3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 48.016

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - D Rel-4 4.0.0 - Clarification of SNS message use in GB/IP and SNS ADD message error case implications GP-04 - - G2 G2-04 GP-010746 Revised 2001-04-27 GPRS - -
0001 1 D Rel-4 4.0.0 4.1.0 Clarification of SNS message use in GB/IP and SNS ADD message error case implications GP-04 GP-010828 Approved G2 G2-04 GP-010828 Agreed 2001-04-27 GPRS - -
0002 - F Rel-4 4.1.1 4.2.0 Clarification of abnormal procedures for SNS Change weight procedures GP-06 GP-011542 Approved G2 G2-06 - Agreed 2001-08-21 GbIP - -
0003 - F Rel-4 4.1.1 4.2.0 Clarification of the Resource Distribution Function GP-06 GP-011541 Approved G2 G2-06 - Agreed 2001-08-21 GbIP - -
0004 - F Rel-5 4.1.1 5.0.0 Blocking procedure in case of Test procedure failure for a blocked NS-VC GP-06 GP-011641 Approved G2 G2-06 - Agreed 2001-08-21 GPRS - -
0005 - F Rel-5 5.0.0 5.1.0 Editorial Corrections GP-07 GP-012171 Approved G2 G2-07 GP-012171 Agreed 2001-11-13 TEI - -
0006 - F Rel-4 4.2.0 - Correction to configuration options for network entities supporting Gb/IP - - - G2 G2-14 GP-030663 withdrawn 2003-03-31 GbIP 0 2003-04-16
0007 - F Rel-5 5.1.0 - Correction to configuration options for network entities supporting Gb/IP - - - G2 G2-14 GP-030664 withdrawn 2003-03-31 GbIP 0 2003-04-16
0008 - F Rel-5 6.1.0 - Clarification of Gb over IP and SGSN in pool - - - G2 G2-15 GP-031444 Revised 2003-06-18 TEI5 0 2003-06-30
0008 1 F Rel-5 5.1.0 5.2.0 Clarification of Gb over IP and SGSN in pool GP-15 GP-031592 Approved G2 G2-15 GP-031592 Agreed 2003-06-25 TEI5 0 2003-06-30
0009 - F Rel-5 5.1.0 - Clarification of NSEI end-to-end significance - - - G2 G2-15 GP-031593 Revised 2003-06-25 TEI5 0 2003-06-30
0009 1 A Rel-5 5.1.0 - Clarification of NSEI end-to-end significance - - - G2 G2-15 GP-031677 Revised 2003-06-26 TEI4 0 2003-06-30
0009 2 A Rel-5 5.1.0 5.2.0 Clarification of NSEI end-to-end significance GP-15 GP-031685 Approved G2 G2-15 GP-031685 Agreed 2003-06-27 TEI4 0 2003-06-30
0010 - F Rel-4 4.2.0 - Clarification of NSEI end-to-end significance - - - G2 G2-15 GP-031676 Revised 2003-06-26 TEI4 0 2003-06-30
0010 1 F Rel-4 4.2.0 4.3.0 Clarification of NSEI end-to-end significance GP-15 GP-031684 Approved G2 G2-15 GP-031684 Agreed 2003-06-27 TEI4 0 2003-06-30
0011 - F Rel-5 5.2.0 - Correction of SNS-SIZE-ACK PDU - - - G2 G2-18b G2-040258 Revised 2004-03-17 TEI5 - 2004-04-27
0011 1 F Rel-5 5.2.0 - Correction of SNS-SIZE-ACK PDU - - - G2 G2-18b G2-040335 Withdrawn 2004-03-23 TEI5 - 2004-04-27
0012 - F Rel-4 4.3.0 - Correction of SNS PDUs for IP support - - - G2 G2-19 GP-040961 revised 2004-04-14 TEI4 - 2004-04-27
0012 1 F Rel-4 4.3.0 - Correction of SNS PDUs for IP support - - - G2 G2-19b G2-040420 Revised in G2-040484 2004-05-19 TEI4 - 2004-06-30
0012 2 F Rel-4 4.3.0 - Correction of SNS PDUs for IP support - - - G2 G2-19b G2-040484 Revised in G2-040492 2004-05-27 TEI4 - 2004-06-30
0012 3 F Rel-4 4.3.0 4.4.0 Correction of SNS PDUs for IP support GP-20 GP-041304 Approved G2 G2-20 GP-041304 Agreed 2004-05-28 TEI4 - 2004-06-30
0013 - A Rel-5 5.2.0 - Correction of SNS PDUs for IP support - - - G2 G2-19 GP-040962 revised 2004-04-14 TEI4 - 2004-04-27
0013 1 A Rel-5 5.2.0 - Correction of SNS PDUs for IP support - - - G2 G2-19b G2-040421 Revised in G2-040485 2004-05-19 TEI4 - 2004-06-30
0013 2 A Rel-5 5.2.0 - Correction of SNS PDUs for IP support - - - G2 G2-19b G2-040485 Revised in G2-040493 2004-05-27 TEI4 - 2004-06-30
0013 3 A Rel-5 5.2.0 5.3.0 Correction of SNS PDUs for IP support GP-20 GP-041305 Approved G2 G2-20 GP-041305 Agreed 2004-05-28 TEI4 - 2004-06-30
0014 - C Rel-6 5.2.0 - Reselection of local IP endpoint at SGSN - - - G2 G2-19b G2-040387 Withdrawn 2004-05-17 TEI6 - 2004-06-30
0015 - C Rel-6 5.1.0 - Reselection of local IP endpoint at SGSN - - - G2 G2-20 GP-041422 Revised 2004-06-15 TEI6 - 2004-06-30
0015 1 C Rel-6 - - Reselection of local IP endpoint at SGSN - - - G2 G2-20 GP-041683 Withdrawn 2004-06-30 TEI - 2004-06-30
0016 - C Rel-6 5.3.0 6.0.0 Reselection of local IP endpoint at NSE GP-21 GP-041936 approved - G2-21 GP-041936 Agreed 2004-08-17 TEI6 - 2004-08-31
0017 - F Rel-5 5.3.0 5.4.0 Correction of SNS PDUs for IP support GP-22 GP-042570 Approved G2 G2-22 GP-042570 Agreed 2004-11-03 TEI5 - 2004-11-19
0018 - A Rel-6 6.0.0 6.1.0 Correction of SNS PDUs for IP support GP-22 GP-042571 Approved G2 G2-22 GP-042571 Agreed 2004-11-03 TEI6 - 2004-11-19
0019 - F Rel-4 4.4.0 - Moving of data flow when marking remote IP endpoint non-operational - - - - G2-23 GP-050306 Withdrawn 2005-01-19 TEI4 - 2005-02-01
0020 - A Rel-5 5.4.0 - Moving of data flow when marking remote IP endpoint non-operational - - - - G2-23 GP-050307 Withdrawn 2005-01-19 TEI4 - 2005-02-01
0021 - A Rel-6 6.1.0 - Moving of data flow when marking remote IP endpoint non-operational - - - - G2-23 GP-050308 Revised 2005-01-19 TEI4 - 2005-02-01
0021 1 F Rel-6 6.1.0 6.2.0 Moving of data flow when marking remote IP endpoint non-operational GP-23 GP-050415 Approved G2 G2-23 GP-050415 Agreed 2005-01-25 TEI6 - 2005-02-01
0022 - F Rel-6 6.1.0 - Selection of remote IP endpoint for Point-to-Multipoint NS-SDUs - - - - G2-23 GP-050318 Withdrawn 2005-01-19 MBMS 2005-09-06: WG status was previously 'postponed'. 2005-02-01
0022 1 F Rel-6 6.2.0 6.3.0 Selection of remote IP endpoint for Point-to-Multipoint NS-SDUs GP-24 GP-050850 Approved G2 G2-24 GP-050850 Agreed 2005-03-02 MBMS - 2005-04-08
0023 - F Rel-6 6.3.0 6.4.0 Correction of PTM traffic handling GP-25 GP-051409 Approved G2 G2-25 GP-051409 Agreed 2005-05-18 MBMS - 2005-06-28
0024 - F Rel-6 6.3.0 - Correction of Test Procedure for IP Sub-network in static configuration mode - - - - G2-24b G2-050253 Revised 2005-05-18 TEI6 - 2005-06-28
0024 1 F Rel-6 6.3.0 6.4.0 Correction of Test Procedure for IP Sub-network in static configuration mode GP-25 GP-051442 Approved G2 G2-25 GP-051442 Agreed 2005-05-26 TEI6 - 2005-06-28
0025 - F Rel-6 6.3.0 6.4.0 Resource Distribution Function for MBMS session data GP-25 GP-051535 Approved G2 G2-25 GP-051535 Agreed 2005-06-15 MBMS - 2005-06-28
0026 - B Rel-7 6.4.0 - Packet Loss Measurement Function - - - - G2-26 GP-052044 Revised 2005-08-23 TEI7 2006-05-09: WG status updated. 2005-09-07
0026 1 B Rel-7 6.4.0 - Packet Loss Measurement Function - - - - G2-26b G2-050393 Rejected 2005-09-28 TEI7 - 2005-11-21
0027 - F Rel-7 6.4.0 7.0.0 Correction of Size and Configuration Procedures for an IP Sub-network GP-27 GP-052678 Approved G2 G2-27 GP-052678 Agreed 2005-09-28 TEI7 - 2005-11-21
0028 - F Rel-7 6.4.0 7.0.0 Miscellaneous corrections and clean-up GP-27 GP-052681 Approved G2 G2-27 GP-052681 Agreed 2005-09-28 TEI7 - 2005-11-21
0029 - F Rel-6 6.4.0 - Additional pre-configured IP endpoint in BSS - - - - G2-26b G2-050408 Revised 2005-09-28 TEI6 - 2005-11-21
0029 1 F Rel-6 6.4.0 6.5.0 Additional pre-configured IP endpoint in BSS GP-27 GP-052698 Approved G2 G2-27 GP-052698 Agreed 2005-10-03 TEI6 - 2005-11-21
0030 - A Rel-7 6.4.0 - Additional pre-configured IP endpoint in BSS - - - - G2-26b G2-050409 Revised 2005-09-28 TEI6 - 2005-11-21
0030 1 A Rel-7 6.4.0 7.0.0 Additional pre-configured IP endpoint in BSS GP-27 GP-052699 Approved G2 G2-27 GP-052699 Agreed 2005-10-03 TEI6 - 2005-11-21
0031 - F Rel-4 4.4.0 - Correction to SNS-SIZE procedure - - - - G2-27 GP-052551 Revised 2005-11-02 TEI4 2006-05-09: WG status updated. 2005-11-21
0031 1 F Rel-4 - - Correction to SNS SIZE procedure - - - - G2-28 GP-060211 Rejected 2006-01-11 TEI - 2006-01-24
0032 - A Rel-5 5.4.0 - Correction to SNS-SIZE procedure - - - - G2-27 GP-052552 Revised 2005-11-02 TEI4 2006-05-09: WG status updated. 2005-11-21
0032 1 A Rel-5 - - Correction to SNS SIZE procedure - - - - G2-28 GP-060212 Rejected 2006-01-11 TEI - 2006-01-24
0033 - A Rel-6 6.4.0 - Correction to SNS-SIZE procedure - - - - G2-27 GP-052553 Revised 2005-11-02 TEI4 2006-05-09: WG status updated. 2005-11-21
0033 1 A Rel-6 - - Correction to SNS SIZE procedure - - - - G2-28 GP-060213 Rejected 2006-01-11 TEI - 2006-01-24
0034 - A Rel-7 6.4.0 - Correction to SNS-SIZE procedure - - - - G2-27 GP-052554 Revised 2005-11-02 TEI4 2006-05-09: WG status updated. 2005-11-21
0034 1 A Rel-7 - - Correction to SNS SIZE procedure - - - - G2-28 GP-060214 Rejected 2006-01-11 TEI - 2006-01-24
0035 - F Rel-7 7.0.0 7.1.0 Corrections to IP sub-network service procedures related to IP endpoints configuration GP-28 GP-060458 Approved G2 G2-28 GP-060458 Agreed 2006-01-19 TEI7 - 2006-01-24
0036 - F Rel-7 7.1.0 7.2.0 Handling of non-operational IP endpoints GP-30 GP-061317 Approved G2 G2-30 GP-061317 Agreed 2006-05-17 TEI7 - 2006-07-06
0037 - F Rel-7 7.2.0 - Abnormal conditions related to load sharing function for an IP sub-network - - - - G2-31b G2-060320 Revised 2006-10-11 TEI7 - -
0037 1 F Rel-7 7.2.0 7.3.0 Abnormal conditions related to load sharing function for an IP sub-network GP-32 GP-062157 Approved G2 G2-32 GP-062157 Agreed 2006-10-17 TEI7 - -
0038 - F Rel-7 7.3.0 - Gb/IP: Usage of pre-configured endpoints and load sharing - - - - G2-36b G2-080053 Revised 2008-01-10 LATRED - 2008-01-10
0038 1 F Rel-7 7.3.0 7.4.0 Gb/IP: Usage of pre-configured endpoints and load sharing GP-37 GP-080222 Approved G2 G2-37 GP-080222 Agreed 2008-02-13 TEI7 - 2008-02-13

page generated from database: 2013-10-16 10:34:39