3GPP Specification detail

Go to spec numbering scheme page

Back to series index


3GPP TR  32.802  (click spec number to see fileserver directory for this spec)

Telecommunication management; User Equipment Management (UEM) feasibility study

.

TSG / WG responsible: S5  (click TSG/WG to see its home page)

Work item which gave rise to this spec:  -  (click WI code to see Work Item details in the Work Plan)

Work items which may have impacted this spec:  click here

Rapporteur: TOCHE, Christian

Specification required for: GERAN-based systems and UTRAN-based systems

In the table below ...

... click meeting number for meeting details;

... click spec version number to download that version;

... click SDO publication reference to download SDO transposed document.

Release Freeze meeting Freeze date :: remarks SDO publications
Rel-5 SP-16 2002-06-13 :: SP-21: No rapporteur, work stopped. SP-26: assume no desire to upgrade to Rel-6. 2006-02: Cf OMA DevMan. . ETSI
 

event

version

available

remarks

click ref to download
 

SP-13

0.0.2

2001-10-01

TP-010213 (!)

-

 

SP-14

1.0.0

2002-01-02

SP-010652 (also TP-010283)

-

 

draft

1.0.1

2002-01-28

-

 

draft

1.0.2

2002-01-31

-

 

SP-15

1.0.4

2002-03-19

SP-020011

-

 

SP-16

2.0.0

2002-06-17

SP-020331

-

 

SP-16

5.0.0

2002-06-20

-

 

SP-17

5.1.0

2002-09-18

-

Change Requests for this spec: click here.

Genealogy of this spec:

antecedent(s) this spec descendant(s)
(no antecedents) 32.802 (no descendants)

page generated from database: 2013-10-16 10:29:47