Go to spec numbering scheme page
3GPP Specification Change Request records for: 36.133
CR no. | rev | cat | Release | CR written to vers | new vers | CR title | TSG meeting | TSG doc | TSG status | source | WG meeting | WG doc | WG status | cover date | work item | remarks | database record created |
0000 | - | F | Rel-9 | 9.7.0 | - | Correction on E-UTRAN FDD RSTD intra frequency case | - | - | - | R4 | R4-59 | R4-112869 | Revised | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0000 | - | A | Rel-10 | 10.2.0 | - | Correction on E-UTRAN FDD RSTD intra frequency case | - | - | - | R4 | R4-59 | R4-112870 | Revised | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0001 | - | B | Rel-8 | 8.0.0 | - | TDD measurements Gap Length in TS36.133 | - | - | - | R4 | R4-46 | R4-080035 | Withdrawn | 2008-02-28 | RAN-Evo | - | 2008-02-28 |
0002 | - | B | Rel-8 | 8.0.0 | 8.1.0 | updates of TS 36.133 | RP-39 | RP-080123 | approved | R4 | R4-46 | R4-080478 | Agreed | 2008-02-28 | LTE-RF | - | 2008-02-28 |
0003 | - | B | Rel-8 | 8.1.0 | 8.2.0 | updates of TS 36.133 Rel 8 | RP-40 | RP-080325 | approved | R4 | R4-47 | R4-081174 | Agreed | 2008-05-22 | LTE-RF | - | 2008-05-22 |
0004 | - | F | Rel-8 | 8.2.0 | 8.3.0 | Correction of E-UTRAN to UTRAN TDD handover | RP-41 | RP-080642 | approved | R4 | R4-47b | R4-081337 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0005 | - | B | Rel-8 | 8.2.0 | - | Addition of Cell Synchronization Accuracy | - | - | - | R4 | R4-47b | R4-081338 | Noted | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0006 | - | B | Rel-8 | 8.2.0 | - | E-UTRAN TDD intra frequency measurements when DRX is used | - | - | - | R4 | R4-47b | R4-081339 | Revised | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0006 | 1 | B | Rel-8 | 8.2.0 | 8.3.0 | E-UTRAN TDD intra frequency measurements when DRX is used | RP-41 | RP-080644 | approved | R4 | R4-47b | R4-081695 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0007 | - | B | Rel-8 | 8.2.0 | - | E-UTRAN TDD TDD inter frequency measurements | - | - | - | R4 | R4-47b | R4-081340 | Withdrawn | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0008 | - | B | Rel-8 | 8.2.0 | - | E-UTRAN TDD - UTRAN TDD measurements | - | - | - | R4 | R4-47b | R4-081341 | Revised | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0008 | 1 | B | Rel-8 | 8.2.0 | 8.3.0 | E-UTRAN TDD - UTRAN TDD measurements | RP-41 | RP-080644 | approved | R4 | R4-47b | R4-081696 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0009 | - | B | Rel-8 | 8.2.0 | - | UTRAN LTDD measurements | - | - | - | R4 | R4-47b | R4-081342 | Noted | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0010 | - | F | Rel-8 | 8.2.0 | - | Cell reselection and handover requirements for E-UTRAN to HRPD/cdma2000 1x | - | - | - | R4 | R4-47b | R4-081403 | Noted | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0011 | - | F | Rel-8 | 8.2.0 | - | Correction to HO requirements | - | - | - | R4 | R4-47b | R4-081405 | Noted | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0012 | - | B | Rel-8 | 8.2.0 | 8.3.0 | RSRQ reporting Range | RP-41 | RP-080644 | approved | R4 | R4-47b | R4-081420 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0013 | - | F | Rel-8 | 8.2.0 | - | Handover delay requirements | - | - | - | R4 | R4-47b | R4-081455 | Noted | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0014 | - | F | Rel-8 | 8.2.0 | - | Handover performance requirements for E-UTRAN TDD-TDD | - | - | - | R4 | R4-47b | R4-081456 | Noted | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0015 | - | F | Rel-8 | 8.2.0 | - | Handover performance requirements for E-UTRAN FDD-TDD | - | - | - | R4 | R4-47b | R4-081457 | Noted | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0016 | - | F | Rel-8 | 8.2.0 | - | Definition of Symbols | - | - | - | R4 | R4-47b | R4-081476 | Revised | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0016 | 1 | F | Rel-8 | 8.2.0 | 8.3.0 | Definition of Symbols | RP-41 | RP-080642 | approved | R4 | R4-47b | R4-081646 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0017 | - | F | Rel-8 | 8.2.0 | - | E-UTRAN TDD UTRAN FDD Monitoring | - | - | - | R4 | R4-47b | R4-081498 | Withdrawn | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0018 | - | B | Rel-8 | 8.2.0 | - | Interfrequency and UTRA interRAT DRX peformance requirements | - | - | - | R4 | R4-47b | R4-081538 | Revised | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0018 | 1 | B | Rel-8 | 8.2.0 | 8.3.0 | Interfrequency and UTRA interRAT DRX peformance requirements | RP-41 | RP-080644 | approved | R4 | R4-47b | R4-081670 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0019 | - | F | Rel-8 | 8.2.0 | - | Idle mode requirements updates | - | - | - | R4 | R4-47b | R4-081551 | Revised | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0019 | 1 | F | Rel-8 | 8.2.0 | 8.3.0 | Idle mode requirements updates | RP-41 | RP-080642 | approved | R4 | R4-47b | R4-081668 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0020 | - | C | Rel-8 | 8.2.0 | - | Additions to UE transmit timing requirements | - | - | - | R4 | R4-47b | R4-081558 | Revised | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0020 | 1 | B | Rel-8 | 8.2.0 | 8.3.0 | Additions to UE transmit timing requirements | RP-41 | RP-080644 | approved | R4 | R4-47b | R4-081674 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0021 | - | F | Rel-8 | 8.2.0 | - | General updates | - | - | - | R4 | R4-47b | R4-081584 | Revised | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0021 | 1 | F | Rel-8 | 8.2.0 | 8.3.0 | General updates to 36.133 | RP-41 | RP-080642 | approved | R4 | R4-47b | R4-081665 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0022 | - | F | Rel-8 | 8.2.0 | - | Corrections to Handover requirements | - | - | - | R4 | R4-47b | R4-081677 | Revised | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0022 | 1 | F | Rel-8 | 8.2.0 | - | Corrections to Handover requirements | RP-41 | RP-080643 | reissued | R4 | R4-48 | R4-082130 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0022 | 1 | F | Rel-8 | 8.2.0 | 8.3.0 | Corrections to Handover requirements | RP-41 | RP-080713 | approved | R4 | R4-48 | R4-082130 | Agreed | 2008-09-05 | LTE-RF | - | 2008-09-05 |
0023 | - | F | Rel-8 | 8.2.0 | - | Handover requirements for E-UTRAN to cdma200 HRPD/1x | - | - | - | R4 | R4-47b | R4-081682 | Withdrawn | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0023 | 1 | F | Rel-8 | 8.2.0 | 8.3.0 | Handover requirements for E-UTRAN to cdma200 HRPD/1x | RP-41 | RP-080642 | approved | R4 | R4-47b | R4-081689 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0024 | - | F | Rel-8 | 8.2.0 | 8.3.0 | Inter-frequency and inter-RAT measurement requirements for multiple layer monitoring | RP-41 | RP-080642 | approved | R4 | R4-47b | R4-081687 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0025 | - | F | Rel-8 | 8.2.0 | 8.3.0 | Side conditions for UE measurement procedures and measurement performance requirements | RP-41 | RP-080642 | approved | R4 | R4-47b | R4-081692 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0026 | - | F | Rel-8 | 8.2.0 | 8.3.0 | Correction to cell reselection Requirement from E-UTRAN to HRPD/cdma200 1x | RP-41 | RP-080642 | approved | R4 | R4-47b | R4-081698 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0027 | - | F | Rel-8 | 8.2.0 | 8.3.0 | IRAT Measurement requirements in TS 36.133 | RP-41 | RP-080642 | approved | R4 | R4-47b | R4-081701 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0028 | - | F | Rel-8 | 8.2.0 | - | Measurement reporting requirements | RP-41 | RP-080643 | reissued | R4 | R4-48 | R4-081735 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0028 | - | F | Rel-8 | 8.2.0 | 8.3.0 | Measurement reporting requirements | RP-41 | RP-080713 | approved | R4 | R4-48 | R4-081735 | Agreed | 2008-09-05 | LTE-RF | - | 2008-09-05 |
0029 | - | F | Rel-8 | 8.2.0 | - | RRC re-establishment requirements | - | - | - | R4 | R4-48 | R4-081736 | Revised | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0029 | 1 | F | Rel-8 | 8.2.0 | - | RRC re-establishment requirements | - | - | - | R4 | R4-48 | R4-082120 | Revised | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0029 | 2 | F | Rel-8 | 8.2.0 | - | RRC re-establishment requirements | RP-41 | RP-080643 | reissued | R4 | R4-48 | R4-082149 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0029 | 2 | F | Rel-8 | 8.2.0 | 8.3.0 | RRC re-establishment requirements | RP-41 | RP-080713 | approved | R4 | R4-48 | R4-082149 | Agreed | 2008-09-05 | LTE-RF | - | 2008-09-05 |
0030 | - | F | Rel-8 | 8.2.0 | - | E-UTRAN TDD/FDD-TDD inter frequency measurement requirements | - | - | - | R4 | R4-48 | R4-081737 | Noted | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0031 | - | F | Rel-8 | 8.2.0 | - | E-UTRAN TDD-FDD inter frequency measurement requirements | - | - | - | R4 | R4-48 | R4-081738 | Noted | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0032 | - | F | Rel-8 | 8.2.0 | - | Correction to UE measurement requirements | RP-41 | RP-080643 | reissued | R4 | R4-48 | R4-081739 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0032 | - | F | Rel-8 | 8.2.0 | 8.3.0 | Correction to UE measurement requirements | RP-41 | RP-080713 | approved | R4 | R4-48 | R4-081739 | Agreed | 2008-09-05 | LTE-RF | - | 2008-09-05 |
0033 | - | F | Rel-8 | 8.2.0 | - | Correction for the definition of interruption time | RP-41 | RP-080643 | reissued | R4 | R4-48 | R4-081753 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0033 | - | F | Rel-8 | 8.2.0 | 8.3.0 | Correction for the definition of interruption time | RP-41 | RP-080713 | approved | R4 | R4-48 | R4-081753 | Agreed | 2008-09-05 | LTE-RF | - | 2008-09-05 |
0034 | - | F | Rel-8 | 8.2.0 | - | Parallel monitoring of multiple frequencies and RATs | - | - | - | R4 | R4-48 | R4-081868 | Noted | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0035 | - | F | Rel-8 | 8.2.0 | - | Correction to Transmission Gap Repetition Period | - | - | - | R4 | R4-48 | R4-081977 | Noted | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0036 | - | F | Rel-8 | 8.2.0 | - | Correction to HO Interruption Time Definition | - | - | - | R4 | R4-48 | R4-081978 | Noted | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0037 | - | F | Rel-8 | 8.2.0 | - | Correction to E-UTRAN FDD inter-frequency measurement requirements when no DRX is used | - | - | - | R4 | R4-48 | R4-081979 | Noted | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0038 | - | F | Rel-8 | 8.2.0 | - | Correction to E-UTRAN TDD inter-frequency measurement requirements when no DRX is used | - | - | - | R4 | R4-48 | R4-081980 | Noted | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0039 | - | B | Rel-8 | 8.2.0 | - | RRC Re-establishment Requirements | - | - | - | R4 | R4-48 | R4-081983 | Noted | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0040 | - | F | Rel-8 | 8.2.0 | - | Correction to idle mode higher priority search requirements | - | - | - | R4 | R4-48 | R4-082037 | Revised | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0040 | 1 | F | Rel-8 | 8.2.0 | - | Correction to idle mode higher priority search requirements | RP-41 | RP-080643 | reissued | R4 | R4-48 | R4-082186 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0040 | 1 | F | Rel-8 | 8.2.0 | 8.3.0 | Correction to idle mode higher priority search requirements | RP-41 | RP-080713 | approved | R4 | R4-48 | R4-082186 | Agreed | 2008-09-05 | LTE-RF | - | 2008-09-05 |
0041 | - | F | Rel-8 | 8.2.0 | - | UTRA interRAT DRX peformance requirements | - | - | - | R4 | R4-48 | R4-082038 | Revised | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0041 | 1 | F | Rel-8 | 8.2.0 | - | UTRA interRAT DRX peformance requirements | - | - | - | R4 | R4-48 | R4-082116 | Withdrawn | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0042 | - | F | Rel-8 | 8.2.0 | - | UE transmit timing requirement | - | - | - | R4 | R4-48 | R4-082063 | Revised | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0042 | 1 | F | Rel-8 | 8.2.0 | - | UE transmit timing requirement | - | - | - | R4 | R4-48 | R4-082079 | Noted | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0043 | - | B | Rel-8 | 8.2.0 | 8.3.0 | Received interference power measurement performance requirement | RP-41 | RP-080644 | approved | R4 | R4-48 | R4-082144 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0044 | - | B | Rel-8 | 8.2.0 | 8.3.0 | Cell Synchronization requirement for E-UTRA TDD | RP-41 | RP-080644 | approved | R4 | R4-48 | R4-082159 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0045 | - | F | Rel-8 | 8.2.0 | - | E-UTRAN TDD inter frequency measurement requirements | RP-41 | RP-080643 | reissued | R4 | R4-48 | R4-082167 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0045 | - | F | Rel-8 | 8.2.0 | 8.3.0 | E-UTRAN TDD inter frequency measurement requirements | RP-41 | RP-080713 | approved | R4 | R4-48 | R4-082167 | Agreed | 2008-09-05 | LTE-RF | - | 2008-09-05 |
0046 | - | F | Rel-8 | 8.2.0 | - | Updates of the Measurement procedures in RRC_Connected state from RAN 4#47bis and RAN 4#48 | RP-41 | RP-080643 | reissued | R4 | R4-48 | R4-082187 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0046 | - | F | Rel-8 | 8.2.0 | 8.3.0 | Updates of the Measurement procedures in RRC_Connected state from RAN 4#47bis and RAN 4#48 | RP-41 | RP-080713 | approved | R4 | R4-48 | R4-082187 | Agreed | 2008-09-05 | LTE-RF | - | 2008-09-05 |
0047 | - | B | Rel-8 | 8.2.0 | 8.3.0 | Power Headroom Requirements | RP-41 | RP-080644 | approved | R4 | R4-48 | R4-082204 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0048 | - | B | Rel-8 | 8.2.0 | 8.3.0 | Event Triggering and Reporting Criteria Capability Requirements | RP-41 | RP-080644 | approved | R4 | R4-48 | R4-082205 | Agreed | 2008-09-04 | LTE-RF | - | 2008-09-04 |
0049 | - | F | Rel-8 | 8.3.0 | 8.4.0 | E-UTRAN TDD TDD intra/inter frequency measurement reporting requirements | RP-42 | RP-080933 | approved | R4 | R4-49 | R4-082662 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0050 | - | F | Rel-8 | 8.3.0 | 8.4.0 | E-UTRAN FDD UTRAN FDD Measurement reporting requirements | RP-42 | RP-080933 | approved | R4 | R4-49 | R4-082663 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0051 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Correction to idle mode requirements | RP-42 | RP-080929 | approved | R4 | R4-49 | R4-082680 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0052 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Definition of out of service area | RP-42 | RP-080929 | approved | R4 | R4-49 | R4-082681 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0053 | - | B | Rel-8 | 8.3.0 | 8.4.0 | Introduction of 700 MHz Bands 12, 14 and 17 | RP-42 | RP-080919 | approved | R4 | R4-49 | R4-082683 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0054 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Measurement requirements for UTRAN TDD cells in idle state | RP-42 | RP-080929 | approved | R4 | R4-49 | R4-082695 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0055 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Correction of E-UTRAN cell measurement requirements in idle state | RP-42 | RP-080929 | approved | R4 | R4-49 | R4-082696 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0056 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Correction of TS36.133 section 8.1.2.1.1 | RP-42 | RP-080933 | approved | R4 | R4-49 | R4-082697 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0057 | - | F | Rel-8 | 8.3.0 | - | Additional condition for TDD intra frequency cell identification requirements | - | - | - | R4 | R4-49 | R4-082698 | Noted | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0058 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Measurement requirement for E-UTRAN TDD to UTRAN TDD/FDD when DRX is used | RP-42 | RP-080933 | approved | R4 | R4-49 | R4-082699 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0059 | - | F | Rel-8 | 8.3.0 | - | E-UTRA TDD test models | - | - | - | R4 | R4-49 | R4-082720 | Noted | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0060 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Interfrequency and GSM measurement performance requirements in large DRX | RP-42 | RP-080933 | approved | R4 | R4-49 | R4-082721 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0061 | - | F | Rel-8 | 8.3.0 | - | Correction to RSRQ Measurement Report Mapping | - | - | - | R4 | R4-49 | R4-082731 | Noted | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0062 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Correction of implementation margin for transmission gap | RP-42 | RP-080933 | approved | R4 | R4-49 | R4-082755 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0063 | - | F | Rel-8 | 8.3.0 | - | Synchronization Requirements for E-UTRAN to 1xRTT and HRPD Handovers | - | - | - | R4 | R4-49 | R4-082766 | Revised | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0063 | 1 | F | Rel-8 | 8.3.0 | - | Synchronization Requirements for E-UTRAN to 1xRTT and HRPD Handovers | - | - | - | R4 | R4-49 | R4-083207 | Revised | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0063 | 2 | F | Rel-8 | 8.3.0 | - | Synchronization Requirements for E-UTRAN to 1xRTT and HRPD Handovers | - | - | - | R4 | R4-49 | R4-083230 | Revised | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0063 | 3 | F | Rel-8 | 8.3.0 | - | Synchronization Requirements for E-UTRAN to 1xRTT and HRPD Handovers | - | - | - | R4 | R4-49 | R4-083239 | Revised | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0063 | 4 | F | Rel-8 | 8.3.0 | 8.4.0 | Synchronization Requirements for E-UTRAN to 1xRTT and HRPD Handovers | RP-42 | RP-080932 | approved | R4 | R4-49 | R4-083334 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0064 | - | F | Rel-8 | 8.3.0 | - | E-UTRAN intra frequency measurements in DRX mode | - | - | - | R4 | R4-49 | R4-082805 | Withdrawn | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0065 | - | F | Rel-8 | 8.3.0 | - | Power Head Room reporting delay | - | - | - | R4 | R4-49 | R4-082806 | Withdrawn | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0066 | - | F | Rel-8 | 8.3.0 | - | Measurements models in RRC_CONNECTED | - | - | - | R4 | R4-49 | R4-082826 | Revised | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0066 | 1 | F | Rel-8 | 8.3.0 | 8.4.0 | Measurements models in RRC_CONNECTED | RP-42 | RP-080933 | approved | R4 | R4-49 | R4-083166 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0067 | - | F | Rel-8 | 8.3.0 | - | Gap Pattern Configurations for LTE UE measurement | - | - | - | R4 | R4-49 | R4-082827 | Noted | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0068 | - | F | Rel-8 | 8.3.0 | - | E-UTRAN intra frequency measurements in non-DRX mode | - | - | - | R4 | R4-49 | R4-082828 | Noted | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0069 | - | F | Rel-8 | 8.3.0 | - | Correction of Inter-RAT UTRA cell reselection requirement | - | - | - | R4 | R4-49 | R4-082830 | Revised | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0069 | 1 | F | Rel-8 | 8.3.0 | - | Correction of Inter-RAT UTRA cell reselection requirement | - | - | - | R4 | R4-49 | R4-083129 | Revised | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0069 | 2 | F | Rel-8 | 8.3.0 | 8.4.0 | Correction of Inter-RAT UTRA cell reselection requirement | RP-42 | RP-080929 | approved | R4 | R4-49 | R4-083246 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0070 | - | F | Rel-8 | 8.3.0 | - | Updates of TS25.133 to include measurement reporting requirements for UTRA to E-UTRA mobility | - | - | - | R4 | R4-49 | R4-082835 | Noted | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0071 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Random access requirements | RP-42 | RP-080931 | approved | R4 | R4-49 | R4-082838 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0072 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Alignment of DRX cycle dependent requirements | RP-42 | RP-080933 | approved | R4 | R4-49 | R4-082928 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0073 | - | F | Rel-8 | 8.3.0 | - | Aligment of sideconditions for mobility measurements | - | - | - | R4 | R4-49 | R4-082929 | Revised | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0073 | 1 | F | Rel-8 | 8.3.0 | - | Aligment of sideconditions for mobility measurements | - | - | - | R4 | R4-49 | R4-083140 | Withdrawn | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0073 | 1 | F | Rel-8 | 8.3.0 | 8.4.0 | Aligment of sideconditions for mobility measurements | RP-42 | RP-080933 | approved | R4 | R4-49 | R4-083141 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0074 | - | B | Rel-8 | 8.3.0 | - | E-UTRA to UTRA cell search requirements for SON | - | - | - | R4 | R4-49 | R4-082997 | Revised | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0074 | 1 | B | Rel-8 | 8.3.0 | 8.4.0 | E-UTRA to UTRA cell search requirements for SON | RP-42 | RP-080937 | approved | R4 | R4-49 | R4-083142 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0075 | - | B | Rel-8 | 8.3.0 | 8.4.0 | cdma2000 1xRTT Measurement Requirements | RP-42 | RP-080936 | approved | R4 | R4-49 | R4-082998 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0076 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Correction to HO Requirements | RP-42 | RP-080930 | approved | R4 | R4-49 | R4-082999 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0077 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Correction to RSRQ Report Mapping | RP-42 | RP-080934 | approved | R4 | R4-49 | R4-083000 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0078 | - | F | Rel-8 | 8.3.0 | - | Limitation of maximum number of layers for multiple monitoring | - | - | - | R4 | R4-49 | R4-083002 | Revised | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0078 | 1 | F | Rel-8 | 8.3.0 | 8.4.0 | Limitation of maximum number of layers for multiple monitoring | RP-42 | RP-080933 | approved | R4 | R4-49 | R4-083236 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0079 | - | B | Rel-8 | 8.3.0 | - | Radio Link Monitoring Minimum Requirements | - | - | - | R4 | R4-49 | R4-083004 | Noted | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0080 | - | B | Rel-8 | 8.3.0 | - | Test Configuration for RRM Tests: Measurement Reference Channels and OCNG | - | - | - | R4 | R4-49 | R4-083005 | Revised | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0080 | 1 | B | Rel-8 | 8.3.0 | 8.4.0 | Test Configuration for RRM Tests: Measurement Reference Channels and OCNG | RP-42 | RP-080935 | approved | R4 | R4-49 | R4-083237 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0081 | - | B | Rel-8 | 8.3.0 | - | Phase I RRM Test Cases | - | - | - | R4 | R4-49 | R4-083006 | Revised | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0081 | 1 | B | Rel-8 | 8.3.0 | 8.4.0 | Phase I RRM Test Cases | RP-42 | RP-080935 | approved | R4 | R4-49 | R4-083153 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0082 | - | B | Rel-8 | 8.3.0 | - | to 36.133 on Radio Link Failure Monitoring | - | - | - | R4 | R4-49 | R4-083021 | Revised | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0082 | 1 | B | Rel-8 | 8.3.0 | - | to 36.133 on Radio Link Failure Monitoring | - | - | - | R4 | R4-49 | R4-083198 | Noted | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0083 | - | F | Rel-8 | 8.3.0 | - | GSM Cell identification requirements for parallel monitoring | - | - | - | R4 | R4-49 | R4-083084 | Revised | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0083 | 1 | F | Rel-8 | 8.3.0 | 8.4.0 | GSM Cell identification requirements for parallel monitoring | RP-42 | RP-080933 | approved | R4 | R4-49 | R4-083299 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0084 | - | F | Rel-8 | 8.3.0 | - | Correction of Inter-RAT UTRA cell reselection requirement | - | - | - | R4 | R4-49 | R4-083241 | Withdrawn | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0085 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Cell phase synchronization error for large cell | RP-42 | RP-080932 | approved | R4 | R4-49 | R4-083259 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0086 | - | F | Rel-8 | 8.3.0 | 8.4.0 | Missing side conditions for RSRP and RSRQ | RP-42 | RP-080934 | approved | R4 | R4-49 | R4-083304 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0087 | - | F | Rel-8 | 8.3.0 | 8.4.0 | UE transmit timing requirement | RP-42 | RP-080933 | approved | R4 | R4-49 | R4-083305 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0088 | - | B | Rel-8 | 8.3.0 | - | to 36.133 on Radio Link Failure Monitoring | - | - | - | R4 | R4-49 | R4-083322 | Revised | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0088 | 1 | B | Rel-8 | 8.3.0 | 8.4.0 | to 36.133 on Radio Link Failure Monitoring | RP-42 | RP-080928 | approved | R4 | R4-49 | R4-083333 | Agreed | 2008-11-28 | LTE-RF | - | 2008-11-28 |
0089 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Modification on measurements of UTRAN TDD cells | RP-43 | RP-090183 | approved | R4 | R4-50 | R4-090457 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0090 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Correction of section 8.1.2.2.2.2 in TS36.133 | RP-43 | RP-090186 | approved | R4 | R4-50 | R4-090458 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0091 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Clarification of the correct behavior when Treselection is not a multiple of idle mode reselection evaluation period | RP-43 | RP-090183 | approved | R4 | R4-50 | R4-090465 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0092 | - | F | Rel-8 | 8.4.0 | - | Cell phase synchronization accuracy | - | - | - | R4 | R4-50 | R4-090472 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0092 | 1 | F | Rel-8 | 8.4.0 | - | Cell phase synchronization accuracy | - | - | - | R4 | R4-50 | R4-090919 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0092 | 2 | F | Rel-8 | 8.4.0 | 8.5.0 | Cell phase synchronization accuracy | RP-43 | RP-090185 | approved | R4 | R4-50 | R4-090994 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0093 | - | F | Rel-8 | 8.4.0 | 8.5.0 | cdma2000 1xRTT and HRPD Measurement Requirements | RP-43 | RP-090186 | approved | R4 | R4-50 | R4-090479 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0094 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Event Triggered Periodic Reporting Requirements for IRAT Measurements | RP-43 | RP-090186 | approved | R4 | R4-50 | R4-090480 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0095 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Measurement Reporting Requirements for E-UTRAN TDD UTRAN TDD Measurements | RP-43 | RP-090186 | approved | R4 | R4-50 | R4-090483 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0096 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Correction to Intra-frequency RSRP Accuracy Requirements | RP-43 | RP-090187 | approved | R4 | R4-50 | R4-090489 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0097 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Radio link monitoring in DRX | RP-43 | RP-090185 | approved | R4 | R4-50 | R4-090504 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0098 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Clarification of out of servicearea concept | RP-43 | RP-090183 | approved | R4 | R4-50 | R4-090505 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0099 | - | F | Rel-8 | 8.4.0 | - | Clarification of UE behavior when GAP is used | - | - | - | R4 | R4-50 | R4-090506 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0099 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Clarification of UE behavior when GAP is used | RP-43 | RP-090186 | approved | R4 | R4-50 | R4-090755 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0100 | - | F | Rel-8 | 8.4.0 | 8.5.0 | E-UTRA to UTRA cell search requirements in DRX for SON | RP-43 | RP-090186 | approved | R4 | R4-50 | R4-090507 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0101 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Correction of A3-offset parameter in RRM test case | RP-43 | RP-090182 | approved | R4 | R4-50 | R4-090508 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0102 | - | F | Rel-8 | 8.4.0 | - | Requirement of event-triggered reporting for detected cell in TS36.133 | - | - | - | R4 | R4-50 | R4-090530 | Withdrawn | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0103 | - | F | Rel-8 | 8.4.0 | - | E-UTRA FDD to GSM Handover Test Case | - | - | - | R4 | R4-50 | R4-090531 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0103 | 1 | F | Rel-8 | 8.4.0 | - | E-UTRA FDD to GSM Handover Test Case | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090940 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0103 | 1 | F | Rel-8 | 8.4.0 | - | E-UTRAN -GSM Handover Test Case | RP-43 | RP-090269 | reissued | R4 | - | R4-090940 | - | 2009-05-02 | LTE-RF | - | 2009-03-20 |
0103 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | E-UTRA FDD to GSM Handover Test Case | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090940 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0104 | - | F | Rel-8 | 8.4.0 | - | E-UTRA FDD- UTRA TDD cell search test case in fading | - | - | - | R4 | R4-50 | R4-090533 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0104 | 1 | F | Rel-8 | 8.4.0 | - | E-UTRA FDD- UTRA TDD cell search test case in fading | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090954 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0104 | 1 | F | Rel-8 | 8.4.0 | - | E-UTRAN FDD - UTRAN TDD Cell Search Test Cases in Fading | RP-43 | RP-090269 | reissued | R4 | - | R4-090954 | - | 2009-01-02 | LTE-RF | - | 2009-03-20 |
0104 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | E-UTRA FDD- UTRA TDD cell search test case in fading | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090954 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0105 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Some Editorial Corrections | RP-43 | RP-090182 | approved | R4 | R4-50 | R4-090534 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0106 | - | F | Rel-8 | 8.4.0 | - | E-UTRA FDD to UTRA FDD Handover Test Case | - | - | - | R4 | R4-50 | R4-090541 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0106 | 1 | F | Rel-8 | 8.4.0 | - | E-UTRA FDD to UTRA FDD Handover Test Case | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090946 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0106 | 1 | F | Rel-8 | 8.4.0 | - | E-UTRA FDD to UTRA FDD Handover Test Case | RP-43 | RP-090269 | reissued | RAN4 | - | R4-090946 | - | 2009-01-30 | LTE-RF | - | 2009-03-20 |
0106 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | E-UTRA FDD to UTRA FDD Handover Test Case | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090946 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0107 | - | F | Rel-8 | 8.4.0 | - | Correction of E-UTRA FDD-FDD Intra-frequency cell reselection test case | - | - | - | R4 | R4-50 | R4-090560 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0107 | 1 | F | Rel-8 | 8.4.0 | - | Correction of E-UTRA FDD-FDD Intra-frequency cell reselection test case | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090936 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0107 | 1 | F | Rel-8 | 8.4.0 | - | Correction of E-UTRA FDD-FDD Intra-frequency cell reselection test case | RP-43 | RP-090269 | reissued | R4 | - | R4-090936 | - | 2009-02-02 | LTE-RF | - | 2009-03-20 |
0107 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Correction of E-UTRA FDD-FDD Intra-frequency cell reselection test case | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090936 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0108 | - | F | Rel-8 | 8.4.0 | - | Correction of E-UTRA FDD-FDD priority based Inter-frequency cell reselection test case | - | - | - | R4 | R4-50 | R4-090561 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0108 | 1 | F | Rel-8 | 8.4.0 | - | Correction of E-UTRA FDD-FDD priority based Inter-frequency cell reselection test case | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090937 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0108 | 1 | F | Rel-8 | 8.4.0 | - | Correction of E-UTRA FDD-FDD priority based Inter-frequency cell reselection test case | RP-43 | RP-090269 | reissued | R4 | - | R4-090937 | - | 2009-02-02 | LTE-RF | - | 2009-03-20 |
0108 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Correction of E-UTRA FDD-FDD priority based Inter-frequency cell reselection test case | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090937 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0109 | - | F | Rel-8 | 8.4.0 | - | UTRA FDD-E-UTRA FDD cell reselection test case when E-UTRA is of lower priority | - | - | - | R4 | R4-50 | R4-090562 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0109 | 1 | F | Rel-8 | 8.4.0 | - | UTRA FDD-E-UTRA FDD cell reselection test case when E-UTRA is of lower priority | - | - | - | R4 | R4-50 | R4-090827 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0109 | 2 | F | Rel-8 | 8.4.0 | - | UTRA FDD-E-UTRA FDD cell reselection test case when E-UTRA is of lower priority | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090958 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0110 | - | F | Rel-8 | 8.4.0 | - | GSM Cell Search Results for parallel monitoring | - | - | - | R4 | R4-50 | R4-090585 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0110 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | GSM Cell Search Results for parallel monitoring | RP-43 | RP-090186 | approved | R4 | R4-50 | R4-090921 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0111 | - | F | Rel-8 | 8.4.0 | - | E-UTRAN TDD - UTRAN FDD Handover Test Case | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090586 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0111 | - | F | Rel-8 | 8.4.0 | - | E-UTRAN TDD - UTRAN FDD Handover Test Case | RP-43 | RP-090269 | reissued | R4 | - | R4-090586 | - | 2009-01-30 | LTE-RF | - | 2009-03-20 |
0111 | - | F | Rel-8 | 8.4.0 | 8.5.0 | E-UTRAN TDD - UTRAN FDD Handover Test Case | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090586 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0112 | - | F | Rel-8 | 8.4.0 | - | E-UTRAN FDD - GSM Cell Search with BSIC Verification Test Case in AWGN | - | - | - | R4 | R4-50 | R4-090587 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0112 | 1 | F | Rel-8 | 8.4.0 | - | E-UTRAN FDD - GSM Cell Search with BSIC Verification Test Case in AWGN | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090938 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0112 | 1 | F | Rel-8 | 8.4.0 | - | E-UTRAN FDD - GSM Cell Search Test Case in AWGN | RP-43 | RP-090269 | reissued | R4 | - | R4-090938 | - | 2009-12-02 | LTE-RF | - | 2009-03-20 |
0112 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | E-UTRAN FDD - GSM Cell Search with BSIC Verification Test Case in AWGN | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090938 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0113 | - | F | Rel-8 | 8.4.0 | - | E-UTRAN - UTRAN FDD Cell Search Test Cases in Fading | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090588 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0113 | - | F | Rel-8 | 8.4.0 | - | E-UTRAN - UTRAN FDD Cell Search Test Cases in Fading | RP-43 | RP-090269 | reissued | R4 | - | R4-090588 | - | 2009-01-30 | LTE-RF | - | 2009-03-20 |
0113 | - | F | Rel-8 | 8.4.0 | 8.5.0 | E-UTRAN - UTRAN FDD Cell Search Test Cases in Fading | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090588 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0114 | - | F | Rel-8 | 8.4.0 | - | E-UTRAN UE Timing Accuracy Related Test Cases | - | - | - | R4 | R4-50 | R4-090589 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0114 | 1 | F | Rel-8 | 8.4.0 | - | E-UTRAN UE Timing Accuracy Related Test Cases | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090934 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0114 | 1 | F | Rel-8 | 8.4.0 | - | E-UTRAN UE Timing Accuracy Related Test Cases | RP-43 | RP-090269 | reissued | R4 | - | R4-090934 | - | 2009-02-13 | LTE-RF | - | 2009-03-20 |
0114 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | E-UTRAN UE Timing Accuracy Related Test Cases | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090934 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0115 | - | F | Rel-8 | 8.4.0 | - | Inclusion of MBSFN Configurations for RRM Test Cases | - | - | - | R4 | R4-50 | R4-090590 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0115 | 1 | F | Rel-8 | 8.4.0 | - | Inclusion of MBSFN Configurations for RRM Test Cases | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090922 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0115 | 1 | F | Rel-8 | 8.4.0 | - | Inclusion of MBSFN Configurations for RRM Test Cases | RP-43 | RP-090269 | reissued | R4 | - | R4-090992 | - | 2009-12-02 | LTE-RF | - | 2009-03-20 |
0115 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Inclusion of MBSFN Configurations for RRM Test Cases | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090922 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0116 | - | F | Rel-8 | 8.4.0 | - | E-UTRAN FDD HRPD Cell Reselection Test Case; HRPD of Low Priority | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090645 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0116 | - | F | Rel-8 | 8.4.0 | - | E-UTRAN FDD HRPD Cell Reselection Test Case; HRPD of Low Priority | RP-43 | RP-090269 | reissued | R4 | - | R4-090645 | - | 2009-01-02 | LTE-RF | - | 2009-03-20 |
0116 | - | F | Rel-8 | 8.4.0 | 8.5.0 | E-UTRAN FDD HRPD Cell Reselection Test Case; HRPD of Low Priority | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090645 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0117 | - | D | Rel-8 | 8.4.0 | 8.5.0 | Alignment of terminology for GAP | RP-43 | RP-090186 | approved | R4 | R4-50 | R4-090649 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0118 | - | F | Rel-8 | 8.4.0 | - | HRPD / 1x reselection | - | - | - | R4 | R4-50 | R4-090726 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0118 | 1 | F | Rel-8 | 8.4.0 | - | HRPD / 1x reselection | - | - | - | R4 | R4-50 | R4-090942 | Noted | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0119 | - | F | Rel-8 | 8.4.0 | - | HRPD / 1x interruption time | - | - | - | R4 | R4-50 | R4-090727 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0119 | 1 | F | Rel-8 | 8.4.0 | - | HRPD / 1x interruption time | - | - | - | R4 | R4-50 | R4-090943 | Noted | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0120 | - | F | Rel-8 | 8.4.0 | - | UE transmit timing | - | - | - | R4 | R4-50 | R4-090728 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0120 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | UE transmit timing | RP-43 | RP-090185 | approved | R4 | R4-50 | R4-090944 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0121 | - | F | Rel-8 | 8.4.0 | - | Radio link monitoring | - | - | - | R4 | R4-50 | R4-090730 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0121 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Radio link monitoring | RP-43 | RP-090183 | approved | R4 | R4-50 | R4-090945 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0122 | - | F | Rel-8 | 8.4.0 | - | Clarification on Annex A.9: Measurement performance requiremnts | - | - | - | R4 | R4-50 | R4-090754 | Revised | 2009-02-27 | RAN-Evo | - | 2009-02-27 |
0122 | 1 | F | Rel-8 | 8.4.0 | - | Clarification on Annex A.9: Measurement performance requirements | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090968 | Agreed | 2009-02-27 | RAN-Evo | - | 2009-02-27 |
0122 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Clarification on Annex A.9: Measurement performance requirements | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090968 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0123 | - | F | Rel-8 | 8.4.0 | - | UTRA TDD-E-UTRA TDD cell reselection_E-UTRA is of higher priority | - | - | - | R4 | R4-50 | R4-090770 | Withdrawn | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0124 | - | F | Rel-8 | 8.4.0 | - | UTRA TDD-E-UTRA TDD cell reselection_E-UTRA is of lower priority | - | - | - | R4 | R4-50 | R4-090771 | Withdrawn | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0125 | - | F | Rel-8 | 8.4.0 | - | E-UTRA TDD-UTRA TDD cell reselection_UTRA is of higher priority | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090772 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0125 | - | F | Rel-8 | 8.4.0 | - | E-UTRA TDD - UTRA TDD cell reselection: UTRA is of higher priority | RP-43 | RP-090269 | reissued | R4 | - | R4-090772 | - | 2009-03-02 | LTE-RF | - | 2009-03-20 |
0125 | - | F | Rel-8 | 8.4.0 | 8.5.0 | E-UTRA TDD-UTRA TDD cell reselection_UTRA is of higher priority | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090772 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0126 | - | F | Rel-8 | 8.4.0 | - | E-UTRA TDD-UTRA TDD cell reselection_UTRA is of lower priority | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090773 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0126 | - | F | Rel-8 | 8.4.0 | - | E-UTRA TDD - UTRA TDD cell reselection: UTRA is of lower priority | RP-43 | RP-090269 | reissued | R4 | - | R4-090773 | - | 2009-03-02 | LTE-RF | - | 2009-03-20 |
0126 | - | F | Rel-8 | 8.4.0 | 8.5.0 | E-UTRA TDD-UTRA TDD cell reselection_UTRA is of lower priority | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090773 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0127 | - | F | Rel-8 | 8.4.0 | - | E-UTRA FDD-UTRA TDD cell reselection | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090774 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0127 | - | F | Rel-8 | 8.4.0 | - | E-UTRA FDD - UTRA TDD cell reselection | RP-43 | RP-090269 | reissued | R4 | - | R4-090774 | - | 2009-03-02 | LTE-RF | - | 2009-03-20 |
0127 | - | F | Rel-8 | 8.4.0 | 8.5.0 | E-UTRA FDD-UTRA TDD cell reselection | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090774 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0128 | - | F | Rel-8 | 8.4.0 | - | E-UTRA TDD-UTRA TDD cell search(fading) | - | - | - | R4 | R4-50 | R4-090775 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0128 | 1 | F | Rel-8 | 8.4.0 | - | E-UTRA TDD-UTRA TDD cell search(fading) | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090956 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0128 | 1 | F | Rel-8 | 8.4.0 | - | E-UTRA TDD-UTRA TDD cell search (fading) | RP-43 | RP-090269 | reissued | R4 | - | R4-090956 | - | 2009-03-02 | LTE-RF | - | 2009-03-20 |
0128 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | E-UTRA TDD-UTRA TDD cell search(fading) | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090956 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0129 | - | F | Rel-8 | 8.4.0 | - | E-UTRA TDD-UTRA TDD handover | - | - | - | R4 | R4-50 | R4-090776 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0129 | 1 | F | Rel-8 | 8.4.0 | - | E-UTRA TDD-UTRA TDD handover | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090957 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0129 | 1 | F | Rel-8 | 8.4.0 | - | E-UTRA TDD-UTRA TDD handover | RP-43 | RP-090269 | reissued | R4 | - | R4-090957 | - | 2009-03-02 | LTE-RF | - | 2009-03-20 |
0129 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | E-UTRA TDD-UTRA TDD handover | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090957 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0130 | - | F | Rel-8 | 8.4.0 | - | Correction on reference measurement channels of TDD for RRM test | - | - | - | R4 | R4-50 | R4-090777 | Noted | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0131 | - | F | Rel-8 | 8.4.0 | - | Modification to the phase 1 interfrequency reselection test case to ensure that the higher priority cell has not been previously detected by the UE | - | - | - | R4 | R4-50 | R4-090781 | Noted | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0132 | - | F | Rel-8 | 8.4.0 | - | Addition of E-UTRA FDD to UTRA FDD reselection test cases | - | - | - | R4 | R4-50 | R4-090782 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0132 | 1 | F | Rel-8 | 8.4.0 | - | Addition of E-UTRA FDD to UTRA FDD reselection test cases | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090941 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0132 | 1 | F | Rel-8 | 8.4.0 | - | Addition of E-UTRA FDD to UTRA FDD reselection test cases | RP-43 | RP-090269 | reissued | R4 | - | R4-090941 | - | 2009-02-02 | LTE-RF | - | 2009-03-20 |
0132 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Addition of E-UTRA FDD to UTRA FDD reselection test cases | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090941 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0133 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Removal of RRC re-establishment procedure delay | RP-43 | RP-090184 | approved | R4 | R4-50 | R4-090796 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0134 | - | F | Rel-8 | 8.4.0 | - | Inter frequency and Inter RAT cell search requirement when DRX is used | - | - | - | R4 | R4-50 | R4-090797 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0134 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Inter frequency and Inter RAT cell search requirement when DRX is used | RP-43 | RP-090186 | approved | R4 | R4-50 | R4-090972 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0135 | - | F | Rel-8 | 8.4.0 | - | Definition of measurement accuracy | - | - | - | R4 | R4-50 | R4-090798 | Noted | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0136 | - | F | Rel-8 | 8.4.0 | - | Power Headroom reporting delay | - | - | - | R4 | R4-50 | R4-090799 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0136 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Power Headroom reporting delay | RP-43 | RP-090187 | approved | R4 | R4-50 | R4-090973 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0137 | - | F | Rel-8 | 8.4.0 | - | Clarification of the reference point for the UE initial transmission timing control requirement | - | - | - | R4 | R4-50 | R4-090801 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0137 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Clarification of the reference point for the UE initial transmission timing control requirement | RP-43 | RP-090185 | approved | R4 | R4-50 | R4-091005 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0138 | - | F | Rel-8 | 8.4.0 | - | Correction for the UE Re-establishment delay requirement | - | - | - | R4 | R4-50 | R4-090802 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0138 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Correction for the UE Re-establishment delay requirement | RP-43 | RP-090184 | approved | R4 | R4-50 | R4-090918 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0139 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Correction of E-UTRAN FDD UTRAN FDD measurements when no DRX | RP-43 | RP-090186 | approved | R4 | R4-50 | R4-090830 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0140 | - | F | Rel-8 | 8.4.0 | - | Correction of FDD and TDD inter-frequency requirements with DRX | - | - | - | R4 | R4-50 | R4-090832 | Noted | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0141 | - | F | Rel-8 | 8.4.0 | - | Correction and introduction of some test related parameters | - | - | - | R4 | R4-50 | R4-090833 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0141 | 1 | F | Rel-8 | 8.4.0 | - | Correction and introduction of some test related parameters | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090935 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0141 | 1 | F | Rel-8 | 8.4.0 | - | Correction and introduction of some test related parameters | RP-43 | RP-090269 | reissued | R4 | - | R4-090935 | - | 2009-02-13 | LTE-RF | - | 2009-03-20 |
0141 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Correction and introduction of some test related parameters | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090935 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0142 | - | F | Rel-8 | 8.4.0 | - | Update of RRC_IDLE state mobility side conditions | - | - | - | R4 | R4-50 | R4-090835 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0142 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Update of RRC_IDLE state mobility side conditions | RP-43 | RP-090183 | approved | R4 | R4-50 | R4-090996 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0143 | - | F | Rel-8 | 8.4.0 | - | Description of Annex A in TS 36.133 | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090846 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0143 | - | F | Rel-8 | 8.4.0 | - | Description of Annex A in TS 36.133 | RP-43 | RP-090269 | reissued | R4 | - | R4-090846 | - | 2009-04-02 | LTE-RF | - | 2009-03-20 |
0143 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Description of Annex A in TS 36.133 | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090846 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0144 | - | F | Rel-8 | 8.4.0 | - | Reselection from E-UTRA FDD to GSM cell test case | - | - | - | R4 | R4-50 | R4-090871 | Withdrawn | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0145 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Clarifications for the DRX state | RP-43 | RP-090182 | approved | R4 | R4-50 | R4-090873 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0146 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Addition of the definition of ""when DRX is used"" | RP-43 | RP-090186 | approved | R4 | R4-50 | R4-090877 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0147 | - | F | Rel-8 | 8.4.0 | - | Corections to E-UTRAN inter-frequency side condtions | - | - | - | R4 | R4-50 | R4-090879 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0147 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Corections to E-UTRAN inter-frequency side condtions | RP-43 | RP-090186 | approved | R4 | R4-50 | R4-090920 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0148 | - | F | Rel-8 | 8.4.0 | - | Reselection from E-UTRA to GSM cell test case | - | - | - | R4 | R4-50 | R4-090910 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0148 | - | F | Rel-8 | 8.4.0 | - | Reselection from E-UTRA to GSM cell test case | RP-43 | RP-090269 | reissued | R4 | - | R4-090939 | - | 2009-02-12 | LTE-RF | - | 2009-03-20 |
0148 | 1 | F | Rel-8 | 8.4.0 | - | Reselection from E-UTRA to GSM cell test case | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-090939 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0148 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | Reselection from E-UTRA to GSM cell test case | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-090939 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0149 | - | F | Rel-8 | 8.4.0 | - | Radio Link Monitoring Test Cases | - | - | - | R4 | R4-50 | R4-090911 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0149 | - | F | Rel-8 | 8.4.0 | - | Radio Link Monitoring Test Cases | RP-43 | RP-090269 | reissued | R4 | - | R4-091040 | - | 2009-02-10 | LTE-RF | - | 2009-03-20 |
0149 | 1 | F | Rel-8 | 8.4.0 | - | Radio Link Monitoring Test Cases | - | - | - | R4 | R4-50 | R4-090933 | Revised | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0149 | 2 | F | Rel-8 | 8.4.0 | - | Radio Link Monitoring Test Cases | RP-43 | RP-090188 | reissued | R4 | R4-50 | R4-091040 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0149 | 2 | F | Rel-8 | 8.4.0 | 8.5.0 | Radio Link Monitoring Test Cases | RP-43 | RP-090370 | approved | R4 | R4-50 | R4-091040 | Agreed | 2009-03-20 | LTE-RF | - | 2009-03-20 |
0150 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Ue measurement capability in IDLE mode | RP-43 | RP-090183 | approved | R4 | R4-50 | R4-091006 | Agreed | 2009-02-27 | LTE-RF | - | 2009-02-27 |
0151 | - | F | Rel-8 | 8.5.0 | 8.6.0 | E-UTRA FDD UTRA TDD HO delay test case | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-091528 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0152 | - | F | Rel-8 | 8.5.0 | - | E-UTRA TDD GSM handover test case | - | - | - | R4 | R4-51 | R4-091529 | Revised | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0152 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | E-UTRA TDD GSM handover test case | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-092012 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0153 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Correction of CQI reporting periodicity for TDD RLM test cases | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-091530 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0154 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Correction of TGRP in clause 8.1.2.1.1 | RP-44 | RP-090548 | approved | R4 | R4-51 | R4-091531 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0155 | - | B | Rel-9 | 8.5.0 | 9.0.0 | Introduction of Extended LTE800 requirements. (Technically Endorsed in R4-50bis - R4-091063) | RP-44 | RP-090559 | approved | R4 | R4-51 | R4-091557 | Agreed | 2009-05-24 | RInImp9-UMTSLTE800 | - | 2009-05-24 |
0156 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Correction on the TDD-TDD inter frequency measurements. (Technically Endorsed in R4-50bis - R4-091071) | RP-44 | RP-090550 | approved | R4 | R4-51 | R4-091559 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0157 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Correction to inter RAT reselection requirements to exclude equal priority. (Technically Endorsed in R4-50bis - R4-091092) | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-091563 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0158 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Alignment of inter frequency and inter RAT RRM reselection testcases with core requirements. (Technically Endorsed in R4-50bis - R4-091094) | RP-44 | RP-090547 | approved | R4 | R4-51 | R4-091564 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0159 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Correction to the Referenced Section Number for Tinter1. (Technically Endorsed in R4-50bis - R4-091153) | RP-44 | RP-090550 | approved | R4 | R4-51 | R4-091566 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0160 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Correction relating E-UTRAN TDD - UE Transmit Timing Accuracy Tests. (Technically Endorsed in R4-50bis - R4-091198) | RP-44 | RP-090547 | approved | R4 | R4-51 | R4-091575 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0161 | - | F | Rel-8 | 8.5.0 | 8.6.0 | E-UTRAN UTRAN HO Command Processing Delay. (Technically Endorsed in R4-50bis - R4-091291) | RP-44 | RP-090549 | approved | R4 | R4-51 | R4-091584 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0162 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Clarifications to UE UL timing requirements. (Technically Endorsed in R4-50bis - R4-091357) | RP-44 | RP-090548 | approved | R4 | R4-51 | R4-091592 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0163 | - | F | Rel-8 | 8.5.0 | - | Correction of E-UTRA FDD-FDD priority based Inter-frequency cell reselection test case. (Technically Endorsed in R4-50bis - R4-091358) | - | - | - | R4 | R4-51 | R4-091593 | Withdrawn | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0164 | - | F | Rel-8 | 8.5.0 | - | UE transmit timing. (Technically Endorsed in R4-50bis - R4-091363) | - | - | - | R4 | R4-51 | R4-091594 | Withdrawn | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0165 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Modifications of T3 and the verification point for in-sync test cases. (Technically Endorsed in R4-50bis - R4-091386) | RP-44 | RP-090547 | approved | R4 | R4-51 | R4-091597 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0166 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Further clarification of DRX/Non-DRX state. (Technically Endorsed in R4-50bis - R4-091389) | RP-44 | RP-090551 | approved | R4 | R4-51 | R4-091598 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0167 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Clarification of the number of monitoring carriers in idle mode. (Technically Endorsed in R4-50bis - R4-091394) | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-091599 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0168 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Clarifications for the Relative RSRP and RSRQ measurement requirements. (Technically Endorsed in R4-50bis - R4-091407) | RP-44 | RP-090548 | approved | R4 | R4-51 | R4-091605 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0169 | - | F | Rel-8 | 8.5.0 | 8.6.0 | OCNG simplification. (Technically Endorsed in R4-50bis - R4-091410) | RP-44 | RP-090551 | approved | R4 | R4-51 | R4-091606 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0170 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Misalignment between TS36.133 and TS36.321. (Technically Endorsed in R4-50bis - R4-091457) | RP-44 | RP-090548 | approved | R4 | R4-51 | R4-091621 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0171 | - | F | Rel-8 | 8.5.0 | - | Reference measurement Channels for Radio Link Monitoring Tests with 2 Antennas. (Technically Endorsed in R4-50bis - R4-091508) | - | - | - | R4 | R4-51 | R4-091640 | Revised | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0171 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | Reference measurement Channels for Radio Link Monitoring Tests with 2 Antennas. (Technically Endorsed in R4-50bis - R4-091508) | RP-44 | RP-090547 | approved | R4 | R4-51 | R4-092017 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0172 | - | F | Rel-8 | 8.5.0 | 8.6.0 | E-UTRAN UE Timing Accuracy Related Test Cases. (Technically Endorsed in R4-50bis - R4-091517) | RP-44 | RP-090547 | approved | R4 | R4-51 | R4-091643 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0173 | - | F | Rel-8 | 8.5.0 | - | Correction of cell reselection test cases | - | - | - | R4 | R4-51 | R4-091645 | Revised | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0173 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | Correction of cell reselection test cases | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-091955 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0174 | - | F | Rel-8 | 8.5.0 | - | UE transmit timing | - | - | - | R4 | R4-51 | R4-091646 | Noted | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0175 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Corrections of Cell Reselection Requirements in Idle Mode | RP-44 | RP-090549 | approved | R4 | R4-51 | R4-091651 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0176 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Corrections of Random Access Requirements | RP-44 | RP-090548 | approved | R4 | R4-51 | R4-091652 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0177 | - | F | Rel-8 | 8.5.0 | - | Introduction of New Reference Channels and OCNG Patterns for 1.4MHz Bandwidth | - | - | - | R4 | R4-51 | R4-091653 | Revised | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0177 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | Introduction of New Reference Channels and OCNG Patterns for 1.4MHz Bandwidth | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-092084 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0178 | - | F | Rel-8 | 8.5.0 | - | Test cases of E-UTRA FDD intra-frequency cell search in fading environment when DRX is used | - | - | - | R4 | R4-51 | R4-091654 | Revised | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0178 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | Test cases of E-UTRA FDD intra-frequency cell search in fading environment when DRX is used | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-092013 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0179 | - | F | Rel-8 | 8.5.0 | - | Test cases of E-UTRA TDD intra-frequency cell search in fading environment when DRX is used | - | - | - | R4 | R4-51 | R4-091655 | Revised | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0179 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | Test cases of E-UTRA TDD intra-frequency cell search in fading environment when DRX is used | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-092010 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0180 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Correction of Core spec references in A.9 Measurements performance test cases | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-091689 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0181 | - | F | Rel-8 | 8.5.0 | - | Removal of [ ] from ranking criteria in Idle mode cell reselection | - | - | - | R4 | R4-51 | R4-091690 | Revised | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0181 | 1 | F | Rel-8 | 8.5.0 | - | Removal of [ ] from ranking criteria in Idle mode cell reselection | - | - | - | R4 | R4-51 | R4-092016 | Revised | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0181 | 2 | F | Rel-8 | 8.5.0 | 8.6.0 | Removal of [ ] from ranking criteria in Idle mode cell reselection | RP-44 | RP-090549 | approved | R4 | R4-51 | R4-092093 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0182 | - | F | Rel-8 | 8.5.0 | - | Introduction of Reference DRX configurations | - | - | - | R4 | R4-51 | R4-091754 | Not handled | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0183 | - | F | Rel-8 | 8.5.0 | - | Addition of DRX configurations into non DRX test cases | - | - | - | R4 | R4-51 | R4-091755 | Withdrawn | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0184 | - | F | Rel-8 | 8.5.0 | 8.6.0 | SON ANR UTRAN FDD Cell Search Test Case | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-091784 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0185 | - | F | Rel-8 | 8.5.0 | - | Correction to Radio Link Monitoring Tests | - | - | - | R4 | R4-51 | R4-091817 | Revised | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0185 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | Correction to Radio Link Monitoring Tests | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-092015 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0186 | - | F | Rel-8 | 8.5.0 | - | OCNG Patterns for 1.4 MHz Channel Bandwidth | - | - | - | R4 | R4-51 | R4-091818 | Noted | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0187 | - | F | Rel-8 | 8.5.0 | 8.6.0 | E-UTRAN FDD cdma2000 1x RTT Cell Reselection Test Case; Cdma2000 1X of Low Priority | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-091819 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0188 | - | F | Rel-8 | 8.5.0 | 8.6.0 | E-UTRAN FDD cdma2000 HO Test cases | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-091820 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0189 | - | F | Rel-8 | 8.5.0 | - | UTRAN FDD - E-UTRAN Cell Search Test Cases | - | - | - | R4 | R4-51 | R4-091821 | Withdrawn | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0190 | - | F | Rel-8 | 8.5.0 | 8.6.0 | E-UTRAN Random Access Test Cases | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-091822 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0191 | - | F | Rel-8 | 8.5.0 | 8.6.0 | E-UTRAN RRC Re-establishment Test Cases | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-091823 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0192 | - | F | Rel-8 | 8.5.0 | 8.6.0 | E-UTRAN TDD - GSM Cell Search Test Case in AWGN | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-091824 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0193 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Correction to Inter-RAT HO Interruption Time Definition | RP-44 | RP-090548 | approved | R4 | R4-51 | R4-091825 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0194 | - | F | Rel-8 | 8.5.0 | - | RLM Clarification | - | - | - | R4 | R4-51 | R4-091898 | Noted | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0195 | - | F | Rel-8 | 8.5.0 | 8.6.0 | c2k RRC delay | RP-44 | RP-090548 | approved | R4 | R4-51 | R4-091899 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0196 | - | F | Rel-8 | 8.5.0 | 8.6.0 | c2k interruption time | RP-44 | RP-090548 | approved | R4 | R4-51 | R4-091900 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0197 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Correction to E-UTRAN FDD - GSM Handover Test case | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-091915 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0198 | - | F | Rel-8 | 8.5.0 | - | Clarification of the number of monitoring cells for intra frequency measurements | - | - | - | R4 | R4-51 | R4-091933 | not handled | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0199 | - | F | Rel-8 | 8.5.0 | - | Corrections for Measurements of GSM cells in RRC_IDLE | - | - | - | R4 | R4-51 | R4-091939 | Not handled | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0200 | - | F | Rel-8 | 8.5.0 | - | Test case for E-UTRA TDD E-UTRA TDD inter frequency cell search when DRX is used in fading conditions | - | - | - | R4 | R4-51 | R4-091942 | Revised | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0200 | 1 | F | Rel-8 | 8.5.0 | - | Test case for E-UTRA TDD E-UTRA TDD inter frequency cell search when DRX is used in fading conditions | - | - | - | R4 | R4-51 | R4-092009 | Revised | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0200 | 2 | F | Rel-8 | 8.5.0 | 8.6.0 | Test case for E-UTRA TDD E-UTRA TDD inter frequency cell search when DRX is used in fading conditions | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-092106 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0201 | - | F | Rel-8 | 8.5.0 | - | Test case for E-UTRA FDD E-UTRA FDD inter frequency cell search when DRX is used in fading conditions | - | - | - | R4 | R4-51 | R4-091943 | Revised | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0201 | 1 | F | Rel-8 | 8.5.0 | 8.6.0 | Test case for E-UTRA FDD E-UTRA FDD inter frequency cell search when DRX is used in fading conditions | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-092014 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0202 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Correction on reference to 3GPP2 specification | RP-44 | RP-090551 | approved | R4 | R4-51 | R4-091989 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0203 | - | F | Rel-8 | 8.5.0 | 8.6.0 | Correction to E-UTRAN FDD to HRPD Cell Reselection Test Case | RP-44 | RP-090546 | approved | R4 | R4-51 | R4-092020 | Agreed | 2009-05-24 | LTE-RF | - | 2009-05-24 |
0204 | - | F | Rel-8 | 8.6.0 | - | Introduction of Reference DRX configurations | RP-45 | RP-090830 | reissued | R4 | - | R4-092609 | - | 2009-07-24 | LTE-RF | - | 2009-09-18 |
0204 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Introduction of Reference DRX configurations (R43-51 Endorsed in: R4-092172) | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-092609 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0205 | - | A | Rel-9 | 9.0.0 | - | Introduction of Reference DRX configurations | RP-45 | RP-090830 | reissued | R4 | - | R4-092610 | - | 2009-07-24 | LTE-RF | - | 2009-09-18 |
0205 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Introduction of Reference DRX configurations (R43-51Cat F Endorsed in: R4-092172) | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-092610 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0206 | - | F | Rel-8 | 8.6.0 | - | Addition of DRX configurations into non DRX test cases | RP-45 | RP-090830 | reissued | R4 | - | R4-092611 | - | 2009-07-24 | LTE-RF | - | 2009-09-18 |
0206 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Addition of DRX configurations into non DRX test cases (R43-51 Endorsed in: R4-092173) | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-092611 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0207 | - | A | Rel-9 | 9.0.0 | - | Addition of DRX configurations into non DRX test cases | RP-45 | RP-090830 | reissued | R4 | - | R4-092612 | - | 2009-07-24 | LTE-RF | - | 2009-09-18 |
0207 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Addition of DRX configurations into non DRX test cases (R43-51Cat F Endorsed in: R4-092173) | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-092612 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0208 | - | F | Rel-8 | 8.6.0 | - | Correction of Srs-ConfigurationIndex for E-UTRAN TDD test cases (R43-51 Endorsed in: R4-092182) | - | - | - | R4 | R4-52 | R4-092613 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0209 | - | A | Rel-9 | 9.0.0 | - | Correction of Srs-ConfigurationIndex for E-UTRAN TDD test cases (R43-51Cat F Endorsed in: R4-092182) | - | - | - | R4 | R4-52 | R4-092614 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0210 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Correction to TDD RMC references in RLM test cases (R43-51 Endorsed in: R4-092215) | RP-45 | RP-090817 | approved | R4 | R4-52 | R4-092623 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0211 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Correction to TDD RMC references in RLM test cases (R43-51Cat F Endorsed in: R4-092215) | RP-45 | RP-090817 | approved | R4 | R4-52 | R4-092624 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0212 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Editorial correction on E-UTRAN inter frequency measurements (R43-51 Endorsed in: R4-092223) | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-092629 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0213 | - | A | Rel-9 | 9.0.0 | - | Editorial correction on E-UTRAN inter frequency measurements (R43-51Cat F Endorsed in: R4-092223) | - | - | - | R4 | R4-52 | R4-092630 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0213 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Editorial correction on E-UTRAN inter frequency measurements (R43-51Cat F Endorsed in: R4-092223) | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-093305 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0214 | - | F | Rel-8 | 8.6.0 | - | Corrections to Measurements of HRPD cells and cdma2000 1X (R43-51 Endorsed in: R4-092242) | - | - | - | R4 | R4-52 | R4-092643 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0214 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | Corrections to Measurements of HRPD cells and cdma2000 1X (R43-51 Endorsed in: R4-092242) | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-093477 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0215 | - | A | Rel-9 | 9.0.0 | - | Corrections to Measurements of HRPD cells and cdma2000 1X (R43-51Cat F Endorsed in: R4-092242) | - | - | - | R4 | R4-52 | R4-092644 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0215 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Corrections to Measurements of HRPD cells and cdma2000 1X (R43-51Cat F Endorsed in: R4-092242) | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-093479 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0216 | - | F | Rel-8 | 8.6.0 | - | Corrections to E-UTRAN RRC_IDLE state mobility requirements (R43-51 Endorsed in: R4-092243) | - | - | - | R4 | R4-52 | R4-092645 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0216 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | Corrections to E-UTRAN RRC_IDLE state mobility requirements (R43-51 Endorsed in: R4-092243) | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-093478 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0217 | - | A | Rel-9 | 9.0.0 | - | Corrections to E-UTRAN RRC_IDLE state mobility requirements (R43-51Cat F Endorsed in: R4-092243) | - | - | - | R4 | R4-52 | R4-092646 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0217 | 1 | A | Rel-9 | 9.0.0 | - | Corrections to E-UTRAN RRC_IDLE state mobility requirements (R43-51Cat F Endorsed in: R4-092243) | - | - | - | R4 | R4-52 | R4-093295 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0217 | 2 | A | Rel-9 | 9.0.0 | 9.1.0 | Corrections to E-UTRAN RRC_IDLE state mobility requirements (R43-51Cat F Endorsed in: R4-092243) | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-093482 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0218 | - | F | Rel-8 | 8.6.0 | 8.7.0 | E-UTRAN FDD-FDD inter frequency measurements when DRX is used (R43-51 Endorsed in: R4-092310) | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-092654 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0219 | - | A | Rel-9 | 9.0.0 | - | E-UTRAN FDD-FDD inter frequency measurements when DRX is used (R43-51Cat F Endorsed in: R4-092310) | - | - | - | R4 | R4-52 | R4-092655 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0219 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | E-UTRAN FDD-FDD inter frequency measurements when DRX is used (R43-51Cat F Endorsed in: R4-092310) | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-093300 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0220 | - | F | Rel-8 | 8.6.0 | 8.7.0 | E-UTRAN TDD-TDD inter frequency cell search/measurement requirements when DRX is used (R43-51 Endorsed in: R4-092312) | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-092656 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0221 | - | A | Rel-9 | 9.0.0 | 9.1.0 | E-UTRAN TDD-TDD inter frequency cell search/measurement requirements when DRX is used (R43-51Cat F Endorsed in: R4-092312) | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-092657 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0222 | - | F | Rel-8 | 8.6.0 | 8.7.0 | E-UTRAN inter RAT measurement requirements (R43-51 Endorsed in: R4-092313) | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-092658 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0223 | - | A | Rel-9 | 9.0.0 | 9.1.0 | E-UTRAN inter RAT measurement requirements (R43-51Cat F Endorsed in: R4-092313) | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-092659 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0224 | - | F | Rel-8 | 8.6.0 | - | Correction to HO Test Cases | RP-45 | RP-090830 | reissued | R4 | - | R4-092260 | - | 2009-08-15 | LTE-RF | - | 2009-09-18 |
0224 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Correction to HO Test Cases (R43-51 Endorsed in: R4-092342) | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-092660 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0225 | - | A | Rel-9 | 9.0.0 | - | Correction to HO Test Cases | RP-45 | RP-090830 | reissued | R4 | - | R4-092261 | - | 2009-08-15 | LTE-RF | - | 2009-09-18 |
0225 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Correction to HO Test Cases (R43-51Cat F Endorsed in: R4-092342) | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-092661 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0226 | - | F | Rel-8 | 8.6.0 | - | Correction to E-UTRAN GSM BSIC Identification Requirements with DRX | RP-45 | RP-090830 | reissued | R4 | - | R4-092262 | - | 2009-08-15 | LTE-RF | - | 2009-09-18 |
0226 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Correction to E-UTRAN GSM BSIC Identification Requirements with DRX (R43-51 Endorsed in: R4-092343) | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-092662 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0227 | - | A | Rel-9 | 9.0.0 | - | Correction to E-UTRAN GSM BSIC Identification Requirements with DRX | RP-45 | RP-090830 | reissued | R4 | - | R4-092263 | - | 2009-08-15 | LTE-RF | - | 2009-09-18 |
0227 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Correction to E-UTRAN GSM BSIC Identification Requirements with DRX (R43-51Cat F Endorsed in: R4-092343) | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-092663 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0228 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Correction to Monitoring of Multiple Layers Using Gaps (R43-51 Endorsed in: R4-092344) | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-092664 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0229 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Correction to Monitoring of Multiple Layers Using Gaps (R43-51Cat F Endorsed in: R4-092344) | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-092665 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0230 | - | F | Rel-8 | 8.6.0 | - | Reference correction | RP-45 | RP-090829 | reissued | RAN4 | - | R4-092672 | - | 2009-09-08 | LTE-RF | - | 2009-09-18 |
0230 | - | F | Rel-8 | 8.6.0 | 8.7.0 | reference correction (R43-51 Endorsed CR in: R4-092478) | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-092672 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0231 | - | A | Rel-9 | 9.0.0 | - | Reference correction | RP-45 | RP-090829 | reissued | RAN4 | - | R4-092673 | - | 2009-09-08 | LTE-RF | - | 2009-09-18 |
0231 | - | A | Rel-9 | 9.0.0 | 9.1.0 | reference correction (R43-51Cat F Endorsed CR in: R4-092478) | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-092673 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0232 | - | F | Rel-8 | 8.6.0 | 8.7.0 | SI HRPD correction (R43-51 Endorsed CR in: R4-092479) | RP-45 | RP-090828 | approved | R4 | R4-52 | R4-092674 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0233 | - | A | Rel-9 | 9.0.0 | 9.1.0 | SI HRPD correction (R43-51Cat F Endorsed CR in: R4-092479) | RP-45 | RP-090828 | approved | R4 | R4-52 | R4-092675 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0234 | - | F | Rel-8 | 8.6.0 | - | Corrections to Measurements of GSM cells in RRC_IDLE (R43-51 Endorsed in: R4-092545) | - | - | - | R4 | R4-52 | R4-092682 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0234 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | Corrections to Measurements of GSM cells in RRC_IDLE (R43-51 Endorsed in: R4-092545) | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-093480 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0235 | - | A | Rel-9 | 9.0.0 | - | Corrections to Measurements of GSM cells in RRC_IDLE (R43-51Cat F Endorsed in: R4-092545) | - | - | - | R4 | R4-52 | R4-092683 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0235 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Corrections to Measurements of GSM cells in RRC_IDLE (R43-51Cat F Endorsed in: R4-092545) | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-093481 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0236 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Correction of timing advance adjustment accuracy test case (R43-51 Endorsed in: R4-092567) | RP-45 | RP-090815 | approved | R4 | R4-52 | R4-092684 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0237 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Correction of timing advance adjustment accuracy test case (R43-51Cat F Endorsed in: R4-092567) | RP-45 | RP-090815 | approved | R4 | R4-52 | R4-092685 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0238 | - | F | Rel-8 | 8.6.0 | - | Corrections to PDSCH RMC-s | - | - | - | R4 | R4-52 | R4-092718 | - | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0239 | - | A | Rel-9 | 9.0.0 | - | Corrections to PDSCH RMC-s | - | - | - | R4 | R4-52 | R4-092719 | - | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0240 | - | F | Rel-8 | 8.6.0 | - | Small corrections to UE Timing and Measurement performance | - | - | - | R4 | R4-52 | R4-092725 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0240 | 1 | F | Rel-8 | 8.6.0 | - | Small corrections to UE Timing and Measurement performance | - | - | - | R4 | R4-52 | R4-093264 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0240 | 2 | F | Rel-8 | 8.6.0 | - | Small corrections to UE Timing and Measurement performance | - | - | - | R4 | R4-52 | R4-093293 | Noted | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0241 | - | A | Rel-9 | 9.0.0 | - | Small corrections to UE Timing and Measurement performance | - | - | - | R4 | R4-52 | R4-092726 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0241 | 1 | A | Rel-9 | 9.0.0 | - | Small corrections to UE Timing and Measurement performance | - | - | - | R4 | R4-52 | R4-093265 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0241 | 2 | A | Rel-9 | 9.0.0 | - | Small corrections to UE Timing and Measurement performance | - | - | - | R4 | R4-52 | R4-093294 | Noted | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0242 | - | F | Rel-8 | 8.6.0 | - | Small corrections to Handover test parameters | - | - | - | R4 | R4-52 | R4-092727 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0242 | 1 | F | Rel-8 | 8.6.0 | - | Small corrections to Handover test parameters | - | - | - | R4 | R4-52 | R4-093420 | - | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0243 | - | A | Rel-9 | 9.0.0 | - | Small corrections to Handover test parameters | - | - | - | R4 | R4-52 | R4-092728 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0243 | 1 | A | Rel-9 | 9.0.0 | - | Small corrections to Handover test parameters | - | - | - | R4 | R4-52 | R4-093421 | - | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0244 | - | F | Rel-8 | 8.6.0 | - | Clarification to applicability of RSRP side conditions in Idle mode | - | - | - | R4 | R4-52 | R4-092729 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0244 | - | F | Rel-8 | 8.6.0 | - | Clarification to applicability of RSRP side conditions in Idle mode | RP-45 | RP-090829 | reissued | RAN4 | - | R4-093289 | - | 2009-08-27 | LTE-RF | - | 2009-09-18 |
0244 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | Clarification to applicability of RSRP side conditions in Idle mode | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-093289 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0245 | - | A | Rel-9 | 9.0.0 | - | Clarification to applicability of RSRP side conditions in Idle mode | - | - | - | R4 | R4-52 | R4-092730 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0245 | - | A | Rel-9 | 9.0.0 | - | Clarification to applicability of RSRP side conditions in Idle mode | RP-45 | RP-090829 | reissued | RAN4 | - | R4-093290 | - | 2009-08-27 | LTE-RF | - | 2009-09-18 |
0245 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Clarification to applicability of RSRP side conditions in Idle mode | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-093290 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0246 | - | F | Rel-8 | 8.6.0 | - | Range of Idle Mode Es/Iot side conditions | RP-45 | RP-090829 | reissued | RAN4 | - | R4-092731 | - | 2009-08-14 | LTE-RF | - | 2009-09-18 |
0246 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Range of Idle Mode Es/Iot side conditions | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-092731 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0247 | - | A | Rel-9 | 9.0.0 | - | Range of Idle Mode Es/Iot side conditions | RP-45 | RP-090829 | reissued | RAN4 | - | R4-092732 | - | 2009-08-14 | LTE-RF | - | 2009-09-18 |
0247 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Range of Idle Mode Es/Iot side conditions | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-092732 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0248 | - | F | Rel-8 | 8.6.0 | - | Removal of [ ] from Tdetect, Tmeasure and Tevaluate | RP-45 | RP-090829 | reissued | RAN4 | - | R4-092733 | - | 2009-08-14 | LTE-RF | - | 2009-09-18 |
0248 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Removal of [ ] from Tdetect, Tmeasure and Tevaluate | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-092733 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0249 | - | A | Rel-9 | 9.0.0 | - | Removal of [ ] from Tdetect, Tmeasure and Tevaluate | RP-45 | RP-090829 | reissued | RAN4 | - | R4-092734 | - | 2009-08-14 | LTE-RF | - | 2009-09-18 |
0249 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Removal of [ ] from Tdetect, Tmeasure and Tevaluate | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-092734 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0250 | - | F | Rel-8 | 8.6.0 | - | Geometry factors for intra-freq cell reselection Test cases | - | - | - | R4 | R4-52 | R4-092735 | Noted | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0251 | - | A | Rel-9 | 9.0.0 | - | Geometry factors for intra-freq cell reselection Test cases | - | - | - | R4 | R4-52 | R4-092736 | Noted | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0252 | - | F | Rel-8 | 8.6.0 | - | E-UTRAN FDD-FDD inter frequency measurements when DRX is used | - | - | - | R4 | R4-52 | R4-092784 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0253 | - | A | Rel-9 | 9.0.0 | - | E-UTRAN FDD-FDD inter frequency measurements when DRX is used | - | - | - | R4 | R4-52 | R4-092785 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0254 | - | F | Rel-8 | 8.6.0 | - | E-UTRAN TDD-TDD inter frequency cell search/measurement requirements when DRX is used | - | - | - | R4 | R4-52 | R4-092786 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0255 | - | A | Rel-9 | 9.0.0 | - | E-UTRAN TDD-TDD inter frequency cell search/measurement requirements when DRX is used | - | - | - | R4 | R4-52 | R4-092787 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0256 | - | F | Rel-8 | 8.6.0 | - | E-UTRAN inter RAT measurement requirements | - | - | - | R4 | R4-52 | R4-092788 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0257 | - | A | Rel-9 | 9.0.0 | - | E-UTRAN inter RAT measurement requirements | - | - | - | R4 | R4-52 | R4-092789 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0258 | - | F | Rel-8 | 8.6.0 | - | Correstions of Test Cases | RP-45 | RP-090830 | reissued | R4 | - | R4-092790 | - | 2009-08-17 | LTE-RF | - | 2009-09-18 |
0258 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Corrections of Test Cases | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-092790 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0259 | - | A | Rel-9 | 9.0.0 | - | Correstions of Test Cases | RP-45 | RP-090830 | reissued | R4 | - | R4-092791 | - | 2009-08-17 | LTE-RF | - | 2009-09-18 |
0259 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Corrections of Test Cases | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-092791 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0260 | - | F | Rel-8 | 8.6.0 | - | E-UTRAN TDD intra frequency measurements | - | - | - | R4 | R4-52 | R4-092792 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0260 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | E-UTRAN TDD intra frequency measurements | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-093312 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0261 | - | A | Rel-9 | 9.0.0 | - | E-UTRAN TDD intra frequency measurements | - | - | - | R4 | R4-52 | R4-092793 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0261 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | E-UTRAN TDD intra frequency measurements | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-093313 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0262 | - | F | Rel-8 | 8.6.0 | - | E-UTRA FDD UTRA FDD Blind Handover test case: unknown target cell | - | - | - | R4 | R4-52 | R4-092817 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0262 | 1 | A | Rel-9 | 9.0.0 | - | E-UTRA FDD -UTRA FDD Blind Handover test case | RP-45 | RP-090830 | reissued | R4 | - | R4-093287 | - | 2009-08-24 | LTE-RF | - | 2009-09-18 |
0262 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | E-UTRA FDD UTRA FDD Blind Handover test case: unknown target cell | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-093286 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0263 | - | A | Rel-9 | 9.0.0 | - | E-UTRA FDD UTRA FDD Blind Handover test case: unknown target cell | - | - | - | R4 | R4-52 | R4-092818 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0263 | 1 | A | Rel-9 | 9.0.0 | - | E-UTRA FDD UTRA FDD Blind Handover test case: unknown target cell | - | - | - | R4 | R4-52 | R4-093287 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0263 | 2 | A | Rel-9 | 9.0.0 | 9.1.0 | E-UTRA FDD UTRA FDD Blind Handover test case: unknown target cell | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-093483 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0264 | - | F | Rel-8 | 8.6.0 | - | Correction to Random Access | - | - | - | R4 | R4-52 | R4-092822 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0264 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | Correction to Random Access | RP-45 | RP-090814 | approved | R4 | R4-52 | R4-093296 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0265 | - | A | Rel-9 | 9.0.0 | - | Correction to Random Access | - | - | - | R4 | R4-52 | R4-092823 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0265 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Correction to Random Access | RP-45 | RP-090814 | approved | R4 | R4-52 | R4-093297 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0266 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Set 3.2. E-UTRA TDD to UTRA TDD cell search in DRX under fading | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-092835 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0267 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Set 3.2. E-UTRA TDD to UTRA TDD cell search in DRX under fading | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-092836 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0268 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Set 3.6. Test case of E-UTRA TDD to E-UTRA TDD and UTRA TDD combined cell search under fading | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-092837 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0269 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Set 3.6. Test case of E-UTRA TDD to E-UTRA TDD and UTRA TDD combined cell search under fading | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-092838 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0270 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Set 3.12. E-UTRA TDD to UTRA TDD blind handover test | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-092839 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0271 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Set 3.12. E-UTRA TDD to UTRA TDD blind handover test | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-092840 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0272 | - | F | Rel-8 | 8.6.0 | - | Corrections to Measurements of GSM cells in RRC_IDLE | - | - | withdrawn | R4 | R4-52 | R4-092873 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0272 | - | F | Rel-8 | 8.6.0 | - | Corrections to Measurements of GSM cells in RRC_IDLE | RP-45 | RP-090829 | withdrawn | R4 | - | R4-092682 | withdrawn | 2009-08-24 | LTE-RF | - | 2009-09-18 |
0273 | - | A | Rel-9 | 9.0.0 | - | Corrections to Measurements of GSM cells in RRC_IDLE | - | - | withdrawn | R4 | R4-52 | R4-092874 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0273 | - | A | Rel-9 | 9.0.0 | - | Corrections to Measurements of GSM cells in RRC_IDLE | RP-45 | RP-090829 | withdrawn | R4 | - | R4-092683 | withdrawn | 2009-08-24 | LTE-RF | - | 2009-09-18 |
0274 | - | F | Rel-8 | 8.6.0 | - | Corrections to Measurements of HRPD cells and cdma2000 1X | - | - | withdrawn | R4 | R4-52 | R4-092875 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0274 | - | F | Rel-8 | 8.6.0 | - | Corrections to Measurements of HRPD cells and cdma2000 1X | RP-45 | RP-090829 | withdrawn | R4 | - | R4-092643 | withdrawn | 2009-08-24 | LTE-RF | - | 2009-09-18 |
0275 | - | A | Rel-9 | 9.0.0 | - | Corrections to Measurements of HRPD cells and cdma2000 1X | - | - | withdrawn | R4 | R4-52 | R4-092876 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0275 | - | A | Rel-9 | 9.0.0 | - | Corrections to Measurements of HRPD cells and cdma2000 1X | RP-45 | RP-090829 | withdrawn | R4 | - | R4-092644 | withdrawn | 2009-08-24 | LTE-RF | - | 2009-09-18 |
0276 | - | F | Rel-8 | 8.6.0 | - | Corrections to E-UTRAN RRC_IDLE state mobility requirements | - | - | withdrawn | R4 | R4-52 | R4-092877 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0276 | - | F | Rel-8 | 8.6.0 | - | Corrections to E-UTRAN RRC_IDLE state mobility requirements | RP-45 | RP-090829 | withdrawn | R4 | - | R4-092645 | withdrawn | 2009-08-24 | LTE-RF | - | 2009-09-18 |
0277 | - | A | Rel-9 | 9.0.0 | - | Corrections to E-UTRAN RRC_IDLE state mobility requirements | - | - | withdrawn | R4 | R4-52 | R4-092878 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0277 | 1 | A | Rel-9 | 9.0.0 | - | Corrections to E-UTRAN RRC_IDLE state mobility requirements | RP-45 | RP-090829 | withdrawn | R4 | - | R4-093295 | withdrawn | 2009-08-25 | LTE-RF | - | 2009-09-18 |
0278 | - | F | Rel-8 | 8.6.0 | 8.7.0 | E-UTRAN FDD - UTRAN FDD Cell Search in DRX Test Cases | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-093057 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0279 | - | A | Rel-9 | 9.0.0 | 9.1.0 | E-UTRAN FDD - UTRAN FDD Cell Search in DRX Test Cases | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-093058 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0280 | - | F | Rel-8 | 8.6.0 | 8.7.0 | E-UTRAN TDD- E-UTRAN TDD and E-UTRAN TDD Inter-frequency Cell Search Test Case | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-093059 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0281 | - | A | Rel-9 | 9.0.0 | 9.1.0 | E-UTRAN TDD- E-UTRAN TDD and E-UTRAN TDD Inter-frequency Cell Search Test Case | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-093060 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0282 | - | F | Rel-8 | 8.6.0 | 8.7.0 | E-UTRAN GSM Blind Handover Test Cases | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-093061 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0283 | - | A | Rel-9 | 9.0.0 | 9.1.0 | E-UTRAN GSM Blind Handover Test Cases | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-093062 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0284 | - | F | Rel-8 | 8.6.0 | - | E-UTRAN GSM Cell Search in DRX Test Cases | - | - | - | R4 | R4-52 | R4-093063 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0284 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | E-UTRAN GSM Cell Search in DRX Test Cases | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-093320 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0285 | - | A | Rel-9 | 9.0.0 | - | E-UTRAN GSM Cell Search in DRX Test Cases | - | - | - | R4 | R4-52 | R4-093064 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0285 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | E-UTRAN GSM Cell Search in DRX Test Cases | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-093321 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0286 | - | F | Rel-8 | 8.6.0 | 8.7.0 | E-UTRAN FDD cdma2000 Blind HO Test cases | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-093065 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0287 | - | A | Rel-9 | 9.0.0 | 9.1.0 | E-UTRAN FDD cdma2000 Blind HO Test cases | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-093066 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0288 | - | F | Rel-8 | 8.6.0 | - | UTRAN FDD- E-UTRAN FDD Handover to Unknown Target Cell Test Cases | - | - | - | R4 | R4-52 | R4-093067 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0289 | - | A | Rel-9 | 9.0.0 | - | UTRAN FDD- E-UTRAN FDD Handover to Unknown Target Cell Test Cases | - | - | - | R4 | R4-52 | R4-093068 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0290 | - | F | Rel-8 | 8.6.0 | - | Correction to UE Transmit Timing Requirements | - | - | - | R4 | R4-52 | R4-093069 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0291 | - | A | Rel-9 | 9.0.0 | - | Correction to UE Transmit Timing Requirements | - | - | - | R4 | R4-52 | R4-093070 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0292 | - | F | Rel-8 | 8.6.0 | - | Side Conditions for Event Triggered Reporting Requirements | - | - | - | R4 | R4-52 | R4-093071 | Noted | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0293 | - | A | Rel-9 | 9.0.0 | - | Side Conditions for Event Triggered Reporting Requirements | - | - | - | R4 | R4-52 | R4-093072 | Noted | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0294 | - | F | Rel-8 | 8.6.0 | 8.7.0 | GSM measurement period | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-093135 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0295 | - | F | Rel-8 | 8.6.0 | 8.7.0 | cdma2000 1x and HRPD number of carriers | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-093136 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0296 | - | F | Rel-8 | 8.6.0 | - | cdma2000 HRPD measurement period | - | - | - | R4 | R4-52 | R4-093137 | Noted | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0297 | - | F | Rel-8 | 8.6.0 | - | cdma2000 1x measurement period | - | - | - | R4 | R4-52 | R4-093138 | Noted | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0298 | - | F | Rel-8 | 8.6.0 | - | Idle mode inter-frequency and inter-RAT measurement conditions | RP-45 | RP-090829 | reissued | RAN4 | - | R4-093139 | - | 2009-08-17 | LTE-RF | - | 2009-09-18 |
0298 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Idle mode IF measurement condition | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-093139 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0299 | - | F | Rel-8 | 8.6.0 | - | Idle mode inter-frequency and inter-RAT measurement conditions | RP-45 | RP-090829 | reissued | RAN4 | - | R4-093140 | - | 2009-08-17 | LTE-RF | - | 2009-09-18 |
0299 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Idle mode IF measurement period | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-093140 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0300 | - | F | Rel-8 | 8.6.0 | - | Clarification of the number of monitoring cells for intra frequency measurements | - | - | - | R4 | R4-52 | R4-093156 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0300 | 1 | F | Rel-8 | 8.6.0 | - | Clarification of the number of monitoring cells for intra frequency measurements | - | - | - | R4 | R4-52 | R4-093298 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0300 | 2 | F | Rel-8 | 8.6.0 | 8.7.0 | Clarification of the number of monitoring cells for intra frequency measurements | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-093448 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0301 | - | F | Rel-8 | 8.6.0 | 8.7.0 | RRM Test case for multiple E-UTRAN FDD-FDD Inter-frequency event triggered reporting under fading propagation conditions | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-093183 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0302 | - | A | Rel-9 | 9.0.0 | 9.1.0 | RRM Test case for multiple E-UTRAN FDD-FDD Inter-frequency event triggered reporting under fading propagation conditions | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-093184 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0303 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Fading reselection test case between E-UTRA and UTRA (UTRA of lower priority | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-093185 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0304 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Fading reselection test case between E-UTRA and UTRA (UTRA of lower priority | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-093186 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0305 | - | F | Rel-8 | 8.6.0 | - | UTRA FDD - UTRA FDD and E-UTRA FDD/ TDD cell search test cases | - | - | - | R4 | R4-52 | R4-093212 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0306 | - | F | Rel-8 | 8.6.0 | - | E-UTRA FDD - E-UTRA FDD and UTRA FDD cell search test cases | RP-45 | RP-090830 | reissued | R4 | - | R4-093213 | - | 2009-08-19 | LTE-RF | - | 2009-09-18 |
0306 | - | F | Rel-8 | 8.6.0 | 8.7.0 | E-UTRA FDD - E-UTRA FDD and UTRA FDD cell search test cases | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-093213 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0307 | - | F | Rel-8 | 8.6.0 | - | E-UTRAN Radio Link Monitoring Test Cases in DRX | RP-45 | RP-090830 | reissued | R4 | - | R4-093214 | - | 2009-08-19 | LTE-RF | - | 2009-09-18 |
0307 | - | F | Rel-8 | 8.6.0 | 8.7.0 | E-UTRAN Radio Link Monitoring Test Cases in DRX | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-093214 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0308 | - | F | Rel-8 | 8.6.0 | - | Inter-frequency E-UTRA - E-UTRA HO test cases: unknown target cell | - | - | - | R4 | R4-52 | R4-093215 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0308 | 1 | F | Rel-8 | 8.6.0 | - | Inter-frequency E-UTRA - E-UTRA HO test cases: unknown target cell | RP-45 | RP-090830 | reissued | R4 | - | R4-093285 | - | 2009-08-27 | LTE-RF | - | 2009-09-18 |
0308 | 1 | F | Rel-8 | 8.6.0 | 8.7.0 | Inter-frequency E-UTRA - E-UTRA HO test cases: unknown target cell | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-093285 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0309 | - | F | Rel-8 | 8.6.0 | - | Configuration of the filter coefficient for Layer 3 filtering on E-UTRAN intra-frequency cell search test cases | - | - | - | R4 | R4-52 | R4-093216 | Noted | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0310 | - | F | Rel-8 | 8.6.0 | - | Cell Search Requirements for Intra-LTE Handover to Unknown Target Cell | - | - | - | R4 | R4-52 | R4-093222 | - | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0311 | - | A | Rel-9 | 9.0.0 | - | Cell Search Requirements for Intra-LTE Handover to Unknown Target Cell | - | - | - | R4 | R4-52 | R4-093223 | - | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0312 | - | F | Rel-8 | 8.6.0 | - | Correction of the values of the cell reselection thresholds threshX-High and threshX-Low | - | - | - | R4 | R4-52 | R4-093253 | - | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0313 | - | A | Rel-9 | 9.0.0 | - | UTRA FDD - UTRA FDD and E-UTRA FDD/ TDD cell search test cases | - | - | - | R4 | R4-52 | R4-093277 | Withdrawn | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0314 | - | A | Rel-9 | 9.0.0 | - | E-UTRA FDD - E-UTRA FDD and UTRA FDD cell search test cases | RP-45 | RP-090830 | reissued | R4 | - | R4-093279 | - | 2009-08-26 | LTE-RF | - | 2009-09-18 |
0314 | - | A | Rel-9 | 9.0.0 | 9.1.0 | E-UTRA FDD - E-UTRA FDD and UTRA FDD cell search test cases | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-093279 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0315 | - | A | Rel-9 | 9.0.0 | - | E-UTRAN Radio Link Monitoring Test Cases in DRX | RP-45 | RP-090830 | reissued | R4 | - | R4-093283 | - | 2009-08-26 | LTE-RF | - | 2009-09-18 |
0315 | - | A | Rel-9 | 9.0.0 | 9.1.0 | E-UTRAN Radio Link Monitoring Test Cases in DRX | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-093283 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0316 | - | A | Rel-9 | 9.0.0 | - | Inter-frequency E-UTRA - E-UTRA HO test cases: unknown target cell | RP-45 | RP-090830 | reissued | R4 | - | R4-093284 | - | 2009-08-27 | LTE-RF | - | 2009-09-18 |
0316 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Inter-frequency E-UTRA - E-UTRA HO test cases: unknown target cell | RP-45 | RP-090880 | approved | R4 | R4-52 | R4-093284 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0317 | - | A | Rel-9 | 9.0.0 | - | Idle mode inter-frequency and inter-RAT measurement conditions | RP-45 | RP-090829 | reissued | RAN4 | - | R4-093291 | - | 2009-08-24 | LTE-RF | - | 2009-09-18 |
0317 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Idle mode IF measurement condition | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-093291 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0318 | - | A | Rel-9 | 9.0.0 | - | Idle mode inter-frequency and inter-RAT measurement conditions | RP-45 | RP-090829 | reissued | RAN4 | - | R4-093292 | - | 2009-08-24 | LTE-RF | - | 2009-09-18 |
0318 | - | A | Rel-9 | 9.0.0 | 9.1.0 | Idle mode IF measurement period | RP-45 | RP-090879 | approved | R4 | R4-52 | R4-093292 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0319 | - | A | Rel-9 | 9.0.0 | - | Clarification of the number of monitoring cells for intra frequency measurements | - | - | - | R4 | R4-52 | R4-093299 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0319 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Clarification of the number of monitoring cells for intra frequency measurements | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-093449 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0320 | - | F | Rel-8 | 8.6.0 | 8.7.0 | Small corrections to Measurements performance tests parameters | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-093301 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0321 | - | A | Rel-9 | 9.0.0 | - | Small corrections to Measurements performance tests parameters | - | - | - | R4 | R4-52 | R4-093302 | Revised | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0321 | 1 | A | Rel-9 | 9.0.0 | 9.1.0 | Small corrections to Measurements performance tests parameters | RP-45 | RP-090836 | approved | R4 | R4-52 | R4-093445 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0322 | - | A | Rel-9 | 9.0.0 | 9.1.0 | GSM measurement period | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-093303 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0323 | - | A | Rel-9 | 9.0.0 | 9.1.0 | cdma2000 1x and HRPD number of carriers | RP-45 | RP-090816 | approved | R4 | R4-52 | R4-093304 | Agreed | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0324 | - | F | Rel-8 | 8.6.0 | - | cdma2000 HRPD measurement period | - | - | - | R4 | R4-52 | R4-093335 | - | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0325 | - | A | Rel-9 | 9.0.0 | - | cdma2000 HRPD measurement period | - | - | - | R4 | R4-52 | R4-093336 | - | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0326 | - | F | Rel-8 | 8.6.0 | - | cdma2000 1x measurement period | - | - | - | R4 | R4-52 | R4-093337 | - | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0327 | - | A | Rel-9 | 9.0.0 | - | cdma2000 1x measurement period | - | - | - | R4 | R4-52 | R4-093338 | - | 2009-09-11 | LTE-RF | - | 2009-09-11 |
0328 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Defining requirements for UTRA TDD measurements for SON (Technically endorsed at RAN 4 52bis in R4-093511) | RP-46 | RP-091275 | approved | R4 | R4-53 | R4-094097 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0329 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Defining requirements for UTRA TDD measurements for SON (Technically endorsed at RAN 4 52bis in R4-093512) | RP-46 | RP-091275 | approved | R4 | R4-53 | R4-094098 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0330 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Modification of test case of E-UTRA TDD intra frequency cell reselection (Technically endorsed at RAN 4 52bis in R4-093520) | RP-46 | RP-091272 | approved | R4 | R4-53 | R4-094099 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0331 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Modification of test case of E-UTRA TDD inter frequency cell reselection (Technically endorsed at RAN 4 52bis in R4-093521) | RP-46 | RP-091272 | approved | R4 | R4-53 | R4-094100 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0332 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Modification of test case of E-UTRA TDD intra frequency cell reselection (Technically endorsed at RAN 4 52bis in R4-093552) | RP-46 | RP-091272 | approved | R4 | R4-53 | R4-094107 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0333 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Modification of test case of E-UTRA TDD inter frequency cell reselection (Technically endorsed at RAN 4 52bis in R4-093553) | RP-46 | RP-091272 | approved | R4 | R4-53 | R4-094108 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0334 | - | B | Rel-9 | 9.1.0 | 9.2.0 | Introduction of Extended LTE1500 requirements for TS36.133 (Technically endorsed at RAN 4 52bis in R4-093636) | RP-46 | RP-091286 | approved | R4 | R4-53 | R4-094121 | Agreed | 2009-11-28 | UMTSLTE1500 | - | 2009-11-28 |
0335 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Addition of E-UTRA TDD to UTRA FDD reselection test cases (Technically endorsed at RAN 4 52bis in R4-093686) | RP-46 | RP-091272 | approved | R4 | R4-53 | R4-094142 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0336 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Addition of E-UTRA TDD to UTRA FDD reselection test cases (Technically endorsed at RAN 4 52bis in R4-093686) | RP-46 | RP-091272 | approved | R4 | R4-53 | R4-094143 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0337 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Correction of missing accuracy requirements for UTRAN FDD (Technically endorsed at RAN 4 52bis in R4-093689) | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094144 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0338 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Correction of missing accuracy requirements for UTRAN FDD (Technically endorsed at RAN 4 52bis in R4-093689) | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094145 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0339 | - | F | Rel-8 | 8.7.0 | 8.8.0 | cdma2000 HRPD measurement period (Technically endorsed at RAN 4 52bis in R4-093720) | RP-46 | RP-091275 | approved | R4 | R4-53 | R4-094154 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0340 | - | A | Rel-9 | 9.1.0 | 9.2.0 | cdma2000 HRPD measurement period (Technically endorsed at RAN 4 52bis in R4-093720) | RP-46 | RP-091275 | approved | R4 | R4-53 | R4-094155 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0341 | - | F | Rel-8 | 8.7.0 | 8.8.0 | cdma2000 1x measurement period (Technically endorsed at RAN 4 52bis in R4-093721) | RP-46 | RP-091275 | approved | R4 | R4-53 | R4-094156 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0342 | - | A | Rel-9 | 9.1.0 | 9.2.0 | cdma2000 1x measurement period (Technically endorsed at RAN 4 52bis in R4-093721) | RP-46 | RP-091275 | approved | R4 | R4-53 | R4-094157 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0343 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Correction for E-UTRAN FDD - UTRAN FDD Cell Search in DRX Test Cases (Technically endorsed at RAN 4 52bis in R4-093890) | RP-46 | RP-091272 | approved | R4 | R4-53 | R4-094181 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0344 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Correction for E-UTRAN FDD - UTRAN FDD Cell Search in DRX Test Cases (Technically endorsed at RAN 4 52bis in R4-093890) | RP-46 | RP-091272 | approved | R4 | R4-53 | R4-094182 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0345 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Revise geometry factors for Intra freq Reselection Test Cases | RP-46 | RP-091272 | approved | R4 | R4-53 | R4-094217 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0346 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Revise geometry factors for Intra freq Reselection Test Cases | RP-46 | RP-091272 | approved | R4 | R4-53 | R4-094218 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0347 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Corrections on RRM parameters for Bands 12, 14, 17 | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094227 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0348 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Corrections on RRM parameters for Bands 12, 14, 17 | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094228 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0349 | - | B | Rel-9 | 9.1.0 | - | Introduction of LTE in 800 MHz for Europe requirements in TS 36.133 | - | - | - | R4 | R4-53 | R4-094239 | Noted | 2009-11-28 | RInImp9-UMTSLTE800EU | - | 2009-11-28 |
0350 | - | F | Rel-8 | 8.7.0 | - | Corrections to PDSCH RMC-s | - | - | - | R4 | R4-53 | R4-094258 | Revised | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0350 | 1 | F | Rel-8 | 8.7.0 | - | Corrections to PDSCH RMC-s | - | - | - | R4 | R4-53 | R4-094800 | Withdrawn | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0350 | 1 | F | Rel-8 | 8.7.0 | 8.8.0 | Corrections to PDSCH RMC-s | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094790 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0351 | - | A | Rel-9 | 9.1.0 | - | Corrections to PDSCH RMC-s | - | - | - | R4 | R4-53 | R4-094259 | Revised | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0351 | 1 | A | Rel-9 | 9.1.0 | - | Corrections to PDSCH RMC-s | - | - | - | R4 | R4-53 | R4-094801 | Withdrawn | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0351 | 1 | A | Rel-9 | 9.1.0 | 9.2.0 | Corrections to PDSCH RMC-s | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094791 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0352 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Corrections of TS36.133 | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094280 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0353 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Corrections of TS36.133 | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094281 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0354 | - | F | Rel-8 | 8.7.0 | - | Modification of UE measurement capability | - | - | - | R4 | R4-53 | R4-094282 | Withdrawn | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0355 | - | A | Rel-9 | 9.1.0 | - | Modification of UE measurement capability | - | - | - | R4 | R4-53 | R4-094283 | Withdrawn | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0356 | - | F | Rel-9 | 9.1.0 | - | UTRA TDD P-CCPCH RSCP absolute accuracy measurement in E-UTRAN | - | - | - | R4 | R4-53 | R4-094284 | Revised | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0356 | 1 | F | Rel-9 | 9.1.0 | 9.2.0 | UTRA TDD P-CCPCH RSCP absolute accuracy measurement in E-UTRAN | RP-46 | RP-091275 | approved | R4 | R4-53 | R4-094772 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0357 | - | F | Rel-8 | 8.7.0 | 8.8.0 | E-UTRAN TDD - UTRAN TDD cell search for SON | RP-46 | RP-091275 | approved | R4 | R4-53 | R4-094287 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0358 | - | A | Rel-9 | 9.1.0 | - | E-UTRAN TDD - UTRAN TDD cell search for SON | - | - | - | R4 | R4-53 | R4-094288 | Revised | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0358 | 1 | A | Rel-9 | 9.1.0 | 9.2.0 | E-UTRAN TDD - UTRAN TDD cell search for SON | RP-46 | RP-091275 | approved | R4 | R4-53 | R4-095040 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0359 | - | F | Rel-9 | 9.1.0 | - | UTRAN E-UTRAN FDD RSRQ Measurement Accuracy Tests | - | - | - | R4 | R4-53 | R4-094316 | Withdrawn | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0360 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Cell Search Requirements for Intra-LTE Handover to Unknown Target Cell | RP-46 | RP-091275 | approved | R4 | R4-53 | R4-094347 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0361 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Cell Search Requirements for Intra-LTE Handover to Unknown Target Cell | RP-46 | RP-091275 | approved | R4 | R4-53 | R4-094348 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0362 | - | F | Rel-8 | 8.7.0 | - | E-UTRA Changes for 25.133 | - | - | - | R4 | R4-53 | R4-094349 | Withdrawn | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0363 | - | F | Rel-9 | 9.1.0 | - | E-UTRA Changes for 25.133 | - | - | - | R4 | R4-53 | R4-094350 | Withdrawn | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0364 | - | F | Rel-9 | 9.1.0 | - | CS Fallback additional cell identification requirements | - | - | - | R4 | R4-53 | R4-094351 | Noted | 2009-11-28 | TEI9 | - | 2009-11-28 |
0365 | - | F | Rel-9 | 9.1.0 | 9.2.0 | Combined E-UTRAN interfrequency and GSM cell search test cases (Scenario set 3.2) | RP-46 | RP-091273 | approved | R4 | R4-53 | R4-094355 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0366 | - | F | Rel-8 | 8.7.0 | - | Correction in UE UTRA TDD P-CCPCH RSCP measurement capability for R8 | - | - | - | R4 | R4-53 | R4-094395 | Revised | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0366 | 1 | F | Rel-8 | 8.7.0 | 8.8.0 | Correction in UE UTRA TDD P-CCPCH RSCP measurement capability for R8 | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094761 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0367 | - | A | Rel-9 | 9.1.0 | - | Correction in UE UTRA TDD P-CCPCH RSCP measurement capability for R9 | - | - | - | R4 | R4-53 | R4-094396 | Revised | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0367 | 1 | A | Rel-9 | 9.1.0 | 9.2.0 | Correction in UE UTRA TDD P-CCPCH RSCP measurement capability for R9 | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094773 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0368 | - | F | Rel-8 | 8.7.0 | - | cdma2000 HRPD measurement period | - | - | - | R4 | R4-53 | R4-094456 | Withdrawn | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0369 | - | A | Rel-9 | 9.1.0 | - | cdma2000 HRPD measurement period | - | - | - | R4 | R4-53 | R4-094457 | Withdrawn | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0370 | - | F | Rel-8 | 8.7.0 | - | cdma2000 1x measurement period | - | - | - | R4 | R4-53 | R4-094458 | Withdrawn | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0371 | - | A | Rel-9 | 9.1.0 | - | cdma2000 1x measurement period | - | - | - | R4 | R4-53 | R4-094459 | Withdrawn | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0372 | - | F | Rel-8 | 8.7.0 | - | Monitoring of multiple layers using gaps | - | - | - | R4 | R4-53 | R4-094460 | Noted | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0373 | - | A | Rel-9 | 9.1.0 | - | Monitoring of multiple layers using gaps | - | - | - | R4 | R4-53 | R4-094461 | Noted | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0374 | - | F | Rel-9 | 9.1.0 | 9.2.0 | E-UTRAN GSM RSSI Measurement Accuracy Tests | RP-46 | RP-091273 | approved | R4 | R4-53 | R4-094547 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0375 | - | F | Rel-9 | 9.1.0 | 9.2.0 | E-UTRAN UTRAN FDD CPICH RSCP Measurement Accuracy Tests | RP-46 | RP-091273 | approved | R4 | R4-53 | R4-094548 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0376 | - | F | Rel-9 | 9.1.0 | 9.2.0 | E-UTRAN UTRAN FDD CPICH Ec/No Measurement Accuracy Tests | RP-46 | RP-091273 | approved | R4 | R4-53 | R4-094549 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0377 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Cell Timing Change Requirements for Event Triggered Reporting | RP-46 | RP-091275 | approved | R4 | R4-53 | R4-094550 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0378 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Cell Timing Change Requirements for Event Triggered Reporting | RP-46 | RP-091275 | approved | R4 | R4-53 | R4-094551 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0379 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Correction to Power Headroom Requirements | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094552 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0380 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Correction to Power Headroom Requirements | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094553 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0381 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Editorial corrections to 36.133 | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094625 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0382 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Editorial corrections to 36.133 | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094626 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0383 | - | F | Rel-8 | 8.7.0 | - | Removal of the term ""out of Service Area"" | - | - | - | R4 | R4-53 | R4-094650 | Noted | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0384 | - | A | Rel-9 | 9.1.0 | - | Removal of the term ""out of Service Area"" | - | - | - | R4 | R4-53 | R4-094651 | Noted | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0385 | - | F | Rel-9 | 9.1.0 | - | UTRAN E-UTRAN FDD RSRP Measurement Accuracy Tests | - | - | - | R4 | R4-53 | R4-094652 | Withdrawn | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0386 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Editorial corrections to the time units for RRC Re-establishment test cases | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094653 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0387 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Editorial corrections to the time units for RRC Re-establishment test cases | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094654 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0388 | - | F | Rel-8 | 8.7.0 | - | Introduction of cell search test case in DRX to verify L3 filtering | - | - | - | R4 | R4-53 | R4-094655 | Revised | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0388 | 1 | F | Rel-8 | 8.7.0 | 8.8.0 | Introduction of cell search test case in DRX to verify L3 filtering | RP-46 | RP-091272 | approved | R4 | R4-53 | R4-094741 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0389 | - | A | Rel-9 | 9.1.0 | - | Introduction of cell search test case in DRX to verify L3 filtering | - | - | - | R4 | R4-53 | R4-094656 | Revised | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0389 | 1 | A | Rel-9 | 9.1.0 | 9.2.0 | Introduction of cell search test case in DRX to verify L3 filtering | RP-46 | RP-091272 | approved | R4 | R4-53 | R4-094742 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0390 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Correction to ONCG Patterns | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094718 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0391 | - | A | Rel-9 | 9.1.0 | 9.2.0 | Correction to ONCG Patterns | RP-46 | RP-091271 | approved | R4 | R4-53 | R4-094719 | Agreed | 2009-11-28 | LTE-RF | - | 2009-11-28 |
0392 | - | F | Rel-8 | 8.7.0 | 8.8.0 | Correction of Band 11 requirements for TS36.133 Rel-8 | RP-46 | RP-091287 | approved | R4 | R4-53 | R4-094979 | Agreed | 2009-11-28 | UMTSLTE1500 | - | 2009-11-28 |
0393 | - | B | Rel-9 | 9.2.0 | 9.3.0 | AOA and TA measurement report mappings | RP-47 | RP-100269 | approved | R4 | R4-AH01 | R4-100067 | Agreed | 2010-03-12 | LCS_LTE | - | 2010-03-12 |
0394 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Corrections for Extended UMTS1500 in TS36.133(Rel-8) | RP-47 | RP-100264 | approved | R4 | R4-54 | R4-100293 | Agreed | 2010-03-12 | UMTSLTE1500 | - | 2010-03-12 |
0395 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Corrections for Extended UMTS1500 in TS36.133(Rel-9) | RP-47 | RP-100264 | approved | R4 | R4-54 | R4-100294 | Agreed | 2010-03-12 | UMTSLTE1500 | - | 2010-03-12 |
0396 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Addition of missing Es/Noc parameters in RRM test cases | RP-47 | RP-100255 | approved | R4 | R4-54 | R4-100324 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0397 | - | A | Rel-9 | 9.2.0 | 9.3.0 | Addition of missing Es/Noc parameters in RRM test cases | RP-47 | RP-100255 | approved | R4 | R4-54 | R4-100325 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0398 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Correction of RSRP value in E-UTRAN FDDFDD Inter frequency reselection test | RP-47 | RP-100255 | approved | R4 | R4-54 | R4-100326 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0399 | - | A | Rel-9 | 9.2.0 | 9.3.0 | Correction of RSRP value in E-UTRAN FDDFDD Inter frequency reselection test | RP-47 | RP-100255 | approved | R4 | R4-54 | R4-100327 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0400 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Correction of E-UTRAN FDD inter frequency measurements | RP-47 | RP-100254 | approved | R4 | R4-54 | R4-100333 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0401 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Correction of E-UTRAN TDD inter frequency measurements_R8 | RP-47 | RP-100254 | approved | R4 | R4-54 | R4-100334 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0402 | - | A | Rel-9 | 9.2.0 | 9.3.0 | Correction of E-UTRAN TDD inter frequency measurements_R9 | RP-47 | RP-100254 | approved | R4 | R4-54 | R4-100335 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0403 | - | B | Rel-9 | 9.2.0 | - | Mapping of UE RxTx time difference measurement | - | - | - | R4 | R4-54 | R4-100339 | Revised | 2010-03-12 | LCS_LTE | - | 2010-03-12 |
0403 | 1 | B | Rel-9 | 9.2.0 | - | Mapping of UE RxTx time difference measurement | - | - | - | R4 | R4-54 | R4-100929 | Revised | 2010-03-12 | LCS_LTE | - | 2010-03-12 |
0403 | 2 | B | Rel-9 | 9.2.0 | 9.3.0 | Mapping of UE RxTx time difference measurement | RP-47 | RP-100269 | approved | R4 | R4-54 | R4-100984 | Agreed | 2010-03-12 | LCS_LTE | - | 2010-03-12 |
0404 | - | F | Rel-8 | 8.8.0 | - | UE measurement capability requirements in Idle and Connected | - | - | - | R4 | R4-54 | R4-100366 | Revised | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0404 | 1 | F | Rel-8 | 8.8.0 | 8.9.0 | UE measurement capability requirements in Idle and Connected | RP-47 | RP-100254 | approved | R4 | R4-54 | R4-100981 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0405 | - | A | Rel-9 | 9.2.0 | - | UE measurement capability requirements in Idle and Connected | - | - | - | R4 | R4-54 | R4-100367 | Revised | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0405 | 1 | A | Rel-9 | 9.2.0 | 9.3.0 | UE measurement capability requirements in Idle and Connected | RP-47 | RP-100254 | approved | R4 | R4-54 | R4-100982 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0406 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Editorial Corrections in TS36.133(Rel-8) | RP-47 | RP-100262 | approved | R4 | R4-54 | R4-100368 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0407 | - | A | Rel-9 | 9.2.0 | 9.3.0 | Editorial Corrections in TS36.133(Rel-9) | RP-47 | RP-100262 | approved | R4 | R4-54 | R4-100369 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0408 | - | F | Rel-9 | 9.2.0 | - | CS Fallback additional cell identification requirements | - | - | - | R4 | R4-54 | R4-100437 | Noted | 2010-03-12 | TEI9 | - | 2010-03-12 |
0409 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Idle mode corrections | RP-47 | RP-100254 | approved | R4 | R4-54 | R4-100442 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0410 | - | A | Rel-9 | 9.2.0 | 9.3.0 | Idle mode corrections | RP-47 | RP-100254 | approved | R4 | R4-54 | R4-100443 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0411 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Removal of activation time from interRAT handover requirements | RP-47 | RP-100254 | approved | R4 | R4-54 | R4-100444 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0412 | - | A | Rel-9 | 9.2.0 | 9.3.0 | Removal of activation time from interRAT handover requirements | RP-47 | RP-100254 | approved | R4 | R4-54 | R4-100445 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0413 | - | B | Rel-9 | 9.2.0 | 9.3.0 | Introduction of LTE in 800 MHz for Europe requirements in TS 36.133 | RP-47 | RP-100263 | approved | R4 | R4-54 | R4-100470 | Agreed | 2010-03-12 | RInImp9-UMTSLTE800EU | - | 2010-03-12 |
0414 | - | F | Rel-9 | 9.2.0 | - | Enhanced GSM Requirements for CSFB | - | - | - | R4 | R4-54 | R4-100610 | Revised | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0414 | 1 | F | Rel-9 | 9.2.0 | 9.3.0 | Enhanced GSM Requirements for CSFB | RP-47 | RP-100254 | approved | R4 | R4-54 | R4-101020 | Email approval | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0415 | - | F | Rel-9 | 9.2.0 | - | Enhanced UTRA FDD Requirements for CSFB | - | - | - | R4 | R4-54 | R4-100611 | Revised | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0415 | 1 | F | Rel-9 | 9.2.0 | 9.3.0 | Enhanced UTRA FDD Requirements for CSFB | RP-47 | RP-100254 | approved | R4 | R4-54 | R4-101021 | Email approval | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0416 | - | F | Rel-8 | 8.8.0 | - | Correction to UE Transmit Timing Requirements | - | - | - | R4 | R4-54 | R4-100615 | Revised | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0416 | 1 | F | Rel-8 | 8.8.0 | 8.9.0 | Correction to UE Transmit Timing Requirements | RP-47 | RP-100254 | approved | R4 | R4-54 | R4-100909 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0417 | - | A | Rel-9 | 9.2.0 | - | Correction to UE Transmit Timing Requirements | - | - | - | R4 | R4-54 | R4-100616 | Revised | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0417 | 1 | A | Rel-9 | 9.2.0 | 9.3.0 | Correction to UE Transmit Timing Requirements | RP-47 | RP-100254 | approved | R4 | R4-54 | R4-100910 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0418 | - | F | Rel-8 | 8.8.0 | - | Correction to RLM Test Cases | - | - | - | R4 | R4-54 | R4-100617 | Revised | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0418 | 1 | F | Rel-8 | 8.8.0 | 8.9.0 | Correction to RLM Test Cases | RP-47 | RP-100255 | approved | R4 | R4-54 | R4-100912 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0419 | - | A | Rel-9 | 9.2.0 | - | Correction to RLM Test Cases | - | - | - | R4 | R4-54 | R4-100618 | Revised | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0419 | 1 | A | Rel-9 | 9.2.0 | 9.3.0 | Correction to RLM Test Cases | RP-47 | RP-100255 | approved | R4 | R4-54 | R4-100913 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0420 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Correction to RRC Re-establishment Test Case | RP-47 | RP-100255 | approved | R4 | R4-54 | R4-100619 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0421 | - | A | Rel-9 | 9.2.0 | 9.3.0 | Correction to RRC Re-establishment Test Case | RP-47 | RP-100255 | approved | R4 | R4-54 | R4-100620 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0422 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Correction to UE Measurement Capability Requirements in Idle Mode | RP-47 | RP-100254 | approved | R4 | R4-54 | R4-100621 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0423 | - | A | Rel-9 | 9.2.0 | 9.3.0 | Correction to UE Measurement Capability Requirements in Idle Mode | RP-47 | RP-100254 | approved | R4 | R4-54 | R4-100622 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0424 | - | B | Rel-9 | 9.2.0 | - | Minimum requirements on SI reading for HeNB inbound mobility | - | - | - | R4 | R4-54 | R4-100816 | Revised | 2010-03-12 | EHNB-RAN2 | - | 2010-03-12 |
0424 | 1 | B | Rel-9 | 9.2.0 | - | Minimum requirements on SI reading for HeNB inbound mobility | - | - | - | R4 | R4-54 | R4-101040 | Revised | 2010-03-12 | EHNB-RAN2 | - | 2010-03-12 |
0424 | 2 | B | Rel-9 | 9.2.0 | 9.3.0 | Minimum requirements on SI reading for HeNB inbound mobility | RP-47 | RP-100266 | approved | R4 | R4-54 | R4-101065 | Agreed | 2010-03-12 | EHNB-RAN2 | - | 2010-03-12 |
0425 | - | B | Rel-9 | 9.2.0 | - | Home eNode B synchronization requirement | - | - | - | R4 | R4-54 | R4-100824 | Revised | 2010-03-12 | HeNB-RF_TDD | - | 2010-03-12 |
0425 | 1 | B | Rel-9 | 9.2.0 | - | Home eNode B synchronization requirement | - | - | - | R4 | R4-54 | R4-100930 | Revised | 2010-03-12 | HeNB-RF_TDD | - | 2010-03-12 |
0425 | 2 | B | Rel-9 | 9.2.0 | 9.3.0 | Home eNode B synchronization requirement | RP-47 | RP-100266 | approved | R4 | R4-54 | R4-100954 | Agreed | 2010-03-12 | HeNB-RF_TDD | - | 2010-03-12 |
0426 | - | F | Rel-8 | 8.8.0 | 8.9.0 | Correction of UE transmit timing test case | RP-47 | RP-100255 | approved | R4 | R4-54 | R4-100844 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0427 | - | A | Rel-9 | 9.2.0 | - | Correction of UE transmit timing test case | - | - | - | R4 | R4-54 | R4-100845 | Revised | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0427 | 1 | A | Rel-9 | 9.2.0 | 9.3.0 | Correction of UE transmit timing test case | RP-47 | RP-100255 | approved | R4 | R4-54 | R4-100911 | Agreed | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0428 | - | F | Rel-8 | 8.8.0 | - | OCNG corrections in TS36.133 | - | - | - | R4 | R4-54 | R4-100994 | Not treated | 2010-03-12 | LTE-RF | - | 2010-03-12 |
0429 | - | B | Rel-9 | 9.3.0 | - | UE RSTD Measurement Accuracy Requirement | - | - | - | R4 | R4-AH02 | R4-101118 | Withdrawn | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0430 | - | B | Rel-9 | 9.3.0 | - | UE Rx Tx Measurement Accuracy Requirement | - | - | - | R4 | R4-AH02 | R4-101119 | Withdrawn | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0431 | - | B | Rel-9 | 9.3.0 | - | RSRQ idle mode requirements | - | - | - | R4 | R4-AH02 | R4-101147 | Noted | 2010-05-28 | EHNB-RAN2 | - | 2010-05-28 |
0432 | - | B | Rel-9 | 9.3.0 | - | RSTD Accuracy Requirements for OTDOA | - | - | - | R4 | R4-AH02 | R4-101238 | Revised | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0432 | 1 | B | Rel-9 | 9.3.0 | - | RSTD Accuracy Requirements for OTDOA | - | - | - | R4 | R4-AH02 | R4-101504 | Revised | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0432 | 2 | B | Rel-9 | 9.3.0 | - | RSTD Accuracy Requirements for OTDOA | - | - | - | R4 | R4-55 | R4-101586 | Withdrawn | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0432 | 2 | B | Rel-9 | 9.3.0 | - | RSTD Accuracy Requirements for OTDOA | - | - | - | R4 | R4-55 | R4-101924 | Revised | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0432 | 3 | B | Rel-9 | 9.3.0 | - | RSTD Accuracy Requirements for OTDOA | - | - | - | R4 | R4-55 | R4-102171 | Revised | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0432 | 4 | B | Rel-9 | 9.3.0 | - | RSTD Accuracy Requirements for OTDOA | - | - | - | R4 | R4-55 | R4-102174 | Revised | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0432 | 5 | B | Rel-9 | 9.3.0 | 9.4.0 | RSTD Accuracy Requirements for OTDOA | RP-48 | RP-100632 | approved | R4 | R4-55 | R4-102234 | Agreed | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0433 | - | B | Rel-9 | 9.3.0 | - | RSTD Measurement Requirements for OTDOA | - | - | - | R4 | R4-AH02 | R4-101239 | Revised | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0433 | 1 | B | Rel-9 | 9.3.0 | - | RSTD Measurement Requirements for OTDOA | - | - | - | R4 | R4-AH02 | R4-101505 | Revised | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0433 | 2 | B | Rel-9 | 9.3.0 | - | RSTD Measurement Requirements for OTDOA | - | - | - | R4 | R4-55 | R4-101925 | Revised | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0433 | 3 | B | Rel-9 | 9.3.0 | - | RSTD Measurement Requirements for OTDOA | - | - | - | R4 | R4-55 | R4-102172 | Revised | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0433 | 4 | B | Rel-9 | 9.3.0 | - | RSTD Measurement Requirements for OTDOA | - | - | - | R4 | R4-55 | R4-102175 | Revised | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0433 | 5 | B | Rel-9 | 9.3.0 | 9.4.0 | RSTD Measurement Requirements for OTDOA | RP-48 | RP-100632 | approved | R4 | R4-55 | R4-102235 | Agreed | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0434 | - | F | Rel-9 | 9.3.0 | - | Correction to HeNB Inbound Mobility Requirements | - | - | - | R4 | R4-AH02 | R4-101241 | Noted | 2010-05-28 | EHNB-RAN2 | - | 2010-05-28 |
0435 | - | F | Rel-9 | 9.3.0 | - | TDD HeNB Inbound Mobility Requirements | - | - | - | R4 | R4-AH02 | R4-101242 | Noted | 2010-05-28 | EHNB-RAN2 | - | 2010-05-28 |
0436 | - | B | Rel-9 | 9.3.0 | - | CR on autonomous gap for SON | - | - | - | R4 | R4-AH02 | R4-101316 | Noted | 2010-05-28 | EHNB-RAN2 | - | 2010-05-28 |
0437 | - | B | Rel-9 | 9.3.0 | - | CR on uplink transmission to autonomous SI reading | - | - | - | R4 | R4-AH02 | R4-101318 | Noted | 2010-05-28 | EHNB-RAN2 | - | 2010-05-28 |
0438 | - | B | Rel-9 | 9.3.0 | - | CR UE RX-TX time-difference measurement requirement | - | - | - | R4 | R4-AH02 | R4-101319 | Revised | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0438 | 1 | B | Rel-9 | 9.3.0 | - | CR UE RX-TX time-difference measurement requirement | - | - | - | R4 | R4-AH02 | R4-101448 | Revised | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0438 | 2 | B | Rel-9 | 9.3.0 | 9.4.0 | CR UE RX-TX time-difference measurement requirement | RP-48 | RP-100632 | approved | R4 | R4-AH02 | R4-101533 | Agreed | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0439 | - | B | Rel-9 | 9.3.0 | 9.4.0 | UE Rx-Tx Time Difference Measurement Requirements for E-CID | RP-48 | RP-100632 | approved | R4 | R4-AH02 | R4-101544 | Agreed | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0440 | - | F | Rel-8 | 8.9.0 | - | Correction of Io value in E-UTRAN FDD and TDD Inter frequency RSRP tests | - | - | - | R4 | R4-55 | R4-101590 | Revised | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0440 | 1 | F | Rel-8 | 8.9.0 | 8.10.0 | Correction of Io value in E-UTRAN FDD and TDD Inter frequency RSRP tests | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-102368 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0441 | - | A | Rel-9 | 9.3.0 | - | Correction of Io value in E-UTRAN FDD and TDD Inter frequency RSRP tests | - | - | - | R4 | R4-55 | R4-101591 | Revised | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0441 | 1 | A | Rel-9 | 9.3.0 | 9.4.0 | Correction of Io value in E-UTRAN FDD and TDD Inter frequency RSRP tests | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-102369 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0442 | - | F | Rel-9 | 9.3.0 | - | Corrections to enhanced cell identification core requirement | - | - | - | R4 | R4-55 | R4-101676 | Revised | 2010-05-28 | TEI9 | - | 2010-05-28 |
0442 | 1 | F | Rel-9 | 9.3.0 | - | Corrections to enhanced cell identification core requirement | - | - | - | R4 | R4-55 | R4-102253 | Revised | 2010-05-28 | TEI9 | - | 2010-05-28 |
0442 | 2 | F | Rel-9 | 9.3.0 | 9.4.0 | Corrections to enhanced cell identification core requirement | RP-48 | RP-100631 | approved | R4 | R4-55 | R4-102342 | Agreed | 2010-05-28 | TEI9 | - | 2010-05-28 |
0443 | - | B | Rel-9 | 9.3.0 | - | Addition of UTRA and GSM enhanced cell identification test cases | - | - | - | R4 | R4-55 | R4-101677 | Noted | 2010-05-28 | TEI9 | Email approval | 2010-05-28 |
0444 | - | F | Rel-9 | 9.3.0 | - | Corrections to CSG SI reading core requirement | - | - | - | R4 | R4-55 | R4-101680 | Revised | 2010-05-28 | EHNB-RAN2 | - | 2010-05-28 |
0444 | 1 | F | Rel-9 | 9.3.0 | - | Corrections to CSG SI reading core requirement | - | - | - | R4 | R4-55 | R4-102254 | Revised | 2010-05-28 | EHNB-RAN2 | - | 2010-05-28 |
0444 | 2 | F | Rel-9 | 9.3.0 | 9.4.0 | Corrections to CSG SI reading core requirement | RP-48 | RP-100627 | approved | R4 | R4-55 | R4-102294 | Agreed | 2010-05-28 | EHNB-RAN2 | - | 2010-05-28 |
0445 | - | B | Rel-9 | 9.3.0 | - | RSRQ idle mode requirements | - | - | - | R4 | R4-55 | R4-101684 | Revised | 2010-05-28 | EHNB-RAN2 | - | 2010-05-28 |
0445 | 1 | B | Rel-9 | 9.3.0 | - | RSRQ idle mode requirements | - | - | - | R4 | R4-55 | R4-102190 | Withdrawn | 2010-05-28 | EHNB-RAN2 | - | 2010-05-28 |
0445 | 1 | B | Rel-9 | 9.3.0 | 9.4.0 | RSRQ idle mode requirements | RP-48 | RP-100627 | approved | R4 | R4-55 | R4-102191 | Agreed | 2010-05-28 | EHNB-RAN2 | - | 2010-05-28 |
0446 | - | F | Rel-8 | 8.9.0 | 8.10.0 | Correction to TDD intrafrequency accuracy test case | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-101685 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0447 | - | A | Rel-9 | 9.3.0 | 9.4.0 | Correction to TDD intrafrequency accuracy test case | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-101686 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0448 | - | F | Rel-8 | 8.9.0 | - | Editorial corrections to 36.133(Rel-8) | - | - | - | R4 | R4-55 | R4-101717 | Revised | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0448 | 1 | F | Rel-8 | 8.9.0 | 8.10.0 | Editorial corrections to 36.133(Rel-8) | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-102262 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0449 | - | A | Rel-9 | 9.3.0 | - | Editorial corrections to 36.133(Rel-9) | - | - | - | R4 | R4-55 | R4-101718 | Revised | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0449 | 1 | A | Rel-9 | 9.3.0 | 9.4.0 | Editorial corrections to 36.133(Rel-9) | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-102263 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0450 | - | F | Rel-8 | 8.9.0 | - | Correction to idle mode requirements(Rel-8) | - | - | - | R4 | R4-55 | R4-101719 | Noted | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0451 | - | A | Rel-9 | 9.3.0 | - | Correction to idle mode requirements(Rel-9) | - | - | - | R4 | R4-55 | R4-101720 | Revised | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0451 | 1 | F | Rel-9 | 9.3.0 | 9.4.0 | Correction to idle mode requirements(Rel-9) | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-102154 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0452 | - | F | Rel-8 | 8.9.0 | 8.10.0 | Clarification on radio link monitoring | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-101756 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0453 | - | F | Rel-9 | 9.3.0 | - | Test case for E-UTRAN TDD in the existence of non-allowed CSG cell | - | - | - | R4 | R4-55 | R4-101774 | Noted | 2010-05-28 | EHNB | Email review | 2010-05-28 |
0454 | - | F | Rel-8 | 8.9.0 | - | Correction of E-UTRAN Inter-frequency Cell Re-selection Requirements | - | - | - | R4 | R4-55 | R4-101928 | Revised | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0454 | 1 | F | Rel-8 | 8.9.0 | 8.10.0 | Correction of E-UTRAN Inter-frequency Cell Re-selection Requirements | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-102256 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0455 | - | A | Rel-9 | 9.3.0 | - | Correction of E-UTRAN Inter-frequency Cell Re-selection Requirements | - | - | - | R4 | R4-55 | R4-101929 | Revised | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0455 | 1 | A | Rel-9 | 9.3.0 | 9.4.0 | Correction of E-UTRAN Inter-frequency Cell Re-selection Requirements | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-102257 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0456 | - | F | Rel-8 | 8.9.0 | 8.10.0 | UE Measurement Capability Requirements for CDMA2000 | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-101930 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0457 | - | A | Rel-9 | 9.3.0 | 9.4.0 | UE Measurement Capability Requirements for CDMA2000 | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-101931 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0458 | - | F | Rel-9 | 9.3.0 | - | Correction of E-UTRA FDD CGI Reporting Requirements | - | - | - | R4 | R4-55 | R4-101932 | Noted | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0459 | - | F | Rel-9 | 9.3.0 | - | E-UTRA TDD CGI Reporting Requirements | - | - | - | R4 | R4-55 | R4-101933 | Noted | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0460 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Missing E-UTRA - UTRA FDD DRX Requirements | RP-48 | RP-100630 | approved | R4 | R4-55 | R4-101934 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0461 | - | F | Rel-8 | 8.9.0 | - | Correction to Absolute RSRP/RSRQ Definitions | - | - | - | R4 | R4-55 | R4-101935 | Noted | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0462 | - | A | Rel-9 | 9.3.0 | - | Correction to Absolute RSRP/RSRQ Definitions | - | - | - | R4 | R4-55 | R4-101936 | Revised | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0462 | 1 | F | Rel-9 | 9.3.0 | 9.4.0 | Correction to Absolute RSRP/RSRQ Definitions | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-102258 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0463 | - | F | Rel-8 | 8.9.0 | - | Correction to RRM Requirements | - | - | - | R4 | R4-55 | R4-101937 | Revised | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0463 | 1 | F | Rel-8 | 8.9.0 | 8.10.0 | Correction to RRM Requirements | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-102155 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0464 | - | A | Rel-9 | 9.3.0 | 9.4.0 | Correction to RRM Requirements | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-101938 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0465 | - | F | Rel-8 | 8.9.0 | - | Correction to RRM Test Cases | - | - | - | R4 | R4-55 | R4-101939 | Revised | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0465 | 1 | F | Rel-8 | 8.9.0 | 8.10.0 | Correction to RRM Test Cases | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-102158 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0466 | - | A | Rel-9 | 9.3.0 | - | Correction to RRM Test Cases | - | - | - | R4 | R4-55 | R4-101940 | Revised | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0466 | 1 | A | Rel-9 | 9.3.0 | 9.4.0 | Correction to RRM Test Cases | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-102159 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0467 | - | F | Rel-9 | 9.3.0 | - | Introduction of Band 41 for ISM coexistence in TS 36.133 | - | - | - | R4 | R4-55 | R4-101947 | Withdrawn | 2010-05-28 | TEI9 | - | 2010-05-28 |
0468 | - | B | Rel-9 | 9.3.0 | - | CR on autonomous gap | - | - | - | R4 | R4-55 | R4-102001 | Noted | 2010-05-28 | EHNB-RAN2 | - | 2010-05-28 |
0469 | - | B | Rel-9 | 9.3.0 | 9.4.0 | Applicability of mobility requirements with inter-frequency RSTD measurements | RP-48 | RP-100632 | approved | R4 | R4-55 | R4-102039 | Agreed | 2010-05-28 | LCS_LTE | - | 2010-05-28 |
0470 | - | B | Rel-9 | 9.3.0 | - | Test cases for R9 cell reselection enhancements | - | - | - | R4 | R4-55 | R4-102113 | Revised | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0470 | 1 | B | Rel-9 | 9.3.0 | 9.4.0 | Test cases for R9 cell reselection enhancements | RP-48 | RP-100630 | approved | R4 | R4-55 | R4-102322 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0471 | - | F | Rel-8 | 8.9.0 | 8.10.0 | Corrections of section numbering on the test case of E-UTRAN FDD-FDD inter-frequency cell search requirements for L3 fitering | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-102138 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0472 | - | A | Rel-9 | 9.3.0 | 9.4.0 | Corrections of section numbering on the test case of E-UTRAN FDD-FDD inter-frequency cell search requirements for L3 fitering | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-102139 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0473 | - | A | Rel-9 | 9.3.0 | 9.4.0 | Clarification on radio link monitoring | RP-48 | RP-100622 | approved | R4 | R4-55 | R4-102168 | Agreed | 2010-05-28 | LTE-RF | - | 2010-05-28 |
0474 | - | F | Rel-9 | 9.4.0 | - | Test case for E-UTRAN TDD in the existence of non-allowed CSG cell | - | - | - | R4 | R4-56 | R4-102487 | Noted | 2010-09-06 | EHNB | - | 2010-09-06 |
0475 | - | F | Rel-8 | 8.10.0 | - | Addition of CSG cell reselection requirements | - | - | - | R4 | R4-56 | R4-102541 | Withdrawn | 2010-09-06 | LTE-L23 | - | 2010-09-06 |
0476 | - | F | Rel-8 | 8.10.0 | - | Cell identity change time in RRM Test cases | - | - | - | R4 | R4-56 | R4-102804 | Revised | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0476 | 1 | F | Rel-8 | 8.10.0 | 8.11.0 | Cell identity change time in RRM Test cases | RP-49 | RP-100914 | approved | R4 | R4-56 | R4-103342 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0477 | - | A | Rel-9 | 9.4.0 | - | Cell identity change time in RRM Test cases | - | - | - | R4 | R4-56 | R4-102805 | Revised | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0477 | 1 | A | Rel-9 | 9.4.0 | 9.5.0 | Cell identity change time in RRM Test cases | RP-49 | RP-100914 | approved | R4 | R4-56 | R4-103343 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0478 | - | F | Rel-8 | 8.10.0 | - | Scrambling code change time in RRM Test cases | - | - | - | R4 | R4-56 | R4-102806 | Revised | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0478 | 1 | F | Rel-8 | 8.10.0 | 8.11.0 | Scrambling code change time in RRM Test cases | RP-49 | RP-100914 | approved | R4 | R4-56 | R4-103348 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0479 | - | A | Rel-9 | 9.4.0 | - | Scrambling code change time in RRM Test cases | - | - | - | R4 | R4-56 | R4-102807 | Revised | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0479 | 1 | A | Rel-9 | 9.4.0 | 9.5.0 | Scrambling code change time in RRM Test cases | RP-49 | RP-100914 | approved | R4 | R4-56 | R4-103349 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0480 | - | F | Rel-8 | 8.10.0 | - | Cell ID change time for RRM Test case A.5.2.10 | - | - | - | R4 | R4-56 | R4-102808 | Noted | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0481 | - | A | Rel-9 | 9.4.0 | - | Cell ID change time for RRM Test case A.5.2.10 | - | - | - | R4 | R4-56 | R4-102809 | Noted | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0482 | - | F | Rel-8 | 8.10.0 | 8.11.0 | Clarification of Radio link monitoring test cases | RP-49 | RP-100914 | approved | R4 | R4-56 | R4-102810 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0483 | - | A | Rel-9 | 9.4.0 | 9.5.0 | Clarification of Radio link monitoring test cases | RP-49 | RP-100914 | approved | R4 | R4-56 | R4-102811 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0484 | - | F | Rel-8 | 8.10.0 | 8.11.0 | Test case for E-UTRA TDD event triggered reporting when L3 filtering is used in R8 | RP-49 | RP-100915 | approved | R4 | R4-56 | R4-102898 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0485 | - | A | Rel-9 | 9.4.0 | 9.5.0 | Test case for E-UTRA TDD event triggered reporting when L3 filtering is used in R9 | RP-49 | RP-100915 | approved | R4 | R4-56 | R4-102899 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0486 | - | F | Rel-8 | 8.10.0 | 8.11.0 | E-UTRA TDD - UTRA TDD cell reselection in fading propagation conditions: UTRA TDD is of lower priority in R8 | RP-49 | RP-100915 | approved | R4 | R4-56 | R4-102900 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0487 | - | A | Rel-9 | 9.4.0 | 9.5.0 | E-UTRA TDD - UTRA TDD cell reselection in fading propagation conditions: UTRA TDD is of lower priority in R9 | RP-49 | RP-100915 | approved | R4 | R4-56 | R4-102901 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0488 | - | F | Rel-9 | 9.4.0 | - | Test case for TDD UE Rx-Tx time difference measurement | - | - | - | R4 | R4-56 | R4-102902 | Revised | 2010-09-06 | LCS_LTE | - | 2010-09-06 |
0488 | 1 | F | Rel-9 | 9.4.0 | - | Test case for TDD UE Rx-Tx time difference measurement | - | - | - | R4 | R4-56 | R4-103370 | Revised | 2010-09-06 | LCS_LTE | - | 2010-09-06 |
0488 | 2 | F | Rel-9 | 9.4.0 | 9.5.0 | Test case for TDD UE Rx-Tx time difference measurement | RP-49 | RP-100920 | approved | R4 | R4-56 | R4-103422 | Agreed | 2010-09-06 | LCS_LTE | - | 2010-09-06 |
0489 | - | F | Rel-9 | 9.4.0 | - | Test case for FDD UE Rx-Tx time difference measurement | - | - | - | R4 | R4-56 | R4-102903 | Noted | 2010-09-06 | LCS_LTE | - | 2010-09-06 |
0490 | - | F | Rel-9 | 9.4.0 | - | Reference measurement channel of 5MHz bandwidth | - | - | - | R4 | R4-56 | R4-102904 | Noted | 2010-09-06 | LCS_LTE | - | 2010-09-06 |
0491 | - | F | Rel-9 | 9.4.0 | - | Definition of 5MHz bandwidth OCNG pattern | - | - | - | R4 | R4-56 | R4-102905 | Noted | 2010-09-06 | LCS_LTE | - | 2010-09-06 |
0492 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Test case for E-UTRAN TDD in the existence of non-allowed CSG cell | RP-49 | RP-100924 | approved | R4 | R4-56 | R4-102912 | Agreed | 2010-09-06 | EHNB | - | 2010-09-06 |
0493 | - | F | Rel-8 | 8.10.0 | 8.11.0 | PDCCH Aggregation level for RRM tests | RP-49 | RP-100915 | approved | R4 | R4-56 | R4-102944 | Agreed | 2010-09-06 | LTE-RF | Email approval | 2010-09-06 |
0494 | - | A | Rel-9 | 9.4.0 | 9.5.0 | PDCCH Aggregation level for RRM tests | RP-49 | RP-100915 | approved | R4 | R4-56 | R4-102945 | Agreed | 2010-09-06 | LTE-RF | Email approval | 2010-09-06 |
0495 | - | F | Rel-8 | 8.10.0 | 8.11.0 | Corrections to RRM OCNG Patterns | RP-49 | RP-100915 | approved | R4 | R4-56 | R4-102946 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0496 | - | A | Rel-9 | 9.4.0 | 9.5.0 | Corrections to RRM OCNG Patterns | RP-49 | RP-100915 | approved | R4 | R4-56 | R4-102947 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0497 | - | B | Rel-10 | 9.4.0 | 10.0.0 | CR LTE_TDD_2600_US spectrum band definition additions to TS 36.133 | RP-49 | RP-100927 | approved | R4 | R4-56 | R4-102953 | Agreed | 2010-09-06 | LTE_TDD_2600_US-Core | - | 2010-09-06 |
0498 | - | F | Rel-9 | 9.4.0 | 9.5.0 | RRC timer accuracy requirement | RP-49 | RP-100919 | approved | R4 | R4-56 | R4-102962 | Agreed | 2010-09-06 | LTE-L23 | - | 2010-09-06 |
0499 | - | F | Rel-9 | 9.4.0 | - | Addition of test cases to give test coverage of SI reading core requirements | - | - | - | R4 | R4-56 | R4-102967 | Revised | 2010-09-06 | EHNB-RAN2 | - | 2010-09-06 |
0499 | 1 | F | Rel-9 | 9.4.0 | - | Addition of test cases to give test coverage of SI reading core requirements | - | - | - | R4 | R4-56 | R4-103415 | Noted | 2010-09-06 | EHNB-RAN2 | Email approval | 2010-09-06 |
0500 | - | F | Rel-8 | 8.10.0 | 8.11.0 | Correction of OCNG | RP-49 | RP-100915 | approved | R4 | R4-56 | R4-103011 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0501 | - | A | Rel-9 | 9.4.0 | 9.5.0 | Correction of OCNG | RP-49 | RP-100915 | approved | R4 | R4-56 | R4-103012 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0502 | - | F | Rel-8 | 8.10.0 | 8.11.0 | Correction of ES/Iot value in E-UTRAN RSRQ FDD intra frequency test | RP-49 | RP-100915 | approved | R4 | R4-56 | R4-103013 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0503 | - | A | Rel-9 | 9.4.0 | 9.5.0 | Correction of ES/Iot value in E-UTRAN RSRQ FDD intra frequency test | RP-49 | RP-100915 | approved | R4 | R4-56 | R4-103014 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0504 | - | F | Rel-8 | 8.10.0 | - | Editorial corrections of test cases(Rel-8) | - | - | - | R4 | R4-56 | R4-103015 | Revised | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0504 | 1 | F | Rel-8 | 8.10.0 | 8.11.0 | Corrections to 36.133(R8) | RP-49 | RP-100915 | approved | R4 | R4-56 | R4-103366 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0505 | - | A | Rel-9 | 9.4.0 | - | Editorial corrections of test cases(Rel-9) | - | - | - | R4 | R4-56 | R4-103016 | Revised | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0505 | 1 | A | Rel-9 | 9.4.0 | 9.5.0 | Corrections to 36.133(R9) | RP-49 | RP-100915 | approved | R4 | R4-56 | R4-103367 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0506 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Correction of drx-RetransmissionTimer parameters | RP-49 | RP-100920 | approved | R4 | R4-56 | R4-103017 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0507 | - | F | Rel-8 | 8.10.0 | 8.11.0 | Correction of Io value in RSRP FDD and TDD Intra frequency test | RP-49 | RP-100915 | approved | R4 | R4-56 | R4-103018 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0508 | - | A | Rel-9 | 9.4.0 | 9.5.0 | Correction of Io value in RSRP FDD and TDD Intra frequency test | RP-49 | RP-100915 | approved | R4 | R4-56 | R4-103019 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0509 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN FDD-FDD intra-frequency RSTD reporting under fading propagation conditions in asynchronous cells | - | - | - | R4 | R4-56 | R4-103020 | Noted | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0510 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN FDD-FDD intra-frequency RSTD reporting under fading propagation conditions in synchronous cells | - | - | - | R4 | R4-56 | R4-103021 | Noted | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0511 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN TDD-TDD intra-frequency RSTD reporting under fading propagation conditions in synchronous cells | - | - | - | R4 | R4-56 | R4-103022 | Noted | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0512 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN FDD-FDD Inter-frequency RSTD reporting under fading propagation conditions in asynchronous cells | - | - | - | R4 | R4-56 | R4-103023 | Noted | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0513 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN TDD-TDD Inter-frequency RSTD reporting under fading propagation conditions in synchronous cells | - | - | - | R4 | R4-56 | R4-103024 | Noted | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0514 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN FDD UE RxTx Time Difference Measurement Accuracy test case | - | - | - | R4 | R4-56 | R4-103025 | Noted | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0515 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN TDD UE RxTx Time Difference Measurement Accuracy test case | - | - | - | R4 | R4-56 | R4-103026 | Noted | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0516 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN FDD-FDD Inter-frequency measurement reporting with autonomous gaps under fading propagation conditions in asynchronous cells | - | - | - | R4 | R4-56 | R4-103027 | Noted | 2010-09-06 | EHNB-RAN2 | - | 2010-09-06 |
0517 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN FDD-FDD Inter-frequency measurement reporting with autonomous gaps when DRX is used under fading propagation conditions in asynchronous cells | - | - | - | R4 | R4-56 | R4-103028 | Noted | 2010-09-06 | EHNB-RAN2 | - | 2010-09-06 |
0518 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN TDD-TDD Inter-frequency measurement reporting with autonomous gaps under fading propagation conditions in synchronous cells | - | - | - | R4 | R4-56 | R4-103029 | Noted | 2010-09-06 | EHNB-RAN2 | - | 2010-09-06 |
0519 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN TDD-TDD Inter-frequency measurement reporting with autonomous gaps when DRX is used under fading propagation conditions in synchronous cells | - | - | - | R4 | R4-56 | R4-103030 | Noted | 2010-09-06 | EHNB-RAN2 | - | 2010-09-06 |
0520 | - | F | Rel-8 | 8.10.0 | - | Editorial corrections to 36.133 (R8) | - | - | - | R4 | R4-56 | R4-103033 | Noted | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0521 | - | A | Rel-9 | 9.4.0 | - | Editorial corrections to 36.133 (R9) | - | - | - | R4 | R4-56 | R4-103034 | Revised | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0521 | 1 | F | Rel-9 | 9.4.0 | 9.5.0 | Editorial corrections to 36.133 (R9) | RP-49 | RP-100920 | approved | R4 | R4-56 | R4-103364 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0522 | - | F | Rel-8 | 8.10.0 | 8.11.0 | Alignment of REFSENS between 36.101 and 36.133(R8) | RP-49 | RP-100914 | approved | R4 | R4-56 | R4-103035 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0523 | - | A | Rel-9 | 9.4.0 | 9.5.0 | Alignment of REFSENS between 36.101 and 36.133(R9) | RP-49 | RP-100914 | approved | R4 | R4-56 | R4-103036 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0524 | - | F | Rel-8 | 8.10.0 | - | Correction of Time to Trigger unit for 36.133(R8) | - | - | - | R4 | R4-56 | R4-103037 | Noted | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0525 | - | A | Rel-9 | 9.4.0 | - | Correction of Time to Trigger unit for 36.133(R9) | - | - | - | R4 | R4-56 | R4-103038 | Revised | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0525 | 1 | F | Rel-9 | 9.4.0 | 9.5.0 | Correction of Time to Trigger unit for 36.133(R9) | RP-49 | RP-100920 | approved | R4 | R4-56 | R4-103371 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0526 | - | F | Rel-8 | 8.10.0 | - | correction of redundant Hysteresis(Hys) for 36.133(R8) | - | - | - | R4 | R4-56 | R4-103039 | Noted | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0527 | - | F | Rel-9 | 9.4.0 | 9.5.0 | correction of redundant Hysteresis(Hys) for 36.133(R9) | RP-49 | RP-100920 | approved | R4 | R4-56 | R4-103040 | Agreed | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0528 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN FDD Intra Frequency RSTD Measurement Accuracy test case | - | - | - | R4 | R4-56 | R4-103142 | Revised | 2010-09-06 | LCS_LTE | - | 2010-09-06 |
0528 | 1 | B | Rel-9 | 9.4.0 | 9.5.0 | E-UTRAN FDD Intra Frequency RSTD Measurement Accuracy test case | RP-49 | RP-100920 | approved | R4 | R4-56 | R4-103439 | Agreed | 2010-09-06 | LCS_LTE | Email approval | 2010-09-06 |
0529 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN TDD Intra Frequency RSTD Measurement Accuracy test case | - | - | - | R4 | R4-56 | R4-103143 | Noted | 2010-09-06 | LCS_LTE | - | 2010-09-06 |
0530 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN FDD Inter Frequency RSTD Measurement Accuracy test case | - | - | - | R4 | R4-56 | R4-103144 | Noted | 2010-09-06 | LCS_LTE | - | 2010-09-06 |
0531 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN TDD Inter Frequency RSTD Measurement Accuracy test case | - | - | - | R4 | R4-56 | R4-103145 | Noted | 2010-09-06 | LCS_LTE | - | 2010-09-06 |
0532 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN FDD-FDD intra-frequency measurement reporting with autonomous gaps under fading propagation conditions in asynchronous cells | - | - | - | R4 | R4-56 | R4-103146 | Noted | 2010-09-06 | EHNB-RAN2 | - | 2010-09-06 |
0533 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN FDD-FDD intra-frequency measurement reporting with autonomous gaps under fading propagation conditions in synchronous cells | - | - | - | R4 | R4-56 | R4-103147 | Noted | 2010-09-06 | EHNB-RAN2 | - | 2010-09-06 |
0534 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN FDD-FDD intra-frequency measurement reporting with autonomous gaps under fading propagation conditions in synchronous cells with DRX | - | - | - | R4 | R4-56 | R4-103148 | Noted | 2010-09-06 | EHNB-RAN2 | - | 2010-09-06 |
0535 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN TDD-TDD intra-frequency measurement reporting with autonomous gaps under fading propagation conditions in synchronous cells | - | - | - | R4 | R4-56 | R4-103149 | Noted | 2010-09-06 | EHNB-RAN2 | - | 2010-09-06 |
0536 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN TDD-TDD intra-frequency measurement reporting with autonomous gaps under fading propagation conditions in synchronous cells with DRX | - | - | - | R4 | R4-56 | R4-103150 | Noted | 2010-09-06 | EHNB-RAN2 | - | 2010-09-06 |
0537 | - | F | Rel-9 | 9.4.0 | 9.5.0 | A clarification text in the RSTD intra-frequency accuracy requirements | RP-49 | RP-100919 | approved | R4 | R4-56 | R4-103153 | Agreed | 2010-09-06 | LCS_LTE | - | 2010-09-06 |
0538 | - | F | Rel-9 | 9.4.0 | - | Correction to Enhanced BSIC Verification Requirements | - | - | - | R4 | R4-56 | R4-103230 | Revised | 2010-09-06 | TEI9 | - | 2010-09-06 |
0538 | 1 | F | Rel-9 | 9.4.0 | 9.5.0 | Correction to Enhanced BSIC Verification Requirements | RP-49 | RP-100919 | approved | R4 | R4-56 | R4-103339 | Agreed | 2010-09-06 | TEI9 | - | 2010-09-06 |
0539 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Enhanced CSFB Requirements with DRX | RP-49 | RP-100919 | approved | R4 | R4-56 | R4-103231 | Agreed | 2010-09-06 | TEI9 | - | 2010-09-06 |
0540 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Correction to E-CID Requirements | RP-49 | RP-100919 | approved | R4 | R4-56 | R4-103232 | Agreed | 2010-09-06 | LCS_LTE | - | 2010-09-06 |
0541 | - | B | Rel-8 | 8.10.0 | - | Introduction of CSG cell reselection requirements | - | - | - | R4 | R4-56 | R4-103276 | Noted | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0542 | - | F | Rel-9 | 9.4.0 | - | Correction of the ACK/NACK sending requirements for autonomous gaps | - | - | - | R4 | R4-56 | R4-103277 | Noted | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0543 | - | F | Rel-9 | 9.4.0 | - | Addition of Band 18, 19 and 21 into UE Rx Tx time difference requirements | - | - | - | R4 | R4-56 | R4-103278 | Not handled | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0544 | - | F | Rel-9 | 9.4.0 | - | Addition of UTRA and GSM enhanced cell identification test cases | - | - | - | R4 | R4-56 | R4-103282 | Revised | 2010-09-06 | TEI9 | - | 2010-09-06 |
0544 | 1 | F | Rel-9 | 9.4.0 | 9.5.0 | Addition of UTRA and GSM enhanced cell identification test cases | RP-49 | RP-100920 | approved | R4 | R4-56 | R4-103386 | Agreed | 2010-09-06 | TEI9 | - | 2010-09-06 |
0545 | - | F | Rel-8 | 8.10.0 | - | Correction to HARQ setting for RRM test cases | - | - | - | R4 | R4-56 | R4-103314 | Not handled | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0546 | - | A | Rel-9 | 9.4.0 | - | Correction to HARQ setting for RRM test cases | - | - | - | R4 | R4-56 | R4-103315 | Not handled | 2010-09-06 | LTE-RF | - | 2010-09-06 |
0547 | - | B | Rel-9 | 9.4.0 | - | E-UTRAN FDD UE Rx – Tx Time Difference Measurement Accuracy test case | - | - | - | R4 | R4-56 | R4-103373 | Revised | 2010-09-06 | LCS_LTE | - | 2010-09-06 |
0547 | 1 | B | Rel-9 | 9.4.0 | 9.5.0 | E-UTRAN FDD UE Rx – Tx Time Difference Measurement Accuracy test case | RP-49 | RP-100920 | approved | R4 | R4-56 | R4-103423 | Agreed | 2010-09-06 | LCS_LTE | - | 2010-09-06 |
0548 | - | B | Rel-8 | 8.10.0 | 8.11.0 | Introduction of CSG cell reselection requirements | RP-49 | RP-100914 | approved | R4 | R4-56 | R4-103458 | Agreed | 2010-09-06 | LTE-L23 | - | 2010-09-06 |
0549 | - | A | Rel-9 | 9.4.0 | 9.5.0 | Introduction of CSG cell reselection requirements | RP-49 | RP-100914 | approved | R4 | R4-56 | R4-103459 | Agreed | 2010-09-06 | LTE-L23 | - | 2010-09-06 |
0550 | - | F | Rel-9 | 9.5.0 | - | Correction on FDD Intra Frequency RSTD Measurement Accuracy test case | - | - | - | R4 | R4-AH04 | R4-103612 | Revised | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0550 | 1 | F | Rel-9 | 9.5.0 | - | Correction on FDD Intra Frequency RSTD Measurement Accuracy test case | - | - | - | R4 | R4-AH04 | R4-103872 | Revised | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0550 | 2 | F | Rel-9 | 9.5.0 | - | Correction on FDD Intra Frequency RSTD Measurement Accuracy test case | - | - | - | R4 | R4-AH04 | R4-103959 | Noted | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0551 | - | B | Rel-9 | 9.5.0 | - | E-UTRAN TDD Intra Frequency RSTD Measurement Accuracy test case | - | - | - | R4 | R4-AH04 | R4-103613 | Revised | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0551 | 1 | B | Rel-9 | 9.5.0 | - | E-UTRAN TDD Intra Frequency RSTD Measurement Accuracy test case | - | - | - | R4 | R4-AH04 | R4-103873 | Revised | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0551 | 2 | B | Rel-9 | 9.5.0 | - | E-UTRAN TDD Intra Frequency RSTD Measurement Accuracy test case | - | - | - | R4 | R4-AH04 | R4-103960 | Revised | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0551 | 3 | B | Rel-9 | 9.5.0 | 9.6.0 | E-UTRAN TDD Intra Frequency RSTD Measurement Accuracy test case | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-104644 | Agreed | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0552 | - | B | Rel-10 | 10.0.0 | 10.1.0 | Introduction of L-band in TS36.133 | RP-50 | RP-101361 | approved | R4 | R4-AH04 | R4-103619 | Agreed | 2010-12-06 | L_Band_LTE_ATC_MSS-Core | - | 2010-12-06 |
0553 | - | B | Rel-10 | 10.0.0 | - | Add 2 GHz band LTE for ATC of MSS in North America to TS36.113 | - | - | - | R4 | R4-AH04 | R4-103638 | Withdrawn | 2010-12-06 | S_Band_LTE_ATC_MSS-Core | - | 2010-12-06 |
0554 | - | F | Rel-9 | 9.5.0 | - | E-UTRAN FDD Intra Frequency RSTD Measurement Delay test case | - | - | - | R4 | R4-AH04 | R4-103649 | Noted | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0555 | - | A | Rel-10 | 10.0.0 | - | E-UTRAN FDD Intra Frequency RSTD Measurement Delay test case | - | - | - | R4 | R4-AH04 | R4-103665 | Noted | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0556 | - | F | Rel-9 | 9.5.0 | - | Correction to test requirement in RSTD test case | - | - | - | R4 | R4-AH04 | R4-103679 | Noted | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0557 | - | F | Rel-9 | 9.5.0 | - | Correction to test requirement in RX TX time difference test cases | - | - | - | R4 | R4-AH04 | R4-103680 | Noted | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0558 | - | B | Rel-9 | 9.5.0 | - | E-UTRA FDD intra-frequency RSTD measurement reporting delay test case | - | - | - | R4 | R4-AH04 | R4-103742 | Revised | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0558 | 1 | B | Rel-9 | 9.5.0 | - | E-UTRAN FDD intra-frequency RSTD measurement reporting delay test case | - | - | - | R4 | R4-AH04 | R4-103885 | Revised | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0558 | 2 | B | Rel-9 | 9.5.0 | - | E-UTRA FDD intra-frequency RSTD measurement reporting delay test case | - | - | - | R4 | R4-AH04 | R4-103952 | Withdrawn | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0558 | 3 | B | Rel-9 | 9.5.0 | - | E-UTRA FDD intra-frequency RSTD measurement reporting delay test case | - | - | - | R4 | R4-AH04 | R4-103982 | Noted | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0559 | - | B | Rel-9 | 9.5.0 | - | E-UTRA TDD intra-frequency RSTD measurement reporting delay test case | - | - | - | R4 | R4-AH04 | R4-103743 | Revised | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0559 | 1 | B | Rel-9 | 9.5.0 | - | E-UTRA TDD intra-frequency RSTD measurement reporting delay test case | - | - | - | R4 | R4-AH04 | R4-103886 | Revised | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0559 | 2 | B | Rel-9 | 9.5.0 | - | E-UTRA TDD intra-frequency RSTD measurement reporting delay test case | - | - | - | R4 | R4-AH04 | R4-103953 | Noted | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0560 | - | B | Rel-10 | 10.0.0 | - | CR 36.133 Evolved Universal Terrestrial Radio Access (E-UTRA); Requirements for support of radio resource management | - | - | - | R4 | R4-AH04 | R4-103903 | Noted | 2010-12-06 | S_Band_LTE_ATC_MSS-core | - | 2010-12-06 |
0561 | - | F | Rel-8 | 8.11.0 | 8.12.0 | PDCCH Aggregation Level for RRM Tests | RP-50 | RP-101332 | approved | R4 | R4-57 | R4-104032 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0562 | - | A | Rel-9 | 9.5.0 | 9.6.0 | PDCCH Aggregation Level for RRM Tests | RP-50 | RP-101332 | approved | R4 | R4-57 | R4-104033 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0563 | - | A | Rel-10 | 10.0.0 | 10.1.0 | PDCCH Aggregation Level for RRM Tests | RP-50 | RP-101332 | approved | R4 | R4-57 | R4-104034 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0564 | - | F | Rel-8 | 8.11.0 | - | Corrections and Clarifications to TS36.133 | - | - | - | R4 | R4-57 | R4-104057 | Revised | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0564 | 1 | F | Rel-8 | 8.11.0 | 8.12.0 | Corrections and Clarifications to TS36.133 | RP-50 | RP-101331 | approved | R4 | R4-57 | R4-104955 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0565 | - | A | Rel-9 | 9.5.0 | - | Corrections and Clarifications to TS36.133 | - | - | - | R4 | R4-57 | R4-104058 | Revised | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0565 | 1 | A | Rel-9 | 9.5.0 | 9.6.0 | Corrections and Clarifications to TS36.133 | RP-50 | RP-101331 | approved | R4 | R4-57 | R4-104956 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0566 | - | A | Rel-10 | 10.0.0 | - | Corrections and Clarifications to TS36.133 | - | - | - | R4 | R4-57 | R4-104059 | Revised | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0566 | 1 | A | Rel-10 | 10.0.0 | 10.1.0 | Corrections and Clarifications to TS36.133 | RP-50 | RP-101331 | approved | R4 | R4-57 | R4-104957 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0567 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Clarification of measurements requirements for HRPD and cdma2000 1x | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-104060 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0568 | - | A | Rel-10 | 10.0.0 | 10.1.0 | Clarification of measurements requirements for HRPD and cdma2000 1x | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-104061 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0569 | - | F | Rel-8 | 8.11.0 | 8.12.0 | MIMO correlation scenario for RLM test cases | RP-50 | RP-101332 | approved | R4 | R4-57 | R4-104081 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0570 | - | A | Rel-9 | 9.5.0 | 9.6.0 | MIMO correlation scenario for RLM test cases | RP-50 | RP-101332 | approved | R4 | R4-57 | R4-104082 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0571 | - | A | Rel-10 | 10.0.0 | 10.1.0 | MIMO correlation scenario for RLM test cases | RP-50 | RP-101332 | approved | R4 | R4-57 | R4-104083 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0572 | - | F | Rel-8 | 8.11.0 | - | Clarify requirements during T5 for in-sync RLM test cases | - | - | - | R4 | R4-57 | R4-104084 | Revised | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0572 | 1 | F | Rel-8 | 8.11.0 | - | Clarify requirements during T5 for in-sync RLM test cases | - | - | - | R4 | R4-57 | R4-104991 | Noted | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0573 | - | A | Rel-9 | 9.5.0 | - | Clarify requirements during T5 for in-sync RLM test cases | - | - | - | R4 | R4-57 | R4-104085 | Revised | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0573 | 1 | A | Rel-9 | 9.5.0 | - | Clarify requirements during T5 for in-sync RLM test cases | - | - | - | R4 | R4-57 | R4-104992 | Noted | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0574 | - | A | Rel-10 | 10.0.0 | - | Clarify requirements during T5 for in-sync RLM test cases | - | - | - | R4 | R4-57 | R4-104086 | Revised | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0574 | 1 | A | Rel-10 | 10.0.0 | - | Clarify requirements during T5 for in-sync RLM test cases | - | - | - | R4 | R4-57 | R4-104993 | Withdrawn | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0575 | - | F | Rel-8 | 8.11.0 | - | UL configration for Non-Contention Based Random Access Tests | - | - | - | R4 | R4-57 | R4-104087 | Noted | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0576 | - | A | Rel-9 | 9.5.0 | - | UL configration for Non-Contention Based Random Access Tests | - | - | - | R4 | R4-57 | R4-104088 | Noted | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0577 | - | A | Rel-10 | 10.0.0 | - | UL configration for Non-Contention Based Random Access Tests | - | - | - | R4 | R4-57 | R4-104089 | Noted | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0578 | - | F | Rel-8 | 8.11.0 | 8.12.0 | Removal of [ ] from PDSCH and PCFICH/PDCCH/PHICH Measurement Channel references in Annex A. | RP-50 | RP-101332 | approved | R4 | R4-57 | R4-104090 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0579 | - | A | Rel-9 | 9.5.0 | 9.6.0 | Removal of [ ] from PDSCH and PCFICH/PDCCH/PHICH Measurement Channel references in Annex A. | RP-50 | RP-101332 | approved | R4 | R4-57 | R4-104091 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0580 | - | A | Rel-10 | 10.0.0 | 10.1.0 | Removal of [ ] from PDSCH and PCFICH/PDCCH/PHICH Measurement Channel references in Annex A. | RP-50 | RP-101332 | approved | R4 | R4-57 | R4-104092 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0581 | - | F | Rel-9 | 9.5.0 | - | Correction to Number of ACK/NAK in SI Reading Requirements | - | - | - | R4 | R4-57 | R4-104141 | Withdrawn | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0582 | - | A | Rel-10 | 10.0.0 | - | Correction to Number of ACK/NAK in SI Reading Requirements | - | - | - | R4 | R4-57 | R4-104142 | Withdrawn | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0583 | - | F | Rel-8 | 8.11.0 | 8.12.0 | Enabling HARQ for RRM Tests | RP-50 | RP-101332 | approved | R4 | R4-57 | R4-104145 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0584 | - | A | Rel-9 | 9.5.0 | 9.6.0 | Enabling HARQ for RRM Tests | RP-50 | RP-101332 | approved | R4 | R4-57 | R4-104146 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0585 | - | A | Rel-10 | 10.0.0 | 10.1.0 | Enabling HARQ for RRM Tests | RP-50 | RP-101332 | approved | R4 | R4-57 | R4-104147 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0586 | - | F | Rel-9 | 9.5.0 | - | Correction of the ACK/NACK sending requirements for autonomous gaps | - | - | - | R4 | R4-57 | R4-104232 | Revised | 2010-12-06 | EHNB-RAN2 | - | 2010-12-06 |
0586 | 1 | F | Rel-9 | 9.5.0 | - | Correction of the ACK/NACK sending requirements for autonomous gaps | - | - | - | R4 | R4-57 | R4-104747 | Noted | 2010-12-06 | EHNB-RAN2 | - | 2010-12-06 |
0587 | - | A | Rel-10 | 10.0.0 | - | Correction of the ACK/NACK sending requirements for autonomous gaps | - | - | - | R4 | R4-57 | R4-104233 | Revised | 2010-12-06 | EHNB-RAN2 | - | 2010-12-06 |
0587 | 1 | A | Rel-10 | 10.0.0 | - | Correction of the ACK/NACK sending requirements for autonomous gaps | - | - | - | R4 | R4-57 | R4-104748 | Not handled | 2010-12-06 | EHNB-RAN2 | - | 2010-12-06 |
0588 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Addition of Band 18, 19 and 21 into UE Rx - Tx time difference requirements | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-104234 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0589 | - | A | Rel-10 | 10.0.0 | 10.1.0 | Addition of Band 18, 19 and 21 into UE Rx - Tx time difference requirements | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-104235 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0590 | - | F | Rel-8 | 8.11.0 | - | Correction to Radio link monitoring test cases | - | - | - | R4 | R4-57 | R4-104280 | Revised | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0590 | 1 | F | Rel-8 | 8.11.0 | 8.12.0 | Correction to Radio link monitoring test cases | RP-50 | RP-101331 | approved | R4 | R4-57 | R4-104754 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0591 | - | A | Rel-9 | 9.5.0 | - | Correction to Radio link monitoring test cases | - | - | - | R4 | R4-57 | R4-104281 | Revised | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0591 | 1 | A | Rel-9 | 9.5.0 | 9.6.0 | Correction to Radio link monitoring test cases | RP-50 | RP-101331 | approved | R4 | R4-57 | R4-104755 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0592 | - | A | Rel-10 | 10.0.0 | - | Correction to Radio link monitoring test cases | - | - | - | R4 | R4-57 | R4-104282 | Revised | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0592 | 1 | A | Rel-10 | 10.0.0 | - | Correction to Radio link monitoring test cases | - | - | - | R4 | R4-57 | R4-104756 | Revised | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0592 | 2 | A | Rel-10 | 10.0.0 | 10.1.0 | Correction to Radio link monitoring test cases | RP-50 | RP-101331 | approved | R4 | R4-57 | R4-105009 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0593 | - | B | Rel-10 | 10.0.0 | - | Add 2 GHz band LTE for ATC of MSS in North America to TS36.133 | RP-50 | RP-101360 | postponed | R4 | R4-57 | R4-104320 | Agreed | 2010-12-06 | S_Band_LTE_ATC_MSS-Core | - | 2010-12-06 |
0593 | 1 | B | Rel-10 | 10.1.0 | - | Add 2 GHz band LTE for ATC of MSS in North America to TS36.133 | - | - | - | R4 | R4-58 | R4-111363 | Noted | 2011-03-14 | S_Band_LTE_ATC_MSS-Core | - | 2011-03-14 |
0594 | - | F | Rel-8 | 8.11.0 | - | Modification on E-UTRAN TDD RLM Test for In-sync | - | - | - | R4 | R4-57 | R4-104364 | Noted | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0595 | - | A | Rel-9 | 9.5.0 | - | Modification on E-UTRAN TDD RLM Test for In-sync | - | - | - | R4 | R4-57 | R4-104365 | Noted | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0596 | - | A | Rel-10 | 10.0.0 | - | Modification on E-UTRAN TDD RLM Test for In-sync | - | - | - | R4 | R4-57 | R4-104366 | Noted | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0597 | - | F | Rel-9 | 9.5.0 | - | E-UTRAN FDD intra-frequency RSTD measurement reporting delay test case | - | - | - | R4 | R4-57 | R4-104429 | Revised | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0597 | 1 | F | Rel-9 | 9.5.0 | 9.6.0 | E-UTRAN FDD intra-frequency RSTD measurement reporting delay test case | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-105015 | Agreed | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0598 | - | A | Rel-10 | 10.0.0 | - | E-UTRAN FDD intra-frequency RSTD measurement reporting delay test case | - | - | - | R4 | R4-57 | R4-104430 | Revised | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0598 | 1 | A | Rel-10 | 10.0.0 | - | E-UTRAN FDD intra-frequency RSTD measurement reporting delay test case | - | - | - | R4 | R4-57 | R4-104765 | Revised | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0598 | 2 | A | Rel-10 | 10.0.0 | 10.1.0 | E-UTRAN FDD intra-frequency RSTD measurement reporting delay test case | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-105017 | Agreed | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0599 | - | F | Rel-9 | 9.5.0 | - | E-UTRAN TDD intra-frequency RSTD measurement reporting delay test case | - | - | - | R4 | R4-57 | R4-104431 | Revised | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0599 | 1 | F | Rel-9 | 9.5.0 | 9.6.0 | E-UTRAN TDD intra-frequency RSTD measurement reporting delay test case | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-105016 | Agreed | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0600 | - | A | Rel-10 | 10.0.0 | - | E-UTRAN TDD intra-frequency RSTD measurement reporting delay test case | - | - | - | R4 | R4-57 | R4-104432 | Revised | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0600 | 1 | A | Rel-10 | 10.0.0 | - | E-UTRAN TDD intra-frequency RSTD measurement reporting delay test case | - | - | - | R4 | R4-57 | R4-104766 | Revised | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0600 | 2 | A | Rel-10 | 10.0.0 | 10.1.0 | E-UTRAN TDD intra-frequency RSTD measurement reporting delay test case | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-105018 | Agreed | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0601 | - | F | Rel-9 | 9.5.0 | - | Correction to Autonomous SI Acquisition in TDD | - | - | - | R4 | R4-57 | R4-104512 | Noted | 2010-12-06 | TEI9 | - | 2010-12-06 |
0602 | - | A | Rel-10 | 10.0.0 | - | Correction to Autonomous SI Acquisition in TDD | - | - | - | R4 | R4-57 | R4-104513 | Revised | 2010-12-06 | TEI9 | - | 2010-12-06 |
0602 | 1 | A | Rel-10 | 10.0.0 | - | Correction to Autonomous SI Acquisition in TDD | - | - | - | R4 | R4-57 | R4-104760 | Not handled | 2010-12-06 | TEI9 | - | 2010-12-06 |
0603 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Correction to Enhanced GSM Cell Identification Requirements | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-104514 | Agreed | 2010-12-06 | TEI9 | - | 2010-12-06 |
0604 | - | A | Rel-10 | 10.0.0 | 10.1.0 | Correction to Enhanced GSM Cell Identification Requirement | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-104515 | Agreed | 2010-12-06 | TEI9 | - | 2010-12-06 |
0605 | - | F | Rel-8 | 8.11.0 | - | Correction of inter-frequency measurement accuracy test cases | - | - | - | R4 | R4-57 | R4-104516 | Noted | 2010-12-06 | TEI8 | - | 2010-12-06 |
0606 | - | A | Rel-9 | 9.5.0 | - | Correction of inter-frequency measurement accuracy test cases | - | - | - | R4 | R4-57 | R4-104517 | Not handled | 2010-12-06 | TEI8 | - | 2010-12-06 |
0607 | - | A | Rel-10 | 10.0.0 | - | Correction of inter-frequency measurement accuracy test cases | - | - | - | R4 | R4-57 | R4-104518 | Not handled | 2010-12-06 | TEI8 | - | 2010-12-06 |
0608 | - | B | Rel-9 | 9.5.0 | - | Addition of test cases for FDD intra-frequency SI reading using autonomous gaps with both non DRX and DRX | - | - | - | R4 | R4-57 | R4-104551 | Noted | 2010-12-06 | EHNB-RAN2 | - | 2010-12-06 |
0609 | - | B | Rel-9 | 9.5.0 | - | Addition of test cases for TDD intra-frequency SI reading using autonomous gaps with both non DRX and DRX | - | - | - | R4 | R4-57 | R4-104552 | Noted | 2010-12-06 | EHNB-RAN2 | - | 2010-12-06 |
0610 | - | B | Rel-9 | 9.5.0 | - | Addition of test cases for FDD inter-frequency SI reading using autonomous gaps with both non DRX and DRX | - | - | - | R4 | R4-57 | R4-104553 | Noted | 2010-12-06 | EHNB-RAN2 | - | 2010-12-06 |
0611 | - | B | Rel-9 | 9.5.0 | - | Addition of test cases for TDD inter-frequency SI reading using autonomous gaps with both non DRX and DRX | - | - | - | R4 | R4-57 | R4-104554 | Noted | 2010-12-06 | EHNB-RAN2 | - | 2010-12-06 |
0612 | - | F | Rel-9 | 9.5.0 | - | Correction to TDD measurements with autonomous gaps requirements | - | - | - | R4 | R4-57 | R4-104555 | Noted | 2010-12-06 | EHNB-RAN2 | - | 2010-12-06 |
0613 | - | F | Rel-8 | 8.11.0 | - | Correction of Timing advance adjustment accuracy | - | - | - | R4 | R4-57 | R4-104556 | noted | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0614 | - | A | Rel-9 | 9.5.0 | - | Correction of Timing advance adjustment accuracy | - | - | - | R4 | R4-57 | R4-104557 | Noted | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0615 | - | A | Rel-10 | 10.0.0 | - | Correction of Timing advance adjustment accuracy | - | - | - | R4 | R4-57 | R4-104558 | Noted | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0616 | - | F | Rel-8 | 8.11.0 | - | Correction of test requirement for RLM | - | - | - | R4 | R4-57 | R4-104559 | Noted | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0617 | - | A | Rel-9 | 9.5.0 | - | Correction of test requirement for RLM | - | - | - | R4 | R4-57 | R4-104560 | Noted | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0618 | - | A | Rel-10 | 10.0.0 | - | Correction of test requirement for RLM | - | - | - | R4 | R4-57 | R4-104561 | Noted | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0619 | - | F | Rel-8 | 8.11.0 | - | Correction for Measurements of inter-RAT cells | - | - | - | R4 | R4-57 | R4-104562 | Withdrawn | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0620 | - | A | Rel-9 | 9.5.0 | - | Correction for Measurements of inter-RAT cells | - | - | - | R4 | R4-57 | R4-104563 | Revised | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0620 | 1 | F | Rel-9 | 9.5.0 | - | Correction for Measurements of inter-RAT cells | - | - | - | R4 | R4-57 | R4-104728 | Revised | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0620 | 2 | F | Rel-9 | 9.5.0 | 9.6.0 | Correction for Measurements of inter-RAT cells | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-104958 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0621 | - | A | Rel-10 | 10.0.0 | - | Correction for Measurements of inter-RAT cells | - | - | - | R4 | R4-57 | R4-104564 | Revised | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0621 | 1 | A | Rel-10 | 10.0.0 | 10.1.0 | Correction for Measurements of inter-RAT cells | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-104959 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0622 | - | F | Rel-8 | 8.11.0 | - | correction of Tinterrupt in FDD-FDD Intra-Inter frequency handover test cases | - | - | - | R4 | R4-57 | R4-104565 | Withdrawn | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0623 | - | A | Rel-9 | 9.5.0 | - | correction of Tinterrupt in FDD-FDD Intra-Inter frequency handover test cases | - | - | - | R4 | R4-57 | R4-104566 | Withdrawn | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0624 | - | A | Rel-10 | 10.0.0 | - | correction of Tinterrupt in FDD-FDD Intra-Inter frequency handover test cases | - | - | - | R4 | R4-57 | R4-104567 | Withdrawn | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0625 | - | F | Rel-8 | 8.11.0 | - | Corrections to 36.133 core requirements | - | - | - | R4 | R4-57 | R4-104568 | Withdrawn | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0626 | - | A | Rel-9 | 9.5.0 | - | Corrections to 36.133 core requirements | - | - | - | R4 | R4-57 | R4-104569 | Withdrawn | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0627 | - | A | Rel-10 | 10.0.0 | - | Corrections to 36.133 core requirements | - | - | - | R4 | R4-57 | R4-104570 | Withdrawn | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0628 | - | B | Rel-9 | 9.5.0 | - | E-UTRA FDD intra-frequency RSTD measurement reporting delay with DRX test case | - | - | - | R4 | R4-57 | R4-104571 | Noted | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0629 | - | B | Rel-9 | 9.5.0 | - | E-UTRA TDD intra-frequency RSTD measurement reporting delay with DRX test case | - | - | - | R4 | R4-57 | R4-104572 | Noted | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0630 | - | F | Rel-8 | 8.11.0 | - | Correction of reselection requirement for UTRAN FDD cell | - | - | - | R4 | R4-57 | R4-104573 | Withdrawn | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0631 | - | A | Rel-9 | 9.5.0 | - | Correction of reselection requirement for UTRAN FDD cell | - | - | - | R4 | R4-57 | R4-104574 | Revised | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0631 | 1 | F | Rel-9 | 9.5.0 | 9.6.0 | Correction of reselection requirement for UTRAN FDD cells | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-104729 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0632 | - | A | Rel-10 | 10.0.0 | 10.1.0 | Correction of reselection requirement for UTRAN FDD cells | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-104575 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0633 | - | F | Rel-8 | 8.11.0 | 8.12.0 | Corrections to 36.133 performance requirements | RP-50 | RP-101331 | approved | R4 | R4-57 | R4-104576 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0634 | - | A | Rel-9 | 9.5.0 | 9.6.0 | Corrections to 36.133 performance requirements | RP-50 | RP-101331 | approved | R4 | R4-57 | R4-104577 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0635 | - | A | Rel-10 | 10.0.0 | 10.1.0 | Corrections to 36.133 performance requirements | RP-50 | RP-101331 | approved | R4 | R4-57 | R4-104578 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0636 | - | F | Rel-8 | 8.11.0 | 8.12.0 | Correction to intra frequency cell identification time | RP-50 | RP-101331 | approved | R4 | R4-57 | R4-104680 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0637 | - | A | Rel-9 | 9.5.0 | 9.6.0 | Correction to intra frequency cell identification time | RP-50 | RP-101331 | approved | R4 | R4-57 | R4-104681 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0638 | - | A | Rel-10 | 10.0.0 | 10.1.0 | Correction to intra frequency cell identification time for FDD and TDD | RP-50 | RP-101331 | approved | R4 | R4-57 | R4-104682 | Agreed | 2010-12-06 | LTE-RF | - | 2010-12-06 |
0639 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Correction to Enhanced UTRA FDD Cell Identification Requirements | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-104689 | Agreed | 2010-12-06 | TEI9 | - | 2010-12-06 |
0640 | - | A | Rel-10 | 10.0.0 | 10.1.0 | Correction to Enhanced UTRA FDD Cell Identification Requirements | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-104690 | Agreed | 2010-12-06 | TEI9 | - | 2010-12-06 |
0641 | - | B | Rel-8 | 8.11.0 | - | Completion of CSG cell reselection requirements | - | - | - | R4 | R4-57 | R4-104691 | Revised | 2010-12-06 | LTE-L23, HNB-supp, LTE-UEConTest, HNB-UEConTestFDD | - | 2010-12-06 |
0641 | 1 | B | Rel-8 | 8.11.0 | 8.12.0 | Completion of CSG cell reselection requirements | RP-50 | RP-101335 | approved | R4 | R4-57 | R4-104847 | Agreed | 2010-12-06 | LTE-L23, HNB-supp, LTE-UEConTest, HNB-UEConTestFDD | - | 2010-12-06 |
0642 | - | A | Rel-9 | 9.5.0 | - | Completion of CSG cell reselection requirements | - | - | - | R4 | R4-57 | R4-104692 | Revised | 2010-12-06 | LTE-L23, HNB-supp, LTE-UEConTest, HNB-UEConTestFDD | - | 2010-12-06 |
0642 | 1 | A | Rel-9 | 9.5.0 | 9.6.0 | Completion of CSG cell reselection requirements | RP-50 | RP-101335 | approved | R4 | R4-57 | R4-104848 | Agreed | 2010-12-06 | LTE-L23, HNB-supp, LTE-UEConTest, HNB-UEConTestFDD | - | 2010-12-06 |
0643 | - | A | Rel-10 | 10.0.0 | - | Completion of CSG cell reselection requirements | - | - | - | R4 | R4-57 | R4-104693 | Revised | 2010-12-06 | LTE-L23, HNB-supp, LTE-UEConTest, HNB-UEConTestFDD | - | 2010-12-06 |
0643 | 1 | A | Rel-10 | 10.0.0 | 10.1.0 | Completion of CSG cell reselection requirements | RP-50 | RP-101335 | approved | R4 | R4-57 | R4-104849 | Agreed | 2010-12-06 | LTE-L23, HNB-supp, LTE-UEConTest, HNB-UEConTestFDD | - | 2010-12-06 |
0644 | - | B | Rel-10 | 10.0.0 | 10.1.0 | Band 42 and 43 parameters for UMTS/LTE 3500 (TDD) for TS 36.133 | RP-50 | RP-101356 | approved | R4 | R4-57 | R4-104703 | agreed | 2010-12-06 | RInImp8-UMTSLTE3500 | - | 2010-12-06 |
0645 | - | A | Rel-10 | 10.0.0 | 10.1.0 | E-UTRAN TDD Intra Frequency RSTD Measurement Accuracy test case | RP-50 | RP-101343 | approved | R4 | R4-57 | R4-104876 | Agreed | 2010-12-06 | LCS_LTE | - | 2010-12-06 |
0646 | - | F | Rel-8 | 8.11.0 | 8.12.0 | Removal of square brackets from scope of TS36.133 | RP-50 | RP-101386 | approved | Fujitsu | - | - | - | 2010-12-07 | LTE-RF | - | 2010-12-08 |
0647 | - | A | Rel-9 | 9.5.0 | 9.6.0 | Removal of square brackets from scope of TS36.133 | RP-50 | RP-101387 | approved | Fujitsu | - | - | - | 2010-12-07 | LTE-RF | - | 2010-12-08 |
0648 | - | A | Rel-10 | 10.0.0 | 10.1.0 | Removal of square brackets from scope of TS36.133 | RP-50 | RP-101388 | approved | Fujitsu | - | - | - | 2010-12-07 | LTE-RF | - | 2010-12-08 |
0649 | - | B | Rel-10 | 10.1.0 | - | CR Expanded 1900 addition to 36.133 | - | - | - | R4 | R4-57AH | R4-110022 | Noted | 2011-03-14 | E1900-Core | - | 2011-03-14 |
0650 | - | B | Rel-10 | 10.1.0 | - | CR upper Extended 850 MHz addition to 36.133 | - | - | - | R4 | R4-57AH | R4-110027 | Revised | 2011-03-14 | e850_UB-Core | - | 2011-03-14 |
0650 | 1 | B | Rel-10 | 10.1.0 | - | CR upper Extended 850 MHz addition to 36.133 | - | - | - | R4 | R4-57AH | R4-110492 | Noted | 2011-03-14 | e850_UB-Core | - | 2011-03-14 |
0650 | 2 | B | Rel-10 | 10.1.0 | - | CR upper Extended 850 MHz addition to 36.133 | - | - | - | R4 | R4-59 | R4-113047 | Withdrawn | 2011-05-30 | e850_UB-Core | - | 2011-05-30 |
0651 | - | F | Rel-10 | 10.1.0 | - | E-UTRAN FDD inter-frequency RSTD measurement reporting delay test case | - | - | - | R4 | R4-57AH | R4-110071 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0652 | - | F | Rel-10 | 10.1.0 | - | E-UTRAN TDD inter-frequency RSTD measurement reporting delay test case | - | - | - | R4 | R4-57AH | R4-110072 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0653 | - | B | Rel-10 | 10.1.0 | - | Requirements for Minimization of Drive Tests (MDT) in LTE | - | - | - | R4 | R4-57AH | R4-110075 | Noted | 2011-03-14 | MDT_UMTSLTE-Core | - | 2011-03-14 |
0654 | - | B | Rel-10 | 10.1.0 | - | E-UTRAN FDD Inter Frequency RSTD Measurement Accuracy test case | - | - | - | R4 | R4-57AH | R4-110179 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0654 | 1 | B | Rel-10 | 10.1.0 | - | E-UTRAN FDD Inter Frequency RSTD Measurement Accuracy test case | - | - | - | R4 | R4-58 | R4-111014 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0655 | - | B | Rel-10 | 10.1.0 | - | E-UTRAN TDD Inter Frequency RSTD Measurement Accuracy test case | - | - | - | R4 | R4-57AH | R4-110180 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0656 | - | B | Rel-10 | 10.1.0 | - | Introduction of MDT in 36.133 | - | - | - | R4 | R4-57AH | R4-110339 | Noted | 2011-03-14 | MDT_UMTSLTE-Core | - | 2011-03-14 |
0657 | - | F | Rel-10 | 10.1.0 | - | CR to 36.133: Aligning relavant RRM requirements for Band 41 with the reference sensitivity values in 36.101 | - | - | - | R4 | R4-57AH | R4-110365 | Not handled formally | 2011-03-14 | LTE_TDD_2600_US-Core | - | 2011-03-14 |
0658 | - | B | Rel-10 | 10.1.0 | 10.2.0 | Addition of UE RRM capabilities for CA | RP-51 | RP-110359 | approved | R4 | R4-58 | R4-110614 | Agreed | 2011-03-14 | LTE_CA-Core | - | 2011-03-14 |
0659 | - | F | Rel-9 | 9.6.0 | - | Refinement of RSRP levels for measurement accuracy test cases | - | - | - | R4 | R4-58 | R4-110619 | Noted | 2011-03-14 | TEI9 | - | 2011-03-14 |
0660 | - | A | Rel-10 | 10.1.0 | - | Refinement of RSRP levels for measurement accuracy test cases | - | - | - | R4 | R4-58 | R4-110620 | Noted | 2011-03-14 | TEI9 | - | 2011-03-14 |
0661 | - | F | Rel-8 | 8.12.0 | 8.13.0 | Correction to E-UTRAN TDD in-sync test requirements | RP-51 | RP-110340 | approved | R4 | R4-58 | R4-110624 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0662 | - | A | Rel-9 | 9.6.0 | 9.7.0 | Correction to E-UTRAN TDD in-sync test requirements | RP-51 | RP-110340 | approved | R4 | R4-58 | R4-110625 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0663 | - | A | Rel-10 | 10.1.0 | 10.2.0 | Correction to E-UTRAN TDD in-sync test requirements | RP-51 | RP-110340 | approved | R4 | R4-58 | R4-110626 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0664 | - | F | Rel-9 | 9.6.0 | - | RSTD requirements, RMC and OCNG patterns | - | - | - | R4 | R4-58 | R4-110627 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0664 | 1 | F | Rel-9 | 9.6.0 | 9.7.0 | RSTD requirements, RMC and OCNG patterns | RP-51 | RP-110348 | approved | R4 | R4-58 | R4-111496 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0665 | - | A | Rel-10 | 10.1.0 | - | RSTD requirements, RMC and OCNG patterns | - | - | - | R4 | R4-58 | R4-110628 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0665 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | RSTD requirements, RMC and OCNG patterns | RP-51 | RP-110348 | approved | R4 | R4-58 | R4-111497 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0666 | - | F | Rel-8 | 8.12.0 | - | Correction to Radio link monitoring test cases | - | - | - | R4 | R4-58 | R4-110630 | Noted | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0667 | - | A | Rel-9 | 9.6.0 | - | Correction to Radio link monitoring test cases | - | - | - | R4 | R4-58 | R4-110631 | Noted | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0668 | - | A | Rel-10 | 10.1.0 | - | Correction to Radio link monitoring test cases | - | - | - | R4 | R4-58 | R4-110632 | Noted | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0669 | - | F | Rel-10 | 10.1.0 | 10.2.0 | CR to 36.133: Aligning relavant RRM requirements for Band 41 with the reference sensitivity values in 36.101 | RP-51 | RP-110350 | approved | R4 | R4-58 | R4-110647 | Agreed | 2011-03-14 | LTE_TDD_2600_US-Core | - | 2011-03-14 |
0670 | - | F | Rel-9 | 9.6.0 | - | CR Sustained Data Rate Test | - | - | - | R4 | R4-58 | R4-110701 | Withdrawn | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0671 | - | A | Rel-10 | 10.1.0 | - | CR Sustained Data Rate Test | - | - | - | R4 | R4-58 | R4-110702 | Withdrawn | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0672 | - | F | Rel-9 | 9.6.0 | - | Modification on ACK number requirement for TDD with autonomous gaps(R9) | - | - | - | R4 | R4-58 | R4-110776 | Noted | 2011-03-14 | EHNB-RAN2 | - | 2011-03-14 |
0673 | - | A | Rel-10 | 10.1.0 | - | Modification on ACK number requirement for TDD with autonomous gaps(R10) | - | - | - | R4 | R4-58 | R4-110777 | Noted | 2011-03-14 | EHNB-RAN2 | - | 2011-03-14 |
0674 | - | F | Rel-8 | 8.12.0 | 8.13.0 | Modification on test case of E-UTRA TDD to UTRA TDD cell reselection(R8) | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-110778 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0675 | - | A | Rel-9 | 9.6.0 | 9.7.0 | Modification on test case of E-UTRA TDD to UTRA TDD cell reselection(R9) | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-110779 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0676 | - | A | Rel-10 | 10.1.0 | 10.2.0 | Modification on test case of E-UTRA TDD to UTRA TDD cell reselection(R10) | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-110780 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0677 | - | B | Rel-10 | 10.1.0 | - | Requirements of deactivated SCell measurement | - | - | - | R4 | R4-58 | R4-110785 | Noted | 2011-03-14 | LTE_CA-Core | - | 2011-03-14 |
0678 | - | F | Rel-9 | 9.6.0 | - | Corrections to RSTD measurement for Rel-9 | - | - | - | R4 | R4-58 | R4-110805 | Revised | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0678 | 1 | F | Rel-9 | 9.6.0 | - | Corrections to RSTD measurement for Rel-9 | - | - | - | R4 | R4-58 | R4-111427 | Revised | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0678 | 2 | F | Rel-9 | 9.6.0 | 9.7.0 | Corrections to RSTD measurement for Rel-9 | RP-51 | RP-110348 | approved | R4 | R4-58 | R4-111516 | Agreed | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0679 | - | F | Rel-8 | 8.12.0 | - | Value of MS_TXPWR_MAX_CCH for EUTRA-GSM reselection test cases A.4.4.x | - | - | - | R4 | R4-58 | R4-110835 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0679 | 1 | F | Rel-8 | 8.12.0 | 8.13.0 | Value of MS_TXPWR_MAX_CCH for EUTRA-GSM reselection test cases A.4.4.x | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-111457 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0680 | - | A | Rel-9 | 9.6.0 | - | Value of MS_TXPWR_MAX_CCH for EUTRA-GSM reselection test cases A.4.4.x | - | - | - | R4 | R4-58 | R4-110836 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0680 | 1 | A | Rel-9 | 9.6.0 | 9.7.0 | Value of MS_TXPWR_MAX_CCH for EUTRA-GSM reselection test cases A.4.4.x | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-111458 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0681 | - | A | Rel-10 | 10.1.0 | - | Value of MS_TXPWR_MAX_CCH for EUTRA-GSM reselection test cases A.4.4.x | - | - | - | R4 | R4-58 | R4-110837 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0681 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | Value of MS_TXPWR_MAX_CCH for EUTRA-GSM reselection test cases A.4.4.x | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-111459 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0682 | - | F | Rel-8 | 8.12.0 | - | Value of RXLEV_ACCESS_MIN for EUTRA-GSM reselection test cases A.4.4.x | - | - | - | R4 | R4-58 | R4-110838 | Noted | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0683 | - | A | Rel-9 | 9.6.0 | - | Value of RXLEV_ACCESS_MIN for EUTRA-GSM reselection test cases A.4.4.x | - | - | - | R4 | R4-58 | R4-110839 | Noted | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0684 | - | A | Rel-10 | 10.1.0 | - | Value of RXLEV_ACCESS_MIN for EUTRA-GSM reselection test cases A.4.4.x | - | - | - | R4 | R4-58 | R4-110840 | Noted | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0685 | - | F | Rel-8 | 8.12.0 | - | Rearrangement of Time periods for EUTRA-UTRA reselection test case A.4.3.1.1 | - | - | - | R4 | R4-58 | R4-110841 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0685 | 1 | F | Rel-8 | 8.12.0 | 8.13.0 | Rearrangement of Time periods for EUTRA-UTRA reselection test case A.4.3.1.1 | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-111460 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0686 | - | A | Rel-9 | 9.6.0 | - | Rearrangement of Time periods for EUTRA-UTRA reselection test case A.4.3.1.1 | - | - | - | R4 | R4-58 | R4-110842 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0686 | 1 | A | Rel-9 | 9.6.0 | 9.7.0 | Rearrangement of Time periods for EUTRA-UTRA reselection test case A.4.3.1.1 | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-111461 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0687 | - | A | Rel-10 | 10.1.0 | - | Rearrangement of Time periods for EUTRA-UTRA reselection test case A.4.3.1.1 | - | - | - | R4 | R4-58 | R4-110843 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0687 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | Rearrangement of Time periods for EUTRA-UTRA reselection test case A.4.3.1.1 | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-111462 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0688 | - | F | Rel-8 | 8.12.0 | - | Removal of ""Force to Cell 2"" during initialisation for EUTRA-UTRA reselection test case A.4.3.1.2 | - | - | - | R4 | R4-58 | R4-110844 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0688 | 1 | F | Rel-8 | 8.12.0 | 8.13.0 | Removal of ""Force to Cell 2"" during initialisation for EUTRA-UTRA reselection test case A.4.3.1.2 | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-111463 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0689 | - | A | Rel-9 | 9.6.0 | - | Removal of ""Force to Cell 2"" during initialisation for EUTRA-UTRA reselection test case A.4.3.1.2 | - | - | - | R4 | R4-58 | R4-110845 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0689 | 1 | A | Rel-9 | 9.6.0 | 9.7.0 | Removal of ""Force to Cell 2"" during initialisation for EUTRA-UTRA reselection test case A.4.3.1.2 | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-111464 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0690 | - | A | Rel-10 | 10.1.0 | - | Removal of ""Force to Cell 2"" during initialisation for EUTRA-UTRA reselection test case A.4.3.1.2 | - | - | - | R4 | R4-58 | R4-110846 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0690 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | Removal of ""Force to Cell 2"" during initialisation for EUTRA-UTRA reselection test case A.4.3.1.2 | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-111465 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0691 | - | F | Rel-8 | 8.12.0 | - | SNR for RRM A.8.x test cases using ETU70 | - | - | - | R4 | R4-58 | R4-110850 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0691 | 1 | F | Rel-8 | 8.12.0 | 8.13.0 | SNR for RRM A.8.x test cases using ETU70 | RP-51 | RP-110340 | approved | R4 | R4-58 | R4-111469 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0692 | - | A | Rel-9 | 9.6.0 | - | SNR for RRM A.8.x test cases using ETU70 | - | - | - | R4 | R4-58 | R4-110851 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0692 | 1 | A | Rel-9 | 9.6.0 | 9.7.0 | SNR for RRM A.8.x test cases using ETU70 | RP-51 | RP-110340 | approved | R4 | R4-58 | R4-111470 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0693 | - | A | Rel-10 | 10.1.0 | - | SNR for RRM A.8.x test cases using ETU70 | - | - | - | R4 | R4-58 | R4-110852 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0693 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | SNR for RRM A.8.x test cases using ETU70 | RP-51 | RP-110340 | approved | R4 | R4-58 | R4-111471 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0694 | - | F | Rel-8 | 8.12.0 | - | Clarify requirements for RLM test cases A.7.3.x | - | - | - | R4 | R4-58 | R4-110853 | Noted | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0695 | - | A | Rel-9 | 9.6.0 | - | Clarify requirements for RLM test cases A.7.3.x | - | - | - | R4 | R4-58 | R4-110854 | Noted | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0696 | - | A | Rel-10 | 10.1.0 | - | Clarify requirements for RLM test cases A.7.3.x | - | - | - | R4 | R4-58 | R4-110855 | Noted | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0697 | - | B | Rel-10 | 10.1.0 | - | Timestamp accuracy requirements for MDT | - | - | - | R4 | R4-58 | R4-110894 | Revised | 2011-03-14 | MDT_UMTSLTE-Core | - | 2011-03-14 |
0697 | 1 | B | Rel-10 | 10.1.0 | - | Timestamp accuracy requirements for MDT | RP-51 | RP-110356 | reissued | R4 | R4-58 | R4-111562 | Agreed | 2011-03-14 | MDT_UMTSLTE-Core | - | 2011-03-14 |
0697 | 1 | B | Rel-10 | 10.1.0 | 10.2.0 | Requirements for Minimaztion of Drive Tests (MDT) in LTE | RP-51 | RP-110408 | approved | RAN4 | - | R4-111562 | - | 2011-03-13 | MDT_UMTSLTE-Core | - | 2011-03-17 |
0698 | - | F | Rel-8 | 8.12.0 | - | Correction of section number errors in 36.133 | - | - | - | R4 | R4-58 | R4-110896 | Noted | 2011-03-14 | TEI8 | - | 2011-03-14 |
0699 | - | A | Rel-9 | 9.6.0 | - | Correction of section number errors in 36.133 | - | - | - | R4 | R4-58 | R4-110897 | Noted | 2011-03-14 | TEI8 | - | 2011-03-14 |
0700 | - | A | Rel-10 | 10.1.0 | - | Correction of section number errors in 36.133 | - | - | - | R4 | R4-58 | R4-110898 | Noted | 2011-03-14 | TEI8 | - | 2011-03-14 |
0701 | - | F | Rel-8 | 8.12.0 | 8.13.0 | Correction to test cases of E-UTRA to UTRA cell reselection when UE is in idle state | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-110899 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0702 | - | A | Rel-9 | 9.6.0 | 9.7.0 | Correction to test cases of E-UTRA to UTRA cell reselection when UE is in idle state | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-110900 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0703 | - | A | Rel-10 | 10.1.0 | 10.2.0 | Correction to test cases of E-UTRA to UTRA cell reselection when UE is in idle state | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-110901 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0704 | - | F | Rel-9 | 9.6.0 | - | Add missing inter-frequency RSTD type to 36.133 | - | - | - | R4 | R4-58 | R4-110908 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0705 | - | A | Rel-10 | 10.1.0 | - | Add missing inter-frequency RSTD type to 36.133 | - | - | - | R4 | R4-58 | R4-110909 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0706 | - | B | Rel-10 | 10.1.0 | - | Introduction of measurement requirements for carrier aggregation | - | - | - | R4 | R4-58 | R4-110937 | Revised | 2011-03-14 | LTE_CA-Core | - | 2011-03-14 |
0706 | 1 | B | Rel-10 | 10.1.0 | - | Introduction of measurement requirements for carrier aggregation | - | - | - | R4 | R4-58 | R4-111527 | Revised | 2011-03-14 | LTE_CA-Core | - | 2011-03-14 |
0706 | 2 | B | Rel-10 | 10.1.0 | 10.2.0 | Introduction of measurement requirements for carrier aggregation | RP-51 | RP-110359 | approved | R4 | R4-58 | R4-111637 | Agreed | 2011-03-14 | LTE_CA-Core | - | 2011-03-14 |
0708 | - | B | Rel-9 | 9.6.0 | - | Addition of test cases for FDD intra-frequency SI reading using autonomous gaps with both non DRX and DRX for Rel-9 | - | - | - | R4 | R4-58 | R4-111067 | Revised | 2011-03-14 | EHNB | - | 2011-03-14 |
0708 | 1 | B | Rel-9 | 9.6.0 | 9.7.0 | Addition of test cases for FDD intra-frequency SI reading using autonomous gaps with both non DRX and DRX for Rel-9 | RP-51 | RP-110347 | approved | R4 | R4-58 | R4-111404 | Agreed | 2011-03-14 | EHNB | - | 2011-03-14 |
0709 | - | A | Rel-10 | 10.1.0 | - | Addition of test cases for FDD intra-frequency SI reading using autonomous gaps with both non DRX and DRX for Rel-10 | - | - | - | R4 | R4-58 | R4-111068 | Revised | 2011-03-14 | EHNB | - | 2011-03-14 |
0709 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | Addition of test cases for FDD intra-frequency SI reading using autonomous gaps with both non DRX and DRX for Rel-10 | RP-51 | RP-110347 | approved | R4 | R4-58 | R4-111405 | Agreed | 2011-03-14 | EHNB | - | 2011-03-14 |
0710 | - | B | Rel-9 | 9.6.0 | - | Addition of test cases for FDD inter-frequency SI reading using autonomous gaps with both non DRX and DRX for Rel-9 | - | - | - | R4 | R4-58 | R4-111069 | Revised | 2011-03-14 | EHNB | - | 2011-03-14 |
0710 | 1 | B | Rel-9 | 9.6.0 | 9.7.0 | Addition of test cases for FDD inter-frequency SI reading using autonomous gaps with both non DRX and DRX for Rel-9 | RP-51 | RP-110347 | approved | R4 | R4-58 | R4-111406 | Agreed | 2011-03-14 | EHNB | - | 2011-03-14 |
0711 | - | A | Rel-10 | 10.1.0 | - | Addition of test cases for FDD inter-frequency SI reading using autonomous gaps with both non DRX and DRX for Rel-10 | - | - | - | R4 | R4-58 | R4-111070 | Revised | 2011-03-14 | EHNB | - | 2011-03-14 |
0711 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | Addition of test cases for FDD inter-frequency SI reading using autonomous gaps with both non DRX and DRX for Rel-10 | RP-51 | RP-110347 | approved | R4 | R4-58 | R4-111407 | Agreed | 2011-03-14 | EHNB | - | 2011-03-14 |
0712 | - | B | Rel-10 | 10.1.0 | - | E-UTRAN TDD Inter Frequency RSTD Measurement Accuracy test case | - | - | - | R4 | R4-58 | R4-111081 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0713 | - | B | Rel-10 | 10.1.0 | - | Introduction of core requirements of radio link monitoring in CA | - | - | - | R4 | R4-58 | R4-111082 | Revised | 2011-03-14 | LTE_CA-Core | - | 2011-03-14 |
0713 | 1 | B | Rel-10 | 10.1.0 | 10.2.0 | Introduction of core requirements of radio link monitoring in CA | RP-51 | RP-110359 | approved | R4 | R4-58 | R4-111549 | Agreed | 2011-03-14 | LTE_CA-Core | - | 2011-03-14 |
0714 | - | F | Rel-8 | 8.12.0 | - | Correction on TDD cell search reporting delay in inter-RAT case for R8 | - | - | - | R4 | R4-58 | R4-111086 | Noted | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0715 | - | A | Rel-9 | 9.6.0 | - | Correction on TDD cell search reporting delay in inter-RAT case for R9 | - | - | - | R4 | R4-58 | R4-111087 | Noted | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0716 | - | A | Rel-10 | 10.1.0 | - | Correction on TDD cell search reporting delay in inter-RAT case for R10 | - | - | - | R4 | R4-58 | R4-111088 | Noted | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0717 | - | F | Rel-8 | 8.12.0 | - | Modification on Test Requirements in E-UTRA - UTRA TDD SON Test Case (A.8.7.3) (R8) | - | - | - | R4 | R4-58 | R4-111102 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0717 | 1 | F | Rel-8 | 8.12.0 | 8.13.0 | Modification on Test Requirements in E-UTRA - UTRA TDD SON Test Case (A.8.7.3) (R8) | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-111410 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0718 | - | A | Rel-9 | 9.6.0 | - | Modification on Test Requirements in E-UTRA - UTRA TDD SON Test Case (A.8.7.3) (R9) | - | - | - | R4 | R4-58 | R4-111103 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0718 | 1 | A | Rel-9 | 9.6.0 | 9.7.0 | Modification on Test Requirements in E-UTRA - UTRA TDD SON Test Case (A.8.7.3) (R9) | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-111411 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0719 | - | A | Rel-10 | 10.1.0 | - | Modification on Test Requirements in E-UTRA - UTRA TDD SON Test Case (A.8.7.3) (R10) | - | - | - | R4 | R4-58 | R4-111104 | Revised | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0719 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | Modification on Test Requirements in E-UTRA - UTRA TDD SON Test Case (A.8.7.3) (R10) | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-111412 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0720 | - | F | Rel-9 | 9.6.0 | - | Changing the successful rate of RSTD delay tests | - | - | - | R4 | R4-58 | R4-111106 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0721 | - | A | Rel-10 | 10.1.0 | - | Changing the successful rate of RSTD delay tests | - | - | - | R4 | R4-58 | R4-111107 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0722 | - | F | Rel-9 | 9.6.0 | - | Clarification on inter-frequency layers for RSTD | - | - | - | R4 | R4-58 | R4-111177 | Revised | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0722 | 1 | F | Rel-9 | 9.6.0 | - | Clarification on inter-frequency layers for RSTD | - | - | - | R4 | R4-58 | R4-111665 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0723 | - | A | Rel-10 | 10.1.0 | - | Clarification on inter-frequency layers for RSTD | - | - | - | R4 | R4-58 | R4-111178 | Revised | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0723 | 1 | A | Rel-10 | 10.1.0 | - | Clarification on inter-frequency layers for RSTD | - | - | - | R4 | R4-58 | R4-111666 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0724 | - | F | Rel-9 | 9.6.0 | - | Clarification on PRS bandwidth for RSTD accuracy requirements | - | - | - | R4 | R4-58 | R4-111179 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0725 | - | A | Rel-10 | 10.1.0 | - | Clarification on PRS bandwidth for RSTD accuracy requirements | - | - | - | R4 | R4-58 | R4-111180 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0726 | - | F | Rel-9 | 9.6.0 | - | Requirements for reporting criteria with positioning measurements | - | - | - | R4 | R4-58 | R4-111181 | Revised | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0726 | 1 | F | Rel-9 | 9.6.0 | - | Requirements for reporting criteria with positioning measurements | - | - | - | R4 | R4-58 | R4-111667 | Revised | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0726 | 2 | F | Rel-9 | 9.6.0 | 9.7.0 | Requirements for reporting criteria with positioning measurements | RP-51 | RP-110348 | approved | R4 | R4-58 | R4-111691 | Agreed | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0727 | - | A | Rel-10 | 10.1.0 | - | Requirements for reporting criteria with positioning measurements | - | - | - | R4 | R4-58 | R4-111182 | Revised | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0727 | 1 | A | Rel-10 | 10.1.0 | - | Requirements for reporting criteria with positioning measurements | - | - | - | R4 | R4-58 | R4-111668 | Revised | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0727 | 2 | A | Rel-10 | 10.1.0 | 10.2.0 | Requirements for reporting criteria with positioning measurements | RP-51 | RP-110348 | approved | R4 | R4-58 | R4-111692 | Agreed | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0728 | - | F | Rel-9 | 9.6.0 | - | Increased rate of successful events in E-UTRAN intra-frequency RSTD measurement reporting delay test cases | - | - | - | R4 | R4-58 | R4-111183 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0729 | - | A | Rel-10 | 10.1.0 | - | Increased rate of successful events in E-UTRAN intra-frequency RSTD measurement reporting delay test cases | - | - | - | R4 | R4-58 | R4-111184 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0730 | - | F | Rel-10 | 10.1.0 | - | E-UTRAN FDD-FDD inter-frequency RSTD measurement reporting delay test case with the reference cell on the serving carrier frequency | - | - | - | R4 | R4-58 | R4-111186 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0731 | - | F | Rel-10 | 10.1.0 | - | E-UTRAN TDD-TDD inter-frequency RSTD measurement reporting delay test case with the reference cell on the serving carrier frequency | - | - | - | R4 | R4-58 | R4-111187 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0732 | - | F | Rel-10 | 10.1.0 | - | E-UTRAN FDD-FDD inter-frequency RSTD measurement reporting delay test case with the reference cell on a non-serving carrier frequency | - | - | - | R4 | R4-58 | R4-111188 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0733 | - | F | Rel-10 | 10.1.0 | - | E-UTRAN TDD-TDD inter-frequency RSTD measurement reporting delay test case with the reference cell on a non-serving carrier frequency | - | - | - | R4 | R4-58 | R4-111189 | Noted | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0734 | - | F | Rel-8 | 8.12.0 | 8.13.0 | Correction of RLM evaluation period in DRX | RP-51 | RP-110340 | approved | R4 | R4-58 | R4-111237 | Agreed | 2011-03-14 | TEI8 | - | 2011-03-14 |
0735 | - | A | Rel-9 | 9.6.0 | 9.7.0 | Correction of RLM evaluation period in DRX | RP-51 | RP-110340 | approved | R4 | R4-58 | R4-111238 | Agreed | 2011-03-14 | TEI8 | - | 2011-03-14 |
0736 | - | A | Rel-10 | 10.1.0 | 10.2.0 | Correction of RLM evaluation period in DRX | RP-51 | RP-110340 | approved | R4 | R4-58 | R4-111239 | Agreed | 2011-03-14 | TEI8 | - | 2011-03-14 |
0737 | - | F | Rel-8 | 8.12.0 | 8.13.0 | Correction of inter-frequency measurement accuracy test cases | RP-51 | RP-110340 | approved | R4 | R4-58 | R4-111240 | Agreed | 2011-03-14 | TEI8 | - | 2011-03-14 |
0738 | - | A | Rel-9 | 9.6.0 | 9.7.0 | Correction of inter-frequency measurement accuracy test cases | RP-51 | RP-110340 | approved | R4 | R4-58 | R4-111241 | Agreed | 2011-03-14 | TEI8 | - | 2011-03-14 |
0739 | - | A | Rel-10 | 10.1.0 | 10.2.0 | Correction of inter-frequency measurement accuracy test cases | RP-51 | RP-110340 | approved | R4 | R4-58 | R4-111242 | Agreed | 2011-03-14 | TEI8 | - | 2011-03-14 |
0740 | - | B | Rel-10 | 10.1.0 | - | Requirements for Minimization of Drive Tests (MDT) in LTE | - | - | - | R4 | R4-58 | R4-111247 | Revised | 2011-03-14 | MDT_UMTSLTE-Core | - | 2011-03-14 |
0741 | - | B | Rel-10 | 10.1.0 | - | RSTD Measurement Requirements with Carrier Aggregation | - | - | - | R4 | R4-58 | R4-111249 | Noted | 2011-03-14 | LTE_CA-Core | - | 2011-03-14 |
0742 | - | F | Rel-8 | 8.12.0 | 8.13.0 | Modification on Test Requirements in E-UTRA GSM cell reselection Test Case (A.4.4) (R8) | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-111304 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0743 | - | A | Rel-9 | 9.6.0 | 9.7.0 | Modification on Test Requirements in E-UTRA GSM cell reselection Test Case (A.4.4) (R9) | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-111305 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0744 | - | A | Rel-10 | 10.1.0 | 10.2.0 | Modification on Test Requirements in E-UTRA GSM cell reselection Test Case (A.4.4) (R10) | RP-51 | RP-110339 | approved | R4 | R4-58 | R4-111306 | Agreed | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0745 | - | F | Rel-10 | 10.1.0 | - | Mapping of Pcmax,c | - | - | - | R4 | R4-58 | R4-111307 | Noted | 2011-03-14 | LTE-RF | - | 2011-03-14 |
0746 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Correction on FDD Intra Frequency RSTD Measurement Accuracy test case | RP-51 | RP-110348 | approved | R4 | R4-58 | R4-111415 | Agreed | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0747 | - | A | Rel-10 | 10.1.0 | - | Corrections to RSTD measurement for Rel-9 | - | - | - | R4 | R4-58 | R4-111428 | Revised | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0747 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | Corrections to RSTD measurement for Rel-9 | RP-51 | RP-110348 | approved | R4 | R4-58 | R4-111517 | Agreed | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0748 | - | A | Rel-10 | 10.1.0 | 10.2.0 | Correction on FDD Intra Frequency RSTD Measurement Accuracy test case | RP-51 | RP-110348 | approved | R4 | R4-58 | R4-111442 | Agreed | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0749 | - | B | Rel-10 | 10.1.0 | - | Add Expanded 1900 MHz Band for UTRA and LTE to TS36.133 | - | - | - | R4 | R4-58 | R4-111488 | Not handled | 2011-03-14 | E1900-Core | - | 2011-03-14 |
0750 | - | F | Rel-9 | 9.6.0 | - | RSTD test case corrections | - | - | - | R4 | R4-58 | R4-111617 | Revised | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0750 | 1 | F | Rel-9 | 9.6.0 | 9.7.0 | RSTD test case corrections | RP-51 | RP-110348 | approved | R4 | R4-58 | R4-111699 | Agreed | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0751 | - | A | Rel-10 | 10.1.0 | - | RSTD test case corrections | - | - | - | R4 | R4-58 | R4-111618 | Revised | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0751 | 1 | A | Rel-10 | 10.1.0 | 10.2.0 | RSTD test case corrections | RP-51 | RP-110348 | approved | R4 | R4-58 | R4-111700 | Agreed | 2011-03-14 | LCS_LTE | - | 2011-03-14 |
0752 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Correction of serving cell performance requirements for autonomous SI acquisition | RP-51 | RP-110344 | approved | R4 | R4-58 | R4-111701 | Agreed | 2011-03-14 | TEI9 | - | 2011-03-14 |
0753 | - | A | Rel-10 | 10.1.0 | 10.2.0 | Correction of serving cell performance requirements for autonomous SI acquisition | RP-51 | RP-110344 | approved | R4 | R4-58 | R4-111702 | Agreed | 2011-03-14 | TEI9 | - | 2011-03-14 |
0754 | - | F | Rel-10 | 10.2.0 | 10.3.0 | E-UTRAN FDD-FDD inter-frequency RSTD measurement reporting delay test case with the reference cell on the serving carrier frequency | RP-52 | RP-110793 | approved | R4 | R4-58AH | R4-112283 | Agreed | 2011-05-30 | LCS_LTE | - | 2011-05-30 |
0755 | - | F | Rel-10 | 10.2.0 | 10.3.0 | E-UTRAN TDD-TDD inter-frequency RSTD measurement reporting delay test case with the reference cell on the serving carrier frequency | RP-52 | RP-110793 | approved | R4 | R4-58AH | R4-112284 | Agreed | 2011-05-30 | LCS_LTE | - | 2011-05-30 |
0756 | - | F | Rel-10 | 10.2.0 | - | Correction to Measurement Requirements for Carrier Aggregation | - | - | - | R4 | R4-58AH | R4-112357 | Noted | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0757 | - | B | Rel-10 | 10.2.0 | 10.3.0 | Core requirements on RRC connection mobility control in CA | RP-52 | RP-110807 | approved | R4 | R4-58AH | R4-112366 | Agreed | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0758 | - | B | Rel-10 | 10.2.0 | 10.3.0 | Timing core requirements in CA | RP-52 | RP-110807 | approved | R4 | R4-58AH | R4-112367 | Agreed | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0759 | - | B | Rel-10 | 10.2.0 | 10.3.0 | Introduction of Handover Requirements for Carrier Aggregation | RP-52 | RP-110807 | approved | R4 | R4-58AH | R4-112370 | Agreed | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0760 | - | B | Rel-10 | 10.2.0 | 10.3.0 | E-UTRAN FDD Inter Frequency RSTD Measurement Accuracy test case | RP-52 | RP-110793 | approved | R4 | R4-58AH | R4-112378 | Agreed | 2011-05-30 | LCS_LTE | - | 2011-05-30 |
0761 | - | B | Rel-10 | 10.2.0 | 10.3.0 | E-UTRAN TDD Inter Frequency RSTD Measurement Accuracy test case | RP-52 | RP-110793 | approved | R4 | R4-58AH | R4-112379 | Agreed | 2011-05-30 | LCS_LTE | - | 2011-05-30 |
0762 | - | B | Rel-10 | 10.2.0 | - | CR on RLM requirements for eICIC | - | - | - | R4 | R4-58AH | R4-112396 | Revised | 2011-05-30 | - | - | 2011-05-30 |
0762 | 1 | B | Rel-10 | 10.2.0 | 10.3.0 | CR on RLM requirements for eICIC | RP-52 | RP-110811 | approved | R4 | R4-59 | R4-113299 | Agreed | 2011-05-30 | eICIC_LTE-Core | - | 2011-05-30 |
0763 | - | F | Rel-8 | 8.13.0 | 8.14.0 | Rearrangement of Time periods for EUTRA-UTRA reselection test case A.4.3.4.1 | RP-52 | RP-110786 | approved | R4 | R4-59 | R4-112423 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0764 | - | A | Rel-9 | 9.7.0 | 9.8.0 | Rearrangement of Time periods for EUTRA-UTRA reselection test case A.4.3.4.1 | RP-52 | RP-110786 | approved | R4 | R4-59 | R4-112424 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0765 | - | A | Rel-10 | 10.2.0 | 10.3.0 | Rearrangement of Time periods for EUTRA-UTRA reselection test case A.4.3.4.1 | RP-52 | RP-110786 | approved | R4 | R4-59 | R4-112425 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0766 | - | F | Rel-8 | 8.13.0 | 8.14.0 | Removal of ""Force to Cell 2"" during initialisation for EUTRA - UTRA reselection test cases | RP-52 | RP-110786 | approved | R4 | R4-59 | R4-112426 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0767 | - | A | Rel-9 | 9.7.0 | 9.8.0 | Removal of ""Force to Cell 2"" during initialisation for EUTRA -UTRA reselection test cases | RP-52 | RP-110786 | approved | R4 | R4-59 | R4-112427 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0768 | - | A | Rel-10 | 10.2.0 | 10.3.0 | Removal of ""Force to Cell 2"" during initialisation for EUTRA -UTRA reselection test cases | RP-52 | RP-110786 | approved | R4 | R4-59 | R4-112428 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0769 | - | F | Rel-8 | 8.13.0 | 8.14.0 | Clarification of Radio link monitoring test requirements | RP-52 | RP-110787 | approved | R4 | R4-59 | R4-112443 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0770 | - | A | Rel-9 | 9.7.0 | - | Clarification of Radio link monitoring test requirements | RP-52 | RP-110787 | approved | R4 | R4-59 | R4-112444 | Agreed | 2011-05-30 | LTE-RF | Not implemented because written to wrong version of the spec. | 2011-05-30 |
0771 | - | A | Rel-10 | 10.2.0 | - | Clarification of Radio link monitoring test requirements | - | - | - | R4 | R4-59 | R4-112445 | Revised | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0771 | 1 | A | Rel-10 | 10.2.0 | - | Clarification of Radio link monitoring test requirements | RP-52 | RP-110787 | approved | R4 | R4-59 | R4-113162 | Agreed | 2011-05-30 | LTE-RF | Not implemented because written to wrong version of the spec. | 2011-05-30 |
0772 | - | F | Rel-8 | 8.13.0 | - | Refinement of RSRP levels for measurement accuracy test cases | - | - | - | R4 | R4-59 | R4-112466 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0773 | - | A | Rel-9 | 9.7.0 | - | Refinement of RSRP levels for measurement accuracy test cases | - | - | - | R4 | R4-59 | R4-112467 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0774 | - | A | Rel-10 | 10.2.0 | - | Refinement of RSRP levels for measurement accuracy test cases | - | - | - | R4 | R4-59 | R4-112468 | Revised | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0774 | 1 | A | Rel-10 | 10.2.0 | - | Refinement of RSRP levels for measurement accuracy test cases | - | - | - | R4 | R4-59 | R4-113189 | Withdrawn | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0775 | - | F | Rel-10 | 10.2.0 | - | Removal of undefined intra-freq RSRQ relative accuracy requirements in CA | - | - | - | R4 | R4-59 | R4-112470 | Revised | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0775 | 1 | F | Rel-10 | 10.2.0 | 10.3.0 | Removal of undefined intra-freq RSRQ relative accuracy requirements in CA | RP-52 | RP-110807 | approved | R4 | R4-59 | R4-113190 | Agreed | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0776 | - | B | Rel-10 | 10.2.0 | 10.3.0 | Introduction of UE interruption requirements in SCC measurements with de-activated SCell | RP-52 | RP-110807 | approved | R4 | R4-59 | R4-112471 | Agreed | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0777 | - | F | Rel-10 | 10.2.0 | - | Search for layers of higher priority in RRC_IDLE state mobility | - | - | - | R4 | R4-59 | R4-112478 | Noted | 2011-05-30 | TEI10 | - | 2011-05-30 |
0778 | - | B | Rel-10 | 10.2.0 | - | Add 2GHz S-Band (Band 23) in 36.133 | - | - | - | R4 | R4-59 | R4-112521 | Revised | 2011-05-30 | S_Band_LTE_ATC_MSS-Core | - | 2011-05-30 |
0778 | 1 | B | Rel-10 | 10.2.0 | 10.3.0 | Add 2GHz S-Band (Band 23) in 36.133 | RP-52 | RP-110812 | approved | R4 | R4-59 | R4-113121 | Agreed | 2011-05-30 | S_Band_LTE_ATC_MSS-Core | - | 2011-05-30 |
0779 | - | F | Rel-9 | 9.7.0 | - | Correction to RSTD measurement for Rel-9 | - | - | - | R4 | R4-59 | R4-112532 | Revised | 2011-05-30 | LCS_LTE | - | 2011-05-30 |
0779 | 1 | F | Rel-9 | 9.7.0 | 9.8.0 | Correction to RSTD measurement for Rel-9 | RP-52 | RP-110794 | approved | R4 | R4-59 | R4-113138 | Agreed | 2011-05-30 | TEI9 | - | 2011-05-30 |
0780 | - | A | Rel-10 | 10.2.0 | - | Correction to RSTD measurement for Rel-10 | - | - | - | R4 | R4-59 | R4-112533 | Revised | 2011-05-30 | LCS_LTE | - | 2011-05-30 |
0780 | 1 | A | Rel-10 | 10.2.0 | 10.3.0 | Correction to RSTD measurement for Rel-10 | RP-52 | RP-110794 | approved | R4 | R4-59 | R4-113139 | Agreed | 2011-05-30 | TEI9 | - | 2011-05-30 |
0781 | - | F | Rel-8 | 8.13.0 | - | PDCCH levels in RLM test cases | - | - | - | R4 | R4-59 | R4-112546 | Withdrawn | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0782 | - | A | Rel-9 | 9.7.0 | - | PDCCH levels in RLM test cases | - | - | - | R4 | R4-59 | R4-112547 | Withdrawn | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0783 | - | A | Rel-10 | 10.2.0 | - | PDCCH levels in RLM test cases | - | - | - | R4 | R4-59 | R4-112548 | Withdrawn | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0784 | - | B | Rel-10 | 10.2.0 | - | Introduction of Band 26 | - | - | - | R4 | R4-59 | R4-112606 | Revised | 2011-05-30 | e850_UB-Core | - | 2011-05-30 |
0784 | 1 | B | Rel-10 | 10.2.0 | - | Introduction of Band 26 | - | - | - | R4 | R4-59 | R4-113281 | Noted | 2011-05-30 | e850_UB-Core | - | 2011-05-30 |
0784 | 1 | B | Rel-10 | 10.2.0 | - | Introduction of Band 26 | - | - | - | R4 | R4-59 | R4-113286 | Withdrawn | 2011-05-30 | e850_UB-Core | - | 2011-05-30 |
0784 | 2 | B | Rel-10 | 10.3.0 | - | Introduction of Band 26 | - | - | - | R4 | R4-60 | R4-114616 | Revised | 2011-09-11 | e850_UB-Core | - | 2011-09-11 |
0784 | 3 | B | Rel-10 | 10.3.0 | - | Introduction of Band 26 | - | - | - | R4 | R4-60 | R4-114800 | Withdrawn | 2011-09-11 | e850_UB-Core | - | 2011-09-11 |
0784 | 4 | B | Rel-10 | 10.3.0 | - | Company CR to add E850 _UB to 36.133 | RP-53 | RP-111219 | revised | Sprint, Ericsson, ST Ericsson | - | - | - | 2011-09-11 | e850_UB-Core | Revised in RP-111384 | 2011-09-11 |
0784 | 5 | B | Rel-10 | 10.3.0 | - | Company CR to add E850 _UB to 36.133 | RP-53 | RP-111384 | withdrawn | Sprint, Ericsson, ST Ericsson | - | - | - | 2011-09-16 | e850_UB-Core | Wrong CR number shown on cover. | 2011-09-11 |
0785 | - | F | Rel-10 | 10.2.0 | - | Simplification of frequency dependent requirements in 36.133 | RP-52 | RP-110796 | revised | R4 | R4-59 | R4-112624 | Agreed | 2011-05-30 | TEI10 | - | 2011-05-30 |
0785 | 1 | F | Rel-10 | 10.2.0 | 10.3.0 | Simplification of frequency dependent requirements in 36.133 | RP-52 | RP-110753 | approved | Ericsson, ST-Ericsson | - | - | - | - | TEI10 | Value error in CR, needs to be fixed at RP-53. | 2011-05-30 |
0786 | - | F | Rel-9 | 9.7.0 | - | Clarification on inter-frequency layers for RSTD | - | - | - | R4 | R4-59 | R4-112661 | Noted | 2011-05-30 | TEI9 | - | 2011-05-30 |
0787 | - | A | Rel-10 | 10.2.0 | - | Clarification on inter-frequency layers for RSTD | - | - | - | R4 | R4-59 | R4-112662 | Revised | 2011-05-30 | TEI9 | - | 2011-05-30 |
0787 | 1 | F | Rel-10 | 10.2.0 | 10.3.0 | Clarification on inter-frequency layers for RSTD | RP-52 | RP-110796 | approved | R4 | R4-59 | R4-113133 | Agreed | 2011-05-30 | TEI10 | - | 2011-05-30 |
0788 | - | B | Rel-10 | 10.2.0 | - | RSRP and RSRQ measurement requirements for eICIC | - | - | - | R4 | R4-59 | R4-112665 | Revised | 2011-05-30 | eICIC_LTE-Core | - | 2011-05-30 |
0788 | 1 | B | Rel-10 | 10.2.0 | - | RSRP and RSRQ measurement requirements for eICIC | - | - | - | R4 | R4-59 | R4-113221 | Revised | 2011-05-30 | eICIC_LTE-Core | - | 2011-05-30 |
0788 | 2 | B | Rel-10 | 10.2.0 | 10.3.0 | RSRP and RSRQ measurement requirements for eICIC | RP-52 | RP-110811 | approved | R4 | R4-59 | R4-113300 | Agreed | 2011-05-30 | eICIC_LTE-Core | - | 2011-05-30 |
0789 | - | B | Rel-10 | 10.2.0 | - | RLM requirements with DRX | - | - | - | R4 | R4-59 | R4-112666 | Noted | 2011-05-30 | eICIC_LTE-Core | - | 2011-05-30 |
0789 | 1 | B | Rel-10 | 10.2.0 | - | RLM requirements with DRX | - | - | - | R4 | R4-59 | R4-113259 | Withdrawn | 2011-05-30 | eICIC_LTE-Core | - | 2011-05-30 |
0790 | - | B | Rel-10 | 10.2.0 | - | UE Rx-TX requirements with eICIC | - | - | - | R4 | R4-59 | R4-112667 | Noted | 2011-05-30 | eICIC_LTE-Core | - | 2011-05-30 |
0791 | - | B | Rel-10 | 10.2.0 | - | RSTD Measurement Requirements with Carrier Aggregation | - | - | - | R4 | R4-59 | R4-112675 | Noted | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0792 | - | B | Rel-10 | 10.2.0 | - | RSTD Measurement Requirements under Pcell Switching | - | - | - | R4 | R4-59 | R4-112676 | Withdrawn | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0793 | - | B | Rel-10 | 10.2.0 | - | E-CID Measurement Requirements under Pcell Switching | - | - | - | R4 | R4-59 | R4-112677 | Revised | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0793 | 1 | B | Rel-10 | 10.2.0 | 10.3.0 | E-CID Measurement Requirements under Pcell Switching | RP-52 | RP-110807 | approved | R4 | R4-59 | R4-113171 | Agreed | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0794 | - | F | Rel-10 | 10.2.0 | - | E-CID Measurement Requirements under Handover | - | - | - | R4 | R4-59 | R4-112678 | Revised | 2011-05-30 | TEI10 | - | 2011-05-30 |
0794 | 1 | F | Rel-10 | 10.2.0 | 10.3.0 | E-CID Measurement Requirements under Handover | RP-52 | RP-110796 | approved | R4 | R4-59 | R4-113295 | Agreed | 2011-05-30 | TEI10 | - | 2011-05-30 |
0795 | - | F | Rel-10 | 10.2.0 | - | RSTD Measurement Requirements under Handover | - | - | - | R4 | R4-59 | R4-112679 | Noted | 2011-05-30 | TEI10 | - | 2011-05-30 |
0796 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Editorial Correction to Cell Re-selection Requirements | RP-52 | RP-110794 | approved | R4 | R4-59 | R4-112693 | Agreed | 2011-05-30 | TEI9 | - | 2011-05-30 |
0797 | - | A | Rel-10 | 10.2.0 | 10.3.0 | Editorial Correction to Cell Re-selection Requirements | RP-52 | RP-110794 | approved | R4 | R4-59 | R4-112694 | Agreed | 2011-05-30 | TEI9 | - | 2011-05-30 |
0798 | - | F | Rel-8 | 8.13.0 | - | Addition of E-UTRAN FDD/TDD cdma2000 1xRTT measurements requirement for SON for Rel-8 | - | - | - | R4 | R4-59 | R4-112718 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0799 | - | A | Rel-9 | 9.7.0 | - | Addition of E-UTRAN FDD/TDD cdma2000 1xRTT measurements requirement for SON for Rel-9 | - | - | - | R4 | R4-59 | R4-112719 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0800 | - | A | Rel-10 | 10.2.0 | - | Addition of E-UTRAN FDD/TDD cdma2000 1xRTT measurements requirement for SON for Rel-10 | - | - | - | R4 | R4-59 | R4-112720 | Revised | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0800 | 1 | F | Rel-10 | 10.2.0 | 10.3.0 | Addition of E-UTRAN FDD/TDD cdma2000 1xRTT measurements requirement for SON for Rel-10 | RP-52 | RP-110796 | approved | R4 | R4-59 | R4-113204 | Agreed | 2011-05-30 | TEI10 | - | 2011-05-30 |
0801 | - | B | Rel-10 | 10.2.0 | - | CA related definitions in TS36.133 | - | - | - | R4 | R4-59 | R4-112723 | Noted | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0802 | - | B | Rel-10 | 10.2.0 | - | Addition of OTDOA measurement requirement for E-UTRAN carrier aggregation | - | - | - | R4 | R4-59 | R4-112724 | Revised | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0802 | 1 | B | Rel-10 | 10.2.0 | - | Addition of OTDOA measurement requirement for E-UTRAN carrier aggregation | - | - | - | R4 | R4-59 | R4-113246 | Revised | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0802 | 2 | B | Rel-10 | 10.2.0 | 10.3.0 | Addition of OTDOA measurement requirement for E-UTRAN carrier aggregation | RP-52 | RP-110807 | approved | R4 | R4-59 | R4-113307 | Agreed | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0803 | - | B | Rel-9 | 9.7.0 | - | Addition of test cases for TDD intra-frequency SI reading using autonomous gaps with both non DRX and DRX for Rel-9 | - | - | - | R4 | R4-59 | R4-112729 | Revised | 2011-05-30 | EHNB-RAN2 | - | 2011-05-30 |
0803 | 1 | B | Rel-9 | 9.7.0 | 9.8.0 | Addition of test cases for TDD intra-frequency SI reading using autonomous gaps with both non DRX and DRX for Rel-9 | RP-52 | RP-110790 | approved | R4 | R4-59 | R4-113205 | Agreed | 2011-05-30 | EHNB-RAN2 | - | 2011-05-30 |
0804 | - | A | Rel-10 | 10.2.0 | - | Addition of test cases for TDD intra-frequency SI reading using autonomous gaps with both non DRX and DRX for Rel-10 | - | - | - | R4 | R4-59 | R4-112730 | Revised | 2011-05-30 | EHNB-RAN2 | - | 2011-05-30 |
0804 | 1 | A | Rel-10 | 10.2.0 | 10.3.0 | Addition of test cases for TDD intra-frequency SI reading using autonomous gaps with both non DRX and DRX for Rel-10 | RP-52 | RP-110790 | approved | R4 | R4-59 | R4-113206 | Agreed | 2011-05-30 | EHNB-RAN2 | - | 2011-05-30 |
0805 | - | B | Rel-9 | 9.7.0 | - | Addition of test cases for TDD inter-frequency SI reading using autonomous gaps with both non DRX and DRX for Rel-9 | - | - | - | R4 | R4-59 | R4-112731 | Revised | 2011-05-30 | EHNB-RAN2 | - | 2011-05-30 |
0805 | 1 | B | Rel-9 | 9.7.0 | 9.8.0 | Addition of test cases for TDD inter-frequency SI reading using autonomous gaps with both non DRX and DRX for Rel-9 | RP-52 | RP-110790 | approved | R4 | R4-59 | R4-113207 | Agreed | 2011-05-30 | EHNB-RAN2 | - | 2011-05-30 |
0806 | - | A | Rel-10 | 10.2.0 | - | Addition of test cases for TDD inter-frequency SI reading using autonomous gaps with both non DRX and DRX for Rel-10 | - | - | - | R4 | R4-59 | R4-112732 | Revised | 2011-05-30 | EHNB-RAN2 | - | 2011-05-30 |
0806 | 1 | A | Rel-10 | 10.2.0 | 10.3.0 | Addition of test cases for TDD inter-frequency SI reading using autonomous gaps with both non DRX and DRX for Rel-10 | RP-52 | RP-110790 | approved | R4 | R4-59 | R4-113208 | Agreed | 2011-05-30 | EHNB-RAN2 | - | 2011-05-30 |
0807 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Correction to side conditions for TDD inter-frequency CGI identification for Rel-9 | RP-52 | RP-110789 | approved | R4 | R4-59 | R4-112734 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0808 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Correction to side conditions for TDD inter-frequency CGI identification for Rel-10 | RP-52 | RP-110789 | approved | R4 | R4-59 | R4-112735 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0809 | - | F | Rel-8 | 8.13.0 | - | Correction to Qin and Qout evaluation period in DRX for Rel-8 | - | - | - | R4 | R4-59 | R4-112736 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0810 | - | A | Rel-9 | 9.7.0 | - | Correction to Qin and Qout evaluation period in DRX for Rel-9 | - | - | - | R4 | R4-59 | R4-112737 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0811 | - | A | Rel-10 | 10.2.0 | - | Correction to Qin and Qout evaluation period in DRX for Rel-10 | - | - | - | R4 | R4-59 | R4-112738 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0812 | - | F | Rel-8 | 8.13.0 | 8.14.0 | Correction to inter-RAT cell identificiation time in DRX for Rel-8 | RP-52 | RP-110786 | approved | R4 | R4-59 | R4-112739 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0813 | - | A | Rel-9 | 9.7.0 | 9.8.0 | Correction to inter-RAT cell identificiation time in DRX for Rel-9 | RP-52 | RP-110786 | approved | R4 | R4-59 | R4-112740 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0814 | - | A | Rel-10 | 10.2.0 | 10.3.0 | Correction to inter-RAT cell identificiation time in DRX for Rel-10 | RP-52 | RP-110786 | approved | R4 | R4-59 | R4-112741 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0815 | - | F | Rel-8 | 8.13.0 | 8.14.0 | Correction to identification time of UTRA FDD cell for SON in DRX for Rel-8 | RP-52 | RP-110787 | approved | R4 | R4-59 | R4-112742 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0816 | - | A | Rel-9 | 9.7.0 | 9.8.0 | Correction to identification time of UTRA FDD cell for SON in DRX for Rel-9 | RP-52 | RP-110787 | approved | R4 | R4-59 | R4-112743 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0817 | - | A | Rel-10 | 10.2.0 | 10.3.0 | Correction to identification time of UTRA FDD cell for SON in DRX for Rel-10 | RP-52 | RP-110787 | approved | R4 | R4-59 | R4-112744 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0818 | - | F | Rel-9 | 9.7.0 | - | Corrections to the RXLEV value in E-UTRAN FDD - GSM cell search requirements test cases for Rel-9 | - | - | - | R4 | R4-59 | R4-112746 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0819 | - | A | Rel-10 | 10.2.0 | - | Corrections to the RXLEV value in E-UTRAN FDD - GSM cell search requirements test cases for Rel-10 | - | - | - | R4 | R4-59 | R4-112747 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0820 | - | F | Rel-8 | 8.13.0 | 8.14.0 | Correction to requirements of E-UTRAN TDDUTRAN TDD measurements for SON when DRX is used for Rel-8 | RP-52 | RP-110787 | approved | R4 | R4-59 | R4-112748 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0821 | - | A | Rel-9 | 9.7.0 | 9.8.0 | Correction to requirements of E-UTRAN TDDUTRAN TDD measurements for SON when DRX is used for Rel-9 | RP-52 | RP-110787 | approved | R4 | R4-59 | R4-112749 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0822 | - | A | Rel-10 | 10.2.0 | 10.3.0 | Correction to requirements of E-UTRAN TDDUTRAN TDD measurements for SON when DRX is used for Rel-10 | RP-52 | RP-110787 | approved | R4 | R4-59 | R4-112750 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0823 | - | F | Rel-8 | 8.13.0 | - | Corrections to E-UTRAN FDD-GSM cell search when DRX is used in AWGN test cases for Rel-8 | - | - | - | R4 | R4-59 | R4-112751 | Withdrawn | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0824 | - | A | Rel-9 | 9.7.0 | - | Corrections to E-UTRAN FDD-GSM cell search when DRX is used in AWGN test cases for Rel-9 | - | - | - | R4 | R4-59 | R4-112752 | Withdrawn | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0825 | - | A | Rel-10 | 10.2.0 | - | Corrections to E-UTRAN FDD-GSM cell search when DRX is used in AWGN test cases for Rel-10 | - | - | - | R4 | R4-59 | R4-112753 | Withdrawn | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0826 | - | F | Rel-8 | 8.13.0 | - | Addition of missing EsNoc parameters in E-UTRAN TDD UTRAN TDD Measurements test cases for Rel-8 | - | - | - | R4 | R4-59 | R4-112754 | Revised | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0826 | 1 | F | Rel-8 | 8.13.0 | 8.14.0 | Addition of missing EsNoc parameters in E-UTRAN TDD UTRAN TDD Measurements test cases for Rel-8 | RP-52 | RP-110787 | approved | R4 | R4-59 | R4-113209 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0827 | - | A | Rel-9 | 9.7.0 | - | Addition of missing EsNoc parameters in E-UTRAN TDD UTRAN TDD Measurements test cases for Rel-9 | - | - | - | R4 | R4-59 | R4-112755 | Revised | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0827 | 1 | A | Rel-9 | 9.7.0 | 9.8.0 | Addition of missing EsNoc parameters in E-UTRAN TDD UTRAN TDD Measurements test cases for Rel-9 | RP-52 | RP-110787 | approved | R4 | R4-59 | R4-113210 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0828 | - | A | Rel-10 | 10.2.0 | - | Addition of missing EsNoc parameters in E-UTRAN TDD UTRAN TDD Measurements test cases for Rel-10 | - | - | - | R4 | R4-59 | R4-112756 | Revised | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0828 | 1 | A | Rel-10 | 10.2.0 | 10.3.0 | Addition of missing EsNoc parameters in E-UTRAN TDD UTRAN TDD Measurements test cases for Rel-10 | RP-52 | RP-110787 | approved | R4 | R4-59 | R4-113211 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0829 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Corrrection to the side condition for measurements for E-UTRA carrier aggregation | RP-52 | RP-110807 | approved | R4 | R4-59 | R4-112757 | Agreed | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0830 | - | F | Rel-8 | 8.13.0 | - | Corrections to E-UTRAN FDD-GSM cell search when DRX is used in AWGN test cases for Rel-8 | - | - | - | R4 | R4-59 | R4-112758 | Withdrawn | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0831 | - | A | Rel-9 | 9.7.0 | - | Corrections to E-UTRAN FDD-GSM cell search when DRX is used in AWGN test cases for Rel-9 | - | - | - | R4 | R4-59 | R4-112759 | Withdrawn | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0832 | - | A | Rel-10 | 10.2.0 | - | Corrections to E-UTRAN FDD-GSM cell search when DRX is used in AWGN test cases for Rel-10 | - | - | - | R4 | R4-59 | R4-112760 | Withdrawn | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0833 | - | F | Rel-9 | 9.7.0 | - | Clarification of reference cell for RSTD measurements for Rel-9 | - | - | - | R4 | R4-59 | R4-112761 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0834 | - | A | Rel-10 | 10.2.0 | - | Clarification of reference cell for RSTD measurements for Rel-10 | - | - | - | R4 | R4-59 | R4-112762 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0835 | - | F | Rel-10 | 10.2.0 | - | Clarification of UE Rx-Tx time difference measurement requirement for carrier aggregation | - | - | - | R4 | R4-59 | R4-112763 | Revised | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0835 | 1 | F | Rel-10 | 10.2.0 | 10.3.0 | Clarification of UE Rx-Tx time difference measurement requirement for carrier aggregation | RP-52 | RP-110807 | approved | R4 | R4-59 | R4-113212 | Agreed | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0836 | - | B | Rel-10 | 10.2.0 | - | CR on RLM test cases for eICIC | - | - | - | R4 | R4-59 | R4-112818 | Not handled | 2011-05-30 | eICIC_LTE-Perf | - | 2011-05-30 |
0837 | - | B | Rel-10 | 10.2.0 | - | CR on cell identification delay for eICIC | - | - | - | R4 | R4-59 | R4-112820 | Not handled | 2011-05-30 | eICIC_LTE-Core | - | 2011-05-30 |
0838 | - | B | Rel-10 | 10.2.0 | - | CR on Relative RSRP accuracy requirements for eICIC | - | - | - | R4 | R4-59 | R4-112822 | Noted | 2011-05-30 | eICIC_LTE-Core | - | 2011-05-30 |
0839 | - | F | Rel-9 | 9.7.0 | - | Minimum performance for UMTS SI acquisition in LTE | - | - | - | R4 | R4-59 | R4-112915 | withdrawn | 2011-05-30 | TEI9 | - | 2011-05-30 |
0840 | - | F | Rel-8 | 8.13.0 | - | Modification on E-UTRA TDD to UTRA TDD cell reselection test case in A.4.3.4.1 for Rel-8 | - | - | - | R4 | R4-59 | R4-112923 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0841 | - | A | Rel-9 | 9.7.0 | - | Modification on E-UTRA TDD to UTRA TDD cell reselection test case in A.4.3.4.1 for Rel-9 | - | - | - | R4 | R4-59 | R4-112924 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0842 | - | A | Rel-10 | 10.2.0 | - | Modification on E-UTRA TDD to UTRA TDD cell reselection test case in A.4.3.4.1 for Rel-10 | - | - | - | R4 | R4-59 | R4-112925 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0843 | - | F | Rel-8 | 8.13.0 | - | Modification on Initial state of E-UTRA to UTRA cell reselection test case for Rel-8 | - | - | - | R4 | R4-59 | R4-112926 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0844 | - | A | Rel-9 | 9.7.0 | - | Modification on Initial state of E-UTRA to UTRA cell reselection test case for Rel-9 | - | - | - | R4 | R4-59 | R4-112927 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0845 | - | A | Rel-10 | 10.2.0 | - | Modification on Initial state of E-UTRA to UTRA cell reselection test case for Rel-10 | - | - | - | R4 | R4-59 | R4-112928 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0846 | - | B | Rel-8 | 8.13.0 | - | cdma2000 1xRTT measurements for SON (Rel-8) | - | - | - | R4 | R4-59 | R4-112972 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0847 | - | A | Rel-9 | 9.7.0 | - | cdma2000 1xRTT measurements for SON (Rel-9) | - | - | - | R4 | R4-59 | R4-112973 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0848 | - | A | Rel-10 | 10.2.0 | - | cdma2000 1xRTT measurements for SON (Rel-10) | - | - | - | R4 | R4-59 | R4-112974 | Noted | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0849 | - | B | Rel-10 | 10.2.0 | - | RSTD Accuracy Requirements for Carrier Aggregation | - | - | - | R4 | R4-59 | R4-112975 | Revised | 2011-05-30 | LTE_CA-Perf | - | 2011-05-30 |
0849 | 1 | B | Rel-10 | 10.2.0 | - | RSTD Accuracy Requirements for Carrier Aggregation | - | - | - | R4 | R4-59 | R4-113183 | Revised | 2011-05-30 | LTE_CA-Perf | - | 2011-05-30 |
0849 | 2 | B | Rel-10 | 10.2.0 | - | RSTD Accuracy Requirements for Carrier Aggregation | RP-52 | RP-110808 | postponed | R4 | R4-59 | R4-113216 | Agreed | 2011-05-30 | LTE_CA-Perf | - | 2011-05-30 |
0849 | 3 | B | Rel-10 | 10.3.0 | 10.4.0 | RSTD Accuracy Requirements for Carrier Aggregation | RP-53 | RP-111266 | approved | R4 | R4-60 | R4-114642 | agreed | 2011-09-11 | LTE_CA-Perf | - | 2011-09-11 |
0850 | - | B | Rel-10 | 10.2.0 | 10.3.0 | CR Timestamp accuracy requirements for MDT | RP-52 | RP-110803 | approved | R4 | R4-59 | R4-112989 | Agreed | 2011-05-30 | MDT_UMTSLTE-Core | - | 2011-05-30 |
0851 | - | B | Rel-10 | 10.2.0 | - | CR on RSRP and RSRQ measurement accuracy requirements for eICIC | - | - | - | R4 | R4-58AH | R4-112409 | Revised | 2011-05-30 | eICIC_LTE-Core | - | 2011-05-30 |
0851 | 1 | B | Rel-10 | 10.2.0 | 10.3.0 | CR on RSRP and RSRQ measurement accuracy requirements for eICIC | RP-52 | RP-110811 | approved | R4 | R4-59 | R4-113306 | Agreed | 2011-05-30 | eICIC_LTE-Core | - | 2011-05-30 |
0852 | - | B | Rel-10 | 10.2.0 | - | Pcmax,c mapping | - | - | - | R4 | R4-59 | R4-113051 | Revised | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0852 | 1 | B | Rel-10 | 10.2.0 | 10.3.0 | Pcmax,c mapping | RP-52 | RP-110807 | approved | R4 | R4-59 | R4-113151 | Agreed | 2011-05-30 | LTE_CA-Core | - | 2011-05-30 |
0853 | - | F | Rel-9 | 9.7.0 | - | Correction on E-UTRAN FDD RSTD intra frequency case | - | - | - | R4 | R4-59 | R4-113090 | Withdrawn | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0854 | - | A | Rel-10 | 10.2.0 | - | Correction on E-UTRAN FDD RSTD intra frequency case | - | - | - | R4 | R4-59 | R4-113091 | Withdrawn | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0855 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Correction on E-UTRAN FDD RSTD intra frequency case | RP-52 | RP-110789 | approved | R4 | R4-59 | R4-113202 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0856 | - | A | Rel-10 | 10.2.0 | 10.3.0 | Correction on E-UTRAN FDD RSTD intra frequency case | RP-52 | RP-110789 | approved | R4 | R4-59 | R4-113203 | Agreed | 2011-05-30 | LTE-RF | - | 2011-05-30 |
0857 | - | F | Rel-9 | 9.7.0 | - | Clarification on PRS bandwidth for RSTD accuracy requirements | - | - | - | R4 | R4-59 | R4-113222 | Withdrawn | 2011-05-30 | TEI9 | - | 2011-05-30 |
0858 | - | A | Rel-10 | 10.2.0 | - | Clarification on PRS bandwidth for RSTD accuracy requirements | - | - | - | R4 | R4-59 | R4-113223 | Withdrawn | 2011-05-30 | TEI9 | - | 2011-05-30 |
0859 | - | B | Rel-10 | 10.2.0 | 10.3.0 | Expanded 1900 MHz addition to 36.133 | RP-52 | RP-110804 | approved | R4 | R4-59 | R4-113268 | Agreed | 2011-05-30 | E1900-Core | - | 2011-05-30 |
0860 | - | B | Rel-10 | 10.2.0 | 10.3.0 | Introduction of RLM requirement for eICIC | RP-52 | RP-110811 | approved | R4 | R4-59 | R4-113273 | Agreed | 2011-05-30 | eICIC_LTE-Core | - | 2011-05-30 |
0861 | - | F | Rel-8 | 8.14.0 | 8.15.0 | Thresholds and margins for reporting of neighbour cells in RRM test A.8.9.1 | RP-53 | RP-111246 | approved | R4 | R4-60 | R4-113330 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0862 | - | A | Rel-9 | 9.8.0 | 9.9.0 | Thresholds and margins for reporting of neighbour cells in RRM test A.8.9.1 | RP-53 | RP-111246 | approved | R4 | R4-60 | R4-113331 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0863 | - | A | Rel-10 | 10.3.0 | 10.4.0 | Thresholds and margins for reporting of neighbour cells in RRM test A.8.9.1 | RP-53 | RP-111246 | approved | R4 | R4-60 | R4-113332 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0864 | - | F | Rel-10 | 10.3.0 | - | Band 41 SCH_RP threshold for E-UTRAN FDD-TDD inter frequency measurements using autonomous gaps | - | - | - | R4 | R4-59AH | R4-113398 | Withdrawn | 2011-09-11 | LTE_CA-Core | - | 2011-09-11 |
0865 | - | B | Rel-10 | 10.3.0 | - | Correction for RSRP and RSRQ accuracy requirements in eICIC | - | - | - | R4 | R4-59AH | R4-113446 | Revised | 2011-09-11 | eICIC_LTE-Perf | - | 2011-09-11 |
0865 | 1 | B | Rel-10 | 10.3.0 | - | Correction for RSRP and RSRQ accuracy requirements in eICIC | - | - | - | R4 | R4-59AH | R4-113892 | Revised | 2011-09-11 | eICIC_LTE-Perf | - | 2011-09-11 |
0865 | 2 | B | Rel-10 | 10.3.0 | - | Correction for RSRP and RSRQ accuracy requirements in eICIC | RP-53 | RP-111309 | postponed | R4 | R4-60 | R4-113915 | agreed | 2011-09-11 | eICIC_LTE-Perf | - | 2011-09-11 |
0866 | - | B | Rel-10 | 10.3.0 | - | E-UTRAN FDD - cdma2000 1xRTT SON ANR cell search reporting under AWGN propagation conditions test case | - | - | - | R4 | R4-59AH | R4-113448 | Withdrawn | 2011-09-11 | TEI10 | - | 2011-09-11 |
0867 | - | B | Rel-10 | 10.3.0 | - | E-UTRAN TDD - cdma2000 1xRTT SON ANR cell search reporting under AWGN propagation conditions test case | - | - | - | R4 | R4-59AH | R4-113449 | Withdrawn | 2011-09-11 | TEI10 | - | 2011-09-11 |
0868 | - | B | Rel-10 | 10.3.0 | - | Test cases for E-UTRAN FDD cell identification in eICIC | - | - | - | R4 | R4-59AH | R4-113453 | rejected | 2011-09-11 | eICIC_LTE-Perf | - | 2011-09-11 |
0869 | - | B | Rel-10 | 10.3.0 | - | Test case for RSRP/RSRQ measurement accuracy in eICIC | - | - | - | R4 | R4-59AH | R4-113454 | rejected | 2011-09-11 | eICIC_LTE-Perf | - | 2011-09-11 |
0870 | - | B | Rel-10 | 10.3.0 | - | Test case for RLM in eICIC | - | - | - | R4 | R4-59AH | R4-113455 | rejected | 2011-09-11 | eICIC_LTE-Perf | - | 2011-09-11 |
0871 | - | B | Rel-10 | 10.3.0 | - | Meausurement reporting test cases for E-UTRA FDD SCC with deactivated SCell when no common DRX is used | - | - | - | R4 | R4-59AH | R4-113457 | rejected | 2011-09-11 | LTE_CA-Perf | - | 2011-09-11 |
0872 | - | B | Rel-10 | 10.3.0 | - | CR on measurement accuracy test cases for CA | - | - | - | R4 | R4-59AH | R4-113458 | rejected | 2011-09-11 | LTE_CA-Perf | - | 2011-09-11 |
0873 | - | B | Rel-10 | 10.3.0 | - | Addition of enhanced UTRAN TDD requirement for CSFB | - | - | - | R4 | R4-59AH | R4-113459 | rejected | 2011-09-11 | TEI10 | - | 2011-09-11 |
0874 | - | F | Rel-10 | 10.3.0 | - | Clarification of TDD uplink-downlink subframe configurations applicability for RSTD measurement in CA | - | - | - | R4 | R4-59AH | R4-113460 | Revised | 2011-09-11 | LTE_CA-Core | - | 2011-09-11 |
0874 | 1 | F | Rel-10 | 10.3.0 | 10.4.0 | Clarification of TDD uplink-downlink subframe configurations applicability for RSTD measurement in CA | RP-53 | RP-111265 | approved | R4 | R4-60 | R4-113914 | agreed | 2011-09-11 | LTE_CA-Core | - | 2011-09-11 |
0875 | - | F | Rel-10 | 10.3.0 | - | CR on UE interruption requirements in SCC measurements with de-activated SCell when common DRX is used | - | - | - | R4 | R4-59AH | R4-113461 | Revised | 2011-09-11 | LTE_CA-Core | - | 2011-09-11 |
0875 | 1 | F | Rel-10 | 10.3.0 | - | CR on UE interruption requirements in SCC measurements with de-activated SCell when common DRX is used | - | - | - | R4 | R4-59AH | R4-113893 | Revised | 2011-09-11 | LTE_CA-Core | - | 2011-09-11 |
0875 | 2 | F | Rel-10 | 10.3.0 | - | CR on UE interruption requirements in SCC measurements with de-activated SCell when common DRX is used | - | - | - | R4 | R4-59AH | R4-113924 | Revised | 2011-09-11 | LTE_CA-Core | - | 2011-09-11 |
0875 | 3 | F | Rel-10 | 10.3.0 | 10.4.0 | CR on UE interruption requirements in SCC measurements with de-activated SCell when common DRX is used | RP-53 | RP-111265 | approved | R4 | R4-60 | R4-113940 | agreed | 2011-09-11 | LTE_CA-Core | - | 2011-09-11 |
0876 | - | B | Rel-10 | 10.3.0 | - | Meausurement reporting test cases for E-UTRA FDD SCC with deactivated SCell when common DRX is used | - | - | - | R4 | R4-59AH | R4-113462 | Withdrawn | 2011-09-11 | LTE_CA-Perf | - | 2011-09-11 |
0877 | - | B | Rel-10 | 10.3.0 | - | E-UTRAN FDD RSTD measurement reporting delay test case with the reference cell on the PCC and neighbouring cells on the configured SCC | - | - | - | R4 | R4-59AH | R4-113463 | rejected | 2011-09-11 | LTE_CA-Perf | - | 2011-09-11 |
0878 | - | B | Rel-10 | 10.3.0 | - | E-UTRAN TDD RSTD measurement reporting delay test case with the reference cell on the PCC and neighbouring cells on the configured SCC | - | - | - | R4 | R4-59AH | R4-113464 | rejected | 2011-09-11 | LTE_CA-Perf | - | 2011-09-11 |
0879 | - | F | Rel-10 | 10.3.0 | - | Correction to RRC connection mobility control in CA | - | - | - | R4 | R4-59AH | R4-113479 | Revised | 2011-09-11 | TEI10 | - | 2011-09-11 |
0879 | 1 | F | Rel-10 | 10.3.0 | 10.4.0 | Correction to RRC connection mobility control in CA | RP-53 | RP-111263 | approved | R4 | R4-60 | R4-113881 | agreed | 2011-09-11 | TEI10 | - | 2011-09-11 |
0880 | - | F | Rel-10 | 10.3.0 | - | Clarification of the intra and inter frequency measurement for CA | - | - | - | R4 | R4-59AH | R4-113482 | rejected | 2011-09-11 | LTE_CA-Perf | - | 2011-09-11 |
0881 | - | F | Rel-10 | 10.3.0 | - | Refinement of RSRP levels for measurement accuracy test cases | - | - | - | R4 | R4-59AH | R4-113536 | rejected | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0882 | - | F | Rel-10 | 10.3.0 | - | Correction of UE interruption requirements for SCell/ SCC measurements in DRX | - | - | - | R4 | R4-59AH | R4-113538 | rejected | 2011-09-11 | LTE_CA-Core | - | 2011-09-11 |
0883 | - | F | Rel-10 | 10.3.0 | - | Alignment of terminology for SCell measurement cycle | - | - | - | R4 | R4-59AH | R4-113539 | Revised | 2011-09-11 | LTE_CA-Core | - | 2011-09-11 |
0883 | 1 | F | Rel-10 | 10.3.0 | 10.4.0 | Alignment of terminology for SCell measurement cycle | RP-53 | RP-111265 | approved | R4 | R4-60 | R4-113910 | agreed | 2011-09-11 | LTE_CA-Core | - | 2011-09-11 |
0884 | - | F | Rel-9 | 9.8.0 | - | Adding enhanced UTRA TDD cell identification requirements for Rel-9 | - | - | - | R4 | R4-59AH | R4-113547 | rejected | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0885 | - | A | Rel-10 | 10.3.0 | - | Adding enhanced UTRA TDD cell identification requirements for Rel-10 | - | - | - | R4 | R4-59AH | R4-113548 | rejected | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0886 | - | F | Rel-8 | 8.14.0 | 8.15.0 | Adding condition of UTRA TDD measurement report delay requirements applied | RP-53 | RP-111247 | approved | R4 | R4-60 | R4-113549 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0887 | - | F | Rel-8 | 8.14.0 | 8.15.0 | Removing [] in section 8.1.2.2.2.2 for Rel-8 | RP-53 | RP-111247 | approved | R4 | R4-60 | R4-113550 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0888 | - | A | Rel-9 | 9.8.0 | 9.9.0 | Removing [] in section 8.1.2.2.2.2 for Rel-9 | RP-53 | RP-111247 | approved | R4 | R4-60 | R4-113551 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0889 | - | A | Rel-10 | 10.3.0 | 10.4.0 | Removing [] in section 8.1.2.2.2.2 for Rel-10 | RP-53 | RP-111247 | approved | R4 | R4-60 | R4-113552 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0890 | - | B | Rel-10 | 10.3.0 | - | Cell identification requirements | - | - | - | R4 | R4-59AH | R4-113607 | Revised | 2011-09-11 | eICIC_LTE-core | - | 2011-09-11 |
0890 | 1 | B | Rel-10 | 10.3.0 | - | Cell identification requirements | - | - | - | R4 | R4-59AH | R4-113853 | rejected | 2011-09-11 | eICIC_LTE-core | - | 2011-09-11 |
0891 | - | B | Rel-10 | 10.3.0 | - | RSRP and RSRQ measurement requirements for eICIC | - | - | - | R4 | R4-59AH | R4-113608 | Revised | 2011-09-11 | eICIC_LTE-core | - | 2011-09-11 |
0891 | 1 | B | Rel-10 | 10.3.0 | 10.4.0 | RSRP and RSRQ measurement requirements for eICIC | RP-53 | RP-111308 | approved | R4 | R4-60 | R4-113854 | agreed | 2011-09-11 | eICIC_LTE-core | - | 2011-09-11 |
0892 | - | B | Rel-10 | 10.3.0 | - | RLM measurement requirements for eICIC | - | - | - | R4 | R4-59AH | R4-113609 | rejected | 2011-09-11 | eICIC_LTE-core | - | 2011-09-11 |
0893 | - | F | Rel-9 | 9.8.0 | 9.9.0 | Requirements for RRC Connection Release with Redirection | RP-53 | RP-111252 | approved | R4 | R4-60 | R4-113616 | agreed | 2011-09-11 | TEI9 | - | 2011-09-11 |
0894 | - | A | Rel-10 | 10.3.0 | 10.4.0 | Requirements for RRC Connection Release with Redirection | RP-53 | RP-111252 | approved | R4 | R4-60 | R4-113617 | agreed | 2011-09-11 | TEI9 | - | 2011-09-11 |
0895 | - | F | Rel-10 | 10.3.0 | - | RSTD Measurement Requirements under Handover | - | - | - | R4 | R4-59AH | R4-113618 | Revised | 2011-09-11 | TEI10 | - | 2011-09-11 |
0895 | 1 | F | Rel-10 | 10.3.0 | - | RSTD Measurement Requirements under Handover | - | - | - | R4 | R4-59AH | R4-113840 | Revised | 2011-09-11 | TEI10 | - | 2011-09-11 |
0895 | 2 | F | Rel-10 | 10.3.0 | 10.4.0 | RSTD Measurement Requirements under Handover | RP-53 | RP-111263 | approved | R4 | R4-60 | R4-114857 | Agreed | 2011-09-11 | TEI10 | - | 2011-09-11 |
0896 | - | F | Rel-10 | 10.3.0 | - | RSTD Measurement Requirements under Pcell Switching | - | - | - | R4 | R4-59AH | R4-113619 | Revised | 2011-09-11 | TEI10 | - | 2011-09-11 |
0896 | 1 | F | Rel-10 | 10.3.0 | - | RSTD Measurement Requirements under Pcell Switching | - | - | - | R4 | R4-59AH | R4-113841 | Revised | 2011-09-11 | TEI10 | - | 2011-09-11 |
0896 | 2 | F | Rel-10 | 10.3.0 | 10.4.0 | RSTD Measurement Requirements under Pcell Switching | RP-53 | RP-111263 | approved | R4 | R4-60 | R4-114858 | Agreed | 2011-09-11 | TEI10 | - | 2011-09-11 |
0897 | - | B | Rel-10 | 10.3.0 | - | Correction to RSRP and RSRQ Accuracy Requirements | - | - | - | R4 | R4-59AH | R4-113621 | rejected | 2011-09-11 | eICIC_LTE-Core | - | 2011-09-11 |
0898 | - | F | Rel-10 | 10.3.0 | - | Introduction of power headroom reporting requirement for carrier aggregation | - | - | - | R4 | R4-59AH | R4-113682 | Revised | 2011-09-11 | LTE_CA-Perf | - | 2011-09-11 |
0898 | 1 | F | Rel-10 | 10.3.0 | 10.4.0 | Introduction of power headroom reporting requirement for carrier aggregation | RP-53 | RP-111266 | approved | R4 | R4-60 | R4-113868 | agreed | 2011-09-11 | LTE_CA-Perf | - | 2011-09-11 |
0899 | - | F | Rel-10 | 10.3.0 | - | Improvement of higher priority reselection | - | - | - | R4 | R4-59AH | R4-113687 | rejected | 2011-09-11 | TEI10 | - | 2011-09-11 |
0900 | - | F | Rel-8 | 8.14.0 | 8.15.0 | Thresholds and margins for RRM tests A.5.2.1 and A.5.2.2 | RP-53 | RP-111246 | approved | R4 | R4-60 | R4-113699 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0901 | - | A | Rel-9 | 9.8.0 | 9.9.0 | Thresholds and margins for RRM tests A.5.2.1 and A.5.2.2 | RP-53 | RP-111246 | approved | R4 | R4-60 | R4-113700 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0902 | - | A | Rel-10 | 10.3.0 | 10.4.0 | Thresholds and margins for RRM tests A.5.2.1 and A.5.2.2 | RP-53 | RP-111246 | approved | R4 | R4-60 | R4-113701 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0903 | - | F | Rel-8 | 8.14.0 | 8.15.0 | Thresholds and margins for RRM tests A.5.2.4 and A.5.2.5 | RP-53 | RP-111246 | approved | R4 | R4-60 | R4-113702 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0904 | - | A | Rel-9 | 9.8.0 | 9.9.0 | Thresholds and margins for RRM tests A.5.2.4 and A.5.2.5 | RP-53 | RP-111246 | approved | R4 | R4-60 | R4-113703 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0905 | - | A | Rel-10 | 10.3.0 | 10.4.0 | Thresholds and margins for RRM tests A.5.2.4 and A.5.2.5 | RP-53 | RP-111246 | approved | R4 | R4-60 | R4-113704 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0906 | - | F | Rel-8 | 8.14.0 | - | CR on E-UTRAN inter frequency measurements | - | - | - | R4 | R4-59AH | R4-113705 | rejected | 2011-09-11 | TEI8 | - | 2011-09-11 |
0907 | - | A | Rel-9 | 9.8.0 | - | CR on E-UTRAN inter frequency measurements | - | - | - | R4 | R4-59AH | R4-113706 | rejected | 2011-09-11 | TEI9 | - | 2011-09-11 |
0908 | - | A | Rel-10 | 10.3.0 | - | CR on E-UTRAN inter frequency measurements | - | - | - | R4 | R4-59AH | R4-113707 | rejected | 2011-09-11 | TEI10 | - | 2011-09-11 |
0909 | - | B | Rel-10 | 10.3.0 | - | Cell identification delay for eICIC | - | - | - | R4 | R4-59AH | R4-113770 | rejected | 2011-09-11 | eICIC_LTE-Core | - | 2011-09-11 |
0910 | - | B | Rel-10 | 10.3.0 | - | Cell identification test cases for eICIC | - | - | - | R4 | R4-59AH | R4-113776 | Withdrawn | 2011-09-11 | eICIC_LTE-Perf | - | 2011-09-11 |
0911 | - | B | Rel-10 | 10.3.0 | - | Relative RSRP accuracy requirements for eICIC | - | - | - | R4 | R4-59AH | R4-113778 | rejected | 2011-09-11 | eICIC_LTE-Perf | - | 2011-09-11 |
0912 | - | B | Rel-10 | 10.3.0 | - | RSRP test cases for eICIC | - | - | - | R4 | R4-59AH | R4-113780 | rejected | 2011-09-11 | eICIC_LTE-Perf | - | 2011-09-11 |
0913 | - | B | Rel-10 | 10.3.0 | - | CR on RLM test cases for eICIC | - | - | - | R4 | R4-59AH | R4-113781 | rejected | 2011-09-11 | eICIC_LTE-Perf | - | 2011-09-11 |
0914 | - | A | Rel-9 | 9.8.0 | 9.9.0 | Adding condition of UTRA TDD measurement report delay requirements applied | RP-53 | RP-111247 | approved | R4 | R4-60 | R4-113794 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0915 | - | A | Rel-10 | 10.3.0 | 10.4.0 | Adding condition of UTRA TDD measurement report delay requirements applied | RP-53 | RP-111247 | approved | R4 | R4-60 | R4-113795 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0916 | - | F | Rel-9 | 9.8.0 | - | Enhanced cell identification requirements for UTRA TDD | - | - | - | R4 | R4-59AH | R4-113888 | rejected | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0917 | - | A | Rel-10 | 10.3.0 | - | Enhanced cell identification requirements for UTRA TDD | - | - | - | R4 | R4-59AH | R4-113889 | rejected | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0918 | - | F | Rel-8 | 8.14.0 | - | Editorial corrections for 36.133 (Rel-8) | - | - | - | R4 | R4-60 | R4-113959 | rejected | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0919 | - | A | Rel-9 | 9.8.0 | - | Editorial corrections for 36.133 (Rel-9) | - | - | - | R4 | R4-60 | R4-113960 | rejected | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0920 | - | A | Rel-10 | 10.3.0 | - | Editorial corrections for 36.133 (Rel-10) | - | - | - | R4 | R4-60 | R4-113961 | Revised | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0920 | 1 | F | Rel-10 | 10.3.0 | 10.4.0 | Editorial corrections for 36.133 (Rel-10) | RP-53 | RP-111263 | approved | R4 | R4-60 | R4-114715 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0921 | - | F | Rel-10 | 10.3.0 | - | Introduction of Pcmax,c reporting requirements for carrier aggregation | - | - | - | R4 | R4-60 | R4-113965 | Revised | 2011-09-11 | LTE_CA-Core | - | 2011-09-11 |
0921 | 1 | F | Rel-10 | 10.3.0 | 10.4.0 | Introduction of Pcmax,c reporting requirements for carrier aggregation | RP-53 | RP-111265 | approved | R4 | R4-60 | R4-114771 | agreed | 2011-09-11 | LTE_CA-Core | - | 2011-09-11 |
0922 | - | F | Rel-10 | 10.3.0 | - | RSRP and RSRQ Test Cases for Carrier Aggregation | - | - | - | R4 | R4-60 | R4-113968 | rejected | 2011-09-11 | LTE_CA-Perf | - | 2011-09-11 |
0923 | - | F | Rel-10 | 10.3.0 | - | CR to TS36.133: Cell identification requirement for eICIC | - | - | - | R4 | R4-60 | R4-114028 | postponed | 2011-09-11 | eICIC_LTE-Perf | - | 2011-09-11 |
0924 | - | F | Rel-10 | 10.3.0 | - | Correction to RRC connection mobility control in CA | - | - | - | R4 | R4-60 | R4-114031 | Revised | 2011-09-11 | TEI10 | - | 2011-09-11 |
0924 | 1 | F | Rel-10 | 10.3.0 | 10.4.0 | Correction to RRC connection mobility control in CA | RP-53 | RP-111263 | approved | R4 | R4-60 | R4-114757 | agreed | 2011-09-11 | TEI10 | - | 2011-09-11 |
0925 | - | F | Rel-9 | 9.8.0 | - | Adding enhanced UTRA TDD cell identification requirements for Rel-9 | - | - | - | R4 | R4-60 | R4-114112 | Revised | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0925 | 1 | F | Rel-9 | 9.8.0 | 9.9.0 | Adding enhanced UTRA TDD cell identification requirements for Rel-9 | RP-53 | RP-111251 | approved | R4 | R4-60 | R4-114773 | Agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0926 | - | A | Rel-10 | 10.3.0 | - | Adding enhanced UTRA TDD cell identification requirements for Rel-10 | - | - | - | R4 | R4-60 | R4-114113 | Revised | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0926 | 1 | A | Rel-10 | 10.3.0 | 10.4.0 | Adding enhanced UTRA TDD cell identification requirements for Rel-10 | RP-53 | RP-111251 | approved | R4 | R4-60 | R4-114774 | Agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0927 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Modifications on TDD inter frequency measurements with autonomous gaps | RP-53 | RP-111263 | approved | R4 | R4-60 | R4-114115 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0928 | - | F | Rel-8 | 8.14.0 | 8.15.0 | Clarify time points and time duration for RLM tests A.7.3.x | RP-53 | RP-111247 | approved | R4 | R4-60 | R4-114135 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0929 | - | A | Rel-9 | 9.8.0 | 9.9.0 | Clarify time points and time duration for RLM tests A.7.3.x | RP-53 | RP-111247 | approved | R4 | R4-60 | R4-114136 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0930 | - | A | Rel-10 | 10.3.0 | 10.4.0 | Clarify time points and time duration for RLM tests A.7.3.x | RP-53 | RP-111247 | approved | R4 | R4-60 | R4-114137 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0931 | - | F | Rel-8 | 8.14.0 | - | CR on E-UTRAN inter frequency measurements | - | - | - | R4 | R4-60 | R4-114165 | rejected | 2011-09-11 | TEI8 | - | 2011-09-11 |
0932 | - | A | Rel-9 | 9.8.0 | - | CR on E-UTRAN inter frequency measurements | - | - | - | R4 | R4-60 | R4-114166 | rejected | 2011-09-11 | TEI8 | - | 2011-09-11 |
0933 | - | A | Rel-10 | 10.3.0 | - | CR on E-UTRAN inter frequency measurements | - | - | - | R4 | R4-60 | R4-114167 | rejected | 2011-09-11 | TEI8 | - | 2011-09-11 |
0934 | - | B | Rel-10 | 10.3.0 | - | Test cases of cell identification for eICIC | - | - | - | R4 | R4-60 | R4-114172 | postponed | 2011-09-11 | eICIC_LTE-Core | - | 2011-09-11 |
0935 | - | B | Rel-10 | 10.3.0 | - | RSRQ test cases for eICIC | - | - | - | R4 | R4-60 | R4-114173 | rejected | 2011-09-11 | eICIC_LTE-Core | - | 2011-09-11 |
0936 | - | B | Rel-10 | 10.3.0 | - | CR on RLM test cases for eICIC with short DRX | - | - | - | R4 | R4-60 | R4-114219 | rejected | 2011-09-11 | eICIC_LTE-Perf | - | 2011-09-11 |
0937 | - | B | Rel-10 | 10.3.0 | - | CR on cell identification delay for eICIC | - | - | - | R4 | R4-60 | R4-114221 | postponed | 2011-09-11 | eICIC_LTE-Perf | - | 2011-09-11 |
0938 | - | B | Rel-10 | 10.3.0 | - | CR on cell identification test cases for eICIC | - | - | - | R4 | R4-60 | R4-114223 | postponed | 2011-09-11 | eICIC_LTE-Perf | - | 2011-09-11 |
0939 | - | B | Rel-10 | 10.3.0 | - | CR on test cases for RSRP RSRQ measurement accuracy | - | - | - | R4 | R4-60 | R4-114225 | rejected | 2011-09-11 | eICIC_LTE-Perf | - | 2011-09-11 |
0940 | - | F | Rel-10 | 10.3.0 | - | Refinement of RSRP levels for measurement accuracy test cases | - | - | - | R4 | R4-60 | R4-114242 | rejected | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0941 | - | F | Rel-10 | 10.3.0 | - | Addition of test case for SCell/ SCC measurements when SCell is deactivated | - | - | - | R4 | R4-60 | R4-114244 | rejected | 2011-09-11 | LTE_CA-Core | - | 2011-09-11 |
0942 | - | B | Rel-10 | 10.3.0 | - | Introduction of UE Measurement Capability for non configured frequencies without measurement gaps | - | - | - | R4 | R4-60 | R4-114245 | rejected | 2011-09-11 | LTE_CA-Core | - | 2011-09-11 |
0943 | - | F | Rel-10 | 10.3.0 | - | Configurations of inter-freq measurement test cases for CA capable UEs | - | - | - | R4 | R4-60 | R4-114246 | rejected | 2011-09-11 | LTE_CA-Perf | - | 2011-09-11 |
0944 | - | F | Rel-10 | 10.3.0 | - | Improvement of higher priority reselection | - | - | - | R4 | R4-60 | R4-114256 | rejected | 2011-09-11 | TEI10 | - | 2011-09-11 |
0945 | - | F | Rel-10 | 10.3.0 | - | Frequency band related requirements to 36.133 | - | - | - | R4 | R4-60 | R4-114290 | Revised | 2011-09-11 | TEI10 | - | 2011-09-11 |
0945 | 1 | F | Rel-10 | 10.3.0 | 10.4.0 | Frequency band related requirements to 36.133 | RP-53 | RP-111263 | approved | R4 | R4-60 | R4-114682 | agreed | 2011-09-11 | TEI10 | - | 2011-09-11 |
0946 | - | B | Rel-10 | 10.3.0 | 10.4.0 | Introduction of Band 22 | RP-53 | RP-111255 | approved | R4 | R4-60 | R4-114380 | Agreed | 2011-09-11 | RInImp8-UMTSLTE3500 | - | 2011-09-11 |
0947 | - | F | Rel-8 | 8.14.0 | - | Correction of references | - | - | - | R4 | R4-60 | R4-114410 | Revised | 2011-09-11 | TEI8 | - | 2011-09-11 |
0947 | 1 | F | Rel-8 | 8.14.0 | 8.15.0 | Correction of references | RP-53 | RP-111250 | approved | R4 | R4-60 | R4-114647 | agreed | 2011-09-11 | TEI8 | - | 2011-09-11 |
0948 | - | A | Rel-9 | 9.8.0 | - | Correction of references | - | - | - | R4 | R4-60 | R4-114411 | Revised | 2011-09-11 | TEI9 | - | 2011-09-11 |
0948 | 1 | A | Rel-9 | 9.8.0 | 9.9.0 | Correction of references | RP-53 | RP-111250 | approved | R4 | R4-60 | R4-114648 | agreed | 2011-09-11 | TEI9 | - | 2011-09-11 |
0949 | - | A | Rel-10 | 10.3.0 | - | Correction of references | - | - | - | R4 | R4-60 | R4-114412 | Revised | 2011-09-11 | TEI10 | - | 2011-09-11 |
0949 | 1 | A | Rel-10 | 10.3.0 | 10.4.0 | Correction of references | RP-53 | RP-111263 | approved | R4 | R4-60 | R4-114649 | agreed | 2011-09-11 | TEI10 | - | 2011-09-11 |
0950 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Alignment of the carrier aggregation terminology | RP-53 | RP-111263 | approved | R4 | R4-60 | R4-114413 | agreed | 2011-09-11 | TEI10 | - | 2011-09-11 |
0951 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Band simplification for core requirements | RP-53 | RP-111263 | approved | R4 | R4-60 | R4-114414 | agreed | 2011-09-11 | TEI10 | - | 2011-09-11 |
0952 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Clarification in inter-frequency RSTD accuracy tests | RP-53 | RP-111263 | approved | R4 | R4-60 | R4-114415 | Agreed | 2011-09-11 | TEI10 | - | 2011-09-11 |
0953 | - | F | Rel-10 | 10.3.0 | - | Editorial corrections for RRM requirements | - | - | - | R4 | R4-60 | R4-114416 | Revised | 2011-09-11 | TEI10 | - | 2011-09-11 |
0953 | 1 | F | Rel-10 | 10.3.0 | 10.4.0 | Editorial corrections for RRM requirements | RP-53 | RP-111263 | approved | R4 | R4-60 | R4-114726 | Agreed | 2011-09-11 | TEI10 | - | 2011-09-11 |
0954 | - | B | Rel-10 | 10.3.0 | - | Cell identification requirements | - | - | - | R4 | R4-60 | R4-114417 | postponed | 2011-09-11 | eICIC_LTE-core | - | 2011-09-11 |
0955 | - | B | Rel-10 | 10.3.0 | - | RLM L1 measurement period requirements | - | - | - | R4 | R4-60 | R4-114421 | postponed | 2011-09-11 | eICIC_LTE-core | - | 2011-09-11 |
0956 | - | B | Rel-10 | 10.3.0 | - | Measurement requirements for UE Rx-Tx time difference measurement | - | - | - | R4 | R4-60 | R4-114423 | - | 2011-09-11 | eICIC_LTE-core | - | 2011-09-11 |
0957 | - | B | Rel-10 | 10.3.0 | - | Accuracy requirements for UE Rx-Tx time difference measurement | - | - | - | R4 | R4-60 | R4-114424 | - | 2011-09-11 | eICIC_LTE-core | - | 2011-09-11 |
0958 | - | F | Rel-8 | 8.14.0 | 8.15.0 | Missing RSRQ in Intra-frequency measurement requirements | RP-53 | RP-111250 | approved | R4 | R4-60 | R4-114434 | agreed | 2011-09-11 | TEI8 | - | 2011-09-11 |
0959 | - | F | Rel-9 | 9.8.0 | 9.9.0 | Missing RSRQ in Intra-frequency measurement requirements | RP-53 | RP-111252 | approved | R4 | R4-60 | R4-114435 | agreed | 2011-09-11 | TEI9 | - | 2011-09-11 |
0960 | - | A | Rel-10 | 10.3.0 | 10.4.0 | Missing RSRQ in Intra-frequency measurement requirements | RP-53 | RP-111252 | approved | R4 | R4-60 | R4-114436 | agreed | 2011-09-11 | TEI9 | - | 2011-09-11 |
0961 | - | F | Rel-10 | 10.3.0 | 10.4.0 | Missing RSRQ in E-UTRA carrier aggregation measurement requirements | RP-53 | RP-111263 | approved | R4 | R4-60 | R4-114437 | agreed | 2011-09-11 | TEI10 | - | 2011-09-11 |
0962 | - | F | Rel-10 | 10.3.0 | - | Inter-RAT UTRAN FDD SI Reading Requirements | - | - | - | R4 | R4-60 | R4-114439 | rejected | 2011-09-11 | TEI10 | - | 2011-09-11 |
0963 | - | B | Rel-10 | 10.3.0 | - | RSRP accuracy test case in eICIC | - | - | - | R4 | R4-60 | R4-114499 | rejected | 2011-09-11 | eICIC_LTE-Perf | - | 2011-09-11 |
0964 | - | F | Rel-9 | 9.8.0 | - | Requirements for RRC Connection Release with Redirection for TDD in R9 | - | - | - | R4 | R4-60 | R4-114505 | Revised | 2011-09-11 | TEI9 | - | 2011-09-11 |
0964 | 1 | F | Rel-9 | 9.8.0 | 9.9.0 | Requirements for RRC Connection Release with Redirection for TDD in R9 | RP-53 | RP-111252 | approved | R4 | R4-60 | R4-114763 | Agreed | 2011-09-11 | TEI9 | - | 2011-09-11 |
0965 | - | A | Rel-10 | 10.3.0 | - | Requirements for RRC Connection Release with Redirection for TDD in R10 | - | - | - | R4 | R4-60 | R4-114506 | Revised | 2011-09-11 | TEI9 | - | 2011-09-11 |
0965 | 1 | A | Rel-10 | 10.3.0 | 10.4.0 | Requirements for RRC Connection Release with Redirection for TDD in R10 | RP-53 | RP-111252 | approved | R4 | R4-60 | R4-114764 | Agreed | 2011-09-11 | TEI9 | - | 2011-09-11 |
0966 | - | F | Rel-9 | 9.8.0 | - | Requirement for the enhanced cell search time for UTRA TDD in R9 | - | - | - | R4 | R4-60 | R4-114508 | rejected | 2011-09-11 | TEI9 | - | 2011-09-11 |
0967 | - | A | Rel-10 | 10.3.0 | - | Requirement for the enhanced cell search time for UTRA TDD in R10 | - | - | - | R4 | R4-60 | R4-114509 | rejected | 2011-09-11 | TEI9 | - | 2011-09-11 |
0968 | - | F | Rel-9 | 9.8.0 | 9.9.0 | CR for E-UTRAN FDD GSM event triggered reporting in AWGN with enhanced BSIC identification in R9 | RP-53 | RP-111251 | approved | R4 | R4-60 | R4-114512 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0969 | - | A | Rel-10 | 10.3.0 | 10.4.0 | CR for E-UTRAN FDD GSM event triggered reporting in AWGN with enhanced BSIC identification in R10 | RP-53 | RP-111251 | approved | R4 | R4-60 | R4-114513 | agreed | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0970 | - | F | Rel-8 | 8.14.0 | - | CR for intra frequency cell identification time | - | - | - | R4 | R4-60 | R4-114515 | rejected | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0971 | - | A | Rel-9 | 9.8.0 | - | CR for intra frequency cell identification time | - | - | - | R4 | R4-60 | R4-114516 | rejected | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0972 | - | B | Rel-10 | 10.3.0 | - | Measurement reporting test cases for E-UTRA FDD SCC with deactivated SCell when no common DRX is used | - | - | - | R4 | R4-60 | R4-114517 | rejected | 2011-09-11 | LTE_CA-Perf | - | 2011-09-11 |
0973 | - | F | Rel-10 | 10.3.0 | - | CR on number of non-MBSFN subframe within restricted resource pattern | - | - | - | R4 | R4-60 | R4-114527 | rejected | 2011-09-11 | TEI10 | - | 2011-09-11 |
0974 | - | F | Rel-10 | 10.3.0 | - | CR on RLM evaluation period for eICIC | - | - | - | R4 | R4-60 | R4-114529 | Revised | 2011-09-11 | TEI10 | - | 2011-09-11 |
0974 | 1 | F | Rel-10 | 10.3.0 | - | CR on RLM evaluation period for eICIC | - | - | - | R4 | R4-60 | R4-114810 | postponed | 2011-09-11 | TEI10 | - | 2011-09-11 |
0975 | - | F | Rel-9 | 9.8.0 | - | Adding requirements of RRC release redirection to UTRA TDD for Rel-9 | - | - | - | R4 | R4-60 | R4-114637 | rejected | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0976 | - | A | Rel-10 | 10.3.0 | - | Adding requirements of RRC release redirection to UTRA TDD for Rel-10 | - | - | - | R4 | R4-60 | R4-114638 | rejected | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0977 | - | F | Rel-9 | 9.8.0 | - | Clarification of Radio link monitoring test requirements | - | - | - | R4 | R4-60 | R4-114639 | rejected | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0978 | - | A | Rel-10 | 10.3.0 | - | Clarification of Radio link monitoring test requirements | - | - | - | R4 | R4-60 | R4-114640 | rejected | 2011-09-11 | LTE-RF | - | 2011-09-11 |
0979 | - | F | Rel-10 | 10.3.0 | - | Modifications of Band 42 and 43 ^^ | - | - | - | R4 | R4-60 | R4-114791 | Revised | 2011-09-11 | RInImp8-UMTSLTE3500 | - | 2011-09-11 |
0979 | 1 | F | Rel-10 | 10.3.0 | 10.4.0 | Modifications of Band 42 and 43 | RP-53 | RP-111255 | approved | R4 | R4-60 | R4-114827 | Agreed | 2011-09-11 | RInImp8-UMTSLTE3500 | - | 2011-09-11 |
0980 | - | F | Rel-8 | 8.15.0 | 8.16.0 | Corrections of inter-frequency measurement accuracy RSRP test cases | RP-54 | RP-111681 | approved | R4 | R4-60 | R4-114944 | Agreed | 2011-12-05 | TEI8 | - | 2011-12-05 |
0981 | - | A | Rel-9 | 9.9.0 | 9.10.0 | Corrections of inter-frequency measurement accuracy RSRP test cases | RP-54 | RP-111681 | approved | R4 | R4-60 | R4-114945 | Agreed | 2011-12-05 | TEI8 | - | 2011-12-05 |
0982 | - | A | Rel-10 | 10.4.0 | 10.5.0 | Corrections of inter-frequency measurement accuracy RSRP and RSRQ test cases | RP-54 | RP-111681 | approved | R4 | R4-60 | R4-114946 | Agreed | 2011-12-05 | TEI8 | - | 2011-12-05 |
0983 | - | F | Rel-9 | 9.9.0 | 9.10.0 | Removing [] in CSFB requirement for Rel-9 | RP-54 | RP-111682 | approved | R4 | R4-60 | R4-115085 | Agreed | 2011-12-05 | LTE-RF | - | 2011-12-05 |
0984 | - | A | Rel-10 | 10.4.0 | 10.5.0 | Removing [] in CSFB requirement for Rel-10 | RP-54 | RP-111682 | approved | R4 | R4-60 | R4-115087 | Agreed | 2011-12-05 | LTE-RF | - | 2011-12-05 |
0985 | - | B | Rel-10 | 10.4.0 | 10.5.0 | Reference channel for RLM testing with eICIC | RP-54 | RP-111693 | approved | R4 | R4-60 | R4-115361 | Agreed | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
0986 | - | F | Rel-9 | 9.9.0 | 9.10.0 | Clarification on RSTD test cases | RP-54 | RP-111683 | approved | R4 | R4-60 | R4-115385 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
0987 | - | A | Rel-10 | 10.4.0 | 10.5.0 | Clarification on RSTD test cases | RP-54 | RP-111683 | approved | R4 | R4-60 | R4-115386 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
0988 | - | F | Rel-10 | 10.4.0 | 10.5.0 | RSRP Measurement performance Io corrections | RP-54 | RP-111690 | approved | R4 | R4-60b | R4-115392 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
0989 | - | F | Rel-10 | 10.4.0 | 10.5.0 | RLM measurement requirements for eICIC | RP-54 | RP-111686 | approved | R4 | R4-60 | R4-115396 | Agreed | 2011-12-05 | eICIC_LTE-Core | - | 2011-12-05 |
0990 | - | B | Rel-10 | 10.4.0 | 10.5.0 | PDCCH/PCFICH transmission parameters for RLM | RP-54 | RP-111693 | approved | R4 | R4-60 | R4-115397 | Agreed | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
0991 | - | F | Rel-9 | 9.9.0 | 9.10.0 | Clarification on PRS bandwidth | RP-54 | RP-111683 | approved | R4 | R4-60 | R4-115491 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
0992 | - | A | Rel-10 | 10.4.0 | 10.5.0 | Clarification on PRS bandwidth | RP-54 | RP-111683 | approved | R4 | R4-60 | R4-115492 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
0993 | - | F | Rel-10 | 10.4.0 | - | Missing RSRQ in intra-frequency measurement requirements for eICIC | RP-54 | RP-111689 | reissued | R4 | R4-60 | R4-115393 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
0993 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Missing RSRQ in intra-frequency measurement requirements for eICIC | RP-54 | RP-111735 | approved | R4 | R4-60 | R4-115393 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
0994 | - | F | Rel-10 | 10.4.0 | - | Test case for TDD RSRQ Accuracy for Carrier Aggregation | - | - | - | R4 | R4-61 | R4-115528 | Revised | 2011-12-05 | LTE_CA-Core | - | 2011-12-05 |
0994 | 1 | F | Rel-10 | 10.4.0 | 10.5.0 | Test case for TDD RSRQ Accuracy for Carrier Aggregation | RP-54 | RP-111686 | approved | R4 | R4-61 | R4-116185 | Agreed | 2011-12-05 | LTE_CA-Core | - | 2011-12-05 |
0995 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Cell identification requirements without DRX | RP-54 | RP-111686 | approved | R4 | R4-61 | R4-115531 | Agreed | 2011-12-05 | eICIC_LTE-Core | - | 2011-12-05 |
0996 | - | F | Rel-10 | 10.4.0 | - | Cell identification requirements with DRX | - | - | - | R4 | R4-61 | R4-115532 | Noted | 2011-12-05 | eICIC_LTE-Core | - | 2011-12-05 |
0997 | - | B | Rel-10 | 10.4.0 | - | Test case for cell identification with eICIC in E-UTRAN FDD | - | - | - | R4 | R4-61 | R4-115533 | Revised | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
0997 | 1 | B | Rel-10 | 10.4.0 | 10.5.0 | Test case for cell identification with eICIC in E-UTRAN FDD | RP-54 | RP-111693 | approved | R4 | R4-61 | R4-116296 | Agreed | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
0998 | - | B | Rel-10 | 10.3.0 | - | Test case for cell identification with eICIC in E-UTRAN TDD | - | - | - | R4 | R4-61 | R4-115534 | Revised | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
0998 | 1 | B | Rel-10 | 10.4.0 | 10.5.0 | Test case for cell identification with eICIC in E-UTRAN TDD | RP-54 | RP-111693 | approved | R4 | R4-61 | R4-116297 | Agreed | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
0999 | - | F | Rel-10 | 10.4.0 | - | Carrier aggregation RSRP measurement test case for TDD | - | - | - | R4 | R4-61 | R4-115538 | Revised | 2011-12-05 | LTE_CA-Core | - | 2011-12-05 |
0999 | 1 | F | Rel-10 | 10.4.0 | 10.5.0 | Carrier aggregation RSRP measurement test case for TDD | RP-54 | RP-111691 | approved | R4 | R4-61 | R4-116200 | Agreed | 2011-12-05 | LTE_CA-Perf | - | 2011-12-05 |
1000 | - | F | Rel-9 | 9.9.0 | 9.10.0 | Test case for enhanced UTRA TDD cell identification for R9 | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-115539 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1001 | - | A | Rel-10 | 10.4.0 | 10.5.0 | Test case for enhanced UTRA TDD cell identification for R10 | RP-54 | RP-111690 | approved | R4 | R4-61 | R4-115540 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1002 | - | F | Rel-9 | 9.9.0 | 9.10.0 | Test case for RRC connection release redirection to UTRA TDD for R9 | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-115541 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1003 | - | A | Rel-10 | 10.4.0 | 10.5.0 | Test case for RRC connection release redirection to UTRA TDD for R10 | RP-54 | RP-111690 | approved | R4 | R4-61 | R4-115543 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1004 | - | F | Rel-10 | 10.4.0 | - | Introduction of Requirements for Multiple Timing Advances for Carrier Aggregation | - | - | - | R4 | R4-61 | R4-115549 | Noted | 2011-12-05 | LTE_CA-Core | - | 2011-12-05 |
1005 | - | F | Rel-10 | 10.4.0 | - | Clarification of the Successful Percentage for Measurement Performance Requirements | RP-54 | RP-111689 | reissued | R4 | R4-61 | R4-115551 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1005 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Clarification of the Successful Percentage for Measurement Performance Requirements | RP-54 | RP-111735 | approved | R4 | R4-61 | R4-115551 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1006 | - | F | Rel-10 | 10.4.0 | - | CR to TS36.133: cell identification requirements for eICIC | - | - | - | R4 | R4-61 | R4-115557 | Noted | 2011-12-05 | eICIC_LTE-Core | - | 2011-12-05 |
1007 | - | F | Rel-10 | 10.4.0 | - | FDD Absolute and Relative RSRQ Accuracy test in CA | - | - | - | R4 | R4-61 | R4-115570 | Revised | 2011-12-05 | LTE_CA-Perf | - | 2011-12-05 |
1007 | 1 | F | Rel-10 | 10.4.0 | - | FDD Absolute and Relative RSRQ Accuracy test in CA | - | - | - | R4 | R4-61 | R4-116184 | Revised | 2011-12-05 | LTE_CA-Perf | - | 2011-12-05 |
1007 | 2 | F | Rel-10 | 10.4.0 | 10.5.0 | FDD Absolute and Relative RSRQ Accuracy test in CA | RP-54 | RP-111691 | approved | R4 | R4-61 | R4-116299 | Agreed | 2011-12-05 | LTE_CA-Perf | - | 2011-12-05 |
1008 | - | F | Rel-9 | 9.9.0 | - | Correction and clarification of RSTD requirements and test cases | - | - | - | R4 | R4-61 | R4-115579 | Revised | 2011-12-05 | TEI9 | - | 2011-12-05 |
1008 | 1 | F | Rel-9 | 9.9.0 | - | Correction and clarification of RSTD requirements and test cases | - | - | - | R4 | R4-61 | R4-116191 | Noted | 2011-12-05 | TEI9 | - | 2011-12-05 |
1009 | - | A | Rel-10 | 10.4.0 | - | Correction and clarification of RSTD requirements and test cases | - | - | - | R4 | R4-61 | R4-115580 | Revised | 2011-12-05 | TEI9 | - | 2011-12-05 |
1009 | 1 | A | Rel-10 | 10.4.0 | - | Correction and clarification of RSTD requirements and test cases | - | - | - | R4 | R4-61 | R4-116192 | Noted | 2011-12-05 | TEI9 | - | 2011-12-05 |
1010 | - | F | Rel-9 | 9.9.0 | - | Test case for RRC connection release redirection to UTRA LCR TDD | - | - | - | R4 | R4-61 | R4-115594 | Noted | 2011-12-05 | TEI9 | - | 2011-12-05 |
1011 | - | F | Rel-10 | 10.4.0 | - | FDD absolute and relative RSRP accuracies test in CA | - | - | - | R4 | R4-61 | R4-115600 | Revised | 2011-12-05 | LTE_CA-Perf | - | 2011-12-05 |
1011 | 1 | F | Rel-10 | 10.4.0 | 10.5.0 | FDD absolute and relative RSRP accuracies test in CA | RP-54 | RP-111691 | approved | R4 | R4-61 | R4-116294 | Agreed | 2011-12-05 | LTE_CA-Perf | - | 2011-12-05 |
1012 | - | F | Rel-10 | 10.4.0 | - | TDD absolute and relative RSRP accuracies test in CA | - | - | - | R4 | R4-61 | R4-115601 | Noted | 2011-12-05 | LTE_CA-Perf | - | 2011-12-05 |
1013 | - | F | Rel-10 | 10.4.0 | - | E-UTRAN FDD Radio Link Monitoring Test for In-sync under time domain measurement resource restriction | - | - | - | R4 | R4-61 | R4-115605 | Noted | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
1014 | - | F | Rel-10 | 10.4.0 | - | E-UTRAN TDD Radio Link Monitoring Test for Out-of-sync under time domain measurement resource restriction | - | - | - | R4 | R4-61 | R4-115606 | Revised | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
1014 | 1 | F | Rel-10 | 10.4.0 | 10.5.0 | E-UTRAN TDD Radio Link Monitoring Test for Out-of-sync under time domain measurement resource restriction | RP-54 | RP-111693 | approved | R4 | R4-61 | R4-116199 | Agreed | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
1015 | - | F | Rel-9 | 9.9.0 | 9.10.0 | E-UTRAN FDD - UTRAN TDD enhanced cell identification test under AWGN propagation conditions in R9 | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-115607 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1016 | - | A | Rel-10 | 10.4.0 | - | E-UTRAN FDD - UTRAN TDD enhanced cell identification test under AWGN propagation conditions in R10 | RP-54 | RP-111689 | reissued | R4 | R4-61 | R4-115608 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1016 | - | A | Rel-10 | 10.4.0 | 10.5.0 | E-UTRAN FDD - UTRAN TDD enhanced cell identification test under AWGN propagation conditions in R10 | RP-54 | RP-111735 | approved | R4 | R4-61 | R4-115608 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1017 | - | F | Rel-9 | 9.9.0 | - | E-UTRAN FDD RRC connection release with redirection to UTRAN TDD in R9 | - | - | - | R4 | R4-61 | R4-115609 | Revised | 2011-12-05 | TEI9 | - | 2011-12-05 |
1017 | 1 | F | Rel-9 | 9.9.0 | 9.10.0 | E-UTRAN FDD RRC connection release with redirection to UTRAN TDD in R9 | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-116148 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1018 | - | A | Rel-10 | 10.4.0 | - | E-UTRAN FDD RRC connection release with redirection to UTRAN TDD in R10 | - | - | - | R4 | R4-61 | R4-115610 | Revised | 2011-12-05 | TEI10 | - | 2011-12-05 |
1018 | 1 | A | Rel-10 | 10.4.0 | - | E-UTRAN FDD RRC connection release with redirection to UTRAN TDD in R10 | RP-54 | RP-111689 | reissued | R4 | R4-61 | R4-116149 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1018 | 1 | A | Rel-10 | 10.4.0 | 10.5.0 | E-UTRAN FDD RRC connection release with redirection to UTRAN TDD in R10 | RP-54 | RP-111735 | approved | R4 | R4-61 | R4-116149 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1019 | - | F | Rel-10 | 10.4.0 | - | E-UTRAN FDD intra frequency measurements with autonomous gaps in eICIC | - | - | - | R4 | R4-61 | R4-115612 | Noted | 2011-12-05 | eICIC_LTE-Core | - | 2011-12-05 |
1020 | - | F | Rel-10 | 10.4.0 | - | E-UTRAN TDD intra frequency measurements with autonomous gaps in eICIC | - | - | - | R4 | R4-61 | R4-115613 | Noted | 2011-12-05 | eICIC_LTE-Core | - | 2011-12-05 |
1021 | - | F | Rel-10 | 10.4.0 | - | CR for Inter-RAT SI reading | - | - | - | R4 | R4-61 | R4-115615 | Revised | 2011-12-05 | TEI10 | - | 2011-12-05 |
1021 | 1 | B | Rel-10 | 10.4.0 | - | CR for Inter-RAT SI reading | RP-54 | RP-111689 | reissued | R4 | R4-61 | R4-116195 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1021 | 1 | B | Rel-10 | 10.4.0 | 10.5.0 | CR for Inter-RAT SI reading | RP-54 | RP-111735 | approved | R4 | R4-61 | R4-116195 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1022 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Addition of E-UTRAN FDD - TDD Inter frequency cell reselection test case | RP-54 | RP-111687 | approved | R4 | R4-61 | R4-115617 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1023 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Addtion of E-UTRAN TDD - FDD Inter frequency cell reselection test case | RP-54 | RP-111687 | approved | R4 | R4-61 | R4-115618 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1024 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Addtion of E-UTRAN FDD - TDD Inter frequency handover test case | RP-54 | RP-111687 | approved | R4 | R4-61 | R4-115619 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1025 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Addtion of E-UTRAN TDD - FDD Inter frequency handover test case | RP-54 | RP-111687 | approved | R4 | R4-61 | R4-115620 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1026 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Addtion of E-UTRAN TDD-FDD Inter-frequency event triggered reporting under fading propagation conditions in asynchronous cells test case | RP-54 | RP-111687 | approved | R4 | R4-61 | R4-115621 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1027 | - | F | Rel-10 | 10.4.0 | - | Addtion of E-UTRAN FDD-TDD Inter-frequency event triggered reporting under fading propagation conditions in asynchronous cells test case | - | - | - | R4 | R4-61 | R4-115622 | Revised | 2011-12-05 | TEI10 | - | 2011-12-05 |
1027 | 1 | F | Rel-10 | 10.4.0 | 10.5.0 | Addtion of E-UTRAN FDD-TDD Inter-frequency event triggered reporting under fading propagation conditions in asynchronous cells test case | RP-54 | RP-111687 | approved | R4 | R4-61 | R4-116150 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1028 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Addtion of E-UTRAN FDD - TDD inter frequency measurement accuracy test case | RP-54 | RP-111687 | approved | R4 | R4-61 | R4-115623 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1029 | - | F | Rel-8 | 8.15.0 | 8.16.0 | Correction for the identification time in DRX for UTRA TDD in R8 | RP-54 | RP-111681 | approved | R4 | R4-61 | R4-115624 | Agreed | 2011-12-05 | TEI8 | - | 2011-12-05 |
1030 | - | A | Rel-9 | 9.9.0 | 9.10.0 | Correction for the identification time in DRX for UTRA TDD in R9 | RP-54 | RP-111681 | approved | R4 | R4-61 | R4-115625 | Agreed | 2011-12-05 | TEI8 | - | 2011-12-05 |
1031 | - | A | Rel-10 | 10.4.0 | 10.5.0 | Correction for the identification time in DRX for UTRA TDD in R10 | RP-54 | RP-111681 | approved | R4 | R4-61 | R4-115626 | Agreed | 2011-12-05 | TEI8 | - | 2011-12-05 |
1032 | - | F | Rel-10 | 10.4.0 | - | Correction the side condition for SCH in R10 | RP-54 | RP-111689 | reissued | R4 | R4-61 | R4-115627 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1032 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Correction the side condition for SCH in R10 | RP-54 | RP-111735 | approved | R4 | R4-61 | R4-115627 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1033 | - | F | Rel-10 | 10.4.0 | - | Correction to event triggered reporting for TS 36.133 in R10 | - | - | - | R4 | R4-61 | R4-115628 | Revised | 2011-12-05 | TEI10 | - | 2011-12-05 |
1033 | 1 | F | Rel-10 | 10.4.0 | - | Correction to event triggered reporting for TS 36.133 in R10 | RP-54 | RP-111689 | reissued | R4 | R4-61 | R4-116156 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1033 | 1 | F | Rel-10 | 10.4.0 | 10.5.0 | Correction to event triggered reporting for TS 36.133 in R10 | RP-54 | RP-111735 | approved | R4 | R4-61 | R4-116156 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1034 | - | F | Rel-9 | 9.9.0 | - | Correction to CGI identifying test case in R9 | - | - | - | R4 | R4-61 | R4-115629 | Noted | 2011-12-05 | TEI9 | - | 2011-12-05 |
1035 | - | A | Rel-10 | 10.4.0 | - | Correction to CGI identifying test case in R10 | - | - | - | R4 | R4-61 | R4-115630 | Noted | 2011-12-05 | TEI10 | - | 2011-12-05 |
1036 | - | F | Rel-8 | 8.15.0 | 8.16.0 | Thresholds and margins for RRM tests A.8.11.3 and A.8.11.4 | RP-54 | RP-111680 | approved | R4 | R4-61 | R4-115632 | Agreed | 2011-12-05 | LTE-RF | - | 2011-12-05 |
1037 | - | F | Rel-8 | 8.15.0 | - | Correction of E-UTRAN TDD-TDD inter frequency handover test case in R8 | - | - | - | R4 | R4-61 | R4-115634 | Revised | 2011-12-05 | TEI8 | - | 2011-12-05 |
1037 | 1 | F | Rel-8 | 8.15.0 | 8.16.0 | Correction of E-UTRAN TDD-TDD inter frequency handover test case in R8 | RP-54 | RP-111681 | approved | R4 | R4-61 | R4-116152 | Agreed | 2011-12-05 | TEI8 | - | 2011-12-05 |
1038 | - | A | Rel-9 | 9.9.0 | - | Correction of E-UTRAN TDD-TDD inter frequency handover test case in R9 | - | - | - | R4 | R4-61 | R4-115635 | Revised | 2011-12-05 | TEI9 | - | 2011-12-05 |
1038 | 1 | A | Rel-9 | 9.9.0 | 9.10.0 | Correction of E-UTRAN TDD-TDD inter frequency handover test case in R9 | RP-54 | RP-111681 | approved | R4 | R4-61 | R4-116153 | Agreed | 2011-12-05 | TEI8 | - | 2011-12-05 |
1039 | - | A | Rel-10 | 10.4.0 | - | Correction of E-UTRAN TDD-TDD inter frequency handover test case in R10 | - | - | - | R4 | R4-61 | R4-115636 | Revised | 2011-12-05 | TEI10 | - | 2011-12-05 |
1039 | 1 | A | Rel-10 | 10.4.0 | 10.5.0 | Correction of E-UTRAN TDD-TDD inter frequency handover test case in R10 | RP-54 | RP-111681 | approved | R4 | R4-61 | R4-116154 | Agreed | 2011-12-05 | TEI8 | - | 2011-12-05 |
1040 | - | F | Rel-9 | 9.9.0 | 9.10.0 | Clarification of Expected RSTD and Expected RSTD uncertainty in RSTD test cases in R9 | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-115637 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1041 | - | F | Rel-10 | 10.4.0 | - | Clarification of Expected RSTD and Expected RSTD uncertainty in RSTD test cases in R10 | RP-54 | RP-111689 | reissued | R4 | R4-61 | R4-115638 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1041 | - | F | Rel-10 | 10.4.0 | 10.5.0 | Clarification of Expected RSTD and Expected RSTD uncertainty in RSTD test cases in R10 | RP-54 | RP-111735 | approved | R4 | R4-61 | R4-115638 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1042 | - | A | Rel-9 | 9.9.0 | 9.10.0 | Thresholds and margins for RRM tests A.8.11.3 and A.8.11.4 | RP-54 | RP-111680 | approved | R4 | R4-61 | R4-115639 | Agreed | 2011-12-05 | LTE-RF | - | 2011-12-05 |
1043 | - | A | Rel-10 | 10.4.0 | 10.5.0 | Thresholds and margins for RRM tests A.8.11.3 and A.8.11.4 | RP-54 | RP-111680 | approved | R4 | R4-61 | R4-115640 | Agreed | 2011-12-05 | LTE-RF | - | 2011-12-05 |
1044 | - | F | Rel-10 | 10.4.0 | - | CR for eICIC core requirement for cell identification in DRX | - | - | - | R4 | R4-61 | R4-115641 | Noted | 2011-12-05 | eICIC_LTE-Core | - | 2011-12-05 |
1045 | - | F | Rel-9 | 9.9.0 | 9.10.0 | Thresholds and margins for RRM tests A.8.11.5 and A.8.11.6 | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-115645 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1046 | - | A | Rel-10 | 10.4.0 | 10.5.0 | Thresholds and margins for RRM tests A.8.11.5 and A.8.11.6 | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-115647 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1047 | - | B | Rel-10 | 10.4.0 | - | RLM Out of Sync Detection Test for eICIC | - | - | - | R4 | R4-61 | R4-115660 | Revised | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
1047 | 1 | B | Rel-10 | 10.4.0 | - | RLM Out of Sync Detection Test for eICIC | - | - | - | R4 | R4-61 | R4-116187 | Revised | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
1047 | 2 | B | Rel-10 | 10.4.0 | 10.5.0 | RLM Out of Sync Detection Test for eICIC | RP-54 | RP-111693 | approved | R4 | R4-61 | R4-116301 | Agreed | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
1048 | - | F | Rel-9 | 9.9.0 | 9.10.0 | RRC Connection Release with Redirection from E-UTRAN FDD to GERAN | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-115688 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1049 | - | A | Rel-10 | 10.4.0 | 10.5.0 | RRC Connection Release with Redirection from E-UTRAN FDD to GERAN | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-115690 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1050 | - | F | Rel-9 | 9.9.0 | 9.10.0 | RRC Connection Release with Redirection from E-UTRAN TDD to GERAN | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-115693 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1051 | - | B | Rel-10 | 10.4.0 | 10.5.0 | Colliding CRS in non-MBSFN ABS | RP-54 | RP-111693 | approved | R4 | R4-61 | R4-115694 | Agreed | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
1052 | - | A | Rel-10 | 10.4.0 | 10.5.0 | RRC Connection Release with Redirection from E-UTRAN TDD to GERAN | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-115695 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1053 | - | B | Rel-10 | 10.4.0 | - | RLM In Sync Detection Test for FDD eICIC | - | - | - | R4 | R4-61 | R4-115696 | Revised | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
1053 | 1 | B | Rel-10 | 10.4.0 | 10.5.0 | RLM In Sync Detection Test for FDD eICIC | RP-54 | RP-111693 | approved | R4 | R4-61 | R4-116197 | Agreed | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
1054 | - | B | Rel-10 | 10.4.0 | - | RLM In Sync Detection Test for TDD eICIC | - | - | - | R4 | R4-61 | R4-115698 | Revised | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
1054 | 1 | B | Rel-10 | 10.4.0 | 10.5.0 | RLM In Sync Detection Test for FDD eICIC | RP-54 | RP-111693 | approved | R4 | R4-61 | R4-116198 | Agreed | 2011-12-05 | eICIC_LTE-Perf | - | 2011-12-05 |
1055 | - | F | Rel-10 | 10.4.0 | - | FDD Event triggered reporting on deactivated Scell in non-DRX | - | - | - | R4 | R4-61 | R4-115718 | Revised | 2011-12-05 | LTE_CA-Perf | - | 2011-12-05 |
1055 | 1 | B | Rel-10 | 10.4.0 | 10.5.0 | FDD Event triggered reporting on deactivated Scell in non-DRX | RP-54 | RP-111691 | approved | R4 | R4-61 | R4-116158 | Agreed | 2011-12-05 | LTE_CA-Perf | - | 2011-12-05 |
1056 | - | F | Rel-10 | 10.4.0 | - | TDD Event triggered reporting on deactivated Scell in non-DRX | - | - | - | R4 | R4-61 | R4-115721 | Revised | 2011-12-05 | LTE_CA-Perf | - | 2011-12-05 |
1056 | 1 | B | Rel-10 | 10.4.0 | 10.5.0 | TDD Event triggered reporting on deactivated Scell in non-DRX | RP-54 | RP-111691 | approved | R4 | R4-61 | R4-116159 | Agreed | 2011-12-05 | LTE_CA-Perf | - | 2011-12-05 |
1057 | - | F | Rel-9 | 9.9.0 | 9.10.0 | Adding Band XX | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-115768 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1058 | - | A | Rel-10 | 10.4.0 | 10.5.0 | Adding Band XX | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-115769 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1059 | - | F | Rel-10 | 10.4.0 | - | CR on Enhanced ICIC cell identification requirements with DRX | - | - | - | R4 | R4-61 | R4-115942 | Noted | 2011-12-05 | eICIC_LTE-Core | - | 2011-12-05 |
1060 | - | F | Rel-10 | 10.4.0 | - | Requirements for UE that support measurements without gaps | - | - | - | R4 | R4-61 | R4-115965 | Noted | 2011-12-05 | LTE-RF | - | 2011-12-05 |
1061 | - | F | Rel-10 | 10.4.0 | - | Optional faster higher priority reselection | - | - | - | R4 | R4-61 | R4-115969 | Revised | 2011-12-05 | TEI10 | - | 2011-12-05 |
1061 | 1 | F | Rel-10 | 10.4.0 | 10.5.0 | Optional faster higher priority reselection | RP-54 | RP-111690 | approved | R4 | R4-61 | R4-116254 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1062 | - | F | Rel-10 | 10.4.0 | - | Clarification of UE behaviours on the transition between SCell activation and deactivation | - | - | - | R4 | R4-61 | R4-115994 | Noted | 2011-12-05 | LTE_CA-Core | - | 2011-12-05 |
1063 | - | B | Rel-10 | 10.4.0 | - | Wider measurement bandwidth for the serving cell | - | - | - | R4 | R4-61 | R4-115996 | Noted | 2011-12-05 | TEI10 | - | 2011-12-05 |
1064 | - | B | Rel-10 | 10.4.0 | - | Addition of a test case at lower RSRP level for the serving cell measurement accuracy | - | - | - | R4 | R4-61 | R4-116000 | Revised | 2011-12-05 | TEI10 | - | 2011-12-05 |
1064 | 1 | B | Rel-10 | 10.4.0 | - | Addition of a test case at lower RSRP level for the serving cell measurement accuracy | RP-54 | RP-111689 | reissued | R4 | R4-61 | R4-116147 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1064 | 1 | B | Rel-10 | 10.4.0 | 10.5.0 | Addition of a test case at lower RSRP level for the serving cell measurement accuracy | RP-54 | RP-111735 | approved | R4 | R4-61 | R4-116147 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1065 | - | F | Rel-9 | 9.9.0 | 9.10.0 | Test cases for RRC connection release with redirection to UTRAN FDD | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-116001 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1066 | - | A | Rel-10 | 10.4.0 | 10.5.0 | Test cases for RRC connection release with redirection to UTRAN FDD | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-116002 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1067 | - | F | Rel-10 | 10.4.0 | - | Maximum timing advance for LTE TDD | - | - | - | R4 | R4-61 | R4-116007 | Noted | 2011-12-05 | LTE-RF | - | 2011-12-05 |
1068 | - | F | Rel-8 | 8.15.0 | - | Clarification on Reporting Delay | - | - | - | R4 | R4-61 | R4-116065 | Noted | 2011-12-05 | LTE-RF | - | 2011-12-05 |
1069 | - | A | Rel-9 | 9.9.0 | - | Clarification on Reporting Delay | - | - | - | R4 | R4-61 | R4-116066 | Noted | 2011-12-05 | LTE-RF | - | 2011-12-05 |
1070 | - | A | Rel-10 | 10.4.0 | - | Clarification on Reporting Delay | - | - | - | R4 | R4-61 | R4-116067 | Noted | 2011-12-05 | LTE-RF | - | 2011-12-05 |
1071 | - | F | Rel-10 | 10.4.0 | - | Reporting criteria requirements for carrier aggregation | - | - | - | R4 | R4-61 | R4-116071 | Noted | 2011-12-05 | TEI10 | - | 2011-12-05 |
1072 | - | F | Rel-10 | 10.4.0 | - | CA definition alignment in test cases | RP-54 | RP-111689 | reissued | R4 | R4-61 | R4-116072 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1072 | - | F | Rel-10 | 10.4.0 | 10.5.0 | CA definition alignment in test cases | RP-54 | RP-111735 | approved | R4 | R4-61 | R4-116072 | Agreed | 2011-12-05 | TEI10 | - | 2011-12-05 |
1073 | - | F | Rel-9 | 9.9.0 | 9.10.0 | Applicable PRS BW for RSTD accuracy requirements | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-116074 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1074 | - | A | Rel-10 | 10.4.0 | 10.5.0 | Applicable PRS BW for RSTD accuracy requirements | RP-54 | RP-111683 | approved | R4 | R4-61 | R4-116077 | Agreed | 2011-12-05 | TEI9 | - | 2011-12-05 |
1075 | - | F | Rel-10 | 10.4.0 | - | RLM requirements with autonomous gaps | - | - | - | R4 | R4-61 | R4-116085 | Noted | 2011-12-05 | eICIC_LTE-Core | - | 2011-12-05 |
1076 | - | F | Rel-9 | 9.10.0 | - | RSTD signalling modifications | - | - | - | R4 | R4-62 | R4-120002 | Revised | 2012-02-24 | TEI9 | - | 2012-02-24 |
1076 | 1 | F | Rel-9 | 9.10.0 | 9.11.0 | RSTD signalling modifications | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-120925 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1077 | - | F | Rel-10 | 10.5.0 | - | RSTD signalling modifications | - | - | - | R4 | R4-62 | R4-120003 | Revised | 2012-02-24 | TEI10 | - | 2012-02-24 |
1077 | 1 | F | Rel-10 | 10.5.0 | 10.6.0 | RSTD signalling modifications | RP-55 | RP-120304 | approved | R4 | R4-62 | R4-120926 | Agreed | 2012-02-24 | TEI10 | - | 2012-02-24 |
1078 | - | F | Rel-9 | 9.10.0 | - | Test case for E-UTRA TDD RRC connection release redirection to UTRA TDD without SI provided for R9 | - | - | - | R4 | R4-62 | R4-120018 | Revised | 2012-02-24 | LTE-RF | - | 2012-02-24 |
1078 | 1 | F | Rel-9 | 9.10.0 | 9.11.0 | Test case for E-UTRA TDD RRC connection release redirection to UTRA TDD without SI provided for R9 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-121019 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1079 | - | A | Rel-10 | 10.5.0 | - | Test case for E-UTRA TDD RRC connection release redirection to UTRA TDD without SI provided for R10 | - | - | - | R4 | R4-62 | R4-120019 | Revised | 2012-02-24 | LTE-RF | - | 2012-02-24 |
1079 | 1 | A | Rel-10 | 10.5.0 | 10.6.0 | Test case for E-UTRA TDD RRC connection release redirection to UTRA TDD without SI provided for R10 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-121020 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1080 | - | F | Rel-9 | 9.10.0 | - | Test case for E-UTRA FDD RRC connection release redirection to UTRA TDD without SI provided for R9 | - | - | - | R4 | R4-62 | R4-120020 | Revised | 2012-02-24 | LTE-RF | - | 2012-02-24 |
1080 | 1 | F | Rel-9 | 9.10.0 | 9.11.0 | Test case for E-UTRA FDD RRC connection release redirection to UTRA TDD without SI provided for R9 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-121021 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1081 | - | A | Rel-10 | 10.5.0 | - | Test case for E-UTRA FDD RRC connection release redirection to UTRA TDD without SI provided for R10 | - | - | - | R4 | R4-62 | R4-120021 | Revised | 2012-02-24 | LTE-RF | - | 2012-02-24 |
1081 | 1 | A | Rel-10 | 10.5.0 | 10.6.0 | Test case for E-UTRA FDD RRC connection release redirection to UTRA TDD without SI provided for R10 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-121022 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1082 | - | F | Rel-8 | 8.16.0 | 8.17.0 | Thresholds and margins for E-UTRAN to C2K RRM reselection test cases (Rel-8) | RP-55 | RP-120291 | approved | R4 | R4-62 | R4-120023 | Agreed | 2012-02-24 | LTE-RF | - | 2012-02-24 |
1083 | - | A | Rel-9 | 9.10.0 | 9.11.0 | Thresholds and margins for E-UTRAN to C2K RRM reselection test cases (Rel-9) | RP-55 | RP-120291 | approved | R4 | R4-62 | R4-120024 | Agreed | 2012-02-24 | LTE-RF | - | 2012-02-24 |
1084 | - | A | Rel-10 | 10.5.0 | 10.6.0 | Thresholds and margins for E-UTRAN to C2K RRM reselection test cases (Rel-10) | RP-55 | RP-120291 | approved | R4 | R4-62 | R4-120025 | Agreed | 2012-02-24 | LTE-RF | - | 2012-02-24 |
1085 | - | F | Rel-10 | 10.5.0 | - | CR to TS36.133: cell identification requirements with DRX for eICIC | - | - | - | R4 | R4-62 | R4-120027 | Noted | 2012-02-24 | TEI10 | - | 2012-02-24 |
1086 | - | F | Rel-9 | 9.10.0 | 9.11.0 | Addition of E-UTRAN TDD-HRPD Cell Reselection: HRPD is of Lower Priority test case R9 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-120073 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1087 | - | A | Rel-10 | 10.5.0 | 10.6.0 | Addition of E-UTRAN TDD-HRPD Cell Reselection: HRPD is of Lower Priority test case R10 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-120074 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1088 | - | F | Rel-9 | 9.10.0 | 9.11.0 | Addition of E-UTRAN TDD-cdma2000 1X Cell Reselection: cdma2000 1X is of Lower Priority test case R9 | RP-55 | RP-120293 | approved | R4 | R4-62 | R4-120075 | Agreed | 2012-02-24 | LTE-RF | - | 2012-02-24 |
1089 | - | A | Rel-10 | 10.5.0 | 10.6.0 | Addition of E-UTRAN TDD-cdma2000 1X Cell Reselection: cdma2000 1X is of Lower Priority test case R10 | RP-55 | RP-120293 | approved | R4 | R4-62 | R4-120076 | Agreed | 2012-02-24 | LTE-RF | - | 2012-02-24 |
1090 | - | F | Rel-9 | 9.10.0 | 9.11.0 | Addition of E-UTRAN TDD-HRPD Handover test case R9 | RP-55 | RP-120293 | approved | R4 | R4-62 | R4-120077 | Agreed | 2012-02-24 | LTE-RF | - | 2012-02-24 |
1091 | - | A | Rel-10 | 10.5.0 | 10.6.0 | Addition of E-UTRAN TDD-HRPD Handover test case R10 | RP-55 | RP-120293 | approved | R4 | R4-62 | R4-120078 | Agreed | 2012-02-24 | LTE-RF | - | 2012-02-24 |
1092 | - | F | Rel-9 | 9.10.0 | 9.11.0 | Addition of E-UTRAN TDD-cdma2000 1X Handover test case R9 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-120079 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1093 | - | A | Rel-10 | 10.5.0 | 10.6.0 | Addition of E-UTRAN TDD-cdma2000 1X Handover test case R10 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-120080 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1094 | - | F | Rel-9 | 9.10.0 | - | Addition of E-UTRAN FDD-TDD Inter-frequency RRC Re-establishment test case R9 | - | - | - | R4 | R4-62 | R4-120081 | Noted | 2012-02-24 | TEI9 | - | 2012-02-24 |
1095 | - | A | Rel-10 | 10.5.0 | - | Addition of E-UTRAN FDD-TDD Inter-frequency RRC Re-establishment test case R10 | - | - | - | R4 | R4-62 | R4-120082 | Noted | 2012-02-24 | TEI9 | - | 2012-02-24 |
1096 | - | F | Rel-9 | 9.10.0 | - | Addition of E-UTRAN TDD-FDD Inter-frequency RRC Re-establishment test case R9 | - | - | - | R4 | R4-62 | R4-120083 | Noted | 2012-02-24 | TEI9 | - | 2012-02-24 |
1097 | - | A | Rel-10 | 10.5.0 | - | Addition of E-UTRAN TDD-FDD Inter-frequency RRC Re-establishment test case R10 | - | - | - | R4 | R4-62 | R4-120084 | Noted | 2012-02-24 | TEI9 | - | 2012-02-24 |
1098 | - | F | Rel-9 | 9.10.0 | 9.11.0 | Addition of E-UTRAN FDD-TDD inter frequency RSRQ measurement accuracy test case R9 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-120085 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1099 | - | A | Rel-10 | 10.5.0 | 10.6.0 | Addition of E-UTRAN FDD-TDD inter frequency RSRQ measurement accuracy test case R10 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-120086 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1100 | - | F | Rel-9 | 9.10.0 | 9.11.0 | Addition of E-UTRAN FDD-TDD Inter frequency cell reselection test case R9 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-120087 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1101 | - | F | Rel-9 | 9.10.0 | 9.11.0 | Addition of E-UTRAN TDD-FDD Inter frequency cell reselection test case R9 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-120088 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1102 | - | F | Rel-9 | 9.10.0 | 9.11.0 | Addition of E-UTRAN FDD-TDD Inter frequency handover test case R9 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-120089 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1103 | - | F | Rel-9 | 9.10.0 | 9.11.0 | Addition of E-UTRAN TDD-FDD Inter frequency handover test case R9 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-120090 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1104 | - | F | Rel-9 | 9.10.0 | 9.11.0 | Addition of E-UTRAN TDD-FDD Inter-frequency event triggered reporting under fading propagation conditions in asynchronous cells test case R9 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-120091 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1105 | - | F | Rel-9 | 9.10.0 | 9.11.0 | Addition of E-UTRAN FDD-TDD Inter-frequency event triggered reporting under fading propagation conditions in asynchronous cells test case R9 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-120092 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1106 | - | F | Rel-9 | 9.10.0 | 9.11.0 | Addition of E-UTRAN FDD-TDD inter frequency measurement accuracy test case R9 | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-120093 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1107 | - | F | Rel-10 | 10.5.0 | - | FDD Event-Triggered Reporting on Deactivated SCell with PCell Interruption | - | - | - | R4 | R4-62 | R4-120094 | Noted | 2012-02-24 | LTE_CA-Perf | - | 2012-02-24 |
1108 | - | F | Rel-10 | 10.5.0 | - | Addition of E-UTRAN FDD RSTD measurement accuracy test case in carrier aggregation | - | - | - | R4 | R4-62 | R4-120095 | Noted | 2012-02-24 | LTE_CA-Perf | - | 2012-02-24 |
1109 | - | F | Rel-10 | 10.5.0 | - | Addition of E-UTRAN TDD RSTD measurement accuracy test case in carrier aggregation | - | - | - | R4 | R4-62 | R4-120096 | Noted | 2012-02-24 | LTE_CA-Perf | - | 2012-02-24 |
1110 | - | F | Rel-10 | 10.5.0 | - | FDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS | - | - | - | R4 | R4-62 | R4-120097 | Noted | 2012-02-24 | eICIC_LTE-Perf | - | 2012-02-24 |
1111 | - | F | Rel-10 | 10.5.0 | - | TDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS | - | - | - | R4 | R4-62 | R4-120098 | Noted | 2012-02-24 | eICIC_LTE-Perf | - | 2012-02-24 |
1112 | - | F | Rel-10 | 10.5.0 | - | RLM test cases with SNRs for OOS and INS for E-UTRAN TDD in eICIC | - | - | - | R4 | R4-62 | R4-120100 | Revised | 2012-02-24 | eICIC_LTE-Perf | - | 2012-02-24 |
1112 | 1 | F | Rel-10 | 10.5.0 | 10.6.0 | RLM test cases with SNRs for OOS and INS for E-UTRAN TDD in eICIC | RP-55 | RP-120300 | approved | R4 | R4-62 | R4-121012 | Agreed | 2012-02-24 | eICIC_LTE-Perf | - | 2012-02-24 |
1113 | - | F | Rel-10 | 10.5.0 | - | Core requirement for cell identification in DRX for eICIC | - | - | - | R4 | R4-62 | R4-120103 | Noted | 2012-02-24 | eICIC_LTE-Core | - | 2012-02-24 |
1114 | - | F | Rel-9 | 9.10.0 | - | E-UTRA TDD RRC connection release redirection to UTRAN FDD without SI provided | - | - | - | R4 | R4-62 | R4-120104 | Noted | 2012-02-24 | TEI9 | - | 2012-02-24 |
1115 | - | F | Rel-10 | 10.5.0 | 10.6.0 | Io difference band-independent in Inter-frequency RSRP TDD TC A.9.1.4 | RP-55 | RP-120304 | approved | R4 | R4-62 | R4-120125 | Agreed | 2012-02-24 | TEI10 | - | 2012-02-24 |
1116 | - | F | Rel-8 | 8.16.0 | - | Thresholds and margins in RRM test case A.8.11.4 | - | - | - | R4 | R4-62 | R4-120130 | Revised | 2012-02-24 | TEI8 | - | 2012-02-24 |
1116 | 1 | F | Rel-8 | 8.16.0 | 8.17.0 | Thresholds and margins in RRM test case A.8.11.4 | RP-55 | RP-120292 | approved | R4 | R4-62 | R4-120938 | Agreed | 2012-02-24 | TEI8 | - | 2012-02-24 |
1117 | - | A | Rel-9 | 9.10.0 | - | Thresholds and margins in RRM test case A.8.11.4 | - | - | - | R4 | R4-62 | R4-120131 | Revised | 2012-02-24 | TEI8 | - | 2012-02-24 |
1117 | 1 | A | Rel-9 | 9.10.0 | 9.11.0 | Thresholds and margins in RRM test case A.8.11.4 | RP-55 | RP-120292 | approved | R4 | R4-62 | R4-120939 | Agreed | 2012-02-24 | TEI8 | - | 2012-02-24 |
1118 | - | A | Rel-10 | 10.5.0 | - | Thresholds and margins in RRM test case A.8.11.4 | - | - | - | R4 | R4-62 | R4-120132 | Revised | 2012-02-24 | TEI8 | - | 2012-02-24 |
1118 | 1 | A | Rel-10 | 10.5.0 | 10.6.0 | Thresholds and margins in RRM test case A.8.11.4 | RP-55 | RP-120292 | approved | R4 | R4-62 | R4-120940 | Agreed | 2012-02-24 | TEI8 | - | 2012-02-24 |
1119 | - | F | Rel-8 | 8.16.0 | 8.17.0 | TDD PRACH Test cases value of PRACH Configuration Index and first preamble power | RP-55 | RP-120292 | approved | R4 | R4-62 | R4-120133 | Agreed | 2012-02-24 | TEI8 | - | 2012-02-24 |
1120 | - | A | Rel-9 | 9.10.0 | 9.11.0 | TDD PRACH Test cases value of PRACH Configuration Index and first preamble power | RP-55 | RP-120292 | approved | R4 | R4-62 | R4-120134 | Agreed | 2012-02-24 | TEI8 | - | 2012-02-24 |
1121 | - | A | Rel-10 | 10.5.0 | 10.6.0 | TDD PRACH Test cases value of PRACH Configuration Index and first preamble power | RP-55 | RP-120292 | approved | R4 | R4-62 | R4-120135 | Agreed | 2012-02-24 | TEI8 | - | 2012-02-24 |
1122 | - | F | Rel-8 | 8.16.0 | - | PDSCH and OCNG pattern in PRACH Test cases A.6.2.1 and A.6.2.3 | - | - | - | R4 | R4-62 | R4-120286 | Revised | 2012-02-24 | TEI8 | - | 2012-02-24 |
1122 | 1 | F | Rel-8 | 8.16.0 | 8.17.0 | PDSCH and OCNG pattern in PRACH Test cases A.6.2.1 and A.6.2.3 | RP-55 | RP-120292 | approved | R4 | R4-62 | R4-120946 | Agreed | 2012-02-24 | TEI8 | - | 2012-02-24 |
1123 | - | A | Rel-9 | 9.10.0 | - | PDSCH and OCNG pattern in PRACH Test cases A.6.2.1 and A.6.2.3 | - | - | - | R4 | R4-62 | R4-120287 | Revised | 2012-02-24 | TEI8 | - | 2012-02-24 |
1123 | 1 | A | Rel-9 | 9.10.0 | 9.11.0 | PDSCH and OCNG pattern in PRACH Test cases A.6.2.1 and A.6.2.3 | RP-55 | RP-120292 | approved | R4 | R4-62 | R4-120947 | Agreed | 2012-02-24 | TEI8 | - | 2012-02-24 |
1124 | - | A | Rel-10 | 10.5.0 | - | PDSCH and OCNG pattern in PRACH Test cases A.6.2.1 and A.6.2.3 | - | - | - | R4 | R4-62 | R4-120288 | Revised | 2012-02-24 | TEI8 | - | 2012-02-24 |
1124 | 1 | A | Rel-10 | 10.5.0 | 10.6.0 | PDSCH and OCNG pattern in PRACH Test cases A.6.2.1 and A.6.2.3 | RP-55 | RP-120292 | approved | R4 | R4-62 | R4-120948 | Agreed | 2012-02-24 | TEI8 | - | 2012-02-24 |
1125 | - | B | Rel-11 | 10.5.0 | - | FDD RSTD Measurement Reporting Delay Test Case for Carrier Aggregation | - | - | - | R4 | R4-62 | R4-120297 | Noted | 2012-02-24 | TEI11 | - | 2012-02-24 |
1126 | - | B | Rel-11 | 10.5.0 | - | TDD RSTD Measurement Reporting Delay Test Case for Carrier Aggregation | - | - | - | R4 | R4-62 | R4-120298 | Noted | 2012-02-24 | TEI11 | - | 2012-02-24 |
1127 | - | B | Rel-11 | 10.5.0 | - | FDD RSTD Measurement Accuracy Test Case for Carrier Aggregation | - | - | - | R4 | R4-62 | R4-120299 | Noted | 2012-02-24 | TEI11 | - | 2012-02-24 |
1128 | - | B | Rel-11 | 10.5.0 | - | TDD RSTD Measurement Accuracy Test Case for Carrier Aggregation | - | - | - | R4 | R4-62 | R4-120300 | Noted | 2012-02-24 | TEI11 | - | 2012-02-24 |
1129 | - | F | Rel-10 | 10.5.0 | - | Add Missing Case for RSTD CA Measurement Accuracy Requirements | - | - | - | R4 | R4-62 | R4-120301 | Revised | 2012-02-24 | TEI10 | - | 2012-02-24 |
1129 | 1 | F | Rel-10 | 10.5.0 | - | Add Missing Case for RSTD CA Measurement Accuracy Requirements | - | - | - | R4 | R4-62 | R4-120951 | Noted | 2012-02-24 | TEI10 | - | 2012-02-24 |
1130 | - | F | Rel-9 | 9.10.0 | - | Correction of PRS BW definition for RSTD measurements | - | - | - | R4 | R4-62 | R4-120379 | Revised | 2012-02-24 | TEI10 | - | 2012-02-24 |
1130 | 1 | F | Rel-9 | 9.10.0 | 9.11.0 | Correction of PRS BW definition for RSTD measurements | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-121017 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1131 | - | A | Rel-10 | 10.5.0 | - | Correction of PRS BW definition for RSTD measurements | - | - | - | R4 | R4-62 | R4-120380 | Noted | 2012-02-24 | TEI10 | - | 2012-02-24 |
1132 | - | B | Rel-10 | 10.5.0 | - | CR on RSRQ test cases for eICIC | - | - | - | R4 | R4-62 | R4-120403 | Noted | 2012-02-24 | TEI10 | - | 2012-02-24 |
1133 | - | F | Rel-10 | 10.5.0 | - | Enhanced ICIC cell identification requirements with DRX | - | - | - | R4 | R4-62 | R4-120418 | Noted | 2012-02-24 | eICIC_LTE-Core | - | 2012-02-24 |
1134 | - | F | Rel-10 | 10.5.0 | - | Clarification of colliding CRS in MBSFN ABS | - | - | - | R4 | R4-62 | R4-120498 | Revised | 2012-02-24 | eICIC_LTE-Core | - | 2012-02-24 |
1134 | 1 | F | Rel-10 | 10.5.0 | 10.6.0 | Clarification of colliding CRS in MBSFN ABS | RP-55 | RP-120300 | approved | R4 | R4-62 | R4-120935 | Agreed | 2012-02-24 | eICIC_LTE-Perf | - | 2012-02-24 |
1135 | - | F | Rel-10 | 10.5.0 | 10.6.0 | Editorial corrections on the test cases of RRC connection release with redirection to UTRAN FDD | RP-55 | RP-120304 | approved | R4 | R4-62 | R4-120503 | Agreed | 2012-02-24 | TEI10 | - | 2012-02-24 |
1136 | - | B | Rel-10 | 10.5.0 | - | Clarification of the UE behaviours during SCell activation and deactivation transitions | - | - | - | R4 | R4-62 | R4-120512 | Noted | 2012-02-24 | TEI10 | - | 2012-02-24 |
1137 | - | F | Rel-10 | 10.5.0 | - | Clarification of eICIC RRM requirements | - | - | - | R4 | R4-62 | R4-120540 | Noted | 2012-02-24 | eICIC_LTE-Core | - | 2012-02-24 |
1138 | - | F | Rel-10 | 10.5.0 | - | Requirements for UE that support measurements without gaps | - | - | - | R4 | R4-62 | R4-120547 | Noted | 2012-02-24 | LTE-RF | - | 2012-02-24 |
1139 | - | F | Rel-10 | 10.5.0 | - | Corrections on test case of Event triggered reporting on deactivated Scell in non-DRX | - | - | - | R4 | R4-62 | R4-120561 | Revised | 2012-02-24 | TEI10 | - | 2012-02-24 |
1139 | 1 | F | Rel-10 | 10.5.0 | 10.6.0 | Corrections on test case of Event triggered reporting on deactivated Scell in non-DRX | RP-55 | RP-120304 | approved | R4 | R4-62 | R4-121028 | Agreed | 2012-02-24 | TEI10 | - | 2012-02-24 |
1140 | - | F | Rel-10 | 10.5.0 | 10.6.0 | Core requirements for E-UTRAN TDD inter-RAT UTRAN FDD SI acquisition using autonomous gaps | RP-55 | RP-120304 | approved | R4 | R4-62 | R4-120576 | Agreed | 2012-02-24 | TEI10 | - | 2012-02-24 |
1141 | - | F | Rel-10 | 10.5.0 | - | Inter-frequency Requirements for Measurements without Measurement Gaps | - | - | - | R4 | R4-62 | R4-120580 | Noted | 2012-02-24 | TEI10 | - | 2012-02-24 |
1142 | - | F | Rel-10 | 10.5.0 | - | Maximum timing advance for LTE TDD | - | - | - | R4 | R4-62 | R4-120625 | Noted | 2012-02-24 | LTE-RF | - | 2012-02-24 |
1143 | - | F | Rel-10 | 10.5.0 | - | Editorial corrections | - | - | - | R4 | R4-62 | R4-120633 | Revised | 2012-02-24 | TEI10 | - | 2012-02-24 |
1143 | 1 | F | Rel-10 | 10.5.0 | 10.6.0 | Editorial corrections | RP-55 | RP-120304 | approved | R4 | R4-62 | R4-120929 | Agreed | 2012-02-24 | TEI10 | - | 2012-02-24 |
1144 | - | F | Rel-10 | 10.5.0 | - | Reporting criteria requirements for carrier aggregation | - | - | - | R4 | R4-62 | R4-120636 | Noted | 2012-02-24 | TEI10 | - | 2012-02-24 |
1145 | - | F | Rel-10 | 10.5.0 | - | Side condition clarification for eICIC with MBSFN | - | - | - | R4 | R4-62 | R4-120638 | Revised | 2012-02-24 | eICIC_LTE-Perf | - | 2012-02-24 |
1145 | 1 | F | Rel-10 | 10.5.0 | 10.6.0 | Side condition clarification for eICIC with MBSFN | RP-55 | RP-120300 | approved | R4 | R4-62 | R4-120936 | Agreed | 2012-02-24 | eICIC_LTE-Perf | - | 2012-02-24 |
1146 | - | F | Rel-10 | 10.5.0 | 10.6.0 | Clarification on reported cells with eICIC | RP-55 | RP-120300 | approved | R4 | R4-62 | R4-120643 | Agreed | 2012-02-24 | eICIC_LTE-Perf | - | 2012-02-24 |
1147 | - | F | Rel-9 | 9.10.0 | 9.11.0 | Correction of RSTD accuracy test cases for TDD | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-120644 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1148 | - | F | Rel-10 | 10.5.0 | 10.6.0 | Correction of RSTD accuracy test cases for TDD | RP-55 | RP-120294 | approved | R4 | R4-62 | R4-120646 | Agreed | 2012-02-24 | TEI9 | - | 2012-02-24 |
1149 | - | F | Rel-9 | 9.10.0 | - | Measurement BW in RSTD accuracy requirements | - | - | - | R4 | R4-62 | R4-120649 | Noted | 2012-02-24 | TEI9 | - | 2012-02-24 |
1150 | - | A | Rel-10 | 10.5.0 | - | Measurement BW in RSTD accuracy requirements | - | - | - | R4 | R4-62 | R4-120651 | Noted | 2012-02-24 | TEI9 | - | 2012-02-24 |
1151 | - | F | Rel-10 | 10.5.0 | - | RLM requirements with autonomous gaps | - | - | - | R4 | R4-62 | R4-120653 | Revised | 2012-02-24 | eICIC_LTE-Perf | - | 2012-02-24 |
1151 | 1 | F | Rel-10 | 10.5.0 | - | RLM requirements with autonomous gaps | - | - | - | R4 | R4-62 | R4-121016 | Revised | 2012-02-24 | eICIC_LTE-Perf | - | 2012-02-24 |
1151 | 2 | F | Rel-10 | 10.5.0 | 10.6.0 | RLM requirements with autonomous gaps | RP-55 | RP-120300 | approved | R4 | R4-62 | R4-121026 | Agreed | 2012-02-24 | eICIC_LTE-Perf | - | 2012-02-24 |
1152 | - | F | Rel-10 | 10.5.0 | - | SNR levels in out-of-sync RLM test cases for eICIC | - | - | - | R4 | R4-62 | R4-120668 | Revised | 2012-02-24 | eICIC_LTE-Perf | - | 2012-02-24 |
1152 | 1 | F | Rel-10 | 10.5.0 | 10.6.0 | SNR levels in out-of-sync RLM test cases for eICIC | RP-55 | RP-120300 | approved | R4 | R4-62 | R4-121013 | Agreed | 2012-02-24 | eICIC_LTE-Perf | - | 2012-02-24 |
1153 | - | F | Rel-10 | 10.5.0 | - | SNR levels in in-sync RLM test cases for eICIC | - | - | - | R4 | R4-62 | R4-120669 | Noted | 2012-02-24 | eICIC_LTE-Perf | - | 2012-02-24 |
1154 | - | B | Rel-11 | 10.5.0 | - | Introduction of Band 26/XXVI to TS 36.133 | - | - | - | R4 | R4-62 | R4-120756 | Revised | 2012-02-24 | e850_UB-Perf | - | 2012-02-24 |
1154 | 1 | B | Rel-11 | 10.5.0 | 11.0.0 | Introduction of Band 26/XXVI to TS 36.133 | RP-55 | RP-120307 | approved | R4 | R4-62 | R4-121042 | Agreed | 2012-02-24 | e850_UB-Perf | - | 2012-02-24 |
1154 | 2 | B | Rel-11 | 10.5.0 | - | Introduction of Band 26/XXVI to TS 36.133 | - | - | - | R4 | R4-62 | R4-121104 | Withdrawn | 2012-02-24 | e850_UB-Perf | - | 2012-02-24 |
1155 | - | B | Rel-11 | 10.5.0 | - | Introduction of Band [27] to TS 36.133 | - | - | - | R4 | R4-62 | R4-120831 | Noted | 2012-02-24 | e850_LB-Core | - | 2012-02-24 |
1156 | - | F | Rel-10 | 10.5.0 | - | CR for 36.133: B41 REFSENS and MOP changes to accommodate single filter architecture | - | - | - | R4 | R4-62 | R4-120849 | Revised | 2012-02-24 | TEI10 | - | 2012-02-24 |
1156 | 1 | F | Rel-10 | 10.5.0 | 10.6.0 | CR for 36.133: B41 REFSENS and MOP changes to accommodate single filter architecture | RP-55 | RP-120303 | approved | R4 | R4-62 | R4-121106 | Agreed | 2012-02-24 | TEI10 | - | 2012-02-24 |
1157 | - | F | Rel-10 | 10.5.0 | 10.6.0 | eICIC measurement accuracy | RP-55 | RP-120300 | approved | R4 | R4-62 | R4-120930 | Agreed | 2012-02-24 | eICIC_LTE-Perf | - | 2012-02-24 |
1158 | - | F | Rel-10 | 10.6.0 | - | Intra-frequency RSTD Measurement Accuracy for Carrier Aggregation | - | - | - | R4 | R4-62b | R4-121155 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1159 | - | A | Rel-11 | 11.0.0 | - | Intra-frequency RSTD Measurement Accuracy for Carrier Aggregation | - | - | - | R4 | R4-62b | R4-121156 | rejected | 2012-06-10 | TEI11 | - | 2012-06-10 |
1160 | - | B | Rel-11 | 11.0.0 | - | Introduction of Requirements for CA Multiple Timing Advances | - | - | - | R4 | R4-62b | R4-121157 | rejected | 2012-06-10 | LTE_CA_enh-Core | - | 2012-06-10 |
1161 | - | F | Rel-10 | 10.6.0 | 10.7.0 | Resolve Band 41 omission between R4-120125 and R4-121106 | RP-56 | RP-120782 | approved | R4 | R4-62b | R4-121173 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1162 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Resolve Band 41 omission between R4-120125 and R4-121106 | RP-56 | RP-120782 | approved | R4 | R4-62b | R4-121174 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1163 | - | F | Rel-9 | 9.11.0 | - | Corrections to FDD-TDD Inter-freq RSRP measurement accuracy test case parameters | - | - | - | R4 | R4-62b | R4-121176 | Revised | 2012-06-10 | TEI9 | - | 2012-06-10 |
1163 | 1 | F | Rel-9 | 9.11.0 | 9.12.0 | Corrections to FDD-TDD Inter-freq RSRP measurement accuracy test case parameters | RP-56 | RP-120770 | approved | R4 | R4-62b | R4-122053 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1164 | - | A | Rel-10 | 10.6.0 | - | Corrections to FDD-TDD Inter-freq RSRP measurement accuracy test case parameters | - | - | - | R4 | R4-62b | R4-121177 | Revised | 2012-06-10 | TEI9 | - | 2012-06-10 |
1164 | 1 | A | Rel-10 | 10.6.0 | 10.7.0 | Corrections to FDD-TDD Inter-freq RSRP measurement accuracy test case parameters | RP-56 | RP-120770 | approved | R4 | R4-62b | R4-122054 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1165 | - | A | Rel-11 | 11.0.0 | - | Corrections to FDD-TDD Inter-freq RSRP measurement accuracy test case parameters | - | - | - | R4 | R4-62b | R4-121178 | Revised | 2012-06-10 | TEI9 | - | 2012-06-10 |
1165 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | Corrections to FDD-TDD Inter-freq RSRP measurement accuracy test case parameters | RP-56 | RP-120770 | approved | R4 | R4-62b | R4-122055 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1166 | - | F | Rel-9 | 9.11.0 | 9.12.0 | OCNG and PDSCH for FDD-TDD event triggered reporting test cases | RP-56 | RP-120771 | approved | R4 | R4-62b | R4-121179 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1167 | - | A | Rel-10 | 10.6.0 | 10.7.0 | OCNG and PDSCH for FDD-TDD event triggered reporting test cases | RP-56 | RP-120771 | approved | R4 | R4-62b | R4-121180 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1168 | - | A | Rel-11 | 11.0.0 | 11.1.0 | OCNG and PDSCH for FDD-TDD event triggered reporting test cases | RP-56 | RP-120771 | approved | R4 | R4-62b | R4-121181 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1169 | - | F | Rel-9 | 9.11.0 | 9.12.0 | RRC Connection Release with Redirection from E-UTRAN FDD to GERAN without System Information | RP-56 | RP-120771 | approved | R4 | R4-62b | R4-121182 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1170 | - | A | Rel-10 | 10.6.0 | 10.7.0 | RRC Connection Release with Redirection from E-UTRAN FDD to GERAN without System Information | RP-56 | RP-120771 | approved | R4 | R4-62b | R4-121183 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1171 | - | A | Rel-11 | 11.0.0 | 11.1.0 | RRC Connection Release with Redirection from E-UTRAN FDD to GERAN without System Information | RP-56 | RP-120771 | approved | R4 | R4-62b | R4-121184 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1172 | - | F | Rel-9 | 9.11.0 | 9.12.0 | RRC Connection Release with Redirection from E-UTRAN TDD to GERAN without System Information | RP-56 | RP-120771 | approved | R4 | R4-62b | R4-121185 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1173 | - | A | Rel-10 | 10.6.0 | 10.7.0 | RRC Connection Release with Redirection from E-UTRAN TDD to GERAN without System Information | RP-56 | RP-120771 | approved | R4 | R4-62b | R4-121186 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1174 | - | A | Rel-11 | 11.0.0 | 11.1.0 | RRC Connection Release with Redirection from E-UTRAN TDD to GERAN without System Information | RP-56 | RP-120771 | approved | R4 | R4-62b | R4-121187 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1175 | - | B | Rel-10 | 10.6.0 | 10.7.0 | OCNG Patterns for MBSFN ABS | RP-56 | RP-120784 | approved | R4 | R4-62b | R4-121191 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1176 | - | A | Rel-11 | 11.0.0 | 11.1.0 | OCNG Patterns for MBSFN ABS | RP-56 | RP-120784 | approved | R4 | R4-62b | R4-121192 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1177 | - | F | Rel-10 | 10.6.0 | - | Inter-frequency Requirements for Measurements without Measurement Gaps for CA Capable UE | - | - | - | R4 | R4-62b | R4-121193 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1178 | - | A | Rel-11 | 11.0.0 | - | Inter-frequency Requirements for Measurements without Measurement Gaps for CA Capable UE | - | - | - | R4 | R4-62b | R4-121194 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1179 | - | F | Rel-10 | 10.6.0 | - | FDD CA RSTD Measurement Reporting Delay Test Case | - | - | - | R4 | R4-62b | R4-121202 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1180 | - | F | Rel-10 | 10.6.0 | - | TDD CA RSTD Measurement Reporting Delay Test Case | - | - | - | R4 | R4-62b | R4-121203 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1181 | - | F | Rel-9 | 9.11.0 | 9.12.0 | Addition of E-UTRAN TDD-FDD Inter-frequency event triggered reporting when DRX is used under fading propagation conditions in asynchronous cells test case R9 | RP-56 | RP-120769 | approved | R4 | R4-62b | R4-121230 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1182 | - | A | Rel-10 | 10.6.0 | 10.7.0 | Addition of E-UTRAN TDD-FDD Inter-frequency event triggered reporting when DRX is used under fading propagation conditions in asynchronous cells test case R10 | RP-56 | RP-120769 | approved | R4 | R4-62b | R4-121231 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1183 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Addition of E-UTRAN TDD-FDD Inter-frequency event triggered reporting when DRX is used under fading propagation conditions in asynchronous cells test case R11 | RP-56 | RP-120769 | approved | R4 | R4-62b | R4-121232 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1184 | - | F | Rel-9 | 9.11.0 | 9.12.0 | Addition of E-UTRAN TDD - FDD Inter-frequency identification of a new CGI of E-UTRA cell using autonomous gaps test case R9 | RP-56 | RP-120769 | approved | R4 | R4-62b | R4-121233 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1185 | - | A | Rel-10 | 10.6.0 | 10.7.0 | Addition of E-UTRAN TDD - FDD Inter-frequency identification of a new CGI of E-UTRA cell using autonomous gaps test case R10 | RP-56 | RP-120769 | approved | R4 | R4-62b | R4-121234 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1186 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Addition of E-UTRAN TDD - FDD Inter-frequency identification of a new CGI of E-UTRA cell using autonomous gaps test case R11 | RP-56 | RP-120769 | approved | R4 | R4-62b | R4-121235 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1187 | - | F | Rel-9 | 9.11.0 | 9.12.0 | Addition of E-UTRAN FDD-TDD Inter-frequency event triggered reporting when DRX is used under fading propagation conditions in asynchronous cells R9 | RP-56 | RP-120769 | approved | R4 | R4-62b | R4-121236 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1188 | - | A | Rel-10 | 10.6.0 | 10.7.0 | Addition of E-UTRAN FDD-TDD Inter-frequency event triggered reporting when DRX is used under fading propagation conditions in asynchronous cells R10 | RP-56 | RP-120769 | approved | R4 | R4-62b | R4-121237 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1189 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Addition of E-UTRAN FDD-TDD Inter-frequency event triggered reporting when DRX is used under fading propagation conditions in asynchronous cells R11 | RP-56 | RP-120769 | approved | R4 | R4-62b | R4-121238 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1190 | - | F | Rel-9 | 9.11.0 | 9.12.0 | Addition of E-UTRAN FDD - TDD Inter-frequency identification of a new CGI of E-UTRA cell using autonomous gaps test case R9 | RP-56 | RP-120769 | approved | R4 | R4-62b | R4-121239 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1191 | - | A | Rel-10 | 10.6.0 | 10.7.0 | Addition of E-UTRAN FDD - TDD Inter-frequency identification of a new CGI of E-UTRA cell using autonomous gaps test case R10 | RP-56 | RP-120769 | approved | R4 | R4-62b | R4-121240 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1192 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Addition of E-UTRAN FDD - TDD Inter-frequency identification of a new CGI of E-UTRA cell using autonomous gaps test case R11 | RP-56 | RP-120769 | approved | R4 | R4-62b | R4-121241 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1193 | - | F | Rel-9 | 9.11.0 | - | Addition of E-UTRAN TDD-HRPD event triggered reporting under fading propagation conditions test case R9 | - | - | - | R4 | R4-62b | R4-121242 | Revised | 2012-06-10 | TEI9 | - | 2012-06-10 |
1193 | 1 | F | Rel-9 | 9.11.0 | 9.12.0 | Addition of E-UTRAN TDD-HRPD event triggered reporting under fading propagation conditions test case R9 | RP-56 | RP-120769 | approved | R4 | R4-62b | R4-122154 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1194 | - | F | Rel-10 | 10.6.0 | - | Addition of E-UTRAN TDD-HRPD event triggered reporting under fading propagation conditions test case R10 | - | - | - | R4 | R4-62b | R4-121243 | Revised | 2012-06-10 | TEI10 | - | 2012-06-10 |
1194 | 1 | F | Rel-10 | 10.6.0 | 10.7.0 | Addition of E-UTRAN TDD-HRPD event triggered reporting under fading propagation conditions test case R10 | RP-56 | RP-120777 | approved | R4 | R4-62b | R4-122155 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1195 | - | A | Rel-11 | 11.0.0 | - | Addition of E-UTRAN TDD-HRPD event triggered reporting under fading propagation conditions test case R11 | - | - | - | R4 | R4-62b | R4-121244 | Revised | 2012-06-10 | TEI11 | - | 2012-06-10 |
1195 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | Addition of E-UTRAN TDD-HRPD event triggered reporting under fading propagation conditions test case R11 | RP-56 | RP-120777 | approved | R4 | R4-62b | R4-122156 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1196 | - | F | Rel-9 | 9.11.0 | - | Addition of E-UTRAN TDD-CDMA2000 1X event triggered reporting under fading propagation conditions test case R9 | - | - | - | R4 | R4-62b | R4-121246 | Revised | 2012-06-10 | TEI9 | - | 2012-06-10 |
1196 | 1 | F | Rel-9 | 9.11.0 | 9.12.0 | Addition of E-UTRAN TDD-CDMA2000 1X event triggered reporting under fading propagation conditions test case R9 | RP-56 | RP-120769 | approved | R4 | R4-62b | R4-122157 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1197 | - | F | Rel-10 | 10.6.0 | - | Addition of E-UTRAN TDD-CDMA2000 1X event triggered reporting under fading propagation conditions test case R10 | - | - | - | R4 | R4-62b | R4-121248 | Revised | 2012-06-10 | TEI10 | - | 2012-06-10 |
1197 | 1 | A | Rel-10 | 10.6.0 | 10.7.0 | Addition of E-UTRAN TDD-CDMA2000 1X event triggered reporting under fading propagation conditions test case R10 | RP-56 | RP-120769 | approved | R4 | R4-62b | R4-122158 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1198 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Addition of E-UTRAN TDD-CDMA2000 1X event triggered reporting under fading propagation conditions test case R11 | RP-56 | RP-120769 | approved | R4 | R4-62b | R4-121250 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1199 | - | F | Rel-9 | 9.11.0 | 9.12.0 | E-UTRA TDD RRC connection release redirection to UTRA FDD test without SI provided R9 | RP-56 | RP-120770 | approved | R4 | R4-62b | R4-121251 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1200 | - | A | Rel-10 | 10.6.0 | 10.7.0 | E-UTRA TDD RRC connection release redirection to UTRA FDD test without SI provided R10 | RP-56 | RP-120770 | approved | R4 | R4-62b | R4-121252 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1201 | - | A | Rel-11 | 11.0.0 | 11.1.0 | E-UTRA TDD RRC connection release redirection to UTRA FDD test without SI provided R11 | RP-56 | RP-120770 | approved | R4 | R4-62b | R4-121253 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1202 | - | F | Rel-10 | 10.6.0 | - | Addition of E-UTRAN FDD RSTD measurement accuracy test case in carrier aggregation | - | - | - | R4 | R4-62b | R4-121254 | rejected | 2012-06-10 | LTE_CA-core | - | 2012-06-10 |
1203 | - | F | Rel-10 | 10.6.0 | - | Addition of E-UTRAN TDD RSTD measurement accuracy test case in carrier aggregation | - | - | - | R4 | R4-62b | R4-121255 | rejected | 2012-06-10 | LTE_CA-core | - | 2012-06-10 |
1204 | - | F | Rel-10 | 10.6.0 | - | FDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS R10 | - | - | - | R4 | R4-62b | R4-121256 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1204 | 1 | F | Rel-10 | 10.6.0 | 10.7.0 | FDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS R10 | RP-56 | RP-120784 | approved | R4 | R4-62b | R4-122164 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1205 | - | A | Rel-11 | 11.0.0 | - | FDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS R11 | - | - | - | R4 | R4-62b | R4-121257 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1205 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | FDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS R11 | RP-56 | RP-120784 | approved | R4 | R4-62b | R4-122165 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1206 | - | F | Rel-10 | 10.6.0 | - | TDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS R10 | - | - | - | R4 | R4-62b | R4-121258 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1206 | 1 | F | Rel-10 | 10.6.0 | 10.7.0 | TDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS R10 | RP-56 | RP-120784 | approved | R4 | R4-62b | R4-122166 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1207 | - | A | Rel-11 | 11.0.0 | - | TDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS R11 | - | - | - | R4 | R4-62b | R4-121259 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1207 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | TDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS R11 | RP-56 | RP-120784 | approved | R4 | R4-62b | R4-122167 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1208 | - | F | Rel-10 | 10.6.0 | - | Corrections of FDD-TDD Inter frequency measurement accuracy RSRP test case R10 | - | - | - | R4 | R4-62b | R4-121260 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1209 | - | F | Rel-9 | 9.11.0 | - | Correction to inter-frequency RSTD measurement accuracy requirement in R9 | - | - | - | R4 | R4-62b | R4-121269 | rejected | 2012-06-10 | TEI9 | - | 2012-06-10 |
1210 | - | F | Rel-10 | 10.6.0 | - | Correction to RSTD measurement accuracy requirement in R10 | - | - | - | R4 | R4-62b | R4-121271 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1211 | - | A | Rel-11 | 11.0.0 | - | Correction to RSTD measurement accuracy requirement in R11 | - | - | - | R4 | R4-62b | R4-121273 | rejected | 2012-06-10 | TEI11 | - | 2012-06-10 |
1212 | - | F | Rel-10 | 10.6.0 | 10.7.0 | CR to TS36.133 Corrections on RRC signalling in RLM test cases for eICIC | RP-56 | RP-120780 | approved | R4 | R4-62b | R4-121287 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1213 | - | A | Rel-11 | 11.0.0 | 11.1.0 | CR to TS36.133 Corrections on RRC signalling in RLM test cases for eICIC | RP-56 | RP-120780 | approved | R4 | R4-62b | R4-121306 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1214 | - | F | Rel-8 | 8.17.0 | - | UL Transmit Timing Requirements | - | - | - | R4 | R4-62b | R4-121363 | rejected | 2012-06-10 | TEI8 | - | 2012-06-10 |
1215 | - | F | Rel-9 | 9.11.0 | - | UL Transmit Timing Requirements | - | - | - | R4 | R4-62b | R4-121364 | rejected | 2012-06-10 | TEI9 | - | 2012-06-10 |
1216 | - | F | Rel-10 | 10.6.0 | - | UL Transmit Timing Requirements | - | - | - | R4 | R4-62b | R4-121365 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1217 | - | B | Rel-11 | 11.0.0 | - | Introduction of Requirements for Multiple Timing Advances for Carrier Aggregation | - | - | - | R4 | R4-62b | R4-121409 | rejected | 2012-06-10 | LTE_CA_enh-Core | - | 2012-06-10 |
1218 | - | F | Rel-10 | 10.6.0 | - | Requirements for interruptions at activation/deactivation for Rel-10 | - | - | - | R4 | R4-62b | R4-121426 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1219 | - | A | Rel-11 | 11.0.0 | - | Requirements for interruptions at activation/deactivation for Rel-11 | - | - | - | R4 | R4-62b | R4-121429 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1220 | - | F | Rel-10 | 10.6.0 | - | Requirements for inter-frequency measurement without GAPs for Rel-10 | - | - | - | R4 | R4-62b | R4-121437 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1221 | - | A | Rel-11 | 11.0.0 | - | Requirements for inter-frequency measurement without GAPs for Rel-11 | - | - | - | R4 | R4-62b | R4-121439 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1222 | - | F | Rel-10 | 10.6.0 | 10.7.0 | Test case for event-triggered reporting on deactivated SCell with PCell interruption | RP-56 | RP-120773 | approved | R4 | R4-62b | R4-121526 | Agreed | 2012-06-10 | LTE_CA-Perf | - | 2012-06-10 |
1223 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Test case for event-triggered reporting on deactivated SCell with PCell interruption | RP-56 | RP-120773 | approved | R4 | R4-62b | R4-121530 | Agreed | 2012-06-10 | LTE_CA-Perf | - | 2012-06-10 |
1224 | - | F | Rel-9 | 9.11.0 | 9.12.0 | Editorial corrections on the test cases of RRC connection release with redirection to UTRAN FDD | RP-56 | RP-120770 | approved | R4 | R4-62b | R4-121630 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1225 | - | F | Rel-9 | 9.11.0 | - | Finalization of Rel.9 cell reselection enhancement related test cases | - | - | - | R4 | R4-62b | R4-121643 | Revised | 2012-06-10 | TEI9 | - | 2012-06-10 |
1225 | 1 | F | Rel-9 | 9.11.0 | 9.12.0 | Finalization of Rel.9 cell reselection enhancement related test cases | RP-56 | RP-120770 | approved | R4 | R4-62b | R4-122159 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1226 | - | A | Rel-10 | 10.6.0 | - | Finalization of Rel.9 cell reselection enhancement related test cases | - | - | - | R4 | R4-62b | R4-121646 | Revised | 2012-06-10 | TEI9 | - | 2012-06-10 |
1226 | 1 | A | Rel-10 | 10.6.0 | 10.7.0 | Finalization of Rel.9 cell reselection enhancement related test cases | RP-56 | RP-120770 | approved | R4 | R4-62b | R4-122160 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1227 | - | A | Rel-11 | 11.0.0 | - | Finalization of Rel.9 cell reselection enhancement related test cases | - | - | - | R4 | R4-62b | R4-121648 | Revised | 2012-06-10 | TEI9 | - | 2012-06-10 |
1227 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | Finalization of Rel.9 cell reselection enhancement related test cases | RP-56 | RP-120770 | approved | R4 | R4-62b | R4-122161 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1228 | - | F | Rel-9 | 9.11.0 | 9.12.0 | E-UTRAN FDD to UTRAN FDD RRC connection release with redirection test case when SI is not provided | RP-56 | RP-120770 | approved | R4 | R4-62b | R4-121652 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1229 | - | A | Rel-10 | 10.6.0 | 10.7.0 | E-UTRAN FDD to UTRAN FDD RRC connection release with redirection test case when SI is not provided | RP-56 | RP-120770 | approved | R4 | R4-62b | R4-121659 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1230 | - | A | Rel-10 | 10.6.0 | - | E-UTRAN FDD to UTRAN FDD RRC connection release with redirection test case when SI is not provided | - | - | - | R4 | R4-62b | R4-121660 | Withdrawn | 2012-06-10 | TEI9 | - | 2012-06-10 |
1231 | - | A | Rel-11 | 11.0.0 | 11.1.0 | E-UTRAN FDD to UTRAN FDD RRC connection release with redirection test case when SI is not provided | RP-56 | RP-120770 | approved | R4 | R4-62b | R4-121669 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1232 | - | B | Rel-10 | 10.6.0 | 10.7.0 | No interruptions on PCell at SCell activation/ deactivation when measCycleSCell is smaller than 640 ms | RP-56 | RP-120781 | approved | R4 | R4-62b | R4-121677 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1233 | - | A | Rel-11 | 11.0.0 | 11.1.0 | No interruptions on PCell at SCell activation/ deactivation when measCycleSCell is smaller than 640 ms | RP-56 | RP-120781 | approved | R4 | R4-62b | R4-121682 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1234 | - | F | Rel-10 | 10.6.0 | 10.7.0 | Editorial corrections | RP-56 | RP-120780 | approved | R4 | R4-62b | R4-121730 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1235 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Editorial corrections | RP-56 | RP-120780 | approved | R4 | R4-62b | R4-121731 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1236 | - | F | Rel-10 | 10.6.0 | - | Reporting criteria requirements for carrier aggregation | - | - | - | R4 | R4-62b | R4-121732 | Revised | 2012-06-10 | TEI10 | - | 2012-06-10 |
1236 | 1 | F | Rel-10 | 10.6.0 | 10.7.0 | Reporting criteria requirements for carrier aggregation | RP-56 | RP-120782 | approved | R4 | R4-62b | R4-122175 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1237 | - | F | Rel-11 | 11.0.0 | - | Reporting criteria requirements for carrier aggregation | - | - | - | R4 | R4-62b | R4-121733 | Revised | 2012-06-10 | TEI10 | - | 2012-06-10 |
1237 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | Reporting criteria requirements for carrier aggregation | RP-56 | RP-120782 | approved | R4 | R4-62b | R4-122176 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1238 | - | F | Rel-10 | 10.6.0 | 10.7.0 | Cell identification requirements with DRX | RP-56 | RP-120784 | approved | R4 | R4-62b | R4-121735 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1239 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Cell identification requirements with DRX | RP-56 | RP-120784 | approved | R4 | R4-62b | R4-121739 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1240 | - | B | Rel-10 | 10.6.0 | - | Phase II eICIC FDD: absolute and relative RSRP accuracies in non-MBSFN ABS | - | - | - | R4 | R4-62b | R4-121741 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1240 | 1 | B | Rel-10 | 10.6.0 | 10.7.0 | Phase II eICIC FDD: absolute and relative RSRP accuracies in non-MBSFN ABS | RP-56 | RP-120784 | approved | R4 | R4-62b | R4-122168 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1241 | - | B | Rel-11 | 11.0.0 | - | Phase II eICIC FDD: absolute and relative RSRP accuracies in non-MBSFN ABS | - | - | - | R4 | R4-62b | R4-121743 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1241 | 1 | B | Rel-11 | 11.0.0 | 11.1.0 | Phase II eICIC FDD: absolute and relative RSRP accuracies in non-MBSFN ABS | RP-56 | RP-120784 | approved | R4 | R4-62b | R4-122169 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1242 | - | B | Rel-10 | 10.6.0 | - | Phase II eICIC TDD: absolute and relative RSRP accuracies in non-MBSFN ABS | - | - | - | R4 | R4-62b | R4-121744 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1242 | 1 | B | Rel-10 | 10.6.0 | 10.7.0 | Phase II eICIC TDD: absolute and relative RSRP accuracies in non-MBSFN ABS | RP-56 | RP-120784 | approved | R4 | R4-62b | R4-122170 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1243 | - | A | Rel-11 | 11.0.0 | - | Phase II eICIC TDD: absolute and relative RSRP accuracies in non-MBSFN ABS | - | - | - | R4 | R4-62b | R4-121745 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1243 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | Phase II eICIC TDD: absolute and relative RSRP accuracies in non-MBSFN ABS | RP-56 | RP-120784 | approved | R4 | R4-62b | R4-122171 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1244 | - | B | Rel-10 | 10.6.0 | - | Phase IIbis eICIC FDD: out-of-sync detection in MBSFN ABS | - | - | - | R4 | R4-62b | R4-121746 | rejected | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1245 | - | A | Rel-10 | 10.6.0 | - | Phase IIbis eICIC FDD: RSRP in MBSFN ABS | - | - | - | R4 | R4-62b | R4-121749 | rejected | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1246 | - | B | Rel-10 | 10.6.0 | - | Phase IIbis eICIC TDD: out-of-sync detection in MBSFN ABS | - | - | - | R4 | R4-62b | R4-121751 | rejected | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1247 | - | A | Rel-11 | 11.0.0 | - | Phase IIbis eICIC TDD: out-of-sync detection in MBSFN ABS | - | - | - | R4 | R4-62b | R4-121752 | rejected | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1248 | - | F | Rel-10 | 10.6.0 | 10.7.0 | RLM requirements with autonomous gaps for DRX | RP-56 | RP-120784 | approved | R4 | R4-62b | R4-121756 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1249 | - | A | Rel-11 | 11.0.0 | 11.1.0 | RLM requirements with autonomous gaps for DRX | RP-56 | RP-120784 | approved | R4 | R4-62b | R4-121757 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1250 | - | F | Rel-10 | 10.6.0 | 10.7.0 | CR for 36.133: Aligning RSRQ measurement requirements in TS 36.133 with TS 36.101 regarding the modification of B41 REFSENS | RP-56 | RP-120779 | approved | R4 | R4-62b | R4-121898 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1251 | - | A | Rel-11 | 11.0.0 | 11.1.0 | CR for 36.133: Aligning RSRQ measurement requirements in TS 36.133 with TS 36.101 regarding the modification of B41 REFSENS | RP-56 | RP-120779 | approved | R4 | R4-62b | R4-121900 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1252 | - | F | Rel-10 | 10.6.0 | - | CR for 36.133: Fixing error for Band 41/42/43 in Table A.9.1.5.2-2 of TS 36.133 | - | - | - | R4 | R4-62b | R4-121904 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1253 | - | A | Rel-11 | 11.0.0 | - | CR for 36.133: Fixing error for Band 41/42/43 in Table A.9.1.5.2-2 of TS 36.133 | - | - | - | R4 | R4-62b | R4-121907 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1254 | - | B | Rel-11 | 11.0.0 | - | Introduction of Band [27] to TS 36.133 | - | - | - | R4 | R4-62b | R4-121962 | rejected | 2012-06-10 | LTE_e850_LB-Perf | - | 2012-06-10 |
1255 | - | F | Rel-10 | 10.6.0 | - | Correction of PRS BW definition for RSTD measurements in CA | - | - | - | R4 | R4-62b | R4-122001 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1256 | - | F | Rel-10 | 10.6.0 | - | CR on RLM test case in FDD | - | - | - | R4 | R4-62b | R4-122003 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1257 | - | F | Rel-10 | 10.6.0 | - | CR on RLM test case in TDD | - | - | - | R4 | R4-62b | R4-122004 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1258 | - | F | Rel-10 | 10.6.0 | - | CR on typo of PDCCH test case of eICIC in FDD | - | - | - | R4 | R4-62b | R4-122010 | Withdrawn | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1259 | - | F | Rel-10 | 10.6.0 | 10.7.0 | Bands 22, 23, 42 and 43 side conditions for inter-frequency measurements with autonomous gaps | RP-56 | RP-120777 | approved | R4 | R4-62b | R4-122035 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1260 | - | B | Rel-10 | 10.6.0 | 10.7.0 | Clarification on UE Rx-Tx with eICIC | RP-56 | RP-120772 | approved | R4 | R4-62b | R4-122173 | Agreed | 2012-06-10 | eICIC_LTE-Core | - | 2012-06-10 |
1260 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Bands 22, 23, 42 and 43 side conditions for inter-frequency measurements with autonomous gaps | RP-56 | RP-120777 | approved | R4 | R4-62b | R4-122036 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1261 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Clarification on UE Rx-Tx with eICIC | RP-56 | RP-120772 | approved | R4 | R4-62b | R4-122174 | Agreed | 2012-06-10 | eICIC_LTE-Core | - | 2012-06-10 |
1262 | - | F | Rel-8 | 8.17.0 | 8.18.0 | Editorial corrections | RP-56 | RP-120767 | approved | R4 | R4-62b | R4-122162 | Agreed | 2012-06-10 | TEI8 | - | 2012-06-10 |
1263 | - | A | Rel-9 | 9.11.0 | 9.12.0 | Editorial corrections | RP-56 | RP-120767 | approved | R4 | R4-62b | R4-122163 | Agreed | 2012-06-10 | TEI8 | - | 2012-06-10 |
1264 | - | F | Rel-8 | 8.17.0 | - | RRM: Correction of sr-ConfigIndex for TDD TC-s with configured scheduling request | - | - | - | R4 | R4-63 | R4-122245 | rejected | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1265 | - | A | Rel-9 | 9.11.0 | - | RRM: Correction of sr-ConfigIndex for TDD TC-s with configured scheduling request | - | - | - | R4 | R4-63 | R4-122246 | rejected | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1266 | - | A | Rel-10 | 10.6.0 | - | RRM: Correction of sr-ConfigIndex for TDD TC-s with configured scheduling request | - | - | - | R4 | R4-63 | R4-122247 | rejected | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1267 | - | A | Rel-11 | 11.0.0 | - | RRM: Correction of sr-ConfigIndex for TDD TC-s with configured scheduling request | - | - | - | R4 | R4-63 | R4-122248 | rejected | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1268 | - | F | Rel-8 | 8.17.0 | 8.18.0 | sr-ConfigIndex in TDD DRX test cases | RP-56 | RP-120767 | approved | R4 | R4-63 | R4-122250 | Agreed | 2012-06-10 | TEI8 | - | 2012-06-10 |
1269 | - | A | Rel-9 | 9.11.0 | 9.12.0 | sr-ConfigIndex in TDD DRX test cases | RP-56 | RP-120767 | approved | R4 | R4-63 | R4-122251 | Agreed | 2012-06-10 | TEI8 | - | 2012-06-10 |
1270 | - | A | Rel-10 | 10.6.0 | 10.7.0 | sr-ConfigIndex in TDD DRX test cases | RP-56 | RP-120767 | approved | R4 | R4-63 | R4-122252 | Agreed | 2012-06-10 | TEI8 | - | 2012-06-10 |
1271 | - | A | Rel-11 | 11.0.0 | 11.1.0 | sr-ConfigIndex in TDD DRX test cases | RP-56 | RP-120767 | approved | R4 | R4-63 | R4-122253 | Agreed | 2012-06-10 | TEI8 | - | 2012-06-10 |
1272 | - | F | Rel-10 | 10.6.0 | 10.7.0 | Remove [ ] from eICIC RSRP, RSRQ Es/Iot side conditions | RP-56 | RP-120782 | approved | R4 | R4-63 | R4-122254 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1273 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Remove [ ] from eICIC RSRP, RSRQ Es/Iot side conditions | RP-56 | RP-120782 | approved | R4 | R4-63 | R4-122255 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1274 | - | F | Rel-8 | 8.17.0 | - | RRM: Clarifications to the OCNG patterns | - | - | - | R4 | R4-63 | R4-122280 | Revised | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1274 | 1 | F | Rel-8 | 8.17.0 | 8.18.0 | RRM: Clarifications to the OCNG patterns | RP-56 | RP-120764 | approved | R4 | R4-63 | R4-123570 | Agreed | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1275 | - | A | Rel-9 | 9.11.0 | - | RRM: Clarifications to the OCNG patterns | - | - | - | R4 | R4-63 | R4-122282 | Revised | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1275 | 1 | A | Rel-9 | 9.11.0 | 9.12.0 | RRM: Clarifications to the OCNG patterns | RP-56 | RP-120764 | approved | R4 | R4-63 | R4-123571 | Agreed | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1276 | - | A | Rel-10 | 10.6.0 | - | RRM: Clarifications to the OCNG patterns | - | - | - | R4 | R4-63 | R4-122283 | Revised | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1276 | 1 | A | Rel-10 | 10.6.0 | 10.7.0 | RRM: Clarifications to the OCNG patterns | RP-56 | RP-120764 | approved | R4 | R4-63 | R4-123572 | Agreed | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1277 | - | A | Rel-11 | 11.0.0 | - | RRM: Clarifications to the OCNG patterns | - | - | - | R4 | R4-63 | R4-122284 | Revised | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1277 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | RRM: Clarifications to the OCNG patterns | RP-56 | RP-120764 | approved | R4 | R4-63 | R4-123573 | Agreed | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1278 | - | F | Rel-10 | 10.6.0 | - | Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | - | - | - | R4 | R4-63 | R4-122330 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1278 | 1 | F | Rel-10 | 10.6.0 | - | Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | - | - | - | R4 | R4-63 | R4-123483 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1278 | 2 | F | Rel-10 | 10.6.0 | 10.7.0 | Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123650 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1279 | - | A | Rel-11 | 11.0.0 | - | Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | - | - | - | R4 | R4-63 | R4-122331 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1279 | 1 | A | Rel-11 | 11.0.0 | - | Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | - | - | - | R4 | R4-63 | R4-123484 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1279 | 2 | A | Rel-11 | 11.0.0 | 11.1.0 | Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123651 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1280 | - | F | Rel-10 | 10.6.0 | - | Intra-Frequency TDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | - | - | - | R4 | R4-63 | R4-122333 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1280 | 1 | F | Rel-10 | 10.6.0 | - | Intra-Frequency TDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | - | - | - | R4 | R4-63 | R4-123485 | rejected | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1281 | - | A | Rel-11 | 11.0.0 | - | Intra-Frequency TDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | - | - | - | R4 | R4-63 | R4-122334 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1281 | 1 | A | Rel-11 | 11.0.0 | - | Intra-Frequency TDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | - | - | - | R4 | R4-63 | R4-123486 | rejected | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1282 | - | B | Rel-11 | 11.0.0 | - | Introduction of Requirements for Multiple Timing Advances for Carrier Aggregation | - | - | - | R4 | R4-63 | R4-122408 | rejected | 2012-06-10 | LTE_CA_enh-Core | - | 2012-06-10 |
1283 | - | B | Rel-10 | 10.6.0 | - | Encouragement of allowedMeasBandwidth utilization | - | - | - | R4 | R4-63 | R4-122527 | rejected | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1284 | - | A | Rel-11 | 11.0.0 | - | Encouragement of allowedMeasBandwidth utilization | - | - | - | R4 | R4-63 | R4-122528 | rejected | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1285 | - | F | Rel-10 | 10.6.0 | - | eICIC FDD out-of-sync RLM test case in MBSFN ABS | - | - | - | R4 | R4-63 | R4-122532 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1285 | 1 | F | Rel-10 | 10.6.0 | 10.7.0 | eICIC FDD out-of-sync RLM test case in MBSFN ABS | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123451 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1286 | - | A | Rel-11 | 11.0.0 | - | eICIC FDD out-of-sync RLM test case in MBSFN ABS | - | - | - | R4 | R4-63 | R4-122547 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1286 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | eICIC FDD out-of-sync RLM test case in MBSFN ABS | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123452 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1287 | - | F | Rel-10 | 10.6.0 | - | eICIC TDD out-of-sync RLM test case in MBSFN ABS | - | - | - | R4 | R4-63 | R4-122554 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1287 | 1 | F | Rel-10 | 10.6.0 | 10.7.0 | eICIC TDD out-of-sync RLM test case in MBSFN ABS | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123453 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1288 | - | A | Rel-11 | 11.0.0 | - | eICIC TDD out-of-sync RLM test case in MBSFN ABS | - | - | - | R4 | R4-63 | R4-122557 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1288 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | eICIC TDD out-of-sync RLM test case in MBSFN ABS | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123454 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1289 | - | F | Rel-11 | 11.0.0 | - | On UE behavior in the uplink subframe after measurement GAP | - | - | - | R4 | R4-63 | R4-122560 | Revised | 2012-06-10 | TEI11 | - | 2012-06-10 |
1289 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | On UE behavior in the uplink subframe after measurement GAP | RP-56 | RP-120781 | approved | R4 | R4-63 | R4-123441 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1290 | - | F | Rel-10 | 10.6.0 | - | Test configurations of inter-frequency/ RAT measurements for UEs configured with CA | - | - | - | R4 | R4-63 | R4-122567 | rejected | 2012-06-10 | LTE_CA-Perf | - | 2012-06-10 |
1291 | - | A | Rel-11 | 11.0.0 | - | Test configurations of inter-frequency/ RAT measurements for UEs configured with CA | - | - | - | R4 | R4-63 | R4-122568 | rejected | 2012-06-10 | LTE_CA-Perf | - | 2012-06-10 |
1292 | - | F | Rel-10 | 10.6.0 | - | Clarification on the number of monitoring layers for CA UEs | - | - | - | R4 | R4-63 | R4-122570 | Revised | 2012-06-10 | LTE_CA-Core | - | 2012-06-10 |
1292 | 1 | F | Rel-10 | 10.6.0 | 10.7.0 | Clarification on the number of monitoring layers for CA UEs | RP-56 | RP-120773 | approved | R4 | R4-63 | R4-123479 | Agreed | 2012-06-10 | LTE_CA-Core | - | 2012-06-10 |
1293 | - | A | Rel-11 | 11.0.0 | - | Clarification on the number of monitoring layers for CA UEs | - | - | - | R4 | R4-63 | R4-122573 | Revised | 2012-06-10 | LTE_CA-Core | - | 2012-06-10 |
1293 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | Clarification on the number of monitoring layers for CA UEs | RP-56 | RP-120773 | approved | R4 | R4-63 | R4-123480 | Agreed | 2012-06-10 | LTE_CA-Core | - | 2012-06-10 |
1294 | - | F | Rel-10 | 10.6.0 | - | CR for PRS BW definition and update RSTD accuracy requirements for rel-10 | - | - | - | R4 | R4-63 | R4-122577 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1295 | - | F | Rel-10 | 10.6.0 | - | CR on FDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10 | - | - | - | R4 | R4-63 | R4-122590 | rejected | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1296 | - | F | Rel-11 | 11.0.0 | - | CR on FDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel11 | - | - | - | R4 | R4-63 | R4-122596 | rejected | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1297 | - | F | Rel-10 | 10.6.0 | - | A General Definition of ABS | - | - | - | R4 | R4-63 | R4-122605 | rejected | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1298 | - | F | Rel-10 | 10.6.0 | - | CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10 | - | - | - | R4 | R4-63 | R4-122607 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1298 | 1 | F | Rel-10 | 10.6.0 | - | CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10 | - | - | - | R4 | R4-63 | R4-123455 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1298 | 2 | F | Rel-10 | 10.6.0 | 10.7.0 | CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10 | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123648 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1299 | - | F | Rel-11 | 11.0.0 | - | CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel11 | - | - | - | R4 | R4-63 | R4-122612 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1299 | 1 | F | Rel-11 | 11.0.0 | - | CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel11 | - | - | - | R4 | R4-63 | R4-123456 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1299 | 2 | F | Rel-11 | 11.0.0 | 11.1.0 | CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel11 | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123649 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1300 | - | F | Rel-10 | 10.6.0 | - | In-Sync RLM test case in MBSFN ABS for E-UTRAN FDD R10 | - | - | - | R4 | R4-63 | R4-122614 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1300 | 1 | F | Rel-10 | 10.6.0 | 10.7.0 | In-Sync RLM test case in MBSFN ABS for E-UTRAN FDD R10 | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123457 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1301 | - | A | Rel-11 | 11.0.0 | - | A General Definition of ABS | - | - | - | R4 | R4-63 | R4-122615 | rejected | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1302 | - | F | Rel-10 | 10.6.0 | - | CR on RLM test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10 | - | - | - | R4 | R4-63 | R4-122616 | Withdrawn | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1303 | - | A | Rel-11 | 11.0.0 | - | In-Sync RLM test case in MBSFN ABS for E-UTRAN FDD R11 | - | - | - | R4 | R4-63 | R4-122622 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1303 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | In-Sync RLM test case in MBSFN ABS for E-UTRAN FDD R11 | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123458 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1304 | - | F | Rel-11 | 11.0.0 | - | CR on RLM test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel11 | - | - | - | R4 | R4-63 | R4-122624 | Withdrawn | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1305 | - | F | Rel-10 | 10.6.0 | - | In-Sync RLM test case in MBSFN ABS for E-UTRAN TDD R10 | - | - | - | R4 | R4-63 | R4-122627 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1305 | 1 | F | Rel-10 | 10.6.0 | 10.7.0 | In-Sync RLM test case in MBSFN ABS for E-UTRAN TDD R10 | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123459 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1306 | - | A | Rel-11 | 11.0.0 | - | In-Sync RLM test case in MBSFN ABS for E-UTRAN TDD R11 | - | - | - | R4 | R4-63 | R4-122631 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1306 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | In-Sync RLM test case in MBSFN ABS for E-UTRAN TDD R11 | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123460 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1307 | - | F | Rel-10 | 10.6.0 | - | The Clarification for OCNG during ABS subframes in eICIC tests R10 | - | - | - | R4 | R4-63 | R4-122636 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1308 | - | A | Rel-11 | 11.0.0 | - | The Clarification for OCNG during ABS subframes in eICIC tests R11 | - | - | - | R4 | R4-63 | R4-122638 | rejected | 2012-06-10 | TEI11 | - | 2012-06-10 |
1309 | - | F | Rel-10 | 10.6.0 | 10.7.0 | Inter-frequency and Inter-RAT Requirements for Measurements without Measurement Gaps | RP-56 | RP-120781 | approved | R4 | R4-63 | R4-122654 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1310 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Inter-frequency and Inter-RAT Requirements for Measurements without Measurement Gaps | RP-56 | RP-120781 | approved | R4 | R4-63 | R4-122656 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1311 | - | F | Rel-10 | 10.6.0 | - | Correction to inter-frequency requirement for CA capability UE without GAP R10 | - | - | - | R4 | R4-63 | R4-122664 | Withdrawn | 2012-06-10 | TEI10 | - | 2012-06-10 |
1312 | - | F | Rel-11 | 11.0.0 | - | Requirements for RSRP and RSRQ for E-CID Positioning | - | - | - | R4 | R4-63 | R4-122668 | rejected | 2012-06-10 | TEI11 | - | 2012-06-10 |
1313 | - | A | Rel-11 | 11.0.0 | - | Correction to inter-frequency requirement for CA capability UE without GAP R11 | - | - | - | R4 | R4-63 | R4-122672 | Withdrawn | 2012-06-10 | TEI11 | - | 2012-06-10 |
1314 | - | F | Rel-10 | 10.6.0 | - | Core requirement on interruption requirement of CA R10 | - | - | - | R4 | R4-63 | R4-122691 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1315 | - | A | Rel-11 | 11.0.0 | - | Core requirement on interruption requirement of CA R11 | - | - | - | R4 | R4-63 | R4-122694 | rejected | 2012-06-10 | TEI11 | - | 2012-06-10 |
1316 | - | F | Rel-10 | 10.6.0 | - | Interruptions for Scell activation/deactivation | - | - | - | R4 | R4-63 | R4-122718 | rejected | 2012-06-10 | TEI11 | - | 2012-06-10 |
1317 | - | A | Rel-11 | 11.0.0 | - | Interruptions for Scell activation/deactivation | - | - | - | R4 | R4-63 | R4-122719 | rejected | 2012-06-10 | TEI11 | - | 2012-06-10 |
1318 | - | B | Rel-11 | 11.0.0 | - | The introduction of Multi-TA timing requirements R11 | - | - | - | R4 | R4-63 | R4-122726 | Revised | 2012-06-10 | LTE_CA_enh-Core | - | 2012-06-10 |
1318 | 1 | B | Rel-11 | 11.0.0 | 11.1.0 | The introduction of Multi-TA timing requirements R11 | RP-56 | RP-120788 | approved | R4 | R4-63 | R4-123542 | Agreed | 2012-06-10 | LTE_CA_enh-Core | - | 2012-06-10 |
1319 | - | F | Rel-10 | 10.6.0 | - | Addition of E-UTRAN FDD RSTD measurement accuracy test case in carrier aggregation R10 | - | - | - | R4 | R4-63 | R4-122730 | Revised | 2012-06-10 | TEI10 | - | 2012-06-10 |
1319 | 1 | F | Rel-10 | 10.6.0 | 10.7.0 | Addition of E-UTRAN FDD RSTD measurement accuracy test case in carrier aggregation R10 | RP-56 | RP-120777 | approved | R4 | R4-63 | R4-123555 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1320 | - | A | Rel-11 | 11.0.0 | - | Addition of E-UTRAN FDD RSTD measurement accuracy test case in carrier aggregation R11 | - | - | - | R4 | R4-63 | R4-122732 | Revised | 2012-06-10 | TEI11 | - | 2012-06-10 |
1320 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | Addition of E-UTRAN FDD RSTD measurement accuracy test case in carrier aggregation R11 | RP-56 | RP-120777 | approved | R4 | R4-63 | R4-123556 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1321 | - | F | Rel-10 | 10.6.0 | - | Addition of E-UTRAN TDD RSTD measurement accuracy test case in carrier aggregation R10 | - | - | - | R4 | R4-63 | R4-122734 | Revised | 2012-06-10 | TEI10 | - | 2012-06-10 |
1321 | 1 | F | Rel-10 | 10.6.0 | 10.7.0 | Addition of E-UTRAN TDD RSTD measurement accuracy test case in carrier aggregation R10 | RP-56 | RP-120777 | approved | R4 | R4-63 | R4-123557 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1322 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Addition of E-UTRAN TDD RSTD measurement accuracy test case in carrier aggregation R11 | RP-56 | RP-120777 | approved | R4 | R4-63 | R4-122736 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1322 | 1 | A | Rel-11 | 11.0.0 | - | Addition of E-UTRAN TDD RSTD measurement accuracy test case in carrier aggregation R11 | - | - | - | R4 | R4-63 | R4-123558 | not handled | 2012-06-10 | TEI11 | - | 2012-06-10 |
1323 | - | F | Rel-8 | 8.17.0 | - | E-UTRA to CDMA2000 1x Hand Over Delay | - | - | - | R4 | R4-63 | R4-122751 | rejected | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1324 | - | A | Rel-9 | 9.11.0 | - | E-UTRA to CDMA2000 1x Hand Over Delay | - | - | - | R4 | R4-63 | R4-122756 | rejected | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1325 | - | A | Rel-10 | 10.6.0 | - | E-UTRA to CDMA2000 1x Hand Over Delay | - | - | - | R4 | R4-63 | R4-122761 | rejected | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1326 | - | A | Rel-11 | 11.0.0 | - | E-UTRA to CDMA2000 1x Hand Over Delay | - | - | - | R4 | R4-63 | R4-122763 | rejected | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1327 | - | F | Rel-10 | 10.6.0 | 10.7.0 | Correction to RLM requirements in eICIC with Autonomous gaps R10 | RP-56 | RP-120779 | approved | R4 | R4-63 | R4-122842 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1328 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Correction to RLM requirements in eICIC with Autonomous gaps R11 | RP-56 | RP-120779 | approved | R4 | R4-63 | R4-122844 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1329 | - | F | Rel-9 | 9.11.0 | - | Correction to E-UTRAN FDD/TDD - UTRAN FDD /TDD enhanced cell identification test case R9 | - | - | - | R4 | R4-63 | R4-122846 | Revised | 2012-06-10 | TEI9 | - | 2012-06-10 |
1329 | 1 | F | Rel-9 | 9.11.0 | 9.12.0 | Correction to E-UTRAN FDD/TDD - UTRAN FDD /TDD enhanced cell identification test case R9 | RP-56 | RP-120770 | approved | R4 | R4-63 | R4-123465 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1330 | - | A | Rel-10 | 10.6.0 | - | Correction to E-UTRAN FDD/TDD - UTRAN FDD /TDD enhanced cell identification test case R10 | - | - | - | R4 | R4-63 | R4-122848 | Revised | 2012-06-10 | TEI10 | - | 2012-06-10 |
1330 | 1 | A | Rel-10 | 10.6.0 | 10.7.0 | Correction to E-UTRAN FDD/TDD - UTRAN FDD /TDD enhanced cell identification test case R10 | RP-56 | RP-120769 | approved | R4 | R4-63 | R4-123466 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1331 | - | A | Rel-11 | 11.0.0 | - | Correction to E-UTRAN FDD/TDD - UTRAN FDD /TDD enhanced cell identification test case R11 | - | - | - | R4 | R4-63 | R4-122850 | Revised | 2012-06-10 | TEI11 | - | 2012-06-10 |
1331 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | Correction to E-UTRAN FDD/TDD - UTRAN FDD /TDD enhanced cell identification test case R11 | RP-56 | RP-120769 | approved | R4 | R4-63 | R4-123467 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1332 | - | F | Rel-9 | 9.11.0 | 9.12.0 | Correction to E-UTRAN TDD redirection to UTRAN FDD test configuration R9 | RP-56 | RP-120770 | approved | R4 | R4-63 | R4-122854 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1333 | - | F | Rel-10 | 10.6.0 | - | FDD CA RSTD Measurement Reporting Delay Test Case (Rel-10) | - | - | - | R4 | R4-63 | R4-122855 | Revised | 2012-06-10 | TEI10 | - | 2012-06-10 |
1333 | 1 | F | Rel-10 | 10.6.0 | 10.7.0 | FDD CA RSTD Measurement Reporting Delay Test Case (Rel-10) | RP-56 | RP-120780 | approved | R4 | R4-63 | R4-123469 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1334 | - | F | Rel-10 | 10.6.0 | - | TDD CA RSTD Measurement Reporting Delay Test Case (Rel-10) | - | - | - | R4 | R4-63 | R4-122856 | Revised | 2012-06-10 | TEI10 | - | 2012-06-10 |
1334 | 1 | F | Rel-10 | 10.6.0 | 10.7.0 | TDD CA RSTD Measurement Reporting Delay Test Case (Rel-10) | RP-56 | RP-120782 | approved | R4 | R4-63 | R4-123471 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1335 | - | A | Rel-10 | 10.6.0 | 10.7.0 | Correction to E-UTRAN TDD redirection to UTRAN FDD test configuration R10 | RP-56 | RP-120770 | approved | R4 | R4-63 | R4-122861 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1336 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Correction to E-UTRAN TDD redirection to UTRAN FDD test configuration R11 | RP-56 | RP-120770 | approved | R4 | R4-63 | R4-122866 | Agreed | 2012-06-10 | TEI9 | - | 2012-06-10 |
1337 | - | A | Rel-11 | 11.0.0 | - | FDD CA RSTD Measurement Reporting Delay Test Case (Rel-11) | - | - | - | R4 | R4-63 | R4-122869 | Revised | 2012-06-10 | TEI11 | - | 2012-06-10 |
1337 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | FDD CA RSTD Measurement Reporting Delay Test Case (Rel-11) | RP-56 | RP-120780 | approved | R4 | R4-63 | R4-123470 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1338 | - | A | Rel-11 | 11.0.0 | - | TDD CA RSTD Measurement Reporting Delay Test Case (Rel-11) | - | - | - | R4 | R4-63 | R4-122870 | Revised | 2012-06-10 | TEI11 | - | 2012-06-10 |
1338 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | TDD CA RSTD Measurement Reporting Delay Test Case (Rel-11) | RP-56 | RP-120782 | approved | R4 | R4-63 | R4-123472 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1339 | - | F | Rel-10 | 10.6.0 | - | Correction to inter-frequency RSTD accuracy requirement in CA R10 | - | - | - | R4 | R4-63 | R4-122872 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1340 | - | A | Rel-11 | 11.0.0 | - | Correction to inter-frequency RSTD accuracy requirement in CA R11 | - | - | - | R4 | R4-63 | R4-122873 | rejected | 2012-06-10 | TEI11 | - | 2012-06-10 |
1341 | - | F | Rel-10 | 10.6.0 | 10.7.0 | Correction to RSTD measurement reporting delay requirement in CA R10 | RP-56 | RP-120779 | approved | R4 | R4-63 | R4-122875 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1342 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Correction to RSTD measurement reporting delay requirement in CA R11 | RP-56 | RP-120779 | approved | R4 | R4-63 | R4-122881 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1343 | - | F | Rel-10 | 10.6.0 | - | Add Band 25 Io values R10 | - | - | - | R4 | R4-63 | R4-122888 | Revised | 2012-06-10 | TEI10 | - | 2012-06-10 |
1343 | 1 | F | Rel-10 | 10.6.0 | 10.7.0 | Add Band 25 Io values R10 | RP-56 | RP-120777 | approved | R4 | R4-63 | R4-123442 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1344 | - | B | Rel-11 | 11.0.0 | - | Introduction of Requirements for CA Multiple Timing Advances | - | - | - | R4 | R4-63 | R4-122892 | rejected | 2012-06-10 | LTE_CA_enh-Core | - | 2012-06-10 |
1345 | - | F | Rel-11 | 11.0.0 | - | Add Band 25 Io values R11 | - | - | - | R4 | R4-63 | R4-122896 | Revised | 2012-06-10 | TEI11 | - | 2012-06-10 |
1345 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | Add Band 25 Io values R11 | RP-56 | RP-120795 | approved | R4 | R4-63 | R4-123443 | Agreed | 2012-06-10 | TEI11 | - | 2012-06-10 |
1346 | - | F | Rel-10 | 10.6.0 | - | Clarification for cell identification condition in inter-RAT SI reading requirement R10 | - | - | - | R4 | R4-63 | R4-122899 | Revised | 2012-06-10 | TEI10 | - | 2012-06-10 |
1346 | 1 | F | Rel-10 | 10.6.0 | 10.7.0 | Clarification for cell identification condition in inter-RAT SI reading requirement R10 | RP-56 | RP-120777 | approved | R4 | R4-63 | R4-123559 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1347 | - | A | Rel-11 | 11.0.0 | - | Clarification for cell identification condition in inter-RAT SI reading requirement R11 | - | - | - | R4 | R4-63 | R4-122908 | Revised | 2012-06-10 | TEI11 | - | 2012-06-10 |
1347 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | Clarification for cell identification condition in inter-RAT SI reading requirement R11 | RP-56 | RP-120777 | approved | R4 | R4-63 | R4-123560 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1348 | - | B | Rel-11 | 11.0.0 | - | Random Access requirements for SCell | - | - | - | R4 | R4-63 | R4-122922 | rejected | 2012-06-10 | LTE_CA_enh-Core | - | 2012-06-10 |
1349 | - | B | Rel-11 | 11.0.0 | 11.1.0 | Introduction of Band 28 | RP-56 | RP-120793 | approved | R4 | R4-63 | R4-122956 | Agreed | 2012-06-10 | LTE_APAC700-Core | - | 2012-06-10 |
1350 | - | B | Rel-11 | 11.0.0 | - | Introduction of Band 44 | - | - | - | R4 | R4-63 | R4-122982 | Revised | 2012-06-10 | LTE_APAC700-Perf | - | 2012-06-10 |
1350 | 1 | B | Rel-11 | 11.0.0 | 11.1.0 | Introduction of Band 44 | RP-56 | RP-120794 | approved | R4 | R4-63 | R4-123677 | Agreed | 2012-06-10 | LTE_APAC700-Perf | - | 2012-06-10 |
1351 | - | F | Rel-10 | 10.6.0 | - | Requirements for UE that support measurements without gaps | - | - | - | R4 | R4-63 | R4-123003 | rejected | 2012-06-10 | TEI11 | - | 2012-06-10 |
1352 | - | A | Rel-11 | 11.0.0 | - | Requirements for UE that support measurements without gaps | - | - | - | R4 | R4-63 | R4-123015 | rejected | 2012-06-10 | TEI11 | - | 2012-06-10 |
1353 | - | F | Rel-10 | 10.6.0 | 10.7.0 | Editorial corrections | RP-56 | RP-120780 | approved | R4 | R4-63 | R4-123024 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1354 | - | F | Rel-8 | 8.17.0 | - | UL Transmit Timing Requirements | - | - | - | R4 | R4-63 | R4-123025 | Revised | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1354 | 1 | F | Rel-8 | 8.17.0 | 8.18.0 | UL Transmit Timing Requirements | RP-56 | RP-120764 | approved | R4 | R4-63 | R4-123553 | Agreed | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1355 | - | A | Rel-11 | 11.0.0 | 11.1.0 | Editorial corrections | RP-56 | RP-120780 | approved | R4 | R4-63 | R4-123026 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1356 | - | A | Rel-9 | 9.11.0 | - | UL Transmit Timing Requirements | - | - | - | R4 | R4-63 | R4-123028 | Revised | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1356 | 1 | A | Rel-9 | 9.11.0 | 9.12.0 | UL Transmit Timing Requirements | RP-56 | RP-120764 | approved | R4 | R4-63 | R4-123640 | Agreed | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1357 | - | F | Rel-8 | 8.17.0 | - | Correction of a timer period in inter-frequency measurement tests | - | - | - | R4 | R4-63 | R4-123029 | Revised | 2012-06-10 | TEI8 | - | 2012-06-10 |
1357 | 1 | F | Rel-8 | 8.17.0 | - | Correction of a timer period in inter-frequency measurement tests | - | - | - | R4 | R4-63 | R4-123475 | Revised | 2012-06-10 | TEI8 | - | 2012-06-10 |
1357 | 2 | F | Rel-8 | 8.17.0 | 8.18.0 | Correction of a timer period in inter-frequency measurement tests | RP-56 | RP-120766 | approved | R4 | R4-63 | R4-123577 | Agreed | 2012-06-10 | TEI8 | - | 2012-06-10 |
1358 | - | A | Rel-10 | 10.6.0 | - | UL Transmit Timing Requirements | - | - | - | R4 | R4-63 | R4-123031 | Revised | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1358 | 1 | A | Rel-10 | 10.6.0 | 10.7.0 | UL Transmit Timing Requirements | RP-56 | RP-120764 | approved | R4 | R4-63 | R4-123641 | Agreed | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1359 | - | A | Rel-9 | 9.11.0 | - | Correction of a timer period in inter-frequency measurement tests | - | - | - | R4 | R4-63 | R4-123032 | Revised | 2012-06-10 | TEI8 | - | 2012-06-10 |
1359 | 1 | A | Rel-9 | 9.11.0 | - | Correction of a timer period in inter-frequency measurement tests | - | - | - | R4 | R4-63 | R4-123476 | Revised | 2012-06-10 | TEI8 | - | 2012-06-10 |
1359 | 1 | A | Rel-9 | 9.11.0 | 9.12.0 | Correction of a timer period in inter-frequency measurement tests | RP-56 | RP-120766 | approved | R4 | R4-63 | R4-123578 | Agreed | 2012-06-10 | TEI8 | - | 2012-06-10 |
1360 | - | A | Rel-10 | 10.6.0 | - | Correction of a timer period in inter-frequency measurement tests | - | - | - | R4 | R4-63 | R4-123034 | Revised | 2012-06-10 | TEI8 | - | 2012-06-10 |
1360 | 1 | A | Rel-10 | 10.6.0 | - | Correction of a timer period in inter-frequency measurement tests | - | - | - | R4 | R4-63 | R4-123477 | Revised | 2012-06-10 | TEI8 | - | 2012-06-10 |
1360 | 2 | A | Rel-10 | 10.6.0 | 10.7.0 | Correction of a timer period in inter-frequency measurement tests | RP-56 | RP-120766 | approved | R4 | R4-63 | R4-123579 | Agreed | 2012-06-10 | TEI8 | - | 2012-06-10 |
1361 | - | A | Rel-11 | 11.0.0 | - | Correction of a timer period in inter-frequency measurement tests | - | - | - | R4 | R4-63 | R4-123035 | Revised | 2012-06-10 | TEI8 | - | 2012-06-10 |
1361 | 1 | A | Rel-11 | 11.0.0 | - | Correction of a timer period in inter-frequency measurement tests | - | - | - | R4 | R4-63 | R4-123478 | Revised | 2012-06-10 | TEI8 | - | 2012-06-10 |
1361 | 2 | A | Rel-11 | 11.0.0 | 11.1.0 | Correction of a timer period in inter-frequency measurement tests | RP-56 | RP-120766 | approved | R4 | R4-63 | R4-123580 | Agreed | 2012-06-10 | TEI8 | - | 2012-06-10 |
1362 | - | F | Rel-10 | 10.6.0 | - | Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS | - | - | - | R4 | R4-63 | R4-123036 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1362 | 1 | F | Rel-10 | 10.6.0 | - | Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS | - | - | - | R4 | R4-63 | R4-123461 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1362 | 2 | B | Rel-10 | 10.6.0 | 10.7.0 | Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123644 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1363 | - | A | Rel-11 | 11.0.0 | - | UL Transmit Timing Requirements | - | - | - | R4 | R4-63 | R4-123037 | Revised | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1363 | 1 | A | Rel-11 | 11.0.0 | 11.1.0 | UL Transmit Timing Requirements | RP-56 | RP-120764 | approved | R4 | R4-63 | R4-123642 | Agreed | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1364 | - | A | Rel-11 | 11.0.0 | - | Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS | - | - | - | R4 | R4-63 | R4-123038 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1364 | 1 | A | Rel-11 | 11.0.0 | - | Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS | - | - | - | R4 | R4-63 | R4-123462 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1364 | 2 | A | Rel-11 | 11.0.0 | 11.1.0 | Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123645 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1365 | - | F | Rel-10 | 10.6.0 | - | Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS | - | - | - | R4 | R4-63 | R4-123040 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1365 | 1 | F | Rel-10 | 10.6.0 | - | Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS | - | - | - | R4 | R4-63 | R4-123463 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1365 | 2 | B | Rel-10 | 10.6.0 | 10.7.0 | Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123646 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1366 | - | A | Rel-11 | 11.0.0 | - | Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS | - | - | - | R4 | R4-63 | R4-123041 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1366 | 1 | A | Rel-11 | 11.0.0 | - | Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS | - | - | - | R4 | R4-63 | R4-123464 | Revised | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1366 | 2 | A | Rel-11 | 11.0.0 | 11.1.0 | Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123647 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1367 | - | F | Rel-10 | 10.6.0 | 10.7.0 | OCNG correction in Phase I eICIC test cases | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123042 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1368 | - | A | Rel-11 | 11.0.0 | 11.1.0 | OCNG correction in Phase I eICIC test cases | RP-56 | RP-120784 | approved | R4 | R4-63 | R4-123044 | Agreed | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1369 | - | F | Rel-10 | 10.6.0 | - | Alignment of Notes in Phase I eICIC tests | - | - | - | R4 | R4-63 | R4-123045 | rejected | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1370 | - | A | Rel-11 | 11.0.0 | - | Alignment of Notes in Phase I eICIC tests | - | - | - | R4 | R4-63 | R4-123046 | rejected | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1371 | - | F | Rel-10 | 10.6.0 | - | Increased bandwidth RSRQ measurements for serving cell | - | - | - | R4 | R4-63 | R4-123047 | rejected | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1372 | - | F | Rel-10 | 10.6.0 | - | ABS definition used in test cases in 36.133 | - | - | - | R4 | R4-63 | R4-123049 | rejected | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1373 | - | A | Rel-11 | 11.0.0 | - | ABS definition used in test cases in 36.133 | - | - | - | R4 | R4-63 | R4-123050 | rejected | 2012-06-10 | eICIC_LTE-Perf | - | 2012-06-10 |
1374 | - | A | Rel-11 | 11.0.0 | - | Increased bandwidth RSRQ measurements for serving cell | - | - | - | R4 | R4-63 | R4-123051 | rejected | 2012-06-10 | LTE-RF | - | 2012-06-10 |
1375 | - | F | Rel-10 | 10.6.0 | 10.7.0 | PRS bandwidth in RSTD accuracy requirements | RP-56 | RP-120781 | approved | R4 | R4-63 | R4-123069 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1376 | - | A | Rel-11 | 11.0.0 | - | PRS bandwidth in RSTD accuracy requirements | - | - | - | R4 | R4-63 | R4-123071 | rejected | 2012-06-10 | TEI10 | - | 2012-06-10 |
1377 | - | B | Rel-11 | 11.0.0 | - | Introduction of Requirements for Multiple Timing Advances for Carrier Aggregation | - | - | - | R4 | R4-63 | R4-123165 | rejected | 2012-06-10 | LTE_CA_enh-Core | - | 2012-06-10 |
1378 | - | F | Rel-11 | 11.0.0 | - | Inter-frequency measurements without gaps | - | - | - | R4 | R4-63 | R4-123192 | rejected | 2012-06-10 | TEI11 | - | 2012-06-10 |
1379 | - | B | Rel-11 | 11.0.0 | 11.1.0 | Introduction of e850_LB (Band 27) to TS 36.133 | RP-56 | RP-120792 | approved | R4 | R4-63 | R4-123203 | Agreed | 2012-06-10 | LTE_e850_LB-Perf | - | 2012-06-10 |
1380 | - | F | Rel-10 | 10.6.0 | 10.7.0 | On UE behavior in the uplink subframe after measurement GAP | RP-56 | RP-120781 | approved | R4 | R4-63 | R4-123440 | Agreed | 2012-06-10 | TEI10 | - | 2012-06-10 |
1381 | - | F | Rel-10 | 10.7.0 | - | Clarification to Measurements of SCC with deactivated SCell requirements | - | - | - | R4 | R4-64 | R4-123725 | Noted | 2012-09-02 | TEI10 | - | 2012-09-02 |
1382 | - | A | Rel-11 | 11.1.0 | - | Clarification to Measurements of SCC with deactivated SCell requirements | - | - | - | R4 | R4-64 | R4-123726 | Withdrawn | 2012-09-02 | TEI10 | - | 2012-09-02 |
1383 | - | F | Rel-9 | 9.12.0 | 9.13.0 | Identification of Cell 3 in RRM Test cases A.4.2.7 and A.4.2.8 | RP-57 | RP-121301 | approved | R4 | R4-64 | R4-123729 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1384 | - | A | Rel-10 | 10.7.0 | 10.8.0 | Identification of Cell 3 in RRM Test cases A.4.2.7 and A.4.2.8 | RP-57 | RP-121301 | approved | R4 | R4-64 | R4-123730 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1385 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Identification of Cell 3 in RRM Test cases A.4.2.7 and A.4.2.8 | RP-57 | RP-121301 | approved | R4 | R4-64 | R4-123731 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1386 | - | F | Rel-10 | 10.7.0 | - | Making CA RSRP and RSRQ measurement accuracy test cases band-agnostic | - | - | - | R4 | R4-64 | R4-123732 | Noted | 2012-09-02 | LTE_CA-Core | - | 2012-09-02 |
1387 | - | A | Rel-11 | 11.1.0 | - | Making CA RSRP and RSRQ measurement accuracy test cases band-agnostic | - | - | - | R4 | R4-64 | R4-123733 | Withdrawn | 2012-09-02 | LTE_CA-Core | - | 2012-09-02 |
1388 | - | F | Rel-9 | 9.12.0 | 9.13.0 | Making FDD-TDD Inter-freq RSRQ measurement accuracy test case band-agnostic | RP-57 | RP-121301 | approved | R4 | R4-64 | R4-123734 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1389 | - | A | Rel-10 | 10.7.0 | 10.8.0 | Making FDD-TDD Inter-freq RSRQ measurement accuracy test case band-agnostic | RP-57 | RP-121301 | approved | R4 | R4-64 | R4-123735 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1390 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Making FDD-TDD Inter-freq RSRQ measurement accuracy test case band-agnostic | RP-57 | RP-121301 | approved | R4 | R4-64 | R4-123736 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1391 | - | F | Rel-10 | 10.7.0 | 10.8.0 | Thresholds and margins in RRM test cases A.8.16.1 and A.8.16.2 | RP-57 | RP-121304 | approved | R4 | R4-64 | R4-123737 | Agreed | 2012-09-02 | LTE_CA-Core | - | 2012-09-02 |
1392 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Thresholds and margins in RRM test cases A.8.16.1 and A.8.16.2 | RP-57 | RP-121304 | approved | R4 | R4-64 | R4-123738 | Agreed | 2012-09-02 | LTE_CA-Core | - | 2012-09-02 |
1393 | - | F | Rel-9 | 9.12.0 | - | E-UTRAN FDD Proximity indication test case (Rel-9) | - | - | - | R4 | R4-64 | R4-123752 | Noted | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1394 | - | A | Rel-10 | 10.7.0 | - | E-UTRAN FDD Proximity indication test case (Rel-10) | - | - | - | R4 | R4-64 | R4-123753 | Noted | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1395 | - | A | Rel-11 | 11.1.0 | - | E-UTRAN FDD Proximity indication test case (Rel-11) | - | - | - | R4 | R4-64 | R4-123754 | Noted | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1396 | - | F | Rel-9 | 9.12.0 | - | Modification of Handover Delay Requirement and Test Cases from E-UTRAN to cdma2000 1x (Rel-9) | - | - | - | R4 | R4-64 | R4-123759 | Revised | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1396 | 1 | A | Rel-9 | 9.12.0 | 9.13.0 | Modification of Handover Delay Requirement and Test Cases from E-UTRAN to cdma2000 1x (Rel-9) | RP-57 | RP-121295 | approved | R4 | R4-64 | R4-124761 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1397 | - | A | Rel-10 | 10.7.0 | - | Modification of Handover Delay Requirement and Test Cases from E-UTRAN to cdma2000 1x (Rel-10) | - | - | - | R4 | R4-64 | R4-123760 | Revised | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1397 | 1 | A | Rel-10 | 10.7.0 | 10.8.0 | Modification of Handover Delay Requirement and Test Cases from E-UTRAN to cdma2000 1x (Rel-10) | RP-57 | RP-121295 | approved | R4 | R4-64 | R4-124763 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1398 | - | A | Rel-11 | 11.1.0 | - | Modification of Handover Delay Requirement and Test Cases from E-UTRAN to cdma2000 1x (Rel-11) | - | - | - | R4 | R4-64 | R4-123761 | Revised | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1398 | 1 | A | Rel-11 | 11.1.0 | 11.2.0 | Modification of Handover Delay Requirement and Test Cases from E-UTRAN to cdma2000 1x (Rel-11) | RP-57 | RP-121295 | approved | R4 | R4-64 | R4-124764 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1399 | - | F | Rel-10 | 10.7.0 | 10.8.0 | Correction to RSRP/RSRQ measurement accuracy tests in MBSFN R10 | RP-57 | RP-121302 | approved | R4 | R4-64 | R4-123888 | agreed | 2012-09-02 | eICIC_LTE-Perf | - | 2012-09-02 |
1400 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Correction to RSRP/RSRQ measurement accuracy tests in MBSFN R11 | RP-57 | RP-121302 | approved | R4 | R4-64 | R4-123889 | agreed | 2012-09-02 | eICIC_LTE-Perf | - | 2012-09-02 |
1401 | - | B | Rel-11 | 11.1.0 | - | Random Access requirements for SCell | - | - | - | R4 | R4-64 | R4-123890 | Noted | 2012-09-02 | LTE_CA_enh-Core | - | 2012-09-02 |
1402 | - | B | Rel-10 | 10.7.0 | 10.8.0 | Activation/deactivation core requirement for carrier aggregation R10 | RP-57 | RP-121304 | approved | R4 | R4-64 | R4-123891 | agreed | 2012-09-02 | LTE_CA-Core | - | 2012-09-02 |
1403 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Activation/ deactivation core requirement for carrier aggregation R11 | RP-57 | RP-121304 | approved | R4 | R4-64 | R4-123892 | agreed | 2012-09-02 | LTE_CA-Core | - | 2012-09-02 |
1404 | - | F | Rel-10 | 10.7.0 | 10.8.0 | Minor corrections for E-UTRAN – GSM measurements without Measurement Gaps and Rx-Tx measurements when PCell is changed | RP-57 | RP-121313 | approved | R4 | R4-64 | R4-123895 | Agreed | 2012-09-02 | TEI10 | - | 2012-09-02 |
1405 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Minor corrections for E-UTRAN – GSM measurements without Measurement Gaps and Rx-Tx measurements when PCell is changed | RP-57 | RP-121313 | approved | R4 | R4-64 | R4-123896 | Agreed | 2012-09-02 | TEI10 | - | 2012-09-02 |
1406 | - | F | Rel-10 | 10.7.0 | - | RRM requirements for CA REFSENSE (Rel-10) | - | - | - | R4 | R4-64 | R4-123898 | Revised | 2012-09-02 | LTE_CA | - | 2012-09-02 |
1406 | 1 | F | Rel-10 | 10.7.0 | - | RRM requirements for CA REFSENSE (Rel-10) | - | - | - | R4 | R4-64 | R4-124810 | Revised | 2012-09-02 | LTE_CA | - | 2012-09-02 |
1406 | 2 | F | Rel-10 | 10.7.0 | - | RRM requirements for CA REFSENSE (Rel-10) | - | - | - | R4 | R4-64 | R4-124979 | Revised | 2012-09-02 | LTE_CA | - | 2012-09-02 |
1406 | 3 | F | Rel-10 | 10.7.0 | 10.8.0 | RRM requirements for CA REFSENSE (Rel-10) | RP-57 | RP-121304 | approved | R4 | R4-64 | R4-124989 | Agreed | 2012-09-02 | LTE_CA-Core | - | 2012-09-02 |
1407 | - | F | Rel-11 | 11.1.0 | - | RRM requirements for CA REFSENSE (Rel-11) | - | - | - | R4 | R4-64 | R4-123900 | Revised | 2012-09-02 | LTE_CA | - | 2012-09-02 |
1407 | 1 | F | Rel-11 | 11.1.0 | - | RRM requirements for CA REFSENSE (Rel-11) | - | - | - | R4 | R4-64 | R4-124929 | Revised | 2012-09-02 | LTE_CA | - | 2012-09-02 |
1407 | 2 | A | Rel-11 | 11.1.0 | - | RRM requirements for CA REFSENSE (Rel-11) | - | - | - | R4 | R4-64 | R4-124980 | Revised | 2012-09-02 | LTE_CA | - | 2012-09-02 |
1407 | 3 | A | Rel-11 | 11.1.0 | 11.2.0 | RRM requirements for CA REFSENSE (Rel-11) | RP-57 | RP-121304 | approved | R4 | R4-64 | R4-125011 | Agreed | 2012-09-02 | LTE_CA-Core | - | 2012-09-02 |
1408 | - | F | Rel-10 | 10.7.0 | 10.8.0 | Square Bracket Removal for RSTD measurement requirement in Pcell changing and Handover R10 | RP-57 | RP-121304 | approved | R4 | R4-64 | R4-123901 | Agreed | 2012-09-02 | LTE_CA-Core | - | 2012-09-02 |
1409 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Square Bracket Removal for RSTD measurement requirement in Pcell changing and Handover R11 | RP-57 | RP-121304 | approved | R4 | R4-64 | R4-123903 | Agreed | 2012-09-02 | LTE_CA-Core | - | 2012-09-02 |
1410 | - | F | Rel-10 | 10.7.0 | 10.8.0 | Correction to the E-UTRAN secondary component carrier measurements when common DRX is used R10 | RP-57 | RP-121304 | approved | R4 | R4-64 | R4-124072 | agreed | 2012-09-02 | LTE_CA-Core | - | 2012-09-02 |
1411 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Correction to the E-UTRAN secondary component carrier measurements when common DRX is used R11 | RP-57 | RP-121304 | approved | R4 | R4-64 | R4-124073 | Agreed | 2012-09-02 | LTE_CA-Core | - | 2012-09-02 |
1412 | - | F | Rel-10 | 10.7.0 | 10.8.0 | Requirements for Inter-frequency Measurements without Gaps when DRX is used R10 | RP-57 | RP-121304 | approved | R4 | R4-64 | R4-124074 | agreed | 2012-09-02 | LTE_CA-Core | - | 2012-09-02 |
1413 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Requirements for Inter-frequency Measurements without Gaps when DRX is used R11 | RP-57 | RP-121304 | approved | R4 | R4-64 | R4-124075 | agreed | 2012-09-02 | LTE_CA-Core | - | 2012-09-02 |
1414 | - | F | Rel-10 | 10.7.0 | 10.8.0 | Clarification on TDD UL-DL subframe configurations in inter-frequency RSTD measurement without gaps R10 | RP-57 | RP-121304 | approved | R4 | R4-64 | R4-124076 | agreed | 2012-09-02 | LTE_CA-Core | - | 2012-09-02 |
1415 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Clarification on TDD UL-DL subframe configurations in inter-frequency RSTD measurement without gaps R11 | RP-57 | RP-121304 | approved | R4 | R4-64 | R4-124077 | agreed | 2012-09-02 | LTE_CA-Core | - | 2012-09-02 |
1416 | - | F | Rel-9 | 9.12.0 | 9.13.0 | Correction for E-UTRA TDD RRC connection release redirection to UTRA TDD test case R9 | RP-57 | RP-121301 | approved | R4 | R4-64 | R4-124078 | Agreed | 2012-09-02 | TEI9 | - | 2012-09-02 |
1417 | - | A | Rel-10 | 10.7.0 | 10.8.0 | Correction for E-UTRA TDD RRC connection release redirection to UTRA TDD test case R10 | RP-57 | RP-121301 | approved | R4 | R4-64 | R4-124079 | Agreed | 2012-09-02 | TEI9 | - | 2012-09-02 |
1418 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Correction for E-UTRA TDD RRC connection release redirection to UTRA TDD test case R11 | RP-57 | RP-121301 | approved | R4 | R4-64 | R4-124080 | Agreed | 2012-09-02 | TEI9 | - | 2012-09-02 |
1419 | - | F | Rel-11 | 11.1.0 | 11.2.0 | Addition of E-UTRAN FDD - UTRAN FDD identification of a new CGI of UTRAN cell using autonomous gaps | RP-57 | RP-121340 | approved | R4 | R4-64 | R4-124081 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1420 | - | F | Rel-11 | 11.1.0 | 11.2.0 | Addition of E-UTRAN TDD - UTRAN FDD identification of a new CGI of UTRAN cell using autonomous gaps | RP-57 | RP-121340 | approved | R4 | R4-64 | R4-124082 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1421 | - | F | Rel-9 | 9.12.0 | 9.13.0 | Correction to E-UTRAN TDD-FDD Inter-frequency event triggered reporting test case R9 | RP-57 | RP-121301 | approved | R4 | R4-64 | R4-124083 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1422 | - | A | Rel-10 | 10.7.0 | 10.8.0 | Correction to E-UTRAN TDD-FDD Inter-frequency event triggered reporting test case R10 | RP-57 | RP-121301 | approved | R4 | R4-64 | R4-124084 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1423 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Correction to E-UTRAN TDD-FDD Inter-frequency event triggered reporting test case R11 | RP-57 | RP-121301 | approved | R4 | R4-64 | R4-124085 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1424 | - | F | Rel-8 | 8.18.0 | 8.19.0 | Remove the brackets for Tq of Uplink Transmit Timing R8 | RP-57 | RP-121295 | approved | R4 | R4-64 | R4-124086 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1425 | - | A | Rel-9 | 9.12.0 | - | Remove the brackets for Tq of Uplink Transmit Timing R9 | - | - | - | R4 | R4-64 | R4-124087 | Withdrawn | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1426 | - | A | Rel-10 | 10.7.0 | - | Remove the brackets for Tq of Uplink Transmit Timing R10 | - | - | - | R4 | R4-64 | R4-124088 | Withdrawn | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1427 | - | A | Rel-11 | 11.1.0 | - | Remove the brackets for Tq of Uplink Transmit Timing R11 | - | - | - | R4 | R4-64 | R4-124089 | Withdrawn | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1428 | - | F | Rel-8 | 8.18.0 | - | Correction to RSRQ accuracy test cases R8 | - | - | - | R4 | R4-64 | R4-124090 | Revised | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1428 | 1 | F | Rel-8 | 8.18.0 | 8.19.0 | Correction to RSRQ accuracy test cases R8 | RP-57 | RP-121294 | approved | R4 | R4-64 | R4-124931 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1429 | - | F | Rel-9 | 9.12.0 | - | Correction to RSRQ accuracy test cases R9 | - | - | - | R4 | R4-64 | R4-124091 | Revised | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1429 | 1 | F | Rel-9 | 9.12.0 | 9.13.0 | Correction to RSRQ accuracy test cases R9 | RP-57 | RP-121294 | approved | R4 | R4-64 | R4-124932 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1430 | - | F | Rel-10 | 10.7.0 | - | Correction to RSRQ accuracy test cases R10 | - | - | - | R4 | R4-64 | R4-124092 | Revised | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1430 | 1 | F | Rel-10 | 10.7.0 | 10.8.0 | Correction to RSRQ accuracy test cases R10 | RP-57 | RP-121294 | approved | R4 | R4-64 | R4-124933 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1431 | - | F | Rel-10 | 10.7.0 | - | Alignment for ABS configurations in RRM Tests R10 | - | - | - | R4 | R4-64 | R4-124109 | Revised | 2012-09-02 | eICIC_LTE-Perf | - | 2012-09-02 |
1431 | 1 | F | Rel-10 | 10.7.0 | 10.8.0 | Alignment for ABS configurations in RRM Tests R10 | RP-57 | RP-121302 | approved | R4 | R4-64 | R4-124930 | Agreed | 2012-09-02 | eICIC_LTE-Perf | - | 2012-09-02 |
1432 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Alignment for ABS configurations in RRM Tests R11 | RP-57 | RP-121302 | approved | R4 | R4-64 | R4-124111 | Agreed | 2012-09-02 | eICIC_LTE-Perf | - | 2012-09-02 |
1433 | - | F | Rel-11 | 11.1.0 | - | Correction to RSRQ accuracy test cases R11 | - | - | - | R4 | R4-64 | R4-124202 | Revised | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1433 | 1 | F | Rel-11 | 11.1.0 | 11.2.0 | Correction to RSRQ accuracy test cases R11 | RP-57 | RP-121294 | approved | R4 | R4-64 | R4-124934 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1434 | - | F | Rel-10 | 10.7.0 | - | RSTD accuracy requirements under cell change | - | - | - | R4 | R4-64 | R4-124257 | Noted | 2012-09-02 | LCS_LTE | - | 2012-09-02 |
1435 | - | A | Rel-11 | 11.1.0 | - | RSTD accuracy requirements under cell change | - | - | - | R4 | R4-64 | R4-124259 | Withdrawn | 2012-09-02 | LCS_LTE | - | 2012-09-02 |
1436 | - | F | Rel-9 | 9.12.0 | 9.13.0 | Radio conditions for PBCH reading in E-UTRA | RP-57 | RP-121297 | approved | R4 | R4-64 | R4-124263 | Agreed | 2012-09-02 | EHNB-RAN2 | - | 2012-09-02 |
1437 | - | A | Rel-10 | 10.7.0 | 10.8.0 | Radio conditions for PBCH reading in E-UTRA | RP-57 | RP-121297 | approved | R4 | R4-64 | R4-124266 | Agreed | 2012-09-02 | EHNB-RAN2 | - | 2012-09-02 |
1438 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Radio conditions for PBCH reading in E-UTRA | RP-57 | RP-121297 | approved | R4 | R4-64 | R4-124267 | Agreed | 2012-09-02 | EHNB-RAN2 | - | 2012-09-02 |
1439 | - | F | Rel-11 | 11.1.0 | - | Requirements for RSRP and RSRQ for E-CID Positioning | - | - | - | R4 | R4-64 | R4-124287 | Revised | 2012-09-02 | LCS_LTE | - | 2012-09-02 |
1439 | 1 | F | Rel-11 | 11.1.0 | - | Requirements for RSRP and RSRQ for E-CID Positioning | - | - | - | R4 | R4-64 | R4-124983 | Noted | 2012-09-02 | LCS_LTE | - | 2012-09-02 |
1440 | - | B | Rel-11 | 11.1.0 | - | Introduction of Multiple TA Relevant Requirements on RA Procedure | - | - | - | R4 | R4-64 | R4-124373 | Noted | 2012-09-02 | LTE_CA_enh-Core | - | 2012-09-02 |
1441 | - | F | Rel-10 | 10.7.0 | - | Introduction of inter-frequency/ RAT measurements in CA | - | - | - | R4 | R4-64 | R4-124386 | Withdrawn | 2012-09-02 | LTE_CA-Perf | - | 2012-09-02 |
1442 | - | F | Rel-10 | 10.7.0 | - | Introduction of inter-frequency/ RAT measurements in CA | - | - | - | R4 | R4-64 | R4-124387 | Withdrawn | 2012-09-02 | LTE_CA-Perf | - | 2012-09-02 |
1443 | - | F | Rel-10 | 10.7.0 | 10.8.0 | Introduction of inter-frequency/ RAT measurements in CA | RP-57 | RP-121305 | approved | R4 | R4-64 | R4-124388 | Agreed | 2012-09-02 | LTE_CA-Perf | - | 2012-09-02 |
1444 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Introduction of inter-frequency/ RAT measurements in CA | RP-57 | RP-121305 | approved | R4 | R4-64 | R4-124390 | Agreed | 2012-09-02 | LTE_CA-Perf | - | 2012-09-02 |
1445 | - | F | Rel-10 | 10.7.0 | - | Definition of known or unknown SCell for Rel-10 | - | - | - | R4 | R4-64 | R4-124478 | Noted | 2012-09-02 | LTE_CA_enh-Core | - | 2012-09-02 |
1446 | - | A | Rel-11 | 11.1.0 | - | Definition of known or unknown SCell for Rel-11 | - | - | - | R4 | R4-64 | R4-124481 | Withdrawn | 2012-09-02 | LTE_CA_enh-Core | - | 2012-09-02 |
1447 | - | B | Rel-11 | 11.1.0 | - | Random Access requirements for SCell | - | - | - | R4 | R4-64 | R4-124514 | Noted | 2012-09-02 | LTE_CA_enh-Core | - | 2012-09-02 |
1448 | - | F | Rel-10 | 10.7.0 | - | ABS signal transmission configuration for RRM tests | - | - | - | R4 | R4-64 | R4-124574 | Revised | 2012-09-02 | eICIC_LTE-Perf | - | 2012-09-02 |
1448 | 1 | F | Rel-10 | 10.7.0 | 10.8.0 | ABS signal transmission configuration for RRM tests | RP-57 | RP-121302 | approved | R4 | R4-64 | R4-124940 | Agreed | 2012-09-02 | eICIC_LTE-Perf | - | 2012-09-02 |
1449 | - | A | Rel-11 | 11.1.0 | 11.2.0 | ABS signal transmission configuration for RRM tests | RP-57 | RP-121302 | approved | R4 | R4-64 | R4-124580 | Agreed | 2012-09-02 | eICIC_LTE-Perf | - | 2012-09-02 |
1450 | - | F | Rel-11 | 11.1.0 | - | Table format update for adding new bands | - | - | - | R4 | R4-64 | R4-124611 | Revised | 2012-09-02 | TEI11 | - | 2012-09-02 |
1450 | 1 | F | Rel-11 | 11.1.0 | 11.2.0 | Table format update for adding new bands | RP-57 | RP-121340 | approved | R4 | R4-64 | R4-124939 | Agreed | 2012-09-02 | TEI11 | - | 2012-09-02 |
1451 | - | F | Rel-9 | 9.12.0 | 9.13.0 | Editorial correction RRM | RP-57 | RP-121301 | approved | R4 | R4-64 | R4-124612 | Agreed | 2012-09-02 | TEI9 | - | 2012-09-02 |
1452 | - | A | Rel-10 | 10.7.0 | 10.8.0 | Editorial correction RRM | RP-57 | RP-121301 | approved | R4 | R4-64 | R4-124615 | Agreed | 2012-09-02 | TEI9 | - | 2012-09-02 |
1453 | - | F | Rel-8 | 8.18.0 | 8.19.0 | Modification of Handover Delay Requirement and Test Cases from E-UTRAN to cdma2000 1x (Rel-9) | RP-57 | RP-121295 | approved | R4 | R4-64 | R4-124762 | Agreed | 2012-09-02 | LTE-RF | - | 2012-09-02 |
1454 | - | A | Rel-11 | 11.1.0 | 11.2.0 | Editorial correction RRM | RP-57 | RP-121301 | approved | R4 | R4-64 | R4-124765 | Agreed | 2012-09-02 | TEI9 | - | 2012-09-02 |
1455 | - | F | Rel-9 | .. | - | E-UTRAN FDD Proximity Indication Test Case (Rel-9) | - | - | - | R4 | R4-64b | R4-125066 | Revised | 2012-12-03 | TEI10 | - | 2012-12-03 |
1455 | 1 | F | Rel-9 | .. | - | E-UTRAN FDD Proximity Indication Test Case (Rel-9) | - | - | - | R4 | R4-64b | R4-125890 | Rejected | 2012-12-03 | TEI10 | - | 2012-12-03 |
1456 | - | A | Rel-10 | .. | - | E-UTRAN FDD Proximity Indication Test Case (Rel-10) | - | - | - | R4 | R4-64b | R4-125067 | Withdrawn | 2012-12-03 | TEI10 | - | 2012-12-03 |
1457 | - | A | Rel-11 | .. | - | E-UTRAN FDD Proximity Indication Test Case (Rel-11) | - | - | - | R4 | R4-64b | R4-125068 | Withdrawn | 2012-12-03 | TEI10 | - | 2012-12-03 |
1458 | - | B | Rel-11 | 11.2.0 | 11.3.0 | Random Access Core Requirement for Scell | RP-58 | RP-121899 | approved | R4 | R4-64b | R4-125091 | Agreed | 2012-12-03 | LTE_CA_enh-Core | - | 2012-12-03 |
1459 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction on CA TDD RSTD measurement accuracy test cases R11 | RP-58 | RP-121861 | approved | R4 | R4-64b | R4-125096 | Agreed | 2012-12-03 | LTE_CA-Core | - | 2012-12-03 |
1460 | - | F | Rel-10 | 10.8.1 | 10.9.0 | Correction to high priority cell measurement of UTRA TDD R10 | RP-58 | RP-121849 | approved | R4 | R4-64b | R4-125097 | Agreed | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1461 | - | A | Rel-11 | 11.2.0 | 11.3.0 | Correction to high priority cell measurement of UTRA TDD R11 | RP-58 | RP-121849 | approved | R4 | R4-64b | R4-125098 | Agreed | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1462 | - | F | Rel-10 | .. | - | Impact of CA Insertion Loss on RRM Test Cases (Rel-10) | - | - | - | R4 | R4-64b | R4-125168 | Rejected | 2012-12-03 | LTE_CA | - | 2012-12-03 |
1463 | - | A | Rel-11 | .. | - | Impact of CA Insertion Loss on RRM Test Cases (Rel-11) | - | - | - | R4 | R4-64b | R4-125169 | Withdrawn | 2012-12-03 | LTE_CA | - | 2012-12-03 |
1464 | - | F | Rel-11 | .. | - | Impact of CA harmonic product on RRM Requirements (Rel-11) | - | - | - | R4 | R4-64b | R4-125175 | Withdrawn | 2012-12-03 | LTE_CA | - | 2012-12-03 |
1465 | - | F | Rel-10 | .. | - | Impact of CA harmonic product on RRM Requirements (Rel-10) | - | - | - | R4 | R4-64b | R4-125176 | Rejected | 2012-12-03 | LTE_CA | - | 2012-12-03 |
1466 | - | F | Rel-10 | 10.8.1 | 10.9.0 | Clarification of Test Requirements for CA RSRP, RSRQ Test Cases | RP-58 | RP-121861 | approved | R4 | R4-64b | R4-125178 | Agreed | 2012-12-03 | LTE_CA-core | - | 2012-12-03 |
1467 | - | A | Rel-11 | 11.2.0 | 11.3.0 | Clarification of Test Requirements for CA RSRP, RSRQ Test Cases | RP-58 | RP-121861 | approved | R4 | R4-64b | R4-125180 | Agreed | 2012-12-03 | LTE_CA-core | - | 2012-12-03 |
1468 | - | F | Rel-9 | 9.13.0 | 9.14.0 | Remove [ ] from 10% requirement in RRM Test cases A.4.2.7 and A.4.2.8 | RP-58 | RP-121850 | approved | R4 | R4-64b | R4-125199 | Agreed | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1469 | - | A | Rel-10 | 10.8.1 | 10.9.0 | Remove [ ] from 10% requirement in RRM Test cases A.4.2.7 and A.4.2.8 | RP-58 | RP-121850 | approved | R4 | R4-64b | R4-125201 | Agreed | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1470 | - | A | Rel-11 | 11.2.0 | 11.3.0 | Remove [ ] from 10% requirement in RRM Test cases A.4.2.7 and A.4.2.8 | RP-58 | RP-121850 | approved | R4 | R4-64b | R4-125203 | Agreed | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1471 | - | F | Rel-10 | .. | - | Definition of known or unknown SCell for Rel-10 | - | - | - | R4 | R4-64b | R4-125210 | Rejected | 2012-12-03 | LTE-CA_enh-Core | - | 2012-12-03 |
1472 | - | A | Rel-11 | .. | - | Definition of known or unknown SCell for Rel-11 | - | - | - | R4 | R4-64b | R4-125211 | Withdrawn | 2012-12-03 | LTE-CA_enh-Core | - | 2012-12-03 |
1473 | - | F | Rel-9 | .. | - | Correction to PRS Configuration Index in TDD RSTD Intra Frequency Test Case | - | - | - | R4 | R4-64b | R4-125274 | Rejected | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1474 | - | F | Rel-10 | 10.8.1 | 10.9.0 | Correction to RSTD Measurement Reporting Delay for Carrier Aggregation Test Cases | RP-58 | RP-121861 | approved | R4 | R4-64b | R4-125275 | Agreed | 2012-12-03 | LTE_CA-Core | - | 2012-12-03 |
1475 | - | B | Rel-11 | .. | - | Introduction of MDT enhancements | - | - | - | R4 | R4-64b | R4-125347 | Rejected | 2012-12-03 | eMDT_UMTSLTE-Core | - | 2012-12-03 |
1476 | - | F | Rel-10 | .. | - | Correction to Inter-frequency Measurements in CA mode test case R10 | - | - | - | R4 | R4-64b | R4-125366 | Revised | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1476 | 1 | F | Rel-10 | 10.9.0 | 10.10.0 | Correction to Inter-frequency Measurements in CA mode test case R10 | RP-59 | RP-130268 | approved | R4 | R4-64b | R4-125913 | Agreed | 2013-02-16 | LTE-RF | - | 2013-02-23 |
1477 | - | A | Rel-11 | .. | - | Correction to Inter-frequency Measurements in CA mode test case R11 | - | - | - | R4 | R4-64b | R4-125367 | Revised | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1477 | 1 | A | Rel-11 | 11.3.1 | 11.4.0 | Correction to Inter-frequency Measurements in CA mode test case R11 | RP-59 | RP-130268 | approved | R4 | R4-64b | R4-125914 | Agreed | 2013-02-16 | LTE-RF | - | 2013-02-23 |
1478 | - | F | Rel-10 | 10.8.1 | 10.9.0 | RSTD accuracy requirements under intra-frequency HO | RP-58 | RP-121854 | approved | R4 | R4-64b | R4-125385 | Agreed | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1479 | - | A | Rel-11 | .. | - | RSTD accuracy requirements under intra-frequency HO | - | - | - | R4 | R4-64b | R4-125386 | Rejected | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1480 | - | F | Rel-11 | .. | - | Requirements for RSRP and RSRQ for E-CID Positioning | - | - | - | R4 | R4-64b | R4-125394 | Revised | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1480 | 1 | F | Rel-11 | 11.3.1 | 11.4.0 | Requirements for RSRP and RSRQ for E-CID Positioning | RP-59 | RP-130287 | approved | R4 | R4-64b | R4-126024 | Agreed | 2013-02-16 | TEI11 | - | 2013-02-23 |
1481 | - | F | Rel-10 | .. | - | Test specification for measurements without gaps | - | - | - | R4 | R4-64b | R4-125549 | Withdrawn | 2012-12-03 | LTE_CA-Perf | - | 2012-12-03 |
1482 | - | A | Rel-11 | .. | - | Test specification for measurements without gaps | - | - | - | R4 | R4-64b | R4-125551 | Withdrawn | 2012-12-03 | LTE_CA-Perf | - | 2012-12-03 |
1483 | - | A | Rel-11 | .. | - | Impact of CA harmonic product on RRM Requirements (Rel-11) | - | - | - | R4 | R4-64b | R4-125679 | Withdrawn | 2012-12-03 | LTE_CA | - | 2012-12-03 |
1484 | - | B | Rel-11 | .. | - | RRM Requirements for RACH on SCell | - | - | - | R4 | R4-64b | R4-125696 | Withdrawn | 2012-12-03 | LTE_CA_enh-Core | - | 2012-12-03 |
1485 | - | F | Rel-10 | .. | - | Clean up for CA | - | - | - | R4 | R4-64b | R4-125752 | Revised | 2012-12-03 | LTE_CA-Core | - | 2012-12-03 |
1485 | 1 | F | Rel-10 | 10.8.1 | 10.9.0 | Clean up for CA | RP-58 | RP-121861 | approved | R4 | R4-64b | R4-125870 | Agreed | 2012-12-03 | LTE_CA-Core | - | 2012-12-03 |
1486 | - | F | Rel-11 | .. | - | Clean up for CA | - | - | - | R4 | R4-64b | R4-125754 | Revised | 2012-12-03 | LTE_CA-Core | - | 2012-12-03 |
1486 | 1 | F | Rel-11 | 11.2.0 | 11.3.0 | Clean up for CA | RP-58 | RP-121861 | approved | R4 | R4-64b | R4-125871 | Agreed | 2012-12-03 | LTE_CA-Core | - | 2012-12-03 |
1487 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Clarification of CPICH RSCP side conditions | RP-58 | RP-121911 | approved | R4 | R4-64b | R4-125755 | Agreed | 2012-12-03 | TEI11 | - | 2012-12-03 |
1488 | - | F | Rel-10 | 10.8.1 | 10.9.0 | Editorial corrections | RP-58 | RP-121867 | approved | R4 | R4-64b | R4-125757 | Agreed | 2012-12-03 | TEI10 | - | 2012-12-03 |
1489 | - | A | Rel-11 | 11.2.0 | 11.3.0 | Editorial corrections | RP-58 | RP-121867 | approved | R4 | R4-64b | R4-125758 | Agreed | 2012-12-03 | TEI10 | - | 2012-12-03 |
1490 | - | F | Rel-11 | .. | - | Relaxation due to CA insertation loss | - | - | - | R4 | R4-64b | R4-125760 | Withdrawn | 2012-12-03 | LTE_CA-Core | - | 2012-12-03 |
1491 | - | F | Rel-10 | .. | - | Relaxation due to CA insertation loss | - | - | - | R4 | R4-64b | R4-125761 | Withdrawn | 2012-12-03 | LTE_CA-Core | - | 2012-12-03 |
1492 | - | A | Rel-11 | .. | - | Relaxation due to CA insertation loss | - | - | - | R4 | R4-64b | R4-125762 | Withdrawn | 2012-12-03 | LTE_CA-Core | - | 2012-12-03 |
1493 | - | F | Rel-9 | .. | - | A clarification in inter-frequency RSTD accuracy requirements | - | - | - | R4 | R4-64b | R4-125769 | Rejected | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1494 | - | F | Rel-10 | .. | - | A clarification in inter-frequency RSTD accuracy requirements | - | - | - | R4 | R4-64b | R4-125770 | Rejected | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1495 | - | F | Rel-11 | .. | - | A clarification in inter-frequency RSTD accuracy requirements | - | - | - | R4 | R4-64b | R4-125773 | Revised | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1495 | 1 | F | Rel-11 | .. | - | A clarification in inter-frequency RSTD accuracy requirements | - | - | - | R4 | R4-64b | R4-125869 | Withdrawn | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1496 | - | F | Rel-10 | 10.8.1 | 10.9.0 | Band correction in RRM requirements | RP-58 | RP-121867 | approved | R4 | R4-64b | R4-125787 | Agreed | 2012-12-03 | TEI10 | - | 2012-12-03 |
1497 | - | A | Rel-11 | 11.2.0 | 11.3.0 | Band correction in RRM requirements | RP-58 | RP-121867 | approved | R4 | R4-64b | R4-125789 | Agreed | 2012-12-03 | TEI10 | - | 2012-12-03 |
1498 | - | B | Rel-11 | .. | - | Updating RRM requirements in 36.133 | - | - | - | R4 | R4-64b | R4-125804 | Rejected | 2012-12-03 | SPIA_IDC_LTE-Core | - | 2012-12-03 |
1499 | - | A | Rel-11 | 11.2.0 | 11.3.0 | Correction to RSTD Measurement Reporting Delay for Carrier Aggregation Test Cases | RP-58 | RP-121861 | approved | R4 | R4-64b | R4-126021 | Agreed | 2012-12-03 | LTE_CA-Core | - | 2012-12-03 |
1500 | - | F | Rel-11 | .. | - | Impact of CA harmonic product on RRM Requirements (Rel-11) | - | - | - | R4 | R4-65 | R4-126084 | Revised | 2012-12-03 | LTE_CA | - | 2012-12-03 |
1500 | 1 | F | Rel-11 | .. | - | Impact of CA harmonic product on RRM Requirements (Rel-11) | - | - | - | R4 | R4-65 | R4-126838 | Rejected | 2012-12-03 | LTE_CA | - | 2012-12-03 |
1501 | - | F | Rel-10 | .. | - | UE Rx-Tx time difference measurement in Handover (Rel-10) | - | - | - | R4 | R4-65 | R4-126086 | Revised | 2012-12-03 | TEI10 | - | 2012-12-03 |
1501 | 1 | F | Rel-10 | .. | - | UE Rx-Tx time difference measurement in Handover (Rel-10) | - | - | - | R4 | R4-65 | R4-126839 | Rejected | 2012-12-03 | TEI10 | - | 2012-12-03 |
1502 | - | F | Rel-10 | .. | - | Clarification of CA Intra-frequency RSTD Measurement Accuracy | - | - | - | R4 | R4-65 | R4-126088 | Rejected | 2012-12-03 | LTE_CA | - | 2012-12-03 |
1503 | - | F | Rel-10 | .. | - | Making CA RSRP and RSRQ measurement accuracy test cases band-agnostic | - | - | - | R4 | R4-65 | R4-126090 | Withdrawn | 2012-12-03 | LTE_CA-core | - | 2012-12-03 |
1504 | - | A | Rel-11 | .. | - | Making CA RSRP and RSRQ measurement accuracy test cases band-agnostic | - | - | - | R4 | R4-65 | R4-126091 | Withdrawn | 2012-12-03 | LTE_CA-core | - | 2012-12-03 |
1505 | - | F | Rel-10 | 10.8.1 | 10.9.0 | Band-dependent RRM requirements for CA | RP-58 | RP-121861 | approved | R4 | R4-65 | R4-126093 | Agreed | 2012-12-03 | LTE_CA-core | - | 2012-12-03 |
1506 | - | A | Rel-11 | 11.2.0 | 11.3.0 | Band-dependent RRM requirements for CA | RP-58 | RP-121861 | approved | R4 | R4-65 | R4-126094 | Agreed | 2012-12-03 | LTE_CA-core | - | 2012-12-03 |
1507 | - | F | Rel-11 | .. | - | CR on RLM Requirements for FeICIC | - | - | - | R4 | R4-65 | R4-126126 | Revised | 2012-12-03 | eICIC_enh_LTE-Core | - | 2012-12-03 |
1507 | 1 | F | Rel-11 | 11.2.0 | 11.3.0 | CR on RLM Requirements for FeICIC | RP-58 | RP-121872 | approved | R4 | R4-65 | R4-126946 | Agreed | 2012-12-03 | eICIC_enh_LTE-Core | - | 2012-12-03 |
1508 | - | F | Rel-10 | .. | - | Cdma2000 1xRTT measurements for SON ANR | - | - | - | R4 | R4-65 | R4-126131 | Withdrawn | 2012-12-03 | TEI10 | - | 2012-12-03 |
1509 | - | F | Rel-9 | .. | - | Corrections to the RSTD intra-frequency measurement test parameters (Rel-9) | - | - | - | R4 | R4-65 | R4-126199 | Withdrawn | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1510 | - | A | Rel-10 | .. | - | Corrections to the RSTD intra-frequency measurement test parameters (Rel-10) | - | - | - | R4 | R4-65 | R4-126200 | Withdrawn | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1511 | - | A | Rel-11 | .. | - | Corrections to the RSTD intra-frequency measurement test parameters (Rel-11) | - | - | - | R4 | R4-65 | R4-126202 | Withdrawn | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1512 | - | F | Rel-9 | .. | - | E-UTRAN CSG Proximity Indication Requirements (Rel-9) | - | - | - | R4 | R4-65 | R4-126215 | Revised | 2012-12-03 | TEI10 | - | 2012-12-03 |
1512 | 1 | F | Rel-9 | 9.13.0 | 9.14.0 | E-UTRAN CSG Proximity Indication Requirements (Rel-9) | RP-58 | RP-121859 | approved | R4 | R4-65 | R4-126837 | Agreed | 2012-12-03 | TEI9 | - | 2012-12-03 |
1513 | - | B | Rel-11 | .. | - | Introduction of CA_4-12 into TS 36.133 | - | - | - | R4 | R4-65 | R4-126224 | Withdrawn | 2012-12-03 | LTE_CA_B4_B12-Core | - | 2012-12-03 |
1514 | - | F | Rel-9 | 9.13.0 | 9.14.0 | Correction of OCNG Patterns for UE Rx - Tx Time Difference Test Cases | RP-58 | RP-121854 | approved | R4 | R4-65 | R4-126226 | Agreed | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1515 | - | A | Rel-10 | 10.8.1 | 10.9.0 | Correction of OCNG Patterns for UE Rx - Tx Time Difference Test Cases | RP-58 | RP-121854 | approved | R4 | R4-65 | R4-126227 | Agreed | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1516 | - | A | Rel-11 | 11.2.0 | 11.3.0 | Correction of OCNG Patterns for UE Rx - Tx Time Difference Test Cases | RP-58 | RP-121854 | approved | R4 | R4-65 | R4-126228 | Agreed | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1517 | - | B | Rel-11 | .. | - | Cell identification requirements in FeICIC | - | - | - | R4 | R4-65 | R4-126258 | Revised | 2012-12-03 | eICIC_enh_LTE-Core | - | 2012-12-03 |
1517 | 1 | B | Rel-11 | 11.2.0 | 11.3.0 | Cell identification requirements in FeICIC | RP-58 | RP-121872 | approved | R4 | R4-65 | R4-126982 | Agreed | 2012-12-03 | eICIC_enh_LTE-Core | - | 2012-12-03 |
1518 | - | B | Rel-11 | .. | - | RSRP/RSRQ measurement accuracy requirements in FeICIC | - | - | - | R4 | R4-65 | R4-126264 | Rejected | 2012-12-03 | eICIC_enh_LTE-Perf | - | 2012-12-03 |
1519 | - | F | Rel-10 | .. | - | Scell Activation Requirements for secondary component carrier with deactivated SCell R10 | - | - | - | R4 | R4-65 | R4-126266 | Rejected | 2012-12-03 | LTE_CA | - | 2012-12-03 |
1520 | - | A | Rel-10 | .. | - | Scell Activation Requirements for secondary component carrier with deactivated SCell R11 | - | - | - | R4 | R4-65 | R4-126267 | Rejected | 2012-12-03 | LTE_CA | - | 2012-12-03 |
1521 | - | F | Rel-10 | .. | - | Time offset correction in CA test cases R10 | - | - | - | R4 | R4-65 | R4-126270 | Revised | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1521 | 1 | F | Rel-10 | 10.8.1 | 10.9.0 | Time offset correction in CA test cases R10 | RP-58 | RP-121851 | approved | R4 | R4-65 | R4-126802 | Agreed | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1522 | - | A | Rel-11 | 11.2.0 | 11.3.0 | Time offset correction in CA test cases R11 | RP-58 | RP-121851 | approved | R4 | R4-65 | R4-126271 | Agreed | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1523 | - | F | Rel-10 | .. | - | Time offset correction in CA RSTD test cases R10 | - | - | - | R4 | R4-65 | R4-126272 | Revised | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1523 | 1 | F | Rel-10 | 10.8.1 | 10.9.0 | Time offset correction in CA RSTD test cases R10 | RP-58 | RP-121851 | approved | R4 | R4-65 | R4-126803 | Agreed | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1524 | - | A | Rel-11 | .. | - | Time offset correction in CA RSTD test cases R11 | - | - | - | R4 | R4-65 | R4-126273 | Withdrawn | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1525 | - | F | Rel-9 | 9.13.0 | 9.14.0 | Clarification on inter-frequency RSTD measurement accuracy requirement R9 | RP-58 | RP-121854 | approved | R4 | R4-65 | R4-126278 | Agreed | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1526 | - | F | Rel-10 | .. | - | Clarification on intra-frequency and inter-frequency RSTD measurement accuracy requirement R10 | - | - | - | R4 | R4-65 | R4-126279 | Revised | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1526 | 1 | F | Rel-10 | .. | - | Clarification on intra-frequency and inter-frequency RSTD measurement accuracy requirement R10 | - | - | - | R4 | R4-65 | R4-126938 | Revised | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1526 | 2 | F | Rel-10 | .. | - | Clarification on intra-frequency and inter-frequency RSTD measurement accuracy requirement R10 | - | - | - | R4 | R4-65 | R4-126944 | Rejected | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1527 | - | F | Rel-11 | .. | - | Clarification on intra-frequency and inter-frequency RSTD measurement accuracy requirement R11 | - | - | - | R4 | R4-65 | R4-126280 | Revised | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1527 | 1 | F | Rel-11 | .. | - | Clarification on intra-frequency and inter-frequency RSTD measurement accuracy requirement R11 | - | - | - | R4 | R4-65 | R4-126939 | Rejected | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1528 | - | F | Rel-10 | .. | - | Clarification on RSTD measurement requirement under HO and Pcell changing R10 | - | - | - | R4 | R4-65 | R4-126281 | Revised | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1528 | 1 | F | Rel-10 | 10.8.1 | 10.9.0 | Clarification on RSTD measurement requirement under HO and Pcell changing R10 | RP-58 | RP-121854 | approved | R4 | R4-65 | R4-126940 | Agreed | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1529 | - | F | Rel-11 | .. | - | Clarification on RSTD measurement requirement under HO and Pcell changing R11 | - | - | - | R4 | R4-65 | R4-126282 | Revised | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1529 | 1 | F | Rel-11 | 11.2.0 | 11.3.0 | Clarification on RSTD measurement requirement under HO and Pcell changing R11 | RP-58 | RP-121854 | approved | R4 | R4-65 | R4-126941 | Agreed | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1530 | - | B | Rel-11 | .. | - | Introduction the IDC requirements in 36.133 Rel-11 | - | - | - | R4 | R4-65 | R4-126284 | Revised | 2012-12-03 | SPIA_IDC_LTE-Core | - | 2012-12-03 |
1530 | 1 | B | Rel-11 | .. | - | Introduction the IDC requirements in 36.133 Rel-11 | - | - | - | R4 | R4-65 | R4-126830 | Revised | 2012-12-03 | SPIA_IDC_LTE-Core | - | 2012-12-03 |
1530 | 2 | B | Rel-11 | 11.2.0 | 11.3.0 | Introduction the IDC requirements in 36.133 Rel-11 | RP-58 | RP-121910 | approved | R4 | R4-65 | R4-126831 | Agreed | 2012-12-03 | SPIA_IDC_LTE-Core | - | 2012-12-03 |
1531 | - | F | Rel-11 | .. | - | The correction for band 4-12 combination requirements in 36.133 | - | - | - | R4 | R4-65 | R4-126286 | Withdrawn | 2012-12-03 | LTE_CA_B4_B12-Core | - | 2012-12-03 |
1532 | - | B | Rel-11 | .. | - | CR for 36.133 Introduction of test cases of RSRQ WB measurement | - | - | - | R4 | R4-65 | R4-126327 | Not handled | 2012-12-03 | TEI11 | - | 2012-12-03 |
1533 | - | B | Rel-11 | .. | - | Introduction of MDT enhancements | - | - | - | R4 | R4-65 | R4-126351 | Rejected | 2012-12-03 | eMDT_UMTSLTE-Core | - | 2012-12-03 |
1534 | - | F | Rel-8 | 8.19.0 | 8.20.0 | Correction on test cases for handover to UTRAN TDD for Rel-8 | RP-58 | RP-121849 | approved | R4 | R4-65 | R4-126359 | Agreed | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1535 | - | A | Rel-9 | 9.13.0 | 9.14.0 | Correction on test cases for handover to UTRAN TDD for Rel-9 | RP-58 | RP-121849 | approved | R4 | R4-65 | R4-126360 | Agreed | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1536 | - | A | Rel-10 | 10.8.1 | 10.9.0 | Correction on test cases for handover to UTRAN TDD for Rel-10 | RP-58 | RP-121849 | approved | R4 | R4-65 | R4-126361 | Agreed | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1537 | - | A | Rel-11 | 11.2.0 | 11.3.0 | Correction on test cases for handover to UTRAN TDD for Rel-11 | RP-58 | RP-121849 | approved | R4 | R4-65 | R4-126363 | Agreed | 2012-12-03 | LTE-RF | - | 2012-12-03 |
1538 | - | F | Rel-11 | .. | - | Cell phase syncronisation for feICIC | - | - | - | R4 | R4-65 | R4-126460 | Rejected | 2012-12-03 | eICIC_enh_LTE-Core | - | 2012-12-03 |
1539 | - | F | Rel-10 | .. | - | Test specification for measurements without gaps | - | - | - | R4 | R4-65 | R4-126479 | Withdrawn | 2012-12-03 | LTE_CA-Perf | - | 2012-12-03 |
1540 | - | A | Rel-11 | .. | - | Test specification for measurements without gaps | - | - | - | R4 | R4-65 | R4-126480 | Withdrawn | 2012-12-03 | LTE_CA-Perf | - | 2012-12-03 |
1541 | - | F | Rel-10 | .. | - | Measurement gap clarification in case of carrier aggregation | - | - | - | R4 | R4-65 | R4-126484 | Rejected | 2012-12-03 | LTE_CA | - | 2012-12-03 |
1542 | - | B | Rel-11 | 11.2.0 | 11.3.0 | RRM requirements under IDC | RP-58 | RP-121910 | approved | R4 | R4-65 | R4-126486 | Agreed | 2012-12-03 | SPIA_IDC_LTE-Core | - | 2012-12-03 |
1543 | - | F | Rel-9 | .. | - | E-UTRAN FDD Proximity Indication Test Case (Rel-9) | - | - | - | R4 | R4-65 | R4-126553 | Rejected | 2012-12-03 | TEI10 | - | 2012-12-03 |
1544 | - | F | Rel-10 | .. | - | Editorial corrections RRM | - | - | - | R4 | R4-65 | R4-126619 | Revised | 2012-12-03 | TEI10 | - | 2012-12-03 |
1544 | 1 | F | Rel-10 | 10.8.1 | 10.9.0 | Editorial corrections RRM | RP-58 | RP-121867 | approved | R4 | R4-65 | R4-126929 | Agreed | 2012-12-03 | TEI10 | - | 2012-12-03 |
1545 | - | A | Rel-11 | 11.2.0 | 11.3.0 | Editorial corrections RRM | RP-58 | RP-121867 | approved | R4 | R4-65 | R4-126620 | Agreed | 2012-12-03 | TEI10 | - | 2012-12-03 |
1546 | - | F | Rel-8 | 8.19.0 | 8.20.0 | Conditions in CSG reselection requirements | RP-58 | RP-121852 | approved | R4 | R4-65 | R4-126621 | Agreed | 2012-12-03 | TEI8 | - | 2012-12-03 |
1547 | - | A | Rel-9 | 9.13.0 | 9.14.0 | Conditions in CSG reselection requirements | RP-58 | RP-121852 | approved | R4 | R4-65 | R4-126622 | Agreed | 2012-12-03 | TEI8 | - | 2012-12-03 |
1548 | - | A | Rel-10 | 10.8.1 | 10.9.0 | Conditions in CSG reselection requirements | RP-58 | RP-121852 | approved | R4 | R4-65 | R4-126624 | Agreed | 2012-12-03 | TEI8 | - | 2012-12-03 |
1549 | - | A | Rel-11 | 11.2.0 | 11.3.0 | Conditions in CSG reselection requirements | RP-58 | RP-121852 | approved | R4 | R4-65 | R4-126625 | Agreed | 2012-12-03 | TEI8 | - | 2012-12-03 |
1550 | - | F | Rel-8 | 8.19.0 | 8.20.0 | Correcting inconsistency between inter-RAT UTRA measurements and requirements | RP-58 | RP-121852 | approved | R4 | R4-65 | R4-126628 | Agreed | 2012-12-03 | TEI8 | - | 2012-12-03 |
1551 | - | A | Rel-9 | 9.13.0 | 9.14.0 | Correcting inconsistency between inter-RAT UTRA measurements and requirements | RP-58 | RP-121852 | approved | R4 | R4-65 | R4-126631 | Agreed | 2012-12-03 | TEi8 | - | 2012-12-03 |
1552 | - | A | Rel-10 | 10.8.1 | 10.9.0 | Correcting inconsistency between inter-RAT UTRA measurements and requirements | RP-58 | RP-121852 | approved | R4 | R4-65 | R4-126633 | Agreed | 2012-12-03 | TEI8 | - | 2012-12-03 |
1553 | - | A | Rel-11 | 11.2.0 | 11.3.0 | Correcting inconsistency between inter-RAT UTRA measurements and requirements | RP-58 | RP-121852 | approved | R4 | R4-65 | R4-126636 | Agreed | 2012-12-03 | TEI8 | - | 2012-12-03 |
1554 | - | F | Rel-10 | 10.8.1 | 10.9.0 | Refsens requirements for CA capable UE | RP-58 | RP-121861 | approved | R4 | R4-65 | R4-126637 | Agreed | 2012-12-03 | LTE_CA-Core | - | 2012-12-03 |
1555 | - | A | Rel-11 | 11.2.0 | 11.3.0 | Refsens requirements for CA capable UE | RP-58 | RP-121861 | approved | R4 | R4-65 | R4-126641 | Agreed | 2012-12-03 | LTE_CA-Core | - | 2012-12-03 |
1556 | - | F | Rel-10 | .. | - | Interruption with RSTD measurements for CA UEs | - | - | - | R4 | R4-65 | R4-126645 | Rejected | 2012-12-03 | LTE_CA-Core | - | 2012-12-03 |
1557 | - | A | Rel-11 | .. | - | Interruption with RSTD measurements for CA UEs | - | - | - | R4 | R4-65 | R4-126652 | not handled | 2012-12-03 | LTE_CA-Core | - | 2012-12-03 |
1558 | - | F | Rel-11 | .. | - | Intra-frequency RSTD accuracy requirements account for serving cell bandwidth | - | - | - | R4 | R4-65 | R4-126656 | Revised | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1558 | 1 | F | Rel-11 | 11.2.0 | 11.3.0 | Intra-frequency RSTD accuracy requirements account for serving cell bandwidth | RP-58 | RP-121854 | approved | R4 | R4-65 | R4-126930 | Agreed | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1559 | - | F | Rel-11 | .. | - | Clarification on the total number of cells for RSTD inter-frequency measurement | - | - | - | R4 | R4-65 | R4-126658 | Revised | 2012-12-03 | LCE_LTE | - | 2012-12-03 |
1559 | 1 | F | Rel-11 | 11.2.0 | 11.3.0 | Clarification on the total number of cells for RSTD inter-frequency measurement | RP-58 | RP-121854 | approved | R4 | R4-65 | R4-126931 | Agreed | 2012-12-03 | LCS_LTE | - | 2012-12-03 |
1560 | - | F | Rel-10 | .. | - | Clarification of the TDM pattern conditions | - | - | - | R4 | R4-65 | R4-126675 | Revised | 2012-12-03 | eICIC_LTE-Core | - | 2012-12-03 |
1560 | 1 | F | Rel-10 | .. | - | Clarification of the TDM pattern conditions | - | - | - | R4 | R4-65 | R4-126937 | Revised | 2012-12-03 | eICIC_LTE-Core | - | 2012-12-03 |
1560 | 2 | F | Rel-10 | .. | - | Clarification of the TDM pattern conditions | - | - | - | R4 | R4-65 | R4-126947 | Withdrawn | 2012-12-03 | eICIC_LTE-Core | - | 2012-12-03 |
1560 | 3 | F | Rel-10 | 10.8.1 | - | Clarification of the TDM pattern conditions | RP-58 | RP-121860 | revised | R4 | R4-65 | R4-126952 | Agreed | 2012-12-03 | eICIC_LTE-Core | Multiple cover sheet errors | 2012-12-03 |
1560 | 4 | A | Rel-10 | 10.8.1 | - | Clarification of the TDM pattern conditions | RP-58 | RP-121972 | revised | R4 | - | - | - | 2012-12-04 | eICIC_LTE-Core | Further cover sheet error, should be cat F | 2012-12-04 |
1560 | 5 | F | Rel-10 | 10.8.1 | 10.9.0 | Clarification of the TDM pattern conditions | RP-58 | RP-121983 | approved | rapporteur | - | - | - | 2012-12-05 | eICIC_LTE-Core | - | 2012-12-05 |
1561 | - | A | Rel-11 | .. | - | Clarification of the TDM pattern conditions | - | - | - | R4 | R4-65 | R4-126677 | Revised | 2012-12-03 | eICIC_LTE-Core | - | 2012-12-03 |
1561 | 1 | A | Rel-11 | 11.2.0 | 11.3.0 | Clarification of the TDM pattern conditions | RP-58 | RP-121860 | approved | R4 | R4-65 | R4-126948 | Agreed | 2012-12-03 | eICIC_LTE-Core | - | 2012-12-03 |
1562 | - | B | Rel-11 | .. | - | MDT requirements in Rel-11 | - | - | - | R4 | R4-65 | R4-126680 | Revised | 2012-12-03 | eMDT_UMTSLTE-Core | - | 2012-12-03 |
1562 | 1 | B | Rel-11 | 11.2.0 | 11.3.0 | MDT requirements in Rel-11 | RP-58 | RP-121873 | approved | R4 | R4-65 | R4-126832 | Agreed | 2012-12-03 | eMDT_UMTSLTE-Core | - | 2012-12-03 |
1563 | - | B | Rel-11 | 11.2.0 | 11.3.0 | Introduction of Band 29 | RP-58 | RP-121901 | approved | R4 | R4-65 | R4-126746 | Agreed | 2012-12-03 | LTE_DL_FDD700-Core | - | 2012-12-03 |
1564 | - | F | Rel-10 | 10.8.1 | 10.9.0 | Impact of Insertion Loss on RRM CA Test Cases | RP-58 | RP-121861 | approved | R4 | R4-65 | R4-126950 | Agreed | 2012-12-03 | LTE_CA | - | 2012-12-03 |
1565 | - | F | Rel-10 | 10.9.0 | 10.10.0 | Secondary Component carrier levels for CA RSRP Test cases A.9.1.6 and A.9.1.7 | RP-59 | RP-130263 | approved | R4 | R4-66 | R4-130021 | Agreed | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1566 | - | A | Rel-11 | 11.3.1 | 11.4.0 | Secondary Component carrier levels for CA RSRP Test cases A.9.1.6 and A.9.1.7 | RP-59 | RP-130263 | approved | R4 | R4-66 | R4-130022 | Agreed | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1567 | - | F | Rel-10 | 10.9.0 | 10.10.0 | Remove intra-frequency relative Requirement for CA RSRQ Test Cases | RP-59 | RP-130263 | approved | R4 | R4-66 | R4-130023 | Agreed | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1568 | - | A | Rel-11 | 11.3.1 | 11.4.0 | Remove intra-frequency relative Requirement for CA RSRQ Test Cases | RP-59 | RP-130263 | approved | R4 | R4-66 | R4-130024 | Agreed | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1569 | - | F | Rel-10 | .. | - | Impact of CA Insertion Loss on RRM Test Cases | - | - | - | R4 | R4-66 | R4-130025 | Rejected | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1570 | - | A | Rel-11 | .. | - | Impact of CA Insertion Loss on RRM Test Cases | - | - | - | R4 | R4-66 | R4-130026 | Rejected | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1571 | - | F | Rel-10 | 10.9.0 | 10.10.0 | Cell timing for CA RSRP and RSRQ Test cases | RP-59 | RP-130263 | approved | R4 | R4-66 | R4-130028 | Agreed | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1572 | - | A | Rel-11 | 11.3.1 | 11.4.0 | Cell timing for CA RSRP and RSRQ Test cases | RP-59 | RP-130263 | approved | R4 | R4-66 | R4-130029 | Agreed | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1573 | - | F | Rel-11 | .. | - | Editorial correction for introduction of Band 29 | - | - | - | R4 | R4-66 | R4-130030 | Revised | 2013-02-16 | LTE_DL_FDD700-Core | - | 2013-02-16 |
1573 | 1 | F | Rel-11 | 11.3.1 | 11.4.0 | Editorial correction for introduction of Band 29 | RP-59 | RP-130277 | approved | R4 | R4-66 | R4-130933 | Agreed | 2013-02-16 | LTE_DL_FDD700-Core | - | 2013-02-16 |
1574 | - | F | Rel-11 | .. | - | Modifing description of measurement GAP | - | - | - | R4 | R4-66 | R4-130084 | Rejected | 2013-02-16 | LTE_CA_enh-Core | - | 2013-02-16 |
1575 | - | F | Rel-10 | .. | - | Clarification of retuning interruption in single carrier operation | - | - | - | R4 | R4-66 | R4-130099 | Revised | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1575 | 1 | F | Rel-10 | 10.9.0 | 10.10.0 | Clarification of retuning interruption in single carrier operation | RP-59 | RP-130263 | approved | R4 | R4-66 | R4-130799 | Agreed | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1576 | - | A | Rel-11 | 11.3.1 | 11.4.0 | Clarification of retuning interruption in single carrier operation | RP-59 | RP-130263 | approved | R4 | R4-66 | R4-130100 | Agreed | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1577 | - | F | Rel-9 | .. | - | RRM: RMC and OCNG pattern for FDD CGI test with autonomous gaps (Rel-9) | - | - | - | R4 | R4-66 | R4-130106 | Revised | 2013-02-16 | LTE-RF | - | 2013-02-16 |
1577 | 1 | F | Rel-9 | 9.14.0 | 9.15.0 | RRM: RMC and OCNG pattern for FDD CGI test with autonomous gaps (Rel-9) | RP-59 | RP-130260 | approved | R4 | R4-66 | R4-130806 | Agreed | 2013-02-16 | LTE-RF | - | 2013-02-16 |
1578 | - | A | Rel-10 | 10.9.0 | 10.10.0 | RRM: RMC and OCNG pattern for FDD CGI test with autonomous gaps (Rel-10) | RP-59 | RP-130260 | approved | R4 | R4-66 | R4-130107 | Agreed | 2013-02-16 | LTE-RF | - | 2013-02-16 |
1579 | - | A | Rel-11 | 11.3.1 | 11.4.0 | RRM: RMC and OCNG pattern for FDD CGI test with autonomous gaps (Rel-11) | RP-59 | RP-130260 | approved | R4 | R4-66 | R4-130108 | Agreed | 2013-02-16 | LTE-RF | - | 2013-02-16 |
1580 | - | F | Rel-9 | .. | - | Correction to CSG proxmity requirement | - | - | - | R4 | R4-66 | R4-130116 | Revised | 2013-02-16 | TEI9 | - | 2013-02-16 |
1580 | 1 | F | Rel-9 | 9.14.0 | 9.15.0 | Correction to CSG proxmity requirement | RP-59 | RP-130261 | approved | R4 | R4-66 | R4-130934 | Agreed | 2013-02-16 | TEI9 | - | 2013-02-16 |
1581 | - | A | Rel-10 | .. | - | Correction to CSG proximity requirements | - | - | - | R4 | R4-66 | R4-130117 | Revised | 2013-02-16 | TEI9 | - | 2013-02-16 |
1581 | 1 | F | Rel-10 | 10.9.0 | 10.10.0 | Correction to CSG proximity requirements | RP-59 | RP-130268 | approved | R4 | R4-66 | R4-130961 | Agreed | 2013-02-16 | TEI10 | - | 2013-02-16 |
1582 | - | A | Rel-11 | 11.3.1 | 11.4.0 | Correction to CSG proximity requirement | RP-59 | RP-130268 | approved | R4 | R4-66 | R4-130118 | Agreed | 2013-02-16 | TEI10 | - | 2013-02-16 |
1583 | - | A | Rel-10 | 10.9.0 | 10.10.0 | E-UTRAN FDD Proximity Indication RRM Requirements (Rel-10) | RP-59 | RP-130268 | approved | R4 | R4-66 | R4-130153 | Agreed | 2013-02-16 | TEI10 | - | 2013-02-16 |
1584 | - | A | Rel-11 | 11.3.1 | 11.4.0 | E-UTRAN FDD Proximity Indication RRM Requirements (Rel-11) | RP-59 | RP-130268 | approved | R4 | R4-66 | R4-130154 | Agreed | 2013-02-16 | TEI10 | - | 2013-02-16 |
1585 | - | F | Rel-9 | .. | - | E-UTRAN FDD Proximity Indication Test Case (Rel-9) | - | - | - | R4 | R4-66 | R4-130156 | Revised | 2013-02-16 | TEI10 | - | 2013-02-16 |
1585 | 1 | F | Rel-9 | 9.14.0 | 9.15.0 | E-UTRAN FDD Proximity Indication Test Case (Rel-9) | RP-59 | RP-130261 | approved | R4 | R4-66 | R4-130827 | Agreed | 2013-02-16 | TEI9 | - | 2013-02-16 |
1586 | - | D | Rel-11 | .. | - | CR 36.133, Cell identification requirements of feICIC | - | - | - | R4 | R4-66 | R4-130167 | Rejected | 2013-02-16 | eICIC_enh_LTE-Perf | - | 2013-02-16 |
1587 | - | F | Rel-11 | .. | - | Impact of CA harmonic product on RRM Requirements (Rel-11) | - | - | - | R4 | R4-66 | R4-130172 | Rejected | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1588 | - | F | Rel-11 | .. | - | Remove the Brackets in cell identification of FeICIC | - | - | - | R4 | R4-66 | R4-130185 | Rejected | 2013-02-16 | eICIC_enh_LTE-Core | - | 2013-02-16 |
1589 | - | F | Rel-11 | .. | - | Clarification of Cell Identification core requirement in FeICIC | - | - | - | R4 | R4-66 | R4-130186 | Revised | 2013-02-16 | eICIC_enh_LTE-Core | - | 2013-02-16 |
1589 | 1 | F | Rel-11 | 11.3.1 | 11.4.0 | Clarification of Cell Identification core requirement in FeICIC | RP-59 | RP-130275 | approved | R4 | R4-66 | R4-130937 | Agreed | 2013-02-16 | eICIC_enh_LTE-Core | - | 2013-02-16 |
1590 | - | F | Rel-11 | .. | - | Clarification of RLM core requirement in FeICIC | - | - | - | R4 | R4-66 | R4-130188 | Rejected | 2013-02-16 | eICIC_enh_LTE-Core | - | 2013-02-16 |
1591 | - | B | Rel-11 | .. | - | RSRP/RSRQ measurement accuracy requirements in FeICIC | - | - | - | R4 | R4-66 | R4-130194 | Revised | 2013-02-16 | eICIC_enh_LTE-Perf | - | 2013-02-16 |
1591 | 1 | B | Rel-11 | 11.3.1 | 11.4.0 | RSRP/RSRQ measurement accuracy requirements in FeICIC | RP-59 | RP-130283 | approved | R4 | R4-66 | R4-130819 | Agreed | 2013-02-16 | eICIC_enh_LTE-Perf | - | 2013-02-16 |
1592 | - | F | Rel-10 | .. | - | Scell Activation Requirements for secondary component carrier with deactivated SCell R10 | - | - | - | R4 | R4-66 | R4-130206 | Rejected | 2013-02-16 | LTE_CA-Perf | - | 2013-02-16 |
1593 | - | A | Rel-11 | .. | - | Scell Activation Requirements for secondary component carrier with deactivated SCell R11 | - | - | - | R4 | R4-66 | R4-130208 | Rejected | 2013-02-16 | LTE_CA-Perf | - | 2013-02-16 |
1594 | - | B | Rel-11 | .. | - | RSRP and RSRQ measurement accuracy requirements for FeICIC | - | - | - | R4 | R4-66 | R4-130253 | Rejected | 2013-02-16 | eICIC_enh_LTE-Perf | - | 2013-02-16 |
1595 | - | F | Rel-10 | .. | - | Clarification on inter-frequency RSTD measurement accuracy requirement R10 | - | - | - | R4 | R4-66 | R4-130261 | Revised | 2013-02-16 | LCS_LTE | - | 2013-02-16 |
1595 | 1 | F | Rel-10 | .. | - | Clarification on inter-frequency RSTD measurement accuracy requirement R10 | - | - | - | R4 | R4-66 | R4-130846 | Revised | 2013-02-16 | LCS_LTE | - | 2013-02-16 |
1595 | 2 | F | Rel-10 | .. | - | Clarification on inter-frequency RSTD measurement accuracy requirement R10 | - | - | - | R4 | R4-66 | R4-130966 | Rejected | 2013-02-16 | LCS_LTE | - | 2013-02-16 |
1596 | - | A | Rel-11 | .. | - | Clarification on inter-frequency RSTD measurement accuracy requirement R11 | - | - | - | R4 | R4-66 | R4-130262 | Withdrawn | 2013-02-16 | LCS_LTE | - | 2013-02-16 |
1597 | - | F | Rel-10 | .. | - | UE interruption requirements in SCC RSTD measurements with de-activated Scell R10 | - | - | - | R4 | R4-66 | R4-130267 | Revised | 2013-02-16 | LCS_LTE | - | 2013-02-16 |
1597 | 1 | F | Rel-10 | 10.9.0 | 10.10.0 | UE interruption requirements in SCC RSTD measurements with de-activated Scell R10 | RP-59 | RP-130263 | approved | R4 | R4-66 | R4-130844 | Agreed | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1598 | - | A | Rel-11 | 11.3.1 | 11.4.0 | UE interruption requirements in SCC RSTD measurements with de-activated Scell R11 | RP-59 | RP-130263 | approved | R4 | R4-66 | R4-130269 | Agreed | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1599 | - | F | Rel-11 | .. | - | Correction to the enhanced MDT requirements in 36.133 | - | - | - | R4 | R4-66 | R4-130293 | Rejected | 2013-02-16 | eMDT_UMTSLTE-Core | - | 2013-02-16 |
1600 | - | F | Rel-10 | .. | - | Correction to Inter-frequency Measurements in CA mode test case R10 | - | - | - | R4 | R4-66 | R4-130298 | Rejected | 2013-02-16 | LTE-RF | - | 2013-02-16 |
1601 | - | A | Rel-11 | .. | - | Correction to Inter-frequency Measurements in CA mode test case R11 | - | - | - | R4 | R4-66 | R4-130299 | Rejected | 2013-02-16 | LTE-RF | - | 2013-02-16 |
1602 | - | F | Rel-11 | 11.3.1 | 11.4.0 | Timing offset correction in CA RSTD test cases | RP-59 | RP-130287 | approved | R4 | R4-66 | R4-130301 | Agreed | 2013-02-16 | LTE-RF | - | 2013-02-16 |
1603 | - | F | Rel-10 | .. | - | Clarification on intra-frequency RSTD measurement accuracy requirement R10 | - | - | - | R4 | R4-66 | R4-130303 | Revised | 2013-02-16 | LTE-RF | - | 2013-02-16 |
1603 | 1 | F | Rel-10 | 10.9.0 | 10.10.0 | Clarification on intra-frequency RSTD measurement accuracy requirement R10 | RP-59 | RP-130268 | approved | R4 | R4-66 | R4-130843 | Agreed | 2013-02-16 | LTE-RF | - | 2013-02-16 |
1604 | - | F | Rel-11 | .. | - | CR to guarantee the core requirement of FeICIC | - | - | - | R4 | R4-66 | R4-130337 | Rejected | 2013-02-16 | eICIC_enh_LTE-Core | - | 2013-02-16 |
1605 | - | B | Rel-10 | .. | - | CR on SCell Activation Delay | - | - | - | R4 | R4-66 | R4-130396 | Rejected | 2013-02-16 | LTE_CA-Perf | - | 2013-02-16 |
1606 | - | B | Rel-10 | .. | - | CR on Interruptions at SCell Configuration | - | - | - | R4 | R4-66 | R4-130401 | Rejected | 2013-02-16 | LTE_CA-Perf | - | 2013-02-16 |
1607 | - | F | Rel-11 | .. | - | Clarifications on Cell Identifications for FeICIC | - | - | - | R4 | R4-66 | R4-130403 | Rejected | 2013-02-16 | eICIC_enh_LTE-Core | - | 2013-02-16 |
1608 | - | F | Rel-11 | .. | - | Requirements for Wideband RSRQ | - | - | - | R4 | R4-66 | R4-130481 | Rejected | 2013-02-16 | TEI11 | - | 2013-02-16 |
1609 | - | F | Rel-10 | .. | - | SCell Activation Delay Requirements in CA | - | - | - | R4 | R4-66 | R4-130487 | Rejected | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1610 | - | A | Rel-11 | .. | - | SCell Activation Delay Requirements in CA | - | - | - | R4 | R4-66 | R4-130488 | Rejected | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1611 | - | F | Rel-10 | .. | - | Test specification for measurements without gaps | - | - | - | R4 | R4-66 | R4-130507 | Rejected | 2013-02-16 | LTE_CA-Perf | - | 2013-02-16 |
1612 | - | A | Rel-11 | .. | - | Test specification for measurements without gaps | - | - | - | R4 | R4-66 | R4-130510 | Withdrawn | 2013-02-16 | LTE_CA-Perf | - | 2013-02-16 |
1613 | - | F | Rel-10 | 10.9.0 | 10.10.0 | Measurement gap clarification in case of carrier aggregation | RP-59 | RP-130264 | approved | R4 | R4-66 | R4-130553 | Agreed | 2013-02-16 | LTE_CA-Perf | - | 2013-02-16 |
1614 | - | F | Rel-11 | .. | - | eMDT requirements in Rel-11 | - | - | - | R4 | R4-66 | R4-130557 | Rejected | 2013-02-16 | eMDT_UMTSLTE-Core | - | 2013-02-16 |
1615 | - | F | Rel-11 | .. | - | Correction on Transmission after Measurement Gaps | - | - | - | R4 | R4-66 | R4-130571 | Rejected | 2013-02-16 | TEI11 | - | 2013-02-16 |
1616 | - | F | Rel-11 | 11.3.1 | 11.4.0 | Editorial corrections for IDC | RP-59 | RP-130280 | approved | R4 | R4-66 | R4-130579 | Agreed | 2013-02-16 | SPIA_IDC_LTE-Core | - | 2013-02-16 |
1617 | - | F | Rel-10 | .. | - | Editorial corrections for eICIC | - | - | - | R4 | R4-66 | R4-130580 | Revised | 2013-02-16 | eICIC_LTE-Perf | - | 2013-02-16 |
1617 | 1 | F | Rel-10 | 10.9.0 | 10.10.0 | Editorial corrections for eICIC | RP-59 | RP-130262 | approved | R4 | R4-66 | R4-130935 | Agreed | 2013-02-16 | eICIC_LTE-Perf | - | 2013-02-16 |
1618 | - | A | Rel-11 | 11.3.1 | 11.4.0 | Editorial corrections for eICIC | RP-59 | RP-130262 | approved | R4 | R4-66 | R4-130582 | Agreed | 2013-02-16 | eICIC_LTE-Perf | - | 2013-02-16 |
1619 | - | F | Rel-8 | 8.20.0 | 8.21.0 | Editorial corrections RRM | RP-59 | RP-130258 | approved | R4 | R4-66 | R4-130583 | Agreed | 2013-02-16 | TEI8 | - | 2013-02-16 |
1620 | - | A | Rel-9 | 9.14.0 | 9.15.0 | Editorial corrections RRM | RP-59 | RP-130258 | approved | R4 | R4-66 | R4-130588 | Agreed | 2013-02-16 | TEI8 | - | 2013-02-16 |
1621 | - | A | Rel-10 | 10.9.0 | 10.10.0 | Editorial corrections RRM | RP-59 | RP-130258 | approved | R4 | R4-66 | R4-130589 | Agreed | 2013-02-16 | TEI8 | - | 2013-02-16 |
1622 | - | A | Rel-11 | 11.3.1 | 11.4.0 | Editorial corrections RRM | RP-59 | RP-130258 | approved | R4 | R4-66 | R4-130590 | Agreed | 2013-02-16 | TEI8 | - | 2013-02-16 |
1623 | - | F | Rel-10 | .. | - | Clarification on supported bandwidth combinations in RSTD requirements with CA | - | - | - | R4 | R4-66 | R4-130596 | Revised | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1623 | 1 | F | Rel-10 | .. | - | Clarification on supported bandwidth combinations in RSTD requirements with CA | - | - | - | R4 | R4-66 | R4-130854 | Rejected | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1624 | - | A | Rel-11 | .. | - | Clarification on supported bandwidth combinations in RSTD requirements with CA | - | - | - | R4 | R4-66 | R4-130598 | Withdrawn | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1625 | - | A | Rel-11 | .. | - | Clarification on supported bandwidth combinations in RSTD requirements with CA | - | - | - | R4 | R4-66 | R4-130599 | Withdrawn | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1626 | - | F | Rel-10 | .. | - | A clarification on measurement gap pattern in RSTD requirements | - | - | - | R4 | R4-66 | R4-130600 | Revised | 2013-02-16 | LCS_LTE | - | 2013-02-16 |
1626 | 1 | F | Rel-10 | 10.9.0 | 10.10.0 | A clarification on measurement gap pattern in RSTD requirements | RP-59 | RP-130259 | approved | R4 | R4-66 | R4-130855 | Agreed | 2013-02-16 | LCS_LTE | - | 2013-02-16 |
1627 | - | A | Rel-11 | 11.3.1 | 11.4.0 | A clarification on measurement gap pattern in RSTD requirements | RP-59 | RP-130259 | approved | R4 | R4-66 | R4-130601 | Agreed | 2013-02-16 | LCS_LTE | - | 2013-02-16 |
1628 | - | F | Rel-11 | .. | - | Condition clarification in MDT requirements | - | - | - | R4 | R4-66 | R4-130603 | Revised | 2013-02-16 | eMDT_UMTSLTE-Core | - | 2013-02-16 |
1628 | 1 | F | Rel-11 | .. | - | Condition clarification in MDT requirements | - | - | - | R4 | R4-66 | R4-130943 | Rejected | 2013-02-16 | eMDT_UMTSLTE-Core | - | 2013-02-16 |
1629 | - | F | Rel-10 | .. | - | Impact of REFSENS requirements on the core specification | - | - | - | R4 | R4-66 | R4-130610 | Revised | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1629 | 1 | F | Rel-10 | .. | - | Impact of REFSENS requirements on the core specification | - | - | - | R4 | R4-66 | R4-130945 | Rejected | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1630 | - | A | Rel-11 | .. | - | Impact of REFSENS requirements on the core specification | - | - | - | R4 | R4-66 | R4-130611 | Withdrawn | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1631 | - | F | Rel-11 | .. | - | Interruption with RSTD measurements for CA UEs | - | - | - | R4 | R4-66 | R4-130614 | Rejected | 2013-02-16 | LTE_CA-Core | - | 2013-02-16 |
1632 | - | F | Rel-10 | .. | - | Inter-frequency RSTD accuracy requirements accounting for serving cell bandwidth | - | - | - | R4 | R4-66 | R4-130616 | Revised | 2013-02-16 | LCS_LTE | - | 2013-02-16 |
1632 | 1 | F | Rel-10 | .. | - | Inter-frequency RSTD accuracy requirements accounting for serving cell bandwidth | - | - | - | R4 | R4-66 | R4-130856 | Withdrawn | 2013-02-16 | LCS_LTE | - | 2013-02-16 |
1633 | - | A | Rel-11 | .. | - | Inter-frequency RSTD accuracy requirements accounting for serving cell bandwidth | - | - | - | R4 | R4-66 | R4-130619 | Withdrawn | 2013-02-16 | LCS_LTE | - | 2013-02-16 |
1634 | - | F | Rel-11 | .. | - | Correction for measurements with enhanced receiver for FeICIC | - | - | - | R4 | R4-66 | R4-130621 | Rejected | 2013-02-16 | eICIC_enh_LTE-Core | - | 2013-02-16 |
1635 | - | F | Rel-11 | .. | - | RLM requirements with FeICIC | - | - | - | R4 | R4-66 | R4-130628 | Revised | 2013-02-16 | eICIC_enh_LTE-Core | - | 2013-02-16 |
1635 | 1 | F | Rel-11 | .. | - | RLM requirements with FeICIC | - | - | - | R4 | R4-66 | R4-130964 | Rejected | 2013-02-16 | eICIC_enh_LTE-Core | - | 2013-02-16 |
1636 | - | F | Rel-11 | .. | - | UE Rx-Tx requirements with FeICIC | - | - | - | R4 | R4-66 | R4-130629 | Revised | 2013-02-16 | eICIC_enh_LTE-Core | - | 2013-02-16 |
1636 | 1 | F | Rel-11 | .. | - | UE Rx-Tx requirements with FeICIC | - | - | - | R4 | R4-66 | R4-130940 | Rejected | 2013-02-16 | eICIC_enh_LTE-Core | - | 2013-02-16 |
1637 | - | F | Rel-11 | .. | - | RRM measurement requirements with FeICIC | - | - | - | R4 | R4-66 | R4-130631 | Rejected | 2013-02-16 | eICIC_enh_LTE-Core | - | 2013-02-16 |
1638 | - | F | Rel-11 | .. | - | RSRP/RSRQ accuracy requirements with FeICIC | - | - | - | R4 | R4-66 | R4-130633 | Rejected | 2013-02-16 | eICIC_enh_LTE-Perf | - | 2013-02-16 |
1639 | - | F | Rel-11 | .. | - | Addition of RRM/RLM measurement requirements during IDC situation into 36.133 | - | - | - | R4 | R4-66 | R4-130634 | Rejected | 2013-02-16 | SPIA_IDC_LTE-Core | - | 2013-02-16 |
1640 | - | F | Rel-9 | .. | - | Modification of PRS configuration for RSTD measurement reporting delay test cases(Rel-9) | - | - | - | R4 | R4-66 | R4-130767 | Revised | 2013-02-16 | TEI10 | - | 2013-02-16 |
1640 | 1 | F | Rel-9 | 9.14.0 | 9.15.0 | Modification of PRS configuration for RSTD measurement reporting delay test cases(Rel-9) | RP-59 | RP-130261 | approved | R4 | R4-66 | R4-130823 | Agreed | 2013-02-16 | TEI9 | - | 2013-02-16 |
1641 | - | F | Rel-10 | .. | - | Modification of PRS configuration for RSTD measurement reporting delay test cases(Rel-10) | - | - | - | R4 | R4-66 | R4-130769 | Revised | 2013-02-16 | TEI10 | - | 2013-02-16 |
1641 | 1 | F | Rel-10 | 10.9.0 | 10.10.0 | Modification of PRS configuration for RSTD measurement reporting delay test cases(Rel-10) | RP-59 | RP-130268 | approved | R4 | R4-66 | R4-130824 | Agreed | 2013-02-16 | TEI10 | - | 2013-02-16 |
1642 | - | A | Rel-11 | .. | - | Modification of PRS configuration for RSTD measurement reporting delay test cases(Rel-11) | - | - | - | R4 | R4-66 | R4-130770 | Revised | 2013-02-16 | TEI10 | - | 2013-02-16 |
1642 | 1 | A | Rel-11 | 11.3.1 | 11.4.0 | Modification of PRS configuration for RSTD measurement reporting delay test cases(Rel-11) | RP-59 | RP-130268 | approved | R4 | R4-66 | R4-130825 | Agreed | 2013-02-16 | TEI10 | - | 2013-02-16 |
1643 | - | A | Rel-10 | 10.9.0 | 10.10.0 | E-UTRAN FDD Proximity Indication Test Case (Rel-10) | RP-59 | RP-130261 | approved | R4 | R4-66 | R4-130841 | Agreed | 2013-02-16 | TEI9 | - | 2013-02-16 |
1644 | - | A | Rel-11 | 11.3.1 | 11.4.0 | E-UTRAN FDD Proximity Indication Test Case (Rel-11) | RP-59 | RP-130261 | approved | R4 | R4-66 | R4-130842 | Agreed | 2013-02-16 | TEI9 | - | 2013-02-16 |
1645 | - | F | Rel-11 | 11.4.0 | - | RSRP and RSRQ relative accuracy requirements for FeICIC | - | - | - | R4 | R4-66b | R4-131025 | Not handled | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1646 | - | F | Rel-9 | 9.15.0 | 9.16.0 | Correction to test parameters for combined E-UTRA - E-UTRA and GSM cell search - Rel 9 | RP-60 | RP-130763 | approved | R4 | R4-66b | R4-131041 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1647 | - | A | Rel-10 | 10.10.0 | 10.11.0 | Correction to test parameters for combined E-UTRA - E-UTRA and GSM cell search - Rel 10 | RP-60 | RP-130763 | approved | R4 | R4-66b | R4-131042 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1648 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Correction to test parameters for combined E-UTRA - E-UTRA and GSM cell search - Rel 11 | RP-60 | RP-130763 | approved | R4 | R4-66b | R4-131043 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1649 | - | F | Rel-11 | 11.4.0 | 11.5.0 | Remove the Brackets in cell identification of FeICIC | RP-60 | RP-130770 | approved | R4 | R4-66b | R4-131093 | Agreed | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1650 | - | F | Rel-11 | 11.4.0 | - | Clarification of UE Capability of RLM in FeICIC | - | - | - | R4 | R4-66b | R4-131095 | Noted | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1651 | - | B | Rel-11 | 11.4.0 | - | Introduce the higher side condition of RSRP/RSRQ measurement accuracy requirements in FeICIC | - | - | - | R4 | R4-66b | R4-131102 | Noted | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1652 | - | F | Rel-10 | 10.10.0 | - | Scell Activation Requirements for secondary component carrier with deactivated SCell R10 | - | - | - | R4 | R4-66b | R4-131108 | Noted | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1653 | - | A | Rel-11 | 11.4.0 | - | Scell Activation Requirements for secondary component carrier with deactivated SCell R11 | - | - | - | R4 | R4-66b | R4-131109 | Noted | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1654 | - | F | Rel-11 | 11.4.0 | - | Correction to the enhanced MDT requirements in 36.133 | - | - | - | R4 | R4-66b | R4-131115 | Noted | 2013-06-07 | eMDT_UMTSLTE-Core | - | 2013-06-07 |
1655 | - | F | Rel-11 | 11.4.0 | - | Wideband RSRQ measurement accuracy requirement in 36.133 | - | - | - | R4 | R4-66b | R4-131121 | Revised | 2013-06-07 | TEI11 | - | 2013-06-07 |
1655 | 1 | F | Rel-11 | 11.4.0 | - | Wideband RSRQ measurement accuracy requirement in 36.133 | - | - | - | R4 | R4-66b | R4-131880 | Withdrawn | 2013-06-07 | TEI11 | - | 2013-06-07 |
1656 | - | F | Rel-10 | 10.10.0 | 10.11.0 | Clarification on inter-frequency RSTD measurement accuracy requirement R10 | RP-60 | RP-130763 | approved | R4 | R4-66b | R4-131125 | Agreed | 2013-06-07 | LCS_LTE | - | 2013-06-07 |
1657 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Clarification on inter-frequency RSTD measurement accuracy requirement R11 | RP-60 | RP-130763 | approved | R4 | R4-66b | R4-131126 | Agreed | 2013-06-07 | LCS_LTE | - | 2013-06-07 |
1658 | - | F | Rel-10 | 10.10.0 | - | RRM test configurations for 20MHz R10 | - | - | - | R4 | R4-66b | R4-131130 | Revised | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1658 | 1 | F | Rel-10 | 10.10.0 | 10.11.0 | RRM test configurations for 20MHz R10 | RP-60 | RP-130765 | approved | R4 | R4-66b | R4-131878 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1659 | - | A | Rel-11 | 11.4.0 | - | RRM test configurations for 20MHz R11 | - | - | - | R4 | R4-66b | R4-131131 | Revised | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1659 | 1 | A | Rel-11 | 11.4.0 | 11.5.0 | RRM test configurations for 20MHz R11 | RP-60 | RP-130765 | approved | R4 | R4-66b | R4-131879 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1660 | - | F | Rel-10 | 10.10.0 | - | Correction to REFSENS requirements in 36.133 R10 | - | - | - | R4 | R4-66b | R4-131132 | Noted | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1661 | - | A | Rel-11 | 11.4.0 | - | Correction to REFSENS requirements in 36.133 R11 | - | - | - | R4 | R4-66b | R4-131133 | Revised | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1661 | 1 | A | Rel-11 | 11.4.0 | - | Correction to REFSENS requirements in 36.133 R11 | - | - | - | R4 | R4-66b | R4-131867 | Withdrawn | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1662 | - | F | Rel-11 | 11.4.0 | - | Correction to Reference Sensitivity Degradation for CA in 36.133 R11 | - | - | - | R4 | R4-66b | R4-131138 | Noted | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1663 | - | F | Rel-10 | 10.10.0 | - | FDD: Absolute and relative RSRQ accuracy test cases for CA with 20MHz BW (Rel-10) | - | - | - | R4 | R4-66b | R4-131219 | Noted | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1664 | - | A | Rel-11 | 11.4.0 | - | FDD: Absolute and relative RSRQ accuracy test cases for CA with 20MHz BW (Rel-11) | - | - | - | R4 | R4-66b | R4-131220 | Withdrawn | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1665 | - | F | Rel-10 | 10.10.0 | - | TDD: Absolute and relative RSRQ accuracy test cases for CA with 20MHz BW (Rel-10) | - | - | - | R4 | R4-66b | R4-131221 | Noted | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1666 | - | A | Rel-11 | 11.4.0 | - | TDD: Absolute and relative RSRQ accuracy test cases for CA with 20MHz BW (Rel-11) | - | - | - | R4 | R4-66b | R4-131222 | Withdrawn | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1667 | - | F | Rel-10 | 10.10.0 | - | Corrections on RSTD measurement test cases (Rel-10) | - | - | - | R4 | R4-66b | R4-131225 | Revised | 2013-06-07 | TEI10 | - | 2013-06-07 |
1667 | 1 | F | Rel-10 | 10.10.0 | - | Corrections on RSTD measurement test cases (Rel-10) | - | - | - | R4 | R4-66b | R4-131875 | Noted | 2013-06-07 | TEI10 | - | 2013-06-07 |
1667 | 2 | F | Rel-10 | 10.10.0 | 10.11.0 | Corrections on RSTD measurement test cases (Rel-10) | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132081 | Agreed | 2013-06-07 | LCS_LTE | - | 2013-06-07 |
1668 | - | A | Rel-11 | 11.4.0 | - | Corrections on RSTD measurement test cases (Rel-11) | - | - | - | R4 | R4-66b | R4-131226 | Noted | 2013-06-07 | TEI10 | - | 2013-06-07 |
1668 | 1 | A | Rel-11 | 11.4.0 | 11.5.0 | Corrections on RSTD measurement test cases (Rel-11) | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132082 | Agreed | 2013-06-07 | LCS_LTE | - | 2013-06-07 |
1669 | - | F | Rel-11 | 11.4.0 | - | Impact of Harmonics on RRM Requirements for inter-band CA (Rel-11) | - | - | - | R4 | R4-66b | R4-131228 | Noted | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1670 | - | F | Rel-10 | 10.10.0 | - | CR on Interruptions for Intra-band Non-contiguous Carrier Aggregation | - | - | - | R4 | R4-66b | R4-131234 | Revised | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1671 | - | F | Rel-9 | 9.15.0 | 9.16.0 | Remove [ ] from GCI identification Test cases A.8.4.4 and A.8.4.5 | RP-60 | RP-130763 | approved | R4 | R4-66b | R4-131262 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1672 | - | A | Rel-10 | 10.10.0 | 10.11.0 | Remove [ ] from GCI identification Test cases A.8.4.4 and A.8.4.5 | RP-60 | RP-130763 | approved | R4 | R4-66b | R4-131263 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1673 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Remove [ ] from GCI identification Test cases A.8.4.4 and A.8.4.5 | RP-60 | RP-130763 | approved | R4 | R4-66b | R4-131265 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1674 | - | F | Rel-8 | 8.21.0 | 8.22.0 | Cell 1 levels for RSRP Test cases A.9.1.3 and A.9.1.4 | RP-60 | RP-130761 | approved | R4 | R4-66b | R4-131276 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1675 | - | A | Rel-9 | 9.15.0 | 9.16.0 | Cell 1 levels for RSRP Test cases A.9.1.3 and A.9.1.4 | RP-60 | RP-130761 | approved | R4 | R4-66b | R4-131277 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1676 | - | A | Rel-10 | 10.10.0 | 10.11.0 | Cell 1 levels for RSRP Test cases A.9.1.3 and A.9.1.4 | RP-60 | RP-130761 | approved | R4 | R4-66b | R4-131278 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1677 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Cell 1 levels for RSRP Test cases A.9.1.3 and A.9.1.4 | RP-60 | RP-130761 | approved | R4 | R4-66b | R4-131279 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1678 | - | F | Rel-10 | 10.10.0 | - | RSRP, RSRQ RRM eICIC Test case cleanup | - | - | - | R4 | R4-66b | R4-131284 | Revised | 2013-06-07 | eICIC_LTE-Perf | - | 2013-06-07 |
1678 | 1 | F | Rel-10 | 10.10.0 | 10.11.0 | RSRP, RSRQ RRM eICIC Test case cleanup | RP-60 | RP-130765 | approved | R4 | R4-66b | R4-131858 | Agreed | 2013-06-07 | eICIC_LTE-Perf | - | 2013-06-07 |
1679 | - | F | Rel-11 | 11.4.0 | - | RSRP, RSRQ RRM eICIC Test case cleanup | - | - | - | R4 | R4-66b | R4-131285 | Revised | 2013-06-07 | eICIC_LTE-Perf | - | 2013-06-07 |
1679 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | RSRP, RSRQ RRM eICIC Test case cleanup | RP-60 | RP-130765 | approved | R4 | R4-66b | R4-131859 | Agreed | 2013-06-07 | eICIC_LTE-Perf | - | 2013-06-07 |
1680 | - | F | Rel-8 | 8.21.0 | - | Update on the GSM carrier RSSI measurement period when DRX is used | - | - | - | R4 | R4-66b | R4-131287 | Revised | 2013-06-07 | TEI8 | - | 2013-06-07 |
1680 | 1 | F | Rel-8 | 8.21.0 | 8.22.0 | Update on the GSM carrier RSSI measurement period when DRX is used | RP-60 | RP-130761 | approved | R4 | R4-66b | R4-131856 | Agreed | 2013-06-07 | TEI8 | - | 2013-06-07 |
1681 | - | A | Rel-9 | 9.15.0 | 9.16.0 | Update on the GSM carrier RSSI measurement period when DRX is used | RP-60 | RP-130761 | approved | R4 | R4-66b | R4-131288 | Agreed | 2013-06-07 | TEI8 | - | 2013-06-07 |
1682 | - | A | Rel-10 | 10.10.0 | 10.11.0 | Update on the GSM carrier RSSI measurement period when DRX is used | RP-60 | RP-130761 | approved | R4 | R4-66b | R4-131289 | Agreed | 2013-06-07 | TEI8 | - | 2013-06-07 |
1683 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Update on the GSM carrier RSSI measurement period when DRX is used | RP-60 | RP-130761 | approved | R4 | R4-66b | R4-131290 | Agreed | 2013-06-07 | TEI8 | - | 2013-06-07 |
1684 | - | B | Rel-11 | 11.4.0 | - | Corrections on Wideband RSRQ inter-frequency accuracy requirements | - | - | - | R4 | R4-66b | R4-131302 | Revised | 2013-06-07 | TEI11 | - | 2013-06-07 |
1684 | 1 | B | Rel-11 | 11.4.0 | - | Corrections on Wideband RSRQ inter-frequency accuracy requirements | - | - | - | R4 | R4-66b | R4-131952 | Noted | 2013-06-07 | TEI11 | - | 2013-06-07 |
1685 | - | B | Rel-11 | 11.4.0 | - | In sync detection with CRS assistance information with non-MBSFN ABS in FDD | - | - | - | R4 | R4-66b | R4-131303 | Noted | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1686 | - | B | Rel-11 | 11.4.0 | - | In sync detection with CRS assistance information with non-MBSFN ABS in TDD | - | - | - | R4 | R4-66b | R4-131304 | Noted | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1687 | - | F | Rel-10 | 10.10.0 | - | Test specification for measurements without gaps | - | - | - | R4 | R4-66b | R4-131340 | Revised | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1687 | 1 | F | Rel-10 | 10.10.0 | - | Test specification for measurements without gaps | - | - | - | R4 | R4-66b | R4-131865 | Noted | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1688 | - | A | Rel-11 | 11.4.0 | - | Test specification for measurements without gaps | - | - | - | R4 | R4-66b | R4-131341 | Noted | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1689 | - | F | Rel-11 | 11.4.0 | - | Modification on description of measurement GAP | - | - | - | R4 | R4-66b | R4-131344 | Noted | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1690 | - | F | Rel-9 | 9.15.0 | 9.16.0 | sr-ConfigIndex in TDD-FDD Inter-frequency event triggered DRX Test case A.8.14.2 | RP-60 | RP-130763 | approved | R4 | R4-66b | R4-131401 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1691 | - | A | Rel-10 | 10.10.0 | 10.11.0 | sr-ConfigIndex in TDD-FDD Inter-frequency event triggered DRX Test case A.8.14.2 | RP-60 | RP-130763 | approved | R4 | R4-66b | R4-131402 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1692 | - | A | Rel-11 | 11.4.0 | 11.5.0 | sr-ConfigIndex in TDD-FDD Inter-frequency event triggered DRX Test case A.8.14.2 | RP-60 | RP-130763 | approved | R4 | R4-66b | R4-131404 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1693 | - | F | Rel-10 | 10.10.0 | 10.11.0 | Testing of CA tests with multiple BW combinations | RP-60 | RP-130767 | approved | R4 | R4-66b | R4-131466 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1694 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Testing of CA tests with multiple BW combinations | RP-60 | RP-130767 | approved | R4 | R4-66b | R4-131471 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1695 | - | F | Rel-10 | 10.10.0 | 10.11.0 | Reference measurement channels for 20 MHz Tests | RP-60 | RP-130767 | approved | R4 | R4-66b | R4-131476 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1696 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Reference measurement channels for 20 MHz Tests | RP-60 | RP-130767 | approved | R4 | R4-66b | R4-131479 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1697 | - | F | Rel-10 | 10.10.0 | - | OCNG Patterns for 20 MHz Tests | - | - | - | R4 | R4-66b | R4-131480 | Noted | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1698 | - | A | Rel-11 | 11.4.0 | - | OCNG Patterns for 20 MHz Tests | - | - | - | R4 | R4-66b | R4-131481 | Withdrawn | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1699 | - | F | Rel-10 | 10.10.0 | - | Phase I CA 20 MHz Tests: Event triggered reporting on deactivating Scells in non-DRX | - | - | - | R4 | R4-66b | R4-131482 | Noted | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1700 | - | A | Rel-11 | 11.4.0 | - | Phase I CA 20 MHz Tests: Event triggered reporting on deactivating Scells in non-DRX | - | - | - | R4 | R4-66b | R4-131484 | Withdrawn | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1701 | - | F | Rel-10 | 10.10.0 | 10.11.0 | Editorial corrections RRM | RP-60 | RP-130765 | approved | R4 | R4-66b | R4-131517 | Agreed | 2013-06-07 | TEI10 | - | 2013-06-07 |
1702 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Editorial corrections RRM | RP-60 | RP-130765 | approved | R4 | R4-66b | R4-131518 | Agreed | 2013-06-07 | TEI10 | - | 2013-06-07 |
1703 | - | F | Rel-8 | 8.21.0 | 8.22.0 | Section numbering correction | RP-60 | RP-130761 | approved | R4 | R4-66b | R4-131524 | Agreed | 2013-06-07 | TEI8 | - | 2013-06-07 |
1704 | - | A | Rel-9 | 9.15.0 | 9.16.0 | Section numbering correction | RP-60 | RP-130761 | approved | R4 | R4-66b | R4-131528 | Agreed | 2013-06-07 | TEI8 | - | 2013-06-07 |
1705 | - | A | Rel-10 | 10.10.0 | 10.11.0 | Section numbering correction | RP-60 | RP-130761 | approved | R4 | R4-66b | R4-131529 | Agreed | 2013-06-07 | TEI8 | - | 2013-06-07 |
1706 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Section numbering correction | RP-60 | RP-130761 | approved | R4 | R4-66b | R4-131532 | Agreed | 2013-06-07 | TEI8 | - | 2013-06-07 |
1707 | - | F | Rel-11 | 11.4.0 | - | A simplification of capturing RRM bands in 36.133 | - | - | - | R4 | R4-66b | R4-131536 | Noted | 2013-06-07 | TEI11 | - | 2013-06-07 |
1708 | - | F | Rel-11 | 11.4.0 | - | Editorial corrections for FeICIC | - | - | - | R4 | R4-66b | R4-131537 | Revised | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1708 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | Editorial corrections for FeICIC | RP-60 | RP-130770 | approved | R4 | R4-66b | R4-131891 | Agreed | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1709 | - | F | Rel-11 | 11.4.0 | - | Removing an eICIC note on measurements | - | - | - | R4 | R4-66b | R4-131540 | Revised | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1709 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | Removing an eICIC note on measurements | RP-60 | RP-130770 | approved | R4 | R4-66b | R4-131948 | Agreed | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1710 | - | F | Rel-10 | 10.10.0 | - | Editorial corrections for eICIC | - | - | - | R4 | R4-66b | R4-131544 | Revised | 2013-06-07 | eICIC_LTE | - | 2013-06-07 |
1710 | 1 | F | Rel-10 | 10.10.0 | - | Editorial corrections for eICIC | - | - | - | R4 | R4-66b | R4-131860 | Noted | 2013-06-07 | eICIC_LTE | - | 2013-06-07 |
1711 | - | F | Rel-11 | 11.4.0 | - | Requirements for Wideband RSRQ | - | - | - | R4 | R4-66b | R4-131547 | Noted | 2013-06-07 | TEI11 | - | 2013-06-07 |
1712 | - | A | Rel-11 | 11.4.0 | - | Editorial corrections for eICIC | - | - | - | R4 | R4-66b | R4-131550 | Withdrawn | 2013-06-07 | eICIC_LTE | - | 2013-06-07 |
1713 | - | F | Rel-11 | 11.4.0 | 11.5.0 | Clean up for CA | RP-60 | RP-130770 | approved | R4 | R4-66b | R4-131553 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1714 | - | F | Rel-9 | 9.15.0 | - | Editorial corrections in RSTD requirements | - | - | - | R4 | R4-66b | R4-131558 | Revised | 2013-06-07 | TEI9 | - | 2013-06-07 |
1714 | 1 | F | Rel-9 | 9.15.0 | 9.16.0 | Editorial corrections in RSTD requirements | RP-60 | RP-130763 | approved | R4 | R4-66b | R4-131881 | Agreed | 2013-06-07 | TEI9 | - | 2013-06-07 |
1715 | - | A | Rel-10 | 10.10.0 | 10.11.0 | Editorial corrections in RSTD requirements | RP-60 | RP-130763 | approved | R4 | R4-66b | R4-131562 | Agreed | 2013-06-07 | TEI9 | - | 2013-06-07 |
1716 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Editorial corrections in RSTD requirements | RP-60 | RP-130763 | approved | R4 | R4-66b | R4-131565 | Agreed | 2013-06-07 | TEI9 | - | 2013-06-07 |
1717 | - | F | Rel-10 | 10.10.0 | - | SCell Activation Delay Requirements in CA | - | - | - | R4 | R4-66b | R4-131568 | Revised | 2013-06-07 | LTE_CA-Core | - | 2013-06-07 |
1717 | 1 | F | Rel-10 | 10.10.0 | 10.11.0 | SCell Activation Delay Requirements in CA | RP-60 | RP-130766 | approved | R4 | R4-66b | R4-131965 | Agreed | 2013-06-07 | LTE_CA-Core | - | 2013-06-07 |
1718 | - | F | Rel-9 | 9.15.0 | 9.16.0 | A clarification on measurement gap pattern in RSTD requirements | RP-60 | RP-130763 | approved | R4 | R4-66b | R4-131570 | Agreed | 2013-06-07 | TEI9 | - | 2013-06-07 |
1719 | - | A | Rel-11 | 11.4.0 | 11.5.0 | SCell Activation Delay Requirements in CA | RP-60 | RP-130766 | approved | R4 | R4-66b | R4-131571 | Agreed | 2013-06-07 | LTE_CA-Core | - | 2013-06-07 |
1720 | - | F | Rel-10 | 10.10.0 | - | Clarification on supported bandwidth combinations in RSTD requirements with CA | - | - | - | R4 | R4-66b | R4-131573 | Revised | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1720 | 1 | F | Rel-10 | 10.10.0 | 10.11.0 | Clarification on supported bandwidth combinations in RSTD requirements with CA | RP-60 | RP-130765 | approved | R4 | R4-66b | R4-131884 | Agreed | 2013-06-07 | TEI10 | - | 2013-06-07 |
1721 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Clarification on supported bandwidth combinations in RSTD requirements with CA | RP-60 | RP-130765 | approved | R4 | R4-66b | R4-131575 | Agreed | 2013-06-07 | TEI10 | - | 2013-06-07 |
1722 | - | F | Rel-10 | 10.10.0 | - | Impact of REFSENS requirements on the core specification | - | - | - | R4 | R4-66b | R4-131577 | Revised | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1722 | 1 | F | Rel-10 | 10.10.0 | 10.11.0 | Impact of REFSENS requirements on the core specification | RP-60 | RP-130766 | approved | R4 | R4-66b | R4-131944 | Agreed | 2013-06-07 | LTE_CA-Core | - | 2013-06-07 |
1723 | - | F | Rel-11 | 11.4.0 | - | Impact of REFSENS requirements on the core specification | - | - | - | R4 | R4-66b | R4-131578 | Revised | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1723 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | Impact of REFSENS requirements on the core specification | RP-60 | RP-130770 | approved | R4 | R4-66b | R4-131945 | Agreed | 2013-06-07 | LTE_CA-Core | - | 2013-06-07 |
1724 | - | F | Rel-11 | 11.4.0 | 11.5.0 | Correction of the total number of reporting criteria | RP-60 | RP-130770 | approved | R4 | R4-66b | R4-131581 | Agreed | 2013-06-07 | TEI11 | - | 2013-06-07 |
1725 | - | F | Rel-11 | 11.4.0 | - | Test case for UE Rx-Tx accuracy with eICIC in FDD | - | - | - | R4 | R4-66b | R4-131586 | Revised | 2013-06-07 | eICIC_LTE | - | 2013-06-07 |
1725 | 1 | F | Rel-11 | 11.4.0 | - | Test case for UE Rx-Tx accuracy with eICIC in FDD | - | - | - | R4 | R4-66b | R4-131946 | Noted | 2013-06-07 | eICIC_LTE | - | 2013-06-07 |
1726 | - | F | Rel-11 | 11.4.0 | - | Test case for UE Rx-Tx accuracy with eICIC in TDD | - | - | - | R4 | R4-66b | R4-131587 | Withdrawn | 2013-06-07 | eICIC_LTE | - | 2013-06-07 |
1726 | 1 | F | Rel-11 | 11.4.0 | - | Test case for UE Rx-Tx accuracy with eICIC in TDD | - | - | - | R4 | R4-66b | R4-131947 | Withdrawn | 2013-06-07 | eICIC_LTE | - | 2013-06-07 |
1727 | - | F | Rel-11 | 11.4.0 | - | Correction on UE Behaviour for Transmission after Measurement Gaps in TDD | - | - | - | R4 | R4-66b | R4-131588 | Noted | 2013-06-07 | TEI11 | - | 2013-06-07 |
1728 | - | F | Rel-11 | 11.4.0 | - | Condition clarification in MDT requirements | - | - | - | R4 | R4-66b | R4-131593 | Revised | 2013-06-07 | eMDT_UMTSLTE-Core | - | 2013-06-07 |
1728 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | Condition clarification in MDT requirements | RP-60 | RP-130769 | approved | R4 | R4-66b | R4-131882 | Agreed | 2013-06-07 | eMDT_UMTSLTE-Core | - | 2013-06-07 |
1729 | - | F | Rel-11 | 11.4.0 | - | Clarification on bandwidth and antenna port configuration wiht FeICIC | - | - | - | R4 | R4-66b | R4-131620 | Revised | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1729 | 1 | F | Rel-11 | 11.4.0 | - | Clarification on bandwidth and antenna port configuration wiht FeICIC | - | - | - | R4 | R4-66b | R4-131969 | Noted | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1730 | - | F | Rel-11 | 11.4.0 | - | Capturing RLM requirements for FeICIC | - | - | - | R4 | R4-66b | R4-131625 | Noted | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1731 | - | F | Rel-11 | 11.4.0 | - | Requirements for IC receiver and the need of autonomous gaps | - | - | - | R4 | R4-66b | R4-131632 | Noted | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1732 | - | F | Rel-11 | 11.4.0 | 11.5.0 | Band 26 test cases corrections | RP-60 | RP-130769 | approved | R4 | R4-66b | R4-131637 | Agreed | 2013-06-07 | e850_UB-Perf | - | 2013-06-07 |
1733 | - | B | Rel-11 | 11.4.0 | - | UE Rx-Tx accuracy requirements with FeICIC | - | - | - | R4 | R4-66b | R4-131638 | Noted | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1734 | - | B | Rel-11 | 11.4.0 | - | UE Rx-Tx measurement requirements with FeICIC | - | - | - | R4 | R4-66b | R4-131646 | Noted | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1735 | - | B | Rel-11 | 11.4.0 | - | Test case for cell identification with FeICIC in FDD | - | - | - | R4 | R4-66b | R4-131648 | Revised | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1735 | 1 | B | Rel-11 | 11.4.0 | - | Test case for cell identification with FeICIC in FDD | - | - | - | R4 | R4-66b | R4-131901 | Noted | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1736 | - | B | Rel-11 | 11.4.0 | - | Test case for cell identification with FeICIC in TDD | - | - | - | R4 | R4-66b | R4-131651 | Revised | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1736 | 1 | B | Rel-11 | 11.4.0 | - | Test case for cell identification with FeICIC in TDD | - | - | - | R4 | R4-66b | R4-131902 | Noted | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1737 | - | B | Rel-10 | 10.10.0 | - | CR on PCell Interruptions | - | - | - | R4 | R4-66b | R4-131662 | Noted | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1738 | - | F | Rel-11 | 11.4.0 | - | Correction to the enhanced MDT requirements in 36.133 | - | - | - | R4 | R4-66b | R4-131830 | Noted | 2013-06-07 | eMDT_UMTSLTE-Core | - | 2013-06-07 |
1739 | - | F | Rel-11 | 11.4.0 | 11.5.0 | CR on Interruptions for Intra-band Non-contiguous Carrier Aggregation | RP-60 | RP-130770 | approved | R4 | R4-66b | R4-131950 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1740 | - | F | Rel-9 | 9.15.0 | 9.16.0 | Time Alignment Timer in Test Case A.8.2.4 | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132064 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1741 | - | F | Rel-9 | 9.15.0 | 9.16.0 | RRM: Adding required measurement gap | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132065 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1742 | - | A | Rel-10 | 10.10.0 | 10.11.0 | Time Alignment Timer in Test Case A.8.2.4 | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132066 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1743 | - | A | Rel-10 | 10.10.0 | 10.11.0 | RRM: Adding required measurement gap | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132067 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1744 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Time Alignment Timer in Test Case A.8.2.4 | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132068 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1745 | - | A | Rel-11 | 11.4.0 | 11.5.0 | RRM: Adding required measurement gap | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132069 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1746 | - | F | Rel-8 | 8.21.0 | 8.22.0 | TDD PRACH configuration index for Test Case A.8.7.2 | RP-60 | RP-130761 | approved | R4 | R4-67 | R4-132070 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1747 | - | F | Rel-9 | 9.15.0 | 9.16.0 | TDD PRACH configuration index for Test Cases A.8.7.2, A.8.15.2 | RP-60 | RP-130761 | approved | R4 | R4-67 | R4-132071 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1748 | - | A | Rel-10 | 10.10.0 | 10.11.0 | TDD PRACH configuration index for Test Cases A.8.7.2, A.8.15.2 | RP-60 | RP-130761 | approved | R4 | R4-67 | R4-132072 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1749 | - | A | Rel-11 | 11.4.0 | 11.5.0 | TDD PRACH configuration index for Test Cases A.8.7.2, A.8.15.2 | RP-60 | RP-130761 | approved | R4 | R4-67 | R4-132073 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1750 | - | F | Rel-9 | 9.15.0 | - | GSM cell list size for Test Cases A.6.3.10, A.6.3.11 | - | - | - | R4 | R4-67 | R4-132074 | Revised | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1750 | 1 | F | Rel-9 | 9.15.0 | 9.16.0 | GSM cell list size for Test Cases A.6.3.10, A.6.3.11 | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-133029 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1751 | - | A | Rel-10 | 10.10.0 | 10.11.0 | GSM cell list size for Test Cases A.6.3.10, A.6.3.11 | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132075 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1752 | - | A | Rel-11 | 11.4.0 | 11.5.0 | GSM cell list size for Test Cases A.6.3.10, A.6.3.11 | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132076 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1753 | - | F | Rel-9 | 9.15.0 | - | Neighbour list for Test cases A.8.5.4, A.8.7.4, A.8.9.2 | - | - | - | R4 | R4-67 | R4-132077 | Revised | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1753 | 1 | F | Rel-9 | 9.15.0 | 9.16.0 | Neighbour list for Test cases A.8.5.4, A.8.7.4, A.8.9.2 | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132932 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1754 | - | A | Rel-10 | 10.10.0 | 10.11.0 | Neighbour list for Test cases A.8.5.4, A.8.7.4, A.8.9.2 | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132078 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1755 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Neighbour list for Test cases A.8.5.4, A.8.7.4, A.8.9.2 | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132079 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1756 | - | F | Rel-9 | 9.15.0 | - | Additional corrections on intra-frequency RSTD test parameters (Rel-9) | - | - | - | R4 | R4-67 | R4-132086 | Revised | 2013-06-07 | LCS_LTE | - | 2013-06-07 |
1756 | 1 | F | Rel-9 | 9.15.0 | 9.16.0 | Additional corrections on intra-frequency RSTD test parameters (Rel-9) | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132919 | Agreed | 2013-06-07 | LCS_LTE | - | 2013-06-07 |
1757 | - | A | Rel-10 | 10.10.0 | 10.11.0 | Additional corrections on intra-frequency RSTD test parameters (Rel-10) | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132087 | Agreed | 2013-06-07 | LCS_LTE | - | 2013-06-07 |
1758 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Additional corrections on intra-frequency RSTD test parameters (Rel-11) | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132088 | Agreed | 2013-06-07 | LCS_LTE | - | 2013-06-07 |
1759 | - | F | Rel-10 | 10.10.0 | - | Additional corrections on inter-frequency RSTD test parameters (Rel-10) | - | - | - | R4 | R4-67 | R4-132089 | Revised | 2013-06-07 | LCS_LTE | - | 2013-06-07 |
1759 | 1 | F | Rel-10 | 10.10.0 | 10.11.0 | Additional corrections on inter-frequency RSTD test parameters (Rel-10) | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132920 | Agreed | 2013-06-07 | LCS_LTE | - | 2013-06-07 |
1760 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Additional corrections on inter-frequency RSTD test parameters (Rel-11) | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132090 | Agreed | 2013-06-07 | LCS_LTE | - | 2013-06-07 |
1761 | - | F | Rel-10 | 10.10.0 | 10.11.0 | Phase I CA 20 MHz Tests: Event triggered reporting on deactivating Scells in non-DRX | RP-60 | RP-130767 | approved | R4 | R4-67 | R4-132147 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1762 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Phase I CA 20 MHz Tests: Event triggered reporting on deactivating Scells in non-DRX | RP-60 | RP-130767 | approved | R4 | R4-67 | R4-132148 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1764 | - | F | Rel-11 | 11.4.0 | - | Requirements for Wideband RSRQ | - | - | - | R4 | R4-67 | R4-132153 | Noted | 2013-06-07 | TEI11 | - | 2013-06-07 |
1765 | - | F | Rel-9 | 9.15.0 | - | Corrections of E-UTRAN FDD CSG Proximity Indication Test Case (Rel-9) | - | - | - | R4 | R4-67 | R4-132155 | revised | 2013-06-07 | TEI9 | - | 2013-06-07 |
1765 | 1 | F | Rel-9 | 9.15.0 | 9.16.0 | Corrections of E-UTRAN FDD CSG Proximity Indication Test Case (Rel-9) | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132936 | Agreed | 2013-06-07 | TEI9 | - | 2013-06-07 |
1766 | - | A | Rel-10 | 10.10.0 | 10.11.0 | Corrections of E-UTRAN FDD CSG Proximity Indication Test Case (Rel-10) | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132156 | Agreed | 2013-06-07 | TEI9 | - | 2013-06-07 |
1767 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Corrections of E-UTRAN FDD CSG Proximity Indication Test Case (Rel-11) | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132158 | Agreed | 2013-06-07 | TEI9 | - | 2013-06-07 |
1768 | - | F | Rel-11 | 11.4.0 | - | Correction on UE Behaviour for Transmission after Measurement Gaps in TDD | - | - | - | R4 | R4-67 | R4-132163 | Noted | 2013-06-07 | TEI11 | - | 2013-06-07 |
1769 | - | B | Rel-12 | 11.4.0 | - | Introduction of Band 30 | - | - | - | R4 | R4-67 | R4-132264 | Revised | 2013-06-07 | LTE_WCS_band-Core | - | 2013-06-07 |
1769 | 1 | B | Rel-12 | 11.4.0 | 12.0.0 | Introduction of Band 30 | RP-60 | RP-130791 | approved | R4 | R4-67 | R4-133041 | Agreed | 2013-06-07 | LTE_WCS_band-Core | - | 2013-06-07 |
1770 | - | B | Rel-11 | 11.4.0 | - | In sync detection with CRS assistance information with non-MBSFN ABS in FDD | - | - | - | R4 | R4-67 | R4-132291 | Revised | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1770 | 1 | B | Rel-11 | 11.4.0 | 11.5.0 | In sync detection with CRS assistance information with non-MBSFN ABS in FDD | RP-60 | RP-130770 | approved | R4 | R4-67 | R4-133013 | Agreed | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1771 | - | B | Rel-11 | 11.4.0 | - | In sync detection with CRS assistance information with non-MBSFN ABS in TDD | - | - | - | R4 | R4-67 | R4-132292 | Revised | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1771 | 1 | B | Rel-11 | 11.4.0 | 11.5.0 | In sync detection with CRS assistance information with non-MBSFN ABS in TDD | RP-60 | RP-130770 | approved | R4 | R4-67 | R4-133014 | Agreed | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1772 | - | B | Rel-11 | 11.4.0 | - | E-UTRAN FDD RLM Out-of-sync Test of FeICIC | - | - | - | R4 | R4-67 | R4-132324 | Revised | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1772 | 1 | B | Rel-11 | 11.4.0 | 11.5.0 | E-UTRAN FDD RLM Out-of-sync Test of FeICIC | RP-60 | RP-130770 | approved | R4 | R4-67 | R4-133015 | Agreed | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1773 | - | B | Rel-11 | 11.4.0 | - | E-UTRAN TDD RLM Out-of-sync Test of FeICIC | - | - | - | R4 | R4-67 | R4-132329 | Revised | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1773 | 1 | B | Rel-11 | 11.4.0 | 11.5.0 | E-UTRAN TDD RLM Out-of-sync Test of FeICIC | RP-60 | RP-130770 | approved | R4 | R4-67 | R4-133016 | Agreed | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1774 | - | B | Rel-11 | 11.4.0 | - | Introduce the higher side condition of RSRP/RSRQ measurement accuracy requirements in FeICIC | - | - | - | R4 | R4-67 | R4-132336 | Noted | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1775 | - | F | Rel-10 | 10.10.0 | - | E-UTRAN FDD absolute and relative RSRP accuracies for 20MHz in CA R10 | - | - | - | R4 | R4-67 | R4-132345 | Revised | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1775 | 1 | F | Rel-10 | 10.10.0 | 10.11.0 | E-UTRAN FDD absolute and relative RSRP accuracies for 20MHz in CA R10 | RP-60 | RP-130767 | approved | R4 | R4-67 | R4-132921 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1776 | - | A | Rel-11 | 11.4.0 | 11.5.0 | E-UTRAN FDD absolute and relative RSRP accuracies for 20MHz in CA R11 | RP-60 | RP-130767 | approved | R4 | R4-67 | R4-132348 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1777 | - | F | Rel-10 | 10.10.0 | - | E-UTRAN TDD absolute and relative RSRP accuracies for 20MHz in CA R10 | - | - | - | R4 | R4-67 | R4-132349 | Revised | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1777 | 1 | F | Rel-10 | 10.10.0 | 10.11.0 | E-UTRAN TDD absolute and relative RSRP accuracies for 20MHz in CA R10 | RP-60 | RP-130767 | approved | R4 | R4-67 | R4-132922 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1778 | - | A | Rel-11 | 11.4.0 | 11.5.0 | E-UTRAN TDD absolute and relative RSRP accuracies for 20MHz in CA R11 | RP-60 | RP-130767 | approved | R4 | R4-67 | R4-132350 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1779 | - | F | Rel-10 | 10.10.0 | 10.11.0 | Modification of OCNG patterns of RRM test configuration for 20MHz R10 | RP-60 | RP-130765 | approved | R4 | R4-67 | R4-132351 | Agreed | 2013-06-07 | TEI10 | - | 2013-06-07 |
1780 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Modification of OCNG patterns of RRM test configuration for 20MHz R11 | RP-60 | RP-130765 | approved | R4 | R4-67 | R4-132352 | Agreed | 2013-06-07 | TEI10 | - | 2013-06-07 |
1781 | - | F | Rel-10 | 10.10.0 | - | Clarification of Pcell in 36.133 R10 | - | - | - | R4 | R4-67 | R4-132354 | Revised | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1781 | 1 | F | Rel-10 | 10.10.0 | 10.11.0 | Clarification of Pcell in 36.133 R10 | RP-60 | RP-130761 | approved | R4 | R4-67 | R4-132930 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1782 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Clarification of Pcell in 36.133 R11 | RP-60 | RP-130761 | approved | R4 | R4-67 | R4-132356 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1783 | - | F | Rel-10 | 10.10.0 | 10.11.0 | FDD Absolute and relative RSRQ accuracies for CA with 20MHz BW (Rel-10) | RP-60 | RP-130767 | approved | R4 | R4-67 | R4-132358 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1784 | - | A | Rel-11 | 11.4.0 | 11.5.0 | FDD Absolute and relative RSRQ accuracies for CA with 20MHz BW (Rel-11) | RP-60 | RP-130767 | approved | R4 | R4-67 | R4-132359 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1785 | - | F | Rel-10 | 10.10.0 | 10.11.0 | TDD Absolute and relative RSRQ accuracies for CA with 20MHz BW (Rel-10) | RP-60 | RP-130767 | approved | R4 | R4-67 | R4-132361 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1786 | - | A | Rel-11 | 11.4.0 | 11.5.0 | TDD Absolute and relative RSRQ accuracies for CA with 20MHz BW (Rel-11) | RP-60 | RP-130767 | approved | R4 | R4-67 | R4-132362 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1787 | - | F | Rel-9 | 9.15.0 | 9.16.0 | Correction of reporting time for intra-frequency RSTD reporting delay test cases (Rel-9 only) | RP-60 | RP-130763 | approved | R4 | R4-67 | R4-132365 | Agreed | 2013-06-07 | LCS_LTE | - | 2013-06-07 |
1788 | - | F | Rel-9 | 9.15.0 | - | Correction of reporting time for intra-frequency RSTD reporting delay test cases (Rel-9) | - | - | - | R4 | R4-67 | R4-132366 | Withdrawn | 2013-06-07 | LCS_LTE | - | 2013-06-07 |
1789 | - | F | Rel-10 | 10.10.0 | - | Correction on fading propagation condition for CA inter-RAT test cases R10 | - | - | - | R4 | R4-67 | R4-132372 | revised | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1789 | 1 | F | Rel-10 | 10.10.0 | 10.11.0 | Correction on fading propagation condition for CA inter-RAT test cases R10 | RP-60 | RP-130761 | approved | R4 | R4-67 | R4-132956 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1790 | - | A | Rel-11 | 11.4.0 | 11.5.0 | Correction on fading propagation condition for CA inter-RAT test cases R11 | RP-60 | RP-130761 | approved | R4 | R4-67 | R4-132374 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1791 | - | F | Rel-11 | 11.4.0 | 11.5.0 | Clean up for band 44 | RP-60 | RP-130770 | approved | R4 | R4-67 | R4-132375 | Agreed | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1792 | - | F | Rel-11 | 11.4.0 | - | Clarification on REFSENS requirements for operating band without uplink band | - | - | - | R4 | R4-67 | R4-132377 | revised | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1792 | 1 | F | Rel-11 | 11.4.0 | - | Clarification on REFSENS requirements for operating band without uplink band | - | - | - | R4 | R4-67 | R4-132957 | Noted | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1793 | - | F | Rel-11 | 11.4.0 | - | E-UTRAN TDD UE Rx-Tx time difference test case in eICIC | - | - | - | R4 | R4-67 | R4-132397 | Revised | 2013-06-07 | eICIC_LTE-Perf | - | 2013-06-07 |
1793 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | E-UTRAN TDD UE Rx-Tx time difference test case in eICIC | RP-60 | RP-130765 | approved | R4 | R4-67 | R4-133030 | Agreed | 2013-06-07 | eICIC_LTE-Perf | - | 2013-06-07 |
1794 | - | F | Rel-11 | 11.4.0 | - | E-UTRAN FDD Transmit timing accuracy test for Scell R11 | - | - | - | R4 | R4-67 | R4-132410 | Noted | 2013-06-07 | LTE_CA_enh-Perf | - | 2013-06-07 |
1795 | - | F | Rel-11 | 11.4.0 | - | E-UTRAN TDD Transmit timing accuracy test for Scell R11 | - | - | - | R4 | R4-67 | R4-132411 | Noted | 2013-06-07 | LTE_CA_enh-Perf | - | 2013-06-07 |
1796 | - | F | Rel-11 | 11.4.0 | - | Wideband RSRQ measurement accuracy requirement in 36.133 | - | - | - | R4 | R4-67 | R4-132416 | Noted | 2013-06-07 | TEI11 | - | 2013-06-07 |
1797 | - | B | Rel-10 | 10.10.0 | - | CR on PCell Interruptions | - | - | - | R4 | R4-67 | R4-132429 | Revised | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1797 | 1 | B | Rel-10 | 10.10.0 | - | CR on PCell Interruptions | - | - | - | R4 | R4-67 | R4-132926 | Noted | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1798 | - | B | Rel-11 | 11.4.0 | - | Test case for RACH on SCell | - | - | - | R4 | R4-67 | R4-132466 | Noted | 2013-06-07 | LTE_CA_enh-Perf | - | 2013-06-07 |
1799 | - | B | Rel-11 | 11.4.0 | - | Test case for UE Transmit Timing Accuracy for SCell | - | - | - | R4 | R4-67 | R4-132474 | revised | 2013-06-07 | LTE_CA_enh-Perf | - | 2013-06-07 |
1799 | 1 | B | Rel-11 | 11.4.0 | 11.5.0 | Test case for UE Transmit Timing Accuracy for SCell | RP-60 | RP-130770 | approved | R4 | R4-67 | R4-132949 | Agreed | 2013-06-07 | LTE_CA_enh-Perf | - | 2013-06-07 |
1800 | - | F | Rel-10 | 10.10.0 | - | CR on measurements without gaps | - | - | - | R4 | R4-67 | R4-132478 | revised | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1800 | 1 | F | Rel-10 | 10.10.0 | 10.11.0 | CR on measurements without gaps | RP-60 | RP-130767 | approved | R4 | R4-67 | R4-132951 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1801 | - | A | Rel-11 | 11.4.0 | 11.5.0 | CR on measurements without gaps | RP-60 | RP-130767 | approved | R4 | R4-67 | R4-132481 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1802 | - | F | Rel-10 | 10.10.0 | - | CR on impact of harmonic products | - | - | - | R4 | R4-67 | R4-132488 | Withdrawn | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1803 | - | A | Rel-11 | 11.4.0 | - | CR on impact of harmonic products | - | - | - | R4 | R4-67 | R4-132489 | Withdrawn | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1804 | - | F | Rel-11 | 11.4.0 | - | Editorial corrections RRM | - | - | - | R4 | R4-67 | R4-132539 | Revised | 2013-06-07 | TEI11 | - | 2013-06-07 |
1804 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | Editorial corrections RRM | RP-60 | RP-130770 | approved | R4 | R4-67 | R4-132931 | Agreed | 2013-06-07 | TEI11 | - | 2013-06-07 |
1805 | - | F | Rel-10 | 10.10.0 | - | Clarification for UE Rx-Tx with eICIC | - | - | - | R4 | R4-67 | R4-132540 | Revised | 2013-06-07 | eICIC_LTE | - | 2013-06-07 |
1805 | 1 | F | Rel-10 | 10.10.0 | 10.11.0 | Clarification for UE Rx-Tx with eICIC | RP-60 | RP-130765 | approved | R4 | R4-67 | R4-133009 | Agreed | 2013-06-07 | eICIC_LTE-Perf | - | 2013-06-07 |
1806 | - | A | Rel-11 | 11.4.0 | - | Clarification for UE Rx-Tx with eICIC | - | - | - | R4 | R4-67 | R4-132541 | Revised | 2013-06-07 | eICIC_LTE | - | 2013-06-07 |
1806 | 1 | A | Rel-11 | 11.4.0 | 11.5.0 | Clarification for UE Rx-Tx with eICIC | RP-60 | RP-130765 | approved | R4 | R4-67 | R4-133010 | Agreed | 2013-06-07 | eICIC_LTE-Perf | - | 2013-06-07 |
1807 | - | F | Rel-11 | 11.4.0 | - | Capturing RF requirements in the core specification | - | - | - | R4 | R4-67 | R4-132548 | Revised | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1807 | 1 | F | Rel-11 | 11.4.0 | - | Capturing RF requirements in the core specification | - | - | - | R4 | R4-67 | R4-133109 | Revised | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1807 | 2 | F | Rel-11 | 11.4.0 | 11.5.0 | Capturing RF requirements in the core specification | RP-60 | RP-130770 | approved | R4 | R4-67 | R4-133135 | Agreed | 2013-06-07 | LTE_CA-Core | - | 2013-06-07 |
1808 | - | F | Rel-11 | 11.4.0 | - | Test case for UE Rx-Tx accuracy with eICIC in FDD | - | - | - | R4 | R4-67 | R4-132553 | Revised | 2013-06-07 | eICIC_LTE | - | 2013-06-07 |
1808 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | Test case for UE Rx-Tx accuracy with eICIC in FDD | RP-60 | RP-130765 | approved | R4 | R4-67 | R4-132967 | Agreed | 2013-06-07 | eICIC_LTE-Perf | - | 2013-06-07 |
1809 | - | B | Rel-12 | 11.4.0 | - | Introduction of LTE 450 into TS 36.133 | - | - | - | R4 | R4-67 | R4-132554 | Withdrawn | 2013-06-07 | LTE450_Brazil | - | 2013-06-07 |
1810 | - | B | Rel-12 | 11.4.0 | - | Introduction of LTE 450 into TS 36.133 | - | - | - | R4 | R4-67 | R4-132555 | Withdrawn | 2013-06-07 | LTE450_Brazil | - | 2013-06-07 |
1811 | - | F | Rel-11 | 11.4.0 | - | RLF reporting requirements for eMDT | - | - | - | R4 | R4-67 | R4-132557 | Noted | 2013-06-07 | eMDT_UMTSLTE-Core | - | 2013-06-07 |
1812 | - | F | Rel-11 | 11.4.0 | - | RSRP and RSRQ relative accuracy requirements for FeICIC | - | - | - | R4 | R4-67 | R4-132589 | revised | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1812 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | RSRP and RSRQ relative accuracy requirements for FeICIC | RP-60 | RP-130770 | approved | R4 | R4-67 | R4-132954 | Agreed | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1813 | - | F | Rel-10 | 10.10.0 | - | Adding clarification for begin and end of measurement GAP for Rel-10 | - | - | - | R4 | R4-67 | R4-132630 | Revised | 2013-06-07 | TEI10 | - | 2013-06-07 |
1813 | 1 | F | Rel-10 | 10.10.0 | 10.11.0 | Adding clarification for begin and end of measurement GAP for Rel-10 | RP-60 | RP-130765 | approved | R4 | R4-67 | R4-132923 | Agreed | 2013-06-07 | TEI10 | - | 2013-06-07 |
1814 | - | F | Rel-11 | 11.4.0 | - | Adding clarification for begin and end of measurement GAP for Rel-11 | - | - | - | R4 | R4-67 | R4-132632 | Revised | 2013-06-07 | TEI11 | - | 2013-06-07 |
1814 | 1 | A | Rel-11 | 11.4.0 | 11.5.0 | Adding clarification for begin and end of measurement GAP for Rel-11 | RP-60 | RP-130765 | approved | R4 | R4-67 | R4-132924 | Agreed | 2013-06-07 | TEI10 | - | 2013-06-07 |
1815 | - | F | Rel-11 | 11.4.0 | - | Modification on UE behaviour on measurement GAP for Rel-11 | - | - | - | R4 | R4-67 | R4-132638 | Noted | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1816 | - | F | Rel-10 | 10.10.0 | - | Rel.10 CR on CA SCell Activation Delay Requirements | - | - | - | R4 | R4-67 | R4-132664 | Revised | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1816 | 1 | F | Rel-10 | 10.10.0 | - | Rel.10 CR on CA SCell Activation Delay Requirements | - | - | - | R4 | R4-67 | R4-133052 | Noted | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1817 | - | F | Rel-11 | 11.4.0 | - | Rel.11 CR on CA SCell Activation Delay Requirements | - | - | - | R4 | R4-67 | R4-132665 | Revised | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1817 | 1 | F | Rel-11 | 11.4.0 | - | Rel.11 CR on CA SCell Activation Delay Requirements | - | - | - | R4 | R4-67 | R4-133053 | Noted | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1818 | - | F | Rel-11 | 11.4.0 | - | Rel. 11 CR on Pcell interruption due to Scell activation/deactivation for DRX case | - | - | - | R4 | R4-67 | R4-132667 | Noted | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1819 | - | F | Rel-10 | 10.10.0 | - | Rel. 10 CR on Pcell interruption due to Scell activation/deactivation for DRX case | - | - | - | R4 | R4-67 | R4-132678 | Revised | 2013-06-07 | LTE_CA | - | 2013-06-07 |
1819 | 1 | F | Rel-10 | 10.10.0 | 10.11.0 | Rel. 10 CR on Pcell interruption due to Scell activation/deactivation for DRX case | RP-60 | RP-130766 | approved | R4 | R4-67 | R4-132927 | Agreed | 2013-06-07 | LTE_CA-Core | - | 2013-06-07 |
1820 | - | F | Rel-11 | 11.4.0 | - | UE Transmit Timing Accuracy Test in DRX | - | - | - | R4 | R4-67 | R4-132718 | Noted | 2013-06-07 | LTE-RF | - | 2013-06-07 |
1821 | - | F | Rel-11 | 11.4.0 | 11.5.0 | Measurement requirements with interruptions due to CA | RP-60 | RP-130770 | approved | R4 | R4-67 | R4-132750 | Agreed | 2013-06-07 | LTE_CA-Perf | - | 2013-06-07 |
1822 | - | F | Rel-11 | 11.4.0 | 11.5.0 | Clarification on antenna ports in the measured and aggressor cells with FeICIC | RP-60 | RP-130770 | approved | R4 | R4-67 | R4-132753 | Agreed | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1823 | - | F | Rel-11 | 11.4.0 | - | Clarification on bandwidths in the measured and aggressor cells wiht FeICIC | - | - | - | R4 | R4-67 | R4-132766 | Noted | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1824 | - | F | Rel-11 | 11.4.0 | - | Capturing RLM requirements for FeICIC | - | - | - | R4 | R4-67 | R4-132771 | Noted | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1825 | - | B | Rel-11 | 11.4.0 | - | UE Rx-Tx accuracy requirements with FeICIC | - | - | - | R4 | R4-67 | R4-132777 | revised | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1825 | 1 | B | Rel-11 | 11.4.0 | 11.5.0 | UE Rx-Tx accuracy requirements with FeICIC | RP-60 | RP-130770 | approved | R4 | R4-67 | R4-132950 | Agreed | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1826 | - | B | Rel-11 | 11.4.0 | 11.5.0 | UE Rx-Tx measurement requirements with FeICIC | RP-60 | RP-130770 | approved | R4 | R4-67 | R4-132781 | Agreed | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1827 | - | B | Rel-11 | 11.4.0 | - | Test case for cell identification with FeICIC in FDD | - | - | - | R4 | R4-67 | R4-132785 | Revised | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1827 | 1 | B | Rel-11 | 11.4.0 | - | Test case for cell identification with FeICIC in FDD | - | - | - | R4 | R4-67 | R4-133034 | Revised | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1827 | 2 | B | Rel-11 | 11.4.0 | 11.5.0 | Test case for cell identification with FeICIC in FDD | RP-60 | RP-130770 | approved | R4 | R4-67 | R4-133112 | Agreed | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1828 | - | B | Rel-11 | 11.4.0 | - | Test case for cell identification with FeICIC in TDD | - | - | - | R4 | R4-67 | R4-132789 | Revised | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1828 | 1 | B | Rel-11 | 11.4.0 | - | Test case for cell identification with FeICIC in TDD | - | - | - | R4 | R4-67 | R4-133035 | Revised | 2013-06-07 | eICIC_enh_LTE-Perf | - | 2013-06-07 |
1828 | 2 | B | Rel-11 | 11.4.0 | 11.5.0 | Test case for cell identification with FeICIC in TDD | RP-60 | RP-130770 | approved | R4 | R4-67 | R4-133113 | Agreed | 2013-06-07 | eICIC_enh_LTE-Core | - | 2013-06-07 |
1829 | - | B | Rel-11 | 11.4.0 | - | Corrections on Wideband RSRQ inter-frequency accuracy requirements | - | - | - | R4 | R4-67 | R4-132290 | Revised | 2013-06-07 | TEI11 | - | 2013-06-07 |
1829 | 1 | F | Rel-11 | 11.4.0 | 11.5.0 | Corrections on Wideband RSRQ inter-frequency accuracy requirements | RP-60 | RP-130770 | approved | R4 | R4-67 | R4-133031 | Agreed | 2013-06-07 | TEI11 | - | 2013-06-07 |
1830 | - | B | Rel-12 | 12.0.0 | - | UTRAN FDD CPICH Ec/No measurement accuracy test for 5MHz bandwidth | - | - | - | R4 | R4-68 | R4-133173 | Revised | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1830 | 1 | B | Rel-12 | 12.0.0 | 12.1.0 | UTRAN FDD CPICH Ec/No measurement accuracy test for 5MHz bandwidth | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-134490 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1831 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Correction on the test cases for UE Transmit Timing Accuracy for SCell (Rel-11) | RP-61 | RP-131291 | approved | R4 | R4-68 | R4-133175 | Agreed | 2013-09-01 | LTE_CA_enh-Perf | - | 2013-09-01 |
1832 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Correction on the test cases for UE Transmit Timing Accuracy for SCell (Rel-12) | RP-61 | RP-131291 | approved | R4 | R4-68 | R4-133176 | Agreed | 2013-09-01 | LTE_CA_enh-Perf | - | 2013-09-01 |
1833 | - | F | Rel-10 | 10.11.0 | - | Corrections on RSTD CA test parameters (Rel-10) | - | - | - | R4 | R4-68 | R4-133177 | Withdrawn | 2013-09-01 | LTE_CA | - | 2013-09-01 |
1834 | - | F | Rel-10 | 10.11.0 | 10.12.0 | Corrections on RSTD CA test parameters (Rel-10) | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133178 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1835 | - | A | Rel-11 | 11.5.0 | 11.6.0 | Corrections on RSTD CA test parameters (Rel-11) | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133179 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1836 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Corrections on RSTD CA test parameters (Rel-12) | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133180 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1837 | - | F | Rel-10 | 10.11.0 | - | FDD: RSTD measurement reporting test cases for CA with 20MHz BW (Rel-10) | - | - | - | R4 | R4-68 | R4-133181 | Revised | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1837 | 1 | F | Rel-10 | 10.11.0 | 10.12.0 | FDD: RSTD measurement reporting test cases for CA with 20MHz BW (Rel-10) | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134290 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1838 | - | A | Rel-11 | 11.5.0 | 11.6.0 | FDD: RSTD measurement reporting test cases for CA with 20MHz BW (Rel-11) | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133182 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1839 | - | A | Rel-12 | 12.0.0 | 12.1.0 | FDD: RSTD measurement reporting test cases for CA with 20MHz BW (Rel-12) | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133183 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1840 | - | F | Rel-10 | 10.11.0 | - | TDD: RSTD measurement reporting test cases for CA with 20MHz BW (Rel-10) | - | - | - | R4 | R4-68 | R4-133184 | Revised | 2013-09-01 | LTE_CA | - | 2013-09-01 |
1840 | 1 | F | Rel-10 | 10.11.0 | 10.12.0 | TDD: RSTD measurement reporting test cases for CA with 20MHz BW (Rel-10) | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134291 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1841 | - | A | Rel-11 | 11.5.0 | 11.6.0 | TDD: RSTD measurement reporting test cases for CA with 20MHz BW (Rel-11) | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133185 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1842 | - | A | Rel-12 | 12.0.0 | 12.1.0 | TDD: RSTD measurement reporting test cases for CA with 20MHz BW (Rel-12) | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133186 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1843 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Timing and RSRP value corrections in Test cases A.9.2.6 and A.9.2.9 | RP-61 | RP-131285 | approved | R4 | R4-68 | R4-133187 | Agreed | 2013-09-01 | LTE_CA-core | - | 2013-09-01 |
1844 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Timing and RSRP value corrections in Test cases A.9.2.6 and A.9.2.9 | RP-61 | RP-131285 | approved | R4 | R4-68 | R4-133188 | Agreed | 2013-09-01 | LTE_CA-core | - | 2013-09-01 |
1845 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Corrections to Bands for 20MHz CA Test cases | RP-61 | RP-131285 | approved | R4 | R4-68 | R4-133190 | Agreed | 2013-09-01 | LTE_CA-core | - | 2013-09-01 |
1846 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Corrections to Bands for 20MHz CA Test cases | RP-61 | RP-131285 | approved | R4 | R4-68 | R4-133191 | Agreed | 2013-09-01 | LTE_CA-core | - | 2013-09-01 |
1847 | - | F | Rel-10 | 10.11.0 | - | CRS Es/Iot for eICIC with MBSFN ABS | - | - | - | R4 | R4-68 | R4-133192 | Revised | 2013-09-01 | eICIC_LTE-Perf | - | 2013-09-01 |
1847 | 1 | F | Rel-10 | 10.11.0 | - | CRS Es/Iot for eICIC with MBSFN ABS | - | - | - | R4 | R4-68 | R4-134305 | Noted | 2013-09-01 | eICIC_LTE-Perf | - | 2013-09-01 |
1848 | - | A | Rel-11 | 11.5.0 | - | CRS Es/Iot for eICIC with MBSFN ABS | - | - | - | R4 | R4-68 | R4-133193 | Withdrawn | 2013-09-01 | eICIC_LTE-Perf | - | 2013-09-01 |
1849 | - | A | Rel-12 | 12.0.0 | - | CRS Es/Iot for eICIC with MBSFN ABS | - | - | - | R4 | R4-68 | R4-133194 | Withdrawn | 2013-09-01 | eICIC_LTE-Perf | - | 2013-09-01 |
1850 | - | F | Rel-8 | 8.22.0 | 8.23.0 | Cell time offset in TDD Inter-RAT test case | RP-61 | RP-131279 | approved | R4 | R4-68 | R4-133195 | Agreed | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1851 | - | F | Rel-9 | 9.16.0 | 9.17.0 | Cell time offset in TDD Inter-RAT test cases | RP-61 | RP-131279 | approved | R4 | R4-68 | R4-133196 | Agreed | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1852 | - | A | Rel-10 | 10.11.0 | 10.12.0 | Cell time offset in TDD Inter-RAT test cases | RP-61 | RP-131279 | approved | R4 | R4-68 | R4-133197 | Agreed | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1853 | - | A | Rel-11 | 11.5.0 | 11.6.0 | Cell time offset in TDD Inter-RAT test cases | RP-61 | RP-131279 | approved | R4 | R4-68 | R4-133198 | Agreed | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1854 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Cell time offset in TDD Inter-RAT test cases | RP-61 | RP-131279 | approved | R4 | R4-68 | R4-133199 | Agreed | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1855 | - | B | Rel-12 | 12.0.0 | 12.1.0 | EUTRA FDD-UTRA FDD cell reselection: UTRA FDD is of lower priority | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-133216 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1856 | - | F | Rel-11 | 11.5.0 | - | Relative Time Stamp Accuracy for RRC Connection Establishment Failure Log Reporting (Rel-11) | - | - | - | R4 | R4-68 | R4-133420 | Noted | 2013-09-01 | eMDT_UMTSLTE-Core | - | 2013-09-01 |
1857 | - | A | Rel-12 | 12.0.0 | - | Relative Time Stamp Accuracy for RRC Connection Establishment Failure Log Reporting (Rel-12) | - | - | - | R4 | R4-68 | R4-133421 | Withdrawn | 2013-09-01 | eMDT_UMTSLTE-Core | - | 2013-09-01 |
1858 | - | F | Rel-11 | 11.5.0 | - | Relative Time Stamp Accuracy for RRC Radio Link Failure Reporting (Rel-11) | - | - | - | R4 | R4-68 | R4-133422 | Noted | 2013-09-01 | eMDT_UMTSLTE-Core | - | 2013-09-01 |
1859 | - | A | Rel-12 | 12.0.0 | - | Relative Time Stamp Accuracy for RRC Radio Link Failure Reporting (Rel-12) | - | - | - | R4 | R4-68 | R4-133423 | Withdrawn | 2013-09-01 | eMDT_UMTSLTE-Core | - | 2013-09-01 |
1860 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Rel-12 CRs on synchronization requirements for E-UTRA to CDMA 2000 handover | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133470 | Agreed | 2013-09-01 | TEI10 | - | 2013-09-01 |
1861 | - | A | Rel-11 | 11.5.0 | 11.6.0 | Rel-11 CRs on synchronization requirements for E-UTRA to CDMA 2000 handover | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133472 | Agreed | 2013-09-01 | TEI10 | - | 2013-09-01 |
1862 | - | F | Rel-10 | 10.11.0 | - | Rel-10 CRs on synchronization requirements for E-UTRA to CDMA 2000 handover | - | - | - | R4 | R4-68 | R4-133474 | Revised | 2013-09-01 | TEI10 | - | 2013-09-01 |
1862 | 1 | F | Rel-10 | 10.11.0 | 10.12.0 | Rel-10 CRs on synchronization requirements for E-UTRA to CDMA 2000 handover | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134358 | Agreed | 2013-09-01 | TEI10 | - | 2013-09-01 |
1863 | - | B | Rel-10 | 10.11.0 | - | CR on PCell interrutptions | - | - | - | R4 | R4-68 | R4-133496 | Revised | 2013-09-01 | LTE_CA | - | 2013-09-01 |
1863 | 1 | F | Rel-10 | 10.11.0 | 10.12.0 | CR on PCell interrutptions | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134286 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1864 | - | F | Rel-10 | 10.11.0 | - | CR on PCell Interrutptions During SCell Measurements for Inter-band CA | - | - | - | R4 | R4-68 | R4-133502 | Revised | 2013-09-01 | LTE_CA | - | 2013-09-01 |
1864 | 1 | F | Rel-10 | 10.11.0 | - | CR on PCell Interrutptions During SCell Measurements for Inter-band CA | - | - | - | R4 | R4-68 | R4-134285 | Noted | 2013-09-01 | LTE_CA | - | 2013-09-01 |
1865 | - | F | Rel-11 | 11.5.0 | - | Correct the SNR values for RLM tests with non-MBSFN ABS in FeICIC R11 | - | - | - | R4 | R4-68 | R4-133549 | Revised | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1865 | 1 | F | Rel-11 | 11.5.0 | 11.6.0 | Correct the SNR values for RLM tests with non-MBSFN ABS in FeICIC R11 | RP-61 | RP-131290 | approved | R4 | R4-68 | R4-134370 | Agreed | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1866 | - | A | Rel-12 | 12.0.0 | - | Correct the SNR values for RLM tests with non-MBSFN ABS in FeICIC R12 | - | - | - | R4 | R4-68 | R4-133550 | Revised | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1866 | 1 | A | Rel-12 | 12.0.0 | 12.1.0 | Correct the SNR values for RLM tests with non-MBSFN ABS in FeICIC R12 | RP-61 | RP-131290 | approved | R4 | R4-68 | R4-134371 | Agreed | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1867 | - | B | Rel-11 | 11.5.0 | - | E-UTRAN FDD RSRP Measurement Accuracy Test in FeICIC R11 | - | - | - | R4 | R4-68 | R4-133551 | Revised | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1867 | 1 | B | Rel-11 | 11.5.0 | 11.6.0 | E-UTRAN FDD RSRP Measurement Accuracy Test in FeICIC R11 | RP-61 | RP-131290 | approved | R4 | R4-68 | R4-134364 | Agreed | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1868 | - | B | Rel-11 | 11.5.0 | - | CR on wideband RSRQ test case | - | - | - | R4 | R4-68 | R4-133552 | Noted | 2013-09-01 | TEI11 | - | 2013-09-01 |
1869 | - | A | Rel-12 | 12.0.0 | - | E-UTRAN FDD RSRP Measurement Accuracy Test in FeICIC R12 | - | - | - | R4 | R4-68 | R4-133553 | Revised | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1869 | 1 | A | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD RSRP Measurement Accuracy Test in FeICIC R12 | RP-61 | RP-131290 | approved | R4 | R4-68 | R4-134372 | Agreed | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1870 | - | B | Rel-11 | 11.5.0 | - | E-UTRAN TDD RSRP Measurement Accuracy Test in FeICIC R11 | - | - | - | R4 | R4-68 | R4-133554 | Revised | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1870 | 1 | B | Rel-11 | 11.5.0 | 11.6.0 | E-UTRAN TDD RSRP Measurement Accuracy Test in FeICIC R11 | RP-61 | RP-131290 | approved | R4 | R4-68 | R4-134365 | Agreed | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1871 | - | A | Rel-12 | 12.0.0 | - | E-UTRAN TDD RSRP Measurement Accuracy Test in FeICIC R12 | - | - | - | R4 | R4-68 | R4-133556 | Revised | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1871 | 1 | A | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN TDD RSRP Measurement Accuracy Test in FeICIC R12 | RP-61 | RP-131290 | approved | R4 | R4-68 | R4-134373 | Agreed | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1872 | - | F | Rel-11 | 11.5.0 | 11.6.0 | E-UTRAN FDD UE Rx-Tx Time difference test in FeICIC R11 | RP-61 | RP-131284 | approved | R4 | R4-68 | R4-133557 | Agreed | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1873 | - | A | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD UE Rx-Tx Time difference test in FeICIC R12 | RP-61 | RP-131284 | approved | R4 | R4-68 | R4-133558 | Agreed | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1874 | - | F | Rel-11 | 11.5.0 | 11.6.0 | E-UTRAN TDD UE Rx-Tx Time difference test in FeICIC R11 | RP-61 | RP-131284 | approved | R4 | R4-68 | R4-133560 | Agreed | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1875 | - | A | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN TDD UE Rx-Tx Time difference test in FeICIC R12 | RP-61 | RP-131284 | approved | R4 | R4-68 | R4-133562 | Agreed | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1876 | - | B | Rel-11 | 11.5.0 | - | Introduction of E-UTRAN FDD WB-RSRQ test case R11 | - | - | - | R4 | R4-68 | R4-133570 | Revised | 2013-09-01 | TEI11 | - | 2013-09-01 |
1876 | 1 | B | Rel-11 | 11.5.0 | - | Introduction of E-UTRAN FDD WB-RSRQ test case R11 | - | - | - | R4 | R4-68 | R4-134341 | Noted | 2013-09-01 | TEI11 | - | 2013-09-01 |
1877 | - | A | Rel-12 | 12.0.0 | - | Introduction of E-UTRAN FDD WB-RSRQ test case R12 | - | - | - | R4 | R4-68 | R4-133571 | Noted | 2013-09-01 | TEI11 | - | 2013-09-01 |
1878 | - | B | Rel-11 | 11.5.0 | - | Introduction of E-UTRAN TDD WB-RSRQ test case R11 | - | - | - | R4 | R4-68 | R4-133572 | Noted | 2013-09-01 | TEI11 | - | 2013-09-01 |
1879 | - | A | Rel-12 | 12.0.0 | - | Introduction of E-UTRAN TDD WB-RSRQ test case R12 | - | - | - | R4 | R4-68 | R4-133573 | Noted | 2013-09-01 | TEI11 | - | 2013-09-01 |
1880 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Clarification on UE Rx-Tx accuracy requirements in FeICIC R11 | RP-61 | RP-131284 | approved | R4 | R4-68 | R4-133586 | Agreed | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1881 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Clarification on UE Rx-Tx accuracy requirements in FeICIC R12 | RP-61 | RP-131284 | approved | R4 | R4-68 | R4-133587 | Agreed | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1882 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Clarification on UE Rx-Tx measurement requirements in FeICIC R11 | RP-61 | RP-131284 | approved | R4 | R4-68 | R4-133588 | Agreed | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1883 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Clarification on UE Rx-Tx measurement requirements in FeICIC R12 | RP-61 | RP-131284 | approved | R4 | R4-68 | R4-133589 | Agreed | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1884 | - | F | Rel-10 | 10.11.0 | 10.12.0 | Clarification on antenna port for timing and eCID test cases R10 | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133591 | Agreed | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1885 | - | A | Rel-11 | 11.5.0 | 11.6.0 | Clarification on antenna port for timing and eCID test cases R11 | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133592 | Agreed | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1886 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Clarification on antenna port for timing and eCID test cases R12 | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133593 | Agreed | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1887 | - | F | Rel-10 | 10.11.0 | - | Addition of TDD serving cell measurement accuracy tests R10 | - | - | - | R4 | R4-68 | R4-133595 | Revised | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1887 | 1 | F | Rel-10 | 10.11.0 | 10.12.0 | Addition of TDD serving cell measurement accuracy tests R10 | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134306 | Agreed | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1888 | - | A | Rel-11 | 11.5.0 | - | Addition of TDD serving cell measurement accuracy tests R11 | - | - | - | R4 | R4-68 | R4-133596 | Revised | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1888 | 1 | A | Rel-11 | 11.5.0 | 11.6.0 | Addition of TDD serving cell measurement accuracy tests R11 | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134342 | Agreed | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1889 | - | A | Rel-12 | 12.0.0 | - | Addition of TDD serving cell measurement accuracy tests R12 | - | - | - | R4 | R4-68 | R4-133597 | Revised | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1889 | 1 | A | Rel-12 | 12.0.0 | 12.1.0 | Addition of TDD serving cell measurement accuracy tests R12 | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134343 | Agreed | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1890 | - | B | Rel-12 | 12.0.0 | 12.1.0 | Introduction of Band 31 in 36.133 | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-133601 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1891 | - | B | Rel-12 | 12.0.0 | 12.1.0 | Addition of New OCNG Pattern for 5MHz | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-133602 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1892 | - | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD intra-frequency RSRP measurement accuracy for 5MHz bandwidth | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-133603 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1893 | - | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD-FDD inter-frequency RSRP measurement accuracy for 5MHz bandwidth | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-133604 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1894 | - | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD Radio Link Monitoring Test for Out-of-sync for 5MHz Bandwidth | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-133605 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1895 | - | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions in asynchronous cells for 5MHz bandwidth | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-133606 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1896 | - | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD-FDD intra-frequency Cell Re-selection case for 5MHz bandwidth | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-133607 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1897 | - | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD intra-frequency RRC re-establishment for 5MHz bandwidth | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-133608 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1898 | - | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD - Contention Based Random Access Test for 5MHz bandwidth | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-133609 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1899 | - | B | Rel-12 | 12.0.0 | - | E-UTRAN FDD - UE Transmit Timing Accuracy Tests for 5MHz bandwidth | - | - | - | R4 | R4-68 | R4-133611 | Revised | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1899 | 1 | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD - UE Transmit Timing Accuracy Tests for 5MHz bandwidth | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-134455 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1900 | - | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRA FDD- UTRA FDD inter-RAT handover case for 5MHz bandwidth | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-133615 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1901 | - | B | Rel-12 | 12.0.0 | - | E-UTRA FDD- UTRA FDD CPICH RSCP measurement accuracy issues | - | - | - | R4 | R4-68 | R4-133616 | Revised | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1901 | 1 | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRA FDD- UTRA FDD CPICH RSCP measurement accuracy issues | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-134491 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1902 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Clarification of Refesens in WB-RSRQ sections of 36.133 R11 | RP-61 | RP-131285 | approved | R4 | R4-68 | R4-133656 | Agreed | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1903 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Clarification of Refesens in WB-RSRQ sections of 36.133 R12 | RP-61 | RP-131285 | approved | R4 | R4-68 | R4-133657 | Agreed | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1904 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Remove the brackets of FeICIC side conditions R11 | RP-61 | RP-131290 | approved | R4 | R4-68 | R4-133659 | Agreed | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1905 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Remove the brackets of FeICIC side conditions R12 | RP-61 | RP-131290 | approved | R4 | R4-68 | R4-133660 | Agreed | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1906 | - | F | Rel-10 | 10.11.0 | - | Test cases of E-UTRAN FDD RSTD Measurement Accuracy for Carrier Aggregation for 20MHz R10 | - | - | - | R4 | R4-68 | R4-133664 | Revised | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1906 | 1 | F | Rel-10 | 10.11.0 | 10.12.0 | Test cases of E-UTRAN FDD RSTD Measurement Accuracy for Carrier Aggregation for 20MHz R10 | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134292 | Agreed | 2013-09-01 | LTE_CA-Perf | - | 2013-09-01 |
1907 | - | A | Rel-11 | 11.5.0 | - | Test cases of E-UTRAN FDD RSTD Measurement Accuracy for Carrier Aggregation for 20MHz R1 | - | - | - | R4 | R4-68 | R4-133667 | Revised | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1907 | 1 | A | Rel-11 | 11.5.0 | 11.6.0 | Test cases of E-UTRAN FDD RSTD Measurement Accuracy for Carrier Aggregation for 20MHz R1 | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134298 | Agreed | 2013-09-01 | LTE_CA-Perf | - | 2013-09-01 |
1908 | - | A | Rel-12 | 12.0.0 | - | Test cases of E-UTRAN FDD RSTD Measurement Accuracy for Carrier Aggregation for 20MHz R12 | - | - | - | R4 | R4-68 | R4-133668 | Revised | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1908 | 1 | A | Rel-12 | 12.0.0 | 12.1.0 | Test cases of E-UTRAN FDD RSTD Measurement Accuracy for Carrier Aggregation for 20MHz R12 | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134299 | Agreed | 2013-09-01 | LTE_CA-Perf | - | 2013-09-01 |
1909 | - | F | Rel-11 | 11.5.0 | - | CR on Intra-frequency RSRQ test case for FDD | - | - | - | R4 | R4-68 | R4-133688 | Revised | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1909 | 1 | F | Rel-11 | 11.5.0 | 11.6.0 | CR on Intra-frequency RSRQ test case for FDD | RP-61 | RP-131290 | approved | R4 | R4-68 | R4-134362 | Agreed | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1910 | - | F | Rel-11 | 11.5.0 | - | CR on Intra-frequency RSRQ test case for TDD | - | - | - | R4 | R4-68 | R4-133690 | Revised | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1910 | 1 | F | Rel-11 | 11.5.0 | 11.6.0 | CR on Intra-frequency RSRQ test case for TDD | RP-61 | RP-131290 | approved | R4 | R4-68 | R4-134363 | Agreed | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1911 | - | F | Rel-10 | 10.11.0 | - | Test cases of E-UTRAN TDD RSTD Measurement Accuracy for Carrier Aggregation for 20MHz R10 | - | - | - | R4 | R4-68 | R4-133693 | Revised | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1911 | 1 | F | Rel-10 | 10.11.0 | 10.12.0 | Test cases of E-UTRAN TDD RSTD Measurement Accuracy for Carrier Aggregation for 20MHz R10 | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134302 | Agreed | 2013-09-01 | LTE_CA-Perf | - | 2013-09-01 |
1912 | - | A | Rel-11 | 11.5.0 | - | Test cases of E-UTRAN TDD RSTD Measurement Accuracy for Carrier Aggregation for 20MHz R11 | - | - | - | R4 | R4-68 | R4-133696 | Revised | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1912 | 1 | A | Rel-11 | 11.5.0 | 11.6.0 | Test cases of E-UTRAN TDD RSTD Measurement Accuracy for Carrier Aggregation for 20MHz R11 | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134303 | Agreed | 2013-09-01 | LTE_CA-Perf | - | 2013-09-01 |
1913 | - | A | Rel-12 | 12.0.0 | - | Test cases of E-UTRAN TDD RSTD Measurement Accuracy for Carrier Aggregation for 20MHz R12 | - | - | - | R4 | R4-68 | R4-133697 | Revised | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1913 | 1 | A | Rel-12 | 12.0.0 | 12.1.0 | Test cases of E-UTRAN TDD RSTD Measurement Accuracy for Carrier Aggregation for 20MHz R12 | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134304 | Agreed | 2013-09-01 | LTE_CA-Perf | - | 2013-09-01 |
1914 | - | F | Rel-12 | 12.0.0 | - | Clarification on UE behaviour after measurement gap | - | - | - | R4 | R4-68 | R4-133702 | Revised | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1914 | 1 | F | Rel-12 | 12.0.0 | - | Clarification on UE behaviour after measurement gap | - | - | - | R4 | R4-68 | R4-134307 | Noted | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1915 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Correction to SCH Es/Iot side condition for intra-frequency measurements under time domain measurement resource restriction with CRS assistance information | RP-61 | RP-131284 | approved | R4 | R4-68 | R4-133734 | Agreed | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1916 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Correction to SCH Es/Iot side condition for intra-frequency measurements under time domain measurement resource restriction with CRS assistance information | RP-61 | RP-131284 | approved | R4 | R4-68 | R4-133737 | Agreed | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1917 | - | F | Rel-11 | 11.5.0 | - | Modification on UE behavior on measurement GAP for Rel-11 | - | - | - | R4 | R4-68 | R4-133745 | Withdrawn | 2013-09-01 | LTE_CA | - | 2013-09-01 |
1918 | - | F | Rel-10 | 10.11.0 | - | Modification on the requirement for PCell interruption for Rel-10 | - | - | - | R4 | R4-68 | R4-133756 | Revised | 2013-09-01 | LTE_CA | - | 2013-09-01 |
1918 | 1 | F | Rel-10 | 10.11.0 | - | Modification on the requirement for PCell interruption for Rel-10 | - | - | - | R4 | R4-68 | R4-134287 | Revised | 2013-09-01 | LTE_CA | - | 2013-09-01 |
1918 | 2 | F | Rel-10 | 10.11.0 | 10.12.0 | Modification on the requirement for PCell interruption for Rel-10 | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134551 | Agreed | 2013-09-01 | LTE_CA-Perf | - | 2013-09-01 |
1919 | - | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD "" Non-contention Based Random Access Test for 5MHz bandwidth | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-133758 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1920 | - | A | Rel-11 | 11.5.0 | 11.6.0 | Modification on the requirement for PCell interruption for Rel-11 | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133760 | Agreed | 2013-09-01 | LTE_CA-Perf | - | 2013-09-01 |
1921 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Modification on the requirement for PCell interruption for Rel-12 | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133764 | Agreed | 2013-09-01 | LTE_CA-Perf | - | 2013-09-01 |
1922 | - | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD "" Timing Advance Accuracy Test for 5MHz bandwidth | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-133768 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1923 | - | A | Rel-11 | 11.5.0 | 11.6.0 | Phase II CA 20 MHz Tests: Event triggered reporting on deactivating SCell and and interruption probability without DRX | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133806 | Agreed | 2013-09-01 | LTE_CA-Perf | - | 2013-09-01 |
1924 | - | F | Rel-10 | 10.11.0 | - | Correction to SCell activation delay | - | - | - | R4 | R4-68 | R4-133808 | Revised | 2013-09-01 | LTE_CA-core | - | 2013-09-01 |
1924 | 1 | F | Rel-10 | 10.11.0 | - | Correction to SCell activation delay | - | - | - | R4 | R4-68 | R4-134553 | Noted | 2013-09-01 | LTE_CA-core | - | 2013-09-01 |
1925 | - | F | Rel-10 | 10.11.0 | 10.12.0 | Phase II CA 20 MHz Tests: Event triggered reporting on deactivating SCell and and interruption probability without DRX | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133810 | Agreed | 2013-09-01 | LTE_CA-Perf | - | 2013-09-01 |
1926 | - | A | Rel-11 | 11.5.0 | - | Correction to SCell activation delay | - | - | - | R4 | R4-68 | R4-133812 | Withdrawn | 2013-09-01 | LTE_CA-core | - | 2013-09-01 |
1927 | - | A | Rel-12 | 12.0.0 | - | Correction to SCell activation delay | - | - | - | R4 | R4-68 | R4-133814 | Withdrawn | 2013-09-01 | LTE_CA-core | - | 2013-09-01 |
1928 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Phase II CA 20 MHz Tests: Event triggered reporting on deactivating SCell and and interruption probability without DRX | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-133816 | Agreed | 2013-09-01 | LTE_CA-Perf | - | 2013-09-01 |
1929 | - | A | Rel-12 | 12.0.0 | - | Inter-frequency WB-RSRQ test cases | - | - | - | R4 | R4-68 | R4-133908 | Withdrawn | 2013-09-01 | TEI11 | - | 2013-09-01 |
1930 | - | F | Rel-11 | 11.5.0 | - | Test specs for WB-RSRQ | - | - | - | R4 | R4-68 | R4-133931 | Withdrawn | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1931 | - | F | Rel-12 | 12.0.0 | - | Correction on UE Behaviour for Transmission after Measurement Gaps in TDD | - | - | - | R4 | R4-68 | R4-133945 | Noted | 2013-09-01 | TEI12 | - | 2013-09-01 |
1932 | - | B | Rel-12 | 12.0.0 | - | Part I RRM tests: Inter-RAT CPICH measurement accuracy tests | - | - | - | R4 | R4-68 | R4-133955 | Noted | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1933 | - | F | Rel-11 | 11.5.0 | - | Inter-frequency WB-RSRQ test cases | - | - | - | R4 | R4-68 | R4-133957 | Withdrawn | 2013-09-01 | TEI11 | - | 2013-09-01 |
1934 | - | B | Rel-12 | 12.0.0 | - | Part I RRM tests: Inter-RAT GSM carrier RSSI measurement accuracy test | - | - | - | R4 | R4-68 | R4-133958 | Noted | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1935 | - | F | Rel-12 | 12.0.0 | - | UE Transmit Timing Accuracy Requirements in first transmission in a DRX cycle | - | - | - | R4 | R4-68 | R4-133967 | Noted | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1936 | - | F | Rel-8 | 8.22.0 | - | Test Cases for UE Transmit Timing Accuracy requirements in DRX | - | - | - | R4 | R4-68 | R4-133969 | Noted | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1937 | - | A | Rel-9 | 9.16.0 | - | Test Cases for UE Transmit Timing Accuracy requirements in DRX | - | - | - | R4 | R4-68 | R4-133970 | Noted | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1938 | - | A | Rel-10 | 10.11.0 | - | Test Cases for UE Transmit Timing Accuracy requirements in DRX | - | - | - | R4 | R4-68 | R4-133972 | Withdrawn | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1939 | - | F | Rel-11 | 11.5.0 | - | Test Cases for UE Transmit Timing Accuracy requirements in DRX | - | - | - | R4 | R4-68 | R4-133973 | Noted | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1940 | - | A | Rel-12 | 12.0.0 | - | Test Cases for UE Transmit Timing Accuracy requirements in DRX | - | - | - | R4 | R4-68 | R4-133976 | Withdrawn | 2013-09-01 | LTE-RF | - | 2013-09-01 |
1941 | - | F | Rel-10 | 10.11.0 | - | CR on CA SCell Activation Delay Requirements | - | - | - | R4 | R4-68 | R4-134050 | Revised | 2013-09-01 | LTE_CA | - | 2013-09-01 |
1941 | 1 | F | Rel-10 | 10.11.0 | - | CR on CA SCell Activation Delay Requirements | - | - | - | R4 | R4-68 | R4-134289 | Noted | 2013-09-01 | LTE_CA | - | 2013-09-01 |
1942 | - | A | Rel-11 | 11.5.0 | - | CR on CA SCell Activation Delay Requirements (Rel.11) | - | - | - | R4 | R4-68 | R4-134051 | Revised | 2013-09-01 | LTE_CA | - | 2013-09-01 |
1942 | 1 | A | Rel-11 | 11.5.0 | - | CR on CA SCell Activation Delay Requirements (Rel.11) | - | - | - | R4 | R4-68 | R4-134469 | Withdrawn | 2013-09-01 | LTE_CA | - | 2013-09-01 |
1943 | - | F | Rel-11 | 11.5.0 | - | FeICIC Intra-frequency RSRQ Accuracy test for FDD (Rel.11) | - | - | - | R4 | R4-68 | R4-134073 | Noted | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1944 | - | F | Rel-11 | 11.5.0 | - | FeICIC Intra-frequency RSRQ Accuracy test for TDD (Rel.11) | - | - | - | R4 | R4-68 | R4-134078 | Noted | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1945 | - | B | Rel-12 | 12.0.0 | - | CR on Applicability of 5MHz Test Cases | - | - | - | R4 | R4-68 | R4-134101 | Revised | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1945 | 1 | B | Rel-12 | 12.0.0 | 12.1.0 | CR on Applicability of 5MHz Test Cases | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-134355 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1946 | - | B | Rel-12 | 12.0.0 | - | E-UTRAN FDD Radio Link Monitoring Test for In-Sync for 5MHz | - | - | - | R4 | R4-68 | R4-134103 | Revised | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1946 | 1 | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD Radio Link Monitoring Test for In-Sync for 5MHz | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-134282 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1946 | 2 | B | Rel-12 | 12.0.0 | - | E-UTRAN FDD Radio Link Monitoring Test for In-Sync for 5MHz | - | - | - | R4 | R4-68 | R4-134482 | Withdrawn | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1947 | - | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD Intra-frequency handover test for 5MHz Channel Bandwidth | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-134104 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1948 | - | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD Intra-frequency RSRQ Accuracy Test for 5MHz Channel Bandwidth | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-134106 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1949 | - | B | Rel-12 | 12.0.0 | - | E-UTRAN FDD Intra-frequency RSRQ Accuracy Test for 5MHz Channel Bandwidth | - | - | - | R4 | R4-68 | R4-134109 | Withdrawn | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1950 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Editorial corrections RRM | RP-61 | RP-131293 | approved | R4 | R4-68 | R4-134111 | Agreed | 2013-09-01 | TEI11 | - | 2013-09-01 |
1951 | - | B | Rel-12 | 12.0.0 | - | E-UTRAN FDD Intra-frequency RSRQ Accuracy Test for 5MHz Channel Bandwidth | - | - | - | R4 | R4-68 | R4-134112 | Withdrawn | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1952 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Editorial corrections RRM | RP-61 | RP-131293 | approved | R4 | R4-68 | R4-134114 | Agreed | 2013-09-01 | TEI11 | - | 2013-09-01 |
1953 | - | F | Rel-11 | 11.5.0 | - | Clarification of CGI reading requirements | - | - | - | R4 | R4-68 | R4-134115 | Revised | 2013-09-01 | TEI11 | - | 2013-09-01 |
1953 | 1 | F | Rel-11 | 11.5.0 | 11.6.0 | Clarification of CGI reading requirements | RP-61 | RP-131293 | approved | R4 | R4-68 | R4-134316 | Agreed | 2013-09-01 | TEI11 | - | 2013-09-01 |
1954 | - | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD Inter-frequency RSRQ Accuracy Test for 5MHz Channel Bandwidth | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-134116 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1955 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Clarification of CGI reading requirements | RP-61 | RP-131293 | approved | R4 | R4-68 | R4-134119 | Agreed | 2013-09-01 | TEI11 | - | 2013-09-01 |
1956 | - | F | Rel-10 | 10.11.0 | 10.12.0 | TDD configurations in RRM requirements | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134121 | Agreed | 2013-09-01 | TEI10 | - | 2013-09-01 |
1957 | - | A | Rel-11 | 11.5.0 | - | TDD configurations in RRM requirements | - | - | - | R4 | R4-68 | R4-134124 | Noted | 2013-09-01 | TEI10 | - | 2013-09-01 |
1958 | - | B | Rel-12 | 12.0.0 | - | E-UTRAN FDD Radio Link Monitoring Test for In-Sync for 5MHz with DRX | - | - | - | R4 | R4-68 | R4-134126 | Revised | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1958 | 1 | B | Rel-12 | 12.0.0 | - | E-UTRAN FDD Radio Link Monitoring Test for In-Sync for 5MHz with DRX | - | - | - | R4 | R4-68 | R4-134284 | Withdrawn | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1958 | 1 | B | Rel-12 | 12.0.0 | - | E-UTRAN FDD Radio Link Monitoring Test for In-Sync for 5MHz with DRX | - | - | - | R4 | R4-68 | R4-134354 | Revised | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1958 | 2 | B | Rel-12 | 12.0.0 | - | E-UTRAN FDD Radio Link Monitoring Test for In-Sync for 5MHz with DRX | - | - | - | R4 | R4-68 | R4-134483 | Withdrawn | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1958 | 2 | B | Rel-12 | 12.0.0 | 12.1.0 | E-UTRAN FDD Radio Link Monitoring Test for In-Sync for 5MHz with DRX | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-134456 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1959 | - | F | Rel-12 | 12.0.0 | - | TDD configurations in RRM requirements | - | - | - | R4 | R4-68 | R4-134127 | Noted | 2013-09-01 | TEI10 | - | 2013-09-01 |
1960 | - | F | Rel-11 | 11.5.0 | - | Editorial corrections in capturing RF requirements | - | - | - | R4 | R4-68 | R4-134129 | Revised | 2013-09-01 | LTE_CA | - | 2013-09-01 |
1960 | 1 | F | Rel-11 | 11.5.0 | 11.6.0 | Editorial corrections in capturing RF requirements | RP-61 | RP-131285 | approved | R4 | R4-68 | R4-134317 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1961 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Editorial corrections in capturing RF requirements | RP-61 | RP-131285 | approved | R4 | R4-68 | R4-134131 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1962 | - | F | Rel-10 | 10.11.0 | 10.12.0 | Clarification on tests for multiple bandwidths | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134133 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1963 | - | A | Rel-11 | 11.5.0 | 11.6.0 | Clarification on tests for multiple bandwidths | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134144 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1964 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Clarification on tests for multiple bandwidths | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134145 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1965 | - | F | Rel-11 | 11.5.0 | - | Band simplification | - | - | - | R4 | R4-68 | R4-134147 | Noted | 2013-09-01 | TEI11 | - | 2013-09-01 |
1966 | - | A | Rel-12 | 12.0.0 | - | Band simplification | - | - | - | R4 | R4-68 | R4-134148 | Withdrawn | 2013-09-01 | TEI11 | - | 2013-09-01 |
1967 | - | A | Rel-11 | 11.5.0 | 11.6.0 | CR on PCell Interruptions | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134149 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1968 | - | F | Rel-11 | 11.5.0 | - | Time stamp accuracy for RLF and handover failure reporting with eMDT | - | - | - | R4 | R4-68 | R4-134150 | Revised | 2013-09-01 | eMDT_UMTSLTE-Core | - | 2013-09-01 |
1968 | 1 | F | Rel-11 | 11.5.0 | 11.6.0 | Time stamp accuracy for RLF and handover failure reporting with eMDT | RP-61 | RP-131283 | approved | R4 | R4-68 | R4-134493 | Agreed | 2013-09-01 | eMDT_UMTSLTE-Core | - | 2013-09-01 |
1969 | - | A | Rel-12 | 12.0.0 | 12.1.0 | CR on PCell interrutptions | RP-61 | RP-131282 | approved | R4 | R4-68 | R4-134151 | Agreed | 2013-09-01 | LTE_CA-Core | - | 2013-09-01 |
1970 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Time stamp accuracy for RLF and handover failure reporting with eMDT | RP-61 | RP-131283 | approved | R4 | R4-68 | R4-134153 | Agreed | 2013-09-01 | eMDT_UMTSLTE-Core | - | 2013-09-01 |
1971 | - | B | Rel-12 | 12.0.0 | 12.1.0 | FDD reference measurement channels for 5 MHz tests | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-134155 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1972 | - | B | Rel-12 | 12.0.0 | 12.1.0 | Part II RRM tests: UE intra-frequency measurements with synchronous cells in DRX FDD | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-134158 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1973 | - | B | Rel-12 | 12.0.0 | 12.1.0 | Part II RRM tests: E-UTRAN FDD - UTRAN FDD event triggered reporting under fading propagation conditions | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-134160 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1974 | - | F | Rel-10 | 10.11.0 | - | UE Rx-Tx during handover | - | - | - | R4 | R4-68 | R4-134161 | Noted | 2013-09-01 | LCS_LTE | - | 2013-09-01 |
1975 | - | A | Rel-11 | 11.5.0 | - | UE Rx-Tx during handover | - | - | - | R4 | R4-68 | R4-134163 | Withdrawn | 2013-09-01 | LCS_LTE | - | 2013-09-01 |
1976 | - | A | Rel-12 | 12.0.0 | - | UE Rx-Tx during handover | - | - | - | R4 | R4-68 | R4-134164 | Withdrawn | 2013-09-01 | LCS_LTE | - | 2013-09-01 |
1977 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Correction of cell identification test case with FeICIC | RP-61 | RP-131284 | approved | R4 | R4-68 | R4-134173 | Agreed | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1978 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Correction of cell identification test case with FeICIC | RP-61 | RP-131284 | approved | R4 | R4-68 | R4-134175 | Agreed | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1979 | - | F | Rel-11 | 11.5.0 | - | Requirements for IC receiver and the need of autonomous gaps | - | - | - | R4 | R4-68 | R4-134186 | Noted | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1980 | - | F | Rel-10 | 10.11.0 | - | Clarification concerning measurement gap for UE with single chip implementation | - | - | - | R4 | R4-68 | R4-134188 | Noted | 2013-09-01 | TEI10 | - | 2013-09-01 |
1981 | - | B | Rel-12 | 12.0.0 | - | Applicability of band and bandwidth independent test cases CR | - | - | - | R4 | R4-68 | R4-134190 | Noted | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
1982 | - | A | Rel-12 | 12.0.0 | - | Requirements for IC receiver and the need of autonomous gaps | - | - | - | R4 | R4-68 | R4-134191 | Withdrawn | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1983 | - | F | Rel-11 | 11.5.0 | 11.6.0 | RLM requirements correction | RP-61 | RP-131284 | approved | R4 | R4-68 | R4-134192 | Agreed | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1984 | - | A | Rel-12 | 12.0.0 | 12.1.0 | RLM requirements correction | RP-61 | RP-131284 | approved | R4 | R4-68 | R4-134193 | Agreed | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1985 | - | F | Rel-11 | 11.5.0 | - | Clarification on bandwidths in the measured and aggressor cells wiht FeICIC | - | - | - | R4 | R4-68 | R4-134197 | Revised | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1985 | 1 | F | Rel-11 | 11.5.0 | - | Clarification on bandwidths in the measured and aggressor cells wiht FeICIC | - | - | - | R4 | R4-68 | R4-134360 | Noted | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1986 | - | A | Rel-12 | 12.0.0 | - | Clarification on bandwidths in the measured and aggressor cells wiht FeICIC | - | - | - | R4 | R4-68 | R4-134198 | Withdrawn | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1987 | - | F | Rel-11 | 11.5.0 | 11.6.0 | Clarification on antenna ports in the measured and aggressor cells for UE Rx-Tx with FeICIC | RP-61 | RP-131284 | approved | R4 | R4-68 | R4-134200 | Agreed | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1988 | - | A | Rel-12 | 12.0.0 | 12.1.0 | Clarification on antenna ports in the measured and aggressor cells for UE Rx-Tx with FeICIC | RP-61 | RP-131284 | approved | R4 | R4-68 | R4-134202 | Agreed | 2013-09-01 | eICIC_enh_LTE-Core | - | 2013-09-01 |
1989 | - | B | Rel-11 | 11.5.0 | 11.6.0 | FeICIC FDD Test for In-sync With MBSFN ABS for Rel. 11 | RP-61 | RP-131290 | approved | R4 | R4-68 | R4-134381 | Agreed | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1990 | - | A | Rel-12 | 12.0.0 | 12.1.0 | FeICIC FDD Test for In-sync With MBSFN ABS for Rel. 12 | RP-61 | RP-131290 | approved | R4 | R4-68 | R4-134382 | Agreed | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1991 | - | B | Rel-11 | 11.5.0 | 11.6.0 | FeICIC TDD Test for In-sync With MBSFN ABS for Rel. 11 | RP-61 | RP-131290 | approved | R4 | R4-68 | R4-134383 | Agreed | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1992 | - | A | Rel-12 | 12.0.0 | 12.1.0 | FeICIC TDD Test for In-sync With MBSFN ABS for Rel. 12 | RP-61 | RP-131290 | approved | R4 | R4-68 | R4-134520 | Agreed | 2013-09-01 | eICIC_enh_LTE-Perf | - | 2013-09-01 |
1993 | - | B | Rel-12 | 12.0.0 | 12.1.0 | Correction of the SNR value of Out of sync RLM test for 5MHz | RP-61 | RP-131303 | approved | R4 | R4-68 | R4-134550 | Agreed | 2013-09-01 | LTE450_Brazil-Perf | - | 2013-09-01 |
page generated from database: 2013-10-16 10:34:25