3GPP TS 29.238 (click spec number to see fileserver directory for this spec)
Interconnection Border Control Functions (IBCF) - Transition Gateway (TrGW) interface, Ix interface; Stage 3
.
TSG / WG responsible: C4 (click TSG/WG to see its home page)
Work item which gave rise to this spec:  -  (click WI code to see Work Item details in the Work Plan)
Work items which may have impacted this spec:  click here
CP-40: WI @ CP-080392.
Rapporteur: HODGES, Phil Specification required for: GERAN-based systems and UTRAN- and E-UTRAN-based systems In the table below ... ... click meeting number for meeting details; ... click spec version number to download that version; ... click SDO publication reference to download SDO transposed document. event version available remarks 0.1.0 - - draft 2008-10-17 - 0.3.0 - - 2009-01-07 - event version available remarks draft 2009-03-24 - draft 2009-05-13 - draft 2009-07-15 - 2009-09-25 CP-090520 - 2009-09-28 CP-090628 - draft 2009-10-21 - 2009-12-12 CP-090821 - 2009-12-19 2010-04-06 2010-06-17 2010-09-28 event version available remarks 2011-04-06 2011-06-15 2011-09-26 2011-12-19 2012-06-27 2012-12-21 2013-06-25 event version available remarks 2012-09-28 2012-12-21 2013-06-25 event version available remarks 2013-09-19 -
Release
Freeze meeting
Freeze date
::
remarks
SDO publications
Rel-8
-
::
CP-43: timed out of Rel-8 RELEASE WITHDRAWN
ETSI
click ref to download
Rel-9
SP-46
2009-12-10
::
.
ETSI
click ref to download
Rel-10
SP-51
2011-03-23
::
. .
ETSI
click ref to download
Rel-11
SP-57
2012-09-12
::
Upgraded from previous Release without technical change .
ETSI
click ref to download
Rel-12
-
::
. .
ETSI
click ref to download
Change Requests for this spec: click here.
Genealogy of this spec:
antecedent(s) | this spec | descendant(s) |
(no antecedents) | 29.238 | (no descendants) |
page generated from database: 2013-10-16 10:27:14