Go to spec numbering scheme page
3GPP TS 24.206 (click spec number to see fileserver directory for this spec)
Voice call continuity between Circuit Switched (CS) and IP Multimedia Subsystem (IMS); Stage 3
.
TSG / WG responsible: C1 (click TSG/WG to see its home page)
Work item which gave rise to this spec:  -  (click WI code to see Work Item details in the Work Plan)
Work items which may have impacted this spec:  click here
Rapporteur: DRAGE, Keith Specification required for: GERAN-based systems and UTRAN- and E-UTRAN-based systems In the table below ... ... click meeting number for meeting details; ... click spec version number to download that version; ... click SDO publication reference to download SDO transposed document. event version available remarks draft 0.1.0 - - 2005-11-07 - C1-b0b 2006-01-24 - 2006-02-21 - 2006-05-29 - C1-43b 2006-07-10 - draft 2006-09-07 - draft 2006-09-12 - 2006-10-10 CP-060449 - draft 2006-11-25 - 2006-12-03 CP-060653 - 2006-12-08 - 2007-01-11 Fixes problem will illegible Visio figures. 2007-03-20 2007-06-20 2007-09-25 2007-12-14 2008-06-06
Release
Freeze meeting
Freeze date
::
remarks
SDO publications
Rel-7
SP-26
2004-12-16
::
No upgrade to Rel-8 due to change of approach to VCC. .
ETSI
click ref to download
Change Requests for this spec: click here.
Genealogy of this spec:
antecedent(s) | this spec | descendant(s) |
23.806 |
24.206 | (no descendants) |
page generated from database: 2013-10-16 10:25:59