3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 48.018

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0020 - F Rel-4 4.2.0 - Rate of transmission of flow control packets on the Gb interface GP-03 - - G2 G2-03 GP-010167 Revised 2001-01-29 TEI - -
0020 1 F Rel-4 4.2.0 - Rate of transmission of flow control packets on the Gb interface GP-03 - - G2 G2-03 GP-010310 Withdrawn 2001-01-29 GPRS - -
0021 - F Rel-4 4.2.0 - lignment Octet/LLC-PDU re-union and spare values clarification GP-03 - - G2 G2-03 GP-010174 Revised 2001-01-29 TEI - -
0021 1 F Rel-4 4.2.0 4.3.0 Alignment Octet/LLC-PDU re-union GP-03 GP-010403 Approved G2 G2-03 GP-010403 Agreed 2001-01-29 TEI - -
0022 - A Rel-4 4.2.0 4.3.0 Corrections to 48.018 GP-03 GP-010314 Approved G2 G2-03 GP-010314 Agreed 2001-01-29 GPRS - -
0023 - F Rel-4 4.2.0 4.3.0 Service based' Network initiated Cell Change Order to UTRAN GP-03 GP-010415 Approved G2 G2-03 GP-010415 Agreed 2001-01-29 2G3Ginterworking - -
0024 - A Rel-4 4.1.0 4.2.0 Cause 'BVCI Unknown' allowed in STATUS PDU GP-04 GP-010477 Approved G2 G2-04 GP-010477 Agreed 2001-04-27 GPRS - -
0025 - F Rel-4 4.1.0 - Clarification on the PDU lifetime GP-04 - - G2 G2-04 GP-010618 Rejected 2001-04-27 GPRS - -
0025 1 F Rel-4 4.2.0 - Clarification on the PDU lifetime IE GP-05 GP-011236 withdrawn WG2 G2-05 - - 2001-06-06 GPRS - -
0026 - F Rel-4 4.1.0 4.2.0 SGSN behaviour upon receipt of a BSSGP RADIO STATUS PDU GP-04 GP-010683 Approved G2 G2-04 GP-010683 Agreed 2001-04-27 GPRS - -
0027 - A Rel-4 4.1.0 - Transmitted values in BSSGP: two clarifications GP-04 - - G2 G2-04 GP-010697 Revised 2001-04-27 TEI - -
0027 1 A Rel-4 4.1.0 4.2.0 Transmitted values in BSSGP: two clarifications GP-04 GP-010827 Approved G2 G2-04 GP-010827 Agreed 2001-04-27 TEI - -
0028 - F Rel-4 4.1.0 - Bucket indicator, bucket filled ratio GP-04 - - G2 G2-04 GP-010538 withdrawn 2001-04-27 GPRS - -
0029 - A Rel-4 4.1.0 - Rate of transmission of flow control packets on Gb interface GP-04 - - G2 G2-04 GP-010745 Revised 2001-04-27 GPRS - -
0029 1 A Rel-4 4.1.0 - Rate of transmission of flow control packets on Gb interface GP-04 - - G2 G2-04 GP-010924 Revised 2001-04-27 GPRS - -
0029 2 A Rel-4 4.1.0 - Rate of transmission of flow control packets on Gb interface GP-04 - - G2 G2-04 GP-010950 Withdrawn 2001-04-27 GPRS - -
0030 - A Rel-4 4.1.0 - Removal of BVC Reset / BVC blocking procedure contradiction GP-04 - - G2 G2-04 GP-010748 Revised 2001-04-27 GPRS - -
0030 1 A Rel-4 4.1.0 4.2.0 Removal of BVC Reset / BVC blocking procedure contradiction GP-04 GP-010830 Approved G2 G2-04 GP-010830 Agreed 2001-04-27 GPRS - -
0031 - A Rel-4 4.1.0 - Introduction of the UTRAN CCO IE in the CREATE-BSS-PFC PDU GP-04 - - G2 G2-04 GP-010779 Revised 2001-04-27 2G3Ginterworking - -
0031 1 A Rel-4 4.1.0 4.2.0 Introduction of the UTRAN CCO IE in the CREATE-BSS-PFC PDU GP-04 GP-010898 Approved G2 G2-04 GP-010898 Agreed 2001-04-27 2G3Ginterworking - -
0032 - A Rel-4 4.2.0 - Rate of transmission of flow control packets on Gb interface GP-05 GP-011107 Revised WG2 G2-05 - - 2001-06-06 GPRS - -
0032 1 A Rel-4 4.2.0 4.3.0 Rate of transmission of flow control packets on Gb interface GP-05 GP-011295 Approved WG2 G2-05 - - 2001-06-06 GPRS - -
0033 - C Rel-5 4.3.0 - Bucket indicator, bucket filled ratio GP-05 GP-011186 Withdrawn WG2 G2-05 - - 2001-06-06 GPRS - -
0034 - A Rel-4 4.2.0 - BVC unblocking and BVC reset procedures interleaving GP-05 GP-011184 Rejected WG2 G2-05 - - 2001-06-06 GPRS - -
0035 - A Rel-4 4.2.0 4.3.0 Bucket indicator, bucket filled ratio GP-05 GP-011299 Approved WG2 G2-05 - - 2001-06-06 GPRS - -
0036 - F Rel-5 4.3.0 - BVC unblocking and BVC reset procedures interleaving GP-05 GP-011297 Revised WG2 G2-05 - - 2001-06-06 GPRS - -
0036 1 F Rel-5 4.3.0 5.0.0 BVC unblocking and BVC reset procedures interleaving GP-05 GP-011427 Approved WG2 G2-05 - - 2001-06-06 GPRS - -
0037 3 B Rel-5 4.3.1 - Introduction of LCS for GPRS to Release 5 GP-06 GP-011710 - G2 G2-06 - Revised 2001-08-27 LCS - -
0037 4 B Rel-5 4.3.1 - Introduction of LCS for GPRS to Release 5 GP-06 GP-011928 - G2 G2-06 - Revised 2001-08-30 LCS - -
0037 5 B Rel-5 4.3.1 5.0.0 Introduction of LCS for GPRS to Release 5 GP-06 GP-011959 Approved G2 G2-06 - - 2001-08-30 LCS No decision at G2 level. Left for the GP to decide. -
0038 2 F Rel-4 4.3.1 4.4.0 Inter-NSE rerouting of DL LLC PDUs GP-06 GP-011704 Approved G2 G2-06 - Agreed 2001-08-21 GPRS - -
0039 - A Rel-5 4.3.1 - Inter-NSE rerouting of DL LLC PDUs GP-06 GP-011741 Withdrawn G2 - - - 2001-08-21 2G3Ginterworking - -
0040 - B Rel-4 4.3.1 - Introduction of DCCM-A GP-06 GP-011583 Withdrawn G2 - - - 2001-08-21 - - -
0041 - F Rel-4 4.3.1 - Clarification of Packet Flow Timer GP-06 GP-011540 - G2 G2-06 - Revised 2001-08-21 Packet_Flow_Management - -
0041 1 F Rel-4 4.3.1 4.4.0 Clarification of Packet Flow Timer GP-06 GP-011810 Approved G2 G2-06 - Agreed 2001-08-27 Packet_Flow_Management - -
0042 - A Rel-5 4.3.1 5.0.0 Inter-NSE rerouting of DL LLC PDUs GP-06 GP-011642 Approved G2 G2-06 - Agreed 2001-08-21 GPRS - -
0043 - F Rel-5 4.3.1 5.0.0 SGSN behaviour during rerouting of DL LLC PDUs GP-06 GP-011775 Approved G2 G2-06 - Agreed 2001-08-22 GPRS - -
0044 - A Rel-4 4.3.1 - BVC-RESET in case of SGSN / Gb failures GP-06 GP-011796 - G2 G2-06 - Rejected 2001-08-22 GPRS - -
0045 - A Rel-5 4.3.1 - BVC-RESET in case of SGSN / Gb failures GP-06 GP-011797 - G2 G2-06 - Rejected 2001-08-22 GPRS - -
0046 - A Rel-5 4.3.1 5.0.0 Clarification of Packet Flow Timer GP-06 GP-011843 Approved G2 G2-06 - Agreed 2001-08-28 Packet_Flow_Management - -
0047 - F Rel-5 5.0.0 - Inter NSE Cell Change for LCS for GPRS - - - G2 G2-06b G2-010237 Revised 2001-10-09 LCS - -
0047 1 F Rel-5 5.0.0 - Inter NSE Cell Change for LCS for GPRS (Rel 5) - - - G2 G2-07 GP-011989 Revised 2001-11-08 LCS - -
0047 2 F Rel-5 5.0.0 - Inter NSE Cell Change for LCS for GPRS (Rel 5) - - - G2 G2-07 GP-012711 Revised 2001-11-28 LCS - -
0047 3 F Rel-5 5.0.0 5.1.0 Inter NSE Cell Change for LCS for GPRS GP-07 GP-012802 Approved G2 G2-07 GP-012802 Agreed 2001-11-29 LCS - -
0048 - F Rel-5 5.0.0 5.1.0 Correction of Feature Bitmap IE GP-07 GP-012047 Approved G2 G2-06b G2-010239 Agreed 2001-10-09 LCS - -
0049 - F Rel-5 5.0.0 - Paging coordination by the core network - - - G2 G2-06b G2-010347 Withdrawn 2001-10-17 LCS - -
0050 - F Rel-5 5.0.0 5.1.0 Cleanup for LCS for GPRS GP-07 GP-012048 Approved G2 G2-06b G2-010447 Agreed 2001-10-24 LCS - -
0051 - A Rel-4 4.4.0 - Correction of code points in IEI - - - G2 G2-07 GP-012164 Rejected 2001-11-13 TEI - -
0052 - A Rel-5 5.0.0 - Correction of code points in IEI - - - G2 G2-07 GP-012165 Rejected 2001-11-13 TEI - -
0053 - A Rel-4 4.4.0 - Correction of code points in IEI - - - G2 G2-07 GP-012167 Rejected 2001-11-13 TEI - -
0054 - A Rel-5 5.0.0 - Correction of code points in IEI - - - G2 G2-07 GP-012168 Rejected 2001-11-13 TEI - -
0055 - F Rel-5 5.0.0 5.1.0 Editorial Corrections GP-07 GP-012172 Approved G2 G2-07 GP-012172 Agreed 2001-11-13 TEI - -
0056 - F Rel-5 5.0.0 5.1.0 LCS Capabilities refer to 24.008 GP-07 GP-012304 Approved G2 G2-07 GP-012304 Agreed 2001-11-16 LCS - -
0057 - B Rel-5 5.0.0 - Introduction of RAN Information Management - - - G2 G2-07 GP-012461 revised 2001-11-20 GEIMP2 - -
0057 1 B Rel-5 - - Introduction of RAN Information Management - - - - G2-07b G2-020029 Revised 2002-01-09 GEIMP2 - -
0057 2 B Rel-5 - - Introduction of RAN Information Management - - - - G2-07b G2-020123 Revised 2002-01-14 GEIMP2 - -
0057 3 B Rel-5 5.1.0 - Introduction of RAN Information Management in 48.018 - - - Ericsson G2-08 GP-020221 revised 2002-01-22 GERAN - -
0057 4 B Rel-5 5.1.0 - Introduction of RAN Information Management in 48.018 GP-08 GP-020428 approved Ericsson G2-08 GP-020428 - 2002-01-22 GERAN - -
0058 - B Rel-5 5.0.0 - Introduction of Global CN-ID when CS paging is done via the PS domain - - - G2 G2-07 GP-012540 revised 2001-11-20 FLOGER - -
0058 1 B Rel-5 - - Introduction of Global CN-Id when CS paging is done via the PS domain - - - - G2-09 GP-020969 revised 2002-04-10 GERAN - -
0058 2 B Rel-5 - - Introduction of Global CN-Id when CS paging is done via the PS domain - - - - G2-09b G2-020562 Revised 2002-05-22 FLOGER 0 -
0058 3 B Rel-5 5.3.0 5.4.0 Introduction of Global CN-Id when CS paging is done via the PS domain GP-10 GP-021723 Approved G2 G2-10 G2-020658 Agreed 2002-05-29 FLOGER 0 -
0059 - F Rel-5 5.0.0 - Inter NSE Cell Change for LCS for GPRS - - - G2 G2-07 GP-012577 Withdrawn 2001-11-21 LCS - -
0060 - F Rel-5 5.0.0 - Alternative solution for Inter NSE Cell Change for LCS for GPRS - - - G2 G2-07 GP-012578 Withdrawn 2001-11-21 LCS - -
0061 - B Rel-5 5.1.0 - Introduction of flow control per PFC between the SGSN and BSS - - - Ericsson G2-08 GP-020255 revised 2002-01-23 TEI To next meeting -
0061 1 B Rel-5 - - Introduction of flow control per PFC between the SGSN and BSS - - - - G2-08b G2-020307 Revised 2002-03-06 TEI - -
0061 2 B Rel-5 5.2.0 5.3.0 Introduction of flow control per PFC GP-09 GP-020967 Approved G2 G2-09 GP-020967 Open 2002-04-10 GERAN - -
0061 3 B Rel-5 - - Introduction of flow control per PFC - - - - G2-09b G2-020561 Revised 2002-05-22 GERQoS 0 -
0061 4 B Rel-5 5.3.0 5.4.0 Introduction of flow control per PFC between the SGSN and BSS GP-10 GP-021836 Approved G2 G2-10 GP-021836 Agreed 2002-06-25 GERQoS 0 -
0062 - F Rel-5 - - Use of PTP BVCI for LCS PDUs on the Gb Interface - - - - G2-08b G2-020211 Revised 2002-03-05 LCS - -
0062 1 F Rel-5 - - Use of PTP BVCI for LCS PDUs on the Gb Interface - - - - G2-08b G2-020 346 Withdrawn 2002-03-11 LCS - -
0063 - F Rel-5 - - [External NACC] Re-introduction of event-driven multiple reports and other corrections - - - - G2-08b G2-020234 Revised 2002-03-05 GEIMP2 - -
0063 1 F Rel-5 - - [External NACC] Re-introduction of event-driven multiple reports and other corrections - - - - G2-08b G2-020391 Revised 2002-03-14 GEIMP2 - -
0063 2 F Rel-5 5.2.0 5.3.0 [External NACC] Re-introduction of event-driven multiple reports and other corrections GP-09 GP-020719 Approved G2 G2-09 GP-020719 Agreed 2002-03-14 GEIMP2 - -
0064 - F Rel-5 - - Clarification regarding the purpose of the guard timer in the FLUSH procedure - - - - G2-08b G2-020329 Withdrawn 2002-03-06 GPRS - -
0065 - A Rel-4 - - Correction to PFC transfer procedure upon cell change - - - - G2-08b G2-020327 Revised 2002-03-12 GPRS - -
0065 1 A Rel-4 - - Correction to PFC transfer procedure upon cell change - - - - G2-09 GP-020971 Revised 2002-04-10 GPRS - -
0065 2 A Rel-4 - - Correction to PFC transfer procedure upon cell change - - - - G2-09 GP-021072 Revised 2002-04-16 GPRS - -
0065 3 A Rel-4 4.4.0 4.5.0 Correction to PFC transfer procedure upon cell change GP-09 GP-021247 Approved G2 G2-09 GP-021247 Plenary 2002-04-19 GPRS - -
0066 - A Rel-5 - - Correction to PFC transfer procedure upon cell change - - - - G2-08b G2-020328 Revised 2002-03-12 GPRS - -
0066 1 A Rel-5 - - Correction to PFC transfer procedure upon cell change - - - - G2-09 GP-020972 Revised 2002-04-10 GPRS - -
0066 2 A Rel-5 - - Correction to PFC transfer procedure upon cell change - - - - G2-09 GP-021073 Revised 2002-04-16 GPRS - -
0066 3 A Rel-5 5.2.0 5.3.0 Correction to PFC transfer procedure upon cell change GP-09 GP-021248 Approved G2 G2-09 GP-021248 Plenary 2002-04-19 GPRS - -
0067 - B Rel-5 5.2.0 5.3.0 Addition of PTP BVCI parameter for LCS PDUs on the Gb Interface GP-09 GP-020620 Approved G2 G2-09 GP-020620 Agreed 2002-04-08 LCS - -
0068 - F Rel-5 - - Removal of Fixed Allocation - - - - G2-09 GP-020655 Withdrawn 2002-04-08 GPRS - -
0069 - F Rel-5 - - Optional guard timer in the FLUSH procedure - - - - G2-09 GP-020790 Withdrawn 2002-04-09 GPRS - -
0070 - F Rel-5 - - SI/PSI coding in RAN-INFORMATION Container Unit - - - - G2-10 GP-021502 Revised 2002-06-17 NACC 0 -
0070 1 F Rel-5 - - SI/PSI coding in RAN-INFORMATION Container Unit - - - - G2-10 GP-022046 Revised 2002-06-27 NACC 0 -
0070 2 F Rel-5 5.3.0 5.4.0 SI/PSI coding in RAN-INFORMATION Container Unit GP-10 GP-022102 Approved G2 G2-10 GP-022102 Agreed 2002-06-27 NACC 0 -
0071 - F Rel-4 - - Removal of an inconsistency in LLC DISCARDED description - - - - G2-10 GP-021689 Revised 2002-06-19 GPRS 0 -
0071 1 F Rel-4 - - Removal of an inconsistency in LLC DISCARDED description - - - - G2-10 GP-021886 Rejected 2002-06-25 GPRS 0 -
0072 - A Rel-5 - - Removal of an inconsistency in LLC DISCARDED description - - - - G2-10 GP-021690 Revised 2002-06-19 GPRS 0 -
0072 1 A Rel-5 - - Removal of an inconsistency in LLC DISCARDED description - - - - G2-10 GP-021887 Revised 2002-06-25 GPRS 0 -
0072 2 A Rel-5 5.3.0 5.4.0 Removal of an inconsistency in LLC DISCARDED description GP-10 GP-022054 Approved G2 G2-10 GP-022054 Agreed 2002-06-27 GPRS 0 -
0073 - F Rel-5 - - Removal of an inconsistency in BVC Reset procedure description - - - - G2-10 GP-021691 Revised 2002-06-19 GPRS 0 -
0073 1 F Rel-5 5.3.0 5.4.0 Removal of an inconsistency in BVC Reset procedure description GP-10 GP-021786 Approved G2 G2-10 GP-021786 Agreed 2002-06-23 GPRS 0 -
0074 - A Rel-4 4.5.0 - Setting of RAI in Suspend and appropriate handling in SGSN - - - - G2-11 GP-022556 Rejected 2002-08-23 TEI 0 -
0075 - A Rel-5 5.4.0 - Setting of RAI in Suspend and appropriate handling in SGSN - - - - G2-11 GP-022499 revised 2002-08-22 TEI 0 -
0075 1 F Rel-5 5.4.0 - Setting of RAI in Suspend and appropriate handling in SGSN - - - - G2-11 GP-022584 revised 2002-08-27 TEI 0 -
0075 2 F Rel-5 5.4.0 5.5.0 Setting of RAI in Suspend and appropriate handling in SGSN GP-11 GP-022778 Approved G2 G2-11 GP-022778 Agreed 2002-08-30 TEI 0 -
0076 - A Rel-4 4.5.0 - Usage of Allocation/Retention Priority - - - G2 G2-11b G2-020715 withdrawn 2002-10-01 TEI 0 2002-11-27
0077 - A Rel-5 5.5.0 - Usage of Allocation/Retention Priority - - - G2 G2-11b G2-020716 withdrawn 2002-10-01 TEI 0 2002-11-27
0078 - F Rel-5 5.5.1 - Correction to PDU Type IE - - - G2 G2-12b G2-030048 Revised 2003-01-08 FlowCon 0 2003-02-11
0078 1 F Rel-5 5.5.1 5.6.0 Correction to PDU Type IE GP-13 GP-030097 Approved G2 G2-13 GP-030097 Agreed 2003-01-14 FlowCon 0 2003-02-11
0079 - C Rel-6 5.5.1 - Enhancement to PFC creation procedure - - - G2 G2-13 GP-030243 Revised 2003-02-06 TEI6 0 2003-02-11
0079 1 C Rel-6 5.5.1 - Enhancement to PFC creation procedure - - - G2 G2-13 GP-030403 Revised 2003-02-06 TEI6 0 2003-02-11
0079 2 C Rel-6 5.5.1 Enhancement to PFC creation procedure - - - G2 G2-13 GP-030420 Revised 2003-02-06 TEI6 0 2003-02-11
0079 3 C Rel-6 5.5.1 6.0.0 Enhancement to PFC creation procedure GP-13 GP-030422 Approved G2 G2-13 GP-030422 Agreed 2003-02-06 TEI6 0 2003-02-11
0080 - B Rel-6 5.5.1 - Usage of Allocation and Retention Priority in the BSS - - - G2 G2-13 GP-030248 Revised 2003-01-29 TEI6 0 2003-02-11
0080 1 B Rel-6 5.5.1 - Usage of Allocation and Retention Priority in the BSS - - - G2 G2-13 GP-030328 revised 2003-02-05 TEI6 0 2003-02-11
0080 2 B Rel-6 6.0.0 - Usage of Allocation and Retention Priority in the BSS - - - G2 G2-13b G2-030207 Revised 2003-03-05 TEI6 0 2003-04-16
0080 3 B Rel-6 6.0.0 - Usage of Allocation and Retention Priority in the BSS - - - G2 G2-14 GP-030825 Revised 2003-04-02 TEI6 0 2003-04-16
0080 4 B Rel-6 6.0.0 6.1.0 Usage of Allocation and Retention Priority in the BSS GP-14 GP-031030 Approved G2 G2-14 GP-031030 Agreed 2003-04-09 TEI6 0 2003-04-16
0081 - C Rel-5 5.5.1 - PFC release procedure - - - G2 G2-13b G2-030225 Revised 2003-03-05 TEI 0 2003-04-16
0081 1 C Rel-6 6.0.0 - PFC release procedure - - - G2 G2-14 GP-031026 Revised 2003-04-09 TEI6 0 2003-04-16
0081 2 C Rel-6 6.0.0 6.1.0 PFC release procedure GP-14 GP-031040 Approved G2 G2-14 GP-031040 Agreed 2003-04-10 TEI6 0 2003-04-16
0082 - D Rel-5 5.5.1 - BSSGP Editorial - PFI - - - G2 G2-13b G2-030226 Withdrawn 2003-03-05 TEI 0 2003-04-16
0083 - F Rel-5 5.6.1 - Introduction of 'End Indication' for RAN Information multiple reports - - - G2 G2-14b G2-030314 Revised 2003-05-13 TEI5 0 2003-06-30
0083 1 F Rel-5 5.6.1 - Introduction of 'End Indication' for RAN Information multiple reports - - - G2 G2-14b G2-030375 Revised 2003-05-19 TEI5 0 2003-06-30
0083 1 A Rel-4 4.5.0 - Correction to the handling of unsuccessful PFC transfer procedure upon cell change - - - G2 G2-16 GP-032086 Withdrawn 2003-08-20 TEI 0 -
0083 2 F Rel-5 5.6.1 5.7.0 Introduction of 'End Indication' for RAN Information multiple reports GP-15 GP-031181 Approved G2 G2-15 GP-031181 Agreed 2003-05-20 TEI5 0 2003-06-30
0084 - A Rel-6 6.2.0 - Introduction of 'End Indication' for RAN Information multiple reports - - - G2 G2-14b G2-030315 Revised 2003-05-13 TEI6 0 2003-06-30
0084 1 A Rel-6 6.2.0 - Introduction of 'End Indication' for RAN Information multiple reports - - - G2 G2-14b G2-030376 Revised 2003-05-19 TEI6 0 2003-06-30
0084 1 A Rel-5 5.7.0 - Correction to the handling of unsuccessful PFC transfer procedure upon cell change - - - G2 G2-16 GP-032087 Withdrawn 2003-08-20 TEI 0 -
0084 2 A Rel-6 6.1.0 6.2.0 Introduction of 'End Indication' for RAN Information multiple reports GP-15 GP-031182 Approved G2 G2-15 GP-031182 Agreed 2003-05-20 TEI6 0 2003-06-30
0085 - A Rel-6 6.2.0 - Correction to the handling of unsuccessful PFC transfer procedure upon cell change - - - G2 G2-14b G2-030320 revised 2003-05-13 TEI 0 2003-06-30
0085 1 A Rel-6 6.2.0 - Correction to the handling of unsuccessful PFC transfer procedure upon cell change - - - G2 G2-16 GP-032088 Withdrawn 2003-08-20 TEI 0 -
0086 - B Rel-6 6.2.0 - Introduction of Suspend functionality to reduce packet loss at cell change - - - G2 G2-14b G2-030324 Revised 2003-05-14 TEI6 0 2003-06-30
0086 1 B Rel-6 6.2.0 - Introduction of Suspend functionality to reduce packet loss at cell change - - - G2 G2-15 GP-031446 Revised 2003-06-18 TEI6 0 2003-06-30
0086 2 B Rel-6 6.2.0 - Introduction of Suspend functionality to reduce packet loss at cell change - - - G2 G2-15 GP-031660 Revised 2003-06-26 TEI6 0 2003-06-30
0086 3 B Rel-6 6.1.0 6.2.0 Introduction of Suspend functionality to reduce packet loss at cell change GP-15 GP-031678 Approved G2 G2-15 GP-031678 Agreed 2003-06-26 TEI6 0 2003-06-30
0087 - A Rel-4 4.5.0 - Correction to the handling of unsuccessful PFC transfer procedure upon cell change - - - G2 G2-14b G2-030318 revised 2003-05-13 TEI 0 2003-06-30
0088 - A Rel-5 5.6.1 - Correction to the handling of unsuccessful PFC transfer procedure upon cell change - - - G2 G2-14b G2-030319 revised 2003-05-13 TEI 0 2003-06-30
0089 - F Rel-5 5.7.0 - RIM and NACC clean-up - - - G2 G2-17 GP-032481 Revised 2003-11-11 TEI5 0 -
0089 1 F Rel-5 5.8.0 - RIM and NACC clean-up - - - G2 G2-17b G2-040080 Revised 2004-01-07 TEI5 - 2004-02-10
0089 2 F Rel-5 5.8.0 - RIM and NACC clean-up - - - G2 G2-18 GP-040139 Revised 2004-01-28 TEI5 - 2004-02-10
0089 3 F Rel-5 5.9.0 - RIM and NACC clean-up - - - G2 G2-18b G2-040204 Revised 2004-03-11 TEI5 0 2004-04-27
0089 4 F Rel-5 5.9.0 - RIM and NACC clean-up - - - G2 G2-18b G2-040341 revised 2004-03-24 TEI5 - 2004-04-27
0089 5 F Rel-5 5.9.0 - RIM and NACC clean-up - - - G2 G2-19 GP-040954 revised 2004-04-14 TEI5 - 2004-04-27
0089 7 F Rel-5 5.10.0 - RIM-NACC clean up - - - G2 G2-21b G2-040518 Revised 2004-09-28 TEI5 - 2004-11-19
0089 8 F Rel-5 5.10.0 - RIM-NACC clean up - - - G2 G2-22 GP-042506 Withdrawn 2004-11-04 TEI5 - 2004-11-19
0090 - F Rel-5 5.7.0 - RIM/extNACC simple solution for Rel-5 - - - G2 G2-17 GP-032533 Withdrawn 2003-11-11 TEI5 0 -
0091 - F Rel-5 5.7.0 - Gap in Numbering in the PFC Flow Control parameters IE - - - G2 G2-17 GP-032534 Revised 2003-11-12 TEI5 0 -
0091 1 F Rel-5 5.7.0 5.8.0 Gap in Numbering in the PFC Flow Control parameters IE GP-17 GP-032692 Approved G2 G2-17 GP-032692 Agreed 2003-11-18 TEI5 0 -
0092 - A Rel-6 6.2.0 - Gap in Numbering in the PFC Flow Control parameters IE - - - G2 G2-17 GP-032535 Revised 2003-11-12 TEI5 0 -
0092 1 A Rel-6 6.2.0 6.3.0 Gap in Numbering in the PFC Flow Control parameters IE GP-17 GP-032693 Approved G2 G2-17 GP-032693 Agreed 2003-11-18 TEI5 0 -
0093 - F Rel-5 5.7.0 - Corrections to several inconsistencies - - - G2 G2-17 GP-032607 Revised 2003-11-13 TEI5 0 -
0093 1 F Rel-5 5.7.0 5.8.0 Corrections to several inconsistencies GP-17 GP-032694 Approved G2 G2-17 GP-032694 Agreed 2003-11-18 TEI5 0 -
0094 - A Rel-6 6.2.0 - Corrections to several inconsistencies - - - G2 G2-17 GP-032608 Revised 2003-11-13 TEI5 0 -
0094 1 A Rel-6 6.2.0 6.3.0 Corrections to several inconsistencies GP-17 GP-032695 Approved G2 G2-17 GP-032695 Agreed 2003-11-18 TEI5 0 -
0095 - F Rel-5 5.7.0 - TOM PFI usage on Gb interface - - - G2 G2-17b G2-040016 Revised 2003-12-15 TEI5 - 2004-02-10
0095 1 F Rel-5 5.8.0 5.9.0 TOM PFI usage on Gb interface GP-18 GP-040120 Approved G2 G2-18 GP-040120 Agreed 2004-01-26 TEI5 - 2004-02-10
0096 - A Rel-6 6.2.0 - TOM PFI usage on Gb interface - - - G2 G2-17b G2-040017 Revised 2003-12-15 TEI5 - 2004-02-10
0096 1 A Rel-6 6.3.0 6.4.0 TOM PFI usage on Gb interface GP-18 GP-040121 Approved G2 G2-18 GP-040121 Agreed 2004-01-26 TEI5 - 2004-02-10
0097 - F Rel-5 5.7.0 - SGSN initiated deletion of BSS PFC during the modification procedure - - - G2 G2-17b G2-040018 Revised 2003-12-15 TEI5 - 2004-02-10
0097 1 F Rel-5 5.7.0 - SGSN initiated deletion of BSS PFC during the modification procedure - - - G2 G2-18 GP-040199 Revised 2004-01-26 TEI5 - 2004-02-10
0097 2 F Rel-5 5.7.0 - SGSN initiated deletion of BSS PFC during the modification procedure - - - G2 G2-18 GP-040438 Revised 2004-02-03 TEI5 - 2004-02-10
0097 3 F Rel-5 5.8.0 5.9.0 SGSN initiated deletion of BSS PFC during the modification procedure GP-18 GP-040530 Approved G2 G2-18 GP-040530 Agreed 2004-02-05 TEI5 - 2004-02-10
0098 - A Rel-6 6.2.0 - SGSN initiated deletion of BSS PFC during the modification procedure - - - G2 G2-17b G2-040019 Revised 2003-12-15 TEI5 - 2004-02-10
0098 1 A Rel-6 6.2.0 - SGSN initiated deletion of BSS PFC during the modification procedure - - - G2 G2-18 GP-040200 Revised 2004-01-26 TEI5 - 2004-02-10
0098 2 A Rel-6 6.2.0 - SGSN initiated deletion of BSS PFC during the modification procedure - - - G2 G2-18 GP-040439 Revised 2004-02-03 TEI5 - 2004-02-10
0098 3 A Rel-6 6.3.0 6.4.0 SGSN initiated deletion of BSS PFC during the modification procedure GP-18 GP-040531 Approved G2 G2-18 GP-040531 Agreed 2004-02-05 TEI5 - 2004-02-10
0099 - F Rel-5 5.7.0 - Download BSS PFC PDU - - - G2 G2-17b G2-040020 Revised 2003-12-15 TEI5 - 2004-02-10
0099 1 F Rel-5 5.9.0 - Download BSS PFC PDU - - - G2 G2-18b G2-040245 Withdrawn 2004-03-16 TEI5 - 2004-04-27
0100 - A Rel-6 6.2.0 - Download BSS PFC PDU - - - G2 G2-17b G2-040021 Revised 2003-12-15 TEI5 - 2004-02-10
0100 1 A Rel-6 6.4.0 - Download BSS PFC PDU - - - G2 G2-18b G2-040246 Revised 2004-03-16 TEI5 - 2004-04-27
0100 2 F Rel-6 6.4.0 6.5.0 Download BSS PFC PDU GP-19 GP-040848 Approved G2 G2-19 GP-040848 Agreed 2004-03-23 TEI5 - 2004-04-27
0101 - F Rel-5 5.8.0 - Initial condition of the PFC flow control parameters leak rate and bucket size - - - G2 G2-17b G2-040043 Rejected 2003-12-26 TEI5 - 2004-02-10
0102 - A Rel-6 6.3.0 - Initial condition of the PFC flow control parameters leak rate and bucket size - - - G2 G2-17b G2-040044 Rejected 2003-12-26 TEI5 - 2004-02-10
0103 - A Rel-4 4.5.0 - Removal of PFC Transfer Result indication - - - G2 G2-17b G2-040103 Revised 2004-01-07 TEI - 2004-02-10
0103 1 A Rel-4 4.5.0 4.6.0 Removal of PFC Transfer Result indication GP-18 GP-040112 Approved G2 G2-18 GP-040112 Agreed 2004-01-26 TEI - 2004-02-10
0104 - A Rel-5 5.8.0 - Removal of PFC Transfer Result indication - - - G2 G2-17b G2-040104 Revised 2004-01-07 TEI5 - 2004-02-10
0104 1 F Rel-5 5.8.0 5.9.0 Removal of PFC Transfer Result indication GP-18 GP-040113 Approved G2 G2-18 GP-040113 Agreed 2004-01-26 TEI5 - 2004-02-10
0105 - A Rel-6 6.3.0 - Removal of PFC Transfer Result indication - - - G2 G2-17b G2-040105 Revised 2004-01-07 TEI5 - 2004-02-10
0105 1 A Rel-6 6.3.0 6.4.0 Removal of PFC Transfer Result indication GP-18 GP-040114 Approved G2 G2-18 GP-040114 Agreed 2004-01-26 TEI5 - 2004-02-10
0106 - F Rel-6 6.4.0 - Length of ABQP IE in BSSGP - - - G2 G2-18b G2-040226 Revised 2004-03-15 TEI - 2004-04-27
0106 1 A Rel-6 6.4.0 - Length of ABQP IE in BSSGP - - - G2 G2-19 GP-040929 Revised 2004-04-14 TEI - 2004-04-27
0106 2 A Rel-6 6.4.0 6.5.0 Length of ABQP IE in BSSGP GP-19 GP-041096 Approved G2 G2-19 GP-041096 Agreed 2004-04-20 TEI - 2004-04-27
0107 - F Rel-6 6.4.0 - Correction of BSS data queue handling at reception of DELETE PFC - - - G2 G2-18b G2-040259 Withdrawn 2004-03-17 TEI6 - 2004-04-27
0108 - A Rel-4 4.6.0 - Length of ABQP IE in BSSGP - - - G2 G2-19 GP-040927 Revised 2004-04-14 TEI - 2004-04-27
0108 1 A Rel-4 4.6.0 4.7.0 Length of ABQP IE in BSSGP GP-19 GP-041094 Approved G2 G2-19 GP-041094 Agreed 2004-04-20 TEI - 2004-04-27
0109 - A Rel-5 5.9.0 - Length of ABQP IE in BSSGP - - - G2 G2-19 GP-040928 Revised 2004-04-14 TEI - 2004-04-27
0109 1 A Rel-5 5.9.0 5.10.0 Length of ABQP IE in BSSGP GP-19 GP-041095 Approved G2 G2-19 GP-041095 Agreed 2004-04-20 TEI - 2004-04-27
0110 - F Rel-6 6.5.0 - Correction in handling MSs not supporting PFCs - - - G2 G2-20 GP-041556 Withdrawn 2004-06-17 TEI6 - 2004-06-30
0111 - F Rel-5 5.8.0 - RIM/eNACC rel-5 CR: Proposal of E2E procedures - - - - G2-21 GP-041945 Withdrawn 2004-08-17 TEI5 Withdrawn 2004-08-31
0112 - A Rel-6 6.5.0 - RIM-NACC clean up - - - G2 G2-21b G2-040519 Revised 2004-09-28 TEI5 - 2004-11-19
0112 2 A Rel-6 6.5.0 - RIM-NACC clean up - - - G2 G2-22 GP-042507 Withdrawn 2004-11-04 TEI5 - 2004-11-19
0113 - B Rel-6 6.5.0 - Introduction of the RIM application SI3 - - - G2 G2-21b G2-040521 Postponed 2004-09-28 MBMS - 2004-11-19
0113 1 - Rel-6 - - Introduction of the RIM application SI3 - - - G2 G2-22 GP-042513 Revised 2004-11-04 MBMS - 2004-11-19
0113 2 - Rel-6 - - Introduction of the RIM application SI3 - - - G2 G2-22 GP-042844 Postponed 2004-11-10 MBMS - 2004-11-19
0113 2 B Rel-6 6.6.0 - SI3 RIM application - - - - G2-23 GP-050376 withdrawn 2005-01-19 MBMS - 2005-02-01
0113 5 B Rel-6 6.7.0 6.8.0 SI3 RIM application GP-24 GP-050851 Approved G2 G2-24 GP-050851 Agreed 2005-03-09 MBMS - 2005-04-08
0114 - B Rel-6 6.5.0 - Introduction of the RIM application MBMS data channel - - - G2 G2-21b G2-040522 Postponed 2004-09-28 MBMS - 2004-11-19
0114 1 - Rel-6 - - Introduction of the RIM application MBMS data channel - - - G2 G2-22 GP-042514 Postponed 2004-11-04 MBMS - 2004-11-19
0114 2 B Rel-6 6.6.0 - MBMS Data Channel RIM application - - - - G2-23 GP-050377 Withdrawn 2005-01-19 MBMS 2005-09-06: WG status was previously 'postponed'. 2005-02-01
0114 4 B Rel-6 6.7.0 6.8.0 MBMS Data Channel RIM application GP-24 GP-050852 Approved G2 G2-24 GP-050852 Agreed 2005-03-07 MBMS - 2005-04-08
0115 - F Rel-6 6.5.0 - Removal of PTM-M - - - G2 G2-22 GP-042460 Revised 2004-11-02 TEI6 - 2004-11-19
0115 1 F Rel-6 6.5.0 6.6.0 Removal of PTM-M GP-22 GP-042883 Approved G2 G2-22 GP-042883 Agreed 2004-11-11 TEI6 - 2004-11-19
0116 - B Rel-6 6.5.0 - Addition of MBMS session start/stop messages - - - G2 G2-22 GP-042544 Revised 2004-11-02 MBMS - 2004-11-19
0116 1 B Rel-6 6.5.0 6.6.0 Addition of MBMS session start/stop messages GP-22 GP-042703 Approved G2 G2-22 GP-042703 Agreed 2004-11-09 MBMS - 2004-11-19
0117 - F Rel-6 6.5.0 - Handling of PFC information transferred between BVCs via FLUSH-LL procedure - - - G2 G2-22 GP-042599 Revised 2004-11-03 TEI6 - 2004-11-19
0117 1 F Rel-6 6.5.0 - Handling of PFC information transferred between BVCs via FLUSH-LL procedure - - - G2 G2-22 GP-042845 Revised 2004-11-11 TEI6 - 2004-11-19
0117 2 F Rel-6 6.5.0 6.6.0 Handling of PFC information transferred between BVCs via FLUSH-LL procedure GP-22 GP-042891 Approved G2 G2-22 GP-042891 Agreed 2004-11-11 TEI6 - 2004-11-19
0118 - F Rel-5 5.10.0 - Overall restructuring of RIM procedures - application to inter-BSC / inter-RAT NACC - - - G2 G2-22 GP-042600 Revised 2004-11-03 TEI5 - 2004-11-19
0118 1 F Rel-5 5.10.0 5.11.0 Overall restructuring of RIM procedures - application to inter-BSC / inter-RAT NACC GP-22 GP-042695 Approved G2 G2-22 GP-042695 Agreed 2004-11-09 TEI5 - 2004-11-19
0119 - A Rel-6 6.5.0 - Overall restructuring of RIM procedures - application to inter-BSC / inter-RAT NACC - - - G2 G2-22 GP-042601 Revised 2004-11-03 TEI5 - 2004-11-19
0119 1 A Rel-6 6.5.0 6.6.0 Overall restructuring of RIM procedures - application to inter-BSC / inter-RAT NACC GP-22 GP-042696 Approved G2 G2-22 GP-042696 Agreed 2004-11-09 TEI5 - 2004-11-19
0120 - B Rel-6 6.6.0 6.7.0 Identifying Session ID as optional GP-23 GP-050319 Approved G2 G2-23 GP-050319 Agreed 2005-01-19 MBMS - 2005-02-01
0121 - B Rel-6 6.6.0 - No data received after an MBMS SESSION START REQUEST - - - - G2-23 GP-050320 Withdrawn 2005-01-19 MBMS 2005-09-06: WG status was previously 'postponed'. 2005-02-01
0122 - B Rel-6 6.6.0 - Inclusion of support for PS Handover for GERAN A/Gb mode - - - - G2-23 GP-050332 Revised 2005-01-19 SCSAGB 2005-09-06: WG status was previously 'postponed'. 2005-02-01
0122 1 F Rel-6 6.7.0 - Inclusion of support for PS Handover for GERAN A/Gb mode - - - - G2-24 GP-050897 Revised 2005-03-29 SCSAGB - 2005-04-08
0122 2 F Rel-6 6.7.0 - Inclusion of support for PS Handover for GERAN A/Gb mode - - - - G2-24 GP-050990 Withdrawn 2005-04-05 SCSAGB 2005-09-06: WG status was previously 'postponed'. 2005-04-08
0122 3 B Rel-6 6.8.0 - Inclusion of support for PS Handover in GERAN A/Gb mode (Rel-6) - - - - G2-24b G2-050219 Revised 2005-05-18 SPSHAGB - 2005-06-28
0122 4 B Rel-6 6.8.0 - Inclusion of support for PS Handover in GERAN A/Gb mode (Rel-6) - - - - G2-24b G2-050299 Postponed 2005-05-24 SPSHAGB Revised 2005-06-28
0122 5 B Rel-6 6.3.0 - Inclusion of support for PS Handover in GERAN A/Gb mode - - - - G2-25 GP-051538 Revised 2005-06-15 SPSHAGB - 2005-06-28
0122 6 B Rel-6 6.8.0 6.9.0 Inclusion of support for PS Handover in GERAN A/Gb mode GP-25 GP-051700 Approved G2 G2-25 GP-051700 Agreed 2005-06-22 SPSHAGB - 2005-06-28
0123 3 F Rel-6 6.7.0 - Inclusion of IMSI in all downlink LLC PDUs for DTM - - - - G2-24 GP-050928 Rejected 2005-03-30 TEI6 - 2005-04-08
0124 3 B Rel-6 6.7.0 6.8.0 Intra-domain connection of RAN nodes to multiple CN nodes GP-24 GP-050853 Approved G2 G2-24 GP-050853 Agreed 2005-03-10 MBMS - 2005-04-08
0125 1 F Rel-6 6.7.0 6.8.0 Wrong name and reference for MBMS Session Identifier IE GP-24 GP-050854 Approved G2 G2-24 GP-050854 Agreed 2005-03-07 MBMS - 2005-04-08
0126 - B Rel-6 6.7.0 - Adding of IMEI to PERFORM-LOCATION-REQUEST PDU - - - - G2-24 GP-050828 Revised 2005-03-29 TEI 6 - 2005-04-08
0127 - F Rel-6 6.7.0 - Making the RIM containers truly transparent to the core network - - - - G2-24 GP-050900 Revised 2005-03-29 TEI6 - 2005-04-08
0127 1 A Rel-6 6.7.0 - Making the RIM containers truly transparent to the core network - - - - G2-24 GP-051020 Revised 2005-04-06 TEI5 - 2005-04-08
0127 2 A Rel-6 6.7.0 - Making the RIM containers truly transparent to the core network - - - - G2-24 GP-051155 Withdrawn 2005-04-07 TEI5 2005-09-06: WG status was previously 'postponed'. 2005-04-08
0128 - F Rel-6 6.7.0 - Always use the RAN-INFORMATION-APPLICATION-ERROR PDU to transport the Application Error container - - - - G2-24 GP-050901 Rejected 2005-03-29 TEI6 - 2005-04-08
0129 - F Rel-6 6.7.0 - Sending of PSI14 in NACC RIM application - - - - G2-24 GP-050902 Withdrawn 2005-03-29 TEI6 2005-09-06: WG status was previously 'postponed'. 2005-04-08
0130 - F Rel-5 5.11.0 - Making the RIM containers truly transparent to the core network - - - - G2-24 GP-051087 Revised 2005-04-06 TEI5 - 2005-04-08
0130 1 F Rel-5 5.11.0 - Making the RIM containers truly transparent to the core network - - - - G2-24 GP-051156 Withdrawn 2005-04-07 TEI5 2005-09-06: WG status was previously 'postponed'. 2005-04-08
0131 - F Rel-7 6.7.0 7.0.0 Enabling the Providing of Velocity GP-24 GP-051158 Approved G2 G2-24 GP-051158 Agreed 2005-04-07 LCS-R7 - 2005-04-08
0132 - B Rel-6 6.8.0 - Adding of IMEI to PERFORM-LOCATION-REQUEST PDU - - - - G2-24b G2-050176 Revised 2005-05-16 TEI6 - 2005-06-28
0132 1 B Rel-6 6.8.0 - Adding of IMEI to PERFORM-LOCATION-REQUEST PDU - - - - G2-25 GP-051434 Revised 2005-05-24 TEI6 - 2005-06-28
0132 2 B Rel-6 6.8.0 6.9.0 Adding of IMEI to PERFORM-LOCATION-REQUEST PDU GP-25 GP-051799 Approved G2 G2-25 GP-051799 Agreed 2005-06-24 TEI6 - 2005-06-28
0133 - B Rel-7 7.0.0 - Adding of IMEI to PERFORM-LOCATION-REQUEST PDU - - - - G2-24b G2-050177 Revised 2005-05-16 TEI6 - 2005-06-28
0133 1 B Rel-7 7.0.0 - Adding of IMEI to PERFORM-LOCATION-REQUEST PDU - - - - G2-25 GP-051435 Revised 2005-05-24 TEI7 - 2005-06-28
0133 2 B Rel-7 7.0.0 7.1.0 Adding of IMEI to PERFORM-LOCATION-REQUEST PDU GP-25 GP-051798 Approved G2 G2-25 GP-051798 Agreed 2005-06-24 TEI7 - 2005-06-28
0134 - F Rel-5 5.11.0 - Making the RIM containers consistently specified - - - - G2-24b G2-050209 Revised 2005-05-18 TEI5 - 2005-06-28
0134 1 F Rel-5 5.11.0 5.12.0 Making the RIM containers consistently specified GP-25 GP-051420 Approved G2 G2-25 GP-051420 Agreed 2005-05-23 TEI5 - 2005-06-28
0135 - A Rel-6 6.8.0 - Making the RIM containers consistently specified - - - - G2-24b G2-050210 Revised 2005-05-18 TEI5 - 2005-06-28
0135 1 A Rel-6 6.8.0 6.9.0 Making the RIM containers consistently specified GP-25 GP-051421 Approved G2 G2-25 GP-051421 Agreed 2005-05-23 TEI5 - 2005-06-28
0136 - A Rel-7 7.0.0 - Making the RIM containers consistently specified - - - - G2-24b G2-050211 Revised 2005-05-18 TEI5 - 2005-06-28
0136 1 A Rel-7 7.0.0 7.1.0 Making the RIM containers consistently specified GP-25 GP-051422 Approved G2 G2-25 GP-051422 Agreed 2005-05-23 TEI5 - 2005-06-28
0137 - B Rel-6 6.8.0 - Support of PS Handover for GERAN A/Gb mode - - - - G2-24b G2-050263 Postponed 2005-05-18 SCSAGB-PSH Revised 2005-06-28
0137 1 B Rel-6 6.8.0 - Support of PS Handover for GERAN A/Gb mode - - - - G2-25 GP-051565 Rejected 2005-06-15 SCSAGB-PSH - 2005-06-28
0138 - F Rel-6 6.8.0 - Resource Distribution Function for MBMS session data - - - - G2-25 GP-051536 Revised 2005-06-15 MBMS - 2005-06-28
0138 1 F Rel-6 6.8.0 6.9.0 Resource Distribution Function for MBMS session data GP-25 GP-051755 Approved G2 G2-25 GP-051755 Agreed 2005-06-23 MBMS - 2005-06-28
0139 - F Rel-6 6.8.0 6.9.0 Correction of IEI numbering GP-25 GP-051579 Approved G2 G2-25 GP-051579 Agreed 2005-06-15 TEI6 - 2005-06-28
0140 - A Rel-7 7.0.0 - Correction of IEI numbering - - - - G2-25 GP-051580 Revised 2005-06-15 TEI6 - 2005-06-28
0140 1 A Rel-7 7.0.0 7.1.0 Correction of IEI numbering GP-25 GP-051759 Approved G2 G2-25 GP-051759 Agreed 2005-06-24 TEI6 - 2005-06-28
0142 - B Rel-7 7.0.0 - Support of PS Handover for GERAN A/Gb mode - - - - G2-25 GP-051566 Withdrawn 2005-06-16 SCSAGB-PSH - 2005-06-28
0143 - A Rel-7 7.0.0 7.1.0 Inclusion of support for PS Handover in GERAN A/Gb mode GP-25 GP-051797 Approved G2 G2-25 GP-051797 Agreed 2005-06-23 SPSHAGB - 2005-06-28
0144 - F Rel-6 6.9.0 - IEI table errors - - - - G2-26 GP-051978 Revised 2005-08-22 TEI6 2006-05-09: WG status updated. 2005-09-07
0144 1 F Rel-6 6.9.0 6.10.0 IEI table errors GP-26 GP-052248 Approved G2 G2-26 GP-052248 Agreed 2005-08-31 TEI6 - 2005-09-07
0145 - B Rel-6 6.9.0 - Introduction of the time to MBMS data transfer (Rel-6) - - - - G2-26 GP-052016 Revised 2005-08-23 MBMS 2006-05-09: WG status updated. 2005-09-07
0145 1 B Rel-6 6.9.0 6.10.0 Introduction of the time to MBMS data transfer GP-26 GP-052219 Approved G2 G2-26 GP-052219 Agreed 2005-08-30 MBMS - 2005-09-07
0147 - F Rel-7 7.1.0 - Corrections to IMEI and Velocity Data IEs description - - - - G2-26 GP-052072 Revised 2005-08-24 TEI7 2006-05-09: WG status updated. 2005-09-07
0147 1 F Rel-7 7.1.0 7.2.0 Corrections to IMEI and Velocity Data IEs description GP-26 GP-052280 Approved G2 G2-26 GP-052280 Agreed 2005-08-31 TEI7 - 2005-09-07
0148 - F Rel-6 6.9.0 6.10.0 Redefinition of the Application Container for the MBMS data channel Application GP-26 GP-052095 Approved G2 G2-26 GP-052095 Agreed 2005-08-24 MBMS - 2005-09-07
0149 - A Rel-7 7.1.0 7.2.0 Redefinition of the Application Container for the MBMS data channel Application GP-26 GP-052096 Approved G2 G2-26 GP-052096 Agreed 2005-08-24 MBMS - 2005-09-07
0150 - F Rel-6 6.9.0 6.10.0 TLLI inclusion in the PS Handover Complete GP-26 GP-052097 Approved G2 G2-26 GP-052097 Agreed 2005-08-24 SPSHAGB - 2005-09-07
0151 - A Rel-7 7.1.0 7.2.0 TLLI inclusion in the PS Handover Complete GP-26 GP-052098 Approved G2 G2-26 GP-052098 Agreed 2005-08-24 SPSHAGB - 2005-09-07
0152 - B Rel-7 7.1.0 - Introduction of the time to MBMS data transfer - - - - G2-26 GP-052115 Revised 2005-08-24 MBMS 2006-05-09: WG status updated. 2005-09-07
0152 1 B Rel-7 7.1.0 7.2.0 Introduction of the time to MBMS data transfer GP-26 GP-052220 Approved G2 G2-26 GP-052220 Agreed 2005-08-30 MBMS - 2005-09-07
0153 - F Rel-6 6.9.0 - ARP for MBMS - - - - G2-26 GP-052139 Revised 2005-08-25 MBMS 2006-05-09: WG status updated. 2005-09-07
0153 1 F Rel-6 6.9.0 6.10.0 ARP for MBMS GP-26 GP-052226 Approved G2 G2-26 GP-052226 Agreed 2005-08-30 MBMS - 2005-09-07
0154 - F Rel-6 6.9.0 6.10.0 Incorrect MBMS Session Duration IE Coding GP-26 GP-052140 Approved G2 G2-26 GP-052140 Agreed 2005-08-25 MBMS - 2005-09-07
0155 - F Rel-7 7.1.0 7.2.0 ARP for MBMS Gp-26 GP-052227 Approved G2 G2-26 GP-052227 Agreed 2005-08-30 MBMS - 2005-09-07
0156 - F Rel-7 7.1.0 - Incorrect MBMS Session Duration IE Coding - - - - G2-26 GP-052228 Revised 2005-08-30 MBMS 2006-05-09: WG status updated. 2005-09-07
0156 1 F Rel-7 7.1.0 7.2.0 Incorrect MBMS Session Duration IE Coding GP-26 GP-052302 Approved G2 G2-26 GP-052302 Agreed 2005-09-01 MBMS - 2005-09-07
0157 - F Rel-6 6.9.0 - Handling of START PS and UE RAC during PS Handover - - - - G2-26 GP-052271 Revised 2005-08-31 SPSHAGB 2006-05-09: WG status updated. 2005-09-07
0157 1 F Rel-6 6.9.0 - Handling of START PS and UE RAC during PS Handover - - - - G2-26 GP-052304 Revised 2005-09-01 SPSHAGB 2006-05-09: WG status updated. 2005-09-07
0157 2 F Rel-6 6.10.0 - Handling of START PS and UE RAC during PS handover - - - - G2-26b G2-050375 Revised 2005-09-28 SPSHAGB - 2005-11-21
0157 3 F Rel-6 6.10.0 6.11.0 Handling of START PS and UE RAC during PS handover GP-27 GP-052695 Approved G2 G2-27 GP-052695 Agreed 2005-10-03 SPSHAGB - 2005-11-21
0158 - A Rel-7 7.1.0 - Handling of START PS and UE RAC during PS Handover - - - - G2-26 GP-052273 Revised 2005-08-31 SPSHAGB 2006-05-09: WG status updated. 2005-09-07
0158 1 A Rel-7 7.1.0 - Handling of START PS and UE RAC during PS Handover - - - - G2-26 GP-052305 Revised 2005-09-01 SPSHAGB 2006-05-09: WG status updated. 2005-09-07
0158 2 A Rel-7 7.2.0 - Handling of START PS and UE RAC during PS handover - - - - G2-26b G2-050376 Revised 2005-09-28 SPSHAGB - 2005-11-21
0158 3 A Rel-7 7.2.0 - Handling of START PS and UE RAC during PS handover - - - - G2-26b G2-050442 Revised 2005-10-03 SPSHAGB - 2005-11-21
0158 3 A Rel-7 7.2.0 7.3.0 Handling of START PS and UE RAC during PS handover GP-27 GP-052704 Approved G2 G2-27 GP-052704 Agreed 2005-10-05 SPSHAGB - 2005-11-21
0159 - B Rel-6 6.10.0 - Introduction of the MBMS Session Repetition Number - - - - G2-26b G2-050413 Revised 2005-09-26 MBMS - 2005-11-21
0159 1 B Rel-6 6.10.0 - Introduction of the MBMS Session Repetition Number - - - - G2-26b G2-050431 Revised 2005-10-03 MBMS - 2005-11-21
0159 2 B Rel-6 6.10.0 6.11.0 Introduction of the MBMS Session Repetition Number GP-27 GP-052686 Approved G2 G2-27 GP-052686 Agreed 2005-10-05 MBMS - 2005-11-21
0160 - B Rel-7 7.2.0 - Introduction of the MBMS Session Repetition Number - - - - G2-26b G2-050355 Revised 2005-09-26 MBMS - 2005-11-21
0160 1 B Rel-7 7.2.0 7.3.0 Introduction of the MBMS Session Repetition Number GP-27 GP-052703 Approved G2 G2-27 GP-052703 Agreed 2005-10-03 MBMS - 2005-11-21
0161 - F Rel-6 6.10.0 6.11.0 Correction to the reference for the MBMS Session Identity IE coding GP-27 GP-052676 Approved G2 G2-27 GP-052676 Agreed 2005-09-26 MBMS - 2005-11-21
0162 - A Rel-7 7.2.0 7.3.0 Correction to the reference for the MBMS Session Identity IE coding GP-27 GP-052677 Approved G2 G2-27 GP-052677 Agreed 2005-09-26 MBMS - 2005-11-21
0163 - F Rel-6 6.10.0 - PFC prioritisation during PS Handover - - - - G2-26b G2-050377 Rejected 2005-09-28 SPSHAGB - 2005-11-21
0163 1 F Rel-6 6.10.0 - PFC prioritisation during PS Handover - - - - G2-26b G2-050446 Withdrawn 2005-10-03 SPSHAGB - 2005-11-21
0164 - A Rel-7 7.2.0 - PFC prioritisation during PS Handover - - - - G2-26b G2-050378 Rejected 2005-09-28 SPSHAGB - 2005-11-21
0164 1 A Rel-7 7.2.0 - PFC prioritisation during PS Handover - - - - G2-26b G2-050447 Withdrawn 2005-10-03 SPSHAGB - 2005-11-21
0165 - F Rel-6 6.10.0 - 48.018-0165: New cause value for PS Handover - - - - G2-26b G2-050381 Postponed 2005-09-28 SPSHAGB - 2005-11-21
0166 - A Rel-7 7.2.0 - 48.018-0166: New cause value for PS Handover - - - - G2-26b G2-050382 Postponed 2005-09-28 SPSHAGB - 2005-11-21
0167 - F Rel-6 6.10.0 6.11.0 Extension of “Service UTRAN CCO” meaning to cover PS Handover GP-27 GP-052679 Approved G2 G2-27 GP-052679 Agreed 2005-09-28 SPSHAGB - 2005-11-21
0168 - A Rel-7 7.2.0 7.3.0 Extension of “Service UTRAN CCO” meaning to cover PS Handover GP-27 GP-052680 Approved G2 G2-27 GP-052680 Agreed 2005-09-28 SPSHAGB - 2005-11-21
0169 - F Rel-6 6.10.0 - Allowing Extensions to PS Handover target-BSS to source-BSS Transparent Container - - - - G2-27 GP-052588 Revised 2005-11-02 TEI6 - 2005-11-21
0169 1 F Rel-6 6.10.0 - Allowing Extensions to PS Handover target-BSS to source-BSS Transparent Container - - - - G2-27 GP-052802 Revised 2005-11-09 TEI6 - 2005-11-21
0169 2 F Rel-6 6.10.0 6.11.0 Allowing Extensions to PS Handover target-BSS to source-BSS Transparent Container GP-27 GP-052867 Approved G2 G2-27 GP-052867 Agreed 2005-11-10 TEI6 - 2005-11-21
0170 - F Rel-7 7.2.0 - Allowing Extensions to PS Handover target-BSS to source-BSS Transparent Container - - - - G2-27 GP-052589 Revised 2005-11-02 TEI6 - 2005-11-21
0170 1 A Rel-7 7.2.0 - Allowing Extensions to PS Handover target-BSS to source-BSS Transparent Container - - - - G2-27 GP-052803 Revised 2005-11-09 TEI6 - 2005-11-21
0170 2 A Rel-7 7.2.0 7.3.0 Allowing Extensions to PS Handover target-BSS to source-BSS Transparent Container GP-27 GP-052868 Approved G2 G2-27 GP-052868 Agreed 2005-11-10 TEI6 - 2005-11-21
0171 - F Rel-4 4.7.0 - Deletion of TLLI contexts in BVC-RESET Procedure. - - - - G2-27 GP-052659 Postponed 2005-11-03 TEI4 - 2005-11-21
0171 - F Rel-4 - - Deletion of TLLI contexts in BVC-RESET Procedure - - - - G2-28 GP-060016 Rejected 2006-01-06 TEI4 - 2006-01-24
0172 - A Rel-5 5.12.0 - Deletion of TLLI contexts in BVC-RESET Procedure. - - - - G2-27 GP-052660 Postponed 2005-11-03 TEI4 - 2005-11-21
0172 - A Rel-5 - - Deletion of TLLI contexts in BVC-RESET Procedure - - - - G2-28 GP-060017 Rejected 2006-01-06 TEI4 - 2006-01-24
0173 - A Rel-6 6.10.0 - Deletion of TLLI contexts in BVC-RESET Procedure. - - - - G2-27 GP-052661 Postponed 2005-11-03 TEI4 - 2005-11-21
0173 - A Rel-6 - - Deletion of TLLI contexts in BVC-RESET Procedure - - - - G2-28 GP-060018 Rejected 2006-01-06 TEI4 - 2006-01-24
0174 - A Rel-7 7.2.0 - Deletion of TLLI contexts in BVC-RESET Procedure. - - - - G2-27 GP-052662 Postponed 2005-11-03 TEI4 - 2005-11-21
0174 - A Rel-7 - - Deletion of TLLI contexts in BVC-RESET Procedure - - - - G2-28 GP-060019 Rejected 2006-01-06 TEI4 - 2006-01-24
0175 - F Rel-7 7.3.0 7.4.0 Cross-reference to Velocity Data GP-28 GP-060110 Approved G2 G2-28 GP-060110 Agreed 2006-01-06 TEI7 - 2006-01-24
0176 - B Rel-7 - - Introduction of Critical Resource Indication - - - - G2-28 GP-060198 Revised 2006-01-10 HO-DSRDTM 2006-05-09: WG status updated. 2006-01-24
0176 1 B Rel-7 7.4.0 - Introduction of Critical Resource Indication - - - - G2-29 GP-060805 Postponed 2006-04-19 HO-DSRDTM - 2006-05-09
0177 - A Rel-7 - - Timer T14 expiry clarification - - - - G2-28 GP-060200 Revised 2006-01-10 SPSHAGB - 2006-01-24
0177 1 A Rel-7 7.3.0 7.4.0 Timer T14 expiry clarification GP-28 GP-060346 Approved G2 G2-28 GP-060346 Agreed 2006-01-17 SPSHAGB - 2006-01-24
0178 - F Rel-6 - - Timer T14 expiry clarification - - - - G2-28 GP-060201 Revised 2006-01-10 SPSHAGB - 2006-01-24
0178 1 F Rel-6 6.11.0 6.12.0 Timer T14 expiry clarification GP-28 GP-060345 Approved G2 G2-28 GP-060345 Agreed 2006-01-17 SPSHAGB - 2006-01-24
0179 - F Rel-7 7.3.0 7.4.0 Clarification of the contents of the Reporting Cell Identifier IE GP-28 GP-060238 Approved G2 G2-28 GP-060238 Agreed 2006-01-11 TEI7 - 2006-01-24
0180 1 B Rel-7 - - Introduction of Enhanced DTM Handover - - - - G2-28b G2-060115 Revised 2006-05-05 HO-DSRDTM - 2006-05-09
0180 2 B Rel-7 7.4.0 - Introduction of Enhanced DTM Handover - - - - G2-29 GP-060802 Revised 2006-04-19 HO-DSRDTM - 2006-05-09
0180 3 B Rel-7 7.4.0 - Introduction of Enhanced DTM Handover - - - - G2-29 GP-060868 Revised 2006-04-26 HO-DSRDTM - 2006-05-09
0180 4 B Rel-7 7.4.0 7.5.0 Introduction of Enhanced DTM Handover GP-29 GP-060975 Approved G2 G2-29 GP-060975 Agreed 2006-04-27 HO-DSRDTM - 2006-05-09
0181 1 B Rel-7 7.4.0 7.5.0 MBMS cell reselection enhancement GP-29 GP-060682 Approved G2 G2-29 GP-060682 Agreed 2006-04-19 TEI7 - 2006-05-09
0182 1 F Rel-6 6.12.0 6.13.0 SI/PSI container for PS Handover GP-29 GP-060666 Approved G2 G2-29 GP-060666 Agreed 2006-04-19 SPSHAGB - 2006-05-09
0183 2 F Rel-7 7.4.0 7.5.0 SI/PSI container for PS Handover GP-29 GP-060675 Approved G2 G2-29 GP-060675 Agreed 2006-04-19 SPSHAGB - 2006-05-09
0184 - F Rel-6 6.12.0 - New cause values for PS Handover - - - - G2-29 GP-060743 Revised 2006-04-19 SPSHAGB - 2006-05-09
0184 1 F Rel-6 6.12.0 6.13.0 New cause values for PS Handover GP-29 GP-060856 Approved G2 G2-29 GP-060856 Agreed 2006-04-25 SPSHAGB - 2006-05-09
0185 - A Rel-7 7.4.0 - New cause values for PS Handover - - - - G2-29 GP-060744 Revised 2006-04-19 SPSHAGB - 2006-05-09
0185 1 A Rel-7 7.4.0 7.5.0 New cause values for PS Handover GP-29 GP-060857 Approved G2 G2-29 GP-060857 Agreed 2006-04-25 SPSHAGB - 2006-05-09
0186 - F Rel-6 6.12.0 6.13.0 Correction to Service UTRAN CCO GP-29 GP-060745 Approved G2 G2-29 GP-060745 Agreed 2006-04-19 TEI6 - 2006-05-09
0187 - A Rel-7 7.4.0 7.5.0 Correction to Service UTRAN CCO GP-29 GP-060746 Approved G2 G2-29 GP-060746 Agreed 2006-04-19 TEI6 - 2006-05-09
0188 - F Rel-5 5.12.0 - Add RAI in RIM Routing information toward a RNC and correct addressing error handling - - - - G2-29 GP-060822 Withdrawn 2006-04-20 TEI5 - 2006-05-09
0189 - A Rel-6 6.12.0 - Add RAI in RIM Routing information toward a RNC and correct addressing error handling - - - - G2-29 GP-060823 Withdrawn 2006-04-20 TEI5 - 2006-05-09
0190 - A Rel-7 7.4.0 - Add RAI in RIM Routing information toward a RNC and correct addressing error handling - - - - G2-29 GP-060824 Revised 2006-04-20 TEI5 - 2006-05-09
0190 1 F Rel-7 7.4.0 7.5.0 Add RAI in RIM Routing information toward a RNC and correct addressing error handling GP-29 GP-060847 Approved G2 G2-29 GP-060847 Agreed 2006-04-25 TEI5 - 2006-05-09
0191 - F Rel-6 6.12.0 6.13.0 Correction of colliding sub-clauses numbering for RIM and MBMS IEs GP-29 GP-060818 Approved G2 G2-29 GP-060818 Agreed 2006-04-20 TEI6 - 2006-05-09
0192 - F Rel-7 7.4.0 7.5.0 Correction of colliding sub-clauses numbering for RIM and MBMS IEs GP-29 GP-060819 Approved G2 G2-29 GP-060819 Agreed 2006-04-20 TEI7 - 2006-05-09
0193 - F Rel-6 6.12.0 - Introduction of CRRM containers in PS Handover - - - - G2-29 GP-060821 Postponed 2006-04-20 SCSAGB-PSH - 2006-05-09
0194 - F Rel-5 5.12.0 5.13.0 Add RAI in RIM Routing information toward a RNC and correct addressing error handling GP-29 GP-060845 Approved G2 G2-29 GP-060845 Agreed 2006-04-25 TEI5 - 2006-05-09
0195 - A Rel-6 6.12.0 6.13.0 Add RAI in RIM Routing information toward a RNC and correct addressing error handling GP-29 GP-060846 Approved G2 G2-29 GP-060846 Agreed 2006-04-25 TEI5 - 2006-05-09
0196 - F Rel-7 7.4.0 - Provision of IMSI in CREATE-BSS-PFC - - - - G2-29 GP-060663 Revised 2006-04-19 TEI7 - 2006-05-09
0196 - F Rel-7 7.4.0 7.5.0 Provision of IMSI in CREATE-BSS-PFC GP-29 GP-060988 Approved G2 G2-29 GP-060988 Agreed 2006-04-27 TEI7 - 2006-05-09
0197 2 F Rel-7 7.5.0 7.6.0 Behaviour and Cause value in case PS resource allocation failure for DTM Handover GP-30 GP-061327 Approved G2 G2-30 GP-061327 Agreed 2006-05-24 HODSRDTM - 2006-07-06
0198 - B Rel-7 7.5.0 - Introduction of Assisted GALILEO capability as an Assisted GNSS into the GERAN - - - - G2-30 GP-061297 revised 2006-06-22 AGNSS-GP - 2006-07-06
0198 1 B Rel-7 7.6.0 - Introduction of Assisted GALILEO capability as an Assisted GNSS into the GERAN - - - - G2-31 GP-061645 Postponed 2006-08-29 AGNSS-GP - 2006-09-12
0198 2 B Rel-7 7.7.0 - Introduction of Assisted GALILEO capability as an Assisted GNSS into the GERAN - - - - G2-31b G2-060318 Postponed 2006-10-11 AGNSS-GP - -
0198 3 B Rel-7 7.7.0 - Introduction of Assisted GALILEO capability as an Assisted GNSS into the GERAN - - - - G2-32 GP-062207 Withdrawn 2006-11-08 AGNSS-GP - -
0199 - F Rel-7 7.5.0 - Initiation of PS Handover Cancel procedure in case of T8 expiry during DTM Handover - - - - G2-30 GP-061182 Postponed 2006-06-22 HO-DSRDTM - 2006-07-06
0200 - F Rel-6 6.13.0 - Missing information about lost MS - - - - G2-30 GP-061260 Postponed 2006-06-22 SPSHAGB - 2006-07-06
0201 - A Rel-7 7.5.0 - Missing information about lost MS - - - - G2-30 GP-061261 Postponed 2006-06-22 SPSHAGB - 2006-07-06
0202 - F Rel-6 6.13.0 - Correction of RNC identifier reference in RIM Routing Information - - - - G2-30 GP-061299 Revised 2006-06-22 TEI6 - 2006-07-06
0202 1 F Rel-6 6.13.0 6.14.0 Correction of RNC identifier reference in RIM Routing Information GP-30 GP-061418 Approved G2 G2-30 GP-061418 Agreed 2006-06-27 TEI6 - 2006-07-06
0203 - F Rel-7 7.9.0 - Correction to the MBMS Session Repetition Number IE length in the MBMS-SESSION-UPDATE-REQUEST PDU - - - - G2-33b G2-070033 Revised 2007-03-21 TEI7 - 2007-03-21
0203 - A Rel-7 7.5.0 - Correction of RNC identifier reference in RIM Routing Information - - - - G2-30 GP-061300 Revised 2006-06-22 TEI6 - 2006-07-06
0203 1 A Rel-7 7.5.0 7.6.0 Correction of RNC identifier reference in RIM Routing Information GP-30 GP-061419 Approved G2 G2-30 GP-061419 Agreed 2006-06-27 TEI6 - 2006-07-06
0203 1 F Rel-7 7.9.0 7.10.0 Correction to the MBMS Session Repetition Number IE length in the MBMS-SESSION-UPDATE-REQUEST PDU GP-34 GP-070935 Approved Telecom Italia S.p.A. G2-34 GP-070935 Agreed 2007-03-26 TEI7 - 2007-03-26
0204 - F Rel-7 7.5.0 7.6.0 Correction to IEs ordering in transparent containers GP-30 GP-061301 Approved G2 G2-30 GP-061301 Agreed 2006-06-22 TEI7 - 2006-07-06
0205 - F Rel-7 7.6.0 - Initiation of PS Handover Cancel procedure in case of T8 expiry during DTM Handover and in case the source BSS detects the MS missing during PS Handover - - - - G2-31 GP-061662 Revised 2006-08-29 HODSRDTM - 2006-09-12
0205 1 F Rel-7 7.6.0 - Initiation of PS Handover Cancel procedure in case of T8 expiry during DTM Handover and in case the source BSS detects the MS missing during PS Handover - - - - G2-31 GP-061785 Revised 2006-09-05 HODSRDTM - 2006-09-12
0205 2 F Rel-7 7.6.0 - Initiation of PS Handover Cancel procedure in case of T8 expiry during DTM Handover and in case the source BSS detects the MS missing during PS Handover - - - - G2-31 GP-061877 Revised 2006-09-07 HODSRDTM - 2006-09-12
0205 3 F Rel-7 7.6.0 7.7.0 Initiation of PS Handover Cancel procedure in case of T8 expiry during DTM Handover and in case the source BSS detects the MS missing during PS Handover GP-31 GP-061893 Approved - G2-31 GP-061893 Agreed 2006-09-07 HODSRDTM - 2006-09-12
0206 - F Rel-6 6.14.0 - Initiation of PS Handover Cancel procedure in case the source BSS detects the MS missing during PS Handover - - - - G2-31 GP-061663 Revised 2006-08-29 SPSHAGB - 2006-09-12
0206 1 F Rel-6 6.14.0 - Initiation of PS Handover Cancel procedure in case the source BSS detects the MS missing during PS Handover - - - - G2-31 GP-061774 Revised 2006-09-05 SPSHAGB - 2006-09-12
0206 2 F Rel-6 6.14.0 6.15.0 Initiation of PS Handover Cancel procedure in case the source BSS detects the MS missing during PS Handover GP-31 GP-061872 Approved - G2-31 GP-061872 Agreed 2006-09-07 SPSHAGB - 2006-09-12
0207 - F Rel-7 7.6.0 7.7.0 Clarification of Modify BSS PFC Procedure GP-31 GP-061709 Approved - G2-31 GP-061709 Agreed 2006-08-30 TEI7 - 2006-09-12
0208 - F Rel-6 6.15.0 - Correction to the MBMS Session Start procedure - - - - G2-31b G2-060251 Revised 2006-10-11 MBMS-GERAN - -
0208 1 F Rel-6 6.15.0 6.16.0 Correction to the MBMS Session Start procedure GP-32 GP-062144 Approved G2 G2-32 GP-062144 Agreed 2006-10-16 MBMS-GERAN - -
0209 - A Rel-7 7.7.0 - Correction to the MBMS Session Start procedure - - - - G2-31b G2-060252 Revised 2006-10-11 MBMS-GERAN - -
0209 1 A Rel-7 7.7.0 7.8.0 Correction to the MBMS Session Start procedure GP-32 GP-062145 Approved G2 G2-32 GP-062145 Agreed 2006-10-16 MBMS-GERAN - -
0210 - B Rel-7 7.7.0 - Introduction of the MBMS Session Update procedure - - - - G2-31b G2-060253 Revised 2006-10-11 TEI7 - -
0210 1 B Rel-7 7.7.0 7.8.0 Introduction of the MBMS Session Update procedure GP-32 GP-062154 Approved G2 G2-32 GP-062154 Agreed 2006-10-17 TEI7 - -
0211 - F Rel-7 7.7.0 7.8.0 Inter-RAT DTM Handover GP-32 GP-062140 Approved G2 G2-32 GP-062140 Agreed 2006-10-11 HODSRDTM - -
0219 - B Rel-7 7.7.0 - Add GNSS Assistance Data as a New Positioning Method for Galileo - - - - G2-31b G2-060270 Postponed 2006-10-11 AGNSS-GP - -
0219 1 B Rel-7 7.7.0 - Add GNSS Assistance Data as a New Positioning Method for Galileo - - - - G2-32 GP-062182 Postponed 2006-11-08 AGNSS-GP - -
0220 - F Rel-5 5.13.0 - Alignment to General Protocol Error Handling for RIM - - - - G2-31b G2-060278 Revised 2006-10-11 TEI5 - -
0220 1 F Rel-5 5.13.0 5.14.0 Alignment to General Protocol Error Handling for RIM GP-32 GP-062146 Approved G2 G2-32 GP-062146 Agreed 2006-10-16 TEI5 - -
0221 - A Rel-6 6.15.0 - Alignment to General Protocol Error Handling for RIM - - - - G2-31b G2-060279 Revised 2006-10-11 TEI5 - -
0221 1 A Rel-6 6.15.0 6.16.0 Alignment to General Protocol Error Handling for RIM GP-32 GP-062147 Approved G2 G2-32 GP-062147 Agreed 2006-10-16 TEI5 - -
0222 - A Rel-7 7.7.0 - Alignment to General Protocol Error Handling for RIM - - - - G2-31b G2-060280 Revised 2006-10-11 TEI5 - -
0222 1 A Rel-7 7.7.0 7.8.0 Alignment to General Protocol Error Handling for RIM GP-32 GP-062148 Approved G2 G2-32 GP-062148 Agreed 2006-10-16 TEI5 - -
0223 - F Rel-7 7.7.0 7.8.0 Impossible requirement for inclusion of IMSI in RA-CAPABILITY-UPDATE-ACK PDU GP-32 GP-062141 Approved G2 G2-32 GP-062141 Agreed 2006-10-11 TEI7 - -
0224 - F Rel-6 6.15.0 - Clarification of PS Handover Cancel abnormal cases - - - - G2-31b G2-060300 Revised 2006-10-11 SPSHAGB - -
0224 1 F Rel-6 6.15.0 - Clarification of PS Handover Cancel abnormal cases - - - - G2-31b G2-060343 Revised 2006-10-16 SPSHAGB - -
0224 2 F Rel-6 6.15.0 - Clarification of PS Handover Cancel abnormal cases - - - - G2-31b G2-060373 Revised 2006-10-19 SPSHAGB - -
0224 3 F Rel-6 6.15.0 6.16.0 Clarification of PS Handover Cancel abnormal cases GP-32 GP-062172 Approved G2 G2-32 GP-062172 Agreed 2006-10-19 SPSHAGB - -
0225 - A Rel-7 7.7.0 - Clarification of PS Handover Cancel abnormal cases - - - - G2-31b G2-060301 Revised 2006-10-11 SPSHAGB - -
0225 1 A Rel-7 7.7.0 - Clarification of PS Handover Cancel abnormal cases - - - - G2-31b G2-060344 Revised 2006-10-16 SPSHAGB - -
0225 2 A Rel-7 7.7.0 - Clarification of PS Handover Cancel abnormal cases - - - - G2-31b G2-060374 Revised 2006-10-19 SPSHAGB - -
0225 3 A Rel-7 7.7.0 7.8.0 Clarification of PS Handover Cancel abnormal cases GP-32 GP-062173 Approved G2 G2-32 GP-062173 Agreed 2006-10-19 SPSHAGB - -
0226 - F Rel-7 7.7.0 - Usage of TLLI for BSSGP - - - - G2-31b G2-060321 Withdrawn 2006-10-11 TEI7 - -
0227 - F Rel-6 6.15.0 6.16.0 NPM Transfer Time in MBMS data channel report GP-32 GP-062142 Approved G2 G2-32 GP-062142 Agreed 2006-10-11 MBMS - -
0228 - A Rel-7 7.7.0 7.8.0 NPM Transfer Time in MBMS data channel report GP-32 GP-062143 Approved G2 G2-32 GP-062143 Agreed 2006-10-11 MBMS - -
0229 - F Rel-6 6.15.0 - MBMS In-band Signalling Indicator in MBMS data channel report - - - - G2-31b G2-060337 Revised 2006-10-16 MBMS - -
0229 1 F Rel-6 6.15.0 6.16.0 MBMS In-band Signalling Indicator in MBMS data channel report GP-32 GP-062164 Approved G2 G2-32 GP-062164 Agreed 2006-10-19 MBMS - -
0230 - A Rel-7 7.7.0 - MBMS In-band Signalling Indicator in MBMS data channel report - - - - G2-31b G2-060338 Revised 2006-10-16 MBMS - -
0230 1 A Rel-7 7.7.0 7.8.0 MBMS In-band Signalling Indicator in MBMS data channel report GP-32 GP-062165 Approved G2 G2-32 GP-062165 Agreed 2006-10-19 MBMS - -
0231 - F Rel-6 6.15.0 - PDUs and messages references cleanup - - - - G2-31b G2-060332 Withdrawn 2006-10-16 TEI6 - -
0232 - F Rel-7 7.7.0 - PDUs and messages references cleanup - - - - G2-31b G2-060333 Revised 2006-10-16 TEI7 - -
0232 1 F Rel-7 7.7.0 7.8.0 PDUs and messages references cleanup GP-32 GP-062163 Approved G2 G2-32 GP-062163 Agreed 2006-10-19 TEI7 - -
0233 - F Rel-6 6.15.0 - Clarification of delete PFC behaviour - - - - G2-32 GP-062247 Rejected 2006-11-07 SPSHAGB - -
0234 - A Rel-7 7.7.0 - Clarification of delete PFC behaviour - - - - G2-32 GP-062248 Rejected 2006-11-07 SPSHAGB - -
0235 - F Rel-6 6.15.0 6.16.0 Correction to the MBMS Session Repetition Number IE GP-32 GP-062136 Approved G2 G2-32 GP-062136 Agreed 2006-11-07 MBMS-GERAN - -
0236 - A Rel-7 7.7.0 7.8.0 Correction to the MBMS Session Repetition Number IE GP-32 GP-062137 Approved G2 G2-32 GP-062137 Agreed 2006-11-07 MBMS-GERAN - -
0237 - F Rel-5 5.13.0 - Response from the serving BSS when RIM application is disabled - - - - G2-32 GP-062267 Revised 2006-11-08 TEI-5 - -
0237 1 F Rel-5 5.13.0 5.14.0 Response from the serving BSS when RIM application is disabled GP-32 GP-062352 Approved G2 G2-32 GP-062352 Agreed 2006-11-14 TEI5 - -
0238 - A Rel-6 6.15.0 - Response from the serving BSS when RIM application is disabled - - - - G2-32 GP-062268 Revised 2006-11-08 TEI-5 - -
0238 1 A Rel-6 6.15.0 - Response from the serving BSS when RIM application is disabled - - - - G2-32 GP-062353 Revised 2006-11-14 TEI5 - -
0238 2 A Rel-6 6.15.0 6.16.0 Response from the serving BSS when RIM application is disabled GP-32 GP-062414 Approved G2 G2-32 GP-062414 Agreed 2006-11-16 TEI5 - -
0239 - A Rel-7 7.7.0 - Response from the serving BSS when RIM application is disabled - - - - G2-32 GP-062269 Revised 2006-11-08 TEI-5 - -
0239 1 A Rel-7 7.7.0 7.8.0 Response from the serving BSS when RIM application is disabled GP-32 GP-062354 Approved G2 G2-32 GP-062354 Agreed 2006-11-14 TEI5 - -
0240 - F Rel-6 6.15.0 - Active PFCs in PS Handover Required - - - - G2-32 GP-062250 Revised 2006-11-08 SPSHAGB - -
0240 1 F Rel-6 6.15.0 - Active PFCs in PS Handover Required - - - - G2-32 GP-062367 Revised 2006-11-14 SPSHAGB - -
0240 2 F Rel-6 6.15.0 6.16.0 Active PFCs in PS Handover Required GP-32 GP-062416 Approved G2 G2-32 GP-062416 Agreed 2006-11-16 SPSHAGB - -
0241 - F Rel-7 7.7.0 - Active PFCs in PS Handover Required - - - - G2-32 GP-062251 Revised 2006-11-08 SPSHAGB - -
0241 1 F Rel-7 7.7.0 - Active PFCs in PS Handover Required - - - - G2-32 GP-062368 Revised 2006-11-14 SPSHAGB - -
0241 2 F Rel-7 7.7.0 7.8.0 Active PFCs in PS Handover Required GP-32 GP-062417 Approved G2 G2-32 GP-062417 Agreed 2006-11-16 SPSHAGB - -
0242 - F Rel-6 6.15.0 - Cause value for CS interaction - - - - G2-32 GP-062252 Revised 2006-11-08 SPSHAGB - -
0242 1 F Rel-6 6.15.0 6.16.0 Cause value for CS interaction GP-32 GP-062375 Approved G2 G2-32 GP-062375 Agreed 2006-11-14 SPSHAGB - -
0243 - F Rel-7 7.7.0 - Cause value for CS interaction - - - - G2-32 GP-062253 Revised 2006-11-08 SPSHAGB - -
0243 1 F Rel-7 7.7.0 7.8.0 Cause value for CS interaction GP-32 GP-062376 Approved G2 G2-32 GP-062376 Agreed 2006-11-14 SPSHAGB - -
0244 - F Rel-6 6.15.0 - Non-critical PS handover reject - - - - G2-32 GP-062232 Revised 2006-11-08 SPSHAGB - -
0244 1 F Rel-6 6.15.0 - Non-critical PS handover reject - - - - G2-32 GP-062363 Revised 2006-11-14 SPSHAGB - -
0244 2 F Rel-6 6.15.0 - Non-critical PS handover reject - - - - G2-32 GP-062420 Revised 2006-11-16 SPSHAGB - -
0244 3 F Rel-6 6.15.0 6.16.0 Non-critical PS handover reject GP-32 GP-062481 Approved G2 G2-32 GP-062481 Agreed 2006-11-16 SPSHAGB - -
0245 - A Rel-7 7.7.0 - Non-critical PS handover reject - - - - G2-32 GP-062233 Revised 2006-11-08 SPSHAGB - -
0245 1 A Rel-7 7.7.0 - Non-critical PS handover reject - - - - G2-32 GP-062364 Revised 2006-11-14 SPSHAGB - -
0245 2 A Rel-7 7.7.0 - Non-critical PS handover reject - - - - G2-32 GP-062461 Revised 2006-11-16 SPSHAGB - -
0245 3 A Rel-7 7.7.0 7.8.0 Non-critical PS handover reject GP-32 GP-062482 Approved G2 G2-32 GP-062482 Agreed 2006-11-16 SPSHAGB - -
0246 - F Rel-6 6.15.0 6.16.0 Removal of duplicate cause value GP-32 GP-062234 Approved G2 G2-32 GP-062234 Agreed 2006-11-08 TEI6 - -
0247 - F Rel-7 7.7.0 7.8.0 Removal of duplicate cause value GP-32 GP-062235 Approved G2 G2-32 GP-062235 Agreed 2006-11-08 TEI7 - -
0248 - F Rel-7 7.7.0 - Usage of TLLI for BSSGP - - - - G2-32 GP-062237 Revised 2006-11-08 TEI7 - -
0248 1 F Rel-7 7.7.0 7.8.0 Usage of TLLI for BSSGP GP-32 GP-062410 Approved G2 G2-32 GP-062410 Agreed 2006-11-16 TEI7 - -
0249 - F Rel-7 7.7.0 7.8.0 Clarification of the FLUSH-LL procedure GP-32 GP-062238 Approved G2 G2-32 GP-062238 Agreed 2006-11-08 TEI7 - -
0250 - F Rel-6 6.15.0 - Introduction of new cause values for PS handover - - - - G2-32 GP-062380 Revised 2006-11-14 SPSHAGB - -
0250 1 F Rel-6 6.15.0 6.16.0 Introduction of new cause values for PS handover GP-32 GP-062462 Approved G2 G2-32 GP-062462 Agreed 2006-11-16 SPSHAGB - -
0251 - A Rel-7 7.7.0 - Introduction of new cause values for PS handover - - - - G2-32 GP-062391 Revised 2006-11-14 SPSHAGB - -
0251 1 A Rel-7 7.7.0 7.8.0 Introduction of new cause values for PS handover GP-32 GP-062463 Approved G2 G2-32 GP-062463 Agreed 2006-11-16 SPSHAGB - -
0252 - F Rel-7 7.8.0 7.9.0 Introduction of the MBMS Session Update procedure GP-33 GP-070021 Approved G2 G2-33 GP-070021 Agreed 2007-01-25 TEI7 - 2007-02-21
0253 - F Rel-6 6.16.0 - Various updates on PS handover - - - - G2-33 GP-070234 Revised 2007-02-06 SPSHAGB - 2007-02-21
0253 1 F Rel-6 6.16.0 - Various updates on PS handover - - - - G2-33 GP-070428 Revised 2007-02-13 SPSHAGB - 2007-02-21
0253 2 F Rel-6 6.16.0 - Various updates on PS handover - - - - G2-33 GP-070489 Revised 2007-02-15 SPSHAGB - 2007-02-21
0253 3 F Rel-6 6.16.0 - Various updates on PS handover - - - - G2-33 GP-070500 Revised 2007-02-15 SPSHAGB - 2007-02-21
0253 4 F Rel-6 6.16.0 - Various updates on PS handover - - - - G2-33 GP-070533 Revised 2007-02-15 SPSHAGB - 2007-02-21
0253 5 F Rel-6 6.16.0 6.17.0 Various updates on PS handover GP-33 GP-070540 Approved G2 G2-33 GP-070540 Agreed 2007-02-15 SPSHAGB - 2007-02-21
0254 - A Rel-7 7.8.0 - Various updates on PS handover - - - - G2-33 GP-070235 Revised 2007-02-06 SPSHAGB - 2007-02-21
0254 1 A Rel-7 7.8.0 - Various updates on PS handover - - - - G2-33 GP-070429 Revised 2007-02-13 SPSHAGB - 2007-02-21
0254 2 A Rel-7 7.8.0 - Various updates on PS handover - - - - G2-33 GP-070490 Revised 2007-02-15 SPSHAGB - 2007-02-21
0254 3 A Rel-7 7.8.0 - Various updates on PS handover - - - - G2-33 GP-070521 Revised 2007-02-15 SPSHAGB - 2007-02-21
0254 4 A Rel-7 7.8.0 - Various updates on PS handover - - - - G2-33 GP-070534 Revised 2007-02-15 SPSHAGB - 2007-02-21
0254 5 A Rel-7 7.8.0 7.9.0 Various updates on PS handover GP-33 GP-070551 Approved G2 G2-33 GP-070551 Agreed 2007-02-15 SPSHAGB - 2007-02-21
0255 - C Rel-7 7.8.0 - Expansion of the Bucket Size and Bucket Leak Rate IEs - - - - G2-33 GP-070303 Postponed 2007-02-07 TEI7 - 2007-02-21
0255 1 B Rel-7 7.9.0 - Expansion of the Bucket Size and Bucket Leak Rate IEs - - - - G2-34 GP-070686 Withdrawn 2007-05-04 TEI7 - 2007-05-04
0256 - B Rel-7 7.8.0 - Add GNSS Assistance Data as a New Positioning Method for Galileo - - - - G2-33 GP-070312 Rejected 2007-02-07 AGNSS-GP - 2007-02-21
0257 - C Rel-7 7.8.0 - Non-critical cause values for DTM Handover - - - - G2-33 GP-070325 Revised 2007-02-07 HODSRDTM - 2007-02-21
0257 1 C Rel-7 7.8.0 7.9.0 Non-critical cause values for DTM Handover GP-33 GP-070436 Approved G2 G2-33 GP-070436 Agreed 2007-02-13 HODSRDTM - 2007-02-21
0258 - F Rel-6 6.16.0 - Cause Indication in Delete BSS PFC PDU - - - - G2-33 GP-070329 Postponed 2007-02-07 SPSHAGB - 2007-02-21
0258 1 F Rel-6 6.16.0 - Cause Indication in Delete BSS PFC PDU - - - - G2-33 GP-070432 Withdrawn 2007-02-13 SPSHAGB - 2007-02-21
0259 - A Rel-7 7.8.0 - Cause Indication in Delete BSS PFC PDU - - - - G2-33 GP-070330 Postponed 2007-02-07 SPSHAGB - 2007-02-21
0259 1 A Rel-7 7.8.0 - Cause Indication in Delete BSS PFC PDU - - - - G2-33 GP-070433 Withdrawn 2007-02-13 SPSHAGB - 2007-02-21
0260 - B Rel-7 7.8.0 - Change Request on TS48.018 for AGNSS - - - - G2-33 GP-070348 Revised 2007-02-08 AGNSS-GP - 2007-02-21
0260 1 B Rel-7 7.8.0 7.9.0 Change Request on TS48.018 for AGNSS GP-33 GP-070531 Approved G2 G2-33 GP-070531 Agreed 2007-02-15 AGNSS-GP - 2007-02-21
0261 - F Rel-6 6.17.0 - PS Handover clarifications: Pre-defined PFIs and Delete BSS PFC procedures - - - - G2-33b G2-070027 Revised 2007-03-21 SPSHAGB - 2007-03-21
0261 1 F Rel-6 6.17.0 - PS Handover clarifications: Pre-defined PFIs and Delete BSS PFC procedures - - - - G2-33b G2-070096 Revised 2007-03-26 SPSHAGB - 2007-03-26
0261 2 F Rel-6 6.17.0 6.18.0 PS Handover clarifications: Pre-defined PFIs and Delete BSS PFC procedures GP-34 GP-070932 Approved Siemens Networks, Nokia G2-34 GP-070932 Agreed 2007-03-30 SPSHAGB - 2007-03-30
0262 - A Rel-7 7.9.0 - PS Handover clarifications: Pre-defined PFIs and Delete BSS PFC procedures - - - - G2-33b G2-070028 Revised 2007-03-21 SPSHAGB - 2007-03-21
0262 1 A Rel-7 7.9.0 - PS Handover clarifications: Pre-defined PFIs and Delete BSS PFC procedures - - - - G2-33b G2-070097 Revised 2007-03-26 SPSHAGB - 2007-03-26
0262 2 A Rel-7 7.9.0 7.10.0 PS Handover clarifications: Pre-defined PFIs and Delete BSS PFC procedures GP-34 GP-070937 Approved Siemens Networks, Nokia G2-34 GP-070937 Agreed 2007-03-30 SPSHAGB - 2007-03-30
0263 - F Rel-6 6.17.0 - Correction of the Global TFI IE - - - - G2-33b G2-070048 Revised 2007-03-21 TEI6 - 2007-03-21
0263 1 F Rel-6 6.17.0 - Correction of the Global TFI IE - - - - G2-33b G2-070103 Revised 2007-03-26 TEI6 - 2007-03-26
0263 2 F Rel-6 6.17.0 6.18.0 Correction of the Global TFI IE GP-34 GP-070938 Approved Ericsson G2-34 GP-070938 Agreed 2007-03-30 TEI6 - 2007-03-30
0264 - A Rel-7 7.9.0 - Correction of the Global TFI IE - - - - G2-33b G2-070049 Revised 2007-03-21 TEI6 - 2007-03-21
0264 1 A Rel-7 7.9.0 - Correction of the Global TFI IE - - - - G2-33b G2-070104 Revised 2007-03-26 TEI6 - 2007-03-26
0264 2 A Rel-7 7.9.0 7.10.0 Correction of the Global TFI IE GP-34 GP-070939 Approved Ericsson G2-34 GP-070939 Agreed 2007-03-30 TEI6 - 2007-03-30
0265 - F Rel-6 6.17.0 6.18.0 Correction of conditions for PS handover reject GP-34 GP-070933 Approved Nortel Networks G2-34 GP-070933 Agreed 2007-03-21 SPSHAGB - 2007-03-21
0266 - A Rel-7 7.9.0 7.10.0 Correction of conditions for PS handover reject GP-34 GP-070934 Approved Nortel Networks G2-34 GP-070934 Agreed 2007-03-21 SPSHAGB - 2007-03-21
0267 - F Rel-6 6.17.0 - Correction of the Source BSS to Target BSS Transparent Container IE - - - - G2-33b G2-070130 Revised 2007-03-28 TEI6 - 2007-03-28
0267 1 F Rel-6 6.17.0 6.18.0 Correction of the Source BSS to Target BSS Transparent Container IE GP-34 GP-070940 Approved Ericsson, Siemens Networks G2-34 GP-070940 Agreed 2007-03-29 TEI6 - 2007-03-29
0268 - A Rel-7 7.9.0 - Correction of the Source BSS to Target BSS Transparent Container IE - - - - G2-33b G2-070131 Revised 2007-03-28 TEI6 - 2007-03-28
0268 1 A Rel-7 7.9.0 7.10.0 Correction of the Source BSS to Target BSS Transparent Container IE GP-34 GP-070936 Approved Ericsson, Siemens Networks G2-34 GP-070936 Agreed 2007-03-29 TEI6 - 2007-03-29
0269 - F Rel-7 7.9.0 - Introduction of Extended RNC-ID - - - - G2-34 GP-070834 Postponed 2007-05-10 TEI7 - 2007-05-10
0270 - B Rel-7 7.9.0 - Support for Gigabit Interface - - - - G2-34 GP-071022 Revised 2007-05-16 TEI7 - 2007-05-16
0270 1 B Rel-7 7.9.0 7.10.0 Support for Gigabit Interface GP-34 GP-071039 Approved Ericsson G2-34 GP-071039 Agreed 2007-05-17 TEI7 - 2007-05-17
0271 - A Rel-7 7.10.0 7.11.0 Corrections to GPRS Timer IEI type GP-35 GP-071354 Approved G2 G2-35 GP-071354 Agreed 2007-06-20 TEI6 - 2007-06-20
0272 - F Rel-6 6.18.0 6.19.0 Corrections to GPRS Timer IEI type GP-35 GP-071355 Approved G2 G2-35 GP-071355 Agreed 2007-06-20 TEI6 - 2007-06-20
0273 - F Rel-6 6.18.0 - Service UTRAN CCO Clarifications - - - - G2-34b G2-070198 Revised 2007-06-20 TEI6 - 2007-06-20
0273 1 F Rel-6 6.18.0 6.19.0 Service UTRAN CCO Clarifications GP-35 GP-071360 Approved G2 G2-35 GP-071360 Agreed 2007-06-25 TEI6 - 2007-06-25
0274 - A Rel-7 7.10.0 - Service UTRAN CCO Clarifications - - - - G2-34b G2-070199 Revised 2007-06-20 TEI6 - 2007-06-20
0274 1 A Rel-7 7.10.0 7.11.0 Service UTRAN CCO Clarifications GP-35 GP-071372 Approved G2 G2-35 GP-071372 Agreed 2007-06-25 TEI6 - 2007-06-25
0275 - B Rel-7 7.10.0 - Introduction of Extended RNC-ID in GERAN - - - - G2-34b G2-070207 Revised 2007-06-20 TEI7 - 2007-06-20
0275 1 B Rel-7 7.10.0 7.11.0 Introduction of Extended RNC-ID in GERAN GP-35 GP-071365 Approved G2 G2-35 GP-071365 Agreed 2007-06-26 TEI7 - 2007-06-26
0276 - F Rel-6 6.18.0 6.19.0 RNC Identifier coding alignment for PS Handover GP-35 GP-071357 Approved G2 G2-35 GP-071357 Agreed 2007-06-20 TEI6 - 2007-06-20
0277 - F Rel-7 7.10.0 - Sending of DTM request clarification - - - - G2-34b G2-070220 Postponed 2007-06-22 TEI7 - 2007-06-22
0278 - B Rel-8 8.0.0 - Support for Inter-Domain Handover - - - - G2-36 GP-071838 Revised 2007-11-08 GELTE - 2007-11-08
0278 1 B Rel-8 8.0.0 - Support for Inter-Domain Handover - - - - G2-36 GP-071936 Postponed 2007-11-14 TEI8 - 2007-11-14
0278 2 B Rel-8 7.11.0 - Draft to 48.018 - Support for Inter-Domain Handover - - - - G2-36b G2-080033 Revised 2008-01-10 GELTE - 2008-01-10
0278 3 B Rel-8 7.11.0 - Support for Inter-Domain Handover - - - - G2-37 GP-080215 Postponed 2008-02-13 TEI8 - 2008-02-13
0278 4 B Rel-8 8.0.0 - Support for Inter-Domain Handover - - - - G2-38b G2-080392 Postponed 2008-06-18 TEI8 - 2008-06-18
0278 4 B Rel-8 8.0.0 - Support for Inter-Domain Handover - - - - G2-38 GP-080693 Postponed 2008-05-07 TEI8 - 2008-05-23
0279 - D Rel-8 7.11.0 - Incorrect Reference to Feature Bitmap - - - - G2-36b G2-080045 Withdrawn 2008-01-10 TEI8 - 2008-01-10
0279 - B Rel-8 8.0.0 - Introduction of inter-RAT PS handover between GERAN and E-UTRAN - - - - G2-39 GP-081185 Postponed 2008-08-20 GELTE - 2008-08-20
0279 1 B Rel-8 8.0.0 - Introduction of inter-RAT PS handover between GERAN and E-UTRAN - - - - G2-39b G2-080552 Revised 2008-09-25 GELTE - 2008-12-15
0279 2 B Rel-8 8.0.0 - Introduction of inter-RAT PS handover between GERAN and E-UTRAN - - - - G2-39b G2-080591 Revised 2008-09-30 GELTE - 2008-12-15
0279 3 B Rel-8 8.0.0 8.1.0 Introduction of inter-RAT PS handover between GERAN and E-UTRAN GP-40 GP-081555 Approved G2 G2-40 GP-081555 Agreed 2008-10-02 GELTE Done 2008-12-15
0280 - B Rel-8 8.0.0 - Corrections on RIM procedures - - - - G2-40 GP-081480 Revised 2008-11-06 GELTE - 2008-12-15
0280 - D Rel-8 7.11.0 8.0.0 Incorrect Reference to Feature Bitmap (Rel-8) GP-37 GP-080214 Approved G2 G2-37 GP-080214 Agreed 2008-02-13 TEI8 - 2008-02-13
0280 1 B Rel-8 8.0.0 - Corrections on RIM procedures - - - - G2-40 GP-081858 Revised 2008-11-19 GELTE - 2008-12-15
0280 2 B Rel-8 8.0.0 - Corrections on RIM procedures - - - - G2-40 GP-081924 Revised 2008-11-20 GELTE - 2008-12-15
0280 3 B Rel-8 8.0.0 8.1.0 Corrections on RIM procedures GP-40 GP-081927 Approved G2 G2-40 GP-081927 Agreed 2008-11-20 GELTE Done 2008-12-15
0281 - F Rel-7 7.11.0 - Missing corrections/additions in TS 48.018 Rel-7 - - - - G2-37 GP-080255 Revised 2008-02-14 TEI7 - 2008-02-14
0281 - B Rel-8 8.0.0 - Service UTRAN CCO IE update for E-UTRAN - - - - G2-40 GP-081670 Revised 2008-11-12 GELTE - 2008-12-15
0281 1 B Rel-8 8.0.0 - Service UTRAN CCO IE update for E-UTRAN - - - - G2-40 GP-081853 Postponed 2008-11-19 GELTE - 2008-12-15
0281 1 F Rel-7 7.11.0 7.12.0 Missing corrections/additions in TS 48.018 Rel-7 GP-37 GP-080349 Approved G2 G2-37 GP-080349 Agreed 2008-02-20 TEI7 - 2008-02-20
0281 2 B Rel-8 8.1.0 - Service UTRAN CCO IE update for E-UTRAN - - - - G2-40b G2-090066 Revised 2009-01-09 GELTE - 2009-01-09
0281 3 B Rel-8 8.1.0 8.2.0 Service UTRAN CCO IE update for E-UTRAN GP-41 GP-090136 Approved G2 G2-41 GP-090136 Agreed 2009-01-14 GELTE - 2009-01-14
0282 - B Rel-8 8.1.0 - Introducing E-UTRAN UE RAC information - - - - G2-40b G2-090026 Revised 2009-01-06 GELTE - 2009-01-06
0282 1 B Rel-8 8.1.0 - Introducing E-UTRAN UE RAC information - - - - G2-40b G2-090082 Revised 2009-01-13 GELTE - 2009-01-13
0282 2 B Rel-8 8.1.0 - Introducing E-UTRAN UE RAC information - - - - G2-40b G2-090107 Revised 2009-01-15 GELTE - 2009-01-15
0282 3 B Rel-8 8.1.0 - Introducing E-UTRAN UE RAC information - - - - G2-40b G2-090111 Revised 2009-01-15 GELTE - 2009-01-15
0282 4 B Rel-8 8.1.0 8.2.0 Introducing E-UTRAN UE RAC information GP-41 GP-090141 Approved G2 G2-41 GP-090141 Agreed 2009-01-15 GELTE - 2009-01-15
0284 - F Rel-8 8.1.0 - Introduction of generic transparent containers for inter-RAT PS handover - - - - G2-40b G2-090054 Revised 2009-01-07 GELTE - 2009-01-07
0284 1 F Rel-8 8.1.0 - Introduction of generic transparent containers for inter-RAT PS handover - - - - G2-41 GP-090131 Revised 2009-01-13 GELTE - 2009-01-13
0284 2 F Rel-8 8.1.0 8.2.0 Introduction of generic transparent containers for inter-RAT PS handover GP-41 GP-090366 Approved G2 G2-41 GP-090366 Agreed 2009-02-17 GELTE - 2009-02-17
0285 - B Rel-8 8.1.0 - Introduction of SPID in GERAN - - - - G2-41 GP-090094 Revised 2009-02-09 GELTE - 2009-02-09
0285 1 B Rel-8 8.1.0 - Introduction of SPID in GERAN - - - - G2-41 GP-090483 Revised 2009-02-18 GELTE - 2009-02-18
0285 2 B Rel-8 8.1.0 - Introduction of SPID in GERAN - - - - G2-41 GP-090541 Revised 2009-02-19 GELTE - 2009-02-19
0285 3 B Rel-8 8.1.0 8.2.0 Introduction of SPID in GERAN GP-41 GP-090558 Approved G2 G2-41 GP-090558 Agreed 2009-02-19 GELTE - 2009-02-19
0286 - F Rel-8 8.1.0 - Adding TAI to RIM procedures for MME addressing - - - - G2-41 GP-090356 Postponed 2009-02-17 GELTE - 2009-02-17
0286 1 F Rel-8 8.2.0 - Adding TAI to RIM Procedures for MME Routing - - - - G2-42 GP-090649 revised 2009-05-04 TEI8 - 2009-05-04
0286 2 F Rel-8 8.2.0 8.3.0 Adding TAI to RIM Procedures for MME Routing GP-42 GP-090920 approved G2 G2-42 GP-090920 agreed 2009-05-04 TEI8 - 2009-05-04
0287 - F Rel-8 8.2.0 - Corrections to SPID - - - - G2-42 GP-090625 revised 2009-04-30 GELTE - 2009-04-30
0287 1 F Rel-8 8.2.0 8.3.0 Corrections to SPID GP-42 GP-090919 approved G2 G2-42 GP-090919 agreed 2009-04-30 GELTE - 2009-04-30
0288 - F Rel-8 8.2.0 - Introduction of PS Handover Complete Acknowledge - - - - G2-42 GP-090807 postponed 2009-05-06 GELTE - 2009-05-06
0288 1 F Rel-8 8.3.0 - Introduction of PS Handover Complete Acknowledge Message - - - - G2-43 GP-091383 Postponed 2009-08-26 GELTE - 2009-08-26
0288 2 F Rel-8 8.4.0 - Introduction of PS Handover Complete Acknowledge MesSge - - - - G2-43b G2-090195 Revised 2009-10-14 GELTE - 2009-10-14
0288 3 F Rel-8 8.4.0 - Introduction of PS Handover Complete Acknowledge MesSge - - - - G2-43b G2-090263 Revised 2009-10-21 GELTE - 2009-10-21
0288 4 F Rel-8 8.4.0 8.5.0 Introduction of PS Handover Complete Acknowledge MesSge GP-44 GP-092068 Approved G2 G2-44 GP-092068 Agreed 2009-10-23 GELTE - 2009-10-23
0289 - F Rel-6 6.19.0 - Introduction of PS Handover Complete Acknowledge Message - - - - G2-43 GP-091385 Postponed 2009-08-26 SPSHAGB - 2009-08-26
0289 1 F Rel-6 6.19.0 - Introduction of PS Handover Complete Acknowledge MesSge - - - - G2-43b G2-090197 Revised 2009-10-14 SPSHAGB - 2009-10-14
0289 2 F Rel-6 6.19.0 6.20.0 Introduction of PS Handover Complete Acknowledge MesSge GP-44 GP-092069 Approved G2 G2-44 GP-092069 Agreed 2009-10-21 SPSHAGB - 2009-10-21
0290 - F Rel-7 7.12.0 - Introduction of PS Handover Complete Acknowledge Message - - - - G2-43 GP-091387 Postponed 2009-08-26 SCSAGB - 2009-08-26
0290 1 F Rel-7 7.12.0 7.13.0 Introduction of PS Handover Complete Acknowledge MesSge GP-44 GP-092070 Approved G2 G2-44 GP-092070 Agreed 2009-10-14 SPSHAGB - 2009-10-14
0291 - F Rel-8 8.3.0 8.4.0 Corrections to eNB identifiers GP-43 GP-091392 Approved G2 G2-43 GP-091392 Agreed 2009-08-26 GELTE - 2009-08-26
0292 - C Rel-9 8.4.0 - Exchanging cell load information between RATs by RIM procedure - - - - G2-44 GP-092391 Postponed 2009-11-18 TEI9 - 2009-11-18
0293 - C Rel-9 9.0.0 - Exchanging cell load information between RATs by RIM procedure. - - - - G2-44b G2-100044 Postponed 2010-01-20 TEI9 - 2010-01-20
0294 - F Rel-8 8.5.0 - Clarification for PS HO from E-UTRAN - - - - G2-44b G2-100092 Revised 2010-01-22 TEI8 - 2010-01-22
0294 1 F Rel-8 8.5.0 8.6.0 Clarification for PS HO from E-UTRAN GP-45 GP-100116 Approved G2 G2-45 GP-100116 Agreed 2010-01-27 GELTE - 2010-01-27
0295 - A Rel-9 9.0.0 - Clarification for PS HO from E-UTRAN - - - - G2-44b G2-100093 Revised 2010-01-22 TEI8 - 2010-01-22
0295 1 A Rel-9 9.0.0 9.1.0 Clarification for PS HO from E-UTRAN GP-45 GP-100117 Approved G2 G2-45 GP-100117 Agreed 2010-01-27 GELTE - 2010-01-27
0296 - C Rel-9 9.0.0 - Exchanging SON information between RATs by RIM procedure. - - - - G2-45 GP-100281 Revised 2010-02-23 TEI9 - 2010-02-23
0296 1 C Rel-9 9.0.0 - Exchanging SON information between RATs by RIM procedure. - - - - G2-45 GP-100377 Revised 2010-03-01 TEI9 - 2010-03-01
0296 2 B Rel-9 9.0.0 - Exchanging SON information between RATs by RIM procedure. - - - - G2-45 GP-100429 Revised 2010-03-03 TEI9 - 2010-03-03
0296 3 B Rel-9 9.0.0 - Exchanging SON information between RATs by RIM procedure. - - - - G2-45 GP-100441 Revised 2010-03-04 TEI9 - 2010-03-04
0296 4 B Rel-9 9.0.0 9.1.0 Exchanging SON information between RATs by RIM procedure. GP-45 GP-100444 Approved G2 G2-45 GP-100444 Agreed 2010-03-04 TEI9 - 2010-03-04
0297 - F Rel-8 8.5.0 - SPID handling during PS Handover - - - - G2-45 GP-100288 Postponed 2010-02-23 GELTE - 2010-02-23
0298 - B Rel-9 9.0.0 - Introduction of PS handover to CSG cells - - - - G2-45 GP-100291 Revised 2010-02-23 EHNB-GERAN - 2010-02-23
0298 1 B Rel-9 9.0.0 - Introduction of PS handover to CSG cells - - - - G2-45 GP-100417 Postponed 2010-03-02 EHNB-GERAN - 2010-03-02
0298 2 B Rel-9 9.1.0 - Introduction of PS handover to CSG cells - - - - G2-45b G2-100259 Revised 2010-04-14 EHNB-GERAN - 2010-04-14
0298 3 B Rel-9 9.1.0 - Introduction of PS handover to CSG cells - - - - G2-46 GP-100820 Revised 2010-05-12 EHNB-GERAN - 2010-05-12
0298 4 B Rel-9 9.1.0 9.2.0 Introduction of PS handover to CSG cells GP-46 GP-100955 Approved G2 G2-46 GP-100955 Agreed 2010-05-18 EHNB-GERAN - 2010-05-18
0298 5 B Rel-9 9.1.0 - Introduction of PS handover to CSG cells - - - - G2-46 GP-100971 Withdrawn 2010-05-20 EHNB-GERAN - 2010-05-20
0299 - B Rel-9 9.1.0 - UTRA SI transfer to E-UTRAN by RIM procedure - - - - G2-45b G2-100226 Postponed 2010-04-14 TEI9 - 2010-04-14
0299 - B Rel-9 9.1.0 9.2.0 UTRA SI transfer to E-UTRAN by RIM procedure GP-46 GP-100737 Approved G2 G2-46 GP-100737 Agreed 2010-05-04 TEI9 - 2010-05-04
0300 - F Rel-9 9.1.0 - Limitation of the number of restart procedures at RIM timers expiry - - - - G2-46 GP-100905 Revised 2010-05-12 TEI9 - 2010-05-12
0300 1 F Rel-9 9.1.0 9.2.0 Limitation of the number of restart procedures at RIM timers expiry GP-46 GP-100964 Approved G2 G2-46 GP-100964 Agreed 2010-05-19 TEI9 - 2010-05-19
0301 - F Rel-8 8.6.0 8.7.0 Correction on SPID IE GP-47 GP-101271 Approved G2 G2-47 GP-101271 Agreed 2010-08-23 GELTE - 2010-08-23
0302 - A Rel-9 9.2.0 9.3.0 Correction on SPID IE GP-47 GP-101272 Approved G2 G2-47 GP-101272 Agreed 2010-08-23 GELTE - 2010-08-23
0303 - B Rel-10 9.3.0 - Support of MOCN by GERAN - - - - G2-47b G2-100326 Revised 2010-10-13 MOCN-GERAN - 2010-10-13
0303 1 B Rel-10 9.3.0 - Support of MOCN by GERAN - - - - G2-47b G2-100374 Revised 2010-10-20 MOCN-GERAN - 2010-10-20
0303 2 B Rel-9 9.3.0 - Support of MOCN by GERAN - - - - G2-48 GP-101889 Revised 2010-11-17 MOCN-GERAN - 2010-11-17
0303 3 B Rel-9 9.3.0 - Support of MOCN by GERAN - - - - G2-48 GP-101986 Revised 2010-11-24 MOCN-GERAN - 2010-11-24
0303 4 B Rel-10 9.3.0 10.0.0 Support of MOCN by GERAN GP-48 GP-102038 Approved G2 G2-48 GP-102038 Agreed 2010-11-25 MOCN-GERAN GERAN approval conditional on 23.251 CR23r2 at SP-50. 2011-01: CR corrected to Rel-10 (was Rel-9, and was therefore mistakenly implemented at Rel-9; error to be corrected by MCC CR asap) 2010-11-25
0304 - F Rel-9 9.4.0 - Support of MOCN by GERAN - - - - G2-49 GP-110145 Revised 2011-02-21 TEI9 - 2011-02-21
0304 1 F Rel-9 9.4.0 9.5.0 Support of MOCN by GERAN GP-49 GP-110354 Approved G2 G2-49 GP-110354 Agreed 2011-03-01 TEI9 - 2011-03-01
0305 - B Rel-10 10.0.0 - Support for detection of unnecessary IRAT HO - - - - G2-49 GP-110291 Postponed 2011-02-23 TEI10 - 2011-02-23
0306 - F Rel-10 10.0.0 - Send V(U) for MOCN support - - - - G2-49 GP-110327 Revised 2011-02-27 MOCN-GERAN - 2011-02-27
0306 1 F Rel-10 10.0.0 - Send V(U) for MOCN support - - - - G2-49 GP-110362 Revised 2011-03-02 MOCN-GERAN - 2011-03-02
0306 2 F Rel-10 10.0.0 - Send V(U) for MOCN support - - - - G2-49 GP-110380 Revised 2011-03-03 MOCN-GERAN - 2011-03-03
0306 3 F Rel-10 10.0.0 10.1.0 Send V(U) for MOCN support GP-49 GP-110394 Approved G2 G2-49 GP-110394 Agreed 2011-03-03 MOCN-GERAN - 2011-03-03
0307 - B Rel-10 10.4.0 - Support for detection of unnecessary IRAT HO - - - - G2-50 GP-110749 Postponed 2011-05-11 TEI10 - 2011-05-11
0307 1 B Rel-10 10.4.0 - Support for detection of unnecessary IRAT HO - - - - G2-50 GP-110818 Withdrawn 2011-05-17 TEI10 - 2011-05-17
0307 1 B Rel-10 10.2.0 - Support for detection of unnecessary IRAT HO - - - - G2-51 GP-111255 Revised 2011-08-24 TEI10 - 2011-08-24
0307 2 B Rel-10 10.2.0 10.3.0 Support for detection of unnecessary IRAT HO GP-51 GP-111348 Approved G2 G2-51 GP-111348 Agreed 2011-08-30 TEI10 - 2011-08-30
0308 - F Rel-9 9.5.0 - RIM Requirements for SON and UTRA SI transfer - - - - G2-50 GP-110807 Revised 2011-05-17 TEI9 - 2011-05-17
0308 1 F Rel-9 9.5.0 9.6.0 RIM Requirements for SON and UTRA SI transfer GP-50 GP-110931 Approved G2 G2-50 GP-110931 Agreed 2011-05-19 TEI9 - 2011-05-19
0309 - A Rel-10 10.4.0 - RIM Requirements for SON and UTRA SI transfer - - - - G2-50 GP-110808 Revised 2011-05-17 TEI9 - 2011-05-17
0309 1 A Rel-10 10.1.0 10.2.0 RIM Requirements for SON and UTRA SI transfer GP-50 GP-110932 Approved G2 G2-50 GP-110932 Agreed 2011-05-19 TEI9 - 2011-05-19
0310 - F Rel-10 10.2.0 - Incorrect message encoding for Network Sharing - - - - G2-51 GP-111217 Revised 2011-08-24 MOCN-GERAN - 2011-08-24
0310 1 F Rel-10 10.2.0 10.3.0 Incorrect message encoding for Network Sharing GP-51 GP-111340 Approved G2 G2-51 GP-111340 Agreed 2011-08-31 MOCN-GERAN - 2011-08-31
0311 - B Rel-10 10.2.0 - Low Priority NAS Indication for PS Domain - - - - G2-51 GP-111226 Rejected 2011-08-24 NIMTC - 2011-08-24
0312 - F Rel-10 10.2.0 10.3.0 Correction of requirements related to the SON Transfer RIM application GP-51 GP-111253 Approved G2 G2-51 GP-111253 Agreed 2011-08-24 TEI10 - 2011-08-24
0313 - F Rel-10 10.3.0 - Correction on Unnecessary IRAT HO - - - - G2-52 GP-111722 Revised 2011-11-16 TEI10 - 2011-11-16
0313 1 F Rel-10 10.3.0 10.4.0 Correction on Unnecessary IRAT HO GP-52 GP-111875 Approved G2 G2-52 GP-111875 Agreed 2011-11-24 TEI10 - 2011-11-24
0314 - F Rel-10 10.3.0 - Correction of conditions to send a REROUTE COMMAND - - - - G2-52 GP-111836 Revised 2011-11-23 MOCN-GERAN - 2011-11-23
0314 1 F Rel-10 10.3.0 10.4.0 Correction of conditions to send a REROUTE COMMAND GP-52 GP-111890 Approved G2 G2-52 GP-111890 Agreed 2011-11-24 MOCN-GERAN - 2011-11-24
0315 - F Rel-10 10.4.0 - Correction to Target to Source Transparent Container - - - - G2-53 GP-120204 Revised 2012-02-22 TEI10 - 2012-02-22
0315 1 A Rel-10 10.4.0 - Correction to Target to Source Transparent Container - - - - G2-53 GP-120348 Revised 2012-03-01 TEI10 - 2012-03-01
0315 2 A Rel-10 10.4.0 10.5.0 Correction to Target to Source Transparent Container GP-53 GP-120435 Approved G2 G2-53 GP-120435 Agreed 2012-03-01 GELTE - 2012-03-01
0316 - B Rel-11 10.4.0 - Handling of PFI in the FULL MOCN network - - - - G2-53 GP-120258 Rejected 2012-02-23 FULL-MOCN–GERAN - 2012-02-23
0317 - F Rel-8 8.7.0 - Correction to the Target to Source Transparent Container - - - - G2-53 GP-120421 Revised 2012-03-01 GELTE - 2012-03-01
0317 1 F Rel-8 8.7.0 8.8.0 Correction to the Target to Source Transparent Container GP-53 GP-120433 Approved G2 G2-53 GP-120433 Agreed 2012-03-01 GELTE - 2012-03-01
0318 - A Rel-9 9.6.1 - Correction to the Target to Source Transparent Container - - - - G2-53 GP-120422 Revised 2012-03-01 GELTE - 2012-03-01
0318 1 A Rel-9 9.6.1 9.7.0 Correction to the Target to Source Transparent Container GP-53 GP-120434 Approved G2 G2-53 GP-120434 Agreed 2012-03-01 GELTE - 2012-03-01
0320 1 F Rel-10 10.5.0 10.6.0 Correction of Application Error Container IE in the RAN-INFORMATION PDU for SON transfer GP-54 GP-120729 Approved - G2-54 GP-120729 Agreed 2012-05-15 TEI10 - 2012-05-15
0321 2 B Rel-11 10.6.0 - SRVCC to E-UTRAN/ UTRAN - - - - G2-55 GP-120998 Revised 2012-08-22 rSRVCC-GERAN - 2012-08-22
0321 3 B Rel-11 10.6.0 - SRVCC to E-UTRAN/ UTRAN - - - - G2-55 GP-121099 Postponed 2012-08-29 rSRVCC-GERAN - 2012-08-29
0321 4 B Rel-11 .. - SRVCC to E-UTRAN/ UTRAN - - - - G2-56 GP-121330 Revised 2012-11-14 rSRVCC-GERAN - 2012-11-14
0321 5 B Rel-11 11.0.0 11.1.0 SRVCC to E-UTRAN/ UTRAN GP-56 GP-121367 Approved - G2-56 GP-121367 Agreed 2012-11-20 rSRVCC-GERAN - 2012-11-20
0323 1 B Rel-11 10.6.0 - Necessary provision of Selected PLMN ID to SGSN for both MOCN and GWCN - - - - G2-55 GP-120910 Postponed 2012-08-20 Full_MOCN-GERAN - 2012-08-20
0324 - B Rel-11 10.6.0 - Gb interface signalling for SIRIG - - - - G2-55 GP-120911 Revised 2012-08-20 SIRIG - 2012-08-20
0324 1 B Rel-11 10.6.0 - Gb interface signalling for SIRIG - - - - G2-55 GP-121094 Revised 2012-08-28 SIRIG - 2012-08-28
0324 2 B Rel-11 10.6.0 11.0.0 Gb interface signalling for SIRIG GP-55 GP-121119 Approved G2 G2-55 GP-121119 Agreed 2012-08-30 SIRIG - 2012-08-30
0325 - B Rel-11 10.6.0 - Support overload control from SGSN to BSS - - - - G2-55 GP-120953 Revised 2012-08-22 Full_MOCN-GERAN - 2012-08-22
0325 1 B Rel-11 10.6.0 - Support overload control from SGSN to BSS - - - - G2-55 GP-121091 Revised 2012-08-28 Full_MOCN-GERAN - 2012-08-28
0325 2 B Rel-11 10.6.0 - Support overload control from SGSN to BSS - - - - G2-55 GP-121112 Revised 2012-08-29 Full_MOCN-GERAN - 2012-08-29
0325 3 B Rel-11 10.6.0 - Support overload control from SGSN to BSS - - - - G2-55 GP-121115 Postponed 2012-08-30 Full_MOCN-GERAN - 2012-08-30
0325 3 B Rel-11 .. - Support overload control from SGSN to BSS - - - - G2-56 GP-121319 Revised 2012-11-14 TEI11 - 2012-11-14
0325 4 B Rel-11 11.0.0 11.1.0 Support overload control from SGSN to BSS GP-56 GP-121403 Approved - G2-56 GP-121403 Agreed 2012-11-22 TEI11 - 2012-11-22
0326 - B Rel-11 10.6.0 - Introduction of Service Identification in Gb interface - - - - G2-55 GP-120957 Rejected 2012-08-22 SIRIG - 2012-08-22
0372 3 B Rel-11 10.6.0 - Introduction of rSRVCC - - - - G2-55 GP-120986 Revised 2012-08-22 rSRVCC - 2012-08-22
0372 4 B Rel-11 10.6.0 - Introduction of rSRVCC - - - - G2-55 GP-121079 Revised 2012-08-28 rSRVCC - 2012-08-28
0372 5 B Rel-11 10.6.0 - Introduction of rSRVCC - - - - G2-55 GP-121098 Postponed 2012-08-29 rSRVCC - 2012-08-29
0373 - F Rel-8 8.8.0 - Correction of contents of the Target to Source Transparent Container IE - - - - G2-55 GP-120987 Revised 2012-08-22 GELTE - 2012-08-22
0373 1 F Rel-8 8.8.0 8.9.0 Correction of contents of the Target to Source Transparent Container IE GP-55 GP-121082 Approved G2 G2-55 GP-121082 Agreed 2012-08-28 GELTE - 2012-08-28
0374 - A Rel-9 9.7.0 - Correction of contents of the Target to Source Transparent Container IE - - - - G2-55 GP-120988 Revised 2012-08-22 GELTE - 2012-08-22
0374 1 A Rel-9 9.7.0 9.8.0 Correction of contents of the Target to Source Transparent Container IE GP-55 GP-121083 Approved G2 G2-55 GP-121083 Agreed 2012-08-28 GELTE - 2012-08-28
0375 - A Rel-10 10.6.0 - Correction of contents of the Target to Source Transparent Container IE - - - - G2-55 GP-120989 Revised 2012-08-22 GELTE - 2012-08-22
0375 1 A Rel-10 10.6.0 10.7.0 Correction of contents of the Target to Source Transparent Container IE GP-55 GP-121084 Approved G2 G2-55 GP-121084 Agreed 2012-08-28 GELTE - 2012-08-28
0376 - B Rel-11 10.6.0 - Clarification of Reporting Cell Identifier and RAT discriminator in SON Transfer RIM application - - - - G2-55 GP-121007 Revised 2012-08-22 TEI11 - 2012-08-22
0376 1 B Rel-11 10.6.0 - Clarification of Reporting Cell Identifier and RAT discriminator in SON Transfer RIM application - - - - G2-55 GP-121106 Plenary 2012-08-29 TEI11 - 2012-08-29
0377 - F Rel-11 10.6.0 - Clarification of the Global eNB ID encoding - - - - G2-55 GP-121008 Revised 2012-08-22 TEI11 - 2012-08-22
0377 1 F Rel-11 10.6.0 11.0.0 Clarification of the Global eNB ID encoding GP-55 GP-121108 Approved G2 G2-55 GP-121108 Agreed 2012-08-29 TEI11 - 2012-08-29
0378 - F Rel-11 .. - Clarification of Operator Group GGSN - - - - G2-56 GP-121241 Withdrawn 2012-11-14 SIRIG - 2012-11-14
0379 - B Rel-11 .. - Indication of selected PLMN to the SGSN - - - - G2-56 GP-121244 Revised 2012-11-14 Full_MOCN-GERAN - 2012-11-14
0379 1 B Rel-11 .. - Indication of selected PLMN to the SGSN - - - - G2-56 GP-121364 Revised 2012-11-20 Full_MOCN-GERAN - 2012-11-20
0379 2 B Rel-11 .. - Indication of selected PLMN to the SGSN - - - - G2-56 GP-121411 Revised 2012-11-22 Full_MOCN-GERAN - 2012-11-22
0379 3 B Rel-11 11.0.0 11.1.0 Indication of selected PLMN to the SGSN GP-56 GP-121425 Approved - G2-56 GP-121425 Agreed 2012-11-22 Full_MOCN-GERAN - 2012-11-22
0380 - D Rel-11 11.1.0 11.2.0 Editorial correction for Paging PS/CS GP-57 GP-130150 Approved G2 G2-57 GP-130150 Agreed 2013-02-20 TEI11 - 2013-02-20
0381 - B Rel-11 11.1.0 - Support for PS handover in shared GERAN scenario - - - - G2-57 GP-130160 Revised 2013-02-20 FULL_MOCN-GERAN - 2013-02-20
0381 1 B Rel-11 11.1.0 11.2.0 Support for PS handover in shared GERAN scenario GP-57 GP-130236 Approved G2 G2-57 GP-130236 Agreed 2013-02-26 FULL_MOCN-GERAN - 2013-02-26
0382 - B Rel-11 11.2.0 - Clarification of Reporting Cell Identifier and RAT discriminator in SON Transfer RIM application - - - - G2-58 GP-130404 Revised in GP-130487 2013-05-02 TEI11 - 2013-05-02
0382 1 B Rel-11 11.2.0 11.3.0 Clarification of Reporting Cell Identifier and RAT discriminator in SON Transfer RIM application GP-58 GP-130413 Approved G2 G2-58 GP-130413 Agreed 2013-05-06 TEI11 - 2013-05-06
0383 - F Rel-11 11.2.0 - Clarification of Operator Group GGSN - - - - G2-58 GP-130422 Revised in GP-130509 2013-05-07 TEI11 - 2013-05-07
0383 1 F Rel-11 11.2.0 - Clarification of Operator Group GGSN - - - - G2-58 GP-130509 Revised in GP-130533 2013-05-14 TEI11 - 2013-05-14
0383 2 F Rel-11 11.2.0 11.3.0 Clarification of Operator Group GGSN GP-58 GP-130533 Approved G2 G2-58 GP-130533 Agreed 2013-05-16 FULL_MOCN-GERAN - 2013-05-16
0384 - F Rel-11 11.2.0 - Clarification on when to include the selected PLMN in the UL-UNITDATA - - - - G2-58 GP-130481 Revised in GP-130511 2013-05-08 FULL_MOCN-GERAN - 2013-05-08
0384 1 F Rel-11 11.2.0 11.3.0 Clarification on when to include the selected PLMN in the UL-UNITDATA GP-58 GP-130511 Approved G2 G2-58 GP-130511 Agreed 2013-05-14 FULL_MOCN-GERAN - 2013-05-14
0385 - F Rel-11 11.2.0 - Correction of SGSN behaviour for rerouting procedure in MOCN configuration - - - - G2-58 GP-130399 GP-130515 2013-05-09 MOCN-GERAN - 2013-05-09
0385 1 A Rel-11 11.2.0 - Correction of SGSN behaviour for rerouting procedure in MOCN configuration - - - - G2-58 GP-130515 Revised in GP-130523 2013-05-15 MOCN-GERAN - 2013-05-15
0385 2 A Rel-11 11.2.0 - Correction of SGSN behaviour for rerouting procedure in MOCN configuration - - - - G2-58 GP-130523 Revised in GP-130528 2013-05-16 MOCN-GERAN - 2013-05-16
0385 3 A Rel-11 11.2.0 11.3.0 Correction of SGSN behaviour for rerouting procedure in MOCN configuration GP-58 GP-130528 Approved G2 G2-58 GP-130528 Agreed 2013-05-16 MOCN-GERAN - 2013-05-16
0386 - F Rel-10 10.7.0 - Correction of SGSN behaviour for rerouting procedure in MOCN configuration - - - - G2-58 GP-130516 Revised in GP-130522 2013-05-15 MOCN-GERAN - 2013-05-15
0386 1 F Rel-10 10.7.0 - Correction of SGSN behaviour for rerouting procedure in MOCN configuration - - - - G2-58 GP-130522 Revised in GP-130527 2013-05-16 MOCN-GERAN - 2013-05-16
0386 2 F Rel-10 10.7.0 10.8.0 Correction of SGSN behaviour for rerouting procedure in MOCN configuration GP-58 GP-130527 Approved G2 G2-58 GP-130527 Agreed 2013-05-16 MOCN-GERAN - 2013-05-16
0387 - F Rel-11 11.3.0 - Additional cause code in redirection indication for MOCN - - - G2 G2-59 GP-130696 Postponed 2013-08-20 TEI11 - 2013-08-20
0388 - F Rel-11 11.3.0 - Clarification on PS/CS coordination for MOCN - - - G2 G2-59 GP-130697 Postponed 2013-08-20 TEI11 - 2013-08-20
0389 - F Rel-11 11.3.0 - Clarification on the PLMN included in the PAGING PDU - - - G2 G2-59 GP-130702 Revised 2013-08-21 FULL_MOCN-GERAN - 2013-08-21
0389 1 F Rel-11 11.3.0 - Clarification on the PLMN included in the PAGING PDU - - - G2 G2-59 GP-130807 Revised 2013-08-27 FULL_MOCN-GERAN - 2013-08-27
0389 2 F Rel-11 11.3.0 11.4.0 Clarification on the PLMN included in the PAGING PDU GP-59 GP-130833 Approved G2 G2-59 GP-130833 Agreed 2013-08-29 FULL_MOCN-GERAN - 2013-08-29
0390 - B Rel-12 11.3.0 - Introduction of Downlink Multi Carrier - - - G2 G2-59 GP-130720 Postponed 2013-08-21 DMCG - 2013-08-21
0391 - B Rel-12 11.3.0 - Adding support of RIM signalling (SON Transfer Application) between LTE and eHRPD - - - G2 G2-59 GP-130731 Revised 2013-08-21 LTE_HRPD_SON - 2013-08-21
0391 1 B Rel-12 11.3.0 - Adding support of RIM signalling (SON Transfer Application) between LTE and eHRPD - - - G2 G2-59 GP-130818 Revised 2013-08-27 LTE_HRPD_SON - 2013-08-27
0391 2 B Rel-12 11.3.0 12.0.0 Adding support of RIM signalling (SON Transfer Application) between LTE and eHRPD GP-59 GP-130834 Approved G2 G2-59 GP-130834 Agreed 2013-08-29 LTE_HRPD_SON - 2013-08-29
0392 - F Rel-11 11.3.0 11.4.0 Correction of reference table for GGSN/P-GW location GP-59 GP-130732 Approved G2 G2-59 GP-130732 Agreed 2013-08-21 TEI11 - 2013-08-21
0393 - F Rel-11 11.3.0 - Correction of Reroute Reject Cause in MOCN configuration - - - G2 G2-59 GP-130735 Postponed 2013-08-21 TEI11 - 2013-08-21
0394 - F Rel-11 11.3.0 - Addition of new reject cause values in MOCN configuration - - - G2 G2-59 GP-130727 Withdrawn 2013-08-21 TEI11 - 2013-08-21
0395 - F Rel-11 11.3.0 - Clarification of registered operator addressing in GWCN case and Network Sharing - - - G2 G2-59 GP-130745 Revised 2013-08-23 FULL_MOCN-GERAN - 2013-08-23
0395 1 F Rel-11 11.3.0 11.4.0 Clarification of registered operator addressing in GWCN case and Network Sharing GP-59 GP-130810 Approved G2 G2-59 GP-130810 Agreed 2013-08-27 FULL_MOCN-GERAN - 2013-08-27
0396 - F Rel-11 11.3.0 - Addition of new reject cause values in MOCN configuration - - - G2 G2-59 GP-130830 Postponed 2013-08-28 TEI11 - 2013-08-28

page generated from database: 2013-10-16 10:34:39