CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - F Rel-5 5.0.0 - Service Class Mapping in the PCF - - - N3 N3-24 N3-020629 Revised to 0710 - E2EQoS - -
0001 1 F Rel-5 5.0.0 - Service Class Mapping in the PCF - - - - N3-24 N3-020710 Revised to 0717 - E2EQoS - -
0001 2 F Rel-5 5.0.0 5.1.0 Service Class Mapping in the PCF NP-17 NP-020412 approved N3 N3-24 N3-020717 Agreed 2002-07-05 E2EQoS - -
0002 - F Rel-5 5.0.0 - Data Rate Mapping in the PCF - - - N3 N3-24 N3-020627 Revised to 0709 - E2EQoS - -
0002 1 F Rel-5 5.0.0 - Data Rate Mapping in the PCF - - - - N3-24 N3-020709 Revised to 0728 - E2EQoS - -
0002 2 F Rel-5 5.0.0 - Data Rate Mapping in the PCF - - - - N3-24 N3-020728 Revised to 0744 - E2EQoS - -
0002 3 F Rel-5 5.0.0 5.1.0 Data Rate Mapping in the PCF NP-17 NP-020412 approved N3 N3-24 N3-020744 Agreed 2002-07-05 E2EQoS - -
0003 - D Rel-5 5.0.0 5.1.0 Correction of Reference [6] NP-17 NP-020412 approved N3 N3-24 N3-020633 Agreed 2002-07-05 E2EQoS - -
0004 - F Rel-5 5.0.0 - QoS Parameter Mapping between IMS and GPRS - - - N3 N3-24 N3-020626 Revised to 0705 - E2EQoS - -
0004 1 F Rel-5 5.0.0 - QoS Parameter Mapping between IMS and GPRS - - - - N3-24 N3-020705 Revised to 0743 - E2EQoS - -
0004 2 F Rel-5 5.0.0 5.1.0 QoS Parameter Mapping between IMS and GPRS NP-17 NP-020412 approved N3 N3-24 N3-020743 Agreed 2002-07-05 E2EQoS - -
0005 - F Rel-5 5.0.0 - RTP/RTCP split - - - N3 N3-24 N3-020579 Withdrawn - E2EQoS - -
0006 - F Rel-5 5.0.0 - Authorized QoS vs. Guaranteed and maximum bit rates - - - N3 N3-24 N3-020574 Revised to 0674 - E2EQoS - -
0006 1 F Rel-5 5.0.0 5.1.0 Authorized QoS vs. Guaranteed and maximum bit rates NP-17 NP-020409 approved N3 N3-24 N3-020674 Agreed 2002-07-05 E2EQoS - -
0007 - F Rel-5 5.0.0 - Support for forking in 29.208 - - - - N3-24 N3-020617 Revised to 0720 - E2EQoS - -
0007 1 F Rel-5 5.0.0 5.1.0 Support for forking in 29.208 NP-17 NP-020410 approved N3 N3-24 N3-020720 Agreed 2002-07-05 E2EQoS - -
0008 - - Rel-5 5.0.0 - Removal of incomplete function - - - - N3-24 N3-020691 Revised to 0711 - E2EQoS - -
0008 1 F Rel-5 5.0.0 5.1.0 Removal of incomplete function NP-17 NP-020412 approved N3 N3-24 N3-020711 Agreed 2002-07-05 E2EQoS - -
0009 - F Rel-5 5.1.0 - QoS mapping in the case of forking - - - N3 N3-25 N3-020825 Revised 2002-11-27 E2eQoS - 2002-11-27
0009 1 F Rel-5 5.1.0 5.2.0 QoS mapping in the case of forking NP-18 NP-020626 approved N3 N3-25 N3-020852 Agreed 2002-11-27 E2eQoS - 2002-11-27
0010 - F Rel-5 5.1.0 - Editorial improvements in TS 29.208 - - - N3 N3-25 N3-020824 Revised 2002-11-27 E2eQoS - 2002-11-27
0010 1 F Rel-5 5.1.0 - Terminology in TS 29.208 in line with TS 29.207, correction of signalling flow diagrams, correction of a rule and Eeditorial improvements - - - N3 N3-25 N3-020850 Revised 2002-11-27 E2eQoS - 2002-11-27
0010 2 F Rel-5 5.1.0 5.2.0 Terminology in TS 29.208 in line with TS 29.207and corrections NP-18 NP-020626 approved N3 N3-25 N3-020866 Agreed 2002-11-27 E2eQoS - 2002-11-27
0011 - F Rel-5 5.1.0 - Remove binding information in DEC message - - - N3 N3-25 N3-020827 Withdrawn 2002-11-27 E2eQoS - 2002-11-27
0012 - F Rel-5 5.1.0 - Mapping of SDP parameters to Authorized IP QoS parameters in the PCF - - - N3 N3-25 N3-020830 Revised 2002-11-27 E2EQoS - 2002-11-27
0012 1 F Rel-5 5.1.0 - Mapping of SDP parameters to Authorized IP QoS parameters in the PCF - - - N3 N3-25 N3-020853 Withdrawn 2002-11-27 E2EQoS - 2002-11-27
0013 - F Rel-5 5.1.0 - PCF by PDF substitution. - - - N3 N3-26 N3-020911 Revised 2002-11-27 E2EQoS - 2002-11-27
0013 1 F Rel-5 5.1.0 5.2.0 PCF to PDF Change NP-18 NP-020624 approved N3 N3-26 N3-021010 Agreed 2002-11-27 E2EQoS conditional on S2 CRs 2002-11-27
0014 - F Rel-5 5.1.0 5.2.0 Removal of editors note regarding calculation of b=AS NP-18 NP-020620 approved N3 N3-26 N3-020932 Agreed 2002-11-27 E2EQoS - 2002-11-27
0015 - F Rel-5 5.1.0 - Re-Introduction of Streaming Class to PCF QoS-Mapping - - - N3 N3-26 N3-020947 Revised 2002-11-27 E2EQoS - 2002-11-27
0015 1 F Rel-5 5.1.0 - Re-Introduction of Streaming Class to PCF QoS-Mapping - - - N3 N3-26 N3-020981 Revised 2002-11-27 E2EQoS - 2002-11-27
0015 2 F Rel-5 5.1.0 - Re-Introduction of Streaming Class to PCF QoS-Mapping - - - N3 N3-26 N3-021015 Withdrawn 2002-11-27 E2EQoS - 2002-11-27
0016 - F Rel-5 5.1.0 - PCF to PDF Change - - - N3 N3-26 N3-020949 Withdrawn 2002-11-27 IMS-CCR - 2002-11-27
0017 - F Rel-5 5.1.0 - RTCP overhead vs. SDP bandwidth - - - N3 N3-26 N3-020955 Withdrawn 2002-11-27 E2EQoS - 2002-11-27
0018 - F Rel-5 5.1.0 5.2.0 Replacement of DIFFSERV class by QoS Class NP-18 NP-020622 approved N3 N3-26 N3-021014 Agreed 2002-11-27 E2EQoS - 2002-11-27
0019 - F Rel-5 5.2.0 - mapping rules for QoS authorization - - - N3 N3-27 N3-030044 Revised 2003-03-06 E2EQoSIW - 2003-03-07
0019 1 F Rel-5 - - mapping rules for QoS authorization - - - N3 N3-27 N3-030134 Revised 2003-03-06 E2EQoSIW - 2003-03-07
0019 2 F Rel-5 - - mapping rules for QoS authorization - - - N3 N3-27 N3-030168 Revised 2003-03-06 E2EQoSIW - 2003-03-07
0019 3 F Rel-5 5.2.0 5.3.0 mapping rules for QoS authorization NP-19 NP-030081 approved N3 N3-27 N3-030182 Agreed 2003-03-06 E2EQoSIW - 2003-03-07
0020 - F Rel-5 5.2.0 - Modification of the rules for deriving Maximum Authorized QoS/Trafic Class per media component. - - - N3 N3-27 N3-030071 Withdrawn 2003-03-06 E2EQoSIW - 2003-03-07
0021 - F Rel-5 5.2.0 - Correction of a clash - - - N3 N3-27 N3-030073 Revised 2003-03-06 E2EQoSIW - 2003-03-07
0021 1 F Rel-5 - - Correction of a clash - - - N3 N3-27 N3-030139 Revised 2003-03-06 E2EQoSIW - 2003-03-07
0021 2 F Rel-5 5.2.0 5.3.0 Correction of a clash NP-19 NP-030081 approved N3 N3-27 N3-030171 Agreed 2003-03-06 E2EQoSIW - 2003-03-07
0022 - F Rel-5 5.2.0 5.3.0 Addition of the SDP directional attribute ""inactive"". NP-19 NP-030081 approved N3 N3-27 N3-030074 Agreed 2003-03-06 E2EQoSIW - 2003-03-07
0023 - F Rel-5 5.2.0 - Introduction of RTCP bandwidth - - - N3 N3-27 N3-030075 Withdrawn 2003-03-06 E2EQoSIW - 2003-03-07
0024 - F Rel-5 5.2.0 - Discussion on additional bandwidth per IP flow. - - - N3 N3-27 N3-030076 Withdrawn 2003-03-06 E2EQoSIW - 2003-03-07
0025 - F Rel-5 5.2.0 - Adding of the Resume case - - - N3 N3-27 N3-030081 Revised 2003-03-06 E2EQoSIW - 2003-03-07
0025 1 F Rel-5 - - Adding of the Resume case - - - N3 N3-27 N3-030136 Revised 2003-03-06 E2EQoSIW - 2003-03-07
0025 2 F Rel-5 5.2.0 5.3.0 Adding of the Resume case NP-19 NP-030081 approved N3 N3-27 N3-030173 Agreed 2003-03-06 E2EQoSIW - 2003-03-07
0026 - F Rel-5 5.2.0 - Clarification on PDP context modification - - - N3 N3-27 N3-030100 Revised 2003-03-06 E2EQoSIW - 2003-03-07
0026 1 F Rel-5 5.2.0 5.3.0 Clarification on PDP context modification NP-19 NP-030081 approved N3 N3-27 N3-030137 Agreed 2003-03-06 E2EQoSIW - 2003-03-07
0027 - F Rel-5 5.2.0 - Corrections (T.B.D.) - - - N3 N3-27 N3-030102 Withdrawn 2003-03-06 E2EQoSIW - 2003-03-07
0028 - F Rel-5 - - Correction and clarification RTCP IP Flow - - - N3 N3-27 N3-030111 Withdrawn 2003-03-06 E2EQoSIW - 2003-03-07
0029 - F Rel-5 - - Correction and clarification that is needed in some cases - - - N3 N3-27 N3-030112 Revised 2003-03-06 E2EQoSIW - 2003-03-07
0029 1 F Rel-5 - - Correction and clarification that is needed in some cases - - - N3 N3-27 N3-030138 Revised 2003-03-06 E2EQoSIW - 2003-03-07
0029 2 F Rel-5 5.2.0 5.3.0 Correction and clarification that is needed in some cases NP-19 NP-030081 approved N3 N3-27 N3-030169 Agreed 2003-03-06 E2EQoSIW - 2003-03-07
0030 - D Rel-5 - - Editorial clarifications and corrections - - - N3 N3-27 N3-030131 Not agreed 2003-03-06 TEI - 2003-03-07
0031 - F Rel-5 5.2.0 5.3.0 Corrections in the table 7.1.1.2 and in the table 7.2.2.1. NP-19 NP-030081 approved N3 N3-27 N3-030141 Agreed 2003-03-06 E2EQoSIW - 2003-03-07
0032 - F Rel-5 5.3.1 - SDP bandwidth modifiers for RTCP bandwidth - - - N3 N3-28 N3-030267 Withdrawn 2003-05-28 E2EQoS - -
0033 - F Rel-5 5.3.1 - Changes due to the introduction of RTCP Bandwidth - - - N3 N3-28 N3-030340 Revised 2003-05-28 E2EQoS - -
0033 1 F Rel-5 - - Changes due to the introduction of RTCP Bandwidth - - - N3 N3-28 N3-030373 Revised 2003-05-28 E2EQoS - -
0033 2 F Rel-5 - - Changes due to the introduction of RTCP Bandwidth - - - N3 N3-28 N3-030416 Postponed 2003-05-28 E2EQoS - -
0034 - F Rel-5 5.3.1 - Revoke QoS authorization procedure for session redirection after bearer establishment - - - N3 N3-28 N3-030348 Revised 2003-05-28 E2EQoS - -
0034 1 F Rel-5 - - Revoke QoS authorization procedure for session redirection after bearer establishment - - - N3 N3-28 N3-030391 Revised 2003-05-28 E2EQoS - -
0034 2 F Rel-5 5.3.1 5.4.0 Revoke QoS authorization procedure for session redirection after bearer establishment NP-20 NP-030175 approved N3 N3-28 N3-030436 Agreed 2003-05-28 E2EQoS - -
0035 - F Rel-5 - - Change media component to IP flow - - - N3 N3-28 N3-030417 Postponed 2003-05-28 E2EQoS - -
0036 - F Rel-5 5.4.0 - Clarification on the use of the inactive attribute at the beginning of the call - - - N3 N3-29 N3-030491 Revised 2003-09-10 E2EQoS - 2003-09-11
0036 1 F Rel-5 - - Clarification on the use of the inactive attribute at the beginning of the call - - - N3 N3-29 N3-030584 Revised 2003-09-10 E2EQoS - 2003-09-11
0036 2 F Rel-5 5.4.0 5.5.0 Clarification on the use of the inactive attribute at the beginning of the call NP-21 NP-030338 approved N3 N3-29 N3-030655 Agreed 2003-09-10 E2EQoS - 2003-09-11
0037 - F Rel-5 5.4.0 - Precision on the event that triggers the Approval of QoS Commit - - - N3 N3-29 N3-030506 Withdrawn 2003-09-10 E2EQoS - 2003-09-11
0038 - F Rel-5 5.4.0 - Handling of media stream removal by the PDF - - - N3 N3-29 N3-030507 Rejected 2003-09-10 E2EQoS - 2003-09-11
0039 - F Rel-5 5.4.0 - Correcting concept description from media level to IP level - - - N3 N3-29 N3-030523 Revised 2003-09-10 E2EQoS - 2003-09-11
0039 1 F Rel-5 - - Correcting concept description from media level to IP level - - - N3 N3-29 N3-030576 Revised 2003-09-10 E2EQoS - 2003-09-11
0039 2 F Rel-5 5.4.0 5.5.0 Correcting concept description from media level to IP level NP-21 NP-030332 approved N3 N3-29 N3-030623 Agreed 2003-09-10 E2EQoS - 2003-09-11
0040 - F Rel-5 5.4.0 - Correcting the calculation of RTCP bandwidth - - - N3 N3-29 N3-030527 Revised 2003-09-10 E2EQoS - 2003-09-11
0040 1 F Rel-5 - - Correcting the calculation of RTCP bandwidth - - - N3 N3-29 N3-030585 Revised 2003-09-10 E2EQoS - 2003-09-11
0040 2 F Rel-5 - - Correcting the calculation of RTCP bandwidth - - - N3 N3-29 N3-030624 Revised 2003-09-10 E2EQoS - 2003-09-11
0040 3 F Rel-5 5.4.0 5.5.0 Correcting the calculation of RTCP bandwidth NP-21 NP-030334 approved N3 N3-29 N3-030635 Agreed 2003-09-10 E2EQoS - 2003-09-11
0041 - F Rel-5 5.4.0 - Examples of deriving the Maximum Authorized parameters from the SDP parameters - - - N3 N3-29 N3-030528 Revised 2003-09-10 E2EQoS - 2003-09-11
0041 1 F Rel-5 - - Examples of deriving the Maximum Authorized parameters from the SDP parameters - - - N3 N3-29 N3-030587 Revised 2003-09-10 E2EQoS - 2003-09-11
0041 2 F Rel-5 5.4.0 5.5.0 Examples of deriving the Maximum Authorized parameters from the SDP parameters NP-21 NP-030338 approved N3 N3-29 N3-030628 Agreed 2003-09-10 E2EQoS - 2003-09-11
0042 - F Rel-5 5.4.0 - Correction of clarification and a typo - - - N3 N3-29 N3-030531 Revised 2003-09-10 E2EQoS - 2003-09-11
0042 1 F Rel-5 - - Correction of clarification and a typo - - - N3 N3-29 N3-030588 Withdrawn 2003-09-10 E2EQoS - 2003-09-11
0043 - F Rel-5 5.4.0 - Closing the gate at HOLD - - - N3 N3-29 N3-030535 Revised 2003-09-10 E2EQoS - 2003-09-11
0043 1 F Rel-5 5.4.0 5.5.0 Closing the gate at HOLD NP-21 NP-030335 approved N3 N3-29 N3-030581 Agreed 2003-09-10 E2EQoS - 2003-09-11
0044 - F Rel-5 5.4.0 5.5.0 Response to remove decision NP-21 NP-030336 approved N3 N3-29 N3-030537 Agreed 2003-09-10 E2EQoS - 2003-09-11
0045 - F Rel-5 5.4.0 - Handling of SIP CANCEL Request - - - N3 N3-29 N3-030546 Revised 2003-09-10 E2EQoS - 2003-09-11
0045 1 F Rel-5 5.4.0 5.5.0 Handling of SIP CANCEL Request NP-21 NP-030338 approved N3 N3-29 N3-030583 Agreed 2003-09-10 E2EQoS - 2003-09-11
0046 - F Rel-5 5.4.0 - Update of QoS Mapping Tables - - - N3 N3-29 N3-030548 Revised 2003-09-10 E2EQoS - 2003-09-11
0046 1 F Rel-5 - - Update of QoS Mapping Tables - - - N3 N3-29 N3-030586 Withdrawn 2003-09-10 E2EQoS - 2003-09-11
0047 - F Rel-5 5.4.0 - Handling of SIP 200 OK with inactive media - - - N3 N3-29 N3-030558 Revised 2003-09-10 E2EQoS - 2003-09-11
0047 1 F Rel-5 - - Handling of SIP 200 OK with inactive media - - - N3 N3-29 N3-030615 Revised 2003-09-10 E2EQoS - 2003-09-11
0047 2 F Rel-5 - - Handling of SIP 200 OK with inactive media - - - N3 N3-29 N3-030629 Revised 2003-09-10 E2EQoS - 2003-09-11
0047 3 F Rel-5 - - Handling of SIP 200 OK with inactive media - - - N3 N3-29 N3-030641 Revised 2003-09-10 E2EQoS - 2003-09-11
0047 4 F Rel-5 5.4.0 5.5.0 Handling of SIP 200 OK with inactive media NP-21 NP-030338 approved N3 N3-29 N3-030664 Agreed 2003-09-10 E2EQoS - 2003-09-11
0048 - F Rel-5 5.5.1 5.6.0 HSDPA impacts to Go interface NP-22 NP-030568 approved N3 N3-30 N3-030694 Agreed 2003-12-04 HSDPA - 2004-01-05
0048 2 F Rel-5 5.6.0 - Removal of media component - - - N3 N3-31 N3-040065 Withdrawn 2004-03-04 E2EQoS - 2004-03-04
0049 - F Rel-5 5.5.1 - Removal of media component vs putting media on hold - - - N3 N3-30 N3-030717 Revised 2003-12-04 E2EQoS - 2004-01-05
0049 1 F Rel-5 5.5.1 - Removal of media component vs putting media on hold - - - N3 N3-30 N3-030808 - 2003-12-04 E2EQoS - 2004-01-05
0050 - F Rel-5 5.5.1 - Approval of the QoS Commit as a part of the authorization decision for early media - - - N3 N3-30 N3-030718 Revised 2003-12-04 E2EQoS - 2004-01-05
0050 1 F Rel-5 5.5.1 - Approval of the QoS Commit as a part of the authorization decision for early media - - - N3 N3-30 N3-030772 Revised 2003-12-04 E2EQoS - 2004-01-05
0050 2 F Rel-5 5.5.1 5.6.0 Approval of the QoS Commit as a part of the authorization decision for early media NP-22 NP-030565 approved N3 N3-30 N3-030810 Agreed 2003-12-04 E2EQoS - 2004-01-05
0051 - F Rel-5 5.5.1 - Session modification without adding or removing media lines - - - N3 N3-30 N3-030726 Revised 2003-12-04 E2EQoS - 2004-01-05
0051 1 F Rel-5 5.5.1 - Session modification without adding or removing media lines - - - N3 N3-30 N3-030773 Revised 2003-12-04 E2EQoS - 2004-01-05
0051 2 F Rel-5 5.5.1 5.6.0 Session modification without adding or removing media lines NP-22 NP-030565 approved N3 N3-30 N3-030809 Agreed 2003-12-04 E2EQoS - 2004-01-05
0052 - F Rel-6 5.5.1 - Gq interface impacts on signalling flows - - - N3 N3-30 N3-030733 Revised 2003-12-04 QoS1 - 2004-01-05
0052 1 F Rel-6 5.5.1 - Gq interface impacts on signalling flows - - - N3 N3-30 N3-030798 Revised 2003-12-04 QoS1 - 2004-01-05
0052 2 F Rel-6 5.5.1 - Gq interface impacts on signalling flows - - - N3 N3-30 N3-030834 Agreed 2003-12-04 QoS1 - 2004-01-05
0053 - F Rel-6 5.5.1 - Gq interface impacts on QoS parameter mapping definitions - - - N3 N3-30 N3-030734 Revised 2003-12-04 QoS1 - 2004-01-05
0053 1 F Rel-6 5.5.1 - Gq interface impacts on QoS parameter mapping definitions - - - N3 N3-30 N3-030800 Revised 2003-12-04 QoS1 - 2004-01-05
0053 2 F Rel-6 5.5.1 - Gq interface impacts on QoS parameter mapping definitions - - - N3 N3-30 N3-030835 Agreed 2003-12-04 QoS1 - 2004-01-05
0054 - F Rel-5 5.5.1 - SDP to policy setup information at PDF - - - N3 N3-30 N3-030761 Withdrawn 2003-12-04 E2EQoS - 2004-01-05
0055 - F Rel-6 5.5.1 - QoS commit in Rel-6 - - - N3 N3-30 N3-030762 Postponed 2003-12-04 E2EQoS - 2004-01-05
0056 - F Rel-5 5.6.0 - Session modification when a biderctional media is done unidirectional - - - N3 N3-31 N3-040031 Revised 2004-03-04 E2EQoS - 2004-03-04
0056 1 F Rel-5 5.6.0 - Session modification when a biderctional media is done unidirectional - - - N3 N3-31 N3-040083 Revised 2004-03-04 E2EQoS - 2004-03-04
0056 2 F Rel-5 5.6.0 5.7.0 Session modification when a biderctional media is done unidirectional NP-23 NP-040080 approved N3 N3-31 N3-040117 Agreed 2004-03-04 E2EQoS - 2004-03-04
0057 - F Rel-6 5.6.0 - SDP offer handling in SIP responses - - - N3 N3-31 N3-040041 Revised 2004-03-04 IMS-CCR-IWIP - 2004-03-04
0057 1 F Rel-6 5.6.0 - SDP offer handling in SIP responses - - - N3 N3-31 N3-040092 postponed 2004-03-04 IMS-CCR-IWIP - 2004-03-04
0058 - B Rel-6 5.6.0 - Gq flows update for Diameter - - - N3 N3-31 N3-040043 Revised 2004-03-04 QoS1 - 2004-03-04
0058 1 B Rel-6 5.6.0 - Gq flows update for Diameter - - - N3 N3-31 N3-040101 Revised 2004-03-04 QoS1 - 2004-03-04
0058 2 B Rel-6 5.6.0 - Gq flows update for Diameter - - - N3 N3-31 N3-040128 Agreed 2004-03-04 QoS1 - 2004-03-04
0059 - F Rel-5 5.6.0 5.7.0 Mapping tables for streaming services NP-23 NP-040080 approved N3 N3-31 N3-040067 Agreed 2004-03-04 E2EQoS - 2004-03-04
0060 - F Rel-5 5.6.0 - Traffic handling priority in the mapping tables - - - N3 N3-31 N3-040068 Revised 2004-03-04 E2EQoS - 2004-03-04
0060 1 F Rel-5 5.6.0 5.7.0 Traffic handling priority in the mapping tables NP-23 NP-040080 approved N3 N3-31 N3-040132 Agreed 2004-03-04 E2EQoS - 2004-03-04
0061 - F Rel-6 - - Updates to Authorize QoS resources callflows - - - N3 N3-31b N3-040177 Revised 2004-05-28 QoS1 - 2004-05-28
0061 1 F Rel-6 - - Updates to Authorize QoS resources callflows - - - N3 N3-31b N3-040216 Revised 2004-05-28 QoS1 - 2004-05-28
0061 2 F Rel-6 - - Updates to Authorize QoS resources callflows - - - N3 N3-31b N3-040242 Agreed 2004-05-28 QoS1 - 2004-05-28
0062 - F Rel-6 - - Updates to Resource reservation flow - - - N3 N3-31b N3-040178 Revised 2004-05-28 QoS1 - 2004-05-28
0062 1 F Rel-6 - - Updates to Resource reservation flow - - - N3 N3-31b N3-040217 Agreed 2004-05-28 QoS1 - 2004-05-28
0063 - F Rel-6 - - Updates to Other flowsd - - - N3 N3-31b N3-040179 Revised 2004-05-28 QoS1 - 2004-05-28
0063 1 F Rel-6 - - Updates to Other flowsd - - - N3 N3-31b N3-040218 Revised 2004-05-28 QoS1 - 2004-05-28
0063 2 F Rel-6 - - Updates to Other flows - - - N3 N3-31b N3-040235 Revised 2004-05-28 QoS1 - 2004-05-28
0063 3 F Rel-6 - - Updates to Other flows - - - N3 N3-31b N3-040245 Agreed 2004-05-28 QoS1 - 2004-05-28
0064 - B Rel-6 - - Indication of PDF-initiated PDP Context Release - - - N3 N3-31b N3-040180 Revised 2004-05-28 QoS1 - 2004-05-28
0064 1 B Rel-6 - - Indication of PDF-initiated PDP Context Release - - - N3 N3-31b N3-040219 Revised 2004-05-28 QoS1 - 2004-05-28
0064 2 B Rel-6 - - Indication of PDF-initiated PDP Context Release - - - N3 N3-31b N3-040236 Agreed 2004-05-28 QoS1 - 2004-05-28
0065 - B Rel-6 - - Generic Desription of QoS Mapping - - - N3 N3-31b N3-040181 Revised 2004-05-28 QoS1 - 2004-05-28
0065 1 B Rel-6 - - Generic Desription of QoS Mapping - - - N3 N3-31b N3-040220 Rejected 2004-05-28 QoS1 - 2004-05-28
0066 - B Rel-6 - - Mapping of Servivce Information - - - N3 N3-31b N3-040182 Rejected 2004-05-28 QoS1 - 2004-05-28
0067 - B Rel-6 - - Updates to Authorize QoS resources callflows for IMS - - - N3 N3-31b N3-040183 Revised 2004-05-28 QoS1 - 2004-05-28
0067 1 B Rel-6 - - Updates to Authorize QoS resources callflows for IMS - - - N3 N3-31b N3-040221 Revised 2004-05-28 QoS1 - 2004-05-28
0067 2 B Rel-6 - - Updates to Authorize QoS resources callflows for IMS - - - N3 N3-31b N3-040237 Agreed 2004-05-28 QoS1 - 2004-05-28
0068 - B Rel-6 - - Updates to IMS callflows - - - N3 N3-31b N3-040184 Revised 2004-05-28 QoS1 - 2004-05-28
0068 1 B Rel-6 - - Updates to IMS callflows - - - N3 N3-31b N3-040222 Revised 2004-05-28 QoS1 - 2004-05-28
0068 2 B Rel-6 - - Updates to IMS callflows - - - N3 N3-31b N3-040246 Agreed 2004-05-28 QoS1 - 2004-05-28
0069 - B Rel-6 5.7.0 6.0.0 Multiple IMS sessions using the same PDP context NP-24 NP-040247 approved N3 N3-32 N3-040304 Agreed 2004-05-28 TEI - 2004-05-28
0070 - F Rel-5 5.6.0 - Media component removal flow - - - N3 N3-32 N3-040310 Revised 2004-05-28 E2EQoS - 2004-05-28
0070 1 F Rel-5 5.6.0 - Media component removal flow - - - N3 N3-32 N3-040335 Revised 2004-05-28 E2EQoS - 2004-05-28
0070 2 F Rel-5 5.6.0 - Media component removal flow - - - N3 N3-32 N3-040348 Revised 2004-05-28 E2EQoS - 2004-05-28
0070 3 F Rel-5 5.7.0 5.8.0 Media component removal flow NP-24 NP-040240 approved N3 N3-32 N3-040395 Agreed 2004-05-28 E2EQoS - 2004-05-28
0071 - F Rel-6 - - Gq actions at PDP context release - - - N3 N3-32 N3-040341 Agreed 2004-05-28 QoS1 - 2004-05-28
0072 - F Rel-6 - - Generic description for Qos Mapping - - - N3 N3-32 N3-040344 Rejected 2004-05-28 QoS1 - 2004-05-28
0073 - B Rel-6 6.0.0 6.1.0 29.208-Rel6: accumulated for Gq impacts NP-25 NP-040338 approved N3 N3-33 N3-040616 Agreed 2004-09-01 QoS1 - 2004-09-01
0074 3 F Rel-6 6.1.0 6.2.0 Correcting Mapping Table[Update to existing 074 against 29.208] NP-26 NP-040586 approved N3 N3-26 N3-040825 Agreed 2004-12-08 QoS1 - 2004-12-09
0075 2 F Rel-6 6.1.0 6.2.0 Clarification on Mapping Table 7.1.1.1 NP-26 NP-040586 approved N3 N3-26 N3-040700 Agreed 2004-12-08 QoS1 - 2004-12-09
0076 3 C Rel-6 6.1.0 6.2.0 Allowing the use of Application identifier for IMS NP-26 NP-040586 approved N3 N3-26 N3-040895 Agreed 2004-12-08 QoS1 - 2004-12-09
0077 1 F Rel-5 5.8.0 5.9.0 Authorize QoS resources with no generation of authorization token at session modification NP-26 NP-040555 approved N3 N3-26 N3-040814 Agreed 2004-12-08 E2EQoS - 2004-12-09
0081 1 F Rel-5 5.8.0 5.9.0 Removal of QoS commit for session modification NP-26 NP-040555 approved N3 N3-26 N3-040815 Agreed 2004-12-08 E2EQoS - 2004-12-09
0082 3 A Rel-6 6.1.0 6.2.0 Removal of QoS commit for session modification NP-26 NP-040555 approved N3 N3-26 N3-040893 Agreed 2004-12-08 E2EQoS - 2004-12-09
0089 1 F Rel-5 5.8.0 5.9.0 Modification of PDP contexts NP-26 NP-040555 approved N3 N3-26 N3-040864 Agreed 2004-12-08 E2EQoS - 2004-12-09
0090 1 A Rel-6 6.1.0 6.2.0 Modification of PDP contexts NP-26 NP-040555 approved N3 N3-26 N3-040865 Agreed 2004-12-08 E2EQoS - 2004-12-09
0095 1 F Rel-6 6.2.1 6.3.0 Essential clarification of the Scope for call flows NP-27 NP-050103 approved N3 N3-35 N3-050144 Agreed - E2EQOS - 2005-03-04
0097 1 F Rel-6 6.2.1 6.3.0 Change of port number NP-27 NP-050103 approved N3 N3-35 N3-050223 Agreed - E2EQOS - 2005-03-04
0098 2 F Rel-6 6.2.0 - Various Corrections CP-28 CP-050039 revised C3 C3-36 C3-050367 QoS1 - - Written to wrong version 2005-05-31
0098 2 F Rel-6 6.3.0 6.4.0 Various Corrections CP-28 CP-050245 approved C3 C3-36 - - 2005-06-02 QoS1 - 2005-06-04
0098 3 F Rel-6 6.3.0 - Various Corrections CP-28 CP-050199 revised - - - QoS1 - - based on C3-050367; Revised to CP-050244 2005-05-31
0100 1 F Rel-6 6.3.0 6.4.0 UE QoS Mapping CP-28 CP-050034 approved C3 C3-36 C3-050401 E2EQoS - - - 2005-05-31
0101 - F Rel-6 6.4.0 - Missing description of behaviour when AAA is not received - - - C3 C3-37 C3-050483 Withdrawn 2005-09-14 CH-FBC - 2005-09-14
0102 - F Rel-6 6.4.0 - Indication of SDP offer - - - C3 C3-37 C3-050554 Revised 2005-09-14 QoS1 - 2005-09-14
0102 1 F Rel-6 6.4.0 6.5.0 Mapping of SDP offer CP-29 CP-050378 approved C3 C3-37 C3-050585 Agreed 2005-09-14 QoS1 - 2005-09-14
0103 - F Rel-6 6.4.0 - Correction of network entities names - - - C3 C3-37 C3-050564 Revised 2005-09-14 QoS1 - 2005-09-14
0103 1 F Rel-6 6.4.0 6.5.0 Correction of network entities names CP-29 CP-050378 approved C3 C3-37 C3-050586 Agreed 2005-09-14 QoS1 - 2005-09-14
0104 - F Rel-6 6.5.0 - Correction and clarification of the identity of the radio access network - - - C3 C3-38 C3-050696 Revised 2005-11-25 QoS1 - 2005-11-24
0104 1 F Rel-6 6.5.0 - Correction and clarification of the identity of the radio access network - - - C3 C3-38 C3-050785 Revised 2005-11-25 QoS1 - 2005-11-24
0104 2 F Rel-6 6.5.0 6.6.0 Correction and clarification of the identity of the radio access network CP-30 CP-050508 approved C3 C3-38 C3-050841 Agreed 2005-11-25 QoS1 - 2005-11-24
0105 - F Rel-6 6.6.1 6.7.0 QoS mapping clarifications for forking CP-36 CP-070417 approved C3 C3-44 C3-070441 Agreed 2007-05-25 QoS1 - 2007-05-25