3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 23.207

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0000 - - Rel-5 5.3.0 Support of RTCP in IMS sessions - - - S2 S2-24 S2-021171 Revised 2002-06-06 - - -
0001 3 B Rel-5 5.1.0 5.2.0 PDP Context Used for Application Level Signalling SP-14 SP-010711 approved S2 S2-20 S2-012600 Agreed. 2001-12-16 E2EQoS - -
0002 - F Rel-5 5.0.0 5.1.0 Token generation at the PCF SP-13 SP-010513 approved S2 S2-19 S2-012104 Agreed. 2001-08-31 QoS - -
0003 - C Rel-5 5.3.0 IP Policy Control Framework and Policy - A practical approach to per-PDP policing at the GGSN SP-16 - - S2 S2-24 S2-021034 Withdrawn 2002-06-06 - - -
0003 1 F Rel-5 5.0.0 5.1.0 Session Flow: QoS Interaction Procedures SP-13 SP-010513 approved S2 S2-19 S2-012444 Agreed 2001-08-31 IMS-CCR - -
0004 1 F Rel-5 5.0.0 5.1.0 COPS Usage for Go Interface SP-13 SP-010513 approved S2 S2-19 S2-012445 Agreed 2001-08-31 IMS-CCR - -
0005 1 F Rel-5 5.0.0 5.1.0 P-CSCF and PCF Clarifications SP-13 SP-010513 approved S2 S2-19 S2-012334 Agreed. 2001-08-31 IMS-CCR - -
0006 1 C Rel-5 - - P-CSCF notification of PDP context modification - - - S2 S2-20 S2-012602 Revised. 2001-12-16 IMS - -
0006 2 C Rel-5 5.1.0 5.2.0 P-CSCF notification of PDP context modification SP-14 SP-010711 approved S2 S2-20 S2-013029 Agreed. 2001-12-16 IMS - -
0007 - F Rel-5 - - Go Reference Point Clarifications - - - S2 S2-20 S2-012770 Revised. 2001-12-16 QoS - -
0007 1 F Rel-5 - - PCF Location Clarification - - - S2 S2-20 S2-013031 Rejected. 2001-12-16 QoS - -
0008 - F Rel-5 - - QoS Scenario Considerations - - - S2 S2-20 S2-012858 Revised 2001-12-16 E2EQoS - -
0008 3 F Rel-5 5.1.0 5.2.0 QoS Scenarios Considerations SP-14 SP-010711 approved S2 S2-20 S2-0129681 Agreed. 2001-12-16 E2EqoS - -
0009 - B Rel-5 - - Session Flow: QoS Interaction Procedures - - - S2 S2-20 S2-012882 Revised. 2001-12-16 E2EQoS - -
0009 1 B Rel-5 5.1.0 5.2.0 Session Flow: QoS Interaction Procedures SP-14 SP-010711 approved S2 S2-20 S2-013032 Agreed. 2001-12-16 IMS-CCR - -
0010 - B Rel-5 5.1.0 5.2.0 COPS Usage for Go Interface SP-14 SP-010711 approved S2 S2-20 S2-012883 Agreed. 2001-12-16 E2EQoS - -
0011 - F Rel-5 - - PCF decision regarding Authorize QoS - - - S2 S2-21 S2-013339 Rejected 2001-12-16 E2EQoS - -
0011 1 C Rel-5 - - PCF decision regarding Authorize QoS - - - S2 S2-21 S2-013588 Rejected. 2001-12-16 E2EqoS - -
0012 - F Rel-5 - - Mapping IP flow based policy information into PDP context based policy information in the GGSN - - - S2 S2-21 S2-013340 Revised. 2001-12-16 E2EQoS - -
0012 - F Rel-5 5.1.0 5.2.0 Mapping IP flow based policy information into PDP context based policy information in the GGSN SP-14 SP-010711 approved S2 S2-21 S2-013511 Agreed. 2001-12-16 E2EQoS - -
0013 - C Rel-5 - - New event for P-CSCF notification of PDP context modification - - - S2 S2-21 S2-013423 Revised. 2001-12-16 IMS-CCR - -
0013 1 C Rel-5 5.1.0 5.2.0 New event for P-CSCF notification of PDP context modification SP-14 SP-010711 approved S2 S2-21 S2-013513 Agreed. 2001-12-16 IMS-CCR - -
0014 - F Rel-5 5.2.0 Removal of packet handling action from PCF decision - - - S2 S2-22 S2-020017 Revised 2002-03-10 E2EQoS - -
0014 1 F Rel-5 5.2.0 5.3.0 Removal of packet handling action from PCF decision SP-15 SP-020134 approved S2 S2-22 S2-020265 Agreed 2002-03-10 E2EQoS - -
0015 - F Rel-5 5.2.0 IMS enhancements (Transfering Binding Information) - - - S2 S2-22 S2-020057 Rejected 2002-03-10 IMS - -
0016 - F Rel-5 5.2.0 Deleting references to PDP Configuration Options - - - S2 S2-22 S2-020117 Revised 2002-03-10 TEI5 - -
0017 - F Rel-5 5.2.0 Authorization of QoS Resources - - - S2 S2-23 S2-020443 Revised 2002-03-10 IMS-CCR - -
0017 1 F Rel-5 5.2.0 5.3.0 Authorization of QoS Resources SP-15 SP-020134 approved S2 S2-23 S2-020786 Agreed 2002-03-10 IMS-CCR - -
0018 - B Rel-5 5.2.0 Requirement for feedback on binding information - - - S2 S2-23 S2-020482 Revised 2002-03-10 E2EQoS - -
0019 - B Rel-5 5.2.0 Number of media components per PDP Context - - - S2 S2-23 S2-020491 Revised 2002-03-10 IMS-CCR - -
0019 - B Rel-5 5.2.0 5.3.0 Number of media components per PDP Context SP-15 SP-020134 approved S2 S2-23 S2-020852 Agreed 2002-03-10 E2EQoS - -
0019 1 B Rel-5 5.2.0 Number of media components per PDP Context - - - S2 S2-23 S2-020797 Revised 2002-03-10 IMS-CCR - -
0020 - F Rel-5 5.2.0 5.3.0 Incorrect Place of the RAB Procedures in Section 6.3.2 SP-15 SP-020134 approved S2 S2-23 S2-020585 Agreed 2002-03-10 IMS-CCR - -
0021 - E Rel-5 5.2.0 Editorial Corrections of QoS Interaction Procedures Flows - - - S2 S2-23 S2-020586 Revised 2002-03-10 IMS-CCR - -
0021 1 D Rel-5 5.2.0 5.3.0 Editorial Corrections of QoS Interaction Procedures Flows SP-15 SP-020134 approved S2 S2-23 S2-020781 Agreed 2002-03-10 IMS-CCR - -
0022 - F Rel-5 5.2.0 Corrections of the Indication of PDP Context Release Procedure - - - S2 S2-23 S2-020587 Revised 2002-03-10 IMS-CCR - -
0022 1 F Rel-5 5.2.0 5.3.0 Corrections of the Indication of PDP Context Release Procedure SP-15 SP-020134 approved S2 S2-23 S2-020782 Agreed 2002-03-10 IMS-CCR - -
0023 - F Rel-5 5.2.0 Corrections in 6.3 Session Flow: QoS Interaction Procedures - - - S2 S2-23 S2-020588 Revised 2002-03-10 IMS-CCR - -
0023 1 F Rel-5 5.2.0 5.3.0 Corrections in 6.3 Session Flow: QoS Interaction Procedures SP-15 SP-020134 approved S2 S2-23 S2-020783 Agreed 2002-03-10 IMS-CCR - -
0024 - B Rel-5 5.2.0 UMTS QoS to Diffserv Mapping for Gi interface interworking - - - S2 S2-23 S2-020788 Withdrawn 2002-03-10 E2EQoS - -
0025 - F Rel-5 5.2.0 5.3.0 Correction of references to obsolete SIP RFC 2543 IETF Specification SP-15 SP-020153 Approved DynamicsSoft - - - 2002-04-05 IMS-CCR - -
0026 - B Rel-5 5.3.0 Speed up PDP context Activation procedure SP-16 - - S2 S2-24 S2-021063 Rejected 2002-06-06 TEI5 - -
0027 - D Rel-5 5.3.0 Clarifications to TS 23.207 SP-16 - - S2 S2-24 S2-021117 Revised. 2002-06-06 E2EQoS - -
0027 1 F Rel-5 5.3.0 5.4.0 Clarifications to TS 23.207 SP-16 SP-020315 approved S2 S2-24 S2-021368 Agreed. 2002-06-06 E2EQoS - -
0028 - F Rel-5 5.3.0 Alignment of TS 23.207 SP-16 - - S2 S2-24 S2-021118 Revised 2002-06-06 E2EQoS - -
0028 2 F Rel-5 5.3.0 5.4.0 Alignment of TS 23.207 SP-16 SP-020315 approved S2 S2-24 S2-0213691 Agreed. 2002-06-06 E2EQoS - -
0029 - F Rel-5 5.3.0 Number of media components per PDP Context SP-16 - - S2 S2-24 S2-021121 Rejected 2002-06-06 IMS-CCR - -
0030 - F Rel-5 5.3.0 5.4.0 Correct miss-match between figure and explanatory texts SP-16 SP-020315 approved S2 S2-24 S2-021140 Agreed. 2002-06-06 E2EQOS - -
0031 - F Rel-5 5.3.0 Removal of an event for the indication of PDP context modification procedure SP-16 - - S2 S2-24 S2-021255 Rejected 2002-06-06 E2EQOS - -
0032 - F Rel-5 5.3.0 Incorrect Place of the RAB Procedures in Fig. 7 of Section 6.3.2 SP-16 - - S2 S2-24 S2-021256 Withdrawn 2002-06-06 E2EQOS - -
0033 - F Rel-5 5.3.0 Support of RTCP SP-16 - - S2 S2-24 S2-021437 Rejected 2002-06-06 IMS - -
0034 - F Rel-5 5.3.0 Number of media components per PDP Context SP-16 - - S2 S2-24 S2-021505 Revised 2002-06-06 E2EQoS - -
0034 3 F Rel-5 5.3.0 5.4.0 Number of media components per PDP Context SP-16 SP-020315 approved S2 S2-24 S2-0215163 Agreed. 2002-06-06 E2EQoS - -
0035 - F Rel-5 5.4.0 IP address identification for SBLP use for Release 5 - - - S2 S2-25 S2-021658 Revised 2002-09-08 E2EQoS - -
0036 - F Rel-5 5.4.0 Modification of IMS signalling PDP context - - - S2 S2-25 S2-021682 Postponed 2002-09-08 IMS-CCR - -
0036 1 F Rel-5 5.4.0 5.5.0 Modification of IMS Signalling PDP context SP-17 SP-020532 approved S2 S2-26 S2-022542 Agreed 2002-09-08 IMS-CCR - -
0037 - F Rel-5 5.4.0 SBLP Handling and TFT Processing - - - S2 S2-25 S2-021710 Revised 2002-09-08 E2EqoS - -
0037 1 F Rel-5 5.4.0 SBLP Handling and TFT Processing - - - S2 S2-25 S2-021946 Revised 2002-09-08 E2EqoS - -
0037 2 F Rel-5 5.4.0 5.5.0 SBLP Handling and TFT Processing SP-17 SP-020532 approved S2 S2-25 S2-022001 Agreed 2002-09-08 E2EqoS - -
0038 - F Rel-5 5.4.0 Alignment with stage 3 - - - S2 S2-25 S2-021711 Rejected 2002-09-08 E2EqoS - -
0039 - F Rel-5 5.4.0 Policy control procedures on PDP context modification - - - S2 S2-25 S2-021731 Revised 2002-09-08 E2EQoS - -
0039 1 F Rel-5 5.4.0 5.5.0 Policy control procedures on PDP context modification SP-17 SP-020532 approved S2 S2-25 S2-021948 Agreed 2002-09-08 E2EQoS - -
0040 - F Rel-5 5.4.0 Source IP address filtering for Service Based Local Policy - - - S2 S2-25 S2-021959 Revised 2002-09-08 E2EQoS - -
0040 1 F Rel-5 5.4.0 Source IP address filtering for Service Based Local Policy - - - S2 S2-25 S2-022007 Postponed 2002-09-08 E2EQoS - -
0040 2 F Rel-5 5.4.0 Source IP address filtering for Service Based Local Policy - - - S2 S2-26 S2-022571 Revised 2002-09-08 E2EQoS - -
0040 3 F Rel-5 5.4.0 Source IP address filtering for Service Based Local Policy - - - S2 S2-26 S2-022579 Revised 2002-09-08 E2EQoS - -
0040 4 F Rel-5 5.4.0 5.5.0 Source IP address filtering for Service Based Local Policy SP-17 SP-020532 approved S2 S2-26 S2-022620 Agreed 2002-09-08 E2EQoS - -
0041 - F Rel-5 5.4.0 Revoke authorization of GPRS and IP resources - - - S2 S2-26 S2-022111 Revised 2002-09-08 IMS-CCR - -
0041 1 F Rel-5 5.4.0 Revoke authorization of GPRS and IP resources - - - S2 S2-26 S2-022503 Withdrawn 2002-09-08 E2EQos - -
0042 - D Rel-5 5.4.0 23207 changes for Access Independence - - - S2 S2-26 S2-022283 Rejected 2002-09-08 IMS-CCR - -
0043 - F Rel-5 5.4.0 Alignment with stage 3 - editorial improvements - - - S2 S2-26 S2-022291 Revised 2002-09-08 E2EQoS - -
0043 1 F Rel-5 5.4.0 5.5.0 Alignment with stage 3 SP-17 SP-020532 approved S2 S2-26 S2-022504 Agreed 2002-09-08 E2EQoS - -
0044 - F Rel-5 5.4.0 Alignment with stage 3 - DS control over Go - - - S2 S2-26 S2-022292 Revised 2002-09-08 E2EQoS - -
0044 1 F Rel-5 5.4.0 Alignment with stage 3 - DS control over Go - - - S2 S2-26 S2-022576 Rejected 2002-09-08 E2EQoS - -
0044 2 F Rel-5 5.5.0 Alignment with stage 3 - DS control over Go - - - S2 S2-27 S2-022873 Revised 2002-12-09 E2EQos - 2002-12-09
0044 3 F Rel-5 5.5.0 - Alignment with stage 3 - DS control over Go SP-18 SP-020774 revised S2 S2-27 S2-023064 Agreed. 2002-12-09 E2Eqos - 2002-12-09
0044 4 F Rel-5 5.5.0 5.6.0 Alignment with stage 3 - DS control over Go SP-18 SP-020819 approved S2 - - - 2002-12-09 E2Eqos - 2002-12-10
0045 - F Rel-5 5.4.0 5.5.0 Alignment with stage 3- RSVP SP-17 SP-020532 approved S2 S2-26 S2-022293 Agreed 2002-09-08 E2EQoS - -
0046 - F Rel-5 5.5.0 Clarifications on Go interface - - - S2 S2-27 S2-022707 Revised 2002-12-09 IMS-CCR - 2002-12-09
0046 1 F Rel-5 5.5.0 5.6.0 Clarifications on Go interface SP-18 SP-020774 approved S2 S2-27 S2-023060 Agreed 2002-12-09 IMS-CCR - 2002-12-09
0047 - F Rel-5 5.5.0 Clarification on authorization token for SDPless session - - - S2 S2-27 S2-022708 Rejected. 2002-12-09 IMS-CCR - 2002-12-09
0048 - F Rel-5 5.5.0 Consistency of stage 2 - RSVP proxy - - - S2 S2-27 S2-022886 Revised 2002-12-09 E2EQoS - 2002-12-09
0048 - F Rel-5 5.5.0 5.6.0 Consistency of stage 2 - RSVP proxy SP-18 SP-020774 approved S2 S2-27 S2-023065 Agreed. 2002-12-09 E2EqoS - 2002-12-09
0049 - F Rel-5 5.5.0 Mobile IP and Service Based Local Policy interactions - - - S2 S2-28 S2-023285 Revised 2002-12-09 E2EqoS - 2002-12-09
0049 - F Rel-5 5.5.0 5.6.0 Mobile IP and Service Based Local Policy interactions SP-18 SP-020774 approved S2 S2-28 S2-023538 Agreed. 2002-12-09 E2EqoS - 2002-12-09
0049 1 F Rel-5 5.5.0 Mobile IP and Service Based Local Policy interactions - - - S2 S2-27 S2-023066 Rejected 2002-12-09 E2EqoS - 2002-12-09
0050 - - Rel-5 5.5.0 - Clarification of Diffserv functions in 23.207 without Go control SP-18 SP-020774 withdrawn S2 S2-27 S2-023063 Agreed. 2002-12-09 E2Eqos Combined with CR044r4. 2002-12-09
0051 - F Rel-5 5.5.0 5.6.0 PCF to PDF Changes SP-18 SP-020774 approved S2 S2-28 S2-023269 Agreed. 2002-12-09 IMS-CCR - 2002-12-09
0052 - F Rel-5 5.5.0 Definition of QoS Class - - - S2 S2-28 S2-023307 Revised 2002-12-09 E2EqoS - 2002-12-09
0052 1 F Rel-5 5.5.0 - Definition of QoS Class SP-18 SP-020774 withdrawn S2 S2-28 S2-023535 Agreed. 2002-12-09 E2EqoS Combined with CR044r4. 2002-12-09
0054 - B Rel-6 5.6.0 Policy-based control of Diffserv - - - S2 S2-29 S2-030261 Rejected 2003-03-17 E2EQoS - 2003-03-18
0055 - F Rel-5 5.6.0 5.7.0 Removal of editors notes SP-19 SP-030119 approved S2 S2-30 S2-030857 Agreed 2003-03-17 E2EQos - 2003-03-18
0056 - F Rel-5 5.6.0 Handling of IMS signalling information in QoS and PCO IEs at GGSN - - - S2 S2-30 S2-030546 Revised 2003-03-17 IMS-CCR - 2003-03-18
0056 1 F Rel-5 5.6.0 Handling of IMS signalling information in QoS and PCO IEs at GGSN - - - S2 S2-30 S2-030956 Rejected 2003-03-17 IMS-CCR - 2003-03-18
0057 - F Rel-5 5.6.0 Handling of IMS signalling information in QoS and PCO IEs at GGSN - - - S2 S2-31 S2-031444 Revised 2003-06-09 IMS-CCR - 2003-06-08
0057 1 F Rel-5 5.7.0 5.8.0 Handling of IMS signalling information in QoS and PCO IEs at GGSN SP-20 SP-030302 approved S2 S2-31 S2-031482 Agreed 2003-06-09 IMS-CCR - 2003-06-08
0058 - B Rel-6 5.8.0 - Functional additions for the Gq interface - - - S2 S2-33 S2-032532 Revised 2003-09-22 QoS1 - 2003-09-11
0058 1 B Rel-6 5.8.0 - Functional additions for the Gq interface - - - S2 S2-33 S2-032693 Rejected 2003-09-22 QoS1 - 2003-09-11
0059 - B Rel-6 5.8.0 - Updates to signaling flows for the Gq interface - - - S2 S2-33 S2-032533 Rejected 2003-09-22 QoS1 - 2003-09-11
0060 - B Rel-6 5.8.0 - Functional additions for the Gq interface - - - S2 S2-34 S2-033040 Revised 2003-09-22 QoS1 - 2003-09-11
0060 1 B Rel-6 5.8.0 6.0.0 Functional additions for the Gq interface SP-21 SP-030378 approved S2 S2-34 S2-033214 Agreed 2003-09-22 QoS1 - 2003-09-11
0061 - B Rel-6 6.0.0 - Procedures in the AF - - - S2 S2-35 S2-033517 Revised 2003-12-15 QoS1 - 2004-01-05
0061 1 B Rel-6 6.0.0 - Procedures in the AF - - - S2 S2-35 S2-033527 Revised 2003-12-15 QoS1 - 2004-01-05
0061 2 B Rel-6 6.0.0 - Procedures in the AF - - - S2 S2-35 S2-033762 Revised 2003-12-15 QoS1 - 2004-01-05
0061 3 B Rel-6 6.0.0 6.1.0 Procedures in the AF SP-22 SP-030656 approved S2 S2-35 S2-033781 Agreed 2003-12-15 QoS1 - 2004-01-05
0062 - B Rel-6 6.0.0 - Information exchanged via Gq interface - - - S2 S2-35 S2-033518 Revised 2003-12-15 QoS1 - 2004-01-05
0062 1 B Rel-6 6.0.0 6.1.0 Information exchanged via Gq interface SP-22 SP-030656 approved S2 S2-35 S2-033727 Agreed 2003-12-15 QoS1 - 2004-01-05
0063 - B Rel-6 6.0.0 - Procedures in the PDF - - - S2 S2-35 S2-033519 Revised 2003-12-15 QoS1 - 2004-01-05
0063 1 B Rel-6 6.0.0 6.1.0 Procedures in the PDF SP-22 SP-030656 approved S2 S2-35 S2-033728 Agreed 2003-12-15 QoS1 - 2004-01-05
0064 - D Rel-6 6.0.0 6.1.0 Editorial corrections to 23.207 SP-22 SP-030656 approved S2 S2-35 S2-033522 Agreed 2003-12-15 QoS1 - 2004-01-05
0065 - B Rel-6 6.0.0 - Gq-related updates to the signaling flows - - - S2 S2-36 S2-034084 Revised 2003-12-15 QoS1 - 2004-01-05
0065 1 B Rel-6 6.0.0 - Gq-related updates to the signaling flows - - - S2 S2-36 S2-034263 Revised 2003-12-15 QoS1 - 2004-01-05
0065 2 B Rel-6 6.0.0 6.1.0 Gq-related updates to the signaling flows SP-22 SP-030656 approved S2 S2-36 S2-034339 Agreed 2003-12-15 QoS1 - 2004-01-05
0066 - C Rel-6 6.0.0 - Requirements for IM CN Subsystem signalling flag - - - S2 S2-36 S2-034192 Revised 2003-12-15 IMS2 - 2004-01-05
0066 1 B Rel-6 6.0.0 - Requirements for IM CN Subsystem signalling flag - - - S2 S2-36 S2-034304 Revised 2003-12-15 IMS2 - 2004-01-05
0066 2 B Rel-6 6.0.0 - Requirements for IM CN Subsystem signalling flag - - - S2 S2-36 S2-034331 Revised 2003-12-15 IMS2 - 2004-01-05
0066 3 B Rel-6 6.0.0 6.1.0 Requirements for IM CN Subsystem signalling flag SP-22 SP-030656 approved S2 S2-36 S2-034380 Agreed 2003-12-15 IMS2 - 2004-01-05
0067 - F Rel-6 6.0.0 6.1.0 Defintion of the Application Function SP-22 SP-030656 approved S2 S2-36 S2-034261 Agreed 2003-12-15 QoS1 - 2004-01-05
0068 - B Rel-6 6.1.0 - Mapping amendment to PDF procedures - - - S2 S2-37 S2-040276 Postponed 2004-03-15 QoS1 - 2004-03-05
0068 1 B Rel-6 6.1.1 6.2.0 Mapping amendment to PDF procedures SP-23 SP-040035 approved S2 S2-38 S2-040802 Agreed 2004-03-15 QoS1 - 2004-03-05
0069 - B Rel-6 6.1.0 - Mapping amendment to AF procedures - - - S2 S2-37 S2-040277 Revised 2004-03-15 QoS1 - 2004-03-05
0069 1 B Rel-6 6.1.0 - Mapping amendment to AF procedures - - - S2 S2-37 S2-040394 Revised 2004-03-15 QoS1 - 2004-03-05
0069 2 B Rel-6 6.1.1 6.2.0 Mapping amendment to AF procedures SP-23 SP-040035 approved S2 S2-38 S2-040803 Agreed 2004-03-15 QoS1 - 2004-03-05
0070 - B Rel-6 6.1.0 - Service information update in Gq - - - S2 S2-37 S2-040278 Revised 2004-03-15 QoS1 - 2004-03-05
0070 1 B Rel-6 6.1.0 - Service information update in Gq - - - S2 S2-37 S2-040395 Postponed 2004-03-15 QoS1 - 2004-03-05
0071 - B Rel-6 6.1.0 - Session description on Gq upon Authorization of QoS resources. - - - S2 S2-37 S2-040308 Withdrawn 2004-03-15 QoS1 - 2004-03-05
0072 - F Rel-5 5.8.0 - Update Authorization Procedure - - - S2 S2-38 S2-040786 Revised 2004-03-15 E2EQoS - 2004-03-05
0072 1 F Rel-5 5.8.0 5.9.0 Update Authorization Procedure SP-23 SP-040035 approved S2 S2-38 S2-040999 Agreed 2004-03-15 E2EQoS - 2004-03-05
0073 - B Rel-6 6.1.1 - SBLP implications of bundling different IMS sessions to the same PDP Context - - - S2 S2-38 S2-040795 Revised 2004-03-15 QoS1, IMS2 - 2004-03-05
0073 1 B Rel-6 6.1.1 6.2.0 SBLP implications of bundling different IMS sessions to the same PDP Context SP-23 SP-040035 approved S2 S2-38 S2-040951 Agreed 2004-03-15 QoS1, IMS2 - 2004-03-05
0074 - B Rel-6 6.1.1 - Update of Authorization on Gq - - - S2 S2-38 S2-040800 Revised 2004-03-15 QoS1 - 2004-03-05
0074 1 B Rel-6 6.1.1 6.2.0 Update of Authorization on Gq SP-23 SP-040035 approved S2 S2-38 S2-040996 Agreed 2004-03-15 QoS1 - 2004-03-05
0075 - B Rel-6 6.1.1 - Service information - - - S2 S2-38 S2-040801 Revised 2004-03-15 QoS1 - 2004-03-05
0075 1 B Rel-6 6.1.1 6.2.0 Service information SP-23 SP-040035 approved S2 S2-38 S2-040997 Agreed 2004-03-15 QoS1 - 2004-03-05
0076 - B Rel-6 6.2.0 - for introduction of an Enhancement for E2E QoS - - - - S2-39 S2-041334 Rejected 2004-08-06 QoS1 - 2004-06-01
0077 - B Rel-6 6.2.0 - Authorisation Reject Procedure by the PDF - - - - S2-39 S2-041422 Revised 2004-08-06 QoS1 - 2004-06-01
0077 1 B Rel-6 6.2.0 - Authorisation Reject Procedure by the PDF - - - - S2-39 S2-041475 Revised 2004-08-06 QoS1 - 2004-06-01
0077 2 B Rel-6 6.2.0 - Authorisation Reject Procedure by the PDF - - - - S2-39 S2-041490 Revised 2004-08-06 QoS1 - 2004-06-01
0077 3 B Rel-6 6.2.0 6.3.0 Authorisation Reject Procedure by the PDF SP-24 SP-040317 approved S2 S2-39 S2-041625 Agreed 2004-08-06 QoS1 - 2004-06-01
0078 - B Rel-6 6.2.0 - New Session Verification Procedure on Gq - - - - S2-39 S2-041423 Revised 2004-08-06 QoS1 - 2004-06-01
0078 1 B Rel-6 6.2.0 - New Session Verification Procedure on Gq - - - - S2-39 S2-041476 Revised 2004-08-06 QoS1 - 2004-06-01
0078 2 B Rel-6 6.2.0 - New Session Verification Procedure on Gq - - - - S2-39 S2-041491 Rejected 2004-08-06 QoS1 - 2004-06-01
0079 - F Rel-6 6.2.0 - AF capabilities - - - - S2-39 S2-041438 Revised 2004-08-06 QoS1 - 2004-06-01
0079 1 F Rel-6 6.2.0 6.3.0 AF capabilities SP-24 SP-040317 approved S2 S2-39 S2-041492 Agreed 2004-08-06 QoS1 - 2004-06-01
0080 - F Rel-6 6.2.0 - General Corrections - - - - S2-39 S2-041439 Revised 2004-08-06 QoS1 - 2004-06-01
0080 1 F Rel-6 6.2.0 - General Corrections - - - - S2-39 S2-041493 Revised 2004-08-06 QoS1 - 2004-06-01
0080 2 B Rel-6 6.2.0 6.3.0 General corrections SP-24 SP-040317 approved S2 S2-40 S2-042119 Agreed 2004-08-06 QoS1 - 2004-06-01
0081 - F Rel-6 6.2.0 - Intra-domain Gq for IMS - - - - S2-39 S2-041374 Revised 2004-08-06 QoS1 - 2004-06-01
0081 1 F Rel-6 6.2.0 6.3.0 Intra-domain Gq for IMS SP-24 SP-040317 approved S2 S2-39 S2-041489 Agreed 2004-08-06 QoS1 - 2004-06-01
0082 - B Rel-6 6.2.0 - for enhancement to PDF and GGSN for e2e Qos - - - - S2-40 S2-042066 Rejected 2004-08-06 QoS1 - 2004-06-01
0083 - B Rel-6 6.2.0 6.3.0 Condition for update authorization procedure SP-24 SP-040317 approved S2 S2-40 S2-042120 Agreed 2004-08-06 QoS1 - 2004-06-01
0084 - F Rel-6 6.3.0 - SBLP and non-realtime PDP Contexts - - - S2 S2-41 S2-042706 Revised 2004-09-13 IMS2, QoS1 - 2004-09-08
0084 1 F Rel-6 6.3.0 6.4.0 SBLP and non-realtime PDP Contexts SP-25 SP-040521 approved S2 S2-41 S2-042844 Agreed 2004-09-13 IMS2, QoS1 - 2004-09-08
0085 - F Rel-6 6.3.0 6.4.0 Generation of multiple tokens SP-25 SP-040521 approved S2 S2-41 S2-042708 Agreed 2004-09-13 QoS1 - 2004-09-08
0086 - B Rel-6 6.4.0 - Add a definition of SLA - - - ZTE S2-43 S2-043528 rejected 2004-11-19 E2E - 2004-12-09
0087 - F Rel-6 6.4.0 6.5.0 Update of binding information handling SP-28 SP-050337 approved Siemens S2-46 S2-051275 agreed 2005-05-04 TEI-6 - 2005-06-03
0088 - F Rel-6 6.5.0 - Correction of reference to non-existent/obsolete document - - - Motorola S2-48 S2-051948 revised 2005-08-24 TEI6 - 2005-06-03
0088 1 A Rel-6 6.5.0 6.6.0 Correction of reference to non-existent/obsolete document SP-29 SP-050474 approved Motorola S2-48 S2-052351 agreed 2005-09-08 TEI-5 - 2005-06-03
0089 - F Rel-5 5.9.0 5.10.0 Correction of reference to non-existent/obsolete document SP-29 SP-050474 approved Motorola S2-48 S2-052352 agreed 2005-09-08 TEI-5 - 2005-06-03
0090 - F Rel-5 5.10.0 - Correction of reference to “End-to-end Quality of Service (QoS) concept and architecture” TS - - - OKI Electric Industry Co., Ltd. S2-49 S2-052506 rejected 2005-10-26 SRSES - 2005-06-03
0091 - A Rel-6 6.6.0 - Correction of reference to “End-to-end Quality of Service (QoS) concept and architecture” TS - - - OKI Electric Industry Co., Ltd. S2-49 S2-052507 rejected 2005-10-26 SRSES - 2005-06-03
0092 - B Rel-7 6.6.0 - Rel-7 version of TS 23.207 main body - - - Ericsson S2-56 S2-070181 rejected 2007-01-08 PCC For e-mail approval. Noted 2005-06-03
0092 1 B Rel-7 6.6.0 - Rel-7 version of TS 23.207 main body - - - - S2-56c S2-071344 revised 2007-03-21 PCC Revised in S2-071494 2007-06-05
0092 2 B Rel-7 6.6.0 - Rel-7 version of TS 23.207 main body - - - - S2-56c S2-071494 revised 2007-04-03 PCC Withdrawn at S2-56c. Revised version provided in S2-57 in S2-071903 2007-06-05
0092 3 B Rel-7 6.6.0 - Rel-7 version of TS 23.207 main body - - - - S2-57 S2-071903 revised 2007-04-18 PCC revised in S2-072080 2007-06-05
0092 4 B Rel-7 6.6.0 - Rel-7 version of TS 23.207 main body - - - - S2-57 S2-072080 revised 2007-04-24 PCC For e-mail approval. Revised in S2-072280 2007-06-05
0092 5 B Rel-7 6.6.0 7.0.0 Rel-7 version of TS 23.207 main body SP-36 SP-070392 approved S2 S2-57 S2-072280 agreed 2007-05-15 PCC e-mail approved 2007-06-05
0093 - F Rel-11 10.0.0 - Reference list correction to align with the corrected TS 29.212 title SP-57 SP-120474 revised Allot Communications, Vodafone, Juniper Networks - - - 2012-08-16 TEI11 - 2012-08-16
0093 1 F Rel-11 10.0.0 11.0.0 Reference list correction to align with the corrected TS 29.212 title SP-57 SP-120627 approved Allot Communications, Vodafone, Juniper Networks - - - 2012-09-06 TEI11 - 2012-09-09

page generated from database: 2013-10-16 10:33:20