3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 32.446

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 1 F Rel-10 10.0.0 - Correcting the Identification of IMS Subscriber Tracing - Align with 32.421 and 32.442 SP-50 SP-100746 reissued S5 S5-74 S5e100186 agreed 2010-11-15 OAM10 - 2010-12-09
0001 1 F Rel-10 10.0.0 - Correcting the Identification of IMS Subscriber Tracing - Align with 32.421 and 32.442 SP-50 SP-100828 revised S5 S5-74 S5e100186 agreed 2010-11-15 OAM10 - 2010-12-12
0001 1 F Rel-10 10.0.0 10.1.0 Correcting the Identification of IMS Subscriber Tracing - Align with 32.421 and 32.442 SP-50 SP-100833 approved S5 - S5e100186 - 2010-11-15 OAM10 - 2010-12-14
0002 - F Rel-10 10.1.0 10.2.0 Add the missing input parameter of activateTraceJob - Align with 32.442 Trace Management IRP Information Service SP-51 SP-110093 approved S5 S5-75 S5-110513 agreed 2011-02-04 OAM8 - 2011-03-17
0003 - F Rel-10 10.1.0 10.2.0 Add mapping of notifyTraceSessionIdentities in SOAP solution set - Align with 32.442 Trace Management IRP Information Service SP-51 SP-110095 approved S5 S5-75 S5-110417 agreed 2011-02-04 OAM10 - 2011-03-17
0030 - B Rel-10 10.1.0 - CR R10 32.446 extend traceIRP operation to support MDT configuration - - - - S5-76 S5-111116 revised 2011-03-16 OAM-PM-UE - 2016-03-11
0030 1 B Rel-10 10.1.0 10.2.0 Extend TraceIRP operation to support MDT configuration - Align with 32.442 SP-51 SP-110102 approved S5 S5-76 S5-111444 agreed 2011-03-03 OAM-PM-UE - 2011-03-17
0031 1 F Rel-10 10.2.0 10.3.0 Add areascope parameter as a MDT configuration SP-52 SP-110292 approved S5 S5-77 S5-112124 agreed 2011-05-13 OAM-PM-UE - 2011-05-31
0032 1 C Rel-11 10.2.0 11.0.0 Modify the definition of traceTarget - Aligned with TS 32.442 SP-52 SP-110286 approved S5 S5-77 S5-112044 agreed 2011-05-11 OAM11 - 2011-05-31
0033 - B Rel-11 11.0.0 11.1.0 Add RLF reporting configuration - Align with 32.422 SP-54 SP-110716 approved S5 S5-80 S5-113833 agreed 2011-12-10 OAM-ePM-UE - 2010-12-11
0034 - F Rel-10 10.3.0 10.4.0 Support multiple cells in area based MDT SP-54 SP-110715 approved S5 S5-80 S5-113873 agreed 2011-12-10 OAM-PM-UE - 2010-12-11
0035 - A Rel-11 11.0.0 11.1.0 Support multiple cells in area based MDT SP-54 SP-110715 approved S5 S5-80 S5-113875 agreed 2011-12-10 OAM-PM-UE - 2010-12-11
0037 - F Rel-10 10.4.0 10.5.0 Inconsistency correction on trace target -Align with 32.442 IS version number SP-55 SP-120053 approved S5 S5-81 S5-120319 agreed 2012-02-09 OAM-PM-UE - 2012-02-16
0038 - A Rel-11 11.1.0 11.2.0 Inconsistency correction on trace target -Align with 32.442 IS version number SP-55 SP-120053 approved S5 S5-81 S5-120320 agreed 2012-02-09 OAM-PM-UE - 2012-02-16
0039 - B Rel-11 .. - CR R11 32.446 Add area based MDT UE number limitation_Align with 32.442 - - - - S5-82 S5-120603 withdrawn 2012-06-08 - - 2012-06-08
0040 - F Rel-10 10.5.0 10.6.0 Rel-10 CR TS32.446 Alignment of the Anonymization parameter with TS 32.422 SP-56 SP-120368 approved S5 S5-83 S5-121103 agreed 2012-06-08 OAM-PM-UE - 2012-06-08
0041 - A Rel-11 11.2.0 11.3.0 Rel-11 CR TS32.446 Alignment of the Anonymization parameter with TS 32.422 SP-56 SP-120368 approved S5 S5-83 S5-121104 agreed 2012-06-08 OAM-PM-UE - 2012-06-08
0042 - - Rel-11 .. - CR R11 32.446 Add maximum UE number limitation in area based Immediate MDT-Align with 32.442 - - - - S5-83 S5-121195 noted 2012-06-08 - - 2012-06-08
0043 - - Rel-11 .. - CR R11 32.446 Add minimum UE number limitation in area based Immediate MDT-Align with 32.442 - - - - S5-83 S5-121196 noted 2012-06-08 - - 2012-06-08
0044 - B Rel-11 .. - rel11 cr 32446 Adding new MDT parameters to align with TS 32.422 and TS 37.320 - - - - S5-84 S5-121862 revised 2012-08-27 OAM-ePM-UE - 2012-08-27
0044 1 B Rel-11 11.3.0 11.4.0 Adding new MDT parameters to align with TS 32.422 and TS 37.320 SP-57 SP-120571 approved S5 S5-84 S5-122069 agreed 2012-08-22 OAM-ePM-UE - 2012-09-09
0045 - - Rel-11 .. - Rel11 cr 32446 Adding RCEF reporting to Trace IRP ΤΗτ Solution Set - - - - S5-84 S5-121867 postponed 2012-08-27 - - 2012-08-27
0045 1 B Rel-11 11.4.0 11.5.0 Adding RCEF reporting to Trace IRP - Solution Set SP-58 SP-120795 approved S5 S5-86 S5-122839 agreed 2012-11-02 OAM-ePM-UE - 2012-12-10
0046 - F Rel-10 10.6.0 10.7.0 Add missing threshold parameter for UMTS event triggered measurements SP-57 SP-120570 approved S5 S5-84 S5-121927 agreed 2012-08-23 OAM-PM-UE - 2012-09-09
0047 - A Rel-11 11.3.0 11.4.0 Add missing threshold parameter for UMTS event triggered measurements SP-57 SP-120570 approved S5 S5-84 S5-121928 agreed 2012-09-04 OAM-PM-UE - 2012-09-09
0048 - B Rel-11 .. - CR R11 32.446 Add new measurement M7 in UMTS MDT -Align with 32.442 - - - - S5-85 S5-122361 noted 2012-10-23 OAM-ePM-UE - 2012-10-23
0049 - - Rel-11 .. - CR R11 32.446 Add MDT configuration parameters for UPH -Align with 32.442 - - - - S5-85 S5-122365 noted 2012-10-23 - - 2012-10-23
0050 - F Rel-10 .. - CR R10 32.446 Correction of UMTS M2 reporting trigger configuration -Align with 32.442 - - - - S5-85 S5-122370 revised 2012-10-23 OAM-PM-UE - 2012-10-23
0050 - F Rel-10 10.7.0 10.8.0 Correction of UMTS M2 reporting trigger configuration -Align with 32.442 SP-58 SP-120794 approved S5 S5-85 S5-122519 agreed 2012-10-11 OAM-PM-UE - 2012-12-10
0051 - - Rel-11 .. - CR R11 32.446 Correction of UMTS M2 reporting trigger configuration -Align with 32.442 - - - - S5-85 S5-122371 revised 2012-10-23 - - 2012-10-23
0051 1 A Rel-11 11.4.0 11.5.0 Correction of UMTS M2 reporting trigger configuration SP-58 SP-120794 approved S5 S5-85 S5-122520 agreed 2012-10-11 OAM-PM-UE - 2012-12-10
0052 - F Rel-11 .. - Rel-11 CR 32.446 Correction on the scope, references and abbreviations related to MDTand RLF - - - - S5-86 S5-122890 revised 2012-11-24 OAM-ePM-UE - 2012-11-24
0052 1 F Rel-11 11.4.0 11.5.0 Correction of the scope, references and abbreviations related to MDTand RLF SP-58 SP-120795 approved S5 S5-86 S5-123072 agreed 2012-11-16 OAM-ePM-UE - 2012-12-10
0053 - C Rel-11 .. - CR R11 32.446 Addition of Network Sharing - - - - S5-86 S5-122910 revised 2012-11-24 OAM-ePM-UE - 2012-11-24
0053 1 C Rel-11 11.4.0 11.5.0 Addition of Network Sharing support SP-58 SP-120796 approved S5 S5-86 S5-123175 agreed 2012-11-27 OAM-ePM-UE - 2012-12-10
0054 - - Rel-11 .. - CR 32.446 R11 Add measurement M7 - - - - S5-86 S5-122954 revised 2012-11-24 - - 2012-11-24
0054 1 B Rel-11 11.4.0 11.5.0 Add MDT measurement M7 with common measurement period for UMTS SP-58 SP-120795 approved S5 S5-86 S5-123063 agreed 2012-11-15 OAM-ePM-UE - 2012-12-10
0055 - B Rel-11 11.4.0 11.5.0 Introducing MDT collection period attribute for UMTS and LTE in Trace IRP SP-58 SP-120795 approved S5 S5-86 S5-123060 agreed 2012-11-16 OAM-ePM-UE - 2012-12-10
0056 - C Rel-11 11.4.0 11.5.0 Combine measurement period parameters for LTE SP-58 SP-120795 approved S5 S5-86 S5-123117 agreed 2012-12-05 OAM-ePM-UE - 2012-12-10

page generated from database: 2013-10-16 10:34:12