3GPP Specification detail

Go to spec numbering scheme page

Back to series index


3GPP TS  32.716  (click spec number to see fileserver directory for this spec)

Telecommunication management; Configuration Management (CM); Transport Network (TN) interface Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions

.

TSG / WG responsible: S5  (click TSG/WG to see its home page)

Work item which gave rise to this spec:  OAM-IRP-SS  (click WI code to see Work Item details in the Work Plan)

Work items which may have impacted this spec:  click here

Rapporteur: TSE, Edwin

Specification required for: GERAN-based systems and UTRAN- and E-UTRAN-based systems

In the table below ...

... click meeting number for meeting details;

... click spec version number to download that version;

... click SDO publication reference to download SDO transposed document.

Release Freeze meeting Freeze date :: remarks SDO publications
Rel-10 SP-51 2011-03-23 :: . ETSI
 

event

version

available

remarks

click ref to download
 

SP-48

1.0.0

2010-06-14

SP-100278

-

 

SP-48

10.0.0

2010-06-18

-

 

SP-49

10.1.0

2010-10-08

-

 

SP-50

10.2.0

2010-12-30

DTS/TSGS-0532716va20

Rel-11 SP-57 2012-09-12 :: Upgraded from previous Release without technical change . ETSI
 

event

version

available

remarks

click ref to download
 

SP-57

11.0.0

2012-09-21

Automatic upgrade from previous Release version 10.2.0

RTS/TSGS-0532716vb00

Change Requests for this spec: click here.

Genealogy of this spec:

antecedent(s) this spec descendant(s)
32.713
32.715
32.716 (no descendants)

page generated from database: 2013-10-16 10:29:45