3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 24.216

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - F Rel-7 7.0.0 - Corrections to parameters in 24.216 - - - - C1-46 C1-070748 Revised 2007-05-29 VCC - 2007-05-29
0001 1 F Rel-7 7.0.0 7.1.0 Corrections to parameters in 24.216 CP-36 CP-070377 approved C1 C1-46 C1-070942 Agreed 2007-05-29 VCC - 2007-05-29
0002 - F Rel-7 7.0.0 - Introduction of operator policies - - - - C1-47 C1-071117 Revised 2007-05-29 VCC - 2007-05-29
0002 1 F Rel-7 7.0.0 7.1.0 Introduction of operator policies CP-36 CP-070377 approved C1 C1-47 C1-071341 Agreed 2007-05-29 VCC - 2007-05-29
0003 - F Rel-7 7.1.0 7.2.0 Editorial modification of the CC object CP-37 CP-070593 approved C1 C1-48 C1-071541 Agreed 2007-09-07 VCC - 2007-09-07
0004 - F Rel-7 7.1.0 - Addition of policy to control UE behaviour for a 2nd call when an existing call is already ongoing - - - C1 C1-48 C1-071819 Postponed 2007-09-07 VCC - 2007-09-07
0006 - B Rel-7 7.2.0 - Introduction of STI and STN in SC MO - - - - C1-56 C1-084699 revised 2008-11-27 IMS-Cont - 2008-11-27
0006 1 B Rel-8 7.2.0 - Introduction of STI and STN in SC MO CP-42 CP-080842 rejected C1 C1-56 C1-085240 agreed 2008-11-27 IMS-Cont replaced by CR9 2008-11-27
0007 - B Rel-7 7.2.0 - IMS SC Operator Policy coding - - - - C1-56 C1-084701 revised 2008-11-27 IMS-Cont - 2008-11-27
0007 1 B Rel-8 7.2.0 - IMS SC Operator Policy coding CP-42 CP-080842 rejected C1 C1-56 C1-085241 agreed 2008-11-27 IMS-Cont replaced by CR9 2008-11-27
0008 - F Rel-7 7.2.0 7.3.0 CC MO URN CP-42 CP-080874 approved C1 C1-56 C1-085083 agreed 2008-11-27 VCC - 2008-11-27
0009 - B Rel-8 7.2.0 8.0.0 Introduction of STI, STN in SC MO and IMS SC Operator Policy coding CP-42 CP-080968 approved C1 - - - 2008-04-12 IMS-Cont - 2008-12-06
0010 - F Rel-7 7.3.0 - MO editorial revision - - - - C1-57 C1-090007 revised 2009-02-26 VCC - 2009-02-26
0010 1 F Rel-7 7.3.0 7.4.0 MO syntax correction CP-43 CP-090119 approved C1 C1-57 C1-091021 agreed 2009-02-26 VCC - 2009-02-26
0011 - A Rel-8 8.0.0 - MO editorial revision - - - - C1-57 C1-090008 revised 2009-02-26 VCC - 2009-02-26
0011 1 A Rel-8 8.0.0 8.1.0 MO syntax correction CP-43 CP-090119 approved C1 C1-57 C1-091022 agreed 2009-02-26 VCC - 2009-02-26
0012 - F Rel-8 8.0.0 - IMS SC Operator Policy coding - - - - C1-57 C1-090177 revised 2009-02-26 IMS-Cont - 2009-02-26
0012 1 F Rel-8 8.0.0 8.1.0 IMS SC Operator Policy coding CP-43 CP-090147 approved C1 C1-57 C1-090917 agreed 2009-02-26 IMS-Cont - 2009-02-26
0013 - F Rel-7 7.3.0 7.4.0 MO DDF XML bug fix CP-43 CP-090119 approved C1 C1-57 C1-090290 agreed 2009-02-26 VCC - 2009-02-26
0014 - A Rel-8 8.0.0 8.1.0 MO DDF XML bug fix CP-43 CP-090119 approved C1 C1-57 C1-090291 agreed 2009-02-26 VCC - 2009-02-26
0015 - F Rel-8 8.0.0 - Add STN-SR to SC MO - - - - C1-57 C1-090391 - 2009-02-26 IMS-Cont - 2009-02-26
0016 - F Rel-8 8.1.0 - Alignment with stage 2 - - - - C1-59 C1-092469 revised 2009-09-11 IMS-Cont - 2009-09-11
0016 1 F Rel-8 8.1.0 - Alignment with stage 2 - - - - C1-59 C1-092943 revised 2009-09-11 IMS-Cont - 2009-09-11
0016 2 F Rel-8 8.1.0 8.2.0 Alignment with stage 2 CP-45 CP-090669 approved C1 C1-59 C1-093020 agreed 2009-09-11 IMS-Cont - 2009-09-11
0017 - F Rel-8 8.1.0 - AS behaviour in case no P-Asserted-Identity - - - - C1-60 C1-093270 revised 2009-09-11 REDOC_TIS-C1 - 2009-09-11
0018 - F Rel-8 8.2.0 - Addition of SC_Enabled and SC_Domain leaf nodes for enabling communication continuity - - - - C1-62 C1-095242 withdrawn 2009-11-18 IMS-Cont - 2009-11-18
0019 - F Rel-9 9.0.0 9.1.0 Inter UE Transfer SCC AS URI CP-47 CP-100142 approved C1 C1-63 C1-100706 agreed 2010-03-08 IMS_SCC-SPI - 2010-03-08
0020 - F Rel-8 8.2.0 - Update scope of TS to correctly cover functionality specified - - - - C1-64 C1-101608 revised 2010-05-28 IMS-Cont - 2010-05-28
0020 1 F Rel-8 8.2.0 8.3.0 Update scope of TS to correctly cover functionality specified CP-48 CP-100344 approved C1 C1-64 C1-101897 agreed 2010-05-28 IMS-Cont - 2010-05-28
0021 - A Rel-9 9.1.0 - Update scope of TS to correctly cover functionality specified - - - - C1-64 C1-101609 revised 2010-05-28 IMS-Cont - 2010-05-28
0021 1 A Rel-9 9.1.0 9.2.0 Update scope of TS to correctly cover functionality specified CP-48 CP-100344 approved C1 C1-64 C1-101898 agreed 2010-05-28 IMS-Cont - 2010-05-28
0022 - F Rel-8 8.3.0 - Correcting DDF of Communication Continuity MO - - - - C1-65 C1-102202 revised 2010-09-07 TEI8 - 2010-09-07
0022 1 F Rel-8 8.3.0 8.4.0 Correcting DDF of Communication Continuity MO CP-49 CP-100493 approved C1 C1-65 C1-102697 agreed 2010-09-07 IMS-Cont - 2010-09-07
0023 - A Rel-9 9.2.0 - Correcting DDF of communication continuity MO - - - - C1-65 C1-102203 revised 2010-09-07 TEI8 - 2010-09-07
0023 1 A Rel-9 9.2.0 9.3.0 Correcting DDF of communication continuity MO CP-49 CP-100493 approved C1 C1-65 C1-102698 agreed 2010-09-07 IMS-Cont - 2010-09-07
0024 - F Rel-8 8.3.0 - Clarification of handling of domain selection for subsequent calls - - - - C1-65 C1-102285 withdrawn 2010-09-07 IMS-Cont - 2010-09-07
0025 - A Rel-9 9.2.0 - Clarification of handling of domain selection for subsequent calls - - - - C1-65 C1-102286 revised 2010-09-07 IMS-Cont - 2010-09-07
0025 1 F Rel-10 9.2.0 - Clarification of handling of domain selection for subsequent calls - - - - C1-65 C1-102558 revised 2010-09-07 TEI10 - 2010-09-07
0025 2 F Rel-10 9.2.0 - Clarification of handling of domain selection for subsequent calls - - - - C1-65 C1-102841 revised 2010-09-07 TEI10 - 2010-09-07
0025 3 F Rel-10 9.2.0 - Clarification of handling of domain selection for subsequent calls - - - - C1-65 C1-102875 revised 2010-09-07 TEI10 - 2010-09-07
0025 4 F Rel-10 9.2.0 - Clarification of handling of domain selection for subsequent calls - - - - C1-65 C1-102884 postponed 2010-09-07 TEI10 - 2010-09-07
0026 - F Rel-9 9.2.0 - Update of MOID - - - - C1-65 C1-102506 postponed 2010-09-07 IMSProtoc3 - 2010-09-07
0027 - B Rel-10 9.2.0 - Addition of access type - - - - C1-65 C1-102507 revised 2010-09-07 IMSProtoc4 - 2010-09-07
0027 1 B Rel-10 9.2.0 - Addition of access type - - - - C1-65 C1-102628 postponed 2010-09-07 IMSProtoc4 - 2010-09-07
0028 - F Rel-7 7.4.0 - Correcting DDF of Communication Continuity MO - - - - C1-65 C1-102820 revised 2010-09-07 VCC - 2010-09-07
0028 1 F Rel-7 7.4.0 - Correcting DDF of Communication Continuity MO - - - - C1-65 C1-102837 revised 2010-09-07 VCC - 2010-09-07
0028 2 F Rel-7 7.4.0 7.5.0 Correcting DDF of Communication Continuity MO CP-49 CP-100484 approved C1 C1-65 C1-102845 agreed 2010-09-07 VCC - 2010-09-07
0029 - B Rel-10 10.0.0 - Insertion of missing requirements to prohibit PS-CS session Continuity - - - - C1-66 C1-102941 revised 2010-09-07 IMS-Cont - 2010-09-07
0029 1 B Rel-10 10.0.0 - Insertion of missing requirements to prohibit PS-CS session Continuity - - - - C1-66 C1-103330 revised 2010-09-07 TEI10 - 2010-09-07
0029 2 B Rel-10 9.2.0 10.0.0 Insertion of missing requirements to prohibit PS-CS session Continuity CP-49 CP-100519 approved C1 C1-66 C1-103505 agreed 2010-09-07 TEI10 - 2010-09-07
0030 - F Rel-11 11.0.0 - PS to PS STI URI configuration - - - - C1-81 C1-124480 revised 2012-12-01 TEI11 - 2012-12-01
0030 1 F Rel-11 11.0.0 11.1.0 PS to PS STI URI configuration CP-58 CP-120793 approved C1 C1-81 C1-124870 agreed 2012-12-01 TEI11 - 2012-12-01

page generated from database: 2013-10-16 10:33:30