3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 23.278

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - F Rel-5 5.0.0 Correction and improvement in the overall SDL architecture - - - N2 N2-26 N2-020825 revised 2002-04-03 IMS-CAMEL - 2002-11-29
0001 1 F Rel-5 5.0.0 Correction and improvement in the overall SDL architecture - - - N2 N2-26 N2-020917 revised 2002-04-03 IMS-CAMEL - 2002-11-29
0001 2 F Rel-5 5.0.0 5.1.0 Correction and improvement in the overall SDL architecture NP-18 NP-020530 approved N2 N2-26 N2-020941 agreed 2002-04-03 IMS-CAMEL - 2002-11-29
0002 - F Rel-5 5.0.0 5.1.0 Correction and improvement in the registration procedures NP-18 NP-020530 approved N2 N2-26 N2-020826 agreed 2002-04-03 IMS-CAMEL - 2002-11-29
0003 - F Rel-5 5.0.0 Correction and improvement in MO procedures - - - N2 N2-26 N2-020827 revised 2002-09-16 IMS-CAMEL - 2002-11-29
0003 1 F Rel-5 5.0.0 Correction and improvement in MO procedures - - - N2 N2-27 N2-020962 revised 2002-09-16 IMS-CAMEL - 2002-11-29
0003 2 F Rel-5 5.0.0 5.1.0 Correction and improvement in MO procedures NP-18 NP-020532 approved N2 N2-27 N2-021049 agreed 2002-09-16 IMS-CAMEL - 2002-11-29
0004 - F Rel-5 5.0.0 Correction and improvement in MT procedures - - - N2 N2-26 N2-020828 revised 2002-09-16 IMS-CAMEL - 2002-11-29
0004 1 F Rel-5 5.0.0 Correction and improvement in MT procedures - - - N2 N2-27 N2-020963 revised 2002-09-16 IMS-CAMEL - 2002-11-29
0004 2 F Rel-5 5.0.0 Correction and improvement in MT procedures - - - N2 N2-27 N2-021050 revised 2002-09-16 IMS-CAMEL - 2002-11-29
0004 3 F Rel-5 5.0.0 5.1.0 Correction and improvement in MT procedures NP-18 NP-020532 approved N2 N2-27 N2-021091 agreed 2002-09-16 IMS-CAMEL - 2002-11-29
0005 - F Rel-5 5.0.0 5.1.0 Correction and improvement in CSI update NP-18 NP-020530 approved N2 N2-26 N2-020829 agreed 2002-09-16 IMS-CAMEL - 2002-11-29
0006 - F Rel-5 5.0.0 5.1.0 Clarification in the case multiple RRBs are sent for a DP NP-18 NP-020530 approved N2 N2-26 N2-020830 agreed 2002-09-16 IMS-CAMEL - 2002-11-29
0007 - F Rel-5 5.0.0 Inconsistent description on ACR: time information - - - N2 N2-26 N2-020831 revised 2002-09-16 IMS-CAMEL - 2002-11-29
0007 1 F Rel-5 5.0.0 5.1.0 Inconsistent description on ACR: time information NP-18 NP-020530 approved N2 N2-26 N2-020945 agreed 2002-09-16 IMS-CAMEL - 2002-11-29
0008 - F Rel-5 5.0.0 5.1.0 Remove support of SCI operation from imcnSSF SDL process NP-18 NP-020530 approved N2 N2-26 N2-020865 agreed 2002-09-17 IMS-CAMEL - 2002-11-29
0009 - F Rel-5 5.0.0 5.1.0 Removal of ETC processing from IM-SSF SDL Procedures NP-18 NP-020530 approved N2 N2-26 N2-020866 agreed 2002-09-17 IMS-CAMEL - 2002-11-29
0010 - F Rel-5 5.0.0 Correction of InitialDP MediaType parameter - - - N2 N2-26 N2-020868 revised 2002-09-17 IMS-CAMEL - 2002-11-29
0010 1 F Rel-5 5.0.0 5.1.0 Correction of InitialDP MediaType parameter NP-18 NP-020530 approved N2 N2-26 N2-020933 agreed 2002-09-17 IMS-CAMEL - 2002-11-29
0011 - F Rel-5 5.0.0 SDL Procedure for Connect To Resource - - - N2 N2-26 N2-020870 withdrawn 2002-09-17 IMS-CAMEL - 2002-11-29
0012 - F Rel-5 5.0.0 IF Description for gsmSRF-related operations for IMS - - - N2 N2-26 N2-020891 postponed 2002-09-18 IMS-CAMEL - 2002-11-29
0012 1 F Rel-5 5.0.0 5.1.0 IF Description for gsmSRF-related operations for IMS NP-18 NP-020532 approved N2 N2-27 N2-021047 agreed 2002-09-18 IMS-CAMEL - 2002-11-29
0013 - F Rel-5 5.0.0 Explanatory text to SDL architecture - - - N2 N2-27 N2-020964 withdrawn 2002-10-26 IMS-CAMEL - 2002-11-29
0014 - D Rel-5 5.0.0 5.1.0 Figure and table numbers NP-18 NP-020529 approved N2 N2-27 N2-020965 agreed 2002-10-26 IMS-CAMEL - 2002-11-29
0015 - D Rel-5 5.0.0 5.1.0 For better document structure NP-18 NP-020531 approved N2 N2-27 N2-020966 agreed 2002-10-26 IMS-CAMEL - 2002-11-29
0016 - D Rel-5 5.0.0 5.1.0 Editorial improvement - clause 2 NP-18 NP-020531 approved N2 N2-27 N2-020967 agreed 2002-10-26 IMS-CAMEL - 2002-11-29
0017 - D Rel-5 5.0.0 5.1.0 Editorial improvement - clause 3 NP-18 NP-020531 approved N2 N2-27 N2-020968 agreed 2002-10-26 IMS-CAMEL - 2002-11-29
0018 - D Rel-5 5.0.0 5.1.0 Editorial improvement - clause 4 NP-18 NP-020531 approved N2 N2-27 N2-020969 agreed 2002-10-26 IMS-CAMEL - 2002-11-29
0019 - D Rel-5 5.0.0 5.1.0 Editorial improvement - clause 5 NP-18 NP-020531 approved N2 N2-27 N2-020970 agreed 2002-10-26 IMS-CAMEL - 2002-11-29
0020 - D Rel-5 5.0.0 5.1.0 Editorial improvement - clause 6 NP-18 NP-020531 approved N2 N2-27 N2-020971 agreed 2002-10-26 IMS-CAMEL - 2002-11-29
0021 - D Rel-5 5.0.0 5.1.0 Editorial improvement - clause 7 NP-18 NP-020531 approved N2 N2-27 N2-020972 agreed 2002-10-26 IMS-CAMEL - 2002-11-29
0022 - F Rel-5 5.0.0 5.1.0 SDL Procedure for Connect To Resource NP-18 NP-020532 approved N2 N2-27 N2-020987 agreed 2002-10-28 IMS-CAMEL - 2002-11-29
0023 - F Rel-5 5.0.0 Stage 2 specifications for Call Gap for IMS - - - N2 N2-27 N2-020996 revised 2002-10-29 IMS-CAMEL - 2002-11-29
0023 1 F Rel-5 5.0.0 5.1.0 Stage 2 specifications for Call Gap for IMS NP-18 NP-020532 approved N2 N2-27 N2-021051 agreed 2002-10-29 IMS-CAMEL - 2002-11-29
0024 - F Rel-5 5.0.0 Clarification of DP destination number trigger criteria for IMS - - - N2 N2-27 N2-020997 revised 2002-10-29 IMS-CAMEL - 2002-11-29
0024 1 F Rel-5 5.0.0 Clarification of DP destination number trigger criteria for IMS - - - N2 N2-27 N2-021052 revised 2002-10-29 IMS-CAMEL - 2002-11-29
0024 2 F Rel-5 5.0.0 5.1.0 Clarification of DP destination number trigger criteria for IMS NP-18 NP-020532 approved N2 N2-27 N2-021090 agreed 2002-10-29 IMS-CAMEL - 2002-11-29
0025 - F Rel-5 5.0.0 5.1.0 Number comparison for D-CSI NP-18 NP-020532 approved N2 N2-27 N2-021039 agreed 2002-11-11 IMS-CAMEL - 2002-11-29
0026 - F Rel-5 5.0.0 5.1.0 Correction to dialled services criteria NP-18 NP-020532 approved N2 N2-26 N2-021059 agreed 2002-11-13 IMS-CAMEL - 2002-11-29
0027 - F Rel-5 5.1.0 Implementing of Connect to Resource handling in CAMEL for IMS - - - N2 N2-28 N2-030033 revised 2003-01-28 IMS-CAMEL - 2003-03-07
0027 1 F Rel-5 5.1.0 5.2.0 Implementing of Connect to Resource handling in CAMEL for IMS NP-19 NP-030090 approved N2 N2-28 N2-030150 agreed 2003-01-28 IMS-CAMEL - 2003-03-07
0028 - F Rel-5 5.1.0 Introduction of ResetTimer input in state WFI-DS (IMS) - - - N2 N2-28 N2-030060 revised 2003-01-30 IMS-CAMEL - 2003-03-07
0028 1 F Rel-5 5.1.0 5.2.0 Introduction of ResetTimer input in state WFI-DS (IMS) NP-19 NP-030090 approved N2 N2-28 N2-030124 agreed 2003-01-30 IMS-CAMEL - 2003-03-07
0029 - F Rel-5 5.1.0 5.2.0 Correction of imcnSSF procedure names NP-19 NP-030090 approved N2 N2-28 N2-030079 agreed 2003-01-30 IMS-CAMEL - 2003-03-07
0030 - F Rel-5 5.1.0 5.2.0 Incorrect procedure names used for CAMEL_MT_CTR and CAMEL_MO_CTR NP-19 NP-030090 approved N2 N2-28 N2-030080 agreed 2003-01-30 IMS-CAMEL - 2003-03-07
0031 - F Rel-5 5.1.0 5.2.0 Incorrect procedures called in CAMEL_IMCN_MT_ANSWER NP-19 NP-030090 approved N2 N2-28 N2-030081 agreed 2003-01-30 IMS-CAMEL - 2003-03-07
0032 - F Rel-5 5.1.0 5.2.0 Sending of provisional response for the INVITE NP-19 NP-030091 approved N2 N2-28 N2-030082 agreed 2003-01-30 IMS-CAMEL - 2003-03-07
0033 - F Rel-5 5.1.0 5.2.0 Incorrect SIP response when no CAMEL is invoked NP-19 NP-030091 approved N2 N2-28 N2-030083 agreed 2003-01-30 IMS-CAMEL - 2003-03-07
0034 - F Rel-5 5.1.0 Incorrect references to MSC in the IF descriptions for IMS - - - N2 N2-28 N2-030084 withdrawn 2003-01-30 IMS-CAMEL - 2003-03-07
0035 - F Rel-5 5.1.0 Corrections in CAMEL_IMCN_MO_ANSWER - - - N2 N2-28 N2-030085 revised 2003-01-30 IMS-CAMEL - 2003-03-07
0035 1 F Rel-5 5.1.0 5.2.0 Corrections in CAMEL_IMCN_MO_ANSWER NP-19 NP-030091 approved N2 N2-28 N2-030143 agreed 2003-01-30 IMS-CAMEL - 2003-03-07
0036 - F Rel-5 5.1.0 5.2.0 Corrections in the procedures for handling failure SIP response NP-19 NP-030091 approved N2 N2-28 N2-030086 agreed 2003-01-30 IMS-CAMEL - 2003-03-07
0037 - F Rel-5 5.1.0 Procedure for DisconnectForwardConnection - - - N2 N2-28 N2-030088 withdrawn 2003-01-30 IMS-CAMEL - 2003-03-07
0038 - F Rel-5 5.1.0 Clarification of the use of gsmSRF CAP operations for IM-SSF - - - N2 N2-28 N2-030089 withdrawn 2003-01-30 IMS-CAMEL - 2003-03-07
0039 - F Rel-5 5.1.0 5.2.0 Inconsistency in Call Information Report in Re-Connect Case NP-19 NP-030091 approved N2 N2-28 N2-030155 agreed 2003-02-13 IMS-CAMEL - 2003-03-07
0040 - F Rel-5 5.2.0 Incorrect list of TDPs listed for O-IM-CSI - - - N2 N2-28 N2-030260 revised 2003-05-07 IMS-CAMEL - 2003-06-04
0040 1 F Rel-5 5.2.0 5.3.0 Incorrect list of TDPs listed for O-IM-CSI NP-20 NP-030191 approved N2 N2-28 N2-030302 agreed 2003-05-07 IMS-CAMEL - 2003-06-04
0041 - F Rel-5 5.2.0 5.3.0 Corrections to process IM_SSF NP-20 NP-030191 approved N2 N2-28 N2-030261 agreed 2003-05-07 IMS-CAMEL - 2003-06-04
0042 - F Rel-5 5.2.0 5.3.0 Redundant check for Final_Response_Received in Disconnect procedures. NP-20 NP-030191 approved N2 N2-28 N2-030262 agreed 2003-05-07 IMS-CAMEL - 2003-06-04
0043 - F Rel-5 5.2.0 Incorrect handling of failure SIP response for MT - - - N2 N2-28 N2-030263 postponed 2003-05-07 IMS-CAMEL - 2003-06-04
0043 1 F Rel-5 5.3.0 - Incorrect handling of failure SIP response for MT - - - N2 N2-30 N2-030369 revised 2003-05-07 IMS-CAMEL 0 2003-09-13
0043 2 F Rel-5 5.3.0 5.4.0 Incorrect handling of failure SIP response for MT NP-21 NP-030374 approved N2 N2-30 N2-030438 agreed 2003-05-07 IMS-CAMEL 0 2003-09-13
0044 - F Rel-5 5.3.0 - Setting of Timers not specified for IMSSF process - - - N2 N2-30 N2-030370 revised 2003-08-11 IMS-CAMEL 0 2003-09-13
0044 1 F Rel-5 5.3.0 - Setting of Timers not specified for IMSSF process - - - N2 N2-30 N2-030440 revised 2003-08-11 IMS-CAMEL 0 2003-09-13
0044 2 F Rel-5 5.3.0 5.4.0 Setting of Timers not specified for IMSSF process NP-21 NP-030374 approved N2 N2-30 N2-030465 agreed 2003-08-11 IMS-CAMEL 0 2003-09-13
0045 - F Rel-5 5.3.0 - Incorrect handling of failure SIP response for MO - - - N2 N2-30 N2-030439 revised 2003-08-26 IMS-CAMEL 0 2003-09-13
0045 1 F Rel-5 5.3.0 5.4.0 Incorrect handling of failure SIP response for MO NP-21 NP-030374 approved N2 N2-30 N2-030443 agreed 2003-08-26 IMS-CAMEL 0 2003-09-13
0046 - F Rel-5 5.4.0 - Correction to the definition of interfaces for the IM-SSF - - - N2 N2-30 N2-030534 revised 2003-10-16 IMS-CAMEL - 2004-01-05
0046 1 F Rel-5 5.4.0 5.5.0 Correction to the definition of interfaces for the IM-SSF NP-22 NP-030525 approved N2 N2-30 N2-030565 agreed 2003-10-16 IMS-CAMEL - 2004-01-05
0047 - F Rel-5 5.5.0 5.6.0 Correction of Check_Criteria Procedure names referenced in Process imcnSSF NP-25 NP-040397 approved N4 N4-24 N4-040939 agreed 2004-07-27 CAMEL4 - 2004-09-03
0048 1 F Rel-6 6.0.0 6.1.0 Removal of references to HLR for CAMEL control of IMS CP-28 CP-050097 APPROVED C4 C4-27 C4-050788 AGREED 2005-04-26 TEI6 - 2005-06-07
0049 - F Rel-6 6.1.0 - Incorrect References CP-30 CP-050621 withdrawn C4 C4-29 C4-051465 AGREED 2005-10-18 TEI6 - 2005-11-29
0049 - F Rel-6 6.1.0 6.2.0 Incorrect References CP-30 CP-050665 approved Lucent Tec - C4-051465 - 2005-10-19 TEI6 - 2005-11-30
0050 - F Rel-7 7.0.0 7.1.0 Specification of gsmSCF Address format in AnyTime request messages CP-31 CP-060082 approved C4 C4-060130 C4-30 AGREED 2006-01-30 TEI7 - 2006-03-02
0051 - F Rel-11 .. - MSISDN as Subscriber Identity in MAP ATSI Request - - - C4 C4-54b C4-112374 Withdrawn 2011-11-28 TEI11 - 2011-11-28
0052 - F Rel-11 10.0.0 - Mapping of SIP Responses code and Camel Detection Points - - - C4 C4-58 C4-121490 Revised 2012-09-05 TEI11 - 2012-09-05
0052 1 F Rel-11 10.0.0 11.0.0 Mapping of SIP Responses code and Camel Detection Points CP-57 CP-120467 approved C4 C4-58 C4-121663 Agreed 2012-09-05 TEI11 - 2012-09-05

page generated from database: 2013-10-16 10:33:23