacti SP-42 SP-080811 approved S2 S2-69 S2-088221 agreed 2008-11-21 SAES Approved 2008-11-21
0247 - F Rel-8 8.3.1 - PCC rule authorization for UE provided traffic mapping information - - - S2 S2-69 S2-087809 revised 2008-11-12 PCC Revised in S2-088095 2008-11-12
0247 1 F Rel-8 8.3.1 8.4.0 PCC rule authorization for UE provided traffic mapping information SP-42 SP-080811 approved S2 S2-69 S2-088095 agreed 2008-11-21 SAES Approved 2008-11-21
0248 - F Rel-8 8.4.0 - Limited PCC support - - - S2 S2-70 S2-090020 Withdrawn 2009-02-20 SAES WITHDRAWN 2009-03-01
0249 - F Rel-8 8.4.0 - Default QCI - - - S2 S2-70 S2-090031 Withdrawn 2009-02-20 SAES WITHDRAWN 2009-03-01
0250 - F Rel-8 8.4.0 - Maximum Packet Delay and Maximum Packet Error Loss Rate - - - S2 S2-70 S2-090032 Noted 2009-02-20 SAES Noted 2009-03-01
0251 - B Rel-9 8.4.0 - Emergency AF PCEF verification - - - S2 S2-70 S2-090070 Revised 2009-02-20 IMS_EMER_GPRS_EPS Revised in S2-090544 2009-03-01
0251 1 B Rel-9 8.4.0 - Emergency AF PCEF verification - - - S2 S2-70 S2-090544 Not Handled 2009-02-20 IMS_EMER_GPRS_EPS Not Handled 2009-03-01
0251 2 B Rel-9 8.4.0 - Support verification of emergency bearer for IMS emergency calls - - - S2 S2-71 S2-091223 Revised 2009-02-20 IMS_EMER_GPRS_EPS Revised to S2-091575 2009-03-01
0251 3 B Rel-9 8.4.0 - Support verification of emergency bearer for IMS emergency calls - - - S2 S2-71 S2-091575 Revised 2009-02-20 IMS_EMER_GPRS_EPS Revised to S2-091599 2009-03-01
0251 4 B Rel-9 8.4.0 9.0.0 Support verification of emergency bearer for IMS emergency calls SP-43 SP-090104 approved S2 S2-71 S2-091599 agreed 2009-02-20 IMS_EMER_GPRS_EPS This CR was approved 2009-03-01
0252 - F Rel-8 8.4.0 - Alignment of to Gateway Control Session Est procedure with 23.402 attach procedure - - - S2 S2-70 S2-090085 Revised 2009-02-20 SAES Revised in S2-090606 2009-03-01
0252 1 F Rel-8 8.4.0 8.5.0 Alignment of to Gateway Control Session Est procedure with 23.402 attach procedure SP-43 SP-090110 approved S2 S2-70 S2-090606 agreed 2009-02-20 SAES This CR was approved 2009-03-01
0253 - F Rel-8 8.4.0 - Clarification on Limited PCC deployment annex - - - S2 S2-70 S2-090131 Noted 2009-02-20 SAES After some discussion, the CR was noted and companies were asked to further discuss this issue off-line. 2009-03-01
0254 - F Rel-8 8.4.0 - Clarification for UE-init operation for multiple BBERF handling - - - S2 S2-70 S2-090134 Revised 2009-02-20 SAES Revised in S2-090600 2009-03-01
0254 1 F Rel-8 8.4.0 8.5.0 Clarification for UE-init operation for multiple BBERF handling SP-43 SP-090110 approved S2 S2-70 S2-090600 agreed 2009-02-20 SAES Approved 2009-03-01
0255 - F Rel-8 8.4.0 - Correlation of QoS resources in the case of inter-BBERF handover - - - S2 S2-70 S2-090135 Noted 2009-02-20 SAES Noted. Used in discussions of S2-090658 2009-03-01
0256 - F Rel-8 8.4.0 - Clarification on BBERF relocation for case 2a - - - S2 S2-70 S2-090136 Revised 2009-02-20 SAES Discussed off-line and revised in S2-090659 2009-03-01
0256 1 F Rel-8 8.4.0 - Clarification on BBERF relocation for case 2a - - - S2 S2-70 S2-090659 Revised 2009-02-20 SAES This CR was approved, revised at S2#71 in S2-090898 2009-03-01
0256 2 F Rel-8 8.4.0 - Clarification of BBERF relocation case 2a - - - S2 S2-71 S2-090898 Revised 2009-02-20 SAES Revision of S2#70 S2-090659 Revised to S2-091505 2009-03-01
0256 3 F Rel-8 8.4.0 8.5.0 Clarification of BBERF relocation case 2a SP-43 SP-090110 approved S2 S2-71 S2-091505 agreed 2009-02-20 SAES This CR was approved 2009-03-01
0257 - F Rel-8 8.4.0 - Multiple bearer binding function for HO between GTP and PMIP - - - S2 S2-70 S2-090179 Revised 2009-02-20 SAES This was further discussed off-line and the CR revised in S2-090660 2009-03-01
0257 1 F Rel-8 8.4.0 - Multiple bearer binding function for HO between GTP and PMIP - - - S2 S2-70 S2-090660 Revised 2009-02-20 SAES The CR revised in S2-090764 2009-03-01
0257 2 F Rel-8 8.4.0 8.5.0 Multiple bearer binding function for HO between GTP and PMIP SP-43 SP-090110 approved S2 S2-70 S2-090764 agreed 2009-02-20 SAES This CR was approved 2009-03-01
0258 - F Rel-8 8.4.0 8.5.0 V-PCRF and local policy rules SP-43 SP-090110 approved S2 S2-70 S2-090180 agreed 2009-02-20 SAES Approved 2009-03-01
0259 - F Rel-8 8.4.0 - Clarification to ACK in the IP-CAN Session Modification; GW(PCEF) initiated - - - S2 S2-70 S2-090181 Revised 2009-02-20 SAES Revised in S2-090661 2009-03-01
0259 1 F Rel-8 8.4.0 - Clarification to ACK in the IP-CAN Session Modification; GW(PCEF) initiated - - - S2 S2-70 S2-090661 Revised 2009-02-20 SAES An editorial error 'OCC' should read 'PCC'. Step 13 and step 14 should be reinstated and the figure corrected for step 14. The CR was revised in S2-090761 2009-03-01
0259 2 F Rel-8 8.4.0 8.5.0 Clarification to ACK in the IP-CAN Session Modification; GW(PCEF) initiated SP-43 SP-090110 approved S2 S2-70 S2-090761 agreed 2009-02-20 SAES This CR was approved 2009-03-01
0260 - F Rel-8 8.4.0 - Clarification to Gateway Control and QoS Rule Request: PCRF initiated IP-CAN Session Modification Implementation - - - S2 S2-70 S2-090182 Noted 2009-02-20 SAES Noted 2009-03-01
0261 - F Rel-8 8.4.0 - Role of V-PCRF when HPLMN does not support PCC - - - S2 S2-70 S2-090252 Revised 2009-02-20 SAES Revised in S2-090662 2009-03-01
0261 1 F Rel-8 8.4.0 8.5.0 Role of V-PCRF when HPLMN does not support PCC SP-43 SP-090110 approved S2 S2-70 S2-090662 agreed 2009-02-20 SAES Approved 2009-03-01
0262 - F Rel-8 8.4.0 - Modification of the IP-CAN Session Establishment Procedure - - - S2 S2-70 S2-090301 Revised 2009-02-20 SAES - 2009-03-01
0262 1 F Rel-8 8.4.0 - Modification of the IP-CAN Session Establishment Procedure - - - S2 S2-70 S2-090571 Revised 2009-02-20 SAES Revised in S2-090663 2009-03-01
0262 2 A Rel-8 8.4.0 - Modification of the IP-CAN Session Establishment Procedure - - - S2 S2-70 S2-090663 Revised 2009-02-20 PCC Approved, but Revised in S2#71 in S2-090870 2009-03-01
0262 3 A Rel-8 8.4.0 - Modification of the IPCAN session establishment procedure - - - S2 S2-71 S2-090870 Revised 2009-02-20 PCC Revision of S2#70 S2-090663 Revised to S2-091680 2009-03-01
0262 4 A Rel-8 8.4.0 - Modification of the IPCAN session establishment procedure - - - S2 S2-71 S2-091680 Revised 2009-02-20 PCC Revised to S2-091745 2009-03-01
0262 5 A Rel-8 8.4.0 8.5.0 Modification of the IPCAN session establishment procedure SP-43 SP-090109 approved S2 S2-71 S2-091745 agreed 2009-02-20 PCC This CR was approved 2009-03-01
0263 - F Rel-7 7.9.0 - Modification of the IP-CAN Session Establishment Procedure - - - S2 S2-70 S2-090302 Revised 2009-02-20 PCC Revised in S2-090553 2009-03-01
0263 1 F Rel-7 7.9.0 - Modification of the IP-CAN Session Establishment Procedure - - - S2 S2-70 S2-090553 Revised 2009-02-20 PCC Approved, but Revised in S2#71 in S2-090871 2009-03-01
0263 2 F Rel-7 7.9.0 - Modification of the IPCAN session establishment procedure - - - S2 S2-71 S2-090871 Revised 2009-02-20 PCC Revision of S2#70 S2-090553 Revised to S2-091470 2009-03-01
0263 3 F Rel-7 7.9.0 - Modification of the IPCAN session establishment procedure - - - S2 S2-71 S2-091470 Revised 2009-02-20 PCC Revised to S2-091679 2009-03-01
0263 4 F Rel-7 7.9.0 7.10.0 Modification of the IPCAN session establishment procedure SP-43 SP-090109 approved S2 S2-71 S2-091679 agreed 2009-02-20 PCC This CR was approved 2009-03-01
0264 - F Rel-8 8.4.0 - Corrections to V-PCRF functionality description - - - S2 S2-70 S2-090361 Revised 2009-02-20 SAES Clarifications to the text of the CR were made and the CR revised in S2-090664 2009-03-01
0264 1 F Rel-8 8.4.0 8.5.0 Corrections to V-PCRF functionality description SP-43 SP-090110 approved S2 S2-70 S2-090664 agreed 2009-02-20 SAES Approved 2009-03-01
0265 - F Rel-8 8.4.0 - Update of definitions and abbreviations section - - - S2 S2-70 S2-090362 Revised 2009-02-20 SAES Revised in S2-090665 2009-03-01
0265 1 F Rel-8 8.4.0 8.5.0 Update of definitions and abbreviations section SP-43 SP-090110 approved S2 S2-70 S2-090665 agreed 2009-02-20 SAES Approved 2009-03-01
0266 - F Rel-8 8.4.0 8.5.0 Control of PCC rule provisioning SP-43 SP-090110 approved S2 S2-70 S2-090363 agreed 2009-02-20 SAES This CR was approved. 2009-03-01
0267 - F Rel-8 8.4.0 - Update of policy control requirements - - - S2 S2-70 S2-090364 Revised 2009-02-20 SAES This was discussed further off-line and the CR revised in S2-090668 2009-03-01
0267 1 F Rel-8 8.4.0 8.5.0 Update of policy control requirements SP-43 SP-090110 approved S2 S2-70 S2-090668 agreed 2009-02-20 SAES This CR was approved 2009-03-01
0268 - F Rel-8 8.4.0 - QoS Allocation Status handling at inter-access system handover - - - S2 S2-70 S2-090393 Revised 2009-02-20 SAES A revision, using S2-090393 as a basis, was drafted in S2-090658 2009-03-01
0268 1 F Rel-8 8.4.0 - QoS Allocation Status handling at inter-access system handover - - - S2 S2-70 S2-090658 Revised 2009-02-20 SAES The CR was revised in S2-090763 2009-03-01
0268 2 F Rel-8 8.4.0 8.5.0 QoS Allocation Status handling at inter-access system handover SP-43 SP-090110 approved S2 S2-70 S2-090763 agreed 2009-02-20 SAES This CR was approved 2009-03-01
0269 - F Rel-8 8.4.0 - Detecting and Reporting Limited PCC - - - S2 S2-71 S2-090864 Withdrawn 2009-02-20 SAES WITHDRAWN 2009-03-01
0270 - F Rel-8 8.4.0 - Enable the option of uniform online charging in Rel-8 networks - - - S2 S2-71 S2-090865 Not Handled 2009-02-20 SAES Not Handled 2009-03-01
0271 - F Rel-8 8.4.0 - Future QCI's values - - - S2 S2-71 S2-090872 Noted 2009-02-20 SAES Noted in parallel sessions 2009-03-01
0272 - B Rel-7 7.9.0 - Usage notification and reporting to PCRF - - - S2 S2-71 S2-090875 Noted 2009-02-20 PCC Noted in parallel sessions 2009-03-01
0273 - A Rel-8 8.4.0 - Usage notification and reporting to PCRF - - - S2 S2-71 S2-090876 Noted 2009-02-20 PCC Noted in parallel sessions 2009-03-01
0273 1 B Rel-9 9.0.0 - Usage notification and reporting to PCRF - - - S2 S2-73 S2-093288 revised 2009-05-26 SAES Wrong WI Code on CR ! Revised to S2-093911 2009-05-26
0273 2 B Rel-9 9.0.0 - Usage notification and reporting to PCRF - - - S2 S2-73 S2-093911 revised 2009-05-26 SAES Wrong WI Code on CR ! Revised to S2-093982 2009-05-26
0273 3 B Rel-9 9.0.0 - Usage notification and reporting to PCRF - - - S2 S2-73 S2-093982 revised 2009-05-26 TEI9 TEI-9 -> TEI9 Revised to S2-094184 2009-05-26
0273 4 B Rel-9 9.0.0 9.1.0 Usage notification and reporting to PCRF SP-44 SP-090358 approved S2 S2-73 S2-094184 agreed 2009-05-26 TEI9 This CR was approved 2009-05-26
0274 - F Rel-8 8.4.0 - Clarification on QoS rules provided during inter-BBERF handovers - - - S2 S2-71 S2-090899 Revised 2009-02-20 SAES Revised to S2-091506 2009-03-01
0274 1 F Rel-8 8.4.0 - Clarification on QoS rules provided during inter-BBERF handovers - - - S2 S2-71 S2-091506 Revised 2009-02-20 SAES This was revised to clean up the text in S2-091716 2009-03-01
0274 2 F Rel-8 8.4.0 8.5.0 Clarification on QoS rules provided during inter-BBERF handovers SP-43 SP-090110 approved S2 S2-71 S2-091716 agreed 2009-02-20 SAES This CR was approved 2009-03-01
0275 - F Rel-8 8.4.0 - Clarification on limited PCC deployment annex - - - S2 S2-71 S2-090900 Revised 2009-02-20 SAES Revised to S2-091509 2009-03-01
0275 1 F Rel-8 8.4.0 - Clarification on limited PCC deployment annex - - - S2 S2-71 S2-091509 Withdrawn 2009-02-20 SAES WITHDRAWN 2009-03-01
0276 - F Rel-8 8.4.0 - Default QCI - - - S2 S2-71 S2-090960 Withdrawn 2009-02-20 SAES WITHDRAWN 2009-03-01
0277 - F Rel-8 8.4.0 - Clarification of PCC rules updates on BBERF relocation for case 2a - - - S2 S2-71 S2-091014 Noted 2009-02-20 SAES Noted in parallel sessions 2009-03-01
0278 - F Rel-8 8.4.0 - Clarification to PCC in only HPLMN - - - S2 S2-71 S2-091015 Withdrawn 2009-02-20 SAES WITHDRAWN 2009-03-01
0279 - F Rel-8 8.4.0 - Clarification of event trigger definition - - - S2 S2-71 S2-091071 Revised 2009-02-20 SAES Revised to S2-091640 2009-03-01
0279 1 F Rel-8 8.4.0 8.5.0 Clarification of event trigger definition SP-43 SP-090110 approved S2 S2-71 S2-091640 agreed 2009-02-20 SAES Agreed in parallel sessions This CR was approved 2009-03-01
0280 - F Rel-8 8.4.0 - Correction to the functions of Gx reference point - - - S2 S2-71 S2-091072 Not Handled 2009-02-20 SAES Not Handled 2009-03-01
0281 - F Rel-8 8.4.0 - On charging ID usage in PCC - - - S2 S2-71 S2-091134 Noted 2009-02-20 SAES Noted in parallel sessions 2009-03-01
0282 - F Rel-8 8.4.0 - Relevance of QCI for PCRF binding - - - S2 S2-71 S2-091251 Revised 2009-02-20 SAES Revised to S2-091508 2009-03-01
0282 1 F Rel-8 8.4.0 - Relevance of QCI for PCRF binding - - - S2 S2-71 S2-091508 Revised 2009-02-20 SAES Revised to S2-091717 2009-03-01
0282 2 F Rel-8 8.4.0 8.5.0 Relevance of QCI for PCRF binding SP-43 SP-090110 approved S2 S2-71 S2-091717 agreed 2009-02-20 SAES This CR was approved 2009-03-01
0283 - F Rel-8 8.4.0 - Clarification of accept/reject bearer signalling - - - S2 S2-71 S2-091252 Revised 2009-02-20 SAES Revised to S2-091641 2009-03-01
0283 1 F Rel-8 8.4.0 - Clarification of accept/reject bearer signalling - - - S2 S2-71 S2-091641 Revised 2009-02-20 SAES Agreed in parallel sessions Revised to S2-091718 2009-03-01
0283 2 F Rel-8 8.4.0 8.5.0 Clarification of accept/reject bearer signalling SP-43 SP-090110 approved S2 S2-71 S2-091718 agreed 2009-02-20 SAES This CR was approved 2009-03-01
0284 - F Rel-8 8.4.0 - Clarification on QoS Rules transfer during inter BBERF handover - - - S2 S2-71 S2-091286 Noted 2009-02-20 SAES Noted in parallel sessions 2009-03-01
0285 - F Rel-8 8.4.0 8.5.0 Correction to signalling of supported BCMs during BBERF relocation SP-43 SP-090110 approved S2 S2-71 S2-091295 agreed 2009-02-20 SAES Agreed in parallel sessions. MCC were asked to remove 'CR' from the CR number on the cover sheet. 2009-03-01
0286 - F Rel-9 9.0.0 - Synonym based solution for Multiple PDN connections to same APN for 23.203 - - - S2 S2-72 S2-092046 noted 2009-05-26 MUPSAP Not Handled 2009-05-26
0287 - F Rel-9 9.0.0 - Network assisted Synonym based solution for multiple PDN connections to same APN for 23.203 - - - S2 S2-72 S2-092049 withdrawn 2009-05-26 MUPSAP LATE DOC: Rx WITHDRAWN 2009-05-26
0288 - F Rel-8 8.5.0 - Supporting multiple Gateway Control Session to Same APN to the PCRF - - - S2 S2-72 S2-092050 withdrawn 2009-05-26 MUPSAP LATE DOC: Rx WITHDRAWN 2009-05-26
0289 - F Rel-8 8.5.0 - Add the term 'QoS Control decision' concept to 3.1 - - - S2 S2-72 S2-092148 postponed 2009-05-26 SAES Postponed to SA WG2 meeting #73 2009-05-26
0290 - F Rel-8 8.5.0 - Displace the RAT type change event trigger from A4.3.1.2 to 6.4.1. - - - S2 S2-72 S2-092150 postponed 2009-05-26 SAES Postponed to SA WG2 meeting #73 2009-05-26
0291 - F Rel-8 8.5.0 - Clarification on the IP-CAN Session Establishment procedure - - - S2 S2-72 S2-092151 postponed 2009-05-26 SAES Postponed to SA WG2 meeting #73 2009-05-26
0292 - F Rel-8 8.5.0 - Clarification of Handling of Multiple BBFs associated with the same IP CAN session - - - S2 S2-72 S2-092161 revised 2009-05-26 SAES Postponed to SA WG2 meeting #73 (S2-093293) 2009-05-26
0292 1 F Rel-8 8.5.0 - Clarification of Handling of Multiple BBFs associated with the same IP CAN session - - - S2 S2-73 S2-093293 noted 2009-05-26 SAES Not Handled 2009-05-26
0293 - F Rel-9 9.0.0 - Clarification to usage of dynamic PCC rule authorization for emergency calls - - - S2 S2-72 S2-092192 revised 2009-05-26 IMS_EMER_GPRS_EPS This was revised off-line to provide a high-level statement at this stage in S2-092773 2009-05-26
0293 1 F Rel-9 9.0.0 - Clarification to usage of dynamic PCC rule authorization for emergency calls - - - S2 S2-72 S2-092773 revised 2009-05-26 IMS_EMER_GPRS_EPS Revised to S2-092992 2009-05-26
0293 2 F Rel-9 9.0.0 9.1.0 Clarification to usage of dynamic PCC rule authorization for emergency calls SP-44 SP-090353 approved S2 S2-72 S2-092992 agreed 2009-05-26 IMS_EMER_GPRS_EPS This CR was approved 2009-05-26
0294 - F Rel-8 8.5.0 - QCI Extension - - - S2 S2-72 S2-092255 postponed 2009-05-26 SAES Postponed to SA WG2 meeting #73 2009-05-26
0295 - F Rel-8 8.5.0 - APR values for intra-domain usage - - - S2 S2-72 S2-092035 revised 2009-05-26 SAES Not Handled. Revised at S2-73 in S2-093147 2009-05-26
0295 1 F Rel-8 8.5.0 - APR values for intra-domain usage - - - S2 S2-73 S2-093147 revised 2009-05-26 SAES Revised to S2-093886 2009-05-26
0295 2 F Rel-8 8.5.0 8.6.0 APR values for intra-domain usage SP-44 SP-090329 approved S2 S2-73 S2-093886 agreed 2009-05-26 SAES This CR was approved 2009-05-26
0296 - A Rel-9 9.1.0 - APR values for intra-domain usage - - - S2 S2-72 S2-092036 revised 2009-05-26 IMS_EMER_GPRS_EPS WRONG WI CODE! Not Handled. Revised at S2-73 in S2-093148 2009-05-26
0296 1 A Rel-9 9.0.0 - APR values for intra-domain usage - - - S2 S2-73 S2-093148 revised 2009-05-26 SAES Wrong WI Code on CR ! Revised to S2-093887 2009-05-26
0296 2 A Rel-9 9.0.0 9.1.0 APR values for intra-domain usage SP-44 SP-090329 approved S2 S2-73 S2-093887 agreed 2009-05-26 SAES Wrong WI Code on CR ! This CR was approved 2009-05-26
0297 - A Rel-9 9.0.0 - Clarification of Handling of Multiple BBFs associated with the same IP CAN session - - - S2 S2-72 S2-092351 revised 2009-05-26 SAES Postponed to SA WG2 meeting #73 (S2-093294) 2009-05-26
0297 1 A Rel-9 9.0.0 - Clarification of Handling of Multiple BBFs associated with the same IP CAN session - - - S2 S2-73 S2-093294 noted 2009-05-26 SAES Not Handled 2009-05-26
0298 - F Rel-9 9.0.0 - Decoration based solution for Multiple PDN connections to same APN for 23.203 - - - S2 S2-72 S2-092374 noted 2009-05-26 MUPSAP Not Handled 2009-05-26
0299 - F Rel-8 8.5.0 - Clarification on the timing of IP-CAN session establishment - - - S2 S2-73 S2-093083 noted 2009-05-26 SAES -> NEC (tamura-san) to handle Noted 2009-05-26
0300 - F Rel-8 8.5.0 - The limited PCC deployment detection - - - S2 S2-73 S2-093114 noted 2009-05-26 SAES limited PCC, Not Handled 2009-05-26
0301 - A Rel-9 9.0.0 - The limited PCC deployment detection - - - S2 S2-73 S2-093115 noted 2009-05-26 SAES limited PCC, Not Handled 2009-05-26
0302 - F Rel-8 8.5.0 - Correction to function of Gx reference point - - - S2 S2-73 S2-093116 revised 2009-05-26 SAES Revised to S2-093903 2009-05-26
0302 1 F Rel-8 8.5.0 8.6.0 Correction to function of Gx reference point SP-44 SP-090329 approved S2 S2-73 S2-093903 agreed 2009-05-26 SAES This CR was approved 2009-05-26
0303 - A Rel-9 9.0.0 - Correction to function of Gx reference point - - - S2 S2-73 S2-093117 revised 2009-05-26 SAES Revised to S2-093904 2009-05-26
0303 1 A Rel-9 9.0.0 - Correction to function of Gx reference point - - - S2 S2-73 S2-093904 revised 2009-05-26 SAES Revised to S2-094185 2009-05-26
0303 2 A Rel-9 9.0.0 9.1.0 Correction to function of Gx reference point SP-44 SP-090329 approved S2 S2-73 S2-094185 agreed 2009-05-26 SAES This CR was approved 2009-05-26
0304 - F Rel-8 8.5.0 - H-PCRF informs the AF limited PCC deployment - - - S2 S2-73 S2-093118 revised 2009-05-26 SAES No Summary of Change! Revised to S2-093975 2009-05-26
0304 1 F Rel-8 8.5.0 - H-PCRF informs the AF limited PCC deployment - - - S2 S2-73 S2-093975 revised 2009-05-26 SAES Revised to S2-094165 2009-05-26
0304 2 F Rel-8 8.5.0 - H-PCRF informs the AF limited PCC deployment - - - S2 S2-73 S2-094165 revised 2009-05-26 SAES Revised to S2-094188 2009-05-26
0304 3 F Rel-8 8.5.0 8.6.0 H-PCRF informs the AF limited PCC deployment SP-44 SP-090329 approved S2 S2-73 S2-094188 agreed 2009-05-26 SAES This CR was approved 2009-05-26
0305 - A Rel-9 9.0.0 - H-PCRF informs the AF limited PCC deployment - - - S2 S2-73 S2-093119 revised 2009-05-26 SAES Revised to S2-093976 2009-05-26
0305 1 A Rel-9 9.0.0 - H-PCRF informs the AF limited PCC deployment - - - S2 S2-73 S2-093976 revised 2009-05-26 SAES Wrong CR Rev ! Revised to S2-094164 2009-05-26
0305 2 A Rel-9 9.0.0 - H-PCRF informs the AF limited PCC deployment - - - S2 S2-73 S2-094164 revised 2009-05-26 SAES Revised to S2-094189 2009-05-26
0305 3 C Rel-9 9.0.0 9.1.0 H-PCRF informs the AF limited PCC deployment SP-44 SP-090358 approved S2 S2-73 S2-094189 agreed 2009-05-26 TEI9 This CR was approved 2009-05-26
0306 - F Rel-8 8.5.0 - Delete the Editor's not in Gateway control session termination procedure - - - S2 S2-73 S2-093120 revised 2009-05-26 SAES Revised to S2-093978 2009-05-26
0306 1 F Rel-8 8.5.0 8.6.0 Delete the Editor's not in Gateway control session termination procedure SP-44 SP-090329 approved S2 S2-73 S2-093978 agreed 2009-05-26 SAES This CR was approved 2009-05-26
0307 - A Rel-9 9.0.0 - Delete the Editor's not in Gateway control session termination procedure - - - S2 S2-73 S2-093121 revised 2009-05-26 SAES Revised to S2-093979 2009-05-26
0307 1 A Rel-9 9.0.0 9.1.0 Delete the Editor's not in Gateway control session termination procedure SP-44 SP-090329 approved S2 S2-73 S2-093979 agreed 2009-05-26 SAES This CR was approved 2009-05-26
0308 - F Rel-8 8.5.0 - Delete the related Editor's not for DRA roles - - - S2 S2-73 S2-093122 revised 2009-05-26 SAES Revised to S2-093980 2009-05-26
0308 1 F Rel-8 8.5.0 8.6.0 Delete the related Editor's not for DRA roles SP-44 SP-090329 approved S2 S2-73 S2-093980 agreed 2009-05-26 SAES This CR was approved 2009-05-26
0309 - A Rel-8 8.5.0 - Delete the related Editor's not for DRA roles - - - S2 S2-73 S2-093123 revised 2009-05-26 SAES Revised to S2-093981 2009-05-26
0309 1 A Rel-8 8.5.0 8.6.0 Delete the related Editor's not for DRA roles SP-44 SP-090329 approved S2 S2-73 S2-093981 agreed 2009-05-26 SAES This CR was approved 2009-05-26
0310 - B Rel-9 9.0.0 - PCC procedure in MAPSUP scenario - - - S2 S2-73 S2-093125 withdrawn 2009-05-26 MAPSUP LATE DOC: WITHDRAWN 2009-05-26
0311 - B Rel-9 9.0.0 - Detecting and Reporting Limited PCC - - - S2 S2-73 S2-093130 noted 2009-05-26 TEI9 TEI-9 -> TEI9. Limited PCC. Not Handled 2009-05-26
0312 - F Rel-8 8.5.0 - Deferred leg linking - - - S2 S2-73 S2-093142 revised 2009-05-26 SAES Revised to S2-093898 2009-05-26
0312 1 F Rel-8 8.5.0 8.6.0 Deferred leg linking SP-44 SP-090329 approved S2 S2-73 S2-093898 agreed 2009-05-26 SAES This CR was approved 2009-05-26
0313 - A Rel-9 9.0.0 - Deferred leg linking - - - S2 S2-73 S2-093143 revised 2009-05-26 SAES Revised to S2-094098 2009-05-26
0313 1 A Rel-9 9.0.0 9.1.0 Deferred leg linking SP-44 SP-090329 approved S2 S2-73 S2-094098 agreed 2009-05-26 SAES This CR was approved 2009-05-26
0314 - B Rel-9 9.0.0 - Emergency service and PCC interactions - - - S2 S2-73 S2-093150 revised 2009-05-26 IMS_EMER_GPRS_EPS The CR was further discussed and revised off-line in S2-094017 2009-05-26
0314 1 B Rel-9 9.0.0 9.1.0 Emergency service and PCC interactions SP-44 SP-090353 approved S2 S2-73 S2-094017 agreed 2009-05-26 IMS_EMER_GPRS_EPS It was clarified that this is intended for restriction of the destination IP address. This CR was then approved. 2009-05-26
0315 - F Rel-8 8.5.0 - QCI Extension - - - S2 S2-73 S2-093187 noted 2009-05-26 SAES Noted in parallel sessions 2009-05-26
0316 - F Rel-8 8.5.0 - Charging ID support in PCC - - - S2 S2-73 S2-093196 revised 2009-05-26 SAES Revised to S2-093896 2009-05-26
0316 1 F Rel-8 8.5.0 8.6.0 Charging ID support in PCC SP-44 SP-090329 approved S2 S2-73 S2-093896 agreed 2009-05-26 SAES This CR was approved 2009-05-26
0317 - A Rel-9 9.0.0 - Charging ID support in PCC - - - S2 S2-73 S2-093197 revised 2009-05-26 SAES Revised to S2-093897 2009-05-26
0317 1 A Rel-9 9.0.0 - Charging ID support in PCC - - - S2 S2-73 S2-093897 revised 2009-05-26 SAES Revised to S2-094182 2009-05-26
0317 2 A Rel-9 9.0.0 9.1.0 Charging ID support in PCC SP-44 SP-090329 approved S2 S2-73 S2-094182 agreed 2009-05-26 SAES This CR was approved 2009-05-26
0318 - F Rel-8 8.5.0 8.6.0 Subscription data usage during GCS establishment SP-44 SP-090329 approved S2 S2-73 S2-093198 agreed 2009-05-26 SAES This CR was approved 2009-05-26
0319 - A Rel-9 9.0.0 9.1.0 Subscription data usage during GCS establishment SP-44 SP-090329 approved S2 S2-73 S2-093199 agreed 2009-05-26 SAES This CR was approved 2009-05-26
0320 - F Rel-8 8.5.0 - Handling of multiple AF sessions by PCRF when bearer binding is in BBF - - - S2 S2-73 S2-093265 noted 2009-05-26 SAES Noted in parallel sessions 2009-05-26
0321 - A Rel-9 9.0.0 - Handling of multiple AF sessions by PCRF when bearer binding is in BBF - - - S2 S2-73 S2-093266 noted 2009-05-26 SAES Not Handled 2009-05-26
0322 - F Rel-8 8.5.0 - UE IP address provision during the BBERF relocation in the PCC - - - S2 S2-73 S2-093284 noted 2009-05-26 SAES Not Handled 2009-05-26
0323 - A Rel-9 9.0.0 - UE IP address provision during the BBERF relocation in the PCC - - - S2 S2-73 S2-093285 noted 2009-05-26 SAES Wrong Cat on CR! Not Handled 2009-05-26
0324 - F Rel-8 8.5.0 - Clarification to provisioning of Event Triggers - - - S2 S2-73 S2-093286 noted 2009-05-26 SAES Not Handled 2009-05-26
0325 - A Rel-9 9.0.0 - Clarification to provisioning of Event Triggers - - - S2 S2-73 S2-093287 noted 2009-05-26 SAES Wrong Cat on CR! Not Handled 2009-05-26
0326 - F Rel-8 8.5.0 - Clarification to the SDF ID - - - S2 S2-73 S2-093289 noted 2009-05-26 SAES Not Handled 2009-05-26
0327 - A Rel-9 9.0.0 - Clarification to the SDF ID - - - S2 S2-73 S2-093290 noted 2009-05-26 SAES Wrong Cat on CR! Not Handled 2009-05-26
0328 - B Rel-9 9.0.0 - PCC supports for Emergency Service without IMS Emergency Registration - - - S2 S2-73 S2-093307 noted 2009-05-26 IMS_EMER_GPRS_EPS This CR required further discussion and clarification of re-use of existing IMS registrations for Emergency call in Rel-9. The CR was then noted. 2009-05-26
0329 - B Rel-9 9.0.0 - Supporting multiple PDN connectivity to same APN in PCC - - - S2 S2-73 S2-093417 revised 2009-05-26 MUPSAP Samsung reported that the first sentence was incorrect after discussion of the previous contribution. This was discussed off-line and revised in S2-093883 2009-05-26
0329 1 B Rel-9 9.0.0 - Supporting multiple PDN connectivity to same APN in PCC - - - S2 S2-73 S2-093883 revised 2009-05-26 MUPSAP A number of clarifications were suggested and the CR was revised in S2-094225 2009-05-26
0329 2 B Rel-9 9.0.0 9.1.0 Supporting multiple PDN connectivity to same APN in PCC SP-44 SP-090357 approved S2 S2-73 S2-094225 agreed 2009-05-26 MUPSAP This CR was approved 2009-05-26
0330 - B Rel-9 9.0.0 - PCC Considerations for LIPA - - - S2 S2-73 S2-093421 withdrawn 2009-05-26 EHNB WITHDRAWN 2009-05-26
0331 - F Rel-8 8.5.0 - PCRF Override of Default Charging Method & Charging Information in the PCEF - - - S2 S2-73 S2-093509 revised 2009-05-26 SAES Revised to S2-093912 2009-05-26
0331 1 F Rel-8 8.5.0 8.6.0 PCRF Override of Default Charging Method & Charging Information in the PCEF SP-44 SP-090329 approved S2 S2-73 S2-093912 agreed 2009-05-26 SAES This CR was approved 2009-05-26
0332 - F Rel-8 8.5.0 - ARP Values for Intra-domain Usage - - - S2 S2-73 S2-093527 noted 2009-05-26 SAES Noted in parallel sessions 2009-05-26
0333 - A Rel-9 9.0.0 - QCI Extensions - - - S2 S2-73 S2-093530 noted 2009-05-26 SAES Not Handled 2009-05-26
0334 - F Rel-8 8.5.0 - Limitations for usage of pre-defined PCC rules for QoS control - - - S2 S2-73 S2-093621 noted 2009-05-26 SAES Noted in parallel sessions 2009-05-26
0335 - A Rel-9 9.0.0 - Limitations for usage of pre-defined PCC rules for QoS control - - - S2 S2-73 S2-093622 revised 2009-05-26 SAES LATE DOC: Rx 06/05, 16:00 Revised to S2-093914 2009-05-26
0335 1 F Rel-9 9.0.0 9.1.0 Limitations for usage of pre-defined PCC rules for QoS control SP-44 SP-090358 approved S2 S2-73 S2-093914 agreed 2009-05-26 TEI9 This CR was approved 2009-05-26
0336 - F Rel-8 8.5.0 - Packet filter handling - - - S2 S2-73 S2-093624 withdrawn 2009-05-26 SAES LATE DOC: WITHDRAWN 2009-05-26
0337 - A Rel-9 9.0.0 - Packet filter handling - - - S2 S2-73 S2-093625 withdrawn 2009-05-26 SAES LATE DOC: WITHDRAWN 2009-05-26
0338 - A Rel-9 9.0.0 - PCRF Override of Default Charging Method & Charging Information in the PCEF - - - S2 S2-73 S2-093653 revised 2009-05-26 SAES Revised to S2-093913 2009-05-26
0338 1 A Rel-9 9.0.0 9.1.0 PCRF Override of Default Charging Method & Charging Information in the PCEF SP-44 SP-090329 approved S2 S2-73 S2-093913 agreed 2009-05-26 SAES This CR was approved 2009-05-26
0339 - F Rel-7 7.10.0 - Alignment of TFT and PCC packet filters - - - S2 S2-73 S2-093890 revised 2009-05-26 PCC Wrong WI Code on CR (SAES) ! Revised to S2-094107 2009-05-26
0339 1 F Rel-7 7.10.0 7.11.0 Alignment of TFT and PCC packet filters SP-44 SP-090320 approved S2 S2-73 S2-094107 agreed 2009-05-26 PCC This CR was approved 2009-05-26
0340 - F Rel-9 9.1.0 - Correction to leg linking for multiple PDN connections to same APN - - - S2 74 S2-094294 revised 2009-07-10 MUPSAP The WI Code should be changed to MUPSAP. The CR was revised in S2-094846 2009-09-17
0340 1 F Rel-9 9.1.0 9.2.0 Correction to leg linking for multiple PDN connections to same APN SP-45 SP-090607 approved S2 74 S2-094846 agreed 2009-07-10 MUPSAP This CR was approved 2009-09-17
0341 - F Rel-9 9.1.0 - Final usage report for usage monitoring control - - - S2 74 S2-094295 revised 2009-07-10 TEI9 Revised to S2-094703 2009-09-17
0341 1 F Rel-9 9.1.0 - Final usage report for usage monitoring control - - - S2 74 S2-094703 revised 2009-07-10 TEI9 Revised to S2-094768 2009-09-17
0341 2 F Rel-9 9.1.0 - Final usage report for usage monitoring control - - - S2 S2-74 S2-094768 revised 2009-07-10 TEI9 The parameter needed to be revised to optional, other issues were raised so the CR was revised off-line in S2-094807 2009-09-17
0341 3 F Rel-9 9.1.0 9.2.0 Final usage report for usage monitoring control SP-45 SP-090608 approved S2 74 S2-094907 agreed 2009-07-10 TEI9 This CR was approved 2009-09-17
0342 - F Rel-8 8.6.0 - Clarification that BCM is sent over Gxx only for non-3GPP access. - - - S2 74 S2-094296 revised 2009-07-10 SAES Revised to S2-094704 2009-09-17
0342 1 F Rel-8 8.6.0 - Clarification that BCM is sent over Gxx only for non-3GPP access. - - - S2 74 S2-094704 revised 2009-07-10 SAES Revised to S2-094773 2009-09-17
0342 2 F Rel-8 8.6.0 8.7.0 Clarification that BCM is sent over Gxx only for non-3GPP access. SP-45 SP-090582 approved S2 74 S2-094773 agreed 2009-07-10 SAES Agreed in parallel sessions 2009-09-17
0343 - A Rel-9 9.1.0 - Clarification that BCM is sent over Gxx only for non-3GPP access. - - - S2 74 S2-094297 revised 2009-07-10 SAES Revised to S2-094705 2009-09-17
0343 1 A Rel-9 9.1.0 9.2.0 Clarification that BCM is sent over Gxx only for non-3GPP access. SP-45 SP-090582 approved S2 74 S2-094705 agreed 2009-07-10 SAES Agreed in parallel sessions 2009-09-17
0344 - F Rel-9 9.1.0 - Clarification for usage monitoring control on IP-CAN session level - - - S2 74 S2-094298 revised 2009-07-10 TEI9 Revised to S2-094706 2009-09-17
0344 1 F Rel-9 9.1.0 - Clarification for usage monitoring control on IP-CAN session level - - - S2 74 S2-094706 revised 2009-07-10 TEI9 Revised to S2-094774 2009-09-17
0344 2 F Rel-9 9.1.0 9.2.0 Clarification for usage monitoring control on IP-CAN session level SP-45 SP-090608 approved S2 74 S2-094774 agreed 2009-07-10 TEI9 This CR was approved 2009-09-17
0345 - F Rel-9 9.1.0 - Emergency PDN connection termination after IMS Emergency call - - - S2 74 S2-094314 revised 2009-07-10 IMS_EMER_GPRS_EPS Other issues were raised and this was further discussed off-line and revised in S2-094761 2009-09-17
0345 1 F Rel-9 9.1.0 - Emergency PDN connection termination after IMS Emergency call - - - S2 74 S2-094761 revised 2009-07-10 IMS_EMER_GPRS_EPS This required further off-line discussion and was revised in S2-094889 2009-09-17
0345 2 F Rel-9 9.1.0 - Emergency PDN connection termination after IMS Emergency call - - - S2 74 S2-094889 revised 2009-07-10 IMS_EMER_GPRS_EPS The CR was revised in S2-094947 2009-09-17
0345 3 F Rel-9 9.1.0 - Emergency PDN connection termination after IMS Emergency call - - - S2 74 S2-094947 revised 2009-07-10 IMS_EMER_GPRS_EPS This CR was approved at S2-74, but revised at S2-75 in S2-095199 2009-09-17
0345 4 F Rel-9 9.1.0 - PSAP Callback indicator from IMS to PCRF - - - S2 75 S2-095199 revised 2009-09-04 IMS_EMER_GPRS_EPS Revised to S2-095755 2009-09-17
0345 5 F Rel-9 9.1.0 - PSAP Callback indicator from IMS to PCRF - - - S2 75 S2-095755 revised 2009-09-04 IMS_EMER_GPRS_EPS Revised to S2-096030 2009-09-17
0345 6 F Rel-9 9.1.0 9.2.0 PSAP Callback indicator from IMS to PCRF SP-45 SP-090601 approved S2 75 S2-096030 agreed 2009-09-04 IMS_EMER_GPRS_EPS This CR was approved 2009-09-17
0346 - F Rel-9 9.1.0 - Usage report during usage threshold change - - - S2 74 S2-094341 noted 2009-07-10 SAES Noted in parallel sessions. Merged into S2-094703 endorsed - separating the request by PCRF for information from the change of threshold by the PCRF 2009-09-17
0347 - F Rel-9 9.1.0 - Add the description of the PCEF to support usage monitoring control - - - S2 74 S2-094342 revised 2009-07-10 SAES Revised to S2-094769 2009-09-17
0347 1 F Rel-9 9.1.0 9.2.0 Add the description of the PCEF to support usage monitoring control SP-45 SP-090592 approved S2 74 S2-094769 agreed 2009-07-10 SAES Agreed in parallel sessions 2009-09-17
0348 - F Rel-9 9.1.0 - Add the description of the SPR to support usage monitoring control - - - S2 74 S2-094343 revised 2009-07-10 SAES Revised to S2-094770 2009-09-17
0348 1 F Rel-9 9.1.0 9.2.0 Add the description of the SPR to support usage monitoring control SP-45 SP-090592 approved S2 74 S2-094770 agreed 2009-07-10 SAES Agreed in parallel sessions 2009-09-17
0349 - F Rel-9 9.1.0 - Modify for the SPR storing usage information in the IP-CAN session termination procedure - - - S2 74 S2-094344 revised 2009-07-10 SAES Revised to S2-094771 2009-09-17
0349 1 F Rel-9 9.1.0 9.2.0 Modify for the SPR storing usage information in the IP-CAN session termination procedure SP-45 SP-090592 approved S2 74 S2-094771 agreed 2009-07-10 SAES Agreed in parallel sessions 2009-09-17
0350 - F Rel-9 9.1.0 - Clarification on usage monitoring function - - - S2 74 S2-094360 noted 2009-07-10 TEI9 Noted in parallel sessions: merged into S2-094703 2009-09-17
0351 - F Rel-8 8.6.0 - UE IP address provision during the BBERF relocation in the PCC - - - S2 74 S2-094368 noted 2009-07-10 SAES Noted in parallel sessions 2009-09-17
0352 - A Rel-9 9.1.0 - UE IP address provision during the BBERF relocation in the PCC - - - S2 74 S2-094369 noted 2009-07-10 SAES Noted in parallel sessions 2009-09-17
0353 - F Rel-8 8.6.0 - Clarification to the SDF ID - - - S2 74 S2-094370 revised 2009-07-10 SAES Revised to S2-094707 2009-09-17
0353 1 F Rel-8 8.6.0 - Clarification to the SDF ID - - - S2 74 S2-094707 revised 2009-07-10 SAES It should be clarified that the SDF ID is used wioth Gx and Gxx. The CR was revised in S2-094908 2009-09-17
0353 2 F Rel-8 8.6.0 8.7.0 Clarification to the SDF ID SP-45 SP-090582 approved S2 74 S2-094908 agreed 2009-07-10 SAES This CR was approved 2009-09-17
0354 - A Rel-9 9.1.0 - Clarification to the SDF ID - - - S2 74 S2-094371 revised 2009-07-10 SAES Revised to S2-094708 2009-09-17
0354 1 A Rel-9 9.1.0 - Clarification to the SDF ID - - - S2 74 S2-094708 revised 2009-07-10 SAES It should be clarified that the SDF ID is used wioth Gx and Gxx. The CR was revised in S2-094909 2009-09-17
0354 2 A Rel-9 9.1.0 9.2.0 Clarification to the SDF ID SP-45 SP-090582 approved S2 74 S2-094909 agreed 2009-07-10 SAES This CR was approved 2009-09-17
0355 - B Rel-9 9.1.0 - PCC supports for Emergency Calls without IMS Emergency Registration - - - S2 74 S2-094393 noted 2009-07-10 IMS_EMER_GPRS_EPS This CR was noted and delegates were invited to further consider the issues around this proposal. 2009-09-17
0356 - F Rel-9 9.1.0 - Clarification on UE identity unavailable/ unauthenticated for EMC service - - - S2 74 S2-094397 revised 2009-07-10 IMS_EMER_GPRS_EPS This was discussed off-line and revised in S2-094758 2009-09-17
0356 1 F Rel-9 9.1.0 - Clarification on UE identity unavailable/ unauthenticated for EMC service - - - S2 74 S2-094758 revised 2009-07-10 IMS_EMER_GPRS_EPS Vodafone asked to changed 'UE' to 'user' and to remove 'UE Equipment Identity (e.g. IMEI)' with 'IMEI'. The CR was revised in S2-094886 2009-09-17
0356 2 F Rel-9 9.1.0 9.2.0 Clarification on UE identity unavailable/ unauthenticated for EMC service SP-45 SP-090601 approved S2 74 S2-094886 agreed 2009-07-10 IMS_EMER_GPRS_EPS This CR was approved 2009-09-17
0357 - B Rel-9 9.1.0 - CSG based Charging 23.203 - - - S2 74 S2-094415 noted 2009-07-10 EHNB Noted 2009-09-17
0357 1 B Rel-9 9.1.0 - CSG based Charging 23.203 - - - S2 75 S2-095139 revised 2009-09-04 EHNB Revised to S2-095742 2009-09-17
0357 2 B Rel-9 9.1.0 - CSG based Charging 23.203 - - - S2 75 S2-095742 revised 2009-09-04 EHNB This required off-line checking and was revised in S2-095883 2009-09-17
0357 3 B Rel-9 9.1.0 - CSG based Charging 23.203 - - - S2 75 S2-095883 revised 2009-09-04 EHNB Vodafone commented that the term 'User CSG information' was wide-ranging and a more accurate term for the information referred-to should be sought. The CR was further discussed off-line and revised in S2-095955 2009-09-17
0357 4 B Rel-9 9.1.0 - CSG based Charging 23.203 - - - S2 75 S2-095955 revised 2009-09-04 EHNB The CR was revised off-line in S2-095999 2009-09-17
0357 5 B Rel-9 9.1.0 9.2.0 CSG based Charging 23.203 SP-45 SP-090597 approved S2 75 S2-095999 agreed 2009-09-04 EHNB This CR was approved 2009-09-17
0358 - B Rel-9 9.1.0 - Add the deccription of the PCRF getting the usage information from the PCEF in real-time - - - S2 74 S2-094459 withdrawn 2009-07-10 SAES WITHDRAWN 2009-09-17
0359 - B Rel-9 9.1.0 - Add the description of the PCEF to support usage monitoring control - - - S2 74 S2-094460 withdrawn 2009-07-10 SAES WITHDRAWN 2009-09-17
0360 - B Rel-9 9.1.0 - Add the description of the SPR to support usage monitoring control - - - S2 74 S2-094461 withdrawn 2009-07-10 SAES WITHDRAWN 2009-09-17
0361 - B Rel-9 9.1.0 - Modify for the SPR storing usage information in the IP-CAN session termination procedure - - - S2 74 S2-094462 withdrawn 2009-07-10 SAES WITHDRAWN 2009-09-17
0362 - F Rel-8 8.6.0 - APN-AMBR enforcement in PCEF - - - S2 74 S2-094463 noted 2009-07-10 SAES Noted in parallel sessions 2009-09-17
0363 - A Rel-9 9.1.0 - APN-AMBR enforcement in PCEF - - - S2 74 S2-094464 noted 2009-07-10 SAES Noted in parallel sessions 2009-09-17
0364 - F Rel-8 8.6.0 - PCC rule creation for UE provided traffic mapping information - - - S2 74 S2-094579 revised 2009-07-10 SAES Revised to S2-094709 2009-09-17
0364 1 F Rel-8 8.6.0 - PCC rule creation for UE provided traffic mapping information - - - S2 74 S2-094709 revised 2009-07-10 SAES Note 4 was clarified and the CR revised in S2-094910 2009-09-17
0364 2 F Rel-8 8.6.0 8.7.0 PCC rule creation for UE provided traffic mapping information SP-45 SP-090582 approved S2 74 S2-094910 agreed 2009-07-10 SAES This CR was approved 2009-09-17
0365 - A Rel-9 9.1.0 - PCC rule creation for UE provided traffic mapping information - - - S2 74 S2-094580 revised 2009-07-10 SAES Revised to S2-094710 2009-09-17
0365 1 A Rel-9 9.1.0 - PCC rule creation for UE provided traffic mapping information - - - S2 74 S2-094710 revised 2009-07-10 SAES Note 4 was clarified and the CR revised in S2-094911 2009-09-17
0365 2 A Rel-9 9.1.0 9.2.0 PCC rule creation for UE provided traffic mapping information SP-45 SP-090582 approved S2 74 S2-094911 agreed 2009-07-10 SAES This CR was approved 2009-09-17
0366 - F Rel-8 8.6.0 - Fix misalignment of QCI mapping for pre-Rel-8 QoS - - - S2 74 S2-094595 revised 2009-07-10 SAES Revised to S2-094715 2009-09-17
0366 1 F Rel-8 8.6.0 8.7.0 Fix misalignment of QCI mapping for pre-Rel-8 QoS SP-45 SP-090582 approved S2 74 S2-094715 agreed 2009-07-10 SAES This CR was approved 2009-09-17
0367 - A Rel-9 9.1.0 - Fix misalignment of QCI mapping for pre-Rel-8 QoS - - - S2 74 S2-094596 revised 2009-07-10 SAES Revised to S2-094716 2009-09-17
0367 1 A Rel-9 9.1.0 9.2.0 Fix misalignment of QCI mapping for pre-Rel-8 QoS SP-45 SP-090582 approved S2 74 S2-094716 agreed 2009-07-10 SAES This CR was approved 2009-09-17
0368 - F Rel-8 8.6.0 - Addition of Input from PCEF/BBERF for PCC decision - - - S2 74 S2-094621 noted 2009-07-10 SAES LATE DOC: Rx 30/06, 16:55 Not Handled 2009-09-17
0369 - F Rel-9 9.1.0 - Addition of Input from PCEF/BBERF for PCC decision - - - S2 74 S2-094622 noted 2009-07-10 SAES LATE DOC: Rx 30/06, 16:55 Not Handled 2009-09-17
0370 - F Rel-7 7.11.0 - Notification about RAT-type change - - - S2 75 S2-095554 noted 2009-09-04 PCC Not Handled 2009-09-17
0370 1 F Rel-7 7.11.0 - Notification about RAT-type change - - - S2 S2-75E S2-096216 Revised 2009-11-17 PCC NOTED Postpone to Kyoto as part of overall T-ADS discussions. Revised at S2-76 in S2-097036 2009-11-26
0370 2 F Rel-7 7.11.0 7.12.0 Notification about RAT-type change SP-46 SP-090766 approved S2 S2-76 S2-097036 agreed 2009-11-17 TEI7 This CR was approved 2009-11-26
0371 - A Rel-8 8.6.0 - Notification about RAT-type change - - - S2 75 S2-095555 noted 2009-09-04 PCC Not Handled 2009-09-17
0371 1 A Rel-8 8.7.0 - Notification about RAT-type change - - - S2 S2-75E S2-096217 Revised 2009-11-17 PCC NOTED Postpone to Kyoto as part of overall T-ADS discussions. Revised at S2-76 in S2-097037 2009-11-26
0371 2 A Rel-8 8.7.0 8.8.0 Notification about RAT-type change SP-46 SP-090766 approved S2 S2-76 S2-097037 agreed 2009-11-17 TEI7 This CR was approved 2009-11-26
0372 - A Rel-9 9.1.0 - Notification about RAT-type change - - - S2 75 S2-095556 noted 2009-09-04 PCC Not Handled 2009-09-17
0372 1 A Rel-9 9.2.0 - Notification about RAT-type change - - - S2 S2-75E S2-096218 Revised 2009-11-17 PCC NOTED Postpone to Kyoto as part of overall T-ADS discussions. Revised at S2-76 in S2-097038 2009-11-26
0372 2 A Rel-9 9.2.0 9.3.0 Notification about RAT-type change SP-46 SP-090766 approved S2 S2-76 S2-097038 agreed 2009-11-17 TEI7 This CR was approved 2009-11-26
0373 - F Rel-9 9.2.0 - Bidirectional filters - - - S2 S2-75E S2-096123 Revised 2009-11-17 TEI9 NOTED Needs a piano in Cabo … :o) Revised at S2-76 in S2-096915 2009-11-26
0373 1 A Rel-9 9.2.0 - Bidirectional filters - - - S2 S2-76 S2-096915 Revised 2009-11-17 SAES Revised to S2-097285 2009-11-26
0373 2 F Rel-9 9.2.0 - Bidirectional filters - - - S2 S2-76 S2-097285 Revised 2009-11-17 TEI9 WRONG TD NUMBER IN HEADER. Revised to S2-097291 2009-11-26
0373 3 F Rel-9 9.2.0 - Bidirectional filters - - - S2 S2-76 S2-097291 Revised 2009-11-17 TEI9 Revised to S2-097408 2009-11-26
0373 4 F Rel-9 9.2.0 9.3.0 Bidirectional filters SP-46 SP-090794 approved S2 S2-76 S2-097408 agreed 2009-11-17 TEI9 This CR was approved 2009-11-26
0374 - F Rel-8 8.7.0 - Correction on BCM over Gx and Gxx - - - S2 S2-75E S2-096143 Revised 2009-11-17 SAES Rev1 APPROVED. Revised in S2-096388 2009-11-26
0374 1 F Rel-8 8.7.0 8.8.0 Correction on BCM over Gx and Gxx SP-46 SP-090776 approved S2 S2-75E S2-096388 agreed 2009-11-17 SAES Revision 1 of S2-096143 2009-11-26
0375 - A Rel-9 9.2.0 - Correction on BCM over Gx and Gxx - - - S2 S2-75E S2-096144 Revised 2009-11-17 SAES Rev1 APPROVED. Revised in S2-096389 2009-11-26
0375 1 A Rel-9 9.2.0 9.3.0 Correction on BCM over Gx and Gxx SP-46 SP-090776 approved S2 S2-75E S2-096389 agreed 2009-11-17 SAES Revision 1 of S2-096144 2009-11-26
0376 - F Rel-8 8.7.0 - Correction to BCM sent over Gxx only for non-3GPP access - - - S2 S2-75E S2-096157 Noted 2009-11-17 SAES NOTED Lars prefers to keep the original step 3, 2009-11-26
0377 - A Rel-9 9.2.0 - Correction to BCM sent over Gxx only for non-3GPP access - - - S2 S2-75E S2-096158 Noted 2009-11-17 SAES NOTED 2009-11-26
0378 - F Rel-8 8.7.0 8.8.0 Correction of the description of The UE IP address change event trigger SP-46 SP-090776 approved S2 S2-75E S2-096265 agreed 2009-11-17 SAES APPROVED 2009-11-26
0379 - A Rel-9 9.2.0 9.3.0 Correction of the description of The UE IP address change event trigger SP-46 SP-090776 approved S2 S2-75E S2-096266 agreed 2009-11-17 SAES APPROVED 2009-11-26
0380 - F Rel-9 9.2.0 - Questioning guarantee that emergency PDN connection is only used for emergency related traffic - - - S2 S2-75E S2-096271 Noted 2009-11-17 IMS_EMER_GPRS_EPS NOTED This is more IMS related and is editorial in nature. 2009-11-26
0380 1 F Rel-9 9.3.0 - Removal of requirements for PSAP call back indicator - - - S2 S2-78 S2-101359 noted 2010-03-16 TEI9 Noted in IMS SWG 2010-03-19
0381 - F Rel-9 9.2.0 - Modification of CSG based charging - - - S2 S2-76 S2-096624 Revised 2009-11-17 EHNB This CR was revised off-line in S2-097473 2009-11-26
0381 1 F Rel-9 9.2.0 9.3.0 Modification of CSG based charging SP-46 SP-090787 approved S2 S2-76 S2-097473 agreed 2009-11-17 EHNB This CR was approved 2009-11-26
0382 - F Rel-9 9.2.0 - Correction to BCM sent over Gxx on GCS Establishment during attach - - - S2 S2-76 S2-096823 Noted 2009-11-17 SAES Noted in parallel sessions 2009-11-26
0383 - F Rel-9 9.2.0 - BBERF provides Subscribed APN-AMBR to the PCRF - - - S2 S2-76 S2-096849 Revised 2009-11-17 TEI9 The WI Code should be TEI9. Further discussion was needed and this was revised off-line in S2-097431 2009-11-26
0383 1 F Rel-9 9.2.0 9.3.0 BBERF provides Subscribed APN-AMBR to the PCRF SP-46 SP-090794 approved S2 S2-76 S2-097431 agreed 2009-11-17 TEI9 This CR was approved 2009-11-26
0384 - F Rel-8 8.7.0 - Bidirectional filters - - - S2 S2-76 S2-096914 Noted 2009-11-17 SAES Noted in parallel sessions 2009-11-26
0385 - F Rel-8 8.7.0 8.8.0 Corrections to annex A.4 SP-46 SP-090776 approved S2 S2-76 S2-096918 agreed 2009-11-17 SAES This CR was approved 2009-11-26
0386 - A Rel-9 9.2.0 - Corrections to annex A.4 - - - S2 S2-76 S2-096919 Revised 2009-11-17 SAES Revised to S2-097286 2009-11-26
0386 1 A Rel-9 9.2.0 9.3.0 Corrections to annex A.4 SP-46 SP-090776 approved S2 S2-76 S2-097286 agreed 2009-11-17 SAES This CR was approved 2009-11-26
0387 - F Rel-9 9.2.0 - Adding PCRF requirement to allow binding in the UE. - - - S2 S2-76 S2-096941 Revised 2009-11-17 TEI9 Revised to S2-097214 2009-11-26
0387 1 F Rel-9 9.2.0 - Adding PCRF requirement to allow binding in the UE. - - - S2 S2-76 S2-097214 Withdrawn 2009-11-17 TEI9 Noted WITHDRAWN 2009-11-26
0388 - F Rel-9 9.2.0 - Gx filter handling clarifications - - - S2 S2-76 S2-097015 Noted 2009-11-17 TEI9 Noted in parallel sessions 2009-11-26
0389 - B Rel-9 9.2.0 - Enhancement for type of IP-CAN change reporting on Rx - - - S2 S2-76 S2-097039 Noted 2009-11-17 TEI9 Not Handled 2009-11-26
0390 - F Rel-9 9.2.0 - Clarification for the description of the uSge monitoring report - - - S2 S2-76 S2-097082 Noted 2009-11-17 SAES LATE REQUEST: LATE DOC: Rx 10/11, 10:20 Not Handled 2009-11-26
0391 - F Rel-8 8.7.0 - Delete the editor's note in clause 5.2.7 - - - S2 S2-76 S2-097083 Noted 2009-11-17 SAES LATE REQUEST: LATE DOC: Rx 10/11, 10:20 Not Handled 2009-11-26
0392 - A Rel-9 9.2.0 - Delete the editor's note in clause 5.2.7 - - - S2 S2-76 S2-097084 Noted 2009-11-17 SAES LATE REQUEST: LATE DOC: Rx 10/11, 10:20 Not Handled 2009-11-26
0393 - D Rel-8 8.8.0 - Unifying PGW and SGW nomenclature - - - S2 S2-77 S2-100157 noted 2010-03-16 SAES Not Handled 2010-03-19
0394 - A Rel-9 9.3.0 - Unifying PGW and SGW nomenclature - - - S2 S2-77 S2-100158 noted 2010-03-16 SAES Not Handled 2010-03-19
0395 - F Rel-8 8.8.0 - Clarification to 23.203 annex A.4 - - - S2 S2-77 S2-100206 revised 2010-03-16 SAES Revised to S2-100915 2010-03-19
0395 1 F Rel-8 8.8.0 - Clarification to 23.203 annex A.4 - - - S2 S2-77 S2-100915 noted 2010-03-16 SAES Not Handled 2010-03-19
0396 - A Rel-9 9.3.0 - Clarification to 23.203 annex A.4 - - - S2 S2-77 S2-100207 revised 2010-03-16 SAES Revised to S2-100916 2010-03-19
0396 1 A Rel-9 9.3.0 - Clarification to 23.203 annex A.4 - - - S2 S2-77 S2-100916 noted 2010-03-16 SAES Not Handled 2010-03-19
0397 - F Rel-8 8.8.0 - Delete the editor's note in clause 5.2.7(Rel-8) - - - S2 S2-77 S2-100254 noted 2010-03-16 SAES Not Handled 2010-03-19
0398 - A Rel-9 9.3.0 - Delete the editor's note in clause 5.2.7(Rel-9) - - - S2 S2-77 S2-100255 noted 2010-03-16 SAES Not Handled 2010-03-19
0399 - F Rel-8 8.8.0 - The Correction to the Gateway Control Session establishment procedure(Rel-8) - - - S2 S2-77 S2-100256 revised 2010-03-16 SAES Revised to S2-100679 2010-03-19
0399 1 F Rel-8 8.8.0 - Correction to the Gateway Control Session establishment procedure SP-47 SP-100136 postponed S2 S2-77 S2-100679 agreed 2010-03-16 SAES This CR was approved 2010-03-19
0399 1 F Rel-8 8.8.0 - Correction to the Gateway Control Session establishment procedure SP-47 SP-100217 withdrawn S2 S2-77 S2-100679 agreed 2010-03-16 SAES cover sheet correction 2010-03-19
0400 - A Rel-9 9.3.0 - The Correction to the Gateway Control Session establishment procedure(Rel-9) - - - S2 S2-77 S2-100257 revised 2010-03-16 SAES Revised to S2-100680 2010-03-19
0400 1 A Rel-9 9.3.0 - Correction to the Gateway Control Session establishment procedure SP-47 SP-100136 postponed S2 S2-77 S2-100680 agreed 2010-03-16 SAES This CR was approved 2010-03-19
0400 1 A Rel-9 9.3.0 - Correction to the Gateway Control Session establishment procedure SP-47 SP-100217 withdrawn S2 S2-77 S2-100680 agreed 2010-03-16 SAES cover sheet correction 2010-03-19
0401 - F Rel-8 8.8.0 - Clarifying the signalling flow in the PCRF initiated IP-CAN Session Modification procedure - - - S2 S2-77 S2-100295 noted 2010-03-16 SAES LATE_DOC: Rx 12/01/2010 20:55 Not Handled 2010-03-19
0402 - A Rel-9 9.3.0 - Clarifying the signalling flow in the PCRF initiated IP-CAN Session Modification procedure - - - S2 S2-77 S2-100296 noted 2010-03-16 SAES LATE_DOC: Rx 12/01/2010 20:55 Not Handled 2010-03-19
0403 - F Rel-9 9.3.0 - PCC Support for CSG Event Triggers - - - S2 S2-77 S2-100333 noted 2010-03-16 eEHNB Noted 2010-03-19
0404 - B Rel-9 9.3.0 - PCC Support for CSG (PMIP Architecture) - - - S2 S2-77 S2-100335 revised 2010-03-16 EHNB Revised to S2-100784 2010-03-19
0404 1 B Rel-9 9.3.0 - PCC Support for CSG (PMIP Architecture) - - - S2 S2-77 S2-100784 revised 2010-03-16 EHNB Revised to S2-100901 2010-03-19
0404 2 B Rel-9 9.3.0 - PCC Support for CSG (PMIP Architecture) - - - S2 S2-77 S2-100901 revised 2010-03-16 EHNB e-mail revision 4 approved. Revised in S2-100954 2010-03-19
0404 3 B Rel-9 9.3.0 9.4.0 PCC Support for CSG (PMIP Architecture) SP-47 SP-100149 approved S2 S2-77 S2-100954 agreed 2010-03-16 EHNB e-mail approved 2010-03-19
0405 - F Rel-9 9.3.0 - Notification about User CSG Information change - - - S2 S2-77 S2-100463 noted 2010-03-16 EHNB Noted 2010-03-19
0406 - F Rel-9 9.3.0 - PCC Spec also applies to MBMS - - - S2 S2-77 S2-100504 noted 2010-03-16 MBMS_EPS Noted 2010-03-19
0407 - F Rel-8 8.8.0 - Control of traffic mapping information generation - - - S2 S2-77 S2-100528 revised 2010-03-16 SAES Revised to S2-100681 2010-03-19
0407 1 F Rel-8 8.8.0 8.9.0 Control of traffic mapping information generation SP-47 SP-100128 approved S2 S2-77 S2-100681 agreed 2010-03-16 SAES This CR was approved 2010-03-19
0408 - A Rel-9 9.3.0 - Control of traffic mapping information generation - - - S2 S2-77 S2-100529 revised 2010-03-16 SAES Revised to S2-100682 2010-03-19
0408 1 A Rel-9 9.3.0 - Control of traffic mapping information generation - - - S2 S2-77 S2-100682 revised 2010-03-16 SAES Revised to S2-100905 2010-03-19
0408 2 F Rel-9 9.3.0 9.4.0 Control of traffic mapping information generation SP-47 SP-100149 approved S2 S2-77 S2-100905 agreed 2010-03-16 TEI9 This CR was approved 2010-03-19
0409 - F Rel-9 9.3.0 - Addition of APN-AMBR control to GPRS Annex - - - S2 S2-77 S2-100530 noted 2010-03-16 SAES Not Handled 2010-03-19
0409 1 F Rel-9 9.4.0 - Addition of APN-AMBR control to GPRS Annex - - - - S2-78E S2-101917 revised 2010-04-09 TEI9 Revised in S2-102020 2010-09-04
0409 2 F Rel-9 9.4.0 9.5.0 Addition of APN-AMBR control to GPRS Annex SP-48 SP-100328 approved S2 S2-78E S2-102020 agreed 2010-04-18 TEI9 Agreed 2010-04-18
0410 - F Rel-8 8.8.0 - Removal of obsolete editor's notes - - - S2 S2-77 S2-100531 noted 2010-03-16 SAES Not Handled 2010-03-19
0410 1 F Rel-8 8.9.0 - Removal of obsolete editor's notes - - - - S2-78E S2-101918 noted 2010-04-09 SAES Noted 2010-09-04
0411 - A Rel-9 9.3.0 - Removal of obsolete editor's notes - - - S2 S2-77 S2-100532 noted 2010-03-16 SAES Not Handled 2010-03-19
0411 1 A Rel-9 9.4.0 - Removal of obsolete editor's notes - - - - S2-78E S2-101919 noted 2010-04-09 SAES Noted 2010-09-04
0412 - F Rel-8 8.9.0 - Clarifying the signalling flow in the PCRF initiated IP-CAN Session Modification procedure - - - - S2-78E S2-101856 noted 2010-04-09 SAES Noted 2010-09-04
0413 - A Rel-9 9.4.0 - Clarifying the signalling flow in the PCRF initiated IP-CAN Session Modification procedure - - - - S2-78E S2-101857 noted 2010-04-09 SAES Noted 2010-09-04
0414 - F Rel-8 8.9.0 - Clarify the usage of deferred leg linking indication in Gateway Control Session establishment during attach(Rel-8) - - - - S2-78E S2-101864 noted 2010-04-09 SAES Noted 2010-09-04
0415 - A Rel-9 9.4.0 - Clarify the usage of deferred leg linking indication in Gateway Control Session establishment during attach(Rel-9) - - - - S2-78E S2-101865 noted 2010-04-09 SAES Noted 2010-09-04
0416 - F Rel-8 8.9.0 - Delete the editor's note in clause 5.2.7(Rel-8) - - - - S2-78E S2-101866 noted 2010-04-09 SAES Noted 2010-09-04
0417 - A Rel-9 9.4.0 - Delete the editor's note in clause 5.2.7(Rel-9) - - - - S2-78E S2-101867 noted 2010-04-09 SAES Noted 2010-09-04
0418 - F Rel-8 8.9.0 - Correction to the update of the subscription information in the PCRF procedure(Rel-8) - - - - S2-78E S2-101868 noted 2010-04-09 SAES Noted 2010-09-04
0419 - A Rel-9 9.4.0 - Correction to the update of the subscription information in the PCRF procedure(Rel-9) - - - - S2-78E S2-101869 noted 2010-04-09 SAES Noted 2010-09-04
0420 - F Rel-8 8.9.0 - Access Network Charging Correlation Information - - - - S2-78E S2-101893 revised 2010-04-09 SAES Revised in S2-102005 2010-09-04
0420 1 F Rel-8 8.9.0 8.10.0 Access Network Charging Correlation Information SP-48 SP-100311 approved S2 S2-78E S2-102005 agreed 2010-04-19 SAES Agreed 2010-04-19
0421 - A Rel-9 9.4.0 - Access Network Charging Correlation Information - - - - S2-78E S2-101894 revised 2010-04-09 SAES Revised in S2-102006 2010-09-04
0421 1 A Rel-9 9.4.0 9.5.0 Access Network Charging Correlation Information SP-48 SP-100311 approved S2 S2-78E S2-102006 agreed 2010-04-17 SAES Agreed 2010-04-17
0422 - F Rel-9 9.4.0 9.5.0 Evolved ARP SP-48 SP-100328 approved S2 S2-78E S2-101898 agreed 2010-04-09 TEI9 Agreed 2010-09-04
0423 - F Rel-9 9.4.0 - Traffic mapping information - - - - S2-78E S2-101905 revised 2010-04-09 TEI9 Revised in S2-102013 2010-09-04
0423 1 F Rel-9 9.4.0 9.5.0 Traffic mapping information SP-48 SP-100328 approved S2 S2-78E S2-102013 agreed 2010-04-18 TEI9 Agreed 2010-04-18
0424 - F Rel-8 8.9.0 - Clarification to Annex A.4 - - - - S2-78E S2-101949 revised 2010-04-09 SAES Revised in S2-102030 2010-09-04
0424 1 F Rel-8 8.9.0 8.10.0 Clarification to Annex A.4 SP-48 SP-100311 approved S2 S2-78E S2-102030 agreed 2010-04-18 SAES Agreed 2010-04-18
0425 - A Rel-9 9.4.0 - Clarification to Annex A.4 - - - - S2-78E S2-101950 revised 2010-04-09 SAES Revised in S2-102031 2010-09-04
0425 1 A Rel-9 9.4.0 9.5.0 Clarification to Annex A.4 SP-48 SP-100311 approved S2 S2-78E S2-102031 agreed 2010-04-18 SAES Agreed 2010-04-18
0426 - B Rel-10 9.4.0 - PCC extensions for IP flow mobility - - - - S2-79 S2-102099 revised 2010-04-27 IFOM Revised in S2-102849 2010-04-27
0426 1 B Rel-10 9.4.0 10.0.0 PCC extensions for IP flow mobility SP-48 SP-100338 approved S2 S2-79 S2-102849 agreed 2010-05-10 IFOM Agreed 2010-10-05
0427 - B Rel-10 9.4.0 - Account for MBR > GBR bearers - - - - S2-79 S2-102176 revised 2010-04-29 ECSRA_LAA Revised in S2-102915 2010-04-29
0427 1 B Rel-10 9.4.0 10.0.0 Account for MBR > GBR bearers SP-48 SP-100337 approved S2 S2-79 S2-102915 agreed 2010-05-12 ECSRA_LAA Agreed 2010-12-05
0428 - F Rel-9 9.4.0 - PS-to-CS HO indicator impacts to PCC - - - - S2-79 S2-102183 - 2010-04-29 TEI9 Not Handled 2010-04-29
0429 - B Rel-10 9.4.0 - PCC changes to support IPv6 Prefix Delegation in the EPC architecture - - - - S2-79 S2-102301 revised 2010-05-01 TEI10 Revised in S2-102645 2010-01-05
0429 1 B Rel-10 9.4.0 - PCC changes to support IPv6 Prefix Delegation in the EPC architecture - - - - S2-79 S2-102645 revised 2010-05-04 TEI10 Revised in S2-102937 2010-04-05
0429 2 B Rel-10 9.4.0 10.0.0 PCC changes to support IPv6 Prefix Delegation in the EPC architecture SP-48 SP-100345 approved S2 S2-79 S2-102937 agreed 2010-05-12 TEI10 Agreed 2010-12-05
0430 - B Rel-10 9.4.0 - AF interaction enhancement for IFOM - - - - S2-79 S2-102562 revised 2010-05-04 IFOM Revised in S2-103011 2010-04-05
0430 1 B Rel-10 9.4.0 10.0.0 AF interaction enhancement for IFOM SP-48 SP-100338 approved S2 S2-79 S2-103011 agreed 2010-05-13 IFOM Agreed 2010-05-13
0431 - D Rel-8 8.9.0 8.10.0 Removing Editor’s Notes from frozen specs SP-48 SP-100379 approved Rapporteur(Ericsson), MCC, SA WG2 Chairman - - - 2010-06-01 SAES Rapprtuer input direct to TSG SA 2010-01-06
0432 - A Rel-9 9.4.0 9.5.0 Removing Editor’s Notes from frozen specs SP-48 SP-100379 approved Rapporteur(Ericsson), MCC, SA WG2 Chairman - - - 2010-06-01 SAES Rapprtuer input direct to TSG SA 2010-01-06
0433 - B Rel-10 10.0.0 - Reporting the eNodeB capability of supporting ECN to PCRF - - - - S2-80 S2-103407 - 2010-08-20 ECSRA_LAA - 2010-08-20
0434 - B Rel-10 10.0.0 - Charging for IFOM - - - - S2-80 S2-103418 Revised 2010-08-20 IFOM Revised 2010-08-20
0434 1 B Rel-10 10.0.0 10.1.0 Charging for IFOM SP-49 SP-100547 approved S2 S2-80 S2-104244 Agreed 2010-09-01 IFOM - 2010-01-09
0435 - F Rel-9 9.5.0 - Correct misused IE names - - - - S2-80 S2-103439 Revised 2010-08-20 EHNB Revised 2010-08-20
0435 1 F Rel-9 9.5.0 9.6.0 Correct misused IE names SP-49 SP-100535 approved S2 S2-80 S2-104008 Agreed 2010-09-03 EHNB - 2010-03-09
0436 - A Rel-10 10.0.0 - Correct misused IE names - - - - S2-80 S2-103440 Revised 2010-08-20 EHNB Revised 2010-08-20
0436 1 A Rel-10 10.0.0 10.1.0 Correct misused IE names SP-49 SP-100535 approved S2 S2-80 S2-104009 Agreed 2010-09-03 EHNB - 2010-03-09
0437 - B Rel-10 10.0.0 - CR to 23.203 for sponsored connectivity - - - - S2-80 S2-103559 Revised 2010-08-23 FS_PP Revised 2010-08-23
0437 1 B Rel-10 10.0.0 - CR to 23.203 for sponsored connectivity - - - - S2-80 S2-104019 Revised 2010-08-31 FS_PP Revised 2010-08-31
0437 2 B Rel-10 10.0.0 10.1.0 CR to 23.203 for sponsored connectivity SP-49 SP-100557 approved S2 S2-80 S2-104085 Agreed 2010-09-03 FS_PP - 2010-03-09
0438 - F Rel-10 10.0.0 - Removal of Annex E and Annex F - - - - S2-80 S2-103638 Revised 2010-08-23 TEI10 Revised 2010-08-23
0438 1 D Rel-10 10.0.0 10.1.0 Removal of Annex E and Annex F SP-49 SP-100557 approved S2 S2-80 S2-104359 Agreed 2010-09-03 PEST SP-50: WI code changed from TEI10 to PEST 2010-03-09
0439 - B Rel-10 10.0.0 10.1.0 PCC aspects of GTP-based S2b SP-49 SP-100555 approved S2 S2-80 S2-103648 Agreed 2010-08-23 SMOG - 2010-08-23
0440 - B Rel-10 10.0.0 - Notification of release of Non-GBR bearer - - - - S2-80 S2-103656 Noted 2010-08-23 TEI10 Noted 2010-08-23
0440 1 B Rel-10 10.1.0 - Notification of release of Non-GBR bearer - - - S2 S2-81 S2-104637 - 2010-10-04 TEI10 Not Handled 2010-11-25
0441 - B Rel-10 10.0.0 - QoS handling for IMS multimedia priority Service - - - - S2-80 S2-103662 Noted 2010-08-23 eMPS Noted 2010-08-23
0442 - B Rel-10 10.0.0 - QCI/ARP handling in support of MPS - - - - S2-80 S2-103668 Revised 2010-08-23 eMPS Revised 2010-08-23
0442 1 B Rel-10 10.0.0 - QCI/ARP handling in support of MPS - - - - S2-80 S2-104184 Revised 2010-08-31 eMPS Revised 2010-08-31
0442 2 B Rel-10 10.0.0 10.1.0 QCI/ARP handling in support of MPS SP-49 SP-100544 approved S2 S2-80 S2-104416 Agreed 2010-09-03 eMPS - 2010-03-09
0443 - C Rel-10 10.0.0 - QCI reservation for eMPS - - - - S2-80 S2-103669 Revised 2010-08-23 eMPS Revised 2010-08-23
0443 1 C Rel-10 10.0.0 10.1.0 QCI reservation for eMPS SP-49 SP-100544 approved S2 S2-80 S2-104263 Agreed 2010-09-01 eMPS - 2010-01-09
0444 - B Rel-10 10.0.0 - MPS user subscription Indicator(s) and MPS EPS bearer service invocation/revocation procedures - - - - S2-80 S2-103670 Revised 2010-08-23 eMPS Revised 2010-08-23
0444 1 B Rel-10 10.0.0 - MPS user subscription Indicator(s) and MPS EPS bearer service invocation/revocation procedures - - - - S2-80 S2-104264 Revised 2010-09-01 eMPS Revised 2010-01-09
0444 2 B Rel-10 10.0.0 10.1.0 MPS user subscription Indicator(s) and MPS EPS bearer service invocation/revocation procedures SP-49 SP-100544 approved S2 S2-80 S2-104348 Agreed 2010-09-02 eMPS - 2010-02-09
0445 - F Rel-9 9.5.0 - PS-to-CS HO indicator impacts to PCC - - - - S2-80 S2-103688 Noted 2010-08-23 TEI9 Noted 2010-08-23
0445 1 F Rel-9 9.6.0 - PS-to-CS HO indicator impacts to PCC - - - S2 S2-81 S2-104765 revised 2010-10-05 TEI9 Noted. Revised at S2-82 in S2-105686 2010-11-25
0445 2 F Rel-9 9.6.0 - PS-to-CS HO indicator impacts to PCC - - - S2 S2-82 S2-105686 - 2010-11-09 TEI9 Not Handled 2010-11-25
0445 3 F Rel-9 9.7.0 - PS-to-CS HO indicator impacts to PCC - - - - S2-82E S2-110063 Revised 2011-01-12 TEI9 Revised 2011-01-12
0445 4 F Rel-9 9.7.0 - PS-to-CS HO indicator impacts to PCC - - - - S2-82E S2-110185 Revised 2011-01-26 TEI9 Revised 2011-01-26
0445 5 F Rel-9 9.7.0 9.8.0 PS-to-CS HO indicator impacts to PCC SP-51 SP-110063 approved S2 S2-83 S2-110349 Agreed 2011-02-09 TEI9 Agreed 2011-02-09
0446 - A Rel-10 10.0.0 - PS-to-CS HO indicator impacts to PCC - - - - S2-80 S2-103689 Noted 2010-08-23 TEI9 Noted 2010-08-23
0446 1 A Rel-10 10.1.0 - PS-to-CS HO indicator impacts to PCC - - - S2 S2-81 S2-104766 noted 2010-10-05 TEI9 Noted 2010-11-25
0447 - F Rel-10 10.0.0 - Policing of mobile originated voice sessions - - - - S2-80 S2-103724 Noted 2010-08-23 TEI10 Noted 2010-08-23
0448 - F Rel-8 8.10.0 - Correction on PCC architecture for roaming with PCEF in visited network - - - - S2-80 S2-103730 Revised 2010-08-23 PCC Revised 2010-08-23
0448 1 F Rel-8 8.10.0 - Correction on PCC architecture for roaming with PCEF in visited network - - - - S2-80 S2-104006 Revised 2010-08-31 PCC Revised 2010-08-31
0448 2 F Rel-8 8.10.0 - Correction on PCC architecture for roaming with PCEF in visited network - - - - S2-80 S2-104093 Revised 2010-09-03 PCC Revised 2010-03-09
0448 3 F Rel-8 8.10.0 8.11.0 Correction on PCC architecture for roaming with PCEF in visited network SP-49 SP-100532 approved S2 S2-80 S2-104360 Agreed 2010-09-03 PCC - 2010-03-09
0449 - A Rel-9 9.5.0 - Correction on PCC architecture for roaming with PCEF in visited network - - - - S2-80 S2-103731 Revised 2010-08-23 PCC Revised 2010-08-23
0449 1 A Rel-9 9.5.0 - Correction on PCC architecture for roaming with PCEF in visited network - - - - S2-80 S2-104007 Revised 2010-08-31 PCC Revised 2010-08-31
0449 2 A Rel-9 9.5.0 - Correction on PCC architecture for roaming with PCEF in visited network - - - - S2-80 S2-104094 Revised 2010-09-03 PCC Revised 2010-03-09
0449 3 A Rel-9 9.5.0 9.6.0 Correction on PCC architecture for roaming with PCEF in visited network SP-49 SP-100532 approved S2 S2-80 S2-104361 Agreed 2010-09-03 PCC - 2010-03-09
0450 - C Rel-10 10.0.0 - Usage of MBR>GBR bearers during roaming - - - - S2-80 S2-103753 Noted 2010-08-23 ECSRA_LAA Noted 2010-08-23
0451 - F Rel-9 9.5.0 - The clarification to groups of service data flows - - - - S2-80 S2-103772 Noted 2010-08-24 SAES Noted 2010-08-24
0452 - B Rel-10 10.0.0 - Introducing UDR to the PCC architecture - - - - S2-80 S2-103840 Revised 2010-08-24 TEI10 Revised 2010-08-24
0452 1 B Rel-10 10.0.0 10.1.0 Introducing UDR to the PCC architecture SP-49 SP-100557 approved S2 S2-80 S2-104023 Agreed 2010-08-31 PEST SP-50: WI code changed from TEI10 to PEST 2010-08-31
0453 - B Rel-10 10.0.0 - Clarification to ASP operator information of sponsored data connectivity - - - - S2-80 S2-104021 - 2010-08-31 TEI10 - 2010-08-31
0453 - B Rel-10 10.0.0 10.1.0 Clarification on ASP operators information for sponsored data connectivity SP-49 SP-100557 approved S2 S2-80 S2-104021 Agreed 2010-08-17 PEST SP-50: WI code changed from TEI10 to PEST 2010-10-09
0454 - A Rel-10 10.0.0 - Correction to CS fallback to UTRAN with PS HO supported - - - - S2-80 S2-104147 Noted 2010-08-31 TEI9 Noted 2010-08-31
0455 - F Rel-10 10.1.0 - Usage monitoring for the IP-CAN session and sponsored data connectivity simultaneously - - - S2 S2-81 S2-104503 - 2010-09-29 FS_PP Not Handled 2010-11-25
0456 - F Rel-10 10.1.0 - Reporting the eNodeB capability of supporting ECN to PCRF - - - S2 S2-81 S2-104505 - 2010-09-29 ECSRA_LAA Not Handled 2010-11-25
0457 - F Rel-8 8.11.0 - Correction of QoS change Event trigger - - - S2 S2-81 S2-104610 noted 2010-10-04 SAES Noted in parallel sessions 2010-11-25
0458 - A Rel-9 9.6.0 - Correction of QoS change Event trigger - - - S2 S2-81 S2-104611 noted 2010-10-04 SAES Noted in parallel sessions 2010-11-25
0459 - A Rel-10 10.1.0 - Correction of QoS change Event trigger - - - S2 S2-81 S2-104612 revised 2010-10-04 SAES Revised to S2-105195 2010-11-25
0459 1 F Rel-10 10.1.0 10.2.0 Correction of QoS change Event trigger SP-50 SP-100691 approved S2 S2-81 S2-105195 agreed 2010-10-14 TEI10 This CR was agreed 2010-11-25
0460 - B Rel-11 10.1.0 - Standardise use of QCI-2 for synchronised video - - - S2 S2-81 S2-104747 noted 2010-10-05 TEI11 Noted in IMS SWG 2010-11-25
0461 - F Rel-10 10.1.0 - Setting IP-CAN priority status for eMPS - - - S2 S2-81 S2-104759 revised 2010-10-05 eMPS Revised to S2-105094 2010-11-25
0461 1 F Rel-10 10.1.0 - Setting IP-CAN priority status for eMPS - - - S2 S2-81 S2-105094 revised 2010-10-12 eMPS This CR was agreed. Revised at S2-82 in S2-105615 2010-11-25
0461 2 F Rel-10 10.1.0 - Setting IP-CAN priority status for eMPS - - - S2 S2-82 S2-105615 revised 2010-11-08 eMPS Revised to S2-105872. 2010-11-25
0461 3 F Rel-10 10.1.0 - Setting IP-CAN priority status for eMPS - - - S2 S2-82 S2-105872 revised 2010-11-16 eMPS Revised to S2-105990. 2010-11-25
0461 4 F Rel-10 10.1.0 10.2.0 Setting IP-CAN priority status for eMPS SP-50 SP-100683 approved S2 S2-82 S2-105990 agreed 2010-11-19 eMPS This CR was agreed. 2010-11-25
0462 - F Rel-10 10.1.0 - Declaring support for extended TFT filter format - - - S2 S2-81 S2-104788 revised 2010-10-05 TEI10 Not Handled. Revised at S2-82 in S2-105462 2010-11-25
0462 1 F Rel-10 10.1.0 - Declaring support for extended TFT filter format - - - S2 S2-82 S2-105462 - 2010-11-05 TEI10 Not Handled 2010-11-25
0462 2 F Rel-10 10.2.1 - Declaring support for extended TFT filter format - - - - S2-82E S2-110076 Noted 2011-01-12 TEI10 Noted 2011-01-12
0463 - F Rel-10 10.1.0 - Clarification of PCC support during IFOM - - - S2 S2-81 S2-104843 revised 2010-10-05 IFOM Not Handled. Revised at S2-82 in S2-105730 2010-11-25
0463 1 F Rel-10 10.1.0 - Clarification of PCC support during IFOM - - - S2 S2-82 S2-105730 - 2010-11-09 IFOM Not Handled 2010-11-25
0463 2 F Rel-10 10.2.1 - Clarification of PCC support during IFOM - - - - S2-82E S2-110054 Revised 2011-01-12 IFOM Revised 2011-01-12
0463 3 F Rel-10 10.2.1 10.3.0 Clarification of PCC support during IFOM SP-51 SP-110068 approved S2 S2-82E S2-110181 Agreed 2011-01-26 IFOM Agreed 2011-01-26
0464 - F Rel-10 10.1.0 - The clarification to groups of services data flows - - - S2 S2-81 S2-104898 - 2010-10-06 TEI10 Not Handled 2010-11-25
0465 - F Rel-10 10.1.0 - The clarification to groups of services data flows - - - S2 S2-81 S2-104899 - 2010-10-06 TEI10 Not Handled 2010-11-25
0466 - F Rel-10 10.1.0 - Introduction of Sponsorship Identity and removal of time interval for Sponsored connectivity - - - S2 S2-81 S2-104966 - 2010-10-06 TEI10 Not Handled 2010-11-25
0467 - F Rel-10 10.1.0 - Support for MTC for 3GPP Accesses with PMIP-based S5/S8 - - - S2 S2-82 S2-105370 withdrawn 2010-11-02 NIMTC WITHDRAWN 2010-11-25
0468 - F Rel-10 10.1.0 - Usage monitoring for the IP-CAN session and sponsored data connectivity simultaneously - - - S2 S2-82 S2-105417 - 2010-11-05 TEI10 Not Handled 2010-11-25
0469 - F Rel-10 10.1.0 - Reporting the eNodeB capability of supporting ECN to PCRF - - - S2 S2-82 S2-105419 noted 2010-11-05 ECSRA_LAA Noted 2010-11-25
0470 - F Rel-10 10.1.0 - Sponsored data connectivity profile in SPR - - - S2 S2-82 S2-105423 - 2010-11-05 TEI10 Not Handled 2010-11-25
0471 - C Rel-10 10.1.0 - MME release of non-GBR bearers - - - S2 S2-82 S2-105453 withdrawn 2010-11-05 TEI10 WITHDRAWN 2010-11-25
0472 - F Rel-10 10.1.0 - Introduction of Sponsorship Identity and removal of time interval for Sponsored connectivity - - - S2 S2-82 S2-105476 noted 2010-11-05 TEI10 Replaced by new CR in S2-105944. Noted 2010-11-25
0473 - F Rel-9 9.6.0 9.7.0 Corrections to bearer binding function in PCEF in Annex A.1 SP-50 SP-100681 approved S2 S2-82 S2-105477 agreed 2010-11-05 TEI9 This CR was agreed. 2010-11-25
0474 - A Rel-10 10.1.0 10.2.0 Corrections to bearer binding function in PCEF in Annex A.1 SP-50 SP-100681 approved S2 S2-82 S2-105478 agreed 2010-11-05 TEI9 This CR was agreed. 2010-11-25
0475 - B Rel-11 10.1.0 - TDF Unsolicited Service Reporting - - - S2 S2-82 S2-105479 - 2010-11-05 TEI11 Not Handled 2010-11-25
0476 - F Rel-10 10.1.0 - Preservation Indication in PCC/QoS Rule - - - S2 S2-82 S2-105482 - 2010-11-05 TEI10 Not Handled 2010-11-25
0477 - F Rel-10 10.1.0 - Inclusion of IMS Signalling Priority in input to PCC decisions - - - S2 S2-82 S2-105513 revised 2010-11-06 eMPS Revised to S2-105869. 2010-11-25
0477 1 F Rel-10 10.1.0 10.2.0 Inclusion of IMS Signalling Priority in input to PCC decisions SP-50 SP-100683 approved S2 S2-82 S2-105869 agreed 2010-11-16 eMPS This CR was agreed. 2010-11-25
0478 - F Rel-10 10.1.0 - ARP/QCI Value after EPS Bearer Service Deactivation - - - S2 S2-82 S2-105524 revised 2010-11-08 eMPS Revised to S2-105871. 2010-11-25
0478 1 F Rel-10 10.1.0 10.2.0 ARP/QCI Value after EPS Bearer Service Deactivation SP-50 SP-100683 approved S2 S2-82 S2-105871 agreed 2010-11-16 eMPS This CR was agreed. 2010-11-25
0479 - F Rel-10 10.1.0 - ARP/QCI Value of new Dedicated Bearers after Priority EPS Bearer Activation - - - S2 S2-82 S2-105525 noted 2010-11-08 eMPS Noted 2010-11-25
0480 - F Rel-10 10.1.0 - ARP Value Determination - - - S2 S2-82 S2-105526 noted 2010-11-08 eMPS Noted 2010-11-25
0481 - F Rel-10 10.1.0 - A single message control over Gx/Gxx - - - S2 S2-82 S2-105617 noted 2010-11-08 TEI10 Noted 2010-11-25
0482 - F Rel-10 10.1.0 - Handling of MPS Priority Services Subscription - - - S2 S2-82 S2-105527 noted 2010-11-09 eMPS Noted 2010-11-25
0483 - B Rel-11 10.1.0 - PCC Requirements for TDF - - - S2 S2-82 S2-105528 - 2010-11-09 SAPP Not Handled 2010-11-25
0484 - B Rel-11 0.3.0 - PCC Procedure Modification for TDF - - - S2 S2-82 S2-105529 - 2010-11-09 SAPP Not Handled 2010-11-25
0485 - B Rel-11 10.1.0 - TDF: TS 23.203 Section 3 and Section 4 modifications - - - S2 S2-82 S2-105692 revised 2010-11-09 TEI11 Revised to S2-105788. 2010-11-25
0485 1 B Rel-11 10.1.0 - TDF: TS 23.203 Section 3 and Section 4 modifications - - - S2 S2-82 S2-105788 revised 2010-11-15 TEI11 Revised to S2-105819. 2010-11-25
0485 2 B Rel-11 10.1.0 11.0.0 TDF: TS 23.203 Section 3 and Section 4 modifications SP-50 SP-100695 approved S2 S2-82 S2-105819 agreed 2010-11-16 TEI11; SAPP This CR was agreed. 2010-11-25
0486 - B Rel-11 10.1.0 - TDF: TS 23.203 Section 5 modifications - - - S2 S2-82 S2-105693 revised 2010-11-09 TEI11 Revised to S2-105789. 2010-11-25
0486 1 B Rel-11 10.1.0 - TDF: TS 23.203 Section 5 modifications - - - S2 S2-82 S2-105789 revised 2010-11-15 TEI11 Revised to S2-105820. 2010-11-25
0486 2 B Rel-11 10.1.0 11.0.0 TDF: TS 23.203 Section 5 modifications SP-50 SP-100695 approved S2 S2-82 S2-105820 agreed 2010-11-16 TEI11; SAPP This CR was agreed. 2010-11-25
0487 - B Rel-11 10.1.0 - TDF: TS 23.203 Section 6 modifications - - - S2 S2-82 S2-105694 revised 2010-11-09 TEI11 Revised to S2-105790. 2010-11-25
0487 1 B Rel-11 10.1.0 - TDF: TS 23.203 Section 6 modifications - - - S2 S2-82 S2-105790 revised 2010-11-15 TEI11 Revised to S2-105821. 2010-11-25
0487 2 B Rel-11 10.1.0 11.0.0 TDF: TS 23.203 Section 6 modifications SP-50 SP-100695 approved S2 S2-82 S2-105821 agreed 2010-11-16 TEI11; SAPP This CR was agreed. 2010-11-25
0488 - B Rel-11 10.1.0 - TDF: TS 23.203 Section 7 modifications - - - S2 S2-82 S2-105695 revised 2010-11-09 TEI11 Revised to S2-105791. 2010-11-25
0488 1 B Rel-11 10.1.0 - TDF: TS 23.203 Section 7 modifications - - - S2 S2-82 S2-105791 revised 2010-11-15 TEI11 Revised to S2-105822. 2010-11-25
0488 2 B Rel-11 10.1.0 11.0.0 TDF: TS 23.203 Section 7 modifications SP-50 SP-100695 approved S2 S2-82 S2-105822 agreed 2010-11-16 TEI11; SAPP This CR was agreed. 2010-11-25
0489 - F Rel-10 10.1.0 - Removal of time interval for Sponsored connectivity - - - S2 S2-82 S2-105944 revised 2010-11-18 TEI10 Revised to S2-105983. 2010-11-25
0489 1 F Rel-10 10.1.0 - Removal of time interval for Sponsored connectivity - - - S2 S2-82 S2-105983 revised 2010-11-19 TEI10 Revised to S2-105996. 2010-11-25
0489 2 F Rel-10 10.1.0 10.2.0 Removal of time interval for Sponsored connectivity SP-50 SP-100691 approved S2 S2-82 S2-105996 agreed 2010-11-19 TEI10 This CR was agreed. 2010-11-25
0490 - F Rel-10 10.2.1 - Usage monitoring for the IP-CAN session and sponsored data connectivity simultaneously - - - - S2-82E S2-110005 Noted 2011-01-11 PEST Noted 2011-01-11
0491 - F Rel-10 10.2.1 - Sponsored data connectivity profile in SPR - - - - S2-82E S2-110006 Revised 2011-01-11 PEST Revised 2011-01-11
0491 1 F Rel-10 10.2.1 10.3.0 Sponsored data connectivity profile in SPR SP-51 SP-110073 approved S2 S2-82E S2-110165 Agreed 2011-01-26 PEST Agreed 2011-01-26
0492 - F Rel-10 10.2.1 - Clarify the usage reporting for Sponsored Data Connectivity - - - - S2-82E S2-110007 Revised 2011-01-11 PEST Revised 2011-01-11
0492 1 F Rel-10 10.2.1 10.3.0 Clarify the usage reporting for Sponsored Data Connectivity SP-51 SP-110073 approved S2 S2-82E S2-110166 Agreed 2011-01-26 PEST Agreed 2011-01-26
0493 - A Rel-10 10.2.1 - PS-to-CS HO indicator impacts to PCC - - - - S2-82E S2-110064 Revised 2011-01-12 TEI9 Revised 2011-01-12
0493 1 A Rel-10 10.2.1 - PS-to-CS HO indicator impacts to PCC - - - - S2-82E S2-110186 Revised 2011-01-26 TEI9 Revised 2011-01-26
0493 2 A Rel-10 10.2.1 10.3.0 PS-to-CS HO indicator impacts to PCC SP-51 SP-110063 approved S2 S2-83 S2-110350 Agreed 2011-02-09 TEI9 Agreed 2011-02-09
0494 - A Rel-11 11.0.1 - PS-to-CS HO indicator impacts to PCC - - - - S2-82E S2-110065 Revised 2011-01-12 TEI9 Revised 2011-01-12
0494 1 A Rel-11 11.0.1 - PS-to-CS HO indicator impacts to PCC - - - - S2-82E S2-110187 Revised 2011-01-26 TEI9 Revised 2011-01-26
0494 2 A Rel-11 11.0.1 11.1.0 PS-to-CS HO indicator impacts to PCC SP-51 SP-110063 approved S2 S2-83 S2-110351 Agreed 2011-02-09 TEI9 Agreed 2011-02-09
0495 - B Rel-11 11.0.1 - Introducing vSRVCC indicator in PCC - - - - S2-83 S2-110366 - 2011-02-09 vSRVCC - 2011-02-09
0496 - A Rel-11 11.0.1 - Clarify the usage reporting for Sponsored Data Connectivity - - - - S2-83 S2-110397 - 2011-02-11 PEST - 2011-02-11
0497 - A Rel-11 11.0.1 - Sponsored data connectivity profile in SPR - - - - S2-83 S2-110398 - 2011-02-11 PEST - 2011-02-11
0498 - F Rel-10 10.2.1 - Usage monitoring for the IP-CAN session and sponsored data connectivity Co-existence - - - - S2-83 S2-110399 - 2011-02-11 PEST - 2011-02-11
0499 - A Rel-11 11.0.1 - Usage monitoring for the IP-CAN session and sponsored data connectivity co-existence - - - - S2-83 S2-110400 - 2011-02-11 PEST - 2011-02-11
0500 - F Rel-10 10.2.1 - Sponsored data connectivity in the roaming case - - - - S2-83 S2-110403 - 2011-02-11 PEST - 2011-02-11
0501 - A Rel-11 11.0.1 - Sponsored data connectivity in the roaming case - - - - S2-83 S2-110404 - 2011-02-11 PEST - 2011-02-11
0502 - F Rel-9 9.7.0 - BCM clarification for multiple PDN connections over same access - - - - S2-83 S2-110475 - 2011-02-12 TEI9 - 2011-02-12
0503 - F Rel-10 10.2.1 - BCM clarification for multiple PDN connections over same access - - - - S2-83 S2-110476 - 2011-02-12 TEI10 - 2011-02-12
0504 - C Rel-11 11.0.0 - Mandating the enforcement actions support by TDF - - - - S2-83 S2-110492 Revised 2011-02-13 SAPP Revised 2011-02-13
0504 1 C Rel-11 11.0.0 11.1.0 Mandating the enforcement actions support by TDF SP-51 SP-110080 approved S2 S2-83 S2-110982 Agreed 2011-02-21 SAPP Agreed 2011-02-21
0505 - F Rel-11 11.0.0 - Clean-up of TS 23.203 for TDF related functionality - - - - S2-83 S2-110493 Revised 2011-02-13 SAPP Revised 2011-02-13
0505 1 F Rel-11 11.0.0 - Clean-up of TS 23.203 for TDF related functionality - - - - S2-83 S2-110808 Revised 2011-02-17 SAPP Revised 2011-02-17
0505 2 F Rel-11 11.0.0 11.1.0 Clean-up of TS 23.203 for TDF related functionality SP-51 SP-110080 approved S2 S2-83 S2-110983 Agreed 2011-02-21 SAPP Agreed 2011-02-21
0506 - F Rel-9 9.7.0 - QoS setting for Pre-R7 UE - - - - S2-83 S2-110636 Noted 2011-02-14 TEI9 Noted 2011-02-14
0507 - A Rel-10 10.2.1 - QoS setting for Pre-R7 UE - - - - S2-83 S2-110637 Revised 2011-02-14 TEI9 Revised 2011-02-14
0507 1 F Rel-10 10.2.1 - QoS setting for Pre-R7 UE - - - - S2-83 S2-110972 Revised 2011-02-25 TEI10 Revised 2011-02-25
0507 2 F Rel-10 10.2.1 10.3.0 QoS setting for Pre-R7 UE SP-51 SP-110075 approved S2 S2-83 S2-111250 Agreed 2011-02-25 TEI10 Agreed 2011-02-25
0508 - A Rel-11 11.0.1 - QoS setting for Pre-R7 UE - - - - S2-83 S2-110638 Revised 2011-02-14 TEI9 Revised 2011-02-14
0508 1 A Rel-11 11.0.1 11.1.0 QoS setting for Pre-R7 UE SP-51 SP-110075 approved S2 S2-83 S2-110973 Agreed 2011-02-25 TEI10 Agreed 2011-02-25
0509 - F Rel-10 10.2.1 - The reasonable corrections to 23.203 - - - - S2-83 S2-110640 - 2011-02-14 TEI10 - 2011-02-14
0509 1 F Rel-10 10.5.0 10.6.0 The reasonable corrections to 23.203 SP-55 SP-120075 approved S2 S2-88E S2-120250 Agreed 2012-01-10 TEI10 Approved 2012-01-10
0510 - A Rel-11 11.0.1 - The reasonable corrections to 23.203 - - - - S2-83 S2-110641 - 2011-02-14 TEI10 - 2011-02-14
0510 1 A Rel-11 11.4.0 11.5.0 The reasonable corrections to 23.203 SP-55 SP-120075 approved S2 S2-88E S2-120251 Agreed 2012-01-10 TEI10 Approved 2012-01-10
0511 - F Rel-10 10.2.1 - Clarification of usage monitoring continuity for ASP service - - - - S2-83 S2-110648 - 2011-02-14 PEST - 2011-02-14
0512 - A Rel-11 11.0.1 - Clarification of usage monitoring continuity for ASP service - - - - S2-83 S2-110649 - 2011-02-14 PEST - 2011-02-14
0513 - B Rel-11 11.0.1 - Routing Operations in the PCEF - - - - S2-83 S2-110653 - 2011-02-14 SAPP - 2011-02-14
0514 - B Rel-11 11.0.1 - Clarification of ADC rules ACK in the PCRF-init IP-CAN session Modification Procedure - - - - S2-83 S2-110654 Revised 2011-02-14 SAPP Revised 2011-02-14
0514 1 F Rel-11 11.0.1 11.1.0 Clarification of ADC rules ACK in the PCRF-init IP-CAN session Modification Procedure SP-51 SP-110080 approved S2 S2-83 S2-110985 Agreed 2011-02-21 SAPP Agreed 2011-02-21
0515 - B Rel-11 11.0.1 - Addition of usage monitoring to Application detection - - - - S2-83 S2-110742 Revised 2011-02-15 SAPP Revised 2011-02-15
0515 1 B Rel-11 11.0.1 11.1.0 Addition of usage monitoring to Application detection SP-51 SP-110080 approved S2 S2-83 S2-110984 Agreed 2011-02-21 SAPP Agreed 2011-02-21
0516 - F Rel-9 9.7.0 - Gateway control and QoS rules provision during Handover Procedure - - - - S2-83 S2-111083 Withdrawn 2011-02-24 TEI9 Withdrawn 2011-02-24
0517 - A Rel-10 10.2.1 - Gateway control and QoS rules provision during Handover Procedure - - - - S2-83 S2-111084 Withdrawn 2011-02-24 TEI9 Withdrawn 2011-02-24
0518 - A Rel-11 11.1.0 - Clarify the usage reporting for Sponsored Data Connectivity - - - - S2-84 S2-111351 Revised 2011-04-04 PEST Revised 2011-04-04
0518 1 A Rel-11 11.1.0 - Clarify the usage reporting for Sponsored Data Connectivity - - - - S2-85 S2-112345 Revised 2011-05-06 PEST Revised 2011-06-05
0518 2 F Rel-11 11.1.0 - Clarify the usage reporting for Sponsored Data Connectivity - - - - S2-85 S2-112670 Revised 2011-05-19 PEST Revised 2011-05-19
0518 3 A Rel-11 11.1.0 11.2.0 Clarify the usage reporting for Sponsored Data Connectivity SP-52 SP-110333 approved S2 S2-85 S2-112856 Agreed 2011-05-25 PEST Agreed 2011-05-25
0519 - A Rel-11 11.1.0 - Sponsored data connectivity profile in SPR - - - - S2-84 S2-111352 Revised 2011-04-04 PEST Revised 2011-04-04
0519 1 A Rel-11 11.1.0 - Sponsored data connectivity profile in SPR - - - - S2-85 S2-112346 Revised 2011-05-06 PEST Revised 2011-06-05
0519 2 A Rel-11 11.1.0 - Sponsored data connectivity profile in SPR - - - - S2-85 S2-112672 Revised 2011-05-19 PEST Revised 2011-05-19
0519 3 A Rel-11 11.1.0 11.2.0 Sponsored data connectivity profile in SPR SP-52 SP-110333 approved S2 S2-85 S2-112858 Agreed 2011-05-20 PEST Agreed 2011-05-20
0520 - F Rel-10 10.3.0 - Sponsored data connectivity in the roaming case - - - - S2-84 S2-111353 Revised 2011-04-04 PEST Revised 2011-04-04
0520 1 F Rel-10 10.3.0 - Sponsored data connectivity in the roaming case - - - - S2-84 S2-112055 Revised 2011-04-13 PEST Revised 2011-04-13
0520 2 B Rel-10 10.3.0 - Sponsored data connectivity in the roaming case - - - - S2-84 S2-112173 Revised 2011-04-15 PEST Revised 2011-04-15
0520 3 F Rel-10 10.3.0 - Sponsored data connectivity in the roaming case - - - - S2-85 S2-112347 Revised 2011-05-06 PEST Revised 2011-06-05
0520 4 F Rel-10 10.3.0 10.4.0 Sponsored data connectivity in the roaming case SP-52 SP-110333 approved S2 S2-85 S2-112673 Agreed 2011-05-19 PEST Agreed 2011-05-19
0521 - A Rel-11 11.1.0 - Sponsored data connectivity in the roaming case - - - - S2-84 S2-111354 Revised 2011-04-04 PEST Revised 2011-04-04
0521 1 A Rel-11 11.1.0 - Sponsored data connectivity in the roaming case - - - - S2-84 S2-112056 Revised 2011-04-13 PEST Revised 2011-04-13
0521 2 A Rel-11 11.1.0 11.2.0 Sponsored data connectivity in the roaming case SP-52 SP-110333 approved S2 S2-84 S2-112174 Agreed 2011-04-15 PEST Agreed 2011-04-15
0521 3 A Rel-11 11.1.0 - Limit Sponsored data connectivity in the roaming case - - - - S2-85 S2-112348 Withdrawn 2011-05-06 PEST Withdrawn 2011-06-05
0522 - B Rel-11 11.1.0 - Functional description of the impacts of Sy reference point - - - - S2-84 S2-111435 Revised 2011-04-04 QoS_SSL Revised 2011-04-04
0522 1 B Rel-11 11.1.0 - Functional description of the impacts of Sy reference point - - - - S2-84 S2-111955 Revised 2011-04-11 QoS_SSL Revised 2011-11-04
0522 2 B Rel-11 11.1.0 - Functional description of the impacts of Sy reference point - - - - S2-84 S2-112007 Revised 2011-04-12 QoS_SSL Revised 2011-12-04
0522 3 B Rel-11 11.1.0 - Functional description of the impacts of Sy reference point. - - - - S2-85 S2-112448 Revised 2011-05-09 QoS_SSL Revised 2011-09-05
0522 4 B Rel-11 11.1.0 11.2.0 Functional description of the impacts of Sy reference point. SP-52 SP-110340 approved S2 S2-85 S2-112722 Agreed 2011-05-16 QoS_SSL Agreed 2011-05-16
0523 - B Rel-11 11.1.0 - Sy reference point. Information flows - - - - S2-84 S2-111436 Revised 2011-04-04 QoS_SSL Revised 2011-04-04
0523 1 B Rel-11 11.1.0 - Sy reference point. Information flows - - - - S2-84 S2-111956 Revised 2011-04-11 QoS_SSL Revised 2011-11-04
0523 2 B Rel-11 11.1.0 - Sy reference point. Information flows - - - - S2-84 S2-112008 Revised 2011-04-12 QoS_SSL Revised 2011-12-04
0523 3 B Rel-11 11.1.0 - Sy reference point. Information flows. - - - - S2-85 S2-112449 Noted. 2011-05-09 QoS_SSL Noted. Merged in S2-112721 2011-09-05
0523 4 B Rel-11 11.1.0 - Sy reference point. Information flows. - - - - S2-85 S2-112571 Revised 2011-05-11 QoS_SSL Revised 2011-11-05
0523 5 B Rel-11 11.1.0 - Sy reference point. Information flows. - - - - S2-85 S2-112721 Revised 2011-05-16 QoS_SSL Revised 2011-05-16
0523 6 B Rel-11 11.1.0 - Sy reference point. Information flows. - - - - S2-85 S2-112814 Revised 2011-05-19 QoS_SSL Revised 2011-05-19
0523 7 B Rel-11 11.1.0 11.2.0 Sy reference point. Information flows. SP-52 SP-110340 approved S2 S2-85 S2-112877 Agreed 2011-05-20 QoS_SSL Agreed 2011-05-20
0524 - B Rel-11 11.1.0 - Definitions and concepts used in Sy reference poin - - - - S2-84 S2-111456 Revised 2011-04-04 QoS_SSL Revised 2011-04-04
0524 1 B Rel-11 11.1.0 - Definitions and concepts used in Sy reference point - - - - S2-84 S2-111957 Revised 2011-04-11 QoS_SSL Revised 2011-11-04
0524 2 B Rel-11 11.1.0 - Definitions and concepts used in Sy reference poin - - - - S2-84 S2-112004 Revised 2011-04-12 QoS_SSL Revised 2011-12-04
0524 3 B Rel-11 11.1.0 - Definitions and concepts used in Sy reference poin - - - - S2-84 S2-112184 Revised 2011-04-15 QoS_SSL Revised 2011-04-15
0524 4 B Rel-11 11.1.0 - Definitions and concepts used in Sy reference point - - - - S2-85 S2-112570 Revised 2011-05-11 QoS_SSL Revised 2011-11-05
0524 5 B Rel-11 11.1.0 - Definitions and concepts used in Sy reference point - - - - S2-85 S2-112720 Revised 2011-05-16 QoS_SSL Revised 2011-05-16
0524 6 B Rel-11 11.1.0 - Definitions and concepts used in Sy reference point - - - - S2-85 S2-112813 Revised 2011-05-19 QoS_SSL Revised 2011-05-19
0524 7 B Rel-11 11.1.0 - Definitions and concepts used in Sy reference point - - - - S2-85 S2-112876 Revised 2011-05-20 QoS_SSL Revised 2011-05-20
0524 8 B Rel-11 11.1.0 11.2.0 Definitions and concepts used in Sy reference point SP-52 SP-110340 approved S2 S2-85 S2-112903 Agreed 2011-05-27 QoS_SSL e-mail agreed 2011-05-27
0525 - B Rel-11 11.1.0 - Requirements on Sy reference point - - - - S2-84 S2-111457 Revised 2011-04-04 QoS_SSL Revised 2011-04-04
0525 1 B Rel-11 11.1.0 - Requirements on Sy reference point - - - - S2-84 S2-111958 Revised 2011-04-11 QoS_SSL Revised 2011-11-04
0525 2 B Rel-11 11.1.0 - Requirements on Sy reference point - - - - S2-84 S2-112005 Revised 2011-04-12 QoS_SSL Revised 2011-12-04
0525 3 B Rel-11 11.1.0 11.2.0 Requirements on Sy reference point SP-52 SP-110340 approved S2 S2-84 S2-112185 Agreed 2011-04-15 QoS_SSL Agreed 2011-04-15
0526 - B Rel-11 11.1.0 - Subscriber Spending Limits: TS 23.203 Clause 5 modifications - - - - S2-84 S2-111458 Revised 2011-04-04 QoS_SSL Revised 2011-04-04
0526 1 B Rel-11 11.1.0 - Subscriber Spending Limits: TS 23.203 Clause 5 modifications - - - - S2-84 S2-111959 Revised 2011-04-11 QoS_SSL Revised 2011-11-04
0526 2 B Rel-11 11.1.0 11.2.0 Subscriber Spending Limits: TS 23.203 Clause 5 modifications SP-52 SP-110340 approved S2 S2-84 S2-112006 Agreed 2011-04-12 QoS_SSL Agreed 2011-12-04
0527 - F Rel-10 10.3.0 - Clarification to 3GPP-GPRS-IPCAN Annex - - - - S2-84 S2-111488 Noted 2011-04-04 TEI10 Noted 2011-04-04
0528 - A Rel-11 11.1.0 - Clarification to 3GPP-GPRS-IPCAN Annex - - - - S2-84 S2-111489 Noted 2011-04-04 TEI10 Noted 2011-04-04
0529 - B Rel-11 11.1.0 - Introducing vSRVCC indicator in PCC - - - - S2-84 S2-111534 Revised 2011-04-04 vSRVCC Revised 2011-04-04
0529 1 B Rel-11 11.1.0 - Introducing vSRVCC indicator in PCC - - - - S2-84 S2-111928 Revised 2011-04-11 vSRVCC Revised 2011-11-04
0529 2 B Rel-11 11.1.0 11.2.0 Introducing vSRVCC indicator in PCC SP-52 SP-110342 approved S2 S2-84 S2-112177 Agreed 2011-04-15 vSRVCC Agreed 2011-04-15
0530 - F Rel-10 10.3.0 - Handling of Low Access Priority Indicator and PDN GW Control of Overload in PMIP-based EPC Architecture - - - - S2-84 S2-111615 Noted 2011-04-05 NIMTC Noted 2011-05-04
0531 - F Rel-8 8.11.0 - Clarification of SRVCC usage of QCI-1 - - - - S2-84 S2-111664 Revised 2011-04-05 TEI8 Revised 2011-05-04
0531 1 F Rel-8 8.11.0 8.12.0 Clarification of SRVCC usage of QCI-1 SP-52 SP-110323 approved S2 S2-84 S2-111976 Agreed 2011-04-14 TEI8 Agreed 2011-04-14
0532 - A Rel-9 9.8.0 - Clarification of SRVCC usage of QCI-1 - - - - S2-84 S2-111665 Revised 2011-04-05 TEI8 Revised 2011-05-04
0532 1 A Rel-9 9.8.0 9.9.0 Clarification of SRVCC usage of QCI-1 SP-52 SP-110323 approved S2 S2-84 S2-111977 Agreed 2011-04-14 TEI8 Agreed 2011-04-14
0533 - A Rel-10 10.3.0 - Clarification of SRVCC usage of QCI-1 - - - - S2-84 S2-111666 Revised 2011-04-05 TEI8 Revised 2011-05-04
0533 1 A Rel-10 10.3.0 10.4.0 Clarification of SRVCC usage of QCI-1 SP-52 SP-110323 approved S2 S2-84 S2-111978 Agreed 2011-04-15 TEI8 Agreed 2011-04-15
0534 - A Rel-11 11.1.0 - Clarification of SRVCC usage of QCI-1 - - - - S2-84 S2-111667 Revised 2011-04-05 TEI8 Revised 2011-05-04
0534 1 A Rel-11 11.1.0 11.2.0 Clarification of SRVCC usage of QCI-1 SP-52 SP-110323 approved S2 S2-84 S2-111979 Agreed 2011-04-15 TEI8 Agreed 2011-04-15
0535 - F Rel-9 9.8.0 - Bearer Control Mode for multiple PDN connections for EPC based cdma2000 HRPD access - - - - S2-84 S2-111758 Revised 2011-04-06 TEI9 Revised 2011-06-04
0535 1 F Rel-9 9.8.0 - Bearer Control Mode for multiple PDN connections for EPC based cdma2000 HRPD access - - - - S2-84 S2-112064 Revised 2011-04-13 TEI9 Revised 2011-04-13
0535 2 F Rel-9 9.8.0 9.9.0 Bearer Control Mode for multiple PDN connections for EPC based cdma2000 HRPD access SP-52 SP-110325 approved S2 S2-84 S2-112153 Agreed 2011-04-14 TEI9 Agreed 2011-04-14
0536 - A Rel-10 10.3.0 - Bearer Control Mode for multiple PDN connections for EPC based cdma2000 HRPD access - - - - S2-84 S2-111759 Revised 2011-04-06 TEI9 Revised 2011-06-04
0536 1 A Rel-10 10.3.0 - Bearer Control Mode for multiple PDN connections for EPC based cdma2000 HRPD access - - - - S2-84 S2-112065 Revised 2011-04-13 TEI9 Revised 2011-04-13
0536 2 A Rel-10 10.3.0 10.4.0 Bearer Control Mode for multiple PDN connections for EPC based cdma2000 HRPD access SP-52 SP-110325 approved S2 S2-84 S2-112154 Agreed 2011-04-14 TEI9 Agreed 2011-04-14
0537 - F Rel-10 10.3.0 - Event Trigger for Pre-R7 QoS issue - - - - S2-84 S2-111785 Revised 2011-04-06 TEI10 Revised 2011-06-04
0537 1 F Rel-10 10.3.0 10.4.0 Event Trigger for Pre-R7 QoS issue SP-52 SP-110337 approved S2 S2-84 S2-112044 Agreed 2011-04-13 TEI10 Agreed 2011-04-13
0538 - A Rel-11 11.1.0 - Event Trigger for Pre-R7 QoS issue - - - - S2-84 S2-111786 Revised 2011-04-06 TEI10 Revised 2011-06-04
0538 1 A Rel-11 11.1.0 11.2.0 Event Trigger for Pre-R7 QoS issue SP-52 SP-110337 approved S2 S2-84 S2-112045 Agreed 2011-04-13 TEI10 Agreed 2011-04-13
0539 - A Rel-11 11.1.0 11.2.0 Bearer Control Mode for multiple PDN connections for EPC based cdma2000 HRPD access SP-52 SP-110325 approved S2 S2-84 S2-112152 Agreed 2011-04-14 TEI9 Agreed 2011-04-14
0540 - B Rel-11 11.1.0 - New normative Annex: Fixed Broadband access interworking - - - - S2-85 S2-112281 Revised 2011-05-04 BBAI Revised 2011-04-05
0540 1 B Rel-11 11.1.0 - New normative Annex: Fixed Broadband access interworking - - - - S2-85 S2-112504 - 2011-05-11 BBAI - 2011-11-05
0541 - F Rel-11 11.1.0 - Align PCEF rules for service awareness with the TDF rules - - - - S2-85 S2-112282 Revised 2011-05-04 SAPP Revised 2011-04-05
0541 1 F Rel-11 11.1.0 - Align PCEF rules for service awareness with the TDF rules - - - - S2-85 S2-112681 Revised 2011-05-16 SAPP Revised 2011-05-16
0541 2 F Rel-11 11.1.0 11.2.0 Align PCEF rules for service awareness with the TDF rules SP-52 SP-110341 approved S2 S2-85 S2-112815 Agreed 2011-05-19 SAPP Agreed 2011-05-19
0542 - F Rel-11 11.1.0 - Clarification of general principles of PCRF Discovery and Selection - - - - S2-85 S2-112350 Revised 2011-05-06 SAPP Revised 2011-06-05
0542 1 F Rel-11 11.1.0 - Clarification of general principles of PCRF Discovery and Selection - - - - S2-85 S2-112682 Revised 2011-05-16 SAPP Revised 2011-05-16
0542 2 F Rel-11 11.1.0 11.2.0 Clarification of general principles of PCRF Discovery and Selection SP-52 SP-110341 approved S2 S2-85 S2-112816 Agreed 2011-05-19 SAPP Agreed 2011-05-19
0543 - F Rel-11 11.1.0 - Clarification of ADC rules modifications - - - - S2-85 S2-112351 Revised 2011-05-06 SAPP Revised 2011-06-05
0543 1 F Rel-11 11.1.0 - Clarification of ADC rules modifications - - - - S2-85 S2-112805 Revised 2011-05-19 SAPP Revised 2011-05-19
0543 2 F Rel-11 11.1.0 11.2.0 Clarification of ADC rules modifications SP-52 SP-110341 approved S2 S2-85 S2-112817 Agreed 2011-05-19 SAPP Agreed 2011-05-19
0544 - F Rel-11 11.1.0 - Updates the Definitions used in Sy reference point - - - - S2-85 S2-112408 Noted. 2011-05-06 QoS_SSL Noted. Merged in S2-112720 2011-06-05
0545 - F Rel-11 11.1.0 - Updates to the Sy reference point. Information flows - - - - S2-85 S2-112409 Noted. 2011-05-06 QoS_SSL Noted. Merged in S2-112721 2011-06-05
0546 - F Rel-11 11.1.0 - Clarifications on Traffic detection Functionality - - - - S2-85 S2-112459 Revised 2011-05-10 SAPP Revised 2011-10-05
0546 1 F Rel-11 11.1.0 11.2.0 Clarifications on Traffic detection Functionality SP-52 SP-110341 approved S2 S2-85 S2-112683 Agreed 2011-05-16 SAPP Agreed 2011-05-16
0547 - C Rel-11 11.1.0 - PCRF Selection for H(e)NB - - - - S2-85 S2-112497 Postponed 2011-05-11 BBAI Postponed 2011-11-05
0548 - C Rel-11 11.1.0 - Unsolicited Application Detection - ADC rules at the TDF - - - - S2-85 S2-112498 Withdrawn 2011-05-11 SAPP Withdrawn 2011-11-05
0549 - F Rel-11 11.1.0 - Information Elements over Sy - - - - S2-85 S2-112499 Withdrawn 2011-05-11 SAPP Withdrawn 2011-11-05
0550 - F Rel-10 10.3.0 10.4.0 Clarify the usage reporting for Sponsored Data Connectivity SP-52 SP-110333 approved S2 S2-85 S2-112669 Agreed 2011-05-16 PEST Agreed 2011-05-16
0551 - F Rel-11 10.3.0 - Sponsored data connectivity profile in SPR - - - - S2-85 S2-112671 Revised 2011-05-16 PEST Revised 2011-05-16
0551 1 F Rel-10 10.3.0 10.4.0 Sponsored data connectivity profile in SPR SP-52 SP-110333 approved S2 S2-85 S2-112857 Agreed 2011-05-20 PEST Agreed 2011-05-20
0552 - B Rel-11 11.2.0 - New normative Annex: Fixed Broadband access interworking. Information Flows - - - - S2-86 S2-112964 Revised 2011-07-01 BBAI Revised 2011-01-07
0552 1 B Rel-11 11.2.0 - New normative Annex: Fixed Broadband access interworking. Information Flows - - - - S2-86 S2-113531 Revised 2011-07-11 BBAI Revised 2011-11-07
0552 2 B Rel-11 11.2.0 - New normative Annex: Fixed Broadband access interworking. Information Flows - - - - S2-86 S2-113694 Revised 2011-07-12 BBAI Revised 2011-12-07
0552 3 B Rel-11 11.2.0 11.3.0 New normative Annex: Fixed Broadband access interworking. Information Flows SP-53 SP-110463 approved S2 S2-86 S2-113572 Agreed 2011-07-13 BBAI Agreed 2011-07-13
0553 - B Rel-11 11.2.0 - New normative Annex: Fixed Broadband access interworking. Requirements - - - - S2-86 S2-112965 Revised 2011-07-01 BBAI Revised 2011-01-07
0553 1 B Rel-11 11.2.0 - New normative Annex: Fixed Broadband access interworking. Requirements - - - - S2-86 S2-113569 Revised 2011-07-13 BBAI Revised 2011-07-13
0553 2 B Rel-11 11.2.0 11.3.0 New normative Annex: Fixed Broadband access interworking. Requirements SP-53 SP-110463 approved S2 S2-86 S2-113783 Agreed 2011-07-14 BBAI Agreed 2011-07-14
0554 - C Rel-11 11.2.0 - Time of day procedures for ADC rules - - - - S2-86 S2-112974 Revised 2011-07-01 SAPP Revised 2011-01-07
0554 1 C Rel-11 11.2.0 - Time of day procedures for ADC rules - - - - S2-86 S2-113697 Revised 2011-07-13 SAPP Revised 2011-07-13
0554 2 C Rel-11 11.2.0 11.3.0 Time of day procedures for ADC rules SP-53 SP-110467 approved S2 S2-86 S2-113741 Agreed 2011-07-13 SAPP Agreed 2011-07-13
0555 - C Rel-11 11.2.0 - Identity/location info for the TDF - - - - S2-86 S2-112975 Revised 2011-07-01 SAPP Revised 2011-01-07
0555 1 C Rel-11 11.2.0 - Identity/location info for the TDF - - - - S2-86 S2-113698 Revised 2011-07-13 SAPP Revised 2011-07-13
0555 2 C Rel-11 11.2.0 - Identity/location info for the TDF - - - - S2-86 S2-113742 Revised 2011-07-13 SAPP Revised 2011-07-13
0555 3 C Rel-11 11.2.0 - Identity/location info for the TDF SP-53 SP-110467 revised S2 S2-86 S2-113790 Agreed 2011-07-14 SAPP Agreed 2011-07-14
0555 4 C Rel-11 11.2.0 11.3.0 Identity/location info for the TDF SP-53 SP-110649 approved SA - - - 2011-09-21 SAPP - 2011-07-14
0556 - C Rel-11 11.2.0 - Gx Assisted TDF bypass - - - - S2-86 S2-113101 Noted 2011-07-01 SAPP Noted 2011-01-07
0557 - C Rel-11 11.2.0 - Order of PCC rules and ADC rules enforcement in the PCEF - - - - S2-86 S2-113102 Revised 2011-07-01 SAPP Revised 2011-01-07
0557 1 C Rel-11 11.2.0 11.3.0 Order of PCC rules and ADC rules enforcement in the PCEF SP-53 SP-110467 approved S2 S2-86 S2-113740 Agreed 2011-07-13 SAPP Agreed 2011-07-13
0558 - F Rel-11 11.2.0 - Redirection function clarifications - - - - S2-86 S2-113104 Revised 2011-07-01 SAPP Revised 2011-01-07
0558 1 F Rel-11 11.2.0 11.3.0 Redirection function clarifications SP-53 SP-110467 approved S2 S2-86 S2-113693 Agreed 2011-07-12 SAPP Agreed 2011-12-07
0559 - F Rel-10 10.4.0 - Alignments with Gx reference point - - - - S2-86 S2-113123 Noted 2011-07-01 TEI10 Noted 2011-01-07
0560 - A Rel-11 11.2.0 - Alignments with Gx reference point - - - - S2-86 S2-113124 Noted 2011-07-01 TEI10 Noted 2011-01-07
0561 - F Rel-11 11.2.0 - Service data flow templates updating report at the TDF - - - - S2-86 S2-113131 Revised 2011-07-01 SAPP Revised 2011-01-07
0561 1 F Rel-11 11.2.0 - Service data flow templates updating report at the TDF - - - - S2-86 S2-113744 Revised 2011-07-13 SAPP Revised 2011-07-13
0561 2 F Rel-11 11.2.0 - Service data flow templates updating report at the TDF - - - - S2-86 S2-113789 Revised 2011-07-14 SAPP Revised 2011-07-14
0561 3 F Rel-11 11.2.0 11.3.0 Service data flow templates updating report at the TDF SP-53 SP-110467 approved S2 S2-86 S2-113819 Agreed 2011-07-15 SAPP Agreed 2011-07-15
0562 - B Rel-11 11.2.0 - URL filtering on application detection and control(ADC) Rules - - - - S2-86 S2-113133 Noted 2011-07-01 SAPP Noted 2011-01-07
0564 - B Rel-11 11.2.0 - The PCC supports TDF-bypass Operations - - - - S2-86 S2-113135 Noted 2011-07-01 SAPP Noted 2011-01-07
0565 - F Rel-11 11.2.0 - Alignments with ADC rules approach and other corrections - - - - S2-86 S2-113165 Revised 2011-07-03 SAPP Revised 2011-03-07
0565 1 F Rel-11 11.2.0 11.3.0 Alignments with ADC rules approach and other corrections SP-53 SP-110467 approved S2 S2-86 S2-113739 Agreed 2011-07-13 SAPP Agreed 2011-07-13
0566 - F Rel-11 11.2.0 - Subscribe/notify messaging for Sy reference point. - - - - S2-86 S2-113199 Noted 2011-07-04 QoS_SSL Noted 2011-04-07
0567 - F Rel-11 11.2.0 - Making unsubscribe optional at last IP-CAN termination. - - - - S2-86 S2-113200 Withdrawn 2011-07-04 QoS_SSL Withdrawn 2011-04-07
0568 - F Rel-11 11.2.0 - Incorrect reference step referred to in call flow descriptions - - - - S2-86 S2-113203 Withdrawn 2011-07-04 SAPP Withdrawn 2011-04-07
0569 - C Rel-11 11.2.0 - Information transported over Sd interface - - - - S2-86 S2-113210 Withdrawn 2011-07-04 SAPP Withdrawn 2011-04-07
0570 - B Rel-11 11.2.0 - New normative Annex: Fixed Broadband access interworking Functional entities - - - - S2-86 S2-113279 Revised 2011-07-04 BBAI Revised 2011-04-07
0570 1 B Rel-11 11.2.0 - New normative Annex: Fixed Broadband access interworking Functional entities - - - - S2-86 S2-113622 Revised 2011-07-11 BBAI Revised 2011-11-07
0570 2 B Rel-11 11.2.0 - New normative Annex: Fixed Broadband access interworking Functional entities - - - - S2-86 S2-113681 Revised 2011-07-12 BBAI Revised 2011-12-07
0570 3 B Rel-11 11.2.0 - New normative Annex: Fixed Broadband access interworking Functional entities SP-53 SP-110463 revised S2 S2-86 S2-113571 Agreed 2011-07-13 BBAI Many editorial probs, rev -> SP-110630 2011-07-13
0570 4 B Rel-11 11.2.0 - New normative Annex: Fixed Broadband access interworking Functional entities SP-53 SP-110630 revised S2 chairman - - - 2011-09-21 BBAI - 2011-09-21
0570 5 B Rel-11 11.2.0 11.3.0 New normative Annex: Fixed Broadband access interworking Functional entities SP-53 SP-110652 approved S2 chairman - - - 2011-09-21 BBAI - 2011-09-21
0571 - B Rel-11 11.2.0 - New normative Annex: Reference architecture - - - - S2-86 S2-113307 Merged 2011-07-04 BBAI Merged with S2-113356 in S2-113630 2011-04-07
0572 - F Rel-11 11.2.0 - Sy Correction - - - - S2-86 S2-113354 Revised 2011-07-05 QoS_SSL Revised 2011-05-07
0572 1 F Rel-11 11.2.0 11.3.0 Sy Correction SP-53 SP-110466 approved S2 S2-86 S2-113746 Agreed 2011-07-13 QoS_SSL Agreed 2011-07-13
0573 - B Rel-11 11.2.0 - Single Sy Connection - - - - S2-86 S2-113355 Noted 2011-07-05 QoS_SSL Noted 2011-05-07
0574 - B Rel-11 11.2.0 - New Normative Annex - BBF Access Interworking Reference Archittcure and Points - - - - S2-86 S2-113356 Merged 2011-07-05 BBAI Merged with S2-113307 in S2-113630 2011-05-07
0574 1 B Rel-11 11.2.0 - New Normative Annex - BBF Access Interworking Reference Archittcure and Points - - - - S2-86 S2-113630 Revised 2011-07-11 BBAI Revised 2011-11-07
0574 2 B Rel-11 11.2.0 11.3.0 New Normative Annex - BBF Access Interworking Reference Architecture and Points SP-53 SP-110463 approved S2 S2-86 S2-113570 Agreed 2011-07-13 BBAI Agreed 2011-07-13
0575 - B Rel-11 11.2.0 - New Normative Annex: S9* HNB CS Procedures - - - - S2-86 S2-113357 Revised 2011-07-05 BBAI Revised 2011-05-07
0575 1 B Rel-11 11.2.0 - New Normative Annex: S9* HNB CS Procedures - - - - S2-86 S2-113669 Revised 2011-07-12 BBAI Revised 2011-12-07
0575 2 B Rel-11 11.2.0 - New Normative Annex: S9* HNB CS Procedures - - - - S2-86 S2-113573 Revised 2011-07-13 BBAI Revised 2011-07-13
0575 3 B Rel-11 11.2.0 11.3.0 New Normative Annex: S9* HNB CS Procedures SP-53 SP-110463 approved S2 S2-86 S2-113784 Agreed 2011-07-14 BBAI Agreed 2011-07-14
0576 - F Rel-11 11.3.0 - Optional reporting of IP-CAN session events from the PCRF into the TDF - - - - S2-87 S2-114044 Noted 2011-09-29 SAPP Noted 2011-09-29
0577 - D Rel-11 11.3.0 11.4.0 Corrections for SAPP SP-54 SP-110744 approved S2 S2-87 S2-114125 Agreed 2011-10-03 SAPP This CR was agreed 2011-10-03
0578 - F Rel-11 11.3.0 - Explicit mentioning of some location/access network information event triggers for the subscription by TDF - - - - S2-87 S2-114126 Revised 2011-10-03 SAPP Revised to S2-114627. 2011-10-03
0578 1 F Rel-11 11.3.0 - Explicit mentioning of some location/access network information event triggers for the subscription by TDF - - - - S2-87 S2-114627 Revised 2011-10-13 SAPP Revised to S2-114661. 2011-10-13
0578 2 F Rel-11 11.3.0 11.4.0 Explicit mentioning of some location/access network information event triggers for the subscription by TDF SP-54 SP-110744 approved S2 S2-87 S2-114661 Agreed 2011-10-13 SAPP This CR was agreed 2011-10-13
0579 - F Rel-8 8.12.0 - TFT operation when SGSN accesses to PGW (R8 23.203) - - - - S2-87 S2-114151 Revised 2011-10-03 SAES Not Handled. Revised at S2-88 in S2-114895 2011-10-03
0579 1 F Rel-8 8.12.0 - TFT operation when SGSN accesses to GGSN/PGW (R8 23.203) - - - - S2-88 S2-114895 - 2011-11-04 SAES Not Handled 2011-11-04
0579 2 F Rel-8 8.12.0 - TFT operation when SGSN accesses to PGW - - - - S2-88E S2-120235 Revised 2012-01-10 SAES Rev5 Approved Revised to S2-120368. 2012-01-10
0579 3 F Rel-8 8.12.0 8.13.0 TFT operation when SGSN accesses to PGW SP-55 SP-120065 approved S2 S2-88E S2-120368 Agreed 2012-01-20 SAES Agreed revision 5 of S2-120235. This CR was agreed 2012-01-20
0580 - A Rel-9 9.9.0 - TFT operation when SGSN accesses to PGW (R9 23.203) - - - - S2-87 S2-114152 Revised 2011-10-03 SAES Not Handled. Revised at S2-88 in S2-114896 2011-10-03
0580 1 A Rel-9 9.9.0 - TFT operation when SGSN accesses to GGSN/PGW (R9 23.203) - - - - S2-88 S2-114896 - 2011-11-04 SAES Not Handled 2011-11-04
0580 2 A Rel-9 9.10.0 - TFT operation when SGSN accesses to PGW - - - - S2-88E S2-120236 Revised 2012-01-10 SAES Rev5 Approved Revised to S2-120369. 2012-01-10
0580 3 A Rel-9 9.10.0 9.11.0 TFT operation when SGSN accesses to PGW SP-55 SP-120065 approved S2 S2-88E S2-120369 Agreed 2012-01-20 SAES Agreed revision 5 of S2-120236. This CR was agreed 2012-01-20
0581 - A Rel-10 10.4.0 - TFT operation when SGSN accesses to PGW (R10 23.203) - - - - S2-87 S2-114153 Revised 2011-10-03 SAES Not Handled. Revised at S2-88 in S2-114897 2011-10-03
0581 1 A Rel-10 10.4.0 - TFT operation when SGSN accesses to GGSN/PGW (R10 23.203) - - - - S2-88 S2-114897 - 2011-11-04 SAES Not Handled 2011-11-04
0581 2 A Rel-10 10.5.0 - TFT operation when SGSN accesses to PGW - - - - S2-88E S2-120237 Revised 2012-01-10 SAES Rev5 Approved Revised to S2-120370. 2012-01-10
0581 3 A Rel-10 10.5.0 10.6.0 TFT operation when SGSN accesses to PGW SP-55 SP-120065 approved S2 S2-88E S2-120370 Agreed 2012-01-20 SAES Agreed revision 5 of S2-120237. This CR was agreed 2012-01-20
0582 - A Rel-11 11.3.0 - TFT operation when SGSN accesses to PGW (R11 23.203) - - - - S2-87 S2-114154 Revised 2011-10-03 SAES Not Handled. Revised at S2-88 in S2-114898 2011-10-03
0582 1 A Rel-11 11.3.0 - TFT operation when SGSN accesses to GGSN/PGW (R11 23.203) - - - - S2-88 S2-114898 - 2011-11-04 SAES Not Handled 2011-11-04
0582 2 A Rel-11 11.4.0 - TFT operation when SGSN accesses to PGW - - - - S2-88E S2-120238 Revised 2012-01-10 SAES Rev5 Approved Revised to S2-120371. 2012-01-10
0582 3 A Rel-11 11.4.0 11.5.0 TFT operation when SGSN accesses to PGW SP-55 SP-120065 approved S2 S2-88E S2-120371 Agreed 2012-01-20 SAES Agreed revision 5 of S2-120238. This CR was agreed 2012-01-20
0583 - F Rel-11 11.3.0 - S9a Session Modification with UE local IP address change - - - - S2-87 S2-114171 Noted 2011-10-03 BBAI Noted in parallel sessions 2011-10-03
0584 - F Rel-11 11.3.0 - Sy policy counter reporting scope clarification - - - - S2-87 S2-114197 Revised 2011-10-03 QoS_SSL Revised to S2-114628. 2011-10-03
0584 1 F Rel-11 11.3.0 11.4.0 Sy policy counter reporting scope clarification SP-54 SP-110741 approved S2 S2-87 S2-114628 Agreed 2011-10-13 QoS_SSL This CR was agreed 2011-10-13
0585 - C Rel-11 11.3.0 - Deferred Policy Counter Status Reporting on Sy - - - - S2-87 S2-114202 Noted 2011-10-03 QoS_SSL Noted 2011-10-03
0586 - F Rel-11 11.3.0 - Incorrect termination of Sy reference point in architecture figure - - - - S2-87 S2-114229 Withdrawn 2011-10-03 QoS_SSL WITHDRAWN - Covered by S2-114367 2011-10-03
0587 - F Rel-11 11.3.0 11.4.0 Clarification on BBAI related Annex P.7 SP-54 SP-110743 approved S2 S2-87 S2-114320 Agreed 2011-10-04 BBAI Agreed in parallel sessions. This CR was agreed. Revised at S2-88 in S2-115096 (Not handled) 2011-10-04
0587 1 F Rel-11 11.3.0 - Clarification on BBAI related Annex P.7 - - - - S2-88 S2-115096 - 2011-11-07 BBAI Not Handled 2011-11-07
0588 - B Rel-11 11.3.0 - Converged Policy Management- Reference Architecture Update - - - - S2-87 S2-114327 Noted 2011-10-04 BBAI BBAI session: We will not handle 23.203 CRs for BB III at this meeting. Work has to be done in the TR first. Noted in parallel sessions 2011-10-04
0589 - B Rel-11 11.3.0 - Credit re-authorisation trigger for home coverage - - - - S2-87 S2-114328 Noted 2011-10-04 BBAI Noted in parallel sessions 2011-10-04
0590 - F Rel-11 11.3.0 - Removal of Service Data Flow Based Credit Control Function from PCC Architecture - - - - S2-87 S2-114367 Revised 2011-10-04 TEI11 Wrong Category and WI Code! Revised to S2-114563. 2011-10-04
0590 1 A Rel-11 11.3.0 11.4.0 Removal of Service Data Flow Based Credit Control Function from PCC Architecture SP-54 SP-110733 approved S2 S2-87 S2-114563 Agreed 2011-10-11 TEI9 This CR was agreed 2011-10-11
0591 - A Rel-10 10.4.0 - Removal of Service Data Flow Based Credit Control Function from PCC Architecture - - - - S2-87 S2-114368 Revised 2011-10-04 TEI11 Wrong WI Code! Revised to S2-114562. 2011-10-04
0591 1 A Rel-10 10.4.0 10.5.0 Removal of Service Data Flow Based Credit Control Function from PCC Architecture SP-54 SP-110733 approved S2 S2-87 S2-114562 Agreed 2011-10-11 TEI9 This CR was agreed 2011-10-11
0592 - A Rel-9 9.9.0 - Removal of Service Data Flow Based Credit Control Function from PCC Architecture - - - - S2-87 S2-114369 Revised 2011-10-04 TEI11 Wrong Category and WI Code! Revised to S2-114561. 2011-10-04
0592 1 F Rel-9 9.9.0 9.10.0 Removal of Service Data Flow Based Credit Control Function from PCC Architecture SP-54 SP-110733 approved S2 S2-87 S2-114561 Agreed 2011-10-11 TEI9 This CR was agreed 2011-10-11
0593 - B Rel-11 11.3.0 - QoS Roaming Agreement - - - - S2-88 S2-114752 Noted 2011-11-01 TEI11 The proposal needed more development and this CR was noted. 2011-11-01
0594 - C Rel-11 11.3.0 - Removal of editor's note on event triggers - - - - S2-88 S2-114761 - 2011-11-01 BBAI Not Handled 2011-11-01
0595 - F Rel-11 11.3.0 - Support for APN in PCRF Discovery over S9a - - - - S2-88 S2-114762 - 2011-11-01 BBAI Not Handled 2011-11-01
0596 - F Rel-8 8.12.0 - Bearer control mode alignment with EPC - - - - S2-88 S2-114774 Revised 2011-11-01 SAES Revised to S2-115384. 2011-11-01
0596 1 F Rel-8 8.12.0 - Bearer control mode alignment with EPC - - - - S2-88 S2-115384 Withdrawn 2011-11-18 SAES WITHDRAWN 2011-11-18
0597 - A Rel-9 9.9.0 - Bearer control mode alignment with EPC - - - - S2-88 S2-114775 Withdrawn 2011-11-01 SAES LATE DOC: Rx. WITHDRAWN 2011-11-01
0598 - A Rel-10 10.4.0 - Bearer control mode alignment with EPC - - - - S2-88 S2-114776 Withdrawn 2011-11-01 SAES WITHDRAWN 2011-11-01
0599 - A Rel-11 11.3.0 - Bearer control mode alignment with EPC - - - - S2-88 S2-114777 Withdrawn 2011-11-01 SAES LATE DOC: Rx. WITHDRAWN 2011-11-01
0600 - F Rel-11 11.3.0 - Correction for Application Instance Identifiers - - - - S2-88 S2-114778 - 2011-11-01 SAPP Not Handled 2011-11-01
0601 - F Rel-11 11.3.0 - Session Binding in PCRF - - - - S2-88 S2-114785 Noted 2011-11-02 BBAI Noted in parallel sessions 2011-11-02
0602 - F Rel-11 11.3.0 - Correction of PCC procedures and flows for BBAI - - - - S2-88 S2-114821 - 2011-11-04 BBAI Not Handled 2011-11-04
0603 - B Rel-11 11.3.0 - UE Initiated QoS For S9-less Scenarios - - - - S2-88 S2-114876 Withdrawn 2011-11-04 TEI11 Samsung asked for comments on this proposal off-line and withdrew the document from this meeting. 2011-11-04
0604 - F Rel-11 11.3.0 - TS23.203: S9a Session Modification with UE local IP address change - - - - S2-88 S2-114906 Noted 2011-11-04 BBAI Parallel Sessions: Issue discussed at S2-87 with no agreements. Noted 2011-11-04
0605 - F Rel-11 11.3.0 - TS23.203 Gx Reference points enhance with BBAI - - - - S2-88 S2-114908 - 2011-11-04 BBAI Not Handled 2011-11-04
0606 - F Rel-11 11.3.0 - IPv6 address support by BBAI - - - - S2-88 S2-114909 Revised 2011-11-04 BBAI Revised to S2-115253. 2011-11-04
0606 1 F Rel-11 11.3.0 11.4.0 IPv6 address support by BBAI SP-54 SP-110743 approved S2 S2-88 S2-115253 Agreed 2011-11-16 BBAI Agreed in parallel sessions. This CR was agreed 2011-11-16
0607 - F Rel-11 11.3.0 - PCRF Discovery and Selection - - - - S2-88 S2-114912 Noted 2011-11-04 BBAI Noted in parallel sessions 2011-11-04
0608 - F Rel-10 10.4.0 10.5.0 Clarification of SGSN change report SP-54 SP-110737 approved S2 S2-88 S2-114986 Agreed 2011-11-05 TEI10 Agreed in parallel sessions. This CR was agreed 2011-11-05
0609 - C Rel-11 11.3.0 - Usage monitoring signalling congestion handling - - - - S2-88 S2-115017 Revised 2011-11-06 TEI11 Revised to S2-115431. 2011-11-06
0609 1 C Rel-11 11.3.0 - Usage monitoring signalling congestion handling - - - - S2-88 S2-115431 Noted 2011-11-17 TEI11 Noted. Contributions on reporting to next meeting 2011-11-17
0610 - F Rel-11 11.3.0 - Clarification of the vSRVCC indicator handling in the PCRF in PCC - - - - S2-88 S2-115033 - 2011-11-07 vSRVCC Not Handled 2011-11-07
0611 - F Rel-11 11.3.0 - Clarification on BBAI related Annex P.7 (BB1) - - - - S2-88 S2-115041 Noted 2011-11-07 BBAI Noted. Merged in drafting session into S2-115301 2011-11-07
0612 - B Rel-11 11.3.0 - Non-emergency bearers associated with an IMS Emergency Session - - - - S2-88 S2-115079 Withdrawn 2011-11-07 NOVES-IMSESOM This can be done in the RAN specifications and was withdrawn. 2011-11-07
0613 - F Rel-11 11.3.0 - Corrections on GW Control and QoS Rules Request Procedure - - - - S2-88 S2-115083 - 2011-11-07 BBAI Not Handled 2011-11-07
0614 - B Rel-11 11.3.0 - GW Control and QoS Rules Provision Procedure - - - - S2-88 S2-115084 - 2011-11-07 BBAI Not Handled 2011-11-07
0615 - F Rel-11 11.3.0 - Clarification of IP-CAN session termination with S9a session termination from PCRF - - - - S2-88 S2-115085 - 2011-11-07 BBAI Not Handled 2011-11-07
0616 - F Rel-11 11.3.0 - GW control and QoS Rules Request procedure in H(e)NB scenario - - - - S2-88 S2-115086 - 2011-11-07 BBAI Not Handled 2011-11-07
0617 - F Rel-11 11.3.0 - Correction to the applicability of Serving Gateway change and SGSN change event triggers - - - - S2-88 S2-115095 Noted 2011-11-07 TEI11 Noted in parallel sessions 2011-11-07
0618 - B Rel-11 11.3.0 - Converged Policy Management- Reference Architecture Update - - - - S2-88 S2-115131 - 2011-11-07 BBAI BBAI session: We will not handle 23.203 CRs for BB3 at this meeting. Work has to be done in the TR first. Not Handled 2011-11-07
0619 - F Rel-11 11.3.0 - Declaring support for extended TFT filter format - - - - S2-88 S2-115146 - 2011-11-07 TEI11 Not Handled 2011-11-07
0620 - D Rel-11 11.4.0 11.5.0 Editorial corrections to 23.203 SP-55 SP-120087 approved S2 S2-88E S2-120059 Agreed 2012-01-04 TEI11 Approved 2012-01-04
0621 - F Rel-7 7.12.0 - Corrections to deferred rule procedures - - - - S2-88E S2-120064 Revised 2012-01-04 PCC Rev12 Approved Revised to S2-120322. 2012-01-04
0621 1 F Rel-7 7.12.0 - Corrections to deferred rule procedures - - - - S2-88E S2-120322 Revised 2012-01-20 PCC Agreed revision 12 of S2-120064. This CR was agreed. Revised at S2-89 in S2-120460 2012-01-20
0621 2 F Rel-7 7.12.0 7.13.0 Corrections to deferred rule procedures SP-55 SP-120063 approved S2 S2-89 S2-120460 Agreed 2012-01-27 PCC This CR was agreed 2012-01-27
0622 - A Rel-8 8.12.0 - Corrections to deferred rule procedures - - - - S2-88E S2-120065 Revised 2012-01-04 PCC Rev4 Approved Revised to S2-120323. 2012-01-04
0622 1 A Rel-8 8.12.0 - Corrections to deferred rule procedures - - - - S2-88E S2-120323 Revised 2012-01-20 PCC Agreed revision 4 of S2-120065. This CR was agreed. Revised at S2-89 in S2-120461 2012-01-20
0622 2 A Rel-8 8.12.0 8.13.0 Corrections to deferred rule procedures SP-55 SP-120063 approved S2 S2-89 S2-120461 Agreed 2012-01-27 PCC This CR was agreed 2012-01-27
0623 - A Rel-9 9.10.0 - Corrections to deferred rule procedures - - - - S2-88E S2-120066 Revised 2012-01-04 PCC Rev4 Approved Revised to S2-120324. 2012-01-04
0623 1 A Rel-9 9.10.0 - Corrections to deferred rule procedures - - - - S2-88E S2-120324 Revised 2012-01-20 PCC Agreed revision 4 of S2-120066. This CR was agreed. Revised at S2-89 in S2-120462 2012-01-20
0623 2 A Rel-9 9.10.0 9.11.0 Corrections to deferred rule procedures SP-55 SP-120063 approved S2 S2-89 S2-120462 Agreed 2012-01-27 PCC This CR was agreed 2012-01-27
0624 - A Rel-10 10.5.0 - Corrections to deferred rule procedures - - - - S2-88E S2-120067 Revised 2012-01-04 PCC Rev4 Approved Revised to S2-120325. 2012-01-04
0624 1 A Rel-10 10.5.0 - Corrections to deferred rule procedures - - - - S2-88E S2-120325 Revised 2012-01-20 PCC Agreed revision 4 of S2-120067. This CR was agreed. Revised at S2-89 in S2-120463 2012-01-20
0624 2 A Rel-10 10.5.0 10.6.0 Corrections to deferred rule procedures SP-55 SP-120063 approved S2 S2-89 S2-120463 Agreed 2012-01-27 PCC This CR was agreed 2012-01-27
0625 - A Rel-11 11.4.0 - Corrections to deferred rule procedures - - - - S2-88E S2-120068 Revised 2012-01-04 PCC Revised to S2-120291. 2012-01-04
0625 1 A Rel-11 11.4.0 - Corrections to deferred rule procedures - - - - S2-88E S2-120291 Revised 2012-01-10 PCC Rev5 Approved Revised to S2-120391. 2012-01-10
0625 2 A Rel-11 11.4.0 - Corrections to deferred rule procedures - - - - S2-88E S2-120391 Revised 2012-01-20 PCC Agreed revision 5 of S2-120291. This CR was agreed. Revised at S2-89 in S2-120464 2012-01-20
0625 3 A Rel-11 11.4.0 11.5.0 Corrections to deferred rule procedures SP-55 SP-120063 approved S2 S2-89 S2-120464 Agreed 2012-01-27 PCC This CR was agreed 2012-01-27
0626 - F Rel-8 8.12.0 8.13.0 QoS Mapping SP-55 SP-120065 approved S2 S2-88E S2-120070 Agreed 2012-01-04 SAES Approved 2012-01-04
0627 - A Rel-9 9.10.0 9.11.0 QoS Mapping SP-55 SP-120065 approved S2 S2-88E S2-120071 Agreed 2012-01-04 SAES Approved 2012-01-04
0628 - A Rel-10 10.5.0 10.6.0 QoS Mapping SP-55 SP-120065 approved S2 S2-88E S2-120072 Agreed 2012-01-04 SAES Approved 2012-01-04
0629 - A Rel-11 11.4.0 11.5.0 QoS Mapping SP-55 SP-120065 approved S2 S2-88E S2-120073 Agreed 2012-01-04 SAES Approved 2012-01-04
0630 - F Rel-11 11.4.0 - Restriction of usage of open Sy requests - - - - S2-88E S2-120074 Noted 2012-01-04 QoS_SSL QoS_SSL is not on the agenda for SA2 88e. 2012-01-04
0631 - F Rel-11 11.4.0 - Removal of Subscriber Id from Intermediate Spending Limit Report Request - - - - S2-88E S2-120075 Revised 2012-01-04 QoS_SSL QoS_SSL is not on the agenda for SA2 88e. Revised at S2-89 in S2-120534 2012-01-04
0631 1 F Rel-11 11.4.0 - Removal of Subscriber Id from Intermediate Spending Limit Report Request - - - - S2-89 S2-120534 Revised 2012-01-27 QoS_SSL Revised to S2-121127. 2012-01-27
0631 2 F Rel-11 11.4.0 - Removal of Subscriber Id from Intermediate Spending Limit Report Request - - - - S2-89 S2-121127 Revised 2012-02-10 QoS_SSL Revised to S2-121139. 2012-02-10
0631 3 F Rel-11 11.4.0 - Removal of Subscriber Id from Intermediate Spending Limit Report Request - - - - S2-89 S2-121139 Revised 2012-02-10 QoS_SSL Revised to S2-121144. 2012-02-10
0631 4 F Rel-11 11.4.0 11.5.0 Removal of Subscriber Id from Intermediate Spending Limit Report Request SP-55 SP-120082 approved S2 S2-89 S2-121144 Agreed 2012-02-10 QoS_SSL This CR was agreed 2012-02-10
0632 - F Rel-11 11.4.0 - Correction for Application Instance Identifiers - - - - S2-88E S2-120080 Noted 2012-01-04 SAPP SAPP is not on the agenda for SA2 88e. 2012-01-04
0632 1 F Rel-11 11.5.0 - Correction for Application Instance Identifiers - - - - S2-90 S2-121245 Revised 2012-04-05 SAPP Revised to S2-121699. 2012-04-05
0632 2 F Rel-11 11.5.0 - Correction for Application Instance Identifiers - - - - S2-90 S2-121699 Withdrawn 2012-04-21 SAPP WITHDRAWN 2012-04-21
0633 - F Rel-7 7.12.0 - Deferred PCC Rules - - - - S2-88E S2-120081 Noted 2012-01-04 PCC 13.01.2012. - Weihua suggests some rewording (but does not supply a rev). 2012-01-04
0634 - A Rel-8 8.12.0 - Deferred PCC Rules - - - - S2-88E S2-120082 Noted 2012-01-04 PCC Noted 2012-01-04
0635 - A Rel-9 9.10.0 - Deferred PCC Rules - - - - S2-88E S2-120083 Noted 2012-01-04 PCC Noted 2012-01-04
0636 - A Rel-10 10.5.0 - Deferred PCC Rules - - - - S2-88E S2-120084 Noted 2012-01-04 PCC Noted 2012-01-04
0637 - A Rel-11 11.4.0 - Deferred PCC Rules - - - - S2-88E S2-120085 Noted 2012-01-04 PCC Noted 2012-01-04
0638 - F Rel-9 9.10.0 - Deferred UMC Rules - - - - S2-88E S2-120086 Noted 2012-01-04 TEI9 [...] difference and a merge would be useful. Answered a question for clarification from Xiaoyun. - Konstantin adds that the requirement is not clear, the text proposed has problems. Noted Merged into 0066 2012-01-04
0639 - A Rel-10 10.5.0 - Deferred UMC Rules - - - - S2-88E S2-120087 Noted 2012-01-04 TEI9 Noted . Merged into 0067. 2012-01-04
0640 - A Rel-11 11.4.0 - Deferred UMC Rules - - - - S2-88E S2-120088 Noted 2012-01-04 TEI9 13.01. - suggests rewording to clarify that dynamic QoS rules are not directly provisioned in the BBERF. Noted Merged into 0068 2012-01-04
0641 - F Rel-11 11.4.0 - Deferred ADC Rules - - - - S2-88E S2-120089 Noted 2012-01-04 TEI11 13.01. - Syed states this should be NOTED as it is handled in 0291. 2012-01-04
0642 - D Rel-11 11.4.0 - Editorial correction on captions of Figures in TS 23.203 - - - - S2-88E S2-120091 Noted 2012-01-05 TEI11 [...] 012. - Erik: this violates drafting rules. There is no error, only strange style (for historical reasons.) The change may break references to the TS from other specifications (in and outside of 3GPP!) 2012-01-05
0643 - D Rel-11 11.4.0 11.5.0 Editorial correction on the numbering of NOTEs in TS 23.203 SP-55 SP-120087 approved S2 S2-88E S2-120092 Agreed 2012-01-05 TEI11 Approved 2012-01-05
0644 - F Rel-11 11.4.0 - Conditions of accumulated usage reporting correction - - - - S2-88E S2-120182 Revised 2012-01-10 TEI11 Rev5 Approved Revised to S2-120353. 2012-01-10
0644 1 F Rel-11 11.4.0 11.5.0 Conditions of accumulated usage reporting correction SP-55 SP-120087 approved S2 S2-88E S2-120353 Agreed 2012-01-20 TEI11 Agreed revision 5 of S2-120182. This CR was agreed 2012-01-20
0645 - F Rel-11 11.4.0 - Including the BBERF interaction in the subscription information update procedure - - - - S2-88E S2-120183 Revised 2012-01-10 TEI11 Rev1 Approved Revised to S2-120354. 2012-01-10
0645 1 F Rel-11 11.4.0 11.5.0 Including the BBERF interaction in the subscription information update procedure SP-55 SP-120087 approved S2 S2-88E S2-120354 Agreed 2012-01-20 TEI11 Agreed revision 1 of S2-120183. This CR was agreed 2012-01-20
0646 - F Rel-11 11.4.0 - PCRF addressing for the PDN connections from the UE to the same APN - - - - S2-88E S2-120184 Noted 2012-01-10 TEI11 [...] e passed === . - Alla will accept rev1 not rev2. - David will accept any, but sees need for more change. - Irfan objects to rev1 and rev2 [late comment]. - Belen seeks more discussion. Noted Postponed 2012-01-10
0647 - D Rel-11 11.4.0 11.5.0 Editorial correction of PCC architecture SP-55 SP-120087 approved S2 S2-88E S2-120185 Agreed 2012-01-10 TEI11 Approved 2012-01-10
0648 - F Rel-11 11.4.0 - Adding usage monitoring control function over Gx reference point - - - - S2-88E S2-120186 Revised 2012-01-10 TEI11 Rev4 Approved Revised to S2-120355. 2012-01-10
0648 1 F Rel-11 11.4.0 11.5.0 Adding usage monitoring control function over Gx reference point SP-55 SP-120087 approved S2 S2-88E S2-120355 Agreed 2012-01-20 TEI11 Agreed revision 4 of S2-120186. This CR was agreed 2012-01-20
0649 - F Rel-11 11.4.0 - Some corrections of IP-CAN session establishment procedure - - - - S2-88E S2-120187 Revised 2012-01-10 TEI11 Rev3 Approved Revised to S2-120356. 2012-01-10
0649 1 F Rel-11 11.4.0 11.5.0 Some corrections of IP-CAN session establishment procedure SP-55 SP-120087 approved S2 S2-88E S2-120356 Agreed 2012-01-20 TEI11 Agreed revision 3 of S2-120187. This CR was agreed 2012-01-20
0650 - F Rel-11 11.4.0 - Correction to QoS rule definition - - - - S2-88E S2-120188 Noted 2012-01-10 TEI11 [...] ication' is desirable between stage 2 and stage 3 before freezing (as this is not a correction of a FASMO error.). 18.01.2012. - Belen asks that this be noted as more work is needed. Noted . Postponed 2012-01-10
0651 - F Rel-9 9.10.0 - PCRF addressing for MUPSAP - - - - S2-88E S2-120189 Revised 2012-01-10 MUPSAP Rev2 Approved Revised to S2-120357. 2012-01-10
0651 1 F Rel-9 9.10.0 9.11.0 PCRF addressing for MUPSAP SP-55 SP-120069 approved S2 S2-88E S2-120357 Agreed 2012-01-20 MUPSAP Agreed revision 2 of S2-120189. This CR was agreed 2012-01-20
0652 - A Rel-10 10.5.0 - PCRF addressing for MUPSAP - - - - S2-88E S2-120190 Revised 2012-01-10 MUPSAP Rev2 Approved Revised to S2-120358. 2012-01-10
0652 1 A Rel-10 10.5.0 10.6.0 PCRF addressing for MUPSAP SP-55 SP-120069 approved S2 S2-88E S2-120358 Agreed 2012-01-20 MUPSAP Agreed revision 2 of S2-120190. This CR was agreed 2012-01-20
0653 - A Rel-11 11.4.0 - PCRF addressing for MUPSAP - - - - S2-88E S2-120191 Revised 2012-01-10 MUPSAP Rev2 Approved Revised to S2-120359. 2012-01-10
0653 1 A Rel-11 11.4.0 11.5.0 PCRF addressing for MUPSAP SP-55 SP-120069 approved S2 S2-88E S2-120359 Agreed 2012-01-20 MUPSAP Agreed revision 2 of S2-120191. This CR was agreed 2012-01-20
0654 - F Rel-8 8.12.0 - Correction to deferred rules operations - - - - S2-88E S2-120194 Noted 2012-01-10 TEI8 Noted 2012-01-10
0655 - A Rel-9 9.10.0 - Correction to deferred rules operations - - - - S2-88E S2-120195 Noted 2012-01-10 TEI8 Noted 2012-01-10
0656 - A Rel-10 10.5.0 - Correction to deferred rules operations - - - - S2-88E S2-120196 Noted 2012-01-10 TEI8 Noted 2012-01-10
0657 - A Rel-11 11.4.0 - Correction to deferred rules operations - - - - S2-88E S2-120197 Noted 2012-01-10 TEI8 Noted 2012-01-10
0658 - F Rel-9 9.10.0 - Correcting Usage Monitoring event trigger - - - - S2-88E S2-120279 Revised 2012-01-10 TEI9 Rev1 Approved Revised to S2-120384. 2012-01-10
0658 1 F Rel-9 9.10.0 9.11.0 Correcting Usage Monitoring event trigger SP-55 SP-120068 approved S2 S2-88E S2-120384 Agreed 2012-01-20 TEI9 Agreed revision 1 of S2-120279. This CR was agreed 2012-01-20
0659 - A Rel-10 10.5.0 - Correcting Usage Monitoring event trigger - - - - S2-88E S2-120280 Revised 2012-01-10 TEI9 Rev1 Approved Revised to S2-120385. 2012-01-10
0659 1 A Rel-10 10.5.0 10.6.0 Correcting Usage Monitoring event trigger SP-55 SP-120068 approved S2 S2-88E S2-120385 Agreed 2012-01-20 TEI9 Agreed revision 1 of S2-120280. This CR was agreed 2012-01-20
0660 - A Rel-11 11.4.0 - Correcting Usage Monitoring event trigger - - - - S2-88E S2-120281 Revised 2012-01-10 TEI9 Rev1 Approved Revised to S2-120386. 2012-01-10
0660 1 A Rel-11 11.4.0 11.5.0 Correcting Usage Monitoring event trigger SP-55 SP-120068 approved S2 S2-88E S2-120386 Agreed 2012-01-20 TEI9 Agreed revision 1 of S2-120281. This CR was agreed 2012-01-20
0661 - F Rel-10 10.5.0 - Alignment of stage 2 onto stage 3 for CSG reporting - - - - S2-88E S2-120292 Withdrawn 2012-01-10 TEI10 WITHDRAWN (LATE). 2012-01-10
0662 - A Rel-11 11.4.0 - Alignment of stage 2 onto stage 3 for CSG reporting - - - - S2-88E S2-120293 Withdrawn 2012-01-10 TEI11 WITHDRAWN. (LATE). 2012-01-10
0663 - C Rel-11 11.4.0 - Usage monitoring signalling congestion handling - - - - S2-89 S2-120449 Revised 2012-01-25 TEI11 Merged with S2-120535 in S2-120919 2012-01-25
0663 1 C Rel-11 11.4.0 11.5.0 Usage monitoring signalling congestion handling SP-55 SP-120087 approved S2 S2-89 S2-120919 Agreed 2012-02-06 TEI11 This CR was agreed 2012-02-06
0664 - B Rel-11 11.4.0 - Updates to TS 23.203 for WLAN with S2a - - - - S2-89 S2-120497 Revised 2012-01-27 SaMOG_WLAN Revised to S2-120987. 2012-01-27
0664 1 B Rel-11 11.4.0 11.5.0 Updates to TS 23.203 for WLAN with S2a SP-55 SP-120085 approved S2 S2-89 S2-120987 Agreed 2012-02-07 SaMOG_WLAN This CR was agreed 2012-02-07
0665 - B Rel-11 11.4.0 - Roaming and enhanced QoS - - - - S2-89 S2-120501 - 2012-01-27 TEI11 Not Handled 2012-01-27
0666 - F Rel-11 11.4.0 - Cleanup of editor’s notes in 23.203 Annex P - - - - S2-89 S2-120502 Revised 2012-01-27 BBAI Revised to S2-120913. 2012-01-27
0666 1 F Rel-11 11.4.0 11.5.0 Cleanup of editor’s notes in 23.203 Annex P SP-55 SP-120077 approved S2 S2-89 S2-120913 Agreed 2012-02-09 BBAI Agreed in parallel sessions. This CR was agreed 2012-02-09
0667 - B Rel-11 11.4.0 - Building Block 2 architecture - - - - S2-89 S2-120509 Revised 2012-01-27 BBAI Revised to S2-120903. 2012-01-27
0667 1 B Rel-11 11.4.0 11.5.0 Building Block 2 architecture SP-55 SP-120077 approved S2 S2-89 S2-120903 Agreed 2012-02-09 BBAI Agreed in parallel sessions. This CR was agreed 2012-02-09
0668 - B Rel-11 11.4.0 - P.5 Functional description - - - - S2-89 S2-120510 Revised 2012-01-27 BBAI Revised to S2-120873. 2012-01-27
0668 1 B Rel-11 11.4.0 - P.5 Functional description - - - - S2-89 S2-120873 Revised 2012-02-06 BBAI Revised to S2-120904. 2012-02-06
0668 2 B Rel-11 11.4.0 - P.5 Functional description - - - - S2-89 S2-120904 Revised 2012-02-09 BBAI Revised to S2-121040. 2012-02-09
0668 3 B Rel-11 11.4.0 11.5.0 P.5 Functional description SP-55 SP-120077 approved S2 S2-89 S2-121040 Agreed 2012-02-09 BBAI Agreed in parallel sessions. This CR was agreed 2012-02-09
0669 - B Rel-11 11.4.0 - PCC Procedures and Flows - - - - S2-89 S2-120511 Revised 2012-01-27 BBAI Revised to S2-120871. 2012-01-27
0669 1 B Rel-11 11.4.0 - PCC Procedures and Flows - - - - S2-89 S2-120871 Revised 2012-02-06 BBAI Revised to S2-120895. 2012-02-06
0669 2 B Rel-11 11.4.0 - PCC Procedures and Flows - - - - S2-89 S2-120895 Revised 2012-02-09 BBAI Should be CR Revision 2. This revision will incorporate the optimization for Gateway Control Session establishment and termination described in S2-120638. Revised to S2-121028. 2012-02-09
0669 3 B Rel-11 11.4.0 - PCC Procedures and Flows - - - - S2-89 S2-121028 Revised 2012-02-09 BBAI Should be CR Revision 3 Revised to S2-121030. 2012-02-09
0669 4 B Rel-11 11.4.0 - PCC Procedures and Flows - - - - S2-89 S2-121030 Revised 2012-02-09 BBAI Revised to S2-121058. 2012-02-09
0669 5 B Rel-11 11.4.0 - PCC Procedures and Flows - - - - S2-89 S2-121058 Revised 2012-02-10 BBAI Revised to S2-121116. 2012-02-10
0669 6 B Rel-11 11.4.0 11.5.0 PCC Procedures and Flows SP-55 SP-120077 approved S2 S2-89 S2-121116 Agreed 2012-02-10 BBAI This CR was agreed 2012-02-10
0670 - B Rel-11 11.4.0 - PCRF selection procedure for WLAN offloaded traffic - - - - S2-89 S2-120512 Revised 2012-01-27 BBAI Revised to S2-120906. 2012-01-27
0670 1 B Rel-11 11.4.0 - PCRF selection procedure for WLAN offloaded traffic - - - - S2-89 S2-120906 Revised 2012-02-09 BBAI Revised to S2-121114. 2012-02-09
0670 2 B Rel-11 11.4.0 - PCRF selection procedure for WLAN offloaded traffic - - - - S2-89 S2-121114 Revised 2012-02-10 BBAI Revised to S2-121118. 2012-02-10
0670 3 B Rel-11 11.4.0 11.5.0 PCRF selection procedure for WLAN offloaded traffic SP-55 SP-120077 approved S2 S2-89 S2-121118 Agreed 2012-02-10 BBAI This CR was agreed 2012-02-10
0671 - C Rel-11 11.4.0 - Include support of other media for IMS Emergency Session - - - - S2-89 S2-120515 Revised 2012-01-27 NOVES-IMSESOM Revised to S2-120923. 2012-01-27
0671 1 C Rel-11 11.4.0 11.5.0 Include support of other media for IMS Emergency Session SP-55 SP-120080 approved S2 S2-89 S2-120923 Agreed 2012-02-06 NOVES-IMSESOM This CR was agreed 2012-02-06
0672 - B Rel-11 11.4.0 - Declaring support for extended TFT filter format - - - - S2-89 S2-120527 Revised 2012-01-27 TEI11 Revised to S2-121005. 2012-01-27
0672 1 B Rel-11 11.4.0 - Declaring support for extended TFT filter format SP-55 SP-120087 revised S2 S2-89 S2-121005 Agreed 2012-02-08 TEI11 This CR was agreed … -> SP-120173 2012-02-08
0672 2 B Rel-11 11.4.0 11.5.0 Declaring support for extended TFT filter format SP-55 SP-120173 approved S2 - - - 2012-03-06 TEI11 - 2012-03-07
0673 - B Rel-11 11.4.0 11.5.0 PCC support for rSRVCC SP-55 SP-120084 approved S2 S2-89 S2-120533 Agreed 2012-01-27 rSRVCC This CR was agreed 2012-01-27
0674 - F Rel-11 11.4.0 - Usage Monitoring signalling overload - - - - S2-89 S2-120535 Noted 2012-01-27 TEI11 Noted. Merged with S2-120449 in S2-120919 2012-01-27
0675 - C Rel-11 11.4.0 - To add description of TDF reference point in PCC Architecture - - - - S2-89 S2-120568 Noted 2012-01-30 TEI11 Noted 2012-01-30
0676 - C Rel-11 11.4.0 - Reducing the load due the User Location Reporting to a PCRF or to an OCS - - - - S2-89 S2-120594 Noted 2012-01-30 TEI11 Noted. May be reconsidered for Rel-12. 2012-01-30
0677 - B Rel-11 11.4.0 - GW Control and QoS Rules Provision Procedure - - - - S2-89 S2-120596 Noted 2012-01-30 BBAI Noted in parallel sessions 2012-01-30
0678 - F Rel-11 11.4.0 - Corrections on GW Control and QoS Rules Request Procedure - - - - S2-89 S2-120597 Revised 2012-01-30 BBAI Revised to S2-121024. 2012-01-30
0678 1 F Rel-11 11.4.0 - Corrections on GW Control and QoS Rules Request Procedure - - - - S2-89 S2-121024 Revised 2012-02-09 BBAI Revised to S2-121106. 2012-02-09
0678 2 F Rel-11 11.4.0 11.5.0 Corrections on GW Control and QoS Rules Request Procedure SP-55 SP-120077 approved S2 S2-89 S2-121106 Agreed 2012-02-09 BBAI This CR was agreed 2012-02-09
0679 - F Rel-11 11.4.0 - Corrections on BPCF Discovery and Selection - - - - S2-89 S2-120598 Revised 2012-01-30 BBAI Revised to S2-121025. 2012-01-30
0679 1 F Rel-11 11.4.0 - Corrections on BPCF Discovery and Selection - - - - S2-89 S2-121025 Revised 2012-02-09 BBAI Revised to S2-121107. 2012-02-09
0679 2 F Rel-11 11.4.0 11.5.0 Corrections on BPCF Discovery and Selection SP-55 SP-120077 approved S2 S2-89 S2-121107 Agreed 2012-02-09 BBAI This CR was agreed 2012-02-09
0680 - F Rel-11 11.4.0 - Correction of IP-CAN session termination with S9a session termination in H(e)NB scenario - - - - S2-89 S2-120600 Noted 2012-01-30 BBAI Noted in parallel sessions. Merged with S2-120891 2012-01-30
0681 - F Rel-11 11.4.0 - Addtion of H(e)NB access with PMIP-based S5/S8 case to session binding and GW control session procedures - - - - S2-89 S2-120601 Revised 2012-01-30 BBAI Revised to S2-121022. 2012-01-30
0681 1 F Rel-11 11.4.0 - Addtion of H(e)NB access with PMIP-based S5/S8 case to session binding and GW control session procedures - - - - S2-89 S2-121022 Withdrawn 2012-02-09 BBAI WITHDRAWN. Merged with S2-121030 2012-02-09
0682 - F Rel-11 11.4.0 - Differentiate the QoS parameter between offload traffic and EPC-routed traffic - - - - S2-89 S2-120602 Revised 2012-01-30 BBAI Revised to S2-121029. 2012-01-30
0682 1 F Rel-11 11.4.0 11.5.0 Differentiate the QoS parameter between offload traffic and EPC-routed traffic SP-55 SP-120077 approved S2 S2-89 S2-121029 Agreed 2012-02-09 BBAI Agreed in parallel sessions. This CR was agreed 2012-02-09
0684 - F Rel-11 11.4.0 - Modification for PCC function description in 23.203 Annex - - - - S2-89 S2-120641 Noted 2012-01-30 BBAI Noted in parallel sessions. Merged with S2-120873 2012-01-30
0685 - F Rel-11 11.4.0 - Correction of PCC procedures and flows for BBAI - - - - S2-89 S2-120642 Noted 2012-01-30 BBAI Noted in parallel sessions 2012-01-30
0686 - B Rel-11 11.4.0 - Changes to PCC to support Network Location for IMS functionality - - - - S2-89 S2-120668 Revised 2012-01-30 NWK-PL2IMS Revised to S2-120829. 2012-01-30
0686 1 B Rel-11 11.4.0 - Changes to PCC to support Network Location for IMS functionality - - - - S2-89 S2-120829 Revised 2012-02-03 NWK-PL2IMS LATE DOC: Revised to S2-120969. 2012-02-03
0686 2 B Rel-11 11.4.0 - Changes to PCC to support Network Location for IMS functionality - - - - S2-89 S2-120969 Revised 2012-02-09 NWK-PL2IMS Revised to S2-121098. 2012-02-09
0686 3 B Rel-11 11.4.0 11.5.0 Changes to PCC to support Network Location for IMS functionality SP-55 SP-120081 approved S2 S2-89 S2-121098 Agreed 2012-02-09 NWK-PL2IMS This CR was agreed 2012-02-09
0687 - F Rel-11 11.4.0 - Clarification on IP-CAN Session Termination/Modification for BBAI (BB1) - - - - S2-89 S2-120734 Noted 2012-01-31 BBAI NOTED - Merged with S2-120871 2012-01-31
0688 - F Rel-11 11.4.0 - Clarification on 3GPP HNB Procedures for CS Support - - - - S2-89 S2-120735 Revised 2012-01-31 BBAI Revised to S2-121026. 2012-01-31
0688 1 F Rel-11 11.4.0 11.5.0 Clarification on 3GPP HNB Procedures for CS Support SP-55 SP-120077 approved S2 S2-89 S2-121026 Agreed 2012-02-10 BBAI Agreed in parallel sessions. This CR was agreed 2012-02-10
0689 - F Rel-11 11.4.0 - Adding the definition of Non-seamless WLAN offload in Annex P (BB2) - - - - S2-89 S2-120736 Noted 2012-01-31 BBAI NOTED - Merged with S2-120904 2012-01-31
0690 - F Rel-11 11.4.0 - Reference points enhancement with BBAI - - - - S2-89 S2-120777 Revised 2012-01-31 BBAI Revised to S2-121023. 2012-01-31
0690 1 F Rel-11 11.4.0 - Reference points enhancement with BBAI - - - - S2-89 S2-121023 Revised 2012-02-09 BBAI Revised to S2-121035. 2012-02-09
0690 2 B Rel-11 11.4.0 11.5.0 Reference points enhancement with BBAI SP-55 SP-120077 approved S2 S2-89 S2-121035 Agreed 2012-02-10 BBAI This CR was agreed 2012-02-10
0691 - F Rel-11 11.4.0 - BBI: Annex P.6 PCRF correction for H(e)NB - - - - S2-89 S2-120780 Withdrawn 2012-01-31 BBAI WITHDRAWN 2012-01-31
0692 - B Rel-11 11.4.0 - Annex P: High level requirements for BB2 - - - - S2-89 S2-120782 Revised 2012-01-31 BBAI Revised to S2-121027. 2012-01-31
0692 1 B Rel-11 11.4.0 - Annex P: High level requirements for BB2 - - - - S2-89 S2-121027 Revised 2012-02-09 BBAI Revised to S2-121113. 2012-02-09
0692 2 B Rel-11 11.4.0 - Annex P: High level requirements for BB2 - - - - S2-89 S2-121113 Revised 2012-02-10 BBAI Revised to S2-121120. 2012-02-10
0692 3 B Rel-11 11.4.0 11.5.0 Annex P: High level requirements for BB2 SP-55 SP-120077 approved S2 S2-89 S2-121120 Agreed 2012-02-10 BBAI This CR was agreed 2012-02-10
0693 - B Rel-11 11.4.0 - P.6 Functional Entities enhancement for BBII NS-WLAN - - - - S2-89 S2-120784 Revised 2012-01-31 BBAI Revised to S2-120907. 2012-01-31
0693 1 B Rel-11 11.4.0 - P.6 Functional Entities enhancement for BBII NS-WLAN - - - - S2-89 S2-120907 Revised 2012-02-09 BBAI Revised to S2-121032. 2012-02-09
0693 2 B Rel-11 11.4.0 - P.6 Functional Entities enhancement for BBII NS-WLAN - - - - S2-89 S2-121032 Revised 2012-02-09 BBAI Revised to S2-121119. 2012-02-09
0693 3 B Rel-11 11.4.0 11.5.0 P.6 Functional Entities enhancement for BBII NS-WLAN SP-55 SP-120077 approved S2 S2-89 S2-121119 Agreed 2012-02-10 BBAI This CR was agreed 2012-02-10
0694 - B Rel-11 11.4.0 - Fixed Broadband access annex - - - - S2-89 S2-120809 Revised 2012-01-31 BBAI Revised to S2-120886. 2012-01-31
0694 1 B Rel-11 11.4.0 - Fixed Broadband access annex - - - - S2-89 S2-120886 Noted 2012-02-08 BBAI Noted in parallel sessions. Vodafone reserves the right to re-submit this CR after discussing with other companies 2012-02-08
0695 - F Rel-10 10.6.0 - Definitions of sponsor and sponsored data connectivity in PCC specification - - - - S2-90 S2-121221 Noted 2012-03-30 PEST Noted in parallel sessions 2012-03-30
0696 - A Rel-11 11.5.0 - Definitions of sponsor and sponsored data connectivity in PCC specification - - - - S2-90 S2-121222 Noted 2012-03-30 PEST Noted in parallel sessions 2012-03-30
0697 - F Rel-11 11.5.0 - Application detection notification method - - - - S2-90 S2-121228 Revised 2012-04-05 SAPP Revised to S2-121695. 2012-04-05
0697 1 F Rel-11 11.5.0 - Application detection notification method - - - - S2-90 S2-121695 Revised 2012-04-19 SAPP Revised to S2-121803. 2012-04-19
0697 2 F Rel-11 11.5.0 11.6.0 Application detection notification method SP-56 SP-120244 approved S2 S2-90 S2-121803 Agreed 2012-04-19 SAPP Agreed in parallel sessions. This CR was agreed. 2012-04-19
0698 - F Rel-11 11.5.0 - General corrections for SAPP - - - - S2-90 S2-121229 Revised 2012-04-05 SAPP Revised to S2-121698. 2012-04-05
0698 1 F Rel-11 11.5.0 11.6.0 General corrections for SAPP SP-56 SP-120244 approved S2 S2-90 S2-121698 Agreed 2012-04-18 SAPP Agreed in parallel sessions. This CR was agreed 2012-04-18
0699 - F Rel-11 11.5.0 - Unsolicited application reporting functionality corrections - - - - S2-90 S2-121230 Revised 2012-04-05 SAPP Revised to S2-121697. 2012-04-05
0699 1 F Rel-11 11.5.0 - Unsolicited application reporting functionality corrections - - - - S2-90 S2-121697 Revised 2012-04-19 SAPP Revised to S2-121806. 2012-04-19
0699 2 F Rel-11 11.5.0 11.6.0 Unsolicited application reporting functionality corrections SP-56 SP-120244 approved S2 S2-90 S2-121806 Agreed 2012-04-19 SAPP Agreed in parallel sessions. This CR was agreed 2012-04-19
0700 - F Rel-11 11.5.0 11.6.0 Deferred ADC rules clarifications SP-56 SP-120244 approved S2 S2-90 S2-121231 Agreed 2012-04-05 SAPP Agreed in parallel sessions. This CR was agreed 2012-04-05
0701 - F Rel-11 11.5.0 - Usage monitoring congestion handling clarification - - - - S2-90 S2-121233 Revised 2012-04-05 TEI11 Revised to S2-121702. 2012-04-05
0701 1 F Rel-11 11.5.0 - Usage monitoring congestion handling clarification - - - - S2-90 S2-121702 Revised 2012-04-18 TEI11 Agreed in parallel sessions. This CR was agreed. Revised at S2-91 in S2-121987 2012-04-18
0701 2 F Rel-11 11.5.0 - Usage monitoring congestion handling clarification - - - - S2-91 S2-121987 Revised 2012-05-12 TEI11 Revised to S2-122410. 2012-05-12
0701 3 F Rel-11 11.5.0 - Usage monitoring congestion handling clarification - - - - S2-91 S2-122410 Revised 2012-05-24 TEI11 Revised to S2-122429. 2012-05-24
0701 4 F Rel-11 11.5.0 - Usage monitoring congestion handling clarification - - - - S2-91 S2-122429 Revised 2012-05-24 TEI11 Revised to S2-122606. 2012-05-24
0701 5 F Rel-11 11.5.0 11.6.0 Usage monitoring congestion handling clarification SP-56 SP-120250 approved S2 S2-91 S2-122606 Agreed 2012-05-25 TEI11 This CR was agreed 2012-05-25
0702 - F Rel-11 11.5.0 - Annex P Corrections - - - - S2-90 S2-121235 Revised 2012-04-05 BBAI Revised to S2-121732. 2012-04-05
0702 1 F Rel-11 11.5.0 - Annex P Corrections - - - - S2-90 S2-121732 Revised 2012-04-17 BBAI Revised to S2-121688. 2012-04-17
0702 2 F Rel-11 11.5.0 - Annex P Corrections - - - - S2-90 S2-121688 Revised 2012-04-17 BBAI Revised to S2-121807. 2012-04-17
0702 3 F Rel-11 11.5.0 - Annex P Corrections - - - - S2-90 S2-121807 Revised 2012-04-19 BBAI Agreed in parallel sessions. This CR was agreed. Revised in S2-91 in S2-121983, S2-122125 and S2-122286 2012-04-19
0702 4 F Rel-11 11.5.0 - Annex P Corrections - - - - S2-91 S2-121983 Revised 2012-05-12 BBAI Revisions also proposed in S2-122125 and S2-122286. P.5.1 is mentioned as an affected clause, but there are no changes proposed in there. Merged in parallel session with S2-122125 and S2-122286 in S2-122403 2012-05-12
0702 5 F Rel-11 11.5.0 - Annex P Corrections - - - - S2-91 S2-122125 Noted 2012-05-14 BBAI Revisions also proposed in S2-121983 and S2-122286. Noted - Merged with S2-122403 2012-05-14
0702 5 F Rel-11 11.5.0 - Annex P Corrections - - - - S2-91 S2-122403 Revised 2012-05-23 BBAI Revised to S2-122434. 2012-05-23
0702 6 F Rel-11 11.5.0 - Annex P Corrections - - - - S2-91 S2-122286 Noted 2012-05-15 BBAI Revisions also proposed in S2-121983 and S2-122125. Noted - Merged with S2-122403 2012-05-15
0702 6 F Rel-11 11.5.0 - Annex P Corrections - - - - S2-91 S2-122434 Revised 2012-05-24 BBAI Revised to S2-122595. 2012-05-24
0702 7 F Rel-11 11.5.0 11.6.0 Annex P Corrections SP-56 SP-120241 approved S2 S2-91 S2-122595 Agreed 2012-05-25 BBAI This CR was agreed 2012-05-25
0703 - F Rel-11 11.5.0 - NetLoc clean up - - - - S2-90 S2-121241 Noted 2012-04-05 NWK-PL2IMS Noted. Combined with S2-121497 in S2-121756 2012-04-05
0704 - B Rel-11 11.5.0 - Propose to add TDF function in BBERF - - - - S2-90 S2-121258 Noted 2012-04-10 SAPP Noted in parallel sessions 2012-04-10
0705 - F Rel-11 11.5.0 - Only to report the necessary applications start/sotp events - - - - S2-90 S2-121290 Withdrawn 2012-04-10 SAPP WITHDRAWN 2012-04-10
0706 - F Rel-11 11.5.0 - Clarification of functional description in P.5 - - - - S2-90 S2-121295 Revised 2012-04-10 BBAI Revised to S2-121683. 2012-04-10
0706 1 F Rel-11 11.5.0 - Clarification of functional description in P.5 - - - - S2-90 S2-121683 Revised 2012-04-17 BBAI Revised to S2-121687. 2012-04-17
0706 2 F Rel-11 11.5.0 - Clarification of functional description in P.5 - - - - S2-90 S2-121687 Revised 2012-04-17 BBAI Agreed in parallel sessions. This CR was agreed. Revised at S2-91 in S2-122124 2012-04-17
0706 3 F Rel-11 11.5.0 - Clarification of functional description in P.5 - - - - S2-91 S2-122124 Revised 2012-05-14 BBAI Revised to S2-122406. 2012-05-14
0706 4 F Rel-11 11.5.0 - Clarification of functional description in P.5 - - - - S2-91 S2-122406 Revised 2012-05-23 BBAI Revised to S2-122437. 2012-05-23
0706 5 F Rel-11 11.5.0 11.6.0 Clarification of functional description in P.5 SP-56 SP-120241 approved S2 S2-91 S2-122437 Agreed 2012-05-24 BBAI This CR was agreed 2012-05-24
0707 - F Rel-11 11.5.0 - Addition for the P.6 Functional Entities for NSWO - - - - S2-90 S2-121296 Revised 2012-04-10 BBAI Revised to S2-121711. 2012-04-10
0707 1 F Rel-11 11.5.0 - Addition for the P.6 Functional Entities for NSWO - - - - S2-90 S2-121711 Revised 2012-04-19 BBAI Revised to S2-121811. 2012-04-19
0707 2 F Rel-11 11.5.0 11.6.0 Addition for the P.6 Functional Entities for NSWO SP-56 SP-120241 approved S2 S2-90 S2-121811 Agreed 2012-04-20 BBAI Agreed in parallel sessions. This CR was agreed 2012-04-20
0708 - F Rel-11 11.5.0 - Defer session linking to support SaMOG - - - - S2-90 S2-121350 Withdrawn 2012-04-10 SaMOG_WLAN WITHDRAWN 2012-04-10
0709 - F Rel-12 11.5.0 - Corrections for TS 23.203. - - - - S2-90 S2-121354 Revised 2012-04-10 BBAI Improve CR title! Revised to S2-121706. 2012-04-10
0709 - F Rel-12 11.5.0 - Corrections for TS 23.203. - - - - S2-90 S2-121706 Revised 2012-04-18 BBAI Revised to S2-121707. 2012-04-18
0709 1 F Rel-12 11.5.0 - Corrections for TS 23.203. SP-56 SP-120241 revised S2 S2-90 S2-121707 Agreed 2012-04-18 BBAI Agreed in parallel sessions. This CR was agreed SP-56: revised in SP-120329. 2012-04-18
0709 2 F Rel-11 11.5.0 11.6.0 Corrections for TS 23.203. SP-56 SP-120329 approved S2 S2-90 S2-121707rev Agreed 2012-04-18 BBAI Agreed in parallel sessions. This CR was agreed 2012-06-08
0710 - F Rel-12 11.5.0 - 23.203 PCRF initiated Gateway control session termination - - - - S2-90 S2-121355 Revised 2012-04-10 BBAI Revised to S2-121686. 2012-04-10
0710 1 F Rel-12 11.5.0 - 23.203 PCRF initiated Gateway control session termination - - - - S2-90 S2-121686 Noted 2012-04-17 BBAI Noted in parallel sessions 2012-04-17
0711 - A Rel-8 8.13.0 - Deferred QoS Rule - - - - S2-90 S2-121361 Noted 2012-04-10 SAES Noted in parallel sessions 2012-04-10
0712 - A Rel-9 9.11.0 - Deferred QoS Rule - - - - S2-90 S2-121362 - 2012-04-10 SAES Not Handled 2012-04-10
0713 - A Rel-10 10.6.0 - Deferred QoS Rule - - - - S2-90 S2-121363 - 2012-04-10 SAES Not Handled 2012-04-10
0714 - A Rel-11 11.5.0 - Deferred QoS Rule - - - - S2-90 S2-121364 - 2012-04-10 SAES Not Handled 2012-04-10
0715 - F Rel-7 7.13.0 - Clarification of complete PCC rule in deferred rule procedures - - - - S2-90 S2-121382 Revised 2012-04-10 PCC Revised to S2-121718. 2012-04-10
0715 1 F Rel-7 7.13.0 - Clarification of complete PCC rule in deferred rule procedures - - - - S2-90 S2-121718 Revised 2012-04-17 PCC Revised to S2-121689. 2012-04-17
0715 2 F Rel-7 7.13.0 - Clarification of complete PCC rule in deferred rule procedures - - - - S2-90 S2-121689 Revised 2012-04-18 PCC Revised to S2-121713. 2012-04-18
0715 3 F Rel-7 7.13.0 7.14.0 Clarification of complete PCC rule in deferred rule procedures SP-56 SP-120231 approved S2 S2-90 S2-121713 Agreed 2012-04-19 PCC Agreed in parallel sessions. This CR was agreed 2012-04-19
0716 - A Rel-8 8.13.0 - Clarification of complete PCC rule in deferred rule procedures - - - - S2-90 S2-121383 Revised 2012-04-10 PCC Revised to S2-121719. 2012-04-10
0716 1 A Rel-8 8.13.0 - Clarification of complete PCC rule in deferred rule procedures - - - - S2-90 S2-121719 Revised 2012-04-17 PCC Revised to S2-121690. 2012-04-17
0716 2 A Rel-8 8.13.0 - Clarification of complete PCC rule in deferred rule procedures - - - - S2-90 S2-121690 Revised 2012-04-18 PCC Revised to S2-121714. 2012-04-18
0716 3 A Rel-8 8.13.0 8.14.0 Clarification of complete PCC rule in deferred rule procedures SP-56 SP-120231 approved S2 S2-90 S2-121714 Agreed 2012-04-19 PCC Agreed in parallel sessions. This CR was agreed 2012-04-19
0717 - A Rel-9 9.11.0 - Clarification of complete PCC rule in deferred rule procedures - - - - S2-90 S2-121384 Revised 2012-04-10 PCC Revised to S2-121720. 2012-04-10
0717 1 A Rel-9 9.11.0 - Clarification of complete PCC rule in deferred rule procedures - - - - S2-90 S2-121720 Revised 2012-04-17 PCC Revised to S2-121691. 2012-04-17
0717 2 A Rel-9 9.11.0 - Clarification of complete PCC rule in deferred rule procedures - - - - S2-90 S2-121691 Revised 2012-04-18 PCC Revised to S2-121715. 2012-04-18
0717 3 A Rel-9 9.11.0 9.12.0 Clarification of complete PCC rule in deferred rule procedures SP-56 SP-120231 approved S2 S2-90 S2-121715 Agreed 2012-04-19 PCC Agreed in parallel sessions. This CR was agreed 2012-04-19
0718 - A Rel-10 10.6.0 - Clarification of complete PCC rule in deferred rule procedures - - - - S2-90 S2-121385 Revised 2012-04-10 PCC Revised to S2-121721. 2012-04-10
0718 1 A Rel-10 10.6.0 - Clarification of complete PCC rule in deferred rule procedures - - - - S2-90 S2-121721 Revised 2012-04-17 PCC Revised to S2-121692. 2012-04-17
0718 2 A Rel-10 10.6.0 - Clarification of complete PCC rule in deferred rule procedures - - - - S2-90 S2-121692 Revised 2012-04-18 PCC Revised to S2-121716. 2012-04-18
0718 3 A Rel-10 10.6.0 10.7.0 Clarification of complete PCC rule in deferred rule procedures SP-56 SP-120231 approved S2 S2-90 S2-121716 Agreed 2012-04-19 PCC Agreed in parallel sessions. This CR was agreed 2012-04-19
0719 - A Rel-11 11.5.0 - Clarification of complete PCC/ADC rule in deferred rule procedures - - - - S2-90 S2-121386 Revised 2012-04-10 PCC Revised to S2-121722. 2012-04-10
0719 1 A Rel-11 11.5.0 - Clarification of complete PCC/ADC rule in deferred rule procedures - - - - S2-90 S2-121722 Revised 2012-04-17 PCC Revised to S2-121693. 2012-04-17
0719 2 A Rel-11 11.5.0 - Clarification of complete PCC/ADC rule in deferred rule procedures - - - - S2-90 S2-121693 Revised 2012-04-18 PCC Revised to S2-121717. 2012-04-18
0719 3 A Rel-11 11.5.0 11.6.0 Clarification of complete PCC/ADC rule in deferred rule procedures SP-56 SP-120231 approved S2 S2-90 S2-121717 Agreed 2012-04-19 PCC Agreed in parallel sessions. This CR was agreed 2012-04-19
0720 - F Rel-11 11.5.0 - V_PCRF Initiated S9a GW Control Session Termination Correction - - - - S2-90 S2-121479 Revised 2012-04-11 BBAI Revised to S2-121708. 2012-04-11
0720 1 F Rel-11 11.5.0 - V_PCRF Initiated S9a GW Control Session Termination Correction - - - - S2-90 S2-121708 Revised 2012-04-19 BBAI Revised to S2-121810. 2012-04-19
0720 2 F Rel-11 11.5.0 - V_PCRF Initiated S9a GW Control Session Termination Correction - - - - S2-90 S2-121810 Revised 2012-04-20 BBAI This CR was agreed. Revised at S2-91 in S2-122126 2012-04-20
0720 3 F Rel-11 11.5.0 - V_PCRF Initiated S9a GW Control Session Termination Correction - - - - S2-91 S2-122126 Revised 2012-05-14 BBAI Revised to S2-122416. 2012-05-14
0720 4 F Rel-11 11.5.0 11.6.0 V_PCRF Initiated S9a GW Control Session Termination Correction SP-56 SP-120241 approved S2 S2-91 S2-122416 Agreed 2012-05-24 BBAI This CR was agreed 2012-05-24
0721 - F Rel-11 11.5.0 - V-PCRF Discovery and Selection by BPCF - - - - S2-90 S2-121480 Revised 2012-04-11 BBAI Revised to S2-121685. 2012-04-11
0721 1 F Rel-11 11.5.0 - V-PCRF Discovery and Selection by BPCF - - - - S2-90 S2-121685 Revised 2012-04-17 BBAI Revised to S2-121813. 2012-04-17
0721 2 F Rel-11 11.5.0 - V-PCRF Discovery and Selection by BPCF - - - - S2-90 S2-121813 Revised 2012-04-20 BBAI This CR was agreed. Revised at S2-91 in S2-121985 2012-04-20
0721 3 F Rel-11 11.5.0 - V-PCRF Discovery and Selection by BPCF - - - - S2-91 S2-121985 Revised 2012-05-12 BBAI Revised to S2-122404. 2012-05-12
0721 4 F Rel-11 11.5.0 11.6.0 V-PCRF Discovery and Selection by BPCF SP-56 SP-120241 approved S2 S2-91 S2-122404 Agreed 2012-05-23 BBAI Approved (was revised to correct text in S2-122586, but was not mentioned during approval) 2012-05-23
0721 5 F Rel-11 11.5.0 - V-PCRF Discovery and Selection by BPCF - - - - S2-91 S2-122586 - 2012-05-25 BBAI Revision of S2-122404 to correct text, but was not mentioned during approval). Not Handled 2012-05-25
0722 - F Rel-11 11.5.0 - Alignment with 23.139 regarding Local IP Address/Port Change Reporting - - - - S2-90 S2-121482 Noted 2012-04-11 BBAI Noted. Revised and title and CR number changed in parallel session in S2-121709 2012-04-11
0723 - F Rel-11 11.5.0 - Removal of CSG ID as a network provided location information parameter - - - - S2-90 S2-121497 Revised 2012-04-11 NWK-PL2IMS Revised to S2-121756. 2012-04-11
0723 1 F Rel-11 11.5.0 11.6.0 Removal of CSG ID as a network provided location information parameter SP-56 SP-120243 approved S2 S2-90 S2-121756 Agreed 2012-04-18 NWK-PL2IMS This CR was agreed 2012-04-18
0724 - F Rel-11 11.5.0 - Clarification on the use of NSWO-APN - - - - S2-90 S2-121534 Noted 2012-04-11 BBAI Proposed changes affect informative text in a NOTE. Noted in parallel sessions 2012-04-11
0725 - F Rel-11 11.5.0 11.6.0 Gx enhancement for trusted S2c access SP-56 SP-120241 approved S2 S2-90 S2-121535 Agreed 2012-04-11 BBAI Agreed in parallel sessions. This CR was agreed 2012-04-11
0726 - F Rel-11 11.5.0 - Transport of ePDG/PGW IP address in different scenarios - - - - S2-90 S2-121536 Revised 2012-04-11 BBAI Revised to S2-121710. 2012-04-11
0726 1 F Rel-11 11.5.0 - Transport of ePDG/PGW IP address in different scenarios - - - - S2-90 S2-121710 Revised 2012-04-20 BBAI Agreed in parallel sessions. This CR was agreed. Revised at S2-91 in S2-122286 2012-04-20
0727 - F Rel-11 11.5.0 - Correction to IP-CAN Session Establishment and BBERF-initiated GW Control Session Establishment Procedure - - - - S2-90 S2-121538 Noted 2012-04-11 BBAI Proposed changes in clause P.7.2.1 are clashing with S2-121235. Noted. Merged with S2-121235 2012-04-11
0728 - F Rel-11 11.5.0 - PCC aspects of SIRIG - - - - S2-90 S2-121836 Revised 2012-04-19 SiRIG Option 1 from CT WG3. This was provided by MCC for information and was not handled. Revised at S2-91 in S2-122353 2012-04-19
0728 1 B Rel-11 11.5.0 - PCC aspects of SIRIG - - - - S2-91 S2-122353 Noted 2012-05-17 SIRIG Noted 2012-05-17
0729 - F Rel-11 11.5.0 - PCC aspects of SIRIG - - - - S2-90 S2-121837 - 2012-04-19 SiRIG Option 2 from CT WG3. This was provided by MCC for information and was not handled. 2012-04-19
0730 - F Rel-11 11.5.0 11.6.0 Clarification of with BBERF location in Annex P of TS 23.203 SP-56 SP-120241 approved S2 S2-90 S2-121709 Agreed 2012-04-19 BBAI Agreed in parallel sessions. This CR was agreed 2012-04-19
0732 - F Rel-11 11.5.0 - Correction of redirection functionality - - - - S2-91 S2-122003 Revised 2012-05-12 SAPP Revised to S2-122408. 2012-05-12
0732 1 F Rel-11 11.5.0 11.6.0 Correction of redirection functionality SP-56 SP-120244 approved S2 S2-91 S2-122408 Agreed 2012-05-24 SAPP This CR was agreed 2012-05-24
0733 - F Rel-11 11.5.0 - Clean-up for spending limit description - - - - S2-91 S2-122004 Revised 2012-05-12 QoS_SSL Revised to S2-122409. 2012-05-12
0733 1 F Rel-11 11.5.0 - Clean-up for spending limit description - - - - S2-91 S2-122409 Revised 2012-05-24 QoS_SSL Revised to S2-122430. 2012-05-24
0733 2 F Rel-11 11.5.0 11.6.0 Clean-up for spending limit description SP-56 SP-120238 approved S2 S2-91 S2-122430 Agreed 2012-05-24 QoS_SSL This CR was agreed 2012-05-24
0734 - F Rel-11 11.5.0 - Case 1, 2a and 2b clarification - - - - S2-91 S2-122120 - 2012-05-14 BBAI Not Handled 2012-05-14
0735 - F Rel-11 11.5.0 - Corrections for Gateway control session over S9a for CS Service - - - - S2-91 S2-122121 Revised 2012-05-14 BBAI Revised to S2-122418. 2012-05-14
0735 1 F Rel-11 11.5.0 - Corrections for Gateway control session over S9a for CS Service - - - - S2-91 S2-122418 Noted 2012-05-24 BBAI Noted in parallel sessions 2012-05-24
0736 - F Rel-11 11.5.0 - Corrections for Gateway control session termination over S9a - - - - S2-91 S2-122122 Revised 2012-05-14 BBAI Revised to S2-122419. 2012-05-14
0736 1 F Rel-11 11.5.0 - Corrections for Gateway control session termination over S9a - - - - S2-91 S2-122419 Revised 2012-05-24 BBAI Revised to S2-122438. 2012-05-24
0736 2 F Rel-11 11.5.0 11.6.0 Corrections for Gateway control session termination over S9a SP-56 SP-120241 approved S2 S2-91 S2-122438 Agreed 2012-05-24 BBAI This CR was agreed 2012-05-24
0737 - F Rel-11 11.5.0 - PCEF and Gx interface function correction and complement - - - - S2-91 S2-122123 Revised 2012-05-14 BBAI Revised to S2-122420. 2012-05-14
0737 1 F Rel-11 11.5.0 - PCEF and Gx interface function correction and complement - - - - S2-91 S2-122420 Revised 2012-05-24 BBAI Revised to S2-122441. 2012-05-24
0737 2 F Rel-11 11.5.0 11.6.0 PCEF and Gx interface function correction and complement SP-56 SP-120241 approved S2 S2-91 S2-122441 Agreed 2012-05-24 BBAI This CR was agreed 2012-05-24
0738 - F Rel-11 11.5.0 - Deletion of the FQDN of the broadband access network - - - - S2-91 S2-122147 Noted 2012-05-14 BBAI Companion CR for TS 23.139 is in S2-122026. If the concept is agreeable, we should move forward with both the CRs. Changes in P.4.1.5 are clashing with S2-122123 and S2-122165. Noted in parallel sessions 2012-05-14
0739 - F Rel-11 11.5.0 - Clarification and correction on P.3 and P.4 - - - - S2-91 S2-122165 Revised 2012-05-14 BBAI Revised to S2-122421. 2012-05-14
0739 1 F Rel-11 11.5.0 11.6.0 Clarification and correction on P.3 and P.4 SP-56 SP-120241 approved S2 S2-91 S2-122421 Agreed 2012-05-24 BBAI This CR was agreed 2012-05-24
0740 - F Rel-11 11.5.0 - Clarification on the Session linking in P.5.1.2 - - - - S2-91 S2-122166 - 2012-05-14 BBAI Not Handled 2012-05-14
0741 - F Rel-11 11.5.0 - Clarification on P.6 - - - - S2-91 S2-122167 Noted 2012-05-14 BBAI Noted in parallel sessions 2012-05-14
0742 - F Rel-10 10.6.0 - Addition of T.140 real-time text to standardized QCI characteristics - - - - S2-91 S2-122233 Noted 2012-05-15 ECSRA_LAA Noted in parallel sessions 2012-05-15
0743 - F Rel-11 11.5.0 - Addition of T.140 real-time text to standardized QCI characteristics - - - - S2-91 S2-122234 Noted 2012-05-15 ECSRA_LAA Noted in parallel sessions 2012-05-15
0744 - F Rel-11 11.5.0 - Correction to BBERF-initiated GCS procedure - - - - S2-91 S2-122268 Revised 2012-05-15 BBAI Revised to S2-122422. 2012-05-15
0744 1 F Rel-11 11.5.0 11.6.0 Correction to BBERF-initiated GCS procedure SP-56 SP-120241 approved S2 S2-91 S2-122422 Agreed 2012-05-24 BBAI This CR was agreed 2012-05-24
0745 - F Rel-8 8.13.0 - Clarification on the description of ARP modification - - - - S2-91 S2-122290 Noted 2012-05-15 SAES Noted in parallel sessions 2012-05-15
0746 - F Rel-9 9.11.0 - Clarification on the description of ARP modification - - - - S2-91 S2-122291 Noted 2012-05-15 SAES Noted in parallel sessions 2012-05-15
0747 - A Rel-10 10.6.0 - Clarification on the description of ARP modification - - - - S2-91 S2-122292 Noted 2012-05-15 SAES Noted in parallel sessions 2012-05-15
0748 - A Rel-11 11.5.0 - Clarification on the description of ARP modification - - - - S2-91 S2-122293 Noted 2012-05-15 SAES Noted in parallel sessions 2012-05-15
0749 - F Rel-11 11.6.0 - Clarification of some functional descriptions related to BBERF - - - - S2-92 S2-122690 - 2012-06-26 TEI11 Not Handled 2012-06-26
0750 - F Rel-11 11.6.0 11.7.0 TDF address transfer over S9a SP-57 SP-120478 approved S2 S2-92 S2-122705 Agreed 2012-06-27 BBAI This CR was agreed 2012-06-27
0751 - F Rel-11 11.6.0 - Clarification on pair DRAs for PCRF selection - - - - S2-92 S2-122711 - 2012-06-28 TEI11 Not Handled 2012-06-28
0752 - F Rel-11 11.6.0 - Additional Input for PCC Rule Authorization - - - - S2-92 S2-122726 Revised 2012-06-28 TEI11 Revised to S2-123280. 2012-06-28
0752 1 F Rel-11 11.6.0 - Additional Input for PCC Rule Authorization - - - - S2-92 S2-123280 Revised 2012-07-12 TEI11 Revised to S2-123388. 2012-07-12
0752 2 F Rel-11 11.6.0 11.7.0 Additional Input for PCC Rule Authorization SP-57 SP-120477 approved S2 S2-92 S2-123388 Agreed 2012-07-13 TEI11 This CR was agreed 2012-07-13
0753 - F Rel-11 11.6.0 11.7.0 Addition of PLMN ID for NETLOC SP-57 SP-120479 approved S2 S2-92 S2-122727 Agreed 2012-06-28 NWK-PL2IMS Agreed in IMS Sessions. This CR was agreed 2012-06-28
0754 - F Rel-11 11.6.0 - OCS dynamic update of list of currently available policy counters - - - - S2-92 S2-122729 - 2012-06-28 QoS_SSL Not Handled 2012-06-28
0754 1 F Rel-11 11.7.0 - OCS dynamic update of list of currently available policy counters - - - - S2-93 S2-123563 - 2012-09-28 QoS_SSL Not Handled 2012-09-28
0755 - F Rel-11 11.6.0 - Transport of ePDG or PGW IP address over S9 - - - - S2-92 S2-122830 Revised 2012-07-02 BBAI Revised to S2-123327. 2012-07-02
0755 1 F Rel-11 11.6.0 11.7.0 Transport of ePDG or PGW IP address over S9 SP-57 SP-120478 approved S2 S2-92 S2-123327 Agreed 2012-07-12 BBAI This CR was agreed 2012-07-12
0756 - F Rel-11 11.6.0 - Notification of PGW IP address in IP-CAN Termination procedure - - - - S2-92 S2-122832 Noted 2012-07-02 BBAI Noted 2012-07-02
0757 - F Rel-11 11.6.0 - Correction of PCC procedures - - - - S2-92 S2-122833 Revised 2012-07-02 BBAI Revised to S2-123326. 2012-07-02
0757 1 F Rel-11 11.6.0 11.7.0 Correction of PCC procedures SP-57 SP-120478 approved S2 S2-92 S2-123326 Agreed 2012-07-12 BBAI This CR was agreed 2012-07-12
0758 - F Rel-11 11.6.0 - Correction on ADC functionality description - - - - S2-92 S2-122894 - 2012-07-02 SAPP Not Handled 2012-07-02
0758 1 F Rel-11 11.7.0 - Correction on ADC functionality description - - - - S2-93 S2-123634 Revised 2012-09-29 SAPP Revised to S2-123945. 2012-09-29
0758 2 F Rel-11 11.7.0 11.8.0 Correction on ADC functionality description SP-58 SP-120720 approved S2 S2-93 S2-123945 Agreed 2012-10-10 SAPP Agreed in parallel sessions. This CR was agreed 2012-10-10
0759 - F Rel-11 11.6.0 - Granularity of ADC reporting - - - - S2-92 S2-122895 - 2012-07-02 SAPP Not Handled 2012-07-02
0760 - F Rel-11 11.6.0 - Case 1, 2a and 2b clarification - - - - S2-92 S2-122913 Revised 2012-07-02 BBAI Revised to S2-123325. 2012-07-02
0760 1 F Rel-11 11.6.0 11.7.0 Case 1, 2a and 2b clarification SP-57 SP-120478 approved S2 S2-92 S2-123325 Agreed 2012-07-12 BBAI This CR was agreed 2012-07-12
0761 - F Rel-11 11.6.0 - Correction of enforcement order of PCC and ADC rules for PCEF enhanced with ADC - - - - S2-92 S2-122962 - 2012-07-03 SAPP Not Handled 2012-07-03
0761 1 F Rel-11 11.7.0 - Correction of enforcement order of PCC and ADC rules for PCEF enhanced with ADC - - - - S2-93 S2-123869 Revised 2012-10-02 SAPP Revised to S2-123943. 2012-10-02
0761 2 F Rel-11 11.7.0 - Correction of enforcement order of PCC and ADC rules for PCEF enhanced with ADC - - - - S2-93 S2-123943 Revised 2012-10-10 SAPP Revised to S2-124109. 2012-10-10
0761 3 F Rel-11 11.7.0 11.8.0 Correction of enforcement order of PCC and ADC rules for PCEF enhanced with ADC SP-58 SP-120720 approved S2 S2-93 S2-124109 Agreed 2012-10-11 SAPP Agreed in parallel sessions. This CR was agreed 2012-10-11
0762 - F Rel-11 11.6.0 - Correction on V-PCRF-Initiated IP-CAN Session Modification for NSWO traffic - - - - S2-92 S2-123043 Revised 2012-07-03 BBAI Revised to S2-123322. 2012-07-03
0762 1 F Rel-11 11.6.0 11.7.0 Correction on V-PCRF-Initiated IP-CAN Session Modification for NSWO traffic SP-57 SP-120478 approved S2 S2-92 S2-123322 Agreed 2012-07-12 BBAI This CR was agreed 2012-07-12
0763 - F Rel-11 11.6.0 - Delete the IMSI over S9a for H(e)NB access - - - - S2-92 S2-123045 - 2012-07-03 BBAI Not Handled 2012-07-03
0764 - F Rel-10 10.7.0 - Removal of Maximum MBR/APN-AMBR - - - - S2-92 S2-123312 Revised 2012-07-11 TEI10 This was revised off-line in S2-123363 2012-07-11
0764 1 F Rel-10 10.7.0 - Removal of Maximum MBR/APN-AMBR - - - - S2-92 S2-123363 Revised 2012-07-12 TEI10 Revised to S2-123376. 2012-07-12
0764 2 F Rel-10 10.7.0 10.8.0 Removal of Maximum MBR/APN-AMBR SP-57 SP-120477 approved S2 S2-92 S2-123376 Technically 2012-07-13 TEI10 Technically Endorsed 2012-07-13
0765 - A Rel-11 11.6.0 - Removal of Maximum MBR/APN-AMBR - - - - S2-92 S2-123313 Revised 2012-07-11 TEI10 This was revised off-line in S2-123364 2012-07-11
0765 1 A Rel-11 11.6.0 - Removal of Maximum MBR/APN-AMBR - - - - S2-92 S2-123364 Revised 2012-07-12 TEI10 Revised to S2-123377. 2012-07-12
0765 2 A Rel-11 11.6.0 11.7.0 Removal of Maximum MBR/APN-AMBR SP-57 SP-120477 approved S2 S2-92 S2-123377 Technically 2012-07-13 TEI10 Technically Endorsed 2012-07-13
0766 - F Rel-11 11.7.0 - Correction of redirection functionality - - - - S2-93 S2-123564 Revised 2012-09-28 SAPP Revised to S2-123941. 2012-09-28
0766 1 F Rel-11 11.7.0 - Correction of redirection functionality - - - - S2-93 S2-123941 Revised 2012-10-10 SAPP Revised to S2-124108. 2012-10-10
0766 2 F Rel-11 11.7.0 11.8.0 Correction of redirection functionality SP-58 SP-120720 approved S2 S2-93 S2-124108 Agreed 2012-10-11 SAPP Agreed in parallel sessions. This CR was agreed 2012-10-11
0767 - A Rel-7 7.14.1 - PCC Clarification of the QoS parameters that can be upgraded and downgraded(Rel-7) - - - - S2-93 S2-123592 - 2012-09-28 PCC Not Handled 2012-09-28
0768 - A Rel-8 8.14.0 - PCC Clarification of the QoS parameters that can be upgraded and downgraded(Rel-8) - - - - S2-93 S2-123593 - 2012-09-28 PCC Not Handled 2012-09-28
0769 - A Rel-9 9.12.0 - PCC Clarification of the QoS parameters that can be upgraded and downgraded(Rel-9) - - - - S2-93 S2-123594 - 2012-09-28 PCC Not Handled 2012-09-28
0770 - A Rel-10 10.8.0 - PCC Clarification of the QoS parameters that can be upgraded and downgraded(Rel-10) - - - - S2-93 S2-123595 - 2012-09-28 PCC Not Handled 2012-09-28
0771 - A Rel-11 11.7.0 - PCC Clarification of the QoS parameters that can be upgraded and downgraded(Rel-11) - - - - S2-93 S2-123596 - 2012-09-28 PCC Not Handled 2012-09-28
0772 - B Rel-12 11.7.0 - Time Usage notification and reporting to PCRF - - - - S2-93 S2-123692 - 2012-09-29 FS_UMONC Not Handled 2012-09-29
0773 - F Rel-11 11.7.0 - Clarification on Charging issue regarding PCC and ADC Rules - - - - S2-93 S2-123700 Noted 2012-09-30 SAPP Noted in Parallel sessions 2012-09-30
0774 - F Rel-11 11.7.0 - Modification text on 'BPCF Discovery and Selection' - - - - S2-93 S2-123902 Withdrawn 2012-10-02 BBAI WITHDRAWN 2012-10-02
0775 - F Rel-11 11.7.0 - Time Based Sy Controls - - - - S2-94 S2-124216 Revised 2012-10-25 QoS_SSL Revised to S2-124639. 2012-10-25
0775 1 F Rel-11 11.7.0 - Time Based Sy Controls - - - - S2-94 S2-124639 Revised 2012-11-12 QoS_SSL Parallel sessions merger of S2-124326, S2-124333 and S2-124216. Revised to S2-124643. 2012-11-12
0775 2 F Rel-11 11.7.0 11.8.0 Time Based Sy Controls SP-58 SP-120716 approved S2 S2-94 S2-124643 Agreed 2012-11-12 QoS_SSL Agreed in parallel sessions. This CR was agreed 2012-11-12
0776 - B Rel-11 11.7.0 - Time Based Sy Controls - - - - S2-94 S2-124326 Merged 2012-11-05 QoS_SSL S2-124216, S2-124333 and S2-124326 are overlapping. Agreeable proposals should be merged. Merged into S2-124639 2012-11-05
0777 - B Rel-11 11.7.0 - Add Final-Unit-Indication to status of policy counter - - - - S2-94 S2-124327 Noted 2012-11-05 QoS_SSL Noted in parallel sessions 2012-11-05
0778 - B Rel-12 11.7.0 - Time Usage notification and reporting to PCRF - - - - S2-94 S2-124332 - 2012-11-05 FS_UMONC Not Handled 2012-11-05
0779 - B Rel-12 11.7.0 - Deferred status of Sy policy counter(s) - - - - S2-94 S2-124333 Merged 2012-11-05 QoS_SSL Noted. Seems to be the same proposal as in S2-124216. Can we capture any applicable content in a revision of S2-124216 and NOTE this contribution? Merged into S2-124639 2012-11-05
0780 - F Rel-11 11.7.0 - Correction to PCRF functionality in P.6.1.1 - - - - S2-94 S2-124362 - 2012-11-05 BBAI Not Handled 2012-11-05
0781 - F Rel-11 11.7.0 - Modification text on 'BPCF Discovery and Selection - - - - S2-94 S2-124434 Noted 2012-11-05 BBAI Noted in parallel sessions 2012-11-05
0782 - C Rel-12 11.8.0 - Time Based Usage Monitoring - - - - S2-95 S2-130093 Revised 2013-01-18 UMONC Revised to S2-130488. 2013-01-18
0782 1 C Rel-12 11.8.0 12.0.0 Time Based Usage Monitoring SP-59 SP-130092 approved S2 S2-95 S2-130488 Agreed 2013-01-29 UMONC Agreed in parallel sessions. This CR was agreed 2013-01-29
0783 - F Rel-11 11.8.0 - S9 optional at local breakout - - - - S2-95 S2-130143 - 2013-01-18 TEI11 This is a TEI11 CR that is not in response to an incoming LS or to correct previously approved TEI11 CRs. Not on the agenda. Paper skipped. Not Handled 2013-01-18
0783 1 F Rel-11 11.9.0 - S9 optional at local breakout - - - - S2-96 S2-130826 Revised 2013-03-27 TEI11 Revised to S2-131344. 2013-03-27
0783 2 F Rel-11 11.9.0 - S9 optional at local breakout - - - - S2-96 S2-131344 Revised 2013-04-11 TEI11 Revised to S2-131511. 2013-04-11
0783 3 F Rel-11 11.9.0 11.10.0 S9 optional at local breakout SP-60 SP-130223 approved S2 S2-96 S2-131511 Agreed 2013-04-12 TEI11 This CR was agreed 2013-04-12
0783 3 F Rel-11 11.9.0 - S9 optional at local breakout SP-60 SP-130308 withdrawn S2 - S2-131511 - 2013-06-04 TEI11 - 2013-06-17
0784 - B Rel-12 11.8.0 - Usage Monitoring via Online Charging System (OCS) - - - - S2-95 S2-130146 Revised 2013-01-18 UMONC Revised to S2-130489. 2013-01-18
0784 1 D Rel-12 11.8.0 - Usage Monitoring via Online Charging System (OCS) - - - - S2-95 S2-130489 Revised 2013-01-30 UMONC Revised to S2-130598. 2013-01-30
0784 2 D Rel-12 11.8.0 12.0.0 Usage Monitoring via Online Charging System (OCS) SP-59 SP-130092 approved S2 S2-95 S2-130598 Agreed 2013-02-01 UMONC This CR was agreed 2013-02-01
0785 - F Rel-11 11.8.0 - PCRF initiated GCS termination in 23 203 - - - - S2-95 S2-130199 Revised 2013-01-21 BBAI Revised to S2-130477. 2013-01-21
0785 1 F Rel-11 11.8.0 - PCRF initiated GCS termination in 23 203 - - - - S2-95 S2-130477 Revised 2013-01-28 BBAI Revised to S2-130659. 2013-01-28
0785 2 F Rel-11 11.8.0 11.9.0 PCRF initiated GCS termination in 23 203 SP-59 SP-130082 approved S2 S2-95 S2-130659 Agreed 2013-01-31 BBAI This CR was agreed 2013-01-31
0786 - F Rel-11 11.8.0 - BPCF initiates Gateway Control and QoS Rule request procedure for HNB CS traffic - - - - S2-95 S2-130200 Revised 2013-01-21 BBAI Revised to S2-130479. 2013-01-21
0786 1 F Rel-11 11.8.0 - BPCF initiates Gateway Control and QoS Rule request procedure for HNB CS traffic - - - - S2-95 S2-130479 Revised 2013-01-28 BBAI Revised to S2-130660. 2013-01-28
0786 2 F Rel-11 11.8.0 11.9.0 BPCF initiates Gateway Control and QoS Rule request procedure for HNB CS traffic SP-59 SP-130082 approved S2 S2-95 S2-130660 Agreed 2013-01-31 BBAI This CR was agreed 2013-01-31
0787 - F Rel-11 11.8.0 - FQDN Removal for BBAI-HeNB case for TS23.203 - - - - S2-95 S2-130201 Noted 2013-01-21 BBAI Noted in parallel sessions 2013-01-21
0788 - F Rel-11 11.8.0 - Clarification on pair DRAs for PCRF selection - - - - S2-95 S2-130210 - 2013-01-21 TEI11 This is a TEI11 CR that is not in response to an incoming LS or to correct previously approved TEI11 CRs. Not on the agenda? Paper skipped. Not Handled 2013-01-21
0789 - F Rel-11 11.8.0 - Alignment and Clarification of PCC based location reporting procedures - - - - S2-95 S2-130284 Revised 2013-01-21 TEI11, NWK-PL2IMS Revised to S2-130501. 2013-01-21
0789 1 F Rel-11 11.8.0 - Alignment and Clarification of PCC based location reporting procedures - - - - S2-95 S2-130501 Revised 2013-01-30 TEI11, NWK-PL2IMS Revised to S2-130441. 2013-01-30
0789 2 F Rel-11 11.8.0 - Alignment and Clarification of PCC based location reporting procedures - - - S2 S2-95 S2-130441 Withdrawn 2013-01-31 TEI11, NWK-PL2IMS WITHDRAWN 2013-01-31
0790 - F Rel-11 11.8.0 - TWAN Location Information over Gx - - - - S2-95 S2-130353 Revised 2013-01-22 SaMOG_WLAN Revised to S2-130478. 2013-01-22
0790 1 F Rel-11 11.8.0 - TWAN Location Information over Gx - - - - S2-95 S2-130478 Revised 2013-01-28 SaMOG_WLAN Revised to S2-130706. 2013-01-28
0790 2 F Rel-11 11.8.0 11.9.0 TWAN Location Information over Gx SP-59 SP-130086 approved S2 S2-95 S2-130706 Agreed 2013-02-01 SaMOG_WLAN This CR was agreed 2013-02-01
0791 - F Rel-11 11.8.0 - User Location Information Age - - - - S2-95 S2-130398 Revised 2013-01-22 NWK-PL2IMS Revised to S2-130444. 2013-01-22
0791 1 F Rel-11 11.8.0 - User Location Information Age - - - - S2-95 S2-130444 Revised 2013-01-31 NWK-PL2IMS Revised to S2-130669. 2013-01-31
0791 2 F Rel-11 11.8.0 11.9.0 User Location Information Age SP-59 SP-130083 approved S2 S2-95 S2-130669 Agreed 2013-01-31 NWK-PL2IMS This CR was agreed 2013-01-31
0792 - F Rel-11 11.8.0 11.9.0 Alignment of BBAI H(e)NB Local IP Address Signalling with RAN WG3 decisions SP-59 SP-130082 approved S2 S2-95 S2-130417 Agreed 2013-01-22 BBAI Related to LS in S2-130033. Agreed in parallel sessions. This CR was agreed 2013-01-22
0793 - C Rel-12 11.8.0 - Correction on charging requirements at PCEF - - - - S2-95 S2-130418 Noted 2013-01-22 TEI12 Related to LS in S2-130039. Noted in parallel sessions 2013-01-22
0794 - F Rel-11 11.9.0 - Onetime reporting of the present Access Network Information - - - - S2-96 S2-130822 Revised 2013-03-27 NWK-PL2IMS Revised to S2-131255. 2013-03-27
0794 1 F Rel-11 11.9.0 - Onetime reporting of the present Access Network Information - - - - S2-96 S2-131255 Withdrawn 2013-04-08 NWK-PL2IMS WITHDRAWN 2013-04-08
0795 - A Rel-12 12.0.0 - Onetime reporting of the present Access Network Information - - - - S2-96 S2-130823 Revised 2013-03-27 NWK-PL2IMS Revised to S2-131256. 2013-03-27
0795 1 A Rel-12 12.0.0 - Onetime reporting of the present Access Network Information - - - - S2-96 S2-131256 Withdrawn 2013-04-08 NWK-PL2IMS WITHDRAWN 2013-04-08
0796 - F Rel-11 11.9.0 - Simplification of pending policy counter status provisioning over Sy - - - - S2-96 S2-130824 - 2013-03-27 QoS_SSL Not Handled 2013-03-27
0797 - A Rel-12 12.0.0 - Simplification of pending policy counter status provisioning over Sy - - - - S2-96 S2-130825 - 2013-03-27 QoS_SSL Not Handled 2013-03-27
0798 - A Rel-12 12.0.0 - S9 optional at local breakout - - - - S2-96 S2-130827 Revised 2013-03-27 TEI11 Revised to S2-131345. 2013-03-27
0798 1 A Rel-12 12.0.0 - S9 optional at local breakout - - - - S2-96 S2-131345 Revised 2013-04-11 TEI11 Revised to S2-131512. 2013-04-11
0798 2 A Rel-12 12.0.0 12.1.0 S9 optional at local breakout SP-60 SP-130223 approved S2 S2-96 S2-131512 Agreed 2013-04-12 TEI11 This CR was agreed 2013-04-12
0798 2 A Rel-12 12.0.0 - S9 optional at local breakout SP-60 SP-130308 withdrawn S2 - S2-131512 - 2013-04-12 TEI11 - 2013-06-17
0799 - B Rel-12 12.0.0 - Application Based Charging functionality added for TDF - - - - S2-96 S2-130835 Revised 2013-03-27 ABC Revised to S2-131313. 2013-03-27
0799 1 B Rel-12 12.0.0 - Application Based Charging functionality added for TDF - - - - S2-96 S2-131313 Revised 2013-04-10 ABC Revised to S2-131350. 2013-04-10
0799 2 B Rel-12 12.0.0 - Application Based Charging functionality added for TDF - - - - S2-96 S2-131350 Revised 2013-04-11 ABC Agreed in parallel sessions. This CR was agreed. Revised at S2#97 to S2-131608. 2013-04-11
0799 3 B Rel-12 12.0.0 - Application Based Charging functionality added for TDF - - - - S2-97 S2-131608 Revised 2013-05-15 ABC Revised to S2-132038. 2013-05-15
0799 4 B Rel-12 12.0.0 - Application Based Charging functionality added for TDF - - - - S2-97 S2-132038 Revised 2013-05-29 ABC Revised to S2-132222. 2013-05-29
0799 5 B Rel-12 12.0.0 12.1.0 Application Based Charging functionality added for TDF SP-60 SP-130230 approved S2 S2-97 S2-132222 Agreed 2013-05-30 ABC This CR was agreed 2013-05-30
0800 - D Rel-12 12.0.0 - Disabling/re-enabling usage monitoring - - - - S2-96 S2-130877 Revised 2013-03-29 UMONC Revised to S2-131348. 2013-03-29
0800 1 D Rel-12 12.0.0 12.1.0 Disabling/re-enabling usage monitoring SP-60 SP-130229 approved S2 S2-96 S2-131348 Agreed 2013-04-11 UMONC Agreed in parallel sessions. This CR was agreed 2013-04-11
0801 - F Rel-11 11.9.0 - Modification text on 'BPCF Discovery and Selection' - - - - S2-96 S2-131157 Withdrawn 2013-04-02 BBAI WITHDRAWN 2013-04-02
0802 - F Rel-12 12.0.0 - Modification text on 'BPCF Discovery and Selection' - - - - S2-96 S2-131159 Withdrawn 2013-04-02 BBAI WITHDRAWN 2013-04-02
0803 - F Rel-11 11.9.0 - Correction of PCC based location reporting procedures - - - - S2-96 S2-131172 Revised 2013-04-02 NWK-PL2IMS Revised to S2-131257. 2013-04-02
0803 1 F Rel-11 11.9.0 - Correction of PCC based location reporting procedures - - - - S2-96 S2-131257 Revised 2013-04-08 NWK-PL2IMS Revised to S2-131506. 2013-04-08
0803 2 F Rel-11 11.9.0 - Correction of PCC based location reporting procedures SP-60 SP-130218 revised S2 S2-96 S2-131506 Agreed 2013-04-12 NWK-PL2IMS This CR was agreed 2013-04-12
0803 3 F Rel-11 11.9.0 11.10.0 Correction of PCC based location reporting procedures SP-60 SP-130323 approved S2 - Pack - 2013-06-18 NWK-PL2IMS - 2013-06-18
0804 - A Rel-12 12.0.0 - Correction of PCC based location reporting procedures - - - - S2-96 S2-131173 Revised 2013-04-02 NWK-PL2IMS Revised to S2-131258. 2013-04-02
0804 1 A Rel-12 12.0.0 - Correction of PCC based location reporting procedures - - - - S2-96 S2-131258 Revised 2013-04-08 NWK-PL2IMS Revised to S2-131507. 2013-04-08
0804 2 A Rel-12 12.0.0 - Correction of PCC based location reporting procedures SP-60 SP-130218 revised S2 S2-96 S2-131507 Agreed 2013-04-12 NWK-PL2IMS This CR was agreed 2013-04-12
0804 3 A Rel-12 12.0.0 12.1.0 Correction of PCC based location reporting procedures SP-60 SP-130323 approved S2 - Pack - 2013-04-12 NWK-PL2IMS - 2013-06-18
0805 - F Rel-11 11.9.0 - Corrections in sections describing the bearer binding and event triggering for GTP based EPC - - - - S2-96 S2-131174 Revised 2013-04-02 TEI11 Revised to S2-131346. 2013-04-02
0805 1 F Rel-11 11.9.0 11.10.0 Corrections in sections describing the bearer binding and event triggering for GTP based EPC SP-60 SP-130223 approved S2 S2-96 S2-131346 Agreed 2013-04-11 TEI11 Agreed in parallel sessions. This CR was agreed 2013-04-11
0805 1 F Rel-11 11.9.0 - Corrections in sections describing the bearer binding and event triggering for GTP based EPC SP-60 SP-130308 withdrawn S2 - S2-131346 - 2013-04-11 TEI11 - 2013-06-17
0806 - A Rel-12 12.0.0 - Corrections in sections describing the bearer binding and event triggering for GTP based EPC - - - - S2-96 S2-131175 Revised 2013-04-02 TEI11 Revised to S2-131347. 2013-04-02
0806 1 A Rel-12 12.0.0 12.1.0 Corrections in sections describing the bearer binding and event triggering for GTP based EPC SP-60 SP-130223 approved S2 S2-96 S2-131347 Agreed 2013-04-11 TEI11 Agreed in parallel sessions. This CR was agreed 2013-04-11
0806 1 A Rel-12 12.0.0 - Corrections in sections describing the bearer binding and event triggering for GTP based EPC SP-60 SP-130308 withdrawn S2 - S2-131347 - 2013-04-11 TEI11 - 2013-06-17
0807 - B Rel-12 12.0.0 - Other changes on Application Based Charging functionality added for TDF - - - - S2-96 S2-131314 Noted 2013-04-11 ABC Created in parallel sessions.. Noted 2013-04-11
0808 1 B Rel-12 12.0.0 - Modifications on Application Based Charging functionality added for TDF - - - - S2-97 S2-131602 Revised 2013-05-13 ABC Error in CR, claims to be revision of CR0807. Revised to S2-132039. 2013-05-13
0808 2 B Rel-12 12.0.0 - Modifications on Application Based Charging functionality added for TDF - - - - S2-97 S2-132039 Revised 2013-05-29 ABC Revised to S2-132223. 2013-05-29
0808 3 B Rel-12 12.0.0 - Modifications on Application Based Charging functionality added for TDF SP-60 SP-130230 revised S2 S2-97 S2-132223 Agreed 2013-05-30 ABC This CR was agreed 2013-05-30
0808 4 B Rel-12 12.0.0 12.1.0 Modifications on Application Based Charging functionality added for TDF SP-60 SP-130329 approved S2 - SP-130329 - 2013-06-18 ABC - 2013-06-18
0809 - F Rel-11 11.9.0 - Functionality of application detection and control in case of PCEF enhanced with ADC - - - - S2-97 S2-131604 Revised 2013-05-13 SAPP Revised to S2-132040. 2013-05-13
0809 1 F Rel-11 11.9.0 - Functionality of application detection and control in case of PCEF enhanced with ADC - - - - S2-97 S2-132040 Revised 2013-05-29 SAPP Revised to S2-132204. 2013-05-29
0809 2 F Rel-11 11.9.0 - Functionality of application detection and control in case of PCEF enhanced with ADC SP-60 SP-130219 revised S2 S2-97 S2-132204 Agreed 2013-05-30 SAPP Agreed in parallel sessions. This CR was agreed 2013-05-30
0809 3 F Rel-11 11.9.0 11.10.0 Functionality of application detection and control in case of PCEF enhanced with ADC SP-60 SP-130318 approved S2 - Pack - 2013-06-18 SAPP - 2013-06-18
0810 - F Rel-12 12.0.0 - Functionality of application detection and control in case of PCEF enhanced with ADC - - - - S2-97 S2-131605 Revised 2013-05-13 SAPP Revised to S2-132041. 2013-05-13
0810 1 F Rel-12 12.0.0 - Functionality of application detection and control in case of PCEF enhanced with ADC - - - - S2-97 S2-132041 Revised 2013-05-29 SAPP Revised to S2-132205. 2013-05-29
0810 2 A Rel-12 12.0.0 - Functionality of application detection and control in case of PCEF enhanced with ADC SP-60 SP-130219 revised S2 S2-97 S2-132205 Agreed 2013-05-30 SAPP Agreed in parallel sessions. This CR was agreed 2013-05-30
0810 3 A Rel-12 12.0.0 12.1.0 Functionality of application detection and control in case of PCEF enhanced with ADC SP-60 SP-130318 approved S2 - Pack - 2013-06-18 SAPP - 2013-06-18
0811 - F Rel-11 11.9.0 - Retrieval of access network information at the SDP offer - - - - S2-97 S2-131624 Merged 2013-05-16 NWK-PL2IMS Merged with S2-131715 and S2-131725 into S2-132032 2013-05-16
0812 - F Rel-11 11.9.0 11.10.0 Remove the editor's note of VPLMN-Id provisioning SP-60 SP-130217 approved S2 S2-97 S2-131668 Agreed 2013-05-17 BBAI Agreed in parallel sessions. This CR was agreed 2013-05-17
0813 - A Rel-12 12.0.0 12.1.0 Remove the editor's note of VPLMN-Id provisioning SP-60 SP-130217 approved S2 S2-97 S2-131669 Agreed 2013-05-17 BBAI Agreed in parallel sessions. This CR was agreed 2013-05-17
0814 - F Rel-10 10.8.0 - PCC support for unidirectional TAD - - - - S2-97 S2-131680 Noted 2013-05-17 TEI10, SAES Noted 2013-05-17
0814 1 F Rel-10 10.8.0 - PCC support for unidirectional TAD - - - - S2-98 S2-132627 Noted 2013-07-09 TEI10, SAES Resubmission of S2-131680. Noted in parallel sessions 2013-07-09
0815 - A Rel-11 11.9.0 - PCC support for unidirectional TAD - - - - S2-97 S2-131681 Noted 2013-05-17 TEI10, SAES Noted 2013-05-17
0815 1 A Rel-11 11.10.0 - PCC support for unidirectional TAD - - - - S2-98 S2-132628 Noted 2013-07-09 TEI10, SAES Resubmission of S2-131681. Noted in parallel sessions 2013-07-09
0816 - A Rel-12 12.0.0 - PCC support for unidirectional TAD - - - - S2-97 S2-131682 Noted 2013-05-17 TEI10, SAES Noted 2013-05-17
0816 1 A Rel-12 12.1.0 - PCC support for unidirectional TAD - - - - S2-98 S2-132629 Noted 2013-07-09 TEI10, SAES Resubmission of S2-131682. Noted in parallel sessions 2013-07-09
0817 - A Rel-12 12.0.0 - Retrieval of access network information at the SDP offer - - - - S2-97 S2-131715 Merged 2013-05-17 NWK-PL2IMS Merged with S2-131624 and S2-131725 into S2-132032 2013-05-17
0818 - F Rel-11 11.9.0 - Onetime reporting of the present Access Network Information - - - - S2-97 S2-131725 Merged 2013-05-17 NWK-PL2IMS Merged with S2-131624 and S2-131715 into S2-132032 2013-05-17
0818 1 F Rel-11 11.9.0 - Onetime reporting of the present Access Network Information - - - - S2-97 S2-132032 Revised 2013-05-29 NWK-PL2IMS Revised to S2-132206. 2013-05-29
0818 2 F Rel-11 11.9.0 - Onetime reporting of the present Access Network Information SP-60 SP-130218 reissued S2 S2-97 S2-132206 Agreed 2013-05-30 NWK-PL2IMS Agreed in parallel sessions. This CR was agreed 2013-05-30
0818 2 F Rel-11 11.9.0 11.10.0 Onetime reporting of the present Access Network Information SP-60 SP-130306 approved S2 - S2-132206 - 2013-05-30 NWK-PL2IMS - 2013-06-17
0819 - A Rel-12 12.0.0 - Onetime reporting of the present Access Network Information - - - - S2-97 S2-131726 Revised 2013-05-17 NWK-PL2IMS Revised to S2-132033. 2013-05-17
0819 1 A Rel-12 12.0.0 - Onetime reporting of the present Access Network Information - - - - S2-97 S2-132033 Revised 2013-05-29 NWK-PL2IMS Revised to S2-132207. 2013-05-29
0819 2 A Rel-12 12.0.0 - Onetime reporting of the present Access Network Information SP-60 SP-130218 reissued S2 S2-97 S2-132207 Agreed 2013-05-30 NWK-PL2IMS Agreed in parallel sessions. This CR was agreed 2013-05-30
0819 2 A Rel-12 12.0.0 12.1.0 Onetime reporting of the present Access Network Information SP-60 SP-130306 approved S2 - S2-132207 - 2013-05-30 NWK-PL2IMS - 2013-06-17
0820 - F Rel-12 12.0.0 - Correction of a single logical DRA entity - - - - S2-97 S2-131755 - 2013-05-20 TEI12 Not on the agenda. Not Handled 2013-05-20
0821 - F Rel-12 12.0.0 - Correction to PCC control at local breakout - - - - S2-97 S2-131756 - 2013-05-20 TEI12 Not on the agenda. Not Handled 2013-05-20
0822 - B Rel-12 12.0.0 - New Annex on support of convergent scenario clause Y.1, Y2 , Y.3 and Y.4 - - - - S2-97 S2-131928 - 2013-05-21 P4C-F Not Handled 2013-05-21
0823 - F Rel-12 12.1.0 - Editorial corrections for Application Based Charging - - - - S2-98 S2-132395 Revised 2013-07-04 ABC Revised to S2-132859. 2013-07-04
0823 1 F Rel-12 12.1.0 - Editorial corrections for Application Based Charging - - - - S2-98 S2-132859 Revised 2013-07-16 ABC Revised to S2-132922. 2013-07-16
0823 2 F Rel-12 12.1.0 12.2.0 Editorial corrections for Application Based Charging SP-61 SP-130383 approved S2 S2-98 S2-132922 Agreed 2013-07-18 ABC Agreed in parallel sessions. This CR was agreed 2013-07-18
0824 - F Rel-11 11.10.0 - PCC support for unidirectional downlink flows in NW-initiated procedures - - - - S2-98 S2-132399 Revised 2013-07-04 TEI11, SAES Revised to S2-132934. 2013-07-04
0824 1 F Rel-11 11.10.0 - PCC support for unidirectional downlink flows in NW-initiated procedures - - - - S2-98 S2-132934 Revised 2013-07-18 TEI11, SAES Revised to S2-133055. 2013-07-18
0824 2 F Rel-11 11.10.0 - PCC support for unidirectional downlink flows in NW-initiated procedures - - - - S2-98 S2-133055 Noted 2013-07-19 TEI11, SAES Noted. Technically Endorsed (not for TSG SA approval at this time) for attachment to the LS. 2013-07-19
0825 - A Rel-12 12.1.0 - PCC support for unidirectional downlink flows in NW-initiated procedures - - - - S2-98 S2-132400 Revised 2013-07-04 TEI11, SAES Revised to S2-132935. 2013-07-04
0825 1 A Rel-12 12.1.0 - PCC support for unidirectional downlink flows in NW-initiated procedures - - - - S2-98 S2-132935 Withdrawn 2013-07-18 TEI11, SAES WITHDRAWN 2013-07-18
0826 - B Rel-12 12.1.0 - Fixed Broadband Access Annex. Functional Entities - - - - S2-98 S2-132401 Revised 2013-07-04 P4C-F Revised to S2-132941. 2013-07-04
0826 1 B Rel-12 12.1.0 - Fixed Broadband Access Annex. Functional Entities - - - - S2-98 S2-132941 Revised 2013-07-18 P4C-F Revised to S2-133021. 2013-07-18
0826 2 B Rel-12 12.1.0 12.2.0 Fixed Broadband Access Annex. Functional Entities SP-61 SP-130382 approved S2 S2-98 S2-133021 Agreed 2013-07-18 P4C-F This CR was agreed 2013-07-18
0827 - F Rel-11 11.10.0 - Reporting ULI and TimeZone at Network-initiated bearer release related procedures - - - - S2-98 S2-132570 Noted 2013-07-08 TEI11, NWK-PL2IMS May need to handle 23.401 CRs first. Noted in parallel sessions 2013-07-08
0828 - A Rel-12 12.1.0 - Reporting ULI and TimeZone at Network-initiated bearer release related procedures - - - - S2-98 S2-132571 Noted 2013-07-08 TEI11, NWK-PL2IMS LATE DOC: Rx 09/07, 18:10. Noted in parallel sessions 2013-07-08
0829 - F Rel-10 10.8.0 - Correction of a single logical DRA entity - - - - S2-98 S2-132619 - 2013-07-09 PCC Not Handled 2013-07-09
0830 - B Rel-12 12.1.0 - Adding New Annex to support Fixed Broadband Access: general, definition and high level requirements - - - - S2-98 S2-132633 Revised 2013-07-09 P4C-F Revised to S2-132756. 2013-07-09
0830 1 B Rel-12 12.1.0 12.2.0 Adding New Annex to support Fixed Broadband Access: general, definition and high level requirements SP-61 SP-130382 approved S2 S2-98 S2-132756 Agreed 2013-07-17 P4C-F This CR was agreed 2013-07-17
0831 - B Rel-12 12.1.0 - Adding New Annex to support Fixed Broadband Access: Reference Architecture - - - - S2-98 S2-132634 Revised 2013-07-09 P4C-F Revised to S2-132939. 2013-07-09
0831 1 B Rel-12 12.1.0 - Adding New Annex to support Fixed Broadband Access: Reference Architecture - - - - S2-98 S2-132939 Revised 2013-07-18 P4C-F Revised to S2-133019. 2013-07-18
0831 2 B Rel-12 12.1.0 12.2.0 Adding New Annex to support Fixed Broadband Access: Reference Architecture SP-61 SP-130382 approved S2 S2-98 S2-133019 Agreed 2013-07-18 P4C-F This CR was agreed 2013-07-18
0832 - B Rel-12 12.1.0 - Adding new Annex to support Fixed Broadband Access: functional description - - - - S2-98 S2-132635 Revised 2013-07-09 P4C-F Revised to S2-132940. 2013-07-09
0832 1 B Rel-12 12.1.0 - Adding new Annex to support Fixed Broadband Access: functional description - - - - S2-98 S2-132940 Revised 2013-07-18 P4C-F Revised to S2-133020. 2013-07-18
0832 2 B Rel-12 12.1.0 12.2.0 Adding new Annex to support Fixed Broadband Access: functional description SP-61 SP-130382 approved S2 S2-98 S2-133020 Agreed 2013-07-18 P4C-F This CR was agreed 2013-07-18
0833 - B Rel-12 12.1.0 - Adding New Annex to support Fixed Broadband Access: IP-CAN procedures - - - - S2-98 S2-132636 Revised 2013-07-09 P4C-F Revised to S2-132942. 2013-07-09
0833 1 B Rel-12 12.1.0 12.2.0 Adding New Annex to support Fixed Broadband Access: IP-CAN procedures SP-61 SP-130382 approved S2 S2-98 S2-132942 Agreed 2013-07-18 P4C-F Agreed in parallel sessions. This CR was agreed 2013-07-18
0834 - F Rel-11 11.10.0 - Some corrections to SAPP - - - - S2-98 S2-132701 Revised 2013-07-09 SAPP Revised to S2-132924. 2013-07-09
0834 1 F Rel-11 11.10.0 11.11.0 Some corrections to SAPP SP-61 SP-130373 approved S2 S2-98 S2-132924 Agreed 2013-07-18 SAPP Agreed in parallel sessions. This CR was agreed 2013-07-18
0835 - A Rel-12 12.1.0 - Some corrections to SAPP - - - - S2-98 S2-132702 Revised 2013-07-09 SAPP Revised to S2-132925. 2013-07-09
0835 1 A Rel-12 12.1.0 12.2.0 Some corrections to SAPP SP-61 SP-130373 approved S2 S2-98 S2-132925 Agreed 2013-07-18 SAPP Agreed in parallel sessions. This CR was agreed 2013-07-18
0836 - F Rel-9 9.12.0 - Clarifications for CSG information transfer - - - - S2-98 S2-132765 Revised 2013-07-16 EHNB Created in Parallel sessions. Revised to S2-132781. 2013-07-16
0836 1 F Rel-9 9.12.0 9.13.0 Clarifications for CSG information transfer SP-61 SP-130369 approved S2 S2-98 S2-132781 Agreed 2013-07-18 EHNB Agreed in parallel sessions. This CR was agreed 2013-07-18
0837 - A Rel-10 10.8.0 - Clarifications for CSG information transfer - - - - S2-98 S2-132766 Revised 2013-07-16 EHNB Created in Parallel sessions. Revised to S2-132782. 2013-07-16
0837 1 A Rel-10 10.8.0 - Clarifications for CSG information transfer - - - - S2-98 S2-132782 Revised 2013-07-18 EHNB Agreed in parallel sessions. This CR was agreed. Revised by MCC to correct CR Cover page in S2-133073. Revised to S2-133073. 2013-07-18
0837 2 A Rel-10 10.8.0 10.9.0 Clarifications for CSG information transfer SP-61 SP-130369 approved S2 S2-98 S2-133073 Agreed 2013-07-25 EHNB MCC Revision of S2-132782. This CR was agreed 2013-07-25
0838 - A Rel-11 11.10.0 - Clarifications for CSG information transfer - - - - S2-98 S2-132767 Revised 2013-07-16 EHNB Created in Parallel sessions. Revised to S2-132783. 2013-07-16
0838 1 A Rel-11 11.10.0 11.11.0 Clarifications for CSG information transfer SP-61 SP-130369 approved S2 S2-98 S2-132783 Agreed 2013-07-18 EHNB Agreed in parallel sessions. This CR was agreed 2013-07-18
0839 - F Rel-12 12.1.0 - Clarifications for CSG information transfer - - - - S2-98 S2-132768 Revised 2013-07-16 ABC, EHNB Created in Parallel sessions. Revised to S2-132784. 2013-07-16
0839 1 F Rel-12 12.1.0 12.2.0 Clarifications for CSG information transfer SP-61 SP-130369 approved S2 S2-98 S2-132784 Agreed 2013-07-18 ABC, EHNB Agreed in parallel sessions. This CR was agreed 2013-07-18