Go to spec numbering scheme page
3GPP TS 29.078 (click spec number to see fileserver directory for this spec)
Customised Applications for Mobile network Enhanced Logic (CAMEL) Phase X; CAMEL Application Part (CAP) specification
.
TSG / WG responsible: C4 (click TSG/WG to see its home page)
Work item which gave rise to this spec:  -  (click WI code to see Work Item details in the Work Plan)
Work items which may have impacted this spec:  click here
NP-24: txferred to N4 on closure of N2.CP-27: change of WG as a result of closure of CN and T.
Rapporteur: HODGES, Phil Specification required for: GERAN-based systems and UTRAN-based systems In the table below ... ... click meeting number for meeting details; ... click spec version number to download that version; ... click SDO publication reference to download SDO transposed document. event version available remarks 1999-04-23 - 1999-06-30 - 1999-12-17 2000-03-15 2000-06-23 - Editorial 2000-06-23 2000-10-10 2001-01-05 2001-03-29 2001-07-03 2001-10-03 2002-01-04 2002-03-19 2002-06-17 2002-09-17 2002-12-18 2003-03-25 2009-09-29 event version available remarks 2001-03-29 2001-07-03 2001-10-03 2002-01-04 2002-03-19 2002-06-17 2002-09-17 2002-12-18 2003-03-25 2009-09-29 event version available remarks 2002-06-18 2002-09-17 2002-12-18 2003-03-25 2003-06-25 2003-09-29 2004-01-05 edito post NP-22 2004-01-22 Editorial corrections to ASN.1 2004-03-29 2004-06-17 2004-09-30 2009-09-29 event version available remarks 2004-01-22 - 2004-03-29 - 2004-06-17 - 2004-10-07 - 2005-01-07 2006-06-13 2009-09-29 event version available remarks 2005-06-21 - 2005-10-11 - 2005-12-15 - 2006-06-13 2007-09-27 2009-09-29 2010-06-17 event version available remarks 2008-12-16 Upgraded unchanged from Rel-7 2009-09-29 2010-04-06 - 2010-04-23 fix invisible figures 2010-06-17 event version available remarks 2009-12-18 Automatic upgrade from previous Release 2010-04-06 - 2010-04-23 fix invisible figures, correct Release on cover page 2010-06-17 event version available remarks 2011-04-08 Automatic upgrade from previous Release version 9.2.0 event version available remarks 2011-09-26 - 2011-12-19 2012-12-21
Release
Freeze meeting
Freeze date
::
remarks
SDO publications
R99
SP-05
1999-10-13
::
Phase 3 .
ETSI
click ref to download
Rel-4
SP-11
2001-03-22
::
Phase 3 .
ETSI
click ref to download
Rel-5
NP-16
2002-06-07
::
Phase 4 .
ETSI
click ref to download
Rel-6
NP-26
2004-12-10
::
Phase 4 .
ETSI
click ref to download
Rel-7
SP-36
2007-06-07
::
Phase 4 .
ETSI
click ref to download
Rel-8
SP-42
2008-12-11
::
.
ETSI
click ref to download
Rel-9
SP-46
2009-12-10
::
Upgraded from previous Release without technical change .
ETSI
click ref to download
Rel-10
SP-51
2011-03-23
::
Upgraded from previous Release without technical change .
ETSI
click ref to download
Rel-11
SP-57
2012-09-12
::
. .
ETSI
click ref to download
Change Requests for this spec: click here.
Genealogy of this spec:
antecedent(s) | this spec | descendant(s) |
09.78 |
29.078 | (no descendants) |
page generated from database: 2013-10-16 10:26:42