3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 45.010

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - - Rel-4 - - Correction of references to relevant 3GPP TSs - - - - G1-07 GP-012379 revised 2001-12-09 - - -
0001 1 F Rel-4 4.0.0 4.1.0 Correction of references to relevant 3GPP TSs GP-07 GP-012776 approved G1 G1-07 GP-012776 agreed 2001-12-09 TEI4 - -
0002 - A Rel-4 4.1.0 - Clarification to Requirements for Synchronization at DTM operation - - - Ericsson G1-08 GP-020088 revised 2002-01-29 Class_A_Dual_Transfer_Mode_(DTM) - -
0002 1 A Rel-4 4.1.0 4.2.0 Clarification to Requirements for Synchronization at DTM operation GP-08 GP-020453 approved G1 G1-08 GP-020453 agreed 2002-02-05 Class_A_Dual_Transfer_Mode_(DTM) - -
0004 - - Rel-5 - - Mobile behaviour within reaction time GP-09 - - - G1-09 GP-021272 rejected 2002-04-19 - - -
0005 - - Rel-4 - - Correction to inter system handover interruption times GP-10 - - - G1-10 GP-021760 revised 2002-06-28 - - -
0005 1 A Rel-4 4.2.0 4.3.0 Correction to inter system handover interruption times GP-10 GP-021930 approved G1 G1-10 GP-021930 agreed 2002-06-28 2G3Ginterworking - -
0006 - - Rel-5 - - Exclusion of TLLI after contention resolution GP-10 - - - G1-10 GP-021933 rejected 2002-06-28 - - -
0007 - F Rel-5 5.0.0 5.1.0 Editorial clean up of references GP-11 GP-022216 approved G1 G1-11 GP-022216 agreed 2002-08-30 TEI5 - -
0008 - A Rel-4 4.3.0 4.4.0 Timing of DTM assignment GP-13 GP-030214 approved G1 G1-13 GP-030214 agreed 2003-02-07 TEI - 2003-02-12
0009 - A Rel-5 5.1.0 5.2.0 Timing of DTM assignment GP-13 GP-030215 approved G1 G1-13 GP-030215 agreed 2003-02-07 TEI - 2003-02-12
0010 - - Rel-4 - - Correction of interruption times for GSM to UTRAN FDD handover GP-13 - - - G1-13 GP-030255 revised 2003-02-06 - - 2003-02-12
0010 1 - Rel-4 - - Correction of interruption times for GSM to UTRAN FDD handover GP-13 - - - G1-13 GP-030375 revised 2003-02-06 - - 2003-02-12
0010 2 A Rel-4 4.3.0 4.4.0 Correction of interruption times for GSM to UTRAN FDD handover GP-13 GP-030438 approved G1 G1-13 GP-030438 agreed 2003-02-07 2G3Ginterworking - 2003-02-12
0011 - - Rel-5 - - Correction of interruption times for GSM to UTRAN FDD handover GP-13 - - - G1-13 GP-030256 revised 2003-02-06 - - 2003-02-12
0011 1 - Rel-5 - - Correction of interruption times for GSM to UTRAN FDD handover GP-13 - - - G1-13 GP-030376 revised 2003-02-06 - - 2003-02-12
0011 2 A Rel-5 5.1.0 5.2.0 Correction of interruption times for GSM to UTRAN FDD handover GP-13 GP-030439 approved G1 G1-13 GP-030439 agreed 2003-02-07 2G3Ginterworking - 2003-02-12
0012 - - Rel-4 - - Correction of interruption times for GSM to UTRAN TDD handover GP-13 - - Siemens G1-13 GP-030258 withdrawn 2003-02-06 - - 2003-02-12
0013 - - Rel-5 - - Correction of interruption times for GSM to UTRAN TDD handover GP-13 - - Siemens G1-13 GP-030259 withdrawn 2003-02-06 - - 2003-02-12
0014 - - Rel-4 - - Clarification on continuous TA procedure - - - Siemens G1-14 GP-030882 rejected 2003-04-15 - - 2003-04-15
0015 - - Rel-5 - - Clarification on continuous TA procedure - - - Siemens G1-14 GP-030883 rejected 2003-04-15 - - 2003-04-15
0016 - F Rel-6 5.2.0 6.0.0 Clarification on continuous TA procedure GP-14 GP-030884 approved G1 G1-14 GP-030884 agreed 2003-04-15 TEI6 - 2003-04-15
0017 - - Rel-4 - - Correction of definition of ""ready to transmit"" for inter-RAT handover - - - Siemens G1-15 GP-031385 rejected 2003-06-27 - - 2003-07-02
0018 - - Rel-5 - - Correction of definition of ""ready to transmit"" for inter-RAT handover - - - Siemens G1-15 GP-031386 rejected 2003-06-27 - - 2003-07-02
0019 - - Rel-6 - - Correction of definition of ""ready to transmit"" for inter-RAT handover - - - Siemens G1-15 GP-031387 rejected 2003-06-27 - - 2003-07-02
0020 - F Rel-6 6.0.0 6.1.0 Clarification on USF decoding reaction time on reception of a new assignment GP-15 GP-031547 approved G1 G1-15 GP-031547 agreed 2003-06-27 GPRS - 2003-07-02
0021 - - Rel-5 - - Clarification of reaction times for Extended Dynamic Allocation and Shifted USF operation - - - - G1-16 GP-031907 revised 2003-08-29 - - 2003-09-02
0021 1 F Rel-5 5.2.0 5.3.0 Clarification of reaction times for Extended Dynamic Allocation and Shifted USF operation GP-16 GP-032116 approved G1 G1-16 GP-032116 agreed 2003-08-29 TEI5 - 2003-09-02
0022 - - Rel-6 - - Clarification of reaction times for Extended Dynamic Allocation and Shifted USF operation - - - - G1-16 GP-031908 revised 2003-08-29 - - 2003-09-02
0022 1 A Rel-6 6.1.0 6.2.0 Clarification of reaction times for Extended Dynamic Allocation and Shifted USF operation GP-16 GP-032117 approved G1 G1-16 GP-032117 agreed 2003-08-29 TEI5 - 2003-09-02
0023 - - Rel-4 - - Correction of definition of ""ready to transmit"" for inter-RAT handover - - - - G1-16 GP-031980 revised 2003-08-29 - - 2003-09-02
0023 1 - Rel-4 - - Correction of definition of ""ready to transmit"" for inter-RAT handover - - - - G1-16 GP-032189 revised 2003-08-29 - - 2003-09-02
0023 2 A Rel-4 4.4.0 4.5.0 Correction of definition of ""ready to transmit"" for inter-RAT handover GP-16 GP-032282 approved G1 G1-16 GP-032282 agreed 2003-08-29 2G3Ginterworking - 2003-09-02
0024 - - Rel-5 - - Correction of definition of ""ready to transmit"" for inter-RAT handover - - - - G1-16 GP-031981 revised 2003-08-29 - - 2003-09-02
0024 1 - Rel-5 - - Correction of definition of ""ready to transmit"" for inter-RAT handover - - - - G1-16 GP-032190 revised 2003-08-29 - - 2003-09-02
0024 2 A Rel-5 5.2.0 5.3.0 Correction of definition of ""ready to transmit"" for inter-RAT handover GP-16 GP-032283 approved G1 G1-16 GP-032283 agreed 2003-08-29 2G3Ginterworking - 2003-09-02
0025 - A Rel-6 - - Correction of definition of ""ready to transmit"" for inter-RAT handover - - - - G1-16 GP-031982 revised 2003-08-29 - - 2003-09-02
0025 1 A Rel-6 - - Correction of definition of ""ready to transmit"" for inter-RAT handover - - - - G1-16 GP-032191 revised 2003-08-29 - - 2003-09-02
0025 2 A Rel-6 6.1.0 6.2.0 Correction of definition of ""ready to transmit"" for inter-RAT handover GP-16 GP-032284 approved G1 G1-16 GP-032284 agreed 2003-08-29 2G3Ginterworking - 2003-09-02
0026 - - Rel-4 - - MS reaction time upon reception of assignment message on CCCH - - - MELCO, Nortel G1-16 GP-032045 rejected 2003-08-29 - - 2003-09-02
0027 - - Rel-5 - - MS reaction time upon reception of assignment message on CCCH - - - - G1-16 GP-032046 revised 2003-09-01 - - 2003-09-02
0027 1 F Rel-5 5.2.0 5.3.0 MS reaction time upon reception of assignment message on CCCH GP-16 GP-032185 approved G1 G1-16 GP-032185 agreed 2003-09-01 GPRS - 2003-09-02
0028 - - Rel-6 - - MS reaction time upon reception of assignment message on CCCH - - - - G1-16 GP-032047 revised 2003-09-01 - - 2003-09-02
0028 1 A Rel-6 6.1.0 6.2.0 MS reaction time upon reception of assignment message on CCCH GP-16 GP-032186 approved G1 G1-16 GP-032186 agreed 2003-09-01 GPRS - 2003-09-02
0029 - - Rel-6 - - Clarification of MS reaction times after receiving an assignment message - - - Ericsson G1-19 GP-040976 rejected 2004-04-22 - - 2004-04-30
0030 - - Rel-6 - - Timing Advance behaviour for DTM to Packet Transfer mode transition - - - G1 G1-22 GP-042455 revised 2004-11-12 - - 2004-11-19
0030 1 F Rel-6 6.2.0 6.3.0 Timing Advance behaviour for DTM to Packet Transfer mode transition GP-22 GP-042881 approved G1 G1-22 GP-042881 agreed 2004-11-12 PSintDTM-Reduct - 2004-11-19
0031 - F Rel-6 6.3.0 6.4.0 Timing Advance for multiple TBFs in Packet Transfer mode GP-23 GP-050139 approved G1 G1-23 GP-050139 agreed 2005-01-28 TEI6 - 2005-02-01
0032 - B Rel-6 6.3.0 6.4.0 Timing advance for MBMS GP-23 GP-050289 approved G1 G1-23 GP-050289 agreed 2005-01-28 MBMS - 2005-02-01
0033 - F Rel-6 6.4.0 6.5.0 Clarification of MS requirements for synchronization GP-24 GP-050862 approved G1 G1-24 GP-050862 agreed 2005-04-08 EDGE-EGPRS - 2005-04-15
0034 - - Rel-6 - - Introduction of PS handover in TS 45.010 - - - - - GP-052600 revised 2005-11-11 - - 2005-11-21
0034 1 F Rel-6 6.5.0 6.6.0 Introduction of PS handover in TS 45.010 GP-27 GP-052749 approved G1 G1-27 GP-052749 agreed 2005-11-11 SPSHAGB - 2005-11-21
0034 2 F Rel-11 10.1.0 - Impact from rSRVCC from GERAN to E-UTRAN GP-55 GP-121146 postponed G1 G1-55 GP-121146 agreed 2012-08-31 rSRVCC - 2012-09-03
0035 - F Rel-7 6.6.0 7.0.0 Clarifications and editorial corrections GP-33 GP-070200 approved G1 G1-33 GP-070200 agreed 2007-02-16 TEI7 - 2007-02-21
0036 - B Rel-7 7.0.0 7.1.0 PAN Reaction Times GP-34 GP-070716 approved G1 G1-34 GP-070716 agreed 2007-05-18 LATRED - 2007-05-28
0037 - - Rel-7 - - Introduction of Reduced Symbol Duration - - - - G1-34 GP-070818 postponed 2007-05-18 - - 2007-05-28
0038 - - Rel-7 - - Introduction of Reduced Symbol Duration - - - - G1-35 GP-071267 revised 2007-08-31 - - 2007-09-06
0038 1 - Rel-7 - - Introduction of Reduced Symbol Duration - - - - G1-35 GP-071499 revised 2007-08-31 - - 2007-09-06
0038 2 B Rel-7 7.1.0 7.2.0 Introduction of Reduced Symbol Duration GP-35 GP-071546 approved G1 G1-35 GP-071546 agreed 2007-08-31 REDHOT - 2007-09-06
0039 - - Rel-7 - - Removal of RL-EGPRS TBF mode - - - - G1-36 GP-071677 revised 2007-11-16 - - 2007-11-23
0039 1 F Rel-7 7.2.0 7.3.0 Removal of RL-EGPRS TBF mode GP-36 GP-071967 approved G1 G1-36 GP-071967 agreed 2007-11-16 LATRED - 2007-11-23
0040 - - Rel-7 - - Synchronisation for REDHOT and HUGE - - - - G1-36 GP-071701 postponed 2007-11-16 - - 2007-11-23
0041 - - Rel-7 - - Reduced PUAN Reaction Time - - - - G1-36 GP-071834 withdrawn 2007-11-16 - - 2007-11-23
0042 - - Rel-7 - - Clarifying Radio Block Specific Reaction Times - - - - G1-37 GP-080122 revised 2008-02-22 - - 2008-02-26
0042 1 B Rel-7 7.3.0 7.4.0 Clarifying Radio Block Specific Reaction Times GP-37 GP-080370 approved - G1-37 - - 2008-02-22 LATRED presented at closing Plenary 2008-02-26
0043 - - Rel-7 - - Synchronisation for REDHOT and HUGE - - - - G1-37 GP-080131 postponed 2008-02-22 - - 2008-02-26
0044 - - Rel-7 - - Time synchronisation - - - - G1-38 GP-080501 revised 2008-05-16 - - 2008-05-21
0044 1 C Rel-7 7.4.0 7.5.0 Time synchronisation GP-38 GP-080780 approved G1 G1-38 GP-080780 agreed 2008-05-16 REDHOT, HUGE - 2008-05-21
0045 - F Rel-6 6.6.0 6.7.0 Timing requirements for PS Handover to UTRAN GP-38 GP-080579 approved G1 G1-38 GP-080579 agreed 2008-05-16 TEI6 - 2008-05-21
0046 - A Rel-7 7.4.0 7.5.0 Timing requirements for PS Handover to UTRAN GP-38 GP-080580 approved G1 G1-38 GP-080580 agreed 2008-05-16 TEI6 - 2008-05-21
0047 - - Rel-8 - - Timing requirements for PS Handover to E-UTRAN - - - - G1-38 GP-080581 postponed 2008-05-16 - - 2008-05-21
0047 1 B Rel-8 8.0.0 8.1.0 Timing requirements for PS Handover to E-UTRAN GP-39 GP-081141 approved G1 G1-39 GP-081141 agreed 2008-08-29 GELTE - 2008-09-08
0048 - F Rel-8 7.4.0 8.0.0 Editorial corrections GP-38 GP-080582 approved G1 G1-38 GP-080582 agreed 2008-05-16 TEI8 - 2008-05-21
0049 - F Rel-7 7.4.0 7.5.0 Reduced Latency terminology alignments GP-38 GP-080663 approved G1 G1-38 GP-080663 agreed 2008-05-16 LATRED - 2008-05-21
0050 - - Rel-7 - - Clarification to the PDAN reaction times when operating in event based FANR - - - - G1-38 GP-080909 revised 2008-05-16 - - 2008-05-21
0050 1 F Rel-7 7.4.0 7.5.0 Clarification to the PDAN reaction times when operating in event based FANR GP-38 GP-080919 approved G1 G1-38 GP-080919 agreed 2008-05-16 LATRED - 2008-05-21
0051 - - Rel-7 - - Assignment reaction time when the TTI configuration of a TBF is changed - - - - G1-39 GP-081055 revised 2008-08-29 - - 2008-09-08
0051 1 - Rel-7 - - Assignment reaction time when the TTI configuration of a TBF is changed - - - - G1-39 GP-081298 revised 2008-08-29 - - 2008-09-08
0051 2 F Rel-7 7.5.0 7.6.0 Assignment reaction time when the TTI configuration of a TBF is changed GP-39 GP-081343 approved G1 G1-39 GP-081343 agreed 2008-08-29 LATRED - 2008-09-08
0052 - - Rel-8 - - Assignment reaction time when the TTI configuration of a TBF is changed - - - - G1-39 GP-081056 revised 2008-08-29 - - 2008-09-08
0052 1 - Rel-8 - - Assignment reaction time when the TTI configuration of a TBF is changed - - - - G1-39 GP-081299 revised 2008-08-29 - - 2008-09-08
0052 2 A Rel-8 8.0.0 8.1.0 Assignment reaction time when the TTI configuration of a TBF is changed GP-39 GP-081344 approved G1 G1-39 GP-081344 agreed 2008-08-29 LATRED - 2008-09-08
0053 - F Rel-8 8.1.0 8.2.0 Corrections to the timing requirements for PS Handover to E-UTRAN GP-40 GP-081562 approved G1 G1-40 GP-081562 agreed 2008-11-21 GELTE - 2008-11-26
0054 - F Rel-8 8.2.0 8.3.0 Corrections to the timing requirements for PS Handover to E-UTRAN GP-41 GP-090148 approved G1 G1-41 GP-090148 agreed 2009-02-26 GELTE - 2009-02-27
0055 - F Rel-8 8.3.0 8.4.0 Removal of brackets GP-42 GP-090611 approved G1 G1-42 GP-090611 agreed 2009-05-15 GELTE - 2009-05-25
0056 - F Rel-9 8.4.0 9.0.0 Introduction of MTD reporting on Hyperframe level GP-44 GP-091962 approved G1 G1-44 GP-091962 agreed 2009-11-20 TEI9 - 2009-11-30
0057 - - Rel-7 - - Modification of PAN Related Reaction TimesModification of PAN Related Reaction Times - - - - G1-44 GP-091995 withdrawn 2009-11-20 - - 2009-11-30
0058 - - Rel-8 - - Modification of PAN Related Reaction Times - - - - G1-44 GP-091996 withdrawn 2009-11-20 - - 2009-11-30
0059 - F Rel-7 7.6.0 7.7.0 Modification of PAN Related Reaction Times GP-44 GP-092160 approved G1 G1-44 GP-092160 agreed 2009-11-20 LATRED - 2009-11-30
0060 - A Rel-8 8.4.0 8.5.0 Modification of PAN Related Reaction Times GP-44 GP-092185 approved G1 G1-44 GP-092185 agreed 2009-11-20 LATRED - 2009-11-30
0061 - - Rel-10 - - Reaction times for DTR - - - - G1-47 GP-101373 postponed 2010-09-03 - - 2010-09-11
0061 1 - Rel-10 - - Reaction times for DTR - - - - G1-48 GP-101864 revised 2010-11-26 - - 2010-12-02
0061 2 F Rel-10 9.0.0 10.0.0 Reaction times for DTR GP-48 GP-102064 approved G1 G1-48 GP-102064 agreed 2010-11-26 TEI10 - 2010-12-02
0062 - B Rel-10 10.0.0 10.1.0 DTR Reaction times: removal of square brackets GP-49 GP-110245 approved G1 G1-49 GP-110245 agreed 2011-03-03 TEI10 - 2011-03-14
0063 - B Rel-11 10.1.0 11.0.0 Synchronization requirements for Local Area multicarrier BTS GP-55 GP-120925 approved G1 G1-55 GP-120925 agreed 2012-08-31 MRLA - 2012-09-03
0064 - - Rel-11 .. - Impact from rSRVCC from GERAN to E-UTRAN - - - - G1-55 GP-120928 revised 2012-08-31 - - 2012-09-03
0064 1 - Rel-11 .. - Impact from rSRVCC from GERAN to E-UTRAN - - - - G1-55 GP-121131 revised 2012-08-31 - - 2012-09-03
0064 2 - Rel-11 .. - Impact from rSRVCC from GERAN to E-UTRAN - - - - G1-55 GP-121146 postponed 2012-08-31 - - 2012-09-03
0064 2 - Rel-11 .. - Impact from rSRVCC from GERAN to E-UTRAN - - - - GP-56 GP-121146 revised 2012-11-23 - - 2012-11-28
0064 3 B Rel-11 11.0.0 11.1.0 Impact from rSRVCC from GERAN to E-UTRAN GP-56 GP-121260 approved G1 GP-56 GP-121260 agreed 2012-11-23 rSRVCC - 2012-11-28

page generated from database: 2013-10-16 10:34:38