Go to spec numbering scheme page
Click on spec number for details
TR 30.002 | Guidelines for the modification of the Mobile Application Part (MAP) | SPECIFICATION WITHDRAWN |
TR 30.007 | Guideline on WI/SI for new Operating Bands | . |
TR 30.00U | SMG - UMTS Work programme | SPECIFICATION WITHDRAWN |
TR 30.01U | UMTS Baseline document: Collection of the SMG’s positions on the UMTS | SPECIFICATION WITHDRAWN |
TR 30.02U | Experience from GSM standardisation to be applied at UMTS standardisation | SPECIFICATION WITHDRAWN |
TR 30.03U | Selection procedures for the choice of radio transmission technologies of the UMTS | . |
TR 30.04U | Definition of the limited number of UTRA concepts | SPECIFICATION WITHDRAWN |
TR 30.05U | UMTS terminology | SPECIFICATION WITHDRAWN |
TR 30.06U | UTRA concept evaluation | . |
TR 30.20U | Technical characteristics, capabilities and limitations of mobile satellite systems applicable to the UMTS | SPECIFICATION WITHDRAWN |
TR 30.301 | 3.84 Mcps TDD enhanced uplink: RAN WG2 Stage 2 decisions | SPECIFICATION WITHDRAWN |
TR 30.302 | 1.28 Mcps TDD enhanced uplink: RAN WG2 Stage 2 decisions | . |
TR 30.504 | Work Plan and Study Items - RAN WG4 | SPECIFICATION WITHDRAWN |
TR 30.531 | Work Plan and Working Procedures - RAN WG3 | . |
TR 30.801 | Overall Project Plan | SPECIFICATION WITHDRAWN |
TR 30.802 | Project plan on Bearer Services and QoS | SPECIFICATION WITHDRAWN |
TR 30.804 | Project plan on GSM/UMTS Interoperation and Mobility Management | SPECIFICATION WITHDRAWN |
TR 30.806 | Project plan on Location based services | SPECIFICATION WITHDRAWN |
TR 30.808 | Project plan on Packet Architecture and Circuit Architecture | SPECIFICATION WITHDRAWN |
TR 30.810 | Project plan on Security | SPECIFICATION WITHDRAWN |
TR 30.812 | Project plan on Services and Service platforms | SPECIFICATION WITHDRAWN |
TR 30.817 | Telecommunication management; Project scheduling and open issues for SA5, Release 7 | . |
TR 30.818 | Telecommunication management; Project scheduling and open issues for SA5, Release 8 | . |
TR 30.819 | Telecommunication management; Project scheduling and open issues for SA5, Release 9 | . |
TR 30.820 | Telecommunication management; Project scheduling and open issues for SA5, Release 10 | . |
TR 30.821 | Telecommunication management; Project scheduling and open issues for SA5, Release 11 | . |
TR 30.902 | Guidelines for the modification of the Mobile Application Part (MAP) in Phase 2+ | . |
page generated from database: 2013-10-16 10:24:47