0001 - F Rel-5 5.0.0 5.1.0 Corrections SP-17 SP-020512 approved S3-LI S3-24 S3-020351 agreed 2002-03-04 SEC1-LI - -
0002 - F Rel-5 5.1.0 5.2.0 Essential corrections to the Annex C.1 (ULIC) SP-18 SP-020705 approved S3-LI S3-25 S3-020491 agreed 2002-03-04 SEC1-LI - 2002-12-06
0003 - F Rel-5 5.1.0 5.2.0 Missing PDP Context Modification event SP-18 SP-020706 approved S3-LI S3-25 S3-020492 agreed 2002-03-04 SEC1-LI - 2002-12-06
0004 - F Rel-6 5.1.0 6.0.0 Aggregation of IRI Records SP-18 SP-020707 approved S3-LI S3-25 S3-020493 agreed 2002-03-04 SEC1-LI - 2002-12-06
0005 - F Rel-5 5.1.0 5.2.0 Essential correction to the LI events generated during RAU, when PDP context is active SP-18 SP-020704 approved S3-LI S3-26 S3-020616 agreed 2002-03-04 SEC1-LI - 2002-12-06
0006 - F Rel-5 5.1.0 5.2.0 U.S. LI Requirements SP-18 SP-020708 approved S3-LI S3-26 S3-020699 agreed 2002-03-04 SEC1-LI - 2002-12-06
0007 - F Rel-5 5.2.0 5.3.0 Coding of ASN.1 parameters of the type OCTET STRING SP-19 SP-030096 approved S3-LI S3-27 S3-030094 agreed 2003-03-05 SEC1-LI - 2003-03-12
0008 - A Rel-6 6.0.0 6.1.0 Coding of ASN.1 parameters of the type OCTET STRING SP-19 SP-030096 approved S3-LI S3-27 S3-030095 agreed 2003-03-05 SEC1-LI - 2003-03-12
0009 - B Rel-6 6.0.0 6.1.0 CS Section for 33.108 SP-19 SP-030097 approved S3-LI S3-27 S3-030110 agreed 2003-03-05 SEC1-LI - 2003-03-12
0010 - F Rel-6 6.0.0 6.1.0 Adjustments to the requirements on the delivery of the intercepted RT data over TCP SP-19 SP-030098 approved S3-LI S3-27 S3-030111 agreed 2003-03-05 SEC1-LI - 2003-03-12
0011 - F Rel-5 5.2.0 5.3.0 Incorrect ASN.1 object tree SP-19 SP-030099 approved S3-LI S3-27 S3-030099 agreed 2003-03-05 SEC1-LI - 2003-03-12
0012 - A Rel-6 6.0.0 6.1.0 Incorrect ASN.1 object tree SP-19 SP-030099 approved S3-LI S3-27 S3-030099 agreed 2003-03-05 SEC1-LI Mirror CR created by MCC after SA3#27 meeting 2003-03-12
0013 - F Rel-5 5.2.0 5.3.0 Correction to implementation of 005 SP-19 SP-030149 approved S3-LI S3-27 - - 2003-03-05 SEC1-LI Produced by MCC 2003-03-12
0014 - A Rel-6 6.0.0 6.1.0 Correction to implementation of 005 SP-19 SP-030149 approved S3-LI S3-27 - - 2003-03-05 SEC1-LI Produced by MCC 2003-03-12
0015 1 F Rel-5 5.3.0 5.4.0 Changes to meet international LI Requirements SP-20 SP-030221 approved S3-LI S3-28 S3-030215 agreed 2003-05-06 SEC1-LI - 2003-05-20
0016 1 A Rel-6 6.1.0 6.2.0 Changes to meet international LI Requirements SP-20 SP-030221 approved S3-LI S3-28 S3-030215 agreed 2003-05-06 SEC1-LI - 2003-05-20
0017 - D Rel-6 6.2.0 - Correct Abbreviations in TS 33.108 SP-21 SP-030480 revised S3-LI S3-29 S3-030352r agreed 2003-07-25 SEC1-LI SA WG3 agreed by e-mail 2003-09-22
0017 1 D Rel-6 6.2.0 6.3.0 Correct Abbreviations in TS 33.108 SP-21 SP-030508 approved S3-LI S3-29 S3-030352 agreed 2003-07-25 SEC1-LI Revised to correct base version of 33.108 2003-09-22
0018 - F Rel-5 5.4.0 - Syntax error in Annex B.3 SP-21 SP-030481 revised S3-LI S3-29 S3-030352r agreed 2003-07-25 SEC1-LI SA WG3 agreed by e-mail 2003-09-22
0018 1 F Rel-5 5.4.0 5.5.0 Syntax error in Annex B.3 SP-21 SP-030509 approved S3-LI S3-29 S3-030352 agreed 2003-07-25 SEC1-LI Revised to correct base version of 33.108 2003-09-22
0019 - A Rel-6 6.2.0 - Syntax error in Annex B.3 SP-21 SP-030481 revised S3-LI S3-29 S3-030352r agreed 2003-07-25 SEC1-LI SA WG3 agreed by e-mail 2003-09-22
0019 1 A Rel-6 6.2.0 6.3.0 Syntax error in Annex B.3 SP-21 SP-030509 approved S3-LI S3-29 S3-030352 agreed 2003-07-25 SEC1-LI Revised to correct base version of 33.108 2003-09-22
0020 - D Rel-6 6.2.0 - Inconsistency in Annex B.3 SP-21 SP-030480 revised S3-LI S3-29 S3-030352r agreed 2003-07-25 SEC1-LI SA WG3 agreed by e-mail 2003-09-22
0020 1 F Rel-6 6.2.0 6.3.0 Inconsistency in Annex B.3 SP-21 SP-030508 approved S3-LI S3-29 S3-030352 agreed 2003-07-25 SEC1-LI Revised to correct base version of 33.108 2003-09-22
0021 - F Rel-6 6.2.0 - Data Link Establishment and Sending part for ROSE operation SP-21 SP-030480 revised S3-LI S3-29 S3-030352r agreed 2003-07-25 SEC1-LI SA WG3 agreed by e-mail 2003-09-22
0021 1 F Rel-6 6.2.0 6.3.0 Data Link Establishment and Sending part for ROSE operation SP-21 SP-030508 approved S3-LI S3-29 S3-030352 agreed 2003-07-25 SEC1-LI Revised to correct base version of 33.108 2003-09-22
0022 - F Rel-6 6.2.0 - Correction on the usage of Lawful Interception identifiers SP-21 SP-030480 revised S3-LI S3-29 S3-030352r agreed 2003-07-25 SEC1-LI SA WG3 agreed by e-mail 2003-09-22
0022 1 F Rel-6 6.2.0 6.3.0 Correction on the usage of Lawful Interception identifiers SP-21 SP-030508 approved S3-LI S3-29 S3-030352 agreed 2003-07-25 SEC1-LI Revised to correct base version of 33.108 2003-09-22
0023 - F Rel-6 6.2.0 - Subscriber controlled input clarification SP-21 SP-030480 revised S3-LI S3-29 S3-030352r agreed 2003-07-25 SEC1-LI SA WG3 agreed by e-mail 2003-09-22
0023 1 F Rel-6 6.2.0 6.3.0 Subscriber controlled input clarification SP-21 SP-030508 approved S3-LI S3-29 S3-030352 agreed 2003-07-25 SEC1-LI Revised to correct base version of 33.108 2003-09-22
0024 - D Rel-6 6.2.0 - Field separator in subaddress SP-21 SP-030480 revised S3-LI S3-29 S3-030352r agreed 2003-07-25 SEC1-LI SA WG3 agreed by e-mail 2003-09-22
0024 1 D Rel-6 6.2.0 6.3.0 Field separator in subaddress SP-21 SP-030508 approved S3-LI S3-29 S3-030352 agreed 2003-07-25 SEC1-LI Revised to correct base version of 33.108 2003-09-22
0025 - F Rel-5 5.4.0 5.5.0 Reference errors in Annex G SP-21 SP-030482 approved S3-LI S3-29 S3-030394 agreed 2003-07-25 SEC1-LI - 2003-09-22
0026 - A Rel-6 6.2.0 6.3.0 Reference errors in Annex G SP-21 SP-030482 approved S3-LI S3-29 S3-030395 agreed 2003-07-25 SEC1-LI - 2003-09-22
0027 - F Rel-5 5.5.0 5.6.0 Correction to Annex G on TCP based transport SP-22 SP-030592 approved S3-LI S3-30 S3-030532 agreed 2003-10-14 SEC1-LI - 2004-01-05
0028 - A Rel-6 6.3.0 6.4.0 Correction to Annex G on TCP based transport SP-22 SP-030592 approved S3-LI S3-30 S3-030608 agreed 2003-10-14 SEC1-LI - 2004-01-05
0029 - B Rel-6 6.3.0 6.4.0 LI Reporting of Dialed Digits SP-22 SP-030593 approved S3-LI S3-30 S3-030606 agreed 2003-10-14 SEC1-LI - 2004-01-05
0030 - F Rel-6 6.3.0 6.4.0 CS Section for 33.108 – LI Management Operation SP-22 SP-030594 approved S3-LI S3-31 S3-030813 agreed 2003-11-24 SEC1-LI - 2004-01-05
0031 - F Rel-6 6.3.0 6.4.0 CS Section for 33.108 – User data packet transfer SP-22 SP-030594 approved S3-LI S3-31 S3-030814 agreed 2003-11-24 SEC1-LI - 2004-01-05
0032 - B Rel-6 6.3.0 6.4.0 Reporting TEL URL SP-22 SP-030591 approved S3-LI S3-31 S3-030785 agreed 2003-11-24 SEC1-LI - 2004-01-05
0033 - F Rel-6 6.3.0 6.4.0 Alignment of Lawful Interception identifiers length to ETSI TS 101 671 SP-22 SP-030595 approved S3-LI S3-31 S3-030787 agreed 2003-11-24 SEC1-LI - 2004-01-05
0034 - F Rel-6 6.4.0 6.5.0 Corrections to Tables 6.2, 6.7 SP-23 SP-040155 approved S3-LI S3-32 S3-040130 agreed 2004-03-10 SEC1-LI SA WG3 agreed by e-mail 2004-03-11
0035 - D Rel-6 6.4.0 6.5.0 Corrections to Correlation Number SP-23 SP-040156 approved S3-LI S3-32 S3-040131 agreed 2004-03-10 SEC1-LI SA WG3 agreed by e-mail 2004-03-11
0036 - B Rel-6 6.4.0 6.5.0 Correction to Identifiers SP-23 SP-040157 approved S3-LI S3-32 S3-040132 agreed 2004-03-10 SEC1-LI SA WG3 agreed by e-mail 2004-03-11
0037 - F Rel-5 5.6.0 5.7.0 Correction on the description of “initiator” in “PDP Context Modification CONTINUE Record” SP-23 SP-040158 approved S3-LI S3-32 S3-040136 agreed 2004-03-10 SEC1-LI SA WG3 agreed by e-mail 2004-03-11
0038 - A Rel-6 6.4.0 6.5.0 Correction on the description of “initiator” in “PDP Context Modification CONTINUE Record” SP-23 SP-040158 approved S3-LI S3-32 S3-040137 agreed 2004-03-10 SEC1-LI SA WG3 agreed by e-mail 2004-03-11
0039 - D Rel-6 6.4.0 6.5.0 Editorial Corrections SP-23 SP-040159 approved S3-LI S3-32 S3-040140 agreed 2004-03-10 SEC1-LI SA WG3 agreed by e-mail 2004-03-11
0040 - F Rel-5 5.6.0 5.7.0 Implications of R5 onwards QoS parameters on ASN.1 module in 33.108. R5 SP-23 SP-040160 approved S3-LI S3-32 S3-040133 agreed 2004-03-10 SEC1-LI SA WG3 agreed by e-mail 2004-03-11
0041 - A Rel-6 6.4.0 6.5.0 Implications of R5 onwards QoS parameters on ASN.1 module in 33.108. R6 SP-23 SP-040160 approved S3-LI S3-32 S3-040134 agreed 2004-03-10 SEC1-LI SA WG3 agreed by e-mail 2004-03-11
0042 - F Rel-5 5.6.0 5.7.0 Syntax error in Annex B.4 SP-23 SP-040161 approved S3-LI S3-32 S3-040141 agreed 2004-03-10 SEC1-LI SA WG3 agreed by e-mail 2004-03-11
0043 - A Rel-6 6.4.0 6.5.0 Syntax error in Annex B.4 SP-23 SP-040161 approved S3-LI S3-32 S3-040135 agreed 2004-03-10 SEC1-LI SA WG3 agreed by e-mail 2004-03-11
0044 - F Rel-6 6.4.0 6.5.0 Clarification on the use of IRI-END record in PS interception SP-23 SP-040162 approved S3-LI S3-32 S3-040139 agreed 2004-03-10 SEC1-LI SA WG3 agreed by e-mail 2004-03-11
0045 - F Rel-6 6.5.0 6.6.0 Correction on interception identities in multi-media domain SP-24 SP-040405 approved S3-LI S3-33 S3-040305 agreed 2004-05-17 SEC1--LI SA WG3 to agree by e-mail 2004-06-04
0046 - F Rel-5 5.7.0 5.8.0 WGS 84 coordinates length correction SP-24 SP-040406 approved S3-LI S3-33 S3-040306 agreed 2004-05-17 SEC1--LI SA WG3 to agree by e-mail 2004-06-04
0047 - A Rel-6 6.5.0 6.6.0 WGS 84 coordinates length correction SP-24 SP-040406 approved S3-LI S3-33 S3-040307 agreed 2004-05-17 SEC1--LI SA WG3 to agree by e-mail 2004-06-04
0048 - F Rel-6 6.5.0 6.6.0 offering alignment to ETSI TS 101 671 SP-24 SP-040407 approved S3-LI S3-33 S3-040311 agreed 2004-05-17 SEC1--LI SA WG3 to agree by e-mail 2004-06-04
0049 - F Rel-6 6.5.0 6.6.0 Additional text for Definition and Acronym section SP-24 SP-040408 approved S3-LI S3-33 S3-040313 agreed 2004-05-17 SEC1--LI SA WG3 to agree by e-mail 2004-06-04
0050 - F Rel-6 6.6.0 6.7.0 Explanation concerning the Sequence Number SP-25 SP-040616 approved S3-LI S3-34 S3-040693 agreed 2004-09-02 SEC1-LI SA WG3 agreed by e-mail 2004-09-03
0051 - B Rel-6 6.6.0 6.7.0 National ASN.1 parameter SP-25 SP-040616 approved S3-LI S3-34 S3-040693 agreed 2004-09-02 SEC1-LI SA WG3 agreed by e-mail 2004-09-03
0052 - D Rel-6 6.6.0 6.7.0 Clarifying clause titles SP-25 SP-040616 approved S3-LI S3-34 S3-040693 agreed 2004-09-02 SEC1-LI SA WG3 agreed by e-mail 2004-09-03
0053 - B Rel-6 6.6.0 6.7.0 Adding azimuth in location SP-25 SP-040616 approved S3-LI S3-34 S3-040693 agreed 2004-09-02 SEC1-LI SA WG3 agreed by e-mail 2004-09-03
0054 - C Rel-6 6.6.0 6.7.0 Correction of the Subaddressing definitions SP-25 SP-040616 approved S3-LI S3-34 S3-040693 agreed 2004-09-02 SEC1-LI SA WG3 agreed by e-mail 2004-09-03
0055 - F Rel-6 6.6.0 - Correction to hi3DomainId definition SP-25 SP-040616 revised S3-LI S3-34 S3-040693 agreed 2004-09-02 SEC1-LI SA WG3 agreed by e-mail 2004-09-03
0055 1 F Rel-6 6.6.0 6.7.0 Correction to hi3DomainId definition SP-25 SP-040685 approved S3-LI S3-34 S3-040693 agreed 2004-09-02 SEC1-LI SA WG3 agreed by e-mail 2004-09-03
0056 - D Rel-6 6.6.0 6.7.0 Correction of wrong use of abbreviations SP-25 SP-040616 approved S3-LI S3-34 S3-040693 agreed 2004-09-02 SEC1-LI SA WG3 agreed by e-mail 2004-09-03
0057 - C Rel-6 6.6.0 6.7.0 Differences between subaddress sections in 33.108 and ETSI TS 101 671 SP-25 SP-040616 approved S3-LI S3-34 S3-040693 agreed 2004-09-02 SEC1-LI SA WG3 agreed by e-mail 2004-09-03
0058 - F Rel-6 6.6.0 6.7.0 Replace SIP URL with SIP URI SP-25 SP-040616 approved S3-LI S3-34 S3-040693 agreed 2004-09-02 SEC1-LI SA WG3 agreed by e-mail 2004-09-03
0059 - F Rel-6 6.6.0 6.7.0 Corrections to References SP-25 SP-040616 approved S3-LI S3-34 S3-040693 agreed 2004-09-02 SEC1-LI SA WG3 agreed by e-mail 2004-09-03
0060 - F Rel-5 5.8.0 5.9.0 Correction to ULIC header SP-26 SP-040851 approved S3-LI S3-36 S3-040913 agreed 2004-11-10 SEC1-LI e-mail approved 30/11/2004 2004-12-12
0061 - A Rel-6 6.7.0 6.8.0 Correction to ULIC header SP-26 SP-040851 approved S3-LI S3-36 S3-040913 agreed 2004-11-10 SEC1-LI e-mail approved 30/11/2004 2004-12-12
0062 - F Rel-6 6.7.0 6.8.0 Correction on parameter GprsOperationErrorCode SP-26 SP-040851 approved S3-LI S3-36 S3-040913 agreed 2004-11-10 SEC1-LI e-mail approved 30/11/2004 2004-12-12
0063 - F Rel-6 6.7.0 6.8.0 Correction to the IMPORTS statements SP-26 SP-040851 approved S3-LI S3-36 S3-040913 agreed 2004-11-10 SEC1-LI e-mail approved 30/11/2004 2004-12-12
0064 - F Rel-6 6.7.0 6.8.0 Syntax Error in Annex B.3 SP-26 SP-040851 approved S3-LI S3-36 S3-040913 agreed 2004-11-10 SEC1-LI e-mail approved 30/11/2004 2004-12-12
0065 - B Rel-6 6.7.0 6.8.0 Deleting CC from SIP message SP-26 SP-040851 approved S3-LI S3-36 S3-040913 agreed 2004-11-10 SEC1-LI e-mail approved 30/11/2004 2004-12-12
0066 - B Rel-6 6.7.0 6.8.0 Adding domain ID to HI3 CS domain module SP-26 SP-040851 approved S3-LI S3-36 S3-040913 agreed 2004-11-10 SEC1-LI e-mail approved 30/11/2004 2004-12-12
0067 - F Rel-6 6.7.0 6.8.0 Syntax Error in Annex B.3a SP-26 SP-040851 approved S3-LI S3-36 S3-040913 agreed 2004-11-10 SEC1-LI e-mail approved 30/11/2004 2004-12-12
0068 - C Rel-6 6.7.0 6.8.0 HI2 SIP Content clarification SP-26 SP-040851 approved S3-LI S3-36 S3-040913 agreed 2004-11-10 SEC1-LI e-mail approved 30/11/2004 2004-12-12
0069 - D Rel-7 6.8.2 7.0.0 Aligning comments in National-HI3-ASN1parameters with comments in National-HI2-ASN1parameters SP-27 SP-050125 approved S3-LI S3-37 S3-050011 agreed 2005-01-19 SEC1-LI - 2005-03-13
0070 - B Rel-7 7.0.0 - Clarifications to the timing issue - - - - S3-38 S3-050198 revised 2005-04-07 SEC-LI - 2005-05-23
0070 1 B Rel-7 7.0.0 7.1.0 Clarifications to the timing issue SP-28 SP-050259 approved S3-38 S3-38 S3-050317 agreed 2005-04-07 SEC1-LI - 2005-05-23
0071 - B Rel-7 7.0.0 7.1.0 Clarification pertaining to the filtering of SDP for IRI-only cases SP-28 SP-050259 approved S3-38 S3-38 S3-050200 agreed 2005-04-05 SEC1-LI - 2005-05-23
0072 - F Rel-6 6.8.2 6.9.0 Correction on IMS correlation SP-28 SP-050258 approved S3-38 S3-38 S3-050202 agreed 2005-04-06 SEC1-LI - 2005-05-23
0073 - C Rel-7 7.0.0 - Correlation for IMS intercption - - - - S3-38 S3-050203 rejected 2005-04-06 SEC1-LI - 2005-05-23
0073 1 C Rel-7 7.0.0 7.1.0 Correlation for IMS intercption SP-28 SP-050383 approved MCC - - - 2005-06-06 SEC1-LI - 2005-06-06
0074 - F Rel-6 6.8.2 6.9.0 Inconsistency in Annex B.5 SP-28 SP-050260 approved S3-38 S3-38 S3-050205 agreed 2005-01-19 SEC1-LI - 2005-05-23
0075 - A Rel-7 7.0.0 7.1.0 Inconsistency in Annex B.5 SP-28 SP-050260 approved S3-38 S3-38 S3-050206 agreed 2005-04-15 SEC1-LI - 2005-05-23
0076 - D Rel-7 7.0.0 7.1.0 Obsolete Import Statement in Annex B.6 SP-28 SP-050259 approved S3-38 S3-38 S3-050207 agreed 2005-01-19 SEC1-LI - 2005-05-23
0077 - F Rel-7 7.1.0 7.2.0 Clarifications to the RAU event SP-29 SP-050571 approved S3 S3-39 S3-050346 agreed 2005-06-16 SEC1-LI - 2005-09-22
0077 - F Rel-7 7.2.0 7.3.0 ASN.1 module cleanup. SP-30 SP-050778 approved S3 S3-41 S3-050865 agreed 2005-10-19 LI-7A - 2005-11-24
0078 - B Rel-7 7.1.0 7.2.0 New event for LDI SP-29 SP-050571 approved S3 S3-39 S3-050348 agreed 2005-06-16 SEC1-LI - 2005-09-22
0078 - D Rel-7 7.2.0 7.3.0 Adding definition for ‘Precision’. SP-30 SP-050778 approved S3 S3-41 S3-050866 agreed 2005-10-18 LI-7A - 2005-11-24
0079 - C Rel-7 7.1.0 7.2.0 Correlation for IMS interception SP-29 SP-050571 approved S3 S3-39 S3-050350 agreed 2005-06-08 SEC1-LI - 2005-09-22
0079 - B Rel-7 7.2.0 7.3.0 Start of interception for already attached UE SP-30 SP-050779 approved S3 S3-41 S3-050868 agreed 2005-10-18 LI-7A - 2005-11-24
0080 - F Rel-7 7.1.0 7.2.0 Clarification on IMS bearer independence SP-29 SP-050571 approved S3 S3-39 S3-050351 agreed 2005-06-08 SEC1-LI - 2005-09-22
0080 - F Rel-6 6.9.0 6.10.0 Wrong references to tables for subaddress SP-30 SP-050762 approved S3 S3-41 S3-050871 agreed 2005-10-18 SEC1-LI - 2005-11-24
0081 - A Rel-7 7.2.0 7.3.0 Wrong references to tables for subaddress SP-30 SP-050762 approved S3 S3-41 S3-050872 agreed 2005-10-18 SEC1-LI - 2005-11-24
0082 - F Rel-7 7.2.0 7.3.0 Alignment with ETSI TS 101 671 - Clarification on CIN SP-30 SP-050778 approved S3 S3-41 S3-050873 agreed 2005-10-19 LI-7A - 2005-11-24
0083 - F Rel-7 7.3.0 7.4.0 Informative example of FTP implementation across HI2/HI3. SP-31 SP-060065 approved S3 S3-42 S3-060101 agreed 2006-01-18 LI-7A - 2006-03-01
0083 - F Rel-7 7.4.0 7.5.0 Missing ETSI parameter on HI2 SP-32 SP-060384 approved S3 S3-43 S3LI06_060 agreed 2006-04-26 LI-7A - 2006-06-01
0084 - F Rel-7 7.3.0 7.4.0 Correction on description of parameter ""event type"" for CS interception SP-31 SP-060065 approved S3 S3-42 S3-060103 agreed 2006-01-17 LI-7A - 2006-03-01
0085 - F Rel-7 7.3.0 7.4.0 Handling of unkown SIP headers SP-31 SP-060065 approved S3 S3-42 S3-060104 agreed 2006-01-18 LI-7A - 2006-03-01
0086 - F Rel-7 7.3.0 7.4.0 Correction on polygon type of shape SP-31 SP-060065 approved S3 S3-42 S3-060105 agreed 2006-01-02 LI-7A - 2006-03-01
0087 - B Rel-7 7.3.0 7.4.0 Extending section A.2.2 and C.2.2 for national use SP-31 SP-060065 approved S3 S3-42 S3-060106 agreed 2006-01-11 LI-7A - 2006-03-01
0088 - B Rel-7 7.5.0 - TS 33.108 - WLAN Interworking Interception Details (v7.0) SP-33 SP-060509 revised SA3 LI S3-44 S3-060559 agreed 2006-06-29 LI-7A - 2006-09-14
0088 1 B Rel-7 7.5.0 7.6.0 TS 33.108 - WLAN Interworking Interception Details (v7.0) SP-33 SP-060660 approved SA3 LI - - - 2006-06-29 LI-7A - 2006-09-27
0089 - F Rel-7 7.6.0 - SMS IRI Reporting for WLAN Interworking (33.108) - - - SA3 LI S3-46 S3-070147 revised 2007-02-08 LI-7A - 2007-03-04
0089 1 F Rel-7 7.6.0 7.7.0 SMS IRI Reporting for WLAN Interworking (33.108) SP-35 SP-070157 approved SA3 LI S3-46 S3-070217 agreed 2007-02-15 LI-7A - 2007-03-04
0090 - B Rel-8 7.7.0 8.0.0 NSAPI (Network layer Service Access Point Identifier) optional in IRI. ASN.1 version update Rel. 8 SP-36 SP-070332 approved S3 S3-47 S3-070419 agreed 2007-04-17 LI8 - 2007-06-05
0091 - B Rel-7 7.7.0 7.8.0 Direct Tunnel LI SP-36 SP-070331 approved S3 S3-47 S3-070421 agreed 2007-04-26 LI-7A - 2007-06-05
0092 - F Rel-8 7.7.0 8.0.0 Clarification of Usage of GPRS Terminology and umtsQOS SP-36 SP-070332 approved S3 S3-47 S3-070422 agreed 2007-04-25 LI8 - 2007-06-05
0093 - B Rel-8 8.0.0 8.1.0 WLAN IRI at AAA for re-authentication SP-37 SP-070601 approved S3 S3-48 - - 2009-07-05 LI8 - 2007-09-17
0094 - D Rel-8 8.0.0 8.1.0 Missing reference to TS 23.234 SP-37 SP-070601 approved S3 S3-48 - - 2009-07-05 LI8 - 2007-09-17
0095 - F Rel-8 8.1.0 8.2.0 Clarifications to FTP filenaming conventions SP-38 SP-070788 approved S3 S3-49 SA3LI07_115 agreed 2007-10-18 LI8 - 2007-10-18
0096 - A Rel-8 8.1.0 8.2.0 Wrong reference SP-38 SP-070789 approved S3 S3-49 SA3LI07_098r1 agreed 2007-09-26 LI-7A - 2007-09-26
0097 - C Rel-8 8.1.0 8.2.0 P-CSCF IMS LI Optional SP-38 SP-070788 approved S3 S3-49 SA3LI07_106r1 agreed 2007-10-16 LI8 - 2007-10-16
0098 - F Rel-7 7.8.0 7.9.0 Wrong reference SP-38 SP-070789 approved S3 S3-49 SA3LI07_097r1 agreed 2007-09-26 LI-7A - 2007-09-26
0099 - C Rel-8 8.2.0 - Editorial update SP-39 SP-080152 revised SA WG3 S3-50 SA3LI08_010r1 Agreed 2008-01-30 LI8 - 2008-01-30
0099 1 C Rel-8 8.2.0 8.3.0 Editorial update SP-39 SP-080173 approved S3 S3-50 - - 2008-01-30 LI8 - 2008-03-07
0100 - B Rel-8 8.3.0 8.4.0 MBMS LI 33.108 SP-40 SP-080263 approved S3 S3-51 update of SA3LI Agreed 2008-04-23 LI8 - 2008-05-23
0101 - F Rel-8 8.4.0 8.5.0 Clarification of encoding of Access Point Name (APN) SP-42 SP-080763 approved S3 - SA3LI08_074r1 agreed 2008-11-11 LI8 - 2008-12-05
0102 - B Rel-8 8.4.0 8.5.0 LI Handover Interface for SAE/EPS SP-42 SP-080763 approved S3 - SA3LI08_077r1 agreed 2008-11-11 LI8 - 2008-12-05
0103 - F Rel-8 8.4.0 8.5.0 Clarification on 3G DT with the GGSN SP-42 SP-080763 approved S3 - SA3LI08_079r1 agreed 2008-11-11 LI8 - 2008-12-05
0104 - F Rel-8 8.5.0 8.6.0 Clarification on IRI record types used in IMS in TS33.108 SP-43 SP-090133 approved S3 - SA3LI09_003r1 agreed 2009-02-10 LI8 - 2009-02-28
0105 - F Rel-8 8.5.0 8.6.0 Clarification in TS33.108 on decryption place in IMS SP-43 SP-090133 approved S3 - SA3LI09_004r2 agreed 2009-02-11 LI8 - 2009-02-28
0106 - F Rel-8 8.5.0 8.6.0 Update of IMS specific non-transmission action example SP-43 SP-090133 approved S3 - SA3LI09_005r1 agreed 2009-02-10 LI8 - 2009-02-28
0107 - F Rel-8 8.5.0 8.6.0 TS 33.108 Alignment with SAE stage 2 specifications approved by TSG SA#42 SP-43 SP-090133 approved S3 - SA3LI09_007 agreed 2009-01-09 LI8 - 2009-02-28
0108 - B Rel-8 8.5.0 8.6.0 ASN.1 coding for the SAE/EPS HI2 interface SP-43 SP-090133 approved S3 - SA3LI09_008r1 agreed 2009-02-10 LI8 - 2009-02-28
0109 - B Rel-8 8.5.0 8.6.0 Introduction of HI3 for SAE/EPS SP-43 SP-090133 approved S3 - SA3LI09_009r1 agreed 2009-02-10 LI8 - 2009-02-28
0110 - B Rel-8 8.5.0 8.6.0 TS 33.108 - Conference Event Reporting SP-43 SP-090133 approved S3 - SA3LI09_010r5 agreed 2009-02-11 LI8 - 2009-02-28
0111 - F Rel-8 8.5.0 8.6.0 TS 33.108 - US Editorial Clean up SP-43 SP-090133 approved S3 - SA3LI09_011r2 agreed 2009-02-11 LI8 - 2009-02-28
0112 - F Rel-8 8.6.1 8.7.0 Correction on UE requested bearer resource modification - Alignment with SAE stage 2 specification SP-44 SP-090272 approved S3 S3-55 SA3LI09_024 agreed 2009-04-10 LI8 - 2009-05-30
0113 - F Rel-8 8.6.1 8.7.0 Clarification on parameter APN for EPS SP-44 SP-090272 approved S3 S3-55 SA3LI09_026 agreed 2009-04-08 LI8 - 2009-05-30
0114 - F Rel-8 8.6.1 8.7.0 Clarification on the handover between 2G/3G access and E-UTRAN with Gn/Gp SP-44 SP-090272 approved S3 S3-55 SA3LI09_028r1 agreed 2009-04-28 LI8 - 2009-05-30
0115 - F Rel-8 8.6.1 8.7.0 Clarification on parameter PDN type SP-44 SP-090272 approved S3 S3-55 SA3LI09_030 agreed 2009-04-08 LI8 - 2009-05-30
0116 - F Rel-8 8.6.1 8.7.0 Correction on GTPv2 instance in ASN.1 module for EPS SP-44 SP-090272 approved S3 S3-55 SA3LI09_031r1 agreed 2009-04-28 LI8 - 2009-05-30
0117 - F Rel-8 8.6.1 8.7.0 Correction on the coding of Protocol Configuration Options coding in ASN.1 for EPS SP-44 SP-090272 approved S3 S3-55 SA3LI09_032 agreed 2009-04-09 LI8 - 2009-05-30
0118 - F Rel-8 8.6.1 8.7.0 Correction on references in ASN.1 for EPS SP-44 SP-090272 approved S3 S3-55 SA3LI09_033 agreed 2009-04-09 LI8 - 2009-05-30
0119 - F Rel-8 8.6.1 8.7.0 33.108 Conference Typo SP-44 SP-090272 approved S3 S3-55 SA3LI09-035r2 agreed 2009-04-29 LI8 - 2009-05-30
0120 - F Rel-8 8.6.1 8.7.0 33.108 Annex H CR SP-44 SP-090272 approved S3 S3-55 SA3LI09-038r2 agreed 2009-04-28 LI8 - 2009-05-30
0121 - F Rel-8 8.7.0 8.8.0 Correction on identities and parameters for LI in case of E-UTRAN access and PMIP based S5/S8 SP-45 SP-090522 approved SA3 S3-56 SA3LI09_056 agreed 2009-07-07 LI8 - 2009-09-16
0122 - F Rel-8 8.7.0 8.8.0 Correction on Serving Evolved Packet System event. SP-45 SP-090522 approved SA3 S3-56 SA3LI09_057r1 agreed 2009-07-15 LI8 - 2009-09-16
0123 - F Rel-8 8.7.0 8.8.0 Correction on the use of initiator in ASN.1 SP-45 SP-090522 approved SA3 S3-56 SA3LI09_058 agreed 2009-06-17 LI8 - 2009-09-16
0124 - F Rel-8 8.7.0 8.8.0 Missing parameters for MME interception in the ASN.1 module SP-45 SP-090522 approved SA3 S3-56 SA3LI09_059 agreed 2009-06-17 LI8 - 2009-09-16
0125 - C Rel-9 8.7.0 9.0.0 FTP table details SP-45 SP-090559 approved SA3 - SA3LI09_061r1 - 2009-07-15 LI9 - 2009-09-21
0126 - F Rel-8 8.8.0 8.9.0 Correction of misalignments for values of ôinitiatorö parameter for EPS SP-46 SP-090817 approved S3 - SA3LI09_096r1 agreed 2009-11-03 LI8 - 2009-11-27
0127 - A Rel-9 9.0.0 9.1.0 Missing TAU Failure Reason parameter mapping for MME interception SP-46 SP-090818 approved S3 - SA3LI_085R1 agreed 2009-10-26 LI8 CR cover sheet shows wi LI9 2009-11-27
0128 - A Rel-9 9.0.0 9.1.0 Correction of misalignments for values of ôinitiatorö parameter for EPS SP-46 SP-090817 approved S3 - SA3LI09_099r1 agreed 2009-11-03 LI8 - 2009-11-27
0129 - F Rel-8 8.8.0 8.9.0 Missing TAU Failure Reason parameter mapping for MME interception SP-46 SP-090817 approved S3 - SA3LI09_110R1 agreed 2009-11-03 LI8 - 2009-11-27
0130 - F Rel-8 8.8.0 8.9.0 Correction on LI correlation for S4-SGSN SP-46 SP-090817 approved S3 - SA3LI09_094r1 agreed 2009-11-03 LI8 - 2009-11-27
0131 - F Rel-8 8.8.0 8.9.0 Correction on the length of RAI parameter in ASN.1 module for HI2 EPS SP-46 SP-090817 approved S3 - SA3LI09_095 agreed 2009-10-19 LI8 - 2009-11-27
0132 - A Rel-9 9.0.0 9.1.0 Correction on LI correlation for S4-SGSN SP-46 SP-090817 approved S3 - SA3LI09_097r1 agreed 2009-11-03 LI8 - 2009-11-27
0133 - A Rel-9 9.0.0 9.1.0 Correction on the length of RAI parameter in ASN.1 module for HI2 EPS SP-46 SP-090817 approved S3 - SA3LI09_098 agreed 2009-10-27 LI8 - 2009-11-27
0134 - A Rel-9 9.1.0 9.2.0 EPSLocation ULI length correction SP-47 SP-100104 approved S3 S3-58 SA3LI10_005 agreed 2010-02-23 LI8 - 2010-02-24
0135 - F Rel-8 8.9.0 8.10.0 Correction on RAI coding inside ôold user location informationö parameter SP-47 SP-100104 approved S3 S3-58 SA3LI10_008 agreed 2010-02-23 LI8 - 2010-02-24
0136 - A Rel-9 9.1.0 9.2.0 Correction on RAI coding inside ôold user location informationö parameter SP-47 SP-100104 approved S3 S3-58 SA3LI10_009r1 agreed 2010-02-23 LI8 - 2010-02-24
0137 - F Rel-8 8.9.0 8.10.0 EPSLocation ULI length correction SP-47 SP-100104 approved S3 S3-58 SA3LI10_004 agreed 2010-02-23 LI8 - 2010-02-24
0138 - A Rel-9 9.2.0 9.3.0 ASN.1 Description of eps-sending-of-IRI Subdomain ID SP-48 SP-100363 approved SA3 - SA3LI10_041r2 - 2010-05-27 LI8 - 2010-06-07
0138 - A Rel-9 9.2.0 9.3.0 ASN.1 Description of eps-sending-of-IRI Subdomain ID SP-48 SP-100383 approved S3 - SA3LI10_041r2 - 2010-05-27 LI8 - 2010-06-07
0139 - F Rel-8 8.10.0 8.11.0 ASN.1 Description of eps-sending-of-IRI Subdomain ID SP-48 SP-100363 approved SA3 - SA3LI10_047r2 - 2010-05-27 LI8 - 2010-06-07
0139 - F Rel-8 8.10.0 8.11.0 ASN.1 Description of eps-sending-of-IRI Subdomain ID SP-48 SP-100383 approved S3 - SA3LI10_047r2 - 2010-05-27 LI8 - 2010-06-07
0140 - F Rel-10 9.2.0 10.0.0 Reporting of Dual Stack PDP address from the SGSN SP-48 SP-100253 approved SA3 - SA3LI10_035r1 agreed 2010-05-26 LI10 - 2010-06-08
0141 - A Rel-10 10.0.0 10.1.0 SCI correction SP-49 SP-100570 approved S3 S3-LI-38 SA3LI10_083 agreed 2010-09-10 TEI9 - 2010-09-14
0142 - F Rel-10 10.0.0 10.1.0 Unsuccessful bearer modification SP-49 SP-100481 approved S3 S3-LI-38 SA3LI10_082r2 agreed 2010-09-10 LI10 - 2010-09-14
0143 - A Rel-10 10.0.0 10.1.0 IMS Conference Overview text modification SP-49 SP-100570 approved S3 S3-LI-38 SA3LI10_086 agreed 2010-09-10 TEI9 - 2010-09-14
0144 - F Rel-9 9.3.0 9.4.0 SCI correction, Rel9 SP-49 SP-100570 approved S3 S3-LI-38 SA3LI10_084 agreed 2010-09-10 TEI9 - 2010-09-14
0145 - F Rel-9 9.3.0 9.4.0 IMS Conference Overview text modification, Rel9 SP-49 SP-100570 approved S3 S3-LI-38 SA3LI10_085 agreed 2010-09-10 TEI9 - 2010-09-14
0146 - A Rel-10 10.1.0 - IMSI in event records SP-50 SP-100727 revised S3 S3-61 SA3LI10_122r1 agreed 2010-11-25 LI8 - 2010-12-09
0146 1 A Rel-10 10.1.0 10.2.0 IMSI in event records SP-50 SP-100845 approved S3 - SA3LI10_122r2 - 2010-12-14 LI8 - 2010-12-14
0147 - B Rel-10 10.1.0 10.2.0 start of interception event at the EPS HI2 SP-50 SP-100729 approved S3 S3-61 SA3LI10_124r1 agreed 2010-11-25 LI10 - 2010-12-09
0148 - B Rel-10 10.1.0 10.2.0 LI Handover Interface for KMS based IMS Media Security SP-50 SP-100729 approved S3 S3-61 SA3LI10_125r2 agreed 2010-11-25 LI10 - 2010-12-09
0149 - F Rel-8 8.11.0 - IMSI in event records SP-50 SP-100727 revised S3 S3-61 SA3LI10_132r2 agreed 2010-11-25 LI8 - 2010-12-09
0149 1 F Rel-8 8.11.0 8.12.0 IMSI in event records SP-50 SP-100845 approved S3 - SA3LI10_132r3 - 2010-12-14 LI8 - 2010-12-14
0150 - A Rel-9 9.4.0 - IMSI in event records SP-50 SP-100727 revised S3 S3-61 SA3LI10_133r1 agreed 2010-11-25 LI8 - 2010-12-09
0150 1 A Rel-9 9.4.0 9.5.0 IMSI in event records SP-50 SP-100845 approved S3 - SA3LI10_133r3 - 2010-12-14 LI8 - 2010-12-14
0151 - F Rel-9 9.4.0 9.5.0 Add a Reference to the ATIS LI VoIP specification for US regulatory requirements SP-50 SP-100728 approved S3 S3-61 SA3LI10_143r1 agreed 2010-11-25 TEI9 - 2010-12-09
0152 - A Rel-10 10.1.0 10.2.0 Add a Reference to the ATIS LI VoIP specification for US regulatory requirements SP-50 SP-100728 approved S3 S3-61 SA3LI10_144r1 agreed 2010-11-25 TEI9 - 2010-12-09
0153 - F Rel-7 7.9.0 7.10.0 Corrections to NEID and Serving System Report Message Required to meet US regulatory requirements SP-50 SP-100726 approved S3 S3-61 SA3LI10_145r1 agreed 2010-11-25 LI-7A - 2010-12-09
0154 - A Rel-8 8.11.0 8.12.0 Corrections to Serving System Report Message Required to meet US regulatory requirements SP-50 SP-100726 approved S3 S3-61 SA3LI10_146r1 agreed 2010-11-25 LI-7A - 2010-12-09
0156 - A Rel-10 10.1.0 10.2.0 Corrections to Serving System Report Message Required to meet US regulatory requirements SP-50 SP-100726 approved S3 S3-61 SA3LI10_148 agreed 2010-11-25 LI-7A - 2010-12-09
0157 - F Rel-7 7.9.0 7.10.0 Clarification added in the US Annex H on the requirement for UMTS LI Correlation Header (ULIC) version SP-50 SP-100726 approved S3 S3-61 SA3LI10_151r1 agreed 2010-11-25 LI-7A - 2010-12-09
0158 - A Rel-8 8.11.0 8.12.0 Clarification added in the US Annex H on the requirement for UMTS LI Correlation Header (ULIC) version SP-50 SP-100726 approved S3 S3-61 SA3LI10_152r1 agreed 2010-11-25 LI-7A - 2010-12-09
0159 - A Rel-9 9.4.0 9.5.0 Clarification added in the US Annex H on the requirement for UMTS LI Correlation Header (ULIC) version SP-50 SP-100726 approved S3 S3-61 SA3LI10_153r1 agreed 2010-11-25 LI-7A - 2010-12-09
0160 - A Rel-10 10.1.0 10.2.0 Clarification added in the US Annex H on the requirement for UMTS LI Correlation Header (ULIC) version SP-50 SP-100726 approved S3 S3-61 SA3LI10_154r1 agreed 2010-11-26 LI-7A - 2010-12-09
0161 - F Rel-8 8.11.0 - Corrections and Alignment for IMS Conferencing SP-50 SP-100727 revised S3 S3-61 SA3LI10_157r4 agreed 2010-11-25 LI8 - 2010-12-09
0161 1 F Rel-8 8.11.0 8.12.0 Corrections and Alignment for IMS Conferencing SP-50 SP-100845 approved S3 - SA3LI10_157r5 - 2010-12-14 LI8 - 2010-12-14
0162 - A Rel-9 9.4.0 - Corrections and Alignment for IMS Conferencing SP-50 SP-100727 revised S3 S3-61 SA3LI10_167 agreed 2010-12-09 LI8 Cover sheet shows Rel-8 2010-12-09
0162 1 A Rel-9 9.4.0 9.5.0 Corrections and Alignment for IMS Conferencing SP-50 SP-100845 approved S3 - SA3LI10_167r1 - 2010-12-14 LI8 - 2010-12-14
0163 - A Rel-10 10.1.0 - Corrections and Alignment for IMS Conferencing SP-50 SP-100727 revised S3 S3-61 SA3LI10_168r1 agreed 2010-11-25 LI8 - 2010-12-09
0163 1 A Rel-10 10.1.0 10.2.0 Corrections and Alignment for IMS Conferencing SP-50 SP-100845 approved S3 - SA3LI10_168r1 - 2010-12-14 LI8 - 2010-12-14
0164 - A Rel-9 9.4.0 9.5.0 Corrections to Serving System Report Message Required to meet US regulatory requirements SP-50 SP-100726 approved S3 S3-61 SA3LI10_147r1 agreed 2010-11-25 LI-7A - 2010-12-09
0165 - F Rel-8 8.12.0 8.13.0 S4-SGSN address in the Serving System Report SP-51 SP-110021 approved S3 S3-62 SA3LI11_008r1 agreed 2011-02-11 LI8 - 2011-02-11
0166 - A Rel-9 9.5.0 9.6.0 S4-SGSN address in the Serving System Report SP-51 SP-110021 approved S3 S3-62 SA3LI11_009r1 agreed 2011-02-11 LI8 - 2011-02-11
0167 - A Rel-10 10.2.0 10.3.0 S4-SGSN address in the Serving System Report SP-51 SP-110021 approved S3 S3-62 SA3LI11_010r1 agreed 2011-02-11 LI8 - 2011-02-11
0168 - F Rel-9 9.5.0 9.6.0 IMSI in event record SP-51 SP-110022 approved S3 S3-62 SA3LI11_007r2 agreed 2011-02-11 TEI9 - 2011-02-11
0169 - F Rel-9 9.5.0 9.6.0 Mistake in the implementation of CR 0139 SP-51 SP-110022 approved S3 S3-62 SA3LI11_012r1 agreed 2011-02-11 TEI9 - 2011-02-11
0170 - F Rel-10 10.2.0 10.3.0 Propagation of mistake in the implementation of CR 0139 (rel-9) on rel-10 SP-51 SP-110023 approved S3 S3-62 SA3LI11_013r1 agreed 2011-02-11 LI10 - 2011-02-11
0171 - F Rel-8 8.12.0 8.13.0 MME address in Serving System report SP-51 SP-110021 approved S3 S3-62 SA3LI11_015r1 agreed 2011-02-11 LI8 - 2011-02-11
0172 - A Rel-9 9.5.0 9.6.0 MME address in Serving System report SP-51 SP-110021 approved S3 S3-62 SA3LI11_016r1 agreed 2011-02-11 LI8 - 2011-02-11
0173 - A Rel-10 10.2.0 10.3.0 MME address in Serving System report SP-51 SP-110021 approved S3 S3-62 SA3LI11_017r2 agreed 2011-02-11 LI8 - 2011-02-11
0174 - F Rel-8 8.12.0 8.13.0 PMIP parameters condition SP-51 SP-110021 approved S3 S3-62 SA3LI11_028r1 agreed 2011-02-11 LI8 - 2011-02-11
0175 - A Rel-9 9.5.0 9.6.0 PMIP parameters condition SP-51 SP-110021 approved S3 S3-62 SA3LI11_029r1 agreed 2011-02-11 LI8 - 2011-02-11
0176 - A Rel-10 10.2.0 10.3.0 PMIP parameters condition SP-51 SP-110021 approved S3 S3-62 SA3LI11_030r1 agreed 2011-02-11 LI8 - 2011-02-11
0177 - F Rel-10 10.2.0 10.3.0 IMS Conf LI 33.108 SP-51 SP-110023 approved S3 S3-62 SA3LI11_041r2 agreed 2011-02-11 LI10 - 2011-02-11
0178 - B Rel-10 10.2.0 10.3.0 Location information for PMIP events SP-51 SP-110023 approved S3 S3-62 SA3LI11_021r1 agreed 2011-02-11 LI10 - 2011-02-11
0179 - F Rel-8 8.12.0 8.13.0 Reporting of Dual Stack PDP address from the S4 SGSN SP-51 SP-110021 approved S3 S3-62 SA3LI11_019r1 agreed 2011-02-11 LI8 - 2011-02-11
0180 - C Rel-10 10.2.0 10.3.0 Security requirements for the LI Handover Interface in KMS based IMS media security SP-51 SP-110023 approved S3 S3-62 SA3LI11_023r1 agreed 2011-02-11 LI10 - 2011-02-11
0181 - F Rel-10 10.2.0 10.3.0 Revocation trigger SP-51 SP-110023 approved S3 S3-62 SA3LI11_024r1 agreed 2011-02-11 LI10 - 2011-02-11
0182 - B Rel-10 10.2.0 10.3.0 Mixed delivery indication for IMS Conference HI3 SP-51 SP-110023 approved S3 S3-62 SA3LI11_032r1 agreed 2011-02-11 LI10 - 2011-02-11
0183 - F Rel-9 9.5.0 9.6.0 IMS Conf LI 33.108 SP-51 SP-110022 approved S3 S3-62 SA3LI11_056r1 agreed 2011-02-11 TEI9 - 2011-02-11
0184 - A Rel-9 9.5.0 9.6.0 Reporting of Dual Stack PDP address from the S4 SGSN SP-51 SP-110021 approved S3 S3-62 SA3LI11_034r1 agreed 2011-02-11 LI8 - 2011-02-11
0185 - F Rel-8 8.12.0 8.13.0 IMS Conf LI 33.108 SP-51 SP-110021 approved S3 S3-62 SA3LI11_055r1 agreed 2011-02-11 LI8 - 2011-02-11
0186 - C Rel-10 10.3.0 10.4.0 TLS profiling for HI2 interface for KMS based IMS media security SP-52 SP-110260 approved S3 S3-LI-41 SA3LI11_070r1 agreed 2011-05-16 LI10 - 2011-05-25
0187 - F Rel-11 10.3.0 - OID (ASN.1 of Object Identifier in CS domain) SP-52 SP-110261 revised S3 S3-LI-41 SA3LI11_072r3 agreed 2011-05-16 LI11 Cat change. 2011-05-25
0187 1 C Rel-11 10.3.0 11.0.0 OID (ASN.1 of Object Identifier in CS domain) SP-52 SP-110425 approved SA3 - SA3LI11_072r4 - 2011-06-07 LI11 - 2011-06-07
0188 - B Rel-11 11.0.0 11.1.0 Reporting of DSMIP session modification SP-53 SP-110511 approved S3 S3-64 SA3LI11_102r1 agreed 2011-09-07 LI11 - 2011-09-08
0189 - F Rel-11 11.1.0 11.2.0 Correction on reference for MIKEY-TICKET SP-55 SP-120034 approved S3 S3-66 SA3LI12_003 agreed 2012-02-11 LI11 - 2012-02-16
0189 2 C Rel-11 11.2.0 11.3.0 CSFB Location transfer over the HI2 interface SP-56 SP-120336 approved S3 S3LI-45 SA3LI12_037r2 agreed 2012-06-05 LI11 - 2012-06-06
0190 - F Rel-11 11.1.0 11.2.0 SAI Reference correction SP-55 SP-120034 approved S3 S3-66 SA3LI12_006r1 agreed 2012-02-11 LI11 - 2012-02-16
0190 2 F Rel-11 11.2.0 11.3.0 PayloadType in CC header SP-56 SP-120336 approved S3 S3LI-45 SA3LI12_038r2 agreed 2012-06-05 LI11 - 2012-06-06
0191 - F Rel-11 11.1.0 11.2.0 Correction on reference for MIP specific parameters for the HI2 interface and alignment of reported information. SP-55 SP-120034 approved S3 S3-66 SA3LI12_005r1 agreed 2012-02-11 LI11 - 2012-02-16
0191 1 F Rel-11 11.2.0 11.3.0 UE Address Info in HI2 SP-56 SP-120336 approved S3 S3LI-45 SA3LI12_041r1 agreed 2012-06-05 LI11 - 2012-06-06
0192 3 C Rel-11 11.2.0 11.3.0 Handover indication at HI2 interface SP-56 SP-120336 approved S3 S3LI-45 SA3LI12_043r3 agreed 2012-06-06 LI11 - 2012-06-06
0193 1 F Rel-11 11.2.0 11.3.0 IMS Conference Services SP-56 SP-120336 approved S3 S3LI-45 SA3LI12_046r3 agreed 2012-06-06 LI11 - 2012-06-06
0194 1 F Rel-11 11.2.0 11.3.0 Correction on parameter name pMIPAttachTunnelDeactivation SP-56 SP-120336 approved S3 S3LI-45 SA3LI12_047 agreed 2012-06-06 LI11 - 2012-06-06
0195 1 F Rel-11 11.2.0 11.3.0 Correction on delivery of encrypted CC in case of IMS media security SP-56 SP-120336 approved S3 S3LI-45 SA3LI12_048 agreed 2012-06-06 LI11 - 2012-06-06
0196 2 C Rel-11 11.2.0 11.3.0 IMS Conference Services SP-56 SP-120336 approved S3 S3LI-45 SA3LI12_056r2 agreed 2012-06-06 LI11 - 2012-06-06
0197 3 F Rel-11 11.2.0 11.3.0 Clarification for Serving Evolved Packet System Message Reporting SP-56 SP-120336 approved S3 S3LI-45 SA3LI12_060r3 agreed 2012-06-06 LI11 - 2012-06-06
0198 - F Rel-11 11.3.0 - Reference list correction to align with the corrected TS 29.212 title SP-57 SP-120474 revised Allot Communications, Vodafone, Juniper Networks - - - 2012-08-16 TEI11 - 2012-09-09
0198 1 F Rel-11 11.3.0 11.4.0 Reference list correction to align with the corrected TS 29.212 title SP-57 SP-120627 approved Allot Communications, Vodafone, Juniper Networks - - - 2012-09-06 TEI11 - 2012-09-09
0199 - A Rel-9 9.6.0 9.7.0 ePSlocationOfTheTarget in EPS-PMIP-SpecificParameters SP-57 SP-120619 approved S3 S3-46LI SA3LI12_084r1 agreed 2012-09-04 LI8 - 2012-09-09
0200 - A Rel-10 10.4.0 10.5.0 ePSlocationOfTheTarget in EPS-PMIP-SpecificParameters SP-57 SP-120619 approved S3 S3-46LI SA3LI12_085r1 agreed 2012-09-04 LI8 - 2012-09-09
0201 - A Rel-11 11.3.0 11.4.0 ePSlocationOfTheTarget in EPS-PMIP-SpecificParameters SP-57 SP-120619 approved S3 S3-46LI SA3LI12_086r1 agreed 2012-09-04 LI8 - 2012-09-09
0202 - A Rel-11 11.3.0 11.4.0 EPS Location ASN.1 Parameter Correction SP-57 SP-120617 approved S3 S3-46LI SA3LI12_087r1 agreed 2012-09-05 LI10 - 2012-09-09
0203 - F Rel-10 10.4.0 10.5.0 EPS Location ASN.1 Parameter Correction SP-57 SP-120617 approved S3 S3-46LI SA3LI12_088r1 agreed 2012-08-29 LI10 - 2012-09-09
0204 - F Rel-8 8.13.0 8.14.0 ePSlocationOfTheTarget in EPS-PMIP-SpecificParameters SP-57 SP-120619 approved S3 S3-46LI SA3LI12_093 agreed 2012-09-04 LI8 - 2012-09-09
0205 - F Rel-12 11.4.0 12.0.0 Correction on EPS userLocationInfo and olduserLocationInfo parameters length SP-59 SP-130034 approved S3-LI S3-70 SA3LI13_016 agreed 2013-02-28 LI12 - 2013-02-28
0206 - F Rel-12 11.4.0 12.0.0 Clarification on the use of EPS Correlation Number for GPRS events in EPS Events SP-59 SP-130034 approved S3-LI S3-70 SA3LI13-003r1 agreed 2013-02-28 LI12 - 2013-02-28
0207 - C Rel-12 11.4.0 12.0.0 Timestamp Requirement for US Networks SP-59 SP-130034 approved S3-LI S3-70 SA3LI13_017r4 agreed 2013-02-28 LI12 - 2013-02-28
0208 - F Rel-12 12.0.0 12.1.0 Name correction of reference [1] SP-60 SP-130248 approved S3-LI S3-71 SA3LI13_040r1 agreed 2013-06-05 LI12 - 2013-06-05
0209 - F Rel-12 12.0.0 12.1.0 Potential Compatibility Issues with use of OCTET STRING Encoding SP-60 SP-130248 approved S3-LI S3-71 SA3LI13_050r2 agreed 2013-06-05 LI12 - 2013-06-05
0210 - B Rel-12 12.0.0 12.1.0 Start of interception for an already established IMS session SP-60 SP-130248 approved S3-LI S3-71 SA3LI13_045r1 agreed 2013-06-05 LI12 - 2013-06-05
0211 - F Rel-12 12.0.0 12.1.0 Missing references to annex B.9 for PS and IMS interception SP-60 SP-130248 approved S3-LI S3-71 SA3LI13_046 agreed 2013-06-05 LI12 - 2013-06-05
0212 - B Rel-12 12.1.0 12.2.0 Annex H Changes for Gateway Interception at Inter-PLMN Interface SP-61 SP-130401 approved - S3-72 SA3LI3_073r3 agreed 2013-08-09 LI12 - 2013-08-09
0213 - F Rel-12 12.1.0 12.2.0 Updating Tel URL to Tel URI SP-61 SP-130401 approved - S3-72 SA3LI13_069r2 agreed 2013-08-09 LI12 - 2013-08-09