3GPP Specification detail

Go to spec numbering scheme page

Back to series index


3GPP TS  32.301-1  (click spec number to see fileserver directory for this spec)

Telecommunication management; Configuration Management (CM); Notification Integration Reference Point (IRP): requirements

SPECIFICATION WITHDRAWN

TSG / WG responsible: S5  (click TSG/WG to see its home page)

Work item which gave rise to this spec:  -  (click WI code to see Work Item details in the Work Plan)

Work items which may have impacted this spec:  click here

Replaces 32.106 (pars). SP-12: stopped. See 32.301.

Rapporteur: PIRT, Trevor

Specification required for: UTRAN-based systems

In the table below ...

... click meeting number for meeting details;

... click spec version number to download that version;

... click SDO publication reference to download SDO transposed document.

Release Freeze meeting Freeze date :: remarks SDO publications
Rel-4 SP-11 2001-03-22 ::  RELEASE WITHDRAWN ETSI
 

event

version

available

remarks

click ref to download
 

SP-12

2.0.0

2001-06-18

-

Change Requests for this spec: (none).

Genealogy of this spec:

antecedent(s) this spec descendant(s)
32.106
32.301-1 32.301

page generated from database: 2013-10-16 10:28:48