3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 25.309

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - F Rel-6 6.0.0 - Outcome of RAN2-44 and Conference Calls - - - Nortel R2-45 R2-042716 revised 2004-12-02 EDCH-L23 - 2004-12-02
0001 1 F Rel-6 6.0.0 - inclusion of e.g. physical layer model, MAC architecture, detail Node B scheduler mechanism and QoS Control principles - - - Nortel, Nokia R2-45 R2-042719 revised 2004-12-02 EDCH-Stage2 - 2004-12-02
0001 2 F Rel-6 6.0.0 - inclusion of e.g. physical layer model, MAC architecture, detail Node B scheduler mechanism and QoS Control principles - - - Nortel R2-45 R2-042725 revised 2004-12-02 EDCH-Stage2 - 2004-12-02
0001 3 F Rel-6 6.0.0 6.1.0 Inclusion of e.g. physical layer model, MAC architecture, detail Node B scheduler mechanism and QoS Control principles RP-26 RP-040486 approved R2 R2-45 R2-042730 agreed 2004-11-29 EDCH-Stage2 - 2004-11-29
0002 - F Rel-6 6.0.0 - Content of the absolute grant - - - Nortel R2-45 R2-042720 revised 2004-12-02 EDCH-L23 - 2004-12-02
0002 1 F Rel-6 6.0.0 - Content of the absolute grant - - - Nortel R2-45 R2-042726 revised 2004-12-02 EDCH-L23 - 2004-12-02
0002 2 F Rel-6 6.0.0 6.1.0 Scheduling Grants as E-DPDCH/DPCCH power ratio RP-26 RP-040487 approved R2 R2-45 R2-042733 - 2004-11-29 EDCH-Stage2 Technically endorsed only. 2004-11-29
0003 - F Rel-6 6.0.0 - Proposed rewording on scheduler sections compared to 001 - - - Nortel R2-45 R2-042723 revised 2004-12-02 EDCH-L23 - 2004-12-02
0003 1 F Rel-6 6.0.0 6.1.0 Proposed rewording on scheduler sections compared to 001r3 RP-26 RP-040486 approved R2 R2-45 R2-042728 agreed 2004-11-29 EDCH-Stage2 - 2004-11-29
0004 - F Rel-6 6.0.0 - Scheduling Grants as (E-DPDCH+DPDCH/DPCCH) power ratio RP-26 RP-040487 rejected R2 R2-45 R2-042731 - 2004-11-29 EDCH-Stage2 Technically endorsed only. 2004-11-29
0005 - B Rel-6 6.1.0 6.2.0 Introduction of Details for the scheduling operation, non-scheduled transmission and E-TFC selection RP-27 RP-050115 approved R2 R2-46 R2-050716 agreed 2005-03-02 EUDCH-L23 - 2005-03-02
0006 3 F Rel-6 6.2.0 6.3.0 Introduction of resource management considerations and refinement of the scheduling mechanism RP-28 RP-050326 approved R2 R2-47 R2-051707 agreed 2005-05-25 EUDCH-L23 - 2005-05-25
0007 - F Rel-6 6.3.0 6.4.0 SG update and retransmission of scheduling information corrections RP-29 RP-050470 approved R2 R2-48 R2-052114 agreed 2005-09-05 EDCH-L23 - 2005-09-05
0008 - F Rel-6 6.3.0 6.4.0 Minor corrections to E-DCH Stage 2 following offline review RP-29 RP-050470 approved R2 R2-48 R2-052115 agreed 2005-09-05 EDCH-L23 - 2005-09-05
0009 - F Rel-6 6.3.0 6.4.0 Clarification of the term “pre-emption” for E-DCH RP-29 RP-050470 approved R2 R2-48 R2-052116 agreed 2005-09-05 EDCH-L23 - 2005-09-05
0010 - B Rel-6 6.3.0 6.4.0 UE behavior to RGs when holding SG RP-29 RP-050470 approved R2 R2-48 R2-052137 agreed 2005-09-05 EDCH-L23 - 2005-09-05
0011 - F Rel-6 6.3.0 6.4.0 Correction to E-TFC selection in compressed mode for 10 ms TTI RP-29 RP-050470 approved R2 R2-48 R2-052250 agreed 2005-09-05 EDCH-L23 - 2005-09-05
0012 - F Rel-6 6.3.0 6.4.0 Correction to MAC-e/es Entity RP-29 RP-050470 approved R2 R2-48 R2-052251 agreed 2005-09-05 EDCH-L23 - 2005-09-05
0013 - F Rel-6 6.3.0 6.4.0 Introduction of Reference Received Total Wideband Power RP-29 RP-050470 approved R2 R2-48 R2-052295 agreed 2005-09-05 EDCH-L23 - 2005-09-05
0014 - F Rel-6 6.3.0 6.4.0 Maximum number of reference E-TFCs RP-29 RP-050470 approved R2 R2-48 R2-052328 agreed 2005-09-09 EDCH-L23 - 2005-09-09
0015 - F Rel-6 6.3.0 6.4.0 Definition of UE power Headroom RP-29 RP-050452 approved Panasonic, - - - 2005-09-16 EDCH-L23 - 2005-09-21
0016 1 F Rel-6 6.4.0 6.5.0 Criteria for the Happy Bit RP-30 RP-050789 approved R2 R2-49 R2-052727 agreed 2005-10-24 EDCH-L23 - 2005-11-21
0017 2 F Rel-6 6.4.0 6.5.0 HARQ process restricition/reservation for non-scheduled/scheduled transmissions RP-30 RP-050789 approved R2 R2-49 R2-053173 agreed 2005-10-26 EDCH-L23 - 2005-11-21
0018 - F Rel-6 6.4.0 6.5.0 Simultaneous E-DCH and DCH (DCH UL capability) RP-30 RP-050789 approved R2 R2-49 R2-053078 agreed 2005-11-10 EDCH-L23 - 2005-11-21
0019 1 F Rel-6 6.4.0 6.5.0 E-DCH RRM measurements in case of multi-cell RLS RP-30 RP-050789 approved R2 R2-49 R2-053148 agreed - EDCH-L23 - 2005-11-21
0020 1 F Rel-6 6.4.0 6.5.0 Secondary Absolute Grant Scope RP-30 RP-050789 approved R2 R2-49 R2-053174 agreed 2005-11-09 EDCH-L23 - 2005-11-21
0021 - F Rel-6 6.4.0 6.5.0 Alignment to stage 3 and removal of details RP-30 RP-050789 approved R2 R2-49 R2-053093 agreed 2005-10-28 EDCH-L23 - 2005-11-21
0022 - F Rel-6 6.5.0 6.6.0 Correction to signalling of reference power offset RP-31 RP-060069 approved R2 R2-51 R2-060668 agreed 2006-02-13 EDCH-L23 Presented by RAN3 in RP-060069, as linked with TS 25.423 CR 1146 and TS 25.433 CR1212 2006-03-02
0023 - F Rel-6 6.5.0 6.6.0 Correction to signalling of load excess indicator RP-31 RP-060084 approved R2 R2-51 R2-060669 agreed 2006-02-13 EDCH-L23 Also contains 25.433 CR 1211rev1 2006-03-02
0024 - F Rel-6 6.5.0 - Support for different E-DCH and HS-DSCH serving cells - - - Qualcomm R2-51 R2-060756 revised 2006-02-06 EDCH-L23 - 2006-03-02
0024 1 F Rel-6 6.5.0 6.6.0 Support for different E-DCH and HS-DSCH serving cells RP-31 RP-060086 approved R2 R2-51 R2-060768 agreed 2006-02-06 EDCH-L23 - 2006-03-02
0025 - F Rel-6 6.5.0 6.6.0 Non-serving to total E-DCH power ratio clarification RP-31 RP-060085 approved R2 R2-51 R2-060763 agreed 2006-02-13 EDCH-L23 - 2006-03-02

page generated from database: 2013-10-16 10:33:43