Go to spec numbering scheme page
3GPP TR 24.819 (click spec number to see fileserver directory for this spec)
Protocol impact from providing IMS services via fixed broadband; Stage-3
.
TSG / WG responsible: C1 (click TSG/WG to see its home page)
Work item which gave rise to this spec:  -  (click WI code to see Work Item details in the Work Plan)
Work items which may have impacted this spec:  click here
CP-27: change of WG as a result of closure of CN and T.
Rapporteur: LEIS, Peter Specification required for: UTRAN-based systems In the table below ... ... click meeting number for meeting details; ... click spec version number to download that version; ... click SDO publication reference to download SDO transposed document. event version available remarks 2005-03-01 - C1-37 2005-07-18 - draft 2005-05-18 - 2005-07-22 - draft 2005-09-12 - 2005-09-22 CP-050353 - draft 2005-10-17 - draft 2005-11-15 - 2005-12-12 CP-050532 - 2005-12-15 All important content will be fed to TSs and this TR will not be maintained. - Change Requests for this spec:
Release
Freeze meeting
Freeze date
::
remarks
SDO publications
Rel-7
SP-36
2007-06-07
::
.
ETSI
click ref to download
Genealogy of this spec:
antecedent(s) | this spec | descendant(s) |
(no antecedents) | 24.819 | (no descendants) |
page generated from database: 2013-10-16 10:26:03