Go to spec numbering scheme page
3GPP TS 32.409 (click spec number to see fileserver directory for this spec)
Telecommunication management; Performance Management (PM); Performance measurements; IP Multimedia Subsystem (IMS)
.
TSG / WG responsible: S5 (click TSG/WG to see its home page)
Work item which gave rise to this spec:  OAM7-PM  (click WI code to see Work Item details in the Work Plan)
Work items which may have impacted this spec:  click here
Rapporteur: YU, Chengzhi Specification required for: GERAN-based systems and UTRAN- and E-UTRAN-based systems In the table below ... ... click meeting number for meeting details; ... click spec version number to download that version; ... click SDO publication reference to download SDO transposed document. event version available remarks 2007-03-04 SP-070067 - draft 2007-03-26 - 2007-05-23 SP-070287 - 2007-06-22 2007-10-03 2008-03-27 2008-12-19 event version available remarks 2007-10-03 - 2008-03-27 - 2008-12-19 2009-10-01 event version available remarks 2009-10-01 - 2009-12-18 - 2010-04-19 correction to change history 2011-04-04 event version available remarks 2010-06-18 - 2010-10-08 - 2010-12-30 - 2011-04-01 2012-03-16 event version available remarks 2011-06-18 - 2011-09-30 - 2011-12-22 - 2012-03-16 - 2012-09-21
Release
Freeze meeting
Freeze date
::
remarks
SDO publications
Rel-7
SP-36
2007-06-07
::
.
ETSI
click ref to download
Rel-8
SP-42
2008-12-11
::
.
ETSI
click ref to download
Rel-9
SP-46
2009-12-10
::
.
ETSI
click ref to download
Rel-10
SP-51
2011-03-23
::
. .
ETSI
click ref to download
Rel-11
SP-57
2012-09-12
::
. .
ETSI
click ref to download
Change Requests for this spec: click here.
Genealogy of this spec:
antecedent(s) | this spec | descendant(s) |
(no antecedents) | 32.409 | (no descendants) |
page generated from database: 2013-10-16 10:29:24