3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 25.432

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - F R99 3.0.0 3.1.0 Iub NBAP Signalling Bearer RP-05 RP-99516 approved R3 - R3-99c74 - 1999-08-17 - - -
0001 2 B Rel-5 4.0.0 5.0.0 Introduction of IP Transport UTRAN RP-15 RP-020189 approved R3 R3-27 R3-020877 agreed 2002-03-01 ETRAN-Iptrans - -
0002 - B R99 3.0.0 3.1.0 ATM switching layer RP-05 RP-99516 approved R3 - R3-99d09 - 1999-08-17 - - -
0003 1 A Rel-5 5.0.1 5.1.0 Addition of new reference on SCTP checksum RP-17 RP-020611 approved R3 R3-31 R3-022032 agreed 2002-08-20 TEI4 - -
0005 - F Rel-7 7.0.0 - Clarification for Client/Server functionality for SCTP in IP based Transport option - - - R3 R3-54 R3-061736 Rejected 2006-11-20 TEI7 - 2006-11-29
0006 - F Rel-7 7.0.0 7.1.0 Clarification for Client/Server functionality for SCTP in IP based Transport option RP-35 RP-070063 approved R3 R3-55 R3-070075 Agreed 2007-02-28 TEI7 - 2007-03-09
0007 - F Rel-7 7.0.0 - Clarification on SCTP association initialization for IP transport - - - R3 R3-55 R3-070231 Withdrawn 2007-02-28 TEI7 - 2007-03-09
0008 - F Rel-10 10.0.0 - Correction to the References - - - - R3-72 R3-111224 Revised 2011-05-23 TEI10 - 2011-05-23
0008 1 F Rel-10 10.0.0 10.1.0 Correction to the References RP-52 RP-110685 approved R3 R3-72 R3-111568 Agreed 2011-05-23 TEI10 - 2011-05-23

page generated from database: 2013-10-16 10:33:48