3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 43.129

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - - Rel-6 - - Correction of data forwarding in case of inter-RAT PS Handover - - - - G1-23 GP-050322 revised 2005-01-28 - - 2005-02-01
0001 1 F Rel-6 6.0.0 6.1.0 Correction of data forwarding in case of inter-RAT PS Handover GP-23 GP-050450 approved G1 G1-23 GP-050450 agreed 2005-01-28 SCSAGB - 2005-02-01
0002 - F Rel-6 6.0.0 6.1.0 “Layer 3 information” not used for PS Handover GP-23 GP-050323 approved G1 G1-23 GP-050323 agreed 2005-01-28 SCSAGB - 2005-02-01
0003 - - Rel-6 - - Overview of New Primitives for PS HO - - - Ericsson G1-23 GP-050324 postponed 2005-01-28 - - 2005-02-01
0004 - - Rel-6 - - Clarification of PDP Context Suspension during inter-SGSN GERAN A/Gb to GERAN A/Gb PS HO - - - - G1-23 GP-050325 revised 2005-01-28 - - 2005-02-01
0004 1 - Rel-6 - - Clarification of PDP Context Suspension during inter-SGSN GERAN A/Gb to GERAN A/Gb PS HO - - - - G1-23 GP-050519 revised 2005-01-28 - - 2005-02-01
0004 2 F Rel-6 6.0.0 6.1.0 Clarification of PDP Context Suspension during inter-SGSN GERAN A/Gb to GERAN A/Gb PS HO GP-23 GP-050603 approved G1 G1-23 GP-050603 agreed 2005-01-28 SCSAGB - 2005-02-01
0005 - F Rel-6 6.0.0 6.1.0 PS Handover Cancel after failed PS Handover GP-23 GP-050326 approved G1 G1-23 GP-050326 agreed 2005-01-28 SCSAGB - 2005-02-01
0006 - F Rel-6 6.0.0 6.1.0 Addition of the SABM-UA exchange procedure GP-23 GP-050327 approved G1 G1-23 GP-050327 agreed 2005-01-28 SCSAGB - 2005-02-01
0007 - - Rel-6 - - Removal of Optionality for the PS Handover Access Message - - - Ericsson G1-23 GP-050328 postponed 2005-01-28 - - 2005-02-01
0008 - - Rel-6 - - Transferring of UE RAC and START PS from the MS to the BSC - - - Ericsson G1-23 GP-050330 postponed 2005-01-28 - - 2005-02-01
0008 2 - Rel-6 - - Transferring of UE RAC and START PS from the MS to the BSC - - - Ericsson G1-26 GP-052272 postponed 2005-09-02 - - 2005-09-12
0008 4 F Rel-6 6.4.0 6.5.0 Transferring of UE RAC and START PS from the MS to the BSC GP-27 GP-052543 approved G1 G1-27 GP-052543 agreed 2005-11-11 SPSHAGB - 2005-11-21
0009 - F Rel-6 6.1.0 6.2.0 Routing Area Update at every Inter-RAT PS Handover GP-24 GP-050894 approved G1 G1-24 GP-050894 agreed 2005-04-08 SCSAGB-Stage2 - 2005-04-15
0010 - - Rel-6 - - XID negotiation and NSAPI/SAPI/PFI mapping - - - Ericsson G1-24 GP-050895 withdrawn 2005-04-08 - - 2005-04-15
0011 - - Rel-6 - - Simplification of PS Handover procedure - - - - G1-24 GP-050925 revised 2005-04-08 - - 2005-04-15
0011 1 - Rel-6 - - Simplification of PS Handover procedure - - - Siemens, Infineon G1-24 GP-051172 postponed 2005-04-08 - - 2005-04-15
0011 3 - Rel-6 - - Simplification of PS Handover procedure - - - - G2-25 GP-051583 revised 2005-06-24 - Merge with GP-051542 in GP-051687 2005-06-29
0011 4 F Rel-6 6.2.0 6.3.0 Simplification of PS Handover procedure GP-25 GP-051687 approved G2 G2-25 GP-051687 agreed 2005-06-24 SPSHAGB - 2005-06-29
0012 - - Rel-6 - - Suspension of DL Data Transfer - - - Siemens, Infineon G1-24 GP-050926 postponed 2005-04-08 - - 2005-04-15
0012 1 - Rel-6 - - Suspension of DL Data Transfer - - - - G2-25 G2-051584 revised 2005-03-08 - - 2005-06-29
0012 2 F Rel-6 6.2.0 6.3.0 Suspension of DL Data Transfer GP-25 GP-051689 approved G2 G2-25 G2-051689 agreed 2005-03-08 SPSHAGB - 2005-06-29
0013 - - Rel-6 - - DL Data Transfer for optimised Intra-BSS PS Handover - - - - G1-24 GP-050938 revised 2005-04-08 - - 2005-04-15
0013 1 - Rel-6 - - DL Data Transfer for optimised Intra-BSS PS Handover - - - - G1-24 GP-050991 revised 2005-04-08 - - 2005-04-15
0013 2 C Rel-6 6.1.0 6.2.0 DL Data Transfer for optimised Intra-BSS PS Handover GP-24 GP-051136 approved G1 G1-24 GP-051136 agreed 2005-04-08 SCSAGB-PSH - 2005-04-15
0014 - - Rel-6 - - Clarification to XID negotiation procedure - - - Nokia G1-24 GP-050939 withdrawn 2005-04-08 - - 2005-04-15
0015 - - Rel-6 - - Various Updates/Clarifications to TS 43.129 - - - - G2-23b G2-050083 revised 2005-03-08 - - 2005-04-15
0015 1 - Rel-6 - - Various Updates/Clarifications to TS 43.129 - - - - G2-23b G2-050122 revised 2005-03-08 - - 2005-04-15
0015 2 F Rel-6 6.1.0 6.2.0 Various Updates/Clarifications to TS 43.129 GP-24 GP-050940 approved G1 G1-24 GP-050940 agreed 2005-04-08 SCSAGB-PSH - 2005-04-15
0016 - - Rel-6 - - Alignment of PDU names with to TS 48.018 - - postponed Ericsson G2-24b GP-051540 - 2005-06-24 - - 2005-06-29
0017 - - Rel-6 - - Clarification on the sending of PS Handover Access messages - - postponed Ericsson G2-24b GP-051541 - 2005-06-24 - - 2005-06-29
0017 2 - Rel-6 - - Clarification on the sending of PS Handover Access messages - - - - G1-26 GP-052031 revised 2005-09-02 - - 2005-09-12
0017 3 F Rel-6 6.3.0 6.4.0 Clarification on the sending of PS Handover Access messages GP-26 GP-052311 approved G1 G1-26 GP-052311 agreed 2005-09-02 SPSHAGB - 2005-09-12
0018 - - Rel-6 - - Alignment with stage 3 specifications - - - - G2-25 GP-051542 revised 2005-06-24 - Merge with GP-051583 in GP-051687 2005-06-29
0019 - F Rel-6 6.2.0 6.3.0 Updates to TS 43.129 GP-25 GP-051558 approved G1 G1-25 GP-051558 agreed 2005-06-24 SPSHAGB - 2005-06-29
0020 - - Rel-6 - - Removal of NSAPI/SAPI/PFI mapping in inter-RAT/inter-mode PS Handover to GERAN A/Gb mode - - - - G1-25 GP-051559 revised 2005-06-24 - - 2005-06-29
0020 1 - Rel-6 - - Removal of NSAPI/SAPI/PFI mapping in inter-RAT/inter-mode PS Handover to GERAN A/Gb mode - - - - G1-25 GP-051688 revised 2005-06-24 - - 2005-06-29
0020 2 F Rel-6 6.2.0 6.3.0 Removal of NSAPI/SAPI/PFI mapping in inter-RAT/inter-mode PS Handover to GERAN A/Gb mode GP-25 GP-051795 approved G1 G1-25 GP-051795 agreed 2005-06-24 SPSHAGB - 2005-06-29
0021 - - Rel-6 - - Alignements of containers use for PS Handover - - - Nortel Networks G1-25 GP-051567 postponed 2005-06-24 - - 2005-06-29
0022 - F Rel-6 6.3.0 6.4.0 Alignment of PDU names with to TS 48.018 GP-26 GP-052030 approved G1 G1-26 GP-052030 agreed 2005-09-02 SPSHAGB - 2005-09-12
0023 - - Rel-6 - - Annex for PS Handover Primitives - - - - G1-26 GP-052032 revised 2005-09-02 - - 2005-09-12
0023 1 F Rel-6 6.3.0 6.4.0 Annex for PS Handover Primitives GP-26 GP-052218 approved G1 G1-26 GP-052218 agreed 2005-09-02 SPSHAGB - 2005-09-12
0024 - F Rel-6 6.3.0 6.4.0 Clarification of CN part and RN part GP-26 GP-052033 approved G1 G1-26 GP-052033 agreed 2005-09-02 SPSHAGB - 2005-09-12
0025 - - Rel-6 - - Corrections to Forward SRNS Context procedures - - - - G1-26 GP-052060 revised 2005-09-02 - - 2005-09-12
0025 1 F Rel-6 6.3.0 6.4.0 Corrections to Forward SRNS Context procedures GP-26 GP-052221 approved G1 G1-26 GP-052221 agreed 2005-09-02 SPSHAGB - 2005-09-12
0026 - F Rel-6 6.4.0 6.5.0 Removal of FFSes related to NAS container GP-27 GP-052541 approved G1 G1-27 GP-052541 agreed 2005-11-11 SPSHAGB - 2005-11-21
0027 - F Rel-6 6.4.0 6.5.0 Security clean-up GP-27 GP-052542 approved G1 G1-27 GP-052542 agreed 2005-11-11 SPSHAGB - 2005-11-21
0028 - - Rel-6 - - Various corrections to TS 43.129 - - - - G1-27 GP-052544 revised 2005-11-11 - - 2005-11-21
0028 1 F Rel-6 6.4.0 6.5.0 Various corrections to TS 43.129 GP-27 GP-052800 approved G1 G1-27 GP-052800 agreed 2005-11-11 SPSHAGB - 2005-11-21
0029 - - Rel-6 - - Corrections to Source RNC to Target RNC container - - - - G1-27 GP-052593 revised 2005-11-11 - - 2005-11-21
0029 1 F Rel-6 6.4.0 6.5.0 Corrections to Source RNC to Target RNC container GP-27 GP-052799 approved G1 G1-27 GP-052799 agreed 2005-11-11 SPSHAGB - 2005-11-21
0030 - - Rel-7 - - Introduction of Critical Resource Indication - - - Siemens G1-28 GP-060196 postponed 2006-01-20 - - 2006-01-24
0030 1 - Rel-7 - - Introduction of Critical Resource Indication - - - Siemens, Telecom It. G1-29 GP-060803 postponed 2006-04-28 - - 2006-05-04
0031 - F Rel-6 6.5.0 6.6.0 Various updates to TS 43.129 GP-28 GP-060226 approved G1 G1-28 GP-060226 agreed 2006-01-20 SPSHAGB - 2006-01-24
0032 - - Rel-6 - - Correction to XID Negotiation - - - Ericsson G1-28 GP-060227 rejected 2006-01-20 - - 2006-01-24
0033 - - Rel-6 - - User-Plane Data Forwarding for Inter-RAT PS Handover - - - - G1-28 GP-060228 revised 2006-01-20 - - 2006-01-24
0033 1 - Rel-6 - - User-Plane Data Forwarding for Inter-RAT PS Handover - - - - G1-28 GP-060341 revised 2006-01-20 - - 2006-01-24
0033 2 F Rel-6 6.5.0 6.6.0 User-Plane Data Forwarding for Inter-RAT PS Handover GP-28 GP-060420 approved G1 G1-28 GP-060420 agreed 2006-01-20 SPSHAGB - 2006-01-24
0034 - - Rel-6 - - Condition for UL data transfer - - - - G1-28 GP-060275 revised 2006-01-20 - - 2006-01-24
0034 1 F Rel-6 6.5.0 6.6.0 Condition for UL data transfer GP-28 GP-060342 approved G1 G1-28 GP-060342 agreed 2006-01-20 TEI6 - 2006-01-24
0035 - - Rel-7 - - Condition for UL data transfer - - - Infineon G1-28 GP-060276 withdrawn 2006-01-20 - - 2006-01-24
0036 - - Rel-6 - - Correction of XID negotation - - - - G1-28 GP-060306 revised 2006-01-20 - - 2006-01-24
0036 1 - Rel-6 - - Correction of XID negotation - - - - G1-28 GP-060339 revised 2006-01-20 - - 2006-01-24
0036 2 F Rel-6 6.5.0 6.6.0 Correction of XID negotation GP-28 GP-060459 approved G1 G1-28 GP-060459 agreed 2005-03-08 SPSHAGB - 2006-01-24
0037 - - Rel-6 - - Various editorial updates to PS Handover procedures - - - - G1-29 GP-060653 revised 2006-04-28 - - 2006-05-04
0037 1 - Rel-6 - - Various editorial updates to PS Handover procedures - - - - G1-29 GP-060855 revised 2006-04-28 - - 2006-05-04
0037 2 F Rel-6 6.6.0 6.7.0 Various editorial updates to PS Handover procedures GP-29 GP-060938 approved G1 G1-29 GP-060938 agreed 2006-04-28 SPSHAGB-PSHO - 2006-05-04
0038 - - Rel-6 - - Various updates - - - - G1-29 GP-060741 revised 2006-04-28 - - 2006-05-04
0038 1 F Rel-6 6.6.0 6.7.0 Various updates GP-29 GP-060828 approved G1 G1-29 GP-060828 agreed 2006-04-28 SPSHAGB - 2006-05-04
0039 - F Rel-6 6.6.0 6.7.0 Various corrections GP-29 GP-060742 approved G1 G1-29 GP-060742 agreed 2006-04-28 SPSHAGB - 2006-05-04
0040 - - Rel-6 - - Behaviour in case of failed Update PDP Context procedure - - - - G1-30 GP-061257 revised 2006-06-30 - - 2006-07-05
0040 1 F Rel-6 6.7.1 6.8.0 Behaviour in case of failed Update PDP Context procedure GP-30 GP-061350 approved G1 G1-30 GP-061350 agreed 2006-06-30 SPSHAGB - 2006-07-05
0041 - F Rel-6 6.7.1 6.8.0 Behaviour in case of missing XID parameters GP-30 GP-061258 approved G1 G1-30 GP-061258 agreed 2006-06-30 SPSHAGB - 2006-07-05
0042 - - Rel-6 - - Missing information about lost MS - - - Ericsson G1-30 GP-061259 postponed 2006-06-30 - - 2006-07-05
0043 - - Rel-6 - - Introduction of CAMEL Trigger Points - - - - G1-30 GP-061302 revised 2006-06-30 - - 2006-07-05
0043 1 - Rel-6 - - Introduction of CAMEL Trigger Points - - - - G1-30 GP-061401 revised 2006-06-30 - - 2006-07-05
0043 2 - Rel-6 - - Introduction of CAMEL Trigger Points - - - Ericsson G1-30 GP-061447 postponed 2006-06-30 - - 2006-07-05
0043 4 F Rel-6 6.9.0 6.10.0 Introduction of CAMEL Trigger Points GP-32 GP-062114 approved G1 G1-32 GP-062114 agreed 2006-11-17 SPSHAGB - 2006-11-19
0044 - - Rel-6 - - Resource release during PS handover when no response from mobile station - - - - G1-31 GP-061628 revised 2006-09-08 - - 2006-09-14
0044 1 - Rel-6 - - Resource release during PS handover when no response from mobile station - - - - G1-31 GP-061773 revised 2006-09-08 - - 2006-09-14
0044 2 F Rel-6 6.8.0 6.9.0 Resource release during PS handover when no response from mobile station GP-31 GP-061871 approved G1 G1-31 GP-061871 agreed 2006-09-08 SPSHAGB - 2006-09-14
0045 - - Rel-6 - - MS Avoidance of XID Collision after PS Handover - - - Ericsson G1-31 GP-061634 rejected 2006-09-08 - - 2006-09-14
0046 - - Rel-7 - - PS Handover Support for GAN - - - - G1-31 GP-061635 revised 2006-09-08 - - 2006-09-14
0046 1 - Rel-7 - - PS Handover Support for GAN - - - Ericsson G1-31 GP-061858 postponed 2006-09-08 - - 2006-09-14
0046 2 - Rel-7 - - PS Handover Support for GAN - - - - G1-32 GP-062118 revised 2006-11-17 - - 2006-11-19
0046 3 - Rel-7 - - PS Handover Support for GAN - - - - G1-32 GP-062398 revised 2006-11-17 - - 2006-11-19
0046 4 B Rel-7 6.10.0 7.0.0 PS Handover Support for GAN GP-32 GP-062470 approved G1 G1-32 GP-062470 agreed 2006-11-17 GUGAN - 2006-11-19
0047 - F Rel-6 6.9.0 6.10.0 Various updates to TS 43.129 GP-32 GP-062115 approved G1 G1-32 GP-062115 agreed 2006-11-17 SPSHAGB - 2006-11-19
0048 - - Rel-6 - - Clarification of PS Handover Cancel behaviour - - - - G1-32 GP-062116 revised 2006-11-17 - - 2006-11-19
0048 1 F Rel-6 6.9.0 6.10.0 Clarification of PS Handover Cancel behaviour GP-32 GP-062365 approved G1 G1-32 GP-062365 agreed 2006-11-17 SPSHAGB - 2006-11-19
0049 - - Rel-6 - - Improved behaviour in case of inactive PFCs/RABs - - - - G1-32 GP-062117 revised 2006-11-17 - - 2006-11-19
0049 - - Rel-6 - - Improved behaviour in case of inactive PFCs/RABs - - - - G1-32 GP-062366 revised 2006-11-17 - - 2006-11-19
0049 1 F Rel-6 6.9.0 6.10.0 Improved behaviour in case of inactive PFCs/RABs GP-32 GP-062415 approved G1 G1-32 GP-062415 agreed 2006-11-17 SPSHAGB - 2006-11-19
0050 - F Rel-6 6.9.0 6.10.0 Definition of Lost MS GP-32 GP-062190 approved G1 G1-32 GP-062190 agreed 2006-11-17 SPSHAGB - 2006-11-19
0051 - - Rel-6 - - Non-critical PS handover reject - - - - G1-32 GP-062230 revised 2006-11-17 - - 2006-11-19
0051 1 - Rel-6 - - Non-critical PS handover reject - - - - G1-32 GP-062361 revised 2006-11-17 - - 2006-11-19
0051 2 F Rel-6 6.9.0 6.10.0 Non-critical PS handover reject GP-32 GP-062418 approved G1 G1-32 GP-062418 agreed 2006-11-17 SPSHAGB - 2006-11-19
0052 - - Rel-7 - - Non-critical PS handover reject - - - Nortel Networks G1-32 GP-062231 withdrawn 2006-11-17 - - 2006-11-19
0052 1 - Rel-7 - - Non-critical PS handover reject - - - Nortel Networks G1-32 GP-062362 withdrawn 2006-11-17 - - 2006-11-19
0052 2 - Rel-7 - - Non-critical PS handover reject - - - Nortel Networks G1-32 GP-062419 withdrawn 2006-11-17 - - 2006-11-19
0053 - - Rel-6 - - Clarification on the PS HO execution phase - - - - G1-32 GP-062263 revised 2006-11-17 - - 2006-11-19
0053 1 F Rel-6 6.9.0 6.10.0 Clarification on the PS HO execution phase GP-32 GP-062373 approved G1 G1-32 GP-062373 agreed 2006-11-17 SPSHAGB - 2006-11-19
0054 - - Rel-6 - - Various updates - - - Siemens Networks G1-33 GP-070190 withdrawn 2007-02-16 - - 2007-02-21
0055 - - Rel-7 - - Various updates - - - Siemens Networks G1-33 GP-070191 withdrawn 2007-02-16 - - 2007-02-21
0056 - - Rel-6 - - Various updates on PS Handover - - - - G1-33 GP-070232 revised 2007-02-16 - - 2007-02-21
0056 1 - Rel-6 - - Various updates on PS Handover - - - - G1-33 GP-070426 revised 2007-02-16 - - 2007-02-21
0056 2 F Rel-6 6.10.0 6.11.0 Various updates on PS Handover GP-33 GP-070488 approved G1 G1-33 GP-070488 agreed 2007-02-16 SPSHAGB - 2007-02-21
0057 - - Rel-7 - - Various updates on PS Handover - - - - G1-33 GP-070233 revised 2007-02-16 - - 2007-02-21
0057 1 A Rel-7 7.0.0 7.1.0 Various updates on PS Handover GP-33 GP-070427 approved G1 G1-33 GP-070427 agreed 2007-02-16 SPSHAGB - 2007-02-21
0058 - F Rel-7 7.0.0 7.1.0 Usage of Activity Status Indicator is missing in TS 43.129 GP-33 GP-070260 approved G1 G1-33 GP-070260 agreed 2007-02-16 TEI7 - 2007-02-21
0059 - - Rel-7 - - Direct Tunnel Functionality - - - - G1-33 GP-070283 revised 2007-02-16 - - 2007-02-21
0059 1 - Rel-7 - - Direct Tunnel Functionality - - - - G1-33 GP-070477 revised 2007-02-16 - - 2007-02-21
0059 2 - Rel-7 - - Direct Tunnel Functionality - - - - G1-33 GP-070532 revised 2007-02-16 - - 2007-02-21
0059 3 - Rel-7 - - Direct Tunnel Functionality - - - Nokia G1-33 GP-070538 postponed 2007-02-16 - - 2007-02-21
0059 4 - Rel-7 - - Direct Tunnel Functionality - - - - G1-34 GP-070769 revised 2007-05-18 - - 2007-05-28
0059 5 B Rel-7 7.1.0 7.2.0 Direct Tunnel Functionality GP-34 GP-071021 approved G1 G1-34 GP-071021 agreed 2007-05-18 TEI7 - 2007-05-28
0060 - F Rel-6 6.10.0 6.11.0 Correction of conditions for PS handover reject GP-33 GP-070339 approved G1 G1-33 GP-070339 agreed 2007-02-16 SPSHAGB - 2007-02-21
0061 - A Rel-7 7.0.0 7.1.0 Correction of conditions for PS handover reject GP-33 GP-070340 approved G1 G1-33 GP-070340 agreed 2007-02-16 SPSHAGB - 2007-02-21
0062 - - Rel-6 - - Correction on GERAN to UTRAN PS handover - - - - G1-34 GP-070660 withdrawn 2007-05-18 - - 2007-05-28
0063 - - Rel-7 - - Correction on GERAN to UTRAN PS handover - - - - G1-34 GP-070661 withdrawn 2007-05-18 - - 2007-05-28
0064 - F Rel-6 6.11.0 6.12.0 Erroneous implementation of 0033 to TS 43.129 GP-34 GP-070713 approved G1 G1-34 GP-070713 agreed 2007-05-18 SPSHAGB - 2007-05-28
0065 - A Rel-7 7.1.0 7.2.0 Erroneous implementation of 0033 to TS 43.129 GP-34 GP-070714 approved G1 G1-34 GP-070714 agreed 2007-05-18 SPSHAGB - 2007-05-28
0066 - - Rel-8 - - Support for Inter-Domain Handover - - - - G1-36 GP-071835 revised 2007-11-16 - - 2007-11-23
0066 1 - Rel-8 - - Support for Inter-Domain Handover - - - - G1-36 GP-071937 postponed 2007-11-16 - - 2007-11-23
0067 - - Rel-8 - - Support for Inter-Domain Handover - - - - G1-37 GP-080123 postponed 2008-02-22 - - 2008-02-26
0067 1 - Rel-8 - - Support for Inter-Domain Handover - - - - G1-38 GP-080676 postponed 2008-05-16 - - 2008-05-21
0068 - - Rel-8 - - Introduction of inter-RAT PS handover between GERAN and E-UTRAN - - - - G1-38 GP-080720 postponed 2008-05-16 - - 2008-05-21
0068 1 - Rel-8 - - Introduction of inter-RAT PS handover between GERAN and E-UTRAN - - - - G2-38b G2-080406 revised 2008-06-26 - - 2008-09-05
0068 2 - Rel-8 - - Introduction of inter-RAT PS handover between GERAN and E-UTRAN - - - - G1-39 GP-081183 revised 2008-08-29 - - 2008-09-08
0068 3 B Rel-8 7.2.0 8.0.0 Introduction of inter-RAT PS handover between GERAN and E-UTRAN GP-39 GP-081350 approved G1 G1-39 GP-081350 agreed 2008-08-29 GELTE - 2008-09-08
0069 - - Rel-7 - - Container Handling during inter-RAT PS handover between GERAN and E-UTRAN - - - - G1-38 GP-080722 postponed 2008-05-16 - - 2008-05-21
0070 - F Rel-8 8.0.0 8.1.0 Introduction of generic transparent containers for inter-RAT PS handover GP-41 GP-090177 approved G1 G1-41 GP-090177 agreed 2009-02-20 GELTE - 2009-02-27
0071 - - Rel-8 - - Inclusion of radio access capabilities - - - - G1-42 GP-090730 postponed 2009-05-15 - - 2009-05-25
0071 1 - Rel-8 - - Inclusion of radio access capabilities - - - - G1-43 GP-091251 revised 2009-09-03 - - 2009-09-09
0071 2 - Rel-8 - - Inclusion of radio access capabilities - - - - G1-43 GP-091757 withdrawn 2009-09-03 - - 2009-09-09
0072 - - Rel-8 - - Introduction of PS Handover Complete Acknowledge Message - - - - G1-42 GP-090806 postponed 2009-05-15 - - 2009-05-25
0072 1 - Rel-8 - - Introduction of PS Handover Complete Acknowledge Message - - - - G1-43 GP-091382 postponed 2009-09-03 - - 2009-09-09
0072 2 - Rel-8 - - Introduction of PS Handover Complete Acknowledge MesSge - - - - G1-44 GP-091873 revised 2009-11-20 - - 2009-11-30
0072 3 F Rel-8 8.1.0 8.2.0 Introduction of PS Handover Complete Acknowledge MesSge GP-44 GP-092331 approved G1 G1-44 GP-092331 agreed 2009-11-20 GELTE - 2009-11-30
0073 - - Rel-6 - - Handing of START_PS at handover from UTRAN to GERAN - - - - G1-43 GP-091249 postponed 2009-09-03 - - 2009-09-09
0074 - - Rel-7 - - Handing of START_PS at handover from UTRAN to GERAN - - - - G1-43 GP-091250 postponed 2009-09-03 - - 2009-09-09
0075 - - Rel-6 - - Introduction of PS Handover Complete Acknowledge Message - - - - G1-43 GP-091384 postponed 2009-09-03 - - 2009-09-09
0075 1 F Rel-6 6.12.0 6.13.0 Introduction of PS Handover Complete Acknowledge MesSge GP-44 GP-091875 approved G1 G1-44 GP-091875 agreed 2009-11-20 SPSHAGB - 2009-11-30
0076 - - Rel-7 - - Introduction of PS Handover Complete Acknowledge Message - - - - G1-43 GP-091386 postponed 2009-09-03 - - 2009-09-09
0076 1 - Rel-7 - - Introduction of PS Handover Complete Acknowledge MesSge - - - - G1-44 GP-091874 revised 2009-11-20 - - 2009-11-30
0076 2 A Rel-7 7.2.0 7.3.0 Introduction of PS Handover Complete Acknowledge MesSge GP-44 GP-092222 approved G1 G1-44 GP-092222 agreed 2009-11-20 SPSHAGB - 2009-11-30
0077 - - Rel-8 - - SPID handling during PS Handover - - - - G1-45 GP-100285 postponed 2010-03-05 - - 2010-03-10
0078 - - Rel-9 - - Introduction of PS handover to CSG cells - - - - G1-45 GP-100289 revised 2010-03-05 - - 2010-03-10
0078 1 - Rel-9 - - Introduction of PS handover to CSG cells - - - - G1-45 GP-100415 postponed 2010-03-05 - - 2010-03-10
0078 2 B Rel-9 9.0.0 - Introduction of PS handover to CSG cells - - - - G2-45b G2-100257 Postponed 2010-04-14 EHNB-GERAN - 2010-04-14
0078 2 B Rel-9 9.0.0 9.1.0 Introduction of PS handover to CSG cells GP-46 GP-100818 approved G1 G1-46 GP-100818 agreed 2010-05-21 EHNB-GERAN - 2010-06-05
0079 - - Rel-10 .. - Correction to the Target to Source Transparent Container - - - - G1-53 GP-120317 revised 2012-03-02 - - 2012-03-05
0079 1 A Rel-10 10.0.0 10.1.0 Correction to the Target to Source Transparent Container GP-53 GP-120428 approved G1 G1-53 GP-120428 agreed 2012-03-02 GELTE - 2012-03-05
0080 - F Rel-8 8.2.0 8.3.0 Correction to the Target to Source Transparent Container GP-53 GP-120425 approved G1 G1-53 GP-120425 agreed 2012-03-02 GELTE - 2012-03-05
0081 - A Rel-9 9.1.0 9.2.0 Correction to the Target to Source Transparent Container GP-53 GP-120426 approved G1 G1-53 GP-120426 agreed 2012-03-02 GELTE - 2012-03-05

page generated from database: 2013-10-16 10:34:34