Go to spec numbering scheme page
3GPP TR 25.867 (click spec number to see fileserver directory for this spec)
Feasibility study for wideband distribution systems in 3rd generation networks
SPECIFICATION WITHDRAWN
TSG / WG responsible: R4 (click TSG/WG to see its home page)
Work item which gave rise to this spec:  -  (click WI code to see Work Item details in the Work Plan)
Work items which may have impacted this spec:  click here
Rapporteur: MATARASSO, Carlo Specification required for: UTRAN-based systems In the table below ... ... click meeting number for meeting details; ... click spec version number to download that version; ... click SDO publication reference to download SDO transposed document. event version available remarks 2002-01-02 RP-010794 - 1.3.0 - R4-030934 - event version available remarks 2002-01-02 inherited from Rel-5 - Change Requests for this spec:
Release
Freeze meeting
Freeze date
::
remarks
SDO publications
Rel-5
RP-15
2002-03-08
::
2003-11-28: WG secretary reports: Timed out of Rel-5, moved to Rel-6. RELEASE WITHDRAWN
ETSI
click ref to download
Rel-6
-
::
2003-11-28: WG secretary reports: Timed out of Rel-5, moved to Rel-6. RP-24: abandoned due to lack of interest. RELEASE WITHDRAWN
ETSI
click ref to download
Genealogy of this spec:
antecedent(s) | this spec | descendant(s) |
(no antecedents) | 25.867 | (no descendants) |
page generated from database: 2013-10-16 10:26:14