3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 32.295

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - F Rel-6 6.0.0 6.1.0 Correction to scope SP-28 SP-050275 approved S5 S5-42 S5-054440 Agreed 2005-05-13 CH - 2005-05-25
0002 - F Rel-6 6.0.0 6.1.0 Correction to references SP-28 SP-050275 approved S5 S5-42 S5-054451 Agreed 2005-05-13 CH - 2005-05-23
0003 - F Rel-6 6.0.0 6.1.0 Correction on the use of ‘reference point’ and ‘interface’ – Align with TR 21.905 SP-28 SP-050275 approved S5 S5-42 S5-054286 Agreed 2005-05-13 CH - 2005-05-23
0004 - B Rel-8 7.0.0 8.0.0 Implication on CDR transfer for EPC Charging SP-40 SP-080274 approved S5 S5-59 S5-080918 agreed 2008-04-25 EPC-CH - 2008-05-29
0005 - F Rel-8 8.0.0 8.1.0 UDP Port number differenciation between GTPÆv2 and GTPv2 SP-45 SP-090536 approved SA5 S5-67 S5-093600 agreed 2009-09-04 CH8 - 2009-09-16
0006 - B Rel-11 10.0.0 - CR R11 32295 Add synchronization mechanisme to release or cancel operations by O&M at the side of CGF and CDF - - - S5 S5-80 S5-113594 revised 2011-12-10 CH11 - 2010-12-11
0006 1 B Rel-10 10.4.0 - CR R11 32295 Add synchronization mechanisme to release or cancel operations by O&M at the side of CGF and CDF - - - S5 S5-80 S5-113835 withdrawn 2011-12-10 OAM10 - 2010-12-11
0007 - F Rel-12 11.0.0 - R12 CR 32.295 Justification on usage of Sequence numbers - - - - S5-90 S5-131183 revised 2013-09-03 CH12 - 2013-09-03
0007 1 F Rel-12 11.0.0 12.0.0 R12 CR 32.295 Justification on usage of Sequence numbers SP-61 SP-130435 approved S5 S5-90 S5-131372 agreed 2013-09-03 CH12 - 2013-09-03

page generated from database: 2013-10-16 10:34:10