Go to spec numbering scheme page
3GPP TR 25.896 (click spec number to see fileserver directory for this spec)
Feasibility study for enhanced uplink for UTRA FDD
.
TSG / WG responsible: R1 (click TSG/WG to see its home page)
Work item which gave rise to this spec:  -  (click WI code to see Work Item details in the Work Plan)
Work items which may have impacted this spec:  click here
Rapporteur: RANTA-AHO, Karri Specification required for: UTRAN-based systems In the table below ... ... click meeting number for meeting details; ... click spec version number to download that version; ... click SDO publication reference to download SDO transposed document. event version available remarks 0.0.1 - R1-021218 - 0.0.2 - R1-021259 - 0.0.3 - - 0.0.4 - - 0.1.0 - - 0.1.1 - - 0.2.0 - R1-030311 - 0.2.1 - - 0.2.2 - - post R1-31 0.3.0 - - 0.3.1 - - post RP-32 0.3.2 - - post RP-32 0.3.3 - - 0.4.0 - - post R1-33 2003-09-04 R1-030951 - post R1-33 2003-09-13 R1-030952 - 2003-09-26 RP-030512 - draft 2003-10-13 R1-031148 - 2003-11-03 R1-031164 - post R1-35 1.1.0 - - post R1-35 2003-12-03 R1-031422 - post R1-35 2003-12-05 R1-031423 - draft 1.2.0 - R1-040105 - draft 2004-02-05 R1-040109 - 1.3.0 - - 2004-02-26 R1-040388 - posat R1-36 2004-03-01 R1-040391 - 2004-03-04 R1-040392 -> RP-040046 - 2004-04-03 - Change Requests for this spec:
Release
Freeze meeting
Freeze date
::
remarks
SDO publications
Rel-6
RP-26
2004-12-10
::
.
ETSI
click ref to download
Genealogy of this spec:
antecedent(s) | this spec | descendant(s) |
(no antecedents) | 25.896 |
25.808 |
page generated from database: 2013-10-16 10:26:16