Go to spec numbering scheme page
3GPP Specification Change Request records for: 29.212
CR no. | rev | cat | Release | CR written to vers | new vers | CR title | TSG meeting | TSG doc | TSG status | source | WG meeting | WG doc | WG status | cover date | work item | remarks | database record created |
0001 | - | B | Rel-7 | 7.0.0 | - | IP-CAN session specific charging | - | - | - | C3 | C3-43b | C3-070280 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0001 | 1 | B | Rel-7 | 7.0.0 | 7.1.0 | IP-CAN session specific charging | CP-36 | CP-070419 | approved | C3 | C3-43b | C3-070362 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0001a | - | F | Rel-8 | - | - | Default QoS handling | - | - | - | C3 | C3-50 | C3-082201 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0002 | - | F | Rel-7 | 7.0.0 | - | Adding Bearer-Priority AVP for Gx | - | - | - | C3 | C3-43b | C3-070290 | Postponed | 2007-05-25 | PCC | - | 2007-05-25 |
0002a | - | B | Rel-8 | - | - | UE-init Bearer Resource Modification request | - | - | - | C3 | C3-50 | C3-082202 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0003 | - | F | Rel-7 | 7.0.0 | - | Event Trigger amendments | - | - | - | C3 | C3-43b | C3-070302 | Withdrawn | 2007-05-25 | PCC | - | 2007-05-25 |
0003a | - | B | Rel-8 | - | - | BCM Selection in Gx and Gxx reference points | - | - | - | C3 | C3-50 | C3-082203 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0004 | - | F | Rel-7 | 7.0.0 | - | Handling of Authorized QoS | - | - | - | C3 | C3-43b | C3-070305 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0004 | 1 | F | Rel-7 | 7.0.0 | - | Handling of Authorized QoS | - | - | - | C3 | C3-43b | C3-070363 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0004 | 10 | F | Rel-7 | 7.0.0 | - | Handling of Authorized QoS | - | - | - | C3 | C3-44 | C3-070614 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0004 | 11 | F | Rel-7 | 7.0.0 | 7.1.0 | Handling of Authorized QoS | CP-36 | CP-070420 | approved | C3 | C3-44 | C3-070618 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0004 | 2 | F | Rel-7 | 7.0.0 | - | Handling of Authorized QoS | - | - | - | C3 | C3-43b | C3-070384 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0004 | 3 | F | Rel-7 | 7.0.0 | - | Handling of Authorized QoS | - | - | - | C3 | C3-43b | C3-070387 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0004 | 4 | F | Rel-7 | 7.0.0 | - | Handling of Authorized QoS | - | - | - | C3 | C3-44 | C3-070425 | Withdrawn | 2007-05-25 | PCC | - | 2007-05-25 |
0004 | 5 | F | Rel-7 | 7.0.0 | - | Handling of Authorized QoS | - | - | - | C3 | C3-44 | C3-070458 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0004 | 6 | F | Rel-7 | 7.0.0 | - | Handling of Authorized QoS | - | - | - | C3 | C3-44 | C3-070567 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0004 | 7 | F | Rel-7 | 7.0.0 | - | Handling of Authorized QoS | - | - | - | C3 | C3-44 | C3-070605 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0004 | 8 | F | Rel-7 | 7.0.0 | - | Handling of Authorized QoS | - | - | - | C3 | C3-44 | C3-070607 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0004 | 9 | F | Rel-7 | 7.0.0 | - | Handling of Authorized QoS | - | - | - | C3 | C3-44 | C3-070611 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0004a | - | F | Rel-8 | - | - | Clean-up of QoS handling procedures | - | - | - | C3 | C3-50 | C3-082204 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0005 | - | F | Rel-7 | 7.0.0 | - | Subscription to notification of Loss of AF signalling | - | - | - | C3 | C3-43b | C3-070307 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0005 | 1 | F | Rel-7 | 7.0.0 | - | Subscription to notification of Loss of AF signalling | - | - | - | C3 | C3-43b | C3-070365 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0005 | 2 | F | Rel-7 | 7.0.0 | 7.1.0 | Subscription to notification of Loss of AF signalling | CP-36 | CP-070419 | approved | C3 | C3-43b | C3-070393 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0005a | - | F | Rel-8 | - | - | Gxx tunnelling information description and use | - | - | - | C3 | C3-50 | C3-082205 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0006 | - | F | Rel-7 | 7.0.0 | - | Routeing of Diameter commands - Gx | - | - | - | C3 | C3-43b | C3-070313 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0006 | 1 | F | Rel-7 | 7.0.0 | 7.1.0 | Routeing of Diameter commands - Gx | CP-36 | CP-070419 | approved | C3 | C3-43b | C3-070366 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0006a | - | B | Rel-8 | - | - | PCRF maintaining PCC and QoS rules aligned | - | - | - | C3 | C3-50 | C3-082206 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0007 | - | F | Rel-7 | 7.0.0 | - | QoS change event | - | - | - | C3 | C3-43b | C3-070324 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0007 | 1 | F | Rel-7 | 7.0.0 | - | QoS change event | - | - | - | C3 | C3-44 | C3-070463 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0007 | 2 | F | Rel-7 | 7.0.0 | - | QoS change event | - | - | - | C3 | C3-44 | C3-070530 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0007 | 3 | F | Rel-7 | 7.0.0 | - | QoS change event | - | - | - | C3 | C3-44 | C3-070590 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0007 | 4 | F | Rel-7 | 7.0.0 | - | QoS change event | - | - | - | C3 | C3-44 | C3-070600 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0007 | 5 | F | Rel-7 | 7.0.0 | 7.1.0 | QoS change event | CP-36 | CP-070420 | approved | C3 | C3-44 | C3-070610 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0008 | - | F | Rel-7 | 7.0.0 | 7.1.0 | PCC rule without Flow-Description AVP | CP-36 | CP-070419 | approved | C3 | C3-43b | C3-070325 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0009 | - | F | Rel-7 | 7.0.0 | - | Removing of event triggers | - | - | - | C3 | C3-43b | C3-070326 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0009 | 1 | F | Rel-7 | 7.0.0 | 7.1.0 | Addition and removal of event triggers | CP-36 | CP-070419 | approved | C3 | C3-44 | C3-070423 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0009 | 2 | F | Rel-7 | 7.0.0 | - | Removing of event triggers | - | - | - | C3 | C3-44 | C3-070464 | Withdrawn | 2007-05-25 | PCC | - | 2007-05-25 |
0010 | - | F | Rel-7 | 7.0.0 | - | Metering-Method AVP | - | - | - | C3 | C3-43b | C3-070327 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0010 | 1 | F | Rel-7 | 7.0.0 | - | Metering-Method AVP | - | - | - | C3 | C3-44 | C3-070461 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0010 | 2 | F | Rel-7 | 7.0.0 | - | Unused | - | - | - | C3 | C3-44 | C3-070534 | Unused | 2007-05-25 | PCC | - | 2007-05-25 |
0010 | 2 | F | Rel-7 | 7.0.0 | 7.1.0 | Metering-Method AVP | CP-36 | CP-070419 | approved | C3 | C3-44 | C3-070565 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0011 | - | F | Rel-7 | 7.0.0 | - | Reporting-Level AVP | - | - | - | C3 | C3-43b | C3-070328 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0011 | 1 | F | Rel-7 | 7.0.0 | - | Reporting-Level AVP | - | - | - | C3 | C3-44 | C3-070462 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0011 | 2 | F | Rel-7 | 7.0.0 | - | Unused | - | - | - | C3 | C3-44 | C3-070535 | Unused | 2007-05-25 | PCC | - | 2007-05-25 |
0011 | 2 | F | Rel-7 | 7.0.0 | 7.1.0 | Reporting-Level AVP | CP-36 | CP-070419 | approved | C3 | C3-44 | C3-070566 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0012 | - | F | Rel-7 | 7.0.0 | - | PCC-Rule-Status AVP | - | - | - | C3 | C3-43b | C3-070329 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0012 | 1 | F | Rel-7 | 7.0.0 | 7.1.0 | PCC-Rule-Status AVP | CP-36 | CP-070419 | approved | C3 | C3-43b | C3-070368 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0013 | - | F | Rel-7 | 7.0.0 | 7.1.0 | Charging-Information AVP | CP-36 | CP-070419 | approved | C3 | C3-43b | C3-070330 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0014 | - | F | Rel-7 | 7.0.0 | - | PCC-Rule-Event AVP | - | - | - | C3 | C3-43b | C3-070331 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0014 | 1 | F | Rel-7 | 7.0.0 | 7.1.0 | PCC-Rule-Event AVP | CP-36 | CP-070419 | approved | C3 | C3-43b | C3-070369 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0015 | - | F | Rel-7 | 7.0.0 | 7.1.0 | Corrections to Reused AVPs | CP-36 | CP-070419 | approved | C3 | C3-43b | C3-070332 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0016 | - | F | Rel-7 | 7.0.0 | - | Precedence AVP | - | - | - | C3 | C3-43b | C3-070333 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0016 | 1 | F | Rel-7 | 7.0.0 | - | Precedence AVP | - | - | - | C3 | C3-43b | C3-070370 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0016 | 3 | F | Rel-7 | 7.0.0 | - | Precedence AVP | - | - | - | C3 | C3-43b | C3-070386 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0016 | 4 | F | Rel-7 | 7.0.0 | 7.1.0 | Precedence AVP | CP-36 | CP-070419 | approved | C3 | C3-43b | C3-070388 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0017 | - | B | Rel-7 | 7.0.0 | - | Mixed Mode | - | - | - | C3 | C3-43b | C3-070334 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0017 | 1 | B | Rel-7 | 7.0.0 | - | Mixed Mode | - | - | - | C3 | C3-43b | C3-070371 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0017 | 2 | B | Rel-7 | 7.0.0 | - | Mixed Mode | - | - | - | C3 | C3-43b | C3-070397 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0017 | 3 | B | Rel-7 | 7.0.0 | - | Mixed Mode | - | - | - | C3 | C3-44 | C3-070457 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0017 | 4 | B | Rel-7 | 7.0.0 | - | Mixed Mode | - | - | - | C3 | C3-44 | C3-070532 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0017 | 5 | B | Rel-7 | 7.0.0 | - | Mixed Mode | - | - | - | C3 | C3-44 | C3-070568 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0017 | 6 | B | Rel-7 | 7.0.0 | 7.1.0 | Mixed Mode | CP-36 | CP-070419 | approved | C3 | C3-44 | C3-070591 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0018 | - | F | Rel-7 | 7.0.0 | - | Correction to where binding should be | - | - | - | C3 | C3-44 | C3-070433 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0018 | 1 | F | Rel-7 | 7.0.0 | - | Correction to where binding should be | - | - | - | C3 | C3-44 | C3-070531 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0018 | 2 | F | Rel-7 | 7.0.0 | 7.1.0 | Correction to where binding should be | CP-36 | CP-070419 | approved | C3 | C3-44 | C3-070595 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0019 | - | B | Rel-7 | 7.0.0 | - | 3GPP2 as IP-CAN-TYPE | - | - | - | C3 | C3-44 | C3-070434 | Withdrawn | 2007-05-25 | PCC | - | 2007-05-25 |
0020 | - | B | Rel-7 | 7.0.0 | - | Mixed Mode | - | - | - | C3 | C3-44 | C3-070435 | Withdrawn | 2007-05-25 | PCC | - | 2007-05-25 |
0021 | - | B | Rel-7 | 7.0.0 | - | PCC Support for emergency Sessions | - | - | - | C3 | C3-44 | C3-070438 | Postponed | 2007-05-25 | PCC | - | 2007-05-25 |
0022 | - | F | Rel-7 | 7.0.0 | - | Removing Editors note of Authorized QoS | - | - | - | C3 | C3-44 | C3-070486 | Withdrawn | 2007-05-25 | PCC | - | 2007-05-25 |
0023 | - | F | Rel-7 | 7.0.0 | - | Upgrading of the requested QoS | - | - | - | C3 | C3-44 | C3-070487 | Withdrawn | 2007-05-25 | PCC | - | 2007-05-25 |
0024 | - | F | Rel-7 | 7.0.0 | - | Alignment of the QoS information | - | - | - | C3 | C3-44 | C3-070563 | Revised | 2007-05-25 | PCC | - | 2007-05-25 |
0024 | 1 | F | Rel-7 | 7.0.0 | 7.1.0 | Alignment of the QoS information | CP-36 | CP-070420 | approved | C3 | C3-44 | C3-070570 | Agreed | 2007-05-25 | PCC | - | 2007-05-25 |
0025 | - | F | Rel-7 | 7.1.0 | 7.2.0 | Usage of Event-Trigger AVP in RAA | CP-37 | CP-070555 | approved | C3 | C3-45 | C3-070665 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0026 | - | F | Rel-7 | 7.1.0 | - | Providing user location information from PCEF to PCRF | - | - | - | C3 | C3-45 | C3-070666 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0026 | 1 | F | Rel-7 | 7.1.0 | - | Location based PCC decisions and Event Triggers | - | - | - | C3 | C3-45 | C3-070788 | Withdrawn | 2007-09-05 | PCC | - | 2007-09-05 |
0027 | - | F | Rel-7 | 7.1.0 | 7.2.0 | Correct inconsistent name of re-used AVPs | CP-37 | CP-070555 | approved | C3 | C3-45 | C3-070667 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0028 | - | F | Rel-7 | 7.1.0 | - | Correct procedure of a PCC rule modification | - | - | - | C3 | C3-45 | C3-070668 | Postponed | 2007-09-05 | PCC | - | 2007-09-05 |
0029 | - | F | Rel-7 | 7.1.0 | - | Multiple QoS-Information AVPs in one Gx message | - | - | - | C3 | C3-45 | C3-070669 | Withdrawn | 2007-09-05 | PCC | - | 2007-09-05 |
0030 | - | F | Rel-7 | 7.1.0 | - | Tariff bases on the time and the service | - | - | - | C3 | C3-45 | C3-070670 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0030 | 1 | F | Rel-7 | 7.1.0 | - | Tariff bases on the time and the service | - | - | - | C3 | C3-45 | C3-070797 | Postponed | 2007-09-05 | PCC | - | 2007-09-05 |
0031 | - | F | Rel-7 | 7.1.0 | - | Combine different sets of authorized QoS information | - | - | - | C3 | C3-45 | C3-070671 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0031 | 1 | F | Rel-7 | 7.1.0 | - | Combine different sets of authorized QoS information | - | - | - | C3 | C3-45 | C3-070790 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0031 | 2 | F | Rel-7 | 7.1.0 | 7.2.0 | Combine different sets of authorized QoS information | CP-37 | CP-070555 | approved | C3 | C3-45 | C3-070867 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0032 | - | F | Rel-7 | 7.1.0 | - | Modification of the Event-Trigger AVP | - | - | - | C3 | C3-45 | C3-070672 | Withdrawn | 2007-09-05 | PCC | - | 2007-09-05 |
0033 | - | F | Rel-7 | 7.1.0 | - | Precedence of the PCC Rule | - | - | - | C3 | C3-45 | C3-070673 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0033 | 1 | F | Rel-7 | 7.1.0 | 7.2.0 | Precedence of the PCC Rule | CP-37 | CP-070555 | approved | C3 | C3-45 | C3-070791 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0034 | - | F | Rel-7 | 7.1.0 | - | Experimental-Result-Code for the IP-CAN session rejection | - | - | - | C3 | C3-45 | C3-070674 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0034 | 1 | F | Rel-7 | 7.1.0 | - | Experimental-Result-Code for the IP-CAN session rejection | - | - | - | C3 | C3-45 | C3-070792 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0034 | 2 | F | Rel-7 | 7.1.0 | - | Experimental-Result-Code for the IP-CAN session rejection | - | - | - | C3 | C3-45 | C3-070894 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0034 | 3 | F | Rel-7 | 7.1.0 | 7.2.0 | Experimental-Result-Code for the IP-CAN session rejection | CP-37 | CP-070555 | approved | C3 | C3-45 | C3-070900 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0035 | - | F | Rel-7 | 7.1.0 | - | Service-based Hot Billing | - | - | - | C3 | C3-45 | C3-070675 | Postponed | 2007-09-05 | PCC | - | 2007-09-05 |
0036 | - | F | Rel-7 | 7.1.0 | - | Several bearer QoS-Authorization AVP(s) in the same command | - | - | - | C3 | C3-45 | C3-070698 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0036 | 1 | F | Rel-7 | 7.1.0 | 7.2.0 | Several bearer QoS-Authorization AVP(s) in the same command | CP-37 | CP-070555 | approved | C3 | C3-45 | C3-070789 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0037 | - | F | Rel-7 | 7.1.0 | - | Bearer Identifier handling in Event Trigger reporting | - | - | - | C3 | C3-45 | C3-070699 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0037 | 1 | F | Rel-7 | 7.1.0 | - | Bearer Identifier handling in Event Trigger reporting | - | - | - | C3 | C3-45 | C3-070794 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0037 | 2 | F | Rel-7 | 7.1.0 | 7.2.0 | Bearer Identifier handling in Event Trigger reporting | CP-37 | CP-070555 | approved | C3 | C3-45 | C3-070868 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0038 | - | F | Rel-7 | 7.1.0 | - | QoS alignments with stage 2 | - | - | - | C3 | C3-45 | C3-070700 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0038 | 1 | F | Rel-7 | 7.1.0 | - | QoS alignments with stage 2 | - | - | - | C3 | C3-45 | C3-070767 | Withdrawn | 2007-09-05 | PCC | - | 2007-09-05 |
0039 | - | F | Rel-7 | 7.1.0 | - | Removal of Editors Notes | - | - | - | C3 | C3-45 | C3-070701 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0039 | 1 | F | Rel-7 | 7.1.0 | - | Removal of Editor's Notes | - | - | - | C3 | C3-45 | C3-070798 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0039 | 2 | F | Rel-7 | 7.1.0 | 7.2.0 | Removal of Editor's Notes | CP-37 | CP-070555 | approved | C3 | C3-45 | C3-070910 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0040 | - | F | Rel-7 | 7.1.0 | - | Dynamic default values for Reporting-Level and Metering-Method AVP | - | - | - | C3 | C3-45 | C3-070702 | Withdrawn | 2007-09-05 | PCC | - | 2007-09-05 |
0041 | - | F | Rel-7 | 7.1.0 | - | Location based PCC decisions and Event Triggers | - | - | - | C3 | C3-45 | C3-070703 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0041 | 2 | F | Rel-7 | 7.1.0 | 7.2.0 | Location based PCC decisions and Event Triggers | CP-37 | CP-070555 | approved | C3 | C3-45 | C3-070853 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0042 | - | F | Rel-7 | 7.1.0 | 7.2.0 | IP-CAN Type AVP missing in commands | CP-37 | CP-070555 | approved | C3 | C3-45 | C3-070704 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0043 | - | F | Rel-7 | 7.1.0 | - | BCM change due to handover | - | - | - | C3 | C3-45 | C3-070705 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0043 | 1 | F | Rel-7 | 7.1.0 | 7.2.0 | BCM change due to handover | CP-37 | CP-070555 | approved | C3 | C3-45 | C3-070800 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0044 | - | F | Rel-7 | 7.1.0 | - | Diameter Base Protocol termination procedures | - | - | - | C3 | C3-45 | C3-070706 | Withdrawn | 2007-09-05 | PCC | - | 2007-09-05 |
0045 | - | F | Rel-7 | 7.1.0 | - | Bearer authorization by PCRF | - | - | - | C3 | C3-45 | C3-070707 | Withdrawn | 2007-09-05 | PCC | - | 2007-09-05 |
0046 | - | F | Rel-7 | 7.1.0 | - | Charging correlation over Gx interface | - | - | - | C3 | C3-45 | C3-070708 | Postponed | 2007-09-05 | PCC | - | 2007-09-05 |
0047 | - | F | Rel-7 | 7.1.0 | - | Authorised MBR per QCI | - | - | - | C3 | C3-45 | C3-070723 | Withdrawn | 2007-09-05 | PCC | - | 2007-09-05 |
0048 | - | F | Rel-7 | 7.1.0 | 7.2.0 | Support of Authorisation Token in Gx | CP-37 | CP-070555 | approved | C3 | C3-45 | C3-070724 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0049 | - | C | Rel-7 | 7.1.0 | - | Extension of IP-CAN-Type AVP to specify non-3GPP IP-CANs | - | - | - | C3 | C3-45 | C3-070737 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0049 | 1 | C | Rel-7 | 7.1.0 | - | Extension of IP-CAN-Type AVP to specify non-3GPP IP-CANs | - | - | - | C3 | C3-45 | C3-070799 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0049 | 2 | C | Rel-7 | 7.1.0 | - | Extension of IP-CAN-Type AVP to specify non-3GPP IP-CANs | - | - | - | C3 | C3-45 | C3-070869 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0049 | 3 | C | Rel-7 | 7.1.0 | 7.2.0 | Extension of IP-CAN-Type AVP to specify non-3GPP IP-CANs | CP-37 | CP-070556 | approved | C3 | C3-45 | C3-070875 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0050 | - | F | Rel-7 | 7.1.0 | - | Explicilty specify the Supported-Vendor-Id for Gx in the CER/CEA. | - | - | - | C3 | C3-45 | C3-070742 | Postponed | 2007-09-05 | PCC | - | 2007-09-05 |
0051 | - | F | Rel-7 | 7.1.0 | - | Authorized QoS per QCI | - | - | - | C3 | C3-45 | C3-070749 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0051 | 1 | F | Rel-7 | 7.1.0 | 7.2.0 | Authorized QoS per QCI | CP-37 | CP-070555 | approved | C3 | C3-45 | C3-070796 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0052 | - | F | Rel-7 | 7.1.0 | 7.2.0 | Applicability to charging or policy control | CP-37 | CP-070555 | approved | C3 | C3-45 | C3-070750 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0053 | - | F | Rel-7 | 7.1.0 | - | IP-CAN bearer operation failure | - | - | - | C3 | C3-45 | C3-070751 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0053 | 1 | F | Rel-7 | 7.1.0 | - | IP-CAN bearer operation failure | - | - | - | C3 | C3-45 | C3-070802 | Revised | 2007-09-05 | PCC | - | 2007-09-05 |
0053 | 2 | F | Rel-7 | 7.1.0 | 7.2.0 | IP-CAN bearer operation failure | CP-37 | CP-070555 | approved | C3 | C3-45 | C3-070870 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0054 | - | F | Rel-7 | 7.1.0 | 7.2.0 | Gx Application ID | CP-37 | CP-070555 | approved | C3 | C3-45 | C3-070881 | Agreed | 2007-09-05 | PCC | - | 2007-09-05 |
0055 | - | F | Rel-7 | 7.2.0 | - | Auth-Application-Id AVP missing in the RAA command | - | - | - | - | C3-46 | C3-070944 | postponed | 2007-11-15 | PCC | - | 2007-11-15 |
0056 | - | F | Rel-7 | 7.2.0 | 7.3.0 | Add Bearer-Identifier AVP in RAA message | CP-38 | CP-070726 | approved | C3 | C3-46 | C3-070945 | agreed | 2007-11-12 | PCC | - | 2007-11-12 |
0057 | - | F | Rel-7 | 7.2.0 | 7.3.0 | Alignment for the Indication of IP-CAN Bearer Termination Implications | CP-38 | CP-070726 | approved | C3 | C3-46 | C3-070946 | agreed | 2007-11-12 | PCC | - | 2007-11-12 |
0058 | - | F | Rel-7 | 7.2.0 | - | Correction of default charging method over Gx interface | - | - | - | - | C3-46 | C3-070947 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0058 | 1 | F | Rel-7 | 7.2.0 | - | Correction of default charging method over Gx interface | - | - | - | - | C3-46 | C3-071060 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0058 | 2 | F | Rel-7 | 7.2.0 | 7.3.0 | Correction of default charging method over Gx interface | CP-38 | CP-070726 | approved | C3 | C3-46 | C3-071128 | agreed | 2007-11-12 | PCC | - | 2007-11-12 |
0059 | - | F | Rel-7 | 7.2.0 | - | Querying the current information with the event trigger | - | - | - | - | C3-46 | C3-070948 | postponed | 2007-11-15 | PCC | - | 2007-11-15 |
0059 | 1 | F | Rel-8 | 7.2.0 | - | Querying the current information with the event trigger | - | - | - | - | C3-46 | C3-071061 | withdrawn | 2007-11-15 | PCC | - | 2007-11-15 |
0060 | - | F | Rel-7 | 7.2.0 | - | Multiple Bearer-Identifiers in same Charging-Rule-Install AVP | - | - | - | - | C3-46 | C3-070949 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0060 | 1 | F | Rel-7 | .. | - | Multiple Bearer-Identifiers in same Charging-Rule-Install AVP | - | - | - | - | C3-46 | C3-071096 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0060 | 2 | F | Rel-8 | 7.2.0 | - | Multiple Bearer-Identifiers in same Charging-Rule-Install AVP | - | - | - | - | C3-46 | C3-071129 | withdrawn | 2007-11-15 | PCC | - | 2007-11-15 |
0061 | - | F | Rel-7 | 7.2.0 | - | Correction of the ambiguous name of Max-Requested-Bandwidth-UL DL AVPs | - | - | - | - | C3-46 | C3-070950 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0061 | 1 | F | Rel-7 | 7.2.0 | - | Correction of the ambiguous name of Max-Requested-Bandwidth-UL DL AVPs | - | - | - | - | C3-46 | C3-071062 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0061 | 2 | F | Rel-7 | 7.2.0 | 7.3.0 | Correction of the ambiguous name of Max-Requested-Bandwidth-UL DL AVPs | CP-38 | CP-070726 | approved | C3 | C3-46 | C3-071130 | agreed | 2007-11-12 | PCC | - | 2007-11-12 |
0062 | - | F | Rel-7 | 7.2.0 | - | Minor modifications | - | - | - | - | C3-46 | C3-070951 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0062 | 1 | F | Rel-7 | 7.2.0 | - | Authorized QoS per QCI provisioned in CCA | - | - | - | - | C3-46 | C3-071097 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0062 | 2 | F | Rel-7 | 7.2.0 | 7.3.0 | Authorized QoS per QCI provisioned in CCA | CP-38 | CP-070726 | approved | C3 | C3-46 | C3-071131 | agreed | 2007-11-12 | PCC | - | 2007-11-12 |
0063 | - | F | Rel-7 | 7.2.0 | - | Diameter session termination procedures for Gx | - | - | - | - | C3-46 | C3-070952 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0063 | 1 | F | Rel-7 | 7.2.0 | - | Diameter session termination procedures for Gx | - | - | - | - | C3-46 | C3-071066 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0063 | 2 | F | Rel-7 | 7.2.0 | - | Diameter session termination procedures for Gx | - | - | - | - | C3-46 | C3-071132 | withdrawn | 2007-11-15 | PCC | - | 2007-11-15 |
0064 | - | F | Rel-7 | 7.2.0 | - | Modify the description of Charging-Rule-Report AVP | - | - | - | - | C3-46 | C3-070953 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0064 | 1 | F | Rel-7 | 7.2.0 | - | Modify the description of Charging-Rule-Report AVP | - | - | - | - | C3-46 | C3-071067 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0064 | 2 | F | Rel-7 | 7.2.0 | - | Modify the description of Charging-Rule-Report AVP | - | - | - | - | C3-46 | C3-071133 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0064 | 3 | F | Rel-7 | 7.2.0 | 7.3.0 | Modify the description of Charging-Rule-Report AVP | CP-38 | CP-070726 | approved | C3 | C3-46 | C3-071153 | agreed | 2007-11-12 | PCC | - | 2007-11-12 |
0065 | - | - | Rel-7 | 7.2.0 | - | Support of access capabilities for QoS control in PCC | - | - | - | - | C3-46 | C3-070991 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0065 | 1 | - | Rel-7 | 7.2.0 | - | Support of access capabilities for QoS control in PCC | - | - | - | - | C3-46 | C3-071071 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0065 | 2 | - | Rel-7 | 7.2.0 | - | Support of access capabilities for QoS control in PCC | - | - | - | - | C3-46 | C3-071154 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0065 | 3 | - | Rel-7 | 7.2.0 | - | Support of access capabilities for QoS control in PCC | - | - | - | - | C3-46 | C3-071169 | - | 2007-11-15 | PCC | - | 2007-11-15 |
0065 | 4 | - | Rel-7 | 7.2.0 | - | Support of access capabilities for QoS control in PCC | - | - | - | - | C3-46 | C3-071170 | reserved for luck | 2007-11-15 | PCC | - | 2007-11-15 |
0066 | - | F | Rel-7 | 7.2.0 | - | Handling of Charging Rule Report | - | - | - | - | C3-46 | C3-070993 | rejected | 2007-11-15 | PCC | - | 2007-11-15 |
0067 | - | F | Rel-7 | 7.2.0 | - | Adding 3GPP-user-location-info AVP in Cmessage | - | - | - | - | C3-46 | C3-071008 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0067 | 1 | F | Rel-7 | 7.2.0 | - | Adding 3GPP-user-location-info AVP in Cmessage | - | - | - | - | C3-46 | C3-071072 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0067 | 2 | F | Rel-7 | 7.2.0 | 7.3.0 | Adding 3GPP-user-location-info AVP in Cmessage | CP-38 | CP-070726 | approved | C3 | C3-46 | C3-071136 | agreed | 2007-11-12 | PCC | - | 2007-11-12 |
0068 | - | F | Rel-7 | 7.2.0 | - | Removing unnecessary and ambigous text from the Charging-Rule-Install section | - | - | - | - | C3-46 | C3-071019 | revised | 2007-11-15 | PCC | - | 2007-11-15 |
0068 | 1 | F | Rel-7 | 7.2.0 | 7.3.0 | Removing unnecessary and ambigous text from the Charging-Rule-Install section | CP-38 | CP-070726 | approved | C3 | C3-46 | C3-071073 | agreed | 2007-11-12 | PCC | - | 2007-11-12 |
0069 | - | F | Rel-7 | 7.2.0 | 7.3.0 | AVP applicability to charging or policy control | CP-38 | CP-070726 | approved | C3 | C3-46 | C3-070980 | agreed | 2007-11-12 | PCC | - | 2007-11-12 |
0070 | - | F | Rel-7 | 7.3.0 | - | Adding missing AVPs to Gx commands ABNF | - | - | - | C3 | C3-47 | C3-080021 | Postponed | 2008-02-25 | PCC | - | 2008-02-25 |
0071 | - | F | Rel-7 | 7.3.0 | 7.4.0 | Adding clarification around the encoding of the IMEISV | CP-39 | CP-080040 | approved | C3 | C3-47 | C3-080022 | Agreed | 2008-02-25 | PCC | - | 2008-02-25 |
0071 | 1 | F | Rel-7 | 7.3.0 | - | Adding clarification around the encoding of the IMEISV | - | - | - | C3 | C3-47 | C3-080135 | Withdrawn | 2008-02-25 | PCC | - | 2008-02-25 |
0072 | - | F | Rel-7 | 7.3.0 | - | Reporting the current event related value by the event trigger | - | - | - | C3 | C3-47 | C3-080026 | Revised | 2008-02-25 | PCC | - | 2008-02-25 |
0072 | 1 | F | Rel-7 | 7.3.0 | 7.4.0 | Reporting the current event related value by the event trigger | CP-39 | CP-080040 | approved | C3 | C3-47 | C3-080136 | Agreed | 2008-02-25 | PCC | - | 2008-02-25 |
0073 | - | F | Rel-7 | 7.3.0 | - | PDP Session | - | - | - | C3 | C3-47 | C3-080094 | Revised | 2008-02-25 | PCC | - | 2008-02-25 |
0073 | 1 | F | Rel-7 | 7.3.0 | 7.4.0 | PDP Session | CP-39 | CP-080040 | approved | C3 | C3-47 | C3-080137 | Agreed | 2008-02-25 | PCC | - | 2008-02-25 |
0074 | - | F | Rel-7 | 7.3.0 | 7.4.0 | Metering method for online charging | CP-39 | CP-080040 | approved | C3 | C3-47 | C3-080096 | Agreed | 2008-02-25 | PCC | - | 2008-02-25 |
0075 | - | F | Rel-7 | 7.3.0 | - | IP-CAN session termination and PCRF | - | - | - | C3 | C3-47 | C3-080098 | Noted | 2008-02-25 | PCC | - | 2008-02-25 |
0076 | - | F | Rel-7 | 7.3.0 | - | IP-CAN session termination by PCRF | - | - | - | C3 | C3-47 | C3-080100 | Noted | 2008-02-25 | PCC | - | 2008-02-25 |
0077 | - | F | Rel-7 | 7.3.0 | - | Support of access capabilities for QoS control in PCC | - | - | - | C3 | C3-47 | C3-080112 | Revised | 2008-02-25 | PCC | - | 2008-02-25 |
0077 | 1 | F | Rel-7 | 7.3.0 | - | Support of access capabilities for QoS control in PCC | - | - | - | C3 | C3-47 | C3-080142 | Revised | 2008-02-25 | PCC | - | 2008-02-25 |
0077 | 2 | F | Rel-7 | 7.3.0 | - | Support of access capabilities for QoS control in PCC | - | - | - | C3 | C3-47 | C3-080240 | Revised | 2008-02-25 | PCC | - | 2008-02-25 |
0077 | 3 | F | Rel-7 | 7.3.0 | - | Support of access capabilities for QoS control in PCC | - | - | - | C3 | C3-47 | C3-080249 | Revised | 2008-02-25 | PCC | - | 2008-02-25 |
0077 | 4 | F | Rel-7 | 7.3.0 | 7.4.0 | Support of access capabilities for QoS control in PCC | CP-39 | CP-080040 | approved | C3 | C3-47 | C3-080253 | Agreed | 2008-02-25 | PCC | - | 2008-02-25 |
0078 | - | C | Rel-8 | 7.4.0 | - | Supporting tunneled and untunneled PCC rules | - | - | - | C3 | C3-47b | C3-080306 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0078 | 1 | C | Rel-8 | 7.4.0 | 8.0.0 | Supporting tunneled and untunneled PCC rules | CP-40 | CP-080299 | approved | C3 | C3-47b | C3-080428 | Agreed | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0079 | - | C | Rel-8 | 8.0.0 | - | PCC Error Handling Procedures | - | - | - | C3 | C3-47b | C3-080335 | postponed | 2008-05-22 | PCC | - | 2008-05-22 |
0079 | 1 | C | Rel-8 | 8.0.0 | - | PCC Error Handling Procedures | - | - | - | C3 | C3-48 | C3-080607 | Revised | 2008-05-22 | REDOC_3GPP2 | - | 2008-05-22 |
0079 | 2 | C | Rel-8 | 8.0.0 | - | PCC Error Handling Procedures | - | - | - | C3 | C3-48 | C3-080663 | postponed | 2008-05-22 | REDOC_3GPP2 | - | 2008-05-22 |
0079 | 3 | F | Rel-8 | 8.0.0 | - | PCC Rule Error Handling | - | - | - | C3 | C3-48b | C3-081031 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0079 | 4 | F | Rel-8 | 8.0.0 | - | PCC Rule Error Handling | - | - | - | C3 | C3-48b | C3-081123 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0079 | 5 | F | Rel-8 | 8.0.0 | - | PCC Rule Error Handling | - | - | - | C3 | C3-48b | C3-081198 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0079 | 6 | F | Rel-8 | 8.0.0 | - | PCC Error Handling Procedures | CP-41 | CP-080565 | revised | C3 | C3-49 | C3-081506 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0079 | 9 | F | Rel-8 | 8.0.0 | 8.1.0 | PCC Error Handling Procedures | CP-41 | CP-080651 | approved | Ericsson | - | - | - | 2008-11-09 | SAES-St3-PCC | - | 2008-09-12 |
0080 | - | F | Rel-7 | 7.4.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-47b | C3-080361 | postponed | 2008-05-22 | PCC | - | 2008-05-22 |
0081 | - | F | Rel-8 | 7.4.0 | 8.0.0 | IP CAN session definition update | CP-40 | CP-080299 | approved | C3 | C3-47b | C3-080365 | Agreed | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0082 | - | B | Rel-8 | 7.4.0 | - | Event Report handling in Gx | - | - | - | C3 | C3-47b | C3-080367 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0082 | 1 | B | Rel-8 | 7.4.0 | - | Event Report handling in Gx | - | - | - | C3 | C3-47b | C3-080430 | postponed | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0082 | 2 | B | Rel-8 | 7.4.0 | - | Event Report handling in Gx | - | - | - | C3 | C3-48 | C3-080571 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0082 | 3 | B | Rel-8 | 7.4.0 | 8.0.0 | Event Report handling in Gx | CP-40 | CP-080299 | approved | C3 | C3-48 | C3-080823 | Agreed | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0082 | 4 | B | Rel-8 | 7.4.0 | - | Event Report handling in Gx | - | - | - | C3 | C3-48 | C3-080836 | Withdrawn | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0083 | - | A | Rel-8 | 7.4.0 | - | Introduction of Gxa reference point | - | - | - | C3 | C3-47b | C3-080369 | Withdrawn | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0084 | - | F | Rel-7 | 7.4.0 | - | IP-CAN session event reporting | - | - | - | C3 | C3-47b | C3-080374 | Withdrawn | 2008-05-22 | PCC | - | 2008-05-22 |
0085 | - | C | Rel-8 | 7.4.0 | - | Gx family applications | - | - | - | C3 | C3-47b | C3-080375 | postponed | 2008-05-22 | PCC | - | 2008-05-22 |
0086 | - | B | Rel-8 | 7.4.0 | 8.0.0 | Introduction of Gxx reference points | CP-40 | CP-080299 | approved | C3 | C3-47b | C3-080433 | Agreed | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0087 | - | F | Rel-7 | 7.4.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-48 | C3-080520 | Revised | 2008-05-22 | PCC | - | 2008-05-22 |
0087 | 1 | F | Rel-7 | 7.4.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-48 | C3-080654 | postponed | 2008-05-22 | PCC | - | 2008-05-22 |
0088 | - | F | Rel-8 | 7.4.0 | - | PCC rule consistency between PCRF and PCEF | - | - | - | C3 | C3-48 | C3-080522 | Revised | 2008-05-22 | PCC | - | 2008-05-22 |
0088 | 1 | F | Rel-8 | 7.4.0 | - | PCC rule consistency between PCRF and PCEF | - | - | - | C3 | C3-48 | C3-080660 | postponed | 2008-05-22 | PCC | - | 2008-05-22 |
0089 | - | B | Rel-8 | 7.4.0 | - | Gxx reference points overview | - | - | - | C3 | C3-48 | C3-080548 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0089 | 1 | B | Rel-8 | 7.4.0 | - | Gxx reference points overview | - | - | - | C3 | C3-48 | C3-080751 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0089 | 2 | B | Rel-8 | 7.4.0 | - | Gxx reference points overview | - | - | - | C3 | C3-48 | C3-080798 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0089 | 3 | B | Rel-8 | 7.4.0 | 8.0.0 | Gxx reference points overview | CP-40 | CP-080299 | approved | C3 | C3-48 | C3-080837 | Agreed | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0090 | - | B | Rel-8 | 7.4.0 | - | Gxx reference model | - | - | - | C3 | C3-48 | C3-080549 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0090 | 1 | B | Rel-8 | 7.4.0 | - | Gxx reference model | - | - | - | C3 | C3-48 | C3-080752 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0090 | 2 | B | Rel-8 | 7.4.0 | 8.0.0 | Gxx reference model | CP-40 | CP-080299 | approved | C3 | C3-48 | C3-080797 | Agreed | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0091 | - | B | Rel-8 | 7.4.0 | - | Quality of Service Control rule definition and operations | - | - | - | C3 | C3-48 | C3-080550 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0091 | 1 | B | Rel-8 | 7.4.0 | - | Quality of Service Control rule definition and operations | - | - | - | C3 | C3-48 | C3-080753 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0091 | 2 | B | Rel-8 | 7.4.0 | 8.0.0 | Quality of Service Control rule definition and operations | CP-40 | CP-080299 | approved | C3 | C3-48 | C3-080795 | Agreed | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0092 | - | B | Rel-8 | 7.4.0 | - | PCRF functional element for Gxx | - | - | - | C3 | C3-48 | C3-080551 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0092 | 1 | B | Rel-8 | 7.4.0 | - | PCRF functional element for Gxx | - | - | - | C3 | C3-48 | C3-080754 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0092 | 2 | B | Rel-8 | 7.4.0 | 8.0.0 | PCRF functional element for Gxx | CP-40 | CP-080299 | approved | C3 | C3-48 | C3-080796 | Agreed | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0093 | - | B | Rel-8 | 7.4.0 | - | BBERF functional element for Gxx | - | - | - | C3 | C3-48 | C3-080552 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0093 | 1 | B | Rel-8 | 7.4.0 | 8.0.0 | BBERF functional element for Gxx | CP-40 | CP-080299 | approved | C3 | C3-48 | C3-080755 | Agreed | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0094 | - | B | Rel-8 | 7.4.0 | - | Request for PCC rules over Gx | - | - | - | C3 | C3-48 | C3-080553 | Withdrawn | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0095 | - | B | Rel-8 | 7.4.0 | - | Gxx re-used AVPs table | - | - | - | C3 | C3-48 | C3-080554 | postponed | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0096 | - | B | Rel-8 | 7.4.0 | - | Gxx specific AVPs table | - | - | - | C3 | C3-48 | C3-080555 | postponed | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0097 | - | B | Rel-8 | 7.4.0 | - | RAT type AVP | - | - | - | C3 | C3-48 | C3-080556 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0097 | 1 | B | Rel-8 | 7.4.0 | - | RAT type AVP | - | - | - | C3 | C3-48 | C3-080748 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0097 | 2 | B | Rel-8 | 7.4.0 | 8.0.0 | RAT type AVP | CP-40 | CP-080299 | approved | C3 | C3-48 | C3-080799 | Agreed | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0098 | - | B | Rel-8 | 7.4.0 | - | IP-CAN session termination procedures at Gxx | - | - | - | C3 | C3-48 | C3-080599 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0098 | 1 | B | Rel-8 | 7.4.0 | 8.0.0 | IP-CAN session termination procedures at Gxx | CP-40 | CP-080299 | approved | C3 | C3-48 | C3-080758 | Agreed | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0099 | - | B | Rel-8 | 7.4.0 | - | IP-CAN session modification procedures at Gxx | - | - | - | C3 | C3-48 | C3-080600 | Revised | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0099 | 1 | B | Rel-8 | 7.4.0 | 8.0.0 | IP-CAN session modification procedures at Gxx | CP-40 | CP-080299 | approved | C3 | C3-48 | C3-080759 | Agreed | 2008-05-22 | SAES-St3-PCC | - | 2008-05-22 |
0100 | - | F | Rel-7 | 7.4.0 | - | Binding of PCC rules having no AF session | - | - | - | C3 | C3-48 | C3-080620 | Revised | 2008-05-22 | PCC | - | 2008-05-22 |
0100 | 1 | F | Rel-7 | 7.4.0 | - | Binding of PCC rules having no AF session | - | - | - | C3 | C3-48 | C3-080655 | Revised | 2008-05-22 | PCC | - | 2008-05-22 |
0100 | 2 | F | Rel-7 | 7.4.0 | 7.5.0 | Binding of PCC rules having no AF session | CP-40 | CP-080292 | approved | C3 | C3-48 | C3-080730 | Agreed | 2008-05-22 | PCC | - | 2008-05-22 |
0101 | - | F | Rel-7 | 7.4.0 | - | Rejection of traffic mapping information | - | - | - | C3 | C3-48 | C3-080621 | Revised | 2008-05-22 | PCC | - | 2008-05-22 |
0101 | 1 | F | Rel-7 | 7.4.0 | - | Rejection of traffic mapping information | - | - | - | C3 | C3-48 | C3-080656 | Revised | 2008-05-22 | PCC | - | 2008-05-22 |
0101 | 2 | F | Rel-7 | 7.4.0 | 7.5.0 | Rejection of traffic mapping information | CP-40 | CP-080292 | approved | C3 | C3-48 | C3-080731 | Agreed | 2008-05-22 | PCC | - | 2008-05-22 |
0102 | - | F | Rel-7 | 7.4.0 | - | Downgrading of QoS request | - | - | - | C3 | C3-48 | C3-080622 | Revised | 2008-05-22 | PCC | - | 2008-05-22 |
0102 | 1 | F | Rel-7 | 7.4.0 | 7.5.0 | Downgrading of QoS request | CP-40 | CP-080292 | approved | C3 | C3-48 | C3-080657 | Agreed | 2008-05-22 | PCC | - | 2008-05-22 |
0103 | - | B | Rel-8 | 8.0.0 | - | Update Gxx interface for Gateway relocation scenarios | - | - | - | C3 | C3-48b | C3-080903 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0103 | 1 | B | Rel-8 | 8.0.0 | - | Update Gxx interface for Gateway relocation scenarios | - | - | - | C3 | C3-48b | C3-081132 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0103 | 2 | B | Rel-8 | 8.0.0 | - | Update Gxx interface for Gateway relocation scenarios | CP-41 | CP-080565 | revised | C3 | C3-48b | C3-081220 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0103 | 3 | B | Rel-8 | 8.0.0 | 8.1.0 | Update Gxx interface for Gateway relocation scenarios | CP-41 | CP-080650 | approved | CT3 Chairman | - | - | - | 2008-11-09 | SAES-St3-PCC | - | 2008-09-12 |
0104 | - | B | Rel-8 | 8.0.0 | - | PCRF Initiated GW Control Session Termination | - | - | - | C3 | C3-48b | C3-080904 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0104 | 1 | B | Rel-8 | 8.0.0 | - | PCRF Initiated GW Control Session Termination | - | - | - | C3 | C3-48b | C3-081133 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0104 | 2 | B | Rel-8 | 8.0.0 | - | PCRF Initiated GW Control Session Termination | CP-41 | CP-080565 | postponed | C3 | C3-48b | C3-081221 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0105 | - | F | Rel-7 | 7.5.0 | - | Removal of BCM=Nw-Only | - | - | - | C3 | C3-48b | C3-080925 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0105 | 1 | F | Rel-7 | 7.5.0 | 7.6.0 | Removal of BCM=Nw-Only | CP-41 | CP-080553 | approved | C3 | C3-48b | C3-081065 | Agreed | 2008-09-03 | PCC | - | 2008-09-05 |
0106 | - | A | Rel-8 | 8.0.0 | - | Removal of BCM=Nw-Init | - | - | - | C3 | C3-48b | C3-080927 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0106 | 1 | A | Rel-8 | 8.0.0 | 8.1.0 | Removal of BCM=Nw-Init | CP-41 | CP-080553 | approved | C3 | C3-48b | C3-081066 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0107 | - | B | Rel-8 | 8.0.0 | - | ARP Handling in Gx | - | - | - | C3 | C3-48b | C3-080929 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0107 | 1 | B | Rel-8 | 8.0.0 | - | ARP Handling in Gx | CP-41 | CP-080565 | reissued | C3 | C3-48b | C3-081134 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0107 | 1 | B | Rel-8 | 8.0.0 | 8.1.0 | ARP Handling in Gx | CP-41 | CP-080634 | approved | C3 | - | C3-081134 | - | 2008-06-17 | SAES-St3-PCC | - | 2008-09-12 |
0108 | - | B | Rel-8 | 8.0.0 | - | Event Triggers handling in Gxx | - | - | - | C3 | C3-48b | C3-080931 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0108 | 1 | B | Rel-8 | 8.0.0 | - | Event Triggers handling in Gxx | - | - | - | C3 | C3-48b | C3-081136 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0108 | 2 | B | Rel-8 | 8.0.0 | - | Event Triggers handling in Gxx | CP-41 | CP-080565 | postponed | C3 | C3-48b | C3-081200 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0109 | - | C | Rel-8 | 8.0.0 | - | Alignment of RAT-type values with GTPv2 | - | - | - | C3 | C3-48b | C3-080932 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0109 | 1 | C | Rel-8 | 8.0.0 | - | Alignment of RAT-type values with GTPv2 | - | - | - | C3 | C3-48b | C3-081137 | Withdrawn | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0110 | - | B | Rel-8 | 8.0.0 | - | Completion of QoS rules request procedure in Gxx | - | - | - | C3 | C3-48b | C3-080933 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0110 | 1 | B | Rel-8 | 8.0.0 | - | Completion of QoS rules request procedure in Gxx | - | - | - | C3 | C3-48b | C3-081140 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0110 | 2 | B | Rel-8 | 8.0.0 | - | Completion of QoS rules request procedure in Gxx | - | - | - | C3 | C3-48b | C3-081201 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0110 | 3 | B | Rel-8 | 8.0.0 | - | Completion of QoS rules request procedure in Gxx | CP-41 | CP-080565 | reissued | C3 | C3-48b | C3-081222 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0110 | 3 | B | Rel-8 | 8.0.0 | 8.1.0 | Completion of QoS rules request procedure in Gxx | CP-41 | CP-080634 | approved | C3 | - | C3-081222 | - | 2008-06-23 | SAES-St3-PCC | - | 2008-09-12 |
0111 | - | F | Rel-7 | 7.5.0 | - | PCC Rule Error Handling | - | - | - | C3 | C3-48b | C3-080934 | Withdrawn | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0112 | - | A | Rel-8 | 8.0.0 | - | PCC Rule Error Handling | - | - | - | C3 | C3-48b | C3-080935 | Withdrawn | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0113 | - | F | Rel-7 | 7.5.0 | 7.6.0 | Error code misalignments | CP-41 | CP-080553 | approved | C3 | C3-48b | C3-080956 | Agreed | 2008-09-03 | PCC | - | 2008-09-05 |
0114 | - | A | Rel-8 | 8.0.0 | 8.1.0 | Error code misalignments | CP-41 | CP-080553 | approved | C3 | C3-48b | C3-080957 | Agreed | 2008-09-03 | PCC | - | 2008-09-05 |
0115 | - | F | Rel-7 | 7.5.0 | - | Out of credit indication | - | - | - | C3 | C3-48b | C3-080958 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0115 | 1 | F | Rel-7 | 7.5.0 | - | Out of credit indication | - | - | - | C3 | C3-48b | C3-081069 | Postponed | 2008-09-03 | PCC | - | 2008-09-05 |
0116 | - | A | Rel-8 | 8.0.0 | - | Out of credit indication | - | - | - | C3 | C3-48b | C3-080959 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0116 | 1 | A | Rel-8 | 8.0.0 | - | Out of credit indication | - | - | - | C3 | C3-48b | C3-081070 | Postponed | 2008-09-03 | PCC | - | 2008-09-05 |
0117 | - | B | Rel-8 | 8.0.0 | - | Add CoA and tunnel related AVPs | - | - | - | C3 | C3-48b | C3-080987 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0117 | 1 | B | Rel-8 | 8.0.0 | - | Add CoA and tunnel related AVPs | - | - | - | C3 | C3-48b | C3-081150 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0117 | 2 | B | Rel-8 | 8.0.0 | - | Add CoA and tunnel related AVPs | - | - | - | C3 | C3-48b | C3-081118 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0117 | 3 | B | Rel-8 | 8.0.0 | - | Add CoA and tunnel related AVPs | CP-41 | CP-080565 | reissued | C3 | C3-48b | C3-081205 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0117 | 3 | B | Rel-8 | 8.0.0 | 8.1.0 | Add CoA and Tunnel related AVPs | CP-41 | CP-080634 | approved | C3 | - | C3-081205 | - | 2008-06-06 | SAES-St3-PCC | - | 2008-09-12 |
0118 | - | B | Rel-8 | 8.0.0 | - | Separation of GPRS specific procedures | - | - | - | C3 | C3-48b | C3-080988 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0118 | 1 | B | Rel-8 | 8.0.0 | - | Separation of GPRS specific procedures | CP-41 | CP-080565 | reissued | C3 | C3-48b | C3-081151 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0118 | 1 | B | Rel-8 | 8.0.0 | 8.1.0 | Separation of GPRS specific procedures | CP-41 | CP-080634 | approved | C3 | - | C3-081151 | - | 2008-06-06 | SAES-St3-PCC | - | 2008-09-12 |
0119 | - | B | Rel-8 | 8.0.0 | - | All access PLMN identifier AN-MCC-MNC AVP | - | - | - | C3 | C3-48b | C3-080998 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0119 | 1 | B | Rel-8 | 8.0.0 | - | All access PLMN identifier AN-MCC-MNC AVP | CP-41 | CP-080565 | revised | C3 | C3-48b | C3-081170 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0119 | 2 | B | Rel-8 | 8.0.0 | - | Use 3GPP-SGSN-MCC-MNC AVP for all accesses | - | - | - | C3 | C3-49 | C3-081618 | postponed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0119 | 4 | B | Rel-8 | 8.0.0 | 8.1.0 | Use 3GPP-SGSN-MCC-MNC AVP for all accesses | CP-41 | CP-080649 | approved | Nortel, CT3 Chairman | - | - | - | 2008-11-09 | SAES-St3-PCC | - | 2008-09-12 |
0120 | - | B | Rel-8 | 8.0.0 | - | Gxx - Initialisation, maintainance and termination of Diameter sessions | - | - | - | C3 | C3-48b | C3-080999 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0120 | 1 | B | Rel-8 | 8.0.0 | - | Gxx - Initialisation, maintainance and termination of Diameter sessions | - | - | - | C3 | C3-48b | C3-081171 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0120 | 2 | B | Rel-8 | 8.0.0 | - | Gxx Application Id | - | - | - | C3 | C3-49 | C3-081403 | revised | 2008-09-03 | SAES-St3-PCC | merged with C3-081425 | 2008-09-05 |
0120 | 3 | B | Rel-8 | 8.0.0 | - | Gxx Application Id | CP-41 | CP-080565 | revised | C3 | C3-49 | C3-081611 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0120 | 4 | B | Rel-8 | 8.0.0 | 8.1.0 | Gxx Application Id | CP-41 | CP-080648 | approved | Ericsson, Camiant | - | - | - | 2008-11-09 | SAES-St3-PCC | - | 2008-09-12 |
0121 | - | F | Rel-7 | 7.5.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-48b | C3-081015 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0121 | 1 | F | Rel-7 | 7.5.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-48b | C3-081083 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0121 | 2 | F | Rel-7 | 7.5.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-48b | C3-081215 | Postponed | 2008-09-03 | PCC | - | 2008-09-05 |
0122 | - | C | Rel-8 | 8.0.0 | - | PCC rule status consistency | - | - | - | C3 | C3-48b | C3-081017 | Merged | 2008-09-03 | PCC | - | 2008-09-05 |
0123 | - | F | Rel-7 | 7.5.0 | - | PCC Error Handling Procedures | - | - | - | C3 | C3-48b | C3-081032 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0123 | 1 | F | Rel-7 | 7.5.0 | - | PCC Error Handling Procedures | - | - | - | C3 | C3-48b | C3-081122 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0123 | 2 | F | Rel-7 | 7.5.0 | - | PCC Error Handling Procedures | - | - | - | C3 | C3-48b | C3-081197 | Agreed | 2008-09-03 | PCC | - | 2008-09-05 |
0123 | 3 | B | Rel-8 | 8.1.0 | - | The redirect DRA flow during IP-CAN session modification | - | - | - | C3 | C3-50 | C3-082282 | Revised | 2008-11-27 | SAES-St3-PCC | Merged into C3-082477 | 2008-11-28 |
0123 | 3 | F | Rel-7 | 7.5.0 | 7.6.0 | PCC Error Handling Procedures | CP-41 | CP-080553 | approved | C3 | C3-49 | C3-081505 | Agreed | 2008-09-03 | PCC | - | 2008-09-05 |
0124 | - | D | Rel-8 | 8.0.0 | - | Removing the unnecessary subclause | - | - | - | C3 | C3-48b | C3-081038 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0124 | 1 | D | Rel-8 | 8.0.0 | - | Removing the unnecessary subclause | CP-41 | CP-080565 | reissued | C3 | C3-48b | C3-081177 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0124 | 1 | D | Rel-8 | 8.0.0 | 8.1.0 | Removing the unnecessary subclause | CP-41 | CP-080634 | approved | C3 | - | C3-081177 | - | 2008-06-26 | SAES-St3-PCC | - | 2008-09-12 |
0125 | - | B | Rel-8 | 8.0.0 | - | PCRF initiated gateway control session termination | - | - | - | C3 | C3-48b | C3-081039 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0125 | 1 | B | Rel-8 | 8.0.0 | - | PCRF initiated gateway control session termination | CP-41 | CP-080565 | reissued | C3 | C3-48b | C3-081224 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0125 | 1 | B | Rel-8 | 8.0.0 | 8.1.0 | PCRF initiated gateway control session termination | CP-41 | CP-080634 | approved | C3 | - | C3-081224 | - | 2008-06-27 | SAES-St3-PCC | - | 2008-09-12 |
0126 | - | B | Rel-8 | 8.0.0 | - | Update of the Gateway control and QoS rules request/reply procedure | - | - | - | C3 | C3-48b | C3-081040 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0126 | 1 | B | Rel-8 | 8.0.0 | - | Update of the Gateway control and QoS rules request/reply procedure | - | - | - | C3 | C3-48b | C3-081178 | Postponed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0127 | - | - | Rel-7 | 7.5.0 | - | Time of the day event trigger | - | - | - | C3 | C3-49 | C3-081357 | Postponed | 2008-09-03 | SAE | - | 2008-09-05 |
0128 | - | - | Rel-8 | 8.0.0 | - | Time of the day event trigger | - | - | - | C3 | C3-49 | C3-081358 | Postponed | 2008-09-03 | PCC | - | 2008-09-05 |
0129 | - | - | Rel-8 | 8.0.0 | - | Gxx Messages | - | - | - | C3 | C3-49 | C3-081359 | revised | 2008-09-03 | PCC | merged into C3-081613 | 2008-09-05 |
0130 | - | - | Rel-8 | 8.0.0 | - | PCC procedures over Gx reference point | - | - | - | C3 | C3-49 | C3-081360 | Withdrawn | 2008-09-03 | SAE | - | 2008-09-05 |
0131 | - | F | Rel-8 | 8.0.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-49 | C3-081368 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0131 | 1 | F | Rel-8 | 8.0.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-49 | C3-081602 | postponed | 2008-09-03 | PCC | - | 2008-09-05 |
0132 | - | F | Rel-7 | 7.5.0 | - | Clarification on PCC Rule authorization for SDFs not known at PCRF | - | - | - | C3 | C3-49 | C3-081393 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0132 | 1 | F | Rel-7 | 7.5.0 | - | Clarification on PCC Rule authorization for SDFs not known at PCRF | - | - | - | C3 | C3-49 | C3-081500 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0132 | 2 | F | Rel-7 | 7.5.0 | - | Clarification on PCC Rule authorization for SDFs not known at PCRF | - | - | - | C3 | C3-49 | C3-081530 | Postponed | 2008-09-03 | PCC | - | 2008-09-05 |
0133 | - | A | Rel-8 | 8.0.0 | - | Clarification on PCC Rule authorization for SDFs not known at PCRF | - | - | - | C3 | C3-49 | C3-081394 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0133 | 1 | A | Rel-8 | 8.0.0 | - | Clarification on PCC Rule authorization for SDFs not known at PCRF | - | - | - | C3 | C3-49 | C3-081501 | Postponed | 2008-09-03 | PCC | - | 2008-09-05 |
0134 | - | F | Rel-7 | 7.5.0 | - | Missing AVP codes | - | - | - | C3 | C3-49 | C3-081398 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0134 | 1 | F | Rel-7 | 7.5.0 | 7.6.0 | Missing AVP codes | CP-41 | CP-080553 | approved | C3 | C3-49 | C3-081503 | Agreed | 2008-09-03 | PCC | - | 2008-09-05 |
0135 | - | A | Rel-8 | 8.0.0 | - | Missing AVP codes | - | - | - | C3 | C3-49 | C3-081399 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0135 | 1 | A | Rel-8 | 8.0.0 | 8.1.0 | Missing AVP codes | CP-41 | CP-080553 | approved | C3 | C3-49 | C3-081504 | Agreed | 2008-09-03 | PCC | - | 2008-09-05 |
0136 | - | F | Rel-8 | 8.0.0 | - | Updates on Gxx reference point | CP-41 | CP-080565 | reissued | C3 | C3-49 | C3-081400 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0136 | - | F | Rel-8 | 8.0.0 | 8.1.0 | Updates on Gxx reference point | CP-41 | CP-080634 | approved | C3 | - | C3-081400 | - | 2008-08-18 | SAES-St3-PCC | - | 2008-09-12 |
0137 | - | B | Rel-8 | 8.0.0 | - | Gxx reused AVPs | - | - | - | C3 | C3-49 | C3-081404 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0137 | 1 | B | Rel-8 | 8.0.0 | - | Gxx reused AVPs | - | - | - | C3 | C3-49 | C3-081612 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0137 | 2 | B | Rel-8 | 8.0.0 | - | Gxx reused AVPs | CP-41 | CP-080565 | revised | C3 | C3-49 | C3-081539 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0137 | 3 | B | Rel-8 | 8.0.0 | 8.1.0 | Gxx reused/specific AVPs | CP-41 | CP-080652 | approved | CT3 Chairman | - | - | - | 2008-08-14 | SAES-St3-PCC | - | 2008-09-12 |
0138 | - | B | Rel-8 | 8.0.0 | - | Gxx commands | - | - | - | C3 | C3-49 | C3-081405 | revised | 2008-09-03 | SAES-St3-PCC | merged with C3-081359 and C3-081426 | 2008-09-05 |
0138 | 1 | B | Rel-8 | 8.0.0 | - | Gxx commands | - | - | - | C3 | C3-49 | C3-081613 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0138 | 2 | B | Rel-8 | 8.0.0 | - | Gxx commands | CP-41 | CP-080565 | reissued | C3 | C3-49 | C3-081683 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0138 | 2 | B | Rel-8 | 8.0.0 | 8.1.0 | Gxx commands | CP-41 | CP-080634 | approved | C3 | - | C3-081683 | - | 2008-07-16 | SAES-St3-PCC | - | 2008-09-12 |
0139 | - | B | Rel-8 | 8.0.0 | - | Add tunnel related AVPs | - | - | - | C3 | C3-49 | C3-081421 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0139 | 1 | B | Rel-8 | 8.0.0 | - | Add tunnel related AVPs | CP-41 | CP-080565 | reissued | C3 | C3-49 | C3-081616 | Agreed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0139 | 1 | B | Rel-8 | 8.0.0 | 8.1.0 | Add Tunnel related AVPs | CP-41 | CP-080634 | approved | C3 | - | C3-081616 | - | 2008-01-08 | SAES-St3-PCC | - | 2008-09-12 |
0140 | - | F | Rel-7 | 7.5.0 | - | Reserved values for event triggers. | - | - | - | C3 | C3-49 | C3-081423 | Withdrawn | 2008-09-03 | PCC | - | 2008-09-05 |
0141 | - | F | Rel-8 | 8.0.0 | - | Reserved values for event triggers. | - | - | - | C3 | C3-49 | C3-081424 | Withdrawn | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0142 | - | B | Rel-8 | 8.0.0 | - | Gxx application-id | - | - | - | C3 | C3-49 | C3-081425 | revised | 2008-09-03 | SAES-St3-PCC | merged into C3-081611 | 2008-09-05 |
0143 | - | B | Rel-8 | 8.0.0 | - | Gxx commands | - | - | - | C3 | C3-49 | C3-081426 | revised | 2008-09-03 | SAES-St3-PCC | merged into C3-081613 | 2008-09-05 |
0144 | - | F | Rel-7 | 7.5.0 | - | Setting of Precedence in PCRF-initiated IP-CAN session modifcation | - | - | - | C3 | C3-49 | C3-081439 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0144 | 1 | F | Rel-7 | 7.5.0 | - | Setting of Precedence in PCRF-initiated IP-CAN session modifcation | - | - | - | C3 | C3-49 | C3-081600 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0144 | 2 | F | Rel-7 | 7.5.0 | 7.6.0 | Setting of Precedence in PCRF-initiated IP-CAN session modifcation | CP-41 | CP-080553 | approved | C3 | C3-49 | C3-081531 | Agreed | 2008-09-03 | PCC | - | 2008-09-05 |
0145 | - | A | Rel-8 | 8.0.0 | - | Setting of Precedence in PCRF-initiated IP-CAN session modifcation | - | - | - | C3 | C3-49 | C3-081440 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0145 | 1 | A | Rel-8 | 8.0.0 | - | Setting of Precedence in PCRF-initiated IP-CAN session modifcation | - | - | - | C3 | C3-49 | C3-081601 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0145 | 2 | A | Rel-8 | 8.0.0 | 8.1.0 | Setting of Precedence in PCRF-initiated IP-CAN session modifcation | CP-41 | CP-080553 | approved | C3 | C3-49 | C3-081532 | Agreed | 2008-09-03 | PCC | - | 2008-09-05 |
0146 | - | B | Rel-8 | 8.0.0 | - | Event Triggers handling in Gxa | - | - | - | C3 | C3-49 | C3-081456 | Revised | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0146 | 1 | B | Rel-8 | 8.0.0 | - | Event Triggers handling in Gxa | - | - | - | C3 | C3-49 | C3-081617 | postponed | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0147 | - | B | Rel-8 | 8.0.0 | - | Command changes for the provisioning of event triggers in Gxa | - | - | - | C3 | C3-49 | C3-081457 | Withdrawn | 2008-09-03 | SAES-St3-PCC | - | 2008-09-05 |
0148 | - | F | Rel-7 | 7.5.0 | - | Correction of RAA command | - | - | - | C3 | C3-49 | C3-081468 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0148 | 1 | F | Rel-7 | 7.5.0 | 7.6.0 | Correction of RAA command | CP-41 | CP-080553 | approved | C3 | C3-49 | C3-081507 | Agreed | 2008-09-03 | PCC | - | 2008-09-05 |
0149 | - | A | Rel-8 | 8.0.0 | - | Correction of RAA command | - | - | - | C3 | C3-49 | C3-081469 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0149 | 1 | A | Rel-8 | 8.0.0 | 8.1.0 | Correction of RAA command | CP-41 | CP-080553 | approved | C3 | C3-49 | C3-081508 | Agreed | 2008-09-03 | PCC | - | 2008-09-05 |
0150 | - | F | Rel-7 | 7.5.0 | - | Out of credit indication | - | - | - | C3 | C3-49 | C3-081470 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0150 | 1 | F | Rel-7 | 7.5.0 | - | Out of credit indication | - | - | - | C3 | C3-49 | C3-081509 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0150 | 2 | F | Rel-7 | 7.5.0 | - | Out of credit indication | - | - | - | C3 | C3-49 | C3-081644 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0150 | 3 | F | Rel-7 | 7.5.0 | - | Out of credit indication | - | - | - | C3 | C3-49 | C3-081581 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0150 | 4 | F | Rel-7 | 7.5.0 | 7.6.0 | Out of credit indication | CP-41 | CP-080553 | approved | C3 | C3-49 | C3-081684 | Agreed | 2008-09-03 | PCC | - | 2008-09-05 |
0151 | - | A | Rel-8 | 8.0.0 | - | Out of credit indication | - | - | - | C3 | C3-49 | C3-081471 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0151 | 1 | A | Rel-8 | 8.0.0 | - | Out of credit indication | - | - | - | C3 | C3-49 | C3-081510 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0151 | 2 | A | Rel-8 | 8.0.0 | - | Out of credit indication | - | - | - | C3 | C3-49 | C3-081645 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0151 | 3 | A | Rel-8 | 8.0.0 | - | Out of credit indication | - | - | - | C3 | C3-49 | C3-081582 | Revised | 2008-09-03 | PCC | - | 2008-09-05 |
0151 | 4 | A | Rel-8 | 8.0.0 | 8.1.0 | Out of credit indication | CP-41 | CP-080553 | approved | C3 | C3-49 | C3-081685 | Agreed | 2008-09-03 | PCC | - | 2008-09-05 |
0152 | - | F | Rel-8 | 8.0.0 | - | Use 3GPP-SGSN-MCC-MNC AVP for all accesses | - | - | - | C3 | C3-49 | C3-081475 | withdrawn | 2008-09-03 | SAES-St3-PCC | replaced by C3-081618 | 2008-09-05 |
0153 | - | F | Rel-7 | 7.5.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-49 | C3-081607 | postponed | 2008-09-03 | PCC | - | 2008-09-05 |
0154 | - | B | Rel-8 | 8.1.0 | - | Gx and Gxx linking session | - | - | - | C3 | C3-49b | C3-081763 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0154 | 1 | B | Rel-8 | 8.1.0 | - | Gx and Gxx linking session | - | - | - | C3 | C3-49b | C3-082012 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0154 | 2 | B | Rel-8 | 8.1.0 | - | Gx and Gxx linking session | - | - | - | C3 | C3-49b | C3-081926 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0154 | 3 | B | Rel-8 | 8.1.0 | - | Gx and Gxx linking session | - | - | - | C3 | C3-50 | C3-082292 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0154 | 4 | B | Rel-8 | 8.1.0 | - | Gx and Gxx linking session | CP-42 | CP-080757 | reissued | C3 | C3-50 | C3-082372 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0154 | 4 | B | Rel-8 | 8.1.0 | 8.2.0 | Gx and Gxx linking session | CP-42 | CP-080920 | approved | C3 | - | C3-082372 | - | 2008-10-11 | SAES-St3-PCC | - | 2008-12-06 |
0155 | - | B | Rel-8 | 8.1.0 | - | APN-AMBR in Gx and Gxx | - | - | - | C3 | C3-49b | C3-081766 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0155 | 1 | B | Rel-8 | 8.1.0 | - | APN-AMBR in Gx and Gxx | - | - | - | C3 | C3-49b | C3-082013 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0155 | 2 | B | Rel-8 | 8.1.0 | - | APN-AMBR in Gx and Gxx | CP-42 | CP-080757 | reissued | C3 | C3-49b | C3-081928 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0155 | 2 | B | Rel-8 | 8.1.0 | 8.2.0 | APN-AMBR in Gx and Gxx | CP-42 | CP-080920 | approved | C3 | - | C3-081928 | - | 2008-09-10 | SAES-St3-PCC | - | 2008-12-06 |
0156 | - | B | Rel-8 | 8.1.0 | - | Default QoS handling | - | - | - | C3 | C3-49b | C3-081767 | Withdrawn | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0157 | - | B | Rel-8 | 8.1.0 | - | New IP-CAN Type 3GPP-EPS and new RAT Type for E-UTRAN. | - | - | - | C3 | C3-49b | C3-081768 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0157 | 1 | B | Rel-8 | 8.1.0 | - | New IP-CAN Type 3GPP-EPS and new RAT Type for E-UTRAN. | CP-42 | CP-080757 | reissued | C3 | C3-49b | C3-082014 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0157 | 1 | B | Rel-8 | 8.1.0 | 8.2.0 | New IP-CAN Type 3GPP-EPS and new RAT Type for E-UTRAN. | CP-42 | CP-080920 | approved | C3 | - | C3-082014 | - | 2008-10-13 | SAES-St3-PCC | - | 2008-12-06 |
0158 | - | B | Rel-8 | 8.1.0 | - | Defining QoS-Rules related AVPs | - | - | - | C3 | C3-49b | C3-081769 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0158 | 1 | B | Rel-8 | 8.1.0 | - | Defining QoS-Rules related AVPs | - | - | - | C3 | C3-49b | C3-081898 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0158 | 2 | B | Rel-8 | 8.1.0 | - | Defining QoS-Rules related AVPs | - | - | - | C3 | C3-49b | C3-082015 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0158 | 3 | B | Rel-8 | 8.1.0 | - | QoS-Rule AVP correction | - | - | - | C3 | C3-50 | C3-082218 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0158 | 4 | B | Rel-8 | 8.1.0 | - | QoS-Rule AVP correction | CP-42 | CP-080757 | reissued | C3 | C3-50 | C3-082397 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0158 | 4 | B | Rel-8 | 8.1.0 | 8.2.0 | Defining QoS-Rules related AVPs | CP-42 | CP-080920 | approved | C3 | - | C3-082397 | - | 2008-10-11 | SAES-St3-PCC | - | 2008-12-06 |
0159 | - | B | Rel-8 | 8.1.0 | - | Including QoS-Rules related AVPs in the procedures | - | - | - | C3 | C3-49b | C3-081770 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0159 | 1 | B | Rel-8 | 8.1.0 | - | Including QoS-Rules related AVPs in the procedures | - | - | - | C3 | C3-49b | C3-082016 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0159 | 2 | B | Rel-8 | 8.1.0 | - | Including QoS-Rules related AVPs in the procedures | CP-42 | CP-080757 | reissued | C3 | C3-49b | C3-082064 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0159 | 2 | B | Rel-8 | 8.1.0 | 8.2.0 | Including QoS-Rules related AVPs in the procedures | CP-42 | CP-080920 | approved | C3 | - | C3-082064 | - | 2008-09-10 | SAES-St3-PCC | - | 2008-12-06 |
0159 | 3 | B | Rel-8 | 8.1.0 | - | Including QoS-Rules related AVPs in the procedures | - | - | - | C3 | C3-50 | C3-082293 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0159 | 4 | B | Rel-8 | 8.1.0 | - | Including QoS-Rules related AVPs in the procedures | - | - | - | C3 | C3-50 | C3-082520 | Withdrawn | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0160 | - | B | Rel-7 | 7.6.0 | - | Time of the Day PCC rule enforcement | - | - | - | C3 | C3-49b | C3-081774 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0160 | 1 | B | Rel-7 | 7.6.0 | - | Time of the Day PCC rule enforcement | - | - | - | C3 | C3-49b | C3-081918 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0160 | 2 | B | Rel-7 | 7.6.0 | - | Time of the Day PCC rule enforcement | - | - | - | C3 | C3-49b | C3-082058 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0160 | 3 | B | Rel-7 | 7.6.0 | - | Time of the Day PCC rule enforcement | - | - | - | C3 | C3-49b | C3-082086 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0160 | 4 | B | Rel-7 | 7.6.0 | - | Time of the Day PCC rule enforcement | - | - | - | C3 | C3-49b | C3-082097 | Agreed | 2008-11-27 | PCC | - | 2008-11-28 |
0160 | 5 | B | Rel-7 | 7.6.0 | - | Time zone for Time Of Day | - | - | - | C3 | C3-50 | C3-082471 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0160 | 6 | B | Rel-7 | 7.6.0 | - | Time zone for Time Of Day | - | - | - | C3 | C3-50 | C3-082529 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0160 | 7 | B | Rel-7 | 7.6.0 | - | Time zone for Time Of Day | CP-42 | CP-080751 | revised | C3 | C3-50 | C3-082462 | Agreed | 2008-11-27 | PCC | - | 2008-11-28 |
0160 | 8 | F | Rel-7 | 7.6.0 | 7.7.0 | Time zone for the time of day | CP-42 | CP-080952 | approved | Huawei | - | - | - | 2008-05-12 | PCC | - | 2008-12-08 |
0161 | - | B | Rel-8 | 8.1.0 | - | Time of the Day PCC rule enforcement | - | - | - | C3 | C3-49b | C3-081775 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0161 | 1 | B | Rel-8 | 8.1.0 | - | Time of the Day PCC rule enforcement | - | - | - | C3 | C3-49b | C3-081919 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0161 | 2 | B | Rel-8 | 8.1.0 | - | Time of the Day PCC rule enforcement | - | - | - | C3 | C3-49b | C3-082059 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0161 | 3 | B | Rel-8 | 8.1.0 | - | Time of the Day PCC rule enforcement | - | - | - | C3 | C3-49b | C3-082087 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0161 | 4 | B | Rel-8 | 8.1.0 | - | Time of the Day PCC rule enforcement | - | - | - | C3 | C3-49b | C3-082098 | Agreed | 2008-11-27 | PCC | - | 2008-11-28 |
0161 | 5 | B | Rel-8 | 8.1.0 | - | Time zone for Time Of Day | - | - | - | C3 | C3-50 | C3-082472 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0161 | 6 | B | Rel-8 | 8.1.0 | - | Time zone for Time Of Day | - | - | - | C3 | C3-50 | C3-082530 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0161 | 7 | A | Rel-8 | 8.1.0 | - | Time zone for Time Of Day | CP-42 | CP-080751 | revised | C3 | C3-50 | C3-082463 | Agreed | 2008-11-27 | PCC | - | 2008-11-28 |
0161 | 8 | B | Rel-8 | 8.1.0 | 8.2.0 | Time zone for the time of day | CP-42 | CP-080960 | approved | Huawei | - | - | - | 2008-05-12 | PCC | - | 2008-12-08 |
0162 | - | B | Rel-8 | 8.1.0 | - | Multiple gateway control sessions per Diameter Session | - | - | - | C3 | C3-49b | C3-081777 | Postponed | 2008-11-27 | SAE | - | 2008-11-28 |
0163 | - | B | Rel-8 | 8.1.0 | - | UE/GW initiated Resource request and management | - | - | - | C3 | C3-49b | C3-081778 | Revised | 2008-11-27 | SAE | - | 2008-11-28 |
0163 | 1 | B | Rel-8 | 8.1.0 | - | UE/GW initiated Resource request and management | - | - | - | C3 | C3-49b | C3-082018 | Postponed | 2008-11-27 | SAE | - | 2008-11-28 |
0164 | - | F | Rel-7 | 7.6.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-49b | C3-081783 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0164 | 1 | F | Rel-7 | 7.6.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-49b | C3-081831 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0164 | 2 | F | Rel-7 | 7.6.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-49b | C3-082001 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0164 | 3 | F | Rel-7 | 7.6.0 | 7.7.0 | IP-CAN session termination initiated by PCRF | CP-42 | CP-080751 | approved | C3 | C3-49b | C3-082084 | Agreed | 2008-11-27 | PCC | - | 2008-11-28 |
0165 | - | F | Rel-8 | 8.1.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-49b | C3-081785 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0165 | 1 | F | Rel-8 | 8.1.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-49b | C3-081833 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0165 | 2 | F | Rel-8 | 8.1.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-49b | C3-082017 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0165 | 3 | F | Rel-8 | 8.1.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-49b | C3-082085 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0165 | 4 | F | Rel-8 | 8.1.0 | - | IP-CAN session termination initiated by PCRF | - | - | - | C3 | C3-50 | C3-082487 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0165 | 5 | F | Rel-8 | 8.1.0 | - | IP-CAN session termination initiated by PCRF | CP-42 | CP-080757 | reissued | C3 | C3-50 | C3-082545 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0165 | 5 | F | Rel-8 | 8.1.0 | 8.2.0 | IP-CAN session termination initiated by PCRF | CP-42 | CP-080920 | approved | C3 | - | C3-082545 | - | 2008-09-22 | PCC | - | 2008-12-06 |
0166 | - | F | Rel-8 | 8.1.0 | - | Use 3GPP-SGSN-MCC-MNC AVP for all accesses | - | - | - | C3 | C3-49b | C3-081809 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0166 | 1 | F | Rel-8 | 8.1.0 | 8.2.0 | Use 3GPP-SGSN-MCC-MNC AVP for all accesses | CP-42 | CP-080768 | approved | C3 | C3-49b | C3-081896 | Agreed | 2008-11-27 | PCC | - | 2008-11-28 |
0167 | - | F | Rel-8 | 8.1.0 | - | RAT Type | - | - | - | C3 | C3-49b | C3-081813 | Postponed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0168 | - | F | Rel-8 | 8.1.0 | - | Application ID for Rel-8 Gx | - | - | - | C3 | C3-49b | C3-081814 | Postponed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0169 | - | B | Rel-8 | 8.1.0 | - | Tunnel information Handling over Gxx | - | - | - | C3 | C3-49b | C3-081826 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0169 | 1 | B | Rel-8 | 8.1.0 | - | Tunnel information Handling over Gxx | CP-42 | CP-080757 | reissued | C3 | C3-49b | C3-082019 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0169 | 1 | B | Rel-8 | 8.1.0 | 8.2.0 | Tunnel information handling over Gxx | CP-42 | CP-080920 | approved | C3 | - | C3-082019 | - | 2008-09-20 | SAES-St3-PCC | - | 2008-12-06 |
0170 | - | B | Rel-8 | 8.1.0 | - | RAA command over Gxx | CP-42 | CP-080757 | reissued | C3 | C3-49b | C3-081827 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0170 | - | B | Rel-8 | 8.1.0 | 8.2.0 | RAA command over Gxx | CP-42 | CP-080920 | approved | C3 | - | C3-081827 | - | 2008-09-20 | SAES-St3-PCC | - | 2008-12-06 |
0171 | - | B | Rel-8 | 8.1.0 | - | New AVP to convey SGW/AGW IP addresses over Gx/Gxx protocols | - | - | - | C3 | C3-49b | C3-081844 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0171 | 1 | B | Rel-8 | 8.1.0 | - | New AVP to convey SGW/AGW IP addresses over Gx/Gxx protocols | - | - | - | C3 | C3-49b | C3-082065 | Postponed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0172 | - | B | Rel-8 | 8.1.0 | - | Multiple BBERF support | - | - | - | C3 | C3-49b | C3-081853 | Postponed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0173 | - | B | Rel-8 | 8.1.0 | - | Support for 3GPP2 BSID in Gx and Gxx | - | - | - | C3 | C3-49b | C3-081866 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0173 | 1 | B | Rel-8 | 8.1.0 | - | Support for 3GPP2 BSID in Gx and Gxx | CP-42 | CP-080757 | reissued | C3 | C3-49b | C3-082020 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0173 | 1 | B | Rel-8 | 8.1.0 | 8.2.0 | Support for 3GPP2 BSID in Gx and Gxx | CP-42 | CP-080920 | approved | C3 | - | C3-082020 | - | 2008-09-10 | SAES-St3-PCC | - | 2008-12-06 |
0174 | - | C | Rel-8 | 8.1.0 | - | Update to TFT-Filter AVP for multiple IP-CAN types | - | - | - | C3 | C3-49b | C3-081867 | Withdrawn | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0175 | - | B | Rel-8 | 8.1.0 | - | Event triggers handling in Gxx | - | - | - | C3 | C3-49b | C3-081878 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0175 | 1 | B | Rel-8 | 8.1.0 | - | Event triggers handling in Gxx | - | - | - | C3 | C3-49b | C3-082021 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0175 | 2 | B | Rel-8 | 8.1.0 | - | Event triggers handling in Gxx | CP-42 | CP-080757 | revised | C3 | C3-49b | C3-082066 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0175 | 3 | B | Rel-8 | 8.1.0 | - | Event Triggers handling in Gxx | - | - | - | C3 | C3-50 | C3-082217 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0175 | 4 | B | Rel-8 | 8.1.0 | - | Event Triggers handling in Gxx | CP-42 | CP-080757 | reissued | C3 | C3-50 | C3-082396 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0175 | 4 | B | Rel-8 | 8.1.0 | 8.2.0 | Event Triggers handling in Gxx | CP-42 | CP-080920 | approved | C3 | - | C3-082396 | - | 2008-09-10 | SAES-St3-PCC | - | 2008-12-06 |
0176 | - | B | Rel-8 | 8.1.0 | - | Re-Used Gxx AVPs | - | - | - | C3 | C3-49b | C3-081888 | Postponed | 2008-11-27 | PCC | - | 2008-11-28 |
0177 | - | B | Rel-8 | 8.1.0 | - | Gxx Experimental Results Code AVP Values | - | - | - | C3 | C3-49b | C3-081889 | Postponed | 2008-11-27 | PCC | - | 2008-11-28 |
0178 | - | B | Rel-8 | 8.1.0 | - | New Gxx AVPs | - | - | - | C3 | C3-49b | C3-081891 | Revised | 2008-11-27 | SAES-St3-PCC | merged | 2008-11-28 |
0179 | - | C | Rel-8 | 8.1.0 | - | V-AF Session Establishment | - | - | - | C3 | C3-49b | C3-081892 | Revised | 2008-11-27 | SAES-St3-PCC | merged with C3-081914 | 2008-11-28 |
0180 | - | B | Rel-8 | 8.1.0 | - | Event Triggers per PCC Reference Point (Gx, Gxx, S9) | - | - | - | C3 | C3-49b | C3-081894 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0180 | 1 | B | Rel-8 | 8.1.0 | - | Event Triggers per PCC Reference Point (Gx, Gxx, S9) | - | - | - | C3 | C3-49b | C3-081921 | Postponed | 2008-11-27 | PCC | - | 2008-11-28 |
0181 | - | - | Rel-8 | 8.1.0 | - | Multiple gateway control sessions per Diameter Session | - | - | - | C3 | C3-50 | C3-082168 | Postponed | 2008-11-27 | SAE | - | 2008-11-28 |
0182 | - | - | Rel-8 | 8.1.0 | - | UE/GW initiated Resource request and management | - | - | - | C3 | C3-50 | C3-082169 | Postponed | 2008-11-27 | SAE | - | 2008-11-28 |
0183 | - | B | Rel-8 | 8.1.0 | - | Provisioning of Credit Control Triggers at the BBERF | - | - | - | C3 | C3-50 | C3-082223 | Postponed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0184 | - | B | Rel-8 | 8.1.0 | - | Predefined QoS Rules | - | - | - | C3 | C3-50 | C3-082225 | Postponed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0185 | - | F | Rel-8 | 8.1.0 | - | Change the format of ARP AVP | - | - | - | C3 | C3-50 | C3-082230 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0185 | 1 | F | Rel-8 | 8.1.0 | - | Change the format of ARP AVP | - | - | - | C3 | C3-50 | C3-082398 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0185 | 2 | F | Rel-8 | 8.1.0 | - | Change the format of ARP AVP | - | - | - | C3 | C3-50 | C3-082453 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0185 | 3 | F | Rel-8 | 8.1.0 | - | Change the format of ARP AVP | - | - | - | C3 | C3-50 | C3-082459 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0185 | 4 | F | Rel-8 | 8.1.0 | - | Change the format of ARP AVP | CP-42 | CP-080757 | reissued | C3 | C3-50 | C3-082610 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0185 | 4 | F | Rel-8 | 8.1.0 | 8.2.0 | Change the format of ARP AVP | CP-42 | CP-080920 | approved | CT3 | - | C3-082610 | - | 2008-10-24 | SAES-St3-PCC | - | 2008-12-06 |
0186 | - | F | Rel-8 | 8.1.0 | - | PCRF reselection for the redirect DRA (29.212) | - | - | - | C3 | C3-50 | C3-082231 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0186 | 1 | F | Rel-8 | 8.1.0 | - | PCRF reselection for the redirect DRA (29.212) | - | - | - | C3 | C3-50 | C3-082523 | Postponed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0187 | - | B | Rel-8 | 8.1.0 | - | PCRF-initiated Gxx session termination (29.212) | - | - | - | C3 | C3-50 | C3-082236 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0187 | 1 | B | Rel-8 | 8.1.0 | - | PCRF-initiated Gxx session termination (29.212) | - | - | - | C3 | C3-50 | C3-082484 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0187 | 2 | B | Rel-8 | 8.1.0 | - | PCRF-initiated Gxx session termination (29.212) | CP-42 | CP-080757 | reissued | C3 | C3-50 | C3-082544 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0187 | 2 | B | Rel-8 | 8.1.0 | 8.2.0 | PCRF-initiated Gxx session termination | CP-42 | CP-080920 | approved | C3 | - | C3-082544 | - | 2008-10-27 | SAES-St3-PCC | - | 2008-12-06 |
0188 | - | B | Rel-7 | 7.6.0 | - | Time zone for Time Of Day | - | - | - | C3 | C3-50 | C3-082239 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0189 | - | B | Rel-8 | 8.1.0 | - | Time zone for Time Of Day | - | - | - | C3 | C3-50 | C3-082240 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0190 | - | F | Rel-8 | 8.1.0 | - | Default QoS handling | - | - | - | C3 | C3-50 | C3-082263 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0190 | 1 | F | Rel-8 | 8.1.0 | - | Default QoS handling | - | - | - | C3 | C3-50 | C3-082521 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0190 | 2 | F | Rel-8 | 8.1.0 | - | Default QoS handling | CP-42 | CP-080757 | reissued | C3 | C3-50 | C3-082590 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0190 | 2 | F | Rel-8 | 8.1.0 | 8.2.0 | Default QoS handling | CP-42 | CP-080920 | approved | C3 | - | C3-082590 | - | 2008-10-11 | SAES-St3-PCC | - | 2008-12-06 |
0191 | - | B | Rel-8 | 8.1.0 | - | UE-init Bearer Resource Modification request | - | - | - | C3 | C3-50 | C3-082264 | Postponed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0192 | - | B | Rel-8 | 8.1.0 | - | BCM Selection in Gx and Gxx reference points | - | - | - | C3 | C3-50 | C3-082265 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0192 | 1 | B | Rel-8 | 8.1.0 | - | BCM Selection in Gx and Gxx reference points | - | - | - | C3 | C3-50 | C3-082522 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0192 | 2 | B | Rel-8 | 8.1.0 | - | BCM Selection in Gx and Gxx reference points | CP-42 | CP-080757 | reissued | C3 | C3-50 | C3-082549 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0192 | 2 | B | Rel-8 | 8.1.0 | 8.2.0 | BCM Selection in Gx and Gxx reference points | CP-42 | CP-080920 | approved | C3 | - | C3-082549 | - | 2008-10-11 | SAES-St3-PCC | - | 2008-12-06 |
0193 | - | F | Rel-8 | 8.1.0 | - | Clean-up of QoS handling procedures | - | - | - | C3 | C3-50 | C3-082266 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0193 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Clean-up of QoS handling procedures | CP-42 | CP-080920 | approved | C3 | - | C3-082266 | - | 2008-10-11 | SAES-St3-PCC | - | 2008-12-06 |
0194 | - | F | Rel-8 | 8.1.0 | - | Gxx tunnelling information description and use | - | - | - | C3 | C3-50 | C3-082267 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0194 | 1 | F | Rel-8 | 8.1.0 | - | Gxx tunnelling information description and use | - | - | - | C3 | C3-50 | C3-082394 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0194 | 2 | F | Rel-8 | 8.1.0 | - | Gxx tunnelling information description and use | CP-42 | CP-080757 | reissued | C3 | C3-50 | C3-082547 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0194 | 2 | F | Rel-8 | 8.1.0 | 8.2.0 | Gxx tunnelling information description and use | CP-42 | CP-080920 | approved | C3 | - | C3-082547 | - | 2008-03-11 | SAES-St3-PCC | - | 2008-12-06 |
0195 | - | B | Rel-8 | 8.1.0 | - | PCRF maintaining PCC and QoS rules aligned | - | - | - | C3 | C3-50 | C3-082268 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0195 | 1 | B | Rel-8 | 8.1.0 | - | PCRF maintaining PCC and QoS rules aligned | - | - | - | C3 | C3-50 | C3-082548 | Postponed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0196 | - | F | Rel-7 | 7.6.0 | - | Additional failure codes in Rule-Failure-Code AVP | - | - | - | C3 | C3-50 | C3-082278 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0196 | 1 | F | Rel-7 | 7.6.0 | 7.7.0 | Additional failure codes in Rule-Failure-Code AVP | CP-42 | CP-080751 | approved | C3 | C3-50 | C3-082473 | Agreed | 2008-11-27 | PCC | - | 2008-11-28 |
0197 | - | A | Rel-8 | 8.1.0 | - | Additional failure codes in Rule-Failure-Code AVP | - | - | - | C3 | C3-50 | C3-082279 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0197 | 1 | A | Rel-8 | 8.1.0 | 8.2.0 | Additional failure codes in Rule-Failure-Code AVP | CP-42 | CP-080751 | approved | C3 | C3-50 | C3-082474 | Agreed | 2008-11-27 | PCC | - | 2008-11-28 |
0198 | - | B | Rel-8 | 8.1.0 | - | New AVP to convey SGW/AGW IP addresses over Gx/Gxx protocols | - | - | - | C3 | C3-50 | C3-082280 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0198 | 1 | B | Rel-8 | 8.1.0 | - | New AVP to convey SGW/AGW IP addresses over Gx/Gxx protocols | CP-42 | CP-080757 | reissued | C3 | C3-50 | C3-082518 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0198 | 1 | B | Rel-8 | 8.1.0 | 8.2.0 | New AVP to convey SGW/AGW IP addresses over Gx protocols | CP-42 | CP-080920 | approved | C3 | - | C3-082518 | - | 2008-10-17 | St3-SAE-PCC | - | 2008-12-06 |
0199 | - | B | Rel-8 | 8.1.0 | - | Additional Event Trigger | - | - | - | C3 | C3-50 | C3-082281 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0199 | 1 | B | Rel-8 | 8.1.0 | - | Additional Event Trigger | CP-42 | CP-080757 | reissued | C3 | C3-50 | C3-082519 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0199 | 1 | B | Rel-8 | 8.1.0 | 8.2.0 | Additional Event Trigger | CP-42 | CP-080920 | approved | C3 | - | C3-082519 | - | 2008-10-27 | St3-SAE-PCC | - | 2008-12-06 |
0200 | - | F | Rel-7 | 7.6.0 | - | IMS session setup with UE initiated resource reservation | - | - | - | C3 | C3-50 | C3-082333 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0200 | 1 | F | Rel-7 | 7.6.0 | - | IMS session setup with UE initiated resource reservation | - | - | - | C3 | C3-50 | C3-082378 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0200 | 2 | F | Rel-7 | 7.6.0 | - | IMS session setup with UE initiated resource reservation | - | - | - | C3 | C3-50 | C3-082531 | Revised | 2008-11-27 | PCC | - | 2008-11-28 |
0200 | 3 | F | Rel-7 | 7.6.0 | 7.7.0 | IMS session setup with UE initiated resource reservation | CP-42 | CP-080751 | approved | C3 | C3-50 | C3-082558 | Agreed | 2008-11-27 | PCC | - | 2008-11-28 |
0201 | - | A | Rel-8 | 8.1.0 | - | IMS session setup with UE initiated resource reservation | - | - | - | C3 | C3-50 | C3-082334 | Postponed | 2008-11-27 | PCC | - | 2008-11-28 |
0202 | - | F | Rel-8 | 8.1.0 | - | Optional/conditional AVPs | - | - | - | C3 | C3-50 | C3-082347 | Postponed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0203 | - | F | Rel-8 | 8.1.0 | - | RAT Type | - | - | - | C3 | C3-50 | C3-082348 | Withdrawn | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0204 | - | F | Rel-8 | 8.1.0 | - | Application ID for Rel-8 Gx | - | - | - | C3 | C3-50 | C3-082349 | Withdrawn | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0205 | - | B | Rel-8 | 8.1.0 | - | Clean-up of IP-CAN bearer and session termination procedures | CP-42 | CP-080757 | reissued | C3 | C3-50 | C3-082486 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0205 | - | B | Rel-8 | 8.1.0 | 8.2.0 | Clean-up of IP-CAN bearer and session termination procedures | CP-42 | CP-080920 | approved | C3 | - | C3-082486 | - | 2008-10-11 | SAES-St3-PCC | - | 2008-12-06 |
0206 | - | F | Rel-8 | 8.1.0 | - | ARP Setting for Default Bearers | - | - | - | C3 | C3-50 | C3-082517 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0206 | 1 | F | Rel-8 | 8.1.0 | - | ARP Setting for Default Bearers | - | - | - | C3 | C3-50 | C3-082542 | Revised | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0206 | 2 | F | Rel-8 | 8.1.0 | - | ARP Setting for Default Bearers | CP-42 | CP-080757 | reissued | C3 | C3-50 | C3-082591 | Agreed | 2008-11-27 | SAES-St3-PCC | - | 2008-11-28 |
0206 | 2 | F | Rel-8 | 8.1.0 | 8.2.0 | ARP Setting for Default Bearer | CP-42 | CP-080920 | approved | C3 | - | C3-082591 | - | 2008-12-14 | SAES-St3-PCC | - | 2008-12-06 |
0207 | - | F | Rel-8 | 8.2.0 | - | PCRF reselection for the redirect DRA | - | - | - | C3 | C3-51 | C3-090028 | postponed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0208 | - | F | Rel-7 | 7.7.0 | - | Missing Ack in GW(PCEF) initiated IP-CAN Session Modification | - | - | - | C3 | C3-51 | C3-090031 | Withdrawn | 2009-02-25 | PCC | - | 2009-02-26 |
0209 | - | F | Rel-8 | 8.2.0 | - | Clarification for provisioning of Event Report Indication | - | - | - | C3 | C3-51 | C3-090035 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0209 | 1 | F | Rel-8 | 8.2.0 | 8.3.0 | Clarification for provisioning of Event Report Indication | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090277 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0210 | - | F | Rel-8 | 8.2.0 | - | Charging rule common report in Gx | - | - | - | C3 | C3-51 | C3-090036 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0210 | 1 | F | Rel-8 | 8.2.0 | - | Charging rule common report in Gx | - | - | - | C3 | C3-51 | C3-090386 | postponed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0211 | - | F | Rel-7 | 7.7.0 | - | Clarification for TFT operations | - | - | - | C3 | C3-51 | C3-090037 | Revised | 2009-02-25 | PCC | - | 2009-02-26 |
0211 | 1 | F | Rel-7 | 7.7.0 | - | Clarification for TFT operations | - | - | - | C3 | C3-51 | C3-090340 | Revised | 2009-02-25 | PCC | - | 2009-02-26 |
0211 | 2 | F | Rel-7 | 7.7.0 | - | Clarification for TFT operations | - | - | - | C3 | C3-51 | C3-090412 | Revised | 2009-02-25 | PCC | - | 2009-02-26 |
0211 | 3 | F | Rel-7 | 7.7.0 | 7.8.0 | Clarification for TFT operations | CP-43 | CP-090074 | approved | C3 | C3-51 | C3-090413 | Agreed | 2009-02-25 | PCC | Mirror CRs @ CP-090269 | 2009-02-26 |
0212 | - | F | Rel-8 | 8.2.0 | - | Cleaning of Editors Notes | - | - | - | C3 | C3-51 | C3-090038 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0212 | 1 | F | Rel-8 | 8.2.0 | - | Cleaning of Editors Notes | - | - | - | C3 | C3-51 | C3-090278 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0212 | 2 | F | Rel-8 | 8.2.0 | - | Cleaning of Editors Notes | - | - | - | C3 | C3-51 | C3-090303 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0212 | 3 | F | Rel-8 | 8.2.0 | - | Cleaning of Editors Notes | - | - | - | C3 | C3-51 | C3-090395 | merged | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0213 | - | F | Rel-7 | 7.7.0 | 7.8.0 | Correction of the Diameter AVP codes | CP-43 | CP-090074 | approved | C3 | C3-51 | C3-090039 | Agreed | 2009-02-25 | PCC | - | 2009-02-26 |
0214 | - | F | Rel-8 | 8.2.0 | 8.3.0 | Inconsistent AVP code of CoA-Information AVP | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090044 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0215 | - | F | Rel-7 | 7.7.0 | - | Correction of Policy enforcement for authorized QoS per service data flow | - | - | - | C3 | C3-51 | C3-090045 | Revised | 2009-02-25 | PCC | - | 2009-02-26 |
0215 | 1 | F | Rel-7 | 7.7.0 | 7.8.0 | Correction of Policy enforcement for authorized QoS per service data flow | CP-43 | CP-090074 | approved | C3 | C3-51 | C3-090201 | Agreed | 2009-02-25 | PCC | - | 2009-02-26 |
0216 | - | F | Rel-8 | 8.2.0 | - | Correction of Policy enforcement for authorized QoS per service data flow | - | - | - | C3 | C3-51 | C3-090046 | Revised | 2009-02-25 | PCC | - | 2009-02-26 |
0216 | 1 | F | Rel-8 | 8.2.0 | - | Correction of Policy enforcement for authorized QoS per service data flow | - | - | - | C3 | C3-51 | C3-090202 | Revised | 2009-02-25 | PCC | - | 2009-02-26 |
0216 | 2 | A | Rel-8 | 8.2.0 | 8.3.0 | Correction of Policy enforcement for authorized QoS per service data flow | CP-43 | CP-090074 | approved | C3 | C3-51 | C3-090208 | Agreed | 2009-02-25 | PCC | - | 2009-02-26 |
0217 | - | F | Rel-8 | 8.2.0 | - | Clarification on QoS control at the BBERF | - | - | - | C3 | C3-51 | C3-090050 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0217 | 1 | F | Rel-8 | 8.2.0 | - | Clarification on QoS control at the BBERF | - | - | - | C3 | C3-51 | C3-090280 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0217 | 2 | F | Rel-8 | 8.2.0 | - | Clarification on QoS control at the BBERF | - | - | - | C3 | C3-51 | C3-090305 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0217 | 3 | F | Rel-8 | 8.2.0 | 8.3.0 | Clarification on QoS control at the BBERF | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090400 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0218 | - | F | Rel-8 | 8.2.0 | - | Clarifications to mandatory event trigger of TFT change | - | - | - | C3 | C3-51 | C3-090051 | Merged | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0219 | - | F | Rel-8 | 8.2.0 | 8.3.0 | Termination-Cause on Gxx | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090052 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0220 | - | F | Rel-8 | 8.2.0 | - | Adding Supported-Features AVP to Gx commands | - | - | - | C3 | C3-51 | C3-090078 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0220 | 1 | F | Rel-8 | 8.2.0 | - | Adding Supported-Features AVP to Gx commands | - | - | - | C3 | C3-51 | C3-090235 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0220 | 3 | F | Rel-8 | 8.2.0 | 8.3.0 | Adding Supported-Features AVP to Gx commands | CP-43 | CP-090082 | approved | C3 | C3-51 | C3-090282 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0221 | - | F | Rel-8 | 8.2.0 | - | Adding Supported-Features AVP to Gxx commands | - | - | - | C3 | C3-51 | C3-090079 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0221 | 1 | F | Rel-8 | 8.2.0 | - | Adding Supported-Features AVP to Gxx commands | - | - | - | C3 | C3-51 | C3-090236 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0221 | 2 | F | Rel-8 | 8.2.0 | 8.3.0 | Adding Supported-Features AVP to Gxx commands | CP-43 | CP-090082 | approved | C3 | C3-51 | C3-090306 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0222 | - | F | Rel-8 | 8.2.0 | - | Event Reporting procedures | - | - | - | C3 | C3-51 | C3-090107 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0222 | 1 | F | Rel-8 | 8.2.0 | - | Event Reporting procedures | - | - | - | C3 | C3-51 | C3-090307 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0222 | 2 | F | Rel-8 | 8.2.0 | 8.3.0 | Event Reporting procedures | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090398 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0223 | - | F | Rel-8 | 8.2.0 | 8.3.0 | MBR per QCI | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090108 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0224 | - | F | Rel-8 | 8.2.0 | - | Bearer-Usage in Gx | - | - | - | C3 | C3-51 | C3-090110 | Withdrawn | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0225 | - | F | Rel-8 | 8.2.0 | - | Derivation of QoS rules from PCC rules | - | - | - | C3 | C3-51 | C3-090112 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0225 | 1 | F | Rel-8 | 8.2.0 | - | Derivation of QoS rules from PCC rules | - | - | - | C3 | C3-51 | C3-090194 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0225 | 2 | F | Rel-8 | 8.2.0 | - | Derivation of QoS rules from PCC rules | - | - | - | C3 | C3-51 | C3-090310 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0225 | 3 | F | Rel-8 | 8.2.0 | - | Derivation of QoS rules from PCC rules | - | - | - | C3 | C3-51 | C3-090347 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0225 | 4 | F | Rel-8 | 8.2.0 | - | Derivation of QoS rules from PCC rules | - | - | - | C3 | C3-51 | C3-090397 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0225 | 5 | F | Rel-8 | 8.2.0 | - | Derivation of QoS rules from PCC rules | - | - | - | C3 | C3-51 | C3-090423 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0225 | 6 | F | Rel-8 | 8.2.0 | 8.3.0 | Derivation of QoS rules from PCC rules | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090433 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0226 | - | F | Rel-8 | 8.2.0 | 8.3.0 | Cleanup of PCC rules request and provisioning procedures | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090113 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0227 | - | F | Rel-8 | 8.2.0 | - | Session linking for S2c case | - | - | - | C3 | C3-51 | C3-090114 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0227 | 1 | F | Rel-8 | 8.2.0 | - | Session linking for S2c case | - | - | - | C3 | C3-51 | C3-090311 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0227 | 2 | F | Rel-8 | 8.2.0 | 8.3.0 | Session linking for S2c case | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090348 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0228 | - | F | Rel-8 | 8.2.0 | - | Removal of GPRS access type from Gxx | - | - | - | C3 | C3-51 | C3-090115 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0228 | 1 | F | Rel-8 | 8.2.0 | 8.3.0 | Removal of GPRS access type from Gxx | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090312 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0229 | - | F | Rel-8 | 8.2.0 | - | Success Notification for Rule Installation | - | - | - | C3 | C3-51 | C3-090117 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0229 | 1 | F | Rel-8 | 8.2.0 | - | Success Notification for Rule Installation | - | - | - | C3 | C3-51 | C3-090200 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0229 | 2 | F | Rel-8 | 8.2.0 | - | Success Notification for Rule Installation | - | - | - | C3 | C3-51 | C3-090388 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0229 | 3 | F | Rel-8 | 8.2.0 | - | Success Notification for Rule Installation | - | - | - | C3 | C3-51 | C3-090416 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0229 | 4 | F | Rel-8 | 8.2.0 | - | Success Notification for Rule Installation | - | - | - | C3 | C3-51 | C3-090422 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0229 | 5 | F | Rel-8 | 8.2.0 | - | Success Notification for Rule Installation | - | - | - | C3 | C3-51 | C3-090431 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0229 | 6 | F | Rel-8 | 8.2.0 | - | Success Notification for Rule Installation | - | - | - | C3 | C3-51 | C3-090436 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0229 | 7 | F | Rel-8 | 8.2.0 | 8.3.0 | Success Notification for Rule Installation | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090440 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0230 | - | F | Rel-8 | 8.2.0 | 8.3.0 | QoS handling in GPRS | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090120 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0231 | - | B | Rel-8 | 8.2.0 | - | Pre-Registration Event-Trigger | - | - | - | C3 | C3-51 | C3-090127 | Withdrawn | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0232 | - | B | Rel-8 | 8.2.0 | - | AN-GW-Address AVP Over Gxx | - | - | - | C3 | C3-51 | C3-090128 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0232 | 1 | B | Rel-8 | 8.2.0 | - | AN-GW-Address AVP Over Gxx | - | - | - | C3 | C3-51 | C3-090313 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0232 | 2 | B | Rel-8 | 8.2.0 | - | AN-GW-Address AVP Over Gxx | - | - | - | C3 | C3-51 | C3-090402 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0232 | 3 | B | Rel-8 | 8.2.0 | - | AN-GW-Address AVP Over Gxx | - | - | - | C3 | C3-51 | C3-090417 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0232 | 4 | F | Rel-8 | 8.2.0 | 8.3.0 | AN-GW-Address AVP Over Gxx | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090424 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0233 | - | F | Rel-8 | 8.2.0 | - | Sending APN-AMBR and Default QoS parameters to the PCRF | - | - | - | C3 | C3-51 | C3-090142 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0233 | 1 | F | Rel-8 | 8.2.0 | - | Sending APN-AMBR and Default QoS parameters to the PCRF | - | - | - | C3 | C3-51 | C3-090314 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0233 | 2 | F | Rel-8 | 8.2.0 | 8.3.0 | Sending APN-AMBR and Default QoS parameters to the PCRF | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090399 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0234 | - | F | Rel-7 | 7.7.0 | - | Correction on Charging-Rule-Report AVP | - | - | - | C3 | C3-51 | C3-090148 | Revised | 2009-02-25 | PCC | - | 2009-02-26 |
0234 | 1 | F | Rel-7 | 7.7.0 | - | Correction on Charging-Rule-Report AVP | - | - | - | C3 | C3-51 | C3-090203 | Revised | 2009-02-25 | PCC | - | 2009-02-26 |
0234 | 2 | F | Rel-7 | 7.7.0 | 7.8.0 | Correction on Charging-Rule-Report AVP | CP-43 | CP-090074 | approved | C3 | C3-51 | C3-090380 | Agreed | 2009-02-25 | PCC | - | 2009-02-26 |
0235 | - | A | Rel-8 | 8.2.0 | - | Correction on Charging-Rule-Report AVP | - | - | - | C3 | C3-51 | C3-090149 | Revised | 2009-02-25 | PCC | - | 2009-02-26 |
0235 | 1 | A | Rel-8 | 8.2.0 | - | Correction on Charging-Rule-Report AVP | - | - | - | C3 | C3-51 | C3-090204 | Revised | 2009-02-25 | PCC | - | 2009-02-26 |
0235 | 2 | A | Rel-8 | 8.2.0 | - | Correction on Charging-Rule-Report AVP | - | - | - | C3 | C3-51 | C3-090381 | Revised | 2009-02-25 | PCC | - | 2009-02-26 |
0235 | 3 | A | Rel-8 | 8.2.0 | 8.3.0 | Correction on Charging-Rule-Report AVP | CP-43 | CP-090074 | approved | C3 | C3-51 | C3-090390 | Agreed | 2009-02-25 | PCC | - | 2009-02-26 |
0236 | - | F | Rel-8 | 8.2.0 | - | Clarification to AVP usage within CCR | - | - | - | C3 | C3-51 | C3-090152 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0236 | 1 | F | Rel-8 | 8.2.0 | - | Clarification to AVP usage within CCR | - | - | - | C3 | C3-51 | C3-090315 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0236 | 2 | F | Rel-8 | 8.2.0 | - | Clarification to AVP usage within CCR | - | - | - | C3 | C3-51 | C3-090403 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0236 | 3 | F | Rel-8 | 8.2.0 | 8.3.0 | Clarification to AVP usage within CCR | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090418 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0237 | - | F | Rel-8 | 8.2.0 | - | Clarification on BCM selection | - | - | - | C3 | C3-51 | C3-090153 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0237 | 1 | F | Rel-8 | 8.2.0 | 8.3.0 | Clarification on bearer control mode selection | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090317 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0238 | - | F | Rel-8 | 8.2.0 | - | Indication of IP-CAN bearer termination | - | - | - | C3 | C3-51 | C3-090154 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0238 | 1 | A | Rel-8 | 8.2.0 | 8.3.0 | Indication of IP-CAN bearer termination | CP-43 | CP-090074 | approved | C3 | C3-51 | C3-090319 | Agreed | 2009-02-25 | PCC | - | 2009-02-26 |
0239 | - | F | Rel-8 | 8.2.0 | - | Error code for conflicting resource request | - | - | - | C3 | C3-51 | C3-090155 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0239 | 1 | F | Rel-8 | 8.2.0 | 8.3.0 | Error code for conflicting resource request | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090321 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0240 | - | F | Rel-8 | 8.2.0 | - | Clarification on event triggers | - | - | - | C3 | C3-51 | C3-090156 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0240 | 1 | F | Rel-8 | 8.2.0 | - | Clarification on event triggers | - | - | - | C3 | C3-51 | C3-090281 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0240 | 2 | F | Rel-8 | 8.2.0 | - | Clarifications on event triggers | - | - | - | C3 | C3-51 | C3-090411 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0240 | 3 | F | Rel-8 | 8.2.0 | - | Clarifications on event triggers | - | - | - | C3 | C3-51 | C3-090419 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0240 | 4 | F | Rel-8 | 8.2.0 | 8.3.0 | Clarifications on event triggers | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090425 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0241 | - | F | Rel-8 | 8.2.0 | - | Clarification on multiple BBERF handling | - | - | - | C3 | C3-51 | C3-090157 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0241 | 1 | F | Rel-8 | 8.2.0 | 8.3.0 | Clarification on multiple BBERF handling | CP-43 | CP-090083 | approved | C3 | C3-51 | C3-090322 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0242 | - | B | Rel-8 | 8.2.0 | - | UE initiated resource request | - | - | - | C3 | C3-51 | C3-090175 | postponed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0243 | - | F | Rel-7 | 7.7.0 | 7.8.0 | TFT at initial CC Request | CP-43 | CP-090074 | approved | C3 | C3-51 | C3-090176 | Agreed | 2009-02-25 | PCC | - | 2009-02-26 |
0244 | - | A | Rel-8 | 8.2.0 | 8.3.0 | TFT at initial CC Request | CP-43 | CP-090074 | approved | C3 | C3-51 | C3-090177 | Agreed | 2009-02-25 | PCC | - | 2009-02-26 |
0245 | - | F | Rel-8 | 8.2.0 | - | IMS session setup with UE initiated resource reservation | - | - | - | C3 | C3-51 | C3-090180 | Revised | 2009-02-25 | PCC | - | 2009-02-26 |
0245 | 1 | F | Rel-8 | 8.2.0 | - | IMS session setup with UE initiated resource reservation | - | - | - | C3 | C3-51 | C3-090374 | Revised | 2009-02-25 | PCC | - | 2009-02-26 |
0245 | 2 | F | Rel-8 | 8.2.0 | 8.3.0 | IMS session setup with UE initiated resource reservation | CP-43 | CP-090096 | approved | C3 | C3-51 | C3-090385 | Agreed | 2009-02-25 | PCC | - | 2009-02-26 |
0246 | - | F | Rel-8 | 8.2.0 | - | Gateway Control session | - | - | - | C3 | C3-51 | C3-090184 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0246 | 1 | F | Rel-8 | 8.2.0 | - | Gateway Control session | - | - | - | C3 | C3-51 | C3-090274 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0246 | 2 | F | Rel-8 | 8.2.0 | 8.3.0 | Gateway Control session | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090394 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0247 | - | F | Rel-8 | 8.2.0 | - | Default bearer QoS provisioning | - | - | - | C3 | C3-51 | C3-090185 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0247 | 1 | F | Rel-8 | 8.2.0 | 8.3.0 | Default bearer QoS provisioning | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090324 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0248 | - | F | Rel-8 | 8.2.0 | - | Removal of overlapping ARP AVPs | - | - | - | C3 | C3-51 | C3-090186 | postponed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0249 | - | F | Rel-8 | 8.2.0 | - | Renaming ARP-Value AVP to Priority-Level | - | - | - | C3 | C3-51 | C3-090318 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0249 | 1 | F | Rel-8 | 8.2.0 | 8.3.0 | Renaming ARP-Value AVP to Priority-Level | CP-43 | CP-090084 | approved | C3 | C3-51 | C3-090327 | Agreed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0250 | - | F | Rel-7 | 7.7.0 | 7.8.0 | Indication of IP-CAN bearer termination | CP-43 | CP-090074 | approved | C3 | C3-51 | C3-090320 | Agreed | 2009-02-25 | PCC | - | 2009-02-26 |
0251 | - | - | Rel-8 | 8.2.0 | - | UE initiated bearer resource request | - | - | - | C3 | C3-51 | C3-090404 | Revised | 2009-02-25 | - | - | 2009-02-26 |
0251 | 1 | B | Rel-8 | 8.2.0 | - | UE initiated bearer resource request | - | - | - | C3 | C3-51 | C3-090429 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0251 | 2 | B | Rel-8 | 8.2.0 | - | UE-init Bearer Resource Modification request | - | - | - | C3 | C3-51 | C3-090430 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0251 | 3 | B | Rel-8 | 8.2.0 | - | UE-init Bearer Resource Modification request | - | - | - | C3 | C3-51 | C3-090438 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0251 | 4 | B | Rel-8 | 8.2.0 | - | UE-init Bearer Resource Modification request | - | - | - | C3 | C3-51 | C3-090446 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0251 | 5 | B | Rel-8 | 8.2.0 | - | UE-init Bearer Resource Modification request | - | - | - | C3 | C3-51 | C3-090447 | Postponed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0252 | - | - | Rel-8 | 8.2.0 | - | UE-init Bearer Resource Modification | - | - | - | C3 | C3-51 | C3-090441 | Revised | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0252 | 1 | - | Rel-8 | 8.2.0 | - | UE-init Bearer Resource Modification | - | - | - | C3 | C3-51 | C3-090445 | Postponed | 2009-02-25 | SAES-St3-PCC | - | 2009-02-26 |
0253 | - | A | Rel-8 | 8.2.0 | - | Clarification for TFT operations | CP-43 | CP-090268 | postponed | Huawei | - | CP-090268 | - | 2009-06-03 | PCC | - | 2009-03-06 |
0254 | - | F | Rel-8 | 8.3.0 | - | Priority level for the default bearer | - | - | - | C3 | C3-52 | C3-090483 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0254 | 1 | F | Rel-8 | 8.3.0 | - | Priority level for the default bearer | - | - | - | C3 | C3-52 | C3-090637 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0254 | 2 | F | Rel-8 | 8.3.0 | 8.4.0 | Priority level for the default bearer | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090715 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0255 | - | F | Rel-8 | 8.3.0 | 8.4.0 | QoS negotiation in 3GPP-EPS | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090484 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0256 | - | F | Rel-8 | 8.3.0 | - | IMS signalling bearer handling for network initiated bearers | - | - | - | C3 | C3-52 | C3-090485 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0256 | 1 | F | Rel-8 | 8.3.0 | 8.4.0 | IMS signalling bearer handling for network initiated bearers | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090638 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0257 | - | F | Rel-8 | 8.3.0 | - | Reporting event trigger value to the PCEF when Gxx is used | - | - | - | C3 | C3-52 | C3-090486 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0257 | 1 | F | Rel-8 | 8.3.0 | - | Reporting event trigger value to the PCEF when Gxx is used | - | - | - | C3 | C3-52 | C3-090639 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0257 | 2 | F | Rel-8 | 8.3.0 | - | Reporting event trigger value to the PCEF when Gxx is used | - | - | - | C3 | C3-52 | C3-090716 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0257 | 3 | F | Rel-8 | 8.3.0 | 8.4.0 | Reporting event trigger value to the PCEF when Gxx is used | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090728 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0258 | - | F | Rel-8 | 8.3.0 | - | Extend Rule-Failure-Code AVP with UNSUCCESSFUL-QoS-VALIDATION value | - | - | - | C3 | C3-52 | C3-090489 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0258 | 1 | F | Rel-8 | 8.3.0 | 8.4.0 | Extend Rule-Failure-Code AVP with UNSUCCESSFUL-QoS-VALIDATION value | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090641 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0259 | - | F | Rel-8 | 8.3.0 | - | Request of Gateway Control Session Termination by PCRF only for case 2a | - | - | - | C3 | C3-52 | C3-090491 | Withdrawn | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0260 | - | F | Rel-8 | 8.3.0 | 8.4.0 | QoS per QCI | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090519 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0261 | - | F | Rel-8 | 8.3.0 | - | QoS per APN, etc. | - | - | - | C3 | C3-52 | C3-090520 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0261 | 1 | F | Rel-8 | 8.3.0 | - | QoS per APN, etc. | - | - | - | C3 | C3-52 | C3-090626 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0261 | 2 | F | Rel-8 | 8.3.0 | - | QoS per APN, etc. | - | - | - | C3 | C3-52 | C3-090750 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0261 | 3 | F | Rel-8 | 8.3.0 | 8.4.0 | QoS per APN, etc. | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090665 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0262 | - | F | Rel-8 | 8.3.0 | - | Handling Multiple BBERF - BBERF Reclassification | - | - | - | C3 | C3-52 | C3-090534 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0262 | 1 | F | Rel-8 | 8.3.0 | - | Handling Multiple BBERF - BBERF Reclassification | - | - | - | C3 | C3-52 | C3-090628 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0262 | 2 | F | Rel-8 | 8.3.0 | - | Handling Multiple BBERF - BBERF Reclassification | - | - | - | C3 | C3-52 | C3-090726 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0262 | 3 | F | Rel-8 | 8.3.0 | 8.4.0 | Handling Multiple BBERF - BBERF Reclassification | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090733 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0263 | - | F | Rel-8 | 8.3.0 | - | Event Trigger Clarification for IPv6 address change | - | - | - | C3 | C3-52 | C3-090538 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0263 | 1 | F | Rel-8 | 8.3.0 | - | Event Trigger Clarification for IPv6 address change | - | - | - | C3 | C3-52 | C3-090644 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0263 | 2 | F | Rel-8 | 8.3.0 | - | Event Trigger Clarification for IPv6 address change | - | - | - | C3 | C3-52 | C3-090758 | Withdrawn | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0264 | - | F | Rel-8 | 8.3.0 | - | Missing RAT Type in CC-Answer | - | - | - | C3 | C3-52 | C3-090539 | Withdrawn | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0265 | - | F | Rel-8 | 8.3.0 | - | MBR-GBR relation in Release 8 | - | - | - | C3 | C3-52 | C3-090540 | Withdrawn | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0266 | - | F | Rel-8 | 8.3.0 | - | Correction to feature bit definition | - | - | - | C3 | C3-52 | C3-090543 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0266 | 1 | F | Rel-8 | 8.3.0 | 8.4.0 | Correction to feature bit definition | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090645 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0267 | - | F | Rel-8 | 8.3.0 | - | Additional filter parameters | - | - | - | C3 | C3-52 | C3-090546 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0267 | 1 | F | Rel-8 | 8.3.0 | 8.4.0 | Additional filter parameters | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090610 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0268 | - | F | Rel-8 | 8.3.0 | - | Charging ID for S2c | - | - | - | C3 | C3-52 | C3-090547 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0268 | 1 | F | Rel-8 | 8.3.0 | 8.4.0 | Charging ID for S2c | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090622 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0269 | - | F | Rel-7 | 7.8.0 | - | Precedence based on IP-CAN type | - | - | - | C3 | C3-52 | C3-090552 | Revised | 2009-05-18 | PCC | - | 2009-05-20 |
0269 | 1 | F | Rel-7 | 7.8.0 | - | Precedence based on IP-CAN type | - | - | - | C3 | C3-52 | C3-090658 | Revised | 2009-05-18 | PCC | - | 2009-05-20 |
0269 | 2 | F | Rel-7 | 7.8.0 | 7.9.0 | Precedence based on IP-CAN type | CP-44 | CP-090334 | approved | C3 | C3-52 | C3-090723 | Agreed | 2009-05-18 | PCC | - | 2009-05-20 |
0270 | - | A | Rel-8 | 8.3.0 | - | Precedence based on IP-CAN type | - | - | - | C3 | C3-52 | C3-090553 | Revised | 2009-05-18 | PCC | - | 2009-05-20 |
0270 | 1 | A | Rel-8 | 8.3.0 | - | Precedence based on IP-CAN type | - | - | - | C3 | C3-52 | C3-090659 | Revised | 2009-05-18 | PCC | - | 2009-05-20 |
0270 | 2 | A | Rel-8 | 8.3.0 | 8.4.0 | Precedence based on IP-CAN type | CP-44 | CP-090334 | approved | C3 | C3-52 | C3-090724 | Agreed | 2009-05-18 | PCC | - | 2009-05-20 |
0271 | - | F | Rel-8 | 8.3.0 | - | Corrections in multiple BBF procedures | - | - | - | C3 | C3-52 | C3-090556 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0271 | 1 | F | Rel-8 | 8.3.0 | 8.4.0 | Corrections in multiple BBF procedures | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090647 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0272 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Correction of Gx CMessage Format | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090558 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0273 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Correction to Gxx Experimental-Result-code DIAMETER_BEARER_EVENT | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090559 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0274 | - | B | Rel-8 | 8.3.0 | - | UE-init Bearer Resource Modification Request | - | - | - | C3 | C3-52 | C3-090560 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0274 | 1 | B | Rel-8 | 8.3.0 | - | UE-init Bearer Resource Modification Request | - | - | - | C3 | C3-52 | C3-090609 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0274 | 2 | B | Rel-8 | 8.3.0 | 8.4.0 | UE-init Bearer Resource Modification Request | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090729 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0275 | - | F | Rel-8 | 8.3.0 | - | 3GPP2 access specific annex including AMBR per APN | - | - | - | C3 | C3-52 | C3-090561 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0275 | 1 | F | Rel-8 | 8.3.0 | - | 3GPP2 access specific annex including AMBR per APN | - | - | - | C3 | C3-52 | C3-090648 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0275 | 2 | F | Rel-8 | 8.3.0 | 8.4.0 | 3GPP2 access specific annex including AMBR per APN | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090662 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0276 | - | B | Rel-8 | 8.3.0 | - | UE-init Bearer Resource Modification request(29.212) | - | - | - | C3 | C3-52 | C3-090564 | revised | 2009-05-18 | SAES-St3-PCC | merged into C3-090609 | 2009-05-20 |
0277 | - | F | Rel-7 | 7.8.0 | - | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R7 29.212) | - | - | - | C3 | C3-52 | C3-090566 | Revised | 2009-05-18 | PCC | - | 2009-05-20 |
0277 | 1 | F | Rel-7 | 7.8.0 | - | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R7 29.212) | - | - | - | C3 | C3-52 | C3-090660 | Revised | 2009-05-18 | PCC | - | 2009-05-20 |
0277 | 2 | F | Rel-7 | 7.8.0 | - | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R7 29.212) | - | - | - | C3 | C3-52 | C3-090702 | Revised | 2009-05-18 | PCC | - | 2009-05-20 |
0277 | 3 | F | Rel-7 | 7.8.0 | - | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R7 29.212) | - | - | - | C3 | C3-52 | C3-090739 | Revised | 2009-05-18 | PCC | - | 2009-05-20 |
0277 | 4 | F | Rel-7 | 7.8.0 | 7.9.0 | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R7 29.212) | CP-44 | CP-090334 | approved | C3 | C3-52 | C3-090747 | Agreed | 2009-05-18 | PCC | - | 2009-05-20 |
0278 | - | A | Rel-8 | 8.3.0 | - | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R8 29.212) | - | - | - | C3 | C3-52 | C3-090567 | Revised | 2009-05-18 | PCC | - | 2009-05-20 |
0278 | 1 | A | Rel-8 | 8.3.0 | - | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R8 29.212) | - | - | - | C3 | C3-52 | C3-090661 | Revised | 2009-05-18 | PCC | - | 2009-05-20 |
0278 | 2 | A | Rel-8 | 8.3.0 | - | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R8 29.212) | - | - | - | C3 | C3-52 | C3-090703 | Revised | 2009-05-18 | PCC | - | 2009-05-20 |
0278 | 3 | A | Rel-8 | 8.3.0 | - | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R8 29.212) | - | - | - | C3 | C3-52 | C3-090740 | Revised | 2009-05-18 | PCC | - | 2009-05-20 |
0278 | 4 | A | Rel-8 | 8.3.0 | 8.4.0 | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R8 29.212) | CP-44 | CP-090334 | approved | C3 | C3-52 | C3-090748 | Agreed | 2009-05-18 | PCC | - | 2009-05-20 |
0279 | - | F | Rel-7 | 7.8.0 | - | Alignment of TFT and PCC packet filters in stage3(R7 29.212) | - | - | - | C3 | C3-52 | C3-090572 | Postponed | 2009-05-18 | PCC | - | 2009-05-20 |
0280 | - | A | Rel-8 | 8.3.0 | - | Alignment of TFT and PCC packet filters in stage3(R8 29.212) | - | - | - | C3 | C3-52 | C3-090573 | merged into C3-09610 | 2009-05-18 | PCC | - | 2009-05-20 |
0281 | - | F | Rel-8 | 8.3.0 | - | Clarification on QoS rules provided during inter-BBERF handovers(29.212) | - | - | - | C3 | C3-52 | C3-090575 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0281 | 1 | F | Rel-8 | 8.3.0 | - | Clarification on QoS rules provided during inter-BBERF handovers | - | - | - | C3 | C3-52 | C3-090649 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0281 | 2 | F | Rel-8 | 8.3.0 | 8.4.0 | Clarification on QoS rules provided during inter-BBERF handovers | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090745 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0282 | - | F | Rel-8 | 8.3.0 | - | Correction to the Tunnel-Information AVP | - | - | - | C3 | C3-52 | C3-090587 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0282 | 1 | F | Rel-8 | 8.3.0 | - | Correction to the Tunnel-Information AVP | - | - | - | C3 | C3-52 | C3-090746 | Revised | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0282 | 2 | F | Rel-8 | 8.3.0 | - | Correction to the Tunnel-Information AVP | - | - | - | C3 | C3-52 | C3-090756 | Postponed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0283 | - | F | Rel-8 | 8.3.0 | - | Correction to Bearer Control Mode Selection | - | - | - | C3 | C3-52 | C3-090588 | revised | 2009-05-18 | SAES-St3-PCC | merged with C3-090520 | 2009-05-20 |
0284 | - | A | Rel-8 | 8.3.0 | 8.4.0 | Correction to the operation on dynamic PCC rules | CP-44 | CP-090334 | approved | C3 | C3-52 | C3-090595 | Agreed | 2009-05-18 | PCC | - | 2009-05-20 |
0285 | - | A | Rel-8 | 8.3.0 | - | IP Packets matching procedures handling | - | - | - | C3 | C3-52 | C3-090596 | Revised | 2009-05-18 | PCC | - | 2009-05-20 |
0285 | 1 | A | Rel-8 | 8.3.0 | - | IP Packets matching procedures handling | - | - | - | C3 | C3-52 | C3-090701 | Revised | 2009-05-18 | PCC | - | 2009-05-20 |
0285 | 2 | A | Rel-8 | 8.3.0 | 8.4.0 | IP Packets matching procedures handling | CP-44 | CP-090334 | approved | C3 | C3-52 | C3-090707 | Agreed | 2009-05-18 | PCC | - | 2009-05-20 |
0286 | - | F | Rel-7 | 7.8.0 | 7.9.0 | Correction to the operation on dynamic PCC rules | CP-44 | CP-090334 | approved | C3 | C3-52 | C3-090597 | Agreed | 2009-05-18 | PCC | - | 2009-05-20 |
0287 | - | F | Rel-7 | 7.8.0 | - | IP Packets matching procedures handling | - | - | - | C3 | C3-52 | C3-090598 | Revised | 2009-05-18 | PCC | - | 2009-05-20 |
0287 | 1 | F | Rel-7 | 7.8.0 | - | IP Packets matching procedures handling | - | - | - | C3 | C3-52 | C3-090700 | Revised | 2009-05-18 | PCC | - | 2009-05-20 |
0287 | 2 | F | Rel-7 | 7.8.0 | 7.9.0 | IP Packets matching procedures handling | CP-44 | CP-090334 | approved | C3 | C3-52 | C3-090705 | Agreed | 2009-05-18 | PCC | - | 2009-05-20 |
0288 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Gxx Application ID | CP-44 | CP-090337 | approved | C3 | C3-52 | C3-090781 | Agreed | 2009-05-18 | SAES-St3-PCC | - | 2009-05-20 |
0289 | - | F | Rel-8 | 8.4.0 | - | Deferred leg linking indicator in Gxx | - | - | - | C3 | C3-54 | C3-090824 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0289 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Deferred leg linking indicator in Gxx | CP-45 | CP-090571 | approved | C3 | C3-54 | C3-091048 | Agreed | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0290 | - | F | Rel-8 | 8.4.0 | - | Supported-Features AVP handling in Gx | - | - | - | C3 | C3-54 | C3-090827 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0290 | 1 | F | Rel-8 | 8.4.0 | - | Supported-Features AVP handling in Gx | - | - | - | C3 | C3-54 | C3-091062 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0290 | 2 | F | Rel-8 | 8.4.0 | - | Supported-Features AVP handling in Gx | - | - | - | C3 | C3-54 | C3-091147 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0290 | 3 | F | Rel-8 | 8.4.0 | 8.5.0 | Supported features handling in Gx | CP-45 | CP-090572 | approved | C3 | C3-54 | C3-091164 | Agreed | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0291 | - | F | Rel-8 | 8.4.0 | - | Indication of QoS reservation result over Gx and Gxx | - | - | - | C3 | C3-54 | C3-090828 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0291 | 1 | F | Rel-8 | 8.4.0 | - | Indication of QoS reservation result over Gx and Gxx | - | - | - | C3 | C3-54 | C3-091063 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0291 | 2 | F | Rel-8 | 8.4.0 | 8.5.0 | Indication of QoS reservation result over Gx and Gxx | CP-45 | CP-090572 | approved | C3 | C3-54 | C3-091123 | Agreed | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0292 | - | F | Rel-8 | 8.4.0 | - | Dual IP address allocation | - | - | - | C3 | C3-54 | C3-090830 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0292 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Dual IP address allocation | CP-45 | CP-090572 | approved | C3 | C3-54 | C3-091064 | Agreed | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0293 | - | F | Rel-8 | 8.4.0 | - | ARP priority level values in intra-operator domain | - | - | - | C3 | C3-54 | C3-090831 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0293 | 1 | F | Rel-8 | 8.4.0 | - | ARP priority level values in intra-operator domain | - | - | - | C3 | C3-54 | C3-091050 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0293 | 2 | F | Rel-8 | 8.4.0 | 8.5.0 | ARP priority level values in intra-operator domain | CP-45 | CP-090571 | approved | C3 | C3-54 | C3-091027 | Agreed | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0294 | - | B | Rel-9 | - | - | Usage Reporting in Gx | - | - | - | C3 | C3-54 | C3-090833 | Revised | 2009-09-07 | TEI9 | - | 2009-09-08 |
0294 | 1 | B | Rel-9 | - | - | Usage Reporting in Gx | - | - | - | C3 | C3-54 | C3-091100 | Postponed | 2009-09-07 | TEI9 | - | 2009-09-08 |
0295 | - | F | Rel-8 | 8.4.0 | - | BCM in Gxx for 3gpp accesses | - | - | - | C3 | C3-54 | C3-090835 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0295 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | BCM in Gxx for 3gpp accesses | CP-45 | CP-090572 | approved | C3 | C3-54 | C3-091055 | Agreed | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0296 | - | F | Rel-8 | 8.4.0 | - | AVP code Reassignment | - | - | - | C3 | C3-54 | C3-090837 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0296 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | AVP code 1051 Reassignment | CP-45 | CP-090572 | approved | C3 | C3-54 | C3-091065 | Agreed | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0297 | - | B | Rel-9 | - | - | IMS Emergency Services | - | - | - | C3 | C3-54 | C3-090839 | Revised | 2009-09-07 | IMS_EMER_GPRS_EPS | - | 2009-09-08 |
0297 | 1 | B | Rel-9 | - | - | IMS Emergency Services | - | - | - | C3 | C3-54 | C3-091092 | Revised | 2009-09-07 | IMS_EMER_GPRS_EPS | - | 2009-09-08 |
0297 | 2 | B | Rel-9 | - | - | IMS Emergency Services | - | - | - | C3 | C3-54 | C3-091139 | Revised | 2009-09-07 | IMS_EMER_GPRS_EPS | - | 2009-09-08 |
0297 | 3 | B | Rel-9 | 8.4.0 | 9.0.0 | IMS Emergency Services | CP-45 | CP-090585 | approved | C3 | C3-54 | C3-091154 | Agreed | 2009-09-07 | IMS_EMER_GPRS_EPS | - | 2009-09-08 |
0298 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Correction for 3GPP2 AVP BSID | CP-45 | CP-090572 | approved | C3 | C3-54 | C3-090841 | Agreed | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0299 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Fix the redirect procedure over the Gx interface | CP-45 | CP-090580 | approved | C3 | C3-54 | C3-090849 | Agreed | 2009-09-07 | PCC | - | 2009-09-08 |
0300 | - | B | Rel-9 | - | - | Usage Monitoring Control over Gx | - | - | - | C3 | C3-54 | C3-090850 | revised | 2009-09-07 | TEI9 | merged into C3-091100 | 2009-09-08 |
0301 | - | B | Rel-9 | - | - | Supporting multiple PDN connection to same APN(R9 29.212) | - | - | - | C3 | C3-54 | C3-090867 | Revised | 2009-09-07 | PCC | - | 2009-09-08 |
0301 | 1 | B | Rel-9 | - | - | Supporting multiple PDN connection to same APN | - | - | - | C3 | C3-54 | C3-091021 | Revised | 2009-09-07 | MUPSAP-PCCEnh | - | 2009-09-08 |
0301 | 2 | B | Rel-9 | 8.4.0 | 9.0.0 | Supporting multiple PDN connection to same APN | CP-45 | CP-090586 | approved | C3 | C3-54 | C3-091159 | Agreed | 2009-09-07 | MUPSAP-PCCEnh | - | 2009-09-08 |
0302 | - | F | Rel-7 | 7.9.0 | - | Alignment of TFT and PCC packet filters(R7 29.212) | - | - | - | C3 | C3-54 | C3-090870 | Revised | 2009-09-07 | PCC | - | 2009-09-08 |
0302 | 1 | F | Rel-7 | 7.9.0 | - | Alignment of TFT and PCC packet filters(R7 29.212) | - | - | - | C3 | C3-54 | C3-090995 | Revised | 2009-09-07 | PCC | - | 2009-09-08 |
0302 | 2 | F | Rel-7 | 7.9.0 | 7.10.0 | Alignment of TFT and PCC packet filters | CP-45 | CP-090569 | approved | C3 | C3-54 | C3-091041 | Agreed | 2009-09-07 | PCC | - | 2009-09-08 |
0303 | - | A | Rel-8 | 8.4.0 | - | Alignment of TFT and PCC packet filters(R8 29.212) | - | - | - | C3 | C3-54 | C3-090871 | Revised | 2009-09-07 | PCC | - | 2009-09-08 |
0303 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Alignment of TFT and PCC packet filters | CP-45 | CP-090569 | approved | C3 | C3-54 | C3-091042 | Agreed | 2009-09-07 | PCC | - | 2009-09-08 |
0304 | - | F | Rel-7 | 7.9.0 | - | Adding the missed AVP in the RAA(R7 29.212) | - | - | - | C3 | C3-54 | C3-090872 | Revised | 2009-09-07 | PCC | - | 2009-09-08 |
0304 | 1 | F | Rel-7 | 7.9.0 | 7.10.0 | Adding the missed AVP in the RAA | CP-45 | CP-090569 | approved | C3 | C3-54 | C3-090996 | Agreed | 2009-09-07 | PCC | - | 2009-09-08 |
0305 | - | A | Rel-8 | 8.4.0 | - | Adding the missed AVP in the RAA(R8 29.212) | - | - | - | C3 | C3-54 | C3-090873 | Revised | 2009-09-07 | PCC | - | 2009-09-08 |
0305 | 1 | A | Rel-8 | 8.4.0 | 8.5.0 | Adding the missed AVP in the RAA | CP-45 | CP-090569 | approved | C3 | C3-54 | C3-091067 | Agreed | 2009-09-07 | PCC | - | 2009-09-08 |
0306 | - | F | Rel-7 | 7.9.0 | - | Removing multiple Charging-Rule-Remove AVP in RAR CCA(R7 29.212) | - | - | - | C3 | C3-54 | C3-090874 | Withdrawn | 2009-09-07 | PCC | - | 2009-09-08 |
0307 | - | A | Rel-8 | 8.4.0 | - | Removing multiple Charging-Rule-Remove AVP in RAR CCA(R8 29.212) | - | - | - | C3 | C3-54 | C3-090875 | Withdrawn | 2009-09-07 | PCC | - | 2009-09-08 |
0308 | - | F | Rel-8 | 8.4.0 | - | Correction of the AVP code(R8 29.212) | - | - | - | C3 | C3-54 | C3-090877 | revised | 2009-09-07 | SAES-St3-PCC | merged into C3-091065 | 2009-09-08 |
0309 | - | F | Rel-8 | 8.4.0 | - | ARP Handling When UE-init Bearer Modification(R8 29.212) | - | - | - | C3 | C3-54 | C3-090878 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0309 | 1 | F | Rel-8 | 8.4.0 | - | ARP Handling When UE-init Bearer Modification(R8 29.212) | - | - | - | C3 | C3-54 | C3-091070 | Postponed | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0310 | - | F | Rel-8 | 8.4.0 | - | Correction that BCM is sent over Gxx only for non-3GPP access(R8 29.212) | - | - | - | C3 | C3-54 | C3-090879 | revised | 2009-09-07 | SAES-St3-PCC | merged into C3-0901055 | 2009-09-08 |
0311 | - | F | Rel-9 | - | - | Correction that BCM is sent over Gxx only for non-3GPP access(R9 29.212) | - | - | - | C3 | C3-54 | C3-090880 | Withdrawn | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0312 | - | F | Rel-9 | - | - | ARP for emergency service(R9 29.212) | - | - | - | C3 | C3-54 | C3-090885 | revised | 2009-09-07 | IMS_EMER_GPRS_EPS | merged into C3-091092 | 2009-09-08 |
0313 | - | F | Rel-9 | - | - | Clarification for the Gxx Gx linking(R9 29.212) | - | - | - | C3 | C3-54 | C3-090886 | Revised | 2009-09-07 | IMS_EMER_GPRS_EPS | - | 2009-09-08 |
0313 | 1 | F | Rel-8 | - | - | Clarification for the Gxx Gx linking | - | - | - | C3 | C3-54 | C3-091094 | Revised | 2009-09-07 | IMS_EMER_GPRS_EPS | - | 2009-09-08 |
0313 | 2 | F | Rel-8 | - | - | Clarification for the Gxx Gx linking | - | - | - | C3 | C3-54 | C3-091126 | Revised | 2009-09-07 | IMS_EMER_GPRS_EPS | - | 2009-09-08 |
0313 | 3 | F | Rel-8 | 8.4.0 | 8.5.0 | Clarification for the Gxx Gx linking | CP-45 | CP-090585 | approved | C3 | C3-54 | C3-091136 | Agreed | 2009-09-07 | IMS_EMER_GPRS_EPS | - | 2009-09-08 |
0314 | - | F | Rel-8 | 8.4.0 | - | Harmonisation of QoS and APN-AMBR parameters | - | - | - | C3 | C3-54 | C3-090906 | Withdrawn | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0315 | - | F | Rel-8 | 8.4.0 | - | PCC/QoS rule modification failure handling | - | - | - | C3 | C3-54 | C3-090910 | Postponed | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0316 | - | F | Rel-8 | 8.4.0 | - | Corrections on setting of IP-CAN type value | - | - | - | C3 | C3-54 | C3-090914 | revised | 2009-09-07 | SAES-St3-PCC | merged into C3-0901072 | 2009-09-08 |
0317 | - | F | Rel-8 | 8.4.0 | - | Access technology types | - | - | - | C3 | C3-54 | C3-090917 | revised | 2009-09-07 | SAES-St3-PCC | merged into C3-091072 | 2009-09-08 |
0318 | - | F | Rel-8 | 8.4.0 | - | Trace (de)activation at P-GW | - | - | - | C3 | C3-54 | C3-090918 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0318 | 1 | F | Rel-8 | 8.4.0 | - | Trace (de)activation at P-GW | - | - | - | C3 | C3-54 | C3-091073 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0318 | 2 | F | Rel-8 | 8.4.0 | - | Trace (de)activation at P-GW | - | - | - | C3 | C3-54 | C3-091125 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0318 | 3 | F | Rel-8 | 8.4.0 | 8.5.0 | Trace (de)activation at P-GW | CP-45 | CP-090572 | approved | C3 | C3-54 | C3-091135 | Agreed | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0319 | - | F | Rel-8 | 8.4.0 | - | UE time zone | - | - | - | C3 | C3-54 | C3-090919 | revised | 2009-09-07 | SAES-St3-PCC | merged into C3-0901074 | 2009-09-08 |
0320 | - | F | Rel-7 | 7.9.0 | - | Error handling in authorized QoS enforcement | - | - | - | C3 | C3-54 | C3-090931 | Revised | 2009-09-07 | PCC | - | 2009-09-08 |
0320 | 1 | F | Rel-7 | 7.9.0 | 7.10.0 | Error handling in authorized QoS enforcement | CP-45 | CP-090569 | approved | C3 | C3-54 | C3-091089 | Agreed | 2009-09-07 | PCC | - | 2009-09-08 |
0321 | - | A | Rel-8 | 8.4.0 | - | Error handling in authorized QoS enforcement | - | - | - | C3 | C3-54 | C3-090932 | Revised | 2009-09-07 | PCC | - | 2009-09-08 |
0321 | 1 | A | Rel-8 | 8.4.0 | 8.5.0 | Error handling in authorized QoS enforcement | CP-45 | CP-090569 | approved | C3 | C3-54 | C3-091090 | Agreed | 2009-09-07 | PCC | - | 2009-09-08 |
0322 | - | F | Rel-8 | 8.4.0 | - | Correction to the BCM selection on Gxx | - | - | - | C3 | C3-54 | C3-090944 | revised | 2009-09-07 | SAES-St3-PCC | merged into C3-0901055 | 2009-09-08 |
0323 | - | F | Rel-8 | 8.4.0 | - | Correction to the table of Gxx re-used AVPs | - | - | - | C3 | C3-54 | C3-090945 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0323 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Correction to the table of Gxx re-used AVPs | CP-45 | CP-090572 | approved | C3 | C3-54 | C3-091075 | Agreed | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0324 | - | F | Rel-8 | 8.4.0 | - | Handling of multiple BBERF | - | - | - | C3 | C3-54 | C3-090946 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0324 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Handling of multiple BBERF | CP-45 | CP-090571 | approved | C3 | C3-54 | C3-091054 | Agreed | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0325 | - | F | Rel-8 | 8.4.0 | - | Report the UE time zone information to the PCRF | - | - | - | C3 | C3-54 | C3-090947 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0325 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Report the UE time zone information to the PCRF | CP-45 | CP-090572 | approved | C3 | C3-54 | C3-091074 | Agreed | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0326 | - | B | Rel-9 | - | - | PCC Support for 3GPP2 cdma1x and HRPD | - | - | - | C3 | C3-54 | C3-090951 | Revised | 2009-09-07 | TEI9 | - | 2009-09-08 |
0326 | 1 | B | Rel-8 | - | - | PCC Support for 3GPP2 cdma1x and HRPD | - | - | - | C3 | C3-54 | C3-091072 | Postponed | 2009-09-07 | TEI9 | - | 2009-09-08 |
0327 | - | B | Rel-9 | - | - | Modification of the description on session linking for the MUPSAP scenario | - | - | - | C3 | C3-54 | C3-090955 | revised | 2009-09-07 | MUPSAP | merged into C3-091021 | 2009-09-08 |
0328 | - | B | Rel-9 | - | - | Addition of PDN connection ID in the Gateway Control Session Establishment | - | - | - | C3 | C3-54 | C3-090956 | revised | 2009-09-07 | MUPSAP | merged into C3-091021 | 2009-09-08 |
0329 | - | B | Rel-9 | - | - | The AVP of PDN Connection ID | - | - | - | C3 | C3-54 | C3-090957 | revised | 2009-09-07 | MUPSAP | merged into C3-091021 | 2009-09-08 |
0330 | - | F | Rel-8 | 8.4.0 | - | 3GPP2-BSID over Gx | - | - | - | C3 | C3-54 | C3-091031 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0330 | 1 | F | Rel-8 | 8.4.0 | - | 3GPP2-BSID over Gx | - | - | - | C3 | C3-54 | C3-091039 | Revised | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0330 | 2 | F | Rel-8 | 8.4.0 | 8.5.0 | 3GPP2-BSID over Gx | CP-45 | CP-090572 | approved | C3 | C3-54 | C3-091127 | Agreed | 2009-09-07 | SAES-St3-PCC | - | 2009-09-08 |
0331 | - | F | Rel-7 | 7.10.0 | - | Adding time zone event related AVP in the RAA | - | - | - | C3 | C3-55 | C3-091195 | Postponed | 2009-11-27 | PCC | - | 2009-11-27 |
0332 | - | A | Rel-8 | 8.5.0 | - | Adding time zone event related AVP in the RAA | - | - | - | C3 | C3-55 | C3-091196 | Revised | 2009-11-27 | PCC | - | 2009-11-27 |
0332 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | Adding time zone event related AVP in the RAA | CP-46 | CP-090836 | approved | C3 | C3-55 | C3-091381 | Agreed | 2009-11-27 | PCC | - | 2009-11-27 |
0333 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Adding time zone event related AVP in the RAA | CP-46 | CP-090836 | approved | C3 | C3-55 | C3-091197 | Agreed | 2009-11-27 | PCC | - | 2009-11-27 |
0334 | - | F | Rel-7 | 7.10.0 | - | RAT type in the initial CCR | - | - | - | C3 | C3-55 | C3-091198 | Revised | 2009-11-27 | PCC | - | 2009-11-27 |
0334 | 1 | F | Rel-7 | 7.10.0 | - | RAT type in the initial CCR | - | - | - | C3 | C3-55 | C3-091497 | Revised | 2009-11-27 | PCC | - | 2009-11-27 |
0334 | 2 | F | Rel-7 | 7.10.0 | 7.11.0 | RAT type in the initial CCR | CP-46 | CP-090836 | approved | C3 | C3-55 | C3-091527 | Agreed | 2009-11-27 | PCC | - | 2009-11-27 |
0335 | - | A | Rel-8 | 8.5.0 | - | RAT type in the initial C(R8 29.212) | - | - | - | C3 | C3-55 | C3-091199 | Revised | 2009-11-27 | PCC | - | 2009-11-27 |
0335 | 1 | A | Rel-8 | 8.5.0 | - | RAT type in the initial C(R8 29.212) | - | - | - | C3 | C3-55 | C3-091498 | Revised | 2009-11-27 | PCC | - | 2009-11-27 |
0335 | 2 | A | Rel-8 | 8.5.0 | 8.6.0 | RAT type in the initial CCR | CP-46 | CP-090836 | approved | C3 | C3-55 | C3-091528 | Agreed | 2009-11-27 | PCC | - | 2009-11-27 |
0336 | - | A | Rel-9 | 9.0.0 | - | RAT type in the initial C(R9 29.212) | - | - | - | C3 | C3-55 | C3-091200 | Revised | 2009-11-27 | PCC | - | 2009-11-27 |
0336 | 1 | A | Rel-9 | 9.0.0 | - | RAT type in the initial C(R9 29.212) | - | - | - | C3 | C3-55 | C3-091499 | Revised | 2009-11-27 | PCC | - | 2009-11-27 |
0336 | 2 | A | Rel-9 | 9.0.0 | 9.1.0 | RAT type in the initial CCR | CP-46 | CP-090836 | approved | C3 | C3-55 | C3-091529 | Agreed | 2009-11-27 | PCC | - | 2009-11-27 |
0337 | - | F | Rel-8 | 8.5.0 | - | Mapping for GRPS QoS Class Identifier to from UMTS QoS parameters | - | - | - | C3 | C3-55 | C3-091201 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0337 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | Mapping for GRPS QoS Class Identifier to from UMTS QoS parameters | CP-46 | CP-090840 | approved | C3 | C3-55 | C3-091470 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0338 | - | A | Rel-9 | 9.0.0 | - | Mapping for GRPS QoS Class Identifier to from UMTS QoS parameters (R9 29.212) | - | - | - | C3 | C3-55 | C3-091202 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0338 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Mapping for GRPS QoS Class Identifier to from UMTS QoS parameters | CP-46 | CP-090840 | approved | C3 | C3-55 | C3-091471 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0339 | - | F | Rel-8 | 8.5.0 | - | ARP Handling When UE-init Bearer Modification(R8 29.212) | - | - | - | C3 | C3-55 | C3-091204 | Postponed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0340 | - | B | Rel-9 | 9.0.0 | - | USge reporting in Gx | - | - | - | C3 | C3-55 | C3-091207 | revised | 2009-11-27 | PCC-Enh | merged into C3-091507 | 2009-11-27 |
0341 | - | F | Rel-8 | 8.5.0 | - | Handling of Bearer Control Mode in roaming cases | - | - | - | C3 | C3-55 | C3-091233 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0341 | 1 | F | Rel-8 | 8.5.0 | - | Handling of Bearer Control Mode in roaming cases | - | - | - | C3 | C3-55 | C3-091455 | Withdrawn | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0342 | - | A | Rel-9 | 9.0.0 | - | Handling of Bearer Control Mode in roaming cases | - | - | - | C3 | C3-55 | C3-091234 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0342 | 1 | A | Rel-9 | 9.0.0 | - | Handling of Bearer Control Mode in roaming cases | - | - | - | C3 | C3-55 | C3-091456 | Withdrawn | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0343 | - | F | Rel-9 | 9.0.0 | - | Supported-Features AVP handling in Gx and Gxx | - | - | - | C3 | C3-55 | C3-091235 | covered by C3-091540 | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0344 | - | F | Rel-8 | 8.5.0 | - | Access Network Charging Identifier handling in Gx | - | - | - | C3 | C3-55 | C3-091238 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0344 | 1 | F | Rel-8 | 8.5.0 | - | Access Network Charging Identifier handling in Gx | - | - | - | C3 | C3-55 | C3-091475 | Withdrawn | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0345 | - | A | Rel-9 | 9.0.0 | - | Access Network Charging Identifier handling in Gx | - | - | - | C3 | C3-55 | C3-091239 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0345 | 1 | A | Rel-9 | 9.0.0 | - | Access Network Charging Identifier handling in Gx | - | - | - | C3 | C3-55 | C3-091476 | Withdrawn | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0346 | - | B | Rel-9 | 9.0.0 | - | USge Reporting in Gx | - | - | - | C3 | C3-55 | C3-091242 | Revised | 2009-11-27 | PCC-Enh | - | 2009-11-27 |
0346 | 1 | B | Rel-9 | 9.0.0 | - | USge Reporting in Gx | - | - | - | C3 | C3-55 | C3-091507 | Revised | 2009-11-27 | PCC-Enh | - | 2009-11-27 |
0346 | 2 | B | Rel-9 | 9.0.0 | 9.1.0 | USge Reporting in Gx | CP-46 | CP-090857 | approved | C3 | C3-55 | C3-091592 | Agreed | 2009-11-27 | PCC-Enh | - | 2009-11-27 |
0347 | - | B | Rel-9 | 9.0.0 | - | Completion of Gx procedures for IMS Emergency calls | - | - | - | C3 | C3-55 | C3-091244 | Revised | 2009-11-27 | IMS_EMER_GPRS_EPS | - | 2009-11-27 |
0347 | 1 | B | Rel-9 | 9.0.0 | - | Completion of Gx procedures for IMS Emergency calls | - | - | - | C3 | C3-55 | C3-091496 | Revised | 2009-11-27 | IMS_EMER_GPRS_EPS | - | 2009-11-27 |
0347 | 2 | B | Rel-9 | 9.0.0 | - | Completion of Gx procedures for IMS Emergency calls | - | - | - | C3 | C3-55 | C3-091520 | Revised | 2009-11-27 | IMS_EMER_GPRS_EPS | - | 2009-11-27 |
0347 | 3 | B | Rel-9 | 9.0.0 | - | Completion of Gx procedures for IMS Emergency calls | - | - | - | C3 | C3-55 | C3-091551 | Revised | 2009-11-27 | IMS_EMER_GPRS_EPS | - | 2009-11-27 |
0347 | 4 | B | Rel-9 | 9.0.0 | 9.1.0 | Completion of Gx procedures for IMS Emergency calls | CP-46 | CP-090856 | approved | C3 | C3-55 | C3-091571 | Agreed | 2009-11-27 | IMS_EMER_GPRS_EPS | - | 2009-11-27 |
0348 | - | B | Rel-9 | 9.0.0 | - | Emergency Call Termination | - | - | - | C3 | C3-55 | C3-091269 | Withdrawn | 2009-11-27 | IMS_EMER_GPRS_EPS | - | 2009-11-27 |
0349 | - | B | Rel-9 | 9.0.0 | - | PCC Support for CSG | - | - | - | C3 | C3-55 | C3-091271 | postponed | 2009-11-27 | [PCC-Enh] | - | 2009-11-27 |
0350 | - | F | Rel-8 | 8.5.0 | - | PCC rule modification failure | - | - | - | C3 | C3-55 | C3-091272 | revised | 2009-11-27 | SAES-St3-PCC | merged into C3-091477 | 2009-11-27 |
0351 | - | F | Rel-8 | 8.5.0 | - | Mapping of access network codes | - | - | - | C3 | C3-55 | C3-091284 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0351 | 1 | F | Rel-8 | 8.5.0 | - | Mapping of access network codes | - | - | - | C3 | C3-55 | C3-091479 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0351 | 2 | F | Rel-8 | 8.5.0 | - | Mapping of access network codes | - | - | - | C3 | C3-55 | C3-091545 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0351 | 3 | F | Rel-8 | 8.5.0 | - | Mapping of access network codes | - | - | - | C3 | C3-55 | C3-091565 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0351 | 4 | F | Rel-8 | 8.5.0 | - | Mapping of access network codes | - | - | - | C3 | C3-56 | C3-091902 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0351 | 5 | F | Rel-8 | 8.5.0 | 8.6.0 | Mapping of access network codes | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091992 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0352 | - | A | Rel-9 | 9.0.0 | - | Mapping of access network codes | - | - | - | C3 | C3-55 | C3-091285 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0352 | 1 | A | Rel-9 | 9.0.0 | - | Mapping of access network codes | - | - | - | C3 | C3-55 | C3-091480 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0352 | 2 | A | Rel-9 | 9.0.0 | - | Mapping of access network codes | - | - | - | C3 | C3-55 | C3-091546 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0352 | 3 | A | Rel-9 | 9.0.0 | - | Mapping of access network codes | - | - | - | C3 | C3-55 | C3-091566 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0352 | 4 | A | Rel-9 | 9.0.0 | - | Mapping of access network codes | - | - | - | C3 | C3-56 | C3-091903 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0352 | 5 | A | Rel-9 | 9.0.0 | 9.1.0 | Mapping of access network codes | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091993 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0353 | - | A | Rel-9 | 9.0.0 | - | Addition of allowed values for QCI AVP | - | - | - | C3 | C3-55 | C3-091286 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0353 | 1 | A | Rel-9 | 9.0.0 | - | Addition of allowed values for QCI AVP | - | - | - | C3 | C3-55 | C3-091374 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0353 | 2 | A | Rel-9 | 9.0.0 | - | Addition of allowed values for QCI AVP | - | - | - | C3 | C3-55 | C3-091482 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0353 | 3 | A | Rel-9 | 9.0.0 | 9.1.0 | Addition of allowed values for QCI AVP | CP-46 | CP-090840 | approved | C3 | C3-55 | C3-091547 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0354 | - | F | Rel-8 | 8.5.0 | - | Addition of allowed values for QCI AVP | - | - | - | C3 | C3-55 | C3-091287 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0354 | 1 | F | Rel-8 | 8.5.0 | - | Addition of allowed values for QCI AVP | - | - | - | C3 | C3-55 | C3-091375 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0354 | 2 | F | Rel-8 | 8.5.0 | - | Addition of allowed values for QCI AVP | - | - | - | C3 | C3-55 | C3-091376 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0354 | 3 | F | Rel-8 | 8.5.0 | - | Addition of allowed values for QCI AVP | - | - | - | C3 | C3-55 | C3-091481 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0354 | 4 | F | Rel-8 | 8.5.0 | 8.6.0 | Addition of allowed values for QCI AVP | CP-46 | CP-090840 | approved | C3 | C3-55 | C3-091548 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0355 | - | F | Rel-8 | 8.5.0 | - | Corrections on setting of IP-CAN Type value | - | - | - | C3 | C3-55 | C3-091299 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0355 | 1 | F | Rel-8 | 8.5.0 | - | Corrections on setting of IP-CAN Type value | - | - | - | C3 | C3-56 | C3-091698 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0355 | 2 | F | Rel-8 | 8.5.0 | 8.6.0 | Corrections on setting of IP-CAN Type value | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091862 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0356 | - | A | Rel-9 | 9.0.0 | - | Corrections on setting of IP-CAN Type value | - | - | - | C3 | C3-55 | C3-091300 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0356 | 1 | A | Rel-9 | 9.0.0 | - | Corrections on setting of IP-CAN Type value | - | - | - | C3 | C3-56 | C3-091699 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0356 | 2 | A | Rel-9 | 9.0.0 | 9.1.0 | Corrections on setting of IP-CAN Type value | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091863 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0357 | - | F | Rel-8 | 8.5.0 | - | PCC/QoS rule modification failure handling | - | - | - | C3 | C3-55 | C3-091301 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0357 | 1 | F | Rel-8 | 8.5.0 | - | PCC/QoS rule modification failure handling | - | - | - | C3 | C3-55 | C3-091477 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0357 | 2 | F | Rel-8 | 8.5.0 | - | PCC/QoS rule modification failure handling | - | - | - | C3 | C3-56 | C3-091700 | revised | 2009-11-27 | SAES-St3-PCC | merged into C3-091900 | 2009-11-27 |
0358 | - | A | Rel-9 | 9.0.0 | - | PCC/QoS rule modification failure handling | - | - | - | C3 | C3-55 | C3-091302 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0358 | 1 | A | Rel-9 | 9.0.0 | - | PCC/QoS rule modification failure handling | - | - | - | C3 | C3-55 | C3-091478 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0358 | 2 | A | Rel-9 | 9.0.0 | - | PCC/QoS rule modification failure handling | - | - | - | C3 | C3-56 | C3-091701 | revised | 2009-11-27 | SAES-St3-PCC | merged into C3-091901 | 2009-11-27 |
0359 | - | F | Rel-8 | 8.5.0 | - | Corrections to applicability of some AVPs | - | - | - | C3 | C3-55 | C3-091303 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0359 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | Corrections to applicability of some AVPs | CP-46 | CP-090840 | approved | C3 | C3-55 | C3-091484 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0360 | - | A | Rel-9 | 9.0.0 | - | Corrections to applicability of some AVPs | - | - | - | C3 | C3-55 | C3-091304 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0360 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Corrections to applicability of some AVPs | CP-46 | CP-090840 | approved | C3 | C3-55 | C3-091485 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0361 | - | F | Rel-8 | 8.5.0 | - | 3GPP2 Annex | - | - | - | C3 | C3-55 | C3-091305 | Postponed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0362 | - | A | Rel-9 | 9.0.0 | - | 3GPP2 Annex | - | - | - | C3 | C3-55 | C3-091306 | Postponed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0363 | - | F | Rel-8 | 8.5.0 | - | Corrections to PCC rule provisioning | - | - | - | C3 | C3-55 | C3-091307 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0363 | 1 | A | Rel-8 | 8.5.0 | 8.6.0 | Corrections to PCC rule provisioning | CP-46 | CP-090836 | approved | C3 | C3-55 | C3-091486 | Agreed | 2009-11-27 | PCC | - | 2009-11-27 |
0364 | - | A | Rel-9 | 9.0.0 | - | Corrections to PCC rule provisioning | - | - | - | C3 | C3-55 | C3-091308 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0364 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Corrections to PCC rule provisioning | CP-46 | CP-090836 | approved | C3 | C3-55 | C3-091487 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0365 | - | F | Rel-8 | 8.5.0 | - | Clarification of the Event-Report-Indication AVP | - | - | - | C3 | C3-55 | C3-091325 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0365 | 1 | F | Rel-8 | 8.5.0 | - | Clarification of the Event-Report-Indication AVP | - | - | - | C3 | C3-56 | C3-091731 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0365 | 2 | F | Rel-8 | 8.5.0 | 8.6.0 | Clarification of the Event-Report-Indication AVP | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091870 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0366 | - | A | Rel-9 | 9.0.0 | - | Clarification of the Event-Report-Indication AVP | - | - | - | C3 | C3-55 | C3-091326 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0366 | 1 | A | Rel-9 | 9.0.0 | - | Clarification of the Event-Report-Indication AVP | - | - | - | C3 | C3-56 | C3-091732 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0366 | 2 | A | Rel-9 | 9.0.0 | 9.1.0 | Clarification of the Event-Report-Indication AVP | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091871 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0367 | - | F | Rel-7 | 7.10.0 | - | Clarification and correction of IPv6 procedures over Gx | - | - | - | C3 | C3-55 | C3-091345 | Revised | 2009-11-27 | PCC | - | 2009-11-27 |
0367 | 1 | F | Rel-7 | 7.10.0 | 7.11.0 | Clarification and correction of IPv6 procedures over Gx | CP-46 | CP-090836 | approved | C3 | C3-55 | C3-091436 | Agreed | 2009-11-27 | PCC | - | 2009-11-27 |
0368 | - | A | Rel-8 | 8.5.0 | - | Clarification and correction of IPv6 procedures over Gx | - | - | - | C3 | C3-55 | C3-091348 | Revised | 2009-11-27 | PCC | - | 2009-11-27 |
0368 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | Clarification and correction of IPv6 procedures over Gx | CP-46 | CP-090836 | approved | C3 | C3-55 | C3-091445 | Agreed | 2009-11-27 | PCC | - | 2009-11-27 |
0369 | - | A | Rel-9 | 9.0.0 | - | Clarification and correction of IPv6 procedures over Gx | - | - | - | C3 | C3-55 | C3-091351 | Revised | 2009-11-27 | PCC | - | 2009-11-27 |
0369 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Clarification and correction of IPv6 procedures over Gx | CP-46 | CP-090836 | approved | C3 | C3-55 | C3-091437 | Agreed | 2009-11-27 | PCC | - | 2009-11-27 |
0370 | - | F | Rel-8 | 8.5.0 | - | Supported Features for Rel-8 Gx | - | - | - | C3 | C3-55 | C3-091353 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0370 | 1 | F | Rel-8 | 8.5.0 | - | Supported Features for Rel-8 Gx | - | - | - | C3 | C3-55 | C3-091536 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0370 | 2 | F | Rel-8 | 8.5.0 | - | Supported Features for Rel-8 Gx | - | - | - | C3 | C3-55 | C3-091588 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0370 | 3 | F | Rel-8 | 8.5.0 | 8.6.0 | Supported Features for Rel-8 Gx | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091773 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0371 | - | B | Rel-9 | 9.0.0 | - | Supported Features for Rel-9 Gx and Gxx | - | - | - | C3 | C3-55 | C3-091355 | Revised | 2009-11-27 | PCC-Enh | - | 2009-11-27 |
0371 | 1 | A | Rel-9 | 9.0.0 | - | Supported Features for Rel-9 Gx and Gxx | - | - | - | C3 | C3-55 | C3-091540 | Revised | 2009-11-27 | PCC-Enh | - | 2009-11-27 |
0371 | 2 | A | Rel-9 | 9.0.0 | - | Supported Features for Rel-9 Gx and Gxx | - | - | - | C3 | C3-56 | C3-091722 | Revised | 2009-11-27 | PCC-Enh | - | 2009-11-27 |
0371 | 3 | A | Rel-9 | 9.0.0 | - | Supported Features for Rel-9 Gx and Gxx | - | - | - | C3 | C3-56 | C3-091873 | Revised | 2009-11-27 | PCC-Enh | - | 2009-11-27 |
0371 | 4 | B | Rel-9 | 9.0.0 | 9.1.0 | Supported Features for Rel-9 Gx and Gxx | CP-46 | CP-090857 | approved | C3 | C3-56 | C3-092006 | Agreed | 2009-11-27 | PCC-Enh | - | 2009-11-27 |
0372 | - | F | Rel-7 | 7.10.0 | 7.11.0 | Corrections to PCC rule provisioning | CP-46 | CP-090836 | approved | C3 | C3-55 | C3-091428 | Agreed | 2009-11-27 | PCC | - | 2009-11-27 |
0373 | - | F | Rel-7 | 7.10.0 | - | Report the UE time zone information to the PCRF | - | - | - | C3 | C3-56 | C3-091625 | Revised | 2009-11-27 | PCC | - | 2009-11-27 |
0373 | 1 | F | Rel-7 | 7.10.0 | - | Report the UE time zone information to the PCRF | - | - | - | C3 | C3-56 | C3-091841 | Revised | 2009-11-27 | PCC | - | 2009-11-27 |
0373 | 2 | F | Rel-7 | 7.10.0 | 7.11.0 | Report the UE time zone information to the PCRF | CP-46 | CP-090836 | approved | C3 | C3-56 | C3-091929 | Agreed | 2009-11-27 | PCC | - | 2009-11-27 |
0374 | - | B | Rel-9 | 9.0.0 | - | PCC Support for CSG(R9 29.212) | - | - | - | C3 | C3-56 | C3-091626 | Revised | 2009-11-27 | PCC-Enh | - | 2009-11-27 |
0374 | 1 | B | Rel-9 | 9.0.0 | - | PCC Support for CSG(R9 29.212) | - | - | - | C3 | C3-56 | C3-091912 | Revised | 2009-11-27 | PCC-Enh | - | 2009-11-27 |
0374 | 2 | B | Rel-9 | 9.0.0 | 9.1.0 | PCC Support for CSG | CP-46 | CP-090857 | approved | C3 | C3-56 | C3-091946 | Agreed | 2009-11-27 | PCC-Enh | - | 2009-11-27 |
0375 | - | F | Rel-7 | 7.10.0 | - | Correction for the missing Charging-Rule-Base-Name | - | - | - | C3 | C3-56 | C3-091628 | Revised | 2009-11-27 | PCC | - | 2009-11-27 |
0375 | 1 | F | Rel-7 | 7.10.0 | 7.11.0 | Correction for the missing Charging-Rule-Base-Name | CP-46 | CP-090836 | approved | C3 | C3-56 | C3-091842 | Agreed | 2009-11-27 | PCC | - | 2009-11-27 |
0376 | - | A | Rel-8 | 8.5.0 | - | Correction for the missing Charging-Rule-Base-Name(R8 29.212) | - | - | - | C3 | C3-56 | C3-091629 | Revised | 2009-11-27 | PCC | - | 2009-11-27 |
0376 | 1 | A | Rel-8 | 8.5.0 | 8.6.0 | Correction for the missing Charging-Rule-Base-Name | CP-46 | CP-090836 | approved | C3 | C3-56 | C3-091843 | Agreed | 2009-11-27 | PCC | - | 2009-11-27 |
0377 | - | A | Rel-9 | 9.0.0 | - | Correction for the missing Charging-Rule-Base-Name(R9 29.212) | - | - | - | C3 | C3-56 | C3-091630 | Revised | 2009-11-27 | PCC | - | 2009-11-27 |
0377 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Correction for the missing Charging-Rule-Base-Name | CP-46 | CP-090836 | approved | C3 | C3-56 | C3-091844 | Agreed | 2009-11-27 | PCC | - | 2009-11-27 |
0378 | - | F | Rel-8 | 8.5.0 | - | QCI change during an MS-Initiated EPS Bearer Modification Procedure(R8 29.212) | - | - | - | C3 | C3-56 | C3-091634 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0378 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | QCI change during an MS-Initiated EPS Bearer Modification Procedure | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091856 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0379 | - | A | Rel-9 | 9.0.0 | - | QCI change during an MS-Initiated EPS Bearer Modification Procedure(R9 29.212) | - | - | - | C3 | C3-56 | C3-091635 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0379 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | QCI change during an MS-Initiated EPS Bearer Modification Procedure | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091857 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0380 | - | F | Rel-8 | 8.5.0 | - | Cleaning of the Editor's Notes | - | - | - | C3 | C3-56 | C3-091637 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0380 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | Cleaning of the Editor's Notes | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091858 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0381 | - | A | Rel-9 | 9.0.0 | - | Cleaning of the Editor's Notes | - | - | - | C3 | C3-56 | C3-091638 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0381 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Cleaning of the Editor's Notes | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091859 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0382 | - | F | Rel-8 | 8.5.0 | - | 3GPP-RAT-Type support for backward compatibility | - | - | - | C3 | C3-56 | C3-091672 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0382 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | 3GPP-RAT-Type support for backward compatibility | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091860 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0383 | - | A | Rel-9 | 9.0.0 | - | 3GPP-RAT-Type support for backward compatibility | - | - | - | C3 | C3-56 | C3-091673 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0383 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | 3GPP-RAT-Type support for backward compatibility | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091861 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0384 | - | F | Rel-8 | 8.5.0 | - | Clarifications in Time of Day Procedures | - | - | - | C3 | C3-56 | C3-091675 | Withdrawn | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0385 | - | A | Rel-9 | 9.0.0 | - | Clarifications in Time of Day Procedures | - | - | - | C3 | C3-56 | C3-091676 | Withdrawn | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0386 | - | F | Rel-8 | 8.5.0 | - | EPC-based non-3GPP Annex | - | - | - | C3 | C3-56 | C3-091702 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0386 | 1 | F | Rel-8 | 8.5.0 | - | EPC-based non-3GPP Annex | - | - | - | C3 | C3-56 | C3-091864 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0386 | 2 | F | Rel-8 | 8.5.0 | - | EPC-based non-3GPP Annex | - | - | - | C3 | C3-56 | C3-091931 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0386 | 3 | F | Rel-8 | 8.5.0 | 8.6.0 | EPC-based non-3GPP Annex | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091944 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0387 | - | A | Rel-9 | 9.0.0 | - | EPC-based non-3GPP Annex | - | - | - | C3 | C3-56 | C3-091703 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0387 | 1 | A | Rel-9 | 9.0.0 | - | EPC-based non-3GPP Annex | - | - | - | C3 | C3-56 | C3-091865 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0387 | 2 | A | Rel-9 | 9.0.0 | - | EPC-based non-3GPP Annex | - | - | - | C3 | C3-56 | C3-091932 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0387 | 3 | A | Rel-9 | 9.0.0 | 9.1.0 | EPC-based non-3GPP Annex | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091945 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0388 | - | F | Rel-8 | 8.5.0 | - | Resolve editors note on MCC/MNC AVP | - | - | - | C3 | C3-56 | C3-091704 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0388 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | Resolve editors note on MCC/MNC AVP | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091866 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0389 | - | A | Rel-9 | 9.0.0 | - | Resolve editors note on MCC/MNC AVP | - | - | - | C3 | C3-56 | C3-091705 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0389 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Resolve editors note on MCC/MNC AVP | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091867 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0390 | - | D | Rel-8 | 8.5.0 | - | Use of QoS Information AVP V-PCRF Acceptable QoS Offer | - | - | - | C3 | C3-56 | C3-091716 | revised | 2009-11-27 | SAES-St3-PCC | replaced by C3-091868 | 2009-11-27 |
0391 | - | D | Rel-9 | 9.0.0 | - | Use of QoS Information AVP V-PCRF Acceptable QoS Offer | - | - | - | C3 | C3-56 | C3-091717 | revised | 2009-11-27 | PCC-Enh | replaced by C3-091869 | 2009-11-27 |
0392 | - | B | Rel-9 | 9.0.0 | - | Correction to applicability of the PDN-Connection-ID AVP | - | - | - | C3 | C3-56 | C3-091749 | Revised | 2009-11-27 | PCC-Enh | - | 2009-11-27 |
0392 | 1 | B | Rel-9 | 9.0.0 | - | Correction to applicability of the PDN-Connection-ID AVP | - | - | - | C3 | C3-56 | C3-091885 | Revised | 2009-11-27 | PCC-Enh | - | 2009-11-27 |
0392 | 2 | B | Rel-9 | 9.0.0 | 9.1.0 | Correction to applicability of the PDN-Connection-ID AVP | CP-46 | CP-090857 | approved | C3 | C3-56 | C3-091927 | Agreed | 2009-11-27 | PCC-Enh | - | 2009-11-27 |
0393 | - | F | Rel-8 | 8.5.0 | - | PCC/QoS rule modification failure handling | - | - | - | C3 | C3-56 | C3-091756 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0393 | 1 | F | Rel-8 | 8.5.0 | - | PCC/QoS rule modification failure handling | - | - | - | C3 | C3-56 | C3-091900 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0393 | 2 | F | Rel-8 | 8.5.0 | 8.6.0 | PCC/QoS rule modification failure handling | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091990 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0394 | - | B | Rel-9 | 9.0.0 | - | P-CSCF Restoration procedure | - | - | - | C3 | C3-56 | C3-091760 | Withdrawn | 2009-11-27 | eIMS_RP | - | 2009-11-27 |
0395 | - | A | Rel-9 | 9.0.0 | - | PCC/QoS rule modification failure handling | - | - | - | C3 | C3-56 | C3-091901 | Revised | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0395 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | PCC/QoS rule modification failure handling | CP-46 | CP-090840 | approved | C3 | C3-56 | C3-091991 | Agreed | 2009-11-27 | SAES-St3-PCC | - | 2009-11-27 |
0396 | - | F | Rel-7 | 7.11.0 | - | Correctiing the wrong name of Charging-Rule-Definition | - | - | - | C3 | C3-57 | C3-100051 | withdrawn | 2010-03-09 | PCC | merged into C3-100391 | 2010-03-10 |
0397 | - | A | Rel-8 | 8.6.0 | - | Correctiing the wrong name of Charging-Rule-Definition (R8 29.212) | - | - | - | C3 | C3-57 | C3-100052 | withdrawn | 2010-03-09 | PCC | merged into C3-100392 | 2010-03-10 |
0398 | - | A | Rel-9 | 9.1.0 | - | Correctiing the wrong name of Charging-Rule-Definition (R9 29.212) | - | - | - | C3 | C3-57 | C3-100053 | withdrawn | 2010-03-09 | PCC | merged into C3-100393 | 2010-03-10 |
0399 | - | F | Rel-7 | 7.11.0 | - | Usage reporting | - | - | - | C3 | C3-57 | C3-100054 | Revised | 2010-03-09 | PCC | - | 2010-03-10 |
0399 | 1 | F | Rel-7 | 7.11.0 | 7.12.0 | Usage reporting | CP-47 | CP-100070 | approved | C3 | C3-57 | C3-100391 | Agreed | 2010-03-09 | PCC | - | 2010-03-10 |
0400 | - | A | Rel-8 | 8.6.0 | - | Usage reporting(R8 29.212) | - | - | - | C3 | C3-57 | C3-100055 | Revised | 2010-03-09 | PCC | - | 2010-03-10 |
0400 | 1 | A | Rel-8 | 8.6.0 | 8.7.0 | Usage reporting | CP-47 | CP-100070 | approved | C3 | C3-57 | C3-100392 | Agreed | 2010-03-09 | PCC | - | 2010-03-10 |
0401 | - | A | Rel-9 | 9.1.0 | - | Usage reporting(R9 29.212) | - | - | - | C3 | C3-57 | C3-100056 | Revised | 2010-03-09 | PCC | - | 2010-03-10 |
0401 | 1 | A | Rel-9 | 9.1.0 | 9.2.0 | Usage reporting | CP-47 | CP-100070 | approved | C3 | C3-57 | C3-100393 | Agreed | 2010-03-09 | PCC | - | 2010-03-10 |
0402 | - | F | Rel-7 | 7.11.0 | - | ToS-Traffic-Class mask (R7 29.212) | - | - | - | C3 | C3-57 | C3-100060 | withdrawn | 2010-03-09 | PCC | merged into C3-100391 | 2010-03-10 |
0402 | 1 | F | Rel-7 | 7.11.0 | - | ToS-Traffic-Class mask | - | - | - | C3 | C3-57 | C3-100394 | Withdrawn | 2010-03-09 | PCC | - | 2010-03-10 |
0403 | - | A | Rel-8 | 8.6.0 | - | ToS-Traffic-Class mask (R8 29.212) | - | - | - | C3 | C3-57 | C3-100061 | withdrawn | 2010-03-09 | PCC | merged into C3-100392 | 2010-03-10 |
0403 | 1 | A | Rel-8 | 8.6.0 | - | ToS-Traffic-Class mask (R8 29.212) | - | - | - | C3 | C3-57 | C3-100395 | Withdrawn | 2010-03-09 | PCC | - | 2010-03-10 |
0404 | - | A | Rel-9 | 9.1.0 | - | ToS-Traffic-Class mask (R9 29.212) | - | - | - | C3 | C3-57 | C3-100062 | withdrawn | 2010-03-09 | PCC | merged into C3-100393 | 2010-03-10 |
0404 | 1 | A | Rel-9 | 9.1.0 | - | ToS-Traffic-Class mask (R9 29.212) | - | - | - | C3 | C3-57 | C3-100396 | Withdrawn | 2010-03-09 | PCC | - | 2010-03-10 |
0405 | - | F | Rel-8 | 8.6.0 | - | PCC supporting IMS signalling bearer(R8 29.212) | - | - | - | C3 | C3-57 | C3-100064 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0405 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | PCC supporting IMS signalling bearer | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100336 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0406 | - | A | Rel-9 | 9.1.0 | - | PCC supporting IMS signalling bearer(R9 29.212) | - | - | - | C3 | C3-57 | C3-100065 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0406 | 1 | A | Rel-9 | 9.1.0 | 9.2.0 | PCC supporting IMS signalling bearer | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100337 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0407 | - | F | Rel-8 | 8.6.0 | - | Reporting the successful installation of PCC rules (R8 29.212) | - | - | - | C3 | C3-57 | C3-100066 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0407 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | Reporting the successful installation of PCC rules | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100338 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0408 | - | A | Rel-9 | 9.1.0 | - | Reporting the successful installation of PCC rules (R9 29.212) | - | - | - | C3 | C3-57 | C3-100067 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0408 | 1 | A | Rel-9 | 9.1.0 | 9.2.0 | Reporting the successful installation of PCC rules (R9 29.212) | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100339 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0409 | - | F | Rel-8 | 8.6.0 | - | ARP Handling When UE-init Bearer Modification(R8 29.212) | - | - | - | C3 | C3-57 | C3-100068 | Postponed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0410 | - | A | Rel-9 | 9.1.0 | - | ARP Handling When UE-init Bearer Modification(R9 29.212) | - | - | - | C3 | C3-57 | C3-100069 | Postponed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0411 | - | F | Rel-8 | 8.6.0 | - | PCC rule for the UE-initiated resource modification (R8 29.212) | - | - | - | C3 | C3-57 | C3-100070 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0411 | 1 | F | Rel-8 | 8.6.0 | - | PCC rule for the UE-initiated resource modification (R8 29.212) | - | - | - | C3 | C3-57 | C3-100397 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0411 | 2 | F | Rel-8 | 8.6.0 | 8.7.0 | PCC rule for the UE-initiated resource modification | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100305 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0412 | - | A | Rel-9 | 9.1.0 | - | PCC rule for the UE-initiated resource modification (R9 29.212) | - | - | - | C3 | C3-57 | C3-100071 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0412 | 1 | A | Rel-9 | 9.1.0 | - | PCC rule for the UE-initiated resource modification (R9 29.212) | - | - | - | C3 | C3-57 | C3-100398 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0412 | 2 | A | Rel-9 | 9.1.0 | 9.2.0 | PCC rule for the UE-initiated resource modification | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100306 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0413 | - | F | Rel-8 | 8.6.0 | - | TAI and ECGI location change event triggers | - | - | - | C3 | C3-57 | C3-100072 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0413 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | TAI and ECGI location change event triggers | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100344 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0414 | - | A | Rel-9 | 9.1.0 | - | TAI and ECGI location change event triggers(R9 29.212) | - | - | - | C3 | C3-57 | C3-100073 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0414 | 1 | A | Rel-9 | 9.1.0 | 9.2.0 | TAI and ECGI location change event triggers | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100345 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0415 | - | F | Rel-9 | 9.1.0 | 9.2.0 | Providing monitoring key for IP-CAN session | CP-47 | CP-100090 | approved | C3 | C3-57 | C3-100074 | Agreed | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0416 | - | F | Rel-9 | 9.1.0 | - | Usage Monitoring Control | - | - | - | C3 | C3-57 | C3-100075 | Revised | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0416 | 1 | F | Rel-9 | 9.1.0 | - | Usage Monitoring Control | - | - | - | C3 | C3-57 | C3-100381 | Revised | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0416 | 2 | F | Rel-9 | 9.1.0 | 9.2.0 | Usage Monitoring Control | CP-47 | CP-100090 | approved | C3 | C3-57 | C3-100313 | Agreed | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0417 | - | F | Rel-8 | 8.6.0 | - | AVPs applicability for case 2a | - | - | - | C3 | C3-57 | C3-100129 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0417 | 1 | F | Rel-8 | 8.6.0 | - | AVPs applicability for case 2a | - | - | - | C3 | C3-57 | C3-100346 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0417 | 2 | F | Rel-8 | 8.6.0 | 8.7.0 | AVPs applicability for case 2a | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100307 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0418 | - | A | Rel-9 | 9.1.0 | - | AVPs applicability for case 2a | - | - | - | C3 | C3-57 | C3-100130 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0418 | 1 | A | Rel-9 | 9.1.0 | 9.2.0 | AVPs applicability for case 2a | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100347 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0419 | - | F | Rel-8 | 8.6.0 | - | QoS handling for 3GPP EPS with Gn/Gp SGSN | - | - | - | C3 | C3-57 | C3-100131 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0419 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | QoS handling for 3GPP EPS with Gn/Gp SGSN | CP-47 | CP-100076 | approved | C3 | C3-57 | C3-100324 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0420 | - | A | Rel-9 | 9.1.0 | - | QoS handling for 3GPP EPS with Gn/Gp SGSN | - | - | - | C3 | C3-57 | C3-100132 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0420 | 1 | A | Rel-9 | 9.1.0 | - | QoS handling for 3GPP EPS with Gn/Gp SGSN | - | - | - | C3 | C3-57 | C3-100325 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0420 | 2 | A | Rel-9 | 9.1.0 | 9.2.0 | QoS handling for 3GPP EPS with Gn/Gp SGSN | CP-47 | CP-100076 | approved | C3 | C3-57 | C3-100297 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0421 | - | F | Rel-8 | 8.6.0 | - | Correction of Flow-Description AVP description | - | - | - | C3 | C3-57 | C3-100135 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0421 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | Correction of Flow-Description AVP description | CP-47 | CP-100076 | approved | C3 | C3-57 | C3-100328 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0422 | - | B | Rel-9 | 9.1.0 | - | Bidirectional Service Data Flow filters | - | - | - | C3 | C3-57 | C3-100136 | Revised | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0422 | 1 | B | Rel-9 | 9.1.0 | - | Bidirectional Service Data Flow filters | - | - | - | C3 | C3-57 | C3-100382 | Revised | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0422 | 2 | B | Rel-9 | 9.1.0 | 9.2.0 | Bidirectional Service Data Flow filters | CP-47 | CP-100090 | approved | C3 | C3-57 | C3-100293 | Agreed | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0423 | - | F | Rel-9 | 9.1.0 | - | Aligning TFT filter handling with TS 24.008 | - | - | - | C3 | C3-57 | C3-100137 | Withdrawn | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0424 | - | B | Rel-9 | 9.1.0 | - | IMS Restoration procedure over Gx | - | - | - | C3 | C3-57 | C3-100141 | Revised | 2010-03-09 | eIMS_RP | - | 2010-03-10 |
0424 | 1 | B | Rel-9 | 9.1.0 | - | IMS Restoration procedure over Gx | - | - | - | C3 | C3-57 | C3-100390 | Revised | 2010-03-09 | eIMS_RP | - | 2010-03-10 |
0424 | 2 | B | Rel-9 | 9.1.0 | - | IMS Restoration procedure over Gx | - | - | - | C3 | C3-57 | C3-100292 | Revised | 2010-03-09 | eIMS_RP | - | 2010-03-10 |
0424 | 3 | B | Rel-9 | 9.1.0 | 9.2.0 | IMS Restoration procedure over Gx | CP-47 | CP-100086 | approved | C3 | C3-57 | C3-100413 | Agreed | 2010-03-09 | eIMS_RP | - | 2010-03-10 |
0425 | - | F | Rel-8 | 8.6.0 | - | BBERF interaction for time of the day procedures | - | - | - | C3 | C3-57 | C3-100152 | Revised | 2010-03-09 | PCC | - | 2010-03-10 |
0425 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | BBERF interaction for time of the day procedures | CP-47 | CP-100080 | approved | C3 | C3-57 | C3-100322 | Agreed | 2010-03-09 | PCC | - | 2010-03-10 |
0426 | - | A | Rel-9 | 9.1.0 | - | BBERF interaction for time of the day procedures | - | - | - | C3 | C3-57 | C3-100153 | Revised | 2010-03-09 | PCC | - | 2010-03-10 |
0426 | 1 | A | Rel-9 | 9.1.0 | 9.2.0 | BBERF interaction for time of the day procedures | CP-47 | CP-100080 | approved | C3 | C3-57 | C3-100323 | Agreed | 2010-03-09 | PCC | - | 2010-03-10 |
0427 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Correcting the Gxx interface function | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100154 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0427 | 1 | F | Rel-8 | 8.6.0 | - | Correcting the Gxx interface function | - | - | - | C3 | C3-57 | C3-100348 | Withdrawn | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0428 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Correcting the Gxx interface function | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100155 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0428 | 1 | A | Rel-9 | 9.1.0 | - | Correcting the Gxx interface function | - | - | - | C3 | C3-57 | C3-100349 | Withdrawn | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0428 | 2 | A | Rel-9 | 9.1.0 | - | Correcting the Gxx interface function | - | - | - | C3 | C3-57 | C3-100308 | Withdrawn | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0429 | - | F | Rel-8 | 8.6.0 | - | Reporting the motility protocol tunnelling header | - | - | - | C3 | C3-57 | C3-100156 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0429 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | Reporting the motility protocol tunnelling header | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100350 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0430 | - | A | Rel-9 | 9.1.0 | - | Reporting the motility protocol tunnelling header | - | - | - | C3 | C3-57 | C3-100157 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0430 | 1 | A | Rel-9 | 9.1.0 | 9.2.0 | Reporting the motility protocol tunnelling header | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100351 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0431 | - | F | Rel-8 | 8.6.0 | - | Add 3GPP-MS-TimeZone AVP over S9 interface | - | - | - | C3 | C3-57 | C3-100158 | Withdrawn | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0432 | - | A | Rel-9 | 9.1.0 | - | Add 3GPP-MS-TimeZone AVP over S9 interface | - | - | - | C3 | C3-57 | C3-100159 | Withdrawn | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0433 | - | F | Rel-9 | 9.1.0 | - | Correction to the Gateway control session to Gx session linking for MUPSAP | - | - | - | C3 | C3-57 | C3-100167 | Revised | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0433 | 1 | F | Rel-9 | 9.1.0 | - | Correction to the Gateway control session to Gx session linking for MUPSAP | - | - | - | C3 | C3-57 | C3-100384 | Revised | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0433 | 2 | F | Rel-9 | 9.1.0 | 9.2.0 | Correction to the Gateway control session to Gx session linking for MUPSAP | CP-47 | CP-100090 | approved | C3 | C3-57 | C3-100425 | Agreed | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0434 | - | F | Rel-9 | 9.1.0 | - | Limitation of usage of predefined PCC rules | - | - | - | C3 | C3-57 | C3-100168 | Revised | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0434 | 1 | F | Rel-9 | 9.1.0 | - | Limitation of usage of predefined PCC rules | - | - | - | C3 | C3-57 | C3-100385 | Revised | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0434 | 2 | F | Rel-9 | 9.1.0 | 9.2.0 | Limitation of usage of predefined PCC rules | CP-47 | CP-100090 | approved | C3 | C3-57 | C3-100428 | Agreed | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0435 | - | F | Rel-9 | 9.1.0 | - | Reporting the user CSG information change to the OCS | - | - | - | C3 | C3-57 | C3-100169 | withdrawn | 2010-03-09 | PCC-Enh | merged into C3-100386 | 2010-03-10 |
0436 | - | F | Rel-9 | 9.1.0 | - | PCC Support for Closed Subscriber Group (CSG) – PMIP Architecture | - | - | - | C3 | C3-57 | C3-100172 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0436 | 1 | F | Rel-9 | 9.1.0 | - | PCC Support for Closed Subscriber Group (CSG) – PMIP Architecture | - | - | - | C3 | C3-57 | C3-100341 | withdrawn | 2010-03-09 | SAES-St3-PCC | merged into C3-100386 | 2010-03-10 |
0437 | - | F | Rel-9 | 9.1.0 | - | Control of traffic mapping information generation | - | - | - | C3 | C3-57 | C3-100196 | Revised | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0437 | 1 | F | Rel-9 | 9.1.0 | - | Control of traffic mapping information generation | - | - | - | C3 | C3-57 | C3-100388 | Revised | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0437 | 2 | F | Rel-9 | 9.1.0 | 9.2.0 | Control of traffic mapping information generation | CP-47 | CP-100090 | approved | C3 | C3-57 | C3-100314 | Agreed | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0438 | - | F | Rel-8 | 8.6.0 | - | Clarification of IP-CAN type for Gn/Gp SGSN connected to PGW in 29.212 R8 | - | - | - | C3 | C3-57 | C3-100210 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0438 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | Removal of Editor's Note on IP-CAN type for Gn/Gp SGSN connected to PGW in 29.212 R8 | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100352 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0439 | - | A | Rel-9 | 9.1.0 | - | Clarification of IP-CAN type for Gn/Gp SGSN connected to PGW in 29.212 R9 | - | - | - | C3 | C3-57 | C3-100211 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0439 | 1 | A | Rel-9 | 9.1.0 | 9.2.0 | Removal of Editor's Note on IP-CAN type for Gn/Gp SGSN connected to PGW in 29.212 R9 | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100353 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0440 | - | F | Rel-8 | 8.6.0 | - | RAT-type value for eHRPD 29.212 R8 | - | - | - | C3 | C3-57 | C3-100212 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0440 | 1 | F | Rel-8 | 8.6.0 | - | RAT-type value for eHRPD 29.212 R8 | - | - | - | C3 | C3-57 | C3-100354 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0440 | 2 | F | Rel-8 | 8.6.0 | 8.7.0 | RAT-type value for eHRPD 29.212 R8 | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100310 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0441 | - | A | Rel-9 | 9.1.0 | - | RAT-type value for eHRPD 29.212 R9 | - | - | - | C3 | C3-57 | C3-100213 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0441 | 1 | A | Rel-9 | 9.1.0 | - | RAT-type value for eHRPD 29.212 R9 | - | - | - | C3 | C3-57 | C3-100355 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0441 | 2 | A | Rel-9 | 9.1.0 | 9.2.0 | RAT-type value for eHRPD 29.212 R9 | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100311 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0442 | - | F | Rel-9 | 9.1.0 | - | Clarification on CSG clauses in 29.212 R9 | - | - | - | C3 | C3-57 | C3-100214 | Revised | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0442 | 1 | F | Rel-9 | 9.1.0 | 9.2.0 | Clarification on CSG clauses for PMIP Architecture in 29.212 R9 | CP-47 | CP-100090 | approved | C3 | C3-57 | C3-100386 | Agreed | 2010-03-09 | PCC-Enh | - | 2010-03-10 |
0443 | - | F | Rel-8 | 8.6.0 | - | Supported-Feature feature bit definitions | - | - | - | C3 | C3-57 | C3-100222 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0443 | 1 | F | Rel-8 | 8.6.0 | - | Supported-Feature feature bit definitions | - | - | - | C3 | C3-57 | C3-100331 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0443 | 2 | F | Rel-8 | 8.6.0 | 8.7.0 | Supported-Feature feature bit definitions | CP-47 | CP-100076 | approved | C3 | C3-57 | C3-100302 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0444 | - | A | Rel-9 | 9.1.0 | - | Supported-Feature feature bit definitions | - | - | - | C3 | C3-57 | C3-100223 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0444 | 1 | A | Rel-9 | 9.1.0 | - | Supported-Feature feature bit definitions | - | - | - | C3 | C3-57 | C3-100332 | Revised | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0444 | 2 | A | Rel-9 | 9.1.0 | 9.2.0 | Supported-Feature feature bit definitions | CP-47 | CP-100076 | approved | C3 | C3-57 | C3-100299 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0445 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Removing Supported-Features in RAR and RAA | CP-47 | CP-100076 | approved | C3 | C3-57 | C3-100228 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0446 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Removing Supported-Features in RAR and RAA | CP-47 | CP-100076 | approved | C3 | C3-57 | C3-100229 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0447 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Correcting Allocation-Retention-Priority AVP M bit setting | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100232 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0448 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Correcting Allocation-Retention-Priority AVP M bit setting | CP-47 | CP-100074 | approved | C3 | C3-57 | C3-100233 | Agreed | 2010-03-09 | SAES-St3-PCC | - | 2010-03-10 |
0449 | - | F | Rel-8 | 8.6.0 | - | eHRPD RAT type | - | - | - | C3 | C3-57 | C3-100234 | withdrawn | 2010-03-09 | SAES-St3-PCC | merged into C3-100354 | 2010-03-10 |
0450 | - | A | Rel-9 | 9.1.0 | - | eHRPD RAT type | - | - | - | C3 | C3-57 | C3-100235 | withdrawn | 2010-03-09 | SAES-St3-PCC | merged into C3-100355 | 2010-03-10 |
0451 | - | F | Rel-8 | 8.7.0 | - | Missing AVP code value | - | - | - | C3 | C3-58 | C3-100460 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0451 | 1 | F | Rel-8 | 8.7.0 | 8.8.0 | Missing AVP code value | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100618 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0452 | - | F | Rel-9 | 9.2.0 | - | Missing code values | - | - | - | C3 | C3-58 | C3-100461 | Revised | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0452 | 1 | F | Rel-9 | 9.2.0 | 9.3.0 | Missing code values | CP-48 | CP-100321 | approved | C3 | C3-58 | C3-100624 | Agreed | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0453 | - | F | Rel-9 | 9.2.0 | - | Reporting accumulated usage for a terminated IP-CAN session | - | - | - | C3 | C3-58 | C3-100488 | Revised | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0453 | 1 | F | Rel-9 | 9.2.0 | 9.3.0 | Reporting accumulated usage for a terminated IP-CAN session | CP-48 | CP-100321 | approved | C3 | C3-58 | C3-100711 | Agreed | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0454 | - | F | Rel-8 | 8.7.0 | - | Access Network Charging Identifier handling in Gx | - | - | - | C3 | C3-58 | C3-100522 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0454 | 1 | F | Rel-8 | 8.7.0 | - | Access Network Charging Identifier handling in Gx | - | - | - | C3 | C3-58 | C3-100620 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0454 | 2 | F | Rel-8 | 8.7.0 | 8.8.0 | Access Network Charging Identifier handling in Gx | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100756 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0455 | - | A | Rel-9 | 9.2.0 | - | Access Network Charging Identifier handling in Gx | - | - | - | C3 | C3-58 | C3-100523 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0455 | 1 | A | Rel-9 | 9.2.0 | - | Access Network Charging Identifier handling in Gx | - | - | - | C3 | C3-58 | C3-100621 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0455 | 2 | A | Rel-9 | 9.2.0 | 9.3.0 | Access Network Charging Identifier handling in Gx | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100757 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0456 | - | F | Rel-8 | 8.7.0 | - | M-bit correction in some AVPs | - | - | - | C3 | C3-58 | C3-100524 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0456 | 1 | F | Rel-8 | 8.7.0 | 8.8.0 | M-bit correction in some AVPs | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100622 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0457 | - | A | Rel-9 | 9.2.0 | - | M-bit correction in some AVPs | - | - | - | C3 | C3-58 | C3-100525 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0457 | 1 | A | Rel-9 | 9.2.0 | 9.3.0 | M-bit correction in some AVPs | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100623 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0458 | - | F | Rel-8 | 8.7.0 | - | Flow-Description AVP to be syntactically optional | - | - | - | C3 | C3-58 | C3-100526 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0458 | 1 | F | Rel-8 | 8.7.0 | 8.8.0 | Flow-Description AVP to be syntactically optional | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100625 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0459 | - | A | Rel-9 | 9.2.0 | - | Flow-Description AVP to be syntactically optional | - | - | - | C3 | C3-58 | C3-100527 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0459 | 1 | A | Rel-9 | 9.2.0 | 9.3.0 | Flow-Description AVP to be syntactically optional | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100626 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0460 | - | F | Rel-8 | 8.7.0 | - | AVPs applicability for case 2a | - | - | - | C3 | C3-58 | C3-100528 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0460 | 1 | F | Rel-8 | 8.7.0 | 8.8.0 | AVPs applicability for case 2a | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100627 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0461 | - | A | Rel-9 | 9.2.0 | - | AVPs applicability for case 2a | - | - | - | C3 | C3-58 | C3-100529 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0461 | 1 | A | Rel-9 | 9.2.0 | 9.3.0 | AVPs applicability for case 2a | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100628 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0462 | - | F | Rel-9 | 9.2.0 | - | Completion of Usage Reporting procedures. | - | - | - | C3 | C3-58 | C3-100532 | Revised | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0462 | 1 | F | Rel-9 | 9.2.0 | - | Completion of Usage Reporting procedures. | - | - | - | C3 | C3-58 | C3-100712 | Revised | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0462 | 2 | F | Rel-9 | 9.2.0 | 9.3.0 | Completion of Usage Reporting procedures. | CP-48 | CP-100321 | approved | C3 | C3-58 | C3-100752 | Agreed | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0463 | - | F | Rel-9 | 9.2.0 | - | Filter direction handling | - | - | - | C3 | C3-58 | C3-100533 | Revised | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0463 | 1 | F | Rel-9 | 9.2.0 | - | Filter direction handling | - | - | - | C3 | C3-58 | C3-100713 | Revised | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0463 | 2 | F | Rel-9 | 9.2.0 | 9.3.0 | Filter direction handling | CP-48 | CP-100321 | approved | C3 | C3-58 | C3-100753 | Agreed | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0464 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Packet-Filter-Usage AVP in Gxx | CP-48 | CP-100321 | approved | C3 | C3-58 | C3-100534 | Agreed | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0465 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Evolved ARP in GPRS | CP-48 | CP-100321 | approved | C3 | C3-58 | C3-100536 | Agreed | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0466 | - | F | Rel-8 | 8.7.0 | - | M bit for Rel8 feature(R8 29.212) | - | - | - | C3 | C3-58 | C3-100541 | merged | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0467 | - | A | Rel-9 | 9.2.0 | - | M bit for Rel8 feature(R9 29.212) | - | - | - | C3 | C3-58 | C3-100542 | merged | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0468 | - | F | Rel-8 | 8.7.0 | - | QoS negotiation for 3GPP EPS access with GnGp SGSN | - | - | - | C3 | C3-58 | C3-100543 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0468 | 1 | F | Rel-8 | 8.7.0 | 8.8.0 | QoS negotiation for 3GPP EPS access with GnGp SGSN | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100629 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0469 | - | A | Rel-9 | 9.2.0 | - | QoS negotiation for 3GPP EPS access with GnGp SGSN | - | - | - | C3 | C3-58 | C3-100544 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0469 | 1 | A | Rel-9 | 9.2.0 | 9.3.0 | QoS negotiation for 3GPP EPS access with GnGp SGSN | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100630 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0470 | - | F | Rel-8 | 8.7.0 | - | ARP Handling When UE-init Bearer Modification | - | - | - | C3 | C3-58 | C3-100545 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0470 | 1 | F | Rel-8 | 8.7.0 | - | ARP Handling When UE-init Bearer Modification | - | - | - | C3 | C3-58 | C3-100631 | Postponed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0471 | - | A | Rel-9 | 9.2.0 | - | ARP Handling When UE-init Bearer Modification | - | - | - | C3 | C3-58 | C3-100546 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0471 | 1 | A | Rel-9 | 9.2.0 | - | ARP Handling When UE-init Bearer Modification | - | - | - | C3 | C3-58 | C3-100632 | Postponed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0472 | - | F | Rel-8 | 8.7.0 | - | Expandable QCI value | - | - | - | C3 | C3-58 | C3-100547 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0472 | 1 | F | Rel-8 | 8.7.0 | - | Expandable QCI value | CP-48 | CP-100310 | revised | C3 | C3-58 | C3-100619 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0472 | 2 | F | Rel-8 | 8.7.0 | - | Enumeration of QCI | CP-48 | CP-100303 | revised | Motorola | CP-48 | - | - | 2010-05-26 | SAES-St3-PCC | - | 2010-05-26 |
0472 | 3 | F | Rel-8 | 8.7.0 | 8.8.0 | Enumeration of QCI | CP-48 | CP-100399 | approved | Motorola, Huawei | - | CP-100399 | - | 2010-05-28 | SAES-St3-PCC | - | 2010-06-03 |
0473 | - | A | Rel-9 | 9.2.0 | - | Expandable QCI value | - | - | - | C3 | C3-58 | C3-100548 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0473 | - | A | Rel-9 | 9.2.0 | - | Enumeration of QCI | CP-48 | CP-100304 | revised | Motorola | CP-48 | - | - | 2010-05-26 | SAES-St3-PCC | - | 2010-05-26 |
0473 | 1 | A | Rel-9 | 9.2.0 | - | Expandable QCI value | CP-48 | CP-100311 | revised | C3 | C3-58 | C3-100633 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0473 | 3 | A | Rel-9 | 9.2.0 | 9.3.0 | Enumeration of QCI | CP-48 | CP-100400 | approved | Motorola, Huawei | - | CP-100400 | - | 2010-05-28 | SAES-St3-PCC | - | 2010-06-03 |
0474 | - | F | Rel-9 | 9.2.0 | - | Bidirectional packet filter for UE initiated resource modification | - | - | - | C3 | C3-58 | C3-100550 | revised | 2010-05-27 | PCC-Enh | merged into C3-100713 | 2010-05-27 |
0475 | - | F | Rel-9 | 9.2.0 | - | Linking the new packet filter to an existing one | - | - | - | C3 | C3-58 | C3-100551 | revised | 2010-05-27 | PCC-Enh | merged into C3-100642 | 2010-05-27 |
0476 | - | F | Rel-9 | 9.2.0 | - | Monitoring key for predefined PCC rules | - | - | - | C3 | C3-58 | C3-100552 | Withdrawn | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0477 | - | F | Rel-9 | 9.2.0 | - | Number of packet filter send to UE(R9 29.212) | - | - | - | C3 | C3-58 | C3-100553 | Revised | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0477 | 1 | F | Rel-9 | 9.2.0 | - | Number of packet filter send to UE | - | - | - | C3 | C3-58 | C3-100714 | Revised | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0477 | 2 | F | Rel-9 | 9.2.0 | 9.3.0 | Number of packet filter send to UE | CP-48 | CP-100321 | approved | C3 | C3-58 | C3-100754 | Agreed | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0478 | - | F | Rel-8 | 8.7.0 | - | Corrections to PCC procedures over Gx reference point | - | - | - | C3 | C3-58 | C3-100584 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0478 | 1 | F | Rel-8 | 8.7.0 | 8.8.0 | Corrections to PCC procedures over Gx reference point | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100639 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0479 | - | A | Rel-9 | 9.2.0 | - | Corrections to PCC procedures over Gx reference point | - | - | - | C3 | C3-58 | C3-100585 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0479 | 1 | A | Rel-9 | 9.2.0 | 9.3.0 | Corrections to PCC procedures over Gx reference point | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100640 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0480 | - | F | Rel-8 | 8.7.0 | - | Add SDF filter to an existing PCC rule | - | - | - | C3 | C3-58 | C3-100586 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0480 | 1 | F | Rel-8 | 8.7.0 | - | Add SDF filter to an existing PCC rule | - | - | - | C3 | C3-58 | C3-100641 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0480 | 2 | F | Rel-8 | 8.7.0 | 8.8.0 | Add SDF filter to an existing PCC rule | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100750 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0481 | - | A | Rel-9 | 9.2.0 | - | Add SDF filter to an existing PCC rule | - | - | - | C3 | C3-58 | C3-100587 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0481 | 1 | A | Rel-9 | 9.2.0 | - | Add SDF filter to an existing PCC rule | - | - | - | C3 | C3-58 | C3-100642 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0481 | 2 | A | Rel-9 | 9.2.0 | 9.3.0 | Add SDF filter to an existing PCC rule | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100751 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0482 | - | F | Rel-8 | 8.7.0 | - | AVPs applicability alignment between table 5.3 and table 5a.4 | - | - | - | C3 | C3-58 | C3-100588 | merged | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0483 | - | F | Rel-9 | 9.2.0 | - | AVPs applicability alignment between table 5.3 and table 5a.4 | - | - | - | C3 | C3-58 | C3-100589 | merged | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0484 | - | F | Rel-8 | 8.7.0 | - | AVPs applicability for case 2b | - | - | - | C3 | C3-58 | C3-100590 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0484 | 1 | F | Rel-8 | 8.7.0 | 8.8.0 | AVPs applicability for case 2b | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100643 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0485 | - | A | Rel-9 | 9.2.0 | - | AVPs applicability for case 2b | - | - | - | C3 | C3-58 | C3-100591 | Revised | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0485 | 1 | A | Rel-9 | 9.2.0 | 9.3.0 | AVPs applicability for case 2b | CP-48 | CP-100309 | approved | C3 | C3-58 | C3-100644 | Agreed | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0486 | - | F | Rel-9 | 9.2.0 | - | Delete the unnecessary sentence in clause 4a.3.2 | - | - | - | C3 | C3-58 | C3-100592 | merged | 2010-05-27 | SAES-St3-PCC | - | 2010-05-27 |
0487 | - | F | Rel-9 | 9.2.0 | - | Clarification of CSG Information Reporting | - | - | - | C3 | C3-58 | C3-100596 | Revised | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0487 | 1 | F | Rel-9 | 9.2.0 | 9.3.0 | Clarification of CSG Information Reporting | CP-48 | CP-100321 | approved | C3 | C3-58 | C3-100715 | Agreed | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0488 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Clarification of Reporting Accumulated Usage | CP-48 | CP-100321 | approved | C3 | C3-58 | C3-100598 | Agreed | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0489 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Usage monitoring control for both session level and PCC rule level | CP-48 | CP-100321 | approved | C3 | C3-58 | C3-100749 | Agreed | 2010-05-27 | PCC-Enh | - | 2010-05-27 |
0490 | - | F | Rel-9 | 9.3.0 | - | User CSG Information when S5/S8 is PMIP | - | - | - | C3 | C3-59 | C3-100813 | Revised | 2010-09-10 | PCC-Enh | - | 2010-09-10 |
0490 | 1 | F | Rel-9 | 9.3.0 | - | User CSG Information when S5/S8 is PMIP | - | - | - | C3 | C3-59 | C3-101049 | postponed | 2010-09-10 | PCC-Enh | - | 2010-09-10 |
0491 | - | F | Rel-9 | 9.3.0 | - | APN-AMBR support in GPRS | - | - | - | C3 | C3-59 | C3-100818 | Revised | 2010-09-10 | SAES-St3-PCC | - | 2010-09-10 |
0491 | 1 | F | Rel-9 | 9.3.0 | 9.4.0 | APN-AMBR support in GPRS | CP-49 | CP-100558 | approved | C3 | C3-59 | C3-101051 | Agreed | 2010-09-10 | SAES-St3-PCC | - | 2010-09-10 |
0492 | - | F | Rel-9 | 9.3.0 | - | Correcting unspecific external reference | - | - | - | C3 | C3-59 | C3-100859 | Revised | 2010-09-10 | PCC | - | 2010-09-10 |
0492 | 1 | F | Rel-9 | 9.3.0 | - | Correcting unspecific external reference | - | - | - | C3 | C3-59 | C3-100939 | Revised | 2010-09-10 | PCC | - | 2010-09-10 |
0492 | 2 | A | Rel-9 | 9.3.0 | 9.4.0 | Correcting unspecific external reference | CP-49 | CP-100548 | approved | C3 | C3-59 | C3-101063 | Agreed | 2010-09-10 | PCC | - | 2010-09-10 |
0493 | - | F | Rel-8 | 8.8.0 | - | Informing bearer termination to the PCRF(R8 29.212) | - | - | - | C3 | C3-59 | C3-100891 | Revised | 2010-09-10 | SAES-St3-PCC | - | 2010-09-10 |
0493 | 1 | F | Rel-8 | 8.8.0 | 8.9.0 | Informing bearer termination to the PCRF | CP-49 | CP-100544 | approved | C3 | C3-59 | C3-100950 | Agreed | 2010-09-10 | SAES-St3-PCC | - | 2010-09-10 |
0494 | - | A | Rel-9 | 9.3.0 | - | Informing bearer termination to the PCRF(R9 29.212) | - | - | - | C3 | C3-59 | C3-100892 | Revised | 2010-09-10 | SAES-St3-PCC | - | 2010-09-10 |
0494 | 1 | A | Rel-9 | 9.3.0 | 9.4.0 | Informing bearer termination to the PCRF | CP-49 | CP-100544 | approved | C3 | C3-59 | C3-100951 | Agreed | 2010-09-10 | SAES-St3-PCC | - | 2010-09-10 |
0495 | - | F | Rel-9 | 9.3.0 | - | ARP for prioritization of IMS Emergency calls (R9 29.212) | - | - | - | C3 | C3-59 | C3-100893 | Revised | 2010-09-10 | PCC-Enh | - | 2010-09-10 |
0495 | 1 | F | Rel-9 | 9.3.0 | 9.4.0 | ARP for prioritization of IMS Emergency calls | CP-49 | CP-100554 | approved | C3 | C3-59 | C3-100983 | Agreed | 2010-09-10 | PCC-Enh | - | 2010-09-10 |
0496 | - | F | Rel-9 | 9.3.0 | - | Usage for policy decisions (R9 29.212) | - | - | - | C3 | C3-59 | C3-100894 | Revised | 2010-09-10 | PCC-Enh | - | 2010-09-10 |
0496 | 1 | F | Rel-9 | 9.3.0 | - | Usage for policy decisions (R9 29.212) | - | - | - | C3 | C3-59 | C3-101059 | Revised | 2010-09-10 | PCC-Enh | - | 2010-09-10 |
0496 | 2 | F | Rel-9 | 9.3.0 | 9.4.0 | Usage for policy decisions | CP-49 | CP-100554 | approved | C3 | C3-59 | C3-100984 | Agreed | 2010-09-10 | PCC-Enh | - | 2010-09-10 |
0497 | - | B | Rel-10 | 9.3.0 | - | Routing rules definition and usage in Gx interface | - | - | - | C3 | C3-59 | C3-100896 | Revised | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0497 | 1 | B | Rel-10 | 9.3.0 | - | Routing rules definition and usage in Gx interface | - | - | - | C3 | C3-59 | C3-101032 | Revised | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0497 | 2 | B | Rel-10 | 9.3.0 | - | Routing rules definition and usage in Gx interface | - | - | - | C3 | C3-59 | C3-101082 | Revised | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0497 | 3 | B | Rel-10 | 9.3.0 | 10.0.0 | Routing rules definition and usage in Gx interface | CP-49 | CP-100561 | approved | C3 | C3-59 | C3-101089 | Agreed | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0498 | - | B | Rel-10 | 9.3.0 | - | Routing rules procedure over Gx interface | - | - | - | C3 | C3-59 | C3-100897 | Revised | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0498 | 1 | B | Rel-10 | 9.3.0 | - | Routing rules procedure over Gx interface | - | - | - | C3 | C3-59 | C3-101033 | Revised | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0498 | 2 | B | Rel-10 | 9.3.0 | 10.0.0 | Routing rules procedure over Gx interface | CP-49 | CP-100561 | approved | C3 | C3-59 | C3-101083 | Agreed | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0499 | - | B | Rel-10 | 9.3.0 | - | Multiple BBF support in case of flow mobility | - | - | - | C3 | C3-59 | C3-100898 | Revised | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0499 | 1 | B | Rel-10 | 9.3.0 | - | Multiple BBF support in case of flow mobility | - | - | - | C3 | C3-59 | C3-101034 | Revised | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0499 | 2 | B | Rel-10 | 9.3.0 | - | Multiple BBF support in case of flow mobility | - | - | - | C3 | C3-59 | C3-101084 | Revised | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0499 | 3 | B | Rel-10 | 9.3.0 | 10.0.0 | Multiple BBF support in case of flow mobility | CP-49 | CP-100561 | approved | C3 | C3-59 | C3-101091 | Agreed | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0500 | - | B | Rel-10 | 9.3.0 | - | Operation on IP Flow Mobility Routing Rules by PCEF | - | - | - | C3 | C3-59 | C3-100899 | Revised | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0501 | - | B | Rel-10 | 9.3.0 | - | IFOM impacts on PCEF & PCRF | - | - | - | C3 | C3-59 | C3-100900 | Revised | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0501 | 1 | B | Rel-10 | 9.3.0 | 10.0.0 | IFOM impacts on PCEF & PCRF | CP-49 | CP-100561 | approved | C3 | C3-59 | C3-101047 | Agreed | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0502 | - | B | Rel-10 | 9.3.0 | - | Event Trigger for IFOM | - | - | - | C3 | C3-59 | C3-100901 | Revised | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0503 | - | B | Rel-10 | 9.3.0 | - | PCC Diameter Command Update in support of IFOM | - | - | - | C3 | C3-59 | C3-100902 | Revised | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0504 | - | B | Rel-10 | 9.3.0 | - | Additional AVPs in support of IFOM | - | - | - | C3 | C3-59 | C3-100903 | Revised | 2010-09-10 | IFOM-CT | - | 2010-09-10 |
0505 | - | F | Rel-8 | 8.8.0 | - | Including two event triggers in Event-Report-Indication AVP | - | - | - | C3 | C3-59 | C3-100907 | Revised | 2010-09-10 | SAES-St3-PCC | - | 2010-09-10 |
0505 | 1 | F | Rel-8 | 8.8.0 | 8.9.0 | Including two event triggers in Event-Report-Indication AVP | CP-49 | CP-100544 | approved | C3 | C3-59 | C3-100952 | Agreed | 2010-09-10 | SAES-St3-PCC | - | 2010-09-10 |
0506 | - | A | Rel-9 | 9.3.0 | 9.4.0 | Including two event triggers in Event-Report-Indication AVP | CP-49 | CP-100544 | approved | C3 | C3-59 | C3-100908 | Agreed | 2010-09-10 | SAES-St3-PCC | - | 2010-09-10 |
0507 | - | F | Rel-9 | 9.3.0 | - | APN-AMBR in GPRS | - | - | - | C3 | C3-59 | C3-100926 | Revised | 2010-09-10 | PCC-Enh | - | 2010-09-10 |
0508 | - | - | Rel-8 | 8.8.0 | - | Correcting unspecific external reference | - | - | - | C3 | C3-59 | C3-100940 | Revised | 2010-09-10 | PCC | - | 2010-09-10 |
0508 | 1 | F | Rel-8 | 8.8.0 | 8.9.0 | Correcting unspecific external reference | CP-49 | CP-100548 | approved | C3 | C3-59 | C3-101062 | Agreed | 2010-09-10 | PCC | - | 2010-09-10 |
0509 | - | F | Rel-8 | 8.8.0 | 8.9.0 | HSS Initiated Subscribed QoS Modification | CP-49 | CP-100544 | approved | C3 | C3-59 | C3-101035 | Agreed | 2010-09-10 | SAES-St3-PCC | - | 2010-09-10 |
0510 | - | A | Rel-9 | 9.3.0 | 9.4.0 | HSS Initiated Subscribed QoS Modification | CP-49 | CP-100544 | approved | C3 | C3-59 | C3-101036 | Agreed | 2010-09-10 | SAES-St3-PCC | - | 2010-09-10 |
0511 | - | B | Rel-10 | 10.0.0 | - | Additions to support sponsored connectivity | - | - | - | C3 | C3-60 | C3-101120 | Revised | 2010-12-05 | PEST | - | 2010-12-09 |
0511 | 1 | B | Rel-10 | 10.0.0 | - | Additions to support sponsored connectivity | - | - | - | C3 | C3-60 | C3-101428 | Revised | 2010-12-05 | PEST | - | 2010-12-09 |
0511 | 2 | B | Rel-10 | 10.0.0 | - | Additions to support sponsored connectivity | - | - | - | C3 | C3-60 | C3-101378 | Revised | 2010-12-05 | PEST | - | 2010-12-09 |
0511 | 3 | B | Rel-10 | 10.0.0 | 10.1.0 | Additions to support sponsored connectivity | CP-50 | CP-100791 | approved | C3 | C3-60 | C3-101384 | Agreed | 2010-12-05 | PEST-CT3 | CT approval dependent on 23.203 CR472 | 2010-12-09 |
0512 | - | F | Rel-8 | 8.9.0 | 8.10.0 | Correcting wrong AVP code of Charging-Correlation-Indicator (R8 29.212) | CP-50 | CP-100773 | approved | C3 | C3-60 | C3-101125 | Agreed | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0513 | - | F | Rel-8 | 8.9.0 | - | Applied access type for Bearer-Control-Mode AVP and Network-Request-Support AVP (R8 29.212) | - | - | - | C3 | C3-60 | C3-101126 | Withdrawn | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0514 | - | A | Rel-9 | 9.4.0 | - | Applied access type for Bearer-Control-Mode AVP and Network-Request-Support AVP (R9 29.212) | - | - | - | C3 | C3-60 | C3-101127 | Withdrawn | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0515 | - | A | Rel-10 | 10.0.0 | - | Applied access type for Bearer-Control-Mode AVP and Network-Request-Support AVP (R10 29.212) | - | - | - | C3 | C3-60 | C3-101128 | Withdrawn | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0516 | - | F | Rel-8 | 8.9.0 | - | Packet Filter Attribute Combinations (R8 29.212) | - | - | - | C3 | C3-60 | C3-101129 | Withdrawn | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0517 | - | A | Rel-9 | 9.4.0 | - | Packet Filter Attribute Combinations (R9 29.212) | - | - | - | C3 | C3-60 | C3-101130 | Withdrawn | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0518 | - | A | Rel-10 | 10.0.0 | - | Packet Filter Attribute Combinations | - | - | - | C3 | C3-60 | C3-101131 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0518 | 1 | F | Rel-10 | 10.0.0 | 10.1.0 | Packet Filter Attribute Combinations | CP-50 | CP-100792 | approved | C3 | C3-60 | C3-101351 | Agreed | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0519 | - | F | Rel-9 | 9.4.0 | - | Correcting wrong AVP code of Packet-Filter-Usage (R9 29.212) | - | - | - | C3 | C3-60 | C3-101135 | Revised | 2010-12-05 | PCC-Enh | - | 2010-12-09 |
0520 | - | A | Rel-10 | 10.0.0 | - | Correcting wrong AVP code of Packet-Filter-Usage (R10 29.212) | - | - | - | C3 | C3-60 | C3-101136 | Revised | 2010-12-05 | PCC-Enh | - | 2010-12-09 |
0521 | - | F | Rel-9 | 9.4.0 | - | Disable monitoring key for a PCC rule (R9 29.212) | - | - | - | C3 | C3-60 | C3-101137 | Withdrawn | 2010-12-05 | PCC-Enh | - | 2010-12-09 |
0522 | - | A | Rel-10 | 10.0.0 | - | Disable monitoring key for a PCC rule | - | - | - | C3 | C3-60 | C3-101138 | Revised | 2010-12-05 | PCC-Enh | - | 2010-12-09 |
0522 | 1 | A | Rel-10 | 10.0.0 | - | Disable monitoring key for a PCC rule | - | - | - | C3 | C3-60 | C3-101489 | Postponed | 2010-12-05 | PCC-Enh | - | 2010-12-09 |
0523 | - | F | Rel-9 | 9.4.0 | - | Packet-Filter-Usage for pre-defined PCC rule (R9 29.212) | - | - | - | C3 | C3-60 | C3-101139 | Withdrawn | 2010-12-05 | PCC-Enh | - | 2010-12-09 |
0524 | - | A | Rel-10 | 10.0.0 | - | Packet-Filter-Usage for pre-defined PCC rule (R10 29.212) | - | - | - | C3 | C3-60 | C3-101140 | Withdrawn | 2010-12-05 | PCC-Enh | - | 2010-12-09 |
0525 | - | F | Rel-10 | 10.0.0 | - | Addition of AVPs to support xDSL line identification on the Gx interface | - | - | - | C3 | C3-60 | C3-101143 | Revised | 2010-12-05 | TEI10 | - | 2010-12-09 |
0525 | 1 | F | Rel-10 | 10.0.0 | 10.1.0 | Addition of AVPs to support xDSL line identification on the Gx interface | CP-50 | CP-100793 | approved | C3 | C3-60 | C3-101417 | Agreed | 2010-12-05 | TEI10 | - | 2010-12-09 |
0526 | - | B | Rel-10 | 10.0.0 | - | UDR and Ud in PCC Architecture | - | - | - | C3 | C3-60 | C3-101145 | Revised | 2010-12-05 | (New WID) | - | 2010-12-09 |
0526 | 1 | B | Rel-10 | 10.0.0 | - | UDR and Ud in PCC Architecture | - | - | - | C3 | C3-60 | C3-101422 | Revised | 2010-12-05 | (New WID) | - | 2010-12-09 |
0526 | 2 | B | Rel-10 | 10.0.0 | - | UDR and Ud in PCC Architecture | - | - | - | C3 | C3-60 | C3-101446 | Revised | 2010-12-05 | (New WID) | - | 2010-12-09 |
0526 | 3 | B | Rel-10 | 10.0.0 | - | UDR and Ud in PCC Architecture | - | - | - | C3 | C3-60 | C3-101497 | Revised | 2010-12-05 | (New WID) | - | 2010-12-09 |
0526 | 4 | B | Rel-10 | 10.0.0 | 10.1.0 | UDR and Ud in PCC Architecture | CP-50 | CP-100791 | approved | C3 | C3-60 | C3-101507 | Agreed | 2010-12-05 | PEST-CT3 | CT approval dependent on 23.203 CR472 | 2010-12-09 |
0527 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Support of EARP in GPRS | CP-50 | CP-100773 | approved | C3 | C3-60 | C3-101202 | Agreed | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0528 | - | A | Rel-10 | 10.0.0 | 10.1.0 | Support of EARP in GPRS | CP-50 | CP-100773 | approved | C3 | C3-60 | C3-101203 | Agreed | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0529 | - | F | Rel-8 | 8.9.0 | - | IP version support in PCC Rules | - | - | - | C3 | C3-60 | C3-101204 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0529 | 1 | F | Rel-8 | 8.9.0 | 8.10.0 | IP version support in PCC Rules | CP-50 | CP-100773 | approved | C3 | C3-60 | C3-101348 | Agreed | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0530 | - | A | Rel-9 | 9.4.0 | - | IP version support in PCC Rules | - | - | - | C3 | C3-60 | C3-101205 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0530 | 1 | A | Rel-9 | 9.4.0 | 9.5.0 | IP version support in PCC Rules | CP-50 | CP-100773 | approved | C3 | C3-60 | C3-101349 | Agreed | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0531 | - | A | Rel-10 | 10.0.0 | - | IP version support in PCC Rules | - | - | - | C3 | C3-60 | C3-101206 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0531 | 1 | F | Rel-10 | 10.0.0 | 10.1.0 | IP version support in PCC Rules | CP-50 | CP-100792 | approved | C3 | C3-60 | C3-101350 | Agreed | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0532 | - | F | Rel-9 | 9.4.0 | - | Incorrect AVP code | - | - | - | C3 | C3-60 | C3-101207 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0532 | 1 | F | Rel-9 | 9.4.0 | 9.5.0 | Incorrect AVP code | CP-50 | CP-100783 | approved | C3 | C3-60 | C3-101346 | Agreed | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0533 | - | A | Rel-10 | 10.0.0 | - | Incorrect AVP code | - | - | - | C3 | C3-60 | C3-101208 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0533 | 1 | A | Rel-10 | 10.0.0 | 10.1.0 | Incorrect AVP code | CP-50 | CP-100783 | approved | C3 | C3-60 | C3-101347 | Agreed | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0534 | - | B | Rel-10 | 10.0.0 | - | MPS support over Gx | - | - | - | C3 | C3-60 | C3-101210 | Revised | 2010-12-05 | eMPS-CN | - | 2010-12-09 |
0534 | 1 | B | Rel-10 | 10.0.0 | - | MPS support over Gx | - | - | - | C3 | C3-60 | C3-101429 | Revised | 2010-12-05 | eMPS-CN | - | 2010-12-09 |
0534 | 2 | B | Rel-10 | 10.0.0 | 10.1.0 | MPS support over Gx | CP-50 | CP-100789 | approved | C3 | C3-60 | C3-101493 | Agreed | 2010-12-05 | eMPS-CN | - | 2010-12-09 |
0535 | - | F | Rel-8 | 8.9.0 | - | QoS-Negotiation and QoS-Upgrade on the Gx for Gn/Gp SGSN (EPC IPCAN) | - | - | - | C3 | C3-60 | C3-101239 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0535 | 1 | F | Rel-8 | 8.9.0 | - | QoS-Negotiation and QoS-Upgrade on the Gx for Gn/Gp SGSN (EPC IPCAN) | - | - | - | C3 | C3-60 | C3-101432 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0535 | 2 | F | Rel-8 | 8.9.0 | - | QoS-Negotiation and QoS-Upgrade on the Gx for Gn/Gp SGSN (EPC IPCAN) | - | - | - | C3 | C3-60 | C3-101439 | Postponed | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0536 | - | A | Rel-9 | 9.4.0 | - | QoS-Negotiation and QoS-Upgrade on the Gx for Gn/Gp SGSN | - | - | - | C3 | C3-60 | C3-101240 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0536 | 1 | A | Rel-9 | 9.4.0 | - | QoS-Negotiation and QoS-Upgrade on the Gx for Gn/Gp SGSN | - | - | - | C3 | C3-60 | C3-101433 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0536 | 2 | A | Rel-9 | 9.4.0 | - | QoS-Negotiation and QoS-Upgrade on the Gx for Gn/Gp SGSN | - | - | - | C3 | C3-60 | C3-101440 | Postponed | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0537 | - | A | Rel-10 | 10.0.0 | - | QoS-Negotiation and QoS-Upgrade on the Gx for Gn/Gp SGSN | - | - | - | C3 | C3-60 | C3-101241 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0537 | 1 | A | Rel-10 | 10.0.0 | - | QoS-Negotiation and QoS-Upgrade on the Gx for Gn/Gp SGSN | - | - | - | C3 | C3-60 | C3-101434 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0537 | 2 | A | Rel-10 | 10.0.0 | - | QoS-Negotiation and QoS-Upgrade on the Gx for Gn/Gp SGSN | - | - | - | C3 | C3-60 | C3-101441 | Postponed | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0538 | - | F | Rel-8 | 8.9.0 | - | Precedence in the PCRF for UE-initiated with multiple TFTs | - | - | - | C3 | C3-60 | C3-101242 | Withdrawn | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0539 | - | A | Rel-9 | 9.4.0 | - | Precedence in the PCRF for UE-initiated with multiple TFTs | - | - | - | C3 | C3-60 | C3-101243 | Withdrawn | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0540 | - | A | Rel-10 | 10.0.0 | - | Precedence in the PCRF for UE-initiated with multiple TFTs | - | - | - | C3 | C3-60 | C3-101244 | Withdrawn | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0541 | - | F | Rel-8 | 8.9.0 | - | Error in PCRF Modification of APN-AMBR and default bearer QoS | - | - | - | C3 | C3-60 | C3-101245 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0541 | 1 | F | Rel-8 | 8.9.0 | - | Error in PCRF Modification of APN-AMBR and default bearer QoS | - | - | - | C3 | C3-60 | C3-101337 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0541 | 2 | F | Rel-8 | 8.9.0 | 8.10.0 | Error in PCRF Modification of APN-AMBR and default bearer QoS | CP-50 | CP-100773 | approved | C3 | C3-60 | C3-101442 | Agreed | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0542 | - | A | Rel-9 | 9.4.0 | - | Error in PCRF Modification of APN-AMBR and default bearer QoS | - | - | - | C3 | C3-60 | C3-101246 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0542 | 1 | A | Rel-9 | 9.4.0 | - | Error in PCRF Modification of APN-AMBR and default bearer QoS | - | - | - | C3 | C3-60 | C3-101338 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0542 | 2 | A | Rel-9 | 9.4.0 | 9.5.0 | Error in PCRF Modification of APN-AMBR and default bearer QoS | CP-50 | CP-100773 | approved | C3 | C3-60 | C3-101443 | Agreed | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0543 | - | A | Rel-10 | 10.0.0 | - | Error in PCRF Modification of APN-AMBR and default bearer QoS | - | - | - | C3 | C3-60 | C3-101247 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0543 | 1 | A | Rel-10 | 10.0.0 | - | Error in PCRF Modification of APN-AMBR and default bearer QoS | - | - | - | C3 | C3-60 | C3-101339 | Revised | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0543 | 2 | A | Rel-10 | 10.0.0 | 10.1.0 | Error in PCRF Modification of APN-AMBR and default bearer QoS | CP-50 | CP-100773 | approved | C3 | C3-60 | C3-101444 | Agreed | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0544 | - | F | Rel-8 | 8.9.0 | - | Revision of Precedence AVP type and Range | - | - | - | C3 | C3-60 | C3-101248 | Withdrawn | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0545 | - | A | Rel-9 | 9.4.0 | - | Revision of Precedence AVP type and Range | - | - | - | C3 | C3-60 | C3-101249 | Withdrawn | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0546 | - | A | Rel-10 | 10.0.0 | - | Revision of Precedence AVP type and Range | - | - | - | C3 | C3-60 | C3-101250 | Withdrawn | 2010-12-05 | SAES-St3-PCC | - | 2010-12-09 |
0547 | - | B | Rel-10 | 10.0.0 | 10.1.0 | Multiple BBERF handling for IFOM | CP-50 | CP-100786 | approved | C3 | C3-60 | C3-101278 | Agreed | 2010-12-05 | IFOM-CT | - | 2010-12-09 |
0548 | - | B | Rel-10 | 10.0.0 | - | Update for GTP-based S2b in 29.212 | - | - | - | C3 | C3-60 | C3-101280 | Revised | 2010-12-05 | SMOG-St3 | - | 2010-12-09 |
0548 | 1 | B | Rel-10 | 10.0.0 | 10.1.0 | Update for GTP-based S2b in 29.212 | CP-50 | CP-100788 | approved | C3 | C3-60 | C3-101419 | Agreed | 2010-12-05 | SMOG-St3 | - | 2010-12-09 |
0549 | - | B | Rel-10 | 10.0.0 | - | Gx reference point update of multimedia priority service | - | - | - | C3 | C3-60 | C3-101283 | Revised | 2010-12-05 | eMPS-CN | - | 2010-12-09 |
0550 | - | B | Rel-10 | 10.0.0 | - | Completion of UDC and Ud update for 29.212 | - | - | - | C3 | C3-60 | C3-101286 | Revised | 2010-12-05 | TEI10 | - | 2010-12-09 |
0551 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Bearer priority handling for EMPS. | CP-51 | CP-110121 | approved | C3 | C3-61 | C3-110017 | Agreed | 2011-03-10 | eMPS-CN | - | 2011-03-10 |
0552 | - | F | Rel-9 | 9.5.0 | - | Completion of CSG information reporting | - | - | - | C3 | C3-61 | C3-110020 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0552 | 1 | F | Rel-9 | 9.5.0 | - | Completion of CSG information reporting | - | - | - | C3 | C3-61 | C3-110208 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0552 | 2 | F | Rel-9 | 9.5.0 | - | Completion of CSG information reporting | - | - | - | C3 | C3-61 | C3-110298 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0552 | 3 | F | Rel-9 | 9.5.0 | - | Completion of CSG information reporting | - | - | - | C3 | C3-62 | C3-110542 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0552 | 4 | F | Rel-9 | 9.5.0 | 9.6.0 | Completion of CSG information reporting | CP-51 | CP-110114 | approved | C3 | C3-62 | C3-110615 | Agreed | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0553 | - | A | Rel-10 | 10.1.0 | - | Completion of CSG information reporting | - | - | - | C3 | C3-61 | C3-110021 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0553 | 1 | A | Rel-10 | 10.1.0 | - | Completion of CSG information reporting | - | - | - | C3 | C3-61 | C3-110209 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0553 | 2 | A | Rel-10 | 10.1.0 | - | Completion of CSG information reporting | - | - | - | C3 | C3-62 | C3-110543 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0553 | 3 | A | Rel-10 | 10.1.0 | 10.2.0 | Completion of CSG information reporting | CP-51 | CP-110114 | approved | C3 | C3-62 | C3-110616 | Agreed | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0554 | - | F | Rel-9 | 9.5.0 | - | Correction of the Event-Trigger AVP enumeration | - | - | - | C3 | C3-61 | C3-110086 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0554 | 1 | F | Rel-9 | 9.5.0 | 9.6.0 | Correction of the Event-Trigger AVP enumeration | CP-51 | CP-110114 | approved | C3 | C3-61 | C3-110210 | Agreed | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0555 | - | A | Rel-10 | 10.1.0 | - | Correction of the Event-Trigger AVP enumeration | - | - | - | C3 | C3-61 | C3-110087 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0555 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | Correction of the Event-Trigger AVP enumeration | CP-51 | CP-110114 | approved | C3 | C3-61 | C3-110211 | Agreed | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0556 | - | F | Rel-9 | 9.5.0 | - | Bearer binding function in PCEF | - | - | - | C3 | C3-61 | C3-110090 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0556 | 1 | F | Rel-9 | 9.5.0 | 9.6.0 | Bearer binding function in PCEF | CP-51 | CP-110114 | approved | C3 | C3-61 | C3-110212 | Agreed | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0557 | - | A | Rel-10 | 10.1.0 | - | Bearer binding function in PCEF | - | - | - | C3 | C3-61 | C3-110091 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0557 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | Bearer binding function in PCEF | CP-51 | CP-110114 | approved | C3 | C3-61 | C3-110213 | Agreed | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0558 | - | F | Rel-9 | 9.5.0 | - | Access type for QOS_CHANGE and QOS_CHANGE_EXCEEDING_AUTHORIZATION (R9 29.212) | - | - | - | C3 | C3-61 | C3-110094 | Revised | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0558 | 1 | F | Rel-9 | 9.5.0 | - | Access type for QOS_CHANGE and QOS_CHANGE_EXCEEDING_AUTHORIZATION (R9 29.212) | - | - | - | C3 | C3-61 | C3-110215 | Revised | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0558 | 2 | A | Rel-9 | 9.5.0 | 9.6.0 | Access type for QOS_CHANGE and QOS_CHANGE_EXCEEDING_AUTHORIZATION (R9 29.212) | CP-51 | CP-110106 | approved | C3 | C3-61 | C3-110334 | Agreed | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0559 | - | A | Rel-10 | 10.1.0 | - | Access type for QOS_CHANGE and QOS_CHANGE_EXCEEDING_AUTHORIZATION (R9 29.212) | - | - | - | C3 | C3-61 | C3-110095 | Revised | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0559 | 1 | A | Rel-10 | 10.1.0 | - | Access type for QOS_CHANGE and QOS_CHANGE_EXCEEDING_AUTHORIZATION (R9 29.212) | - | - | - | C3 | C3-61 | C3-110216 | Revised | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0559 | 2 | A | Rel-10 | 10.1.0 | 10.2.0 | Access type for QOS_CHANGE and QOS_CHANGE_EXCEEDING_AUTHORIZATION (R9 29.212) | CP-51 | CP-110106 | approved | C3 | C3-61 | C3-110335 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0560 | - | F | Rel-10 | 10.1.0 | - | Event triggers for multiple BBERFs in IP flow mobility case (R10 29.212) | - | - | - | C3 | C3-61 | C3-110098 | Revised | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0560 | 1 | F | Rel-10 | 10.1.0 | 10.2.0 | Event triggers for multiple BBERFs in IP flow mobility case (R10 29.212) | CP-51 | CP-110118 | approved | C3 | C3-61 | C3-110190 | Agreed | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0560 | 2 | F | Rel-10 | 10.1.0 | - | Event triggers for multiple BBERFs in IP flow mobility case | - | - | - | C3 | C3-62 | C3-110550 | revised | 2011-03-10 | IFOM-CT | merged into C3-110630 | 2011-03-10 |
0561 | - | B | Rel-10 | 10.1.0 | - | Reporting for sponsored connectivity (R10 29.212) | - | - | - | C3 | C3-61 | C3-110100 | Revised | 2011-03-10 | PEST-CT3 | - | 2011-03-10 |
0561 | 1 | B | Rel-10 | 10.1.0 | - | Reporting for sponsored connectivity (R10 29.212) | - | - | - | C3 | C3-61 | C3-110184 | Revised | 2011-03-10 | PEST-CT3 | - | 2011-03-10 |
0561 | 2 | B | Rel-10 | 10.1.0 | 10.2.0 | Reporting for sponsored connectivity (R10 29.212) | CP-51 | CP-110125 | approved | C3 | C3-61 | C3-110228 | Agreed | 2011-03-10 | PEST-CT3 | - | 2011-03-10 |
0562 | - | F | Rel-10 | 10.1.0 | - | Requesting Usage Monitoring Control for sponsored connectivity (R10 29.212) | - | - | - | C3 | C3-61 | C3-110102 | Revised | 2011-03-10 | PEST-CT3 | - | 2011-03-10 |
0562 | 1 | F | Rel-10 | 10.1.0 | - | Requesting Usage Monitoring Control for sponsored connectivity (R10 29.212) | - | - | - | C3 | C3-61 | C3-110186 | Revised | 2011-03-10 | PEST-CT3 | - | 2011-03-10 |
0562 | 2 | F | Rel-10 | 10.1.0 | - | Requesting Usage Monitoring Control for sponsored connectivity (R10 29.212) | - | - | - | C3 | C3-61 | C3-110229 | Revised | 2011-03-10 | PEST-CT3 | - | 2011-03-10 |
0562 | 3 | F | Rel-10 | 10.1.0 | - | Requesting Usage Monitoring Control for sponsored connectivity (R10 29.212) | - | - | - | C3 | C3-61 | C3-110301 | Revised | 2011-03-10 | PEST-CT3 | - | 2011-03-10 |
0562 | 4 | F | Rel-10 | 10.1.0 | - | Requesting Usage Monitoring Control for sponsored connectivity (R10 29.212) | - | - | - | C3 | C3-61 | C3-110365 | Revised | 2011-03-10 | PEST-CT3 | - | 2011-03-10 |
0562 | 5 | F | Rel-10 | 10.1.0 | - | Requesting Usage Monitoring Control for sponsored connectivity (R10 29.212) | - | - | - | C3 | C3-62 | C3-110519 | Revised | 2011-03-10 | PEST-CT3 | - | 2011-03-10 |
0562 | 6 | F | Rel-10 | 10.1.0 | 10.2.0 | Requesting Usage Monitoring Control for sponsored connectivity (R10 29.212) | CP-51 | CP-110125 | approved | C3 | C3-62 | C3-110584 | Agreed | 2011-03-10 | PEST-CT3 | - | 2011-03-10 |
0563 | - | F | Rel-10 | 10.1.0 | - | Gx request handling (R10 29.212) | - | - | - | C3 | C3-61 | C3-110104 | Revised | 2011-03-10 | TEI10 | - | 2011-03-10 |
0563 | 1 | F | Rel-10 | 10.1.0 | - | Gx request handling (R10 29.212) | - | - | - | C3 | C3-61 | C3-110183 | Revised | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0563 | 2 | F | Rel-10 | 10.1.0 | 10.2.0 | Gx request handling (R10 29.212) | CP-51 | CP-110132 | approved | C3 | C3-61 | C3-110312 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0564 | - | B | Rel-10 | 10.1.0 | - | S2b GTP addition to Annex D.1 | - | - | - | C3 | C3-61 | C3-110124 | Revised | 2011-03-10 | SMOG-ST3 | - | 2011-03-10 |
0564 | 1 | B | Rel-10 | 10.1.0 | - | S2b GTP addition to Annex D.1 | - | - | - | C3 | C3-61 | C3-110224 | Revised | 2011-03-10 | SMOG-ST3 | - | 2011-03-10 |
0564 | 2 | B | Rel-10 | 10.1.0 | 10.2.0 | S2b GTP addition to Annex D.1 | CP-51 | CP-110120 | approved | C3 | C3-61 | C3-110338 | Agreed | 2011-03-10 | SMOG-ST3 | - | 2011-03-10 |
0565 | - | B | Rel-10 | 10.1.0 | - | S2b RAT Type | - | - | - | C3 | C3-61 | C3-110125 | Revised | 2011-03-10 | SMOG-ST3 | - | 2011-03-10 |
0565 | 1 | B | Rel-10 | 10.1.0 | 10.2.0 | S2b RAT Type | CP-51 | CP-110120 | approved | C3 | C3-61 | C3-110225 | Agreed | 2011-03-10 | SMOG-ST3 | - | 2011-03-10 |
0566 | - | F | Rel-8 | 8.10.0 | - | Modification failure of APN-AMBR and Default EPS Bearer QoS | - | - | - | C3 | C3-61 | C3-110145 | Revised | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0566 | 1 | F | Rel-8 | 8.10.0 | 8.11.0 | Modification failure of APN-AMBR and Default EPS Bearer QoS | CP-51 | CP-110106 | approved | C3 | C3-61 | C3-110202 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0567 | - | A | Rel-9 | 9.5.0 | - | Modification failure of APN-AMBR and Default EPS Bearer QoS | - | - | - | C3 | C3-61 | C3-110146 | Revised | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0567 | 1 | A | Rel-9 | 9.5.0 | 9.6.0 | Modification failure of APN-AMBR and Default EPS Bearer QoS | CP-51 | CP-110106 | approved | C3 | C3-61 | C3-110203 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0568 | - | A | Rel-10 | 10.1.0 | - | Modification failure of APN-AMBR and Default EPS Bearer QoS | - | - | - | C3 | C3-61 | C3-110147 | Revised | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0568 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | Modification failure of APN-AMBR and Default EPS Bearer QoS | CP-51 | CP-110106 | approved | C3 | C3-61 | C3-110204 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0569 | - | B | Rel-10 | 10.1.0 | - | RAT based charging for IFOM | - | - | - | C3 | C3-61 | C3-110153 | Revised | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0569 | 1 | B | Rel-10 | 10.1.0 | - | RAT based charging for IFOM | - | - | - | C3 | C3-61 | C3-110194 | Revised | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0569 | 2 | B | Rel-10 | 10.1.0 | 10.2.0 | RAT based charging for IFOM | CP-51 | CP-110118 | approved | C3 | C3-61 | C3-110353 | Agreed | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0570 | - | B | Rel-10 | 10.1.0 | - | Clarification of the sponsored data connectivity support (29.212) | - | - | - | C3 | C3-61 | C3-110159 | revised | 2011-03-10 | PEST-CT3 | merged with 186 into 229 | 2011-03-10 |
0571 | - | B | Rel-10 | 10.1.0 | - | Correction to feature bit for sponsored data connectivity (29.212) | - | - | - | C3 | C3-61 | C3-110160 | Revised | 2011-03-10 | PEST-CT3 | - | 2011-03-10 |
0571 | 1 | B | Rel-10 | 10.1.0 | - | Correction to feature bit for sponsored data connectivity (29.212) | - | - | - | C3 | C3-61 | C3-110291 | Revised | 2011-03-10 | PEST-CT3 | - | 2011-03-10 |
0571 | 2 | A | Rel-10 | 10.1.0 | 10.2.0 | M-bit cleared for AVPs related to a supported feature | CP-51 | CP-110106 | approved | C3 | C3-62 | C3-110442 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0572 | - | B | Rel-10 | 10.1.0 | - | Correction to Sponsor-Identity AVP and Application-Service-Provider-Identity AVP(29.212) | - | - | - | C3 | C3-61 | C3-110161 | Revised | 2011-03-10 | PEST-CT3 | - | 2011-03-10 |
0572 | 1 | B | Rel-10 | 10.1.0 | - | Correction to Sponsor-Identity AVP and Application-Service-Provider-Identity AVP(29.212) | - | - | - | C3 | C3-61 | C3-110292 | Revised | 2011-03-10 | PEST-CT3 | - | 2011-03-10 |
0572 | 2 | B | Rel-10 | 10.1.0 | 10.2.0 | Correction to Sponsor-Identity AVP and Application-Service-Provider-Identity AVP(29.212) | CP-51 | CP-110125 | approved | C3 | C3-61 | C3-110343 | Agreed | 2011-03-10 | PEST-CT3 | - | 2011-03-10 |
0573 | - | B | Rel-10 | 10.1.0 | - | Correction to the AVPs to support xDSL line identification on the Gx | - | - | - | C3 | C3-61 | C3-110167 | Revised | 2011-03-10 | TEI10 | - | 2011-03-10 |
0573 | 1 | B | Rel-10 | 10.1.0 | 10.2.0 | Correction to the AVPs to support xDSL line identification on the Gx | CP-51 | CP-110123 | approved | C3 | C3-61 | C3-110310 | Agreed | 2011-03-10 | TEI10 | - | 2011-03-10 |
0574 | - | B | Rel-10 | 10.1.0 | - | Identification of BBF against IP flow mobility routing rule | - | - | - | C3 | C3-61 | C3-110144 | Revised | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0574 | 1 | B | Rel-10 | 10.1.0 | - | Identification of BBF against IP flow mobility routing rule | - | - | - | C3 | C3-61 | C3-110192 | Revised | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0574 | 2 | B | Rel-10 | 10.1.0 | - | Identification of BBF against IP flow mobility routing rule | - | - | - | C3 | C3-61 | C3-110297 | Revised | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0574 | 3 | B | Rel-10 | 10.1.0 | 10.2.0 | Identification of BBF against IP flow mobility routing rule | CP-51 | CP-110118 | approved | C3 | C3-61 | C3-110302 | Agreed | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0575 | - | F | Rel-9 | 9.5.0 | - | Bearer control mode when using MUPSAP | - | - | - | C3 | C3-61 | C3-110172 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0575 | 1 | F | Rel-9 | 9.5.0 | - | Bearer control mode when using MUPSAP | - | - | - | C3 | C3-61 | C3-110221 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0575 | 2 | F | Rel-9 | 9.5.0 | - | Bearer control mode for multiple PDN connections | CP-51 | CP-110223 | postponed | C3 | C3-61 | C3-110361 | Agreed | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0576 | - | A | Rel-10 | 10.1.0 | - | Bearer control mode when using MUPSAP | - | - | - | C3 | C3-61 | C3-110173 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0576 | 1 | A | Rel-10 | 10.1.0 | - | Bearer control mode when using MUPSAP | - | - | - | C3 | C3-61 | C3-110222 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0576 | 2 | A | Rel-10 | 10.1.0 | - | Bearer control mode for multiple PDN connections | CP-51 | CP-110223 | postponed | C3 | C3-61 | C3-110362 | Agreed | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0577 | - | F | Rel-8 | 8.10.0 | - | Reference to 3GPP2 updated | - | - | - | C3 | C3-61 | C3-110174 | Revised | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0577 | 1 | F | Rel-8 | 8.10.0 | 8.11.0 | Reference to 3GPP2 updated | CP-51 | CP-110106 | approved | C3 | C3-61 | C3-110205 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0578 | - | A | Rel-9 | 9.5.0 | - | Reference to 3GPP2 updated | - | - | - | C3 | C3-61 | C3-110175 | Revised | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0578 | 1 | A | Rel-9 | 9.5.0 | 9.6.0 | Reference to 3GPP2 updated | CP-51 | CP-110106 | approved | C3 | C3-61 | C3-110206 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0579 | - | A | Rel-10 | 10.1.0 | - | Reference to 3GPP2 updated | - | - | - | C3 | C3-61 | C3-110176 | Revised | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0579 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | Reference to 3GPP2 updated | CP-51 | CP-110106 | approved | C3 | C3-61 | C3-110207 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0580 | - | F | Rel-10 | 10.1.0 | - | Overlapping AVP code values | - | - | - | C3 | C3-61 | C3-110178 | Revised | 2011-03-10 | TEI10 | - | 2011-03-10 |
0580 | 1 | F | Rel-10 | 10.1.0 | - | Overlapping AVP code values | - | - | - | C3 | C3-61 | C3-110181 | Revised | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0580 | 2 | F | Rel-10 | 10.1.0 | 10.2.0 | Overlapping AVP code values | CP-51 | CP-110118 | approved | C3 | C3-61 | C3-110196 | Agreed | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0581 | - | F | Rel-8 | 8.10.0 | - | Access type for QOS_CHANGE and QOS_CHANGE_EXCEEDING_AUTHORIZATION (R8 29.212) | - | - | - | C3 | C3-61 | C3-110214 | Revised | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0581 | 1 | F | Rel-8 | 8.10.0 | 8.11.0 | Access type for QOS_CHANGE and QOS_CHANGE_EXCEEDING_AUTHORIZATION (R8 29.212) | CP-51 | CP-110106 | approved | C3 | C3-61 | C3-110333 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0582 | - | F | Rel-8 | 8.10.0 | - | Mapping between EPS and Rel-99 QoS parameters | - | - | - | C3 | C3-62 | C3-110437 | Revised | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0582 | 1 | F | Rel-8 | 8.10.0 | 8.11.0 | Mapping between EPS and Rel-99 QoS parameters | CP-51 | CP-110106 | approved | C3 | C3-62 | C3-110592 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0583 | - | A | Rel-9 | 9.5.0 | - | Mapping between EPS and Rel-99 QoS parameters | - | - | - | C3 | C3-62 | C3-110438 | Revised | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0583 | 1 | A | Rel-9 | 9.5.0 | 9.6.0 | Mapping between EPS and Rel-99 QoS parameters | CP-51 | CP-110106 | approved | C3 | C3-62 | C3-110593 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0584 | - | A | Rel-10 | 10.1.0 | - | Mapping between EPS and Rel-99 QoS parameters | - | - | - | C3 | C3-62 | C3-110439 | Revised | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0584 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | Mapping between EPS and Rel-99 QoS parameters | CP-51 | CP-110106 | approved | C3 | C3-62 | C3-110594 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0585 | - | F | Rel-8 | 8.10.0 | 8.11.0 | M-bit cleared for AVPs related to a supported feature | CP-51 | CP-110106 | approved | C3 | C3-62 | C3-110440 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0586 | - | A | Rel-9 | 9.5.0 | 9.6.0 | M-bit cleared for AVPs related to a supported feature | CP-51 | CP-110106 | approved | C3 | C3-62 | C3-110441 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0587 | - | B | Rel-11 | 10.1.0 | - | Sd reference point in PCC Architecture | - | - | - | C3 | C3-62 | C3-110444 | Revised | 2011-03-10 | SAPP-CT3 | - | 2011-03-10 |
0587 | 1 | B | Rel-11 | 10.1.0 | 11.0.0 | Sd reference point in PCC Architecture | CP-51 | CP-110133 | approved | C3 | C3-62 | C3-110621 | Agreed | 2011-03-10 | SAPP-CT3 | - | 2011-03-10 |
0588 | - | B | Rel-10 | 10.1.0 | - | IFOM feature in Release 10 | - | - | - | C3 | C3-62 | C3-110491 | Revised | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0588 | 1 | B | Rel-10 | 10.1.0 | - | IFOM feature in Release 10 | - | - | - | C3 | C3-62 | C3-110628 | Revised | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0588 | 2 | B | Rel-10 | 10.1.0 | - | IFOM feature in Release 10 | - | - | - | C3 | C3-62 | C3-110716 | Revised | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0588 | 3 | B | Rel-10 | 10.1.0 | 10.2.0 | IFOM feature in Release 10 | CP-51 | CP-110118 | approved | C3 | C3-62 | C3-110744 | Agreed | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0589 | - | B | Rel-10 | 10.1.0 | - | Access type for IFOM | - | - | - | C3 | C3-62 | C3-110492 | Revised | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0589 | 1 | B | Rel-10 | 10.1.0 | - | Access type for IFOM | - | - | - | C3 | C3-62 | C3-110629 | Revised | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0589 | 2 | B | Rel-10 | 10.1.0 | - | Access type for IFOM | - | - | - | C3 | C3-62 | C3-110745 | Revised | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0589 | 3 | B | Rel-10 | 10.1.0 | 10.2.0 | Access type for IFOM | CP-51 | CP-110118 | approved | C3 | C3-62 | C3-110760 | Agreed | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0590 | - | B | Rel-10 | 10.1.0 | - | Multiple trigger registration for IFOM | - | - | - | C3 | C3-62 | C3-110493 | Revised | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0590 | 1 | B | Rel-10 | 10.1.0 | - | Multiple trigger registration for IFOM | - | - | - | C3 | C3-62 | C3-110630 | Revised | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0590 | 2 | B | Rel-10 | 10.1.0 | 10.2.0 | Multiple trigger registration for IFOM | CP-51 | CP-110118 | approved | C3 | C3-62 | C3-110717 | Agreed | 2011-03-10 | IFOM-CT | - | 2011-03-10 |
0591 | - | F | Rel-8 | 8.10.0 | 8.11.0 | TFT-Packet-Filter-Information AVP over Gxx (R8 29.212) | CP-51 | CP-110106 | approved | C3 | C3-62 | C3-110511 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0592 | - | A | Rel-9 | 9.5.0 | 9.6.0 | TFT-Packet-Filter-Information AVP over Gxx (R9 29.212) | CP-51 | CP-110106 | approved | C3 | C3-62 | C3-110512 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0593 | - | A | Rel-10 | 10.1.0 | 10.2.0 | TFT-Packet-Filter-Information AVP over Gxx (R10 29.212) | CP-51 | CP-110106 | approved | C3 | C3-62 | C3-110513 | Agreed | 2011-03-10 | SAES-St3-PCC | - | 2011-03-10 |
0594 | - | B | Rel-9 | 9.5.0 | - | PS-to-CS HO indicator impacts to PCC (R9 29.212) | - | - | - | C3 | C3-62 | C3-110517 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0594 | 1 | B | Rel-9 | 9.5.0 | 9.6.0 | PS-to-CS HO indicator impacts to PCC (R9 29.212) | CP-51 | CP-110114 | approved | C3 | C3-62 | C3-110597 | Agreed | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0595 | - | A | Rel-10 | 10.1.0 | - | PS-to-CS HO indicator impacts to PCC (R10 29.212) | - | - | - | C3 | C3-62 | C3-110518 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0595 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | PS-to-CS HO indicator impacts to PCC (R10 29.212) | CP-51 | CP-110114 | approved | C3 | C3-62 | C3-110598 | Agreed | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0596 | - | F | Rel-9 | 9.5.0 | - | Correction to the Usage-Monitoring-Report AVP | - | - | - | C3 | C3-62 | C3-110548 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0596 | 1 | F | Rel-9 | 9.5.0 | 9.6.0 | Correction to the Usage-Monitoring-Report AVP | CP-51 | CP-110114 | approved | C3 | C3-62 | C3-110617 | Agreed | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0597 | - | B | Rel-10 | 10.1.0 | - | PCRF Failure and Restoration (R10 29.212) | - | - | - | C3 | C3-62 | C3-110522 | Revised | 2011-03-10 | PCRF-FR | - | 2011-03-10 |
0597 | 1 | B | Rel-10 | 10.1.0 | - | PCRF Failure and Restoration (R10 29.212) | - | - | - | C3 | C3-62 | C3-110662 | Revised | 2011-03-10 | PCRF-FR | - | 2011-03-10 |
0597 | 2 | B | Rel-10 | 10.1.0 | 10.2.0 | PCRF Failure and Restoration (R10 29.212) | CP-51 | CP-110131 | approved | C3 | C3-62 | C3-110740 | Agreed | 2011-03-10 | PCRF-FR | - | 2011-03-10 |
0598 | - | B | Rel-11 | 10.1.0 | 11.0.0 | Introduction of new clauses to support service awareness and privacy policies | CP-51 | CP-110133 | approved | C3 | C3-62 | C3-110526 | Agreed | 2011-03-10 | SAPP-CT3 | - | 2011-03-10 |
0599 | - | A | Rel-10 | 10.1.0 | - | Correction to the Usage-Monitoring-Report AVP | - | - | - | C3 | C3-62 | C3-110549 | Revised | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0599 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | Correction to the Usage-Monitoring-Report AVP | CP-51 | CP-110114 | approved | C3 | C3-62 | C3-110618 | Agreed | 2011-03-10 | PCC-Enh | - | 2011-03-10 |
0600 | - | B | Rel-10 | 10.1.0 | - | NIMTC Low Priority Indicator handling and PGW/GGSN Control overload | - | - | - | C3 | C3-62 | C3-110648 | Revised | 2011-03-10 | NIMTC | - | 2011-03-10 |
0600 | 1 | B | Rel-10 | 10.1.0 | - | NIMTC Low Priority Indicator handling and PGW/GGSN Control overload | - | - | - | C3 | C3-62 | C3-110666 | postponed | 2011-03-10 | NIMTC | postponed till the next meeting | 2011-03-10 |
0601 | - | F | Rel-8 | 8.11.1 | - | Coordination of supported features in PCC | - | - | - | C3 | C3-63 | C3-110813 | Withdrawn | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0602 | - | A | Rel-9 | 9.6.1 | - | Coordination of supported features in PCC | - | - | - | C3 | C3-63 | C3-110814 | Withdrawn | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0603 | - | A | Rel-10 | 10.2.1 | - | Coordination of supported features in PCC | - | - | - | C3 | C3-63 | C3-110815 | Withdrawn | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0604 | - | A | Rel-11 | 11.0.1 | - | Coordination of supported features in PCC | - | - | - | C3 | C3-63 | C3-110816 | Withdrawn | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0605 | - | F | Rel-10 | 10.2.1 | - | Pre-emption value for Default Bearer | - | - | - | C3 | C3-63 | C3-110862 | Revised | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0605 | 1 | F | Rel-10 | 10.2.1 | 10.3.0 | Pre-emption value for Default Bearer | CP-52 | CP-110422 | approved | C3 | C3-63 | C3-111056 | Agreed | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0606 | - | F | Rel-10 | 10.2.1 | - | Pre-emption AVP Clarification | - | - | - | C3 | C3-63 | C3-110863 | Revised | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0606 | 1 | F | Rel-10 | 10.2.1 | 10.3.0 | Pre-emption AVP for Bearer | CP-52 | CP-110396 | approved | C3 | C3-63 | C3-111060 | Agreed | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0607 | - | A | Rel-11 | 11.0.1 | - | Pre-emption value for Default Bearer | - | - | - | C3 | C3-63 | C3-110893 | Revised | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0607 | 1 | A | Rel-11 | 11.0.1 | 11.1.0 | Pre-emption value for Default Bearer | CP-52 | CP-110422 | approved | C3 | C3-63 | C3-111057 | Agreed | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0608 | - | A | Rel-11 | 11.0.1 | - | Pre-emption AVP Clarification | - | - | - | C3 | C3-63 | C3-110894 | Revised | 2011-06-01 | TEI11 | - | 2011-06-01 |
0608 | 1 | A | Rel-11 | 11.0.1 | 11.1.0 | Pre-emption AVP for Bearer | CP-52 | CP-110396 | approved | C3 | C3-63 | C3-111061 | Agreed | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0609 | - | F | Rel-10 | 10.2.1 | - | Restricting the use of sponsored connectivity to those scenarios where AF is present in home network and the traffic is home-routed | - | - | - | C3 | C3-63 | C3-110896 | Withdrawn | 2011-06-01 | PEST-CT3 | - | 2011-06-01 |
0610 | - | F | Rel-10 | 10.2.1 | - | Restricting the use of sponsored connectivity to those scenarios where AF is present in home network and the traffic is home-routed | - | - | - | C3 | C3-63 | C3-110897 | Withdrawn | 2011-06-01 | PEST-CT3 | - | 2011-06-01 |
0611 | - | F | Rel-9 | 9.6.1 | 9.7.0 | Correction to applicablitity of QoS-Base-Rule-Name | CP-52 | CP-110405 | approved | C3 | C3-63 | C3-110915 | Agreed | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0612 | - | A | Rel-10 | 10.2.1 | 10.3.0 | Correction to applicablitity of QoS-Base-Rule-Name | CP-52 | CP-110405 | approved | C3 | C3-63 | C3-110916 | Agreed | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0613 | - | A | Rel-11 | 11.0.1 | 11.1.0 | Correction to applicablitity of QoS-Base-Rule-Name | CP-52 | CP-110405 | approved | C3 | C3-63 | C3-110917 | Agreed | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0614 | - | F | Rel-10 | 10.2.1 | - | Remove the editors note in clause 4.5.16 | - | - | - | C3 | C3-63 | C3-110922 | Revised | 2011-06-01 | PEST-CT3 | - | 2011-06-01 |
0614 | 1 | F | Rel-10 | 10.2.1 | 10.3.0 | Remove the editors note in clause 4.5.16 | CP-52 | CP-110413 | approved | C3 | C3-63 | C3-111091 | Agreed | 2011-06-01 | PEST-CT3 | - | 2011-06-01 |
0615 | - | A | Rel-11 | 11.0.1 | - | Remove the editors note in clause 4.5.16 | - | - | - | C3 | C3-63 | C3-110923 | Revised | 2011-06-01 | PEST-CT3 | - | 2011-06-01 |
0615 | 1 | A | Rel-11 | 11.0.1 | - | Remove the editors note in clause 4.5.16 | - | - | - | C3 | C3-63 | C3-111092 | Revised | 2011-06-01 | PEST-CT3 | - | 2011-06-01 |
0615 | 2 | A | Rel-11 | 11.0.1 | 11.1.0 | Remove the editors note in clause 4.5.16 | CP-52 | CP-110413 | approved | C3 | C3-63 | C3-111208 | Agreed | 2011-06-01 | PEST-CT3 | - | 2011-06-01 |
0616 | - | B | Rel-11 | 11.0.1 | - | Unsolicited service reporting | - | - | - | C3 | C3-63 | C3-110936 | Revised | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0616 | 1 | B | Rel-11 | 11.0.1 | - | Unsolicited service reporting | - | - | - | C3 | C3-63 | C3-111156 | Postponed | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0617 | - | B | Rel-11 | 11.0.1 | - | TDF Session Establishment | - | - | - | C3 | C3-63 | C3-110937 | revised | 2011-06-01 | SAPP-CT3 | Merged into C3-111164 and C3-111070 | 2011-06-01 |
0618 | - | F | Rel-8 | 8.11.1 | 8.12.0 | RAR command over Gx | CP-52 | CP-110396 | approved | C3 | C3-63 | C3-110959 | Agreed | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0619 | - | F | Rel-9 | 9.6.1 | - | Accumulated usage reporting for all the enabled monitoring keys (R9 29.212) | - | - | - | C3 | C3-63 | C3-110960 | Revised | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0619 | 1 | F | Rel-9 | 9.6.1 | 9.7.0 | Accumulated usage reporting for all the enabled monitoring keys (R9 29.212) | CP-52 | CP-110405 | approved | C3 | C3-63 | C3-111051 | Agreed | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0620 | - | A | Rel-10 | 10.2.1 | - | Accumulated usage reporting for all the enabled monitoring keys (R10 29.212) | - | - | - | C3 | C3-63 | C3-110961 | Revised | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0620 | 1 | A | Rel-10 | 10.2.1 | 10.3.0 | Accumulated usage reporting for all the enabled monitoring keys (R10 29.212) | CP-52 | CP-110405 | approved | C3 | C3-63 | C3-111052 | Agreed | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0621 | - | A | Rel-11 | 11.0.1 | - | Accumulated usage reporting for all the enabled monitoring keys (R11 29.212) | - | - | - | C3 | C3-63 | C3-110962 | Revised | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0621 | 1 | A | Rel-11 | 11.0.1 | 11.1.0 | Accumulated usage reporting for all the enabled monitoring keys (R11 29.212) | CP-52 | CP-110405 | approved | C3 | C3-63 | C3-111053 | Agreed | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0622 | - | F | Rel-9 | 9.6.1 | 9.7.0 | Event Trigger not used in Gxx (R9 29.212) | CP-52 | CP-110405 | approved | C3 | C3-63 | C3-110963 | Agreed | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0623 | - | A | Rel-10 | 10.2.1 | - | Event Trigger not used in Gxx (R10 29.212) | - | - | - | C3 | C3-63 | C3-110964 | Revised | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0623 | 1 | A | Rel-10 | 10.2.1 | 10.3.0 | Event Trigger not used in Gxx (R10 29.212) | CP-52 | CP-110405 | approved | C3 | C3-63 | C3-111054 | Agreed | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0624 | - | A | Rel-11 | 11.0.1 | - | Event Trigger not used in Gxx (R11 29.212) | - | - | - | C3 | C3-63 | C3-110965 | Revised | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0624 | 1 | A | Rel-11 | 11.0.1 | 11.1.0 | Event Trigger not used in Gxx (R11 29.212) | CP-52 | CP-110405 | approved | C3 | C3-63 | C3-111055 | Agreed | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0625 | - | F | Rel-10 | 10.2.1 | - | QoS setting for Pre-R7 UE (R10 29.212) | - | - | - | C3 | C3-63 | C3-110966 | Revised | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0625 | 1 | F | Rel-10 | 10.2.1 | 10.3.0 | QoS setting for Pre-R7 UE (R10 29.212) | CP-52 | CP-110420 | approved | C3 | C3-63 | C3-111063 | Agreed | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0626 | - | A | Rel-11 | 11.0.1 | - | QoS setting for Pre-R7 UE (R11 29.212) | - | - | - | C3 | C3-63 | C3-110967 | Revised | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0626 | 1 | A | Rel-11 | 11.0.1 | 11.1.0 | QoS setting for Pre-R7 UE (R11 29.212) | CP-52 | CP-110420 | approved | C3 | C3-63 | C3-111064 | Agreed | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0627 | - | B | Rel-11 | 11.0.1 | - | Subscriber Spending Limits based on Sy reference point (R11 29.212) | - | - | - | C3 | C3-63 | C3-110971 | Revised | 2011-06-01 | TEI11 | - | 2011-06-01 |
0627 | 1 | B | Rel-11 | 11.0.1 | 11.1.0 | Subscriber Spending Limits based on Sy reference point (R11 29.212) | CP-52 | CP-110425 | approved | C3 | C3-63 | C3-111066 | Agreed | 2011-06-01 | QoS_SSL | Depends on chosen Sy option in SA. | 2011-06-01 |
0628 | - | F | Rel-10 | 10.2.1 | - | Restricting the use of sponsored connectivity to those scenarios where AF is present in home network and the traffic is home-routed | - | - | - | C3 | C3-63 | C3-110985 | Withdrawn | 2011-06-01 | PEST-CT3 | - | 2011-06-01 |
0629 | - | F | Rel-10 | 10.2.1 | - | Restricting the use of sponsored connectivity to those scenarios where AF is present in home network and the traffic is home-routed | - | - | - | C3 | C3-63 | C3-110986 | Withdrawn | 2011-06-01 | PEST-CT3 | - | 2011-06-01 |
0630 | - | B | Rel-11 | 11.0.1 | - | 29.212 general modifications of title, scope and definitions related to the introduction of TDF | - | - | - | C3 | C3-63 | C3-110995 | Revised | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0630 | 1 | B | Rel-11 | 11.0.1 | 11.1.0 | general modifications of title, scope and definitions related to the introduction of TDF | CP-52 | CP-110423 | approved | C3 | C3-63 | C3-111154 | Agreed | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0631 | - | B | Rel-11 | 11.0.1 | - | 29.212 modifications related to the introduction of TDF enhancements into PCEF | - | - | - | C3 | C3-63 | C3-110996 | Revised | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0631 | 1 | B | Rel-11 | 11.0.1 | 11.1.0 | modifications related to the introduction of TDF enhancements into PCEF | CP-52 | CP-110423 | approved | C3 | C3-63 | C3-111157 | Agreed | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0632 | - | B | Rel-11 | 11.0.1 | - | 29.212: introduction of new AVPs into Gx related to TDF functionality | - | - | - | C3 | C3-63 | C3-110997 | Revised | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0632 | 1 | B | Rel-11 | 11.0.1 | - | 29.212: introduction of new AVPs into Gx related to TDF functionality | - | - | - | C3 | C3-63 | C3-111162 | Revised | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0632 | 2 | B | Rel-11 | 11.0.1 | - | 29.212: introduction of new AVPs into Gx related to TDF functionality | - | - | - | C3 | C3-63 | C3-111148 | Revised | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0632 | 3 | B | Rel-11 | 11.0.1 | 11.1.0 | introduction of new AVPs into Gx related to TDF functionality | CP-52 | CP-110423 | approved | C3 | C3-63 | C3-111216 | Agreed | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0633 | - | B | Rel-11 | 11.0.1 | - | 29.212 modifications related to the introduction of Sd: Section 4b general and functional elements definitions. | - | - | - | C3 | C3-63 | C3-110998 | Revised | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0633 | 1 | B | Rel-11 | 11.0.1 | - | 29.212 modifications related to the introduction of Sd: Section 4b general and functional elements definitions. | - | - | - | C3 | C3-63 | C3-111163 | Revised | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0633 | 2 | B | Rel-11 | 11.0.1 | 11.1.0 | modifications related to the introduction of Sd: Section 4b general and functional elements definitions. | CP-52 | CP-110423 | approved | C3 | C3-63 | C3-111149 | Agreed | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0634 | - | B | Rel-11 | 11.0.1 | - | 29.212 modifications related to the introduction of Sd: Section 4b - ADC Procedures definitions | - | - | - | C3 | C3-63 | C3-110999 | Revised | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0634 | 1 | B | Rel-11 | 11.0.1 | - | 29.212 modifications related to the introduction of Sd: Section 4b - ADC Procedures definitions | - | - | - | C3 | C3-63 | C3-111070 | Revised | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0634 | 2 | B | Rel-11 | 11.0.1 | 11.1.0 | modifications related to the introduction of Sd: Section 4b - ADC Procedures definitions | CP-52 | CP-110423 | approved | C3 | C3-63 | C3-111165 | Agreed | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0635 | - | B | Rel-11 | 11.0.1 | - | 29.212 modifications related to the introduction of Sd: Section 5b - Sd protocol AVPs | - | - | - | C3 | C3-63 | C3-111000 | Revised | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0635 | 1 | B | Rel-11 | 11.0.1 | - | 29.212 modifications related to the introduction of Sd: Section 5b - Sd protocol AVPs | - | - | - | C3 | C3-63 | C3-111164 | Revised | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0635 | 2 | B | Rel-11 | 11.0.1 | 11.1.0 | modifications related to the introduction of Sd: Section 5b - Sd protocol AVPs | CP-52 | CP-110423 | approved | C3 | C3-63 | C3-111168 | Agreed | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0636 | - | B | Rel-11 | 11.0.1 | - | 29.212 modifications related to the introduction of Sd: Section 5b - Sd messages | - | - | - | C3 | C3-63 | C3-111001 | Revised | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0636 | 1 | B | Rel-11 | 11.0.1 | - | 29.212 modifications related to the introduction of Sd: Section 5b - Sd messages | - | - | - | C3 | C3-63 | C3-111069 | Revised | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0636 | 2 | B | Rel-11 | 11.0.1 | 11.1.0 | modifications related to the introduction of Sd: Section 5b - Sd messages | CP-52 | CP-110423 | approved | C3 | C3-63 | C3-111166 | Agreed | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0637 | - | B | Rel-11 | 11.0.1 | - | TDF Application Identifier AVP | - | - | - | C3 | C3-63 | C3-111007 | Revised | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0637 | 1 | B | Rel-11 | 11.0.1 | - | TDF Application Identifier AVP | - | - | - | C3 | C3-63 | C3-111034 | Revised | 2011-06-01 | SAPP-CT3 | Merged into C3-110997 | 2011-06-01 |
0638 | - | B | Rel-11 | 11.0.1 | - | TDF Redirect Information | - | - | - | C3 | C3-63 | C3-111008 | Revised | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0638 | 1 | B | Rel-11 | 11.0.1 | - | TDF Redirect Information | - | - | - | C3 | C3-63 | C3-111035 | Withdrawn | 2011-06-01 | SAPP-CT3 | - | 2011-06-01 |
0639 | - | B | Rel-11 | 11.0.1 | - | TDF Protocol Support | - | - | - | C3 | C3-63 | C3-111009 | revised | 2011-06-01 | SAPP-CT3 | partly Merged into C3-111000 | 2011-06-01 |
0640 | - | F | Rel-9 | 9.6.1 | - | Bearer Control Mode for multiple PDN connections for 3GPP2 accesses | - | - | - | C3 | C3-63 | C3-111013 | Revised | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0640 | 1 | F | Rel-9 | 9.6.1 | - | Bearer Control Mode for multiple PDN connections for 3GPP2 accesses | - | - | - | C3 | C3-63 | C3-111151 | Revised | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0640 | 2 | F | Rel-9 | 9.6.1 | 9.7.0 | Bearer Control Mode for multiple PDN connections for 3GPP2 accesses | CP-52 | CP-110405 | approved | C3 | C3-63 | C3-111143 | Agreed | 2011-06-01 | PCC-Enh | Dependent on CRs 535/6/9 to 23.203 (S2) | 2011-06-01 |
0641 | - | A | Rel-10 | 10.2.1 | - | Bearer Control Mode for multiple PDN connections for 3GPP2 accesses | - | - | - | C3 | C3-63 | C3-111014 | Revised | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0641 | 1 | A | Rel-10 | 10.2.1 | - | Bearer Control Mode for multiple PDN connections for 3GPP2 accesses | - | - | - | C3 | C3-63 | C3-111152 | Revised | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0641 | 2 | A | Rel-10 | 10.2.1 | 10.3.0 | Bearer Control Mode for multiple PDN connections for 3GPP2 accesses | CP-52 | CP-110405 | approved | C3 | C3-63 | C3-111142 | Agreed | 2011-06-01 | PCC-Enh | Dependent on CRs 535/6/9 to 23.203 (S2) | 2011-06-01 |
0642 | - | A | Rel-11 | 11.0.1 | - | Bearer Control Mode for multiple PDN connections for 3GPP2 accesses | - | - | - | C3 | C3-63 | C3-111015 | Revised | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0642 | 1 | A | Rel-11 | 11.0.1 | - | Bearer Control Mode for multiple PDN connections for 3GPP2 accesses | - | - | - | C3 | C3-63 | C3-111153 | Revised | 2011-06-01 | PCC-Enh | - | 2011-06-01 |
0642 | 2 | A | Rel-11 | 11.0.1 | 11.1.0 | Bearer Control Mode for multiple PDN connections for 3GPP2 accesses | CP-52 | CP-110405 | approved | C3 | C3-63 | C3-111144 | Agreed | 2011-06-01 | PCC-Enh | Dependent on CRs 535/6/9 to 23.203 (S2) | 2011-06-01 |
0643 | - | F | Rel-8 | 8.11.1 | - | QoS-Negotiation and QoS-Upgrade on the Gx for GnGp SGSN (R8 29.212) | - | - | - | C3 | C3-63 | C3-111028 | Postponed | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0644 | - | A | Rel-9 | 9.6.1 | - | QoS-Negotiation and QoS-Upgrade on the Gx for GnGp SGSN (R9 29.212) | - | - | - | C3 | C3-63 | C3-111029 | Postponed | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0645 | - | A | Rel-10 | 10.2.1 | - | QoS-Negotiation and QoS-Upgrade on the Gx for GnGp SGSN (R10 29.212) | - | - | - | C3 | C3-63 | C3-111030 | Postponed | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0646 | - | A | Rel-11 | 11.0.1 | - | QoS-Negotiation and QoS-Upgrade on the Gx for GnGp SGSN (R11 29.212) | - | - | - | C3 | C3-63 | C3-111031 | Postponed | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0647 | - | F | Rel-8 | 8.11.1 | 8.12.0 | Pre-emption AVP for Bearer | CP-52 | CP-110396 | approved | C3 | C3-63 | C3-111058 | Agreed | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0648 | - | A | Rel-9 | 9.6.1 | 9.7.0 | Pre-emption AVP for Bearer | CP-52 | CP-110396 | approved | C3 | C3-63 | C3-111059 | Agreed | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0649 | - | A | Rel-8 | 8.11.1 | - | Pre-emption value for Default Bearer | - | - | - | C3 | C3-63 | C3-111146 | Postponed | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0649 | 1 | F | Rel-8 | 8.14.0 | - | Pre-emption Vulnerability for Default Bearer | CP-55 | CP-120058 | revised | C3 | C3-68 | C3-120003 | Agreed | 2012-02-22 | SAES-St3-PCC | cover sheet error | 2012-02-22 |
0649 | 2 | F | Rel-8 | 8.14.0 | 8.15.0 | Pre-emption Vulnerability for Default Bearer | CP-55 | CP-120200 | approved | C3 | - | C3-120003 | - | 2012-01-24 | SAES-St3-PCC | - | 2012-03-01 |
0650 | - | A | Rel-9 | 9.6.1 | - | Pre-emption value for Default Bearer | - | - | - | C3 | C3-63 | C3-111147 | Postponed | 2011-06-01 | SAES-St3-PCC | - | 2011-06-01 |
0650 | 1 | A | Rel-9 | 9.9.0 | - | Pre-emption Vulnerability for Default Bearer | CP-55 | CP-120058 | revised | C3 | C3-68 | C3-120004 | Agreed | 2012-02-22 | SAES-St3-PCC | cover sheet error | 2012-02-22 |
0650 | 2 | A | Rel-9 | 9.9.0 | 9.10.0 | Pre-emption Vulnerability for Default Bearer | CP-55 | CP-120200 | approved | C3 | - | C3-120004 | - | 2012-01-24 | SAES-St3-PCC | - | 2012-03-01 |
0651 | - | F | Rel-8 | 8.12.0 | 8.13.0 | Gn/Gp PGW internal bearer MBR mediation in relation to APN-AMBR | CP-53 | CP-110608 | approved | C3 | C3-65 | C3-111297 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0652 | - | A | Rel-9 | 9.7.0 | 9.8.0 | Gn/Gp PGW internal bearer MBR mediation in relation to APN-AMBR | CP-53 | CP-110608 | approved | C3 | C3-65 | C3-111298 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0653 | - | A | Rel-10 | 10.3.0 | 10.4.0 | Gn/Gp PGW internal bearer MBR mediation in relation to APN-AMBR | CP-53 | CP-110608 | approved | C3 | C3-65 | C3-111299 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0654 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Gn/Gp PGW internal bearer MBR mediation in relation to APN-AMBR | CP-53 | CP-110608 | approved | C3 | C3-65 | C3-111300 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0655 | - | F | Rel-8 | 8.12.0 | - | QoS Modification failure handling | - | - | - | C3 | C3-65 | C3-111306 | Revised | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0655 | 1 | F | Rel-8 | 8.12.0 | 8.13.0 | QoS Modification failure handling | CP-53 | CP-110608 | approved | C3 | C3-65 | C3-111558 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0656 | - | A | Rel-9 | 9.7.0 | - | QoS Modification failure handling | - | - | - | C3 | C3-65 | C3-111307 | Revised | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0656 | 1 | A | Rel-9 | 9.7.0 | 9.8.0 | QoS Modification failure handling | CP-53 | CP-110608 | approved | C3 | C3-65 | C3-111559 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0657 | - | A | Rel-10 | 10.3.0 | - | QoS Modification failure handling | - | - | - | C3 | C3-65 | C3-111308 | Revised | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0657 | 1 | A | Rel-10 | 10.3.0 | 10.4.0 | QoS Modification failure handling | CP-53 | CP-110608 | approved | C3 | C3-65 | C3-111560 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0658 | - | A | Rel-11 | 11.1.0 | - | QoS Modification failure handling | - | - | - | C3 | C3-65 | C3-111309 | Revised | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0658 | 1 | A | Rel-11 | 11.1.0 | 11.2.0 | QoS Modification failure handling | CP-53 | CP-110608 | approved | C3 | C3-65 | C3-111561 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0659 | - | B | Rel-11 | 11.1.0 | - | Unsolicited service reporting | - | - | - | C3 | C3-65 | C3-111310 | Postponed | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0660 | - | B | Rel-11 | 11.1.0 | - | Adding PS to CS session continuity indication for vSRVCC | - | - | - | C3 | C3-65 | C3-111314 | Revised | 2011-09-07 | vSRVCC-CT | - | 2011-09-08 |
0660 | 1 | B | Rel-11 | 11.1.0 | - | Adding PS to CS session continuity indication for vSRVCC | - | - | - | C3 | C3-65 | C3-111522 | Revised | 2011-09-07 | vSRVCC-CT | - | 2011-09-08 |
0660 | 2 | B | Rel-11 | 11.1.0 | 11.2.0 | Adding PS to CS session continuity indication for vSRVCC | CP-53 | CP-110624 | approved | C3 | C3-65 | C3-111631 | Agreed | 2011-09-07 | vSRVCC-CT | - | 2011-09-08 |
0661 | - | F | Rel-11 | 11.1.0 | - | Correcting terminology on service flow | - | - | - | C3 | C3-65 | C3-111315 | Revised | 2011-09-07 | PCC | - | 2011-09-08 |
0661 | 1 | F | Rel-11 | 11.1.0 | - | Correcting terminology on service flow | - | - | - | C3 | C3-65 | C3-111535 | Revised | 2011-09-07 | PCC | - | 2011-09-08 |
0661 | 2 | F | Rel-11 | 11.1.0 | 11.2.0 | Correcting terminology on service flow | CP-53 | CP-110627 | approved | C3 | C3-65 | C3-111599 | Agreed | 2011-09-07 | PCC | - | 2011-09-08 |
0662 | - | F | Rel-11 | 11.1.0 | - | Editorial cleanup in TS 29.212 | - | - | - | C3 | C3-65 | C3-111316 | Revised | 2011-09-07 | PCC | - | 2011-09-08 |
0662 | 1 | F | Rel-11 | 11.1.0 | 11.2.0 | Editorial cleanup in TS 29.212 | CP-53 | CP-110627 | approved | C3 | C3-65 | C3-111536 | Agreed | 2011-09-07 | PCC | - | 2011-09-08 |
0663 | - | F | Rel-11 | 11.1.0 | - | RAT type for xHRPD | - | - | - | C3 | C3-65 | C3-111330 | Postponed | 2011-09-07 | TEI11 | - | 2011-09-08 |
0664 | - | B | Rel-11 | 11.1.0 | - | Modifications for Gx procedures related to ADC Rules support | - | - | - | C3 | C3-65 | C3-111332 | Revised | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0664 | 1 | B | Rel-11 | 11.1.0 | - | Modifications for Gx procedures related to ADC Rules support | - | - | - | C3 | C3-65 | C3-111493 | Revised | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0664 | 2 | B | Rel-11 | 11.1.0 | 11.2.0 | Modifications for Gx procedures related to ADC Rules support | CP-53 | CP-110623 | approved | C3 | C3-65 | C3-111550 | Agreed | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0665 | - | F | Rel-11 | 11.1.0 | 11.2.0 | Gxx text correction with regard to Application Detection and Control feature | CP-53 | CP-110623 | approved | C3 | C3-65 | C3-111333 | Agreed | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0666 | - | B | Rel-11 | 11.1.0 | - | Sd procedures add/modifications | - | - | - | C3 | C3-65 | C3-111334 | Revised | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0666 | 1 | B | Rel-11 | 11.1.0 | - | Sd procedures add/modifications | - | - | - | C3 | C3-65 | C3-111494 | Revised | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0666 | 2 | B | Rel-11 | 11.1.0 | 11.2.0 | Sd procedures add/modifications | CP-53 | CP-110623 | approved | C3 | C3-65 | C3-111574 | Agreed | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0667 | - | B | Rel-11 | 11.1.0 | - | Gx AVPs and messages adds/modifications related to Application Detection and Control feature | - | - | - | C3 | C3-65 | C3-111335 | Revised | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0667 | 1 | B | Rel-11 | 11.1.0 | 11.2.0 | Gx AVPs and messages adds/modifications related to Application Detection and Control feature | CP-53 | CP-110623 | approved | C3 | C3-65 | C3-111495 | Agreed | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0668 | - | B | Rel-11 | 11.1.0 | - | Sd AVPs and messages adds/modifications | - | - | - | C3 | C3-65 | C3-111336 | Revised | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0668 | 1 | B | Rel-11 | 11.1.0 | - | Sd AVPs and messages adds/modifications | - | - | - | C3 | C3-65 | C3-111496 | Revised | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0668 | 2 | B | Rel-11 | 11.1.0 | - | LS on TFT operation on S4-SGSN | - | - | - | C3 | C3-65 | C3-111549 | agreed | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0668 | 2 | B | Rel-11 | 11.1.0 | 11.2.0 | Sd AVPs and messages adds/modifications | CP-53 | CP-110623 | approved | C3 | C3-65 | C3-111597 | Agreed | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0669 | - | F | Rel-11 | 11.1.0 | 11.2.0 | ADC event triggers not used over Gxx (R11 29.212) | CP-53 | CP-110623 | approved | C3 | C3-65 | C3-111376 | Agreed | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0670 | - | F | Rel-11 | .. | - | PCRF addressing for TDF (R11 29.213) | - | - | - | C3 | C3-65 | C3-111377 | Withdrawn | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0671 | - | F | Rel-11 | 11.1.0 | - | Scope of application start and stop event (R11 29.212) | - | - | - | C3 | C3-65 | C3-111378 | Revised | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0671 | 1 | F | Rel-11 | 11.1.0 | 11.2.0 | Scope of application start and stop event (R11 29.212) | CP-53 | CP-110623 | approved | C3 | C3-65 | C3-111497 | Agreed | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0672 | - | F | Rel-11 | 11.1.0 | - | TDF and Sd functionalities over S9 (R11 29.215) | - | - | - | C3 | C3-65 | C3-111379 | Revised | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0672 | 1 | F | Rel-11 | 11.1.0 | - | TDF and Sd functionalities over S9 (R11 29.215) | - | - | - | C3 | C3-65 | C3-111532 | Withdrawn | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0673 | - | F | Rel-11 | .. | - | URL categories for ADC rule (R11 29 212) | - | - | - | C3 | C3-65 | C3-111380 | Postponed | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0674 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Correcting the value of CHARGING_CORRELATION_EXCHANGE (R9 29.212) | CP-53 | CP-110614 | approved | C3 | C3-65 | C3-111381 | Agreed | 2011-09-07 | PCC-Enh | - | 2011-09-08 |
0675 | - | A | Rel-10 | 10.3.0 | 10.4.0 | Correcting the value of CHARGING_CORRELATION_EXCHANGE (R10 29.212) | CP-53 | CP-110614 | approved | C3 | C3-65 | C3-111382 | Agreed | 2011-09-07 | PCC-Enh | - | 2011-09-08 |
0676 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Correcting the value of CHARGING_CORRELATION_EXCHANGE (R11 29.212) | CP-53 | CP-110614 | approved | C3 | C3-65 | C3-111383 | Agreed | 2011-09-07 | PCC-Enh | - | 2011-09-08 |
0677 | - | F | Rel-8 | 8.12.0 | - | TFT operation when GnGp SGSN accesses to PGW (R8 29.212) | - | - | - | C3 | C3-65 | C3-111385 | Postponed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0678 | - | A | Rel-9 | 9.7.0 | - | TFT operation when GnGp SGSN accesses to PGW (R9 29.212) | - | - | - | C3 | C3-65 | C3-111386 | Postponed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0679 | - | A | Rel-10 | 10.3.0 | - | TFT operation when GnGp SGSN accesses to PGW (R10 29.212) | - | - | - | C3 | C3-65 | C3-111387 | Postponed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0680 | - | A | Rel-11 | .. | - | TFT operation when GnGp SGSN accesses to PGW (R11 29.212) | - | - | - | C3 | C3-65 | C3-111388 | Postponed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0681 | - | F | Rel-8 | 8.12.0 | - | PCC rule error handling procedure (R8 29.212) | - | - | - | C3 | C3-65 | C3-111389 | Withdrawn | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0682 | - | A | Rel-9 | 9.7.0 | - | PCC rule error handling procedure (R9 29.212) | - | - | - | C3 | C3-65 | C3-111390 | Withdrawn | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0683 | - | A | Rel-10 | 10.3.0 | - | PCC rule error handling procedure (R10 29.212) | - | - | - | C3 | C3-65 | C3-111391 | Withdrawn | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0684 | - | A | Rel-11 | 11.1.0 | - | PCC rule error handling procedure (R11 29.212) | - | - | - | C3 | C3-65 | C3-111392 | Revised | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0684 | 1 | F | Rel-11 | 11.1.0 | - | PCC rule error handling procedure | CP-53 | CP-110628 | revised | C3 | - | C3-111563 | - | 2011-08-26 | SAES-St3-PCC | - | 2011-09-15 |
0684 | 1 | F | Rel-11 | 11.1.0 | 11.2.0 | PCC rule error handling procedure (R11 29.212) | CP-53 | CP-110701 | approved | C3 | C3-65 | C3-111563 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0685 | - | F | Rel-10 | 10.3.0 | - | MPS Identifier over Gx interface (R10 29.212) | - | - | - | C3 | C3-65 | C3-111393 | Withdrawn | 2011-09-07 | PCC-Enh | - | 2011-09-08 |
0686 | - | A | Rel-11 | .. | - | MPS Identifier over Gx interface (R11 29.212) | - | - | - | C3 | C3-65 | C3-111394 | Withdrawn | 2011-09-07 | PCC-Enh | - | 2011-09-08 |
0687 | - | F | Rel-10 | 10.3.0 | - | PCC rule activation time (R10 29.212) | - | - | - | C3 | C3-65 | C3-111395 | Revised | 2011-09-07 | PCC-Enh | - | 2011-09-08 |
0687 | 1 | F | Rel-10 | 10.3.0 | - | PCC rule activation time (R10 29.212) | - | - | - | C3 | C3-65 | C3-111572 | Postponed | 2011-09-07 | PCC-Enh | - | 2011-09-08 |
0688 | - | A | Rel-11 | .. | - | PCC rule activation time (R11 29.212) | - | - | - | C3 | C3-65 | C3-111396 | Revised | 2011-09-07 | PCC-Enh | - | 2011-09-08 |
0688 | 1 | A | Rel-11 | .. | - | PCC rule activation time (R11 29.212) | - | - | - | C3 | C3-65 | C3-111573 | Postponed | 2011-09-07 | PCC-Enh | - | 2011-09-08 |
0689 | - | B | Rel-11 | .. | - | Unsolicited Service Reporting point | - | - | - | C3 | C3-65 | C3-111406 | Postponed | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0690 | - | B | Rel-11 | .. | - | Suppression of ADC rules reporting for the unsolicited reporting case | - | - | - | C3 | C3-65 | C3-111407 | Postponed | 2011-09-07 | SAPP-CT3 | - | 2011-09-08 |
0691 | - | A | Rel-9 | 9.7.0 | - | TFT Modification correction | - | - | - | C3 | C3-65 | C3-111426 | Withdrawn | 2011-09-07 | PCC | - | 2011-09-08 |
0692 | - | A | Rel-10 | 10.3.0 | - | TFT Modification correction | - | - | - | C3 | C3-65 | C3-111427 | Withdrawn | 2011-09-07 | PCC | - | 2011-09-08 |
0693 | - | F | Rel-11 | 11.1.0 | - | TFT Modification correction | - | - | - | C3 | C3-65 | C3-111428 | Withdrawn | 2011-09-07 | PCC | - | 2011-09-08 |
0694 | - | F | Rel-8 | 8.12.0 | 8.13.0 | Correction to the architecture figure(Rel-8) | CP-53 | CP-110608 | approved | C3 | C3-65 | C3-111429 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0695 | - | A | Rel-9 | 9.7.0 | 9.8.0 | Correction to the architecture figure(Rel-9) | CP-53 | CP-110608 | approved | C3 | C3-65 | C3-111430 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0696 | - | A | Rel-10 | 10.3.0 | 10.4.0 | Correction to the architecture figure(Rel-10) | CP-53 | CP-110608 | approved | C3 | C3-65 | C3-111431 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0697 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Correction to the architecture figure(Rel-11) | CP-53 | CP-110608 | approved | C3 | C3-65 | C3-111432 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0698 | - | F | Rel-8 | 8.12.0 | - | Usage limitation of the deferred PCC&QoS rule (Rel-8) | - | - | - | C3 | C3-65 | C3-111433 | Revised | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0698 | 1 | F | Rel-8 | 8.12.0 | 8.13.0 | Usage limitation of the deferred PCC&QoS rule (Rel-8) | CP-53 | CP-110608 | approved | C3 | C3-65 | C3-111564 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0699 | - | A | Rel-9 | 9.7.0 | - | Usage limitation of the deferred PCC&QoS rule (Rel-9) | - | - | - | C3 | C3-65 | C3-111434 | Revised | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0699 | 1 | A | Rel-9 | 9.7.0 | 9.8.0 | Usage limitation of the deferred PCC&QoS rule (Rel-9) | CP-53 | CP-110608 | approved | C3 | C3-65 | C3-111565 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0700 | - | A | Rel-10 | 10.3.0 | - | Usage limitation of the deferred PCC&QoS rule (Rel-10) | - | - | - | C3 | C3-65 | C3-111435 | Revised | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0700 | 1 | A | Rel-10 | 10.3.0 | 10.4.0 | Usage limitation of the deferred PCC&QoS rule (Rel-10) | CP-53 | CP-110608 | approved | C3 | C3-65 | C3-111566 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0701 | - | A | Rel-11 | 11.1.0 | - | Usage limitation of the deferred PCC&QoS rule (Rel-11) | - | - | - | C3 | C3-65 | C3-111436 | Revised | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0701 | 1 | A | Rel-11 | 11.1.0 | 11.2.0 | Usage limitation of the deferred PCC&QoS rule (Rel-11) | CP-53 | CP-110608 | approved | C3 | C3-65 | C3-111567 | Agreed | 2011-09-07 | SAES-St3-PCC | - | 2011-09-08 |
0702 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Reintroduce provisioning of CSG information reporting indication(Rel-9) | CP-53 | CP-110614 | approved | C3 | C3-65 | C3-111445 | Agreed | 2011-09-07 | PCC-Enh | - | 2011-09-08 |
0703 | - | A | Rel-10 | 10.3.0 | 10.4.0 | Reintroduce provisioning of CSG information reporting indication(Rel-9) | CP-53 | CP-110614 | approved | C3 | C3-65 | C3-111446 | Agreed | 2011-09-07 | PCC-Enh | - | 2011-09-08 |
0704 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Reintroduce provisioning of CSG information reporting indication(Rel-9) | CP-53 | CP-110614 | approved | C3 | C3-65 | C3-111447 | Agreed | 2011-09-07 | PCC-Enh | - | 2011-09-08 |
0705 | - | F | Rel-9 | 9.8.0 | - | Alignment of PCC reference architecture with Stage 2 specification | CP-54 | CP-110830 | revised | C3 | C3-67 | C3-111671 | Agreed | 2011-12-02 | PCC-Enh | Conditional on SA CRs (see C3 status report for details) | 2011-12-04 |
0705 | 1 | F | Rel-9 | 9.8.0 | 9.9.0 | Alignment of PCC reference architecture with Stage 2 specification | CP-54 | CP-110935 | approved | C3 | - | C3-111671 | - | 2011-12-08 | PCC-Enh | - | 2011-12-08 |
0706 | - | A | Rel-10 | 10.4.0 | - | Alignment of PCC reference architecture with Stage 2 specification | CP-54 | CP-110830 | revised | C3 | C3-67 | C3-111672 | Agreed | 2011-12-02 | PCC-Enh | Conditional on SA CRs (see C3 status report for details) | 2011-12-04 |
0706 | 1 | A | Rel-10 | 10.4.0 | 10.5.0 | Alignment of PCC reference architecture with Stage 2 specification | CP-54 | CP-110935 | approved | C3 | - | C3-111672 | - | 2011-12-08 | PCC-Enh | - | 2011-12-08 |
0707 | - | A | Rel-11 | 11.2.0 | - | Alignment of PCC reference architecture with Stage 2 specification | CP-54 | CP-110830 | revised | C3 | C3-67 | C3-111673 | Agreed | 2011-12-02 | PCC-Enh | Conditional on SA CRs (see C3 status report for details) | 2011-12-04 |
0707 | 1 | A | Rel-11 | 11.2.0 | 11.3.0 | Alignment of PCC reference architecture with Stage 2 specification | CP-54 | CP-110935 | approved | C3 | - | C3-111673 | - | 2011-12-08 | PCC-Enh | - | 2011-12-08 |
0708 | - | B | Rel-11 | 11.2.0 | - | Addition of Unsolicited Application Reporting from TDF | - | - | - | C3 | C3-67 | C3-111684 | Revised | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0708 | 1 | B | Rel-11 | 11.2.0 | - | Addition of Unsolicited Application Reporting from TDF | - | - | - | C3 | C3-67 | C3-111932 | Revised | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0708 | 2 | B | Rel-11 | 11.2.0 | - | Addition of Unsolicited Application Reporting from TDF | - | - | - | C3 | C3-67 | C3-112047 | Revised | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0708 | 3 | B | Rel-11 | 11.2.0 | - | Addition of Unsolicited Application Reporting from TDF | - | - | - | C3 | C3-67 | C3-112065 | Revised | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0708 | 4 | B | Rel-11 | 11.2.0 | 11.3.0 | Addition of Unsolicited Application Reporting from TDF | CP-54 | CP-110838 | approved | C3 | C3-67 | C3-112084 | Agreed | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0709 | - | F | Rel-11 | 11.2.0 | - | Editorial correction to the definition of APPLICATION START and APPLICATION STOP event triggers | - | - | - | C3 | C3-67 | C3-111685 | Revised | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0709 | 1 | F | Rel-11 | 11.2.0 | - | Editorial correction to the definition of APPLICATION START and APPLICATION STOP event triggers | - | - | - | C3 | C3-67 | C3-111934 | Revised | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0709 | 2 | F | Rel-11 | 11.2.0 | 11.3.0 | Use of APPLICATION START and APPLICATION STOP event triggers for unsolicited application reporting | CP-54 | CP-110838 | approved | C3 | C3-67 | C3-112054 | Agreed | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0710 | - | B | Rel-11 | .. | - | Addition of new Event Trigger specific for the unsolicited ADC to suppress only notification … | - | - | - | C3 | C3-67 | C3-111686 | Revised | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0710 | 1 | B | Rel-11 | .. | - | Addition of new Event Trigger specific for the unsolicited ADC to suppress only notification … | - | - | - | C3 | C3-67 | C3-111935 | Withdrawn | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0711 | - | F | Rel-8 | 8.13.0 | 8.14.0 | Corrections in AVP and Command definitions | CP-54 | CP-110827 | approved | C3 | C3-67 | C3-111757 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0712 | - | F | Rel-9 | 9.8.0 | - | Corrections in AVP and Command definitions | - | - | - | C3 | C3-67 | C3-111758 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0712 | 1 | A | Rel-9 | 9.8.0 | 9.9.0 | Corrections in AVP and Command definitions | CP-54 | CP-110827 | approved | C3 | C3-67 | C3-111915 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0713 | - | A | Rel-10 | 10.4.0 | 10.5.0 | Corrections in AVP and Command definitions | CP-54 | CP-110827 | approved | C3 | C3-67 | C3-111759 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0714 | - | F | Rel-11 | 11.2.0 | - | Corrections in AVP and Command definitions | - | - | - | C3 | C3-67 | C3-111760 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0714 | 1 | A | Rel-11 | 11.2.0 | 11.3.0 | Corrections in AVP and Command definitions | CP-54 | CP-110827 | approved | C3 | C3-67 | C3-111916 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0715 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Corrections in AVPnames | CP-54 | CP-110845 | approved | C3 | C3-67 | C3-111761 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0716 | - | C | Rel-11 | 11.2.0 | - | Additinal parameters/event triggers support for location information transferred to TDF and Editor's notes removals | - | - | - | C3 | C3-67 | C3-111763 | Revised | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0716 | 1 | B | Rel-11 | 11.2.0 | 11.3.0 | Additinal parameters/event triggers support for location information transferred to TDF and Editor's notes removals | CP-54 | CP-110838 | approved | C3 | C3-67 | C3-112037 | Agreed | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0717 | - | F | Rel-8 | 8.13.0 | - | QoS-Negotiation and QoS-Upgrade on the Gx for 3GPP-EPS access type (R8 29.212) | - | - | - | C3 | C3-67 | C3-111774 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0717 | 1 | F | Rel-8 | 8.13.0 | 8.14.0 | QoS-Negotiation and QoS-Upgrade on the Gx for 3GPP-EPS access type (R8 29.212) | CP-54 | CP-110827 | approved | C3 | C3-67 | C3-111987 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0718 | - | A | Rel-9 | 9.8.0 | - | QoS-Negotiation and QoS-Upgrade on the Gx for 3GPP-EPS access type (R9 29.212) | - | - | - | C3 | C3-67 | C3-111775 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0718 | 1 | A | Rel-9 | 9.8.0 | 9.9.0 | QoS-Negotiation and QoS-Upgrade on the Gx for 3GPP-EPS access type (R9 29.212) | CP-54 | CP-110827 | approved | C3 | C3-67 | C3-111988 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0719 | - | A | Rel-10 | 10.4.0 | - | QoS-Negotiation and QoS-Upgrade on the Gx for 3GPP-EPS access type (R10 29.212) | - | - | - | C3 | C3-67 | C3-111776 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0719 | 1 | A | Rel-10 | 10.4.0 | 10.5.0 | QoS-Negotiation and QoS-Upgrade on the Gx for 3GPP-EPS access type (R10 29.212) | CP-54 | CP-110827 | approved | C3 | C3-67 | C3-111989 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0720 | - | A | Rel-11 | 11.2.0 | - | QoS-Negotiation and QoS-Upgrade on the Gx for 3GPP-EPS access type (R11 29.212) | - | - | - | C3 | C3-67 | C3-111777 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0720 | 1 | A | Rel-11 | 11.2.0 | 11.3.0 | QoS-Negotiation and QoS-Upgrade on the Gx for 3GPP-EPS access type (R11 29.212) | CP-54 | CP-110827 | approved | C3 | C3-67 | C3-111990 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0721 | - | F | Rel-9 | 9.8.0 | - | The Scope of the Monitoring Key (R9 29.212) | - | - | - | C3 | C3-67 | C3-111778 | Revised | 2011-12-02 | PCC-Enh | - | 2011-12-04 |
0721 | 1 | F | Rel-9 | 9.8.0 | - | The Scope of the Monitoring Key (R9 29.212) | - | - | - | C3 | C3-67 | C3-112004 | Revised | 2011-12-02 | PCC-Enh | - | 2011-12-04 |
0721 | 2 | F | Rel-9 | 9.8.0 | - | The Scope of the Monitoring Key (R9 29.212) | - | - | - | C3 | C3-67 | C3-112120 | Revised | 2011-12-02 | PCC-Enh | - | 2011-12-04 |
0721 | 3 | F | Rel-9 | 9.8.0 | - | The Scope of the Monitoring Key (R9 29.212) | CP-54 | CP-110830 | revised | C3 | C3-67 | C3-112133 | Agreed | 2011-12-02 | PCC-Enh | - | 2011-12-04 |
0721 | 3 | F | Rel-9 | 9.8.0 | 9.9.0 | The Scope of the Monitoring Key | CP-54 | CP-110935 | approved | C3 | - | C3-112133 | - | 2011-11-18 | PCC-Enh | - | 2011-12-08 |
0722 | - | A | Rel-10 | 10.4.0 | - | The Scope of the Monitoring Key (R10 29.212) | - | - | - | C3 | C3-67 | C3-111779 | Revised | 2011-12-02 | PCC-Enh | - | 2011-12-04 |
0722 | 1 | A | Rel-10 | 10.4.0 | - | The Scope of the Monitoring Key (R10 29.212) | - | - | - | C3 | C3-67 | C3-112005 | Revised | 2011-12-02 | PCC-Enh | - | 2011-12-04 |
0722 | 2 | A | Rel-10 | 10.4.0 | - | The Scope of the Monitoring Key (R10 29.212) | CP-54 | CP-110830 | revised | C3 | C3-67 | C3-112134 | Agreed | 2011-12-02 | PCC-Enh | - | 2011-12-04 |
0722 | 2 | A | Rel-10 | 10.4.0 | 10.5.0 | The Scope of the Monitoring Key | CP-54 | CP-110935 | approved | C3 | - | C3-112134 | - | 2011-11-18 | PCC-Enh | - | 2011-12-08 |
0723 | - | A | Rel-11 | 11.2.0 | - | The Scope of the Monitoring Key (R11 29.212) | - | - | - | C3 | C3-67 | C3-111780 | Revised | 2011-12-02 | PCC-Enh | - | 2011-12-04 |
0723 | 1 | A | Rel-11 | 11.2.0 | - | The Scope of the Monitoring Key (R11 29.212) | - | - | - | C3 | C3-67 | C3-112006 | Revised | 2011-12-02 | PCC-Enh | - | 2011-12-04 |
0723 | 2 | A | Rel-11 | 11.2.0 | - | The Scope of the Monitoring Key (R11 29.212) | - | - | - | C3 | C3-67 | C3-112135 | Postponed | 2011-12-02 | PCC-Enh | - | 2011-12-04 |
0724 | - | F | Rel-10 | 10.4.0 | - | Providing the Packet-Filter-Identifier AVP to the PCEF (R10 29.212) | - | - | - | C3 | C3-67 | C3-111781 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0724 | 1 | F | Rel-10 | 10.4.0 | - | Providing the Packet-Filter-Identifier AVP to the PCEF (R10 29.212) | - | - | - | C3 | C3-67 | C3-112007 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0724 | 2 | F | Rel-10 | 10.4.0 | 10.5.0 | Providing the Packet-Filter-Identifier AVP to the PCEF (R10 29.212) | CP-54 | CP-110832 | approved | C3 | C3-67 | C3-112107 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0725 | - | A | Rel-11 | 11.2.0 | - | Providing the Packet-Filter-Identifier AVP to the PCEF (R11 29.212) | - | - | - | C3 | C3-67 | C3-111782 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0725 | 1 | A | Rel-11 | 11.2.0 | 11.3.0 | Providing the Packet-Filter-Identifier AVP to the PCEF (R11 29.212) | CP-54 | CP-110832 | approved | C3 | C3-67 | C3-112008 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0726 | - | F | Rel-11 | 11.2.0 | - | Precedence Mapping in the PCEF (R11 29.212) | - | - | - | C3 | C3-67 | C3-111784 | Postponed | 2011-12-02 | PCC | - | 2011-12-04 |
0727 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Modify Diameter AVP code values for Gx Protocol(R11 29 212) | CP-54 | CP-110838 | approved | C3 | C3-67 | C3-111786 | Agreed | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0728 | - | F | Rel-11 | 11.2.0 | - | URL categories for ADC rule (R11 29 212) | - | - | - | C3 | C3-67 | C3-111787 | Revised | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0728 | 1 | F | Rel-11 | 11.2.0 | - | URL categories for ADC rule (R11 29 212) | - | - | - | C3 | C3-67 | C3-112038 | Revised | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0728 | 2 | F | Rel-11 | 11.2.0 | 11.3.0 | URL categories for ADC rule (R11 29 212) | CP-54 | CP-110838 | approved | C3 | C3-67 | C3-112066 | Agreed | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0729 | - | F | Rel-11 | 11.2.0 | - | Solicited application reporting (R11 29.212) | - | - | - | C3 | C3-67 | C3-111788 | Revised | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0729 | 1 | F | Rel-11 | 11.2.0 | - | Solicited application reporting (R11 29.212) | - | - | - | C3 | C3-67 | C3-112039 | Revised | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0729 | 2 | F | Rel-11 | 11.2.0 | 11.3.0 | Solicited application reporting (R11 29.212) | CP-54 | CP-110838 | approved | C3 | C3-67 | C3-112101 | Agreed | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0730 | - | B | Rel-11 | 11.2.0 | - | BBF Access Interworking Reference Architecture and Points (R11 29.212) | - | - | - | C3 | C3-67 | C3-111797 | Revised | 2011-12-02 | BBAI_BBI-CT | - | 2011-12-04 |
0730 | 1 | B | Rel-11 | 11.2.0 | 11.3.0 | BBF Access Interworking Reference Architecture and Points (R11 29.212) | CP-54 | CP-110843 | approved | C3 | C3-67 | C3-112079 | Agreed | 2011-12-02 | BBAI_BBI-CT | - | 2011-12-04 |
0731 | - | B | Rel-11 | 11.2.0 | - | PCC Procedures over S9a reference point (R11 29.212) | - | - | - | C3 | C3-67 | C3-111800 | Revised | 2011-12-02 | BBAI_BBI-CT | - | 2011-12-04 |
0731 | 1 | B | Rel-11 | 11.2.0 | - | PCC Procedures over S9a reference point (R11 29.212) | - | - | - | C3 | C3-67 | C3-112083 | Revised | 2011-12-02 | BBAI_BBI-CT | - | 2011-12-04 |
0731 | 2 | B | Rel-11 | 11.2.0 | 11.3.0 | PCC Procedures over S9a reference point (R11 29.212) | CP-54 | CP-110843 | approved | C3 | C3-67 | C3-112124 | Agreed | 2011-12-02 | BBAI_BBI-CT | - | 2011-12-04 |
0732 | - | B | Rel-11 | 11.2.0 | - | Message and AVP definition for S9a (R11 29.212) | - | - | - | C3 | C3-67 | C3-111801 | Postponed | 2011-12-02 | BBAI_BBI-CT | - | 2011-12-04 |
0733 | - | F | Rel-8 | 8.13.0 | - | ToD PCC Rules and QoS Rules handling | - | - | - | C3 | C3-67 | C3-111818 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0733 | 1 | F | Rel-8 | 8.13.0 | 8.14.0 | ToD PCC Rules and QoS Rules handling | CP-54 | CP-110827 | approved | C3 | C3-67 | C3-111983 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0734 | - | A | Rel-9 | 9.8.0 | - | ToD PCC Rules and QoS Rules handling | - | - | - | C3 | C3-67 | C3-111819 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0734 | 1 | A | Rel-9 | 9.8.0 | 9.9.0 | ToD PCC Rules and QoS Rules handling | CP-54 | CP-110827 | approved | C3 | C3-67 | C3-111984 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0735 | - | A | Rel-10 | 10.4.0 | - | ToD PCC Rules and QoS Rules handling | - | - | - | C3 | C3-67 | C3-111820 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0735 | 1 | A | Rel-10 | 10.4.0 | 10.5.0 | ToD PCC Rules and QoS Rules handling | CP-54 | CP-110827 | approved | C3 | C3-67 | C3-111985 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0736 | - | A | Rel-11 | 11.2.0 | - | ToD PCC Rules and QoS Rules handling | - | - | - | C3 | C3-67 | C3-111821 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0736 | 1 | A | Rel-11 | 11.2.0 | 11.3.0 | ToD PCC Rules and QoS Rules handling | CP-54 | CP-110827 | approved | C3 | C3-67 | C3-111986 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0737 | - | F | Rel-11 | 11.2.0 | - | Correction on supported features handling in Gx | - | - | - | C3 | C3-67 | C3-111836 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0737 | 1 | F | Rel-11 | 11.2.0 | 11.3.0 | Correction on supported features handling in Gx | CP-54 | CP-110845 | approved | C3 | C3-67 | C3-112009 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0738 | - | B | Rel-11 | 11.2.0 | - | Unsolicited service reporting | - | - | - | C3 | C3-67 | C3-111838 | Revised | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0738 | 1 | B | Rel-11 | 11.2.0 | - | Unsolicited service reporting | - | - | - | C3 | C3-67 | C3-111937 | Withdrawn | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0739 | - | B | Rel-11 | 11.2.0 | - | Redirection Address Handling | - | - | - | C3 | C3-67 | C3-111842 | Revised | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0739 | 1 | B | Rel-11 | 11.2.0 | 11.3.0 | Redirection Address Handling | CP-54 | CP-110838 | approved | C3 | C3-67 | C3-112041 | Agreed | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0740 | - | B | Rel-11 | 11.2.0 | - | ToD ADC Rules handling | - | - | - | C3 | C3-67 | C3-111845 | Revised | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0740 | 1 | B | Rel-11 | 11.2.0 | 11.3.0 | ToD ADC Rules handling | CP-54 | CP-110838 | approved | C3 | C3-67 | C3-112042 | Agreed | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0741 | - | B | Rel-11 | 11.2.0 | - | New annex to define fixed broadband access interworking with EPC | - | - | - | C3 | C3-67 | C3-111847 | Revised | 2011-12-02 | BBAI_BBI-CT | - | 2011-12-04 |
0741 | 1 | B | Rel-11 | 11.2.0 | - | New annex to define fixed broadband access interworking with EPC | - | - | - | C3 | C3-67 | C3-112073 | Revised | 2011-12-02 | BBAI_BBI-CT | - | 2011-12-04 |
0741 | 2 | B | Rel-11 | 11.2.0 | 11.3.0 | New annex to define fixed broadband access interworking with EPC | CP-54 | CP-110843 | approved | C3 | C3-67 | C3-112125 | Agreed | 2011-12-02 | BBAI_BBI-CT | - | 2011-12-04 |
0742 | - | B | Rel-11 | 11.2.0 | - | Definition of functional entities | - | - | - | C3 | C3-67 | C3-111848 | Revised | 2011-12-02 | BBAI_BBI-CT | - | 2011-12-04 |
0742 | 1 | B | Rel-11 | 11.2.0 | 11.3.0 | Definition of functional entities | CP-54 | CP-110843 | approved | C3 | C3-67 | C3-112078 | Agreed | 2011-12-02 | BBAI_BBI-CT | - | 2011-12-04 |
0743 | - | F | Rel-8 | 8.13.0 | - | Correction to the usage of Even-Report-Indication(Rel-8) | - | - | - | C3 | C3-67 | C3-111854 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0743 | 1 | F | Rel-8 | 8.13.0 | 8.14.0 | Correction to the usage of Even-Report-Indication(Rel-8) | CP-54 | CP-110827 | approved | C3 | C3-67 | C3-111991 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0744 | - | A | Rel-9 | 9.8.0 | - | Correction to the usage of Even-Report-Indication(Rel-9) | - | - | - | C3 | C3-67 | C3-111855 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0744 | 1 | A | Rel-9 | 9.8.0 | 9.9.0 | Correction to the usage of Even-Report-Indication(Rel-9) | CP-54 | CP-110827 | approved | C3 | C3-67 | C3-111992 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0745 | - | A | Rel-10 | 10.4.0 | - | Correction to the usage of Even-Report-Indication(Rel-10) | - | - | - | C3 | C3-67 | C3-111856 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0745 | 1 | A | Rel-10 | 10.4.0 | 10.5.0 | Correction to the usage of Even-Report-Indication(Rel-10) | CP-54 | CP-110827 | approved | C3 | C3-67 | C3-111993 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0746 | - | A | Rel-11 | 11.2.0 | - | Correction to the usage of Even-Report-Indication(Rel-11) | - | - | - | C3 | C3-67 | C3-111857 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0746 | 1 | A | Rel-11 | 11.2.0 | 11.3.0 | Correction to the usage of Even-Report-Indication(Rel-11) | CP-54 | CP-110827 | approved | C3 | C3-67 | C3-111994 | Agreed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0747 | - | F | Rel-8 | 8.13.0 | - | Complemention of deferred rules update(Rel-8) | - | - | - | C3 | C3-67 | C3-111858 | Postponed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0748 | - | A | Rel-9 | 9.8.0 | - | Complemention of deferred rules update (Rel-9) | - | - | - | C3 | C3-67 | C3-111859 | Postponed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0749 | - | A | Rel-10 | 10.4.0 | - | Complemention of deferred rules update(Rel-10) | - | - | - | C3 | C3-67 | C3-111860 | Postponed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0750 | - | A | Rel-11 | 11.2.0 | - | Complemention of deferred rules update(Rel-11) | - | - | - | C3 | C3-67 | C3-111861 | Postponed | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0751 | - | F | Rel-8 | 8.13.0 | - | Correction to deferred rules activation and deactivation (Rel-8) | - | - | - | C3 | C3-67 | C3-111862 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0752 | - | A | Rel-9 | 9.8.0 | - | Correction to deferred rules activation and deactivation (Rel-9) | - | - | - | C3 | C3-67 | C3-111863 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0753 | - | A | Rel-10 | 10.4.0 | - | Correction to deferred rules activation and deactivation (Rel-10) | - | - | - | C3 | C3-67 | C3-111864 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0754 | - | A | Rel-11 | 11.2.0 | - | Correction to deferred rules activation and deactivation (Rel-11) | - | - | - | C3 | C3-67 | C3-111865 | Revised | 2011-12-02 | SAES-St3-PCC | - | 2011-12-04 |
0755 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Clarification of application detection by using ADC rule | CP-54 | CP-110838 | approved | C3 | C3-67 | C3-111874 | Agreed | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0756 | - | F | Rel-11 | 11.2.0 | - | Several corrections for SAPP | - | - | - | C3 | C3-67 | C3-111875 | Revised | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0756 | 1 | F | Rel-11 | 11.2.0 | 11.3.0 | Several corrections for SAPP | CP-54 | CP-110838 | approved | C3 | C3-67 | C3-112049 | Agreed | 2011-12-02 | SAPP-CT3 | - | 2011-12-04 |
0757 | - | B | Rel-11 | 11.2.0 | - | Bearer binding for vSRVCC(29.212) | - | - | - | C3 | C3-67 | C3-111887 | Revised | 2011-12-02 | vSRVCC-CT | - | 2011-12-04 |
0757 | 1 | B | Rel-11 | 11.2.0 | 11.3.0 | Bearer binding for vSRVCC(29.212) | CP-54 | CP-110840 | approved | C3 | C3-67 | C3-112072 | Agreed | 2011-12-02 | vSRVCC-CT | - | 2011-12-04 |
0758 | - | B | Rel-11 | 11.2.0 | - | Definition and abbreviations for BBAI annex | - | - | - | C3 | C3-67 | C3-111889 | Revised | 2011-12-02 | BBAI_BBI-CT | - | 2011-12-04 |
0758 | 1 | B | Rel-11 | 11.2.0 | 11.3.0 | Definition and abbreviations for BBAI annex | CP-54 | CP-110843 | approved | C3 | C3-67 | C3-112077 | Agreed | 2011-12-02 | BBAI_BBI-CT | - | 2011-12-04 |
0759 | - | B | Rel-11 | 11.2.0 | - | Reference points and architecture for BBAI annex | - | - | - | C3 | C3-67 | C3-111890 | Revised | 2011-12-02 | BBAI_BB1_CT | - | 2011-12-04 |
0760 | - | F | Rel-8 | 8.14.0 | - | Access-Network-Charging-Identifier-Gx AVP for pre-defined PCC rule (R8 29.212) | - | - | - | C3 | C3-68 | C3-120011 | Withdrawn | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0761 | - | A | Rel-9 | 9.9.0 | - | Access-Network-Charging-Identifier-Gx AVP for pre-defined PCC rule (R9 29.212) | - | - | - | C3 | C3-68 | C3-120012 | Postponed | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0762 | - | A | Rel-10 | 10.5.0 | - | Access-Network-Charging-Identifier-Gx AVP for pre-defined PCC rule (R10 29.212) | - | - | - | C3 | C3-68 | C3-120013 | Postponed | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0763 | - | A | Rel-11 | 11.3.0 | - | Access-Network-Charging-Identifier-Gx AVP for pre-defined PCC rule (R8 29.212) | - | - | - | C3 | C3-68 | C3-120014 | Revised | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0763 | 1 | F | Rel-11 | 11.3.0 | 11.4.0 | Access-Network-Charging-Identifier-Gx AVP for pre-defined PCC rule | CP-55 | CP-120078 | approved | C3 | C3-68 | C3-120275 | Agreed | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0764 | - | F | Rel-8 | 8.14.0 | - | TFT operation when GnGp SGSN accesses to PGW (R8 29.212) | - | - | - | C3 | C3-68 | C3-120015 | Revised | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0764 | 1 | F | Rel-8 | 8.14.0 | - | TFT operation when GnGp SGSN accesses to PGW (R8 29.212) | - | - | - | C3 | C3-68 | C3-120276 | Revised | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0764 | 2 | F | Rel-8 | 8.14.0 | - | TFT operation when GnGp SGSN accesses to PGW (R8 29.212) | CP-55 | CP-120058 | revised | C3 | C3-68 | C3-120404 | Agreed | 2012-02-22 | SAES-St3-PCC | cover sheet error | 2012-02-22 |
0764 | 3 | F | Rel-8 | 8.14.0 | 8.15.0 | TFT operation when GnGp SGSN accesses to PGW | CP-55 | CP-120200 | approved | C3 | - | C3-120404 | - | 2012-02-08 | SAES-St3-PCC | - | 2012-03-01 |
0765 | - | A | Rel-9 | 9.9.0 | - | TFT operation when GnGp SGSN accesses to PGW (R9 29.212) | - | - | - | C3 | C3-68 | C3-120016 | Revised | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0765 | 1 | A | Rel-9 | 9.9.0 | - | TFT operation when GnGp SGSN accesses to PGW (R9 29.212) | - | - | - | C3 | C3-68 | C3-120277 | Revised | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0765 | 2 | A | Rel-9 | 9.9.0 | - | TFT operation when GnGp SGSN accesses to PGW (R9 29.212) | CP-55 | CP-120058 | revised | C3 | C3-68 | C3-120405 | Agreed | 2012-02-22 | SAES-St3-PCC | cover sheet error | 2012-02-22 |
0765 | 3 | A | Rel-9 | 9.9.0 | 9.10.0 | TFT operation when GnGp SGSN accesses to PGW | CP-55 | CP-120200 | approved | C3 | - | C3-120405 | - | 2012-02-08 | SAES-St3-PCC | - | 2012-03-01 |
0766 | - | A | Rel-10 | 10.5.0 | - | TFT operation when GnGp SGSN accesses to PGW (R10 29.212) | - | - | - | C3 | C3-68 | C3-120017 | Revised | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0766 | 1 | A | Rel-10 | 10.5.0 | - | TFT operation when GnGp SGSN accesses to PGW (R10 29.212) | - | - | - | C3 | C3-68 | C3-120278 | Revised | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0766 | 2 | A | Rel-10 | 10.5.0 | - | TFT operation when GnGp SGSN accesses to PGW (R10 29.212) | - | - | - | C3 | C3-68 | C3-120406 | Revised | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0766 | 3 | A | Rel-10 | 10.5.0 | - | TFT operation when GnGp SGSN accesses to PGW (R10 29.212) | CP-55 | CP-120058 | revised | C3 | C3-68 | C3-120413 | Agreed | 2012-02-22 | SAES-St3-PCC | cover sheet error | 2012-02-22 |
0766 | 4 | A | Rel-10 | 10.5.0 | 10.6.0 | TFT operation when GnGp SGSN accesses to PGW | CP-55 | CP-120200 | approved | C3 | - | C3-120413 | - | 2012-02-08 | SAES-St3-PCC | - | 2012-03-01 |
0767 | - | A | Rel-11 | 11.3.0 | - | TFT operation when GnGp SGSN accesses to PGW (R11 29.212) | - | - | - | C3 | C3-68 | C3-120018 | Revised | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0767 | 1 | A | Rel-11 | 11.3.0 | - | TFT operation when GnGp SGSN accesses to PGW (R11 29.212) | - | - | - | C3 | C3-68 | C3-120279 | Revised | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0767 | 2 | A | Rel-11 | 11.3.0 | - | TFT operation when GnGp SGSN accesses to PGW (R11 29.212) | - | - | - | C3 | C3-68 | C3-120407 | Revised | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0767 | 3 | A | Rel-11 | 11.3.0 | - | TFT operation when GnGp SGSN accesses to PGW (R11 29.212) | CP-55 | CP-120058 | revised | C3 | C3-68 | C3-120414 | Agreed | 2012-02-22 | SAES-St3-PCC | cover sheet error | 2012-02-22 |
0767 | 4 | A | Rel-11 | 11.3.0 | 11.4.0 | TFT operation when GnGp SGSN accesses to PGW | CP-55 | CP-120200 | approved | C3 | - | C3-120414 | - | 2012-02-08 | SAES-St3-PCC | - | 2012-03-01 |
0768 | - | F | Rel-10 | 10.5.0 | - | SGSN change event report (R10 29.212) | - | - | - | C3 | C3-68 | C3-120019 | Revised | 2012-02-22 | PCC-Enh | - | 2012-02-22 |
0769 | - | A | Rel-11 | 11.3.0 | - | SGSN change event report (R11 29.212) | - | - | - | C3 | C3-68 | C3-120020 | Revised | 2012-02-22 | PCC-Enh | - | 2012-02-22 |
0770 | - | F | Rel-11 | 11.3.0 | - | Application detecting and reporting (R11 29.212) | - | - | - | C3 | C3-68 | C3-120028 | Revised | 2012-02-22 | SAPP-CT3 | - | 2012-02-22 |
0770 | 1 | F | Rel-11 | 11.3.0 | - | Application detecting and reporting (R11 29.212) | - | - | - | C3 | C3-68 | C3-120374 | Revised | 2012-02-22 | SAPP-CT3 | - | 2012-02-22 |
0770 | 2 | F | Rel-11 | 11.3.0 | 11.4.0 | Application detecting and reporting (R11 29.212) | CP-55 | CP-120070 | approved | C3 | C3-68 | C3-120420 | Agreed | 2012-02-22 | SAPP-CT3 | - | 2012-02-22 |
0771 | - | F | Rel-11 | 11.3.0 | - | The Scope of the Monitoring Key (R11 29.212) | - | - | - | C3 | C3-68 | C3-120030 | Revised | 2012-02-22 | PCC-Enh | - | 2012-02-22 |
0771 | 1 | F | Rel-11 | 11.3.0 | - | The Scope of the Monitoring Key (R11 29.212) | - | - | - | C3 | C3-68 | C3-120265 | Revised | 2012-02-22 | PCC-Enh | - | 2012-02-22 |
0771 | 2 | F | Rel-11 | 11.3.0 | 11.4.0 | The Scope of the Monitoring Key (R11 29.212) | CP-55 | CP-120077 | approved | C3 | C3-68 | C3-120409 | Agreed | 2012-02-22 | PCC-Enh | - | 2012-02-22 |
0772 | - | F | Rel-11 | 11.3.0 | - | Multiple instances of the Subscription Id (R11 29.212) | - | - | - | C3 | C3-68 | C3-120031 | Revised | 2012-02-22 | PCC-Enh | - | 2012-02-22 |
0772 | 1 | F | Rel-11 | 11.3.0 | 11.4.0 | Multiple instances of the Subscription Id (R11 29.212) | CP-55 | CP-120077 | approved | C3 | C3-68 | C3-120370 | Agreed | 2012-02-22 | PCC-Enh | - | 2012-02-22 |
0773 | - | F | Rel-11 | 11.3.0 | - | IPv6 address for BBAI (R11 29.212) | CP-55 | CP-120074 | reissued | C3 | C3-68 | C3-120037 | Agreed | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0773 | - | F | Rel-11 | 11.3.0 | 11.4.0 | IPv6 address for BBAI | CP-55 | CP-120201 | approved | C3 | - | - | - | 2012-01-30 | BBAI_BBI-CT | - | 2012-03-02 |
0774 | - | F | Rel-11 | 11.3.0 | - | Optional support of xDSL and 3GPP2 parameters over Sd | - | - | - | C3 | C3-68 | C3-120059 | Revised | 2012-02-22 | SAPP-CT3 | - | 2012-02-22 |
0774 | 1 | F | Rel-11 | 11.3.0 | 11.4.0 | Optional support of xDSL and 3GPP2 parameters over Sd | CP-55 | CP-120070 | approved | C3 | C3-68 | C3-120381 | Agreed | 2012-02-22 | SAPP-CT3 | - | 2012-02-22 |
0775 | - | F | Rel-11 | 11.3.0 | - | Support of Framed-IPv6-Prefix AVP for the Unsolicited mode | - | - | - | C3 | C3-68 | C3-120119 | Revised | 2012-02-22 | SAPP-CT3 | - | 2012-02-22 |
0775 | 1 | F | Rel-11 | 11.3.0 | 11.4.0 | Support of Framed-IPv6-Prefix AVP for the Unsolicited mode | CP-55 | CP-120070 | approved | C3 | C3-68 | C3-120382 | Agreed | 2012-02-22 | SAPP-CT3 | - | 2012-02-22 |
0776 | - | F | Rel-7 | 7.12.0 | - | Correction to deferred rules | - | - | - | C3 | C3-68 | C3-120184 | Revised | 2012-02-22 | PCC | - | 2012-02-22 |
0776 | 1 | F | Rel-7 | 7.12.0 | 7.13.0 | Correction to deferred rules | CP-55 | CP-120056 | approved | C3 | C3-68 | C3-120270 | Agreed | 2012-02-22 | PCC | - | 2012-02-22 |
0777 | - | A | Rel-8 | 8.14.0 | - | Correction to deferred rules | - | - | - | C3 | C3-68 | C3-120185 | Revised | 2012-02-22 | PCC | - | 2012-02-22 |
0777 | 1 | A | Rel-8 | 8.14.0 | 8.15.0 | Correction to deferred rules | CP-55 | CP-120056 | approved | C3 | C3-68 | C3-120271 | Agreed | 2012-02-22 | PCC | - | 2012-02-22 |
0778 | - | A | Rel-9 | 9.9.0 | - | Correction to deferred rules | - | - | - | C3 | C3-68 | C3-120186 | Revised | 2012-02-22 | PCC | - | 2012-02-22 |
0778 | 1 | A | Rel-9 | 9.9.0 | 9.10.0 | Correction to deferred rules | CP-55 | CP-120056 | approved | C3 | C3-68 | C3-120272 | Agreed | 2012-02-22 | PCC | - | 2012-02-22 |
0779 | - | A | Rel-10 | 10.5.0 | - | Correction to deferred rules | - | - | - | C3 | C3-68 | C3-120187 | Revised | 2012-02-22 | PCC | - | 2012-02-22 |
0779 | 1 | A | Rel-10 | 10.5.0 | 10.6.0 | Correction to deferred rules | CP-55 | CP-120056 | approved | C3 | C3-68 | C3-120273 | Agreed | 2012-02-22 | PCC | - | 2012-02-22 |
0780 | - | A | Rel-11 | 11.3.0 | - | Correction to deferred rules | - | - | - | C3 | C3-68 | C3-120188 | Revised | 2012-02-22 | PCC | - | 2012-02-22 |
0780 | 1 | A | Rel-11 | 11.3.0 | 11.4.0 | Correction to deferred rules | CP-55 | CP-120056 | approved | C3 | C3-68 | C3-120274 | Agreed | 2012-02-22 | PCC | - | 2012-02-22 |
0781 | - | F | Rel-8 | 8.14.0 | - | QoS mapping | - | - | - | C3 | C3-68 | C3-120189 | Revised | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0781 | 1 | F | Rel-8 | 8.14.0 | - | QoS mapping | CP-55 | CP-120058 | revised | C3 | C3-68 | C3-120280 | Agreed | 2012-02-22 | SAES-St3-PCC | cover sheet error | 2012-02-22 |
0781 | 2 | F | Rel-8 | 8.14.0 | 8.15.0 | QoS mapping (R8 29.212) | CP-55 | CP-120200 | approved | C3 | - | C3-120280 | - | 2012-02-07 | SAES-St3-PCC | - | 2012-03-01 |
0782 | - | A | Rel-9 | 9.9.0 | - | QoS mapping | - | - | - | C3 | C3-68 | C3-120190 | Revised | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0782 | 1 | A | Rel-9 | 9.9.0 | - | QoS mapping | CP-55 | CP-120058 | revised | C3 | C3-68 | C3-120281 | Agreed | 2012-02-22 | SAES-St3-PCC | cover sheet error | 2012-02-22 |
0782 | 2 | A | Rel-9 | 9.9.0 | 9.10.0 | QoS mapping (R9 29.212) | CP-55 | CP-120200 | approved | C3 | - | C3-120281 | - | 2012-02-07 | SAES-St3-PCC | - | 2012-03-01 |
0783 | - | A | Rel-10 | 10.5.0 | - | QoS mapping | - | - | - | C3 | C3-68 | C3-120191 | Revised | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0783 | 1 | A | Rel-10 | 10.5.0 | - | QoS mapping | CP-55 | CP-120058 | revised | C3 | C3-68 | C3-120282 | Agreed | 2012-02-22 | SAES-St3-PCC | cover sheet error | 2012-02-22 |
0783 | 2 | A | Rel-10 | 10.5.0 | 10.6.0 | QoS mapping (R10 29.212) | CP-55 | CP-120200 | approved | C3 | - | C3-120282 | - | 2012-02-07 | SAES-St3-PCC | - | 2012-03-01 |
0784 | - | A | Rel-11 | 11.3.0 | - | QoS mapping | - | - | - | C3 | C3-68 | C3-120192 | Revised | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0784 | 1 | A | Rel-11 | 11.3.0 | - | QoS mapping | - | - | - | C3 | C3-68 | C3-120283 | Revised | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0784 | 2 | A | Rel-11 | 11.3.0 | - | QoS mapping | CP-55 | CP-120058 | revised | C3 | C3-68 | C3-120408 | Agreed | 2012-02-22 | SAES-St3-PCC | cover sheet error | 2012-02-22 |
0784 | 3 | A | Rel-11 | 11.3.0 | 11.4.0 | QoS mapping (R11 29.212) | CP-55 | CP-120200 | approved | C3 | - | C3-120408 | - | 2012-02-08 | SAES-St3-PCC | - | 2012-03-01 |
0785 | - | F | Rel-9 | 9.9.0 | - | Correction to usage monitoring control | - | - | - | C3 | C3-68 | C3-120193 | Revised | 2012-02-22 | PCC-Enh | - | 2012-02-22 |
0785 | 1 | F | Rel-9 | 9.9.0 | 9.10.0 | Correction to usage monitoring control | CP-55 | CP-120063 | approved | C3 | C3-68 | C3-120288 | Agreed | 2012-02-22 | PCC-Enh | - | 2012-02-22 |
0786 | - | A | Rel-10 | 10.5.0 | - | Correction to usage monitoring control | - | - | - | C3 | C3-68 | C3-120194 | Revised | 2012-02-22 | PCC-Enh | - | 2012-02-22 |
0786 | 1 | A | Rel-10 | 10.5.0 | 10.6.0 | Correction to usage monitoring control | CP-55 | CP-120063 | approved | C3 | C3-68 | C3-120289 | Agreed | 2012-02-22 | PCC-Enh | - | 2012-02-22 |
0787 | - | A | Rel-11 | 11.3.0 | - | Correction to usage monitoring control | - | - | - | C3 | C3-68 | C3-120195 | Revised | 2012-02-22 | PCC-Enh | - | 2012-02-22 |
0787 | 1 | A | Rel-11 | 11.3.0 | 11.4.0 | Correction to usage monitoring control | CP-55 | CP-120063 | approved | C3 | C3-68 | C3-120290 | Agreed | 2012-02-22 | PCC-Enh | - | 2012-02-22 |
0788 | - | F | Rel-10 | 10.5.0 | - | Clarification of SGSN change reporting | - | - | - | C3 | C3-68 | C3-120196 | Revised | 2012-02-22 | TEI10 | - | 2012-02-22 |
0788 | 1 | F | Rel-10 | 10.5.0 | 10.6.0 | Clarification of SGSN change reporting | CP-55 | CP-120068 | approved | C3 | C3-68 | C3-120291 | Agreed | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0789 | - | A | Rel-11 | 11.3.0 | - | Clarification of SGSN change reporting | - | - | - | C3 | C3-68 | C3-120197 | Revised | 2012-02-22 | TEI10 | - | 2012-02-22 |
0789 | 1 | A | Rel-11 | 11.3.0 | 11.4.0 | Clarification of SGSN change reporting | CP-55 | CP-120068 | approved | C3 | C3-68 | C3-120292 | Agreed | 2012-02-22 | SAES-St3-PCC | - | 2012-02-22 |
0790 | - | B | Rel-11 | 11.3.0 | - | Gx and Gxx protocol enhancement for BBAI | - | - | - | C3 | C3-68 | C3-120204 | Revised | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0790 | 1 | B | Rel-11 | 11.3.0 | - | Gx and Gxx protocol enhancement for BBAI | - | - | - | C3 | C3-68 | C3-120258 | Revised | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0790 | 2 | B | Rel-11 | 11.3.0 | - | Gx and Gxx protocol enhancement for BBAI | CP-55 | CP-120074 | reissued | C3 | C3-68 | C3-120415 | Agreed | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0790 | 2 | B | Rel-11 | 11.3.0 | 11.4.0 | Gx and Gxx protocol enhancement for BBAI (29.212) | CP-55 | CP-120201 | approved | C3 | - | - | - | 2012-02-08 | BBAI_BBI-CT | - | 2012-03-02 |
0791 | - | B | Rel-11 | 11.3.0 | - | Functional Elements updated of BBAI | - | - | - | C3 | C3-68 | C3-120205 | Revised | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0791 | 1 | B | Rel-11 | 11.3.0 | - | Functional Elements updated of BBAI | CP-55 | CP-120074 | reissued | C3 | C3-68 | C3-120260 | Agreed | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0791 | 1 | B | Rel-11 | 11.3.0 | 11.4.0 | Functional Elements of BBAI annex update (29.212) | CP-55 | CP-120201 | approved | C3 | - | - | - | 2012-02-08 | BBAI_BBI-CT | - | 2012-03-02 |
0792 | - | B | Re-l11 | 11.3.0 | - | PCC procedure over Gx and Gxb for BBAI | - | - | - | C3 | C3-68 | C3-120206 | Revised | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0792 | 1 | B | Re-l11 | 11.3.0 | - | PCC procedure over Gx and Gxb for BBAI | - | - | - | C3 | C3-68 | C3-120261 | Revised | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0792 | 2 | B | Re-l11 | 11.3.0 | - | PCC procedure over Gx and Gxb for BBAI | CP-55 | CP-120074 | reissued | C3 | C3-68 | C3-120416 | Agreed | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0792 | 2 | B | Rel-11 | 11.3.0 | 11.4.0 | PCC procedure Gx and Gxb* for BBAI (29.212) | CP-55 | CP-120201 | approved | C3 | - | - | - | 2012-02-09 | BBAI_BBI-CT | - | 2012-03-02 |
0793 | - | B | Rel-11 | 11.3.0 | - | S15 procedure | - | - | - | C3 | C3-68 | C3-120207 | Revised | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0793 | 1 | B | Rel-11 | 11.3.0 | - | S15 procedure | - | - | - | C3 | C3-68 | C3-120262 | Revised | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0793 | 2 | B | Rel-11 | 11.3.0 | - | S15 procedure | CP-55 | CP-120074 | reissued | C3 | C3-68 | C3-120348 | Agreed | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0793 | 2 | B | Rel-11 | 11.3.0 | 11.4.0 | S15 procedure for BBAI (29.212) | CP-55 | CP-120201 | approved | C3 | - | - | - | 2012-02-09 | BBAI_BBI-CT | - | 2012-03-02 |
0794 | - | B | Rel-11 | 11.3.0 | - | S15 protocol | - | - | - | C3 | C3-68 | C3-120208 | Revised | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0794 | 1 | B | Rel-11 | 11.3.0 | - | S15 protocol | - | - | - | C3 | C3-68 | C3-120263 | Revised | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0794 | 2 | B | Rel-11 | 11.3.0 | - | S15 protocol | - | - | - | C3 | C3-68 | C3-120349 | Revised | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0794 | 3 | B | Rel-11 | 11.3.0 | - | S15 protocol | - | - | - | C3 | C3-68 | C3-120474 | Revised | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0794 | 4 | B | Rel-11 | 11.3.0 | - | S15 protocol | CP-55 | CP-120074 | reissued | C3 | C3-68 | C3-120478 | Agreed | 2012-02-22 | BBAI_BBI-CT | - | 2012-02-22 |
0794 | 4 | B | Rel-11 | 11.3.0 | 11.4.0 | S15 protocol (29.212) | CP-55 | CP-120201 | approved | C3 | - | - | - | 2012-02-10 | BBAI_BBI-CT | - | 2012-03-02 |
0795 | - | F | Rel-11 | 11.3.0 | - | Alignment of 29.212 Section 5b.4 to the agreed specification | - | - | - | C3 | C3-68 | C3-120242 | Revised | 2012-02-22 | SAPP-CT3 | - | 2012-02-22 |
0795 | 1 | F | Rel-11 | 11.3.0 | 11.4.0 | Alignment of 29.212 Section 5b.4 to the agreed specification | CP-55 | CP-120070 | approved | C3 | C3-68 | C3-120403 | Agreed | 2012-02-22 | SAPP-CT3 | - | 2012-02-22 |
0796 | - | B | Rel-11 | 11.3.0 | - | Technical Improvement for Application level Heartbeat betweeb TDF/PCEF/BBERF and PCRF | - | - | - | C3 | C3-68 | C3-120243 | Revised | 2012-02-22 | TEI11 | - | 2012-02-22 |
0796 | 1 | B | Rel-11 | 11.3.0 | - | Technical Improvement for Application level Heartbeat betweeb TDF/PCEF/BBERF and PCRF | - | - | - | C3 | C3-68 | C3-120247 | Postponed | 2012-02-22 | TEI11 | - | 2012-02-22 |
0797 | - | B | Rel-11 | 11.4.0 | - | Discussion paper on Application level heartbeat on Gx , Rx and Sd and Failure handling standardization | - | - | - | C3 | C3-68b | C3-120523 | Withdrawn | 2012-06-06 | TEI11 | - | 2012-06-06 |
0798 | - | B | Rel-11 | 11.4.0 | - | Technical Improvement for Application level Heartbeat between TDF/PCEF/BBERF and PCRF | - | - | - | C3 | C3-68b | C3-120525 | Withdrawn | 2012-06-06 | TEI11 | - | 2012-06-06 |
0799 | - | B | Rel-11 | 11.4.0 | - | Application-level failure handling for Gx and Sd introducing CC Failure handling | - | - | - | C3 | C3-68b | C3-120526 | Withdrawn | 2012-06-06 | TEI11 | - | 2012-06-06 |
0800 | - | B | Rel-11 | 11.4.0 | - | Support of rSRVCC in Gx | - | - | - | C3 | C3-68b | C3-120548 | Revised | 2012-06-06 | rSRVCC-CT | - | 2012-06-06 |
0800 | 1 | B | Rel-11 | 11.4.0 | 11.5.0 | Support of rSRVCC in Gx | CP-56 | CP-120352 | approved | C3 | C3-68b | C3-120725 | Agreed | 2012-06-06 | rSRVCC-CT | - | 2012-06-06 |
0800 | 2 | B | Rel-11 | 11.4.0 | - | Support of rSRVCC in Gx | - | - | - | C3 | C3-69 | C3-120946 | Revised | 2012-06-06 | RSRVCC-CT | - | 2012-06-06 |
0800 | 3 | B | Rel-11 | 11.4.0 | - | Support of rSRVCC in Gx | - | - | - | C3 | C3-69 | C3-121128 | Withdrawn | 2012-06-06 | RSRVCC-CT | - | 2012-06-06 |
0801 | - | F | Rel-11 | 11.4.0 | - | ToD ADC Rules handling | - | - | - | C3 | C3-68b | C3-120550 | Revised | 2012-06-06 | SAPP-CT3 | - | 2012-06-06 |
0801 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | ToD ADC Rules handling | CP-56 | CP-120346 | approved | C3 | C3-68b | C3-120834 | Agreed | 2012-06-06 | SAPP-CT3 | - | 2012-06-06 |
0802 | - | B | Rel-11 | 11.4.0 | - | Support for local address in TFT filters | - | - | - | C3 | C3-68b | C3-120552 | Postponed | 2012-06-06 | TEI11 | - | 2012-06-06 |
0803 | - | B | Rel-11 | 11.4.0 | - | Impacts in Gx and Gxx to complete WLAN scenario | - | - | - | C3 | C3-68b | C3-120557 | Revised | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0803 | 1 | B | Rel-11 | 11.4.0 | - | Impacts in Gx and Gxx to complete WLAN scenario | - | - | - | C3 | C3-68b | C3-120728 | Revised | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0803 | 2 | B | Rel-11 | 11.4.0 | - | Impacts in Gx and Gxx to complete WLAN scenario | - | - | - | C3 | C3-68b | C3-120839 | Agreed | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0803 | 3 | B | Rel-11 | 11.4.0 | - | Impacts in Gx and Gxx to complete WLAN scenario | - | - | - | C3 | C3-69 | C3-120949 | Revised | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0803 | 4 | B | Rel-11 | 11.4.0 | 11.5.0 | Impacts in Gx and Gxx to complete WLAN scenario | CP-56 | CP-120350 | approved | C3 | C3-69 | C3-121129 | Agreed | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0804 | - | F | Rel-8 | 8.15.0 | - | Adapting GERAN/UTRAN procedures with S4-SGSN | - | - | - | C3 | C3-68b | C3-120588 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0804 | 1 | F | Rel-8 | 8.15.0 | 8.16.0 | Adapting GERAN/UTRAN procedures with S4-SGSN | CP-56 | CP-120335 | approved | C3 | C3-68b | C3-120758 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0805 | - | A | Rel-9 | 9.10.0 | - | Adapting GERAN/UTRAN procedures with S4-SGSN | - | - | - | C3 | C3-68b | C3-120589 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0805 | 1 | A | Rel-9 | 9.10.0 | 9.11.0 | Adapting GERAN/UTRAN procedures with S4-SGSN | CP-56 | CP-120335 | approved | C3 | C3-68b | C3-120759 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0806 | - | A | Rel-10 | 10.6.0 | - | Adapting GERAN/UTRAN procedures with S4-SGSN | - | - | - | C3 | C3-68b | C3-120590 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0806 | 1 | A | Rel-10 | 10.6.0 | 10.7.0 | Adapting GERAN/UTRAN procedures with S4-SGSN | CP-56 | CP-120335 | approved | C3 | C3-68b | C3-120760 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0807 | - | A | Rel-11 | 11.4.0 | - | Adapting GERAN/UTRAN procedures with S4-SGSN | - | - | - | C3 | C3-68b | C3-120591 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0807 | 1 | A | Rel-11 | 11.4.0 | 11.5.0 | Adapting GERAN/UTRAN procedures with S4-SGSN | CP-56 | CP-120335 | approved | C3 | C3-68b | C3-120761 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0808 | - | F | Rel-11 | 11.4.0 | - | Mapping of the Precedence AVP from PCC rule to precedence information of the service data flow filter for 3GPP accesses | - | - | - | C3 | C3-68b | C3-120592 | Revised | 2012-06-06 | TEI11 | - | 2012-06-06 |
0808 | 1 | F | Rel-11 | 11.4.0 | - | Mapping of the Precedence AVP from PCC rule to precedence information of the service data flow filter for 3GPP accesses | - | - | - | C3 | C3-68b | C3-120875 | Postponed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0809 | - | F | Rel-11 | 11.4.0 | - | PCRF behavior and applicability of QoS-Upgrade AVP | - | - | - | C3 | C3-68b | C3-120593 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0809 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | PCRF behavior and applicability of QoS-Upgrade AVP | CP-56 | CP-120358 | approved | C3 | C3-68b | C3-120841 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0810 | - | B | Rel-11 | 11.4.0 | - | New Rule-Failure Codes | - | - | - | C3 | C3-68b | C3-120622 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0810 | 1 | B | Rel-11 | 11.4.0 | - | New Rule-Failure Codes | - | - | - | C3 | C3-68b | C3-120710 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0810 | 2 | B | Rel-11 | 11.4.0 | - | New Rule-Failure Codes | - | - | - | C3 | C3-68b | C3-120762 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0810 | 3 | B | Rel-11 | 11.4.0 | 11.5.0 | New Rule-Failure Codes | CP-56 | CP-120358 | approved | C3 | C3-68b | C3-120888 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0811 | - | F | Rel-11 | 11.4.0 | - | Diameter session termination | - | - | - | C3 | C3-68b | C3-120632 | Revised | 2012-06-06 | PCC | - | 2012-06-06 |
0811 | 1 | A | Rel-11 | 11.4.0 | 11.5.0 | Diameter session termination | CP-56 | CP-120335 | approved | C3 | C3-68b | C3-120779 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0812 | - | F | Rel-11 | 11.4.0 | - | Add Event-Trigger AVP in the RAA command | - | - | - | C3 | C3-68b | C3-120635 | Withdrawn | 2012-06-06 | TEI11 | - | 2012-06-06 |
0813 | - | F | Rel-8 | 8.15.0 | - | QoS authorization for UE request resource modification(29.212 R8) | - | - | - | C3 | C3-68b | C3-120636 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0814 | - | A | Rel-9 | 9.10.0 | - | QoS authorization for UE request resource modification(29.212 R9) | - | - | - | C3 | C3-68b | C3-120637 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0815 | - | A | Rel-10 | 10.6.0 | - | QoS authorization for UE request resource modification(29.212 R10) | - | - | - | C3 | C3-68b | C3-120638 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0816 | - | A | Rel-11 | 11.4.0 | - | QoS authorization for UE request resource modification(29.212 R11) | - | - | - | C3 | C3-68b | C3-120639 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0817 | - | B | Rel-11 | 11.4.0 | - | PCC support for rSRVCC(29.212) | - | - | - | C3 | C3-68b | C3-120645 | Revised | 2012-06-06 | rSRVCC-CT | - | 2012-06-06 |
0818 | - | B | Rel-11 | 11.4.0 | - | Update the architecture and reference point for S5/S8 PMIP case | - | - | - | C3 | C3-68b | C3-120648 | Revised | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0818 | 1 | B | Rel-11 | 11.4.0 | - | Update the architecture and reference point for S5/S8 PMIP case | - | - | - | C3 | C3-68b | C3-120811 | Agreed | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0818 | 2 | B | Rel-11 | 11.4.0 | - | Update the architecture and reference point for S5/S8 PMIP case | - | - | - | C3 | C3-69 | C3-121048 | Revised | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0818 | 3 | B | Rel-11 | 11.4.0 | 11.5.0 | Update the architecture and reference point for S5/S8 PMIP case | CP-56 | CP-120350 | approved | C3 | C3-69 | C3-121138 | Agreed | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0819 | - | B | Rel-11 | 11.4.0 | - | Update the definition and abbreviation(29.212) | - | - | - | C3 | C3-68b | C3-120650 | Revised | 2012-06-06 | BBAI_BBII-CT | - | 2012-06-06 |
0819 | 1 | B | Rel-11 | 11.4.0 | - | Update the definition and abbreviation(29.212) | - | - | - | C3 | C3-68b | C3-120824 | Revised | 2012-06-06 | BBAI_BBII-CT | - | 2012-06-06 |
0819 | 2 | B | Rel-11 | 11.4.0 | 11.5.0 | Update the definition and abbreviation(29.212) | CP-56 | CP-120351 | approved | C3 | C3-68b | C3-120835 | Agreed | 2012-06-06 | BBAI_BBII-CT | - | 2012-06-06 |
0820 | - | B | Rel-11 | 11.4.0 | - | Sd impact to support NSWO | - | - | - | C3 | C3-68b | C3-120653 | Revised | 2012-06-06 | BBAI_BBII-CT | - | 2012-06-06 |
0820 | 1 | B | Rel-11 | 11.4.0 | - | Sd impact to support NSWO | - | - | - | C3 | C3-68b | C3-120828 | Revised | 2012-06-06 | BBAI_BBII-CT | - | 2012-06-06 |
0820 | 2 | B | Rel-11 | 11.4.0 | - | Sd impact to support NSWO | - | - | - | C3 | C3-68b | C3-120889 | Revised | 2012-06-06 | BBAI_BBII-CT | - | 2012-06-06 |
0820 | 3 | B | Rel-11 | 11.4.0 | 11.5.0 | Sd impact to support NSWO | CP-56 | CP-120351 | approved | C3 | C3-68b | C3-120894 | Agreed | 2012-06-06 | BBAI_BBII-CT | - | 2012-06-06 |
0821 | - | B | Rel-11 | 11.4.0 | - | Architecture of NSWO(29.212) | - | - | - | C3 | C3-68b | C3-120654 | Revised | 2012-06-06 | BBAI_BBII-CT | - | 2012-06-06 |
0821 | 1 | B | Rel-11 | 11.4.0 | 11.5.0 | Architecture of NSWO(29.212) | CP-56 | CP-120351 | approved | C3 | C3-68b | C3-120829 | Agreed | 2012-06-06 | BBAI_BBII-CT | - | 2012-06-06 |
0822 | - | B | Rel-11 | 11.4.0 | - | Changes to Gx interface to support Network Location for IMS functionality(29.212) | - | - | - | C3 | C3-68b | C3-120658 | Revised | 2012-06-06 | NWK-PL2IMS-CT | - | 2012-06-06 |
0823 | - | B | Rel-11 | 11.4.0 | - | Changes to Gxx interface to support Network Location for IMS functionality(29.212) | - | - | - | C3 | C3-68b | C3-120659 | Revised | 2012-06-06 | NWK-PL2IMS-CT | - | 2012-06-06 |
0824 | - | B | Rel-11 | 11.4.0 | - | complement of support features to support Network Location for IMS functionality(29.212) | - | - | - | C3 | C3-68b | C3-120660 | Revised | 2012-06-06 | NWK-PL2IMS-CT | - | 2012-06-06 |
0825 | - | C | Rel-11 | 11.4.0 | 11.5.0 | Include support of other media for IMS Emergency Session | CP-56 | CP-120345 | approved | C3 | C3-68b | C3-120662 | Agreed | 2012-06-06 | TEI11 | - | 2012-06-06 |
0826 | - | F | Rel-8 | 8.15.0 | - | QoS Validation for UE initiated resource modification (R8 29.212) | - | - | - | C3 | C3-68b | C3-120664 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0826 | 1 | F | Rel-8 | 8.15.0 | 8.16.0 | QoS Validation for UE initiated resource modification (R8 29.212) | CP-56 | CP-120335 | approved | C3 | C3-68b | C3-120750 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0826 | 2 | F | Rel-8 | 8.15.0 | - | QoS Validation for UE initiated resource modification (R8 29.212) | - | - | - | C3 | C3-69 | C3-121002 | Postponed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0827 | - | A | Rel-9 | 9.10.0 | - | QoS Validation for UE initiated resource modification (R9 29.212) | - | - | - | C3 | C3-68b | C3-120665 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0827 | 1 | A | Rel-9 | 9.10.0 | 9.11.0 | QoS Validation for UE initiated resource modification (R9 29.212) | CP-56 | CP-120335 | approved | C3 | C3-68b | C3-120751 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0827 | 2 | A | Rel-9 | 9.10.0 | - | QoS Validation for UE initiated resource modification (R9 29.212) | - | - | - | C3 | C3-69 | C3-121003 | Postponed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0828 | - | A | Rel-10 | 10.6.0 | - | QoS Validation for UE initiated resource modification (R10 29.212) | - | - | - | C3 | C3-68b | C3-120666 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0828 | 1 | A | Rel-10 | 10.6.0 | 10.7.0 | QoS Validation for UE initiated resource modification (R10 29.212) | CP-56 | CP-120335 | approved | C3 | C3-68b | C3-120752 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0828 | 2 | A | Rel-10 | 10.6.0 | - | QoS Validation for UE initiated resource modification (R10 29.212) | - | - | - | C3 | C3-69 | C3-121004 | Postponed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0829 | - | A | Rel-11 | 11.4.0 | - | QoS Validation for UE initiated resource modification (R11 29.212) | - | - | - | C3 | C3-68b | C3-120667 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0829 | 1 | A | Rel-11 | 11.4.0 | 11.5.0 | QoS Validation for UE initiated resource modification (R11 29.212) | CP-56 | CP-120335 | approved | C3 | C3-68b | C3-120753 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0829 | 2 | A | Rel-11 | 11.4.0 | - | QoS Validation for UE initiated resource modification (R11 29.212) | - | - | - | C3 | C3-69 | C3-121005 | Postponed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0830 | - | F | Rel-8 | 8.15.0 | - | TFT operation for S4-SGSN (R8 29.212) | - | - | - | C3 | C3-68b | C3-120672 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0831 | - | A | Rel-9 | 9.10.0 | - | TFT operation for S4-SGSN (R9 29.212) | - | - | - | C3 | C3-68b | C3-120673 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0832 | - | A | Rel-10 | 10.6.0 | - | TFT operation for S4-SGSN (R10 29.212) | - | - | - | C3 | C3-68b | C3-120674 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0833 | - | A | Rel-11 | 11.4.0 | - | TFT operation for S4-SGSN (R11 29.212) | - | - | - | C3 | C3-68b | C3-120675 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0834 | - | F | Rel-8 | 8.15.0 | - | TFT usage for the primary PDP context when using PGW (R8 29.212) | - | - | - | C3 | C3-68b | C3-120677 | Postponed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0835 | - | A | Rel-9 | 9.10.0 | - | TFT usage for the primary PDP context when using PGW (R9 29.212) | - | - | - | C3 | C3-68b | C3-120678 | Postponed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0836 | - | A | Rel-10 | 10.6.0 | - | TFT usage for the primary PDP context when using PGW (R10 29.212) | - | - | - | C3 | C3-68b | C3-120679 | Postponed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0837 | - | A | Rel-11 | 11.4.0 | - | TFT usage for the primary PDP context when using PGW (R11 29.212) | - | - | - | C3 | C3-68b | C3-120680 | Postponed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0838 | - | F | Rel-11 | 11.4.0 | - | Support extended TFT filter format (R11 29.212) | - | - | - | C3 | C3-68b | C3-120685 | Postponed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0839 | - | F | Rel-11 | 11.4.0 | 11.5.0 | Command Code for TSR &TSA (R11 29.212) | CP-56 | CP-120346 | approved | C3 | C3-68b | C3-120688 | Agreed | 2012-06-06 | SAPP-CT3 | - | 2012-06-06 |
0840 | - | B | Rel-11 | 11.4.0 | - | Support trusted WLAN over S2a (R11 29.212) | - | - | - | C3 | C3-68b | C3-120690 | Revised | 2012-06-06 | SaMOG_WLAN-CN | - | 2012-06-06 |
0840 | 1 | B | Rel-11 | 11.4.0 | 11.5.0 | Support trusted WLAN over S2a (R11 29.212) | CP-56 | CP-120353 | approved | C3 | C3-68b | C3-120852 | Agreed | 2012-06-06 | SaMOG_WLAN-CN | - | 2012-06-06 |
0841 | - | B | Rel-11 | 11.4.0 | - | PCC impact on SIRIG (R11 29.212) | - | - | - | C3 | C3-68b | C3-120694 | Postponed | 2012-06-06 | SIRIG | - | 2012-06-06 |
0842 | - | B | Rel-11 | 11.4.0 | - | Support network location reporting for IMS functionality over GxGxx interfaces (R11 29212) | - | - | - | C3 | C3-68b | C3-120703 | Revised | 2012-06-06 | NWK-PL2IMS-CT | - | 2012-06-06 |
0842 | 1 | B | Rel-11 | 11.4.0 | - | Support network location reporting for IMS functionality over GxGxx interfaces (R11 29212) | - | - | - | C3 | C3-68b | C3-120856 | Revised | 2012-06-06 | NWK-PL2IMS-CT | - | 2012-06-06 |
0842 | 2 | B | Rel-11 | 11.4.0 | 11.5.0 | Support network location reporting for IMS functionality over GxGxx interfaces (R11 29212) | CP-56 | CP-120354 | approved | C3 | C3-68b | C3-120892 | Agreed | 2012-06-06 | NWK-PL2IMS-CT | - | 2012-06-06 |
0843 | - | B | Rel-11 | 11.4.0 | - | Reslove the FFS of CS-Service-Request-Opeartion AVP | - | - | - | C3 | C3-68b | C3-120706 | Revised | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0843 | 1 | B | Rel-11 | 11.4.0 | - | Reslove the FFS of CS-Service-Request-Opeartion AVP | - | - | - | C3 | C3-68b | C3-120820 | Postponed | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0843 | 2 | B | Rel-11 | 11.4.0 | - | Resolve the FFS of CS-Service-QoS-Request-Operation AVP | - | - | - | C3 | C3-69 | C3-121053 | Revised | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0844 | - | F | Rel-8 | 8.15.0 | 8.16.0 | Add Event-Trigger AVP in the RAA command | CP-56 | CP-120335 | approved | C3 | C3-68b | C3-120806 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0845 | - | A | Rel-9 | 9.10.0 | 9.11.0 | Add Event-Trigger AVP in the RAA command | CP-56 | CP-120335 | approved | C3 | C3-68b | C3-120807 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0846 | - | A | Rel-10 | 10.6.0 | 10.7.0 | Add Event-Trigger AVP in the RAA command | CP-56 | CP-120335 | approved | C3 | C3-68b | C3-120808 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0847 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Add Event-Trigger AVP in the RAA command | CP-56 | CP-120335 | approved | C3 | C3-68b | C3-120809 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0848 | - | F | Rel-8 | 8.15.0 | 8.16.0 | Diameter session termination | CP-56 | CP-120335 | approved | C3 | C3-68b | C3-120776 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0849 | - | A | Rel-9 | 9.10.0 | 9.11.0 | Diameter session termination | CP-56 | CP-120335 | approved | C3 | C3-68b | C3-120777 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0850 | - | A | Rel-10 | 10.6.0 | 10.7.0 | Diameter session termination | CP-56 | CP-120335 | approved | C3 | C3-68b | C3-120778 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0851 | - | F | Rel-11 | 11.4.0 | - | Missing clarification on unsolicited application reporting session establishment | - | - | - | C3 | C3-69 | C3-120929 | Revised | 2012-06-06 | SAPP-CT3 | - | 2012-06-06 |
0851 | 1 | F | Rel-11 | 11.4.0 | - | Missing clarification on unsolicited application reporting session establishment | - | - | - | C3 | C3-69 | C3-121105 | Revised | 2012-06-06 | SAPP-CT3 | - | 2012-06-06 |
0851 | 2 | F | Rel-11 | 11.4.0 | 11.5.0 | Missing clarification on unsolicited application reporting session establishment | CP-56 | CP-120346 | approved | C3 | C3-69 | C3-121205 | Agreed | 2012-06-06 | SAPP-CT3 | - | 2012-06-06 |
0852 | - | F | Rel-11 | 11.4.0 | - | Mute for application detection notification requirements | - | - | - | C3 | C3-69 | C3-120930 | Revised | 2012-06-06 | SAPP-CT3 | - | 2012-06-06 |
0852 | 1 | F | Rel-11 | 11.4.0 | - | Mute for application detection notification requirements | - | - | - | C3 | C3-69 | C3-121102 | Revised | 2012-06-06 | SAPP-CT3 | - | 2012-06-06 |
0852 | 2 | F | Rel-11 | 11.4.0 | 11.5.0 | Mute for application detection notification requirements | CP-56 | CP-120346 | approved | C3 | C3-69 | C3-121206 | Agreed | 2012-06-06 | SAPP-CT3 | - | 2012-06-06 |
0853 | - | C | Rel-11 | 11.4.0 | - | Usage Monitoring Congestion Handling | - | - | - | C3 | C3-69 | C3-120932 | Revised | 2012-06-06 | TEI11 | - | 2012-06-06 |
0853 | 1 | C | Rel-11 | 11.4.0 | - | Usage Monitoring Congestion Handling | - | - | - | C3 | C3-69 | C3-121104 | Revised | 2012-06-06 | TEI11 | - | 2012-06-06 |
0853 | 2 | C | Rel-11 | 11.4.0 | 11.5.0 | Usage Monitoring Congestion Handling | CP-56 | CP-120345 | approved | C3 | C3-69 | C3-121181 | Agreed | 2012-06-06 | TEI11 | - | 2012-06-06 |
0854 | - | F | Rel-8 | 8.15.0 | - | Mapping of the Precedence AVP from PCC rule to precedence information of the service data flow filter for 3GPP accesses | - | - | - | C3 | C3-69 | C3-120935 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0854 | 1 | F | Rel-8 | 8.15.0 | 8.16.0 | Mapping of the Precedence AVP from PCC rule to precedence information of the service data flow filter for 3GPP accesses | CP-56 | CP-120335 | approved | C3 | C3-69 | C3-121215 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0855 | - | A | Rel-9 | 9.10.0 | - | Mapping of the Precedence AVP from PCC rule to precedence information of the service data flow filter for 3GPP accesses | - | - | - | C3 | C3-69 | C3-120936 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0855 | 1 | A | Rel-9 | 9.10.0 | 9.11.0 | Mapping of the Precedence AVP from PCC rule to precedence information of the service data flow filter for 3GPP accesses | CP-56 | CP-120335 | approved | C3 | C3-69 | C3-121216 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0856 | - | A | Rel-10 | 10.6.0 | - | Mapping of the Precedence AVP from PCC rule to precedence information of the service data flow filter for 3GPP accesses | - | - | - | C3 | C3-69 | C3-120937 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0856 | 1 | A | Rel-10 | 10.6.0 | 10.7.0 | Mapping of the Precedence AVP from PCC rule to precedence information of the service data flow filter for 3GPP accesses | CP-56 | CP-120335 | approved | C3 | C3-69 | C3-121217 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0857 | - | A | Rel-11 | 11.4.0 | - | Mapping of the Precedence AVP from PCC rule to precedence information of the service data flow filter for 3GPP accesses | - | - | - | C3 | C3-69 | C3-120938 | Revised | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0857 | 1 | A | Rel-11 | 11.4.0 | 11.5.0 | Mapping of the Precedence AVP from PCC rule to precedence information of the service data flow filter for 3GPP accesses | CP-56 | CP-120335 | approved | C3 | C3-69 | C3-121218 | Agreed | 2012-06-06 | SAES-St3-PCC | - | 2012-06-06 |
0858 | - | B | Rel-11 | 11.4.0 | - | Supported-Feature support for Extended filter handling over Gx/Gxx | - | - | - | C3 | C3-69 | C3-120948 | Revised | 2012-06-06 | TEI11 | - | 2012-06-06 |
0858 | 1 | B | Rel-11 | 11.4.0 | 11.5.0 | Supported-Feature support for Extended filter handling over Gx/Gxx | CP-56 | CP-120345 | approved | C3 | C3-69 | C3-121126 | Agreed | 2012-06-06 | TEI11 | - | 2012-06-06 |
0859 | - | F | Rel-7 | 7.13.0 | - | Complete PCC rule in deferred rule procedures (R7 29.212) | - | - | - | C3 | C3-69 | C3-120997 | Revised | 2012-06-06 | PCC | - | 2012-06-06 |
0859 | 1 | F | Rel-7 | 7.13.0 | - | Complete PCC rule in deferred rule procedures (R7 29.212) | - | - | - | C3 | C3-69 | C3-121116 | Revised | 2012-06-06 | PCC | - | 2012-06-06 |
0859 | 2 | F | Rel-7 | 7.13.0 | - | Complete PCC rule in deferred rule procedures (R7 29.212) | - | - | - | C3 | C3-69 | C3-121223 | Revised | 2012-06-06 | PCC | - | 2012-06-06 |
0859 | 3 | F | Rel-7 | 7.13.0 | 7.14.0 | Complete PCC rule in deferred rule procedures (R7 29.212) | CP-56 | CP-120330 | approved | C3 | C3-69 | C3-121270 | Agreed | 2012-06-06 | PCC | - | 2012-06-06 |
0860 | - | A | Rel-8 | 8.15.0 | - | Complete PCC rule in deferred rule procedures (R8 29.212) | - | - | - | C3 | C3-69 | C3-120998 | Revised | 2012-06-06 | PCC | - | 2012-06-06 |
0860 | 1 | A | Rel-8 | 8.15.0 | - | Complete PCC rule in deferred rule procedures (R8 29.212) | - | - | - | C3 | C3-69 | C3-121117 | Revised | 2012-06-06 | PCC | - | 2012-06-06 |
0860 | 2 | A | Rel-8 | 8.15.0 | - | Complete PCC rule in deferred rule procedures (R8 29.212) | - | - | - | C3 | C3-69 | C3-121224 | Revised | 2012-06-06 | PCC | - | 2012-06-06 |
0860 | 3 | A | Rel-8 | 8.15.0 | 8.16.0 | Complete PCC rule in deferred rule procedures (R8 29.212) | CP-56 | CP-120330 | approved | C3 | C3-69 | C3-121271 | Agreed | 2012-06-06 | PCC | - | 2012-06-06 |
0861 | - | A | Rel-9 | 9.10.0 | - | Complete PCC rule in deferred rule procedures (R9 29.212) | - | - | - | C3 | C3-69 | C3-120999 | Revised | 2012-06-06 | PCC | - | 2012-06-06 |
0861 | 1 | A | Rel-9 | 9.10.0 | - | Complete PCC rule in deferred rule procedures (R9 29.212) | - | - | - | C3 | C3-69 | C3-121118 | Revised | 2012-06-06 | PCC | - | 2012-06-06 |
0861 | 2 | A | Rel-9 | 9.10.0 | - | Complete PCC rule in deferred rule procedures (R9 29.212) | - | - | - | C3 | C3-69 | C3-121225 | Revised | 2012-06-06 | PCC | - | 2012-06-06 |
0861 | 3 | A | Rel-9 | 9.10.0 | 9.11.0 | Complete PCC rule in deferred rule procedures (R9 29.212) | CP-56 | CP-120330 | approved | C3 | C3-69 | C3-121272 | Agreed | 2012-06-06 | PCC | - | 2012-06-06 |
0862 | - | A | Rel-10 | 10.6.0 | - | Complete PCC rule in deferred rule procedures (R10 29.212) | - | - | - | C3 | C3-69 | C3-121000 | Revised | 2012-06-06 | PCC | - | 2012-06-06 |
0862 | 1 | A | Rel-10 | 10.6.0 | - | Complete PCC rule in deferred rule procedures (R10 29.212) | - | - | - | C3 | C3-69 | C3-121119 | Revised | 2012-06-06 | PCC | - | 2012-06-06 |
0862 | 2 | A | Rel-10 | 10.6.0 | - | Complete PCC rule in deferred rule procedures (R10 29.212) | - | - | - | C3 | C3-69 | C3-121226 | Revised | 2012-06-06 | PCC | - | 2012-06-06 |
0862 | 3 | A | Rel-10 | 10.6.0 | 10.7.0 | Complete PCC rule in deferred rule procedures (R10 29.212) | CP-56 | CP-120330 | approved | C3 | C3-69 | C3-121273 | Agreed | 2012-06-06 | PCC | - | 2012-06-06 |
0863 | - | A | Rel-11 | 11.4.0 | - | Complete PCC rule in deferred rule procedures (R11 29.212) | - | - | - | C3 | C3-69 | C3-121001 | Revised | 2012-06-06 | PCC | - | 2012-06-06 |
0863 | 1 | A | Rel-11 | 11.4.0 | - | Complete PCC rule in deferred rule procedures (R11 29.212) | - | - | - | C3 | C3-69 | C3-121120 | Revised | 2012-06-06 | PCC | - | 2012-06-06 |
0863 | 2 | A | Rel-11 | 11.4.0 | - | Complete PCC rule in deferred rule procedures (R11 29.212) | - | - | - | C3 | C3-69 | C3-121227 | Revised | 2012-06-06 | PCC | - | 2012-06-06 |
0863 | 3 | A | Rel-11 | 11.4.0 | 11.5.0 | Complete PCC rule in deferred rule procedures (R11 29.212) | CP-56 | CP-120330 | approved | C3 | C3-69 | C3-121274 | Agreed | 2012-06-06 | PCC | - | 2012-06-06 |
0864 | - | B | Rel-11 | 11.4.0 | - | PCC impact on SIRIG (R11 29.212) | - | - | - | C3 | C3-69 | C3-121009 | Withdrawn | 2012-06-06 | SIRIG | - | 2012-06-06 |
0865 | - | B | Rel-11 | 11.4.0 | - | Transport of ePDG or PGW IP address (TS29.212) | - | - | - | C3 | C3-69 | C3-121017 | Revised | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0865 | 1 | B | Rel-11 | 11.4.0 | - | Transport of ePDG or PGW IP address (TS29.212) | - | - | - | C3 | C3-69 | C3-121136 | Revised | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0865 | 2 | B | Rel-11 | 11.4.0 | 11.5.0 | Transport of ePDG or PGW IP address (TS29.212) | CP-56 | CP-120350 | approved | C3 | C3-69 | C3-121232 | Agreed | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0866 | - | F | Rel-11 | 11.4.0 | - | Resolve the FFS of CS-Service-Request-Operation AVP | - | - | - | C3 | C3-69 | C3-121019 | Revised | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0866 | 1 | F | Rel-11 | 11.4.0 | - | Resolve the FFS of CS-Service-Request-Operation AVP | - | - | - | C3 | C3-69 | C3-121143 | Revised | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0866 | 2 | B | Rel-11 | 11.4.0 | 11.5.0 | Resolve the FFS of CS-Service-Request-Operation AVP | CP-56 | CP-120350 | approved | C3 | C3-69 | C3-121233 | Agreed | 2012-06-06 | BBAI_BBI-CT | - | 2012-06-06 |
0867 | - | F | Rel-11 | 11.4.0 | - | Clarification of Sd reference point overview | - | - | - | C3 | C3-69 | C3-121041 | Revised | 2012-06-06 | SAPP-CT3 | - | 2012-06-06 |
0867 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | Clarification of Sd reference point overview | CP-56 | CP-120346 | approved | C3 | C3-69 | C3-121210 | Agreed | 2012-06-06 | SAPP-CT3 | - | 2012-06-06 |
0868 | - | F | Rel-11 | 11.4.0 | - | TDF session Linking in case of unsolicited application | - | - | - | C3 | C3-69 | C3-121042 | Revised | 2012-06-06 | SAPP-CT3 | - | 2012-06-06 |
0868 | 1 | F | Rel-11 | 11.4.0 | - | TDF session Linking in case of unsolicited application | - | - | - | C3 | C3-69 | C3-121211 | Revised | 2012-06-06 | SAPP-CT3 | - | 2012-06-06 |
0868 | 2 | F | Rel-11 | 11.4.0 | 11.5.0 | TDF session Linking in case of unsolicited application | CP-56 | CP-120346 | approved | C3 | C3-69 | C3-121275 | Agreed | 2012-06-06 | SAPP-CT3 | - | 2012-06-06 |
0869 | - | B | Rel-11 | 11.4.0 | - | Support of rSRVCC in Gx | - | - | - | C3 | C3-69 | C3-121047 | Revised | 2012-06-06 | rSRVCC-CT | - | 2012-06-06 |
0870 | - | F | Rel-11 | 11.5.0 | - | 29.212 header correction to remove Sd | - | - | - | C3 | C3-70 | C3-121285 | Tech Endorsed | 2012-08-31 | SAPP-CT3 | Agreed internally | 2012-08-31 |
0871 | - | F | Rel-11 | 11.5.0 | - | ADC Rule mapping | - | - | - | C3 | C3-70 | C3-121295 | Postponed | 2012-08-31 | SAPP-CT3 | - | 2012-08-31 |
0872 | - | B | Rel-11 | 11.5.0 | 11.6.0 | BBAI related Event Triggers completion | CP-57 | CP-120528 | approved | C3 | C3-70 | C3-121371 | Agreed | 2012-08-31 | BBAI_BBI-CT | - | 2012-08-31 |
0873 | - | B | Rel-11 | 11.5.0 | - | Inclusion of ePDG/PGW IP Address in Gx/Gxx procedures | - | - | - | C3 | C3-70 | C3-121376 | Revised | 2012-08-31 | BBAI_BBI-CT | Merged with C3-121438 into C3-121549 | 2012-08-31 |
0873 | 1 | B | Rel-11 | 11.5.0 | 11.6.0 | Inclusion of ePDG/PGW IP Address in Gx/Gxx procedures | CP-57 | CP-120528 | approved | C3 | C3-70 | C3-121549 | Agreed | 2012-08-31 | BBAI_BBI-CT | - | 2012-08-31 |
0874 | - | B | Rel-11 | 11.5.0 | - | Completion of Sd procedures for BBAI II | - | - | - | C3 | C3-70 | C3-121377 | Revised | 2012-08-31 | BBAI_BBII-CT | - | 2012-08-31 |
0874 | 1 | B | Rel-11 | 11.5.0 | 11.6.0 | Completion of Sd procedures for BBAI II | CP-57 | CP-120529 | approved | C3 | C3-70 | C3-121575 | Agreed | 2012-08-31 | BBAI_BBII-CT | - | 2012-08-31 |
0875 | 1 | B | Rel-11 | 11.5.0 | - | Addition of PLMN ID for NETLOC in TS 29.212 | CP-57 | CP-120534 | reissued | C3 | C3-70 | C3-121667 | Agreed | 2012-08-31 | NWK-PL2IMS_CT | - | 2012-08-31 |
0875 | 1 | B | Rel-11 | 11.5.0 | 11.6.0 | Addition of PLMN ID for NETLOC in TS 29.212 | CP-57 | CP-120646 | approved | C3 | - | - | - | 2012-09-03 | NWK-PL2IMS_CT | - | 2012-09-05 |
0876 | - | F | Rel-8 | 8.16.0 | - | Store session information and identify IP-CAN Session (R8 29.212) | - | - | - | C3 | C3-70 | C3-121404 | Withdrawn | 2012-08-31 | SAES-St3-PCC | - | 2012-08-31 |
0877 | - | A | Rel-9 | 9.11.0 | - | Store session information and identify IP-CAN Session (R9 29.212) | - | - | - | C3 | C3-70 | C3-121405 | Withdrawn | 2012-08-31 | SAES-St3-PCC | - | 2012-08-31 |
0878 | - | A | Rel-10 | 10.7.0 | - | Store session information and identify IP-CAN Session (R10 29.212) | - | - | - | C3 | C3-70 | C3-121406 | Withdrawn | 2012-08-31 | SAES-St3-PCC | - | 2012-08-31 |
0879 | - | A | Rel-11 | 11.5.0 | - | Store session information and identify IP-CAN Session (R11 29.212) | - | - | - | C3 | C3-70 | C3-121407 | Withdrawn | 2012-08-31 | SAES-St3-PCC | - | 2012-08-31 |
0880 | - | F | Rel-8 | 8.16.0 | - | TFT usage for the primary PDP context when using PGW (R8 29.212) | - | - | - | C3 | C3-70 | C3-121412 | Postponed | 2012-08-31 | SAES-St3-PCC | - | 2012-08-31 |
0881 | - | A | Rel-9 | 9.11.0 | - | TFT usage for the primary PDP context when using PGW (R9 29.212) | - | - | - | C3 | C3-70 | C3-121413 | Postponed | 2012-08-31 | SAES-St3-PCC | - | 2012-08-31 |
0882 | - | A | Rel-10 | 10.7.0 | - | TFT usage for the primary PDP context when using PGW (R10 29.212) | - | - | - | C3 | C3-70 | C3-121414 | Postponed | 2012-08-31 | SAES-St3-PCC | - | 2012-08-31 |
0883 | - | A | Rel-11 | 11.5.0 | - | TFT usage for the primary PDP context when using PGW (R11 29.212) | - | - | - | C3 | C3-70 | C3-121415 | Postponed | 2012-08-31 | SAES-St3-PCC | - | 2012-08-31 |
0884 | - | F | Rel-10 | 10.7.0 | - | Removal of Maximum MBR APN-AMBR (R10 29.212) | - | - | - | C3 | C3-70 | C3-121420 | Revised | 2012-08-31 | SAES-St3-PCC | - | 2012-08-31 |
0884 | 1 | F | Rel-10 | 10.7.0 | 10.8.0 | Removal of Maximum MBR APN-AMBR (R10 29.212) | CP-57 | CP-120520 | approved | C3 | C3-70 | C3-121723 | Agreed | 2012-08-31 | PCC-Enh | - | 2012-08-31 |
0885 | - | A | Rel-11 | 11.5.0 | - | Removal of Maximum MBR APN-AMBR (R11 29.212) | - | - | - | C3 | C3-70 | C3-121421 | Revised | 2012-08-31 | SAES-St3-PCC | - | 2012-08-31 |
0885 | 1 | A | Rel-11 | 11.5.0 | 11.6.0 | Removal of Maximum MBR APN-AMBR (R11 29.212) | CP-57 | CP-120520 | approved | C3 | C3-70 | C3-121719 | Agreed | 2012-08-31 | PCC-Enh | - | 2012-08-31 |
0886 | - | F | Rel-11 | 11.5.0 | - | PCC support for rSRVCC (R11 29.212) | - | - | - | C3 | C3-70 | C3-121423 | Postponed | 2012-08-31 | rSRVCC-CT | - | 2012-08-31 |
0887 | - | F | Rel-11 | 11.5.0 | - | Addition of PLMN ID for NETLOC (R11 29.212) | - | - | - | C3 | C3-70 | C3-121425 | Revised | 2012-08-31 | NWK-PL2IMS_CT | Merged with C3-121403 into C3-121667 | 2012-08-31 |
0888 | - | F | Rel-11 | 11.5.0 | - | Serving network limitation for PCC Rule Authorization (R11 29.212) | - | - | - | C3 | C3-70 | C3-121427 | Revised | 2012-08-31 | SAES-St3-PCC | - | 2012-08-31 |
0888 | 1 | F | Rel-11 | 11.5.0 | - | Serving network limitation for PCC Rule Authorization (R11 29.212) | - | - | - | C3 | C3-70 | C3-121671 | Revised | 2012-08-31 | SAES-St3-PCC | - | 2012-08-31 |
0888 | 2 | F | Rel-11 | 11.5.0 | 11.6.0 | Serving network limitation for PCC Rule Authorization (R11 29.212) | CP-57 | CP-120536 | approved | C3 | C3-70 | C3-121720 | Agreed | 2012-08-31 | SAES-St3-PCC | - | 2012-08-31 |
0889 | - | F | Rel-11 | 11.5.0 | - | Supported feature for R11 (R11 29.212) | - | - | - | C3 | C3-70 | C3-121429 | Revised | 2012-08-31 | SAES-St3-PCC | Merged with C3-121509 into C3-121662 | 2012-08-31 |
0889 | 1 | F | Rel-11 | 11.5.0 | 11.6.0 | Supported feature for R11 (R11 29.212) | CP-57 | CP-120536 | approved | C3 | C3-70 | C3-121662 | Agreed | 2012-08-31 | SAES-St3-PCC | - | 2012-08-31 |
0890 | - | F | Rel-11 | 11.5.0 | - | Correction of redirection functionality (R11 29.212) | - | - | - | C3 | C3-70 | C3-121431 | Postponed | 2012-08-31 | SAPP-CT3 | - | 2012-08-31 |
0891 | - | F | Rel-11 | 11.5.0 | - | Usage monitoring congestion handling (R11 29.212) | - | - | - | C3 | C3-70 | C3-121432 | Revised | 2012-08-31 | TEI11 | Merged with C3-121508 into C3-121664 | 2012-08-31 |
0892 | - | F | Rel-11 | 11.5.0 | - | Available APN for Gateway Control Session Establishment (R11 29.212) | - | - | - | C3 | C3-70 | C3-121438 | Revised | 2012-08-31 | BBAI_BBI-CT | Merged with C3-121376 into C3-121549 | 2012-08-31 |
0893 | - | F | Rel-11 | 11.5.0 | - | Definition of case 1, case 2a and case 2b (R11 29.212) | - | - | - | C3 | C3-70 | C3-121439 | Revised | 2012-08-31 | BBAI_BBI-CT | - | 2012-08-31 |
0893 | 1 | F | Rel-11 | 11.5.0 | 11.6.0 | Definition of case 1, case 2a and case 2b (R11 29.212) | CP-57 | CP-120528 | approved | C3 | C3-70 | C3-121550 | Agreed | 2012-08-31 | BBAI_BBI-CT | - | 2012-08-31 |
0894 | - | F | Rel-7 | 7.14.0 | - | Clarification of QoS authorization in the case that QoS upgrated is not supported | - | - | - | C3 | C3-70 | C3-121486 | Postponed | 2012-08-31 | PCC | - | 2012-08-31 |
0895 | - | A | Rel-8 | 8.16.0 | - | Clarification of QoS authorization in the case that QoS upgrated is not supported | - | - | - | C3 | C3-70 | C3-121487 | Postponed | 2012-08-31 | PCC | - | 2012-08-31 |
0896 | - | A | Rel-9 | 9.11.0 | - | Clarification of QoS authorization in the case that QoS upgrated is not supported | - | - | - | C3 | C3-70 | C3-121488 | Postponed | 2012-08-31 | PCC | - | 2012-08-31 |
0897 | - | A | Rel-10 | 10.7.0 | - | Clarification of QoS authorization in the case that QoS upgrated is not supported | - | - | - | C3 | C3-70 | C3-121489 | Postponed | 2012-08-31 | PCC | - | 2012-08-31 |
0898 | - | A | Rel-11 | 11.5.0 | - | Clarification of QoS authorization in the case that QoS upgrated is not supported | - | - | - | C3 | C3-70 | C3-121490 | Postponed | 2012-08-31 | PCC | - | 2012-08-31 |
0899 | - | F | Rel-11 | 11.5.0 | - | Clarification of the redirection function | - | - | - | C3 | C3-70 | C3-121491 | Revised | 2012-08-31 | SAPP-CT3 | - | 2012-08-31 |
0899 | 1 | F | Rel-11 | 11.5.0 | 11.6.0 | Clarification of the redirection function | CP-57 | CP-120523 | approved | C3 | C3-70 | C3-121583 | Agreed | 2012-08-31 | SAPP-CT3 | - | 2012-08-31 |
0900 | - | B | Rel-11 | 11.5.0 | - | Support of rSRVCC in Gx | - | - | - | C3 | C3-70 | C3-121492 | Postponed | 2012-08-31 | rSRVCC-CT | - | 2012-08-31 |
0901 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Correction to the scope of BBAI annex | CP-57 | CP-120528 | approved | C3 | C3-70 | C3-121493 | Agreed | 2012-08-31 | BBAI_BBI-CT | - | 2012-08-31 |
0902 | - | B | Rel-11 | 11.5.0 | - | Including the ePDG address and P-GW address on Gx and Gxx | - | - | - | C3 | C3-70 | C3-121494 | Revised | 2012-08-31 | BBAI_BBI-CT | - | 2012-08-31 |
0902 | 1 | B | Rel-11 | 11.5.0 | 11.6.0 | Including the ePDG address and P-GW address on Gx and Gxx | CP-57 | CP-120528 | approved | C3 | C3-70 | C3-121672 | Agreed | 2012-08-31 | BBAI_BBI-CT | - | 2012-08-31 |
0903 | - | B | Rel-11 | 11.5.0 | 11.6.0 | Including the UDP-Source-Port in the Qos-Rule-Install | CP-57 | CP-120528 | approved | C3 | C3-70 | C3-121495 | Agreed | 2012-08-31 | BBAI_BBI-CT | - | 2012-08-31 |
0904 | - | B | Rel-11 | 11.5.0 | 11.6.0 | Unsolicited application reporting for BBAI | CP-57 | CP-120528 | approved | C3 | C3-70 | C3-121496 | Agreed | 2012-08-31 | BBAI_BBI-CT | - | 2012-08-31 |
0905 | - | B | Rel-11 | 11.5.0 | - | Remove the IP-CAN type and RAT Type from the Gx/Gxx protocol | - | - | - | C3 | C3-70 | C3-121497 | Revised | 2012-08-31 | BBAI_BBI-CT | - | 2012-08-31 |
0905 | 1 | B | Rel-11 | 11.5.0 | - | Remove the IP-CAN type and RAT Type from the Gx/Gxx protocol | - | - | - | C3 | C3-70 | C3-121554 | Revised | 2012-08-31 | BBAI_BBI-CT | - | 2012-08-31 |
0905 | 2 | B | Rel-11 | 11.5.0 | 11.6.0 | Removal of RAT-Type BBF-WLAN from the Gx/Gxx protocol | CP-57 | CP-120528 | approved | C3 | C3-70 | C3-121727 | Agreed | 2012-08-31 | BBAI_BBI-CT | - | 2012-08-31 |
0906 | - | B | Rel-11 | 11.5.0 | 11.6.0 | Remove the editors note regarding the supported feature for NSWO | CP-57 | CP-120529 | approved | C3 | C3-70 | C3-121501 | Agreed | 2012-08-31 | BBAI_BBII-CT | - | 2012-08-31 |
0907 | - | B | Rel-11 | 11.5.0 | - | Define the new IP-CAN type value BBF for the NSWO case | - | - | - | C3 | C3-70 | C3-121502 | Withdrawn | 2012-08-31 | BBAI_BBII-CT | - | 2012-08-31 |
0908 | - | F | Rel-11 | 11.5.0 | - | Clarification of the usage monitoring congestion handling | - | - | - | C3 | C3-70 | C3-121508 | Revised | 2012-08-31 | TEI11 | Merged with C3-121432 into C3-121664 | 2012-08-31 |
0908 | 1 | F | Rel-11 | 11.5.0 | - | Clarification of the usage monitoring congestion handling | - | - | - | C3 | C3-70 | C3-121664 | Revised | 2012-08-31 | TEI11 | - | 2012-08-31 |
0908 | 2 | F | Rel-11 | 11.5.0 | 11.6.0 | Clarification of the usage monitoring congestion handling | CP-57 | CP-120522 | approved | C3 | C3-70 | C3-121722 | Agreed | 2012-08-31 | TEI11 | - | 2012-08-31 |
0909 | - | B | Rel-11 | 11.5.0 | - | Remove the FFS regarding the mandatory feature in Rel11 | - | - | - | C3 | C3-70 | C3-121509 | Revised | 2012-08-31 | TEI11 | Merged with C3-121429 into C3-121662 | 2012-08-31 |
0910 | - | F | Rel-11 | 11.5.0 | - | Clean-up of TS 29.212 to align with the new specification number | - | - | - | C3 | C3-70 | C3-121538 | Withdrawn | 2012-08-31 | TEI11 | - | 2012-08-31 |
0911 | - | F | Rel-11 | 11.5.0 | - | Title correction | CP-57 | CP-120521 | revised | C3 | C3-70 | C3-121568 | Agreed | 2012-08-31 | TEI11 | -> CP-120655 | 2012-08-31 |
0911 | 1 | F | Rel-11 | 11.5.0 | 11.6.0 | Title correction | CP-57 | CP-120655 | approved | Allot Communications, Juniper Networks | - | - | - | 2012-09-06 | TEI11 | - | 2012-09-06 |
0912 | - | F | Rel-11 | 11.6.0 | - | Clarification of Supported-Features AVP (29.212 R11) | - | - | - | C3 | C3-71 | C3-121800 | Revised | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0912 | 1 | F | Rel-11 | 11.6.0 | - | Clarification of Supported-Features AVP (29.212 R11) | - | - | - | C3 | C3-71 | C3-122014 | Revised | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0912 | 2 | F | Rel-11 | 11.6.0 | 11.7.0 | Clarification of Supported-Features AVP (29.212 R11) | CP-58 | CP-120843 | approved | C3 | C3-71 | C3-122095 | Agreed | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0913 | - | F | Rel-8 | 8.16.0 | - | QCI and ARP handling, Gn connected P-GW | - | - | - | C3 | C3-71 | C3-121804 | Revised | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0913 | 1 | F | Rel-8 | 8.16.0 | 8.17.0 | QCI and ARP handling, Gn connected P-GW | CP-58 | CP-120824 | approved | C3 | C3-71 | C3-122010 | Agreed | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0914 | - | A | Rel-9 | 9.11.0 | - | QCI and ARP handling, Gn connected P-GW | - | - | - | C3 | C3-71 | C3-121805 | Revised | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0914 | 1 | A | Rel-9 | 9.11.0 | 9.12.0 | QCI and ARP handling, Gn connected P-GW | CP-58 | CP-120824 | approved | C3 | C3-71 | C3-122011 | Agreed | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0915 | - | A | Rel-10 | 10.8.0 | - | QCI and ARP handling, Gn connected P-GW | - | - | - | C3 | C3-71 | C3-121806 | Revised | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0915 | 1 | A | Rel-10 | 10.8.0 | 10.9.0 | QCI and ARP handling, Gn connected P-GW | CP-58 | CP-120824 | approved | C3 | C3-71 | C3-122012 | Agreed | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0916 | - | A | Rel-11 | 11.6.0 | - | QCI and ARP handling, Gn connected P-GW | - | - | - | C3 | C3-71 | C3-121807 | Revised | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0916 | 1 | A | Rel-11 | 11.6.0 | 11.7.0 | QCI and ARP handling, Gn connected P-GW | CP-58 | CP-120824 | approved | C3 | C3-71 | C3-122013 | Agreed | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0917 | - | F | Rel-11 | 11.6.0 | - | Correction of redirection functionality | - | - | - | C3 | C3-71 | C3-121814 | Merged | 2012-11-28 | SAPP-CT3 | - | 2012-11-28 |
0918 | - | B | Rel-11 | 11.6.0 | - | PCC Impacts due to SGW Restoration procedures | - | - | - | C3 | C3-71 | C3-121815 | Merged | 2012-11-28 | eNR_EPC | - | 2012-11-28 |
0918 | 1 | B | Rel-11 | 11.6.0 | - | PCC Impacts due to SGW Restoration procedures | CP-58 | CP-120834 | revised | C3 | C3-71 | C3-122064 | Agreed | 2012-11-28 | eNR_EPC | cover page error, tick boxes, clauses affected | 2012-11-28 |
0918 | 2 | B | Rel-11 | 11.6.0 | 11.7.0 | PCC Impacts due to SGW Restoration procedures | CP-58 | CP-120912 | approved | CP | - | CP-120912 | - | 2012-12-07 | eNR_EPC | - | 2012-12-07 |
0919 | - | F | Rel-11 | 11.6.0 | - | End of CS to PS handover procedure | - | - | - | C3 | C3-71 | C3-121819 | Merged | 2012-11-28 | rSRVCC-CT | - | 2012-11-28 |
0919 | 1 | F | Rel-11 | 11.6.0 | - | End of CS to PS handover procedure | - | - | - | C3 | C3-71 | C3-122020 | Revised | 2012-11-28 | rSRVCC-CT | - | 2012-11-28 |
0919 | 2 | F | Rel-11 | 11.6.0 | 11.7.0 | End of CS to PS handover procedure | CP-58 | CP-120838 | approved | C3 | C3-71 | C3-122098 | Agreed | 2012-11-28 | rSRVCC-CT | - | 2012-11-28 |
0920 | - | F | Rel-7 | 7.14.0 | - | QoS parameters which can be upgraded or downgraded (R7 29.212) | - | - | - | C3 | C3-71 | C3-121857 | Merged | 2012-11-28 | PCC | - | 2012-11-28 |
0920 | 1 | F | Rel-7 | 7.14.0 | - | QoS parameters which can be upgraded or downgraded (R7 29.212) | - | - | - | C3 | C3-71 | C3-122001 | Revised | 2012-11-28 | PCC | - | 2012-11-28 |
0920 | 2 | F | Rel-7 | 7.14.0 | 7.15.0 | QoS parameters which can be upgraded or downgraded (R7 29.212) | CP-58 | CP-120823 | approved | C3 | C3-71 | C3-122074 | Agreed | 2012-11-28 | PCC | - | 2012-11-28 |
0921 | - | A | Rel-8 | 8.16.0 | - | QoS parameters which can be upgraded or downgraded (R8 29.212) | - | - | - | C3 | C3-71 | C3-121858 | Merged | 2012-11-28 | PCC | - | 2012-11-28 |
0921 | 1 | A | Rel-8 | 8.16.0 | - | QoS parameters which can be upgraded or downgraded (R8 29.212) | - | - | - | C3 | C3-71 | C3-122002 | Revised | 2012-11-28 | PCC | - | 2012-11-28 |
0921 | 2 | A | Rel-8 | 8.16.0 | - | QoS parameters which can be upgraded or downgraded (R8 29.212) | - | - | - | C3 | C3-71 | C3-122075 | Revised | 2012-11-28 | PCC | - | 2012-11-28 |
0921 | 3 | A | Rel-8 | 8.16.0 | 8.17.0 | QoS parameters which can be upgraded or downgraded (R8 29.212) | CP-58 | CP-120823 | approved | C3 | C3-71 | C3-122113 | Agreed | 2012-11-28 | PCC | - | 2012-11-28 |
0922 | - | A | Rel-9 | 9.11.0 | - | QoS parameters which can be upgraded or downgraded (R9 29.212) | - | - | - | C3 | C3-71 | C3-121859 | Merged | 2012-11-28 | PCC | - | 2012-11-28 |
0922 | 1 | A | Rel-9 | 9.11.0 | - | QoS parameters which can be upgraded or downgraded (R9 29.212) | - | - | - | C3 | C3-71 | C3-122003 | Revised | 2012-11-28 | PCC | - | 2012-11-28 |
0922 | 2 | A | Rel-9 | 9.11.0 | 9.12.0 | QoS parameters which can be upgraded or downgraded (R9 29.212) | CP-58 | CP-120823 | approved | C3 | C3-71 | C3-122076 | Agreed | 2012-11-28 | PCC | - | 2012-11-28 |
0923 | - | A | Rel-10 | 10.8.0 | - | QoS parameters which can be upgraded or downgraded (R10 29.212) | - | - | - | C3 | C3-71 | C3-121860 | Merged | 2012-11-28 | PCC | - | 2012-11-28 |
0923 | 1 | A | Rel-10 | 10.8.0 | - | QoS parameters which can be upgraded or downgraded (R10 29.212) | - | - | - | C3 | C3-71 | C3-122004 | Revised | 2012-11-28 | PCC | - | 2012-11-28 |
0923 | 2 | A | Rel-10 | 10.8.0 | 10.9.0 | QoS parameters which can be upgraded or downgraded (R10 29.212) | CP-58 | CP-120823 | approved | C3 | C3-71 | C3-122077 | Agreed | 2012-11-28 | PCC | - | 2012-11-28 |
0924 | - | A | Rel-11 | 11.6.0 | - | QoS parameters which can be upgraded or downgraded (R11 29.212) | - | - | - | C3 | C3-71 | C3-121861 | Merged | 2012-11-28 | PCC | - | 2012-11-28 |
0924 | 1 | A | Rel-11 | 11.6.0 | - | QoS parameters which can be upgraded or downgraded (R11 29.212) | - | - | - | C3 | C3-71 | C3-122005 | Revised | 2012-11-28 | PCC | - | 2012-11-28 |
0924 | 2 | A | Rel-11 | 11.6.0 | 11.7.0 | QoS parameters which can be upgraded or downgraded (R11 29.212) | CP-58 | CP-120823 | approved | C3 | C3-71 | C3-122078 | Agreed | 2012-11-28 | PCC | - | 2012-11-28 |
0925 | - | F | Rel-11 | 11.6.0 | - | Clean up of Editor's Notes (R11 29.212) | - | - | - | C3 | C3-71 | C3-121866 | Revised | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0925 | 1 | F | Rel-11 | 11.6.0 | 11.7.0 | Clean up of Editor's Notes (R11 29.212) | CP-58 | CP-120843 | approved | C3 | C3-71 | C3-122021 | Agreed | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0926 | - | F | Rel-11 | 11.6.0 | - | IP-CAN session termination when usage quota reached (R11 29.212) | - | - | - | C3 | C3-71 | C3-121870 | Withdrawn | 2012-11-28 | PCC-Enh | - | 2012-11-28 |
0927 | - | F | Rel-11 | 11.6.0 | - | Correction on ADC functionality description (R11 29.212) | - | - | - | C3 | C3-71 | C3-121871 | Revised | 2012-11-28 | SAPP-CT3 | - | 2012-11-28 |
0927 | 1 | F | Rel-11 | 11.6.0 | 11.7.0 | Correction on ADC functionality description (R11 29.212) | CP-58 | CP-120831 | approved | C3 | C3-71 | C3-121989 | Agreed | 2012-11-28 | SAPP-CT3 | - | 2012-11-28 |
0928 | - | F | Rel-11 | 11.6.0 | - | Enforcement order of PCC and ADC rules for PCEF enhanced with ADC (R11 29.212) | - | - | - | C3 | C3-71 | C3-121873 | Revised | 2012-11-28 | SAPP-CT3 | - | 2012-11-28 |
0928 | 1 | F | Rel-11 | 11.6.0 | 11.7.0 | Enforcement order of PCC and ADC rules for PCEF enhanced with ADC (R11 29.212) | CP-58 | CP-120831 | approved | C3 | C3-71 | C3-121993 | Agreed | 2012-11-28 | SAPP-CT3 | - | 2012-11-28 |
0929 | - | F | Rel-11 | 11.6.0 | - | Redirect address for ADC rule (R11 29.212) | - | - | - | C3 | C3-71 | C3-121874 | Merged | 2012-11-28 | SAPP-CT3 | - | 2012-11-28 |
0929 | 1 | F | Rel-11 | 11.6.0 | - | Redirect address for ADC rule (R11 29.212) | - | - | - | C3 | C3-71 | C3-121988 | Revised | 2012-11-28 | SAPP-CT3 | - | 2012-11-28 |
0929 | 2 | F | Rel-11 | 11.6.0 | 11.7.0 | Redirect address for ADC rule (R11 29.212) | CP-58 | CP-120831 | approved | C3 | C3-71 | C3-122085 | Agreed | 2012-11-28 | SAPP-CT3 | - | 2012-11-28 |
0930 | - | F | Rel-11 | 11.6.0 | - | PCC support for rSRVCC (R11 29.212) | - | - | - | C3 | C3-71 | C3-121877 | Merged | 2012-11-28 | rSRVCC-CT | - | 2012-11-28 |
0931 | - | B | Rel-11 | 11.6.0 | - | BBERF (SGW) restoration (R11 29 212) | - | - | - | C3 | C3-71 | C3-121880 | Merged | 2012-11-28 | eNR_EPC | - | 2012-11-28 |
0932 | - | F | Rel-7 | 7.14.0 | - | Clarification of QoS authorization in the case that QoS upgrated is not supported | - | - | - | C3 | C3-71 | C3-121897 | Merged | 2012-11-28 | PCC | - | 2012-11-28 |
0933 | - | A | Rel-8 | 8.16.0 | - | Clarification of QoS authorization in the case that QoS upgrated is not supported | - | - | - | C3 | C3-71 | C3-121898 | Merged | 2012-11-28 | PCC | - | 2012-11-28 |
0934 | - | A | Rel-9 | 9.11.0 | - | Clarification of QoS authorization in the case that QoS upgrated is not supported | - | - | - | C3 | C3-71 | C3-121899 | Merged | 2012-11-28 | PCC | - | 2012-11-28 |
0935 | - | A | Rel-10 | 10.8.0 | - | Clarification of QoS authorization in the case that QoS upgrated is not supported | - | - | - | C3 | C3-71 | C3-121900 | Merged | 2012-11-28 | PCC | - | 2012-11-28 |
0936 | - | A | Rel-11 | 11.6.0 | - | Clarification of QoS authorization in the case that QoS upgrated is not supported | - | - | - | C3 | C3-71 | C3-121901 | Merged | 2012-11-28 | PCC | - | 2012-11-28 |
0937 | - | A | Rel-8 | 8.16.0 | - | Bearer binding mechenism for GPRS | - | - | - | C3 | C3-71 | C3-121902 | Revised | 2012-11-28 | PCC | - | 2012-11-28 |
0937 | 1 | A | Rel-8 | 8.16.0 | 8.17.0 | Bearer binding mechenism for GPRS | CP-58 | CP-120824 | approved | C3 | C3-71 | C3-122006 | Agreed | 2012-11-28 | PCC | - | 2012-11-28 |
0938 | - | A | Rel-9 | 9.11.0 | - | Bearer binding mechenism for GPRS | - | - | - | C3 | C3-71 | C3-121903 | Revised | 2012-11-28 | PCC | - | 2012-11-28 |
0938 | 1 | A | Rel-9 | 9.11.0 | 9.12.0 | Bearer binding mechenism for GPRS | CP-58 | CP-120824 | approved | C3 | C3-71 | C3-122007 | Agreed | 2012-11-28 | PCC | - | 2012-11-28 |
0939 | - | A | Rel-10 | 10.8.0 | - | Bearer binding mechenism for GPRS | - | - | - | C3 | C3-71 | C3-121904 | Revised | 2012-11-28 | PCC | - | 2012-11-28 |
0939 | 1 | A | Rel-10 | 10.8.0 | 10.9.0 | Bearer binding mechenism for GPRS | CP-58 | CP-120824 | approved | C3 | C3-71 | C3-122008 | Agreed | 2012-11-28 | PCC | - | 2012-11-28 |
0940 | - | A | Rel-11 | 11.6.0 | - | Bearer binding mechenism for GPRS | - | - | - | C3 | C3-71 | C3-121905 | Revised | 2012-11-28 | PCC | - | 2012-11-28 |
0940 | 1 | A | Rel-11 | 11.6.0 | 11.7.0 | Bearer binding mechenism for GPRS | CP-58 | CP-120824 | approved | C3 | C3-71 | C3-122009 | Agreed | 2012-11-28 | PCC | - | 2012-11-28 |
0941 | - | F | Rel-11 | 11.6.0 | - | Support of rSRVCC in Gx | - | - | - | C3 | C3-71 | C3-121906 | Merged | 2012-11-28 | rSRVCC-CT | - | 2012-11-28 |
0942 | - | F | Rel-11 | 11.6.0 | - | AN-GW-Address over Gx for EPC-routed | - | - | - | C3 | C3-71 | C3-121911 | Merged | 2012-11-28 | BBAI_BBI-CT | - | 2012-11-28 |
0942 | 1 | F | Rel-11 | 11.6.0 | 11.7.0 | AN-GW-Address over Gx for EPC-routed | CP-58 | CP-120837 | approved | C3 | C3-71 | C3-121998 | Agreed | 2012-11-28 | BBAI_BBI-CT | - | 2012-11-28 |
0943 | - | B | Rel-11 | 11.6.0 | - | PCC impacts of the S-GW restoration | - | - | - | C3 | C3-71 | C3-121919 | Merged | 2012-11-28 | eNR_EPC | - | 2012-11-28 |
0944 | - | F | Rel-11 | 11.6.0 | - | ADC Rule mapping | - | - | - | C3 | C3-71 | C3-121920 | Merged | 2012-11-28 | SAPP-CT3 | - | 2012-11-28 |
0945 | - | F | Rel-8 | 8.16.0 | - | TFT usage for the primary PDP context when using PGW (R8 29.212) | - | - | - | C3 | C3-71 | C3-121932 | Revised | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0945 | 1 | F | Rel-8 | 8.16.0 | - | TFT usage for the primary PDP context when using PGW (R8 29.212) | - | - | - | C3 | C3-71 | C3-122079 | Revised | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0945 | 2 | F | Rel-8 | 8.16.0 | - | TFT usage for the primary PDP context when using PGW (R8 29.212) | - | - | - | C3 | C3-71 | C3-122109 | Revised | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0945 | 3 | F | Rel-8 | 8.16.0 | 8.17.0 | TFT usage for the primary PDP context when using PGW (R8 29.212) | CP-58 | CP-120824 | approved | C3 | C3-71 | C3-122114 | Agreed | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0946 | - | A | Rel-9 | 9.11.0 | - | TFT usage for the primary PDP context when using PGW (R9 29.212) | - | - | - | C3 | C3-71 | C3-121933 | Revised | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0946 | 1 | A | Rel-9 | 9.11.0 | - | TFT usage for the primary PDP context when using PGW (R9 29.212) | - | - | - | C3 | C3-71 | C3-122080 | Revised | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0946 | 2 | A | Rel-9 | 9.11.0 | 9.12.0 | TFT usage for the primary PDP context when using PGW (R9 29.212) | CP-58 | CP-120824 | approved | C3 | C3-71 | C3-122115 | Agreed | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0947 | - | A | Rel-10 | 10.8.0 | - | TFT usage for the primary PDP context when using PGW (R10 29.212) | - | - | - | C3 | C3-71 | C3-121934 | Revised | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0947 | 1 | A | Rel-10 | 10.8.0 | - | TFT usage for the primary PDP context when using PGW (R10 29.212) | - | - | - | C3 | C3-71 | C3-122081 | Revised | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0947 | 2 | A | Rel-10 | 10.8.0 | 10.9.0 | TFT usage for the primary PDP context when using PGW (R10 29.212) | CP-58 | CP-120824 | approved | C3 | C3-71 | C3-122116 | Agreed | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0948 | - | A | Rel-11 | 11.6.0 | - | TFT usage for the primary PDP context when using PGW (R11 29.212) | - | - | - | C3 | C3-71 | C3-121935 | Revised | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0948 | 1 | A | Rel-11 | 11.6.0 | - | TFT usage for the primary PDP context when using PGW (R11 29.212) | - | - | - | C3 | C3-71 | C3-122082 | Revised | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0948 | 2 | A | Rel-11 | 11.6.0 | 11.7.0 | TFT usage for the primary PDP context when using PGW (R11 29.212) | CP-58 | CP-120824 | approved | C3 | C3-71 | C3-122117 | Agreed | 2012-11-28 | SAES-St3-PCC | - | 2012-11-28 |
0949 | - | B | Rel-11 | 11.6.0 | - | Transport of ePDG IP address over Gx | - | - | - | C3 | C3-71 | C3-121936 | Merged | 2012-11-28 | BBAI_BBI-CT | - | 2012-11-28 |
0950 | - | F | Rel-11 | 11.6.0 | - | Clarification to connection establishment procedure on Sd interface | - | - | - | C3 | C3-71 | C3-121938 | Withdrawn | 2012-11-28 | SAPP-CT3 | - | 2012-11-28 |
0951 | - | F | Rel-8 | 8.17.0 | 8.18.0 | Correction for TFT usage for the primary PDP context when using PGW | CP-59 | CP-130059 | approved | C3 | C3-72 | C3-130026 | Agreed | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0952 | - | A | Rel-9 | 9.12.0 | 9.13.0 | Correction for TFT usage for the primary PDP context when using PGW | CP-59 | CP-130059 | approved | C3 | C3-72 | C3-130027 | Agreed | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0953 | - | A | Rel-10 | 10.9.0 | 10.10.0 | Correction for TFT usage for the primary PDP context when using PGW | CP-59 | CP-130059 | approved | C3 | C3-72 | C3-130028 | Agreed | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0954 | - | A | Rel-11 | 11.7.0 | 11.8.0 | Correction for TFT usage for the primary PDP context when using PGW | CP-59 | CP-130059 | approved | C3 | C3-72 | C3-130029 | Agreed | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0955 | - | C | Rel-11 | 11.7.0 | - | Required Changes to implement PCC for CDMA2000 1X and HRPD | - | - | - | C3 | C3-72 | C3-130030 | Withdrawn | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0956 | - | F | Rel-8 | 8.17.0 | - | The scope of Loss_Rec of beaer_29212_R8 | - | - | - | C3 | C3-72 | C3-130039 | Revised | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0956 | 1 | F | Rel-8 | 8.17.0 | 8.18.0 | The scope of Loss_Rec of beaer_29212_R8 | CP-59 | CP-130059 | approved | C3 | C3-72 | C3-130280 | Agreed | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0957 | - | A | Rel-9 | 9.12.0 | - | The scope of Loss_Rec of beaer_29212_R9 | - | - | - | C3 | C3-72 | C3-130040 | Revised | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0957 | 1 | A | Rel-9 | 9.12.0 | 9.13.0 | The scope of Loss_Rec of beaer_29212_R9 | CP-59 | CP-130059 | approved | C3 | C3-72 | C3-130281 | Agreed | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0958 | - | A | Rel-10 | 10.9.0 | - | The scope of Loss_Rec of beaer_29212_R10 | - | - | - | C3 | C3-72 | C3-130041 | Revised | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0958 | 1 | A | Rel-10 | 10.9.0 | 10.10.0 | The scope of Loss_Rec of beaer_29212_R10 | CP-59 | CP-130059 | approved | C3 | C3-72 | C3-130282 | Agreed | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0959 | - | A | Rel-11 | 11.7.0 | - | The scope of Loss_Rec of beaer_29212_R11 | - | - | - | C3 | C3-72 | C3-130042 | Revised | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0959 | 1 | A | Rel-11 | 11.7.0 | 11.8.0 | The scope of Loss_Rec of beaer_29212_R11 | CP-59 | CP-130059 | approved | C3 | C3-72 | C3-130283 | Agreed | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0960 | - | F | Rel-8 | 8.17.0 | - | QCI and ARP handling, Gn connected P-GW (REL-8 29.212) | - | - | - | C3 | C3-72 | C3-130048 | Revised | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0960 | 1 | F | Rel-8 | 8.17.0 | 8.18.0 | QCI and ARP handling, Gn connected P-GW (REL-8 29.212) | CP-59 | CP-130059 | approved | C3 | C3-72 | C3-130284 | Agreed | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0961 | - | A | Rel-9 | 9.12.0 | 9.13.0 | QCI and ARP handling, Gn connected P-GW (R9 29.212) | CP-59 | CP-130059 | approved | C3 | C3-72 | C3-130049 | Agreed | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0962 | - | A | Rel-10 | 10.9.0 | 10.10.0 | QCI and ARP handling, Gn connected P-GW (R10 29.212) | CP-59 | CP-130059 | approved | C3 | C3-72 | C3-130050 | Agreed | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0963 | - | A | Rel-11 | 11.7.0 | 11.8.0 | QCI and ARP handling, Gn connected P-GW (R11 29.212) | CP-59 | CP-130059 | approved | C3 | C3-72 | C3-130051 | Agreed | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0964 | - | F | Rel-9 | 9.12.0 | - | Traffic mapping information sent to UE during the IP-CAN session establishment (R9 29.212) | - | - | - | C3 | C3-72 | C3-130056 | Revised | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0964 | 1 | F | Rel-9 | 9.12.0 | 9.13.0 | Traffic mapping information sent to UE during the IP-CAN session establishment (R9 29.212) | CP-59 | CP-130068 | approved | C3 | C3-72 | C3-130310 | Agreed | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0965 | - | A | Rel-10 | 10.9.0 | - | Traffic mapping information sent to UE during the IP-CAN session establishment (R10 29.212) | - | - | - | C3 | C3-72 | C3-130057 | Revised | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0965 | 1 | A | Rel-10 | 10.9.0 | 10.10.0 | Traffic mapping information sent to UE during the IP-CAN session establishment (R10 29.212) | CP-59 | CP-130068 | approved | C3 | C3-72 | C3-130311 | Agreed | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0966 | - | A | Rel-11 | 11.7.0 | - | Traffic mapping information sent to UE during the IP-CAN session establishment (R11 29.212) | - | - | - | C3 | C3-72 | C3-130058 | Revised | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0966 | 1 | A | Rel-11 | 11.7.0 | 11.8.0 | Traffic mapping information sent to UE during the IP-CAN session establishment (R11 29.212) | CP-59 | CP-130068 | approved | C3 | C3-72 | C3-130312 | Agreed | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0967 | - | F | Rel-11 | 11.7.0 | - | 3GPP-SGSN-MCC-MNC AVP for all accesses (R11 29.212) | - | - | - | C3 | C3-72 | C3-130059 | Merged | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0968 | - | F | Rel-11 | 11.7.0 | - | IP-CAN session termination when usage quota reached (R11 29.212) | - | - | - | C3 | C3-72 | C3-130063 | Revised | 2013-02-19 | PCC | - | 2013-02-20 |
0968 | 1 | F | Rel-12 | 11.7.0 | - | IP-CAN session termination when usage quota reached (R11 29.212) | - | - | - | C3 | C3-72 | C3-130301 | Revised | 2013-02-19 | PCC | - | 2013-02-20 |
0968 | 2 | F | Rel-12 | 11.7.0 | - | IP-CAN session termination when usage quota reached (R11 29.212) | - | - | - | C3 | C3-72 | C3-130316 | Revised | 2013-02-19 | PCC | - | 2013-02-20 |
0968 | 3 | C | Rel-12 | 11.7.0 | - | IP-CAN session termination when usage quota reached (R11 29.212) | - | - | - | C3 | C3-72 | C3-130329 | Revised | 2013-02-19 | PCC | - | 2013-02-20 |
0968 | 4 | C | Rel-12 | 11.7.0 | 12.0.0 | IP-CAN session termination when usage quota reached (R11 29.212) | CP-59 | CP-130082 | approved | C3 | C3-72 | C3-130358 | Agreed | 2013-02-19 | PCC | - | 2013-02-20 |
0969 | - | F | Rel-11 | 11.7.0 | - | Session linking between Sd and Gx interface for IP address not unique | - | - | - | C3 | C3-72 | C3-130077 | Revised | 2013-02-19 | PCC | - | 2013-02-20 |
0969 | 1 | F | Rel-11 | 11.7.0 | - | Session linking between Sd and Gx interface for IP address not unique | - | - | - | C3 | C3-72 | C3-130219 | Postponed | 2013-02-19 | PCC | - | 2013-02-20 |
0970 | - | F | Rel-11 | 11.7.0 | - | Location and PLMN handling in SaMOG (29.212 R11) | - | - | - | C3 | C3-72 | C3-130098 | Revised | 2013-02-19 | SaMOG_WLAN-CN | - | 2013-02-20 |
0970 | 1 | F | Rel-11 | 11.7.0 | - | Location and PLMN handling in SaMOG (29.212 R11) | - | - | - | C3 | C3-72 | C3-130220 | Revised | 2013-02-19 | SaMOG_WLAN-CN | - | 2013-02-20 |
0970 | 2 | F | Rel-11 | 11.7.0 | 11.8.0 | Location and PLMN handling in SaMOG (29.212 R11) | CP-59 | CP-130078 | approved | C3 | C3-72 | C3-130321 | Agreed | 2013-02-19 | SaMOG_WLAN-CN | - | 2013-02-20 |
0971 | - | F | Rel-11 | 11.7.0 | - | Use of Cause Value from RFC 4006 | - | - | - | C3 | C3-72 | C3-130099 | Revised | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0971 | 1 | F | Rel-11 | 11.7.0 | - | Use of Cause Value from RFC 4006 | - | - | - | C3 | C3-72 | C3-130234 | Revised | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0971 | 2 | F | Rel-11 | 11.7.0 | 11.8.0 | Use of Cause Value from RFC 4006 | CP-59 | CP-130080 | approved | C3 | C3-72 | C3-130315 | Agreed | 2013-02-19 | SAES-St3-PCC | - | 2013-02-20 |
0972 | - | F | Rel-11 | 11.7.0 | - | Remove the H(e)NB FQDN from the BBAI (29.212) | - | - | - | C3 | C3-72 | C3-130150 | Revised | 2013-02-19 | BBAI_BBI-CT | - | 2013-02-20 |
0972 | 1 | F | Rel-11 | 11.7.0 | 11.8.0 | Remove the H(e)NB FQDN from the BBAI (29.212) | CP-59 | CP-130077 | approved | C3 | C3-72 | C3-130223 | Agreed | 2013-02-19 | BBAI_BBI-CT | - | 2013-02-20 |
0973 | - | F | Rel-11 | 11.7.0 | 11.8.0 | Add BBAI related AVPs in CCR of Gx and Gxx | CP-59 | CP-130077 | approved | C3 | C3-72 | C3-130151 | Agreed | 2013-02-19 | BBAI_BBI-CT | - | 2013-02-20 |
0974 | - | F | Rel-11 | 11.7.0 | - | Access Network Identifier for Trusted WLAN Access | - | - | - | C3 | C3-72 | C3-130166 | Merged | 2013-02-19 | SaMOG_WLAN-CN | - | 2013-02-20 |
0975 | - | F | Rel-11 | 11.7.0 | - | Correct the session termination of S15 Diameter session | - | - | - | C3 | C3-72 | C3-130168 | Revised | 2013-02-19 | BBAI_BBI-CT | - | 2013-02-20 |
0975 | 1 | F | Rel-11 | 11.7.0 | 11.8.0 | Correct the session termination of S15 Diameter session | CP-59 | CP-130077 | approved | C3 | C3-72 | C3-130228 | Agreed | 2013-02-19 | BBAI_BBI-CT | - | 2013-02-20 |
0976 | - | F | Rel-11 | 11.7.0 | - | Gx Procedures for Retrieval of network related location information | - | - | - | C3 | C3-72 | C3-130190 | Postponed | 2013-02-19 | NWK-PL2IMS-CT | - | 2013-02-20 |
0977 | - | B | Rel-12 | 12.0.0 | - | Reference model update to include Gyn and Gzn | - | - | - | C3 | C3-73 | C3-130361 | Revised | 2013-06-07 | ABC-CT3 | - | 2013-06-07 |
0977 | 1 | B | Rel-12 | 12.0.0 | 12.1.0 | Reference model update to include Gyn and Gzn | CP-60 | CP-130341 | approved | C3 | C3-73 | C3-130793 | Agreed | 2013-06-07 | ABC-CT3 | - | 2013-06-07 |
0978 | - | B | Rel-12 | 12.0.0 | - | Modifcation to 29.212 to reflect S2-130836 to enhance PCC rules for application detection and control | - | - | - | C3 | C3-73 | C3-130366 | Withdrawn | 2013-06-07 | SAPP-CT3 | - | 2013-06-07 |
0979 | - | F | Rel-8 | 8.18.0 | - | Correction in QoS handling procedures in Gn-PGW | - | - | - | C3 | C3-73 | C3-130372 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0979 | 1 | F | Rel-8 | 8.18.0 | - | Correction in QoS handling procedures in Gn-PGW | - | - | - | C3 | C3-73 | C3-130680 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0979 | 2 | F | Rel-8 | 8.18.0 | 8.19.0 | Correction in QoS handling procedures in Gn-PGW | CP-60 | CP-130316 | approved | C3 | C3-73 | C3-130838 | Agreed | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0980 | - | A | Rel-9 | 9.13.0 | - | Correction in QoS handling procedures in Gn-PGW | - | - | - | C3 | C3-73 | C3-130373 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0980 | 1 | A | Rel-9 | 9.13.0 | - | Correction in QoS handling procedures in Gn-PGW | - | - | - | C3 | C3-73 | C3-130681 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0980 | 2 | A | Rel-9 | 9.13.0 | 9.14.0 | Correction in QoS handling procedures in Gn-PGW | CP-60 | CP-130316 | approved | C3 | C3-73 | C3-130839 | Agreed | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0981 | - | A | Rel-10 | 10.10.0 | - | Correction in QoS handling procedures in Gn-PGW | - | - | - | C3 | C3-73 | C3-130374 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0981 | 1 | A | Rel-10 | 10.10.0 | - | Correction in QoS handling procedures in Gn-PGW | - | - | - | C3 | C3-73 | C3-130682 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0981 | 2 | A | Rel-10 | 10.10.0 | 10.11.0 | Correction in QoS handling procedures in Gn-PGW | CP-60 | CP-130316 | approved | C3 | C3-73 | C3-130840 | Agreed | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0982 | - | A | Rel-11 | 11.8.0 | - | Correction in QoS handling procedures in Gn-PGW | - | - | - | C3 | C3-73 | C3-130375 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0982 | 1 | A | Rel-11 | 11.8.0 | - | Correction in QoS handling procedures in Gn-PGW | - | - | - | C3 | C3-73 | C3-130683 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0982 | 2 | A | Rel-11 | 11.8.0 | - | Correction in QoS handling procedures in Gn-PGW | - | - | - | C3 | C3-73 | C3-130827 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0982 | 3 | A | Rel-11 | 11.8.0 | 11.9.0 | Correction in QoS handling procedures in Gn-PGW | CP-60 | CP-130316 | approved | C3 | C3-73 | C3-130841 | Agreed | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0983 | - | A | Rel-12 | 12.0.0 | - | Correction in QoS handling procedures in Gn-PGW | - | - | - | C3 | C3-73 | C3-130376 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0983 | 1 | A | Rel-12 | 12.0.0 | - | Correction in QoS handling procedures in Gn-PGW | - | - | - | C3 | C3-73 | C3-130684 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0983 | 2 | A | Rel-12 | 12.0.0 | 12.1.0 | Correction in QoS handling procedures in Gn-PGW | CP-60 | CP-130316 | approved | C3 | C3-73 | C3-130842 | Agreed | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0984 | - | F | Rel-11 | 11.8.0 | - | IP-CAN Session Modification Rejection during SGW Restoration procedure | - | - | - | C3 | C3-73 | C3-130377 | Revised | 2013-06-07 | eNR_EPC | - | 2013-06-07 |
0984 | 1 | F | Rel-11 | 11.8.0 | - | IP-CAN Session Modification Rejection during SGW Restoration procedure | - | - | - | C3 | C3-73 | C3-130711 | Revised | 2013-06-07 | eNR_EPC | - | 2013-06-07 |
0984 | 2 | F | Rel-11 | 11.8.0 | 11.9.0 | IP-CAN Session Modification Rejection during SGW Restoration procedure | CP-60 | CP-130325 | approved | C3 | C3-73 | C3-130903 | Agreed | 2013-06-07 | eNR_EPC | - | 2013-06-07 |
0985 | - | A | Rel-12 | 12.0.0 | - | IP-CAN Session Modification Rejection during SGW Restoration procedure | - | - | - | C3 | C3-73 | C3-130378 | Revised | 2013-06-07 | eNR_EPC | - | 2013-06-07 |
0985 | 1 | A | Rel-12 | 12.0.0 | 12.1.0 | IP-CAN Session Modification Rejection during SGW Restoration procedure | CP-60 | CP-130325 | approved | C3 | C3-73 | C3-130712 | Agreed | 2013-06-07 | eNR_EPC | - | 2013-06-07 |
0986 | - | F | Rel-11 | 11.8.0 | - | 3GPP-EPS & 3GPP-GPRS access network related location information | - | - | - | C3 | C3-73 | C3-130386 | Merged | 2013-06-07 | NWK-PL2IMS_CT | - | 2013-06-07 |
0987 | - | A | Rel-12 | 12.0.0 | - | 3GPP-EPS & 3GPP-GPRS access network related location information | - | - | - | C3 | C3-73 | C3-130387 | Merged | 2013-06-07 | NWK-PL2IMS_CT | - | 2013-06-07 |
0988 | - | B | Rel-12 | 12.0.0 | - | Time-based usage monitoring control | - | - | - | C3 | C3-73 | C3-130388 | Revised | 2013-06-07 | UMONC-CT3 | - | 2013-06-07 |
0988 | 1 | B | Rel-12 | 12.0.0 | - | Time-based usage monitoring control | - | - | - | C3 | C3-73 | C3-130782 | Revised | 2013-06-07 | UMONC-CT3 | - | 2013-06-07 |
0988 | 2 | B | Rel-12 | 12.0.0 | - | Time-based usage monitoring control (29.212) | - | - | - | C3 | C3-73 | C3-130871 | Revised | 2013-06-07 | UMONC-CT3 | - | 2013-06-07 |
0988 | 3 | B | Rel-12 | 12.0.0 | 12.1.0 | Time-based usage monitoring control | CP-60 | CP-130350 | approved | C3 | C3-73 | C3-130892 | Agreed | 2013-06-07 | UMONC-CT3 | Conditionally approved, SA2 dependence as alternative to '349. | 2013-06-07 |
0989 | - | F | Rel-9 | 9.13.0 | - | Incorrect rule failure code value for PS_to_CS_handover | - | - | - | C3 | C3-73 | C3-130389 | Merged | 2013-06-07 | rSRVCC-CT | - | 2013-06-07 |
0990 | - | F | Rel-11 | 11.8.0 | - | Event-Report-Indication in CCA command | - | - | - | C3 | C3-73 | C3-130466 | Merged | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0991 | - | A | Rel-12 | 12.0.0 | - | Event-Report-Indication in CCA command | - | - | - | C3 | C3-73 | C3-130467 | Merged | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
0992 | - | F | Rel-11 | 11.8.0 | - | Correction of PCC Rules to include support for ADC function | - | - | - | C3 | C3-73 | C3-130472 | Revised | 2013-06-07 | SAPP-CT3 | - | 2013-06-07 |
0992 | 1 | F | Rel-11 | 11.8.0 | - | Correction of PCC Rules to include support for ADC function | - | - | - | C3 | C3-73 | C3-130665 | Revised | 2013-06-07 | SAPP-CT3 | - | 2013-06-07 |
0992 | 2 | F | Rel-11 | 11.8.0 | - | Correction of PCC Rules to include support for ADC function | - | - | - | C3 | C3-73 | C3-130869 | Revised | 2013-06-07 | SAPP-CT3 | - | 2013-06-07 |
0992 | 3 | F | Rel-11 | 11.8.0 | 11.9.0 | Correction of PCC Rules to include support for ADC function | CP-60 | CP-130322 | approved | C3 | C3-73 | C3-130895 | Agreed | 2013-06-07 | SAPP-CT3 | - | 2013-06-07 |
0993 | - | A | Rel-12 | 12.0.0 | - | Correction of PCC Rules to include support for ADC function | - | - | - | C3 | C3-73 | C3-130473 | Revised | 2013-06-07 | SAPP-CT3 | - | 2013-06-07 |
0993 | 1 | B | Rel-12 | 12.0.0 | - | Correction of PCC Rules to include support for ADC function | - | - | - | C3 | C3-73 | C3-130764 | Revised | 2013-06-07 | SAPP-CT3 | - | 2013-06-07 |
0993 | 2 | B | Rel-12 | 12.0.0 | 12.1.0 | Correction of PCC Rules to include support for ADC function | CP-60 | CP-130349 | approved | C3 | C3-73 | C3-130872 | Agreed | 2013-06-07 | SAPP-CT3 | Conditionally approved, SA2 dependence | 2013-06-07 |
0994 | - | F | Rel-11 | 11.8.0 | - | UE IPv4 address avaliability in TDF session establishement | - | - | - | C3 | C3-73 | C3-130478 | Revised | 2013-06-07 | SAPP-CT3 | - | 2013-06-07 |
0994 | 1 | F | Rel-11 | 11.8.0 | 11.9.0 | UE IPv4 address avaliability in TDF session establishement | CP-60 | CP-130322 | approved | C3 | C3-73 | C3-130765 | Agreed | 2013-06-07 | SAPP-CT3 | - | 2013-06-07 |
0995 | - | A | Rel-12 | 12.0.0 | - | UE IPv4 address avaliability in TDF session establishement | - | - | - | C3 | C3-73 | C3-130479 | Revised | 2013-06-07 | SAPP-CT3 | - | 2013-06-07 |
0995 | 1 | A | Rel-12 | 12.0.0 | 12.1.0 | UE IPv4 address avaliability in TDF session establishement | CP-60 | CP-130322 | approved | C3 | C3-73 | C3-130766 | Agreed | 2013-06-07 | SAPP-CT3 | - | 2013-06-07 |
0996 | - | F | Rel-11 | 11.8.0 | - | User Location Information Age | - | - | - | C3 | C3-73 | C3-130481 | Revised | 2013-06-07 | NWK-PL2IMS_CT | - | 2013-06-07 |
0996 | 1 | F | Rel-11 | 11.8.0 | - | User Location Information Age | - | - | - | C3 | C3-73 | C3-130788 | Revised | 2013-06-07 | NWK-PL2IMS_CT | - | 2013-06-07 |
0996 | 2 | F | Rel-11 | 11.8.0 | - | User Location Information Age | - | - | - | C3 | C3-73 | C3-130867 | Revised | 2013-06-07 | NWK-PL2IMS_CT | - | 2013-06-07 |
0996 | 3 | F | Rel-11 | 11.8.0 | - | User Location Information Age | - | - | - | C3 | C3-73 | C3-130896 | Revised | 2013-06-07 | NWK-PL2IMS_CT | - | 2013-06-07 |
0996 | 4 | F | Rel-11 | 11.8.0 | 11.9.0 | User Location Information Age | CP-60 | CP-130331 | approved | C3 | C3-73 | C3-130912 | Agreed | 2013-06-07 | NWK-PL2IMS_CT | - | 2013-06-07 |
0997 | - | A | Rel-12 | 12.0.0 | - | User Location Information Age | - | - | - | C3 | C3-73 | C3-130482 | Revised | 2013-06-07 | NWK-PL2IMS_CT | - | 2013-06-07 |
0997 | 1 | A | Rel-12 | 12.0.0 | - | User Location Information Age | - | - | - | C3 | C3-73 | C3-130789 | Revised | 2013-06-07 | NWK-PL2IMS_CT | - | 2013-06-07 |
0997 | 2 | A | Rel-12 | 12.0.0 | 12.1.0 | User Location Information Age | CP-60 | CP-130331 | approved | C3 | C3-73 | C3-130897 | Agreed | 2013-06-07 | NWK-PL2IMS_CT | - | 2013-06-07 |
0998 | - | F | Rel-11 | 11.8.0 | - | IP-CAN Session Modification Rejection during SGW Restoration procedure | - | - | - | C3 | C3-73 | C3-130487 | Merged | 2013-06-07 | eNR_EPC | - | 2013-06-07 |
0999 | - | A | Rel-12 | 12.0.0 | - | IP-CAN Session Modification Rejection during SGW Restoration procedure | - | - | - | C3 | C3-73 | C3-130488 | Merged | 2013-06-07 | eNR_EPC | - | 2013-06-07 |
1000 | - | B | Rel-12 | 12.0.0 | 12.1.0 | Disabling usage monitoring | CP-60 | CP-130348 | approved | C3 | C3-73 | C3-130495 | Agreed | 2013-06-07 | UMONC-CT3 | Conditionally approved, SA2 dependence | 2013-06-07 |
1001 | - | F | Rel-9 | 9.13.0 | - | Correction of the Rule-Failure-Code AVP enumeration | - | - | - | C3 | C3-73 | C3-130501 | Revised | 2013-06-07 | PCC-Enh | - | 2013-06-07 |
1001 | 1 | F | Rel-9 | 9.13.0 | 9.14.0 | Correction of the Rule-Failure-Code AVP enumeration | CP-60 | CP-130319 | approved | C3 | C3-73 | C3-130695 | Agreed | 2013-06-07 | PCC-Enh | - | 2013-06-07 |
1002 | - | F | Rel-11 | 11.8.0 | - | Correction to event reporting indication | - | - | - | C3 | C3-73 | C3-130512 | Revised | 2013-06-07 | SAPP-CT3 | - | 2013-06-07 |
1002 | 1 | F | Rel-11 | 11.8.0 | 11.9.0 | Correction to event reporting indication | CP-60 | CP-130322 | approved | C3 | C3-73 | C3-130768 | Agreed | 2013-06-07 | SAPP-CT3 | - | 2013-06-07 |
1003 | - | A | Rel-12 | 12.0.0 | - | Correction to event reporting indication | - | - | - | C3 | C3-73 | C3-130513 | Revised | 2013-06-07 | SAPP-CT3 | - | 2013-06-07 |
1003 | 1 | A | Rel-12 | 12.0.0 | 12.1.0 | Correction to event reporting indication | CP-60 | CP-130322 | approved | C3 | C3-73 | C3-130769 | Agreed | 2013-06-07 | SAPP-CT3 | - | 2013-06-07 |
1004 | - | F | Rel-11 | 11.8.0 | - | Supporting BPCF-initiated gatewaycontro and QoS rule request procedure for HNB CS traffic | - | - | - | C3 | C3-73 | C3-130515 | Revised | 2013-06-07 | BBAI_BBI-CT | - | 2013-06-07 |
1004 | 1 | F | Rel-11 | 11.8.0 | - | Supporting BPCF-initiated gatewaycontro and QoS rule request procedure for HNB CS traffic | - | - | - | C3 | C3-73 | C3-130699 | Revised | 2013-06-07 | BBAI_BBI-CT | - | 2013-06-07 |
1004 | 2 | F | Rel-11 | 11.8.0 | 11.9.0 | Supporting BPCF-initiated gatewaycontro and QoS rule request procedure for HNB CS traffic | CP-60 | CP-130328 | approved | C3 | C3-73 | C3-130860 | Agreed | 2013-06-07 | BBAI_BBI-CT | - | 2013-06-07 |
1005 | - | A | Rel-12 | 12.0.0 | - | Supporting BPCF-initiated gatewaycontro and QoS rule request procedure for HNB CS traffic | - | - | - | C3 | C3-73 | C3-130516 | Revised | 2013-06-07 | BBAI_BBI-CT | - | 2013-06-07 |
1005 | 1 | A | Rel-12 | 12.0.0 | - | Supporting BPCF-initiated gatewaycontro and QoS rule request procedure for HNB CS traffic | - | - | - | C3 | C3-73 | C3-130700 | Revised | 2013-06-07 | BBAI_BBI-CT | - | 2013-06-07 |
1005 | 2 | A | Rel-12 | 12.0.0 | 12.1.0 | Supporting BPCF-initiated gatewaycontro and QoS rule request procedure for HNB CS traffic | CP-60 | CP-130328 | approved | C3 | C3-73 | C3-130861 | Agreed | 2013-06-07 | BBAI_BBI-CT | - | 2013-06-07 |
1006 | - | F | Rel-12 | 12.0.0 | - | Clarification of the packet filter id only assigned for the UE-initiated resource modification procedure | - | - | - | C3 | C3-73 | C3-130528 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1006 | 1 | F | Rel-12 | 12.0.0 | 12.1.0 | Clarification of the packet filter id only assigned for the UE-initiated resource modification procedure | CP-60 | CP-130346 | approved | C3 | C3-73 | C3-130715 | Agreed | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1007 | - | F | Rel-11 | 11.8.0 | - | network provided location information related corrections | - | - | - | C3 | C3-73 | C3-130562 | Revised | 2013-06-07 | NWK-PL2IMS_CT | - | 2013-06-07 |
1007 | 1 | F | Rel-11 | 11.8.0 | 11.9.0 | network provided location information related corrections | CP-60 | CP-130331 | approved | C3 | C3-73 | C3-130786 | Agreed | 2013-06-07 | NWK-PL2IMS_CT | - | 2013-06-07 |
1008 | - | A | Rel-12 | 12.0.0 | - | network provided location information related corrections | - | - | - | C3 | C3-73 | C3-130563 | Revised | 2013-06-07 | NWK-PL2IMS_CT | - | 2013-06-07 |
1008 | 1 | A | Rel-12 | 12.0.0 | 12.1.0 | network provided location information related corrections | CP-60 | CP-130331 | approved | C3 | C3-73 | C3-130787 | Agreed | 2013-06-07 | NWK-PL2IMS_CT | - | 2013-06-07 |
1009 | - | F | Rel-8 | 8.18.0 | - | Corrections to the Event Report Indication | - | - | - | C3 | C3-73 | C3-130612 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1009 | 1 | F | Rel-8 | 8.18.0 | - | Corrections to the Event Report Indication (29121 R8) | - | - | - | C3 | C3-73 | C3-130685 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1009 | 2 | F | Rel-8 | 8.18.0 | - | Corrections to the Event Report Indication | - | - | - | C3 | C3-73 | C3-130843 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1009 | 3 | F | Rel-8 | 8.18.0 | 8.19.0 | Corrections to the Event Report Indication | CP-60 | CP-130316 | approved | C3 | C3-73 | C3-130883 | Agreed | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1010 | - | A | Rel-9 | 9.13.0 | - | Corrections to the Event Report Indication | - | - | - | C3 | C3-73 | C3-130613 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1010 | 1 | A | Rel-9 | 9.13.0 | - | Corrections to the Event Report Indication (29212 R9) | - | - | - | C3 | C3-73 | C3-130686 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1010 | 2 | A | Rel-9 | 9.13.0 | - | Corrections to the Event Report Indication | - | - | - | C3 | C3-73 | C3-130844 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1010 | 3 | A | Rel-9 | 9.13.0 | 9.14.0 | Corrections to the Event Report Indication | CP-60 | CP-130316 | approved | C3 | C3-73 | C3-130884 | Agreed | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1011 | - | A | Rel-10 | 10.10.0 | - | Corrections to the Event Report Indication | - | - | - | C3 | C3-73 | C3-130614 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1011 | 1 | A | Rel-10 | 10.10.0 | - | Corrections to the Event Report Indication (29212 R10) | - | - | - | C3 | C3-73 | C3-130687 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1011 | 2 | A | Rel-10 | 10.10.0 | - | Corrections to the Event Report Indication | - | - | - | C3 | C3-73 | C3-130845 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1011 | 3 | A | Rel-10 | 10.10.0 | 10.11.0 | Corrections to the Event Report Indication | CP-60 | CP-130316 | approved | C3 | C3-73 | C3-130885 | Agreed | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1012 | - | A | Rel-11 | 11.8.0 | - | Corrections to the Event Report Indication | - | - | - | C3 | C3-73 | C3-130615 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1012 | 1 | A | Rel-11 | 11.8.0 | - | Corrections to the Event Report Indication (29212 R11) | - | - | - | C3 | C3-73 | C3-130688 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1012 | 2 | A | Rel-11 | 11.8.0 | - | Corrections to the Event Report Indication | - | - | - | C3 | C3-73 | C3-130846 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1012 | 3 | A | Rel-11 | 11.8.0 | 11.9.0 | Corrections to the Event Report Indication | CP-60 | CP-130316 | approved | C3 | C3-73 | C3-130886 | Agreed | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1013 | - | A | Rel-12 | 12.0.0 | - | Corrections to the Event Report Indication | - | - | - | C3 | C3-73 | C3-130616 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1013 | 1 | A | Rel-12 | 12.0.0 | - | Corrections to the Event Report Indication (29212 R12) | - | - | - | C3 | C3-73 | C3-130689 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1013 | 2 | A | Rel-12 | 12.0.0 | - | Corrections to the Event Report Indication | - | - | - | C3 | C3-73 | C3-130847 | Revised | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1013 | 3 | A | Rel-12 | 12.0.0 | 12.1.0 | Corrections to the Event Report Indication | CP-60 | CP-130316 | approved | C3 | C3-73 | C3-130887 | Agreed | 2013-06-07 | SAES-St3-PCC | - | 2013-06-07 |
1014 | - | B | Rel-12 | 12.0.0 | - | Race condition handling for Gx based applications | - | - | - | C3 | C3-73 | C3-130634 | Revised | 2013-06-07 | TEI12 | - | 2013-06-07 |
1014 | 1 | B | Rel-12 | 12.0.0 | - | Race condition handling for Gx based applications | - | - | - | C3 | C3-73 | C3-130679 | Revised | 2013-06-07 | TEI12 | - | 2013-06-07 |
1014 | 2 | B | Rel-12 | 12.0.0 | 12.1.0 | Race condition handling for Gx based applications | CP-60 | CP-130336 | approved | C3 | C3-73 | C3-130800 | Agreed | 2013-06-07 | TEI12 | - | 2013-06-07 |
1015 | - | B | Rel-12 | 12.0.0 | - | Clarify the provision of default PCC rules | - | - | - | C3 | C3-73 | C3-130717 | Revised | 2013-06-07 | PCC | - | 2013-06-07 |
1015 | 1 | A | Rel-12 | 12.0.0 | 12.1.0 | Clarify the provision of PCC rules | CP-60 | CP-130315 | approved | C3 | C3-73 | C3-130866 | Agreed | 2013-06-07 | PCC | - | 2013-06-07 |
1016 | - | F | Rel-8 | 8.18.0 | - | Clarify the provision of default PCC rules | - | - | - | C3 | C3-73 | C3-130833 | Revised | 2013-06-07 | PCC | - | 2013-06-07 |
1016 | 1 | F | Rel-8 | 8.18.0 | 8.19.0 | Clarify the provision of PCC rules | CP-60 | CP-130315 | approved | C3 | C3-73 | C3-130862 | Agreed | 2013-06-07 | PCC | - | 2013-06-07 |
1017 | - | A | Rel-9 | 9.13.0 | - | Clarify the provision of default PCC rules | - | - | - | C3 | C3-73 | C3-130834 | Revised | 2013-06-07 | PCC | - | 2013-06-07 |
1017 | 1 | A | Rel-9 | 9.13.0 | 9.14.0 | Clarify the provision of PCC rules | CP-60 | CP-130315 | approved | C3 | C3-73 | C3-130863 | Agreed | 2013-06-07 | PCC | - | 2013-06-07 |
1018 | - | A | Rel-10 | 10.10.0 | - | Clarify the provision of default PCC rules | - | - | - | C3 | C3-73 | C3-130835 | Revised | 2013-06-07 | PCC | - | 2013-06-07 |
1018 | 1 | A | Rel-10 | 10.10.0 | 10.11.0 | Clarify the provision of PCC rules | CP-60 | CP-130315 | approved | C3 | C3-73 | C3-130864 | Agreed | 2013-06-07 | PCC | - | 2013-06-07 |
1019 | - | A | Rel-11 | 11.8.0 | - | Clarify the provision of default PCC rules | - | - | - | C3 | C3-73 | C3-130836 | Revised | 2013-06-07 | PCC | - | 2013-06-07 |
1019 | 1 | A | Rel-11 | 11.8.0 | 11.9.0 | Clarify the provision of PCC rules | CP-60 | CP-130315 | approved | C3 | C3-73 | C3-130865 | Agreed | 2013-06-07 | PCC | - | 2013-06-07 |
1020 | - | B | Rel-12 | 12.1.0 | - | Addition of Application Based Charging feature | - | - | - | C3 | C3-74 | C3-130927 | Revised | 2013-08-28 | ABC-CT3 | - | 2013-08-30 |
1020 | 1 | B | Rel-12 | 12.1.0 | - | Addition of Application Based Charging feature | - | - | - | C3 | C3-74 | C3-131253 | Revised | 2013-08-28 | ABC-CT3 | - | 2013-08-30 |
1020 | 2 | B | Rel-12 | 12.1.0 | 12.2.0 | Addition of Application Based Charging feature | CP-61 | CP-130561 | approved | C3 | C3-74 | C3-131267 | Agreed | 2013-08-28 | ABC-CT3 | - | 2013-08-30 |
1021 | - | F | Rel-8 | 8.19.0 | 8.20.0 | REVALIDATION_TIMEOUT event trigger over Gxx | CP-61 | CP-130539 | approved | C3 | C3-74 | C3-130968 | Agreed | 2013-08-28 | PCC | - | 2013-08-30 |
1022 | - | A | Rel-9 | 9.14.0 | 9.15.0 | REVALIDATION_TIMEOUT event trigger over Gxx | CP-61 | CP-130539 | approved | C3 | C3-74 | C3-130969 | Agreed | 2013-08-28 | PCC | - | 2013-08-30 |
1023 | - | A | Rel-10 | 10.11.0 | 10.12.0 | REVALIDATION_TIMEOUT event trigger over Gxx | CP-61 | CP-130539 | approved | C3 | C3-74 | C3-130970 | Agreed | 2013-08-28 | PCC | - | 2013-08-30 |
1024 | - | A | Rel-11 | 11.9.0 | - | REVALIDATION_TIMEOUT event trigger over Gxx | - | - | - | C3 | C3-74 | C3-130971 | Revised | 2013-08-28 | PCC | - | 2013-08-30 |
1024 | 1 | A | Rel-11 | 11.9.0 | 11.10.0 | REVALIDATION_TIMEOUT event trigger over Gxx | CP-61 | CP-130539 | approved | C3 | C3-74 | C3-131205 | Agreed | 2013-08-28 | PCC | - | 2013-08-30 |
1025 | - | A | Rel-12 | 12.1.0 | - | REVALIDATION_TIMEOUT event trigger over Gxx | - | - | - | C3 | C3-74 | C3-130972 | Revised | 2013-08-28 | PCC | - | 2013-08-30 |
1025 | 1 | A | Rel-12 | 12.1.0 | 12.2.0 | REVALIDATION_TIMEOUT event trigger over Gxx | CP-61 | CP-130539 | approved | C3 | C3-74 | C3-131206 | Agreed | 2013-08-28 | PCC | - | 2013-08-30 |
1026 | - | F | Rel-11 | 11.9.0 | - | Alignment correction on PCC rule definition in the PCEF | - | - | - | C3 | C3-74 | C3-130973 | Revised | 2013-08-28 | SAPP-CT3 | - | 2013-08-30 |
1026 | 1 | F | Rel-11 | 11.9.0 | 11.10.0 | Alignment correction on PCC rule definition in the PCEF | CP-61 | CP-130548 | approved | C3 | C3-74 | C3-131144 | Agreed | 2013-08-28 | SAPP-CT3 | - | 2013-08-30 |
1027 | - | A | Rel-12 | 12.1.0 | - | Alignment correction on PCC rule definition in the PCEF | - | - | - | C3 | C3-74 | C3-130974 | Revised | 2013-08-28 | SAPP-CT3 | - | 2013-08-30 |
1027 | 1 | A | Rel-12 | 12.1.0 | 12.2.0 | Alignment correction on PCC rule definition in the PCEF | CP-61 | CP-130548 | approved | C3 | C3-74 | C3-131145 | Agreed | 2013-08-28 | SAPP-CT3 | - | 2013-08-30 |
1028 | - | B | Rel-12 | 12.1.0 | - | Adding new Annex to support Fixed Broadband Access network convergence | - | - | - | C3 | C3-74 | C3-130978 | Revised | 2013-08-28 | P4C_F-CT3 | - | 2013-08-30 |
1028 | 1 | B | Rel-12 | 12.1.0 | - | Adding new Annex to support Fixed Broadband Access network convergence | - | - | - | C3 | C3-74 | C3-131256 | Revised | 2013-08-28 | P4C_F-CT3 | - | 2013-08-30 |
1028 | 2 | B | Rel-12 | 12.1.0 | - | Adding new Annex to support Fixed Broadband Access network convergence | - | - | - | C3 | C3-74 | C3-131268 | Revised | 2013-08-28 | P4C_F-CT3 | - | 2013-08-30 |
1028 | 3 | B | Rel-12 | 12.1.0 | 12.2.0 | Adding new Annex to support Fixed Broadband Access network convergence | CP-61 | CP-130563 | approved | C3 | C3-74 | C3-131274 | Agreed | 2013-08-28 | P4C_F-CT3 | - | 2013-08-30 |
1029 | - | B | Rel-12 | 12.1.0 | - | The scope of Fixed Broadband Access network convergence | - | - | - | C3 | C3-74 | C3-130979 | Revised | 2013-08-28 | P4C_F-CT3 | - | 2013-08-30 |
1029 | 1 | B | Rel-12 | 12.1.0 | - | The scope of Fixed Broadband Access network convergence | - | - | - | C3 | C3-74 | C3-131257 | Revised | 2013-08-28 | P4C_F-CT3 | - | 2013-08-30 |
1029 | 2 | B | Rel-12 | 12.1.0 | 12.2.0 | The scope of Fixed Broadband Access network convergence | CP-61 | CP-130563 | approved | C3 | C3-74 | C3-131279 | Agreed | 2013-08-28 | P4C_F-CT3 | - | 2013-08-30 |
1030 | - | F | Rel-11 | 11.9.0 | - | User Location Information Age | - | - | - | C3 | C3-74 | C3-130982 | Revised | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1031 | - | A | Rel-12 | 12.1.0 | - | User Location Information Age | - | - | - | C3 | C3-74 | C3-130983 | Revised | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1032 | - | F | Rel-8 | 8.19.0 | 8.20.0 | Correction to QoS handling for interoperation with GnGp SGSN | CP-61 | CP-130539 | approved | C3 | C3-74 | C3-131001 | Agreed | 2013-08-28 | SAES-St3-PCC | - | 2013-08-30 |
1033 | - | A | Rel-9 | 9.14.0 | - | Correction to QoS handling for interoperation with GnGp SGSN | - | - | - | C3 | C3-74 | C3-131002 | Revised | 2013-08-28 | SAES-St3-PCC | - | 2013-08-30 |
1033 | 1 | A | Rel-9 | 9.14.0 | 9.15.0 | Correction to QoS handling for interoperation with GnGp SGSN | CP-61 | CP-130539 | approved | C3 | C3-74 | C3-131207 | Agreed | 2013-08-28 | SAES-St3-PCC | - | 2013-08-30 |
1034 | - | A | Rel-10 | 10.11.0 | - | Correction to QoS handling for interoperation with GnGp SGSN | - | - | - | C3 | C3-74 | C3-131003 | Revised | 2013-08-28 | SAES-St3-PCC | - | 2013-08-30 |
1034 | 1 | A | Rel-10 | 10.11.0 | 10.12.0 | Correction to QoS handling for interoperation with GnGp SGSN | CP-61 | CP-130539 | approved | C3 | C3-74 | C3-131208 | Agreed | 2013-08-28 | SAES-St3-PCC | - | 2013-08-30 |
1035 | - | A | Rel-11 | 11.9.0 | - | Correction to QoS handling for interoperation with GnGp SGSN | - | - | - | C3 | C3-74 | C3-131004 | Revised | 2013-08-28 | SAES-St3-PCC | - | 2013-08-30 |
1035 | 1 | A | Rel-11 | 11.9.0 | 11.10.0 | Correction to QoS handling for interoperation with GnGp SGSN | CP-61 | CP-130539 | approved | C3 | C3-74 | C3-131209 | Agreed | 2013-08-28 | SAES-St3-PCC | - | 2013-08-30 |
1036 | - | A | Rel-12 | 12.1.0 | - | Correction to QoS handling for interoperation with GnGp SGSN | - | - | - | C3 | C3-74 | C3-131005 | Revised | 2013-08-28 | SAES-St3-PCC | - | 2013-08-30 |
1036 | 1 | A | Rel-12 | 12.1.0 | 12.2.0 | Correction to QoS handling for interoperation with GnGp SGSN | CP-61 | CP-130539 | approved | C3 | C3-74 | C3-131210 | Agreed | 2013-08-28 | SAES-St3-PCC | - | 2013-08-30 |
1037 | - | F | Rel-9 | 9.14.0 | - | Clarifications for CSG information transfer | - | - | - | C3 | C3-74 | C3-131009 | Revised | 2013-08-28 | PCC-Enh | - | 2013-08-30 |
1037 | 1 | F | Rel-9 | 9.14.0 | 9.15.0 | Clarifications for CSG information transfer | CP-61 | CP-130542 | approved | C3 | C3-74 | C3-131214 | Agreed | 2013-08-28 | PCC-Enh | - | 2013-08-30 |
1038 | - | A | Rel-10 | 10.11.0 | - | Clarifications for CSG information transfer | - | - | - | C3 | C3-74 | C3-131010 | Revised | 2013-08-28 | PCC-Enh | - | 2013-08-30 |
1038 | 1 | A | Rel-10 | 10.11.0 | - | Clarifications for CSG information transfer | - | - | - | C3 | C3-74 | C3-131215 | Revised | 2013-08-28 | PCC-Enh | - | 2013-08-30 |
1038 | 2 | A | Rel-10 | 10.11.0 | 10.12.0 | Clarifications for CSG information transfer | CP-61 | CP-130542 | approved | C3 | C3-74 | C3-131264 | Agreed | 2013-08-28 | PCC-Enh | - | 2013-08-30 |
1039 | - | A | Rel-11 | 11.9.0 | - | Clarifications for CSG information transfer | - | - | - | C3 | C3-74 | C3-131011 | Revised | 2013-08-28 | PCC-Enh | - | 2013-08-30 |
1039 | 1 | A | Rel-11 | 11.9.0 | - | Clarifications for CSG information transfer | - | - | - | C3 | C3-74 | C3-131216 | Revised | 2013-08-28 | PCC-Enh | - | 2013-08-30 |
1039 | 2 | A | Rel-11 | 11.9.0 | 11.10.0 | Clarifications for CSG information transfer | CP-61 | CP-130542 | approved | C3 | C3-74 | C3-131265 | Agreed | 2013-08-28 | PCC-Enh | - | 2013-08-30 |
1040 | - | A | Rel-12 | 12.1.0 | - | Clarifications for CSG information transfer | - | - | - | C3 | C3-74 | C3-131012 | Revised | 2013-08-28 | PCC-Enh | - | 2013-08-30 |
1040 | 1 | A | Rel-12 | 12.1.0 | - | Clarifications for CSG information transfer | - | - | - | C3 | C3-74 | C3-131217 | Revised | 2013-08-28 | PCC-Enh | - | 2013-08-30 |
1040 | 2 | A | Rel-12 | 12.1.0 | 12.2.0 | Clarifications for CSG information transfer | CP-61 | CP-130542 | approved | C3 | C3-74 | C3-131266 | Agreed | 2013-08-28 | PCC-Enh | - | 2013-08-30 |
1041 | - | F | Rel-11 | 11.9.0 | 11.10.0 | Correction to event report indication for SAPP | CP-61 | CP-130548 | approved | C3 | C3-74 | C3-131013 | Agreed | 2013-08-28 | SAPP-CT3 | - | 2013-08-30 |
1042 | - | A | Rel-12 | 12.1.0 | 12.2.0 | Correction to event report indication for SAPP | CP-61 | CP-130548 | approved | C3 | C3-74 | C3-131014 | Agreed | 2013-08-28 | SAPP-CT3 | - | 2013-08-30 |
1043 | - | F | Rel-11 | 11.9.0 | 11.10.0 | AVP code value correction | CP-61 | CP-130551 | approved | C3 | C3-74 | C3-131021 | Agreed | 2013-08-28 | BBAI_BBI-CT | - | 2013-08-30 |
1044 | - | A | Rel-12 | 12.1.0 | 12.2.0 | AVP code value correction | CP-61 | CP-130551 | approved | C3 | C3-74 | C3-131022 | Agreed | 2013-08-28 | BBAI_BBI-CT | - | 2013-08-30 |
1045 | - | F | Rel-11 | 11.9.0 | - | Remove the editors note of VPLMN-Id provisioning | - | - | - | C3 | C3-74 | C3-131023 | Withdrawn | 2013-08-28 | BBAI_BBII-CT | - | 2013-08-30 |
1046 | - | A | Rel-12 | 12.1.0 | - | Remove the editors note of VPLMN-Id provisioning | - | - | - | C3 | C3-74 | C3-131024 | Withdrawn | 2013-08-28 | BBAI_BBII-CT | - | 2013-08-30 |
1047 | - | F | Rel-11 | 11.9.0 | - | Completion of the access network information reporting | - | - | - | C3 | C3-74 | C3-131025 | Revised | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1048 | - | A | Rel-12 | 12.1.0 | - | Completion of the access network information reporting | - | - | - | C3 | C3-74 | C3-131026 | Revised | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1049 | - | F | Rel-11 | 11.9.0 | - | One time reporting of the present Access Network Information | - | - | - | C3 | C3-74 | C3-131038 | Revised | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1049 | 1 | F | Rel-11 | 11.9.0 | - | One time reporting of the present Access Network Information | - | - | - | C3 | C3-74 | C3-131245 | Revised | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1049 | 2 | F | Rel-11 | 11.9.0 | 11.10.0 | One time reporting of the present Access Network Information | CP-61 | CP-130553 | approved | C3 | C3-74 | C3-131270 | Agreed | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1050 | - | A | Rel-12 | 12.1.0 | - | One time reporting of the present Access Network Information | - | - | - | C3 | C3-74 | C3-131039 | Revised | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1050 | 1 | A | Rel-12 | 12.1.0 | - | One time reporting of the present Access Network Information | - | - | - | C3 | C3-74 | C3-131246 | Revised | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1050 | 2 | A | Rel-12 | 12.1.0 | 12.2.0 | One time reporting of the present Access Network Information | CP-61 | CP-130553 | approved | C3 | C3-74 | C3-131271 | Agreed | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1051 | - | F | Rel-11 | 11.9.0 | - | Completion of NetLoc procedures in Gx & Gxx reference points | - | - | - | C3 | C3-74 | C3-131047 | Revised | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1051 | 1 | F | Rel-11 | 11.9.0 | - | Completion of NetLoc procedures in Gx & Gxx reference points | - | - | - | C3 | C3-74 | C3-131242 | Revised | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1051 | 2 | F | Rel-11 | 11.9.0 | - | Completion of NetLoc procedures in Gx & Gxx reference points | - | - | - | C3 | C3-74 | C3-131314 | Revised | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1051 | 3 | F | Rel-11 | 11.9.0 | 11.10.0 | Completion of NetLoc procedures in Gx & Gxx reference points | CP-61 | CP-130553 | approved | C3 | C3-74 | C3-131317 | Agreed | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1052 | - | A | Rel-12 | 12.1.0 | - | Completion of NetLoc procedures in Gx & Gxx reference points | - | - | - | C3 | C3-74 | C3-131048 | Revised | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1052 | 1 | A | Rel-12 | 12.1.0 | - | Completion of NetLoc procedures in Gx & Gxx reference points | - | - | - | C3 | C3-74 | C3-131243 | Revised | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1052 | 2 | A | Rel-12 | 12.1.0 | - | Completion of NetLoc procedures in Gx & Gxx reference points | - | - | - | C3 | C3-74 | C3-131315 | Revised | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1052 | 3 | A | Rel-12 | 12.1.0 | 12.2.0 | Completion of NetLoc procedures in Gx & Gxx reference points | CP-61 | CP-130553 | approved | C3 | C3-74 | C3-131318 | Agreed | 2013-08-28 | NWK-PL2IMS-CT | - | 2013-08-30 |
1053 | - | F | Rel-11 | 11.9.0 | - | TWAN-Identifier applicability for Trusted-WLAN supported feature | - | - | - | C3 | C3-74 | C3-131056 | Revised | 2013-08-28 | SaMOG_WLAN-CN | - | 2013-08-30 |
1053 | 1 | F | Rel-11 | 11.9.0 | 11.10.0 | TWAN-Identifier applicability for Trusted-WLAN supported feature | CP-61 | CP-130552 | approved | C3 | C3-74 | C3-131222 | Agreed | 2013-08-28 | SaMOG_WLAN-CN | - | 2013-08-30 |
1054 | - | A | Rel-12 | 12.1.0 | - | TWAN-Identifier applicability for Trusted-WLAN supported feature | - | - | - | C3 | C3-74 | C3-131057 | Revised | 2013-08-28 | SaMOG_WLAN-CN | - | 2013-08-30 |
1054 | 1 | A | Rel-12 | 12.1.0 | 12.2.0 | TWAN-Identifier applicability for Trusted-WLAN supported feature | CP-61 | CP-130552 | approved | C3 | C3-74 | C3-131223 | Agreed | 2013-08-28 | SaMOG_WLAN-CN | - | 2013-08-30 |
page generated from database: 2013-10-16 10:34:00