3GPP Specification series

Go to spec numbering scheme page


Click on spec number for details

TR 30.002 Guidelines for the modification of the Mobile Application Part (MAP) SPECIFICATION WITHDRAWN
TR 30.007 Guideline on WI/SI for new Operating Bands .
TR 30.00U SMG - UMTS Work programme SPECIFICATION WITHDRAWN
TR 30.01U UMTS Baseline document: Collection of the SMG’s positions on the UMTS SPECIFICATION WITHDRAWN
TR 30.02U Experience from GSM standardisation to be applied at UMTS standardisation SPECIFICATION WITHDRAWN
TR 30.03U Selection procedures for the choice of radio transmission technologies of the UMTS .
TR 30.04U Definition of the limited number of UTRA concepts SPECIFICATION WITHDRAWN
TR 30.05U UMTS terminology SPECIFICATION WITHDRAWN
TR 30.06U UTRA concept evaluation .
TR 30.20U Technical characteristics, capabilities and limitations of mobile satellite systems applicable to the UMTS SPECIFICATION WITHDRAWN
TR 30.301 3.84 Mcps TDD enhanced uplink: RAN WG2 Stage 2 decisions SPECIFICATION WITHDRAWN
TR 30.302 1.28 Mcps TDD enhanced uplink: RAN WG2 Stage 2 decisions .
TR 30.504 Work Plan and Study Items - RAN WG4 SPECIFICATION WITHDRAWN
TR 30.531 Work Plan and Working Procedures - RAN WG3 .
TR 30.801 Overall Project Plan SPECIFICATION WITHDRAWN
TR 30.802 Project plan on Bearer Services and QoS SPECIFICATION WITHDRAWN
TR 30.804 Project plan on GSM/UMTS Interoperation and Mobility Management SPECIFICATION WITHDRAWN
TR 30.806 Project plan on Location based services SPECIFICATION WITHDRAWN
TR 30.808 Project plan on Packet Architecture and Circuit Architecture SPECIFICATION WITHDRAWN
TR 30.810 Project plan on Security SPECIFICATION WITHDRAWN
TR 30.812 Project plan on Services and Service platforms SPECIFICATION WITHDRAWN
TR 30.817 Telecommunication management; Project scheduling and open issues for SA5, Release 7 .
TR 30.818 Telecommunication management; Project scheduling and open issues for SA5, Release 8 .
TR 30.819 Telecommunication management; Project scheduling and open issues for SA5, Release 9 .
TR 30.820 Telecommunication management; Project scheduling and open issues for SA5, Release 10 .
TR 30.821 Telecommunication management; Project scheduling and open issues for SA5, Release 11 .
TR 30.902 Guidelines for the modification of the Mobile Application Part (MAP) in Phase 2+ .

page generated from database: 2013-10-16 10:24:47