3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 26.268

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - - Rel-8 - - Correction of a mismatch with 3GPP TS 26.267 concerning synchronization - - - - S4-53 S4-090249 revised 2009-04-17 - - 2009-05-23
0001 1 F Rel-8 8.0.0 8.1.0 Correction of a mismatch with 3GPP TS 26.267 concerning synchronization SP-44 SP-090251 approved S4 S4-53 S4-090326 agreed 2009-04-17 eCall_Phase2 - 2009-05-23
0002 - - Rel-8 - - Correction concerning modulator initialization - - - - S4-53 S4-090250 revised 2009-04-17 - - 2009-05-23
0002 1 F Rel-8 8.0.0 8.1.0 Correction concerning modulator initialization SP-44 SP-090251 approved S4 S4-53 S4-090327 agreed 2009-04-17 eCall_Phase2 - 2009-05-23
0003 - - Rel-8 - - Correction of a mismatch with 3GPP TS 26.267 concerning ACK transmission - - - - S4-53 S4-090251 revised 2009-04-17 - - 2009-05-23
0003 1 F Rel-8 8.0.0 8.1.0 Correction of a mismatch with 3GPP TS 26.267 concerning ACK transmission SP-44 SP-090251 approved S4 S4-53 S4-090328 agreed 2009-04-17 eCall_Phase2 - 2009-05-23
0004 - - Rel-8 - - Extension of eCall test setup to allow conformance testing of ACK messages - - - - S4-53 S4-090252 revised 2009-04-17 - - 2009-05-23
0004 1 F Rel-8 8.0.0 8.1.0 Extension of eCall test setup to allow conformance testing of ACK messages SP-44 SP-090251 approved S4 S4-53 S4-090330 agreed 2009-04-17 eCall_Phase2 - 2009-05-23
0005 - - Rel-8 - - Separation of IVS and PSAP transmitter and receiver functions in the C-code - - - - S4-53 S4-090253 revised 2009-04-17 - - 2009-05-23
0005 1 - Rel-8 - - Separation of IVS and PSAP transmitter and receiver functions in the C-code - - - - S4-53 S4-090331 revised 2009-04-17 - - 2009-05-23
0005 2 F Rel-8 8.0.0 8.1.0 Separation of IVS and PSAP transmitter and receiver functions in the C-code SP-44 SP-090251 approved S4 S4-53 S4-090361 agreed 2009-04-17 eCall_Phase2 - 2009-05-23
0006 - - Rel-8 - - Integration of higher-layer acknowledgement message - - - - S4-54 S4-090471 revised 2009-06-26 - - 2009-09-11
0006 1 C Rel-8 8.1.0 8.2.0 Integration of higher-layer acknowledgement message SP-45 SP-090565 approved S4 S4-54 S4-090539 agreed 2009-06-26 eCall_Phase2 - 2009-09-11
0007 - C Rel-8 8.1.0 8.2.0 Integration of IVS-initiated signalling option SP-45 SP-090576 approved S4 S4-54 S4-090473 agreed 2009-06-26 eCall_Phase2 Working agreement set at SA4#55 2009-09-11
0008 - F Rel-8 8.1.0 8.2.0 Parameter change in eCall test setup SP-45 SP-090565 approved S4 S4-54 S4-090474 agreed 2009-06-26 eCall_Phase2 - 2009-09-11
0009 - C Rel-8 8.1.0 8.2.0 Update of receiver-transmitter interfaces for conformance testing SP-45 SP-090565 approved S4 S4-55 S4-090597 agreed 2009-08-21 eCall_Phase2 - 2009-09-11
0010 - F Rel-8 8.1.0 8.2.0 Corrections and bugfixes of the eCall source code SP-45 SP-090565 approved S4 S4-55 S4-090598 agreed 2009-08-21 eCall_Phase2 - 2009-09-11
0011 - - Rel-8 - - Correction of ACK detection conditions - - - - S4-58 S4-100220 revised 2010-04-29 - - 2010-05-27
0011 1 F Rel-8 8.2.0 8.3.0 Correction of ACK detection conditions SP-48 SP-100297 approved S4 S4-58 S4-100366 agreed 2010-03-02 eCall_Phase2 - 2010-05-27
0012 - - Rel-9 - - Correction of ACK detection conditions - - - - S4-58 S4-100221 revised 2010-03-03 - - 2010-05-27
0012 1 A Rel-9 9.0.0 9.1.0 Correction of ACK detection conditions SP-48 SP-100297 approved S4 S4-58 S4-100367 agreed 2010-03-04 eCall_Phase2 - 2010-05-27
0013 - - Rel-8 - - Detector for handling PCM sample inversion in the network - - - - S4-58 S4-100225 revised 2010-04-29 - - 2010-05-27
0013 1 F Rel-8 8.2.0 8.3.0 Detector for handling PCM sample inversion in the network SP-48 SP-100297 approved S4 S4-58 S4-100368 agreed 2010-03-03 eCall_Phase2 - 2010-05-27
0014 - - Rel-9 - - Detector for handling PCM sample inversion in the network - - - - S4-58 S4-100226 revised 2010-03-04 - - 2010-05-27
0014 1 A Rel-9 9.0.0 9.1.0 Detector for handling PCM sample inversion in the network SP-48 SP-100297 approved S4 S4-58 S4-100369 agreed 2010-05-10 eCall_Phase2 - 2010-05-27
0015 - - Rel-8 - - Feedback signal modifications to increase robustness in the presence of network echo cancellers - - - - S4-58 S4-100230 revised 2010-05-10 - - 2010-05-27
0015 1 F Rel-8 8.2.0 8.3.0 Feedback signal modifications to increase robustness in the presence of network echo cancellers SP-48 SP-100297 approved S4 S4-58 S4-100364 agreed 2010-05-10 eCall_Phase2 - 2010-05-27
0016 - - Rel-9 - - Feedback signal modifications to increase robustness in the presence of network echo cancellers - - - - S4-58 S4-100231 revised 2010-05-10 - - 2010-05-27
0016 1 A Rel-9 9.0.0 9.1.0 Feedback signal modifications to increase robustness in the presence of network echo cancellers SP-48 SP-100297 approved S4 S4-58 S4-100365 agreed 2010-05-10 eCall_Phase2 - 2010-05-27
0017 - F Rel-8 8.3.0 8.4.0 Correction of some errors in the eCall reference code SP-49 SP-100462 approved S4 S4-59 S4-100411 agreed 2010-06-24 eCall_Phase2 - 2010-09-09
0018 - A Rel-9 9.1.0 9.2.0 Correction of some errors in the eCall reference code SP-49 SP-100462 approved S4 S4-59 S4-100412 agreed 2010-06-24 eCall_Phase2 - 2010-09-09
0019 - F Rel-8 8.3.0 8.4.0 Update of eCall test framework software to handle new in-band modem features SP-49 SP-100462 approved S4 S4-59 S4-100413 agreed 2010-06-24 eCall_Phase2 - 2010-09-09
0020 - A Rel-9 9.1.0 9.2.0 Update of eCall test framework software to handle new in-band modem features SP-49 SP-100462 approved S4 S4-59 S4-100414 agreed 2010-06-24 eCall_Phase2 - 2010-09-09
0021 - F Rel-8 8.4.0 8.5.0 Correction of synchronization procedures in the eCall in-band modem SP-50 SP-100783 approved S4 S4-61 S4-100806 agreed 2010-11-12 eCall_Phase2 - 2010-12-02
0022 - - Rel-9 - - Correction of synchronization procedures in the eCall in-band modem - - - - S4-61 S4-100807 revised 2010-11-12 - - 2010-12-02
0022 1 A Rel-9 9.2.0 9.3.0 Correction of synchronization procedures in the eCall in-band modem SP-50 SP-100783 approved S4 S4-61 S4-100907 agreed 2010-11-12 eCall_Phase2 - 2010-12-02
0023 - F Rel-8 8.4.0 8.5.0 State machine corrections in the eCall in-band modem SP-50 SP-100783 approved S4 S4-61 S4-100810 agreed 2010-11-12 eCall_Phase2 - 2010-12-02
0024 - - Rel-9 - - State machine corrections in the eCall in-band modem - - - - S4-61 S4-100811 revised 2010-11-12 - - 2010-12-02
0024 1 A Rel-9 9.2.0 9.3.0 State machine corrections in the eCall in-band modem SP-50 SP-100783 approved S4 S4-61 S4-100910 agreed 2010-11-12 eCall_Phase2 - 2010-12-02
0025 - F Rel-8 8.4.0 8.5.0 Correction of the inversion detector SP-50 SP-100783 approved S4 S4-61 S4-100864 agreed 2010-11-12 eCall_Phase2 - 2010-12-02
0026 - - Rel-9 - - Correction of the inversion detector - - - - S4-61 S4-100865 revised 2010-11-12 - - 2010-12-02
0026 1 A Rel-9 9.2.0 9.3.0 Correction of the inversion detector SP-50 SP-100783 approved S4 S4-61 S4-100935 agreed 2010-11-12 eCall_Phase2 - 2010-12-02
0027 - F Rel-8 8.5.0 8.6.0 Correction of synchronization algorithm for the eCall in-band modem SP-51 SP-110033 approved S4 S4-62 S4-110050 agreed 2011-01-14 eCall_Phase2 - 2011-03-10
0028 - A Rel-9 9.3.0 9.4.0 Correction of synchronization algorithm for the eCall in-band modem SP-51 SP-110033 approved S4 S4-62 S4-110051 agreed 2011-01-14 eCall_Phase2 - 2011-03-10
0029 - F Rel-8 8.5.0 8.6.0 Correction of signal inversion operation and callback message event set SP-51 SP-110033 approved S4 S4-62 S4-110289 agreed 2011-02-18 eCall_Phase2 - 2011-03-10
0030 - A Rel-9 9.3.0 9.4.0 Correction of signal inversion operation and callback message event set SP-51 SP-110033 approved S4 S4-62 S4-110290 agreed 2011-02-18 eCall_Phase2 - 2011-03-10

page generated from database: 2013-10-16 10:33:53