Go to spec numbering scheme page
3GPP Specification Change Request records for: 25.309
CR no. | rev | cat | Release | CR written to vers | new vers | CR title | TSG meeting | TSG doc | TSG status | source | WG meeting | WG doc | WG status | cover date | work item | remarks | database record created |
0001 | - | F | Rel-6 | 6.0.0 | - | Outcome of RAN2-44 and Conference Calls | - | - | - | Nortel | R2-45 | R2-042716 | revised | 2004-12-02 | EDCH-L23 | - | 2004-12-02 |
0001 | 1 | F | Rel-6 | 6.0.0 | - | inclusion of e.g. physical layer model, MAC architecture, detail Node B scheduler mechanism and QoS Control principles | - | - | - | Nortel, Nokia | R2-45 | R2-042719 | revised | 2004-12-02 | EDCH-Stage2 | - | 2004-12-02 |
0001 | 2 | F | Rel-6 | 6.0.0 | - | inclusion of e.g. physical layer model, MAC architecture, detail Node B scheduler mechanism and QoS Control principles | - | - | - | Nortel | R2-45 | R2-042725 | revised | 2004-12-02 | EDCH-Stage2 | - | 2004-12-02 |
0001 | 3 | F | Rel-6 | 6.0.0 | 6.1.0 | Inclusion of e.g. physical layer model, MAC architecture, detail Node B scheduler mechanism and QoS Control principles | RP-26 | RP-040486 | approved | R2 | R2-45 | R2-042730 | agreed | 2004-11-29 | EDCH-Stage2 | - | 2004-11-29 |
0002 | - | F | Rel-6 | 6.0.0 | - | Content of the absolute grant | - | - | - | Nortel | R2-45 | R2-042720 | revised | 2004-12-02 | EDCH-L23 | - | 2004-12-02 |
0002 | 1 | F | Rel-6 | 6.0.0 | - | Content of the absolute grant | - | - | - | Nortel | R2-45 | R2-042726 | revised | 2004-12-02 | EDCH-L23 | - | 2004-12-02 |
0002 | 2 | F | Rel-6 | 6.0.0 | 6.1.0 | Scheduling Grants as E-DPDCH/DPCCH power ratio | RP-26 | RP-040487 | approved | R2 | R2-45 | R2-042733 | - | 2004-11-29 | EDCH-Stage2 | Technically endorsed only. | 2004-11-29 |
0003 | - | F | Rel-6 | 6.0.0 | - | Proposed rewording on scheduler sections compared to 001 | - | - | - | Nortel | R2-45 | R2-042723 | revised | 2004-12-02 | EDCH-L23 | - | 2004-12-02 |
0003 | 1 | F | Rel-6 | 6.0.0 | 6.1.0 | Proposed rewording on scheduler sections compared to 001r3 | RP-26 | RP-040486 | approved | R2 | R2-45 | R2-042728 | agreed | 2004-11-29 | EDCH-Stage2 | - | 2004-11-29 |
0004 | - | F | Rel-6 | 6.0.0 | - | Scheduling Grants as (E-DPDCH+DPDCH/DPCCH) power ratio | RP-26 | RP-040487 | rejected | R2 | R2-45 | R2-042731 | - | 2004-11-29 | EDCH-Stage2 | Technically endorsed only. | 2004-11-29 |
0005 | - | B | Rel-6 | 6.1.0 | 6.2.0 | Introduction of Details for the scheduling operation, non-scheduled transmission and E-TFC selection | RP-27 | RP-050115 | approved | R2 | R2-46 | R2-050716 | agreed | 2005-03-02 | EUDCH-L23 | - | 2005-03-02 |
0006 | 3 | F | Rel-6 | 6.2.0 | 6.3.0 | Introduction of resource management considerations and refinement of the scheduling mechanism | RP-28 | RP-050326 | approved | R2 | R2-47 | R2-051707 | agreed | 2005-05-25 | EUDCH-L23 | - | 2005-05-25 |
0007 | - | F | Rel-6 | 6.3.0 | 6.4.0 | SG update and retransmission of scheduling information corrections | RP-29 | RP-050470 | approved | R2 | R2-48 | R2-052114 | agreed | 2005-09-05 | EDCH-L23 | - | 2005-09-05 |
0008 | - | F | Rel-6 | 6.3.0 | 6.4.0 | Minor corrections to E-DCH Stage 2 following offline review | RP-29 | RP-050470 | approved | R2 | R2-48 | R2-052115 | agreed | 2005-09-05 | EDCH-L23 | - | 2005-09-05 |
0009 | - | F | Rel-6 | 6.3.0 | 6.4.0 | Clarification of the term “pre-emption” for E-DCH | RP-29 | RP-050470 | approved | R2 | R2-48 | R2-052116 | agreed | 2005-09-05 | EDCH-L23 | - | 2005-09-05 |
0010 | - | B | Rel-6 | 6.3.0 | 6.4.0 | UE behavior to RGs when holding SG | RP-29 | RP-050470 | approved | R2 | R2-48 | R2-052137 | agreed | 2005-09-05 | EDCH-L23 | - | 2005-09-05 |
0011 | - | F | Rel-6 | 6.3.0 | 6.4.0 | Correction to E-TFC selection in compressed mode for 10 ms TTI | RP-29 | RP-050470 | approved | R2 | R2-48 | R2-052250 | agreed | 2005-09-05 | EDCH-L23 | - | 2005-09-05 |
0012 | - | F | Rel-6 | 6.3.0 | 6.4.0 | Correction to MAC-e/es Entity | RP-29 | RP-050470 | approved | R2 | R2-48 | R2-052251 | agreed | 2005-09-05 | EDCH-L23 | - | 2005-09-05 |
0013 | - | F | Rel-6 | 6.3.0 | 6.4.0 | Introduction of Reference Received Total Wideband Power | RP-29 | RP-050470 | approved | R2 | R2-48 | R2-052295 | agreed | 2005-09-05 | EDCH-L23 | - | 2005-09-05 |
0014 | - | F | Rel-6 | 6.3.0 | 6.4.0 | Maximum number of reference E-TFCs | RP-29 | RP-050470 | approved | R2 | R2-48 | R2-052328 | agreed | 2005-09-09 | EDCH-L23 | - | 2005-09-09 |
0015 | - | F | Rel-6 | 6.3.0 | 6.4.0 | Definition of UE power Headroom | RP-29 | RP-050452 | approved | Panasonic, | - | - | - | 2005-09-16 | EDCH-L23 | - | 2005-09-21 |
0016 | 1 | F | Rel-6 | 6.4.0 | 6.5.0 | Criteria for the Happy Bit | RP-30 | RP-050789 | approved | R2 | R2-49 | R2-052727 | agreed | 2005-10-24 | EDCH-L23 | - | 2005-11-21 |
0017 | 2 | F | Rel-6 | 6.4.0 | 6.5.0 | HARQ process restricition/reservation for non-scheduled/scheduled transmissions | RP-30 | RP-050789 | approved | R2 | R2-49 | R2-053173 | agreed | 2005-10-26 | EDCH-L23 | - | 2005-11-21 |
0018 | - | F | Rel-6 | 6.4.0 | 6.5.0 | Simultaneous E-DCH and DCH (DCH UL capability) | RP-30 | RP-050789 | approved | R2 | R2-49 | R2-053078 | agreed | 2005-11-10 | EDCH-L23 | - | 2005-11-21 |
0019 | 1 | F | Rel-6 | 6.4.0 | 6.5.0 | E-DCH RRM measurements in case of multi-cell RLS | RP-30 | RP-050789 | approved | R2 | R2-49 | R2-053148 | agreed | - | EDCH-L23 | - | 2005-11-21 |
0020 | 1 | F | Rel-6 | 6.4.0 | 6.5.0 | Secondary Absolute Grant Scope | RP-30 | RP-050789 | approved | R2 | R2-49 | R2-053174 | agreed | 2005-11-09 | EDCH-L23 | - | 2005-11-21 |
0021 | - | F | Rel-6 | 6.4.0 | 6.5.0 | Alignment to stage 3 and removal of details | RP-30 | RP-050789 | approved | R2 | R2-49 | R2-053093 | agreed | 2005-10-28 | EDCH-L23 | - | 2005-11-21 |
0022 | - | F | Rel-6 | 6.5.0 | 6.6.0 | Correction to signalling of reference power offset | RP-31 | RP-060069 | approved | R2 | R2-51 | R2-060668 | agreed | 2006-02-13 | EDCH-L23 | Presented by RAN3 in RP-060069, as linked with TS 25.423 CR 1146 and TS 25.433 CR1212 | 2006-03-02 |
0023 | - | F | Rel-6 | 6.5.0 | 6.6.0 | Correction to signalling of load excess indicator | RP-31 | RP-060084 | approved | R2 | R2-51 | R2-060669 | agreed | 2006-02-13 | EDCH-L23 | Also contains 25.433 CR 1211rev1 | 2006-03-02 |
0024 | - | F | Rel-6 | 6.5.0 | - | Support for different E-DCH and HS-DSCH serving cells | - | - | - | Qualcomm | R2-51 | R2-060756 | revised | 2006-02-06 | EDCH-L23 | - | 2006-03-02 |
0024 | 1 | F | Rel-6 | 6.5.0 | 6.6.0 | Support for different E-DCH and HS-DSCH serving cells | RP-31 | RP-060086 | approved | R2 | R2-51 | R2-060768 | agreed | 2006-02-06 | EDCH-L23 | - | 2006-03-02 |
0025 | - | F | Rel-6 | 6.5.0 | 6.6.0 | Non-serving to total E-DCH power ratio clarification | RP-31 | RP-060085 | approved | R2 | R2-51 | R2-060763 | agreed | 2006-02-13 | EDCH-L23 | - | 2006-03-02 |
page generated from database: 2013-10-16 10:33:43