3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 36.214

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 1 F Rel-8 8.0.0 8.1.0 RRC state correction for LTE UE measurements RP-38 RP-070949 approved R1 R1-51 R1-075104 Agreed 2007-11-14 LTE-Phys - 2007-11-22
0003 1 F Rel-8 8.1.0 8.2.0 Inclusion of agreements from RAN1#51bis and RAN1#52 RP-39 RP-080145 approved R1 R1-52 R1-081159 Agreed 2008-02-21 LTE-Phys - 2008-02-29
0004 - F Rel-8 8.2.0 - Introduction of eNode B Measurement of Received Interference Power RP-40 RP-080355 reissued R1 R1-53 R1-082188 Agreed 2008-05-09 LTE-Phys - 2008-05-23
0004 - F Rel-8 8.2.0 8.3.0 Introduction of eNode B Measurement of Received Interference Power RP-40 RP-080435 approved R1 R1-53 R1-082188 Agreed 2008-05-09 LTE-Phys - 2008-05-27
0005 - F Rel-8 8.2.0 - Introduction of eNode B Measurement of Thermal Noise Power RP-40 RP-080355 reissued R1 R1-53 R1-082187 Agreed 2008-05-09 LTE-Phys - 2008-05-23
0005 - F Rel-8 8.2.0 8.3.0 Introduction of eNode B Measurement of Thermal Noise Power RP-40 RP-080435 approved R1 R1-53 R1-082187 Agreed 2008-05-09 LTE-Phys - 2008-05-27
0006 - F Rel-8 8.3.0 8.4.0 Modification to the RSRP definition RP-41 RP-080671 approved R1 R1-53b R1-082608 Agreed 2008-06-24 LTE-PHys - 2008-08-09
0007 - F Rel-8 8.3.0 8.4.0 Modification of RSRQ and removal of RSSI RP-41 RP-080671 approved R1 R1-53b R1-082650 Agreed 2008-07-04 LTE-Phys - 2008-08-09
0008 - F Rel-8 8.4.0 8.5.0 RSRQ Measurement Definition RP-42 RP-080985 approved R1 R1-55 R1-084373 Agreed 2008-11-04 LTE-Phys - 2008-01-12
0009 - F Rel-8 8.5.0 8.6.0 RSRP and RSRQ Definitions with Receiver Diversity RP-43 RP-090237 approved R1 R1-56 R1-090910 Agreed 2009-02-03 LTE-Phys - 2009-02-27
0010 - F Rel-8 8.6.0 8.7.0 Clarification on reference point of RSRP and RSRQ for EUTRA RP-45 RP-090888 approved R1 R1-57b R1-092925 Agreed 2009-07-03 LTE-Phys - 2009-09-10
0011 1 B Rel-9 8.7.0 9.0.0 Introduction of LTE positioning RP-46 RP-091172 approved R1 R1-59 R1-094430 Agreed 2009-11-02 LCS_LTE - 2009-11-27
0012 1 F Rel-9 9.0.0 9.1.0 Modification of RSRQ definition RP-47 RP-100205 approved R1 R1-59b R1-100739 Agreed 2010-01-15 LTE-Phys - 2010-03-11
0014 - F Rel-9 9.1.0 9.2.0 On alignment of RAN1/2 positioning specification RP-48 RP-100590 approved R1 R1-60b R1-102472 Agreed 2010-04-12 LCS_LTE - 2010-05-27
0015 1 F Rel-9 9.1.0 9.2.0 Clarification of RSTD measurement RP-48 RP-100590 approved R1 R1-61 R1-103301 Agreed 2010-05-07 LCS_LTE - 2010-05-27
0016 - C Rel-10 10.0.0 10.1.0 RSRQ Measurement with ABS RP-51 RP-110258 approved R1 R1-64 R1-111123 Agreed - eICIC_LTE-Core - 2011-03-11
0018 3 B Rel-11 10.1.0 - UL Relative Time of Arrival - - - R1 R1-69 R1-122477 Postponed - LCS_LTE-NBPS - 2012-06-16
0018 3 B Rel-11 10.1.0 - UL Relative Time of Arrival - - - R1 R1-70 R1-123136 Revised - LCS_LTE-NBPS - 2012-08-30
0018 4 B Rel-11 10.1.0 11.0.0 UL Relative Time of Arrival RP-57 RP-121273 approved R1 R1-70 R1-123990 Agreed 2012-08-17 LCS_LTE-NBPS-Core - 2012-09-02
0019 - F Rel-11 11.0.0 - Correcting inconsistency between inter-RAT UTRA measurements and requirements - - - R1 R1-71 R1-125289 Revised - LTE-Phys - 2012-11-30
0019 1 F Rel-11 11.0.0 11.1.0 Correcting inconsistency between inter-RAT UTRA measurements and requirements RP-58 RP-121837 approved R1 R1-71 R1-125399 Agreed 2012-11-27 LTE-Phys - 2012-11-30

page generated from database: 2013-10-16 10:34:26